You are on page 1of 15

Project No.

Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L46 K

Total chilled water required: 126.1 l/s 1998 gpm


For 3 pumps: 42.0 l/s 666 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
12.00 9.6 31.50 36.22 1999 126.10 0.80 0.29
8.00 4.0 13.12 15.09 1005 63.43 1.70 0.26
8.00 2.2 7.22 8.30 876 55.25 1.40 0.12
6.00 30.4 99.74 114.70 677 42.71 2.80 3.21
6.00 26.2 85.96 98.85 564 35.60 2.00 1.98
6.00 6.4 21.00 24.15 417 26.30 1.30 0.31
Sub-Total-1 5.85 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 666 2.80 0.20
Pump

Globe Valve 6.00 1.0 170 666 2.80 4.76


Check Valve 6.00 1.0 60 666 2.80 1.68
Gate Valve 6.00 1.0 7 666 2.80 0.20
Gate Valve 6.00 2.0 7 417 1.3 0.182
2-way Control Valve 6.00 1.0 170 417 1.3 2.21
AHU

Balancing Valve 6.00 1.0 170 417 1.3 2.21


Strainer 6.00 1.0 110 417 1.3 1.43
Coil - 1.0 417 9.2
Sub-Total-2 22.06 ft

Sub Total 28 ft
Sub Total 9m
Total with 10% safety 9m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L46 K

Total chilled water required: 126.1 l/s 1998 gpm


For 3 pumps: 42.0 l/s 666 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
12.00 4.8 15.75 18.11 1999 126.10 0.80 0.14
8.00 2.0 6.56 7.55 1005 63.43 1.70 0.13
3.00 38.0 124.67 143.37 130 8.18 3.80 5.45
2.50 13.0 42.65 49.05 77 4.86 4.50 2.21
2.50 23.0 75.46 86.78 65 4.09 3.30 2.86
2.50 19.4 63.65 73.20 57 3.58 2.50 1.83
1.50 27.2 89.24 102.62 21 1.30 3.20 3.28
1.25 27.8 91.21 104.89 15 0.96 3.80 3.99
1.25 2.0 6.56 7.55 14 0.89 3.30 0.25
1.25 3.6 11.81 13.58 13 0.84 2.80 0.38
1.25 3.0 9.84 11.32 11 0.69 2.20 0.25
1.25 6.2 20.34 23.39 10 0.64 1.80 0.42
1.25 6.0 19.69 22.64 9 0.59 1.60 0.36
1.25 1.0 3.28 3.77 9 0.54 1.60 0.06
1.00 4.8 15.75 18.11 6 0.38 2.50 0.45
1.00 1.6 5.25 6.04 5 0.33 1.80 0.11
0.75 14.6 47.90 55.09 3 0.21 2.50 1.38
0.75 5.6 18.37 21.13 2 0.14 1.30 0.27
0.75 15.2 49.87 57.35 1 0.07 0.50 0.29
Sub-Total-1 24.11 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 666 2.80 0.20
Pump

Globe Valve 6.00 1.0 170 666 2.80 4.76


Check Valve 6.00 1.0 60 666 2.80 1.68
Gate Valve 6.00 1.0 7 666 2.80 0.20
Gate Valve 0.75 1.0 0.9 1.1 0.5 0.0045
Fan Coil Unit

2-way Control Valve 0.75 1.0 22 1.1 0.5 0.11


Balancing Valve 0.75 1.0 22 1.1 0.5 0.11
Globe Valve 0.75 1.0 22 1.1 0.5 0.11
Strainer 0.75 1.0 4 1.1 0.5 0.02
Coil - 1.0 1.1 2.1
Sub-Total-2 9.29 ft

Sub Total 33 ft
Sub Total 10 m
Total with 10% safety 11 m

* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 9 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L112 K

Total chilled water required: 45.6 l/s 723 gpm


For 2 pumps: 22.8 l/s 361 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
8.00 6.4 21.00 24.15 723 45.60 0.90 0.22
6.00 19.6 64.30 73.95 673 42.44 2.90 2.14
6.00 16.8 55.12 63.39 491 30.99 1.70 1.08
6.00 21.2 69.55 79.99 489 30.88 1.70 1.36
6.00 21.2 69.55 79.99 420 26.49 1.20 0.96
6.00 19.6 64.30 73.95 418 26.38 1.20 0.89
6.00 5.2 17.06 19.62 263 16.62 0.50 0.10
6.00 10.0 32.81 37.73 262 16.51 0.50 0.19
Sub-Total-1 6.65 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 361 1.00 0.07
Pump

