PLUMBING DESIGN CALCULATIONS

IRRIGATION WATER DEMAND:

a.) Irrigation Data :

Landscape Planting take-off


Palm Trees = 21.00 PALM TREE
Trees = 8.00 TREE
Shrubs and ground cover = 0.00 m ###
Lawn areas = 1054.00 m ###

b.) Irrigation water requirement/day:

Palm Trees = 120 lit / tree / day


Trees = 100 lit / tree / day
Shrubs and ground cover = 10 liters / m ###
/day
Lawn areas = 15 liters / m ###
/day

c.) No. of storage days (as per = 5 DAYS


Client requirement)

d.) Calculations :
DRIP IRRIGATION WATER REQUIREMENT PER DAY 3320 LITRES
SPRAY IRRIGATION WATER REQUIREMENT PER DAY = 15810 LITRES
Total storage water for DRIP irrigation = 16.6 M ###
Total storage water for SPRAY(LAWN) irrigation = 79.05 M ###
TOTAL WATER REQUIRED FOR IRR. = 95.65 M ###

3.)IRRIGATION WATER TANK :


Total irrigation storage water = 100 m ###

ZFP PROJECTS NO.J06-08100 1


PLUMBING DESIGN CALCULATIONS

SIZING OF IRRIGATION WATER PUMPS :-

1) IRRIGATION PUMP FOR SHRUBS & TREES:


A) SYSTEM CAPACITY.

MAXIMUM FLOW ( Q ) = 99.45 gpm ( 6.27 ) lps


(AT RCV 5)

Flow (Q) = 22.59 m3/hour ( 6.27 ) lps

At safety factor = 110%

Required system flow = 109.40 gpm ( 6.90 ) lps

use system capacity = 125.00 gpm ( 7.89 ) lps


( 28.39 ) m3/hr

B) SYSTEM'S TOTAL DYNAMIC HEAD.

MAX INLET PRESSURE REQUIRED = 39.92 psi ( 28.06 ) m

Static head = 7.11 psi ( 5.00 ) m

Pipe friction loss allowance = 10.00 psi ( 7.03 ) m

miscellaneous losses = 5.00 psi ( 3.52 ) m


T O TAL = 62.03 psi ( 43.61 ) m

USE SYSTEM'S TDH = 69.00 psi ( 48.51 ) m

C) RECOMMENDED PUMP CAPACITY.

USE PACKAGED TYPE CONSTANT PRESSURE PUMP SYSTEM (DUPLEX MODEL) (1+1)

TOTAL SYSTEM CAPACITY = 28.39 m3/hr vs 48.51 m


= 125.00 gpm vs 69.00 psi

ZFP PROJECTS NO.J06-08100 2


PLUMBING DESIGN CALCULATIONS

HYDRAULIC CALCULATIONS FOR IRRIGATION NETWORK


SERVING PLANTING AREAS, TREES & SHRUBS AND GROUND COVER:-

DESIGN DATA:

Main PIPE MATERIAL uPVC SCHEDULE 80/SASO Class V


Secondary PIPE MATERIAL Polyethylene
MAX VELOCITY = 1.83 M/SEC = 6.O FEET/SEC.

SG - ONE (1) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (G) SHALL BE PROVIDED
FOR SHRUBS AND GROUND COVER (1 BUBBLER / 1M2)
(THE BUBBLER DISCHARGE = 0.01577 L/S).

P - SIX (6) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (P) SHALL BE PROVIDED
FOR EVERY PALM TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

T - FIVE (5) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (T) SHALL BE PROVIDED
FOR EVERY TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

FOR RCV 1

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) BUBBLERS LOAD LPS GPM MM VALUE M/SEC M
SG P T
1 100 20 0 1 0.41 6.50 40 150 0.33 0.34

TOTAL DISCHARGE THROUGH RCV = 0.41 LPS = 6.50 GPM


TOTAL HEAD LOSS = 0.34 M

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST BUBBLER = 20.00 PSI 137.9 kpa


TOTAL FRICTION LOSS = 0.49 PSI 3.4 kpa
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI 10.3 kpa

