MINUTES

ASME B31.1
Power Piping Section Committee

Sheraton Myrtle Beach Convention Center


2101 North Oak Street
Myrtle Beach, SC 29577

January 27, 2016


8:00 A.M. 3:00 P.M.

Notice: These Minutes are for Committee use only and are subject to
approval. These are not to be duplicated or quoted for other than
Committee business.

1
1. CALL TO ORDER AND INTRODUCTIONS
The meeting was called to order at 8:00am by the Chair, Mr. William Mauro.
Members
Name Affiliation
W. J. Mauro, Chair American Electric Power X
K. A. Vilminot, Vice Chair Black & Veatch X
C. E. OBrien, Staff Secretary ASME Codes & Standards X
D. D. Christian Victaulic X
M. J. Cohn Intertek AIM X
R. Corbit CB&I X
D. H. Creates Ontario Power Generation
P. M. Davis AMECFW X
R. P. Deubler Fronek Power Systems
A. S. Drake Constellation Energy Group X
M. K. Engelkemier Stanley Consultants X
S. J. Findlan Shaw Power Group R
P. D. Flenner Flenner Engineering Services X
J. W. Frey Stress Engineering Services X
S. Gingrich AECOM X
J. W. Goodwin Southern Co. X
J. Hainsworth Superheat FGH X
T. E. Hansen AEP/PSO - Tulsa
R. W. Haupt Pressure Piping Engineering X
C. L. Henley Black & Veatch X
B. P. Holbrook Riley Power Inc. X
M. W. Johnson NRG Energy X
R. J. Kennedy DTE Energy X
D. J. Leininger Worley Parsons
W. M. Lundy U.S. Coast Guard
L. C. McDonald Structural Integrity X
T. Monday Team Industries X
M. L. Nayyar Bechtel Power Corporation
J. W. Power Alstom X
D. W. Rahoi CCM 2000 X
K. I. Rapkin FPL - Power Generation Division X
R. K. Reamey Turner Industries Group X
E. H. Rinaca Dominion - Retired
J. P. Scott Dominion X
J. J. Sekely Welding Services, Inc R
H. R. Simpson Colby Company
S. K. Sinha Lucius Pitkin, Inc.
A. L. Watkins The Perry Nuclear Power Plant
R. B. Wilson R. B. Wilson & Associates LTD.

2
The following representatives were accepted by the Chair:
Brian Boseo for Jim Sekely
Ray Miletti for Shane Findlan

A quorum was reached at this meeting with 27 out of the 38 members of the committee in
attendance, including representatives.

SUBGROUP MEMBERS AND GUESTS


Name Affiliation Email

Brian Boseo Graycor Services Brian.boseo@graycor.com


Eric Cutlip Babcock & Wilcox evcutlip@babcock.com
Scott Davis Worley Parsons Scott.davis@worleyparsons.com
Bill Goedde Duke Energy Bill.goedde@duke-energy.com
Ata allah Hassan PSEG Co ahrahman@psegco.com
Anthony Guarnieri GE Power Anthony.guarnieri@ge.com
Mark Gwynn American Spiralweld Pipe mgwynn@american-usa.com
Alan Kirchhoff Wectec arkirchhoff@outlook.com
Jack McCormick Common Wealth Jack.mccormick@cai-engr.com
Fay Mannon CCM fmannon@hotmail.com
Ray Miletti Babcock & Wilcox rlmiletti@babcock.com
Scott Seewald Swagelok Company Jonathan.seewald@swagelok.com
Roger Thein St Paul Pipefitters JATC r.pipefitter@comcast.net
Rick Valdez ARB INC rvaldez@arbinc.com
Larry Vetter Sargent & Lundy Lorenz.g.vetter@sargentlundy.com
David Yoder Worley Parsons David.yoder@worleyparsons.com
Ronald Young American Electric Power rgyoung@aep.com
Please see pages 20-22 for the PDH Sign in Sheet.

2. ADOPTION OF AGENDA
Changes:
Add item Harrys files under New Business

MOTION made to adopt the agenda with the specified change. This motion was
seconded and unanimously APPROVED by the committee.

3. APPROVAL OF MINUTES September 16, 2015


MOTION to approve as published, motion was seconded and approved.

4. ANNOUNCEMENTS
None

3
5. MEMBERSHIP REPORT

Section Committee and Subgroup Rosters are located on pages 23-42.


Members Percentage Ballot Voting Record for the past year, the minimum required percentage is
75%: See page 43.
For a copy of the attendance Record for the past three years, please see page 44.
January 2016: All reappointment ballots and new SG-GR appointments will be balloted on CS Connect
following the meeting.

6. CHAIRS REPORT
None

7. LIAISON REPORTS

7.1 MDC & B31 Standards (E, G, H, J) B. Holbrook / R. Haupt


Mr. Holbrook reported that the B31 MDC last met in Chicago in September, they really only
cleaned up the agenda and talked about the SIF project. Mr. Haupt reported that B31J as
balloted will be similar to B31.1 Appendix D; a list of all of the SIFs and the first annex is the
old B31J. There will hopefully be a meeting in the spring to push the agenda further.

7.2 Fabrication and Examination P. Flenner


Mr. Flenner reported that they last met in Chicago in September. They went through the comments
received from the technical committee on the B31P standard. He noted that he has a lot of work to
do to work through the comments that were received and come to a resolution. They will be adding
on appendices regarding alternatives to heat treatment like temperbead and fracture mechanics.

7.3 Section IX (B&PVC) P. Flenner


Mr. Flenner reported that there was a proposal for welder certification by an AWS accredited
program

7.4 B16 Committees M. Nayyar


No report.

7.5 EPRI M. Cohn & Dana Couch


See pages 45-51 for a copy of the EPRI Highlights provided by Mr. Cohn.

7.6 B31.3 R. Haupt, P. Flenner, D. Rahoi


Mr. Haupt reported that their next meeting is scheduled for April. He noted that they have a
much more aggressive equation for sustained loads than B31.1. They do not have an
equation for occasional loads; they use a term called sustained stress indices. We might
want to consider their approach for in plane and out of plane SIFs.
7.7 Section II (B & PVC) D. Rahoi
Mr. Rahoi reported that at the last meeting they came to a consensus about powder
metallurgy specifications and materials. Until -50F the point at which it becomes time
dependent they can be used with the same info as wrought materials; the allowable stress
values would be the same.

4
7.8 BPV I T. Hansen
See page 52-53 for a copy of the report provided by Mr. Hansen.

7.9 MSS R.P. Deubler


Please see page 54 for a copy of the report provided by Mr. Deubler.

7.10 ASME Comm. On Post Const. S. Findlan


No report.

7.11 NBIC
Mr. Miletti reported that they had a significant item of interest regarding thick wall repairs
without postweld heat treatment. They want to make sure that everyone is well educated in
the dangers that this may present. There is a national board alternative weld repair for thick
wall tubes with very strict rules for personnel safety.

7.12 BPTCS W. Lundy


No report

7.13 PSP Forum T. Monday


The following presentations were given at Mondays PSP Forum:
1. Code Compliant UT vs Service UT Exams in High Energy Piping - Dave Overton
2. Case Studies Aged Constant Supports & Unintended Stress Bill Goedde
3. Bench Marking Pipe Supports Joe Frey
4. Distinguishing Non-optimum Heat Treatments of Grade 91 Base Metal Marvin Cohn
7.14 Honors S. Sinha
Certificates of Appreciation were awarded, a picture of the recipients is included below:

5
7.15 MTC P. Deubler
Please see page 55 for a copy of the report provided by Mr. Deubler.

7.16 PFI T. Monday


Mr. Monday reported that they have not met since the last time this committee met so there
is nothing new to report.

7.17 B31.1 IWG Dan Christian


Mr. Christian reported that the B31.1 IWG India was supposed to have met in November but
did not. In order to keep active IWG members involved Colleen will reach out to them and
propose them as contributing members on various subgroups.

7.18 NFPA H. Simpson


No report

7.19 Nonmetallic Pressure Piping Standards Committee - C. Henley, L. Vetter


Mr. Henley reported that they are working on three simultaneous books, NM-1, NM-2 and NM-3. All
chapters and sections of all three books have gone through subcommittee and about half at
Standards. They are about two months away from balloting the entire document to the standards
committee and board. The goal is to publish by the end of this year, once they are published B31.1
will need to review them to see how to reinforce/incorporate.

8. NEW BUSINES
Harrys Files
Mr. Holbrook reported that Harry was a member of B31.1 for more than 40 years. Brian made an effort
to speak with Mrs. Ainsworth after the sept meeting and expressed the committees condolences. Brian
got a note from Harrys son and indicated that they are in the process of cleaning out the house and
there are boxes of files that may be of use to the committee.

9. ERRATA
None

6
10. INQUIRIES
Record Status Subject SG ProjectManager Report
05--0425 SC Proposal Table A-3, Stainless Steels, A351, CFM8M MTL D.Rahoi Mr.Rahoinotedthattheproposalisreadyandwill
Casting
besentforballotsoon
11--1674 Out for SC Inquiry regarding materials for internal BEP MTL D.Rahoi PMwillberevisingtheproposalandwillreballot
Ballot valves (Transferred from BPV I)

12--0888 Stds Comm Intent Interpretation of B31.1 para. 122.8 DE D.Creates ThePMnotedthathedoesnothaveasolutionat
Proposal "Piping for Flammable Gases, Toxic Fluids
(Gases or Liquids), or Nonflammable
thispoint,therearealwayssomewhodisagreewith
Nontoxic Gasses" itnomatterwhathedoes.Thesubgroupwillre
reviewitatthenextmeetingMesser'sEngelkemier
andMaurowillreviewitbetweenmeetings.
13--0686 SC Proposal Design pressure of economizer feedwater de P.Sandage Thecommitteereviewedthisrequestand
piping
determinedthatitisarequestforconsulting.
MOTIONwasmadetosendaconsultingletterandto
closethisitem.Motionwassecondedand
APPROVED.

7
13--0898 SC Proposal Inquiry; Para 101.5.3 Earthquake DE R.Haupt Aballotwillbeissuedthisweek

13--1392 SC Proposal B31.1; use of SB 167 UNS N06617 MTL D.Rahoi ThePMfeelslikeacodecasewouldbeapplicablefor
thisrequestthesecretarywillopenone.
14--0518 SC Proposal tempering temp PWHT FE J.Hainsworth ThePMpresentedanewproposaltothesubgroup
andposteditontherecordthiswillberesubmitted
foranotherballot.
14--1145 SC Proposal Special Fittings SA J.Scott Hopestogetsomethingoutshortlymayneedto
followupwiththeinquirerwantstoknowifhecan
shortenthemtobecomespecialfittings.Larry
mentionedthattheremaybeanoldinterpretation
onthis.
14--2371 SC Proposal Greater Material Thickness / Control FE S.Gingrich ThePMwillupdatetherecordandsendarequestfor
Thickness
aballot.
14--2460 SC Proposal Use of B31.1 Materials for BEP MTL R.Young Aballotwillbeissuedshortly
15--0686 SC Proposal Rerating of system OM R.Kennedy MOTIONwasmadetoclosethisitem.Motionwas
secondedandapproved.
Thesecretarywillincludethecorrespondencewith
theinquirer.
15--0839 SC Proposal Carbon Steel Above 800F MTL C.Henley Thereisacodecasethatspecificallyaddressesthis
inquirybutitreceivednegativesatstandards.The
PMwillfollowupwiththeinquirerandfindoutthe
urgencyofitandseeifhecanwaitfortheCCorifhe
needstheinquirynow.
15--1192 SC Branch connections does not require DE M.Engelkemier Therearesomeeditorialchangesneededbeforethe
Approved supporting reinforcement calculations
nextballot
15--2437 SC Proposal Revision item to coinside with intent FE S.Gingrich ThiswasoriginallyopenedtoaddressthePWHT
interpretation #14-2371
portionofanotheritembutitsincehasbeen
incorporatedintotheotheritem.MOTIONtocloseit
secondedandapproved.
15--2459 SC Proposal Materials DE M.Engelkemier Outforballot

8
15--2467 SC Proposal L and Lmax in Fig II-2-1 DE M.Barcelona PMisaddressingthecommentsanewrevisionitem
hascomeoutofthis
15--2592 SC Proposal Pneumatic Testing of Buried Pipe FE R.Reamey Thishasbeenthroughseveraliterationsthecurrent
proposedanswerisoutforballotrightnow.
15--2896 SC Proposal Steam Piping DE M.Engelkemier ChangePMtoBrianHolbrookThePMreceived
informationfromtheinquirer.Thefirstquestionis
answerablebutthesecondisnotreallyaquestion;
thePMwillfollowupwithinquirer
15--2936 SC Proposal Pressure Relief DE M.Engelkemier ThePMwillfollowupwithPeteonthis.

160123 SC DE M.Engelkemier Mr.Holbrookwillbereviewingthisandexpectsa


Proposal ballotinaweekortwo.
12. REVISIONS
See pages 56-78 for the item tracking list for all B31.1 records which includes all active B31.1 Section
Committee items. This table shows the record status, most recent ballots at each level of approval, and
Project Manager and Subgroup information.
*Subgroup Chairs are requested to provide an oral report at the meeting on the top items of interest to
the committee which will be recorded in the Minutes below; a written status report is to be provided to
the Secretary for inclusion in the meeting Minutes.
Subgroup on Design:
See pages 79-115 for a copy of the report provided by Mr. Engelkemier.

Top Items:
Record Status Subject Project StatusUpdate
Manager
02--3307 Out for Appendix II Sample problem M. Barcelona PMreportedthathesentthisoutanda
SC correction
Ballot
fewthingsarosefromcomments
includingscarfing.Theydonotwantto
putnomenclatureinthenonmandatory
appendix.
05--0754 SC Flare, flareless compression Joints > R. Haupt Mr.Hauptreportedthatthisisa
Proposal 2 inch OD
revisiontopara115regarding
nonstandardjoints.Itwasballotedand
therewaslittlecriticismofthe
methodologybutagreatdealof
criticismofdefinitionsofjointsand
components.Technicallythiscanget
passedbuthehastodosome
wordsmithingonthedefinitions.

06--0181 SC Partial Penetration Welds J. Goodwin Foracopyofthepresentationshownat


Proposal
themeetingseepages116118.
09--1071 SC Limit of controls for over pressure A. Watkins changePMtoWayneLundy
Proposal protection para 122.6.1

09--1663 SC Para 106.1 Design Consideration for J. Goodwin Mr.Hauptreportedthattheydiscussed


Proposal Weld on Branch Connections for
Fig. 127.4.8 (E)
thisonMondayanddevelopeda
markupoffigure127.4.8eplusan
additionalpara104.3.1b.2.
11--0358 SC Undercut on Circumferential Groove R. Haupt Mr.Hauptnotedthatthisis
Proposal Welds
recommendedtobedropped.There
wasanundercuttaskgroupmeeting
yesterdayandthroughvirtually
unanimousagreement,theyfeelthatit
isbesttodropthisbecause"ifitisnt
brokendontfixit".MOTIONtocloseit
wassecondedandAPPROVED.

9
13--2195 SC Revision Request for Table 102.4 K. Vilminot ThePMreviewedthisandthereisno
Proposal
technicaljustificationformakingthe
requestedchange.MOTIONmadeto
closethisitemwassecondedand
APPROVED.
15--0236 SC Revision to Appendix G D. Selman ChangePMtoNickCircolone
Proposal Nomenclature and Index

Subgroup on Fabrication and Examination:

See pages 119-144 for a copy of the report provided by Mr. Reamey.

Top Items:
Record Status Subject Project Manager
02--0111 SC QC for non-BEP P. Flenner Mr.Davisnotedthatwedonotneed
Proposal
thisitemanymoreaswehavemoved
farbeyondwhatthisitemintended.
MOTIONwasmadetoclosethis.
MOTIONwassecondedandapproved.
Mr.DaviswillsavewhatevertheTG
mayneedfromthisitemforfuture
work.
09--1675 SC P15 E PWHT Comparison Between J. Hainsworth Mr.Hainsworthnotedthathesentthis
Proposal Table 132 and Section I Table
PW39
outforballotandgotseveral
commentsback.Hewouldliketomake
thechangesfortheirpartofthecode
andthenhavedesignworkontheirs.
Theywouldliketotransfertosubgroup
materialsandreassigntoRonYoungto
completetheitemforGrade91.
11--1045 Stds Revision to Figure 127.4.4 (c) D. Couch Thiswentoutforstandardscommittee
Comm
Proposal
voteandseveralnegativeswere
received.PMneedstoworkon
addressingthoseandtheywillreballot.
11--1660 Stds Revise paragraph 137.4.3 (Test C. Zimpel Thiswasballotedtostandardsand
Comm Medium), 137.1.2 (Temperature of
Proposal Test Medium), 137.5.2 (Pneumatic
therewerenegativesthatneedtobe
Testing) addressedandpossiblyreballoted.
11--2019 SC Correction to figure references in R. Corbit Mr.Corbitreportedthattherewere
Approved para 104.3.1(c.2)
threenegativesfromtherecirculation
ballot;theywillberespondedtoand
willbesentbackoutforballot

10
12--0209 Stds Add definition for "Volumetric S. Gingrich Mr.Gingrichreportedthatthiswas
comm Examination" to para 100.2
approved
standardscommitteeapprovedwith
commentsthiscanmoveto
publicationoncecommentsare
addressed.
12--1788 SC Alternative to hydrotest on NBEP R. Miletti Mr.Milettinotedthatthisreceived6
Proposal when hydrotesting is not practical
disapprovals,someofwhichwere
piggybacked.Theyplantosenditout
foranewballotandwilltrytotalkit
outwiththenegativevoters.
13--0247 SC New Paragraph to address "closure S. Gingrich Therecommendationistoadda
Proposal welds"
hydrotestforclosurewelds.B31.3
allowsalternativetestingandB31.1
doesnotwhichcausesissuesin
construction.HeusedB31.3wordsand
received1214negatives.Hewill
continueworkingonresolving
comments.

13--0248 Out for para 131.6 Reduction of weld C. Zimpel WillbesenttotheSecretaryforballot.


SC Ballot temperature below martensitic
temperature between welding and
PWHT for P No 15E Materials
15--0478 SC Clarification of Para 132.4 - S. Gingrich Thiswasopenedasaresultofthe
Proposal Definition of Thickness Governing
PWHT
nominalthicknessinquiry;itisno
longerneeded.MOTIONtoclosethis
secondedandAPPROVED.
15--1073 Stds correction to para 129.3.3.1 (B.1) P. Davis Mr.Davisreportedthattheyhada
Comm and CSEF bending heat treatment
Proposal rules
motiontodropthisinthesubgroupas
itwaspreplacedwith151186which
tabularizedtheverbiagehewastrying
tocorrect.MOTIONwassecondedand
APPROVED.
15--2544 SC Revision for intent interpretation S. Gingrich Mr.Gingrichreportedthatthiswasone
Proposal #14-2371
oftworecordsopenedtoaddressthe
inquiry;thisisnolongerneededsince
wewillreplytotheinquirywitha"yes".
MOTIONtoclosethiswasseconded
andAPPROVED.
15--2593 SC Revision to para 137.2.1, Exposure R. Reamey ReassigntoBillGoedde
Proposal of Joints

11
Subgroup on General Requirements:

See pages 145-149 for a copy of the report provided by Mr. Power.

Top Items:
Record Status Subject Project Manager
02--0177 SC Design changes to Fabrication W. Mauro Indiscussioninthesubgrouptheyfelt
Proposal Requirements
thecodeaddressesminimum
requirementsnotgoingaboveand
beyond.Norevisiontothecodeis
necessary.MOTIONwasmadetoclose
this;secondedandAPPROVED
03--0305 SC Metrication of Appendix VI G. Trinker Mr.PowerreportedthatMr.Trinker
Proposal
didnotfindanythingthatneededto
bemetricatedMOTIONwasmadeto
closethis,secondedandAPPROVED.
03--0372 SC B31.1: Ammonia Piping Exclusion M. Treat Mr.PowerreportedonbehalfofMr.
Proposal
Treatthatthisitemisreadyforballot.
08--0022 SC Fig. 100.1.2(B) J. Power Therewasamarkupfromafewyears
Proposal
agoregardinganerrantnotation
whichhassincebeenremoved.The
subgroupfeltthatthefigureisnow
correctandnoactionisneededatthis
point.MOTIONtoclosethisitemwas
secondedandapproved.

12--0900 SC Addition of reference to NFPA 54- W. Mauro Thisitemwentoutforballotand


Proposal 2012 and NFPA 56PS-2012
receivedonenegativewhichhassince
beenwithdrawn;thiscannowproceed
tothestandardscommittee.
13--1747 Stds Update of ASME Standards W. Mauro Thisitemisnotinalignmentwiththe
Comm (Appendix F)
Proposal
standardscommitteedirectiontogo
withcurrenteditionsofASME
Standardsandnotshowspecific
editiondates.Thereisanotheritemto
addthe"currentedition"#070176
whichwillstayactive.MOTIONto
closethis,secondedandAPPROVED.

13--1870 SC Clarify the need for sound J. Frey ChangePMtoW.Mauro.


Proposal engineering judgment and the use
of more detailed analyses in all B31
Codes (B31.1 Record #13-1870)

12
Subgroup on Materials:

Top Items:
Record Status Subject Project
Manager
02--0097 SC Appendix A Metrication C. Henley Thisitemisjointlycoveredwith12
Proposal
811;Mr.Henleyreportedthatheis
about98%donewiththetables
portionofthis,heneedstofinishup
themetrictablesofinformationthat
isnotinBPVII.Heisalsoupdating
wallthicknessequationsforjoint
efficiencyfactors;therearealotof
looseendstocleanupaswellasany
changesbetween2013and2015
editionsofBPVII.
Thisitemwillbechangedtotracking
andtheactionwillbeincorporated
into12811
05--0753 Stds TRACKING: Definition of Ferrous W. Sherman ChangetoPMtoMr.Rahoi.Thereis
Comm Vs. Nonferrous
Proposal
adefinitionfromASTMforferrous
andnonferrouswhichwillbeused.
05--1329 Stds Extend Allowable Stresses in Table D. Rahoi NotesneedtobeaddedtotableA8
Comm A-8 up to 1650F
Approved
andthereisonelinewherethefont
needstobeitalic.
07--1517 Stds Increase maximum temperature C. Henley Mr.Henleynotedthatthispassed
Comm allowable stress values of P22 to
Proposal 1200F
subcommitteebutwasdisapproved
atstandards;somearemore
editorialbutthereis12whoalso
votednegativeatsubcommittee
levelhewillcontinuetoworkthe
processtogetthisthrough.
12--0218 Stds Appendix 6 review to compare with C. McDonald PMreceivedanegativeatstandards
Comm new SC II requirements
Proposal
committee;hewantsarequirement
fortherequestertoindicatewhat
theneedforusingthematerialisin
theirrequest.Itisbesttobringthis
backdowntothesubcommittee
levelandaddthestatementto
mandatetheuserneed.
15--1326 SC Correct BEP Errors in Table A4 to R. Young Mr.Youngreportedthatitwas
Approved allow BEP
approvedwithcommenthe
requestedthatarecordbetakenout
toaddressanissuebroughtupinthe
comment.Thisitemwillthenbe
allowedtomoveforward.

13
Subgroup on Operation and Maintenance:
See page 150 for a copy of the report provided by Mr. Scott.
Top Items:
Record Status Subject Project
Manager
07--1603 SC Move Para. V-8.0 to Chapter 7 K. Rapkin Mr.Rapkinreportedthattherewasa
Proposal
ballotthatwasdisapproved;heis
workingonrespondingtothe
negativesandwillbeissuinganew
ballot.
11--0351 SC Add new para 14 to appendix 5 to R. Haupt ThePMisworkingonacautionary
Proposal determine stress allowable for older
pipe
note.
11--1040 SC Add Rules or Guidelines for the B. Goedde PresentationsweremadeinPSP
Proposal Maintenance and Testing of Spring
Hangers to Chapter VII and
Forumonthisitem,theyarelooking
Appendix V atperhapsanothercautionarynotein
Appendix5.
12--0813 SC Add new paragraph for abandoned L. Vetter Mr.Vetterreportedthatthisisbeing
Proposal piping systems
broughtintoappendix5;theywill
addsomeadditionalcautions
14--0777 Out for Revise definitions of "failure" and R. Reamey Currentlyoutforballot.
SC Ballot "repair" in Appendix V

Subgroup on Special Assignments:


See page 151 for a copy of the report provided by Mr. Scott.
Top Items:
Record Status Subject Project
Manager
03--0315 stds Update Appendix N, Paragraph N- L. Vetter Mr.Vetterballotedthiswhich
Comm 102.3.1
Approved
receivedonecommentfrom
standards.Therearealsosome
editorialcommentstoputintothe
figure,thismayneedtobesent
aroundagainforballot.
08--1376 Stds updating AWWA Standard edition H. Simpson Thisitemistiedto101665;both
comm numbers in Appendix F, to be
approved considered in conjunction with Item
itemspassedthiscommitteeandwent
10-1665 ontostandards.Therewasone
commentonthisitemthatneedstobe
addressedand1665hasonenegative
and4commentsPMwillseewhathe
needstodotomovethisforward.
10--1665 Stds restricting the use of special H. Simpson see081376
comm gaskets to increase the rating of
proposal standard flanges
13--0199 Stds Revise HDPE Fusion bonding H. Simpson Thishasbeenballotedthroughand
Comm qualifications in accordance with
Approved those being developed by ASME
hasonecommentthatneedstobe
Section IX addressedtomoveitforward,itmay
needanotherballot

14
13. CODE CASES
13.1 Open Code Case Items
Project
Record Subject SG Manager Status
03--0344 Carbon Steel above 800F MTL C. Henley Thisitemhassomenegativesand
commentsatstandards
10--0738 B31.1 Code Case; Alternate Rules for DE R. Haupt waitingforpublicationofB31.3
High Cycle Fatigue
AppendixW.
10-1188 B31.1 and B31.3 Code Case for Heavy DE R. Haupt MOTIONtodropthisbecauseitisa
Walled Fittings
duplicateitem.Motionwasseconded
andAPPROVED.
12--0808 New Code Case on AISI 4130 steel for MTL D. Rahoi Therearenegativesheistryingto
couplings and fittings
address
14--1613 B31.1 Code Case for Use of CF8C-Plus MTL D. Rahoi Mr.Rahoiwillrevisehisresponseto
Casting Material
Mr.Nayyarandthiswillbe
recirculatedwitheditorialchangesin
responsetoMr.Frikken
15--1325 Revision to B31 Case 192 - add MTL D. Rahoi MOTIONwasmadetoclosethisitem
reference to Para 102.2.4
asitturnsoutthatitisnotneeded
becausethereisalreadyastatement
inthecodethataddressesit;we
donthaveallowablestressvalues
abovethattemperature.Motionwas
secondedandAPPROVED.Mr.Rahoi
willsendanotetoMr.Frikkenfor
this.
15--1906 Localized PWHT for CSEF Materials FE J. Hainsworth ThePMisworkingonresolving
commentsfromtheballottoSGFE
andB31.1.
15--1949 Code Case to address the gap in Fig FE D. Couch workinprocess
127.4.4(c), Socket Weld Fittings __Item
# 11-1045 / Existing Ballot# 13-519RC1
15--2192 CC on heavy wall fittings DE R. Haupt Ronnotedthatthiswasballotedby
B31.3andgotonenegativeandwill
ballotithere.
16--0079 Revision to B31 Case 190 MTL D. Rahoi ThiswasreviewedwiththeSection
Committeeontheprojectorsothat
theyareawareoftheproposed
changes.Henotedthatthereareno
technicalchangestothiscc.Thiswill
besentforballotfollowingthe
meeting

15
13.2 Existing Code Cases

Case 182 Use of 1.15Ni-0.65Cu-Mo-Cb (WB36) Materials


Subgroup: MTL Project Manager: R. Deubler
Record 07-1516 has been assigned for incorporation of this CC; it will be published in the 2014
edition
September 16, 2015: Item #14-1926 has been Board Approved; this will be removed from future
agendas

Case 183-1 Use of Seamless 9Cr-2W Materials


Subgroup: MTL Project Manager: P. Deubler
This will remain as a CC rather than get incorporated into the code.
Case 187 Alternate PWHT Holding Temp. Range Requirements for P-No. 5A and P No. 5B
Group 1 Materials
Subgroup: FE Project Manager: D. Leininger
This has been incorporated into the code and the CC can now be annulled; a record for this
needs to be opened.
Case 189 Use of Alternative Ultrasonic Examination Acceptance Criteria in ASME B31.1
Subgroup: FE Project Manager: R. Reamey
Item 07-172 was assigned for incorporation
Case 190 Seamless Ni-25Cr-20Co Material Use in B31.1
Subgroup: MTL Project Manager: D. Rahoi
Case 192-1 Cu-13Zn-1.1Ni-Si-A1 Alloy Seamless Pipe and Tubing
Subgroup: MTL Project Manager: D. Rahoi
CASE 195 Use of UNS S32003 Stainless Steel for ASME B31.1
Subgroup MTL Project Manager: D. Rahoi
Case 197 Grade 1 Ni-Cr-Mo-Cb alloy (UNS N06625)
Subgroup MTL Project Manager: D. Rahoi

14. NEW RECORD REQUESTS


New record requests should be submitted to the B31.1 Staff Secretary using the form provided, a copy
of this form can be found on page 67 and on the Committee Page.

