Part1:Bidding Procedures

T2 Bidders Organization and Experiences

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Note to Bidders: The information requested is required in the format provided below and
should be included by the Bidder in its technical proposal.

T2. Bidders Organization and Experiences

Bidders Organisation

[Provide a brief (approximately two pages) description of your firm/entity (and each
associate for the assignment) background, organization etc.]

China Civil Engineering Construction Corporation (CCECC) was established in 1979


according to the approval of the State Council of the Peoples Republic of China. As one of
the pioneers performing international contracting and economic cooperation, CCECC has
been developed from the earlier Foreign Aid Bureau of the Ministry of Railways of China
into a large-scale state-owned enterprise with Chinese National Super Grade Qualification
for railway project contracting, and has been listed among the worlds top 225 international
contractors for many years by the Engineering News Record.

Since its execution of Tanzania-Zambia Railway, the biggest economic-aid project


undertaken by China in 1960s, CCECC has been in constant development. At present,
CCECCs business scope covers project contracting, civil engineering design &
consultancy, real estate development, import & export trading, hotel management etc. The
business activities of CCECC have spread over 60 countries in Asia, Africa, America,
Europe and Oceania with its overseas offices or subsidiaries established in more than 40
countries. By the end of 2011, the number of core staff of CCECC had exceeded 3,000 and
that of foreign employees exceeded 10,000, with annual newly-signed contract value of
8.466 billion USD among which a turnover of 1.119 billion USD had been achieved.

In recent years, CCECC has achieved rapid development, undertaking and executing
numerous key projects ranging from railway, light rail, expressway to bridges, buildings, and
municipal works. CCECC has successfully signed the contracts for many large-scale
projects in the past three years, such as Algerian 175 km Double Line Electrified Railway
Project (contract value:1.728 billion Euros) in 2009, Nigerian Railway Modernization Project
(Abuja-Kaduna) (contract value:850 million USD) in 2010, and many other large-scale
railway and expressway projects in Ethiopia, Djibouti, Nigeria and Chad in 2011, among
which the contract value of the Railway Project between Ethiopia and Djibouti hit 1.702
billion USD. By the end of 2011, the number of CCECCs projects under execution
amounted to 128 with total contract value of 8.385 billion USD, which in turn guarantees
CCECC for its sustainable business development and ever growing strength for project
contracting.

Whilst consolidating and expanding its project contracting market, CCECC is also focusing
on developing its diversified business and specialized professional edges, thus achieving a

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
steadily strengthened financing capacity and an increasingly widened business scope.
Adhering to the concept of "people-oriented, scientific development", CCECC will continue
to carry out an even more extensive and deeper cooperation with friends all over the world
to develop hand in hand for a prosperous win-win future and mutual development by
offering best service to its clients and contributing more elaborate works to the society.

China Railway Group Limited (CREC), with the corporate motto of strive to challenge
limits and achieve excellence, CREC has participated in the construction of all domestic
major railway lines and constructed, rebuilt and extended a total length of exceeding 82,821
km, accounting for more than two thirds of total operating length of railway lines constructed
in China, among which, 58,899 km of electrified railway lines, accounting for approx. 95% of
the total operating length of the same project in China, 8,388 Km of expressway, accounting
for on tenths of the total length in China. CREC also has undertaken three fifths of urban rail
transit system design and construction in China. The number of bridges completed is about
10,000 Km whilst tunnel design and construction length added up to 7,907 Km. CREC has
dispatched 12 expedition team to the South Pole to undertake the construction and
maintenance for the scientific research station of Zhongshan, Great Wall and Kunlun.
Moreover, the company has designed and constructed numerous top-qualify projects in the
field of highway, airport, wharf, hydropower station, metro, LRT, MRT, Monorail, high-rise
building and variety of municipal facilities. Of all the completed projects, CREC had been
awarded by Chinese Government for 120 Luban Prizes, 159 National supreme quality
projects, 76 Zhan Tianyou Civil Engineerig Prizes, and 98 National Advanced Science and
Technology Prizes.

CREC widely opened the oversea market all around the world since 1950s, has undertaken
the design and construction services provision for more than 550 overseas projects
including railway, expressway, highway, bridge, tunnel, building construction, dredging,
airport and municipal works in more than 60 countries and regions globally since its
international business expanding.

With the outstanding achievement and turnover in the most popular industry field, CREC
was ranked in 86th of the Fortune Global 500.

Among those outstanding railway design and construction experiences, CREC is also the
expert in the field of operation and maintenance for the existing railway networks in China.

