Professional Documents
Culture Documents
TOTAL BIAYA
Err:509
Cumm
Harga Jumlah % for
Satuan Harga-Harga Major
(Rupiah) (Rupiah) Items
g h i
59,590,000 59,590,000
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
69,459 0 Err:509
1,061,587 0 Err:509
1,148,485 0 Err:509
1,531,494 0 Err:509
2,368,523 0 Err:509
3,084,253 0 Err:509
20,087,114 0 Err:509
482,557 0 Err:509
514,465 0 Err:509
546,660 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
- 0 Err:509
503,168 0 Err:509
33,498 0 Err:509
80,534 0 Err:509
72,636 1,986,597 Err:509
403,795 0 Err:509
19,226 2,522,515 Err:509
713,482 0 Err:509
717,178 0 Err:509
242,645 0 Err:509
133,682 0 Err:509
- 0 Err:509
- 0 Err:509
392,784 76,537,587 Err:509
417,464 54,231,161 Err:509
415,099 0 Err:509
1,546 0 Err:509
190,820 0 Err:509
258,040 0 Err:509
361,288 0 Err:509
568,005 0 Err:509
1,195,831 0 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
689,768 0 Err:509
599,188 0 Err:509
2,737,161 0 Err:509
368,680 0 Err:509
10,282 0 Err:509
20,432 0 Err:509
14,827 0 Err:509
682,254 0 Err:509
580,083 0 Err:509
549,652 0 Err:509
686,141 0 Err:509
2,554,785 0 Err:509
- 0 Err:509
- 0 Err:509
2,805,401 0 Err:509
316,103 0 Err:509
- 0 Err:509
- 0 Err:509
14,965 0 Err:509
- 0 Err:509
Err:509 Err:509 Err:509
17,105 0
- 0
- 0
22,802 0
36,002 0
19,244 0
- 0
- 0
- 0
- 0
- 0
- 0
86,322 0
106,173 0
684,702 0
- 0
601,606 0
603,510 0
611,256 0
580,791 0
610,706 0
- 0
610,581 0
644,234 0
610,581 0
931,424 0
616,749 0
622,016 0
616,749 0
622,016 0
16,800,000 0
78,445 0
2,221 0
19,362 0
9,295 0
12,747 0
1,832,188 0
13,188,055 0
78,445 0
3,687,535 0
2,783,921 0
2,956,439 0
- 0
3,746,211 0
- 0
3,462,005 0
3,346,480 0
2,819,962 80,137,686
2,575,105 0
2,085,071 0
1,692,979 0
1,910,282 9,818,848
- 0
43,527,684 0
71,236,352 0
104,689,428 0
923,723 0
- 0
43,527,684 0
71,236,352 0
104,689,428 0
923,723 0
- 0
- 0
- 0
- 0
- 0
335,458 0
89,139,834 0
2,396,211 0
- 0
21,642 59,354,661
33,043 0
33,043 76,534,668
36,588 0
13,983 0
61,454 0
- 0
- 0
33,898 0
33,898 0
33,898 0
- 0
- 0
- 0
- 0
- 0
- 0
1,048 0
816 0
1,048 0
816 0
347,727 0
362,436 0
74,349 0
187,241 0
- 0
- 0
- 0
- 0
11,188,257 0
- 0
- 0
- 0
1,385,332 0
- 0
- 0
156,177 0
- 0
55,962 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
52,059 0
- 0
- 0
1,918,532 0
4,793 0
22,082 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
11,015,886 0
537,848 0
1,323,429 859,608,678 ###
1,230,082 0
512,873 0
14,258,138 0
- 0
- 0
- 0
- 0
- 0
611,400 8,559,600
146,431 0
- 0
1,139,400 9,115,200
- 0
- 0
315,426 0
1,054,008 2,108,016
376,706 0
681,796 0
359,337 0
134,190 0
453,484 0
310,882 0
139,332 0
307,720 0
- 0
315,426 0
693,035 0
692,117 0
627,162 0
599,272 0
4,427,237 0
- 0
2,765,319 0
3,411,662 0
19,352 0
203,058 0
217,557 0
361,288 0
568,005 0
1,195,831 0
15,384 0
15,085 0
14,315 0
274,143 0
193,705 0
572,949 0
768,306 0
617,499 0
855,649 0
241,318 9,652,721
870,590 0
386,512 0
822,167 0
202,803 0
252,963 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
60,646 0
102,508 0
148,571 0
515,050 54,080,216 ###
69,316 0
1,545,946 0
24,004,933 0
2,977,965 0
2,933,761 0
2,977,965 0
2,933,761 0
2,977,965 0
676,412 0
2,149,415 0
16,755 0
12,957 0
15,093 0
363,947 0
595,872 0
362,705 0
914,626 0
755,850 0
679,421 0
348,844 0
667,517 0
751,768 0
476,180 0
402,857 0
56,768 0
445,994 0
221,604 0
195,474 0
53,070 0
41,022 0
33,632,212 0
16,771,664 0
36,355,252 0
6,124,195 0 Err:509
59,057,215 0 Err:509
Err:509
No. Mata Perkiraan Harga
Uraian Satuan
Pembayaran Kuantitas Satuan
(Rupiah)
a b c d e
4.3693 59,590,000
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
1,986,596.5145 1,986,597
- 0
2,522,515.0096 2,522,515
- 0
- 0
- 0
- 0
- 0
- 0
76,537,587.0604 76,537,587
54,231,161.2988 54,231,161
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
Err:509 Err:509 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0 ###
- 0
- 0
- 0
- 0
- 0
80,137,685.9659 80,137,686
- 0
- 0
- 0
9,818,847.7707 9,818,848
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
59,354,660.8601 59,354,661
- 0
76,534,667.9539 76,534,668
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
859,608,677.8272 859,608,678
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
8,559,600.0000 8,559,600
- 0
- 0
9,115,200.0000 9,115,200
- 0
- 0
- 0
2,108,015.5575 2,108,016
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
9,652,721.3293 9,652,721
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
54,080,216.1900 54,080,216
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Perhitungan Kebutuhan Alat untuk Mob
No Nama Alat Kode Jadwal Pekerjaan Kuantitas Sat
No Item Pekerjaan Alat bulan Hari Kerja Jam Kerja Pekerjaan
per hari total
1 2 3 4 5 6=4x5 7
1 Asphalt Mixing Plant E01
6.3 (1) 3 75 7 525 0 M2
6.3 (2) 9 225 7 1575 0 M2
6.3 (3) 9 225 7 1575 0 M2
6.3(3a) 9 225 7 1575 0 Ton
6.3(4) 9 225 7 1575 0 M3
6.3(4a) 9 225 7 1575 0 Ton
6.3(5a) 9 225 7 1575 0 M2
6.3(5b) 9 225 7 1575 0 M2
6.3(5c) 9 225 7 1575 0 Ton
6.3(5d) 2 50 7 350 0 Ton
6.3(6a) 9 225 7 1575 0 M3
6.3(6b) 9 225 7 1575 0 M3
6.3(6c) 9 225 7 1575 0 Ton
6.3(6d) 9 225 7 1575 0 Ton
6.3(7a) 9 225 7 1575 0 M3
6.3(7b) 9 225 7 1575 0 M3
6.3(7c) 9 225 7 1575 0 Ton
6.3(7d) 9 225 7 1575 0 Ton
8.1 (5) 9 225 7 1575 0 M3
4 Bulldozer E04
9.7 7 175 7 1225 jam
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3
7.1(6) 4 100 7 700 m3
7.1(8) 4 100 7 700 m3
7 Compressor E05
6.1(1) 9 225 7 1575 liter
9.17 7 175 7 1225 jam
8 Crane E07
9.12 7 175 7 1225 jam
10 Excavator E10
2.1 7 175 7 1225 m3
3.1(1) 6 150 7 1050 m3
9.11 7 175 7 1225 jam
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
File : 371073626.xlsx
Total Biaya Pemeliharaan & Perlindungan Lalu Lintas 236,520,741
Catatan :Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
File : 371073626.xlsx
INFORMASI UMUM
No. URAIAN INFORMASI
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 5.12 Kilometer
9.95 Km = a C 4.00 Km = b
A B
1.0 Km = c
Base Camp --------->
D
20 ....................................
