Life Cycle Stages

MS SE 5341 Systems Engineering Fundamentals


Masters of Science in Systems Engineering
Click here to
The University of Texas at El Paso
Begin

MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 1


Contents
Table of
Adaptation

ISO?IEC/IEEE
15288
This presentation is an adaptation of the information given in ISO/IEC/IEEE 15288:2015(E).

Reference

Agreement
Processes
ISO/IEC/IEEE 15288:2015(E). 2015. Systems and software engineering System life cycle processes, First Edition. Switzerland:
ISO, IEC, IEEE.

Project Enabling
Organizational
Back to Title

Processes
Please note:
This presentation contains hyperlinks and animations that are indicated by orange filled
boxes. You will need to click on them to go further into the sections.

Management
Processes

Technical
Watch for any boxes blue boxes with NOTE indication.
At any time if there is a box with a , please click on that box to enable an animation.
- Brown boxes with a picture of the previous material and section tabs, always to the far right
of the screen, may be used to navigate through the material. (Click on the picture itself)

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 2
Contents
Table of
Table of Contents

ISO?IEC/IEEE
15288
Navigation:
The topic images can be
clicked upon to proceed, or;
The tabs on the right

Agreement
Processes
hand side of the slide can
be used to access the first
slide of that section.
Adaptation ISO/IEC/IEEE Agreement Process
Slide 2 Slides 4-11 Slides 12
Prev
Adapted/Sourced

Project Enabling
Organizational
Material

Processes
Patterns

Exist in natural and artificial


systems

Management
Organizational Technical Technical Processes

Processes

Technical
Are used in: Systems Science, Project Enabling Management Slides 15-43
Theories in Science, and Systems Process Slide 14
Engineering Slide 13
Depending on the context in
which patterns are used, their
definition may vary slightly

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 3
Contents
Table of
ISO/IEC/IEEE 15288

ISO?IEC/IEEE
15288
ISO/IEC/IEEE
15288

Agreement
Processes
Life Cycle Processes in
Concepts Description this Standard

Project Enabling
Organizational
Processes
System Life
Cycle Model

Management
Processes

Technical
System Life
Note: Click on
Cycle Stages orange tabs

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 4
Contents
Table of
ISO/IEC/IEEE 15288

ISO?IEC/IEEE
15288
ISO/IEC/IEEE
15288

Agreement
Processes
Life Cycle Processes in
Concepts Description this Standard

Project Enabling
Organizational
Processes
All systems have life cycles that
System Life represent their need, realization,
Cycle Model utilization, evolution, and disposal.
Systems progress through their life

Management
Processes

Technical
cycles through actions by people
System Life developing and managing them. Note: Click on
Cycle Stages orange tabs

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 5
Contents
Table of
ISO/IEC/IEEE 15288

ISO?IEC/IEEE
15288
ISO/IEC/IEEE
15288

Agreement
Processes
Life Cycle Processes in
Concepts Description this Standard

Project Enabling
Organizational
Processes
Represent major life cycle periods that
describe major progress and achievements
System Life Typical system life cycles stages include
Cycle Model concept, development, production,

Management
Processes

Technical
utilization, support, and retirement. (ISO
15288, 14)
System Life
Vary depending on use, circumstance, Note: Click on
Cycle Stages purpose, and nature. orange tabs

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 6
Contents
Table of
Processes in this Standard

ISO?IEC/IEEE
15288
System Life Cycle Processes
Processes in the Standard are categorized into four different process groups (Click on
them for a general description).

Agreement
Processes
Description

Project Enabling
Organizational
Processes
Technical
Agreement
Management
Processes Processes

Management
Processes

Technical
Organizational
Technical
Project-Enabling
Processes Processes Note: Click on
orange tabs

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 7
Contents
Table of
Processes in this Standard

ISO?IEC/IEEE
15288
System Life Cycle Processes
Processes in the Standard are categorized into four different process groups (Click on
them for a general description).