15. OTHER ITEMS

16
16. APPROVED ITEMS SCHEDULED FOR PUBLICATION
*Interpretations are published immediately after they are issued to the inquirer and are no longer being
included in each edition of the Code.

2016 Edition
The next edition of B31.1 is scheduled for June 2016; the following items were approved for
inclusion:

Revisions Scheduled for the 2016 Edition:


Record Subject ProjectManager
020105
(2105) RequirementsforExpansionJoints P.Sandage
030299 MetricationofChaptersI,II,VandVI G.Trinker
030303 MetricationofAppendixIV G.Trinker
060688 AddReferenceinPara.101.1 K.Vilminot
061109 ReferencingPCC2RepairofPressureEquipmentandPiping P.Davis
ReviewPara.104.8and119.7.1toeliminateneedfortwoequations
061228 (checkwithAppendixG) R.Wilson
061255 ReviewofAppendixVPara.V3.0and4.0 J.Scott
071601 ReviewofAppendixVPara.V6.0 R.Reamey
080174 AdditionofUNSN08904(904L) D.Rahoi
090341 AddreferencetoB31J W.Lundy
090345 Para136.3.2,QualificationsofNDEPersonnel S.Leach
PermittheuseofStainlessSteelA403Type304seamlessandwelded
090585 fittingsonBoilerExternalPiping A.Drake
090929 AdditionofS32101toAppendixA D.Rahoi
090930 AdditionofUNSS31726(317LMN) D.Rahoi
091219 BEPMaterialsusageforAlloyN06625 D.Rahoi
091657 AddAlloy690toB166,B168andTable126.1 D.Rahoi
UpdatingoftheAluminumallowablesperSectionIIitem#00128
101662 6061alloyperitem#131910and95083peritem#141425 R.Deubler
101666 Para136.1.4QualificationofOwnersInspectors K.Kofford
110352 EvaluateAppendixVParaV10.0forinclusioninChapter7Para147 P.Davis
120205 ReviseTable136.4toaddressthethicknessofbranchconnections T.Monday
120217 LowermaximumtemperatureforUNSS32750(2507) W.Sherman
CorrectTablestoshowUNSS32205withanewhigherY.Strengthand
120219 TensileStrengthof70/95KSI D.Rahoi
120222 AddReferencetoWeldingProceduresunderpara.139 R.Reamey
120770 correctionsinyvalue,andaddB167seamlesspipeandtube D.Rahoi
120812 Replaceprescribewithprovideinpara.100.1.4 M.Engelkemier
121837 RemoveyearreferencefromASCE0705soitreadsASCE07 M.Engelkemier
130055 BoltingmaterialASTMA453Grade660ClassesA&B C.McDonald
Figure127.4.8(e),note4changeterminologytobetterdefine
130246 longitudinalcenterline T.Monday
Para104.8.1Referencetopara.102.3.2(c),102.3.2(D)inerror,
131441 AppendixGdefinitionofSh D.Selman

17
140060 CorrectthetemperaturecolumnsinTableA5 R.Deubler
ReviewandupdatethereferencedMSSStandardsinAppendixFand
140162 Table126.1 D.Yoder
Replacethewordshouldwithshall,asapplicable,intheNon
MandatoryAppendixV,para.V10revisedbyTR110352tobe
140171 consistentwiththeForewordoftheCode. P.Davis
140564 ReviseTable136.4addnote(6) T.Monday
140998 ModifythedefinitionofCoveredPipingSystemsin100.2 T.Hansen
141129 Revisepara.136.4,ExaminationMethodsofWelds R.Reamey
141131 Progressiveannealingofausteniticmaterials P.Flenner
ConflictinstatementsonPWHTexemptionsinpara.127.4.2andTable
141132 132.2 P.Flenner
141161 CodeJurisdictionalLimitsforPiping P.Sandage
PossibleCorrectiontoreferencestoFigure127.4.8inpara104.3.1
141469 (C.2) K.Vilminot
141789 ReviewandCorrectCastingFactorsinB31.1TableA5 P.Deubler
142486 UpdateChapterVII,Paragraph140 M.Cohn
Consolidateinformationcontainedinpara129.3.3.1and129.3.3.2into
151186 tabularformat P.Davis
151470 CorrectionstoTable129.3.4.1basedon2015EditionofASMESectionI P.Davis

Code Cases Scheduled for the 2016 Edition:


Record Subject ProjectManager
060186 CC,UseofUNSS32003toA240,A789,A790 D.Rahoi
131560 NewB31.1CodeCasecoveringcoppercastingalloyC87600toASTM D.Rahoi
B584to600F(316C).

132206 CodeCaseonGrade91PowderMetallurgyHIP D.Rahoi

140784 RevisiontoB31Case192ChangeinDataAnalysis D.Rahoi

141926 AnnulB31CC182 P.Deubler


151948 AnnulB31Case187 R.Reamey

2018 Edition
The next edition of B31.1 is scheduled for June 2018; all items to be included must be Standards
Committee Approved by November 30, 2017. The following items were approved for
inclusion:

Revisions Scheduled for the 2018 Edition:


Record Subject ProjectManager
152149 AppF;reviewofASMECA12014forinclusioninthelistofstandards T.Hansen
asanevergreenreference

152150 AppF;reviewofASMEQAI12014forinclusioninthelistof T.Hansen


standardsasanevergreenreference

18
152151 AppJ;reviewofCA1forreplacementofcurrentQCsectionsinB31.1 T.Hansen
bodyandAppendixJinparallelwithsimilaractioninBPVI.Also
identifywhatwordsandlocationswouldbenecessaryforCPS
conformitytext
152152 100.2Definitions;coveredpipingsystems(CPS);reviewofdefinition T.Hansen
totightenscopetoaclearerdefinedboundaryinlieuoffigures

Code Cases Scheduled for the 2018 Edition:

Errata Scheduled for the 2018 Edition:

17. FUTURE MEETING DATES


The following is the agreed schedule for future Section Committee meetings:

May 16-18, 2016 Safety Harbor Resort and Spa


105 N Bayshore Drive
Safety Harbor, FL 34695
888-237-8772
Room Rate: $129
Guest Room Reservation Cutoff: April 23, 2016
Group Name: ASME B31.1 Power Piping
Committee Meeting

September 19-21, 2016 1st choice: Charleston, SC


2nd choice: Boston, MA

Jan 23-25, 2017 1st choice: San Diego, CA


2nd choice: San Antonio, TX

18. ADJOURNMENT
The meeting was adjourned at 11:25am.

Respectfully Submitted,

Colleen OBrien
Secretary, B31.1 SC
Phone: 212.591.7881
Fax: 212.591.8501
Email: obrienc@asme.org

19
20
21
22
N10020200 B31.1 Power Piping Section Committee Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 5
William J. Mauro, PE, AW Marvin J. Cohn, PE, AF
Chair Member
Principal Engineer Piping Asset Integrity Management Director
American Electric Power * Intertek AIM
1 Riverside Plz 601 W California Ave
Columbus, OH 43215-2355 Sunnyvale, CA 94086-4831
Phone # 1(360)609-2681 Phone # 1(408)636-5360
Fax # 1(614)716-3204 Fax # 1(408)734-0445
wjmauro@aep.com marvin.cohn@intertek.com
Com. Exp. Date - 06/30/2018 Com. Exp. Date - 06/30/2020

Kristi A. Vilminot, PE, AB Richard Corbit, AW


Vice Chair Member
Mechanical Engineer 31790 Chablis Ln
Black & Veatch Lewes, DE 19958-2524
3550 Green Ct Phone # 14844670797
Ann Arbor, MI 48105-1579 richard.corbit@cbi.com
Phone # 1(734)622-8728 Com. Exp. Date - 06/30/2020
Fax # 1(734)622-8700
vilminotka@bv.com
Com. Exp. Date - 06/30/2018

Colleen E. O'Brien David Creates, AB


Staff Secretary Member
Engineering Administrator Sr Design Engr
ASME Ontario Power Generation Inc.
MS: 6-2B 889 Brock Road 5F-1
2 Park Ave Pickering ON L1W 3J2
New York, NY 10016-5902 Canada
Phone # 1(212)591-7881 Phone # 1(905)839-6746 EXT4282
Fax # 1(212)591-8501 Fax # 1(905)837-3995
obrienc@asme.org david.creates@opg.com
Com. Exp. Date - 06/30/2049 Com. Exp. Date - 06/30/2016

Daniel D. Christian, AK Paul M. Davis, AK


Member Member
Director, Oil, Gas, Chemical & Power Market Europe-Middle East-India-Africa
Corporate QA/QC Mgr for FWCI
Victaulic Amec Foster Wheeler Plc
PO Box 17683 Global Power Group
Jebel Ali Free Zone 501 Grant Street, Suite 400
Dubai Pittsburgh, PA 15219-2249
United Arab Emirates Phone # 1(412)222-5892
Phone # 971566443188 paul.davis2@amecfw.com
Fax # 97148838860 Com. Exp. Date - 06/30/2020
dchristian@victaulic.com
Com. Exp. Date - 06/30/2017

23
N10020200 B31.1 Power Piping Section Committee Date Printed: 1/15/2016
As of: 01/15/2016
Page 2 of 5
Pete Deubler, AB Philip D. Flenner, AW
Member Member
Technical Director Senior Welding Consultant
Fronek Power Systems, LLC Flenner Engineering Services
12 Ramland Rd 6537 Wyndham Drive
Orangeburg, NY 10962-2606 Kalamazoo, MI 49009-8031
Phone # 1(845)359-0292 Phone # 1(269)353-1166
Fax # 1(845)359-0185 Fax # 1(269)353-1167
deublerr@asme.org flnr@aol.com
Com. Exp. Date - 06/30/2018 Com. Exp. Date - 06/30/2019

Andre S. Drake, AW Joseph W. Frey , PE, AF


Member Member
Principal Engineer Staff Consultant
Constellation Energy Group Stress Engineering Services, Inc.
Calvert Cliffs Nuclear Power Pl 13800 Westfair East Dr
Lusby, MD 20657 Houston, TX 77041-1101
Phone # 1(410)495-3932 Phone # 1(281)955-2900
Fax # 1(410)495-3614 Fax # 1(281)955-2638
andre.drake@exeloncorp.com joseph.Frey@stress.com
Com. Exp. Date - 06/30/2016 Com. Exp. Date - 06/30/2020

Monte Engelkemier, PE, AB Stan Gingrich, P.Eng., PE, AA


Member Member
Project Principal Manager, Materials & Welding Engineering
Stanley Consultants, Inc. AECOM
225 Iowa Ave 7800 E Union Ave
Muscatine, IA 52761-3764 Denver, CO 80237-2715
Phone # 1(563)264-6641 Phone # 1(719)651-5464
Fax # 1(563)264-6658 stan.gingrich@aecom.com
engelkemierm@stanleygroup.com Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/30/2016

Shane Findlan, AA Jeff W. Goodwin, AW


Member Member
Chief Engineer, Welding Principal Engineer, High Energy Piping
CB&I Southern Co.
128 S Tryon St Ste 1000 Bldg 42 Inverness Center Pkwy
Charlotte, NC 28202-0004 Birmingham, AL 35242
Phone # 1(704)331-6238 Phone # 1(205)992-6962
Fax # 1(704)331-5655 Fax # 1(205)992-7535
findlas@westinghouse.com jwgoodwi@southernco.com
Com. Exp. Date - 06/30/2016 Com. Exp. Date - 06/30/2019

24
N10020200 B31.1 Power Piping Section Committee Date Printed: 1/15/2016
As of: 01/15/2016
Page 3 of 5
John Hainsworth , PE, AF Brian P. Holbrook , PE, AK
Member Member
411 Walnut St Apt 9000 Principal Engineer
Green Cove Springs, FL 32043-3443 Babcock Power Inc
Phone # 1(330)497-9009 Riley Power Inc 5 Neponset St
john.hainsworth@ymail.com PO Box 15040
Com. Exp. Date - 06/30/2018 Worcester, MA 01615-0040
Phone # 1(508)854-3817
Fax # 1(508)854-4670
bholbrook@babcockpower.com
Com. Exp. Date - 06/30/2018

Tom E. Hansen, AW Michael W. Johnson , PE, AW


Member Member
Principal Engineer Mechanical Engineer
American Electric Power NRG Energy
Region IV Engineering MS: 2038-B
PO Box 201 1000 Main St
Tulsa, OK 74102-0201 Houston, TX 77002-6336
Phone # 1(918)858-3865 Phone # 1(832)357-7243
Fax # 1(866)342-0126 michael.johnson@nrg.com
tehansen@aep.com Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/30/2017

Ron W. Haupt, AF Richard Kennedy, AW


Member Member
Senior Consultant Technological Specialist
Pressure Piping Engineering Associates Inc DTE Energy
291 Puffin Ct One Energy Plaza, Room 404 G.O.
Foster City, CA 94404-1318 Detroit, MI 48226-1203
Phone # 1(650)574-8195 Phone # 1(313)235-5146
Fax # 1(650)574-2153 Fax # 1(313)235-5126
ron@ppea.net kennedyr@dteenergy.com
Com. Exp. Date - 06/30/2018 Com. Exp. Date - 06/30/2016

Charles Henley, PE, AB Donald J. Leininger , PE, AF


Member Member
Chief Engineer Sr Staff Engr
8409 Lakeview Ave WorleyParsons
Lenexa, KS 66219-2064 4320 Audley Green Ter
Phone # 1(913)458-2050 Williamsburg, VA 23188-7283
henleycl@bv.com Phone # 1(757)345-5775
Com. Exp. Date - 06/30/2016 Fax # 1(610)855-2727
djlsr1973@gmail.com
Com. Exp. Date - 06/30/2016

25
N10020200 B31.1 Power Piping Section Committee Date Printed: 1/15/2016
As of: 01/15/2016
Page 4 of 5
Wayne M. Lundy, PE, AT John W. Power, AB
Member Member
Mechanical Engineer Mechanical Engineer
U. S. Coast Guard GE Power
2703 Martin Luther King Jr Ave SE Stop 7509 175 Addison Rd
Commandant (CG-ENG-3) Windsor, CT 06095-2176
Washington, DC 20593-7509 Phone # 1(860)285-4854
Phone # 1(202)372-1379 Fax # 1(860)285-9222
Fax # 1(202)372-1925 john.w.power@power.alstom.com
Wayne.M.Lundy@uscg.mil Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/10/2019

L. Clark McDonald, Ph.D., PE, AF Dennis W. Rahoi, AF


Member Member
Associate Consultant
1903 Indian Blanket Dr CCM 2000
Cedar Park, TX 78613-1548 1500 South Grant Street
Phone # 1(512)695-8152 Iron Mountain, MI 49801-2118
Fax # 1(512)873-2281 Phone # 1(906)779-5080
cmcdonald@structint.com drahoi@chartermi.net
Com. Exp. Date - 06/30/2020 Com. Exp. Date - 06/30/2017

Timothy Monday, AA Keith I. Rapkin , PE, AW


Member Member
Vp Techincal Operations Principal Engineer
Team Industries Inc FPL
1200 Maloney Rd Power Generation Div.
Kaukauna, WI 54130-4112 700 Universe Blvd PO Box 14000
Phone # 1(920)462-1150 Juno Beach, FL 33408-0420
Fax # 1(920)766-0486 Phone # 1(561)691-2617
tmonday@teamind.com Fax # 1(561)691-7031
Com. Exp. Date - 06/30/2017 keith_rapkin@fpl.com
Com. Exp. Date - 06/30/2018

Mohinder L. Nayyar, PE, AB Raymond Reamey, AA


Member Member
NICE Director, Quality Services
19405 Prospect Point Ct Turner Industries Group, L.L.C.
Brookeville, MD 20833-2246 8687 United Plaza Blvd.
Phone # 1(301)774-3806 Baton Rouge, LA 70809-7009
Fax # 1(301)774-3806 Phone # 1(225)214-2898
nayyar1222@gmail.com Fax # (225) 215-6356
Com. Exp. Date - 06/30/2019 rreamey@turner-industries.com
Com. Exp. Date - 06/30/2017

26
N10020200 B31.1 Power Piping Section Committee Date Printed: 1/15/2016
As of: 01/15/2016
Page 5 of 5
Edward Rinaca, PE, AW Sri K. Sinha, AF
Member Member
Retired Director Engineering
Dominion Resources Inc. Lucius Pitkin Inc.
9430 Waterfowl Flyway 304 Hudson St
Chesterfield, VA 23838-5285 New York, NY 10013-1015
Phone # 1(804)273-3097 Phone # 1(212)233-2737
ed-rinaca@comcast.net Fax # 1(212)233-2737
Com. Exp. Date - 06/30/2018 ssinha@lpiny.com
Com. Exp. Date - 06/30/2018

John P. Scott, AW Arthur L. Watkins, AW


Member Member
Engineer III Staff Engineer
Dominion The Perry Nuclear Power Plant
5000 Dominion Blvd. (1SE) First Energy Corp.
Glen Allen, VA 23060-3308 PO Box 97, Mail Zone A170
Phone # 1(804)273-2149 Perry, OH 44081
Fax # 1(804)273-3614 Phone # 1(440)280-7305
john.scott@dom.com Fax # 1(440)280-8002
Com. Exp. Date - 06/30/2016 alwatkins@firstenergycorp.com
Com. Exp. Date - 06/30/2020

James J. Sekely, AF Robert B. Wilson, AB


Member Member
Welding Consultant Piping Stress Engineer
Welding Services, Inc. R.B.WILSON & ASSOCIATES LTD.
716 Vanderbilt Drive 58 Hopkins Ct.
Monroeville, PA 15146-1924 Dundas ON L9H 5M5
Phone # 1(724)327-7381 Canada
Fax # 1(724)327-7381 Phone # 1 (905) 627-2665
jsekely@comcast.net Fax # 1 (905) 634-4071
Com. Exp. Date - 06/30/2016 bob.wilson@pipingdesign.net
Com. Exp. Date - 06/30/2020

Henry R. Simpson, PE, AB Evans C. Goodling Jr, PE


Member Contributing Member
Principal Retired
PM&C Engineering 3 Gaelsong Ln
20 Garden St Reading, PA 19610-3119
Bath, ME 04530-2620 Phone # 1(610)856-7776
Phone # 1(207)553-1479 Fax # 1(610)855-3397
Fax # 1(207)541-5800 ecgoodling@comcast.net
hanks@colbycoengineering.com Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/30/2018

Total Number of Members: 40


27
N10020206 B31.1 Subgroup on Special Assignments Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 2
Sri K. Sinha, AF Mr. Ata allah Hassan, AB
Chair Member
Director Engineering Plant Design Engineering Specialist
Lucius Pitkin Inc. PGESCo
304 Hudson St 41 Al Salam Avenue, Central District
New York, NY 10013-1015 New Cairo
Phone # 1(212)233-2737 Cairo 11341
Fax # 1(212)233-2737 Egypt
ssinha@lpiny.com Phone # 00 00105031492
Com. Exp. Date - 06/30/2020 ahrahman@pgesco.com
Com. Exp. Date - 06/30/2019

John P. Scott, AW Edward Rinaca, PE, AW


Secretary Member
Engineer III Retired
Dominion Dominion Resources Inc.
5000 Dominion Blvd. (1SE) 9430 Waterfowl Flyway
Glen Allen, VA 23060-3308 Chesterfield, VA 23838-5285
Phone # 1(804)273-2149 Phone # 1(804)273-3097
Fax # 1(804)273-3614 ed-rinaca@comcast.net
john.scott@dom.com Com. Exp. Date - 06/30/2019
Com. Exp. Date - 06/30/2016

Marvin J. Cohn, PE, AF Henry R. Simpson, PE, AB


Member Member
Piping Asset Integrity Management Director Principal
Intertek AIM PM&C Engineering
601 W California Ave 20 Garden St
Sunnyvale, CA 94086-4831 Bath, ME 04530-2620
Phone # 1(408)636-5360 Phone # 1(207)553-1479
Fax # 1(408)734-0445 Fax # 1(207)541-5800
marvin.cohn@intertek.com hanks@colbycoengineering.com
Com. Exp. Date - 06/30/2020 Com. Exp. Date - 06/30/2020

Ms. Sylwia DuChez Lorenz Vetter, AB


Member Member
Piping Material Engineer Manager, Fossil Plant Pipe Analysis
Bechtel Power Sargent & Lundy Engrs
5275 westview drive 55 E Monroe St
frederick, MD 21703-8306 Chicago, IL 60603-5713
Phone # 1(301)228-6779 Phone # 1(312)269-6857
soduchez@bechtel.com Fax # 1(312)269-7533
Com. Exp. Date - 06/30/2017 lorenz.g.vetter@sargentlundy.com
Com. Exp. Date - 06/30/2020

28
N10020206 B31.1 Subgroup on Special Assignments Date Printed: 1/15/2016
As of: 01/15/2016
Page 2 of 2
David Yoder, AB
Member
Piping Engineer in Training
Worleyparsons
2675 Morgantown Road
Reading, PA 19607
Phone # 1(610)855-3096
Fax # 1(610)855-2628
david.yoder@worleyparsons.com
Com. Exp. Date - 06/30/2019

Evans C. Goodling Jr, PE


Contributing Member
Retired
3 Gaelsong Ln
Reading, PA 19610-3119
Phone # 1(610)856-7776
Fax # 1(610)855-3397
ecgoodling@comcast.net
Com. Exp. Date - 06/30/2020

Total Number of Members: 10


29
N10020201 B31.1 Subgroup on Operation and Maintenance Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 3
John P. Scott, AW David Creates, AB
Chair Member
Engineer III Sr Design Engr
Dominion Ontario Power Generation Inc.
5000 Dominion Blvd. (1SE) 889 Brock Road 5F-1
Glen Allen, VA 23060-3308 Pickering ON L1W 3J2
Phone # 1(804)273-2149 Canada
Fax # 1(804)273-3614 Phone # 1(905)839-6746 EXT4282
john.scott@dom.com Fax # 1(905)837-3995
Com. Exp. Date - 06/30/2020 david.creates@opg.com
Com. Exp. Date - 06/30/2020

Paul M. Davis, AK Ms. Sylwia DuChez


Secretary Member
Corporate QA/QC Mgr for FWCI Piping Material Engineer
Amec Foster Wheeler Plc Bechtel Power
Global Power Group 5275 westview drive
501 Grant Street, Suite 400 frederick, MD 21703-8306
Pittsburgh, PA 15219-2249 Phone # 1(301)228-6779
Phone # 1(412)222-5892 soduchez@bechtel.com
paul.davis2@amecfw.com Com. Exp. Date - 06/30/2017
Com. Exp. Date - 06/30/2020

Michael J. Barcelona Monte Engelkemier, PE, AB


Member Member
Sr. Engineer Project Principal
Riley Power Inc. Stanley Consultants, Inc.
5 Neponset St 225 Iowa Ave
Worcester, MA 01606-2714 Muscatine, IA 52761-3764
Phone # 1(508)854-3673 Phone # 1(563)264-6641
Fax # 1(508)854-4670 Fax # 1(563)264-6658
mbarcelona@babcockpower.com engelkemierm@stanleygroup.com
Com. Exp. Date - 06/30/2017 Com. Exp. Date - 06/30/2020

Marvin J. Cohn, PE, AF Philip D. Flenner, AW


Member Member
Piping Asset Integrity Management Director Senior Welding Consultant
Intertek AIM Flenner Engineering Services
601 W California Ave 6537 Wyndham Drive
Sunnyvale, CA 94086-4831 Kalamazoo, MI 49009-8031
Phone # 1(408)636-5360 Phone # 1(269)353-1166
Fax # 1(408)734-0445 Fax # 1(269)353-1167
marvin.cohn@intertek.com flnr@aol.com
Com. Exp. Date - 06/30/2020 Com. Exp. Date - 06/30/2020

30
N10020201 B31.1 Subgroup on Operation and Maintenance Date Printed: 1/15/2016
As of: 01/15/2016
Page 2 of 3
Joseph W. Frey , PE, AF Ron W. Haupt, AF
Member Member
Staff Consultant Senior Consultant
Stress Engineering Services, Inc. Pressure Piping Engineering Associates Inc
13800 Westfair East Dr 291 Puffin Ct
Houston, TX 77041-1101 Foster City, CA 94404-1318
Phone # 1(281)955-2900 Phone # 1(650)574-8195
Fax # 1(281)955-2638 Fax # 1(650)574-2153
joseph.Frey@stress.com ron@ppea.net
Com. Exp. Date - 06/30/2019 Com. Exp. Date - 06/30/2020

William J. Goedde, AW Brian P. Holbrook , PE, AK


Member Member
High Energy Piping SME Principal Engineer
1745 E 1025 S Babcock Power Inc
Haubstadt, IN 47639-8024 Riley Power Inc 5 Neponset St
Phone # 1(812)664-1350 PO Box 15040
bill.goedde@duke-energy.com Worcester, MA 01615-0040
Com. Exp. Date - 06/30/2019 Phone # 1(508)854-3817
Fax # 1(508)854-4670
bholbrook@babcockpower.com
Com. Exp. Date - 06/30/2020

Jeff W. Goodwin, AW Michael W. Johnson , PE, AW


Member Member
Principal Engineer, High Energy Piping Mechanical Engineer
Southern Co. NRG Energy
Bldg 42 Inverness Center Pkwy MS: 2038-B
Birmingham, AL 35242 1000 Main St
Phone # 1(205)992-6962 Houston, TX 77002-6336
Fax # 1(205)992-7535 Phone # 1(832)357-7243
jwgoodwi@southernco.com michael.johnson@nrg.com
Com. Exp. Date - 06/30/2020 Com. Exp. Date - 06/30/2017

Tom E. Hansen, AW Richard Kennedy, AW


Member Member
Principal Engineer Technological Specialist
American Electric Power DTE Energy
Region IV Engineering One Energy Plaza, Room 404 G.O.
PO Box 201 Detroit, MI 48226-1203
Tulsa, OK 74102-0201 Phone # 1(313)235-5146
Phone # 1(918)858-3865 Fax # 1(313)235-5126
Fax # 1(866)342-0126 kennedyr@dteenergy.com
tehansen@aep.com Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/30/2019