21 ....................................
22 ....................................
INFORMASI
r ( Leff = a + b )
meter
meter
eriode Pelaksanaan)
2)*b } / (a+b)
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
HARGA
No. URAIAN SATUAN VOL. SATUAN
(Rp.)
B. PERALATAN
Periksa lembar 1.2-2
C. FASILITAS KONTRAKTOR
1 Base Camp M2 70 20,000
2 Kantor M2 70 20,000
3 Barak M2 70 20,000
4 Bengkel M2
5 Gudang, dan lain-lain M2 70 20,000
6 ...................... ....
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2
3 Bituminous Testing
Marshall Asphalt Test Set 2,000,000
Extraction Test, Centrifuge/Refflux Method Set 900,000
Specific Gravity for Coarse Aggregate Set 900,000
Specific Gravity for Fine Aggregate Set 900,000
Mix Air Viod Content (Accurate Method) Set 1,500,000
Core Drill Set 1,500,000
Metal Thermometer Set 100,000
Accessories and Tolls Set 500,000
Penetration Test Bln 100,000
Softening Point Set 600,000
Refusal Density Compactor Set 1,500,000
4 Concrete Testing
Slump Cone Set 1.00 50,000
Cylinder/Cube Mould for Compressive Strength Set 1.00 1,000,000
Beam Mould for Flexural Strength (RIGID) Set 1,000,000
Crushing Machine Set 5,000,000
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS
2 Pemeliharaan Jalan Kerja / Samping LS
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 5,000,000
2 ...................... ....
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
F. DEMOBILISASI LS 1 3,240,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
Lembar 1.2-1
JUMLAH
HARGA
(Rp.)
9,900,000
10,800,000
1,400,000
1,400,000
1,400,000
1,400,000
-
-
-
-
-
-
-
-
0
0
0
0
0
0
0
0
0
0
0
50,000.00
1,000,000.00
0
0
3,000,000.00
21,000,000.00
5,000,000
3,240,000
59,590,000.00
KODE HARGA
No. JENIS ALAT ALAT SATUAN VOL. SATUAN
(Rp.)
B. PERALATAN
0
1,800,000.00
2,400,000.00
3,600,000.00
-
1,200,000.00
0
0
0
1,200,000.00
0
600,000.00
0
0
0
0
-
0
0
0
0
0
0
0
-
0
0
0
0
0
0
0
0
10,800,000.00
VOLUME
VOLUME HARGA SATUAN
NO. URAIAN PEKERJAAN SAT. CCO ( Rp )
KONTRAK
1 2 3 4 5 6
REKAPITULASI
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1 Umum 59,590,000.00
2 Drainase -
3 Pekerjaan Tanah 135,277,859.88
4 Pelebaran Perkerasan dan Bahu Jalan -
5 Pekerasan Berbutir -
6 Perkerasan Aspal -
7 Struktur 1,105,237,355.94
8 Pengembalian Kondisi dan Pekerjaan Minor 63,732,937.52
9 Pekerjaan Harian -
10 Pekerjaan Pemeliharaan Rutin -
SK.10.1 Pekerjaan Layanan Pemeliharaan Jalan -
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1,363,838,153.34
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 136,383,815.33
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 1,500,221,968.67
(D) PEMBULATAN 1,500,221,000.00
Terbilang : SATU MILYAR LIMA RATUS JUTA DUA RATUS DUA PULUH SATU RIBU RUPIAH
Nama
Jabatan
DAFTAR KUANTITAS DA
TAHUN 2014
NAMA PERUSAHAAN
NAMA PAKET
LOKASI
No. Mata
Pembayaran
1.2
1.8
1.18.(1)
1.18.(2)
1.18.(3)
1.18.(4)
1.18.(5)
1.20.1
1.20.2
1.21
2.1
2.2
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.3.8
2.3.9
2.3.10
2.3.11
2.3.12
2.3.13
2.3.14
2.4.1
No. Mata
Pembayaran
2.4.2
2.4.3
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9.
3.2.1
3.2.2
3.2.3
3.3
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata
Pembayaran
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
5.1.1
5.1.2
5.1.3
5.2,1
5.3.1
5.3.2
5.3.3
5.4.1
5.4.2
5.5.(1)
5.5.(2)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
6.1 (1)(a)
6.1 (1)(b)
6.1 (2)(a)
6.1 (2)(b)
6.1 (2)(c)
6.2 (1)
6.2 (2)
6.2 (3)(a)
6.2 (3)(b)
6.2 (4)(a)
6.2 (4)(b)
6.2 (4)(c)
6.2 (4)(d)
6.2 (4)(e)
No. Mata
Pembayaran
6.3 (1)
6.3 (2)
6.3(3a)
6.3(3b)
6.3.4a
6.3.4b
6.3(5a)
6.3(5b)
6.3(5c)
6.3(5d)
6.3(6a)
6.3(6b)
6.3(6c)
6.3(6d)
6.3(7a)
6.3(7b)
6.3(7c)
6.3(7d)
6.3.8
6.3.9
6.3.10
6.4 (1)
6.4 (2)
6.4 (3)
6.4 (4)
6.4 (5)
6.4 (6)
6.5
6.6.1
6.6.2
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata
Pembayaran
7.1 (6)
7.1 (7)
7.1 (8)
7.1 (9)
7.1 (10)
7.2 (1)
7.2 (1)
7.2 (1)
7.2 (1)
7.2 (1)
7.2 (2)
7.2 (2)
7.2 (2)
7.2 (2)
7.2 (2)
7.2 (3)
7.2 (3)
7.2 (3)
7.2 (3)
7.2 (3)
7.2.(4)
7.2.(5)
7.2.(6)
7.3 (1)
7.3 (2)
7.3 (3)
7.3 (4)
7.3 (5)
7.3 (6)
7.4 (1)
7.4 (2)
7.4 (3)
7.4 (4)
7.4 (5)
7.4 (6)
7.4 (7)
7.4 (8)
7.5 (1)
7.5 (2)
7.6 (1)
No. Mata
Pembayaran
7.6 (2)
7.6 (3)
7.6 (4)
No. Mata
Pembayaran
7.6 (5)
7.6 (6)
7.6 (7)
7.6 (8)
7.6 (9)
7.6 (10)
7.6 (11)
7.6 (12)
7.6 (13)
7.6 (14)
7.6 (15)
7.6 (16)
7.6 (17)
7.7 (1)
7.7 (2)
7.9
7.10 (1)
7.10 (2)
7.10 (3)
7.11 (1)
7.11 (2)
7.11 (3)
7.11 (4)
7.11 (5)
7.11 (6)
7.12 (3)
7.14
No. Mata
Pembayaran
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata
Pembayaran
8.4.(5)
8.5(2)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DAFTAR KUANTITAS DAN HARGA
TAHUN 2014
Uraian
DIVISI 1. UMUM
Mobilisasi
Manajemen dan Keselamatan Lalu Lintas
Relokasi Utilitas dan Pelayanan Telkom yang Ada
Relokasi Utilitas dan Pelayanan PDAM yang Ada
Relokasi Utilitas dan Pelayanan PLN yang Ada
Relokasi Utilitas dan Pelayanan Gas yang Ada
Relokasi Utilitas dan Pelayanan Lain yang Ada
Pengeboran, termasuk SPT dan Laporan
Sondir termasuk Laporan
Manajemen Mutu
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
Gorong-gorong Pipa Beton Bertulang, diameter dalam 50 cm
Gorong-gorong Pipa Beton Bertulang, diameter 50 - 70 cm
Gorong-gorong Pipa Beton Bertulang, diameter dalam 70 - 100 cm
Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 - 130 cm
Gorong2 Pipa Baja Bergelombang
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm
Saluran berbentuk U Tipe DS 1
Saluran berbentuk U Tipe DS 2
Saluran berbentuk U Tipe DS 3
Beton K250 (fc 20) untuk struktur drainase beton minor
Baja Tulangan untuk struktur drainase beton minor
Pasangan Batu tanpa Adukan (Aanstamping)
Bahan Porous untuk Bahan Penyaring (Filter)
Uraian
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Uraian
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Uraian
DIVISI 7. STRUKTUR
Beton mutu sedang dengan fc= 25 MPa (K-300)
Beton mutu sedang dengan fc= 20 MPa (K-250)
Beton mutu rendah dengan fc= 15 MPa (K-175)
Beton Siklop fc=15 MPa (K-175)
Beton mutu rendah dengan fc= 10 MPa (K-125)
Unit Pracetak Gelagar Tipe I
(a) Bentang 16 meter
(b) Bentang 25 meter
(c) Bentang 35 meter
(d) Bentang ....... meter
Unit Pracetak Gelagar Tipe U
(a) Bentang 16 meter
(b) Bentang 25 meter
(c) Bentang 35 meter
(d) Bentang ....... meter
Unit Pracetak Gelagar Tipe V
(a) Bentang 16 meter
(b) Bentang 25 meter
(c) Bentang 35 meter
(d) Bentang ....... meter
Baja Prategang
Pelat Berongga (Hollow Slab) Pracetak bentang 21 meter
Beton Diafragma K350 (fc 30 MPa) termasuk pekerjaan penegangan
Setelah Pengecoran(post-tension)
Baja Tulangan BJ 24 Polos
Baja Tulangan BJ 32 Polos
Baja Tulangan BJ 32 Ulir
Baja Tulangan BJ 39 Ulir
Baja Tulangan BJ 48 Ulir
Anyaman Kawat Yang Dilas (Welded Wire Mesh)
Baja Struktur BJ 34 (Titik Leleh 210 MPa), penyediaan dan pemasangan.