REQUIRED OUTLET PRESSURE = 21.99 PSI 151.603 kpa

RCV PRESSURE REQUIREMENT = 5.00 PSI 34.48 kpa

REQUIRED INLET PRESSURE = 26.99 PSI 186.078 kpa

TOTAL SHRUBS AREA = 20.00 M2


TOTAL NO OF PALM TREES = 0 PALM TREES
TOTAL NO OF TREES = 1 TREES

DAILY OPERATING TIME = 12 MIN

ZFP PROJECTS NO.J06-08100 3


PLUMBING DESIGN CALCULATIONS

HYDRAULIC CALCULATIONS FOR IRRIGATION NETWORK


SERVING PLANTING AREAS, TREES & SHRUBS AND GROUND COVER:-

DESIGN DATA:

Main PIPE MATERIAL uPVC SCHEDULE 80/SASO Class V


Secondary PIPE MATERIAL Polyethylene
MAX VELOCITY = 1.83 M/SEC = 6.O FEET/SEC.

SG - ONE (1) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (G) SHALL BE PROVIDED
FOR SHRUBS AND GROUND COVER (1 BUBBLER / 1M2)
(THE BUBBLER DISCHARGE = 0.01577 L/S).

P - SIX (5) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (P) SHALL BE PROVIDED
FOR EVERY PALM TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

T - FIVE (3) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (T) SHALL BE PROVIDED
FOR EVERY TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

FOR RCV 2

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) BUBBLERS LOAD LPS GPM MM VALUE M/SEC M
SG P T
1 45 126 8 0 3.25 51.50 50 150 1.66 2.40

TOTAL DISCHARGE THROUGH RCV = 3.25 LPS = 51.50 GPM


TOTAL HEAD LOSS = 2.40 M

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST BUBBLER = 20.00 PSI 137.9 kpa


TOTAL FRICTION LOSS = 3.41 PSI 23.5 kpa
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI 10.3 kpa

REQUIRED OUTLET PRESSURE = 24.91 PSI 171.743 kpa

RCV PRESSURE REQUIREMENT = 5.00 PSI 34.48 kpa

REQUIRED INLET PRESSURE = 29.91 PSI 206.218 kpa

TOTAL SHRUBS AREA = 126.00 M2


TOTAL NO OF PALM TREES = 8 PALM TREES
TOTAL NO OF TREES = 0 TREES

DAILY OPERATING TIME = 11 MIN

ZFP PROJECTS NO.J06-08100 4


PLUMBING DESIGN CALCULATIONS

HYDRAULIC CALCULATIONS FOR IRRIGATION NETWORK


SERVING PLANTING AREAS, TREES & SHRUBS AND GROUND COVER:-

DESIGN DATA:

Main PIPE MATERIAL uPVC SCHEDULE 80/SASO Class V


Secondary PIPE MATERIAL Polyethylene
MAX VELOCITY = 1.83 M/SEC = 6.O FEET/SEC.

SG - ONE (1) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (G) SHALL BE PROVIDED
FOR SHRUBS AND GROUND COVER (1 BUBBLER / 1M2)
(THE BUBBLER DISCHARGE = 0.01577 L/S).

P - SIX (5) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (P) SHALL BE PROVIDED
FOR EVERY PALM TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

T - FIVE (3) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (T) SHALL BE PROVIDED
FOR EVERY TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

FOR RCV 3

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) BUBBLERS LOAD LPS GPM MM VALUE M/SEC M
SG P T
1 25 18.5 1 1 0.54 8.62 50 150 0.28 0.05

TOTAL DISCHARGE THROUGH RCV = 0.54 LPS = 8.62 GPM


TOTAL HEAD LOSS = 0.05 M

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST BUBBLER = 20.00 PSI 137.9 kpa


TOTAL FRICTION LOSS = 0.07 PSI 0.5 kpa
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI 10.3 kpa