31
N10020201 B31.1 Subgroup on Operation and Maintenance Date Printed: 1/15/2016
As of: 01/15/2016
Page 3 of 3
William J. Mauro, PE, AW Raymond Reamey, AA
Member Member
Principal Engineer Director, Quality Services
American Electric Power * Turner Industries Group, L.L.C.
1 Riverside Plz 8687 United Plaza Blvd.
Columbus, OH 43215-2355 Baton Rouge, LA 70809-7009
Phone # 1(360)609-2681 Phone # 1(225)214-2898
Fax # 1(614)716-3204 Fax # (225) 215-6356
wjmauro@aep.com rreamey@turner-industries.com
Com. Exp. Date - 06/30/2019 Com. Exp. Date - 06/30/2020

L. Clark McDonald, Ph.D., PE, AF Edward Rinaca, PE, AW


Member Member
Associate Retired
1903 Indian Blanket Dr Dominion Resources Inc.
Cedar Park, TX 78613-1548 9430 Waterfowl Flyway
Phone # 1(512)695-8152 Chesterfield, VA 23838-5285
Fax # 1(512)873-2281 Phone # 1(804)273-3097
cmcdonald@structint.com ed-rinaca@comcast.net
Com. Exp. Date - 06/30/2019 Com. Exp. Date - 06/30/2020

Mohinder L. Nayyar, PE, AB Lorenz Vetter, AB


Member Member
NICE Manager, Fossil Plant Pipe Analysis
19405 Prospect Point Ct Sargent & Lundy Engrs
Brookeville, MD 20833-2246 55 E Monroe St
Phone # 1(301)774-3806 Chicago, IL 60603-5713
Fax # 1(301)774-3806 Phone # 1(312)269-6857
nayyar1222@gmail.com Fax # 1(312)269-7533
Com. Exp. Date - 06/30/2019 lorenz.g.vetter@sargentlundy.com
Com. Exp. Date - 06/30/2016

Keith I. Rapkin , PE, AW Evans C. Goodling Jr, PE


Member Contributing Member
Principal Engineer Retired
FPL 3 Gaelsong Ln
Power Generation Div. Reading, PA 19610-3119
700 Universe Blvd PO Box 14000 Phone # 1(610)856-7776
Juno Beach, FL 33408-0420 Fax # 1(610)855-3397
Phone # 1(561)691-2617 ecgoodling@comcast.net
Fax # 1(561)691-7031 Com. Exp. Date - 06/30/2020
keith_rapkin@fpl.com
Com. Exp. Date - 06/30/2020

Total Number of Members: 24


32
N10020203 B31.1 Subgroup on Materials Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 1
Dennis W. Rahoi, AF L. Clark McDonald, Ph.D., PE, AF
Chair Member
Consultant Associate
CCM 2000 1903 Indian Blanket Dr
1500 South Grant Street Cedar Park, TX 78613-1548
Iron Mountain, MI 49801-2118 Phone # 1(512)695-8152
Phone # 1(906)779-5080 Fax # 1(512)873-2281
drahoi@chartermi.net cmcdonald@structint.com
Com. Exp. Date - 06/30/2017 Com. Exp. Date - 06/30/2019

Pete Deubler, AB Mohinder L. Nayyar, PE, AB


Member Member
Technical Director NICE
Fronek Power Systems, LLC 19405 Prospect Point Ct
12 Ramland Rd Brookeville, MD 20833-2246
Orangeburg, NY 10962-2606 Phone # 1(301)774-3806
Phone # 1(845)359-0292 Fax # 1(301)774-3806
Fax # 1(845)359-0185 nayyar1222@gmail.com
deublerr@asme.org Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/30/2020

Charles Henley, PE, AB Ronald G. Young


Member Member
Chief Engineer Director, Quality Assurance Services
8409 Lakeview Ave American Electric Power
Lenexa, KS 66219-2064 Quality Assurance Svcs - 20th Floor
Phone # 1(913)458-2050 1 Riverside Plaza
henleycl@bv.com Columbus, OH 43215-2373
Com. Exp. Date - 06/30/2019 Phone # 1(614)716-1931
Fax # 1(614)716-2304
rgyoung@aep.com
Com. Exp. Date - 06/30/2020

Steven L. McCracken, PE, AF


Member
Senior Project Managers
Electric Power Research Institute - WRTC
1300 West W T Harris Blvd.
Charlotte, NC 28262-8550
Phone # 1(704)595-2129
smccracken@epri.com
Com. Exp. Date - 06/30/2019

Total Number of Members: 7


33
N10020204 B31.1 Subgroup on General Requirements Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 1
John W. Power, AB Mark Treat, AW
Chair Member
Mechanical Engineer Senior Engineer
GE Power Associated Electric Cooperative Inc.
175 Addison Rd 3735 W Randall Rd
Windsor, CT 06095-2176 Springfield, MO 65810-3703
Phone # 1(860)285-4854 Phone # 1(417)886-6835
Fax # 1(860)285-9222 Fax # 1(417)885-9389
john.w.power@power.alstom.com mtreat@aeci.org
Com. Exp. Date - 06/30/2020 Com. Exp. Date - 06/30/2017

Daniel D. Christian, AK Mr. Gary B. Trinker


Member Member
Director, Oil, Gas, Chemical & Power Market Europe-Middle East-India-Africa
Sr. Product Engineer - Power, Oil and Gas
Victaulic Victaulic Co.
PO Box 17683 4901 Kesslersville Road
Jebel Ali Free Zone Easton, PA 18040
Dubai Phone # (610) 252-3549
United Arab Emirates gtrinker@victaulic.com
Phone # 971566443188 Com. Exp. Date - 06/30/2017
Fax # 97148838860
dchristian@victaulic.com
Com. Exp. Date - 06/30/2020

William J. Mauro, PE, AW


Member
Principal Engineer
American Electric Power *
1 Riverside Plz
Columbus, OH 43215-2355
Phone # 1(360)609-2681
Fax # 1(614)716-3204
wjmauro@aep.com
Com. Exp. Date - 06/30/2020

Roger Thein, AF
Member
St Paul Pipefitters JATC
5385 Reed Pl
Saint Paul, MN 55110-5819
Phone # 1(651)728-2445
Fax # 1(651)846-1302
exergy3206@comcast.net
Com. Exp. Date - 06/30/2019

Total Number of Members: 6


34
N10020205 B31.1 Subgroup on Fabrication and Examination Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 3
Raymond Reamey, AA Paul M. Davis, AK
Chair Member
Director, Quality Services Corporate QA/QC Mgr for FWCI
Turner Industries Group, L.L.C. Amec Foster Wheeler Plc
8687 United Plaza Blvd. Global Power Group
Baton Rouge, LA 70809-7009 501 Grant Street, Suite 400
Phone # 1(225)214-2898 Pittsburgh, PA 15219-2249
Fax # (225) 215-6356 Phone # 1(412)222-5892
rreamey@turner-industries.com paul.davis2@amecfw.com
Com. Exp. Date - 06/30/2017 Com. Exp. Date - 06/30/2019

Brian Michael Boseo Shane Findlan, AA


Member Member
Manager, Quality Systems Chief Engineer, Welding
Graycor Industrial Constructors Inc CB&I
2 Mid America Plz 128 S Tryon St Ste 1000
Oakbrook Terrace, IL 60181-4451 Charlotte, NC 28202-0004
Phone # 1(630)684-7300 Phone # 1(704)331-6238
Fax # 1(630)684-7116 Fax # 1(704)331-5655
brian_boseo@graycor.com findlas@westinghouse.com
Com. Exp. Date - 06/30/2019 Com. Exp. Date - 06/30/2020

Richard Corbit, AW Philip D. Flenner, AW


Member Member
31790 Chablis Ln Senior Welding Consultant
Lewes, DE 19958-2524 Flenner Engineering Services
Phone # 14844670797 6537 Wyndham Drive
richard.corbit@cbi.com Kalamazoo, MI 49009-8031
Com. Exp. Date - 06/30/2016 Phone # 1(269)353-1166
Fax # 1(269)353-1167
flnr@aol.com
Com. Exp. Date - 06/30/2019

Mr. Robert Dana Couch, AF Joseph W. Frey , PE, AF


Member Member
Senior Project Manager, Materials Staff Consultant
ELECTRIC POWER RESEARCH INSTITUTE Stress Engineering Services, Inc.
1300 W WT Harris Blvd 13800 Westfair East Dr
Charlotte, NC 28262 Houston, TX 77041-1101
Phone # 1(704)595-2504 Phone # 1(281)955-2900
Fax # 1(704)595-2863 Fax # 1(281)955-2638
rcouch@epri.com joseph.Frey@stress.com
Com. Exp. Date - 06/30/2016 Com. Exp. Date - 06/30/2020

35
N10020205 B31.1 Subgroup on Fabrication and Examination Date Printed: 1/15/2016
As of: 01/15/2016
Page 2 of 3
Stan Gingrich, P.Eng., PE, AA Kyle G. Kofford, AW
Member Member
Manager, Materials & Welding Engineering Welding Engineer
AECOM Idaho National Laboratory
7800 E Union Ave PO Box 1625
Denver, CO 80237-2715 pc5139326
Phone # 1(719)651-5464 Idaho Falls, ID 83415-9242
stan.gingrich@aecom.com Phone # 1(208)526-3847
Com. Exp. Date - 06/30/2018 Fax # 1(208)526-4381
kyle.kofford@inl.gov
Com. Exp. Date - 06/30/2020

William J. Goedde, AW Donald J. Leininger , PE, AF


Member Member
High Energy Piping SME Sr Staff Engr
1745 E 1025 S WorleyParsons
Haubstadt, IN 47639-8024 4320 Audley Green Ter
Phone # 1(812)664-1350 Williamsburg, VA 23188-7283
bill.goedde@duke-energy.com Phone # 1(757)345-5775
Com. Exp. Date - 06/30/2019 Fax # 1(610)855-2727
djlsr1973@gmail.com
Com. Exp. Date - 06/30/2020

John Hainsworth , PE, AF Raymond L. Miletti, AA


Member Member
411 Walnut St Apt 9000 Manager, Quality Assurance
Green Cove Springs, FL 32043-3443 Babcock & Wilcox Construction Company
Phone # 1(330)497-9009 74 Robinson Avenue
john.hainsworth@ymail.com Barberton, OH 44203
Com. Exp. Date - 06/30/2016 Phone # 1(330)860-2589
Fax # 1(330)860-2180
rlmiletti@babcock.com
Com. Exp. Date - 06/30/2018

Tom E. Hansen, AW Timothy Monday, AA


Member Member
Principal Engineer Vp Techincal Operations
American Electric Power Team Industries Inc
Region IV Engineering 1200 Maloney Rd
PO Box 201 Kaukauna, WI 54130-4112
Tulsa, OK 74102-0201 Phone # 1(920)462-1150
Phone # 1(918)858-3865 Fax # 1(920)766-0486
Fax # 1(866)342-0126 tmonday@teamind.com
tehansen@aep.com Com. Exp. Date - 06/30/2016
Com. Exp. Date - 06/30/2020

36
N10020205 B31.1 Subgroup on Fabrication and Examination Date Printed: 1/15/2016
As of: 01/15/2016
Page 3 of 3
James J. Sekely, AF
Member
Welding Consultant
Welding Services, Inc.
716 Vanderbilt Drive
Monroeville, PA 15146-1924
Phone # 1(724)327-7381
Fax # 1(724)327-7381
jsekely@comcast.net
Com. Exp. Date - 06/30/2020

Clint R. Zimpel, AK
Member
Chief Engineer
Bendtec Inc
366 Garfield Ave
Duluth, MN 55802-2628
clint.zimpel@bendtec.com
Com. Exp. Date - 06/30/2017

Edward F. Gerwin, PE
Honorary Member
Retired
715 Maiden Choice Ln
Cr 409
Cantonsville, MD 21228-5999
Phone # 1(410)242-4925
Edward.Gerwin@gmail.com
Com. Exp. Date - 06/30/2049

Total Number of Members: 19


37
N10020202 B31.1 Subgroup on Design Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 3
Monte Engelkemier, PE, AB Nick P Circolone
Chair Member
Project Principal Sargent & Lundy, LLC
Stanley Consultants, Inc. 55 E. Monroe St
225 Iowa Ave Chicago, IL 60603-5780
Muscatine, IA 52761-3764 Phone # 1(847)774-7063
Phone # 1(563)264-6641 nick.p.circolone@sargentlundy.com
Fax # 1(563)264-6658 Com. Exp. Date - 06/30/2020
engelkemierm@stanleygroup.com
Com. Exp. Date - 06/30/2020

Richard Kennedy, AW David Creates, AB


Secretary Member
Technological Specialist Sr Design Engr
DTE Energy Ontario Power Generation Inc.
One Energy Plaza, Room 404 G.O. 889 Brock Road 5F-1
Detroit, MI 48226-1203 Pickering ON L1W 3J2
Phone # 1(313)235-5146 Canada
Fax # 1(313)235-5126 Phone # 1(905)839-6746 EXT4282
kennedyr@dteenergy.com Fax # 1(905)837-3995
Com. Exp. Date - 06/30/2020 david.creates@opg.com
Com. Exp. Date - 06/30/2020

Michael J. Barcelona Scott A. Davis


Member Member
Sr. Engineer Principal Engineer
Riley Power Inc. Worley Parsons
5 Neponset St 2675 Morgantown Rd
Worcester, MA 01606-2714 Reading, PA 19607-9676
Phone # 1(508)854-3673 Phone # 1(610)855-2264
Fax # 1(508)854-4670 scott.davis@worleyparsons.com
mbarcelona@babcockpower.com Com. Exp. Date - 06/30/2019
Com. Exp. Date - 06/30/2017

Salim M. Byda , PE, AB Andre S. Drake


Member Member
Mechanical Engineer Principal Engineer
2136 S Chippewa Pl Constellation Energy Group
Boise, ID 83709-2603 Calvert Cliffs Nuclear Power Pl
Phone # 1(208)371-2737 Lusby, MD 20657
Fax # 1(208)378-0025 Phone # 1(410)495-3932
smbyda@yahoo.com Fax # 1(410)495-3614
Com. Exp. Date - 06/30/2017 andre.drake@exeloncorp.com
Com. Exp. Date - 06/30/2018

38
N10020202 B31.1 Subgroup on Design Date Printed: 1/15/2016
As of: 01/15/2016
Page 2 of 3
Jeff W. Goodwin, AW Wayne M. Lundy, PE, AT
Member Member
Principal Engineer, High Energy Piping Mechanical Engineer
Southern Co. U. S. Coast Guard
Bldg 42 Inverness Center Pkwy 2703 Martin Luther King Jr Ave SE Stop 7509
Birmingham, AL 35242 Commandant (CG-ENG-3)
Phone # 1(205)992-6962 Washington, DC 20593-7509
Fax # 1(205)992-7535 Phone # 1(202)372-1379
jwgoodwi@southernco.com Fax # 1(202)372-1925
Com. Exp. Date - 06/30/2020 Wayne.M.Lundy@uscg.mil
Com. Exp. Date - 06/30/2020

Ron W. Haupt, AF Jack McCormick


Member Member
Senior Consultant Commonwealth Associates Inc.
Pressure Piping Engineering Associates Inc 2700 Argyle
291 Puffin Ct Jackson, MI 49201
Foster City, CA 94404-1318 Phone # 1(517)990-8322
Phone # 1(650)574-8195 jack.mccormick@cai-engr.com
Fax # 1(650)574-2153 Com. Exp. Date - 06/30/2019
ron@ppea.net
Com. Exp. Date - 06/30/2020

Brian P. Holbrook , PE, AK Keith I. Rapkin , PE, AW


Member Member
Principal Engineer Principal Engineer
Babcock Power Inc FPL
Riley Power Inc 5 Neponset St Power Generation Div.
PO Box 15040 700 Universe Blvd PO Box 14000
Worcester, MA 01615-0040 Juno Beach, FL 33408-0420
Phone # 1(508)854-3817 Phone # 1(561)691-2617
Fax # 1(508)854-4670 Fax # 1(561)691-7031
bholbrook@babcockpower.com keith_rapkin@fpl.com
Com. Exp. Date - 06/30/2020 Com. Exp. Date - 06/30/2020

Michael W. Johnson , PE, AW Philip E. Sandage , PE, AB


Member Member
Mechanical Engineer 904 NW Oakridge Dr
NRG Energy Blue Springs, MO 64015-1547
MS: 2038-B Phone # 1(913)681-2881
1000 Main St Fax # 1(913)681-8475
Houston, TX 77002-6336 psandog@swbell.net
Phone # 1(832)357-7243 Com. Exp. Date - 06/30/2016
michael.johnson@nrg.com
Com. Exp. Date - 06/30/2020

39
N10020202 B31.1 Subgroup on Design Date Printed: 1/15/2016
As of: 01/15/2016
Page 3 of 3
Takemitsu Sato, AF Robert B. Wilson, AB
Member Member
Japan Power Engineering and Inspection Corporation Piping Stress Engineer
KDX Shibadaimon Bldg. 3FL R.B.WILSON & ASSOCIATES LTD.
10-12, 2-Chome, Shibadaimon, Minato-ku, Tokyo 58 Hopkins Ct.
Minato-Ku Dundas ON L9H 5M5
Tokyo, 105-0012 Canada
Japan Phone # 1 (905) 627-2665
Phone # 81 43874 Fax # 1 (905) 634-4071
Fax # 81 43882 bob.wilson@pipingdesign.net
satou-takemitsu@japeic.or.jp Com. Exp. Date - 06/30/2017
Com. Exp. Date - 06/30/2018

David B. Selman, PE, AB Alan D. Nance


Member Contributing Member
Senior Engineer Senior Consultant
Middough Inc 4545 Glenda Ln
700 Commerce Dr Ste 200 Evans, GA 30809-3215
Oak Brook, IL 60523-1702 Phone # 1(706)650-1807
Phone # 1(256)679-6716 Fax # 1(706)650-1894
Fax # 1(630)795-7001 adnanceassoc@aol.com
david.selman@middough.com Com. Exp. Date - 06/30/2020
Com. Exp. Date - 06/30/2016

Kristi A. Vilminot, PE, AB


Member
Mechanical Engineer
Black & Veatch
3550 Green Ct
Ann Arbor, MI 48105-1579
Phone # 1(734)622-8728
Fax # 1(734)622-8700
vilminotka@bv.com
Com. Exp. Date - 06/30/2020

Arthur L. Watkins, AW
Member
Staff Engineer
The Perry Nuclear Power Plant
First Energy Corp.
PO Box 97, Mail Zone A170
Perry, OH 44081
Phone # 1(440)280-7305
Fax # 1(440)280-8002
alwatkins@firstenergycorp.com
Com. Exp. Date - 06/30/2018

Total Number of Members: 22


40
B31.1 Power Piping India International Working Group (IWG) Date Printed: 1/15/2016
As of: 01/15/2016
Page 1 of 2
Anil Kumar Daniel D. Christian
Chair Member
Project Engineer Director, Oil, Gas, Chemical & Power Market Europe-Middle East-India-Africa
Bechtel India Victaulic
C-6, Bandh Vihar Apts. PO Box 17683
Plot No. 11 Sector 10, Dwarka Jebel Ali Free Zone
New Delhi 110075 Dubai
India United Arab Emirates
Phone # 91 10174529 Phone # 971566443188
akumar2@bechtel.com Fax # 97148838860
Com. Exp. Date - 06/30/2016 dchristian@victaulic.com
Com. Exp. Date - 06/30/2020

Ganesan Ravichandran Ayush Gupta


Vice Chair Member
Sr DGM Sr Mgr (Training)
BHEL Gail Training Institute
Plant Lab Plot No: 24, Sector-16 A
BHEL Noida 201301
Tiruchirappalli 620014 India
India Phone # 911202515353
Phone # 91 12571293 ayushgupta@gail.co.in
drgravi@bheltry.co.in Com. Exp. Date - 06/30/2019
Com. Exp. Date - 06/30/2016

V. D. Bharani B. P. Gupta
Member Member
SR LEAD STRESS ENGINEER Consultant (Oil and Gas) and GM
CH2M Hill PVGRB/QCI/GAIL
HL 20 L BLOCK ANAND VIHAR New Delhi
JAIL ROAD HARI NAGAR E-77
New Delhi 110064 Anian Games Village, New Delhi - 49
India New Delhi 10049
Phone # 919971462022 India
Fax # 911244531501 Phone # 91 26495120
vd.bharani@rediffmail.com guptabpgail@gmail.com
Com. Exp. Date - 06/30/2017 Com. Exp. Date - 06/30/2019

Sanjay Chauhan Neeraj Khera


Member Member
Sr Mgr (O&M) Head of Department - Piping
Gail (India) Limited Ch2mhill (india) Pvt. Ltd.
Uttar Pradesh N-87, First Floor
B35,36, Sector 1 Kirti Nagar
NOIDA New Delhi 110015
Noida 201301 India
India Phone # 919810224519
Phone # 91 0045761 Fax # 911125931364
sanjaychauhan@gail.co.in neeraj.khera@yahoo.com
Com. Exp. Date - 06/30/2019 Com. Exp. Date - 06/30/2017

41
B31.1 Power Piping India International Working Group (IWG) Date Printed: 1/15/2016
As of: 01/15/2016
Page 2 of 2
P. S. Khinchi Deepak V. Shastry
Member Member
Chief Manager (TRG) Gail (India) Ltd., Gail Training Inst.
Gail (India) Limited Plot No: 24, Sector-16 A
Rajasthan Noida, U.P. 201301
Sector 6 Vidyadhar India
Nagao, Jaipur Phone # 91 2513289
Jaipur 30202 Fax # 91 2511134
India dvshastry@gail.co.in
pakhinchi@gail.co.in Com. Exp. Date - 06/30/2019
Com. Exp. Date - 06/30/2019

Tushar Monani Madhukar Sharma


Member Contributing Member
Senior Engineer - Piping Country Manager
Foster Wheeler India ASME India Pvt. Ltd.
1, Vrundavan appt, Beside haveli 335 Udyog Vihar
Parimal Phase-iv
Bhavnagar 364001 Gurgaon Haryana 122015
Gujarat India
India Phone # 91244308411
Phone # 919871394316 Fax # 91244308207
tushar_monani@fwuk.fwc.com sharmam@asme.org
Com. Exp. Date - 06/30/2017 Com. Exp. Date - 06/30/2049

Satyajit Subhash Palkar


Member
Process Piping Engineer
CB&I India Private Limited
Infinity Tower-B, 3rd Floor
DLF Cybercity
Gurgaon 122002
Haryana
India
Phone # 9101244179659
Fax # 911244531501
sspalkar@gmail.com
06/30/2017
Vipul T. Randeria
Member
Associate Vice President
Gujarat Gas Limited
Adajan Gam Post Box No 915
P.O. Navyug Collage
Surat 395009
India
Phone # 919824477826
Fax # 912612736362
vipul.randeria@gujaratgas.com
Com. Exp. Date - 06/30/2019

Total Number of Members: 14


42
Ballot Participation
Name Percentage
ChristianD 100
CohnM 100
DeublerR 100
Engelkemie 100
FlennerP 100
LeiningerD 100
PowerJ 100
ReameyR 100
SekelyJ 100
DavisP 99
CorbitR 97
HolbrookB 97
WilsonRB 97
MondayT 96
VilminotK 96
GingrichS 93
NayyarM 93
HauptR 92
FindlanS 89
Hainsworth 89
KennedyR 89
SinhaS 89
FreyJ 88
ScottJoh 88
CreatesD 85
GoodlingE 85
JohnsonMW 85
RahoiD 85
GoodwinJ 84
McDonaldL 82
MauroW 77
DrakeA 63
HansenT 63
HenleyC 55
RinacaE 55
LundyW 48
RapkinK 47
CrossS 45
DeludeG 44
WatkinsA 27
SimpsonH 12

43
B31.1 Power Piping Section Committee
MEETING ATTENDANCE LIST
Sept 2012 Jan 2013 May 2013 Sept 2013 Jan 2014 May 2014 Sept 2014 Jan 2015 May 2015 Sept 2015
D. Christian
M. Cohn X X X X X
D. Creates X X X X X X
R. Corbit X
P. Davis
R. Deubler X E
A. Drake X X X E
M. Engelkemier
S. Findlan X X X X
P. Flenner
J. Frey E
S. Gingrich X
J. Goodwin X E
J. Hainsworth
T. Hansen X E
R. Haupt
C. Henley
B. Holbrook X X
M. Johnson E X X
R. Kennedy
D. Leininger X X X X X R X X X X
W. Lundy X E X E X X
W. Mauro
L. McDonald X
T. Monday X
M. Nayyar X X X X X X
J. Power
D. Rahoi
K. Rapkin X X X X X X
R. Reamey
E. Rinaca E X X X X
J. Scott
J. Sekely X X X X
H. Simpson X X X X X X
S. Sinha X E X
K. Vilminot X E
A. Watkins X X E X E E X X E X
R. Wilson

X= Absence
= NotYetaMember
E= Excused
R= Representative

44
45
46
47
48
49
50
51
BPVILiaisonReportJanuary2016

LastBPVImeetingwasinAtlanta,GAonNovember5,2015.

Twomajorareasofemphasisatthismeetingwere1)modernizationprojectand2)pushfor2017
Editionitemcompletions(withthreemeetingstogotoeditionfreeze).

Modernizationismakingslowbutsteadypaceasdecisionsregardingformatanddesignatorneedsare
beingnarrowed.Researchprojectsarenearingcompletiontoallowthedesignbyanalysissectiontogo
toahighergear.Theotherareaswerefurtheralongandaremakingsteadyprogresstoinitialdrafts.

The2017EditionitemstouchingonB31.1inprogress

SeveralerrataitemsarestillbeingfoundandaddressedonthePG58.3.1(JurisdictionalLimits)
figures;

CodeCaseforGrade91ClassI

ProcessingrulesforPartsincludinghydrostatictesting

Locomotiveandsolarboilerrulesincludingjurisdictionallimits

The2017Editionitemsreadyforpublicationnextpage

52
ASME Committee on Power Boilers (BPV I) 11/5/2015 Agenda

06.3 The BPTCS is requesting nominations for individuals for the 2015 Dedicated Service
Award, see page 50. The deadline for submittal is November 13, 2015.

06.4 The BPTCS is requesting nominations for individuals for the J. Hall Taylor Medal, see
pages 51 - 53. The deadline for submittal is November 13, 2015.

07. 2017 EDITION

Items BPTCS approved and scheduled for publication in the 2017 Edition of Section I as noted
as follows:
Errata
15-1666 Section I Errata, Fig. PG-33.2

Revisions
Design
14-2419 Section I, Paragraph IV-2
15-195 Section I, Revision PG-27.4.7

F&E
13-129 Standard Practice for Local Heating of Welds in CSEF Steels in Piping & Tubing

GR&P
09-1324 Section I, Changing Set Pressure of Pressure Relief Valves
14-239 BPV I; Pressure Relief Valve Capacity Testing - Failure of "Replacement Valves"
14-304 BPV I - PG-73.5.2.2.2; Auxiliary Lift Assist Devices
14-1985 Section I, Review of PG-60.3.1 and PG-60.3.7
14-2420 Section I, A-353 General Note

Materials
15-174 Section I, Deletion of SA-202 from PR-7

Code Case Items


Design
14-2358 Section I, Annulment of Code Case 2664

Materials
14-296 Revision to the Specified Chemistry in Section I Code Case 2199

08. INTERPRETATIONS

BPVC Interpretation Volumes are located at: https://cstools.asme.org/interpretations.cfm


Interpretations issued since the last meeting are noted as follows:
13-500 Section I Inquiry, Designated Organization
14-1673 Section I Inquiry, PW-51.4, Retention of Film Radiographs as Digital Images
15-675 Section I Inquiry, Section I vs. B31.1 Jurisdiction
15-902 Section I Inquiry, Digital Radiographs
15-968 Section I Inquiry, PG 9.4
15-1075 Section I Inq., Unflanged Stayed Flat Heads, Shell-Stay Dist. in Electric Boilers
15-1502 Section I Inquiry, PHRSG-3.1
2
53
MSS Report to B31.1 meeting of 1/27/2016
Provided by Pete Deubler 1/8/2016

MSS SP Revisions since last report (Sept, 2015)

SP-88-
Diaphragm Valves
2015
SP-94- Quality Standard for Ferritic and Martensitic Steel Castings and Forgings for
2015 Valves, Flanges, Fittings, and Other
SP-100- Qualification Requirements for Elastomer Diaphragms for Nuclear Service
2015 Diaphragm Valves

SP-88 and SP-94 are referenced in B31.1 and need updating.

