You are on page 1of 11

Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October

Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
Al-Rimal Gated C
Community - Schedule Rev7 246 06-Feb-17 A 25-Nov-17

Doors & Windows


Window - Aluminum Installation 246 06-Feb-17 A 25-Nov-17

PRIORITY # 1 (APA
(APARTMENTS) 77 06-Feb-17 A 29-Jul-17
Stage A - Apartments
Apartm 53 06-Feb-17 A 26-Jul-17
Block - 8 32 06-Feb-17 A 26-Jul-17
A3 28 06-Feb-17 A 25-Jul-17
Doors & Windows 28 06-Feb-17 A 25-Jul-17
A1600 Installation of Frames 14 06-Feb-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A1610 Installation of Glass (Doors, Windows & Shutters) 14 22-Feb-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 32 06-Feb-17 A 26-Jul-17
Doors & Windows 32 06-Feb-17 A 26-Jul-17
A3210 Installation of Frames 16 06-Feb-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3220 Installation of Glass (Doors, Windows & Shutters) 16 25-Feb-17 A 26-Jul-17 26-Jul-17, 26-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 7 28 06-Feb-17 A 25-Jul-17
A3 28 06-Feb-17 A 25-Jul-17
Doors & Windows 28 06-Feb-17 A 25-Jul-17
A3230 Installation of Frames 14 06-Feb-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A3240 Installation of Glass (Doors, Windows & Shutters) 14 22-Feb-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 28 06-Feb-17 A 25-Jul-17
Doors & Windows 28 06-Feb-17 A 25-Jul-17
A3250 Installation of Frames 14 06-Feb-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A3260 Installation of Glass (Doors, Windows & Shutters) 14 22-Feb-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 5 28 07-Mar-17 A 23-Jul-17
A1 28 07-Mar-17 A 23-Jul-17
Doors & Windows 28 07-Mar-17 A 23-Jul-17
A3270 Installation of Frames 14 07-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3280 Installation of Glass (Doors, Windows & Shutters) 14 23-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A2 28 07-Mar-17 A 23-Jul-17
Doors & Windows 28 07-Mar-17 A 23-Jul-17
A3290 Installation of Frames 14 07-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3300 Installation of Glass (Doors, Windows & Shutters) 14 23-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A3 28 07-Mar-17 A 23-Jul-17
Doors & Windows 28 07-Mar-17 A 23-Jul-17
A3310 Installation of Frames 14 07-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3320 Installation of Glass (Doors, Windows & Shutters) 14 23-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 28 07-Mar-17 A 23-Jul-17
Doors & Windows 28 07-Mar-17 A 23-Jul-17
A3330 Installation of Frames 14 07-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3340 Installation of Glass (Doors, Windows & Shutters) 14 23-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Stage B - Apartments
Apartm 33 12-Mar-17 A 25-Jul-17
Block - 1 28 12-Mar-17 A 23-Jul-17
A1 28 12-Mar-17 A 23-Jul-17
Doors & Windows 28 12-Mar-17 A 23-Jul-17
A3350 Installation of Frames 14 12-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3360 Installation of Glass (Doors, Windows & Shutters) 14 28-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A2 28 12-Mar-17 A 23-Jul-17
Doors & Windows 28 12-Mar-17 A 23-Jul-17
A3370 Installation of Frames 14 12-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3380 Installation of Glass (Doors, Windows & Shutters) 14 28-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A3 28 12-Mar-17 A 23-Jul-17
Doors & Windows 28 12-Mar-17 A 23-Jul-17
A3390 Installation of Frames 14 12-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3400 Installation of Glass (Doors, Windows & Shutters) 14 28-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 28 12-Mar-17 A 23-Jul-17
Doors & Windows 28 12-Mar-17 A 23-Jul-17
A3410 Installation of Frames 14 12-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3420 Installation of Glass (Doors, Windows & Shutters) 14 28-Mar-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 2 28 15-Mar-17 A 24-Jul-17
A1 28 15-Mar-17 A 23-Jul-17
Doors & Windows 28 15-Mar-17 A 23-Jul-17
A3430 Installation of Frames 14 15-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3440 Installation of Glass (Doors, Windows & Shutters) 14 01-Apr-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A2 28 15-Mar-17 A 23-Jul-17
Doors & Windows 28 15-Mar-17 A 23-Jul-17
A3450 Installation of Frames 14 15-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3460 Installation of Glass (Doors, Windows & Shutters) 14 01-Apr-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 1 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A3 28 15-Mar-17 A 24-Jul-17
Doors & Windows 28 15-Mar-17 A 24-Jul-17
A3470 Installation of Frames 14 15-Mar-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A3480 Installation of Glass (Doors, Windows & Shutters) 14 01-Apr-17 A 24-Jul-17 24-Jul-17, 24-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 28 15-Mar-17 A 24-Jul-17
Doors & Windows 28 15-Mar-17 A 24-Jul-17
A3490 Installation of Frames 14 15-Mar-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A3500 Installation of Glass (Doors, Windows & Shutters) 14 01-Apr-17 A 24-Jul-17 24-Jul-17, 24-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 3 30 15-Mar-17 A 25-Jul-17
A1 30 15-Mar-17 A 25-Jul-17
Doors & Windows 30 15-Mar-17 A 25-Jul-17
A3510 Installation of Frames 15 15-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames

A3520 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A2 30 15-Mar-17 A 25-Jul-17
Doors & Windows 30 15-Mar-17 A 25-Jul-17
A3530 Installation of Frames 15 15-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3540 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A3 30 15-Mar-17 A 25-Jul-17
Doors & Windows 30 15-Mar-17 A 25-Jul-17
A3550 Installation of Frames 15 15-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3560 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 30 15-Mar-17 A 25-Jul-17
Doors & Windows 30 15-Mar-17 A 25-Jul-17
A3570 Installation of Frames 15 15-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3580 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 25-Jul-17 25-Jul-17, 25-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 4 30 15-Mar-17 A 23-Jul-17
A1 30 15-Mar-17 A 23-Jul-17
Doors & Windows 30 15-Mar-17 A 23-Jul-17
A3590 Installation of Frames 15 15-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3600 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A2 30 15-Mar-17 A 23-Jul-17
Doors & Windows 30 15-Mar-17 A 23-Jul-17
A3610 Installation of Frames 15 15-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3620 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A3 30 15-Mar-17 A 23-Jul-17
Doors & Windows 30 15-Mar-17 A 23-Jul-17
A3630 Installation of Frames 15 15-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3640 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 30 15-Mar-17 A 23-Jul-17
Doors & Windows 30 15-Mar-17 A 23-Jul-17
A3650 Installation of Frames 15 15-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3660 Installation of Glass (Doors, Windows & Shutters) 15 02-Apr-17 A 23-Jul-17 23-Jul-17, 23-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Stage F - Apartments
Apartm 42 19-Mar-17 A 29-Jul-17
Block - 10 30 19-Mar-17 A 24-Jul-17
A3 30 19-Mar-17 A 24-Jul-17
Doors & Windows 30 19-Mar-17 A 24-Jul-17
A3670 Installation of Frames 15 19-Mar-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A3680 Installation of Glass (Doors, Windows & Shutters) 15 05-Apr-17 A 24-Jul-17 24-Jul-17, 24-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 30 19-Mar-17 A 24-Jul-17
Doors & Windows 30 19-Mar-17 A 24-Jul-17
A3690 Installation of Frames 15 19-Mar-17 A 19-Jul-17 19-Jul-17, 19-Jul-17, Installation of Frames
A3700 Installation of Glass (Doors, Windows & Shutters) 15 05-Apr-17 A 24-Jul-17 24-Jul-17, 24-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 11 28 23-Mar-17 A 26-Jul-17
A1 28 23-Mar-17 A 26-Jul-17
Doors & Windows 28 23-Mar-17 A 26-Jul-17
A3710 Installation of Frames 14 23-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3720 Installation of Glass (Doors, Windows & Shutters) 14 09-Apr-17 A 26-Jul-17 26-Jul-17, 26-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A3 28 23-Mar-17 A 26-Jul-17
Doors & Windows 28 23-Mar-17 A 26-Jul-17
A3730 Installation of Frames 14 23-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3740 Installation of Glass (Doors, Windows & Shutters) 14 09-Apr-17 A 26-Jul-17 26-Jul-17, 26-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 28 23-Mar-17 A 26-Jul-17
Doors & Windows 28 23-Mar-17 A 26-Jul-17
A3750 Installation of Frames 14 23-Mar-17 A 20-Jul-17 20-Jul-17, 20-Jul-17, Installation of Frames
A3760 Installation of Glass (Doors, Windows & Shutters) 14 09-Apr-17 A 26-Jul-17 26-Jul-17, 26-Jul-17, Installation of Glass (Doors, Windows & Shutters)
Block - 12 38 23-Mar-17 A 29-Jul-17

