You are on page 1of 1
No.CE/Admn/PLA/1014/2005, Office of the Chief Engineer, P.W.D., Roads & Bridges & Administration, Thiruvananthapuram. CIRCULAR Sub: Cost Index to be adopted to 2014 DSR Ref: letter No.CE/BL/TVMI/GL/12/2014 dated 02/12/2014 of the Chief Engineer, PWD Buildings CPWD has published latest cost indeces for various places with effect from 01/04/201§ based on DPAR 2012. Consequent on revision of CPWD to DSOR 2014 with base of 105 in DPAR 2012, the latest cost index over DSOR 2014 need to be equated as provided in the table below. st. on Cost index with respect to | Cost index to be INo. DPR 2012 with base 100 | added to DSR 2014 TIROVANANTTIAPORAN iso Team |VITHURA, THIRUVANANTHAPURAM, 156.00 48.57% |KOLLAM_ 155.00 47.62% |PATHANAMTHITTA. 153.00 45.11% |CHENNERKARA 153.00 45.11% |ALAPPUZHA. 161.00 53.33% ISAI PUNNAMADA. 173.00 64.76% IKOTTAYAM, 154.00 46.67% IMUNNAR_ 163.00 55.24% IDURKI rai 35296 |THODUPUZHA 152.00 44.76% IMANIMALAKUNNU/KOOTHATUKULAM 153.00 45.11% ERNARUTAM is20 nares |THRISSUR_ 143.00 36.19% PALAKKAD 143.00 36.19% MAL APPORAN vas ei [KOZHIKODE 145.00 38.10% IMAHE & BADAGARA 145.00, 38.10% [NADAPURAM 145.00 38.10% IKALPETTA / WAYANAD 146.00 39.05% ANNU ‘aa sre RASARAGOD ion ra Adoption of DSOR 2014 with Cost Index as above will be mandatory of all estimate with effect from 01-08-2015. —Noel [EF ENGINEER 1 The Chief Engineer, PWD, Roads & Bridges, Thiruvananthapuram for information 2 The Chief Engineer, PWD, National Highways, Thiruvananthapuram for information 3 The Chief Engineer PWD, Buldings, Tirwvetanthapura fer nformaion 4 The Chief Engineer, PWD, Design, Thiruvananthapuram for 3 The Chief Engineer, PWD, KSTP, Thiruvananthapt:ram for

You might also like