MSS new SPs since last report (Sept, 2015)

SP-149- Preformed Elastomeric and Polytetrafluoroethylene (PTFE) V-Ring Packing Sets


2015 for Waterworks Valves

SP-150-
Valves for Use in Hydrogen Peroxide Service
2015
Complete
Complete

MSS Received ANSI Approval for Two Standards:

SP-134-2012,

Valves for Cryogenic Service, including Requirements for Body/Bonnet Extensions

SP-144-2013,

Pressure Seal Bonnet Valves

54
MTC Report to B31.1 meeting of 1/27/2016
Provided by Pete Deubler 1/8/2016

MTC last met on 9/17/2015 in Chicago during B31 Code Week

The minutes are not yet available so a detailed report will not be provided until May.

The next edition of B31T is scheduled for 2015 and expected to occur in 2016.

MTC will next meet on Thursday during 2016 B31 Code Week

55
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
02--0076 Revision SC Para. 102.2.4, DE W. Lundy awaiting proposal
Proposal permit single event from PM
which encompass
02--0077 Revision SC Revise Paras. DE W. Lundy 09--1429 comments need
Proposal 101.2.2 & c: 10/6/09 responses
101.3.2(A) for DISAPPROVED
consideration of (5 Negatives)
predictable
operating
02--0093 Revision SC Para. 122, Blow-off DE M. Johnson awaiting proposal
Proposal Valve Rewrite from PM
02--0097 Revision SC Appendix A MTL C. Henley on hold
Proposal Metrication
02--0105 Revision Board Requirements for DE P. Sandage 06--0540RC1 13--0009RC101 15--1063 2016
(2-105) Approved Expansion Joints c: 09/10/12 c: 6/10/14 c: 5/8/15
APPROVED APPROVED APPROVED
(2 Negatives)
02--0106 Revision SC Para. 101, Design DE M. Engelkemier 15--0944 comments need
(2-106) Proposal Conditions c: 5/8/15 responses

56
DISAPPROVED
(9 Negatives)
02--0111 Revision SC QC for non-BEP Ad P. Flenner 04--0371 Tom has
Proposal Hoc Disapproved volunteered to talk
TG (3 Negatives) to accreditation
department on what
needs to be done,
will determine if
they will need a
new stamp or will
take over PP
symbol.

02--0113 Revision SC Revision to Fig. DE D. Selman 10--1929 comments need


Proposal 104.3.1(G) c: 10/25/10 responses
DISAPPROVED
(4 Negatives)
02--0163 Revision Stds Allowable Stresses MTL C. Henley 14--1013RC1 15--1646 Comments need
Comm for Dual Certified c: 2/19/15 c: 7/21/15 responses
Proposal Materials APPROVED DISAPPROVED
(3 Negatives)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
02--0168 Revision SC [Tracking Only] GR J. Power awaiting proposal
Proposal Review of MSS from PM
Stds. (Hydrotest &
Trans. Press
02--0169 Revision SC [Tracking Only] GR j. power awaiting proposal
Proposal Review ASME from PM
Stds. (Hydrotest &
Trans. Press
02--0177 Revision SC Design changes to GR W. Mauro awaiting proposal
Proposal Fabrication from PM
Requirements
02--3307 Revision Out for Appendix II DE M. Barcelona 15--1247
SC Ballot Sample problem Scheduled to
correction close: 6/3/15
02--3315 Revision SC A356 Allowable MTL C. Henley awaiting proposal
Proposal Stresses from PM
03--0187 Revision SC Revision of DE R. Haupt letter sent to BPV
Proposal Paragraph 102.3.3 II, we are looking
(A), Occasional for

57
load in the creep justification/thought
regime behind this topic.

03--0299 Revision stds Metrication of GR G. Trinker 15--1206 15--3055 16-0002 2016


Comm Chapters I, II, V c: 6/3/15 c: 12/2/15 Scheduled to
Approved and VI APPROVED APPROVED close:
1/17/16
03--0302 Revision SC Metrication of GR G. Trinker
Proposal Appendix N
03--0303 Revision stds Metrication of SA G. Trinker 12-1293 15-1205 15--3055 16-0002 2016
Comm Appendix IV APPROVED c: 6/3/15 c: 12/2/15 Scheduled to
Approved APPROVED APPROVED close:
1/17/16
03--0305 Revision SC Metrication of GR G. Trinker PROPOSAL
Proposal Appendix VI DRAFTED
03--0306 Revision SC Metrication of GR G. Trinker
Proposal Appendix VII
03--0314 Revision SC Update Appendix SA E. Rinaca awaiting proposal
Proposal N, Table 4.1.1 from PM
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
03--0315 Revision stds Update Appendix SA L. Vetter 14--2119 14--2445RC1 comments need
Comm N, Paragraph N- c: 10/8/14 c: 2/26/15 responses
Approved 102.3.1 APPROVED APPROVED
03--0344 Code Case Stds Carbon Steel MTL C. Henley 12--1192RC101 15--1372 comments need
Comm above 800F c: 2/19/15 c: 7/1/15 responses
Proposal APPROVED DISAPPROVED
(4 Negatives)
03--0359 Revision SC Metrication of GR G. Trinker
Proposal Appendix D
03--0360 Revision SC Metrication of GR G. Trinker
Proposal Appendix II
03--0361 Revision SC Metrication of GR G. Trinker
Proposal Appendix VII
section VII-6.0
Example
Calculations, and
03--0372 Revision SC B31.1: Ammonia GR M. Treat 06--0315 06--0315RC1 comments need
Proposal Piping Exclusion c: 07/05/06 c: 12/20/06 responses
DISAPPROVED DISAPPROVED

58
(4 Negatives) (3 Negatives)
03--0974 Revision stds Para. 121.1, DE W. Lundy 07--0233RC3 11--1491RC1 comments need
Comm Temporary Support Approved c: 1/8/14 responses
Approved using non-metallic APPROVED
material (5 Negatives)
03--0976 Revision SC Appendix Adding DE K. Rapkin 12--0311 comments need
Proposal Classes and Joint c: 03/21/12 responses
Efficiency Factor to DISAPPROVED
Appendix A (10 Negatives)
04--0180 Revision SC Para. 132 Temper FE P. Flenner 08--1489 all comments
Proposal Bead Welding c:12/23/08 responded to,
(Alternative to DISAPPROVED awaiting revised
PWHT for P-No. 1 (2 Negatives) proposal from PM
04--1337 Revision SC Inclusion of ASTM MTL C. Henley awaiting proposal
Proposal B 584 (C84400) in from PM
Table A-6
04--1355 Revision SC Temperature Rates DE D. Creates 14-1518 comments need
Proposal of Change - Table c: 7/23/14 responses
102.3.2 (C) & Para. DISAPPROVED
119.7.1 (A.3) (8 Negatives)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
05--0204 Revision SC [Tracking Only] DE K. Vilminot 13--2278 comments need
Proposal Review of c: 11/4/13 responses
Standards listed in DISAPPROVED
Appendix F and
05--0425 Interpretations SC Table A-3, MTL D. Rahoi waiting on proposal
Proposal Stainless Steels, from PM
A351, CFM8M
05--0749 Revision Stds Consideration of DE D. Creates 13-1857RC1 14--2754 comments need
Comm Thermal c: 4/22/14 c: 12/29/14 responses
Proposal Discontinuity APPROVED DISAPPROVED
Stress in Dissimilar (8 Negatives)
Socket Welds
05--0750 Revision SC BEP Note, Water MTL D. Rahoi awaiting proposal
Proposal Wetted Services from PM
05--0753 Revision Stds TRACKING: MTL W. Sherman 10--0037 10--1569 10/18/10: Request
Comm Definition of APPROVED c: 8/24/10 sent to BPV II for
Proposal Ferrous Vs. c:2/4/10 DISAPPROVED addition of
Nonferrous (1 Negative) definitions
05--0754 Revision SC Flare, flareless DE R. Haupt 15-1072 comments need

59
Proposal compression Joints c: 5/22/15 responses
> 2 inch OD DISAPPROVED
(6 Negatives)
05--1329 Revision stds Extend Allowable MTL D. Rahoi 13--0088RC1 13--0732RC1 linked to record #14-
Comm Stresses in Table c: 4/2/13 c: 8/28/14 2309
Approved A-8 up to 1650F APPROVED APPROVED
(1 Negative) *revision and recirc
needed in response
to comment

06--0181 Revision SC Partial Penetration DE J. Goodwin awaiting proposal


Proposal Welds from PM
06--0186 Code Case Bptcs CC, Use of UNS MTL D. Rahoi 06--0580RC1 09--0696RC102 14--2700 2016
approved S32003 to A240, APPROVED c: 8/20/14 c: 12/02/14
A789, A790 APPROVED APPROVED
06--0688 Revision stds Add Reference in DE K. Vilminot 10--2069RC1 11--2457RC101 16-0002 2016
Comm Para. 101.1 c: 05/19/11 c: 5/8/13 Scheduled to
Approved APPROVED APPROVED close:
1/17/16
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
06--0689 Revision stds Appendix IV DE A. Watkins 13--0362RC1 14--2717 comments need
Comm references review c: 11/10/14 c: 12/16/14 resposnes
Approved APPROVED APPROVED
06--1109 Revision Board Referencing PCC- OM P. Davis 13-0008RC1 14--0203RC101 15--1063 2016
Approved 2 Repair of c: 4/3/13 c: 2/26/15 c: 5/8/15
Pressure APPROVED APPROVED APPROVED
Equipment and (2 Negatives)
06--1228 Revision stds Review Para. DE R. Wilson 14-1909 14--2417RC1 16-0002 2016
Comm 104.8 and 119.7.1 c: 9/22/14 c: 5/1/15 Scheduled to
Approved to eliminate need APPROVED APPROVED close:
for two equations 1/17/16
06--1254 Revision SC Review of OM W. Mauro 13--1610 comments need
Proposal Appendix V c: 8/20/13 response - will have
Foreword, DISAPPROVED to be a new first
Definitions, and (5 Negatives) consideration ballot
Para. V-6.0
06--1255 Revision stds Review of OM J. Scott 15--1630RC1 15--3055 16-0002 2016
Comm Appendix V Para. c: 8/6/15 c: 12/2/15 Scheduled to
Approved V-3.0 and 4.0 APPROVED APPROVED close:

60
1/17/16
06--1521 Revision SC [Tracking Only] GR D. Christian
Proposal ANSI/FCI 79-1
07--0172 Revision SC Incorporate B31.1 FE R. Miletti awaiting proposal
Proposal Code Case 189 on from PM
alternate UT
acceptance criteria
07--0173 Revision SC Incorporation of MTL C. McDonald 15-1340 comments need
Proposal heat treatment c: 7/1/15 responses
definitions DISAPPROVED
(I Negative)
07--0176 Revision SC Adopt use of GR W. Mauro 11--0516 comments need
Proposal "latest edition" text c: 04/04/11 responses
(ASME Standards DISAPPROVED
only (9 Negatives)
07--1476 Revision SC Qualifications of GR M. Treat 14--2428 Comments need
Proposal the Designer DE c: 11/11/14 responses
DISAPPROVED
(7 Negatives)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
07--1510 Revision Stds Para. 121.2(H) and DE W. Lundy 09--1436RC101 14--2407 comments need
Comm 121.8.2(B), c: 5/15/14 c: 11/11/14 responses
Proposal Allowable Stress APPROVED DSAPPROVED
for Support Welds (2 Negatives)
07--1517 Revision Stds Increase maximum MTL C. Henley 14--1010RC1 15--1346 comments need
Comm temperature c: 2/26/15 c: 6/23/15 responses
Proposal allowable stress APPROVED DISAPPROVED
values of (1 Negative) (4 Negatives)
07--1518 Revision SC [TRACKING] MTL R. Deubler awaiting proposal
Proposal Removing joint from PM
efficiency factor
07--1601 Revision Board Review of OM R. Reamey 13--2414RC1 13--2856RC1 15--1063 2016
Approved Appendix V - Para. c: 12/9/13 c: 3/28/14 c: 5/8/15
V-6.0 APPROVED APPROVED APPROVED
(1 Negative)
07--1603 Revision SC Move Para. V-8.0 OM K. Rapkin 15-2536 comments need
Proposal to Chapter 7 c: 10/22/15 responses
DISAPPROVED
(8 Negatives)

61
07--1604 Revision SC Evaluate Appendix OM M. Engelkemier 15--2138 comments need
Proposal V, para. V-9 for c: 9/4/15 responses
Inclusion in DISAPPROVED
Chapter VII, para. (13 Negatives)
07--1607 Revision SC Review of OM D. Creates 15--2253 comments need
Proposal Appendix V - Para. c: 9/29/15 responses
V-13.0 DISAPPROVED
(12 Negatives)
08--0022 Revision SC Fig. 100.1.2(B) GR j. power
08--0174 Revision Board Addition of UNS MTL D. Rahoi 12--0999RC1 13--1511RC1 15--1063 2016
Approved N08904 (904L) c: 3/26/13 c: 01/10/14 c: 5/8/15
APPROVED APPROVED APPROVED
(1 Negative)
08--0931 Revision Stds Define Material MTL C. McDonald 13--2280RC101 14-2434RC1 change "but" to
comm Recommendations c: 9/22/14 c: 11/24/15 "and" in manuscript
approved for FAC APPROVED APPROVED -- need recirc?
Applications (1 Negative)
08--0932 Revision SC Addition of A312 MTL D. Rahoi 12--0550 comments need
Proposal Heavy Cold c: 03/28/12 responses
Worked (HCW) to DISAPPROVED
Table A-3 (2 Negatives)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
08--0978 Revision SC Relocate DE R. Haupt --- 11--2373 comments need
Proposal Paragraph 102.3.3 c: 11/10/11 responses
& Re-word DISAPPROVED
Paragraph 104.8.2 (9 Negatives)
08--1369 Revision SC Add B16.34 cold DE M. Johnson awaiting proposal
Proposal water rating to para from PM
08--1376 Revision Stds updating AWWA SA H. Simpson 11--2181 15--3055 comment needs
comm Standard edition c: 10/26/11 c: 12/2/15 response
approved numbers in APPROVED APPROVED
Appendix F, to be
considered in
conjunction with
09--0341 Revision Stds Add reference to DE W. Lundy 14--2211 15-2567RC1 16-0002 2016
comm B31 J c: 10/16/14 c: 11/12/15 Scheduled to
approved APPROVED APPROVED close:
1/17/16
09--0345 Revision Board Para 136.3.2, FE S. Leach 13--1581RC1 13--2807 15--1063 2016
Approved Qualifications of c: 12/4/13 c: 01/10/14 c: 5/8/15
NDE Personnel APPROVED APPROVED APPROVED

62
09--0585 Revision Board Permit the use of MTL A. Drake 11--0100RC1 12--0333RC1 15--1063 2016
Approved Stainless Steel A c: 11/04/11 c: 10/08/13 c: 5/8/15
403 Type 304 APPROVED APPROVED APPROVED
seamless and
welded fittings on
09--0929 Revision Board Addition of S32101 MTL D. Rahoi 10--1575 14--0355RC1 15--1063 2016
Approved to Appendix A c: 1/31/12 c: 5/23/14 c: 5/8/15
APPROVED APPROVED APPROVED
09--0930 Revision Board Addition of UNS MTL D. Rahoi 14--1110RC1 14--2443 15--1063 2016
Approved S31726 (317LMN) c: 7/23/14 c: 11/20/14 c: 5/8/15
APPROVED APPROVED APPROVED
09--0980 Revision SC TRACKING - SA S. Sinha awaiting proposal
Proposal Incorporation of from PM
HDPE Examination
09--1071 Revision SC Limit of controls for DE A. Watkins awaiting proposal
Proposal over pressure from PM
protection para
09--1219 Revision Board BEP Materials MTL D. Rahoi 14--1693 14--2409RC1 15--1063 2016
Approved usage for Alloy c: 8/6/14 c: 1/5/14 c: 5/8/15
N06625 APPROVED APPROVED APPROVED
(1 Negative)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
09--1238 Revision SC Inconsistencies MTL D. Rahoi awaiting proposal
Proposal between B31.1 and from PM
BPV Section I
09--1484 Revision Stds Reference to PTC All E. Rinaca 02--0153 13--2275 recrculation ballot
Comm 19.3 Thermowells c: 01/28/13 c: 1/06/14 for BPTCS
Proposal APPROVED DISAPPROVED Comment needed
(1 BPTCS
Comment)
09--1657 Revision Board Add Alloy 690 to MTL D. Rahoi 10--1574 10--1746 12--0027 2016
Approved B166, B168 and c: 8/30/10 c: 9/21/10 c: 1/22/12 *linked to 12-770
Table 126.1 APPROVED Approved APPROVED
09--1660 Revision SC Evaluation of all 9 DE J. McCormick 14--2214 comments need
Proposal Chrome Materials c: 10/13/14 responses
for Creep Strength DISAPPROVED
Enhanced Ferritics (9 Negatives)
for Y Value
09--1663 Revision SC Para 106.1 Design DE J. Goodwin 14--2212 comments need
Proposal Consideration for c: 10/16/14 responses
Weld on Branch DISAPPROVED

63
Connections for (10 Negatives)
09--1674 Revision SC Add Pipe Fitting OM B. Holbrook 14--2703RC1 comments need
Approved Manufacturing c: 9/30/15 responses
Details to Chapter APPROVED
VII, Para. 141
09--1675 Revision SC P15 E PWHT FE J. Hainsworth 14-0811 must be new first
Proposal Comparison c: 5/9/14 consideration ballot
Between Table 132 DISAPPROVED
and Section I (4 Negatives)
10--0305 Revision SC Reference to Para DE K. Rapkin 11--0192
Proposal 104.3.1 (d) - Area c: 02/18/11
Replacement DISAPPROVED
Rules Review of (1 Negative)
ASME BPV III
10--0307 Revision SC Consistency in DE B. Wilson 1/27/10: item
Proposal Reference to requested at
Stress Range meeting
10--0308 Revision SC Review of API 579/ OM J. Frey
Proposal ASME FFS-1 for
Incorporation in
Chapter 7 or
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
10--0309 Revision SC Review of ASME OM M. Johnson 15--1364 hold for BPTCS
Proposal PCC-3 for c: 7/8/15 action on RBI
Incorporation in DISAPPROVED
Chapter 7 or (1 Negative)
10--0738 Code Case SC B31.1 Code Case; DE R. Haupt
Proposal Alternate Rules for
High Cycle Fatigue
10-1188 Code Case SC B31.1 and B31.3 DE R. Haupt
Proposal Code Case for
Heavy Walled
10--1662 Revision Stds Updating of the MTL R. Deubler 15--0925 15--1172RC1 16-0002 NOTE TO EDITOR: 2016
comm Aluminum c: 5/1/15 c: 6/30/15 Scheduled to On Page 3 of 9,
approved allowables per APPROVED APPROVED close: .006 should be
Section II item #00- 1/17/16 0.006.
128 - 6061 alloy
per item # 13-1910 On Page 8 of 9,
and 95083 per They also apply to
item # 14-1425 seamless pipe NPS
1 and larger. is

64
awkward. I would
instead suggest,
They also apply to
NPS 1 and larger
seamless pipe.

10--1665 Revision Stds restricting the use SA H. Simpson 11--2181 15--3055 comments need
comm of special gaskets c: 10/26/11 c: 12/2/15 responses
proposal to increase the APPROVED DISAPPROVED
rating of standard (1 Negative)
10--1666 Revision Board Para 136.1.4 FE K. Kofford 12--0549rc101 13--1504RC101 15--1063 2016
Approved Qualification of c: 1/28/13 c: 6/10/14 c: 5/8/15
Owners Inspectors APPROVED APPROVED APPROVED
(1 Negative)
11--0346 Revision SC Review of API 5L MTL C. Henley 01/26/11: Item
Proposal spec to compare requested at
the categories meeting
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
11--0350 Revision SC TRACKING: Add OM L. McDonald
Proposal derating of a piping
system to Chapter
VII or Appendix V
11--0351 Revision SC Add new para 14 OM R. Haupt
Proposal to appendix 5 to
determine stress
allowable for older
11--0352 Revision Board Evaluate Appendix OM P. Davis 12--2555RC101 13--1627RC1 15--1063 2016
Approved V Para V-10.0 for c: 5/29/13 c: 10/2/13 c: 5/8/15
inclusion in APPROVED APPROVED APPROVED
Chapter 7 Para
11--0358 Revision SC Undercut on DE R. Haupt 14-1184 comments need
Proposal Circumferential c: 6/16/14 responses - new
Groove Welds DISAPPROVED 1st consid ballot
(12 Negatives)
11--0776 Revision SC Design of Socket DE S. Davis 14--1182 comments need
Proposal Welded Fittings c: 6/16/14 responses - new
DISAPPROVED 1st consid ballot

65
(7 Negatives)
11--1039 Revision SC Add Rules for OM R. Kennedy 15--2008 comments need
Proposal Repair of Covered c: 8/25/15 responses
Piping Systems to DISAPPROVED
Chapter VII (9 Negatives)
11--1040 Revision SC Add Rules or OM B. Goedde
Proposal Guidelines for the
Maintenance and
Testing of Spring
Hangers to
Chapter VII and
11--1042 Revision SC Review 875 F MTL C. McDonald 15--3049 recirculate?
Approved Warning for c: 12/2/15
Graphitization of APPROVED
Carbon-Moly Steel
(Table 124.2(B)
11--1045 Revision Stds Revision to Figure FE D. Couch 12--0106RC101 13--0519RC101 close?
Comm 127.4.4 (c) c: 09/26/12 c: 10/22/15
Proposal APPROVED DISAPPROVED
(13 Negatives)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
11--1168 Revision SC Review of 101.3.2 DE S. Byda
Proposal Design
Temperature
11--1169 Revision Stds Consolidation of DE R. Wilson 14-1908 14--2425RC101 NOTE TO EDITOR:
comm Wall Thickness c: 9/22/14 c: 6/3/15 Do and TM have
approved Equations APPROVED APPROVED subscripts
(1 Negative) ** disapproved
votes were never
addressed**

11--1632 Revision SC B31 Consistency FE P. Flenner item requested by


Proposal Ballot for Preheat - PM
11--1634 Revision SC B31 Consistency FE P. Flenner item requested by
Proposal Ballot for PWHT - PM
11--1660 Revision Stds Revise paragraph FE C. Zimpel 13--2170 14--2552RC1 15--0939 comments need
Comm 137.4.3 (Test c: 10/8/13 c: 2/25/15 c: 5/8/15 responses
Proposal Medium), 137.1.2 APPROVED DISAPPROVED
(Temperature of (5 Negatives)
Test Medium),

66
137.5.2
11--1674 Interpretations (
Out for Inquiry regarding MTL D. Rahoi 14--1692
SC Ballot materials for Scheduled to
internal BEP close: 7/21/14
valves (Transferred
from BPV I)
11--1881 Revision SC Correct SI units GR G. Trinker
Proposal throughout the
11--2019 Revision SC Correction to figure FE R. Corbit 11--2630RC1 comments need
Approved references in para c: 9/30/15 responses
104.3.1(c.2) APPROVED
(4 Negatives)
12--0043 Revision SC Add notes to Table MTL D. Rahoi
Proposal A-10
12--0205 Revision Board Revise Table 136.4 FE T. Monday 12--1064RC1 13--1552RC1 15--1063 2016
Approved to address the c: 10/01/12 c: 3/28/14 c: 5/8/15
thickness of APPROVED APPROVED APPROVED
branch (1 Negative) (1 Negative)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
12--0209 Revision Stds Add definition for FE S. Gingrich 14--2427 15--244RC1 comments need
comm "Volumetric c: 1/22/15 c: 12/1/15 responses
approved Examination" to APPROVED APPROVED
para 100.2
12--0217 Revision Board Lower maximum MTL W. Sherman 13--1509RC101 14-60RC1 15--1063 2016
Approved temperature for c: 1/9/13 c: 3/28/14 c: 5/8/15
UNS S32750 APPROVED APPROVED APPROVED
12--0218 Revision Stds Appendix 6 review MTL C. McDonald 14--2127RC1 15--3158 comments need
Comm to compare with c: 11/12/15 c: 12/9/15 responses
Proposal new SC II APPROVED DISAPPROVED
requirements (1 Negative) (1 Negative)
12--0219 Revision Board Correct Tables to MTL D. Rahoi 13--2907 14--0358 15--1063 2016
Approved show UNS S32205 c: 01/24/14 c: 3/28/14 c: 5/8/15
with a new higher APPROVED APPROVED APPROVED
Y.Strength and
Tensile Strength of
12--0222 Revision Board Add Reference to OM R. Reamey 13--1668 13--2019RC1 15--1063 2016
Approved Welding c: 8/20/13 c: 3/28/14 c: 5/8/15
Procedures under APPROVED APPROVED APPROVED

67
12--0223 Revision SC Add list of material OM C. McDonald 15--1362 comments need
Proposal degradation c: 7/8/15 responses
mechanisms to DISAPPROVED
para. 146 (2 Negatives)
12--0598 Revision SC revise 104.8.3 to DE R. Haupt
Proposal cover both cyclic
and non-cyclic
displacement
12--0618 Revision SC New item to correct MTL D. Rahoi 12--1020 comments need
Proposal Table 3and 8 in c: 05/29/12 responses
alloys TP 321 and DISAPPROVED
TP321H to allow (1 Negative)
for change in
mechanical
12--0770 Revision Board corrections in y MTL D. Rahoi 12--1968 13--2876RC102 15--1063 2016
Approved value, and add c: 9/19/12 c: 2/26/15 c: 5/8/15
B167 seamless APPROVED APPROVED APPROVED
pipe and tube
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
12--0808 Code Case Stds New Code Case MTL D. Rahoi 14-107RC101 15--1625 comments need
Comm on AISI 4130 steel c: 7/30/14 c: 7/21/15 responses
Proposal for couplings and APPROVED DISAPPROVED
fittings (3 Negatives)
12--0810 Revision SC Original material MTL C. McDonald
Proposal information
required to be
documented for
12--0811 Revision SC Using ASME SC II MTL C. Henley
Proposal Part D Book for full
listing of B31.1
12--0812 Revision Board Replace DE M. Engelkemier 14-0676 14--1272 15--1063 2016
Approved prescribe with c: 4/22/14 c: 6/20/14 c: 5/8/15
provide in para. APPROVED APPROVED APPROVED
12--0813 Revision SC Add new OM L. Vetter 15--0236 comments need
Proposal paragraph for C: 3/24/15 responses
abandoned piping DISAPPROVED
12--0814 Revision SC Maintaining Design DE S. Byda 14--0354 comments need
Proposal Records c: 3/31/14 responses