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 2 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A3 38 23-Mar-17 A 29-Jul-17
Doors & Windows 38 23-Mar-17 A 29-Jul-17
A3770 Installation of Frames 14 23-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3780 Installation of Glass (Doors, Windows & Shutters) 24 09-Apr-17 A 29-Jul-17 29-Jul-17, 29-Jul-17, Installation of Glass (Doors, Windows & Shutters)
A4 28 23-Mar-17 A 29-Jul-17
Doors & Windows 28 23-Mar-17 A 29-Jul-17
A3790 Installation of Frames 14 23-Mar-17 A 18-Jul-17 18-Jul-17, 18-Jul-17, Installation of Frames
A3800 Installation of Glass (Doors, Windows & Shutters) 14 09-Apr-17 A 29-Jul-17 29-Jul-17, 29-Jul-17, Installation of Glass (Doors, Windows & Shutters)
PRIORITY # 2 (VILLAS)
(VIL 99 02-Jul-17 A 26-Oct-17
Villa Type 1 (V1) 72 02-Jul-17 A 25-Sep-17
V1-W1 42 15-Jul-17 31-Aug-17
Production 22 15-Jul-17 08-Aug-17
A1000 Sash Fabrication 6 15-Jul-17 20-Jul-17 15-Jul-17 20-Jul-17, Sash Fabrication
A1005 Frame Fabrication 2 07-Aug-17* 08-Aug-17 07-Aug-17 08-Aug-17, Frame Fabrication
Delivery of M
Materials 18 27-Jul-17 16-Aug-17
A1010 Delivery of Sashes 4 27-Jul-17 31-Jul-17 27-Jul-17 31-Jul-17, Delivery of Sashes
A1015 Delivery of Frames 4 13-Aug-17 16-Aug-17 13-Aug-17 16-Aug-17, Delivery of Frames
Installation 18 12-Aug-17 31-Aug-17
A1020 Installation of Sliding + Hinged Door Sashes 18 12-Aug-17 31-Aug-17 12-Aug-17 31-Aug-17, Installation of Sliding + Hinged Door Sashes
A1025 Installation of Sliding + Hinged Door Frames 15 15-Aug-17 31-Aug-17 15-Aug-17 31-Aug-17, Installation of Sliding + Hinged Door Frames
V1-W1-D 25 22-Jul-17 19-Aug-17
Production 5 22-Jul-17 26-Jul-17
A1030 Sash Fabrication 5 22-Jul-17 26-Jul-17 22-Jul-17 26-Jul-17, Sash Fabrication
A1035 Frame Fabrication 5 22-Jul-17 26-Jul-17 22-Jul-17 26-Jul-17, Frame Fabrication
Delivery of M
Materials 7 27-Jul-17 03-Aug-17
A1040 Delivery of Sashes 4 27-Jul-17 31-Jul-17 27-Jul-17 31-Jul-17, Delivery of Sashes
A1045 Delivery of Frames 4 31-Jul-17 03-Aug-17 31-Jul-17 03-Aug-17, Delivery of Frames
Installation 15 02-Aug-17 19-Aug-17
A1050 Installation of Hinged Doors (Sashes) 15 02-Aug-17 19-Aug-17 02-Aug-17 19-Aug-17, Installation of Hinged Doors (Sashes)
A1055 Installation of Hinged Doors (Frames) 14 02-Aug-17 17-Aug-17 02-Aug-17 17-Aug-17, Installation of Hinged Doors (Frames)
V1-W1A 37 19-Jul-17 30-Aug-17
Production 22 19-Jul-17 13-Aug-17
A1060 Sash Fabrication 7 19-Jul-17 26-Jul-17 19-Jul-17 26-Jul-17, Sash Fabrication
A1065 Frame Fabrication 3 10-Aug-17 13-Aug-17 10-Aug-17 13-Aug-17, Frame Fabrication
Delivery of M
Materials 23 27-Jul-17 22-Aug-17
A1070 Delivery of Sashes 4 27-Jul-17 31-Jul-17 27-Jul-17 31-Jul-17, Delivery of Sashes
A1075 Delivery of Frames 4 19-Aug-17 22-Aug-17 19-Aug-17 22-Aug-17, Delivery of Frames
Installation 10 20-Aug-17 30-Aug-17
A1080 Installation of Sliding Windows (Sashes) 9 21-Aug-17 30-Aug-17 21-Aug-17 30-Aug-17, Installation of Sliding Windows (Sashes)
A1085 Installation of Sliding Windows (Frames) 9 20-Aug-17 29-Aug-17 20-Aug-17 29-Aug-17, Installation of Sliding Windows (Frames)
V1-W1B 31 27-Jul-17 31-Aug-17
Production 19 27-Jul-17 17-Aug-17
A1090 Sash Fabrication 7 27-Jul-17 03-Aug-17 27-Jul-17 03-Aug-17, Sash Fabrication
A1095 Frame Fabrication 4 14-Aug-17 17-Aug-17 14-Aug-17 17-Aug-17, Frame Fabrication
Delivery of M
Materials 10 12-Aug-17 22-Aug-17
A1100 Delivery of Sashes 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Delivery of Sashes
A1105 Delivery of Frames 4 19-Aug-17 22-Aug-17 19-Aug-17 22-Aug-17, Delivery of Frames
Installation 11 20-Aug-17 31-Aug-17
A1110 Installation of Sliding Windows (Sashes) 10 21-Aug-17 31-Aug-17 21-Aug-17 31-Aug-17, Installation of Sliding Windows (Sashes)
A1115 Installation of Sliding Windows (Frames) 10 20-Aug-17 30-Aug-17 20-Aug-17 30-Aug-17, Installation of Sliding Windows (Frames)
V1-W2 32 05-Aug-17 11-Sep-17
Production 16 05-Aug-17 22-Aug-17
A1120 Sash Fabrication 6 05-Aug-17 10-Aug-17 05-Aug-17 10-Aug-17, Sash Fabrication
A1125 Frame Fabrication 4 19-Aug-17 22-Aug-17 19-Aug-17 22-Aug-17, Frame Fabrication
Delivery of M
Materials 14 12-Aug-17 27-Aug-17
A1130 Delivery of Sashes 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Delivery of Sashes
A1135 Delivery of Frames 4 23-Aug-17 27-Aug-17 23-Aug-17 27-Aug-17, Delivery of Frames
Installation 14 26-Aug-17 11-Sep-17
A1140 Installation of Sliding Windows (Sashes) 14 26-Aug-17 11-Sep-17 26-Aug-17 11-Sep-17, Installation of Sliding Windows (Sashes)
A1145 Installation of Sliding Windows (Frames) 12 26-Aug-17 09-Sep-17 26-Aug-17 09-Sep-17, Installation of Sliding Windows (Frames)
V1-W3 35 27-Jul-17 06-Sep-17
Production 10 27-Jul-17 07-Aug-17
A1150 Sash Fabrication 10 27-Jul-17 07-Aug-17 27-Jul-17 07-Aug-17, Sash Fabrication
A1155 Frame Fabrication 10 27-Jul-17 07-Aug-17 27-Jul-17 07-Aug-17, Frame Fabrication
Delivery of M
Materials 5 10-Aug-17 15-Aug-17

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 3 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A1160 Delivery of Sashes 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Delivery of Sashes
A1165 Delivery of Frames 4 10-Aug-17 14-Aug-17 10-Aug-17 14-Aug-17, Delivery of Frames
Installation 22 12-Aug-17 06-Sep-17
A1170 Installation of Hinged + Fixed (Sashes) 20 14-Aug-17 06-Sep-17 14-Aug-17 06-Sep-17, Installation of Hinged + Fixed (Sashes)
A1175 Installation of Hinged + Fixed (Frames) 15 12-Aug-17 28-Aug-17 12-Aug-17 28-Aug-17, Installation of Hinged + Fixed (Frames)
V1-W4 17 12-Aug-17 30-Aug-17
Production 4 12-Aug-17 15-Aug-17
A1180 Sash Fabrication 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Sash Fabrication
A1182 Frame Fabrication 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Frame Fabrication
Delivery of M
Materials 10 16-Aug-17 27-Aug-17
A1184 Delivery of Sashes 4 16-Aug-17 20-Aug-17 16-Aug-17 20-Aug-17, Delivery of Sashes
A1186 Delivery of Frames 4 23-Aug-17 27-Aug-17 23-Aug-17 27-Aug-17, Delivery of Frames
Installation 5 26-Aug-17 30-Aug-17
A1188 Installation of Fixed + Bottom Hung + Louver (Sashes) 5 26-Aug-17 30-Aug-17 26-Aug-17 30-Aug-17, Installation of Fixed + Bottom Hung + Louver (Sashes)
A1190 Installation of Fixed + Bottom Hung + Louver (Frames) 5 26-Aug-17 30-Aug-17 26-Aug-17 30-Aug-17, Installation of Fixed + Bottom Hung + Louver (Frames)
V1-W5 30 02-Jul-17 A 05-Aug-17

