You are on page 1of 28

DISEO DE ZAPATAS AISLADAS ZAPATA N: 19

OJO: Solo colocar valores en el cuadro de caracteristicas del material.


CARGAS: CARACTERISTICAS DEL MATERIAL:
PD= 65789 Kg Fy= 4200 Kg/cm2 COLUMNA: 25 x 25 cm2
PL= 19657 Kg F'c= 210 Kg/cm2 As 1/2" = 1.29
= 0.98 Kg/cm2 = 0.002 (para zapatas y losas) As 5/8" = 2.00

PARA ZAPATAS CONCENTRICAS:

1,- PREDIMENSIONAMIENTO DE LA ZAPATA:

Pt = PD+PL Pt = 85446 Kg

Para el predimensionamiento: P ; P = Pt + (6% ; 12%)


=
A Porcentaje asumido de 10% de Pt.
Despejando se obtiene: P = Pt + 10%Pt

P Kg = cm2 P= 93990.6 Kg
A= Kg/cm2

A = 95908.78 cm2
A= 9.591 m2

*Considerando que la zapata requerida fuese cuadrada, se tiene: A a2 = 95909 cm2


a= 309.69 cm
redondeando: a= 310 cm

2,- CALCULO DE VERIFICACION DE RESISTENCIA:


A= 310 2
A= 96100 cm2

P 93990.6 = 0.98 Kg/cm2 < 1.0 Kg/cm2 ok!


u= 96100
A
3,- CALCULO DEL u : Pu = 1,5PD + 1,8PL
Pu = 134066.1 Kg.
Pu
u= u = 1.40 > 1.0 Kg/cm2 OK ( real)
A
4,- DIMENSIONAMIENTO EN ELEVACION:

A = 310 x 310 cm2 = 1.40 Kg/cm2


u = 0.98 Kg/cm2 Pu = 134066.1 Kg 310
143 25 143
DATO DE LA COLUMNA: 25 x 25 cm2

Mu
d 2= ;
FY
FY ( 10 .59 )
F 'C
WuL 2 B
Wu= U B Mu=
2
Wu= 432.47 Kg/cm Mu= 4390935 kg-cm u
Mu= 43909.3507 kg-m

cuantia para zapatas y losas: 0.002 Aplicando formula se tiene:


d= 43.805 cm
cuantia para zapatas = cuantia mnima = 0.002 d= 44 cm
multiplicamos "d" por un factor de seguridad: d = 1,5d
d = 66 cm adoptamos: 70

5,- VERIFICACION DEL POR FLEXION O MOMENTO FLECTOR:

V actuante =B U (cd )
310 B d b
V act. = 31354.17 Kg.

a
70 72.5
c = 143

6,- VERIFICACION POR PUNZONAMIENTO: Se verifica a d/2 con el esfuerzo cortante.

(bn+ B) A= 24321.88 cm2


A= Z
2
310 143 bn d bn+ B
V = U (c )( ) V= 33930.7 Kg.
2 2
V
P= = = 2.21 Kg/cm2
143 25 143 d
bn(c )
35 108 Z 2

admZapata =1.1 F ' c


admZapata= 13.55 Kg/cm2 < admZapata OK

7,- CALCULO DEL AREA DEL ACERO:

MU A S FY Donde: B = lado de la zapata


A S= a=
FY (d a /2 ) 0. 85 F ' C B
2.9E+10 8.3E+20 3.2E+07
As = 905.50 cm2 As min = 0,002 x B x d
As = 16.75 cm2 As min = 43.40 cm2 Por lo tanto asumimos el As mn

8,- CALCULO DEL ESPACIAMIENTO DEL ACERO:

e = diametro As x ancho de zapata As 1/2" = 1.29 1/2" e= 9.21 elegimos


area de acero recomendado cualquiera
As 5/8" = 2.00 5/8" e= 14.29 de los dos.
143 25 143 resultados.
Asumir cualquiera
5/8" @ 0.15
1/2" @ 0.10 rI= 7.5 cm
rl= 5 cm
310 F'c = 210 kg/cm2
70 F' y= 4200 kg/cm2
7.5