Baja Struktur BJ 37 (Titik Leleh 240 MPa), penyediaan dan pemasangan.
Baja Struktur BJ 41 (Titik Leleh 250 MPa), penyediaan dan pemasangan.
Baja Struktur BJ 50 (Titik Leleh 290 MPa), penyediaan dan pemasangan.
Baja Struktur BJ 55 (Titik Leleh 410 MPa), penyediaan dan pemasangan.
Pengadaan Struktur Jembatan Rangka Baja
a) Panjang 40 m, Lebar 9 m
b) Panjang 45 m, Lebar 9 m
c) Panjang 50 m, Lebar 9 m
d) Panjang 60 m, Lebar 9 m
e) Panjang .... m, Lebar 9m
Pemasangan jembatan baja fabrikasi
Pengangkutan Bahan Jembatan Rangka Baja
Pemasangan jembatan rangka baja
Pengangkutan Bahan Jembatan
Fondasi Cerucuk, Pengadaan dan Pemancangan
Uraian
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Uraian
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
HARGA
59,590,000.00
M3 69,459.00 -
M3 1,061,587.05 -
M1 1,148,485.00 0.00
M1 1,531,493.86 0.00
M1 2,368,522.60 0.00
M1 3,084,252.88 0.00
Ton 20,087,113.94 0
M1 482,557.29 0
M1 514,464.65 0
M1 546,659.93 0
M1 0
M1 0
M1 0
M3 0
Kg 0
M3 0
M3 503,167.55 0
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
M2 33,498.25 0
M1 80,534.19 0
135,277,859.88
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
M3 689,767.76 0
M3 599,188.05 0
Ton 2,737,161.06 0
M3 368,679.96 0
M2 10,281.64 0
Liter 20,431.57 0
Liter 14,827.26 0
M3 682,253.76 -
M3 580,082.54 -
M3 549651.566507106 0
M3 686,141.03 0
M3 2554784.69849396 0
M3 0
M3 0
Ton 2805401.20412475 0
M3 316103.31297204 0
M3
M3
Liter 14,964.68 -
Liter
Liter 17,104.51 -
Liter
Liter
M2 22,802.36 0
M2 36,002.26 0
Liter 19,244.34 0
Liter
Liter
Liter
Liter
Liter
Liter
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
M2 86,322.42 0
M2 106,172.98 0
Ton 684,701.90 -
Ton 0
Ton 601,605.88 -
Ton 603,509.75 0
Ton 611,255.98 0
Ton 580,790.72 0
Ton 610,705.98 0
Ton 0
Ton 610,580.98 0
Ton 644,233.78 0
Ton 610,580.98 0
Ton 931,424.35 0
Ton 616,748.82 0
Ton 622,016.25 0
Ton 616,748.82 0
Ton 622,016.25 0
Ton 16,800,000.00 -
Kg 78,445.50 -
Kg 2,220.85 -
M2 19,361.82 0
M2 9,294.66 0
M2 12,746.99 0
Ton 1,832,187.50 0
Ton 13,188,055.10 0
Liter 78,445.50 0
M3 3,687,535.11 0
M3 2,783,921.31 0
M3 2,956,439.37 0
-
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
Buah 43,527,683.67 0
Buah 71,236,352.00 0
Buah 104,689,427.91 0
Buah 923,722.89 0
Buah 43,527,683.67 0
Buah 71,236,352.00 0
Buah 104,689,427.91 0
Buah 923,722.89 0
Buah 0
Buah 0
Buah 0
Buah 0
Kg 335,457.67 0
Buah 89,139,833.64 0
m3 2,396,210.79 0
Meter Panjang
Meter Panjang
Meter Panjang
1,105,237,355.94
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
63,732,937.52
NAMA PERUSAHAAN : CV. ADHI TRI KARSA
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
LOKASI : KAB. HALMAHERA SELATAN
a b c d
DIVISI 1. UMUM
DIVISI 7. STRUKTUR
7.1 (6) Beton mutu sedang dengan fc= 25 MPa (K-300) M3 28.42
7.1 (10) Beton mutu rendah dengan fc= 10 MPa (K-125) M3 5.14
7.11 (6) Expansion Joint Tipe baja bersudut Meter Panjang 14.00
7.12 (3) Perletakan Elastomer jenis 2 (350 x 400 x 39) Buah 8.00
1,363,838,153.34 100.00 - - - - - - - - - - - - -
136,383,815.33 - - - - - - - - - - - - - -
1,500,221,968.67
0 0.125 0.25 0.375 0.5 0.625 0.75 0.875 1 4.75 9.5 14.25 19 23.75
)
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9
- - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - -
28.5 33.25 38 42.75 47.5 52.25 57 61.75 66.5 71.25 76 80.75 85.5 90.25 95 95.625 96.25 96.875 97.5 98.125 98.75
BULAN 9
MINNGU
35 36
BULAN 9
MINNGU
BULAN 9
MINNGU
- 0.0
- -
99.375 100
100
90
80
70
REKAPITULASI PERHITUNGA
TINGKAT KOMPONEN DALAM NEGER
(1) (2)
Barang
I. Material Langsung (Bahan Baku)
I. Material & Peralatan (Barang Jadi) 1,363,838,153.34
A. Sub Total Barang
Jasa
III. Manajemen Proyek dan Perekayasaan
IV. Alat Kerja / Fasilitas Kerja
V. Konstruksi dan Fabriaksi
VI. Jasa Umum 136,383,815.33
B. Sub Total Jasa
C. TOTAL BIAYA (A + B)
D. PEMBULATAN
REKAPITULASI PERHITUNGAN
AT KOMPONEN DALAM NEGERI (TKDN)
a b
AKKAN
Satuan
c
DAFTAR PEKERJAAN UTAMA
NAMA PERUSAHAAN : CV. ADHI TRI KARSA
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
LOKASI : KAB. HALMAHERA SELATAN
a b
DIVISI 1. UMUM
1.2 Mobilisasi
DIVISI 7. STRUKTUR
Satuan
LS
M3
M3
M3
M3
Kg
Kg
Meter Kubik
Meter Panjang
Buah
Buah
Buah
M2
Panjang Lebar Tebal VOL Koef Total
Lapis Perekat
HRS WC 3585.405 2.25 8,067.16 Ton
Aspal 7.0% 564.70 Ton 1,285.11
Filler 1.5% 121,007.42 Kg 287,256.43
Aditif 0.25% 1,411.75 Kg 3,212.78
5294.78705
1482.6
Divisi Pacing
HRS-BASE PACING M3 2.25
LPA PACING M3 2.25
`
145.00 0.35 710.5 9.00 0.35 0 9.00 468.00
97.00 0.35 84.875 0 2.50 77.00
600 2730
1768 -
10437 0
0
13,984.30
84.88
14,069.18 M3
-
634.65
Rp 24,470,336,321.82
Liter
M3
Ton HRS BASE 4,433.31
Kg HRS WC 3,585.41
Kg Lapis Resap Pengikat - Aspal Cair 89,394.14
Lapis Perekat - Aspal Cair 57,314.62
3,916.44
11,959.00
DAFTA
HARGA DASAR SA
HARGA
SATUAN SATUAN
( Rp.)