Production 6 02-Jul-17 A 08-Jul-17 A


A1192 Sash Fabrication 6 02-Jul-17 A 08-Jul-17 A 02-Jul-17 A 08-Jul-17 A, Sash Fabrication
A1194 Frame Fabrication 6 02-Jul-17 A 08-Jul-17 A 02-Jul-17 A 08-Jul-17 A, Frame Fabrication
Delivery of M
Materials 5 15-Jul-17 A 19-Jul-17 A
A1196 Delivery of Sashes 5 15-Jul-17 A 19-Jul-17 A 15-Jul-17 A 19-Jul-17 A, Delivery of Sashes
A1198 Delivery of Frames 5 15-Jul-17 A 19-Jul-17 A 15-Jul-17 A 19-Jul-17 A, Delivery of Frames
Installation 11 24-Jul-17 05-Aug-17
A1202 Installation of Fixed Windows (Sashes) 7 29-Jul-17 05-Aug-17 29-Jul-17 05-Aug-17, Installation of Fixed Windows (Sashes)
A1204 Installation of Fixed Windows (Frames) 5 24-Jul-17 29-Jul-17 24-Jul-17 29-Jul-17, Installation of Fixed Windows (Frames)
V1-W5A 33 16-Aug-17 25-Sep-17
Production 14 16-Aug-17 31-Aug-17
A1206 Sash Fabrication 14 16-Aug-17 31-Aug-17 16-Aug-17 31-Aug-17, Sash Fabrication
A1208 Frame Fabrication 14 16-Aug-17 31-Aug-17 16-Aug-17 31-Aug-17, Frame Fabrication
Delivery of M
Materials 3 31-Aug-17 04-Sep-17
A1212 Delivery of Sashes 3 31-Aug-17 04-Sep-17 31-Aug-17 04-Sep-17, Delivery of Sashes
A1214 Delivery of Frames 3 31-Aug-17 04-Sep-17 31-Aug-17 04-Sep-17, Delivery of Frames
Installation 19 03-Sep-17 25-Sep-17
A1216 Installation of Fixed + Hinged + Louver (Sashes) 18 04-Sep-17 25-Sep-17 04-Sep-17 25-Sep-17, Installation of Fixed + Hinged + Louver (Sashes)
A1218 Installation of Fixed + Hinged + Louver (Frames) 17 03-Sep-17 21-Sep-17 03-Sep-17 21-Sep-17, Installation of Fixed + Hinged + Louver (Frames)
Villa Type 2 (V2) 42 25-Jul-17 12-Sep-17
V2-W1 30 25-Jul-17 28-Aug-17
Production 23 25-Jul-17 20-Aug-17
A1222 Sash Fabrication 3 25-Jul-17* 27-Jul-17 25-Jul-17 27-Jul-17, Sash Fabrication
A1224 Frame Fabrication 3 17-Aug-17 20-Aug-17 17-Aug-17 20-Aug-17, Frame Fabrication
Delivery of M
Materials 23 29-Jul-17 23-Aug-17
A1226 Delivery of Sashes 3 29-Jul-17 31-Jul-17 29-Jul-17 31-Jul-17, Delivery of Sashes
A1228 Delivery of Frames 3 21-Aug-17 23-Aug-17 21-Aug-17 23-Aug-17, Delivery of Frames
Installation 5 23-Aug-17 28-Aug-17
A1232 Installation of Sliding Windows (Sashes) 4 24-Aug-17 28-Aug-17 24-Aug-17 28-Aug-17, Installation of Sliding Windows (Sashes)
A1234 Installation of Sliding Windows (Frames) 4 23-Aug-17 27-Aug-17 23-Aug-17 27-Aug-17, Installation of Sliding Windows (Frames)
V2-W2 35 29-Jul-17 07-Sep-17
Production 22 29-Jul-17 22-Aug-17
A1236 Sash Fabrication 6 29-Jul-17 03-Aug-17 29-Jul-17 03-Aug-17, Sash Fabrication
A1238 Frame Fabrication 2 21-Aug-17 22-Aug-17 21-Aug-17 22-Aug-17, Frame Fabrication
Delivery of M
Materials 19 05-Aug-17 26-Aug-17
A1242 Delivery of Sashes 3 05-Aug-17 07-Aug-17 05-Aug-17 07-Aug-17, Delivery of Sashes
A1244 Delivery of Frames 3 23-Aug-17 26-Aug-17 23-Aug-17 26-Aug-17, Delivery of Frames
Installation 12 24-Aug-17 07-Sep-17
A1246 Installation of Sliding Windows (Sashes) 12 24-Aug-17 07-Sep-17 24-Aug-17 07-Sep-17, Installation of Sliding Windows (Sashes)
A1248 Installation of Sliding Windows (Frames) 6 26-Aug-17 31-Aug-17 26-Aug-17 31-Aug-17, Installation of Sliding Windows (Frames)
V2-W3 10 25-Jul-17 05-Aug-17
Production 4 25-Jul-17 29-Jul-17
A1252 Sash Fabrication 3 26-Jul-17 29-Jul-17 26-Jul-17 29-Jul-17, Sash Fabrication
A1254 Frame Fabrication 3 25-Jul-17 27-Jul-17 25-Jul-17 27-Jul-17, Frame Fabrication
Delivery of M
Materials 4 29-Jul-17 01-Aug-17
A1256 Delivery of Sashes 3 30-Jul-17 01-Aug-17 30-Jul-17 01-Aug-17, Delivery of Sashes
A1258 Delivery of Frames 2 29-Jul-17 30-Jul-17 29-Jul-17 30-Jul-17, Delivery of Frames
Installation 5 31-Jul-17 05-Aug-17
A1262 Installation of Top Hung Windows (Sashes) 3 02-Aug-17 05-Aug-17 02-Aug-17 05-Aug-17, Installation of Top Hung Windows (Sashes)

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 4 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A1264 Installation of Top Hung Windows (Frames) 3 31-Jul-17 02-Aug-17 31-Jul-17 02-Aug-17, Installation of Top Hung Windows (Frames)
V2-W4 16 29-Jul-17 15-Aug-17
Production 7 29-Jul-17 05-Aug-17
A1268 Sash Fabrication 6 30-Jul-17 05-Aug-17 30-Jul-17 05-Aug-17, Sash Fabrication
A1274 Frame Fabrication 5 29-Jul-17 02-Aug-17 29-Jul-17 02-Aug-17, Frame Fabrication
Delivery of M
Materials 5 03-Aug-17 08-Aug-17
A1276 Delivery of Sashes 3 06-Aug-17 08-Aug-17 06-Aug-17 08-Aug-17, Delivery of Sashes
A1278 Delivery of Frames 3 03-Aug-17 06-Aug-17 03-Aug-17 06-Aug-17, Delivery of Frames
Installation 10 05-Aug-17 15-Aug-17
A1282 Installation of Hinged Windows (Sashes) 6 09-Aug-17 15-Aug-17 09-Aug-17 15-Aug-17, Installation of Hinged Windows (Sashes)
A1284 Installation of Hinged Windows (Frames) 7 05-Aug-17 12-Aug-17 05-Aug-17 12-Aug-17, Installation of Hinged Windows (Frames)
V2-W5 7 01-Aug-17 08-Aug-17
Production 2 01-Aug-17 02-Aug-17
A1286 Sash Fabrication 2 01-Aug-17 02-Aug-17 01-Aug-17 02-Aug-17, Sash Fabrication
A1288 Frame Fabrication 2 01-Aug-17 02-Aug-17 01-Aug-17 02-Aug-17, Frame Fabrication
Delivery of M
Materials 2 03-Aug-17 05-Aug-17
A1292 Delivery of Sashes 2 03-Aug-17 05-Aug-17 03-Aug-17 05-Aug-17, Delivery of Sashes
A1294 Delivery of Frames 2 03-Aug-17 05-Aug-17 03-Aug-17 05-Aug-17, Delivery of Frames
Installation 3 06-Aug-17 08-Aug-17
A1296 Installation of Fixed Windows (Sashes) 3 06-Aug-17 08-Aug-17 06-Aug-17 08-Aug-17, Installation of Fixed Windows (Sashes)
A1298 Installation of Fixed Windows (Frames) 3 06-Aug-17 08-Aug-17 06-Aug-17 08-Aug-17, Installation of Fixed Windows (Frames)
V2-W5A 12 02-Aug-17 15-Aug-17
Production 3 02-Aug-17 05-Aug-17
A1302 Sash Fabrication 2 02-Aug-17 03-Aug-17 02-Aug-17 03-Aug-17, Sash Fabrication
A1304 Frame Fabrication 2 03-Aug-17 05-Aug-17 03-Aug-17 05-Aug-17, Frame Fabrication
Delivery of M
Materials 4 05-Aug-17 08-Aug-17
A1306 Delivery of Sashes 3 05-Aug-17 07-Aug-17 05-Aug-17 07-Aug-17, Delivery of Sashes
A1308 Delivery of Frames 3 06-Aug-17 08-Aug-17 06-Aug-17 08-Aug-17, Delivery of Frames
Installation 7 08-Aug-17 15-Aug-17
A1312 Installation of Fixed + Top Louver (Sashes) 7 08-Aug-17 15-Aug-17 08-Aug-17 15-Aug-17, Installation of Fixed + Top Louver (Sashes)
A1314 Installation of Fixed + Top Louver (Frames) 4 08-Aug-17 12-Aug-17 08-Aug-17 12-Aug-17, Installation of Fixed + Top Louver (Frames)
V2-W6 24 05-Aug-17 31-Aug-17
Production 18 05-Aug-17 24-Aug-17
A1316 Sash Fabrication 3 05-Aug-17 07-Aug-17 05-Aug-17 07-Aug-17, Sash Fabrication
A1318 Frame Fabrication 2 23-Aug-17 24-Aug-17 23-Aug-17 24-Aug-17, Frame Fabrication
Delivery of M
Materials 18 08-Aug-17 28-Aug-17
A1322 Delivery of Sashes 3 08-Aug-17 10-Aug-17 08-Aug-17 10-Aug-17, Delivery of Sashes
A1324 Delivery of Frames 3 26-Aug-17 28-Aug-17 26-Aug-17 28-Aug-17, Delivery of Frames
Installation 5 27-Aug-17 31-Aug-17
A1326 Installation of Lift Slide (Sashes) 4 28-Aug-17 31-Aug-17 28-Aug-17 31-Aug-17, Installation of Lift Slide (Sashes)
A1328 Installation of Lift Slide (Frames) 4 27-Aug-17 30-Aug-17 27-Aug-17 30-Aug-17, Installation of Lift Slide (Frames)
V2-W7 23 08-Aug-17 04-Sep-17
Production 17 08-Aug-17 27-Aug-17
A1332 Sash Fabrication 3 08-Aug-17 10-Aug-17 08-Aug-17 10-Aug-17, Sash Fabrication
A1334 Frame Fabrication 2 26-Aug-17 27-Aug-17 26-Aug-17 27-Aug-17, Frame Fabrication
Delivery of M
Materials 18 10-Aug-17 30-Aug-17
A1336 Delivery of Sashes 3 10-Aug-17 13-Aug-17 10-Aug-17 13-Aug-17, Delivery of Sashes
A1338 Delivery of Frames 3 28-Aug-17 30-Aug-17 28-Aug-17 30-Aug-17, Delivery of Frames
Installation 5 29-Aug-17 04-Sep-17
A1342 Installation of Lift Slide (Sashes) 4 30-Aug-17 04-Sep-17 30-Aug-17 04-Sep-17, Installation of Lift Slide (Sashes)
A1344 Installation of Lift Slide (Frames) 4 29-Aug-17 03-Sep-17 29-Aug-17 03-Sep-17, Installation of Lift Slide (Frames)
V2-W8 8 06-Aug-17 14-Aug-17
Production 3 06-Aug-17 08-Aug-17
A1346 Sash Fabrication 3 06-Aug-17 08-Aug-17 06-Aug-17 08-Aug-17, Sash Fabrication
A1348 Frame Fabrication 3 06-Aug-17 08-Aug-17 06-Aug-17 08-Aug-17, Frame Fabrication
Delivery of M
Materials 3 09-Aug-17 12-Aug-17
A1352 Delivery of Sashes 3 09-Aug-17 12-Aug-17 09-Aug-17 12-Aug-17, Delivery of Sashes
A1354 Delivery of Frames 3 09-Aug-17 12-Aug-17 09-Aug-17 12-Aug-17, Delivery of Frames
Installation 4 10-Aug-17 14-Aug-17
A1356 Installation of Fixed Windows (Sashes) 4 10-Aug-17 14-Aug-17 10-Aug-17 14-Aug-17, Installation of Fixed Windows (Sashes)
A1358 Installation of Fixed Windows (Frames) 4 10-Aug-17 14-Aug-17 10-Aug-17 14-Aug-17, Installation of Fixed Windows (Frames)
V2-W9 9 09-Aug-17 19-Aug-17
Production 3 09-Aug-17 12-Aug-17
A1362 Sash Fabrication 3 09-Aug-17 12-Aug-17 09-Aug-17 12-Aug-17, Sash Fabrication
A1364 Frame Fabrication 3 09-Aug-17 12-Aug-17 09-Aug-17 12-Aug-17, Frame Fabrication