5/8" @ 0.15
1/2" @ 0.10


DISEO DE LOSA ALIGERADA
PREDIMENCIONAMIENTO, METRADO, ANALISIS Y DISEO DE LOSAS

DATOS REQUERIDOS
Sec.Vigueta
Peso Especifico del C = 2400.00 Kg/m3 S/C(RNC) Desc Altura Ancho
Cielo raso = 100.00 Kg/m2 C.M. 1.5 h 0.25 1.00
Tabiqueria = 150.00 Kg/m2 C.V. 1.8 Ladrill 0.20 0.30
Piso terminado = 100.00 Kg/m2 Viguet 0.20 0.10
peso del ladrillo = 9.00 Kg LnD. 5.500 Losa 0.05 0.40
S/C. = 400.00 Kg/m2 LnS. 4.325
L2(may) = 4.325
L1(men) = 4.325
1) PREDIMENCIONAMIENTO

l .l arg . 550 cm.


h= 25
25
h= 22.00 cm.
h equiv. = 25 cm.

2) METRADO DE CARGAS

DESCRIPCION e a l P.E. parcial


peso propio de la losa 0.05 0.40 1.00 2400.00 48.00
peso propio de la vigueta 0.20 0.10 1.00 2400.00 48.00
peso del ladrillo 0.30 1.00 9.00 30.00
TOTAL = 126.00

Carga Muerta Losa por m2 315.00 Kg/m2


tab.,cielo raso, piso term. 350.00 Kg/m2
TOTAL = 665.00 Kg/m2

MAYORACION DE CARGAS
Wu 1.5 CM + 1.8 CV
Wu 1.5 665 + 1.8 400
997.5 + 720
TOTAL = 1717.50

Wu por vigueta (Wu) = 687.00 Kg.m

2) ANALISIS POR EL METODO DE LOS COEF. ACI

Mm=Wu . Ln2 = 20,781.7500 = 20.78175 Tn.

CONDICIONES PARA EL USO DEL METODO a = 1/24*Mn 0.8659 Tn.m


b = 1/11*Mn 1.8893 Tn.m
1) LnD = 1.2717 OKY c = 1/10*Mn 2.0782 Tn.m
=3
LnS d = 1/16*Mn 1.2989 Tn.m
a = 1/11*Mn 1.8893 Tn.m
2) L2 = 1.0000 OKY
=1 .20
L1
L2
=1 .20
L1
a1 = 1/2*Mn 10.3909 Tn.
3) b1 = 1.5/2*M 16.6254 Tn.

2) ANALISIS POR EL METODO DE LOS COEF. ACI

DATOS DE DISEO CALCULOS PREVIOS


Mud = Valores de a,b,c,.. Peralte = 5/8 = 1.59
F`c = 210.00 Kg.cm2
F`y = 4200.00 Kg.cm2 d=h-(2+/2) = 0.22206
h(altura) = 25.00 Cm.
d(peralte) = 22.21 Cm. Acero Minimo
b(base) = 40.00 Cm. Asmin = 1.8 Cm2
FORMULAS A UTILIZAR
5
2 . 61xMudx105 Mudx10
W= a=d (d W )2
As=
Fcxb 0 . 9xFyx(da/2)
A) TRAMO "a" (eje A)

Asmin = 1.800
Mud = 1.898 ENTONCES
w= 58.974
a= 1.370 2.33 > 1.59 FALTA
As = 2.333 Faltante = 0.75 < 0.95 MUCHO

Adoptado = 5/8 + 3/8 =>1 5/8 +1 3/8

A) TRAMO "a" (eje A)


