MASTERFILL 300

Semi-flexible epoxy joint sealant

DESCRIPTION SPECIFICATION
Masterfill 300 is a semi-flexible, 100% solids epoxy joint
sealant designed to protect stable internal joint edges and Part A Part B Mixed
to prevent spalling due to traffic impact in control and
relief joints in concrete floors. For tough slip or skid- Colour * Neutral Off White
resistant coatings, Masterfill 300 may be applied with a Mix Ratio (by vol) 1 1
broadcast of selected aggregate. Pot Life 25-30 min
Available in gunable, pourable and paste grades. *Colour pack must be added. Special colours available.
Add 1 x 0.6kg Mastertop X1 Colour Pack to Part A for a
RECOMMENDED FOR
10L kit.
Stable construction joints in manufacturing and
SURFACE PREPARATION
warehouse floors
Filling saw-cut, relief and control joints To obtain maximum performance concrete should be well
Filling and sealing wire slots in concrete and asphalt cured, at least 28 days old and have a minimum
pavement (eg. inductive loop detectors) compressive strength of 25MPa. Allow sufficient time for
Miscellaneous patching of concrete spalls initial shrinkage of concrete (90-120 days). Joint surfaces
Use with BASF Mastertop Floors must be dry and free from all substances detrimental to
Situations where spillage of diesel or chemicals the bonding of epoxy compounds and clean with no dust,
degrade traditional sealants oils, construction debris, laitance. Roughen with angle
grinder if in doubt.
FEATURES AND BENEFITS
Flexibility at low temperature with a lower brittle Priming
point than normal epoxies Priming is not required on dry surfaces. On wet or damp
Economical surfaces, prime with Concresive 2525.
Remains flexible
Easier to place and trim Application
Achieves seamless floor surfaces Joints: The mixed material should be applied by pouring
Easy proportioning or knifing into joints that have a backing rod placed as per
Available in selected colour range diagram below.
Provides essential support to joint edges Using paste grade and knifing flush will produce seamless
ramping or bridging across joints. When coating with
PERFORMANCE DATA (Typical) Masterfill 300 Pourable, apply with trowel or roller, with or
without Mastertop F1/F5 to provide non-skid textures
Property Test Method Value and semi-resilient surfaces for enhanced work
environments.
Tensile Strength ASTM D 638 3.4-5.5MPa Joint Dimension: Standard width to depth ratio will be
Tensile Elongation ASTM D 638 40-50% between 1:1 and 2:1.
Impact Resistance Gardner-Direct 18.1 N-m Minimum depth of Masterfill 300 is 12mm.
Bond to Concrete >1.7MPa Use closed cell backing rod in joints with no gap forming
Hardness ASTM D2240 75-80 board to determine correct depth.
(Shore A) In joints with board in place, debonding tape can be used.
Test specimens were cured 7 days @ 23C.
MIXING
Properties listed are typical and descriptive of the product,
and may be used as a guide for determining suitability for Mix only the amount of material that can be used before
particular applications. the expiration of the pot life. Add 1 x 0.6kg of Mastertop
X1 Colour Pack to Part A and blend until uniform. (Should
a deeper colour be required add 2 x 0.6kg of Mastertop
X1 Colour Packs in total). Add Part B to preblended Part
A and mix for a minimum of 3 minutes using an electric
drill-powered paint mixer. Carefully scrape the sides and
bottom of the container while mixing.
MASTERFILL 300
PACKAGING CURING
10 Litre kits: Part A - 4.7L Thin Film @ 23C
Part B - 5.0L
Tack Free Time: 8 Hours
X1 Colour Pack - 0.6kg
Hard Dry Time: 12 Hours
SHELF LIFE Full Cure Time: 3 Days
Masterfill 300 can be stored undercover in tightly closed CLEAN UP
original containers for 24 months at moderate
temperatures. Remove excess material from surfaces and tools. Use
Thinner No.1 to clean equipment and tools before the
ESTIMATING DATA material hardens.
Coverage Rates PRECAUTIONS
Joint Size Litres per Metre run READ ALL SAFETY DIRECTION AND WARNINGS ON
(mm) metre run per 10L Kit THIS BEFORE USE. REFER TO MATERIAL SAFETY
5x5 0.025 400 DATA SHEETS FOR HANDLING PROCEDURES.
10 x 10 0.100 100
1) As with all epoxy products, wear protective overalls
15 x 10 0.150 66.6
and gloves - prolonged contact with skin should be
20 x 10 0.200 50
avoided as it could produce dermatitis, particularly
25 x 15 0.375 26.6
with people whose skin may be sensitive to epoxy
30 x 15 0.450 22.2
resin systems.
Estimates do not take into consideration material lost 2) Ensure adequate ventilation.
during mixing and application. 3) Do not attempt to split units unless accurate
measuring can be assured.
4) Do not use at temperatures of less than 8C unless
artificial means of heating can be used to assist cure.
During cold weather Part A should be pre-warmed to
between 20 and 30C.
5) Not to be used for conditions where fluctuations in
temperature exist eg. -15C to +15C.
Masterfill 300 is designed for use in control joints and
other non-moving/stress relief type joints only. DO NOT
use in an expansion or isolation joint.

All BASF Construction Chemicals Australia & New Zealand data sheets are updated on a regular basis, it is the users responsibility
to obtain the most recent issue AMf300/7/1006

The technical information and application advice given in this BASF Construction Chemicals publication are
based on the present state of our best scientific and practical knowledge. As the information herein is of a
STATEMENT OF general nature, no assumption can be made as to a product's suitability for a particular use or application
RESPONSIBILITY and no warranty as to its accuracy, reliability or completeness either expressed or implied is given other than
those required by law. The user is responsible for checking the suitability of products for their intended use.
Field service where provided does not constitute supervisory responsibility. Suggestions made by
BASF Construction Chemicals either orally or in writing may be followed, modified or rejected by the
NOTE owner, engineer or contractor since they, and not BASF Construction Chemicals, are responsible for
carrying out procedures appropriate to a specific application.
BASF Construction Chemicals Australia Pty Ltd Newcastle (02) 4961 3819 Adelaide (08) 8139 7500
Incorporated in NSW A.B.N. 46 000 450 288 Canberra (02) 6280 6010 Perth (08) 9366 2600
Head Office: 11 Stanton Road Seven Hills, NSW 2147 Brisbane (07) 3633 9900 Darwin (08) 8984 3269
Ph. (02) 8811 4200 Townsville (07) 4774 7344 Kalgoorlie 0417 772 355
Melbourne (03) 9567 7300

BASF Construction Chemicals New Zealand Ltd Head Office: 45 William Pickering Drive, Albany, Auckland Ph: (09) 414 7233
BASF WEB SITES www.basf-cc.com.au www.basf-cc.co.nz www.basf-ugc.com

You might also like