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 5 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
Delivery of M
Materials 3 13-Aug-17 15-Aug-17
A1366 Delivery of Sashes 3 13-Aug-17 15-Aug-17 13-Aug-17 15-Aug-17, Delivery of Sashes
A1368 Delivery of Frames 3 13-Aug-17 15-Aug-17 13-Aug-17 15-Aug-17, Delivery of Frames
Installation 4 15-Aug-17 19-Aug-17
A1372 Installation of Fixed Windows (Sashes) 4 15-Aug-17 19-Aug-17 15-Aug-17 19-Aug-17, Installation of Fixed Windows (Sashes)
A1374 Installation of Fixed Windows (Frames) 4 15-Aug-17 19-Aug-17 15-Aug-17 19-Aug-17, Installation of Fixed Windows (Frames)
V2-W10 13 17-Aug-17 31-Aug-17
Production 4 17-Aug-17 21-Aug-17
A1376 Sash Fabrication 4 17-Aug-17 21-Aug-17 17-Aug-17 21-Aug-17, Sash Fabrication
A1378 Frame Fabrication 4 17-Aug-17 21-Aug-17 17-Aug-17 21-Aug-17, Frame Fabrication
Delivery of M
Materials 3 22-Aug-17 24-Aug-17
A1382 Delivery of Sashes 3 22-Aug-17 24-Aug-17 22-Aug-17 24-Aug-17, Delivery of Sashes
A1384 Delivery of Frames 3 22-Aug-17 24-Aug-17 22-Aug-17 24-Aug-17, Delivery of Frames
Installation 8 23-Aug-17 31-Aug-17
A1386 Installation of Top Hung Windows (Sashes) 7 24-Aug-17 31-Aug-17 24-Aug-17 31-Aug-17, Installation of Top Hung Windows (Sashes)
A1388 Installation of Top Hung Windows (Frames) 6 23-Aug-17 29-Aug-17 23-Aug-17 29-Aug-17, Installation of Top Hung Windows (Frames)
V2-W11 18 22-Aug-17 12-Sep-17
Production 6 22-Aug-17 28-Aug-17
A1392 Sash Fabrication 6 22-Aug-17 28-Aug-17 22-Aug-17 28-Aug-17, Sash Fabrication
A1394 Frame Fabrication 6 22-Aug-17 28-Aug-17 22-Aug-17 28-Aug-17, Frame Fabrication
Delivery of M
Materials 3 29-Aug-17 31-Aug-17
A1396 Delivery of Sashes 3 29-Aug-17 31-Aug-17 29-Aug-17 31-Aug-17, Delivery of Sashes
A1398 Delivery of Frames 3 29-Aug-17 31-Aug-17 29-Aug-17 31-Aug-17, Delivery of Frames
Installation 10 31-Aug-17 12-Sep-17
A1402 Installation of Louvers (Sashes) 10 31-Aug-17 12-Sep-17 31-Aug-17 12-Sep-17, Installation of Louvers (Sashes)
A1404 Installation of Louvers (Frames) 8 31-Aug-17 10-Sep-17 31-Aug-17 10-Sep-17, Installation of Louvers (Frames)
Villa Type 3 (V3) 33 10-Aug-17 18-Sep-17
V3-W1 22 10-Aug-17 05-Sep-17
Production 17 10-Aug-17 29-Aug-17
A1406 Sash Fabrication 2 10-Aug-17 12-Aug-17 10-Aug-17 12-Aug-17, Sash Fabrication
A1408 Frame Fabrication 2 28-Aug-17 29-Aug-17 28-Aug-17 29-Aug-17, Frame Fabrication
Delivery of M
Materials 18 13-Aug-17 03-Sep-17
A1410 Delivery of Sashes 2 13-Aug-17 14-Aug-17 13-Aug-17 14-Aug-17, Delivery of Sashes
A1412 Delivery of Frames 2 31-Aug-17 03-Sep-17 31-Aug-17 03-Sep-17, Delivery of Frames
Installation 3 03-Sep-17 05-Sep-17
A1414 Installation of Sliding Windows (Sashes) 3 03-Sep-17 05-Sep-17 03-Sep-17 05-Sep-17, Installation of Sliding Windows (Sashes)
A1416 Installation of Sliding Windows (Frames) 2 03-Sep-17 04-Sep-17 03-Sep-17 04-Sep-17, Installation of Sliding Windows (Frames)
V3-W2 20 13-Aug-17 05-Sep-17
Production 17 13-Aug-17 31-Aug-17
A1418 Sash Fabrication 2 13-Aug-17 14-Aug-17 13-Aug-17 14-Aug-17, Sash Fabrication
A1420 Frame Fabrication 2 30-Aug-17 31-Aug-17 30-Aug-17 31-Aug-17, Frame Fabrication
Delivery of M
Materials 16 15-Aug-17 03-Sep-17
A1422 Delivery of Sashes 2 15-Aug-17 16-Aug-17 15-Aug-17 16-Aug-17, Delivery of Sashes
A1424 Delivery of Frames 2 31-Aug-17 03-Sep-17 31-Aug-17 03-Sep-17, Delivery of Frames
Installation 3 03-Sep-17 05-Sep-17
A1426 Installation of Sliding Windows (Sashes) 3 03-Sep-17 05-Sep-17 03-Sep-17 05-Sep-17, Installation of Sliding Windows (Sashes)
A1428 Installation of Sliding Windows (Frames) 3 03-Sep-17 05-Sep-17 03-Sep-17 05-Sep-17, Installation of Sliding Windows (Frames)
V3-W3 7 29-Aug-17 06-Sep-17
Production 2 29-Aug-17 30-Aug-17
A1430 Sash Fabrication 2 29-Aug-17 30-Aug-17 29-Aug-17 30-Aug-17, Sash Fabrication
A1432 Frame Fabrication 2 29-Aug-17 30-Aug-17 29-Aug-17 30-Aug-17, Frame Fabrication
Delivery of M
Materials 2 31-Aug-17 03-Sep-17
A1434 Delivery of Sashes 2 31-Aug-17 03-Sep-17 31-Aug-17 03-Sep-17, Delivery of Sashes
A1436 Delivery of Frames 2 31-Aug-17 03-Sep-17 31-Aug-17 03-Sep-17, Delivery of Frames
Installation 4 03-Sep-17 06-Sep-17
A1438 Installation of Fixed Windows (Sashes) 3 04-Sep-17 06-Sep-17 04-Sep-17 06-Sep-17, Installation of Fixed Windows (Sashes)
A1440 Installation of Fixed Windows (Frames) 2 03-Sep-17 04-Sep-17 03-Sep-17 04-Sep-17, Installation of Fixed Windows (Frames)
V3-W4 25 13-Aug-17 11-Sep-17
Production 19 13-Aug-17 04-Sep-17
A1442 Sash Fabrication 2 13-Aug-17 14-Aug-17 13-Aug-17 14-Aug-17, Sash Fabrication
A1444 Frame Fabrication 2 03-Sep-17 04-Sep-17 03-Sep-17 04-Sep-17, Frame Fabrication
Delivery of M
Materials 20 15-Aug-17 07-Sep-17
A1446 Delivery of Sashes 3 15-Aug-17 17-Aug-17 15-Aug-17 17-Aug-17, Delivery of Sashes
A1448 Delivery of Frames 3 05-Sep-17 07-Sep-17 05-Sep-17 07-Sep-17, Delivery of Frames
Installation 5 06-Sep-17 11-Sep-17