CUADRO RESUMEN

DESCRIP a=A b=AB c=B d=BC e=C DE E


Mud = 0.866 1.889 2.078 1.299 1.889 1.560 1.560
w= 26.905 58.702 64.6 40.4 58.7 48.5 48.5
a= 0.614 1.364 1.5 0.9 1.4 1.1 1.1
As = 1.046 2.322 2.6 1.6 2.3 1.9 1.9
DISEO DE LOSA ALIGERADA
PREDIMENCIONAMIENTO, METRADO, ANALISIS Y DISEO DE LOSAS

DATOS REQUERIDOS
Sec.Vigueta
Peso Especifico del C = 2400.00 Kg/m3 S/C(RNC) Desc Altura Ancho
Cielo raso = 100.00 Kg/m2 C.M. 1.5 h 0.25 1.00
Tabiqueria = 150.00 Kg/m2 C.V. 1.8 Ladrill 0.20 0.30
Piso terminado = 100.00 Kg/m2 Viguet 0.20 0.10
peso del ladrillo = 9.00 Kg LnD. 3.900 Losa 0.05 0.40
S/C. = 500.00 Kg/m2 LnS. 5.500
L2(may) = 3.900
L1(men) = 3.900
1) PREDIMENCIONAMIENTO

l .l arg . 390 cm.


h= 25
25
h= 15.60 cm.
h equiv. = 25 cm.

2) METRADO DE CARGAS

DESCRIPCION e a l P.E. parcial


peso propio de la losa 0.05 0.40 1.00 2400.00 48.00
peso propio de la vigueta 0.20 0.10 1.00 2400.00 48.00
peso del ladrillo 0.30 1.00 9.00 30.00
TOTAL = 126.00

Carga Muerta Losa por m2 315.00 Kg/m2


tab.,cielo raso, piso term. 350.00 Kg/m2
TOTAL = 665.00 Kg/m2

MAYORACION DE CARGAS
Wu 1.5 CM + 1.8 CV
Wu 1.5 665 + 1.8 500
997.5 + 900
TOTAL = 1897.50

Wu por vigueta (Wu) = 759.00 Kg.m

2) ANALISIS POR EL METODO DE LOS COEF. ACI

Mm=Wu . Ln2 = 11,544.3900 = 11.54439 Tn.

CONDICIONES PARA EL USO DEL METODO a = 1/24*Mn = 0.4810 Tn.m


b = 1/11*Mn = 1.0495 Tn.m
1) LnD = 0.7091 OKY c = 1/10*Mn = 1.1544 Tn.m
=3
LnS d = 1/16*Mn = 0.7215 Tn.m
e = 1/11*Mn = 1.0495 Tn.m
2) L2 = 1.0000 OKY
=1 .20
L1
a1 = 1/2*Mn = 5.7722 Tn.
3) b1 = 1.5/2*Mn 9.2355 Tn.
2) ANALISIS POR EL METODO DE LOS COEF. ACI

DATOS DE DISEO CALCULOS PREVIOS


Mud = Valores de a,b,c,.. Peralte = 1/2 = 1.27
F`c = 210.00 Kg.cm2
F`y = 4200.00 Kg.cm2 d=h-(2+/2) = 0.22365
h(altura) = 25.00 Cm.
d(peralte) = 22.37 Cm. Acero Minimo = 0.0018*h*b
b(base) = 40.00 Cm. Asmin = 1.80 Cm2
FORMULAS A UTILIZAR

2 . 61xMudx105 Mudx105
W= a=d (d W ) 2 As=
Fcxb 0 . 9xFyx(da/2)
A) TRAMO "a" (eje A)

Asmin = 1.800
Mud = 1.800 ENTONCES
w= 55.929
a= 1.287 2.19 > 1.59 FALTA
As = 2.192 Faltante = 0.60 < 0.95 MUCHO

Adoptado = 5/8 + 3/8 =>1 5/8 +1 3/8


B) TRAMO "b" (eje A-B)