Agreement
Processes
Description Note: Click on
orange tabs

Project Enabling
Organizational
Processes
Achieved when an Technical
Agreement organization/individual tasks another Management
Processes to provide a product or service Processes
Can be used within the same

Management
Processes

Technical
Organizational organization to establish
responsibilities and functions. Technical
Project-Enabling
Processes Processes
Note: Click on
to proceed

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 8
Contents
Table of
Processes in this Standard

ISO?IEC/IEEE
15288
System Life Cycle Processes
Processes in the Standard are categorized into four different process groups (Click on
them for a general description).

Agreement
Processes
Description Note: Click on
orange tabs

Project Enabling
Organizational
Processes
Provides resources needed to meet the Technical
Agreement needs and expectations of the project
Management
Processes Establishes, redirects, or cancels project
Provides resources required
Processes
Sets and monitors quality measures for the

Management
Processes

Technical
Organizational system
Face of an organization
Technical
Project-Enabling
Processes Processes
Note: Click on
to proceed

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 9
Contents
Table of
Processes in this Standard

ISO?IEC/IEEE
15288
System Life Cycle Processes
Processes in the Standard are categorized into four different process groups (Click on
them for a general description).

Agreement
Processes
Description Note: Click on
orange tabs

Project Enabling
Organizational
Processes
Concerned with managing resources Technical
Agreement and assets towards fulfilling Management
Processes agreements Processes
Applied at each Technical Process

Management
Processes

Technical
Organizational
Technical
Project-Enabling
Processes Processes
Note: Click on
to proceed

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 10
Contents
Table of
Processes in this Standard

ISO?IEC/IEEE
15288
System Life Cycle Processes
Processes in the Standard are categorized into four different process groups (Click on
them for a general description).

Agreement
Processes
Description Note: Click on
orange tabs

Project Enabling
Organizational
Processes
Concerned with technical actions required from a
Technical
Agreement product or service to address stakeholder needs and
expectations including health, safety, security, and Management
Processes environmental factors Processes
Apply at every level and life cycle stage of a system

Management
Used to define requirements and transform them

Processes

Technical
Organizational into a product
Used to define activities that allow for the
Technical
Project-Enabling
Processes optimization of benefits to risks during technical Processes
decisions and actions Note: Click on
to proceed

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 11
Contents
Table of
Agreement Processes

ISO?IEC/IEEE
15288
Agreement
Processes
Acquisition Process (Clause 6.1.1)

Project Enabling
Organizational
Processes
Supply Process (Clause 6.1.2)

Management
Processes

Technical
Note: Click on
orange tabs

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 12
Contents
Table of
Organizational Project-Enabling
Processes

ISO?IEC/IEEE
15288
Life Cycle Model Management Process Human Resources Management Process

Agreement
Processes
(Clause 6.2.1) (Clause 6.2.4)

Infrastructure Management Process Quality Management Process

Project Enabling
Organizational
Processes
(Clause 6.2.2) (Clause 6.2.5)

Management
Processes

Technical
Portfolio Management Process Knowledge Management Process
(Clause 6.2.3) (Clause 6.2.6)

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 13
Contents
Table of
Technical Management Processes

ISO?IEC/IEEE
15288
Project Planning Process Configuration Management Process
(Clause 6.3.1) (Clause 6.3.5)

Agreement
Processes
Project Assessment and Control Information Management Process
Process (Clause 6.3.2) (Clause 6.3.6)

Project Enabling
Organizational
Processes
Decision Management Process Measurement Process
(Clause 6.3.3) (Clause 6.3.7)

Management
Processes

Technical
Risk Management Process Quality Assurance Process Note: Click on
(Clause 6.3.4) (Clause 6.3.8) orange tabs

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 14
Contents
Table of
Technical Processes

ISO?IEC/IEEE
15288
Business or Mission Analysis Process Implementation Process Maintenance Process
(Clause 6.4.1) (Clause 6.4.7) (Clause 6.4.13)

Stakeholder Needs & Requirements Integration Process Disposal Process

Agreement
Processes
Definition Process (Clause 6.4.2) (Clause 6.4.8) (Clause 6.4.14)

System Requirements Definition Verification Process


Process (Clause 6.4.3) (Clause 6.4.9)

Project Enabling
Organizational
Processes
Architecture Definition Process Transition Process
(Clause 6.4.4) (Clause 6.4.10)

