You are on page 1of 14

PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING

SUBJECT : BMS - I/O SCHEDULE


DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
MAIN BUILDING
GROUND FLOOR
12 TOILET EXHAUST FAN
1 EF fan flow status 12 Air differential pressure switch P
2 EF fan on/off status 12 VFC from fan control panel P
3 EF fan auto/manual position status 12 VFC from fan control panel P
4 EF fan trip status 12 VFC from fan control panel P
5 EF fan enable/disable command 12 Relay output from BMS P
0 0 0 36 12 0 0 0 12 0
Total 0 48 0 12 60
4 PANTRY EXHAUST FAN
1 EF fan flow status 4 Air differential pressure switch P
2 EF fan on/off status 4 VFC from fan control panel P
3 EF fan auto/manual position status 4 VFC from fan control panel P
4 EF fan trip status 4 VFC from fan control panel P
5 EF fan enable/disable command 4 Relay output from BMS P
0 0 0 12 4 0 0 0 4 0
Total 0 16 0 4 20
12 FM 200 SYSTEM
1 Abort switch status 12 VFC from system control panel P
2 1st stage alarm 12 VFC from system control panel P
3 2nd stage alarm 12 VFC from system control panel P
4 Manual release alarm 12 VFC from system control panel P
5 System trouble alarm 12 VFC from system control panel P
6 Gas leakage alarm 12 VFC from system control panel P
7 Gas discharge alarm 12 VFC from system control panel P
0 0 0 12 72 0 0 0 0 0
Total 0 84 0 0 84
1 UTILITY EXHAUST FAN (EF-1)
1 EF fan flow status 1 Air differential pressure switch P
2 EF fan on/off status 1 VFC from fan control panel P
3 EF fan auto/manual position status 1 VFC from fan control panel P
4 EF fan trip status 1 VFC from fan control panel P
5 EF fan enable/disable command 1 Relay output from BMS P

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-1 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
0 0 0 3 1 0 0 0 1 0
Total 0 4 0 1 5

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-2 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
11 FRESH AIR FAN
1 Fan on/off status P
2 Fan auto/manual position status P
Through Open Protocol P
3 Fan trip status
4 Fan enable/disable command P
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
87 FCU
1 Space temperature/setpoint/fan speed P
2 ACCU status Through Open Protocol P
3 FCU 3-speed control P
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0

37 MOTORIZED FIRE DAMPER


1 Damper open/close status 37 VFC from fire damper (by others) P
0 0 0 37 0 0 0 0 0 0
Total 0 37 0 0 37
8 PRECISION AC UNITS
1 Unit on/off status P
Through Open Protocol P
2 Unit trip status
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
2 UPS
1 Unit Healthy status 2 VFC from UPS control panel P
2 Unit fault alarm 2 VFC from UPS control panel P
0 0 0 2 2 0 0 0 0 0
Total 0 4 0 0 4