Asmin = 1.800
Mud = 1.049 ENTONCES
w= 32.609
a= 0.741 1.80 > 1.59 FALTA
As = 1.262 Faltante = 0.21 < 1.27 MUCHO

Adoptado = 5/8 + 1/2 =>1 5/8 +1 1/2


C) TRAMO "c" (eje B)

Asmin = 1.800
Mud = 1.154 ENTONCES
w= 35.870
a= 0.741 1.80 > 1.59 FALTA
As = 1.389 Faltante = 0.21 < 1.27 MUCHO

Adoptado = 5/8 + 1/2 =>1 5/8 +1 1/2


D) TRAMO "d" (eje B-C)

Asmin = 1.800
Mud = 0.722 ENTONCES
w= 22.419
a= 0.741 1.80 > 1.59 FALTA
As = 0.868 Faltante = 0.21 < 1.27 MUCHO
Adoptado = 5/8 + 1/2 =>1 5/8 +1 1/2
E) TRAMO "e" (eje C)

Asmin = 1.800
Mud = 1.049 ENTONCES
w= 32.609
a= 0.741 1.80 > 1.59 FALTA
As = 1.262 Faltante = 0.21 < 1.27 MUCHO

Adoptado = 5/8 + 1/2 =>1 5/8 +1 1/2

CUADRO RESUMEN

DESCRIP a=A b=AB c=B d=BC e=C DE E


Mud = 0.481 1.049 1.154 0.722 1.049 1.560 1.560
w= 14.946 32.609 35.9 22.4 32.6 48.5 48.5
a= 0.337 0.741 0.8 0.5 0.7 1.1 1.1
As = 0.573 1.262 1.4 0.9 1.3 1.9 1.9
DISEO DE LOSAS ALIGERADA POR EL METODO DEL ACI
PROYECTO : IGLESIA CRISTIANA "CRISTO REY"
UBICACIN : VILQUE
DIS. HECHO POR: EDWIN @ SAP
FECHA : 11/18/2017

DATOS:
Long. = 3.9 m
Rec. = 5 cm.
P.esp = 2400 Kg/cm3
vigutas = 10 cm.
S/C = 300 Kg/m2
PREDT.
H= L/20 0.195 0.2
ASUM. H= 19.5 cm. 40

METRADOS 5
20 15
P.Losa = 48 Kg
P. Vigueta = 34.8 Kg
P. Ladrillo = 27 Kg 30 10 30
109 Kg 30 ........ 30

Peso por m2 de alig. = 274 Kg/m2


Peso del tarrajeo = 100 Kg/m2
Peso por tabiqueria = 100 Kg/m2
CD = 474 Kg/m2

CL = 300 Kg/m2

LA CARGA ULTIMO DE DISEO

Wu = 1.4CD+1.7CL

Wu = 1173 Kg/cm2

CALCULO DE LOS MOMENTOS ULTIMOS:

M1 = 1/24(WU*L) 743.47 Kg/m


M2 = 1/14(WU*L) 1274.53 Kg/m
M3 = 1/10(WU*L) 1784.34 Kg/m
M4 = 1/16(WU*L) 1115.21 Kg/m
M5 = 1/11(WU*L) 1622.12 Kg/m
M6 = 1/16(WU*L) 1115.21 Kg/m
M7 = 1/10(WU*L) 1784.34 Kg/m
M8 = 1/14(WU*L) 1274.53 Kg/m
M9 = 1/24(WU*L) 743.47 Kg/m

CALCULO DE AREAS DE ACERO POR EL METODO DE RESISTENCIA ULTIMA

FORMULA
AS = MU
0.9*FY*(D-(A-2))
A= AS * FY
0.85*B*F'c USAR

MU1 = 74347.325 KG/Cm 1.24880029 AREAS DE ACEROS


FY = 4200 KG/Cm 2.93835361 1 4 3 8 1 2 5 8 3 4 1 1 3 8
F'c = 210 KG/Cm 1.18981398 0.32 0.71 1.29 2 2.84 5.1 10.06
D= 18 Cm 2.7995623 0.00 0.00 0.00 0.00 0.00 0.00 0.00
A= 4.5 Cm 1.18484007
B= 10 Cm 2.78785899
As = 1.18442256 cm