REQUIRED OUTLET PRESSURE = 21.57 PSI 148.721 kpa

RCV PRESSURE REQUIREMENT = 5.00 PSI 34.48 kpa

REQUIRED INLET PRESSURE = 26.57 PSI 183.196 kpa

TOTAL SHRUBS AREA = 18.50 M2


TOTAL NO OF PALM TREES = 1 PALM TREES
TOTAL NO OF TREES = 1 TREES

DAILY OPERATING TIME = 12 MIN

ZFP PROJECTS NO.J06-08100 5


PLUMBING DESIGN CALCULATIONS

HYDRAULIC CALCULATIONS FOR IRRIGATION NETWORK


SERVING PLANTING AREAS, TREES & SHRUBS AND GROUND COVER:-

DESIGN DATA:

Main PIPE MATERIAL uPVC SCHEDULE 80/SASO Class V


Secondary PIPE MATERIAL Polyethylene
MAX VELOCITY = 1.83 M/SEC = 6.O FEET/SEC.

SG - ONE (1) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (G) SHALL BE PROVIDED
FOR SHRUBS AND GROUND COVER (1 BUBBLER / 1M2)
(THE BUBBLER DISCHARGE = 0.01577 L/S).

P - SIX (5) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (P) SHALL BE PROVIDED
FOR EVERY PALM TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

T - FIVE (3) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (T) SHALL BE PROVIDED
FOR EVERY TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

FOR RCV 5

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) BUBBLERS LOAD LPS GPM MM VALUE M/SEC M
SG P T
1 10 0 13 0 2.05 32.50 50 150 1.04 0.23

TOTAL DISCHARGE THROUGH RCV = 2.05 LPS = 32.50 GPM


TOTAL HEAD LOSS = 0.23 M

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST BUBBLER = 20.00 PSI 137.9 kpa


TOTAL FRICTION LOSS = 0.32 PSI 2.2 kpa
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI 10.3 kpa

REQUIRED OUTLET PRESSURE = 21.82 PSI 150.471 kpa

RCV PRESSURE REQUIREMENT = 5.00 PSI 34.48 kpa

REQUIRED INLET PRESSURE = 26.82 PSI 184.946 kpa

TOTAL SHRUBS AREA = 0.00 M2


TOTAL NO OF PALM TREES = 13 PALM TREES
TOTAL NO OF TREES = 0 TREES

DAILY OPERATING TIME = 13 MIN

ZFP PROJECTS NO.J06-08100 6


PLUMBING DESIGN CALCULATIONS

HYDRAULIC CALCULATIONS FOR IRRIGATION NETWORK


SERVING PLANTING AREAS, TREES & SHRUBS AND GROUND COVER:-

DESIGN DATA:

Main PIPE MATERIAL uPVC SCHEDULE 80/SASO Class V


Secondary PIPE MATERIAL Polyethylene
MAX VELOCITY = 1.83 M/SEC = 6.O FEET/SEC.

SG - ONE (1) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (G) SHALL BE PROVIDED
FOR SHRUBS AND GROUND COVER (1 BUBBLER / 1M2)
(THE BUBBLER DISCHARGE = 0.01577 L/S).

P - SIX (5) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (P) SHALL BE PROVIDED
FOR EVERY PALM TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

T - FIVE (3) PRESSURE COMPENSATING TYPE FULL CIRCLE BUBBLER (T) SHALL BE PROVIDED
FOR EVERY TREE, (THE BUBBLER DISCHARGE = 0.03154 L/S).

FOR RCV 5

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) BUBBLERS LOAD LPS GPM MM VALUE M/SEC M
SG P T
1 125 350 0 8 6.28 99.49 50 150 3.20 22.50

TOTAL DISCHARGE THROUGH RCV = 6.28 LPS = 99.49 GPM


TOTAL HEAD LOSS = 22.50 M

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST BUBBLER = 20.00 PSI 137.9 kpa


TOTAL FRICTION LOSS = 32.02 PSI 220.7 kpa
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI 10.3 kpa

REQUIRED OUTLET PRESSURE = 53.52 PSI 368.990 kpa

RCV PRESSURE REQUIREMENT = 5.00 PSI 34.48 kpa

REQUIRED INLET PRESSURE = 58.52 PSI 403.465 kpa

TOTAL SHRUBS AREA = 350.00 M2


TOTAL NO OF PALM TREES = 0 PALM TREES
TOTAL NO OF TREES = 8 TREES

DAILY OPERATING TIME = 11 MIN

ZFP PROJECTS NO.J06-08100 7


HYDRAULIC CALCULATIONS FOR LAWN IRRIGATION NETWORK :-

DESIGN DATA:

PIPE MATERIAL UPVC CLASS (V)

MAX VELOCITY = 1.83 M/SEC= 6 FEET/SEC.

