1. Bored excavation for 300mm diameter piers, depth of 2.50 meters.
The total number of piers are 44 spread out of maximum 1800mm, as per below
drawing.
2 Bulk excavation m3 73
Page 1 of 6
3. N25 concrete to the slab on ground
Slab: 12,830 x 5,760 x 100 = 7.39 m3
Garage set down: 5,640 x 5,500 x 75 = 2.32 m3
Patio Slab: 1,670 x 6,350 x 100 =1.06 m3
Family Room: 5,510 x 4,080 x 100 = 2.24 m3
450 12,830
4,080
11,870
5,510
Page 2 of 6
Pad footings
1200 x 900 x 2 = 2.16
350 x 240 = 0.84
Slab on ground m3 8
12.83 x 5.76 x 0.100 = 7.39
Patio Slab m3 2
1.67 x 6.35 x 0.100 = 1.06
Family Room m3 3
5,510 x 4,080 x 100 = 2.24
Pad footing m3 2
2.16 + 0.84 x 0.350 = 1.05
Total m3 22
5. The lengths of SL12TM required to complete the construction of the slab on ground.
Page 3 of 6
Item Particulars Unit Quantity Rate $ C
3 x 12.73 =38.19
3 x 11.77 = 35.31
1 x 5.41 =5.41
2 x 4.98 = 9.96
88.87
7. The plasterboard required to complete the lining of first floor rooms excluding the wet
areas.
a) Nett measure in m2. The rate per m2 will include a wastage factor.
b) The number of sheets of plasterboard required to complete the lining of the
rooms.
7 (a) Plasterboard m2
Total m2 85
Page 4 of 6
4.2 4 sheets
5.4 2 sheets
Bedroom 2: 3.54 x 3.49 = 12.35 8
2.7 4 sheets
3.6 4 sheets
Bedroom 3: 3.54 x 3.23 = 11.43 8
2.7 4 sheets
3.3 4 sheets
Bedroom 4: 3.34 x 3.29 = 10.98 8
2.4 2 sheets
3.3 4 sheets
3.6 2 sheets
Rumpus Room:
14
4.00 + 7.26 + 1.99 + 4.16 + 3.03 + 6.06 =
26.50
2.4 4 sheets
3.3 2 sheets
3.6 4 sheets
4.2 4 sheets
Total Sheets:
46
2.4 6 sheets
2.7 10 sheets
3.3 10 sheets
3.6 10 sheets
4.2 8 sheets
5.4 2 sheets
Page 5 of 6
Rumpus Room: 7
4.00 + 7.26 + 1.99 + 4.16 + 3.03 + 6.06
2.4m (1 length)
2.7m (2 lengths)
3.3m (3 lengths)
4.2m (1 length)
Total:
23
2.1m 1 length
2.4m 2 length
2.7m 6 lengths
3.3m 7 lengths
3.6m 3 lengths
4.2m 3 lengths
5.4m 1 length
Total m 70