MU2 = 127452.557 KG/Cm 2.14080049


FY = 4200 KG/Cm 1.25929441
F'c = 210 KG/Cm 1.94110092
D= 18 Cm 1.14182407
A= 4.5 Cm 1.9345595
B= 40 Cm 1.13797618
As = 1.93434597 cm

MU3 = 178433.58 KG/Cm 2.99712069


FY = 4200 KG/Cm 7.05204867
F'c = 210 KG/Cm 3.26134656
D= 18 Cm 7.67375662
A= 4.5 Cm 3.33292701
B= 10 Cm 7.84218119
As = 3.35286274 cm

MU4 = 111520.99 KG/Cm 1.87320043


FY = 4200 KG/Cm 1.1018826
F'c = 210 KG/Cm 1.69080219
D= 18 Cm 0.99458953
A= 4.5 Cm 1.68561981
B= 40 Cm 0.99154107
As = 1.68547303 cm

MU5 = 162212.35 KG/Cm 2.72465517


FY = 4200 KG/Cm 6.41095334
F'c = 210 KG/Cm 2.90062194
D= 18 Cm 6.82499279
A= 4.5 Cm 2.94178634
B= 10 Cm 6.92185022
As = 2.95158524 cm

MU6 = 111520.99 KG/Cm 1.87320043


FY = 4200 KG/Cm 1.1018826
F'c = 210 KG/Cm 1.69080219
D= 18 Cm 0.99458953
A= 4.5 Cm 1.68561981
B= 40 Cm 0.99154107
As = 1.68547303 cm

MU7 = 178433.58 KG/Cm 2.99712069


FY = 4200 KG/Cm 7.05204867
F'c = 210 KG/Cm 3.26134656
D= 18 Cm 7.67375662
A= 4.5 Cm 3.33292701
B= 10 Cm 7.84218119
As = 3.35286274 cm

MU8 = 127452.56 KG/Cm 2.14080049


FY = 4200 KG/Cm 1.25929441
F'c = 210 KG/Cm 1.94110092
D= 18 Cm 1.14182407
A= 4.5 Cm 1.9345595
B= 40 Cm 1.13797618
As = 1.93434597 cm

MU9 = 74347.33 KG/Cm 1.24880029


FY = 4200 KG/Cm 2.93835361
F'c = 210 KG/Cm 1.18981398
D= 18 Cm 2.7995623
A= 4.5 Cm 1.18484007
B= 10 Cm 2.78785899
As = 1.18442256 cm
DISTRIBUCION DE ACEROS
DISEO DE ACERO LONGITUDINAL

Datos que se tiene: 6

Elemento N 1
f'c 210 Kg/cm2
fy 4200 Kg/cm2 h = 60 d = 54
h 60 cm
b 30 cm
d 54 cm
Mu mnimo Kg-m
Mu mximo Kg-m b = 30

14 b. d
As min= Mu Mn
fy
Pb=0 . 85
f ' c 6100
(
fy 6100+fy ) [ ( )]
Mu= As . fy d
a
2
P max=0 . 75 Pb As . fy
a=
P max. d . fy 0 . 85 f ' c . b
a=
0. 85 f ' c As . fy
a
Mu= As . fy d
( 2(0 . 85 f ' c . b ) )
( )
Mn=0 . 85 f ' c d . a. b
2
Clculo de cuantias y momento resistente:
Asmin 5.400
Pb 0.021 As
Pmax 0.016 0.000 137.700
a 20.388 0.000 137.700
fMn 4304314.733

Diseo para Mu mnimo


Mu 0 No Requiere acero en compresin
As 137.700 No As>Asmin

Diseo para Mu mximo


Mu 0 Kg-m Requiere acero en compresin
As 137.700 cm2
As>Asmin
Requiere acero en compresin