68
DISAPPROVED
(12 Negatives)
12--0815 Revision SC Figure 104.3.1D DE D. Selman
Proposal nomenclature, d2,
Fig G uses r1
12--0888 Intent Stds Intent DE D. Creates 13--0591RC1 13--2015
Interpretation & Comm Interpretation of c: 8/12/13 c: 10/18/13
Revision Proposal B31.1 para. 122.8 APPROVED DISAPPROVED
"Piping for (1 Negative) (4 Negatives)
Flammable Gases,
Toxic Fluids
(Gases or Liquids),
12--0900 Revision SC Addition
N fl of bl GR W. Mauro 15-2566 comment needs
Proposal reference to NFPA c: 10/22/15 response
54-2012 and NFPA DISAPPROVED
56PS-2012 (1 Negative)
12--1690 Revision Out for Figure 100.1.2(C) DE B. Holbrook 16--0073
SC Ballot Desuperheater Scheduled to
note and spray close: 2/7/16
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
12--1691 Revision SC Chapter VII OM R. Kennedy 13--1505 comments need
Proposal Paragraph c: 7/19/13 responses - will be
Reorganization DISAPPROVED a new first
(8 Negatives) consideration ballot
when revised

12--1788 Revision SC Alternative to FE R. Miletti 15--2623 will be new first


Proposal hydrotest on NBEP c: 10/22/15 consideration ballot
when hydrotesting DISAPROVED
is not practical (6 Negatives)
12--1837 Revision Stds Remove year DE M. Engelkemier 13--2164 13--2593RC1 16-0002 2016
Comm reference from c: 10/24/13 c: 10/22/15 Scheduled to
Approved ASCE 07-05 so it APPROVED APPROVED close:
reads ASCE 07 (2 Negatives) 1/17/16
13--0055 Revision Board Bolting material MTL C. McDonald 13--1510 14--0184 15--1063 2016
Approved ASTM A453 Grade c: 8/12/13 c: 3/28/14 c: 5/8/15
660 Classes A & B APPROVED APPROVED APPROVED
13--0135 Revision SC B31.1: Addition of MTL D. Rahoi
Proposal SAE Bolting

69
13--0189 Revision SC Add A193 and MTL C. Henley
Proposal A320 to Table A-10
13--0191 Revision SC Removal of GR M. Treat
Proposal Specific Paragraph
references in
13--0195 Revision SC B31.1; Code Case MTL D. Rahoi
Proposal Guidelines
13--0198 Revision SC Add thermowell SA E. Rinaca 15-1619 comments need
Proposal design para in c: 7/9/15 respones
design section DISAPPROVED
(7 Negatives)
13--0199 Revision Stds Revise HDPE SA H. Simpson 15-2565 15--2939 comments need
Comm Fusion bonding c: 10/22/15 c: 11/16/15 responses
Approved qualifications in APPROVED APPROVED
accordance with
those being
13--0200 Revision SC revise 105.3(b), SA H. Simpson
Proposal metallic piping
lined with
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
13--0245 Revision SC Scope of Chapter GR W. Mauro 15--0086 comments need
Proposal IV and Contents of c: 2/19/15 responses
Table 126.1 DISAPPROVED
(5 Negatives)
13--0246 Revision Board Figure 127.4.8(e), FE T. Monday 13--1489 14--0185 15--1063 2016
Approved note 4 - change c: 7/19/13 c: 3/28/14 c: 5/8/15
terminology to APPROVED APPROVED APPROVED
better define
13--0247 Revision SC New Paragraph to FE S. Gingrich 15--0014 comments need
Proposal address "closure c: 2/19/15 responses
welds" DISAPPROVED
(9 Negatives)
13--0248 Revision Out for para 131.6 FE C. Zimpel 14--2491 16--0092
SC Ballot Reduction of weld c: 11/11/14 Scheduled to
temperature below close: 2/9/16
martensitic
temperature
between welding
13--0388 Revision SC f
Table 102.4.7 FE P. Flenner

70
Proposal Unify notes and
materials with
13--0686 Interpretations SC Design pressure of de P. Sandage 15--3489 comments need
Proposal economizer c: 1/13/16 responses
feedwater piping DISAPPROVED
13--0898 Interpretations SC Inquiry; Para DE R. Haupt 15--1337 comments need
Proposal 101.5.3 c: 6/9/15 responses
Earthquake DISAPPROVED
(4 Negatives)
13--1087 Revision SC Removal of GR W. Mauro 15--0087 comments need
Proposal "addenda" c: 2/19/15 responses
throughout the DISAPPROVED
code (3 Negatives)
13--1200 Revision SC Localized PWHT FE J. Hainsworth
Proposal for CSEF Materials
13--1392 Interpretations SC B31.1; use of SB MTL D. Rahoi
Proposal 167 UNS N06617
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
13--1441 Revision Board Para 104.8.1 DE D. Selman 13--2169 14-2435 15--1063 2016
Approved Reference to para. c: 10/24/13 c: 11/11/14 c: 5/8/15
102.3.2(c), APPROVED APPROVED APPROVED
102.3.2(D) in error,
Appendix G
13--1560 Code Case to be New B31.1 Code MTL D. Rahoi 13--2877 14--1279 14--2700 2016
published Case covering c: 01/15/14 c: 6/24/14 c: 12/2/14
copper casting APPROVED APPROVED APPROVED
alloy C87600 to
13--1585 revision SC B31.1 Revise para. DE K. Vilminot
Proposal 104.8 to
incorporate
13--1587 Revision SC Revise paragraph DE R. Haupt
Proposal 120.2.4
Supplementary
13--1588 Revision SC Add definition of DE M. Engelkemier 14--2414 comments need
Proposal occasional loads c: 11/11/14 resposnes
to Section 101 DISAPPROVED
Design Conditions (8 Negatives)

71
13--1744 Revision SC Addition of Fusing FE S. Findlan
Proposal requirements
including
procedure and
operator
qualification for
13--1745 Revision SC Addition of Visual FE S. Findlan
Proposal Examination
acceptance criteria
for Fused HDPE
Pipe into Chapter
13--1747 Revision Stds Update of ASME gr W. Mauro 13-2542 13-2542 revised proposal
Comm Standards c: 12/4/13 c: 12/4/13 and recirc needed
Porposal (Appendix F) DISAPPROVED DISAPPROVED
13--1870 Revision SC Clarify the need for GR J. Frey 13--2912 notify noel NOTIFY NOEL to
Proposal sound engineering c: 01/24/14 send B31 Stds
judgment and the DISAPPROVED Comm ballot
use of more (7 Negatives)
detailed analyses
in all B31 Codes
(B31.1 Record #13-
1870)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
13--1991 Revision SC Incorporating DE J. McCormick 14--2755RC1 comments need
Approved B31.3-2012 para. c: 10/22/15 response
300(c)(5) APPROVED
(4 Negatives)
13--1992 Revision SC Modify Figure DE K. Vilminot 15-2564 comments need
Proposal 127.4.2 c: 10/22/15 responses
DISAPPROVED
(6 Negatives)
13--1993 Revision SC Incorporating of DE K. Vilminot
Proposal B31.3 Appendix P
13--2072 Revision SC Add definition of tm FE D. Leininger 15--0943 15--1828
Proposal to Figure 127.3 c: 5/1/15 c: 8/6/15
DISAPPROVED
(4 Negatives)
13--2195 Revision SC Revision Request DE K. Vilminot
Proposal for Table 102.4
13--2206 Code Case Bptcs Code Case on MTL D. Rahoi 14--2704RC1 14--2704RC1 15--3056 2016
approved Grade 91 Powder c: 1/21/15 c: 1/21/15 c: 11/20/15
Metallurgy-HIP APPROVED APPROVED APPROVED

72
14--0050 Revision SC Buried Piping SA S. Duchez
Proposal (Appendix VII)
14--0060 Revision Board Correct the MTL R. Deubler 14--2053 14--2489 15--1063 2016
Approved temperature c: 10/8/14 c: 11/20/14 c: 5/8/15
columns in Table A- APPROVED APPROVED APPROVED
14--0162 Revision Stds Review and update SA D. Yoder 15-2625 15--2940 16-0002 2016
Comm the referenced c: 10/22/15 c: 11/16/15 Scheduled to
Approved MSS Standards in APPROVED APPROVED close:
Appendix F and 1/17/16
14--0171 Revision Board Replace the word OM P. Davis 14--0396RC1 14--2426 15--1063 2016
Approved should with c: 9/22/14 c: 11/12/14 c: 5/8/15
shall , as APPROVED APPROVED APPROVED
applicable , in the (1 Negative)
Non Mandatory
Appendix V, para.
V-10 revised by TR
11-0352 to be
consistent with the
14--0518 Interpretations SC F
tempering f th
d temp FE J. Hainsworth 14--2843 15--2457 comments need
Proposal PWHT c: 12/17/14 c: 10/21/15 responses
DISAPPROVED
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
14--0564 Revision Stds Revise Table 136.4 FE T. Monday 14--1694 15--3055 16-0002 -- write out NDE to 2016
Comm add note (6) c: 8/6/14 c: 12/2/15 Scheduled to Nondestructive
Approved APPROVED APPROVED close: Examination
1/17/16 same as 12-205
14--0617 Administrative SC Proposal for new P. Flenner 14--0925 14--1619
Approved QC program for c: 5/9/14 c: 8/04/14
B31.1 APPROVED
(1 Negative)
14--0777 Revision Out for Revise definitions OM R. Reamey 16--0075
SC Ballot of "failure" and Scheduled to
"repair" in close: 2/7/16
14--0783 Revision SC Metallic Bellows DE P. Sandage
Proposal Expansion Joint
Requirements
14--0784 Code Case to be Revision to B31 MTL D. Rahoi 14--1112RC1 14--2442 15--2256 2016
published Case 192 - c: 8/21/14 c: 11/20/14 c: 9/3/15
Change in Data APPROVED APPROVED APPROVED
Analysis (1 Negative)
14--0998 Revision Board Modify the TG T. Hansen 14--1285RC1 14--1885 15--1063 2016

73
Approved definition of on c: 8/6/14 c: 9/5/14 c: 5/8/15
Covered Piping QC APPROVED APPROVED APPROVED
14--1129 revision Stds Revise para. FE R. Reamey 14--2161 15--3055RC1 16-0002 2016
Comm 136.4, Examination c: 10/16/14 c: 12/29/15 Scheduled to
Approved Methods of Welds APPROVED APPROVED close:
1/17/16
14--1131 Revision Board Progressive FE P. Flenner 14--1824 14--2444RC1 15--1063 2016
Approved annealing of c: 9/4/14 c: 2/25/15 c: 5/8/15
austenitic materials APPROVED APPROVED APPROVED
14--1132 Revision Board Conflict in FE P. Flenner 14--2446 14--2776 15--1063 2016
Approved statements on c: 11/20/14 c: 12/29/14 c: 5/8/15
PWHT exemptions APPROVED APPROVED APPROVED
in para. 127.4.2
14--1145 Interpretations SC Special Fittings SA J. Scott
14--1160 Revision SC Investigate DE B. Wilson
Proposal Longitudinal Welds
on Bends and
14--1161 Revision Stds Code Jurisdictional DE P. Sandage 14--2405RC101 15-2482 16-0002 2016
Comm Limits for Piping c: 5/22/15 c: 10/22/15 Scheduled to
Approved APPROVED APPROVED close:
1/17/16
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
14-1469 Revision Stds Possible DE K. Vilminot 15--1361 15-2459 16-0002 2016
Comm Correction to c: 7/8/15 c: 10/22/15 Scheduled to
Approved references to APPROVED APPROVED close:
Figure 127.4.8 in 1/17/16
14--1613 code case Stds B31.1 Code Case MTL D. Rahoi 15--0960 15--3325 comments need
Comm for Use of CF8C- c: 11/30/15 c:1/12/16 response
Proposal Plus Casting APPROVED DISAPPROVED
Material (1 Negative)
14--1688 Revision SC Redefining DE B. Wilson 15--2645RC1 comments need
Approved Pressure c: 12/16/15 response
APPROVED
(1 Negative)
14-1789 Revision Stds Review and MTL P. Deubler 15--0232 15--0809RC1 16-0002 2016
Comm Correct Casting c: 3/24/15 c: 7/23/15 Scheduled to
Approved Factors in B31.1 APPROVED APPROVED close:
Table A-5 1/17/16
14--1926 code case Bptcs Annul B31 CC 182 mtl P. Deubler 15--0926 15--1171 15--1519 2016
approved c: 5/1/15 c: 6/1/15 c: 6/24/15
APPROVED APPROVED APPROVED

74
14--1927 Revision SC Updating of MTL P. Deubler
Proposal Aluminum
Allowables per
14--2309 Revision SC Add note to Table MTL C. McDonald 14--2980 linked to #05-1329
Approved A8 c: 1/21/15
APPROVED comments need
responses

14--2371 Interpretations SC Greater Material FE S. Gingrich


Proposal Thickness / Control
Thickness
14--2460 Interpretations SC Use of B31.1 MTL R. Young do review and
Proposal Materials for BEP comment first?
14--2486 Revision Stds Update Chapter OM M. Cohn 15--0967 15--1363RC1 16-0002 2016
Comm VII, Paragraph 140 c: 5/5/15 c: 9/4/15 Scheduled to
Approved APPROVED APPROVED close:
(1 Negative) 1/17/16
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
15--0160 Revision SC System pressure GR M. Treat
Proposal test limits for piping
components
having class
ratings. paras
15--0161 Revision SC Abnormal GR M. Treat
Proposal operating
conditions cannot
exceed P-T ratings
for piping
components
whose product
15--0236 Revision SC Revision
ifi tito h DE D. Selman
Proposal Appendix G
Nomenclature and
15--0238 Revision SC Determining DE A. Drake
Proposal Design Life of
15--0239 Revision SC Non-metallic pipe DE W. Lundy
Proposal support

75
components for
15--0240 Revision SC Reconcile Table DE M. Engelkemier
Proposal 104.1.2(A) with
Appendix A for
other metals with
15--0478 Revision SC Clarification of FE S. Gingrich
Proposal Para 132.4 -
Definition of
Thickness
15--0479 Revision Out for Revise paragraph FE R. Reamey 15--3189RC1
SC Ballot 136.4.5, Scheduled to
Radiography, to close: 1/11/16
include acceptance
15--0686 Interpretations SC Rerating of system OM R. Kennedy
15--0839 Interpretations SC Carbon Steel MTL C. Henley
Proposal Above 800F
15--1073 Revision Stds correction to para FE P. Davis 15--1370 15--900 Comments need
Comm 129.3.3.1 (B.1) and c: 7/8/15 c: 8/18/15 responses
Proposal CSEF bending APPROVED DISAPPROVED
heat treatment (5 Negatives)
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
15--1186 Revision Stds Consolidate FE P. Davis 15--1879RC1 15--2927 16-0002 see revised 2016
Comm information c: 10/22/15 c: 11/17/15 Scheduled to proposal in
Approved contained in para APPROVED APPROVED close: comments
129.3.3.1 and 1/17/16
129.3.3.2 into
15--1192 Interpretations SC Branch DE M. Engelkemier 15--3553 to be issued with
Approved connections does c: 1/13/16 typo corrections
not require APPROVED
supporting
reinforcement
15--1325 Code Case SC Revision to B31 MTL D. Rahoi
Proposal Case 192 - add
reference to Para
15--1326 Revision SC Correct BEP Errors MTL R. Young 15-2622 comments need
Approved in Table A4 to c: 10/22/15 resposnes
allow BEP APPROVED
15--1327 Revision SC Correct location MTL C. McDonald
Proposal and add welded
tubing to A789 and

76
A790 for UNS
15--1328 Revision SC Revise Table A-3 - MTL R. Young 15--2550 comments need
Proposal Note 26 c: 10/22/15 responses
DISAPPROVED
(3 Negatives)
15--1342 Revision SC Desuperheating DE S. Byda 15--2987 comments need
Proposal Piping Drainage c: 12/1/15 responses
DISAPPROVED
(8 Negatives)
15--1343 Revision SC Elimination of DE R. Wilson
Proposal duplicate
15--1470 Revision Stds Corrections to FE P. Davis 15--1883 15--2996RC1 16-0002 2016
Comm Table 129.3.4.1 c: 8/18/15 c: 12/16/15 Scheduled to
Approved based on 2015 APPROVED APPROVED close:
Edition of ASME (1 Negative) 1/17/16
15--1906 Code Case Out for Localized PWHT FE J. Hainsworth 15--3603
SC Ballot for CSEF Materials c:1/18/16
15--1948 Code Case Stds Annul B31 Case FE R. Reamey approved at Sept 15--3054 16-0002 2016
Comm 187 2015 Meeting c: 11/24/15 Scheduled to
Approved APPROVED close:
1/17/16
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
15--1949 Code Case SC Code Case to FE D. Couch
Proposal address the gap in
Fig 127.4.4(c),
Socket Weld
Fittings __Item #
11-1045 / Existing
15--2117 Revision SC Clarify# LanguageC MTL R. Young
Proposal in para 123.1.1 (c)
15--2125 revision SC Evaluate changes de M. Engelkemier
Proposal to SIF based on
next published
B31J Edition
(2016?) and ASME
15--2126 revision SC Add a statement to DE S. Davis
Proposal para. 104.1.2 to all
use of unlisted
materials per
15--2149 Revision Stds App F; review of TG T. Hansen 15-2580 15--3063RC1 to be included in 2018
Comm ASME CA-1 2014 on c: 10/16/15 c: 1/5/15 next BPTCS Ballot

77
Approved for inclusion in the QC APPROVED APPROVED
list of standards as
an evergreen
15--2150 Revision Stds App F; review of TG T. Hansen 15-2580RC1 15--3063 to be included in 2018
Comm ASME QAI-1 2014 on c: 11/5/15 c: 12/2/15 next BPTCS Ballot
Approved for inclusion in the QC APPROVED APPROVED
list of standards as
an evergreen
15--2151 Revision Stds App J; review of TG T. Hansen 15-2580RC1 15--3063RC1 to be included in 2018
comm CA-1 for on c: 11/5/15 c: 1/5/16 next BPTCS Ballot
approved replacement of QC APPROVED APPROVED
current QC (2 Negatives)
sections in B31.1
body and Appendix
J in parallel with
similar action in
BPV I. Also
identify what words
and locations
Record# Item Type Record Subject SG Project R&C Sub Com Ballot Stds Comm Board Ballot Status/Comment Addenda/
Level Manager SG Ballot Ballot Edition
Year
15--2152 revision Stds 100.2 Definitions; TG T. Hansen 15-2580RC1 15--3063RC1 to be included in 2018
Comm covered piping on c: 11/5/15 c: 1/5/16 next BPTCS Ballot
Approved systems (CPS); QC APPROVED APPROVED
review of definition (1 Negative) (2 Negatives)
to tighten scope to
a clearer defined
boundary in lieu of
15--2153 Revision SC fiRevise Table 132 FE P. Flenner 15--2992 comments need
Approved to adjust lower c: 11/16/15 responses
temperature limit APPROVED
for P-No. 15E
PWHT to 1300F
(1250F for thin
materials. EPRI
15--2192 Code Case SC CC on heavy d tiwallDE R. Haupt
Proposal fittings
15--2437 Intent SC Revision item to FE S. Gingrich
Interpretation & Proposal coinside with intent
Revision interpretation #14-

78
15--2459 Interpretations SC Materials DE M. Engelkemier 15--3491
Proposal c: 1/12/16
15--2467 Interpretations SC L and Lmax in Fig DE M. Barcelona 15--3327 comments need
Proposal II-2-1 c: 1/13/16 responses
DISAPPROVED
15--2544 Revision SC Revision for intent FE S. Gingrich
Proposal interpretation #14-
15--2592 Interpretations SC Pneumatic Testing FE R. Reamey 15--3596 goes with revision
Proposal of Buried Pipe c: 1/13/16 item #15-2593
DISAPPROVED
15--2593 Revision SC Revision to para FE R. Reamey goes with inquiry
Proposal 137.2.1, Exposure #15-2592
of Joints
15--2594 Revision SC Update to MTL C. McDonald
Proposal Appendix IV
15--2896 Interpretations SC Steam Piping DE M. Engelkemier
15--2936 Interpretations SC Pressure Relief DE M. Engelkemier
15--2954 Revision SC Reference to DE B. Holbrook
16--0079 Code Case SC Revision to B31 MTL D. Rahoi
Proposal Case 190
COMMITTEE CORRESPONDENCE

COMMITTEE: ASME B31.1 ADDRESS WRITER


Design Sub-Group CARE OF: Richard J. Kennedy, P.E.
DTE Energy
One Energy Plaza
Detroit, MI 48226
SUBJECT: Meeting Minutes PHONE: (313) 235-5146
B31.1 Design Sub-Group
FAX: (313) 235-5126
EMAIL: kennedyr@dteenergy.com

DATE: January 26, 2016 COPY TO: Bill Mauro - B31.1 Chair
Kristi Vilminot - B31.1 Vice-Chair
TO: Colleen O'Brien Monte Engelkemier-Chair SG Design
ASME B31.1 Secretary Remaining Members of SG-Design and Visitors

Following are the minutes for the ASME B31.1 Sub Group Design meeting held on January 26th, 2016, in Myrtle Beach,
SC.

The meeting was called to order at 8:00 a.m. and adjourned at 12:15 p.m with a 15 minute break.

The following SG members were present:


Mike Barcelona (Phone) Babcock Power, Inc mbarcelona@babcockpower.com
Scott Davis Worley Parsons scott.davis@worleyparsons.com
Andre Drake Constellation Energy Group andre.drake@exeloncorp.com
Monte Engelkemier, Chair Stanley Consultants engelkemierm@stanleygroup.com
Jeff Goodwin Southern Company jwgoodwi@southernco.com
Ron Haupt Pressure Piping Engineering Assoc., ron@ppea.net
Inc.
Brian Holbrook Babcock Power, Inc bholbrook@babcockpower.com
Mike Johnson NRG Energy Michael.johnson@nrg.com
Richard Kennedy, Secretary DTE Energy kennedyr@dteenergy.com
Wayne Lundy (Phone) United States Coast Guard wayne.m.lundy@uscg.mil
Jack McCormick Commonwealth Associates Inc. jack.mccormick@cai-engr.com
Keith Rapkin Florida Power & Light Co. keith_rapkin@fpl.com
Phil Sandage (Phone) Retired psandog@swbell.net
Kristi Vilminot Black & Veatch vilminotka@bv.com
Bob Wilson RB Wilson & Associates, LTD bob.wilson@pipingdesign.net

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 79ASME Codes and Standards Department Informed
Keep
Page 2 of 21

The following SG members were excused:


Nick Circolone Sargent & Lundy nick.p.circolone@sargentlundy.com
Dave Creates Ontario Power Generation david.creates@opg.com
Art Watkins First Energy Corporation alwatkins@firstenergycorp.com

The following SG members were absent:


Sam Byda Consultant smbyda@yahoo.com
Al Nance AD Nance Associates Sitanance@comcast.net
Takemitsu Sato JPE&IC satou-takemitsu@japeic.or.jp
David Selman Middough, Inc. david.selman@middough.com

The following visitors were present:


Jonathan Seewald Swagelok Co. jonathan.seewald@swagelok.com

The following items were discussed:

1. Section Committee meeting format is changing. After the liason reports each SubGroup chair will have an
opportunity to report on select items. Status of all Interpretations and Code Cases will be addressed.
2. Unless otherwise notified SG Design will convenve at 8:00 AM Sharp.
3. The minutes will be published and sent out without review. Any changes or correction to the minutes will take
place at the next meeting.
4. PDH Hours Sheet is attached.
5. Our meeting minutes will be published on the C&S Connect sub-group page by the staff secretary.
6. Conference call and webex are available for the Design Sub-group Meeting and the B31.1 Committee meetings
is available at future meetings if chair is notified more than two days prior to the next meeting..
7. At future meetings, the Chair will always try to have a projector available to review revisions with the subgroup.
If you would like to have a specific revision reviewed, please either bring it on a USB or email it to the Chair in
advanced.
8. Distribution of work was discussed. Workload average is between two and three items. We will be attempting to
go to team approach. Also, other TGs workload is not significant and help may be available if needed.
9. All items included in the 2016 Edition will be retained on the Design TG agenda until the edition is published
and the PM has had an opportunity to review the items incorporation.

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 80ASME Codes and Standards Department Informed
Keep
Page 3 of 21

INTERPRETATIONS
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
12-0888 Dave Creates Std. Ballot 13-2015 Ballot Disapproved (4 Neg.)
Intent Interpretation of B31.1 para. 122.8 "Piping for Flammable Gases, Toxic Fluids (Gases or Liquids), or Nonflammable
Nontoxic Gases" for Inquiry 08-1148
1/13/2015 No Report. Waiting for change to be made to Code. In Progress
9/15/2015 No Report. In Progress
1/26/2016 Intent interpretation based on reference interpretation 08-1148. This Std. Ballot 13- Ballot Disapproved
item is awaiting the TR processing. 2015 (4 Neg.)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-0686 Phil Sandage 15-3489 2nd ballot
B31 .1 Inquiry; design pressure of economizer feedwater piping
1/13/2015 This item was balloted to a Special Committee for Interpretations. The 14-2215 1st Ballot Pending
ballot requires unanimous agreement to be approved. One objection
(MauroW) was received. Responses have been made to all the
comments. If the one objection is not withdrawn a new proposal will be
generated and balloted.No Report.
5/13/2015 PM is trying to get the one negative changed. 14-2215 1st Ballot
Disapprove (1)
9/15/2015 PM has resolved negative. Will respond to other comments. 14-2215 1st Ballot
Disapprove (1)
1/26/2016 PM suggests sending inquirer a standard consulting letter. Dopped at 15-3489 2nd ballot
Section Committee Mtg. Disapprove (1)
Item Dropped

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-0898 Ron Haupt 15-1337 1st Ballot Disapproved.
B31 .1 Inquiry; Para 101.5.3 Earthquake
1/13/2015 Mr. Haupt provided a discussion regarding ASCE 7 to SG Secretary. In Progress
See attached.
5/13/2015 PM has asked ASME Secretary to ballot. In Progress
9/15/2015 Disapproved. New ballot shortly. 15-1337 1st Ballot
Disapproved.
1/26/2016 Incorporating comments. Ballot coming soon. 15-1337 1st Ballot
Disapproved.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-1192 Monte Engelkemier 15-3553 1st Ballot Approved 1/13/16
Branch Connections do not require supporting reinforcement calculations
1/26/2016 Ballot passed. Inquiry letter will be issued after minor typo corrections 15-3553 1st Ballot
Approved 1/13/16

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 81ASME Codes and Standards Department Informed
Keep
Page 4 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
15-2210 Monte Engelkemier Withdrawn
119.6.4 Stresses, Para. 119.6.4
1/26/2016 Inquirer withdrew the item. Withdrawn

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-2459 Monte Engelkemier 15-3491 1st Ballot Ballot Pending
Materials
1/26/2016 Ballot pending. 15-3491 1st Ballot Pending
Ballot
16-0206 2nd
Ballot
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
15-2467 Mike Barcelona 15-3327 1st Ballot Disapproved 1/13/16

L and Lmax in Figure II-2-1


1/26/2016 Ballot Pending. Will need a new TR to clarify Lmax. 15-3327 1st Ballot
Disapproved
1/13/16

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-2896 Brian Holbrook In Progress
Steam Piping
1/26/2016 Recently received clarification from the inquirer. Reassign PM from In Progress
Monte to Brian.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-2936 Monte Engelkemier In Progress
Pressure Relief
1/26/2016 PM will contact Pete Deubler for advice. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
16-0123 Monte Engelkemier In Progress
Boiler Fill Valve Para. 122.1.7
1/26/2016 New Item added at meeting. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
16-0172 Monte Engelkemier In Progress
Design Temperature for Feedwater Piping
1/26/2016 Item added at January meeting. In Progress

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 82ASME Codes and Standards Department Informed
Keep
Page 5 of 21

TENTATIVE REVISIONS
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
02-0076 Wayne Lundy In Progress
Paragraph 102.2.4, Single Event [TR 88-12(D) ]
2015-01 No Report In Progress
2015-05 No Report In Progress
2015-09 No Report. Ballot by January Meeting. In Progress
2016-01 No Report. PM is contemplating an approach. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
02-0077 Wayne Lundy 09-1429 Ballot Disapproved (5)
Occasional loads [TR 88-12(E)]
2015-01 No Report 09-1429 Ballot Disapproved
(5)
2015-05 No Report 09-1429 Ballot Disapproved
(5)
2015-09 No Report. Ballot by January Meeting. 09-1429 Ballot Disapproved
(5)
2016-01 No Report 09-1429 Ballot Disapproved
(5)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
02-0093 Mike Johnson In Progress
Paragraph 122.1.7, Blowoff Valve Re-Write
2015-01 No Report In Progress
2015-09 No Report In Progress
2016-01 No Progress In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
02-0105 Phil Sandage 2016 Edition
Requirements for Expansion Joints (joint item w/B31.3)
2015-05 Board Approved 15-1063 2016 Edition
2016-01 2016 Edition 2016 Edition

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 83ASME Codes and Standards Department Informed
Keep
Page 6 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
02-0106 Monte Engelkemier 15-0944 Ballot Disapproved
Design Conditions, Para. 101 (joint item w/B31.3)
2015-01 Ballot by next meeting In Progress
2015-05 1st Ballot Disapproved. PM plans to respond comments and re-issue a 15-1063 1st Ballot
new ballot by next meeting. Disapproved
2015-09 1st Ballot Disapproved. PM plans to respond comments and re-issue a 15-1063 1st Ballot
new ballot by next meeting. Disapproved
2016-01 Scott Davis will provide assistance to PM. 15-0944 Ballot Disapproved
(9 Negatives)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
02-0113 David Selman 10-1929 1st Ballot Disapproved
Area Replacement Figure for Branch Connections, Fig. 104.3.1(G)
2015-01 Draft or ballot by next meeting. 10-1929 1st Ballot
Disapproved
2015-05 No Report 10-1929 1st Ballot
Disapproved
2015-09 No Report In Progress
2016-01 No Report. Chairman requested support for this item. Mike Johnson 10-1929 1st Ballot
and Andre Drake both volunteered drafting services. The PM should Disapproved
contact them regarding any drafting needs. (4 negatives)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
02-3307 Mike Barcelona 15-1247 2nd Ballot Pending
Appendix II Correct sample problem
2015-01 Ballot by next week. 03-0949 1st Ballot
Disapproved.
2015-05 2nd Ballot Pending. Negatives have been received. 15-1247 2nd Ballot Pending
2015-09 2nd Ballot Disapproved. Received a lot of comments, including 8 15-1247 2nd Ballot Pending
negatives (ballot #15-1247). Some comments and negatives were with
regards to items that were originally outside of the revisions scope. PM
needs to go through and categorize the comments, address what is
applicable, and decide to address the new issues in this revision or
suggest a new one. PM will try and get together a review and proposed
path forward by next meeting.
2016-01 Revised proposal by next mtg. Nomenclature from Appendix II will not 15-1247 2nd Ballot Pending
be included in Appendix G since it is a non-manditory appendix.
Reasons for scarfing vent pipe end was discussed. Item details was
discussed at Section Committee meeting.