M3 329,100.00
M3 406,300.00
M3 406,300.00
M3 215,300.00
M3 283,600.00
M3 408,157.97
M3 408,157.97
Kg 2,220.85
M3 333,700.00
M3 494,300.00
M3 142,113.60
M3 165,856.00
KG 16,800.00
LITER 5,500.00
Zak 111,042.73
Kg 2,220.85
Kg 15,776.27
Kg 28,098.00
Kg 835,920.00
M3 216,400.00
Kg 37,500.00
Kg 75,000.00
Kg 29,400.00
M3 2,100,000.00
M3 4,000,000.00
LITER 11,900.00
LITER 11,900.00
LITER 35,000.00
M2 15,000.00
Staf 254,013.60
M' 40,253.40
M3 398,086.60
M3 329,629.01
M3 433,935.41
M3 0.00
M2 36,300.00
Kg 16,800.00
M2 7,000.00
LITER 30,000.00
Kg 45,000.00
BH 176,000.00
BH 216,500.00
M' 412,500.00
M3 2,341,004.48
Kg 15,776.27
Kg 24,751.61
M3 40,000.00
M3 408,157.97
Kg 216.55
Kg 42,480.00
Bh. 12,600.00
M3 215,300.00
Kg. 32,000.00
Kg 12,500.00
M3 1,736,619.70
Kg 30,000.00
M' 25,247.37
M3 423,957.93
Dos 40,000.00
Kg 15,000.00
Liter 6,237.00
Liter 3,000.00
Ton 325,000.00
Kg 8,000.00
Kg 24,751.61
Kg 29,000.00
Kg 9,000.00
Buah 86,000,000
Buah 97,000,000
Buah 124,000,000
Buah 157,000,000
Buah 168,000,000
Buah 192,000,000
M3 2,563,602.01
M3 1,895,519.48
M 276,000
buah 300,000
liter 5,000
buah 75,000
buah 480,000
Kg 78,445.50
Kg 1,000.00
M3 3,405,646.63
M3 3,147,277.50
M' 150,000
M' 50,000
M3 3,042,254.27
Lbr 181,500.00
buah 526,800.00
buah 889,200.00
buah 1,139,400.00
M 1,320,000.00
M 1,632,000.00
M 611,400.00
Buah 684,000.00
Buah 45,000.00
Buah 40,000.00
Buah 27,000.00
M1 1,200,000.00
Buah 229,500.00
Set 607,500.00
Set 67,500.00
M1 60,750.00
Buah 405,000.00
Botol 229,500.00
Botol 114,750.00
Kg 600.00
M 207,861.33
M 99,840.00
M3 408,157.97
M3 408,157.97
M3 408,157.97
Kg 34,100.00
Kg 35,750.00
M2 6,050.00
Kg 19,250.00
Ltr 38,500.00
M3 2,100,000.00
Ltr 30,000.00
M2 9,000.00
M3 259,000.00
45,000.00
kg 500.00
Buah 45,000.00
Buah 50,000.00
Buah 55,000.00
Kg 75,000.00
KETERANGAN
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Tidak tersedia
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Hasil Proses
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY
(Rp) ( Km )
2,00 km 2,00 km
PETA LOKASI QUARRY
0,5,00 km
0,5 km 0,5 km
10,00 km 8,00 km
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 2.48 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 2.48 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 2.48 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 6,358.07 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 2.48 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 3.48 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 3.48 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 2.48 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
2,00 km
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
284,227.20
606,833.92
595,750.83
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
222,656.00
606,833.92
595,750.83
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
251,169.60
606,833.92
595,750.83
617,655.44
11,778.71
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
426,340.80
606,833.92
595,750.83
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
165,856.00
606,833.92
595,750.83
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
165,856.00
606,833.92
595,750.83
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
331,598.40
606,833.92
595,750.83
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
Formulir Penentuan Harga Bahan
Bahan : Semen
Bahan : Aspal
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT
2. Tenaga Pw 294.0
3. Kapasitas Cp 60.0
4. Alat a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 3,135,000,000.0
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 500.00
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER
2. Tenaga Pw 72.4
3. Kapasitas Cp 10.0
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 1,400.0
c. Harga Alat B 2,200,000,000
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER
2. Tenaga Pw 4.0
3. Kapasitas Cp 850.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 120,000,000
A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP
2. Tenaga Pw 155.0
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 2,100,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M
2. Tenaga Pw 60.0
3. Kapasitas Cp 5,000.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 150,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3
2. Tenaga Pw 20.0
3. Kapasitas Cp 500.0
4. Alat Baru : a. Umur Ekonomis A 2.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 175,500,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON
2. Tenaga Pw 138.0
3. Kapasitas Cp 15.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,488,000,000
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON
2. Tenaga Pw 100.0
3. Kapasitas Cp 3.5
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 315,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir / Mekanik U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON
2. Tenaga Pw 190.0
3. Kapasitas Cp 10.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 570,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir / Mekanik U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 133.0
3. Kapasitas Cp 0.93
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,200,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3
2. Tenaga Pw 190.0
3. Kapasitas Cp 10.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 330,800,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET
2. Tenaga Pw 180.0
3. Kapasitas Cp 135.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 250,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP
2. Tenaga Pw 135.0
3. Kapasitas Cp 10,800.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,535,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP
2. Tenaga Pw 70.0
3. Kapasitas Cp 0.8
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 560,000,000
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 56,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3
2. Tenaga Pw 96.0
3. Kapasitas Cp 1.5
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,625,000,000
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 162,500,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T
2. Tenaga Pw 55.0
3. Kapasitas Cp 8.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 350,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. URAIAN KODE KOEF.
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T.
2. Tenaga Pw 82.0
3. Kapasitas Cp 7.050
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 655,000,000
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 65,500,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR
2. Tenaga Pw 5.5
3. Kapasitas Cp 25.0
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 7,500,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER
2. Tenaga Pw 220.0
3. Kapasitas Cp 50.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 2,000,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm
2. Tenaga Pw 6.0
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 3.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 17,500,000
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L.