Globe Valve 6.00 1.0 170 361 1.00 1.70


Check Valve 6.00 1.0 60 361 1.00 0.60
Gate Valve 6.00 1.0 7 361 1.00 0.07
Gate Valve 6.00 1.0 7 262 0.5 0.035
2-way Control Valve 6.00 1.0 170 262 0.5 0.85
AHU

Balancing Valve 6.00 1.0 170 262 0.5 0.85


Strainer 6.00 1.0 110 262 0.5 0.55
Coil - 1.0 262 5
Sub-Total-2 9.73 ft

Sub Total 16 ft
Sub Total 5m
Total with 10% safety 5m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L112 K

Total chilled water required: 45.6 l/s 723 gpm


For 2 pumps: 22.8 l/s 361 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
8.00 3.2 10.50 12.07 723 45.60 0.90 0.11
6.00 9.8 32.15 36.98 673 42.44 2.90 1.07
6.00 8.4 27.56 31.69 491 30.99 1.70 0.54
6.00 10.6 34.78 39.99 489 30.88 1.70 0.68
6.00 10.6 34.78 39.99 420 26.49 1.20 0.48
6.00 9.8 32.15 36.98 418 26.38 1.20 0.44
4.00 12.2 40.03 46.03 155 9.76 1.30 0.60
2.50 34.0 111.55 128.28 52 3.27 2.10 2.69
2.00 7.2 23.62 27.17 45 2.85 3.80 1.03
2.00 6.6 21.65 24.90 39 2.43 3.20 0.80
2.00 6.0 19.69 22.64 32 2.01 2.10 0.48
1.50 22.0 72.18 83.01 19 1.17 2.90 2.41
1.25 1.4 4.72 5.43 13 0.80 2.70 0.15
1.25 6.0 19.69 22.64 11 0.69 2.10 0.48
1.25 5.6 18.37 21.13 9 0.58 1.70 0.36
1.00 1.0 3.28 3.77 7 0.47 3.50 0.13
1.00 6.0 19.69 22.64 6 0.36 2.50 0.57
0.75 1.5 4.86 5.58 4 0.25 4.00 0.22
0.75 4.4 14.44 16.60 3 0.18 2.50 0.42
0.75 11.8 38.71 44.52 1 0.07 0.35 0.16
Sub-Total-1 13.80 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 361 1.00 0.07
Pump

Globe Valve 6.00 1.0 170 361 1.00 1.70


Check Valve 6.00 1.0 60 361 1.00 0.60
Gate Valve 6.00 1.0 7 361 1.00 0.07
Gate Valve 0.75 1.0 0.9 1.1 0.5 0.0045
Fan Coil Unit

2-way Control Valve 0.75 1.0 22 1.1 0.5 0.11


Balancing Valve 0.75 1.0 22 1.1 0.5 0.11
Globe Valve 0.75 1.0 22 1.1 0.5 0.11
Strainer 0.75 1.0 4 1.1 0.5 0.02
Coil - 1.0 1.1 2.1
Sub-Total-2 4.89 ft

Sub Total 19 ft
Sub Total 6m
Total with 10% safety 6m

* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 5 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L01 K

Total chilled water required: 97.8 l/s 1551 gpm


For 2 pumps: 48.9 l/s 775 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 34.8 114.17 131.30 1551 97.83 1.10 1.44
10.00 4.0 13.12 15.09 1443 91.07 0.95 0.14
6.00 14.0 45.93 52.82 533 33.62 1.80 0.95
6.00 3.0 9.84 11.32 530 33.41 1.80 0.20
Sub-Total-1 2.74 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 8.00 1.0 9 775 1.00 0.09
Pump

Globe Valve 8.00 1.0 220 775 1.00 2.20


Check Valve 8.00 1.0 80 775 1.00 0.80
Gate Valve 8.00 1.0 9 775 1.00 0.09
Gate Valve 6.00 2.0 7 530 1.8 0.252
2-way Control Valve 6.00 1.0 170 530 1.8 3.06
AHU