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 6 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A1450 Installation of Sliding Windows (Sashes) 4 07-Sep-17 11-Sep-17 07-Sep-17 11-Sep-17, Installation of Sliding Windows (Sashes)
A1452 Installation of Sliding Windows (Frames) 3 06-Sep-17 09-Sep-17 06-Sep-17 09-Sep-17, Installation of Sliding Windows (Frames)
V3-W5 12 31-Aug-17 14-Sep-17
Production 3 31-Aug-17 04-Sep-17
A1454 Sash Fabrication 3 31-Aug-17 04-Sep-17 31-Aug-17 04-Sep-17, Sash Fabrication
A1456 Frame Fabrication 3 31-Aug-17 04-Sep-17 31-Aug-17 04-Sep-17, Frame Fabrication
Delivery of M
Materials 3 05-Sep-17 07-Sep-17
A1458 Delivery of Sashes 3 05-Sep-17 07-Sep-17 05-Sep-17 07-Sep-17, Delivery of Sashes
A1460 Delivery of Frames 3 05-Sep-17 07-Sep-17 05-Sep-17 07-Sep-17, Delivery of Frames
Installation 8 06-Sep-17 14-Sep-17
A1462 Installation of Tilt & Turn Window (Sashes) 6 09-Sep-17 14-Sep-17 09-Sep-17 14-Sep-17, Installation of Tilt & Turn Window (Sashes)
A1464 Installation of Tilt & Turn Window (Frames) 5 06-Sep-17 11-Sep-17 06-Sep-17 11-Sep-17, Installation of Tilt & Turn Window (Frames)
V3-W6 8 05-Sep-17 13-Sep-17
Production 2 05-Sep-17 06-Sep-17
A1466 Sash Fabrication 2 05-Sep-17 06-Sep-17 05-Sep-17 06-Sep-17, Sash Fabrication
A1468 Frame Fabrication 2 05-Sep-17 06-Sep-17 05-Sep-17 06-Sep-17, Frame Fabrication
Delivery of M
Materials 2 07-Sep-17 09-Sep-17
A1470 Delivery of Sashes 2 07-Sep-17 09-Sep-17 07-Sep-17 09-Sep-17, Delivery of Sashes
A1472 Delivery of Frames 2 07-Sep-17 09-Sep-17 07-Sep-17 09-Sep-17, Delivery of Frames
Installation 5 09-Sep-17 13-Sep-17
A1474 Installation of Tilt & Turn Window (Sashes) 4 10-Sep-17 13-Sep-17 10-Sep-17 13-Sep-17, Installation of Tilt & Turn Window (Sashes)
A1476 Installation of Tilt & Turn Window (Frames) 3 09-Sep-17 11-Sep-17 09-Sep-17 11-Sep-17, Installation of Tilt & Turn Window (Frames)
V3-W7 10 05-Sep-17 16-Sep-17
Production 5 05-Sep-17 10-Sep-17
A1478 Sash Fabrication 3 07-Sep-17 10-Sep-17 07-Sep-17 10-Sep-17, Sash Fabrication
A1480 Frame Fabrication 3 05-Sep-17 07-Sep-17 05-Sep-17 07-Sep-17, Frame Fabrication
Delivery of M
Materials 4 09-Sep-17 12-Sep-17
A1482 Delivery of Sashes 2 11-Sep-17 12-Sep-17 11-Sep-17 12-Sep-17, Delivery of Sashes
A1484 Delivery of Frames 2 09-Sep-17 10-Sep-17 09-Sep-17 10-Sep-17, Delivery of Frames
Installation 6 10-Sep-17 16-Sep-17
A1486 Installation of Sliding Window (Sashes) 3 13-Sep-17 16-Sep-17 13-Sep-17 16-Sep-17, Installation of Sliding Window (Sashes)
A1488 Installation of Sliding Window (Frames) 3 10-Sep-17 12-Sep-17 10-Sep-17 12-Sep-17, Installation of Sliding Window (Frames)
V3-W8 8 07-Sep-17 16-Sep-17
Production 2 07-Sep-17 09-Sep-17
A1490 Sash Fabrication 2 07-Sep-17 09-Sep-17 07-Sep-17 09-Sep-17, Sash Fabrication
A1492 Frame Fabrication 2 07-Sep-17 09-Sep-17 07-Sep-17 09-Sep-17, Frame Fabrication
Delivery of M
Materials 3 10-Sep-17 12-Sep-17
A1494 Delivery of Sashes 3 10-Sep-17 12-Sep-17 10-Sep-17 12-Sep-17, Delivery of Sashes
A1496 Delivery of Frames 3 10-Sep-17 12-Sep-17 10-Sep-17 12-Sep-17, Delivery of Frames
Installation 5 11-Sep-17 16-Sep-17
A1498 Installation of Top Hung Window (Sashes) 4 12-Sep-17 16-Sep-17 12-Sep-17 16-Sep-17, Installation of Top Hung Window (Sashes)
A1502 Installation of Top Hung Window (Frames) 4 11-Sep-17 14-Sep-17 11-Sep-17 14-Sep-17, Installation of Top Hung Window (Frames)
V3-W9 8 10-Sep-17 18-Sep-17
Production 2 10-Sep-17 11-Sep-17
A1504 Sash Fabrication 2 10-Sep-17 11-Sep-17 10-Sep-17 11-Sep-17, Sash Fabrication
A1506 Frame Fabrication 2 10-Sep-17 11-Sep-17 10-Sep-17 11-Sep-17, Frame Fabrication
Delivery of M
Materials 3 12-Sep-17 14-Sep-17
A1508 Delivery of Sashes 3 12-Sep-17 14-Sep-17 12-Sep-17 14-Sep-17, Delivery of Sashes
A1512 Delivery of Frames 3 12-Sep-17 14-Sep-17 12-Sep-17 14-Sep-17, Delivery of Frames
Installation 5 13-Sep-17 18-Sep-17
A1514 Installation of Hinged Door (Sashes) 4 14-Sep-17 18-Sep-17 14-Sep-17 18-Sep-17, Installation of Hinged Door (Sashes)
A1516 Installation of Hinged Door (Frames) 3 13-Sep-17 16-Sep-17 13-Sep-17 16-Sep-17, Installation of Hinged Door (Frames)
V3-W10 15 13-Aug-17 29-Aug-17
Production 4 13-Aug-17 16-Aug-17
A1518 Sash Fabrication 4 13-Aug-17* 16-Aug-17 13-Aug-17 16-Aug-17, Sash Fabrication
A1522 Frame Fabrication 4 13-Aug-17 16-Aug-17 13-Aug-17 16-Aug-17, Frame Fabrication
Delivery of M
Materials 3 17-Aug-17 20-Aug-17
A1524 Delivery of Sashes 3 17-Aug-17 20-Aug-17 17-Aug-17 20-Aug-17, Delivery of Sashes
A1526 Delivery of Frames 3 17-Aug-17 20-Aug-17 17-Aug-17 20-Aug-17, Delivery of Frames
Installation 10 19-Aug-17 29-Aug-17
A1528 Installation of Louver (Sashes) 8 21-Aug-17 29-Aug-17 21-Aug-17 29-Aug-17, Installation of Louver (Sashes)
A1530 Installation of Louver (Frames) 6 19-Aug-17 24-Aug-17 19-Aug-17 24-Aug-17, Installation of Louver (Frames)
Villa Type 4 (V4) 99 02-Jul-17 A 26-Oct-17
V4-W1 61 02-Jul-17 A 11-Sep-17
Production 52 02-Jul-17 A 30-Aug-17