2. Tenaga Pw 100.0
3. Kapasitas Cp 4,000.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 310,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER
2. Tenaga Pw 8.8
3. Kapasitas Cp 835.000
4. Alat Baru : a. Umur Ekonomis A 3.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 280,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER
2. Tenaga Pw 4.7
3. Kapasitas Cp 121.000
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 17,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER
2. Tenaga Pw 0.0
3. Kapasitas Cp 1,330.000
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 35,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER
2. Tenaga Pw 345.0
3. Kapasitas Cp 2,005
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 900,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP
2. Tenaga Pw 100.0
3. Kapasitas Cp 8.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 315,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON
2. Tenaga Pw 175.0
3. Kapasitas Cp 20.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 780,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER
2. Tenaga Pw 25.0
3. Kapasitas Cp 2.50
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 400,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON
2. Tenaga Pw 125.0
3. Kapasitas Cp 35.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 700,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET
2. Tenaga Pw 40.0
3. Kapasitas Cp 250.00
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 39,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 150.0
3. Kapasitas Cp 2,000.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 2,250,000,000
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 225,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER
2. Tenaga Pw 5.0
3. Kapasitas Cp 1,000.0
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 15,000,000
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 1,500,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER
2. Tenaga Pw 40.0
3. Kapasitas Cp 20,000.0
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 15,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 16,634.43
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85
4. Bahan Bakar Bensin Mb 11,900.00
5. Bahan Bakar Solar Ms 11,900.00
6. Minyak Pelumas Mp 35,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
SATUAN KET.
liter
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Khusus AMP
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Rp/kg
SATUAN KET.
LT FINISHER E02
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
LT SPRAYER E03
HP
Liter
Tahun
Jam
Rupiah
Liter
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
ROLLER 6-8 T. E17
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
OLLER 8-10 T. E18
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
TE VIBRATOR E20
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
E CRUSHER E21
HP
T/Jam
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
AMPER E25
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
K HAMMER E26
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
VI MIXER E27
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
TENAGA KAPASITAS HARGA ALAT YANG DIP
ALAT ALAT ALAT JAM
UMUR KERJA
ALAT 1 TAHUN
HP Cp B A W
1 2 2a 3 4 5 6 7
1. ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 3,135,000,000 10.0 1,500.0
2. ASPHALT FINISHER E02 72.4 10.0 Ton 2,200,000,000 6.0 1,400.0
3. ASPHALT SPRAYER E03 4.0 850.0 Liter 120,000,000 5.0 2,000.0
4. BULLDOZER 100-150 HP E04 155.0 - - 2,100,000,000 5.0 2,000.0
5. COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 5,000.0 150,000,000 5.0 2,000.0
6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 175,500,000 2.0 1,500.0
7. CRANE 10-15 TON E07 138.0 15.0 Ton 1,488,000,000 5.0 2,000.0
8. DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 315,000,000 5.0 2,000.0
9. DUMP TRUCK 10 TON E09 190.0 10.0 Ton 570,000,000 5.0 2,000.0
10. EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,200,000,000 5.0 2,000.0
11. FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 330,800,000 5.0 2,000.0
12. GENERATOR SET E12 180.0 135.0 KVA 250,000,000 5.0 2,000.0
13. MOTOR GRADER >100 HP E13 135.0 10,800.0 10,800.0 1,535,000,000 5.0 2,000.0
14. TRACK LOADER 75-100 HP E14 70.0 0.8 M3 560,000,000 5.0 2,000.0
15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,625,000,000 5.0 2,000.0
16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 350,000,000 5.0 2,000.0
17. TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 950,000,000 5.0 2,000.0
18. TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 640,000,000 5.0 2,000.0
19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 655,000,000 5.0 2,000.0
20. CONCRETE VIBRATOR E20 5.5 25.0 25.0 7,500,000 4.0 1,000.0
21. STONE CRUSHER E21 220.0 50.0 T/Jam 2,000,000,000 5.0 2,000.0
22. WATER PUMP 70-100 mm E22 6.0 - - 17,500,000 3.0 2,000.0
23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 310,000,000 5.0 2,000.0
24. PEDESTRIAN ROLLER E24 8.8 835.0 Ton 280,000,000 3.0 2,000.0
25. TAMPER E25 4.7 121.0 Ton 17,000,000 4.0 1,000.0
26. JACK HAMMER E26 0.0 1,330.0 1,330.0 35,000,000 5.0 2,000.0
27. FULVI MIXER E27 345.0 2,005.0 2,005.0 900,000,000 4.0 1,000.0
28. CONCRETE PUMP E28 100.0 8.00 M3 315,000,000 6.0 2,000.0
29. TRAILER 20 TON E29 175.0 20.00 Ton 780,000,000 6.0 2,000.0
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 400,000,000 5.0 2,000.0
31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 700,000,000 6.0 2,000.0
32. WELDING SET E32 40.0 250.00 Amp 39,000,000 5.0 2,000.0
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000 6.0 2,000.0
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 15,000,000 4.0 2,000.0
KETERANGAN : 1 Tingkat Suku Bunga =
2 Upah Operator / Sopir / Mekanik =
3 Upah Pembantu Operator/Sopir/Mekanik =
4 Harga Bahan Bakar Bensin =
5 Harga Bahan Bakar Solar =
6 Minyak Pelumas =
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulas
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) se
TENAGA KAPASITAS HARGA ALAT YANG DIP
ALAT ALAT ALAT JAM
UMUR KERJA
ALAT 1 TAHUN
HP Cp B A W
1 2 2a 3 4 5 6 7
B C D e1 e2 E f1 f2
8 9 10 11 12 13 14 15
B C D e1 e2 E f1 f2
8 9 10 11 12 13 14 15
10.00 % per-tahun
16,634 Rupiah per-orang/jam
12,750 Rupiah per-orang/jam
11,900 Rupiah per-liter
11,900 Rupiah per-liter
35,000 Rupiah per-liter
embar Rekapitulasi Biaya Pekerjaan
nasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
M KERJA (I)
OPERATOR PEMBANTU
BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR
/ SOPIR
(Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.)
f1 x HP x 1 Orang 1 Orang
Harga BBM 0.0625 (g1 x B') 0.125 (g1 x B') Per Per
+ s/d ----- s/d ----------- Jam Kerja Jam Kerja
f2 x HP x 0.0875 W 0.175 W = =
Harga Olie Rp16,634.4 Rp12,749.9
F g1 G g1 G H I
16 17 18 17 18 19 20
F+G+H+I E+J
J K L
21 22 23
F+G+H+I E+J
J K L
21 22 23
BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)
8,101,903.07
935,725.86
75,826.34
860,862.90
201,458.11
177,703.64
683,425.07
330,861.32
595,750.83
606,833.92
541,701.47
500,414.00
687,136.14
317,131.25
617,655.44
235,134.88
432,891.20
405,449.45
366,233.34
48,902.46
1,000,711.86
48,245.81
329,731.53
130,347.15
51,606.98
37,292.84
1,478,540.63
326,014.88
596,656.47
177,342.83
464,660.60
130,316.68
848,624.25
44,637.46
603,425.24
1,743,394.57
309,971.49
4,206,405.55
7,585,380.82
587,661.35
408,982.73
578,265.59
708,754.55
926,116.96
619,840.94
572,240.94
88,273.03
145,976.02
705,513.43
704,316.55
693,347.26
171,134.30
125,242.46
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 450,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 4,945,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2,200 M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 9,200,000,000 Rupiah
5.
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 29,250,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 395,000,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 395,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER
2. Tenaga Pw 105 HP
3. Kapasitas Cp 2.50 M
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,337,142,857 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,000,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPAHLT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 500,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 50,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350)
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 200,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,170,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,634.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,749.85 Rp./Jam
4. Bahan Bakar Bensin Mb 11,900.00 Liter
5. Bahan Bakar Solar Ms 11,900.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 100 Rupiah
###
HARGA
KET.