Balancing Valve 6.00 1.0 170 530 1.8 3.06


Strainer 6.00 1.0 110 530 1.8 1.98
Coil - 1.0 530 11.4
Sub-Total-2 22.93 ft

Sub Total 26 ft
Sub Total 8m
Total with 10% safety 9m

* The friction loss in the line leading to the farthest FCU was calculated as 8 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L01 K

Total chilled water required: 97.8 l/s 1551 gpm


For 2 pumps: 48.9 l/s 775 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 17.4 57.09 65.65 1551 97.83 1.10 0.72
10.00 2.0 6.56 7.55 1443 91.07 0.95 0.07
8.00 7.8 25.59 29.43 911 57.45 1.40 0.41
8.00 16.0 52.49 60.37 814 51.35 1.00 0.60
8.00 18.2 59.71 68.67 774 48.84 0.95 0.65
8.00 14.2 46.59 53.58 714 45.07 0.80 0.43
6.00 11.4 37.40 43.01 635 40.06 2.50 1.08
6.00 7.6 24.93 28.67 531 33.51 1.80 0.52
6.00 20.4 66.93 76.97 516 32.54 1.70 1.31
6.00 22.2 72.83 83.76 305 19.22 0.65 0.54
6.00 7.6 24.93 28.67 301 19.01 0.65 0.19
4.00 4.0 13.12 15.09 201 12.67 2.20 0.33
1.50 15.6 51.18 58.86 19 1.18 2.90 1.71
1.25 35.0 114.83 132.05 17 1.07 4.50 5.94
1.25 4.0 13.12 15.09 16 1.00 4.00 0.60
1.25 4.6 15.09 17.36 15 0.95 3.70 0.64
1.25 5.6 18.37 21.13 14 0.88 3.20 0.68
1.25 2.8 9.19 10.56 13 0.81 2.70 0.29
1.00 2.8 9.19 10.56 6 0.36 2.50 0.26
1.00 5.6 18.37 21.13 5 0.29 2.00 0.42
0.75 5.6 18.37 21.13 3 0.22 2.50 0.53
0.75 5.8 19.03 21.88 2 0.15 1.30 0.28
Sub-Total-1 18.21 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 8.00 1.0 9 775 1.00 0.09
Pump

Globe Valve 8.00 1.0 220 775 1.00 2.20


Check Valve 8.00 1.0 80 775 1.00 0.80
Gate Valve 8.00 1.0 9 775 1.00 0.09
Gate Valve 0.75 1.0 0.9 2.4 1.7 0.0153
Fan Coil Unit

2-way Control Valve 0.75 1.0 22 2.4 1.7 0.374


Balancing Valve 0.75 1.0 22 2.4 1.7 0.374
Globe Valve 0.75 1.0 22 2.4 1.7 0.374
Strainer 0.75 1.0 4 2.4 1.7 0.068
Coil - 1.0 2.4 1.6
Sub-Total-2 5.99 ft

Sub Total 24 ft
Sub Total 7m
Total with 10% safety 8m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L80 K

Total chilled water required: 78.9 l/s 1251 gpm


For 2 pumps: 39.5 l/s 626 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 13.6 44.62 51.31 1251 78.93 0.70 0.36
8.00 9.8 32.15 36.98 721 45.48 0.90 0.33
8.00 7.8 25.59 29.43 719 45.37 0.90 0.26
6.00 4.0 13.12 15.09 553 34.87 2.00 0.30
6.00 2.0 6.56 7.55 502 31.65 1.80 0.14
Sub-Total-1 1.39 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 775 3.80 0.27
Pump

Globe Valve 6.00 1.0 170 775 3.80 6.46


Check Valve 6.00 1.0 60 775 3.80 2.28
Gate Valve 6.00 1.0 7 775 3.80 0.27
Gate Valve 6.00 1.0 7 502 1.8 0.126
2-way Control Valve 6.00 1.0 170 502 1.8 3.06
AHU

Balancing Valve 6.00 1.0 170 502 1.8 3.06


Strainer 6.00 1.0 110 502 1.8 1.98
Coil - 1.0 502 10.7
Sub-Total-2 28.20 ft

Sub Total 30 ft
Sub Total 9m
Total with 10% safety 10 m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L80 K