Requiere acero en compresin


DISEO DE ACERO LONGITUDINAL

Datos que se tiene: 6

Elemento N 1
f'c 210 Kg/cm2
fy 4200 Kg/cm2 h = 50
d = 46
h 50 cm
b 25 cm
d 46 cm
Mu mnimo 7350 Kg-m
Mu mximo 14700 Kg-m b = 25

14 b . d
As min= Mu Mn
fy
Pb=0 . 85
f ' c 6100
(
fy 6100+fy ) [ ( )]
Mu= As . fy d
a
2
P max=0 . 75Pb As . fy
a=
P max. d . fy 0 . 85 f ' c . b
a= As . fy
0. 85 f ' c
a
Mu= As . fy d
( 2(0 . 85 f ' c . b ) )
( )
Mn=0 . 85 f ' c d . a. b
2
Clculo de cuantias y momento resistente:
Asmin 3.833
Pb 0.021 As
Pmax 0.016 4.428 93.322
a 17.367 9.348 88.402
fMn 2602860.647

Diseo para Mu mnimo


Mu 7350 No Requiere acero en compresin
As 4.428 No As>Asmin

Diseo para Mu mximo


Mu 14700 Kg-m Require acero en compresin
As 9.348 cm2
As>Asmin
Requiere acero en compresin

Require acero en compresin


DISEO DE ESCALERAS

a=?

DATOS :
Luz de rampa proyectada 2.40m
Luz de descanso 1.50m
Angulo de Inclinacin 30
Peso acabado 100kg/m
f'c 210kg/cm2
fy 4,200kg/cm2
Recubrimiento 2.00cm
Sobrecarga 3 Vivienda y edificios residencias (Rec 250kg/cm2
Contra paso Edificios Comerciales 17.50cm

Las alturas de contrapasos tiene los valores siguientes

TIPO DE ESCALERAS CONTRAPASO


Escaleras Secundarias 18 - 20
Edificios Comerciales 15 - 17.5
Zonas Monumentales 13 -15

Magnitudes de Sobrecargas a considerar en escalesras es como sigue:

Descripcion S/C
1 Escaleras secundarias 200kg/m2
2 Vivienda (RCN) y edificios residenciales 200kg/m2
3 Vivienda y edificios residencias (Recomendado) 250kg/m2
4 Edificios pblicos 400kg/m2
5 Edificios y oficinas 500kg/m2
6 Tribunas 500kg/m2

1.- CALCULO DE ESPESOR DE LOSA DE DESCANSO

t= L ^ L
25 20
Por Criterio Tomamos
Por Criterio Tomamos
t= 150 cm = 6cm 8cm
25
2.- CALCULO DE ESPESOR DE LOSA INCLINADA

e= t + CP
cos 2

e= 8cm + 17.5cm
### 2

e= 17cm 0.17 m

3.- METRADO DE CARGAS POR (1m)

Descanso
P.Propio 8cm 1m 2400 =192kg/m
Peso Acabados =100kg/m
Wd =292kg/m
Peso de sobrecarga Ws =250kg/m
W =542kg/m
Inclinada
P.Propio .17 m 1m 2400 =402kg/m
Peso Acabados =100kg/m
Wd =502kg/m
Peso de sobrecarga Ws =250kg/m
W =752kg/m

Multiplicando por el Factor de seguridad

Wu1= 1.5 292 1.8 250


Wu2= 1.5 502 1.8 200

Wu1= 888kg/m
Wu2= 1,113kg/m

Wu = Wu1*L1+Wu2*l2
L1+L2

Wu= 1,026kg/m

4.- CALCULO DE MOMENTOS

M1 =493kg-m
M1 = 1 WL2
12
M2 =591kg-m
M2 = 1 WL2
10
2
M3 =434kg-m
L+ L
M3 = 1 W 1 2
9 2
M4 =231kg-m
M4 = 1 WL22
10

