Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
12.00 9.6 31.50 36.22 1999 126.10 0.80 0.29
8.00 4.0 13.12 15.09 1005 63.43 1.70 0.26
8.00 2.2 7.22 8.30 876 55.25 1.40 0.12
6.00 30.4 99.74 114.70 677 42.71 2.80 3.21
6.00 26.2 85.96 98.85 564 35.60 2.00 1.98
6.00 6.4 21.00 24.15 417 26.30 1.30 0.31
Sub-Total-1 5.85 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 666 2.80 0.20
Pump
Sub Total 28 ft
Sub Total 9m
Total with 10% safety 9m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
12.00 4.8 15.75 18.11 1999 126.10 0.80 0.14
8.00 2.0 6.56 7.55 1005 63.43 1.70 0.13
3.00 38.0 124.67 143.37 130 8.18 3.80 5.45
2.50 13.0 42.65 49.05 77 4.86 4.50 2.21
2.50 23.0 75.46 86.78 65 4.09 3.30 2.86
2.50 19.4 63.65 73.20 57 3.58 2.50 1.83
1.50 27.2 89.24 102.62 21 1.30 3.20 3.28
1.25 27.8 91.21 104.89 15 0.96 3.80 3.99
1.25 2.0 6.56 7.55 14 0.89 3.30 0.25
1.25 3.6 11.81 13.58 13 0.84 2.80 0.38
1.25 3.0 9.84 11.32 11 0.69 2.20 0.25
1.25 6.2 20.34 23.39 10 0.64 1.80 0.42
1.25 6.0 19.69 22.64 9 0.59 1.60 0.36
1.25 1.0 3.28 3.77 9 0.54 1.60 0.06
1.00 4.8 15.75 18.11 6 0.38 2.50 0.45
1.00 1.6 5.25 6.04 5 0.33 1.80 0.11
0.75 14.6 47.90 55.09 3 0.21 2.50 1.38
0.75 5.6 18.37 21.13 2 0.14 1.30 0.27
0.75 15.2 49.87 57.35 1 0.07 0.50 0.29
Sub-Total-1 24.11 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 666 2.80 0.20
Pump
Sub Total 33 ft
Sub Total 10 m
Total with 10% safety 11 m
* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 9 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
8.00 6.4 21.00 24.15 723 45.60 0.90 0.22
6.00 19.6 64.30 73.95 673 42.44 2.90 2.14
6.00 16.8 55.12 63.39 491 30.99 1.70 1.08
6.00 21.2 69.55 79.99 489 30.88 1.70 1.36
6.00 21.2 69.55 79.99 420 26.49 1.20 0.96
6.00 19.6 64.30 73.95 418 26.38 1.20 0.89
6.00 5.2 17.06 19.62 263 16.62 0.50 0.10
6.00 10.0 32.81 37.73 262 16.51 0.50 0.19
Sub-Total-1 6.65 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 361 1.00 0.07
Pump
Sub Total 16 ft
Sub Total 5m
Total with 10% safety 5m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
8.00 3.2 10.50 12.07 723 45.60 0.90 0.11
6.00 9.8 32.15 36.98 673 42.44 2.90 1.07
6.00 8.4 27.56 31.69 491 30.99 1.70 0.54
6.00 10.6 34.78 39.99 489 30.88 1.70 0.68
6.00 10.6 34.78 39.99 420 26.49 1.20 0.48
6.00 9.8 32.15 36.98 418 26.38 1.20 0.44
4.00 12.2 40.03 46.03 155 9.76 1.30 0.60
2.50 34.0 111.55 128.28 52 3.27 2.10 2.69
2.00 7.2 23.62 27.17 45 2.85 3.80 1.03
2.00 6.6 21.65 24.90 39 2.43 3.20 0.80
2.00 6.0 19.69 22.64 32 2.01 2.10 0.48
1.50 22.0 72.18 83.01 19 1.17 2.90 2.41
1.25 1.4 4.72 5.43 13 0.80 2.70 0.15
1.25 6.0 19.69 22.64 11 0.69 2.10 0.48
1.25 5.6 18.37 21.13 9 0.58 1.70 0.36
1.00 1.0 3.28 3.77 7 0.47 3.50 0.13
1.00 6.0 19.69 22.64 6 0.36 2.50 0.57
0.75 1.5 4.86 5.58 4 0.25 4.00 0.22
0.75 4.4 14.44 16.60 3 0.18 2.50 0.42
0.75 11.8 38.71 44.52 1 0.07 0.35 0.16
Sub-Total-1 13.80 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 361 1.00 0.07
Pump
Sub Total 19 ft
Sub Total 6m
Total with 10% safety 6m
* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 5 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 34.8 114.17 131.30 1551 97.83 1.10 1.44
10.00 4.0 13.12 15.09 1443 91.07 0.95 0.14
6.00 14.0 45.93 52.82 533 33.62 1.80 0.95
6.00 3.0 9.84 11.32 530 33.41 1.80 0.20
Sub-Total-1 2.74 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 8.00 1.0 9 775 1.00 0.09
Pump
Sub Total 26 ft
Sub Total 8m
Total with 10% safety 9m
* The friction loss in the line leading to the farthest FCU was calculated as 8 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 17.4 57.09 65.65 1551 97.83 1.10 0.72
10.00 2.0 6.56 7.55 1443 91.07 0.95 0.07
8.00 7.8 25.59 29.43 911 57.45 1.40 0.41
8.00 16.0 52.49 60.37 814 51.35 1.00 0.60
8.00 18.2 59.71 68.67 774 48.84 0.95 0.65
8.00 14.2 46.59 53.58 714 45.07 0.80 0.43
6.00 11.4 37.40 43.01 635 40.06 2.50 1.08
6.00 7.6 24.93 28.67 531 33.51 1.80 0.52
6.00 20.4 66.93 76.97 516 32.54 1.70 1.31
6.00 22.2 72.83 83.76 305 19.22 0.65 0.54
6.00 7.6 24.93 28.67 301 19.01 0.65 0.19
4.00 4.0 13.12 15.09 201 12.67 2.20 0.33
1.50 15.6 51.18 58.86 19 1.18 2.90 1.71
1.25 35.0 114.83 132.05 17 1.07 4.50 5.94
1.25 4.0 13.12 15.09 16 1.00 4.00 0.60
1.25 4.6 15.09 17.36 15 0.95 3.70 0.64
1.25 5.6 18.37 21.13 14 0.88 3.20 0.68
1.25 2.8 9.19 10.56 13 0.81 2.70 0.29
1.00 2.8 9.19 10.56 6 0.36 2.50 0.26
1.00 5.6 18.37 21.13 5 0.29 2.00 0.42
0.75 5.6 18.37 21.13 3 0.22 2.50 0.53
0.75 5.8 19.03 21.88 2 0.15 1.30 0.28
Sub-Total-1 18.21 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 8.00 1.0 9 775 1.00 0.09
Pump
Sub Total 24 ft
Sub Total 7m
Total with 10% safety 8m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 13.6 44.62 51.31 1251 78.93 0.70 0.36
8.00 9.8 32.15 36.98 721 45.48 0.90 0.33
8.00 7.8 25.59 29.43 719 45.37 0.90 0.26
6.00 4.0 13.12 15.09 553 34.87 2.00 0.30
6.00 2.0 6.56 7.55 502 31.65 1.80 0.14
Sub-Total-1 1.39 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 775 3.80 0.27
Pump
Sub Total 30 ft
Sub Total 9m
Total with 10% safety 10 m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 6.8 22.31 25.66 1251 78.93 0.70 0.18
6.00 2.4 7.87 9.06 530 33.45 1.80 0.16
6.00 9.0 29.53 33.96 350 22.09 0.95 0.32
6.00 7.0 22.97 26.41 275 17.35 0.55 0.15
6.00 6.6 21.65 24.90 273 17.24 0.55 0.14
3.00 2.0 6.56 7.55 113 7.13 2.80 0.21
2.50 4.4 14.44 16.60 51 3.21 2.00 0.33
1.50 7.4 24.28 27.92 25 1.55 4.00 1.12
1.50 13.0 42.65 49.05 23 1.44 3.80 1.86
1.50 2.0 6.56 7.55 18 1.15 2.60 0.20
1.25 9.8 32.15 36.98 15 0.94 4.00 1.48
1.25 69.6 228.35 262.60 14 0.87 3.50 9.19
1.25 6.4 21.00 24.15 12 0.76 2.40 0.58
1.25 6.4 21.00 24.15 10 0.65 1.80 0.43
1.25 6.4 21.00 24.15 9 0.54 1.60 0.39
1.00 6.4 21.00 24.15 7 0.43 3.50 0.85
1.00 6.4 21.00 24.15 5 0.32 1.80 0.43
0.75 11.0 36.09 41.50 3 0.21 2.50 1.04
Sub-Total-1 19.06 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 6.00 1.0 7 775 3.80 0.27
Pump
Sub Total 32 ft
Sub Total 10 m
Total with 10% safety 11 m
* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 10 m.
