8 Mega 1 2 Overage In general the two AC units are operational and Both outdoor unit installed on
the system starts successfully the ground without sufficient
The electrical connection is good but the system reinforcement and needs
operates only when there is generator since grid immediate fixing before
connected power is not sufficient to operate the operation to avoid operational
units. problem.
ACs with lower capacity than installed could Grid connected electrical power
have been used with appropriate air distribution problem should be solved
plan Since the location is very cold
during summer, heating
functionality should be
incorporated with the AC system
9 Gambo 2 1.5 Overage Power shortage is strong problem as such the Power shortage problem should
Ber system was not checked for its functionality be solved to make the system
even during installation by contractor functional.
In general the two AC units are not operational Regarding the outdoor units,
due to electrical power shortage and the system both outdoor units are installed
didnt start. in a very close proximity wall
Visually no installation problem is observed but and without sufficient fixing of
the optimum position of the indoor units with the support and hence
respect to room cooling is not advisable. reinforcing is required