You are on page 1of 8

INTEGRATED DESIGN PROJECT

INCEPTION / PRELIMINARY REPORT ASSESSMENT RUBRICS


Preliminary Report (Structural/Infrastructural design)(PLOI3-A5)
SEMESTER / SESSION : ____________________________ PROJECT TITLE / FIELD: ______________________
GROUP NAME : ____________________________ DATE : ______________________

Assessment Criteria Weightage 1 2 3 4 5 Total Marks


Very Poor Poor Fair Good Excellent
Introduction

Description of the project background. 4

Conceptual Planning

Indicate the suitable structural/


infrastructure scheme to be used. 10
Sketch the structural/ infrastructure
scheme.

Design data

Identify the parameters and data to be used


in the structural/ infrastructure design according 6
to the relevant standard or guideline.

Total /100

19 August 2015
INTEGRATED DESIGN PROJECT

FINAL REPORT ASSESSMENT RUBRICS


Final Report (Structural/Infrastructural design) (PLO9-P5)
SEMESTER / SESSION : ____________________________ PROJECT TITLE / FIELD: ______________________
GROUP NAME : ____________________________ DATE : ______________________
Assessment Criteria Weightage 1 2 3 4 5 Total Marks
Very Poor Poor Fair Good Excellent
Introduction
Detail description of the project 2
background and team working.
Analysis & Design
Application of civil engineering software
to carry out structural/ infrastructure analysis 8
and design.
Verification of the design output. Interpretation and
Comparison of Result
Calculation & Drawing
Provide calculation for structural/
infrastructure design. 6
Produce structural / infrastructure
drawing/layout & detailing by using CAD
software.
Cost Estimation
Estimation of the project cost. 2
Organization of report
Organize and arrange the information, 2
calculation, design output, drawings, references
and appendices.

19 August 2015
Total /100
TOOL 1 2 3 4 5

Ability to
Ability to
describe the
Define and Project analyse the Ability to propose the type Ability to justify or defend
Ability to identify causes of the
implications of study or investigation the proposed course of
formulate solutions Report Problems related problems in
of the problem in order to solve the action in project
to complex design to the various project
selected in project problem in project management
problem [C] project management
management management
management

Use the design Ability to


Ability to solve the
standards with Ability to propose the Ability to
Ability to apply the problems using
consideration of analyse the type of design evaluate or
Project technical technical
design and implications or investigation justify the
real world competency using competency with
Report of the problem in order to proposed
constraint in moden tools to moden tools to
selected using technical solve the design using technical
particular the complex design complex design
[C] competency with moden problem using technical competency with moden
environmental problem problem
tools to complex design competency with moden tools to complex design
responsibilities of problem tools to complex design problem
professional problem
engineer
Project
Demonstrate Aware of Ability to Ability to express the Ability to Ability to
Report
leadership skills, the basic describe the components of design formulate and influence
ability to work contents of design contents of the project (key plan, defend the clients on
[P] project design project drawings, loading, design project the soundness
analysis, etc) of the design project
Demonstrate Project Ability to develop Ability to Ability to give a good All the members in group All the members in group
leadership skills, Report the team members responsibilities interaction among the ability to contibute the very good commitment
ability to work among the group group. idea how to defend the and ability to justify the
independently and [A] members project finding. idea how to defend the
project finding.
in a team through
project design,
presentation and
defend of project

19 August 2015
findings.
INTEGRATED DESIGN PROJECT

PRESENTATION ASSESSMENT RUBRICS


Presentation Interview Structure/Infrastructural (PLOI3-A5)

SEMESTER / SESSION : ____________________________ PROJECT TITLE / FIELD: ______________________


GROUP NAME : ____________________________ DATE : ______________________

Assessment Criteria Weightage 1 2 3 4 5 Total Marks


Very Poor Poor Fair Good Excellent
Organization of Presentation

Introduction of the project background and


team members. 6
Group participation.
Deliver the main ideas and relevant content
within the time given in the presentation.

Delivery

Use proper language and appropriate


engineering terms. 6
Capture the interest of the audience.
Eye contact and vocal expression.

Question and Answer

Respond and provide the relevant answers


for the questions given by the panel. 6
Conclusion

Summarize the presentation and highlight 2


the final output.

19 August 2015
Total /100

TOOL 1 2 3 4 5

Demonstrate effective Presentation Aware of Ability to Ability to Ability to Ability to


communication skill the basic communicate express the formulate and influence
( used slide power
through presentation contents of of the design components of defend the clients on
point , poster,
and defense of design model etc) design project design project design project the soundness
project. project (key plan, of the design
drawings, project
loading, analysis,
checks, etc)

Demonstrate Aware of Ability to Ability to Ability to Ability to


leadership skills, ability the basic communicate, express the formulate and influence
to work independently contents of contribute of components of defend the clients on
and in a team through design the design design project design project, the soundness
project design, project project and initiate and organize of the design
presentation and design the group work project
defense of project procedures
findings.

19 August 2015
(laterst)

PENILAIAN (ASSESSMENT)
Preliminary Report (Structural design)(PLOI3-A5) : 100% 6% CLO 3
Preliminary Report (Infrastructure) (PLOI3-A5) : 100% 8% CLO 3
Final Report (Structural design) (PLO9-P5) : 100% 30% CLO 2
Final Report (Infrastructure) (PLO9-P5) : 100% 30% CLO 2
Final Report Presentation/Interview
100% CLO 3
i. Presentation Interview Structure (PLOI3-A5) : 3%
100% CLO 3
ii. Presentation Interview Infrastructure (PLOI3-A5) 3%
100% CLO 1
Fundamental Civil Engineering Exam(PLOI0-C5) : 20%

Total : 100%

A Preliminary Report (Structural design)(PLOI3-A5) 6% CLO 3


1. Introduction 20
2. Analysis & Design 50
3. Calculation & Drawing 30
100
A Preliminary Report (Infrastructure)(PLOI3-A5) 8% CLO 3
1. Introduction 20

19 August 2015
2. Analysis & Design 50
3. Calculation & Drawing 30
100

B Final Report (Structural design) (PLO9-P5) 30% CLO 2


1. Introduction 10
2. Analysis & Design 40
3. Calculation & Drawing 30
4. Cost Estimation 10
5. Organization of report 10
100

B Final Report (Structural design) (PLO9-P5) 30% CLO 2


1. Introduction 10
2. Analysis & Design 40
3. Calculation & Drawing 30
4. Cost Estimation 10
5. Organization of report 10
100

C Presentation Interview Structure (PLOI3-A5) 3% CLO 3


1. Organization of Presentation 30
2. Delivery 30
3. Question and Answer 30
4. Conclusion 10
100
C Presentation Interview Structure (PLOI3-A5) 3% CLO 3
1. Organization of Presentation 30
2. Delivery 30
3. Question and Answer 30
4. Conclusion 10
100

D Fundamental Civil Engineering Exam(PLO10-C5) 100 20% CLO 1

19 August 2015
100%

19 August 2015

You might also like