Total chilled water required: 78.9 l/s 1251 gpm


For 2 pumps: 39.5 l/s 626 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 6.8 22.31 25.66 1251 78.93 0.70 0.18
6.00 2.4 7.87 9.06 530 33.45 1.80 0.16
6.00 9.0 29.53 33.96 350 22.09 0.95 0.32
6.00 7.0 22.97 26.41 275 17.35 0.55 0.15
6.00 6.6 21.65 24.90 273 17.24 0.55 0.14
3.00 2.0 6.56 7.55 113 7.13 2.80 0.21
2.50 4.4 14.44 16.60 51 3.21 2.00 0.33
1.50 7.4 24.28 27.92 25 1.55 4.00 1.12
1.50 13.0 42.65 49.05 23 1.44 3.80 1.86
1.50 2.0 6.56 7.55 18 1.15 2.60 0.20
1.25 9.8 32.15 36.98 15 0.94 4.00 1.48
1.25 69.6 228.35 262.60 14 0.87 3.50 9.19
1.25 6.4 21.00 24.15 12 0.76 2.40 0.58
1.25 6.4 21.00 24.15 10 0.65 1.80 0.43
1.25 6.4 21.00 24.15 9 0.54 1.60 0.39
1.00 6.4 21.00 24.15 7 0.43 3.50 0.85
1.00 6.4 21.00 24.15 5 0.32 1.80 0.43
0.75 11.0 36.09 41.50 3 0.21 2.50 1.04
Sub-Total-1 19.06 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 775 3.80 0.27
Pump

Globe Valve 6.00 1.0 170 775 3.80 6.46


Check Valve 6.00 1.0 60 775 3.80 2.28
Gate Valve 6.00 1.0 7 775 3.80 0.27
Gate Valve 0.75 1.0 0.9 3.3 3 0.027
Fan Coil Unit

2-way Control Valve 0.75 1.0 22 3.3 3 0.66


Balancing Valve 0.75 1.0 22 3.3 3 0.66
Globe Valve 0.75 1.0 22 3.3 3 0.66
Strainer 0.75 1.0 4 3.3 3 0.12
Coil - 1.0 3.3 2
Sub-Total-2 13.40 ft

Sub Total 32 ft
Sub Total 10 m
Total with 10% safety 11 m

* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 10 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL ROOM L80 K

Total chilled water required: 78.9 l/s 1251 gpm


For 2 pumps: 39.5 l/s 626 gpm

Pump Head Components

A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 6.8 22.31 25.66 1251 78.93 0.70 0.18
6.00 2.4 7.87 9.06 530 33.45 1.80 0.16
6.00 9.0 29.53 33.96 350 22.09 0.95 0.32
6.00 7.0 22.97 26.41 275 17.35 0.55 0.15
6.00 6.6 21.65 24.90 273 17.24 0.55 0.14
3.00 2.0 6.56 7.55 113 7.13 2.80 0.21
2.50 4.4 14.44 16.60 51 3.21 2.00 0.33
2.00 21.6 70.87 81.50 26 1.66 1.70 1.39
1.50 2.6 8.53 9.81 24 1.54 3.90 0.38
1.25 7.2 23.62 27.17 14 0.86 3.50 0.95
1.25 34.4 112.86 129.79 13 0.79 3.00 3.89
1.25 9.0 29.53 33.96 11 0.72 2.00 0.68
1.25 2.0 6.56 7.55 10 0.65 1.80 0.14
1.25 6.8 22.31 25.66 9 0.56 1.60 0.41
1.25 4.2 13.78 15.85 8 0.51 1.20 0.19
1.00 2.2 7.22 8.30 7 0.46 3.50 0.29
1.00 3.4 11.15 12.83 6 0.41 2.50 0.32
1.00 4.0 13.12 15.09 6 0.36 2.50 0.38
0.75 8.0 26.25 30.18 3 0.21 2.50 0.75
0.75 4.6 15.09 17.36 2 0.14 1.30 0.23
0.75 17.0 55.77 64.14 1 0.07 0.40 0.26
Sub-Total-1 10.51 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Pump