Management
Design Definition Process Validation Process

Processes

Technical
(Clause 6.4.5) (Clause 6.4.11)
Note: Click on
System Analysis Process Operation Process orange tabs

(Clause 6.4.6) (Clause 6.4.12)

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 15
Contents
Table of
Business or Mission Analysis Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Encompasses all stakeholders


Its purpose is to define the business or mission,

Agreement
Processes
Applies throughout the life of
characterize a solution space, and determine potential Can you list the outputs for the system and is revisited if a
change in environment, needs,
solutions. this process? or other drivers occurs
Related to the concept of
When youre ready click on Output identifying and analyzing
capabilities required or desired
icon on the left

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 16
Contents
Table of
Business or Mission Analysis Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to define the business or mission, Problem or opportunity space is defined Encompasses all stakeholders

Agreement
Processes
Applies throughout the life of
characterize a solution space, and determine potential Solution space is characterized the system and is revisited if a
Preliminary operational concepts and other change in environment, needs,
solutions. concepts in life cycle are defined or other drivers occurs
Related to the concept of
Alternative solution classes are identified and identifying and analyzing
analyzed capabilities required or desired
Preferred alternative solution class(es) are

Project Enabling
Organizational
selected

Processes
Any enabling systems or services needed for
business or mission analysis are available Note: Click on
orange tab
Control Traceability of business or problems with
preferred alternative solution classes is
established

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 17
Contents
Table of
Stakeholder Needs & Requirements
Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to define the stakeholder requirements for a Identifies stakeholders

Agreement
Processes
involved throughout the
system that can provide the capabilities needed in a Can you list the outputs for entire lifecycle of the system
defined environment. this process? along with their needs.
Considers the context of
When youre ready click on Output System of Interest (SOI) with
interoperating and enabling
icon on the left systems

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 18
Contents
Table of
Stakeholder Needs & Requirements
Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to define the stakeholder requirements for a Stakeholders of the system are identified Identifies stakeholders

Agreement
Processes
system that can provide the capabilities needed in a Required characteristics, context of use of involved throughout the
entire lifecycle of the system
capabilities, and capabilities are defined
defined environment. Constraints on system are identified
along with their needs.
Considers the context of
Stakeholders needs are identified System of Interest (SOI) with
Stakeholders needs are prioritized and interoperating and enabling
transformed into stakeholder requirements systems

Project Enabling
Organizational
Critical performance measures are defined

Processes
Stakeholder agreement that their needs and
expectations are reflected in the requirements Note: Click on
orange tab
Control Enabling systems or services needed for needs
and requirements are available
Traceability of requirements to stakeholders and

Management
their needs are established

Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 19
Contents
Table of
System Requirements Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to transform stakeholder, user-oriented Creates set of measurable

Agreement
Processes
system requirements that
view of capabilities into a technical view of a solution that Can you list the outputs for specifies the characteristics,
meets the operational needs of the user. (ISO/IEC/IEEE this process? attributes, and functional
and performance
15288, 54)
When youre ready click on Output requirements the system
must have to fulfill
icon on the left stakeholders requirements.

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 20
Contents
Table of
System Requirements Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to transform stakeholder, user-oriented System description, including system interfaces, Creates set of measurable

Agreement
Processes
functions, and boundaries, for the system solution system requirements that
view of capabilities into a technical view of a solution that specifies the characteristics,
is defined.
meets the operational needs of the user. (ISO/IEC/IEEE System requirements (functional, performance,
attributes, and functional
and performance
15288, 54) process, non-functional, and interface) and design requirements the system
constraints are defined. must have to fulfill
Critical performance measures are defined. stakeholders requirements.

Project Enabling
Organizational
System Requirements are analyzed.

Processes
Enabling systems or services needed for system
requirements definition are available. Note: Click on
orange tab
Control Traceability of system requirements to
stakeholder requirements is developed.

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 21
Contents
Table of
Architecture Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints
Iteration of the process with Business or
Its purpose is to generate system architecture alternatives.

Agreement
Mission Analysis, System Requirements

Processes
Can you list the outputs for Definition, Design Definition, and
Stakeholder Needs and Requirements
Definition process is used to negotiate
this process? understanding of problem and to agree on a
solution.
Deals with the incorporation of
When youre ready click on Output fundamental principles, concepts,
properties, and characteristics into the SOI.
icon on the left Helps identify stakeholders and their
concerns.