M5 = 1 WL22
16
M5 = 1 WL22 M5 =144kg-m
16

5.-CALCULO DE AREA DE ACERO


Calculo de Acero para M1, M2 y M3

Mu Asfy
As= a=
a 0. 85f ' cb
fy d ( 2 )
Tanteo a= 0.2

492.7*100
As= =0.89cm2
0.9*4200*(15-0.1)

Comprobando

0.89*4200
a= =0.21cm
0.85*210*100

Chequeo de acero mnimo

0.8 f ' c
As min= bd As min = 4.07 Cm2

fy

NOTA.- Como el Area del Acero Minimo Es Mayor que el area del Acero
Tanteado, entonces Trabajamos con:

Usando Acero de 3/8" = 0.71cm2

As 0.71*100
e= b e=
4.07
=0,17m
As min

As 3/8"@ 0.18m

NOTA.- Si se realiza las demas comprobaciones para los momentos M2 y M3 se


sabe que ser menor que el area del acero mnimo, se repetira el calculo.
El area de acero equivalente a:
As 3/8"@ 0.18m

Calculo de Acero para M4 Tanteo a Err:522

230.95*100
As= Err:522
Err:522
Comprobando
Err:522
a= Err:522
0.85*210*100

Chequeo de acero mnimo

0.8 f ' c
As min= bd As min =1.66cm2

fy
Usando Acero de 3/8" = 0.71cm2

As
e= b
As min
Tomamos el area del acero Tanteado por su area es mayor que
el acero mnimo.

0.71*100
e= =0,43m
1.66
Por recomendaciones e=0.30

As 3/8"@ 0.30m

Calculo de Acero para M5 Tanteo a Err:522

144.35*100
As= Err:522
Err:522

Comprobando

Err:522
a= Err:522
0.85*210*100

Chequeo de acero mnimo

As min= bd
0.8 f ' c As min =1.66cm2

fy
Usando Acero de 3/8" = 0.71cm2

As
e= b
As min
Tomamos el area del acero mnimo por que su area es mayor que el area
del acero tanteado

0.71*100
e= =0,43m
1.66
Por recomendaciones e=0.30 As 3/8"@ 0.30m
6.-CALCULO DE ACERO DE TEMPERATURA
Para el calculo del area del acero de temperatuara tomamos el valor del espesor
menor

Acero currugado Espaciamiento mximo


As T =0 . 0018be S max =3 t
Acero lizo Espaciamiemto
As T =0 . 0025be e=
As
b
As min
Ast= 1.08 cm2 usando 3/8"

@= 65.74 cm Ast=3/8" @ 40cm


Smax= 50.25 cm

Por recomendacin o criterio tomamos 3/8" @ 40cm

7.-DISEO DE CROQUIS

L/5

0.15

M4=As:3/8"@0.15

As:3/8"@0.40
M2=As:3/8"@0.15
L/5
M1=As:3/8"@0.15

0.15 ESQUEMA TIPICO


Edificios Co Escaleras SeEdificios Co Zonas Monumentales
15.00 18.00 15.00 13.00
15.50 18.50 15.50 13.50
16.00 19.00 16.00 14.00
16.50 19.50 16.50 14.50
17.00 20.00 17.00 15.00
17.50 17.50
Diseo de Mezclas
Mtodo ACI

Resistencia Caracterstica = 210.0 kg/cm2

Caracteristicas Peso Modulo Humedad % de P.U. P.U.