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-3 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
FIRST FLOOR
14 TOILET EXHAUST FAN (TEF:14-28)
1 EF fan flow status 14 Air differential pressure switch P
2 EF fan on/off status 14 VFC from fan control panel P
3 EF fan auto/manual position status 14 VFC from fan control panel P
4 EF fan trip status 14 VFC from fan control panel P
5 EF fan enable/disable command 14 Relay output from BMS P
0 0 0 42 14 0 0 0 14 0
Total 0 56 0 14 70
4 PANTRY EXHAUST FAN (KEF 6,7,8,9)
1 EF fan flow status 4 Air differential pressure switch P
2 EF fan on/off status 4 VFC from fan control panel P
3 EF fan auto/manual position status 4 VFC from fan control panel P
4 EF fan trip status 4 VFC from fan control panel P
5 EF fan enable/disable command 4 Relay output from BMS P
0 0 0 12 4 0 0 0 4 0
Total 0 16 0 4 20
4 UTILITY EXHAUST FAN (EF-2,3,4,5)
1 EF fan flow status 4 Air differential pressure switch P
2 EF fan on/off status 4 VFC from fan control panel P
3 EF fan auto/manual position status 4 VFC from fan control panel P
4 EF fan trip status 4 VFC from fan control panel P
5 EF fan enable/disable command 4 Relay output from BMS P
0 0 0 12 4 0 0 0 4 0
Total 0 16 0 4 20
2 FM 200 SYSTEM
1 Abort switch status 2 VFC from system control panel P
2 1st stage alarm 2 VFC from system control panel P
3 2nd stage alarm 2 VFC from system control panel P
4 Manual release alarm 2 VFC from system control panel P
5 System trouble alarm 2 VFC from system control panel P
6 Gas leakage alarm 2 VFC from system control panel P
7 Gas discharge alarm 2 VFC from system control panel P
0 0 0 2 12 0 0 0 0 0
Total 0 14 0 0 14
Prepared by: C.Naveen
Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-4 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
11 FRESH AIR FAN
1 Fan on/off status P
2 Fan auto/manual position status P
Through Open Protocol P
3 Fan trip status
4 Fan enable/disable command P
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
69 FCU
1 Space temperature/setpoint/fan speed P
2 ACCU status Through Open Protocol P
3 FCU 3-speed control P
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
2 LIFTS
1 On/off status 2 VFC from unit control panel P
2 Trip alarm 2 VFC from unit control panel P
0 0 0 2 2 0 0 0 0 0
Total 0 4 0 0 4

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-5 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
ROOF
2set BOOSTER PUMP (1 duty/1 standby)(BP-01)
1 Pump on/off status 4 VFC from pump control panel P
2 Pump auto/manual status 4 VFC from pump control panel P
3 Pump local/remote status 4 VFC from pump control panel P
4 Pump trip status 4 VFC from pump control panel P
0 0 0 12 4 0 0 0 0 0
Total 0 16 0 0 16
22 AIR COOLED CONDENSING UNIT
1 Unit on/off status
2 Unit trip status Through Open Protocol
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-6 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
MOSQUE
2 TOILET EXHAUST FAN -2 NOS
1 EF fan flow status 2 Air differential pressure switch P
2 EF fan on/off status 2 VFC from fan control panel P
3 EF fan auto/manual position status 2 VFC from fan control panel P
4 EF fan trip status 2 VFC from fan control panel P
5 EF fan enable/disable command 2 Relay output from BMS P
0 0 0 6 2 0 0 0 2 0
Total 0 8 0 2 10
3 UTILITY EXHAUST FAN (EF-1,2,3)
1 EF fan flow status
2 EF fan on/off status
3 EF fan auto/manual position status
4 EF fan trip status
5 EF fan enable/disable command
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
BOOSTER PUMP (1 duty/1 standby)(ROOF) (BP-
1 set
02)
1 Pump on/off status 2 VFC from pump control panel P
2 Pump auto/manual status 2 VFC from pump control panel P
3 Pump local/remote status 2 VFC from pump control panel P
4 Pump trip status 2 VFC from pump control panel P
0 0 0 6 2 0 0 0 0 0
Total 0 8 0 0 8
1 AC UNIT
1 Unit on/off status
2 Unit trip status Through Open Protocol
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-7 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
SECURITY BLOCK AREA
1 TOILET EXHAUST FAN (TEF-1)
1 EF fan flow status 1 Air differential pressure switch P
2 EF fan on/off status 1 VFC from fan control panel P
3 EF fan auto/manual position status 1 VFC from fan control panel P
4 EF fan trip status 1 VFC from fan control panel P
5 EF fan enable/disable command 1 Relay output from BMS P
0 0 0 3 1 0 0 0 1 0
Total 0 4 0 1 5
1 PANTRY EXHAUST FAN (KEF-1)
1 EF fan flow status 1 Air differential pressure switch P
2 EF fan on/off status 1 VFC from fan control panel P
3 EF fan auto/manual position status 1 VFC from fan control panel P
4 EF fan trip status 1 VFC from fan control panel P
5 EF fan enable/disable command 1 Relay output from BMS P
0 0 0 3 1 0 0 0 1 0
Total 0 4 0 1 5
2 LIFTING BARRIERS
1 Unit status 2 VFC from unit control panel P
2 Unit trip status 2 VFC from unit control panel P
0 0 0 2 2 0 0 0 0 0
Total 0 4 0 0 4

