Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
Part1:Bidding Procedures
Note to Bidders: The information requested is required in the format provided below and
should be included by the Bidder in its technical proposal. If none, include form and state
None.
(Including the data, services and facilities to be provided by the Procuring Entity) [Give any
comments, suggestions or proposed improvements to the terms of reference e.g. deleting
unnecessary activities, proposing additional activities, proposing different phasing etc. Any
comments should be incorporated in your proposal.
Also give any comments on the data, services and facilities to be provided by the Procuring
Entity e.g. administrative support, office space, local transportation, equipment, data,
counterpart staff etc.]
2. Law system
Establishment of Railway Law and integrated into Ethiopian National law system is
suggested, for protecting the railway infrastructure facilities and the legal rights of Operation,
which is convenient and practical for execution.
3. Via investigation, neither Ethiopia nor Djibouti is the member of International Federation
of Freight Forwarders Associations (FIATA). For better applying the rules and regulations
Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
Part1:Bidding Procedures
4. Enterprise loyalty training needs to be added into the training programme of all employee,
and -Semi-military management system widely applied in China Railway System will be
introduced for Operation Management.
5. Being the EPC contractor of the railway project, we have constructed a lot of temporary
facilities such as offices and dormitories during the project implementation. If we can win
the bid, all these facilities can be provided free of charge and treated as the capacity
building and training facilities.
6. The CCECC-CREC Joint venture has lots of equipments and instrument during the
construction of Ethiopia Djibouti Railway project. Those equipments could be provided to
the procurement entity during the management contract by certain condition.
7. Being the EPC contractor of the railway project, our consortium has the best
understandings of all the equipment, facilities and standards applied in this project. Since
all the EPC processes in the project have adopted the Chinese standard, our consortium is
able to provide a full set of technical specifications and operation regulations to fit the
Chinese standard and also accommodate the local situation. Therefore, it is well belied that
the operation handled by our consortium will be the most efficient, safe and reliable.
8. All the equipment, facilities and locomotives are purchased from China, and our
consortium definitely has very good connections with each supplier. Thus, we can
guarantee that our consortium can provide the best services in capacity building,
maintenances, repairs and other aspects during the future operation period.
9. Being the EPC contractor of the railway project, our consortium has the best
understandings in the design codes, technical specifications, structures in each field and all
features of electrification, communication and signaling works. Therefore, our consortium
can fully assure you that we can provide the best maintenance and operation services in
the future.