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 84ASME Codes and Standards Department Informed
Keep
Page 7 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
03-0187 Ron Haupt In Progress
Allowable Stresses for Occasional Loads in the Creep Range, Paragraph 102.3.3.a
2015-01 Plans to attend the next Section II meeting. In Progress
2015-05 Attended the Section II Meeting. Need to ask Section II for yield In Progress
strength above 1000 F. Plans to ballot based on what B31.3 has for
similar situation.
2015-09 Ballot based on B31.3 rules before next meeting. In Progress
2016-01 Ballot based on B31.3 rules. Ballot forthcoming. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
03-0974 Wayne Lundy 11-1491RC1 Recirc Ballot Approved
Material Usage for Supports Paragraph 121.1
2015-01 No Report 11-1491RC1 Recirc Stds Ballot
Pending
2015-05 No Report 11-1491RC1 Recirc Stds Ballot
Pending
2015-09 Will try to make 2016 Edition 11-1491RC1 Recirc Stds Ballot
Pending
2016-01 Comments from Standards is suggesting a recirculation at both Section 11-1491RC1 Recirc Ballot
Committee and Standards. Std. Comm. Approved
Ballot (5 negatives
require response)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
03-0976 Keith Rapkin 12-0311 1st Ballot Disapproved (10)
Add Classes and Joint Efficiency Factors to Appendix A for Seam Welded Fittings
2015-01 Work in progress 12-0311 1st Ballot
Disapproved (10)
2015-05 2nd Ballot Draft will be ready to review at the next meeting. 12-0311 1st Ballot
Disapproved (10)
2015-09 Work in progress. 12-0311 1st Ballot
Disapproved (10)
2016-01 Working with Pete Deubler. Expect a proposal for discussion at next 12-0311 1st Ballot
meeting. Disapproved (10)

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 85ASME Codes and Standards Department Informed
Keep
Page 8 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
04-1355 Dave Creates 14-1518 3rd Ballot Disapproved (8)
Temperature Rates of Change Table 102.3.2(c) & Para. 119.7.1(A.3)
2015-01 No Report 14-1518 3rd Ballot
Disapproved (8)
2015-05 No Report 14-1518 3rd Ballot
Disapproved (8)
2015-09 No Report 14-1518 3rd Ballot
Disapproved (8)
2016-01 No Report 14-1518 3rd Ballot
Disapproved (8)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
05-0204 Kristi Vilminot 13-2278 1st Ballot & Stds Ballot Disapproved
Appendix F and Table 126, Review of standards applicable to the Design chapter
2015-01 On hold awaiting API 5L material review. Plans to reballot. 13-2278 1st Ballot & Stds
Ballot Disapproved

2015-05 On hold awaiting API 5L material review. Plans to reballot. 13-2278 1st Ballot & Stds
Ballot Disapproved

2015-09 Tracking. On hold awaiting API 5L material review. Plans to reballot. 13-2278 1st Ballot & Stds
Ballot Disapproved

2016-01 Tracking. On hold awaiting API 5L material review. 13-2278 1st Ballot & Stds
Ballot Disapproved

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
05-0749 Dave Creates 14-2754 Stds Disapproved (8)
Consideration of dissimilar metal socket welds thermal discontinuity stresses para. 119.3
2015-01 Will address the negatives. 14-2754 Stds Disapproved
(8)
2015-05 Will address the negatives. 14-2754 Stds Disapproved
(8)
2015-09 No Report 14-2754 Stds Disapproved
(8)
2016-01 Contemplating a course of action. 14-2754 Stds Disapproved
(8)

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 86ASME Codes and Standards Department Informed
Keep
Page 9 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
05-0754 Ron Haupt 15-1075 2nd Ballot Disapproved (6)
Flare, Flareless Compression Joints, Rewrite of para. 115
2015-01 New Ballot shortly. 05-0966 1st Ballot
Disapproved
2015-05 2nd Ballot Pending 15-1072 In Progress
2015-09 2nd Ballot Disapproved. New Ballot by next meeting 15-1075 2nd Ballot
Disapproved (6)
2016-01 Attempting to respond to comments. Discussed at the Section 15-1075 2nd Ballot
Committee mtg. See attached report on this item. Disapproved (6)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
06-0181 Jeff Goodwin In Progress
Partial Penetration Weld
2015-01 No Report In Progress
2015-05 Work in progress. In Progress
2015-09 No Report. Trying to meet with F&E during Code Week. PM changed In Progress
to Jeff Goodwin.
2016-01 New figure proposed. Jeff provided figures for discussion by TG. In Progress
Proposed addition of partial penetration weld with a fillet cap weld was
presented. Presentation made at SC Mtg. See attached.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
06-0688 Kristi Vilminot 2016 Edition
Add Reference to Para. 104.8 and sub-paragraphs
2015-01 Reassigned to Kristi Vilminot 11-2457RC101 Standards Ballot
Approved
2015-05 Reassigned to Kristi Vilminot 11-2457RC101 Standards Ballot
Approved
2015-09 2016 Edition. 11-2457RC101 Standards Ballot
Approved
2016-01 2016 Edition 2016 Edition

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
06-0689 Watkins/Selman 13-0362RC1 Stds Approved
Appendix IV Reference Review
2015-01 Standards Approved 14-2717 Stds Approved
2015-05 Standards Approved 14-2717 Stds Approved
2015-09 Standards Approved. PM needs to respond to comments. 14-2717 Stds Approved
2016-01 Standards Comm comments need responses. Recirculation ballot 13-0362RC1 Stds Approved
markup is with Dave Selman waiting for his review. with comments

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 87ASME Codes and Standards Department Informed
Keep
Page 10 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
06-1228 Bob Wilson 2016 Edition
Delete duplicate equations (11) and (12), and in para. 119.7.1.(A.3)
2015-01 Stds Disapproved. Working to address negatives. 14-2417 Stds Disapproved
(1)
2015-05 Standards Approved 14-2417RC1 Stds Approved
2016-01 2016 Edition 2016 Edition

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
07-1510 Wayne Lundy 14-2407 Stds Disapproved (2)
Para. 121.2(H) and 121.8.2(B)- Allowable Stress for Support Welds
2015-01 Stds Disapproved. PM to address negatives. 14-2407 Stds Disapproved
(2)
2015-05 Stds Disapproved. PM to address negatives. 14-2407 Stds Disapproved
(2)
2015-09 New Ballot to be issued. 14-2407 Stds Disapproved
(2)
2016-01 No Report. Stds committee ballot disapproved. Revised proposal and 14-2407 Stds Disapproved
new ballot required. (2)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
08-0978 Ron Haupt 11-2373 1st Ballot (9) Disapproved
Relocate Paragraph 102.3.3 & Re-word Paragraph 104.8.2 Short-Term Sustained Loads
2015-01 Work in progress. 11-2373 1st Ballot (9)
Disapproved
2015-05 Work in progress. Ballot soon. 11-2373 1st Ballot (9)
Disapproved
2015-09 Work in progress. 11-2373 1st Ballot (9)
Disapproved
2016-01 Work in progress. 11-2373 1st Ballot (9)
Disapproved

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
08-1369 Mike Johnson In Progress
122.1.7 Add B16.34 cold water rating note
2015-01 PM needs to communicate with Harry Ainsworth. In Progress
2015-05 PM needs to communicate with Harry Ainsworth. In Progress
2015-09 Ballot by next meeting. In Progress
2016-01 More research required. Looking into MSS standards. In Progress

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 88ASME Codes and Standards Department Informed
Keep
Page 11 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
09-0341 Wayne Lundy 16-22 2016 Edition
Add Reference to B31 J
2015-01 Ballot Approved. PM Needs to respond to comments. 14-2211 1st Ballot
2015-05 Ballot Approved. PM Needs to respond to comments. 14-2211 1st Ballot
2015-09 Ready for Standards. Will Push for 2016 Edition. 14-2211 1st Ballot
2016-01 2016 Edition 16-22 2016 Edition

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
09-1071 Wayne Lundy In Progress
Para. 122.6.1 Use of I&C Controls for Over Pressure Protection
2015-01 No Report In Progress
2015-05 No Report In Progress
2015-09 No Report. Mr Lundy to contact PM regarding this. In Progress
2016-01 No Report. Change PM from Art Watkins to Wayne Lundy In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
09-1660 Jack McCormick 14-2214 2nd Ballot Disapproved (9)
Evaluation of all 9 Chrome materials for Creep Strength Enhanced Feritics for Y Value
2015-01 Working to resolve negatives. 12-2113 1st Ballot
Disapproved (12)
2015-05 PM will be changed to Jack McCormick and assisted by Ron Haupt. 12-2113 1st Ballot
Disapproved (12)
2015-09 PM needs information from Mr. Haupt. 14-2214 2nd Ballot
Disapproved (9)
2016-01 Discussion at TG. Suggested that Y value is for all CSEF materials and 14-2214 2nd Ballot
not just Grade 91. PM will validate Y value by graphical method. Ballot Disapproved (9)
by next meeting.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
09-1663 Jeff Goodwin 14-2212 1st Ballot (10 Negatives)
Para. 106.1 Design Considerations for Weld-On Branch Connections for Figure 127.4.8 (E)
2015-01 New Ballot by September 14-2212 1st Ballot (10
Negatives)
2015-05 Responses to comments have been uploaded to C&S Connect. Ron 14-2212 1st Ballot (10
Haupt and Jeff Goodwin will try to have a meeting with F&E September Negatives)
meeting.
2015-09 Responsed to comment. Ron Haupt and Jeff Goodwin will try to have a 14-2212 1st Ballot (10
meeting with F&E September meeting. Negatives)
2016-01 Work in progress. Long discussion with Tim Monday of F&E to define 14-2212 1st Ballot (10
direction. Item discussed at SC Mtg. Current figures do not address Negatives)
design considerations.

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 89ASME Codes and Standards Department Informed
Keep
Page 12 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
10-0305 Keith Rapkin 11-0192 1st Ballot Disapproved (1)
Para. 104.3.1[D] Area Replacement Rules Review of ASME BPVC Section III Record 04-1612
2015-01 Work in progress. 11-0192 1st Ballot
Disapproved (2)
2015-05 Work in progress 11-0192 1st Ballot
Disapproved (2)
2015-09 No Report 11-0192 1st Ballot
Disapproved (1)
2016-01 No report. 11-0192 1st Ballot
Disapproved (1)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
10-0307 Bob Wilson In Progress
Consistency in Reference to Stress Range
2015-01 Work in progress. In Progress
2015-05 Work in progress. In Progress
2015-09 Work in progress. In Progress
2016-01 Under review to set path forward. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
11-0358 Ron Haupt 14-1184 Item Dropped
Undercut on Circumferential Groove Welds
2015-01 PM purposes to change definition of minimum specified thickness. 14-1184 1st Ballot
Ballot shortly. Disapproved.
2015-05 PM purposes to change definition of minimum specified thickness. 14-1184 1st Ballot
Ballot shortly. Disapproved.
2015-09 Meeting with F&E to resolve this. 14-1184 1st Ballot (12
Negatives)
2016-01 Still in discussion with F&E at undercut meeting. Motion to drop item 14-1184 Item Dropped
accepted at the Section Committee Mtg.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
11-0776 Scott Davis 14-1182 1st Ballot
Design of Socket Welded Fittings
2015-01 Work in progress. PM will change to Scott Davis once he becomes a 14-1182 1st Ballot
Design SG member. Disapproved
2015-05 PM still has some background calculations to do. Objective is to have 14-1182 1st Ballot
either a revised ballot or recommendation to drop the item by the Disapproved.
September meeting.
2015-09 PM to draft letter to B16.11 regarding shoulder width design. Ron 14-1182 1st Ballot
Haupt to send MDC Figure regarding this to PM. (7 Negatives)
2016-01 PM is researching item history in B16.11. 14-1182 1st Ballot
(7 Negatives)

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 90ASME Codes and Standards Department Informed
Keep
Page 13 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
11-1168 Sam Byda In Progress
Review of 101.3.2 Design Temperature Definition
2015-01 No Report In Progress
2015-05 Messers Engelkemier and Byda will determine if this is included in 02- In Progress
0106.
2015-09 On hold pending 02-0106 reballot. In Progress
2016-01 On hold pending 02-0106 reballot. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
11-1169 Bob Wilson 14-2425RC101 Stds Approved
Consolidation of Wall Thickness Equations
2015-01 Standards Disapproved. PM to address negatives. 14-2425 Stds Disapproved
(1)
2015-05 Standards Approved 14-2425RC1 Stds Approved
2015-05 2016 Edition 14-2425RC1 Stds Approved
2016-01 Comments need to be addressed. Do and Tm have subscripts. Need to 14-2425RC101 Stds Approved
talk to SC Secretary (1 Neg)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
12-0598 Ron Haupt In Progress
Revise 104.8.3 to cover both cyclic and non-cyclic displacement stresses
2015-01 Work in progress. In Progress
2015-05 Work in progress. In Progress
2015-09 Work in progress. In Progress
2016-01 No Report. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
12-0812 Monte Engelkemier 2016 edition
Replace prescribe with provide in para. 100.1.4
2015-05 Board Approved 15-1063 2016 Edition
2016-01 2016 Edition 2016 edition

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 91ASME Codes and Standards Department Informed
Keep
Page 14 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
12-0814 Sam Byda 14-0354 1st Ballot Disapproved (12)
Maintaining Design Records
2015-01 1st Ballot Disapproved. No report. 14-0354 1st Ballot
Disapproved (12)
2015-05 New ballot, with a new approach coming. 14-0354 1st Ballot
Disapproved (12)
2015-09 PM will determine by January meeting if this should be dropped. 14-0354 1st Ballot
Disapproved (12)
2016-01 PM will determine by May meeting if this should be dropped. 14-0354 1st Ballot
Disapproved (12)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
12-0815 David Selman In Progress
Figure 104.3.1D nomenclature, d2, Fig G uses r1
2015-01 Tied to 02-0113. In Progress
2015-05 Tied to 02-0113. No Report In Progress
2015-09 No Report In Progress
2016-01 No Report. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
12-1690 Brian Holbrook 16-0073 2nd Ballot closes on 2/7/16
Figure 100.1.2(C) Desuperheater note and spray water source
2015-01 1st Ballot Disapproved. New Ballot by next meeting. 14-2833 1st Ballot
Disapproved (3)
2015-05 1st Ballot Disapproved. New Ballot by next meeting. 14-2833 1st Ballot
Disapproved (3)
2015-09 Will respond to negatives. Plan on a new ballot shortly. 14-2833 1st Ballot
Disapproved (3)
2016-01 Attempting responses to comments so far. Currently out for ballot. 16-0073 2nd Ballot closes
Anticipating new ballot by next meeting. on 2/7/16

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
12-1837 Monte Engelkemier Board Ballot 16-2 2016 Edition
Remove year reference from ASCE 7-05 so it reads ASCE 7.
2015-01 Plan to re-issue a new ballot regarding this. 13-2593 Stds Disapproved
(2)
2015-05 Plan to re-issue a new ballot regarding this. 13-2593 Stds Disapproved
(2)
2015-09 Asked secretary to recirculate Standards Ballot. 13-2593 Stds Disapproved
(2)
2016-01 2016 Edition Board Ballot 2016 Edition
16-2

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 92ASME Codes and Standards Department Informed
Keep
Page 15 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
13-1441 David Selman/Nick Circolone 2016 Edition
Para. 104.8.1 reference to para. 102.3.2(C), 102.3.2(D) in error, Appendix G definition of Sh
2015-01 Standards approved 14-2434 2016 Publication
2015-05 Board Approved 15-1063 2016 Publication
2016-01 2016 Edition 2016 Edition

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-1585 Kristi Vilminot In Progress
Revise para. 104.8 to incorporate reference to para. 101.1 (Linked to 06-0688)
2015-01 Reassigned to Kristi Vilminot. In Progress
2015-05 Would like to ballot before 06-0688 is published. In Progress
2015-09 Would like to ballot before 06-0688 is published. In Progress
2016-01 Submitted ballot to the secretary. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-1587 Ron Haupt In Progress
Revise paragraph 120.2.4 Supplementary Steel
2015-01 Work in progress, ballot soon. In Progress
2015-05 Work in progress, ballot soon. In Progress
2015-09 Work in progress, ballot soon. In Progress
2016-01 Ballot by next meeting In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-1588 Monte Engelkemier 14-2414 1st Ballot Disapproved (8)
Add definition of occasional loads to Section 101 Design Conditions
2015-01 1st Ballot Disapproved. Need to respond to comments and negatives. 14-2414 1st Ballot
New ballot by September. Disapproved (8)
2015-05 No Report. 14-2414 1st Ballot
Disapproved (8)
2015-05 1st Ballot Disapproved. Need to respond to comments and negatives. 14-2414 1st Ballot
New ballot by September. Disapproved (8)
2016-01 1st Ballot Disapproved. Need to respond to comments and negatives. 14-2414 1st Ballot
No report. Disapproved (8)

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 93ASME Codes and Standards Department Informed
Keep
Page 16 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
13-1991 Jack McCormick 14-2755RC1 Ballot Disapproved.
Incorporating B31.3-2012 para. 300(c)(5)
2015-01 1st Ballot Disapproved. Needs to respond to comments and negatives. 14-2755 1st Ballot
Plans to reballot. Disapproved.
2015-09 1st Ballot Disapproved. Plans to recirculate. PM changed to Jack 14-2755 1st Ballot
McCormick. Disapproved.
(4 negatives)
2016-01 PM is attempting to resolve negatives. Recirc is required to address 14-2755RC1 Ballot Disapproved.
some of the comments. Suggest discussion with Paul Davis to resolve (4 negatives)
his concern.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-1992 Vilminot/Bethea 15-2564 1st Ballot Disapproved
Modify Figure 127.4.2
2015-01 Work in progress. In Progress
2015-05 Work in progress. In Progress
2015-09 PM has secretary to ballot. In Progress
2016-01 New ballot sent to secretary 15-2564 1st Ballot
Disapproved
(6 Negatives)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-1993 Kristi Vilminot In Progress
Incorporating of B31.3 Appendix P in to B31.1
2015-01 Ron Haupt to provide reference information on this from the changes to In Progress
B31.3.
2015-05 No report. In Progress
2015-09 Work in progress. Obtained B31.3 items #'s. In Progress
2016-01 No Report. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
13-2015 Brian Holbrook Item Withdrawn
Para 122.4(A.1), Fig 122.4 and Fig 100.1.2(C)
2015-01 Awaiting for original inquirer to respond to communication sent. PM In Progress
plans to call inquirer.
2015-05 Awaiting for original inquirer to respond to communication sent. PM In Progress
plans to call inquirer.
2015-09 On hold pending TWPD Committee. In Progress
2016-01 Revision is no longer required. Inquirer came up with a solution to Item Withdrawn
resolve the original issue. Item can be closed.

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 94ASME Codes and Standards Department Informed
Keep
Page 17 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
13-2195 Kristi Vilminot Item Dropped
Table 102.4.3
2015-01 Received additional information from inquirer. Work in Progress. In Progress
2015-05 Work in progress. In Progress
2015-09 Reviewed by Kristi Vilminot and Ron Haupt. Not sure this is In Progress
technically warranted. Plans to consult with Phil Flenner.
2016-01 There is no data to support the change. Motion to drop in TG was Item Dropped
approved. Item dropped at Section Committee Mtg.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
14-0783 Phil Sandage In Progress
Metallic Bellows Expansion Jonit Requirements
2015-01 First draft has been prepared for a new Mandatory Appendix Metallic In Progress
Bellows Expansion Joints. Should have proposal balloted by next
meeting.
2015-05 On hold. PM will circulate a draft once the new version of EJMA is In Progress
issued.
2015-09 On hold pending B31.3. In Progress
2016-01 Ballot by May meeting. Revision will include 10th Edition of EJMA In Progress
Standard which includes fatique correction factor. Expect "new"
manditory Appendix similar to B31.3.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
14-1160 Bob Wilson In Progress
Investigate Longitudinal Welds on Bends and Elbows
2015-01 No Report In Progress
2015-05 Work in progress. In Progress
2015-09 Work in progress. Change PM to Bob Wilson. In Progress
2016-01 Bob presented discussion of item regarding the location of weld seams In Progress
on bends. Phil Sandage will forward additional information on this
subject. See attached presentation for additional info.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
14-1161 Phil Sandage Board Ballot 16-2 2016 Edition
Code Jurisdictional Limits for Piping
2015-01 This item was balloted and received one negative vote. Responses have 14-2405 1st Ballot
been made to all the comments. The proposal has been modified to Disapproved
correct the figure legends and has been uploaded for balloting.
2015-05 Recirculation Ballot Pending 14-2405RC101 1st Ballot
Recirculating
2015-09 Ready for Standards. 14-2405RC101 1st Ballot
Approved.
2016-01 2016 Edition Board Ballot 2016 Edition
16-2

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 95ASME Codes and Standards Department Informed
Keep
Page 18 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
14-1469 Kristi Vilminot Board Ballot 16-2 2016 Edition
Possible Correction to reference to Figure 127.4.8 in para 104.3.1(C.2)
2015-01 No Report In Progress
2015-05 Ready for Ballot. In Progress
2015-09 Ballot 15-1361 approved at section level 15-2459 Standards Ballot
Pending
2016-01 2016 Edition Board Ballot 2016 Edition
16-2

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
14-1688 Bob Wilson 15-2645RC1 Ballot Approved
Redefining Pressure
2015-01 Will be issued for ballot once 11-1169 is approved. In Progress
2015-05 Looking to procede with this. In Progress
2015-09 Reviewed latest proposal during meeting. PM will revise ballot to limit 15-1767 1st Ballot
to only Pocc. Disapproved
2016-01 Section Committee approved. Ready for Std. Comm. Ballot 15-2645RC1 Ballot Approved
(1 negative)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-0236 Nick Circolone In Progress
Revision to Appendix G Nomenclature and Index
2015-05 No Report In Progress
2015-09 No Report In Progress
2016-01 Changed PM to Nick Circolone. Nick has prepared a spreasheet of App. In Progress
G. Will provide discussion proposal by next mtg.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-0238 Andre Drake In Progress
Determining Design Life of Piping
2015-01 New Item. Mr. Haupt requested that the Design SG determine a way for In Progress
a Designer to develop an expected design life of a piping system.
2015-05 No Report In Progress
2015-09 Ballot by next meeting. In Progress
2016-01 Working In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-0239 Wayne Lundy In Progress
Non-Metallic pipe support components for permanent piping.
2015-05 No Report In Progress
2015-09 No Report In Progress
2016-01 Ballot by next meeting. In Progress

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 96ASME Codes and Standards Department Informed
Keep
Page 19 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
15-0240 Monte Engelkemier In Progress
Reconcile Table 104.1.2(A) with Appendix A for other metals with y = 0.
2015-01 New Item. PM will work with Pete Deubler of Materials SG. In Progress
2015-05 Awaiting comments from Pete Deubler on this. In Progress
2015-09 No Report In Progress
2016-01 No Report. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-1342 Sam Byda 15-2987 2nd Ballot Diapproved
Desuperheating Piping Drainage
2015-05 New Item. Jorgen Gertz presented information regarding In Progress
desuperheating piping to make sure that the system is
properly drained to prevent water hammer. See attached
information that Mr. Gertz presented. A new item will be
opened to address this, Sam Byda will PM.
2015-09 1st Ballot Disapproved. Reviewed 1st Ballot during meeting. It was 15-2007 1st Ballot
agreed that not all of Section I should be included. Only where Section Disapproved
I offered guidance versus prescriptive wording.
2016-01 No Report 15-2987 2nd Ballot
Diapproved
(8 Negatives)

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-1343 Bob Wilson In Progress
Elimination of Duplicate Equations
2016-01 No Report. Working with 14-1688. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-2125 Monte Engelkemier In Progress
Evaluate changes to SIF based on next published B31J Edition (2016?) and ASME STP-PT-073
2015-09 New Item opened. Will be tracking until B31J published. In Progress
2016-01 Tracking until B31J published. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-2126 Scott Davis In Progress
Add a statement to para. 104.1.2 to all use of unlisted materials per 123.1.3
2015-09 New Item. This was requested by Ron Haupt. In Progress
2016-01 Proposed ballot circulated to the SG. PM submitted new proposal to In Progress
secretary for ballot.