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-8 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
TRANSPORTATION STAFF BUILDING
2 TOILET EXHAUST FAN-2 NOS
1 EF fan flow status 2 Air differential pressure switch P
2 EF fan on/off status 2 VFC from fan control panel P
3 EF fan auto/manual position status 2 VFC from fan control panel P
4 EF fan trip status 2 VFC from fan control panel P
5 EF fan enable/disable command 2 Relay output from BMS P
0 0 0 6 2 0 0 0 2 0
Total 0 8 0 2 10
2 AC UNIT
1 Unit on/off status
2 Unit trip status Through Open Protocol
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
WORKSHOP AND STORES
1 TOILET EXHAUST FAN
1 EF fan flow status 1 Air differential pressure switch P
2 EF fan on/off status 1 VFC from fan control panel P
3 EF fan auto/manual position status 1 VFC from fan control panel P
4 EF fan trip status 1 VFC from fan control panel P
5 EF fan enable/disable command 1 Relay output from BMS P
0 0 0 3 1 0 0 0 1 0
Total 0 4 0 1 5
2 ROLLING SHUTTERS
1 Unit status 2 VFC from unit control panel P
2 Unit trip status 2 VFC from unit control panel P
0 0 0 2 2 0 0 0 0 0
Total 0 4 0 0 4

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-9 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
1 PANTRY EXHAUST FAN (KEF-1)
1 EF fan flow status 1 Air differential pressure switch P
2 EF fan on/off status 1 VFC from fan control panel P
3 EF fan auto/manual position status 1 VFC from fan control panel P
4 EF fan trip status 1 VFC from fan control panel P
5 EF fan enable/disable command 1 Relay output from BMS P
0 0 0 3 1 0 0 0 1 0
Total 0 4 0 1 5
2 UTILITY EXHAUST FAN
1 EF fan flow status 2 Air differential pressure switch P
2 EF fan on/off status 2 VFC from fan control panel P
3 EF fan auto/manual position status 2 VFC from fan control panel P
4 EF fan trip status 2 VFC from fan control panel P
5 EF fan enable/disable command 2 Relay output from BMS P
0 0 0 6 2 0 0 0 2 0
Total 0 8 0 2 10
1 SUPPLY FAN
1 SF fan flow status 1 Air differential pressure switch P
2 SF fan on/off status 1 VFC from fan control panel P
3 SF fan auto/manual position status 1 VFC from fan control panel P
4 SF fan trip status 1 VFC from fan control panel P
5 SF fan enable/disable command 1 Relay output from BMS P
0 0 0 3 1 0 0 0 1 0
Total 0 4 0 1 5

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-10 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
SUBSTATION BUILDING
1 UTILITY EXHAUST FAN (EF-1)
1 EF fan flow status
2 EF fan on/off status
3 EF fan auto/manual position status
4 EF fan trip status
5 EF fan enable/disable command
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0
4 GENERATOR(3 NOS+1 MOBILE GEN)
1 Generator status 4 VFC from generator control panel P
2 Generator daily fuel tank level status 4 VFC from fuel level switch (by others) P
3 Generator storage fuel tank level status 4 VFC from fuel level switch (by others) P
4 Generator ATS status 4 VFC from generator control panel P
5 Generator Failure alarm 4 VFC from generator control panel P
6 Generator ATS trip status 4 VFC from generator control panel P
7 Generator alarm 4 VFC from generator control panel P
0 0 0 16 12 0 0 0 0 0
Total 0 28 0 0 28
3 MV PANEL
1 MV panel on/off status 3 VFC from MV panel P
3 MV panel trip status 3 VFC from MV panel P
0 0 0 3 3 0 0 0 0 0
Total 0 6 0 0 6
3 TRANSFORMER
1 Unit Healthy status 3 VFC from transformer P
2 Unit fault alarm 3 VFC from transformer P
0 0 0 3 3 0 0 0 0 0
Total 0 6 0 0 6