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
A- Pipe Losses
Length supply and Friction
Dia Eq.leng Flow Losses
return losses
in m ft ft GPM L/s ft/100ft ft
10.00 6.8 22.31 25.66 1251 78.93 0.70 0.18
6.00 2.4 7.87 9.06 530 33.45 1.80 0.16
6.00 9.0 29.53 33.96 350 22.09 0.95 0.32
6.00 7.0 22.97 26.41 275 17.35 0.55 0.15
6.00 6.6 21.65 24.90 273 17.24 0.55 0.14
3.00 2.0 6.56 7.55 113 7.13 2.80 0.21
2.50 4.4 14.44 16.60 51 3.21 2.00 0.33
2.00 21.6 70.87 81.50 26 1.66 1.70 1.39
1.50 2.6 8.53 9.81 24 1.54 3.90 0.38
1.25 7.2 23.62 27.17 14 0.86 3.50 0.95
1.25 34.4 112.86 129.79 13 0.79 3.00 3.89
1.25 9.0 29.53 33.96 11 0.72 2.00 0.68
1.25 2.0 6.56 7.55 10 0.65 1.80 0.14
1.25 6.8 22.31 25.66 9 0.56 1.60 0.41
1.25 4.2 13.78 15.85 8 0.51 1.20 0.19
1.00 2.2 7.22 8.30 7 0.46 3.50 0.29
1.00 3.4 11.15 12.83 6 0.41 2.50 0.32
1.00 4.0 13.12 15.09 6 0.36 2.50 0.38
0.75 8.0 26.25 30.18 3 0.21 2.50 0.75
0.75 4.6 15.09 17.36 2 0.14 1.30 0.23
0.75 17.0 55.77 64.14 1 0.07 0.40 0.26
Sub-Total-1 10.51 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Pump
Sub Total 20 ft
Sub Total 6m
Total with 10% safety 7m
Project No. Date
DESIGN CALCULATION E0328 4-Jun-2004
MECHANICAL PLANT
A- Pipe Losses
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Gate Valve 2.50 1.0 2.8 79 4.70 0.13
Pump
Sub Total 26 ft
Sub Total 8m
Total with 10% safety 9m
Project No. Date
DESIGN CALCULATION E0328 14-Apr-2004
PRIMARY PUMPS
A- Pipe Losses
Frictionlos
Pipe Run Dia Length Eq.leng Flow Losses
ses
in m ft ft GPM L/s ft/100ft ft
From Primary 20 17 56.76 65.27 5601 353.39 0.56 0.37
To Chillers 12 55 181.10 208.27 2801 176.70 1.40 2.92
At Chiller 6 3 8.20 9.43 560 35.34 2.10 0.20
From Chillers 20 62 204.72 235.43 5601 353.39 0.56 1.32
Bypass 20 7 23.95 27.54 5601 353.39 0.56 0.15
To Primary 20 15 48.88 56.22 5601 353.39 0.56 0.31
Sub-Total-1 5.27 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Check valve 6 1 60 560 2.10 1.26
Pump
Sub-Total 25 ft
Sub Total 8m
Total with 10% safety 8m
Project No. Date
DESIGN CALCULATION E0328 14-Apr-2004
SECONDARY PUMPS
A- Pipe Losses
Frictionlos
Dia Length Eq.leng Flow Losses
ses
in m ft ft GPM L/s ft/100ft ft
20 25 82.02 94.32 5601 353.39 0.56 0.53
20 150 492.13 565.94 5523 348.45 0.52 2.94
16 250 820.21 943.24 3972 250.62 0.90 8.49
12 75 246.06 282.97 1974 124.53 0.75 2.12
10 160 524.93 603.67 1251 78.93 0.75 4.53
Sub-Total-1 18.61 ft
B- Accessories Losses
Friction
Dia Quantity Eq.leng Flow Losses
Item losses
in no. ft gpm ft/100ft ft
Check valve 10 1 100 1867 1.70 1.70
Pump
Sub-Total-2 10.87
Sub-Total 29 ft
Sub Total 9m
Total with 10% safety 10 m
Project No. Date
DESIGN CALCULATION Q0206 12-Jul-2003
CHP-66-02
2- Pump Head
A- Pipe Losses
B- Accessories Losses
21 ft
sub total= 26 ft
10% safety= 3 ft
Total= 29 ft
Total= 9 m
Project No. Date
Q0206 7-Dec-03
2- Pump Head
A- Pipe Losses
B- Accessories Losses
21 ft
sub total= 30 ft
10% safety= 3 ft
Total= 33 ft
Total= 10 m