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 97ASME Codes and Standards Department Informed
Keep
Page 20 of 21
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
15-2954 Brian Holbrook In Progress
Reference to ASME B16.5
2016-01 Reviewing Table 112 for consistency with B16. Expect ballot by next In Progress
meeting.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
16-0189 Mike Barcelona In Progress
Clarify Lmax in Appendix II
2016-01 New item added at January meeting. See attached record request. In Progress

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 98ASME Codes and Standards Department Informed
Keep
Page 21 of 21

CODE CASES
C&S CONNECT Assigned To: Ballot No.(s) Status
Item No.
10-0738 Ron Haupt In Progress
Alternate rules for high cycle fatigue > 10,000 cycles
2015-Jan Work in progress, waiting on B31.3 to complete Appendix W. In Progress
2015-May Work in progress, waiting on B31.3 to complete Appendix W. In Progress
2015-Sep Awaiting on Appedix W. In Progress
2016-Jan Awaiting publication of Appendix W. In Progress

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
10-1188 Ron Haupt Dropped
B31.1 and B31.3 Code Case for Heavy Wyes
2015-May 10-0739 will be incorporated into this item. In Progress
2015-Sep PM decided to ballot separate of B31.3. In Progress
2016-Jan PM requesting this item to be dropped. This is a B31.3 only item. Item Dropped
dropped at Section Committee Mtg.

C&S CONNECT Assigned To: Ballot No.(s) Status


Item No.
15-2192 Ron Haupt In Progress
CC on heavy wall fittings
2016-Jan Ballot by next meeting. Working with B31.3 Item 10-1188. In Progress

The American Society of


Mechanical Engineers
Three Park Avenue
New York, NY 10016 99ASME Codes and Standards Department Informed
Keep
100
101
B31.1 05-0754 Para. 115 Revision Status (160127)

The agenda item was balloted in late spring of 2015 and was disapproved. The primary
objections to the proposed revision to para. 115 were the definitions that were used for
components and joints which are respectively discussed in Parts 3 and 4 of B31.1. There were
no significant objections to the technical proposal for how to qualify mechanical joints except for
some minor word-smithing. Rather, the definitions were thought to be too verbose and/or
unnecessary. It should be remembered that this agenda item is the first of a two part proposed
action to reorganize a jumbled Part 3 (for components) and Part 4 (for joints) which have not
been significantly worked on in 40 years. With attention to the definitions, this should be ready
for reballot shortly.

102
TR 15-1343
B31.1; Review Para. 104.8.1 and 104.8.2 and eliminate the need for two equations

Background:
This TR was originally TR 13-1586 which was closed as it was decided to include it in TR 06-1228, however this proved to be difficult and hence a new TR is
requested to replace TR 13-1586.

Proposal:
The word design to be removed from definition of pressure, P
The designation P to be changed to Ps to designate normal operating pressure in equation (15)

Existing Code Proposed Code

104.8.1 Stress Due to Sustained Loads. The effects 104.8.1 Stress Due to Sustained Loads. The effects
of pressure, weight, and other sustained mechanical of pressure, weight, and other sustained mechanical
loads shall meet the requirements of eq. (15). loads shall meet the requirements of eq. (15).

(U.S. Customary Units) (U.S. Customary Units) (SI Units)

SL = PDo + 0.75iMA 1.0 Sh (15)


4tn Z SL = Ps Do + 0.75iMA 1.0 Sh (15)
4tn Z
(SI Units)

SL = PDo + 0.75iMA 1.0 Sh DELETE


(1000)4tn Z where
i = stress intensification factor (see Appendix D).
where The product 0.75i shall never be taken as less
i = stress intensification factor (see Appendix D). than 1.0.
The product 0.75i shall never be taken as less
than 1.0. MA = resultant moment loading on cross section due
to weight and other sustained loads, in-lb
MA = resultant moment loading on cross section due (mm-N) (see para. 104.8.4)
to weight and other sustained loads, in-lb Sh= basic material allowable stress at maximum
(mm-N) (see para. 104.8.4) (hot) temperature [see para. 102.3.2(D)]
Sh= basic material allowable stress at maximum SL = sum of the longitudinal stresses due to pressure,
(hot) temperature [see para. 102.3.2(D)] weight, and other sustained loads
SL = sum of the longitudinal stresses due to pressure, Z = section modulus, in.3 (mm3) (see para. 104.8.4)
weight, and other sustained loads
Z = section modulus, in.3 (mm3) (see para. 104.8.4) Ps = Normal sustained operating pressure of pipe, component,
psi (MPa)

103
Existing Code Proposed Code

104.8.2 Stress Due to Occasional Loads. The 104.8.2 Stress Due to Occasional Loads. The effects
effects of pressure, weight, other sustained loads, and of pressure, weight, other sustained loads, and occasional
occasional loads including earthquake shall meet the loads including earthquake shall meet the requirements of
requirements of eq. (16). eq. (16).

U.S. Customary Units U.S. Customary Units, (SI Units)

Po Do + 0.75iMA + 0.75iMB kSh (16) Po Do + 0.75iMA + 0.75iMB kSh (16)


4tn Z Z 4tn Z Z

(SI Units) DELETE


Terms same as para. 104.8.1, except
Po Do + 0.75iMA + 0.75iMB kSh k = 1.15 for occasional loads acting for no more
(1000)4tn Z Z than 8 hr at any one time and no more than
800 hr/year [see para. 102.3.3(A)]
Terms same as para. 104.8.1, except = 1.2 for occasional loads acting for no more than
k = 1.15 for occasional loads acting for no more 1 hr at any one time and no more than 80 hr/
than 8 hr at any one time and no more than year [see para. 102.3.3(A)]
800 hr/year [see para. 102.3.3(A)] MB = resultant moment loading on the cross section
= 1.2 for occasional loads acting for no more than due to occasional loads, such as thrusts from
1 hr at any one time and no more than 80 hr/ relief/safety valve loads, from pressure and
year [see para. 102.3.3(A)] flow transients, and earthquake, in.lb (mm-N)
MB = resultant moment loading on the cross section [see paras. 102.3.3(A) and 104.8.4]
due to occasional loads, such as thrusts from
relief/safety valve loads, from pressure and
flow transients, and earthquake, in.lb (mm-N) Po = Pressure coincident with the occasional
[see paras. 102.3.3(A) and 104.8.4] load being evaluated, psi (MPa)

Po = Pressure coincident with the occasional


load being evaluated, psi (kPa)

104
Appendix G

ASME B31.1-2012

Units References
Symbol Definition SI U.S. Paragraph Table/Fig./App.

P Internal design gage pressure of pipe, component kPa psi 102.3.2(D) App. D, Table D-1
104.1.2(A)[eqs. (7),
(8), (9), (10)]
104.5.1(A)
104.5.2(B)
104.5.3(A)[eq. (14)]
104.5.3(B)
DELETE 104.8.1[eq. (15)]
104.8.2[eq. (16)]
122.1.2(A)
122.1.3(A)
122.1.4(A)
122.1.4(B)
122.1.6(B)
122.1.7(C)
122.4(B)
Ps Normal operating pressure of pipe, component MPa psi 104.8.1[eq. (15)]
Po Maximum pressure coincident with the occasional
load being evaluated MPa psi 104.8.2[eq. (16)] ADD

TR 06-1228

105
TR 14-1160
B31.1; Investigate Longitudinal
Welds on Bends and Elbows

Pipe Bending: Where to Locate the Weld Seam

Except for seamless tubing and pipe, the other grades of tubing and pipe have a longitudinal
weld seam. When pipe bending is done, the question often arises about where to locate the
weld seam.

Possibilities include putting the weld seam on the inside radius of the bend, on the outside

106
radius of the bend, and on the centerline radius of the bend.
107
Figure 5
WELDS ALL LOCATED ON INTRADOS
AND EXTRADOS

108
SEAM WELDING USING
SUBMERGED ARC WELDING
109
???????

INPUT REQUIRED

110
Branch Connection Partial Penetration TR 06-181

111
Issues:
- Figure does not represent a partial penetration weld
- Remove the P/T restrictions and add additional required NDE to allow for the use of this
configuration for thermowells on high temp/pressure piping (which is already being done in
the industry)

Proposed fix:
- Replace the figure with a typical thermowell configuration showing a partial penetration weld
- Add required additional NDE if P/T limits exceeded
Branch Connection Partial Penetration TR 06-181

112
Branch Connection Partial Penetration TR 06-181

113
Branch Connection Partial Penetration TR 06-181

and piping attachments

114
If this is or

the partial penetration weld configuration shall be


volumetrically inspected to the extent possible and surface
inspected per the method as described in Note 4 of Table 136.4.
and Piping Attachments
Questions

115
4/12/2016

Branch Connection Partial Penetration TR 06-181

Issues:
Figuredoesnotrepresentapartialpenetrationweld
RemovetheP/TrestrictionsandaddadditionalrequiredNDEtoallowfortheuseofthis
configurationforthermowells onhightemp/pressurepiping(whichisalreadybeingdonein
theindustry)

Proposedfix:
Replacethefigurewithatypicalthermowell configurationshowingapartialpenetrationweld
AddrequiredadditionalNDEifP/Tlimitsexceeded

Branch Connection Partial Penetration TR 06-181

116 1
4/12/2016

Branch Connection Partial Penetration TR 06-181

Branch Connection Partial Penetration TR 06-181

andpipingattachments

Ifthis is or

thepartialpenetrationweldconfigurationshallbe
volumetricallyinspectedtotheextentpossibleandsurface
inspectedperthemethodasdescribedinNote4ofTable136.4.
andPipingAttachments

117 2
4/12/2016

Questions

118 3
COMMITTEE CORRESPONDENCE

COMMITTEE: SG/F&E Correspondence No. SG-F&E-Minutes

SUBJECT: Minutes 1/26/2016 Meeting

TO: Colleen OBrien Reply to:


Raymond Reamey, PE
Turner Industries Group, LLC
8687 United Plaza Blvd.
Baton Rouge, LA 70809

DATE: January27, 2016 Telephone: (225) 214-2898


FAX: (225) 215-6356
E-Mail: rreamey@turner-industries.com

Following are the minutes for the SG/F&E meeting of January 26, 2016 meeting in Myrtle Beach,
SC.

The meeting was called to order. The following members were present:
R Reamey, Chair, Email: rreamey@turner-industries.com
J Hainsworth, SG Member, Email: john.hainsworth@ymail.com
R Miletti, SG Member, Email: rlmiletti@babcock.com
S Gingrich, SG Member: stan.gingrich@aecom.com
P Davis, SG Member Email: paul_davis@amecfw.com
Clint Zimpel, SG Member, Email: clint.zimpel@bendtec.com
P Flenner, Email: flnr@aol.com
R Corbit, SG Member, Email: richard.corbit@cbi.com
Brian Boseo, Member, Email: brian_boseo@graycor.com
J Frey, Member, Email: joe.frey@stress.com
T Monday, SG Member, Email: tmonday@teamind.com
B. Goedde, SG Member, Email: bill.goedde@duke-energy.com
J Sekely, Member, Email: jsekely@comcast.net

The following SG Members were absent:


D Leininger, Member, Email: Donald.J.Leininger@worleyparsons.com
T Hansen, Member, Email: tehansen@aep.com
K Kofford, SG Member, Email: Kyle.Kofford@inl.gov
S Findlan, Member, Email: shane.findlan@cbi.com
D Couch, SG Member, Email: rcouch@epri.com

119
The following visitors were present:
Rick Valdez - ARB, Inc. rvaldez@arbinc.com
Eric Cutlip Babcock & Wilcox evcutlip@babcock.com
Brandon Roe Tampa Electric biroe@tecoenergy.com
David Overton Structural Integrity doverton@structint.com

Messrs. Kofford, Hansen, Findlan, Couch and Leininger, informed the Chair that they would be
unable to make the meeting and sent reports on their items.

The agenda which was followed is attached.

The inquiries, TRs, Editorial Revisions, and Cases were discussed as shown on the attachment.

Next meeting:
Clearwater Beach, FL
May 16-18, 2016

Raymond Reamey, PE

CC: SG/F&E

120
AGENDA
Myrtle Beach, SC January 26, 2016

0800 -- Call to Order


-- Introductions

0810 -- Approval of Minutes - Approved

0815 Approval of Agenda Approved with comments

0820 Membership
Alternates
New SG Membership

0830 Inquiries See attached list

0900 Break

0915 Tentative Revisions See attached list

1030 Code Cases See attached list

1100 Editorial Revisions and Errata - None

1115 Old Business

Discussion of Pin Brazing Dana Couch Update


Task Group to review the requirements in para. 127.2.1, Electrodes and Filler Metal
Jim Sekely & Ray Miletti & Shane Findlan Jim Sekely to be PM - Request Item
Request Code Case to address the gap in Fig 127.4.4(c), Socket Weld Fittings Dana
Couch (15-1949)
Request new Item to address revision of Table 132 for P15E material temperature range -
Phil Flenner (15-2153)
Request Item to address Clarification of Paragraph 131.4.1 - Definition of Thickness
Governing Preheat Stan Gingrich (15-478)
1200 New Business
Discussion on using nickel based filler metals on P-91 material repairs with no PWHT
Discussion of Item 15-2593, Exposure of joints Assigned to Bill Goedde
Fig. 127.4.8(e) & para. 127.4.8(b) Tim Monday

121
Request Item to revise para. 136.4.5, Radiography See page 21
(comment received from ballot of Item 14-1129) No Item required because B31.1
mirrors the ASME Section I requirement
Discussion on revising Table 127.4.2, note b, to address internal reinforcement
similar to what B31.3 states. (See discussion on page 22) Request Item and assign
to Paul Davis - Item16-188

Future Meeting Dates May 16 18, 2016


Clearwater Beach, FL

September 19 23, 2016


Charleston, SC (Primary)
Boston, MA (Back-up)

Jan 23-25, 2017


1st choice: San Diego, CA
2nd choice: San Antonio, TX

1300 Adjournment

122
SG/F&E STAFF WORKLOAD
ACTION ITEM
ASSIGNED TO
INQUIRIES TRs CCs
(M) Phil Flenner 0 5(2) 0
(M) Rich Corbit 0 1(0) 0
(M) Shane Findlan - Milletti 0 2(0) 0
(M) Joe Frey 0 0(0) 0
(M) John Hainsworth 1 2(0) 1
(M) Tom Hansen - Boseo (1) 0(0) 0
(M) Don Leininger 0 1(0) 0
(M) Tim Monday 0 1(2) 0
(M) Ray Reamey 1(7) 3(0) 1
(M) Jim Sekely 0 0(0) 0
(M) Stan Gingrich 1 5(0) 0
(M) Paul Davis (2) 3(0) 0
(A) Kyle Kofford 0 0(1) 0
(A) Dana Couch (1) 1(0) 1
(A) Ray Miletti 0 2(1) 0
(A) Bill Goedde 0 1(0) 0
(A) Clint Zimpel 0 2(0) 0
(A) Brian Boseo 0 0 0
TOTAL 3(11) 28(6) 3
() = Addenda Package Items, completed inquiries, or existing cases
[ ] = Cases which may be annulled

123
List of CS Connect Item Numbers
Assignment CSCONNECT Notes
Item Number
Inquiries
Hainsworth 14-518 PWHT Temperature Exceeding Material
Specification Tempering Temperature
Davis 14-1456 B31.1 2012, Request for clarification of "Nominal
material thickness"
Gingrich 14-2371 ASME B31.1 2014, para. 131.4.1, Greater Material
Thickness
Reamey 15-1172 Unit Conversion
Reamey 15-2592 Pneumatic testing of buried pipe

Tentative Revisions
Flenner 04-180 Para. 132 Temper Bead Welding (Alternative to
PWHT for P-No. 1 to P-No. 5A Materials)
Miletti 07-172 Incorporate B31.1 Code Case 189 on alternate UT
acceptance criteria into the Code
Hainsworth 09-1675 P15E Grp. 1 PWHT comparison between Table
132 & Section I Table PW-39
Couch 11-1045 Revision to Fig. 127.4.4(C) Socket Welds
Flenner 11-1632 B31 Consistency Ballot for Preheat B31.1
Flenner 11-1634 B31 Consistency Ballot for PWHT B31.1
Zimpel 11-1660 Revise para. 137.4.3 (Test Medium)
Corbit 11-2019 Correction to figure references in para 104.3.1(c.2)
Add definition for "Volumetric Examination" to para
Gingrich 12-209
100.2
Alternative to hydrotest on NBEP when hydrotesting
Miletti 12-1788
is not practical
Gingrich 13-247 Add new paragraph to address Closure Welds
Paragraph 131.6 reduction of weld temperature
Zimpel 13-248 below martensitic temperature between welding and
PWHT for P No. 15E materials
B31.1; Table 102.4.7 Unify notes and materials with
Flenner 13-388
those in Section I
Hainsworth 13-1200 Localized PWHT for CSEF Materials

124
Assignment CSCONNECT Notes
Item Number
Addition of welding requirements including procedure
Findlan 13-1744 and operator qualification for welded HDPE Pipe into
Chapter V
Addition of Visual Examination acceptance criteria for
Findlan 13-1745
welded HDPE Pipe into Chapter VI
Leininger 13-2072 Para. 127.3 Add definition of tm
Monday 14-564 B31.1; Revise Table 136.4 note (4)
B31.1; Revise Para 136.4, Examination Methods of
Reamey 14-1129
Welds
Clarification of Paragraph 132.4 - Definition of
Gingrich 15-478
Thickness Governing PWHT
Revise para. 136.4.5(A), Radiography Acceptance
Reamey 15-479 Standards, to include acceptance criteria for
undercut.
Correction to para. 129.3.3.1(B.1) to remove the
Davis 15-1073
words the cold strained area
Consolidate information contained in para 129.3.3.1
Davis 15-1186
and 129.3.3.2 into tabular format
Corrections to Table 129.3.4.1 based on 2015
Davis 15-1470
Edition of ASME Section I
Revise Table 132 to adjust lower temperature limit for P-
Flenner 15-2153 No. 15E PWHT to 1300F (1250F for thin materials. EPRI
recommendations
Goedde 15-2593 Revision to para. 137.2.1, Exposure of joints
Gingrich 15-2544 Dropped
Gingrich 15-2437 Dropped

Code Cases
Code Case to address Localized PWHT for CSEF
Hainsworth 15-1906
Materials
Reamey 15-1948 Annul Code Case 187
Code Case to address the gap in Fig
Couch 15-1949
127.4.4(c), Socket Weld Fittings

Highlighted Items are scheduled to be published in the next Edition of the Code.

125
INQUIRIES

CSCONNECT
Assigned to: Ballot No. Status
Item No.
14-518 Hainsworth Sub Committee Ballot
PWHT Temperature Exceeding Material Specification Tempering Temperature
5/20/14 Ballot out by mid-June
9/16/14 Negatives received and a new ballot will be issued
12/29/14 Comments received
1/13/15 Respond to comments received and submit for ballot
5/13/15 Proposal revised and a new ballot to be issued
9/15/15 Currently being balloted
1/26/16 Negatives received, a new ballot to be submitted

CSCONNECT
Assigned to: Ballot No. Status
Item No.
14-2371 Gingrich Pending
ASME B31.1 2014, para. 131.4.1, Greater Material Thickness
12/29/14 In process
1/13/15 Combine 14-2370 and 14-2371 and request an intent interpretation
5/13/15 On hold pending outcome of Item 15-478
9/15/15 Change to Intent Interpretation Let Colleen know
1/26/16 To go forward with revisions

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-2592 Reamey 15-3569 Pending
ASME B31.1 2012, para. 137.2.1, Pneumatic testing of buried pipe
1/26/16 Out for ballot

126
TENTATIVE REVISIONS
CSCONNECT
Assigned to: Ballot No. Status
Item No.
04-180 Flenner 08-1489 Sub Committee Ballot
Para 132, Use of Temperbead Welding Techniques to Eliminate PWHT Requirement
2/3/04 - New item. This is intended to introduce the use of the subject techniques pending the
introduction of qualification rules in Section IX.
5/25/04 - This is related to an EPRI project that seeks to instill similar rules for TB welding
qualifications in ASME Section XI, NBIC, and B31.1. A ballot will be issued by
Christmas, 2004.
9/21/04 - A ballot will be issued by Christmas, 2004.
2/8/05 - The tentative approach for this change was discussed and approved in principle. More
information needs to be developed. On hold.
5/24/05 - The development of an appropriate hardness acceptance criteria continues to be a
problem. Related to Section I item BC04-1511.
9/20/05 - A white paper is currently under review which proposes a hardness acceptance
criteria. Once reviewed and comments incorporated, a ballot will be issued.
2/7/06 - There are still some remaining issues to be solved in this white paper regarding the
hardness level requirements for the temper bead qualification. These issues include
the hardness level and the load required for the hardness test (or the hardness test
method). Coordination is on-going with Section I regarding their version of this issue.
They are currently not expecting to require a hardness test acceptance criteria for P
Nos. 1 & 3. They also are not currently planning on allowing the alternative
requirement for P Nos. 4 & 5A. Work is continuing on this issue.
5/23/06 - Reported that the problem may include determination of appropriate hardness test
method.
9/19/06 - The white paper still is being drafted. Some progress has been made to identify the
hardness test requirements for the acceptance criteria.
1/23/07 - No action taken this period. The white paper will be done toward the end of the
summer, 2007. A ballot will be issued then.
5/22/07 - The white paper should be available by the September meeting.
9/18/07 - Progress delayed. On hold.
1/22/08 - No progress. White paper required by May meeting.
5/20/08 - No progress. White paper required by September meeting.
9/23/08 - The white paper is nearly complete and a ballot is expected after that.
1/20/09 - Ballot issued. Negatives received, a new ballot will be issued
9

127
CSCONNECT
Assigned to: Ballot No. Status
Item No.
04-180 Flenner 08-1489 Sub Committee Ballot
Para 132, Use of Temperbead Welding Techniques to Eliminate PWHT Requirement
5/19/09 - Ballot closed 2 negatives In process
9/22/09 Ballot to be issued by November
1/26/10 - The white paper is nearly complete and a ballot is expected after that
5/18/10 - The white paper is nearly complete and a ballot is expected after that
9/21/10 - The white paper is nearly complete and a ballot is expected after that
1/25/11 - The white paper is nearly complete and a ballot is expected after that
5/24/11 - The white paper is nearly complete, and should be issued by Thanksgiving and a ballot
is expected after that.
9/20/11 On hold
1/24/12 On Hold
5/8/12 On hold
9/18/12 On Hold
1/29/13 On Hold
5/21/13 On hold
9/24/13 On hold
1/28/14 On Hold
5/20/14 On Hold pending Section IX activity
9/16/14 - On Hold pending B31 P
12/29/14 - On Hold pending B31 P
5/13/15 - On Hold pending B31 P
9/15/15 - On Hold pending B31 P
1/26/16 - On Hold pending B31 P

CSCONNECT
Assigned to: Ballot No. Status
Item No.
07-172 Miletti Pending
Incorporate B31.1 Code Case 189 on alternate UT acceptance criteria into the Code
1/23/07 - New item. Mr. Reamey will participate.
5/22/07 - On hold. This will be studied by Mr. Emslander.
9/18/07 - This was expanded to include not only the review of the B31.3 CC181 but also the
B&PV CC 2235. Dennis Sullivan to be kept in loop for review.
1/22/08 - Gathering information.
5/20/08 - Related to SCI item 05.190. On hold.
9/23/08 - Waiting on SC V action.
1/20/09 - In process, waiting on SC V action
5/19/09 - In process Look at Section I #08-1013 & Section V #09-429
9/22/09 In process Look at Section I #08-1013 & Section V #09-429
1/26/10 In process Look at Section I #08-1013 & Section V #09-429
5/18/10 Incorporate B31.3 code case 181-2 in this Item
09/21/10 - Incorporate B31.1 code case 181-2 in this Item get update to Chuck
1/25/11 - Incorporate B31.1 code case based on B31.3 Code case 181-2 in this Item get
update to Chuck
5/24/11 On hold pending Item 10-1605

10

128
CSCONNECT
Assigned to: Ballot No. Status
Item No.
07-172 Miletti Pending
Incorporate B31.1 Code Case 189 on alternate UT acceptance criteria into the Code
9/20/11 - On hold pending Item 10-1605
1/24/12 - On hold pending Item 10-1605
5/8/12 - On hold pending Item 10-1605
9/18/12 Item 10-1605 is Board approved
1/29/13 In process, look at what B31.3 is doing on this subject
5/21/13 - Need to revise subject line to the record, proposing incorporating B31.1 Code Case
189 on UT acceptance criteria similar to how B31.3 has done on this subject.
9/24/13 In process
1/28/14 In Process
5/20/14 In Process
9/16/14 In process contact B31.3 to coordinate wording
12/29/14 - In process
5/13/15 In process ballot out by next meeting
9/15/15 In Process
1/26/16 In Process

CSCONNECT
Assigned to: Ballot No. Status
Item No.
09-1675 Hainsworth 14-811 Sub Committee Ballot
P15E Grp. 1 PWHT comparison between Table 132 & Section I Table PW-39
1/26/10 In process
5/18/10 Look at Section I Items 09-698 & 09-1351- Ballot to be issued this summer
9/21/10 In process - Look at Section I Items 09-698 & 09-1351
1/25/11 - In process - tracking Section I Items 09-698 & 09-1351
5/24/11 No Report. Proposal to be presented to Committee on 5/25.
9/20/11 In process
1/24/12 Negatives received and addressed On hold Section I
5/8/12 New ballot pending Section I
9/18/12 Item passed Section I, new ballot by next meeting
1/29/13 In Process comments to be addressed ballot out by May meeting
5/21/13 On Hold pending Item 08-179
9/24/13 A new proposal to be submitted
1/28/14 New proposal to be submitted by 2/1/14
5/20/14 Ballot closed on 5/5/14 negatives and comments received and will be addressed
9/16/14 Negatives and comments to be addressed and a new ballot issued by next meeting
12/29/14 - Negatives and comments to be addressed
1/13/15 Submit a new ballot and ask Materials Group to add words to the
Code to revise Table A-2
5/13/15 Ballot to be submitted and a new Item taken out to address revision of Table 132 for
P15E material temperature range
9/15/15 In Process
1/26/16 Item transferred to SG - Materials

11

129
CSCONNECT
Assigned to: Ballot No. Status
Item No.
11-1045 Couch 13-519RC1 Standards Committee Ballot
Revise Fig 127.4.4(c), Socket Weld Fittings
[2/1/00] This item was taken out as a tracking TR for B31 F&E changes to socket Weld Fittings.
This item is waiting on F&E Technical Committee action.
[6/6/00] Still waiting on F&E technical committee.
[10/24/00] No report.
[1/30/01] Still waiting on F&E technical committee.
[6/5/01] No report.
[11/13/01] Still waiting on B31 F&E/TC Item FE 90-12 and MDC/TC MD 90-08d.
[1/29/02] This remains on hold pending further action by the B31 TCs. Mr. Sommerfeld
requested a copy of the B31 TC Minutes.
[6/4/02] [9/24/02] No report. (Note that the FETC meeting considered this issue and that
information will be sent to the sponsor.)
[1/28/03] No report.
[5/28/03] No report required. Reassigned to S. Findlan.
[9/23/03] No Report. This is expected to address weld requirements and insert depth.
[2/3/04] Due to recent activity at EPPRI RRAC, the insertion depth may include details at both
ends of the socket. A ballot should be issued by the next meeting.
[5/25/04] A ballot will be issued by Labor Day, 2004. (Note: A similar item was covered in
B31.3, which will be forwarded to the PTM.)
[9/21/04] The B31.3 revision similar to this item will be reviewed and a ballot will be issued by
Halloween, 2004.
[2/8/05] A handout was reviewed. A ballot is due by March 1, 2005.
[5/24/05] A ballot was issued 3/18/05 and was due to close 4/15/05. 12 negatives have been
received. This will be discussed in TG with the possibility of combining this item with item 02-
159 concerning slip-on and socket welded flanges. The primary objection seems to be historical
with the data supporting this item needing to be given to the voters. The negatives are being
addressed, most dealt with the zero gap. This item will only cover the gap and will be split with
new item to cover insertion depth on socket welded components other than flanges. The gap on
the socket weld flange will be covered however.
[9/20/05] A presentation was made to the PSP by G Frederick. A ballot will be issued by
Thanksgiving (2005) to deal with the gap requirement for socket welds. A proposal will be made
to modify Para 127.3(E) and to remove the 1/16 requirement in Fig. 127.4.4.
[2/7/06] The proposal will be revised to incorporate comments and a new ballot will be prepared
by Good Friday, 2006.
[5/23/06] An attempt to resolve the comments and negatives will be made in a new ballot. A
note reference will be added on the gap. New ballot by Fathers Day, 2006.
[9/19/06] The comments and negatives were discussed. A new ballot will be issued by
Thanksgiving, 2006, which will keep the figure similar to the present figures with a note
referencing the exception paragraph.
[1/23/07] Revised ballot submitted on 1/23/07.
[5/22/07] A discussion on the negatives was held and it was suggested that a brief explanation
of the need should be made. In addition, a correction to the notes reference is needed. A new
ballot is due by Memorial Day.
12