BARU
Depresiasi
E37
E38
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
E40
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
KET.
###
E41
E36
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E42
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E43
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
###
KET.
###
###
###
E38
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E45
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E46
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
E47
###
KET.
###
###
###
E39
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E48
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E49
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E50
###
###
KET.
###
###
###
E40
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E51
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
KET.
###
###
###
E41
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
KET.
###
###
###
E42
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
KET.
###
###
###
E43
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
KET.
###
> 15th ?
Kondisi Alat
E44
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
KET.
Kondisi Alat
Nilai B' dari
Depresiasi
E45
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
KET.
Depresiasi
###
E46
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
###
###
###
###
###
###
###
###
###
###
E
###
###
###
###
###
KET.
###
###
###
E47
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
KET.
E48
KET.
E49
KET.
E50
KET.
E51
KET.
E52
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Hasil produksi Alat Pemecah Batu : - Agregat Halus H 30.00
- Agregat Kasar K 70.00
4 Berat Isi Bahan : - Batu / Gravel D1 1.20
- Pasir D2 1.40
- Batu Pecah D3 1.35
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 283,600.00
- Pasir Rp2 329,100.00
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3 1,000,711.86
- Wheel Loader Rp4 617,655.44
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 50.00
- Wheel Loader Cp2 1.50
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.70
- Wheel Loader Fa2 0.83
9 Faktor Kehilangan Material Fh 1.10
10 Agregat Halus masih perlu dicampur dengan pasir
II METHODE PELAKSANAAN
III PERHITUNGAN
SATUAN KETERANGAN
%
%
Ton/M3 Berongga
Ton/M3 Berongga
Ton/M3 Berongga
Rp./M3
Rp./M3
Rp./Jam
Rp./Jam
Ton/Jam
M3 Kap. Bucket
-
-
-
Jam
M3/Jam Batu pecah
M3/Jam
M3
menit
Jam
Rp./M3
Rp./M3
Berlanjut
URAIAN ANALISA HARGA SATUAN
Lanjutan 1
SATUAN KETERANGAN
%
Rupiah per 1 M3
ITEM PEMBAYARAN : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 KM
5 Tebal lapis agregat padat t 0.12 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 %
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
- Pasir Urug Fh3 1.05
1. BAHAN
- Agr 20-30 = "20-30" x 1 M3 x Fh1 M93 0.2940 M3
- Agr 5 - 10 & 10 - 20 = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.4410 M3
- Pasir Urug = PU x 1 M3 x Fh3 M44 0.3150 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Gradasi harus
memenuhi Spec.
(lepas)
kondisi sedang
jarak 50 meter
padat
ITEM PEMBAYARAN : AGREGAT KELAS B (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUA
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l 50.00 M
3 Jam kerja effektif perhari Tk 7.00 jam
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip 1.81
6 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 5-10&10-20 18.00 %
- Sirtu St 64.00 %
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 Fh2 1.05
- Sirtu Fh3 1.05
II URUTAN PEKERJAAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat belending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Gradasi harus
memenuhi
Spesifikasi
(lepas)
kondisi sedang
jarak 50 meter
padat
ITEM PEMBAYARAN : AGREGAT KELAS C
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS C
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUA
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN
KETERANGAN
Kap. Bucket
Di luar PPN
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Berlanjut ke halaman
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 643.25 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0435 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0109 Jam
Rp. 69,459.00 / M3
KETERANGAN
Faktor Konversi
masuk dalam
waktu siklus
disesuaikan dgn
lapangan
Berlanjut ke halaman berikut
Analisa EI-21
KETERANGAN
ITEM PEMBAYARAN NO. : 3.1 (1)
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat volume tanah (lepas) D 1.60
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 1.00
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90
Waktu siklus Ts1
- Menggali , memuat T1 0.320
- Lain lain T2 0.100
Waktu siklus = T1 x Fv Ts1 0.42
SATUAN KETERANGAN
Jam
-
ton/m3 1.40 - 1.80
Km
M3
-
Faktor konversi
menit dihapus, masuk
menit dalam waktu siklus
menit disesuaikam
menit
M3/Jam
Jam
ton
-
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
M3/Jam
Jam
Lump Sump
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89
Produksi Galian / hari = Tk x Q1 Qt 643.25
Kebutuhan tenaga :
- Pekerja P 2.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0218
- Mandor = (Tk x M) : Qt (L03) 0.0109
Rp. 72,636.07 / M3
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-311
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Tebal hamparan padat t 0.15
7 Berat volume bahan (lepas) D 1.60
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 1.00
Faktor Efisiensi Alat Fa 0.83
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Menggali, memuat T1 0.32
- Lain lain T2 0.10
Waktu Siklus = T1 x Fv Ts1 0.42
SATUAN KETERANGAN
Jam
-
M
Ton/M3
Km
M3
M3
-
-
menit
menit
menit
M3 kondisi padat
Jam
Ton
-
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
M3
Jam
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89
Produksi Timbunan / hari = Tk x Q1 Qt 643.25
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0435
- Mandor = (Tk x M) : Qt (L02) 0.0109
Rp. 392,783.53 / M3
SATUAN KETERANGAN
M
M
-
Km / Jam
lintasan
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
M
-
M3
Jam
M3
M3
liter/menit
M3
jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK FORM
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETER
KETER
NAMA PERUSAHAAN : CV. ADHI TRI KARSA
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
LOKASI : KAB. HALMAHERA SELATAN : KAB.
0 0 0
0 0 0
ITEM PEMBAYARAN NO. : 4.2 (1) PERKIRAAN VOL. PEK. : 0.00 0.00
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA (Rp.) : 0.00 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00 0.00
Jam
M
PERKIRAAN HARGA JUMLAH JUMLA
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA HARG
(Rp.) (Rp.) (Rp.)
ton/m3
1.05
A. TENAGA TENAG
URUTA
1. Pekerja (L01) Jam 0.0496 11,778.71 584.34 584.34
2. Mandor (L03) Jam 0.0071 15,232.14 107.95 107.95
Dump
pekerj
JUMLAH HARGA TENAGA 692.30 692.30
B. BAHAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 %
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 5.1 (1)
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0496 jam
- Mandor = (Tk x M) : Qt (L03) 0.0071 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 5.1 (1)
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
KETERANGAN
Gradasi harus
memenuhi Spec.
(lepas)
kondisi sedang
panduan
Berlanjut ke hal. berikut
Analisa EI-511
KETERANGAN
1 x pp
Lump Sum
Berlanjut ke hal. berikut
Analisa EI-511
KETERANGAN
Analisa EI-634a
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 617,655.44 5,911.82
2. AMP E01 Jam 0.0201 8,101,903.07 162,688.82
3. Genset E12 Jam 0.0201 500,414.00 10,048.47
4. Dump Truck E08 Jam 0.2626 330,861.32 86,870.33
5. Asphalt Finisher E02 Jam 0.0035 935,725.86 3,313.88
6. Tandem Roller E17 Jam 0.0137 432,891.20 5,913.33
7 P. Tyre Roller E18 Jam 0.0043 405,449.45 1,731.32
8 Alat Bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 %
- Pasir Ps 49.50 %
- Asbuton Asb 16.00 %
- Peremaja, terdiri atas : Md 4.50 %
- Bunker Oil (BO) Bo 47.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 15.00 %
- Bahan Anti Stripping (jarang digunakan) As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 %
- Pasir Ps 73.00 %
- Asbuton Asb 21.00 %
- Peremaja, terdiri atas : Md 6.00 %
- Bunker Oil (BO) Bo 44.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 18.00 %
- Bahan Anti Stripping As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 %
- Pasir Ps 63.00 %
- Asbuton Asb 18.00 %
- Peremaja, terdiri atas : Md 5.00 %
- Bunker Oil (BO) Bo 44.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 18.00 %
- Bahan Anti Stripping As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 15.00 %
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 %
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1. BAHAN
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.26 Ton
Produksi / hari = Tk x Q1 Qt 8.85 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / Ton :
- Pekerja = (Tk x P) / Qt (L01) 7.9104 Jam
- Mandor = (Tk x M) / Qt (L02) 0.7910 Jam
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Berlanjut ke hal. berikut.