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 7 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A1532 Sash Fabrication 10 20-Aug-17* 30-Aug-17 20-Aug-17 30-Aug-17, Sash Fabrication
A1534 Frame Fabrication 6 02-Jul-17 A 08-Jul-17 A 02-Jul-17 A 08-Jul-17 A, Frame Fabrication
Delivery of M
Materials 10 28-Aug-17 09-Sep-17
A1536 Delivery of Sashes 10 28-Aug-17 09-Sep-17 28-Aug-17 09-Sep-17, Delivery of Sashes
A1538 Delivery of Frames 10 28-Aug-17 09-Sep-17 28-Aug-17 09-Sep-17, Delivery of Frames
Installation 10 30-Aug-17 11-Sep-17
A1542 Installation of Lift Slide (Sashes) 10 30-Aug-17 11-Sep-17 30-Aug-17 11-Sep-17, Installation of Lift Slide (Sashes)
A1544 Installation of Lift Slide (Frames) 10 30-Aug-17 11-Sep-17 30-Aug-17 11-Sep-17, Installation of Lift Slide (Frames)
V4-W2 27 28-Aug-17 30-Sep-17
Production 19 28-Aug-17 19-Sep-17
A1546 Sash Fabrication 19 28-Aug-17 19-Sep-17 28-Aug-17 19-Sep-17, Sash Fabrication
A1548 Frame Fabrication 3 07-Sep-17 10-Sep-17 07-Sep-17 10-Sep-17, Frame Fabrication
Delivery of M
Materials 9 14-Sep-17 25-Sep-17
A1552 Delivery of Sashes 4 20-Sep-17 25-Sep-17 20-Sep-17 25-Sep-17, Delivery of Sashes
A1554 Delivery of Frames 4 14-Sep-17 18-Sep-17 14-Sep-17 18-Sep-17, Delivery of Frames
Installation 12 16-Sep-17 30-Sep-17
A1556 Installation of Lift Slide (Sashes) 7 21-Sep-17 30-Sep-17 21-Sep-17 30-Sep-17, Installation of Lift Slide (Sashes)
A1558 Installation of Lift Slide (Frames) 12 16-Sep-17 30-Sep-17 16-Sep-17 30-Sep-17, Installation of Lift Slide (Frames)
V4-W3 39 11-Sep-17 26-Oct-17
Production 23 11-Sep-17 08-Oct-17
A1562 Sash Fabrication 15 20-Sep-17 08-Oct-17 20-Sep-17 08-Oct-17, Sash Fabrication
A1564 Frame Fabrication 3 11-Sep-17 13-Sep-17 11-Sep-17 13-Sep-17, Frame Fabrication
Delivery of M
Materials 24 14-Sep-17 12-Oct-17
A1566 Delivery of Sashes 4 09-Oct-17 12-Oct-17 09-Oct-17 12-Oct-17, Delivery of Sashes
A1568 Delivery of Frames 4 14-Sep-17 18-Sep-17 14-Sep-17 18-Sep-17, Delivery of Frames
Installation 33 18-Sep-17 26-Oct-17
A1572 Installation of Lift Slide (Sashes) 12 14-Oct-17 26-Oct-17 14-Oct-17 26-Oct-17, Installation of Lift Slide (Sashes)
A1574 Installation of Lift Slide (Frames) 10 18-Sep-17 30-Sep-17 18-Sep-17 30-Sep-17, Installation of Lift Slide (Frames)
V4-W4 13 06-Sep-17 20-Sep-17
Production 5 06-Sep-17 11-Sep-17
A1576 Sash Fabrication 5 06-Sep-17* 11-Sep-17 06-Sep-17 11-Sep-17, Sash Fabrication
A1578 Frame Fabrication 5 06-Sep-17 11-Sep-17 06-Sep-17 11-Sep-17, Frame Fabrication
Delivery of M
Materials 4 12-Sep-17 16-Sep-17
A1582 Delivery of Sashes 4 12-Sep-17 16-Sep-17 12-Sep-17 16-Sep-17, Delivery of Sashes
A1584 Delivery of Frames 4 12-Sep-17 16-Sep-17 12-Sep-17 16-Sep-17, Delivery of Frames
Installation 4 17-Sep-17 20-Sep-17
A1586 Installation of Hinged Window (Sashes) 4 17-Sep-17 20-Sep-17 17-Sep-17 20-Sep-17, Installation of Hinged Window (Sashes)
A1588 Installation of Hinged Window (Frames) 4 17-Sep-17 20-Sep-17 17-Sep-17 20-Sep-17, Installation of Hinged Window (Frames)
V4-W5 14 08-Aug-17 23-Aug-17
Production 3 08-Aug-17 10-Aug-17
A1592 Sash Fabrication 3 08-Aug-17* 10-Aug-17 08-Aug-17 10-Aug-17, Sash Fabrication
A1594 Frame Fabrication 3 08-Aug-17 10-Aug-17 08-Aug-17 10-Aug-17, Frame Fabrication
Delivery of M
Materials 4 12-Aug-17 15-Aug-17
A1596 Delivery of Sashes 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Delivery of Sashes
A1598 Delivery of Frames 4 12-Aug-17 15-Aug-17 12-Aug-17 15-Aug-17, Delivery of Frames
Installation 7 16-Aug-17 23-Aug-17
A1602 Installation of Louver (Sashes) 7 16-Aug-17 23-Aug-17 16-Aug-17 23-Aug-17, Installation of Louver (Sashes)
A1604 Installation of Louver (Frames) 4 16-Aug-17 20-Aug-17 16-Aug-17 20-Aug-17, Installation of Louver (Frames)
Villa Type 5 (V5) 70 09-Jul-17 A 30-Sep-17
V5-W1 38 09-Jul-17 A 21-Aug-17
Production 32 09-Jul-17 A 14-Aug-17
A1606 Sash Fabrication 3 12-Aug-17* 14-Aug-17 12-Aug-17 14-Aug-17, Sash Fabrication
A1608 Frame Fabrication 5 09-Jul-17 A 13-Jul-17 A 09-Jul-17 A 13-Jul-17 A, Frame Fabrication
Delivery of M
Materials 30 15-Jul-17 A 17-Aug-17
A1612 Delivery of Sashes 3 15-Aug-17 17-Aug-17 15-Aug-17 17-Aug-17, Delivery of Sashes
A1614 Delivery of Frames 3 15-Jul-17 A 17-Jul-17 A 15-Jul-17 A 17-Jul-17 A, Delivery of Frames
Installation 23 26-Jul-17 21-Aug-17
A1616 Installation of Sliding Window (Sashes) 5 16-Aug-17 21-Aug-17 16-Aug-17 21-Aug-17, Installation of Sliding Window (Sashes)
A1618 Installation of Sliding Window (Frames) 3 26-Jul-17* 29-Jul-17 26-Jul-17 29-Jul-17, Installation of Sliding Window (Frames)
V5-W2 43 09-Jul-17 A 27-Aug-17
Production 35 09-Jul-17 A 17-Aug-17
A1622 Sash Fabrication 3 15-Aug-17 17-Aug-17 15-Aug-17 17-Aug-17, Sash Fabrication
A1624 Frame Fabrication 5 09-Jul-17 A 13-Jul-17 A 09-Jul-17 A 13-Jul-17 A, Frame Fabrication
Delivery of M
Materials 33 15-Jul-17 A 21-Aug-17
A1626 Delivery of Sashes 3 19-Aug-17 21-Aug-17 19-Aug-17 21-Aug-17, Delivery of Sashes