130
CSCONNECT
Assigned to: Ballot No. Status
Item No.
11-1045 Couch 13-519RC1 Standards Committee Ballot
Revise Fig 127.4.4(c), Socket Weld Fittings
[9/18/07] This will be placed on temporary hold to allow review and resolution of the 8 negatives
received. Mr. Findlan to contact the negative voters to see if resolution can be obtained.
[1/22/08] No Report.
[5/20/08] Discussion pointed out that Section I stub-in rules do not include gap requirement
(PW16.1). A white paper may be needed to summarize data. Ballot by next meeting.
[9/23/08] a new presentation will be developed and a ballot issued.
[1/20/09] More information coming in a white paper.
(5/19/09) In process ballot by 7/4/09
9/22/09 Will distribute a White Paper and address any comments before balloting
1/26/10 Will distribute a White Paper and address any comments before balloting
5/18/10 Will distribute a White Paper and address any comments before balloting
9/21/10 Dana Couch will get with Shane and offer what help he can
1/25/11 - Will distribute a White Paper and address any comments before balloting by
May meeting.
5/24/11 Section I considering in Item 10-1713 for recess for tubes into headers, to
recommended 1/16 inch recess. A draft white paper Technical Evaluation
of Zero Gap Socket Welds was provided by Dana Couch (EPRI) with a
request for comments. New ballot to be issued immediately after September
Meeting. Nominated by SC as co-number 1 priority. Dana Couch will provide
a presentation during the September 2011 meeting in Denver to the PSPF.
9/20/11- Reassigned to Dana Couch, new number 11-1045 - Ballot by next meeting
possibly.
1/24/12 Out for Ballot
5/8/12 Negatives and comments to be addressed and a new ballot issued
9/18/12 New recirculation ballot out closes on 9/24/12 - look at taking out an ASME research
project on higher temp limits Dana to write proposal
1/29/13 Negatives at the Standards Committee level, new recirculation ballot out by Valentines
Day
5/21/13 Standards Committee comments and negatives to be addressed and a new ballot to
be issued
9/24/13 Negatives addressed and recirculation ballot to be issued in Standards Committee
1/28/14 Negatives received on the recirculation ballot
5/20/14 Negatives received a new ballot to be issued by next meeting
9/16/14 Negatives received at the Standards Committee a recirculation ballot will be issued
12/29/14 Approved comments received
5/13/15 Standards Committee approved comments to be addressed
9/15/15 Item to remain on Hold while a Code Case is initiated CC 15-1949
1/26/16 Negatives received in Standards Committee

13

131
CSCONNECT
Assigned to: Ballot No. Status
Item No.
11-1632 Flenner On Hold
B31 Consistency Ballot for Preheat B31.1
1/24/12 Pending
5/8/12 Pending
9/18/12 Pending
1/29/13 Pending
5/21/13 On Hold
9/24/13 On Hold
1/28/14 On Hold
5/20/14 On Hold pending B31 P issuance
9/16/14 - On Hold pending B31 P issuance
12/29/14 - On Hold pending B31 P issuance
5/13/15 - On Hold pending B31 P issuance
9/15/15 - On Hold pending B31 P issuance
1/26/16 - On Hold pending B31 P issuance

CSCONNECT
Assigned to: Ballot No. Status
Item No.
11-1634 Flenner On Hold
B31 Consistency Ballot for PWHT B31.1
1/24/12 Pending
5/8/12 Pending
9/18/12 Pending
1/29/13 Pending
5/21/13 - On Hold
9/24/13 On Hold
1/28/14 On Hold
5/20/14 - On Hold pending B31 P issuance
9/16/14 - On Hold pending B31 P issuance
12/29/14 - On Hold pending B31 P issuance
5/13/15 - On Hold pending B31 P issuance
9/15/15 - On Hold pending B31 P issuance
1/26/16 - On Hold pending B31 P issuance

CSCONNECT
Assigned to: Ballot No. Status
Item No.
11-1660 Zimpel 15-939 Standards Committee Ballot
B31.1; Revise paragraph 137.4.3 (Test Medium)
1/24/12 Ballot Pending
5/8/12 In process reassign to Clint Zimpel with Tom as sponser?
9/18/12 In Process
1/29/13 Transfer to Clint Zimpel
5/21/13 Proposal to be sent to SG for comment
9/24/13 New proposal to be developed and sent out for review and ballot
1/28/14 Ask Colleen to submit for ballot Negatives received
14

132
5/20/14 Last ballot received several comments and nine negatives a new ballot will be issued
9/16/14 Latest ballot received six negatives negatives to be addressed and a new ballot
issued by next meeting
12/29/14 Comments and negatives received
1/13/15 New ballot issued negatives received, recirculation ballot to be issued
5/13/15 On hold pending Design Item 2-106
9/15/15 - On hold pending Design Item 2-106
1/26/16 Negatives received at Standards Committee

CSCONNECT
Assigned to: Ballot No. Status
Item No.
11-2019 Corbit 11-2630 Sub Committee Ballot
Correction to figure references in para. 104.3.1 (c.2)
1/24/12 Negatives received
5/8/12 Negatives to be addressed
9/18/12 - Negatives to be addressed Check with Rich
1/29/13 - Negatives to be addressed Check with Rich
5/21/13 Negatives addressed
9/24/13 New proposal to be sent out for ballot
1/28/14 Negatives addressed and a new proposal will be sent out
5/20/14 New ballot out by mid-June
9/16/14 No progress on the new ballot
12/29/14 No progress on the new ballot
1/13/15 In process ballot out by Ides of March
5/13/15 Recirculation ballot to be sent out
9/15/15 Recirculation ballot in process
1/26/16 Respond to comments and negatives

CSCONNECT
Assigned to: Ballot No. Status
Item No.
12-209 Gingrich 15-244 Board Ballot
Add definition for "Volumetric Examination" to para 100.2
5/8/12 Ballot out by June 2012
9/18/12 negatives and comments received new ballot to be issued by Halloween
1/29/13 Comments addressed, ballot request sent to the Secretary
5/21/13 Comments addressed, new ballot forthcoming
9/24/13 New ballot to be submitted by Halloween
1/28/14 Negatives received to be sent out for new ballot See Colleen
5/20/14 to be sent out for new ballot
9/16/14 A new ballot to be issued by next meeting
12/29/14 One negative received
1/13/15 Recirculation ballot to be submitted
5/13/15 Editorial changes to be made and a recirculation ballot to be submitted
9/15/15 BPTCS comments received that must be addressed
1/26/16 Standards Committee approved

15

133
CSCONNECT
Assigned to: Ballot No. Status
Item No.
12-1788 Miletti 15-1648 Subcommittee Ballot
Alternative to hydrotest on NBEP when hydrotesting is not practical
1/8/13 Pending
1/29/13 Pending
5/21/13 In Process
9/24/13 In process, ballot out by Xmas
1/28/14 In process, ballot out by Ides of March
5/20/14 No report
9/16/14 In process
12/29/14 Comments and negatives received
1/13/15 new ballot to be submitted
5/13/15 Negatives received revised proposal to be submitted
9/15/15 Negatives received on latest ballot, new ballot to be submitted
1/26/16 Negatives to be addressed and a new ballot to be submitted

CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-247 Gingrich 15-14 Sub Committee Ballot
Add new paragraph to address Closure Welds
5/21/13 In Process
9/24/13 In process
1/28/14 In process
5/20/14 In process
9/16/14 A new ballot to be issued
12/29/14 - A new ballot to be issued
1/13/15 Out for ballot
5/13/15 Negatives received and new ballot to be submitted
9/15/15 - Negatives received and new ballot to be submitted
1/26/16 - Negatives received and new ballot to be submitted

16

134
CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-248 Zimpel 15-940 SC Ballot
Paragraph 131.6 reduction of weld temperature below martensitic temperature between welding and
PWHT for P No. 15E materials
5/21/13 On Hold pending Item 08-179
9/24/13 In process, a ballot to be submitted by Halloween
1/28/14 In process Low hydrogen electrode should always be used for this material, see
wording in NBIC for guidance. Negatives received
5/20/14 New ballot to be issued by next meeting
9/16/14 New ballot out by October 1st.
12/29/14 Comments received
1/13/15 a ballot to be submitted
5/13/15 Subcommittee Approved editorial comments to be addressed
9/15/15 Negatives and comments received a new ballot to be submitted
1/26/16 SC Ballot submitted

CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-388 Flenner Pending
B31.1; Table 102.4.7 Unify notes and materials with those in Section I
9/16/14 On hold pending B31.3 publication and Section I
12/29/14 - On hold pending B31.3 publication and Section I
1/13/15 - On hold pending B31.3 publication and Section I
5/13/15 - On hold pending B31.3 publication and Section I
9/15/15 - On hold pending B31.3 publication and Section I
1/26/16 - On hold pending B31.3 publication and Section I

CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-1200 Hainsworth 14-1792 Sub Committee Ballot
Localized PWHT for CSEF Materials
9/24/13 In process
1/28/14 In process ballot out by August
5/20/14 - In process ballot out by August
9/16/14 Negatives and comments to be addressed and a new ballot to be issued
12/29/14 Comments and negatives received
1/13/15 On Hold pending Section I ballot
5/13/15 On hold pending Section I ballot and open a Code Case to address this issue
9/15/15 - On hold pending Section I ballot and open a Code Case 15-1906
1/26/16 - On hold pending Section I ballot and open a Code Case 15-1906

17

135
CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-1744 Findlan Pending
Addition of fusing requirements including procedure and operator qualification for fused HDPE Pipe into
Chapter V
1/28/14 In process check with Hank Simpson Appendix N AWS B2.4 CC N755
Reassign to Shane Findlan
5/20/14 In Process
9/16/14 No report
12/29/14 In process
1/13/15 In process
5/13/15 In process
9/15/15 Ballot out by the Winter Solstice 2015
1/26/16 No Report

CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-1745 Findlan Pending
Addition of Visual Examination acceptance criteria for fused HDPE Pipe into Chapter VI
1/28/14 - In process check with Hank Simpson Appendix N? AWS B2.4 CC N755 Reassign
to Shane Findlan
5/20/14 - In Process
9/16/14 No report
12/29/14 In process
1/13/15 In process
5/13/15 In process
9/15/15 - Ballot out by the Winter Solstice 2015
1/26/16 No Report

CSCONNECT
Assigned to: Ballot No. Status
Item No.
13-2072 Leininger 15-943 Sub Committee Ballot
Fig. 127.3 Add definition of tm
1/28/14 Sub group comment ballot out by 2/14
5/20/14 Ballot out by June 15th
9/16/14 Reference Fig. 127.3 in Appendix G
12/29/14 In process
1/13/15 To be sent to F&E members for comment
5/13/15 Revise proposal based on comments and submit for ballot.
9/15/15 Negatives received new ballot out by Halloween
1/26/16 New ballot submitted

18

136
CSCONNECT
Assigned to: Ballot No. Status
Item No.
14-564 Monday 14-1694 Board Approved
B31.1; Revise Table 136.4 add note (6)
5/20/14 In process
9/16/14 To be Standards Committee for ballot
12/29/14 Waiting to be balloted at Standards Committee
1/13/15 - Waiting to be balloted at Standards Committee
5/13/15 Sub Committee approved
9/15/15 Standards Committee ballot
1/26/16 Board Approved

CSCONNECT
Assigned to: Ballot No. Status
Item No.
14-1129 Reamey 14-2161 Board Approved
B31.1; Revise Para 136.4, Examination Methods of Welds
9/16/14 Out for ballot
12/29/14 Approved comments received
1/13/15 Comment to be addressed
5/13/15 Standards Committee ballot
9/15/15 Approved
1/26/16 Board Approved

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-478 Gingrich Dropped
Clarification of Paragraph 132.4 - Definition of Thickness Governing PWHT
5/13/15 In process
9/15/15 In process
1/26/16 Move to drop

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-479 Reamey Pending
Revise para. 136.4.5(A), Radiography Acceptance Standards, to include acceptance criteria for undercut.
5/13/15 In process
9/15/15 In process, ballot to be submitted by Halloween
1/26/16 Out for recirculation ballot

19

137
CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-1073 Davis Dropped
Correction to para. 129.3.3.1(B.1) to remove the words the cold strained area
5/13/15 In process
9/15/15 On Hold pending Item 15-1186
1/26/16 Propose to drop

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-1186 Davis Board Approved
Consolidate information contained in para 129.3.3.1 and 129.3.3.2 into tabular format
9/15/15 Negatives received new ballot to be submitted
1/26/16 Board Approved - 2016

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-1470 Davis Board Approved
Corrections to Table 129.3.4.1 based on 2015 Edition of ASME Section I
9/15/15 SC approved
1/26/16 Board Approved - 2016

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-2153 Flenner Standards Committee Ballot
Revise Table 132 to adjust lower temperature limit for P-No. 15E PWHT to 1300F (1250F for thin materials. EPRI
recommendations
1/26/16 Comments to be addressed and goes forward to Standards

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-2593 Goedde SC Ballot
Revision to para. 137.2.1, Exposure of joints
1/26/16 In process reassigned to Bill Goedde

CODE CASES

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-1906 Hainsworth Pending
Code Case to address Localized PWHT for CSEF Materials
9/15/15 In process
1/26/16 Ballot to be submitted by Super Bowl 2016
20

138
CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-1948 Reamey Board Approved
B31.1 Item to annul Code Case 187 Alternate PWHT holding temperature range requirements for P-
No 5A and P-No 5B Group 1 materials
9/15/15 In process request voice vote to annul
1/26/16 Board Approved

CSCONNECT
Assigned to: Ballot No. Status
Item No.
15-1949 Couch Pending
Code Case to address the gap in Fig 127.4.4(c), Socket Weld Fittings
9/15/15 In process
1/26/16 In process

ADDENDA ITEMS
SCONNECT
Assigned to: SC No. Status
Item No.
09-345 Miletti TR 2016 Edition
10-1666 Kofford TR 2016 Edition
12-80 Couch Inquiry 2016 Edition
12-205 Monday TR 2016 Edition
13-246 Monday TR 2016 Edition
14-312 Reamey Inquiry 2016 Edition
14-661 Hansen Inquiry 2016 Edition
14-673 Davis Inquiry 2016 Edition
14-1131 Flenner TR 2016 Edition
14-1132 Flenner TR 2016 Edition
14-1456 Davis Inquiry 2016 Edition
14-1669 Reamey Inquiry 2016 Edition
14-1815 Reamey Inquiry 2016 Edition
14-2000 Reamey Inquiry 2016 Edition
15-49 Reamey Inquiry 2016 Edition
15-1074 Reamey Inquiry 2016 Edition
15-1172 Reamey Inquiry 2016 Edition

21

139
ITEMS DROPPED AT LAST MEETING

CSCONNECT
Assigned to: SC No. Description
Item No.
14-1130 Hansen PWHT of RT plugs in P-No 15E materials
15-894 Reamey ASME B31.1 2014, Interpretation of B31.1
para. 137.4.5

22

140
B31.1 2014, 136.4.5 Radiography. When required by this Chapter (see Table
136.4), radiographic examination shall be performed in accordance with Article 2 of
Section V of the ASME Boiler and Pressure Vessel Code. except that the
requirements of T-274 are to be used as a guide but not for the rejection of
radiographs unless the geometrical unsharpness exceeds 0.07 in. (2.0 mm).

B31.3 2014, 344.5 Radiographic Examination.


344.5.1 Method. Radiography of castings is covered in para. 302.3.3. Radiography
of welds and of components other than castings shall be performed in accordance
with BPV Code, Section V, Article 2.

ASME Section V
Article 2, T-274 T-274 GEOMETRIC UNSHARPNESS
T-274.1 Geometric Unsharpness Determination.
Geometric unsharpness of the radiograph shall be determined in accordance with:

where:

D = distance from source of radiation to weld or object being radiographed


d = distance from source side of weld or object being radiographed to the film
F = source size: the maximum projected dimension of the radiating source (or
effective focal spot) in the plane perpendicular to the distance D from the weld or
object being radiographed
Ug = geometric unsharpness
D and d shall be determined at the approximate center of the area of interest.
NOTE: Alternatively, a nomograph as shown in Standard Guide for
Radiographic Examination SE-94 may be used.

T-274.2 Geometric Unsharpness Limitations. Recommended maximum values


for geometric unsharpness are as follows:
Material Thickness, in. (mm) Ug Maximum, in. (mm)
Under 2 (50) 0.020 (0.51)
2 through 3 (5075) 0.030 (0.76)
0.040 (1.02)
Over 3 through 4 (75100)

Greater than 4 (100) 0.070 (1.78)

NOTE: Material thickness is the thickness on which the IQI is based.

23

141
24

142
25

143
26

144
COMMITTEE CORRESPONDENCE

COMMITTEE: ASME B31.1 ADDRESS WRITER


General Requirements CARE OF: John W. Power
Sub-Group General Electric
175 Addison Road
SUBJECT: Meeting Minutes Windsor, CT 06095
B31.1 General Requirements
Sub-Group PHONE: (860) 285-4854

DATE: January 26, 2016 FAX: (860) 285-3222

TO: Colleen OBrien EMAIL: john.power@ge.com


ASME B31.1 Secretary

Following are the minutes for the ASME B31.1 Sub-Group General Requirements meeting held on
January 26, 2016 in Myrtle Beach, SC. The meeting was called to order at 8:00 a.m. and adjourned at
12:15 p.m. with no breaks. With travel restrictions due to inclement weather, attendance was limited.

The following sub-group members were present:

John Power, Chair General Electric john.power@ge.com


Roger Thein St. Paul Pipefitters JATC exergy3206@comcast.net
William Mauro American Electric Power wjmauro@aep.com

The following sub-group members participated and were excused from attending:

Mark Treat Associated Electric Cooperative mtreat@aeci.org


Gary Trinker Victaulic gtrinker@victaulic.com

The following sub-group members were excused from attending:

Daniel Christian Victaulic dchristian@victaulic.com

The following guests (seeking membership in the sub-group) were present:

Anthony Guarnieri General Electric anthony.guarnieri@ge.com


Mark Gwynn American Spiral Weld Pipe mgwynn@american-usa.com

145
TENTATIVE REVISIONS
C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
02-0168 John Power Tracking Only
Review of MSS Stds. (Hydrotest & Trans. Press. Allowances)
2016-01 No Report

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
02-0169 John Power Tracking Only
Review of ASME Stds. (Hydrotest & Trans. Press. Allowances)
2016-01 No Report

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
02-0177 William Mauro Move to Drop
Design Changes to Fabrication Requirements
2016-01 Move to Drop: B31.1 addresses minimum requirements; original inquiry was
regarding exceeding code requirements, no revision to B31.1 needed.
Item 02-0177 dropped from agenda via voice vote of B31.1 Committee 17-Jan-2016.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0302 Gary Trinker In Process
Metrication of Appendix N
2016-01 Appendix N is written in 3 Chapters N-I, N-II and N-III with no regard to
metric values. N-I is Definitions, which have no conversions needed. N-III
is Materials, and there is one location where -20F is mentioned and (-29C)
can easily be added. N-II, Design, contains several tables and formulas in
Parts 1 - 2 in imperial units only. Parts 3 6 have metric conversions
(including table values) where needed. I suggest we send this back to the
subcommittee that wrote Appendix N for an update of Parts 1 and 2.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0305 Gary Trinker Move to Drop
Metrication of Appendix VI
2016-01 Move to Drop: Sub-group reviewed Appendix VI, no metrication needed.
Item 03-0305 dropped from agenda via voice vote of B31.1 Committee 17-Jan-2016.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0306 Gary Trinker In Process
Metrication of Appendix VII
2016-01 This is a table and formula laden chapter that contains sample
calculations. This is not an easy conversion chapter. Will need a subject
expert to examine this Appendix. May make more sense to rewrite a metric
version of this Appendix than try to convert imperial numbers.

146
C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0359 Gary Trinker In Process
Metrication of Appendix D
2016-01 This is a table and formula laden chapter regarding flexibility and stress
intensification factors. There are some metric conversion and variables that
are referenced in mm but a subject expert is needed to examine this appendix
to see that all formulas are translatable to metric.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0360 Gary Trinker In Process
Metrication of Appendix II
2016-01 This is a graph and formula laden chapter that contains sample
calculations. This is not an easy conversion chapter. Will need a subject
expert to examine this Appendix. May make more sense to rewrite a metric
version of this Appendix than try to convert imperial numbers.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0361 Gary Trinker In Process
Metrication of Appendix VII Section 6.0 Example Calculations and revise Section 7.0 References
2016-01 Should this be combined with Item No. 03-0306?

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
03-0372 Mark Treat Ready for Ballot
B31.1 Ammonia Piping Exclusion
2016-01 Ready for ballot.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
06-1521 Dan Christian Tracking Only
ANSI/FCI 79-1
2016-01 No Report

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
07-0176 John Power Reassign PM
Adopt use of latest edition text (ASME Standards only)
2016-01 Reassign from William Mauro to John Power

147
C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
07-1476 Mark Treat In Process
Qualifications of the Designer
2016-01 We had developed something taking into consideration what B31.3 was doing,
and then Mo advised us to stop as BNCS (Board of Nuclear Codes and
Standards) was working on a similar item. Tried to contact BNCS but have
had no response to date.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
08-0022 John Power Move to Drop
Figure 100.1.2(B)
2016-01 Move to Drop: Sub-group reviewed Fig.100.1.2(B), no changes needed.
Item 08-0022 dropped from agenda via voice vote of B31.1 Committee 17-Jan-2016.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
11-1881 Gary Trinker In Process
Correct SI units throughout the code
2016-01 May move to drop at next meeting as this item has a very broad description
and is being partially addressed through other more specific items.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
12-0900 William Mauro Sent to Stds. Comm.
Addition of reference to NFPA 54-2012 and NFPA 56PS-2012
2016-01 Negative withdrawn, sent to Standards Committee.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
13-0191 Mark Treat In Process
Removal of specific paragraph references in B31.1
2016-01 I need to go through looking for more references one more time using the 2016
version then send to the group for review.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
13-0245 William Mauro In Process
Scope of Chapter IV and contents of Table 126.1
2016-01 Need to address couple of negative ballots.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
13-1087 William Mauro In Process
Removal of addenda throughout the code
2016-01 Work in progress

148
C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
13-1747 William Mauro Move to Drop
Update of ASME Standards (Appendix F)
2016-01 Move to Drop: item would put specific editions into Appendix F, this is not in
alignment with standards committee direction.
Item 13-1747 dropped from agenda via voice vote of B31.1 Committee 17-Jan-2016.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
13-1870 Joe Frey In Process
Clarify the need for sound engineering judgement and the use of more detailed analyses in all B31.1
codes
2016-01 No Report.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
15-0160 Mark Treat In Process
System pressure test limits for piping components having class ratings, paras. 137.4.5 and 137.5.5.
2016-01 Need further clarification of this item.

C&S CONNECT
Assigned to: Ballot No.(s) Status
Item No.
15-0161 Mark Treat In Process
Abnormal operating conditions cannot exceed P-T ratings for piping components whose product
specification has class ratings para. 102.2.4.
2016-01 Need further clarification of this item.

ADDITIONAL INFORMATION
Colleen will send out a ballot for the nomination of Mark Gwynn as a member of the General
Requirements Sub-group after distributing the January minutes.

Colleen will send out a ballot for the nomination of Anthony Guarnieri as a member of the General
Requirements Sub-group after distributing the January minutes.

The General Requirements Sub-group will offer assistance to the Design Sub-group to possibly reduce the
Design Sub-group workload.

149
OM
Record Status Subject ProjectManager StatusReport
06--1254 SC Proposal Review of Appendix V Foreword, Definitions, W. Mauro NewBallotforthcoming
and Para. V-6.0 "Material History"

07--1603 SC Proposal Move Para. V-8.0 to Chapter 7 K. Rapkin NewBallotbyMarch

07--1604 SC Proposal Evaluate Appendix V, para. V-9 for Inclusion in M. Engelkemier 4thBallotDisapproved(13)
Chapter VII, para. 148
AwaitingRecirc.Ballot
07--1607 SC Proposal Review of Appendix V - Para. V-13.0 D. Creates AwaitingNewBallot

09--1674 SC Approved Add Pipe Fitting Manufacturing Details to B. Holbrook ReadyforStd.Cmttee


Chapter VII, Para. 141

10--0308 SC Proposal Review of API 579/ ASME FFS-1 for J. Frey InProgress
Incorporation in Chapter 7 or Appendix 5

10--0309 SC Proposal Review of ASME PCC-3 for Incorporation in M. Johnson AwaitingJFTaskGroupforBPTCS


Chapter 7 or Appendix 5

11--0350 SC Proposal TRACKING: Add derating of a piping system to C. McDonald InProgress


Chapter VII or Appendix V

11--0351 SC Proposal Add new para 14 to appendix 5 to determine R. Haupt Afterdiscussions,Proposaltobe


stress allowable for older pipe
forthcoming
perhapsascautionarynote
paragraph
11--1039 SC Proposal Add Rules for Repair of Covered Piping R. Kennedy Onholduntilaconcretedirectionis
Systems to Chapter VII
provided
11--1040 SC Proposal Add Rules or Guidelines for the Maintenance B. Goedde InProgresspresentationgiveninPSP
and Testing of Spring Hangers to Chapter VII
forum
and Appendix V
12--0223 SC Proposal Add list of material degradation mechanisms to C. McDonald NewBallotbynextmeeting
para. 146

12--0813 SC Proposal Add new paragraph for abandoned piping L. Vetter NewBallotinnextfewweeksbasedon
systems
presentation
12--1691 SC Proposal Chapter VII Paragraph Reorganization R. Kennedy Onholduntilnextmeeting

14--0777 Out for SC Revise definitions of "failure" and "repair" in R. Reamey 5thBallotPending
Ballot Appendix V

150
SA
Record Status Subject ProjectManager
03--0314 SC Proposal Update Appendix N, Table 4.1.1 E. Rinaca Inprogress
03--0315 stds Comm Update Appendix N, Paragraph L. Vetter CommentsatStandardslevel
Approved N-102.3.1
workingtoresolve
08--1376 Stds comm updating AWWA Standard H. Simpson ResolvingcommentsforStandardsballot
approved edition numbers in Appendix F,
to be considered in conjunction
with Item 10-1665

09--0980 SC Proposal TRACKING - Incorporation of S. Sinha EPRIandGTIarelookingatthisalso.


HDPE Examination Criteria

09--1484 Stds Comm Reference to PTC 19.3 E. Rinaca Holdingfor13198


Proposal Thermowells
10--1665 Stds comm restricting the use of special H. Simpson Resolvingcommentsand1neg
proposal gaskets to increase the rating of
fromStandardsballot
standard flanges
13--0198 SC Proposal Add thermowell design para in E. Rinaca Inprogress
design section
13--0199 Stds Comm Revise HDPE Fusion bonding H. Simpson ResolvingcommentatStandardsballot
Approved qualifications in accordance
with those being developed by
ASME Section IX

13--0200 SC Proposal revise 105.3(b), metallic piping H. Simpson Inprogress


lined with nonmetals
14--0050 SC Proposal Buried Piping (Appendix VII) S. Duchez Inprogress