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-11 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
PUMP HOUSE BUILDING
IRRIGATION BOOSTER PUMP (IRBP-01) (2
1 set
DUTY,1 STANDBY)
1 Pump on/off status 3 VFC from pump control panel P
2 Pump auto/manual status 3 VFC from pump control panel P
3 Pump local/remote status 3 VFC from pump control panel P
4 Pump trip status 3 VFC from pump control panel P
0 0 0 9 3 0 0 0 0 0
Total 0 12 0 0 12
1 set POTABLE WATER TRANSFER PUMP
1 Pump on/off status 2 VFC from pump control panel P
2 Pump auto/manual status 2 VFC from pump control panel P
3 Pump local/remote status 2 VFC from pump control panel P
4 Pump trip status 2 VFC from pump control panel P
0 0 0 6 2 0 0 0 0 0
Total 0 8 0 0 8

1 set WATER PUMPS (PWP)


1 Pump on/off status 2 VFC from pump control panel P
2 Pump auto/manual status 2 VFC from pump control panel P
3 Pump local/remote status 2 VFC from pump control panel P
4 Pump trip status 2 VFC from pump control panel P
0 0 0 6 2 0 0 0 0 0
Total 0 8 0 0 8

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-12 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
1 set FIRE FIGHTING PUMP
1 System pressure 1 Liquid pressure sensor P
2 Pump flow status 1 VFC from pump control panel P
3 Pump gate valve status 1 VFC from valve actuator (by others) P
4 Electric pump on/off status 1 VFC from pump control panel P
5 Diesel pump on/off status 1 VFC from pump control panel P
6 Jockey pump on/off status 1 VFC from pump control panel P
7 Electric pump trip status 1 VFC from pump control panel P
8 Diesel pump trip status 1 VFC from pump control panel P
9 Jockey pump trip status 1 VFC from pump control panel P
0 1 0 5 3 0 0 0 0 0
Total 1 8 0 0 9

1 DIESEL TANK
1 Tank high water level status 1 VFC from fuel level switch (by others) P
2 Tank low water level status 1 VFC from fuel level switch (by others) P
0 0 0 2 0 0 0 0 0 0
Total 0 2 0 0 2

3 WATER TANK (IR-WT-01,P-WT-01,FF-WT-01)


1 Tank high water level status 3 Level switch P
2 Tank low water level status 3 Level switch P
0 0 0 6 0 0 0 0 0 0
Total 0 6 0 0 6

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-13 of 14
PROJECT - MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
SUBJECT : BMS - I/O SCHEDULE
DIGITAL ANALOG DIGITAL
ANALOG INPUTS

Field Devices / Signal


INPUTS OUTPUTS OUTPUTS

Provision By others
By BMS suppliers
Start/Stop/On/Off
Analog output
Valve mod.out
Analog Input

Rel.Humidity
Temperature

Open/Close

Field Devices /
Item

Qty
Point Description Remarks

Heater
Status

Alarm
Security system ( CCTV,ACCESS CONTROL) FIRE
1
ALARM SYSTEM
1 System Healthy status through common integrated solution software P
2 System fault status Honeywell EBI. P
0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0

GRAND TOTAL POINTS 1 375 0 50

TOTAL POINTS 426


Note:-1
The point schedule was prepared based on the following documents
1 Schedule of Equipments (16 pages)
2 Equipment Schedule ( QDC-1474-AC-14,QDC-1474-AC-13)
3 Site plumbing layout plan (QDC-1474-PL-01,PL-02,PL-03,05,09,10)
Note:-2
Since point schedule was not provided to us, All the equipments are designed by M/S J.B.K controls based on the minimum requirements of the equipments

Prepared by: C.Naveen


Project: MINISTRY OF INTERIOR-INFORMATION SYSTEM BUILDING
11/08/2017
Page:-14 of 14

You might also like