Kenya Coast National Polytechnic 7/11/017

Building & Civil Engineering

COST OF (KNEC) EXAMINATION MATERIALS

CLASS CODE NO OF CANDTDATES FEES COLLECTED


1 CRBT16J 14 1,067747
2 CRBT17J 16 754,100
3 DCE14S/15J 11 1,442245
4 DBT14S/15J 06 1,390,455
5 DCE17J 21 1,198,300
6 DBT17J 14 8434,400
TOTAL 6596247

Examination material bought for the above named classes are as follows

MATERIAL QUANTITY AMOUNT(Ksh)


1 Hardwood 10050 20ft 4,000
2 Softwood(cypress)10050 450ft 36,000
3 Wire nails 2 1kg 180
4 Lime 10bags 1,0000
5 Chips & dust 7tons 10,000
6 River sand 7tones 21,000
7 Ballast 7tons 21,000
8 Brooms handles 10 pcs 3,750
9 Cement 25bags 18750
TOTAL 125,180

Prepared by Mwaoda Josam . HOD BCE