Especifico Fineza Natural Absorcin Suelto Compactado
kgs/m3 kgs/m3
Cemento Tipo I 3.150 1,500
Agregado Fino 2.535 3.270 3.01 1,482 1,622
Agregado Gueso 2.530 2.80 1,545 1,692
Chema Estruct 1.000
Chema Entrampaire 1.040

a) Resistencia Requerida Promedio

1,- Se conoce desviacin Estandar SI


2,- Desviacin Estandar (s) 15.00 kg/cm2
3,- Resistencia Requerida 230.1 kg/cm2

b) Valores de Diseo

1,- Asentamiento 3" - 4"


2,- T.M. 1 1 /2"
3,- Aire Incorporado SI
4,- W/C 0.60
5,- Agua 165.00 ltrs
6,- Total de Aire 5.00 %
7,- Volumen de A.G. 0.700
8,- % de Aditivo en base al peso de Cemento
Aditivo 1 Air mix 200 1.03% 438.00 cc / bolsa
Aditivo 2 Euco WR37 0.03% 12.26 cc / bolsa
Aditivo 3

c) Analisis del Diseo

Factor Cemento 275 kgs / m3


6.5 bls / m3

Volumen Absoluto del Cemento 0.087 m3 / m3


Volumen Absoluto del Agua 0.165 m3 / m3
Volumen Absoluto del Aire 0.050 m3 / m3
Volumen Absoluto Aditivo 1 m3 / m3
Volumen Absoluto Aditivo 2 m3 / m3
Volumen Absoluto Aditivo 3 m3 / m3

Volumen Absoluto de la Pasta 0.302

Volumen Absoluto de los Agregados 0.698

Volumen Absoluto del Agregado Grueso 0.468


Volumen Absoluto del Agregado Fino 0.230

Sumatoria de Volmenes Absolutos 1.000

d) Cantidad de Materiales por m3 en peso

Cemento 275 kgs / m3 6.5 bolsas


Agua 165 ltrs / m3
Agregado Fino 582 kgs / m3
Agregado Grueso 1,184 kgs / m3
Aditivo 1
Aditivo 2
Aditivo 3

Peso de la Mezcla 2,206 kgs / m3

e) Correccin por Humedad

Agregado Fino Hmedo 582 kgs/m3


Agregado Grueso Hmedo 1184 kgs/m3

f) Contribucin de Agua de los Agregados


% ltrs
Agregado Fino -3.01 -17.52
Agregado Grueso -2.80 -33.16
50.68

Agua de Mezcla corregida 216 lts/m3

g) Cantidad de Materiales Corregidos por m3

Cemento 275 kgs / m3


Agua 216 ltrs / m3
Agregado Fino 582 kgs / m3
Agregado Grueso 1,184 kgs / m3

h) Cantidad de Materiales Corregidos por Bolsa

Cemento 42.5 kgs / m3


Agua 33.3 ltrs / m3
Agregado Fino 89.9 kgs / m3
Agregado Grueso 183.0 kgs / m3

C A.F. A.G.
Proporcin en Peso 1.0 2.1 4.3
Proporcin
Proporcin en Volumen C 0.183 1.0
A.F. 0.393 2.1
A.G. 0.767 4.2
Cualquiera de las celdas en amarillo las puedes modificar para poner el numero de varillas deseado

Area (cm2)
varilla #
Nmero de varillas www.construaprende.com
#/8 1 2 3 4 5 6 7 8 9 10
3 0.713 1.425 2.138 2.850 3.563 4.275 4.988 5.700 6.413 7.126
4 1.267 2.534 3.800 5.067 6.334 7.601 8.867 10.134 11.401 12.668
5 1.979 3.959 5.938 7.917 9.897 11.876 13.855 15.835 17.814 19.793
6 2.850 5.700 8.551 11.401 14.251 17.101 19.952 22.802 25.652 28.502
7 3.879 7.759 11.638 15.518 19.397 23.277 27.156 31.036 34.915 38.795
8 5.067 10.134 15.201 20.268 25.335 30.402 35.470 40.537 45.604 50.671
9 6.413 12.826 19.239 25.652 32.065 38.478 44.891 51.304 57.717 64.130
10 7.917 15.835 23.752 31.669 39.587 47.504 55.421 63.338 71.256 79.173

You might also like