Gate Valve 6.00 1.0 7 775 3.80 0.27


Globe Valve 6.00 1.0 170 775 3.80 6.46
Gate Valve 6.00 1.0 7 775 3.80 0.27
Fan Coil Unit

Gate Valve 0.75 1.0 0.9 1.1 0.5 0.0045


2-way Control Valve 0.75 1.0 22 1.1 0.5 0.11
Globe Valve 0.75 1.0 22 1.1 0.5 0.11
Strainer 0.75 1.0 4 1.1 0.5 0.02
Coil - 1.0 1.1 2.1
Sub-Total-2 9.34 ft

Sub Total 20 ft
Sub Total 6m
Total with 10% safety 7m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Tertiary Chilled Water Pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

MECHANICAL PLANT

Total chilled water required: 5.0 l/s 79 gpm


For 1 pumps: 5.0 l/s 79 gpm

Pump Head Components

A- Pipe Losses

Length supply and Friction


Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
2.50 3.0 9.84 11.32 79 4.99 4.70 0.53
2.50 2.0 6.56 7.55 57 3.58 2.40 0.18
2.00 4.6 15.09 17.36 44 2.80 3.50 0.61
2.00 2.0 6.56 7.55 40 2.54 3.00 0.23
2.00 6.6 21.65 24.90 34 2.12 2.40 0.60
1.25 66.2 217.19 249.77 17 1.06 4.50 11.24
Sub-Total-1 13.38 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 2.50 1.0 2.8 79 4.70 0.13
Pump

Globe Valve 2.50 1.0 69 79 4.70 3.24


Check Valve 2.50 1.0 25 79 4.70 1.18
Gate Valve 2.50 1.0 2.8 79 4.70 0.13
Fan Coil Unit

Gate Valve 1.25 1.0 1.5 1.1 4.5 0.0675


2-way Control Valve 1.25 1.0 38 1.1 4.5 1.71
Globe Valve 1.25 1.0 38 1.1 4.5 1.71
Strainer 1.25 1.0 9 1.1 4.5 0.405
Coil - 1.0 1.1 3.6
Sub-Total-2 12.17 ft

Sub Total 26 ft
Sub Total 8m
Total with 10% safety 9m
Project No. Date
DESIGN CALCULATION E0328 14-Apr-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Primary chilled water pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

PRIMARY PUMPS

Total chilled water required: 353.4 l/s 5601 gpm


For 10 pumps: 35.3 l/s 560 gpm

Pump Head Components

A- Pipe Losses
Frictionlos
Pipe Run Dia Length Eq.leng Flow Losses
ses
in m ft ft GPM L/s ft/100ft ft
From Primary 20 17 56.76 65.27 5601 353.39 0.56 0.37
To Chillers 12 55 181.10 208.27 2801 176.70 1.40 2.92
At Chiller 6 3 8.20 9.43 560 35.34 2.10 0.20
From Chillers 20 62 204.72 235.43 5601 353.39 0.56 1.32
Bypass 20 7 23.95 27.54 5601 353.39 0.56 0.15
To Primary 20 15 48.88 56.22 5601 353.39 0.56 0.31
Sub-Total-1 5.27 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Check valve 6 1 60 560 2.10 1.26
Pump

Globe valve 6 1 170 560 2.10 3.57


Gate Valve 6 1 7 560 2.10 0.15
Gate Valve 6 1 7 560 2.10 0.15
Chiller - 1 - 560 - 10.70
Chiller

Globe valve 6 1 170 560 2.10 3.57

Gate valve 6 2 7 560 2.10 0.29


Sub-Total-2 19.69

Sub-Total 25 ft
Sub Total 8m
Total with 10% safety 8m
Project No. Date
DESIGN CALCULATION E0328 14-Apr-2004

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT M.G.

Subject Primary chilled water pumps Checked by Approved by


Building Sharm El-Sheikh Airport New Terminal Building H.A. T.Z.