Analisa EI-641
KETERANGAN
lihat tabel
V - loading
Panduan
Berlanjut ke hal. berikut.
Analisa EI-641
KETERANGAN
Lump Sum
Analisa EI-642
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-642
KETERANGAN
Panduan
Analisa EI-642
KETERANGAN
Lump Sum
Analisa EI-642
KETERANGAN
Analisa EI-643
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-643
KETERANGAN
Panduan
Berlanjut ke hal. berikut.
Analisa EI-643
KETERANGAN
Lump Sum
Analisa EI-644
KETERANGAN
Analisa EI-645
KETERANGAN
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Berlanjut ke hal. berikut.
Analisa EI-645
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 6.4 (1)
JENIS PEKERJAAN : Lasbutag
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 6.4 (2)
JENIS PEKERJAAN : Latasbusir Kelas A
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja (L01) Jam 0.0064
2. Mandor (L02) Jam 0.0003
B. BAHAN
1. Pasir (M01) M3 0.0137
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 6.4 (3)
JENIS PEKERJAAN : Latasbusir Kelas B
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 6.4 (4)
JENIS PEKERJAAN : Bitumen Asbuton
SATUAN PEMBAYARAN : Ton
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 6.4 (5)
JENIS PEKERJAAN : Bitumen Bahan Peremaja
SATUAN PEMBAYARAN : Ton
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
1. Bunker Oil (M54) Ltr 647.3300
2. Aspal Semen (M10) Kg 507.6720
4. Minyak Tanah (M11) Ltr 250.4960
C. PERALATAN
UNTUK
ING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
11,778.71 73.32
15,232.14 4.74
408,157.97 4,601.98
329,100.00 6,122.49
617,655.44 142.63
330,861.32 5,374.01
405,449.45 218.32
432,891.20 354.80
935,725.86 291.23
177,703.64 418.13
0.00 0.00
17,601.66
1,760.17
19,361.82
ja dan Peralatan, volume dan/atau ukuran
UNTUK
ING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
11,778.71 75.09
15,232.14 4.86
617,655.44 69.64
330,861.32 2,700.07
405,449.45 218.32
432,891.20 354.80
935,725.86 298.25
177,703.64 214.10
0.00 0.00
8,449.69
844.97
9,294.66
ja dan Peralatan, volume dan/atau ukuran
UNTUK
ING HARGA SATUAN
11,778.71 75.09
15,232.14 4.86
408,157.97 1,431.73
329,100.00 5,194.84
617,655.44 95.09
330,861.32 3,629.74
405,449.45 218.32
432,891.20 354.80
935,725.86 298.25
177,703.64 285.47
0.00 0.00
11,588.17
1,158.82
12,746.99
ja dan Peralatan, volume dan/atau ukuran
UNTUK
ING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
325,000.00 1,665,625.00
1,665,625.00
166,562.50
1,832,187.50
ja dan Peralatan, volume dan/atau ukuran
Analisa EI-645
UNTUK
ING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
11,778.71 93,174.66
15,232.14 12,049.28
44,637.46 35,310.15
11,989,141.00
1,198,914.10
###
ja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.12 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 350 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3
: Pasir Ps 631.0 Kg/M3
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5097 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
KETERANGAN
Berdasarkan
JMF dari EE
663
1,042
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 7.1 (4)
JENIS PEKERJAAN : Beton K-300
SATUAN PEMBAYARAN : M3 URAIAN ANAL
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 2,819,962.21 / M3
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
Analisa EI-7
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K-300 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
28.42
80,137,685.97
5.34
JUMLAH
HARGA
(Rp.)
9,460.81
15,153.71
1,529.33
26,143.86
1,303,863.74
207,072.36
303,669.53
420,000.00
47,040.00
2,281,645.62
71,160.10
172,072.31
12,580.12
0.00
255,812.53
2,563,602.01
256,360.20
2,819,962.21
an/atau ukuran
satuan pekerjaan
diubah kecuali
da Peserta Lelang
ak termasuk PPN
ITEM PEMBAYARAN NO. : 7.1 (8)
JENIS PEKERJAAN : Beton K125
SATUAN PEMBAYARAN : M3 URAIAN ANAL
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.12 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 250 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 311.060 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5113 M3
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3
1.e. Kayu Perancah (M19) 0.0500 M3
1.f Paku (M18) 0.4000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
KETERANGAN
Berdasarkan
JMF dari EE
Agregat Kasar
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 7.1 (8)
JENIS PEKERJAAN : Beton K125
SATUAN PEMBAYARAN : M3 URAIAN ANAL
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3655 jam
Rp. 1,910,281.7 / M3
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
Analisa EI-7
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.1 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Beton K125 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
5.14
9,818,847.77
0.65
JUMLAH
HARGA
(Rp.)
16,083.38
18,735.50
10,399.45
45,218.33
863,523.79
207,728.69
369,485.00
105,000.00
11,760.00
1,557,497.48
121,323.77
12,580.12
0.00
133,903.89
1,736,619.70
173,661.97
1,910,281.67
an/atau ukuran
satuan pekerjaan
diubah kecuali
da Peserta Lelang
ak termasuk PPN
ITEM PEMBAYARAN NO. : 7.3 (1)
JENIS PEKERJAAN : Baja Tulangan 24 Polos
SATUAN PEMBAYARAN : Kg URAIAN ANAL
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.12 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 21,641.69 / Kg
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
KETERANGAN
Analisa EI-7
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Baja Tulangan 24 Polos TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
2,742.61
59,354,660.86
3.96
JUMLAH
HARGA
(Rp.)
1,236.76
480.24
533.12
2,250.12
17,353.89
70.25
17,424.14
0.00
0.00
19,674.26
1,967.43
21,641.69
an/atau ukuran
satuan pekerjaan
diubah kecuali
da Peserta Lelang
ak termasuk PPN
ITEM PEMBAYARAN NO. : 7.3 (3)
JENIS PEKERJAAN : Baja Tulangan 32 Ulir
SATUAN PEMBAYARAN : Kg URAIAN ANAL
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.12 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D32 (M39b) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 33,042.75 / Kg
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
KETERANGAN
Analisa EI-7
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.3 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Baja Tulangan 32 Ulir TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
2,316.23
76,534,667.95
5.10
JUMLAH
HARGA
(Rp.)
1,236.76
480.24
533.12
2,250.12
27,226.78
561.96
27,788.74
0.00
0.00
30,038.86
3,003.89
33,042.75
an/atau ukuran
satuan pekerjaan
diubah kecuali
da Peserta Lelang
ak termasuk PPN
ITEM PEMBAYARAN NO. : 7.9
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.12 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25 %
: - Volume Pasir Ps 75 %
7 Perbandingan Batu & Mortar :
- Batu Bt 65 %
- Mortar (campuran semen & pasir) Mr 35 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.30 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1700 M3
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1225 M3
x {D5 x (1000)} (M12) 176.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.5088 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts 17.00 menit
Berlanjut ke hal.
PROYEK : 7.9
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA S
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 1.465 M3/Jam
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 10.25 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Batu Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 5.4618 jam
Rp. 1,323,428.70 / M3
KETERANGAN
Spec.
Spec.
Lepas
Berlanjut ke hal. berikut.
Analisa EI-79
KETERANGAN
Analisa
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.9 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
649.53
859,608,677.83
57.30
JUMLAH
HARGA
(Rp.)
