Design verification summery Testing and commissioning summery Recommendation

No Branch Actual no Require Conclusi


name of AC d no of on
available AC
1 Gudu 0 2 Not Not Installed The bank should check if the proposed
Malle installed two AC units are shifted to other
Branch districts otherwise shouldnt be part
agreement.
2 Goro 2 2 Correct In general the two AC units are operational One of the outdoor unit should
Dugda and the system starts successfully, both the be repositioned and
indoor and outdoor units fans are functional. appropriately fixed
Outdoor unit installed on the ground (AC-2)
needs immediate fixing and repositioning
There is cold air distribution problem
3 Bule 2 1.5 Overage In general the two AC units are operational Both outdoor unit installed on
Hora and the system starts successfully. the ground and needs
Visually no installation problem is observed immediate fixing before
but the optimum position of one of the indoor operation to avoid operational
units with respect to room cooling is not problem.
advisable.
From air distribution point of view, there is
local draught near bank bolt.
Outdoor units are not properly fixed
4 Mei Beko 2 1 Overage In general the two AC units are not operational Structural supports fixing and
due to electrical power shortage and the system reinforcing is required
didnt start Electrical power shortage
Regarding the outdoor units, both outdoor problem should be solved to
units are installed in a very close proximity check functionality of system
and without sufficient fixing of the support and One of the AC units can be
hence not advisable moved to other site that have
shortage like Amaro Kelle
5 Melka 1 1 Correct The ACs are installed but are not operational Electrical power shortage
Soda due to power problem problem should be solved to
check functionality of the
system
6 Amaro 2 1 Shortage The Ac unit is installed in a confined space
Kelle without considering the entire room air The outdoor unit installed on
circulation system. Hence the installation is not the hollow concrete block and
optimal needs immediate fixing before
In general the AC unit is operational and the operation to avoid operational
system starts successfully problem
One additional AC unit is
required
7 Yabello 2 2 Correct The AC unit mounted on south facing wall is Both outdoor unit installed on
not operational. The electrical connection and the ground without sufficient
power availability is checked and concluded reinforcement and needs
that the problem is from the AC unit not from immediate fixing before
power line. operation to avoid operational
In general one of the two AC units is problem.
operational and the system starts successfully.

8 Mega 1 2 Overage In general the two AC units are operational and Both outdoor unit installed on
the system starts successfully the ground without sufficient
The electrical connection is good but the system reinforcement and needs
operates only when there is generator since grid immediate fixing before
connected power is not sufficient to operate the operation to avoid operational
units. problem.
ACs with lower capacity than installed could Grid connected electrical power
have been used with appropriate air distribution problem should be solved
plan Since the location is very cold
during summer, heating
functionality should be
incorporated with the AC system
9 Gambo 2 1.5 Overage Power shortage is strong problem as such the Power shortage problem should
Ber system was not checked for its functionality be solved to make the system
even during installation by contractor functional.
In general the two AC units are not operational Regarding the outdoor units,
due to electrical power shortage and the system both outdoor units are installed
didnt start. in a very close proximity wall
Visually no installation problem is observed but and without sufficient fixing of
the optimum position of the indoor units with the support and hence
respect to room cooling is not advisable. reinforcing is required