SPRINKLER HEAD FOR LAWN AREAS RADIUS OF THROW SHALL BE


3.35 METERS WITH A DISCHARGE FLOW OF 1.80 GPM

THROW DIAMETER OF SPRINKLER HEAD = 6.7 m

WETTED AREA PER SPRINKLER = 22.00 m2

ASSUME OVERLAP RATIO OF WETTED AREA = 50%

SPACING OF SPRINKLERS = 3.35 m

FOR RCV 1

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) LAWN AREA SP (LOAD) LPS GPM MM VALUE M/SEC M
m2 No.
1 40 28 3 0.40 6.29 50 150 0.20 0.044

TOTAL DISCHARGE THROUGH RCV = 0.40 LPS = 6.29 GPM


TOTAL HEAD LOSS = 0.04 m

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST SPRINKLER = 25.00 PSI


TOTAL FRICTION LOSS = 0.06 PSI
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI

RQUIRED OUTLET PRESSURE = 26.56 PSI

RCV PRESSURE REQUIREMENT = 5.00 PSI

RQUIRED INLET PRESSURE = 31.56 PSI

TOTAL LAWN AREA = 28.00 m2

DAILY OPERATING TIME FOR THIS RCV = 18 MIN


HYDRAULIC CALCULATIONS FOR LAWN IRRIGATION NETWORK :-

DESIGN DATA:

PIPE MATERIAL UPVC CLASS (V)

MAX VELOCITY = 1.83 M/SEC= 6.O FEET/SEC.

SPRINKLER HEAD FOR LAWN AREAS RADIUS OF THROW SHALL BE


3.35 METERS WITH A DISCHARGE FLOW OF 1.80 GPM

THROW DIAMETER OF SPRINKLER HEAD = 6.7 m

WETTED AREA PER SPRINKLER = 35.24 m2

ASSUME OVERLAP RATIO OF WETTED AREA = 50%

SPACING OF SPRINKLERS = 3.35 m

FOR RCV 2

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) LAWN AREA SP (LOAD) LPS GPM MM VALUE M/SEC M
m2 No.
2 30 178 17 1.91 30.35 50 150 0.98 0.600

TOTAL DISCHARGE THROUGH RCV = 1.91 LPS = 30.35 GPM


TOTAL HEAD LOSS = 0.60 m

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST SPRINKLER = 25.00 PSI


TOTAL FRICTION LOSS = 0.85 PSI
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI

RQUIRED OUTLET PRESSURE = 27.35 PSI

RCV PRESSURE REQUIREMENT = 5.00 PSI

RQUIRED INLET PRESSURE = 32.35 PSI

TOTAL LAWN AREA = 178.00 m2

DAILY OPERATING TIME FOR THIS RCV = 23 MIN


HYDRAULIC CALCULATIONS FOR LAWN IRRIGATION NETWORK :-

DESIGN DATA:

PIPE MATERIAL UPVC CLASS (V)

MAX VELOCITY = 1.83 M/SEC= 6.O FEET/SEC.