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 8 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
A1628 Delivery of Frames 3 15-Jul-17 A 17-Jul-17 A 15-Jul-17 A 17-Jul-17 A, Delivery of Frames
Installation 28 26-Jul-17 27-Aug-17
A1632 Installation of Sliding Window (Sashes) 5 22-Aug-17 27-Aug-17 22-Aug-17 27-Aug-17, Installation of Sliding Window (Sashes)
A1634 Installation of Sliding Window (Frames) 4 26-Jul-17* 30-Jul-17 26-Jul-17 30-Jul-17, Installation of Sliding Window (Frames)
V5-W3 8 12-Sep-17 20-Sep-17
Production 3 12-Sep-17 14-Sep-17
A1636 Sash Fabrication 3 12-Sep-17 14-Sep-17 12-Sep-17 14-Sep-17, Sash Fabrication
A1638 Frame Fabrication 3 12-Sep-17 14-Sep-17 12-Sep-17 14-Sep-17, Frame Fabrication
Delivery of M
Materials 3 14-Sep-17 17-Sep-17
A1642 Delivery of Sashes 3 14-Sep-17 17-Sep-17 14-Sep-17 17-Sep-17, Delivery of Sashes
A1644 Delivery of Frames 3 14-Sep-17 17-Sep-17 14-Sep-17 17-Sep-17, Delivery of Frames
Installation 5 16-Sep-17 20-Sep-17
A1646 Installation of Top Hung Window (Sashes) 4 17-Sep-17 20-Sep-17 17-Sep-17 20-Sep-17, Installation of Top Hung Window (Sashes)
A1648 Installation of Top Hung Window (Frames) 3 16-Sep-17 18-Sep-17 16-Sep-17 18-Sep-17, Installation of Top Hung Window (Frames)
V5-W4 7 16-Sep-17 24-Sep-17
Production 2 16-Sep-17 17-Sep-17
A1652 Sash Fabrication 2 16-Sep-17 17-Sep-17 16-Sep-17 17-Sep-17, Sash Fabrication
A1654 Frame Fabrication 2 16-Sep-17 17-Sep-17 16-Sep-17 17-Sep-17, Frame Fabrication
Delivery of M
Materials 3 17-Sep-17 19-Sep-17
A1656 Delivery of Sashes 3 17-Sep-17 19-Sep-17 17-Sep-17 19-Sep-17, Delivery of Sashes
A1658 Delivery of Frames 3 17-Sep-17 19-Sep-17 17-Sep-17 19-Sep-17, Delivery of Frames
Installation 5 18-Sep-17 24-Sep-17
A1662 Installation of Bottom Hung Window (Sashes) 4 19-Sep-17 24-Sep-17 19-Sep-17 24-Sep-17, Installation of Bottom Hung Window (Sashes)
A1664 Installation of Bottom Hung Window (Frames) 4 18-Sep-17 21-Sep-17 18-Sep-17 21-Sep-17, Installation of Bottom Hung Window (Frames)
V5-W4A 7 18-Sep-17 26-Sep-17
Production 2 18-Sep-17 19-Sep-17
A1666 Sash Fabrication 2 18-Sep-17 19-Sep-17 18-Sep-17 19-Sep-17, Sash Fabrication
A1668 Frame Fabrication 2 18-Sep-17 19-Sep-17 18-Sep-17 19-Sep-17, Frame Fabrication
Delivery of M
Materials 3 19-Sep-17 21-Sep-17
A1672 Delivery of Sashes 3 19-Sep-17 21-Sep-17 19-Sep-17 21-Sep-17, Delivery of Sashes
A1674 Delivery of Frames 3 19-Sep-17 21-Sep-17 19-Sep-17 21-Sep-17, Delivery of Frames
Installation 5 20-Sep-17 26-Sep-17
A1676 Installation of Hinged Window (Sashes) 4 21-Sep-17 26-Sep-17 21-Sep-17 26-Sep-17, Installation of Hinged Window (Sashes)
A1678 Installation of Hinged Window (Frames) 4 20-Sep-17 25-Sep-17 20-Sep-17 25-Sep-17, Installation of Hinged Window (Frames)
V5-W5 41 09-Jul-17 A 24-Aug-17
Production 37 09-Jul-17 A 20-Aug-17
A1682 Sash Fabrication 2 19-Aug-17 20-Aug-17 19-Aug-17 20-Aug-17, Sash Fabrication
A1684 Frame Fabrication 5 09-Jul-17 A 13-Jul-17 A 09-Jul-17 A 13-Jul-17 A, Frame Fabrication
Delivery of M
Materials 34 16-Jul-17 A 23-Aug-17
A1686 Delivery of Sashes 3 21-Aug-17 23-Aug-17 21-Aug-17 23-Aug-17, Delivery of Sashes
A1688 Delivery of Frames 3 16-Jul-17 A 18-Jul-17 A 16-Jul-17 A 18-Jul-17 A, Delivery of Frames
Installation 26 26-Jul-17 24-Aug-17
A1692 Installation of Sliding Window (Sashes) 3 22-Aug-17 24-Aug-17 22-Aug-17 24-Aug-17, Installation of Sliding Window (Sashes)
A1694 Installation of Sliding Window (Frames) 3 26-Jul-17 29-Jul-17 26-Jul-17 29-Jul-17, Installation of Sliding Window (Frames)
V5-W6 8 20-Sep-17 30-Sep-17
Production 2 20-Sep-17 21-Sep-17
A1696 Sash Fabrication 2 20-Sep-17 21-Sep-17 20-Sep-17 21-Sep-17, Sash Fabrication
A1698 Frame Fabrication 2 20-Sep-17 21-Sep-17 20-Sep-17 21-Sep-17, Frame Fabrication
Delivery of M
Materials 3 21-Sep-17 25-Sep-17
A1702 Delivery of Sashes 3 21-Sep-17 25-Sep-17 21-Sep-17 25-Sep-17, Delivery of Sashes
A1704 Delivery of Frames 3 21-Sep-17 25-Sep-17 21-Sep-17 25-Sep-17, Delivery of Frames
Installation 6 24-Sep-17 30-Sep-17
A1706 Installation of Hinged Window (Sashes) 5 25-Sep-17 30-Sep-17 25-Sep-17 30-Sep-17, Installation of Hinged Window (Sashes)
A1708 Installation of Hinged Window (Frames) 5 24-Sep-17 28-Sep-17 24-Sep-17 28-Sep-17, Installation of Hinged Window (Frames)
V5-W7 61 09-Jul-17 A 18-Sep-17
Production 53 09-Jul-17 A 09-Sep-17
A1712 Sash Fabrication 2 07-Sep-17* 09-Sep-17 07-Sep-17 09-Sep-17, Sash Fabrication
A1714 Frame Fabrication 5 09-Jul-17 A 13-Jul-17 A 09-Jul-17 A 13-Jul-17 A, Frame Fabrication
Delivery of M
Materials 50 16-Jul-17 A 12-Sep-17
A1716 Delivery of Sashes 3 10-Sep-17 12-Sep-17 10-Sep-17 12-Sep-17, Delivery of Sashes
A1718 Delivery of Frames 3 16-Jul-17 A 18-Jul-17 A 16-Jul-17 A 18-Jul-17 A, Delivery of Frames
Installation 47 25-Jul-17 18-Sep-17
A1722 Installation of Lift Slide (Sashes) 5 13-Sep-17 18-Sep-17 13-Sep-17 18-Sep-17, Installation of Lift Slide (Sashes)
A1724 Installation of Lift Slide (Frames) 3 25-Jul-17* 27-Jul-17 25-Jul-17 27-Jul-17, Installation of Lift Slide (Frames)
V5-W8 60 09-Jul-17 A 17-Sep-17

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 9 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
Production 55 09-Jul-17 A 11-Sep-17
A1726 Sash Fabrication 2 10-Sep-17 11-Sep-17 10-Sep-17 11-Sep-17, Sash Fabrication
A1728 Frame Fabrication 5 09-Jul-17 A 13-Jul-17 A 09-Jul-17 A 13-Jul-17 A, Frame Fabrication
Delivery of M
Materials 52 16-Jul-17 A 14-Sep-17
A1732 Delivery of Sashes 3 12-Sep-17 14-Sep-17 12-Sep-17 14-Sep-17, Delivery of Sashes
A1734 Delivery of Frames 3 16-Jul-17 A 18-Jul-17 A 16-Jul-17 A 18-Jul-17 A, Delivery of Frames
Installation 45 26-Jul-17 17-Sep-17
A1736 Installation of Lift Slide (Sashes) 3 14-Sep-17 17-Sep-17 14-Sep-17 17-Sep-17, Installation of Lift Slide (Sashes)
A1738 Installation of Lift Slide (Frames) 3 26-Jul-17 29-Jul-17 26-Jul-17 29-Jul-17, Installation of Lift Slide (Frames)
PRIORITY # 3 (SE
(SERVICE BUILDINGS) 56 20-Sep-17 25-Nov-17
Stage H 34 20-Sep-17 30-Oct-17
Block - 34 (Rec
(Recreattion Building) 34 20-Sep-17 30-Oct-17
Production 22 20-Sep-17 16-Oct-17
A1742 Sash Fabrication 20 24-Sep-17 16-Oct-17 24-Sep-17 16-Oct-17, Sash Fabrication
A1744 Frame Fabrication 15 20-Sep-17 08-Oct-17 20-Sep-17 08-Oct-17, Frame Fabrication
Delivery of M
Materials 23 30-Sep-17 25-Oct-17
A1746 Delivery of Sashes 14 30-Sep-17 15-Oct-17 30-Sep-17 15-Oct-17, Delivery of Sashes
A1748 Delivery of Frames 20 03-Oct-17 25-Oct-17 03-Oct-17 25-Oct-17, Delivery of Frames
Doors & Windows
Win 22 05-Oct-17 30-Oct-17
A1752 Installation of Sashes 20 08-Oct-17 30-Oct-17 08-Oct-17 30-Oct-17, Installation of Sashes
A1754 Installation of Frames 14 05-Oct-17 21-Oct-17 05-Oct-17 21-Oct-17, Installation of Frames
Stage I 34 20-Sep-17 30-Oct-17
Block - 21 (Service
(Ser Apartments) 34 20-Sep-17 30-Oct-17
Production 22 20-Sep-17 16-Oct-17
A5330 Sash Fabrication 20 24-Sep-17 16-Oct-17 24-Sep-17 16-Oct-17, Sash Fabrication
A5340 Frame Fabrication 15 20-Sep-17 08-Oct-17 20-Sep-17 08-Oct-17, Frame Fabrication
Delivery of M
Materials 23 30-Sep-17 25-Oct-17
A5350 Delivery of Frames 20 03-Oct-17 25-Oct-17 03-Oct-17 25-Oct-17, Delivery of Frames
A5360 Delivery of Sashes 14 30-Sep-17 15-Oct-17 30-Sep-17 15-Oct-17, Delivery of Sashes
Doors & Windows
Win 22 05-Oct-17 30-Oct-17
A5310 Installation of Frames 14 05-Oct-17 21-Oct-17 05-Oct-17 21-Oct-17, Installation of Frames
A5320 Installation of Sashes 20 08-Oct-17 30-Oct-17 08-Oct-17 30-Oct-17, Installation of Sashes
Stage F 34 20-Sep-17 30-Oct-17
Block - 13 (Staff
(Sta Housing & Warehouse) 34 20-Sep-17 30-Oct-17
Production 22 20-Sep-17 16-Oct-17
A5390 Sash Fabrication 20 24-Sep-17 16-Oct-17 24-Sep-17 16-Oct-17, Sash Fabrication
A5400 Frame Fabrication 15 20-Sep-17 08-Oct-17 20-Sep-17 08-Oct-17, Frame Fabrication
Delivery of M
Materials 23 30-Sep-17 25-Oct-17
A5410 Delivery of Frames 20 03-Oct-17 25-Oct-17 03-Oct-17 25-Oct-17, Delivery of Frames
A5420 Delivery of Sashes 14 30-Sep-17 15-Oct-17 30-Sep-17 15-Oct-17, Delivery of Sashes
Doors & Windows
Win 22 05-Oct-17 30-Oct-17
A5370 Installation of Frames 14 05-Oct-17 21-Oct-17 05-Oct-17 21-Oct-17, Installation of Frames
A5380 Installation of Sashes 20 08-Oct-17 30-Oct-17 08-Oct-17 30-Oct-17, Installation of Sashes
Stage ME 34 20-Sep-17 30-Oct-17