64,333.52
18,735.50
10,399.45
93,468.47
331,812.00
488,588.01
167,461.27
987,861.28
121,323.77
463.48
0.00
121,787.25
1,203,117.00
120,311.70
1,323,428.70
an pekerjaan
ITEM PEMBAYARAN NO. : 7.14
JENIS PEKERJAAN : Papan Nama Jembatan
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan di lokasi jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.12 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Marmer 0.750 M2
2. ALAT
2.a. Alat bantu pertukangan
3. TENAGA
Produksi Papan Nama dalam 1 hari
= Tk x Q1 = Qt 1.00 Buah
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 7.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.00 jam
- Pekerja = (Tk x P) : Qt (L01) 14.00 jam
KETERANGAN
Analisa EI-7
PROYEK
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
0
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.14 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Papan Nama Jembatan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
2.00
2,108,015.56
0.14
JUMLAH
HARGA
(Rp.)
164,901.94
0.00
106,624.98
271,526.92
513,000.00
173,661.97
686,661.97
0.00
0.00
958,188.89
95,818.89
1,054,007.78
an pekerjaan
ITEM PEMBAYARAN NO. : 7.7 (2)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, Diameter 300 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA S
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
KETERANGAN
Spec.
Tambahan
Tambahan
Analisa EI-772
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.7 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, D TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Err:509
Err:509
Err:509
JUMLAH
HARGA
(Rp.)
123,676.46
48,023.50
17,770.83
189,470.79
4,118,510.18
4,163,258.49
1,484,402.53
58,800.00
9,824,971.19
0.00
0.00
10,014,441.98
1,001,444.20
11,015,886.18
olume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.1 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 7.07 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.93 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 194.52 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
KETERANGAN
Lump Sump
KETERANGAN
Analisa EI-776
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 7.7 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, D TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Err:509
Err:509
Err:509
JUMLAH
HARGA
(Rp.)
16,954.86
2,740.74
19,695.60
0.00
154,361.40
314,895.85
0.00
469,257.24
488,952.84
48,895.28
537,848.12
olume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fk
6 Tebal Lantai Jembatan Kayu
1. BAHAN
- Kayu Klas I untuk 1 m2.
- Paku dan material lainnya
2. ALAT
3. TENAGA
Produksi menentukan : Q1
Produksi Penggembalian kondisi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 515,049.68 / M3
7.00 Jam
1.10 -
0.10 cm
0.10 m3
0.20 kg
Lump Sump
1.00 M2/Jam
7.00 M2/Hari
4.00 orang
1.00 orang
4.0000 Jam
1.0000 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 8.5.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan kayu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (Rp.
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
47,114.84
15,232.14
62,346.98
400,000.00
5,880.00
405,880.00
0.00
0.00
468,226.98
46,822.70
515,049.68
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
k termasuk PPN
ITEM PEMBAYARAN NO. : 8.4.(5)
JENIS PEKERJAAN : Patok Pengarah
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA SATU
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.1 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 24.6 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 74.6 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 93.48 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0749 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2995 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5991 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-845
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : 55. PEMBANGUNAN JEMBATAN AKE DORO I (DAK)
PROP / KAB / KODYA : KAB. HALMAHERA SELATAN
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
40.00
9,652,721.33
0.64
JUMLAH
HARGA
(Rp.)
7,056.38
4,109.98
1,140.66
12,307.02
67,172.47
115,124.01
0.00
182,296.48
24,776.52
0.00
24,776.52
219,380.03
21,938.00
241,318.03
tan, volume dan/atau ukuran
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
KET.
E08
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E11)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E23)
0
0
0
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E04)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E13)
0
0
0
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E15)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E14)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E10)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E07)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E16)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E19)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E25)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E18)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E05)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E06)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E22)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
E26
Analisa EI-1011
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (4)
JENIS PEKERJAAN : Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (5)
JENIS PEKERJAAN : Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
2.04
JUMLAH
HARGA
(Rp.)
2,968,234.92
767,699.86
3,735,934.78
262,332.35
1,102,879.52
703,623.83
741,000.00
2,809,835.69
11,543,887.15
9,100,584.75
3,384,496.25
24,028,968.14
30,574,738.61
3,057,473.86
33,632,212.47
4,204,026.56
4,204,026.56
uk PPN yang dibayarkan
1.12
JUMLAH
HARGA
(Rp.)
989,411.64
255,899.95
1,245,311.59
1,549,286.75
155,000.00
1,704,286.75
5,771,943.57
4,550,292.37
1,975,133.02
12,297,368.97
15,246,967.31
1,524,696.73
16,771,664.04
2,096,458.00
2,096,458.00
uk PPN yang dibayarkan
2.42
JUMLAH
HARGA
(Rp.)
1,484,117.46
383,849.93
1,867,967.39
20,063,995.00
20,063,995.00
0.00
11,116,940.45
11,116,940.45
33,048,902.84
3,304,890.28
36,353,793.12
4,544,224.14
4,544,224.14
uk PPN yang dibayarkan
0.41
JUMLAH
HARGA
(Rp.)
494,705.82
63,974.99
558,680.81
458,477.09
458,477.09
4,550,292.37
4,550,292.37
5,567,450.27
556,745.03
6,124,195.30
765,524.41
765,524.41
uk PPN yang dibayarkan
3.94
JUMLAH
HARGA
(Rp.)
5,936,469.84
1,535,399.71
7,471,869.55
713,584.03
713,584.03
45,502,923.73
45,502,923.73
53,688,377.31
5,368,837.73
59,057,215.04
7,382,151.88
7,382,151.88
uk PPN yang dibayarkan
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.1 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 10.A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.1 KM
5 Tebal Lapis Hotmix padat t 0.03 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.50 -
- Aspal Fh2 1.40 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 %
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 %
- Semen FF 2.00 %
- Asphalt As 7.00 %
11 Berat Isi bahan :
- AC-WC D1 2.23 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0316 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0307 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 2.0070 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 6.5562 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke h
ITEM PEMBAYARAN NO. : 10.B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA S
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 1.27 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 8.92 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 7.8461 Jam
- Mandor = (Tk x M) / Qt (L03) 1.5692 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.12 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
Ts1 0.45 menit
Berlanjut ke h
ITEM PEMBAYARAN NO. : 10.C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA S
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.1 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 7.00 %
- Tebal nominal padat t 0.03 M
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.7000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.844 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 12.91 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5422 jam
- Pekerja = (Tk x P) : Qt (L01) 6.5060 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 10.D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA S
Rp. 4,332,740.96 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 5.1 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 %
- Minyak Fluk / Pencair K 13.00 %
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.50 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 352.75 liter
Produksi / hari = Tk x Q1 Qt 2,469.25 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
KETERANGAN
padat
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Analisa EI-10B
KETERANGAN
Gradasi harus -
memenuhi -
Spesifikasi
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Lump Sum
Analisa EI-10C
KETERANGAN
Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t)
Lihat panduan
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Lump Sum
Analisa EI-10D
KETERANGAN
KETERANGAN
Melayani 1 buah
molen
Berlanjut ke halaman berikut
Analisa EI-10D
KETERANGAN
Analisa EI-10E
KETERANGAN
100 bagian
15 bagian
campuran
Berlanjut ke halaman berikut
Analisa EI-10E
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : SK. 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan
Note: 1 Biaya Pekerjaan Lump Sump sudah termasuk untuk matrial, tenaga kerja, bahan bakar, bahan habis terpaka
2 Biaya Satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN y
3 Harga Lump sump yang diajukan penyedia harus mencakup seluruh tambahan tenaga kerja, bahan, peralat
NTUK
NG HARGA SATUAN
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0
0.00 0.00
ahan bakar, bahan habis terpakai dan operator serta biaya inspeksi lapan
an (tetapi tidak termasuk PPN yang dibayarkan dari kontrak ) dan biaya-b