SECONDARY PUMPS

Total chilled water required: 353.4 l/s 5601 gpm


For 3 pumps: 117.8 l/s 1867 gpm

Pump Head Components

A- Pipe Losses
Frictionlos
Dia Length Eq.leng Flow Losses
ses
in m ft ft GPM L/s ft/100ft ft
20 25 82.02 94.32 5601 353.39 0.56 0.53
20 150 492.13 565.94 5523 348.45 0.52 2.94
16 250 820.21 943.24 3972 250.62 0.90 8.49
12 75 246.06 282.97 1974 124.53 0.75 2.12
10 160 524.93 603.67 1251 78.93 0.75 4.53
Sub-Total-1 18.61 ft

B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Check valve 10 1 100 1867 1.70 1.70
Pump

Globe valve 10 1 280 1867 1.70 4.76


Gate Valve 10 1 12 1867 1.70 0.20
Gate Valve 10 1 12 1867 1.70 0.20
Seperator
Air

Pressure Drop - 1 - 5601 - 4.00

Sub-Total-2 10.87

Sub-Total 29 ft
Sub Total 9m
Total with 10% safety 10 m
Project No. Date
DESIGN CALCULATION Q0206 12-Jul-2003

Mechanical & Industrial Department SHEET Sheet No. Computed by


CAI R O - E GYPT H.A

Subject Circulating chilled water pumps Checked by Approved by


Building Qatar National Library L.N T.Z.

1- Chilled water Flow

CHP-66-02

Total flow: 173.7 l/s = 2753.2 gpm

2- Pump Head

A- Pipe Losses

Diameter length length Equ. L Flow fr. Losses


in. m ft. ft. gpm ft/100ft ft.
1 12 8 26 30 2753.2 1.4 0.4226
2 12 22 72 83 2731.6 1.4 1.1621
3 12 9 30 34 2720.9 1.4 0.4754
4 10 12 39 45 1331.2 0.9 0.4075
5 10 12 39 45 1329.5 0.9 0.4075
6 10 20 66 75 1327.7 0.9 0.6791
7 8 3 10 11 1029.3 1.6 0.1811
8 5 14 46 53 384.0 2.5 1.3205
9 5 24 79 91 380.0 2.5 2.2638
10 5 8 26 30 304.1 1.7 0.5131
11 5 6 20 23 152.0 0.55 0.1245
5.0558

B- Accessories Losses

Item Dia Qty. Equ. L Flow Fr. Losses


in. ft. gpm ft/100ft ft.
Isolating valve 12 1 13 2753.2 0.8 0.104
Pump

Globe valve 12 1 320 2753.2 0.8 2.56


Isolating valve 12 1 13 2753.2 0.8 0.104
2-way control 5 1 55 152 2.7 1.485
AHU-93-1

strainer 5 1 152 0.94


Gate Valve 5 2 6 152 2.7 0.324
Globe valve 5 1 140 152 2.7 3.78
Coil 1 152 11.8

21 ft
sub total= 26 ft
10% safety= 3 ft
Total= 29 ft
Total= 9 m
Project No. Date
Q0206 7-Dec-03

Mechanical & Industrial Department Sheet No. Computed by


CAI R O - E GYPT
1 of 1 Hoda
Subject Checked by Approved by
Building T.Z. T.Z.
secondry pump

1- Chilled water Flow

Total flow: 0.28 l/s = 4.4 gpm

2- Pump Head

A- Pipe Losses

Diameter length length Equ. L Flow fr. Losses


in. m ft. ft. gpm ft/100ft ft.
1 8 140 459 528 941.0 1.7 8.979659
8.979659

B- Accessories Losses

Item Dia Qty. Equ. L Flow Fr. Losses


in. ft. gpm ft/100ft ft.
Isolating valve 12 1 13 4.4 0.8 0.104
Basket strainer 12 1 250 4.4 0.8 2
Pump

Silent check valve 12 1 120 4.4 0.8 0.96


Globe valve 12 1 320 4.4 0.8 2.56
Isolating valve 12 1 13 4.4 0.8 0.104
2-way control 2.5 1 55 60.56 2.7 1.485
AHU-93-1

strainer 2.5 1 27 60.56 2.7 0.729


Gate Valve 2.5 1 2.3 60.56 2.7 0.0621
Globe valve 2.5 1 55 60.56 2.7 1.485
Coil 1 60.56 2.7 11.8

21 ft
sub total= 30 ft
10% safety= 3 ft
Total= 33 ft
Total= 10 m

You might also like