Block - 14/15 ((Security Building) 34 20-Sep-17 30-Oct-17


Production 22 20-Sep-17 16-Oct-17
A5450 Sash Fabrication 20 24-Sep-17 16-Oct-17 24-Sep-17 16-Oct-17, Sash Fabrication
A5460 Frame Fabrication 15 20-Sep-17 08-Oct-17 20-Sep-17 08-Oct-17, Frame Fabrication
Delivery of M
Materials 23 30-Sep-17 25-Oct-17
A5470 Delivery of Frames 20 03-Oct-17 25-Oct-17 03-Oct-17 25-Oct-17, Delivery of Frames
A5480 Delivery of Sashes 14 30-Sep-17 15-Oct-17 30-Sep-17 15-Oct-17, Delivery of Sashes
Doors & Windows
Win 22 05-Oct-17 30-Oct-17
A5430 Installation of Frames 14 05-Oct-17 21-Oct-17 05-Oct-17 21-Oct-17, Installation of Frames
A5440 Installation of Sashes 20 08-Oct-17 30-Oct-17 08-Oct-17 30-Oct-17, Installation of Sashes
F 34 20-Sep-17 30-Oct-17
Block - 14 (Irrig
(Irrigation Pump Station) 34 20-Sep-17 30-Oct-17
Production 22 20-Sep-17 16-Oct-17
A5510 Sash Fabrication 20 24-Sep-17 16-Oct-17 24-Sep-17 16-Oct-17, Sash Fabrication
A5520 Frame Fabrication 15 20-Sep-17 08-Oct-17 20-Sep-17 08-Oct-17, Frame Fabrication
Delivery of M
Materials 23 30-Sep-17 25-Oct-17
A5530 Delivery of Frames 20 03-Oct-17 25-Oct-17 03-Oct-17 25-Oct-17, Delivery of Frames
A5540 Delivery of Sashes 14 30-Sep-17 15-Oct-17 30-Sep-17 15-Oct-17, Delivery of Sashes
Doors & Windows
Win 22 05-Oct-17 30-Oct-17
A5490 Installation of Frames 14 05-Oct-17 21-Oct-17 05-Oct-17 21-Oct-17, Installation of Frames
A5500 Installation of Sashes 20 08-Oct-17 30-Oct-17 08-Oct-17 30-Oct-17, Installation of Sashes

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 10 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7
Activity ID Activity Name Original Start Finish June 2017 July 2017 August 2017 September 2017 October 2017 November 2017 December 2017
Duration
11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24
Utility Buildings 41 09-Oct-17 25-Nov-17
Production 19 09-Oct-17 30-Oct-17
A5270 Sash Fabrication 12 17-Oct-17 30-Oct-17 17-Oct-17 30-Oct-17, Sash Fabrication
A5280 Frame Fabrication 15 09-Oct-17 25-Oct-17 09-Oct-17 25-Oct-17, Frame Fabrication
Delivery of Materials
Ma 14 21-Oct-17 05-Nov-17
A5290 Delivery of Frames 10 21-Oct-17 31-Oct-17 21-Oct-17 31-Oct-17, Delivery of Frames
A5300 Delivery of Sashes 12 23-Oct-17 05-Nov-17 23-Oct-17 05-Nov-17, Delivery of Sashes
Doors & Windows
Windo 21 01-Nov-17 25-Nov-17
A4630 Installation of Frames 20 01-Nov-17 23-Nov-17 01-Nov-17 23-Nov-17, Installation of Frames
A4640 Installation of Sashes 14 09-Nov-17 25-Nov-17 09-Nov-17 25-Nov-17, Installation of Sashes
Pool Bath House 41 09-Oct-17 25-Nov-17
Production 19 09-Oct-17 30-Oct-17
A5570 Sash Fabrication 12 17-Oct-17 30-Oct-17 17-Oct-17 30-Oct-17, Sash Fabrication
A5580 Frame Fabrication 15 09-Oct-17 25-Oct-17 09-Oct-17 25-Oct-17, Frame Fabrication
Delivery of Materials
Ma 14 21-Oct-17 05-Nov-17
A5590 Delivery of Frames 10 21-Oct-17 31-Oct-17 21-Oct-17 31-Oct-17, Delivery of Frames
A5600 Delivery of Sashes 12 23-Oct-17 05-Nov-17 23-Oct-17 05-Nov-17, Delivery of Sashes
Doors & Windows
Windo 21 01-Nov-17 25-Nov-17
A5550 Installation of Frames 20 01-Nov-17 23-Nov-17 01-Nov-17 23-Nov-17, Installation of Frames
A5560 Installation of Sashes 14 09-Nov-17 25-Nov-17 09-Nov-17 25-Nov-17, Installation of Sashes

METAL WORKS 123 10-Jun-17 A 05-Nov-17

Pergola's (Villa 1-5


1-5, Pool Bath House) 75 10-Jun-17 A 05-Sep-17
Fabrication 60 10-Jun-17 A 24-Aug-17
A4930 Fabrication of Pergola 60 10-Jun-17 A 24-Aug-17 24-Aug-17, 24-Aug-17, Fabrication of Pergola
Transportation 60 17-Jun-17 A 28-Aug-17
A4940 Transportation of Materials 60 17-Jun-17 A 28-Aug-17 ul-17 28-Aug-17, 28-Aug-17, Transportation of Materials
Installation 63 24-Jun-17 A 05-Sep-17
A4950 Installation of Brackets 60 24-Jun-17 A 24-Aug-17 7 A, 15-Jul-17 24-Aug-17, 24-Aug-17, Installation of Brackets
A4960 Installation of Pergola 60 01-Jul-17 A 05-Sep-17 01-Jul-17 A, 15-Jul-17 05-Sep-17, 05-Sep-17, Installation of Pergola
Hand Rail ( Apartment
Apartm 1-4, Villa-3) 65 20-Aug-17 05-Nov-17
Fabrication 55 20-Aug-17 24-Oct-17
A4730 Fabrication of Handrails 55 20-Aug-17* 24-Oct-17 20-Aug-17 24-Oct-17, Fabrication of Handrails
Transportation 55 23-Aug-17 28-Oct-17
A4740 Transportation of Materials 55 23-Aug-17 28-Oct-17 23-Aug-17 28-Oct-17, Transportation of Materials
Installation 59 27-Aug-17 05-Nov-17
A4750 Installation of Brackets 50 27-Aug-17 25-Oct-17 27-Aug-17 25-Oct-17, Installation of Brackets
A4760 Installation of Handrail 50 07-Sep-17 05-Nov-17 07-Sep-17 05-Nov-17, Installation of Handrail
Louvers ( Service Aptmt., Villa-4) 23 24-Aug-17 20-Sep-17
Fabrication 14 24-Aug-17 10-Sep-17
A4830 Fabrication of Louvers 14 24-Aug-17* 10-Sep-17 24-Aug-17 10-Sep-17, Fabrication of Louvers
Transportation 6 06-Sep-17 12-Sep-17
A4840 Transportation of Materials 6 06-Sep-17 12-Sep-17 06-Sep-17 12-Sep-17, Transportation of Materials
Installation 10 10-Sep-17 20-Sep-17
A4850 Installation of Brackets 6 10-Sep-17 16-Sep-17 10-Sep-17 16-Sep-17, Installation of Brackets
A4860 Installation of Louvers 8 12-Sep-17 20-Sep-17 12-Sep-17 20-Sep-17, Installation of Louvers

Actual Level of Effort Remaining Work Date Revision Checked Approved


Page 11 of 11 AL-RIMAL GATED COMMUNITY
15-Jul-17 Schedule - R6
Actual Work Critical Remaining Work Villa Schedule - R7