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 22
Contents
Table of
Architecture Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to generate system architecture alternatives. Identified stakeholder concerns are addressed by the Iteration of the process with Business or

Agreement
Mission Analysis, System Requirements

Processes
architecture Definition, Design Definition, and
Architecture viewpoints are developed Stakeholder Needs and Requirements
Definition process is used to negotiate
Context, boundaries, and external interfaces of the understanding of problem and to agree on a
system are defined solution.
Deals with the incorporation of
Architecture views and models are developed fundamental principles, concepts,
Concepts, properties, characteristics, behaviors, properties, and characteristics into the SOI.
Helps identify stakeholders and their
functions, or constraints that are significant to decisions concerns.

Project Enabling
Organizational
of the architecture are allocated to architecture entities.

Processes
System elements and their interfaces are identified.
Architecture candidates are assessed. Note: Click on
Architectural basis for processes throughout the life cycle orange tab
Control is achieved
Architecture alignment with requirements and design
characteristics is achieved.

Management
Enabling systems or services needed for architecture

Processes

Technical
definition are available.
Input Act (Process) Output Traceability of architecture elements to stakeholder and
system requirements is developed.

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 23
Contents
Table of
Design Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to provide enough detailed data and Driven by requirements that

Agreement
Processes
have been reviewed through
information about the system and its elements to allow for Can you list the outputs for architecture.
the implementation that is consistent with architectural this process? Considers technologies and
their contributions to the
entities.
When youre ready click on Output

system.
Provides feedback to
icon on the left architecture of the system

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 24
Contents
Table of
Design Definition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to provide enough detailed data and Design characteristics of each system element are Driven by requirements that

Agreement
Processes
defined. have been reviewed through
information about the system and its elements to allow for architecture.
System requirements are allocated to system
the implementation that is consistent with architectural elements.
Considers technologies and
their contributions to the
entities. Design enablers necessary for design definition system.
are defined. Provides feedback to
Interfaces between system elements that architecture of the system

Project Enabling
Organizational
compose the system are defined.

Processes
Design alternatives for system elements are
assessed. Note: Click on
orange tab
Control Design artifacts are developed.
Enabling system or services needed for design
definition are available.

Management
Traceability of design characteristics to

Processes

Technical
Input Act (Process) Output architectural entities is established.

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 25
Contents
Table of
System Analysis Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Applies to the development of


Its purpose is to provide a rigorous source of data and

Agreement
Processes
inputs required for any technical
information for the technical understanding to help in the Can you list the outputs for
assessment.
Includes mathematical analysis,
decision-making throughout the life cycle. this process? modeling, simulation,
experimentation, and others to
analyze technical performance,
When youre ready click on Output behavior, feasibility, affordability,
critical quality characteristics,
icon on the left technical risks, and others

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 26
Contents
Table of
System Analysis Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to provide a rigorous source of data and System analysis needed are identified. Applies to the development of

Agreement
Processes
inputs required for any technical
information for the technical understanding to help in the System analysis assumptions and results are assessment.
validated. Includes mathematical analysis,
decision-making throughout the life cycle. System analysis results are provided for decisions.
modeling, simulation,
experimentation, and others to
Enabling systems or services needed for system analyze technical performance,
behavior, feasibility, affordability,
analysis are available. critical quality characteristics,
Traceability of the system analysis results is technical risks, and others

Project Enabling
Organizational
established.

Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 27
Contents
Table of
Implementation Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Transforms requirements,
Its purpose is to realize a specified system element.

Agreement
Processes
architecture, and design into
Can you list the outputs for actions that create a system
element according to practices of

this process? selected implementation


technology and technical
specialties.
When youre ready click on Output Results in a system element that
satisfies specified system
icon on the left requirements (allocated and

Project Enabling
derived), architecture, and design.

Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 28
Contents
Table of
Implementation Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to realize a specified system element. Implementation constraints that influence Transforms requirements,

Agreement
Processes
architecture, and design into
requirements, architecture, or design are actions that create a system
identified. element according to practices of
selected implementation
A system elements is realized. technology and technical
A system element is packaged or stored. specialties.
Results in a system element that
Enabling Systems or services needed for satisfies specified system
implementation are available. requirements (allocated and

Project Enabling
derived), architecture, and design.

Organizational
Traceability is established.

Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 29
Contents
Table of
Integration Process

ISO?IEC/IEEE
15288
Description Outputs Hints
Interfaces activated to enable
Its purpose is to synthesize a set of system elements into a

Agreement
interoperability of the system

Processes
realized system that satisfies requirements, architecture, Can you list the outputs for
elements as intended.
Iteratively combines
and design. this process? implemented system elements
to form a complete or partial
When youre ready click on Output

system configuration.
Interfaces are defined in
icon on the left Architecture Definition and

Project Enabling
Design Definition processes.

Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 30
Contents
Table of
Integration Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Integration constraints that influence system Interfaces activated to enable


Its purpose is to synthesize a set of system elements into a

Agreement
interoperability of the system

Processes
realized system that satisfies requirements, architecture, requirements, architecture, and design (including elements as intended.
interfaces) are identified. Iteratively combines
and design. Approach and checkpoints for the correct implemented system elements
to form a complete or partial
operation of the assembled interfaces and system configuration.
functions are defined. Interfaces are defined in
Enabling systems or services needed for Architecture Definition and

Project Enabling
Design Definition processes.

Organizational
integration are available.

Processes
System composed of implemented system
elements is integrated. Note: Click on
orange tab
Control Interfaces between the implemented system
elements that constitute the system are checked.
The interface between the system and its external

Management
environment are checked.

Processes

Technical
Act (Process) Integration results and anomalies are identified.
Input Output
Traceability of the integrated system elements is
established.

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 31
Contents
Table of
Verification Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to provide objective evidence that a system Identifies anomalies such

Agreement
Processes
as errors, defects, or
or system element meets specified requirements and Can you list the outputs for faults.
characteristics. this process? Insures that the system or
product is build right.
When youre ready click on Output

icon on the left

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 32
Contents
Table of
Verification Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to provide objective evidence that a system Constraints of verification that influence Identifies anomalies such

Agreement
Processes
requirements, architecture, or design are as errors, defects, or
or system element meets specified requirements and faults.
identified.
characteristics. Enabling systems or services needed for
Insures that the system or
product is build right.
verification are available.
System or system element is verified.
Data providing information for corrective action is

Project Enabling
Organizational
reported.

Processes
Objective evidence that the realized system fulfills
the requirements, architecture, and design is Note: Click on
orange tab
Control provided.
Verification results and anomalies are identified.
Traceability of the verified system elements is

Management
established.

Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 33
Contents
Table of
Transition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to establish a capability for the system to Moves the system in a

Agreement
Processes
orderly planned manner into
provide services specified by stakeholder requirements in Can you list the outputs for the operational status.
the operational environment specified. this process? Installs verified systems with
relevant enabling systems,
When youre ready click on Output such as planning, support,
operator training, user
icon on the left training systems.

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 34
Contents
Table of
Transition Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to establish a capability for the system to Transition constraints that influence system Moves the system in a

Agreement
Processes
requirements, architecture, or design are orderly planned manner into
provide services specified by stakeholder requirements in the operational status.
identified.
the operational environment specified. Enabling systems or services needed for transition
Installs verified systems with
relevant enabling systems,
are available. such as planning, support,
Site is prepared. operator training, user
System installed in its operational location is training systems.

Project Enabling
Organizational
capable of delivering specified functions.

Processes
Operators, users and other stakeholders
necessary for the system utilization and support Note: Click on
orange tab
Control are trained.
Transition results and anomalies are identified.
The installed system is activated and ready for

Management
operation.

Processes

Technical
Act (Process) Traceability of the transitioned elements is
Input Output
established

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 35
Contents
Table of
Validation Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Objective is to acquire
Its purpose is to provide objective evidence that the

Agreement
Processes
confidence in the systems
system fulfills its business or mission objectives and Can you list the outputs for ability to achieve its intended
use in intended environment.
stakeholder requirements in its intended operational this process? Insures that the right system or
environment. product is built.
When youre ready click on Output Also applies to system elements
produced in the definition and
icon on the left realization of the system.

