HINDALCO INDUSTRIES LTD (WHEEL DIVISION)

DAILY ENERGY CONSUMPTION REPORT


For Date:
WHEEL DIVISION
Energy Consumed (KWh) Power Factor
Today Todate Today

### WHEEL PLANT EQUIPMENT WISE CONSUMPTION


'A' SHIFT 'B' SHIFT 'C' SHIFT
07.00AM TO 3:00PM TO 11:00PM TO
03:00PM 11:00 PM 07:00 AM TO DAY TODATE
WHEEL PLANT 11 KV Bkr 0.00
Supply#1 0.00
Supply#2 0.00
Supply#3 0.00
TOTAL WHEEL PLANT
(SUPPLY# 1+2+3) 0.00 0.00 0.00 0.00 0.00

(A) MELTING AREA 0.00 0.00 0.00 0.00 0.00


Melting-1,2&3, Hyd,Jib
crane,Degassing,N2 Gen 0.00
CRUCIBLE HEATING 0.00
(B) DIE SHOP 0.00 0.00 0.00 0.00 0.00
DIE PREHEAT OVEN 0.00

(C) CASTER AREA 0.00 0.00 0.00 0.00 0.00


Caster-1 Heater 0.00
Caster-2 Heater 0.00
Caster-3 Heater 0.00
Caster-4 Heater 0.00
Caster-5 Heater 0.00
Caster-6 Heater 0.00
Caster-7 Heater 0.00
Caster-8 Heater 0.00
CASTING NORTH 0.00
CASTING SOUTH 0.00

(C ) X-RAY 0.00

(D) SHOT BLAST 0.00 0.00 0.00 0.00 0.00


SHOT BLAST-1 (Vertical) 0.00
SHOT BLAST-2 (Horizontal) 0.00

(E) HEAT TREATMENT 0.00 0.00 0.00 0.00 0.00


Solution furnace # 1 0.00
Solution furnace # 2 0.00
Age oven 0.00
H.T.MCC 0.00

(F) MACHINING AREA 0.00 0.00 0.00 0.00 0.00


IMT DRILLING 0.00
IMT TURNING # 1 0.00
IMT TURNING # 2 0.00
LOKESH DRILLING 0.00
LOKESH FFM 0.00
MORI SEIKI FFM 0.00
LEAK TESTER 0.00

(F) POLISHING MACHINE 0.00

(G) PAINTING AREA 0.00 0.00 0.00 0.00 0.00


PT LINE MCC 0.00
VERTICAL LINE MCC 0.00
HORIZONTAL BOOTH MCC 0.00
LANTEC MCC 0.00
POWDER COATING MCC 0.00
VOLTAS CHILLER UNIT 0.00

(H) E.T.P. 0.00

(I) UTILITIES 0.00 0.00 0.00 0.00 0.00


Compressor-1 0.00
Compressor-2 0.00
Cooling Tower panel 0.00
LPG MCC 0.00

Report generated by Gloabtel Convergence Ltd.


LAB 0.00
MLDB (Plant lighting) 0.00

Report Generated by Gloabtel Convergence Ltd.

Report generated by Gloabtel Convergence Ltd.


HINDALCO INDUSTRIES LTD (WHEEL DIVISION)
DAILY ENERGY CONSUMPTION REPORT
For Date:
WHEEL DIVISION
Energy Consumed (KWh) Power Factor
Today Todate Today

### WHEEL PLANT EQUIPMENT WISE CONSUMPTION


'A' SHIFT 'B' SHIFT 'C' SHIFT
07.01AM TO 3:01PM TO 11:01PM TO
03:00PM 11:00 PM 07:00 AM TO DAY TODATE
WHEEL PLANT 11 KV Bkr 0.00
TOTAL WHEEL PLANT
(SUPPLY# 1+2+3) 0.00

(A) MELTING AREA 0.00

(B) DIE MAINT AREA 0.00

(C) CASTER AREA 0.00


Caster-1 0.00
Caster-2 0.00
Caster-3 0.00
Caster-4 0.00
Caster-5 0.00
Caster-6 0.00
Caster-7 0.00
Caster-8 0.00
(C ) X-RAY 0.00

(D) SHOT BLAST 0.00

(E) HEAT TREATMENT 0.00 0.00 0.00 0.00 0.00


Solution furnace # 1 0.00
Solution furnace # 2 0.00
Age oven 0.00
H.T.MCC 0.00

(F) MACHINING AREA 0.00 0.00 0.00 0.00 0.00


IMT DRILLING 0.00
IMT TURNING # 1 0.00
IMT TURNING # 2 0.00
LOKESH DRILLING 0.00
LOKESH FFM 0.00
MORI SEIKI FFM 0.00

(F) POLISHING MACHINE 0.00

(G) PAINTING AREA 0.00

(H) E.T.P. 0.00

(I) UTILITIES 0.00 0.00 0.00 0.00 0.00


Compressor-1 0.00
Compressor-2 0.00
Cooling Tower panel 0.00
MLDB (Plant lighting) 0.00

Report Generated by Gloabtel Convergence Ltd.

Report generated by Gloabtel Convergence Ltd.