SPRINKLER HEAD FOR LAWN AREAS RADIUS OF THROW SHALL BE


3.35 METERS WITH A DISCHARGE FLOW OF 1.80 GPM

THROW DIAMETER OF SPRINKLER HEAD = 6.7 m

WETTED AREA PER SPRINKLER = 35.24 m2

ASSUME OVERLAP RATIO OF WETTED AREA = 50%

SPACING OF SPRINKLERS = 3.35 m

FOR RCV 4

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) LAWN AREA SP (LOAD) LPS GPM MM VALUE M/SEC M
m2 No.
3 65 190.5 18 2.04 32.35 50 150 1.04 1.464

TOTAL DISCHARGE THROUGH RCV = 2.04 LPS = 32.35 GPM


TOTAL HEAD LOSS = 1.46 m

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST SPRINKLER = 25.00 PSI


TOTAL FRICTION LOSS = 2.08 PSI
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI

RQUIRED OUTLET PRESSURE = 28.58 PSI

RCV PRESSURE REQUIREMENT = 5.00 PSI

RQUIRED INLET PRESSURE = 33.58 PSI

TOTAL LAWN AREA = 190.50 m2

DAILY OPERATING TIME FOR THIS RCV = 23 MIN


HYDRAULIC CALCULATIONS FOR LAWN IRRIGATION NETWORK :-

DESIGN DATA:

PIPE MATERIAL UPVC CLASS (V)

MAX VELOCITY = 1.83 M/SEC= 6.O FEET/SEC.

SPRINKLER HEAD FOR LAWN AREAS RADIUS OF THROW SHALL BE


3.35 METERS WITH A DISCHARGE FLOW OF 1.80 GPM

THROW DIAMETER OF SPRINKLER HEAD = 6.7 m

WETTED AREA PER SPRINKLER = 35.24 m2

ASSUME OVERLAP RATIO OF WETTED AREA = 50%

SPACING OF SPRINKLERS = 3.35 m

FOR RCV 7

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) LAWN AREA SP (LOAD) LPS GPM MM VALUE M/SEC M
m2 No.
4 130 123 12 1.36 21.53 50 150 0.69 1.378

TOTAL DISCHARGE THROUGH RCV = 1.36 LPS = 21.53 GPM


TOTAL HEAD LOSS = 1.38 m

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST SPRINKLER = 25.00 PSI


TOTAL FRICTION LOSS = 1.96 PSI
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI

RQUIRED OUTLET PRESSURE = 28.46 PSI

RCV PRESSURE REQUIREMENT = 5.00 PSI

RQUIRED INLET PRESSURE = 33.46 PSI

TOTAL LAWN AREA = 123.00 m2

DAILY OPERATING TIME FOR THIS RCV = 23 MIN


HYDRAULIC CALCULATIONS FOR LAWN IRRIGATION NETWORK :-

DESIGN DATA:

PIPE MATERIAL UPVC CLASS (V)

MAX VELOCITY = 1.83 M/SEC= 6.O FEET/SEC.

SPRINKLER HEAD FOR LAWN AREAS RADIUS OF THROW SHALL BE


3.35 METERS WITH A DISCHARGE FLOW OF 1.80 GPM

THROW DIAMETER OF SPRINKLER HEAD = 6.7 m

WETTED AREA PER SPRINKLER = 35.24 m2

ASSUME OVERLAP RATIO OF WETTED AREA = 50%

SPACING OF SPRINKLERS = 3.35 m

FOR RCV 8

LINE LENGTH TOTAL DESIGN FLOW DIAMETER C V HL


NO. (MTS) LAWN AREA SP (LOAD) LPS GPM MM VALUE M/SEC M
m2 No.
#VALUE! 155 257 24 2.71 43.02 50 150 1.38 5.915

TOTAL DISCHARGE THROUGH RCV = 2.71 LPS = 43.02 GPM


TOTAL HEAD LOSS = 5.91 m

CALCULATIONS:

REQUIRED PRESSURE AT REMOTEST SPRINKLER = 25.00 PSI


TOTAL FRICTION LOSS = 8.42 PSI
FITTINGS AND VALVES HEAD LOSS = 1.50 PSI

RQUIRED OUTLET PRESSURE = 34.92 PSI

RCV PRESSURE REQUIREMENT = 5.00 PSI

RQUIRED INLET PRESSURE = 39.92 PSI

TOTAL LAWN AREA = 257.00 m2

DAILY OPERATING TIME FOR THIS RCV = 24 MIN