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 36
Contents
Table of
Validation Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to provide objective evidence that the Stakeholders of the system are identified Objective is to acquire

Agreement
Processes
confidence in the systems
system fulfills its business or mission objectives and Required characteristics, context of use of ability to achieve its intended
capabilities, and capabilities are defined use in intended environment.
stakeholder requirements in its intended operational Constraints on system are identified Insures that the right system or
environment. Stakeholders needs are identified product is built.
Also applies to system elements
Stakeholders needs are prioritized and produced in the definition and
transformed into stakeholder requirements realization of the system.

Project Enabling
Organizational
Critical performance measures are defined

Processes
Stakeholder agreement that their needs and
expectations are reflected in the requirements Note: Click on
orange tab
Control Enabling systems or services needed for needs
and requirements are available
Traceability of requirements to stakeholders and

Management
their needs are established

Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 37
Contents
Table of
Operation Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to use the system to deliver its services. Establishes and assigns

Agreement
Processes
requirements for
Can you list the outputs for personnel to operate the
system.
this process? Monitors services and
When youre ready click on Output operator system
performance.
icon on the left

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 38
Contents
Table of
Operation Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to use the system to deliver its services. Operational constraints that influence system Establishes and assigns

Agreement
Processes
requirements, architecture, or design are requirements for
personnel to operate the
identified.
system.
Enabling systems, services, and material required Monitors services and
for operations are available. operator system
Trained and qualified operators are available. performance.
System services that meet stakeholder

Project Enabling
Organizational
requirements are delivered.

Processes
System performance during operation is
monitored. Note: Click on
orange tab
Control Support is provided to the customer.

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 39
Contents
Table of
Maintenance Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to sustain the capability of the system in Monitors the systems

Agreement
Processes
capability to deliver services,
order to provide a service. Can you list the outputs for records, and to take
corrective, adaptive,
this process? perfective, and preventive
When youre ready click on Output actions.

icon on the left

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 40
Contents
Table of
Maintenance Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to sustain the capability of the system in Maintenance constraints that influence system Monitors the systems

Agreement
Processes
requirements, architecture, and design are capability to deliver services,
order to provide a service. records, and to take
identified.
corrective, adaptive,
Enabling systems or services needed for perfective, and preventive
maintenance are available. actions.
Replacement, repaired, or revised system
elements are made available.

Project Enabling
Organizational
Need for changes to address corrective,

Processes
perfective, or adaptive maintenance is reported.
Failure and lifetime data, including associated Note: Click on
orange tab
Control costs, is determined.

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 41
Contents
Table of
Disposal Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to end the existence of a system or system Deactivates, disassembles,

Agreement
Processes
and removes system or
element in a proper fashion that is in accordance with Can you list the outputs for system elements from
specific use.
identified critical disposal needs specified in agreements this process? Intended to be applicable in
and policies. the disposing of all waste
When youre ready click on Output
during the systems entire
life cycle.
icon on the left

Project Enabling
Organizational
Processes
Note: Click on
orange tab
Control

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 42
Contents
Table of
Disposal Process

ISO?IEC/IEEE
15288
Description Outputs Hints

Its purpose is to end the existence of a system or system Disposal constraints are provided as inputs to Deactivates, disassembles,

Agreement
Processes
and removes system or
element in a proper fashion that is in accordance with requirements, architecture, design, and system elements from
implementation. specific use.
identified critical disposal needs specified in agreements Enabling system or services needed for disposal Intended to be applicable in
and policies. are available. the disposing of all waste
System elements or waste products are during the systems entire
life cycle.
destroyed, stored, reclaimed, refurbished, or

Project Enabling
Organizational
recycled in accordance with safety and security

Processes
requirements.
The environment is returned to its original or Note: Click on
orange tab
Control agreed state.
Records of disposal actions and analysis are
available.

Management
Processes

Technical
Input Act (Process) Output

Enabler
END OF SECTION

Processes
Technical
MS SE 5341 FUNDAMENTALS THE UNIVERSITY OF TEXAS AT EL PASO 43