RETROFITTING CHECK LIST RCC

PROJECT NAME :
COLUMN GRIDE/ID : A/1 RC3 FLOOR GF

SIZE OF FOOTING: 8X8 FT DEPTH 24 IN


SIZE OF SHORT COLM: 18X15 IN DEPTH 7 FT
SIZE OF COLUMN: 12X15 IN HIGHT 9.5 FT
16 MM 20MM
NUMBER OF VERTICAL REBAR 12 0

RING/TIE SPACING 5 IN DIA 10 MM


SHEAR CONNECTOR SPACING 12 IN C/C DIA 10 MM

SRT 2ND
NUMBER OF SHEAR FOOTING VERTICAL COLM 1ST LIFT LIFT 3RD LIFT
CONNECTOR 16 12 35 60 56 28

DATE OF JOB
DATE
1 FLOOR BREAKING 25/8/17

2 EARTH EXCAVATION 25/8/17 TO 28/8/17

3 FOOTING BROKEN & 29/8/17 TO 30/8/17


EXTENSION
4 SHORT COLM PREPARE 1/9/17 TO
(CHIPPING,SC,ROD BIND
5 BONDING CHEMICAL USE TIME 11.30am AM/PM 70 SFT
12.00p
6 SHATERING TIME m 100 SFT
7 SHORT COLM CASTING TIME 1.10pm 2/9/17 DATE

8 1ST LIFT Col PREPARE TO


(CHIPPING,SC,ROD BIND
9 BONDING CHEMICAL USE TIME AM/PM SFT
10 SHATERING TIME SFT
11 1ST LIFT COLM CASTING TIME DATE

12 2nd LIFT Col PREPARE TO


(CHIPPING,SC,ROD BIND
13 BONDING CHEMICAL USE TIME AM/PM SFT
14 SHATERING TIME SFT
15 2ND LIFT COLM CASTING TIME DATE

16 3rd LIFT Col PREPARE TO


(CHIPPING,SC,ROD BIND
17 BONDING CHEMICAL USE TIME AM/PM SFT
18 SHATERING TIME SFT
19 3RD LIFT COLM CASTING TIME DATE

DESIGN & DEVELOPMENT SOLUTION (structural consultant)