CREC owns 1,483 sets of advanced railway construction and maintenance equipments,
with the total power of 264,441 KW, and 442 sets of locomotives in various types, and has
the comprehensive strength for participating in construction and maintenance of high-speed
railways in accumulated operated length over 4,500 Km per year. With strong scientific and
technological strength, advanced construction technologies, superior mechanized
construction and installation equipment, glorious track laying, bridging and transportation
performance with HSE guaranteed, and remarkable achievement for railway operation
management, CREC always takes the lead in the same domestic industry.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
CREC successively configured and deployed steam locomotives, DF1 and Beijing diesel
locomotives. At present, the main locomotive type is DF4 diesel locomotives and heavy rail
motor cars for engineering transport as well as DF8B diesel locomotives and SS4
development electric locomotives for contracting transport. Under the background of
popularizing Harmony high-power AC locomotives in China Railway, the company has
purchased 4 sets of Harmony electric locomotives. For the dedicated part of freight
transportation management, CREC owns SS4G TYPE AC locomotives for 57 sets, DF4
diesel locomotives for 98 sets, freight wagon of 270 sets, rail flat wagon of 170 sets, K13
ballast dumping wagon of 158 sets and K18 hopper wagons of 217 sets; owns 26 train
examination railway maintenance workshop, conducting the regular and overhaul
maintenance services for all rolling stock and trains under operation management by
CREC.

So far since establishment, CREC has undertaken railway operation for both passenger
and freight delivery for over 3,904.24 Km, separately realized the accumulated
transportation volume over 399 million person.times and totally 152 million ton with
operation income exceed 5.3 Billion USD, made great contribution for the fast development
of railway operation in China.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Bidders Experience
CCECC

[Using the format below, provide information on relevant assignments carried out in the last
eight years which best illustrate your experience, where your firm/entity (and each
associate for the assignment) provided services similar to the ones requested under this
assignment.
In particular, please list any useful information to show Experience and proficiency in the
direct management of Freight rail services and to show Experience and proficiency in the
direct management of intermodal Freight services and logistics.]

Assignment Name: Approx. value of the contract (in current US$):


Inner Mongolia Dongsheng-Wuhai Railway 73,140,000 USD
Country: China
Duration of assignment (month): 46 months
Location within Country: Dongsheng - Wuhai
Name of Client: Inner Mongolia Hohhot Rail Total No. of staff-months:
Investment and Development Center 25760 man-months
Approx. value of the services provided by
Address: No. 26, Xincheng District, Hohhot City,
Inner Mongolia your firm (in current US$): 73,140,000 USD (for
maintenance and operation service)
Start Date(month/year) : Completion Date (month/year) :
March 2010 January 2014
No. of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Narrative description of project:
Dongsheng-Wuhai Railway is a railway used for the coal transportation. After the project comes into use,
the coal transportation and line maintenance task will be undertaken by the Wanfang company. The total
length of the line is 315.75 km. Track laying was started on June, 2006 and the line was completed on
April 30, 2007. The line was opened to traffic on January 5, 2008.
Description of Actual Services Provided by Your Staff:
CCECC was responsible for the maintenance and operation of the railway line from March 2010 to
January 2014, including the maintenance of the railway line, electric power, electrification, signal
facilities and devices, and the safety inspection, train scheduling, vehicle maintenance and part
procurement, cargo transport, personnel training and the tasks related to operation.
CCECC sent a total of 7.8 million tons of coal and 1.4 million tons of other goods during the operations
and well completed the repair and maintenance to the relevant devices and facilities on the railway line.
No safety accidents occurred during operations.

Bidders name: China Civil Engineering Construction Corporation

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current US$):


Inner Mongolia Hohhot - Jungar Banner Railway 648,000,000 USD
Country: China Duration of assignment (months):
Location within Country: Hohhot - Jungar Banner 60 months
Name of Client:
Total No. of staff-months:
Inner Mongolia Hohhot Rail Investment and
27720 staff-month
Development Center
Approx. value of the services provided by
Address: No. 26, Xincheng District, Hohhot City, your firm (in current US$):
Inner Mongolia 648,000,000 USD (for maintenance and
operation service)
Completion Date (Month/Year):
Start Date (Month/Year): May 2009
May 2014
No. of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Name: Xu Yue Year: 2009 - 2014
Position: Capacity Building Manager
Activity implemented:
1) Coordinating with relevant departments, summarizing, and preparing overall and professional
training plans, based on the analysis on the railway operation plan;
2) Organizing technical personnel to train personnel of owners based on the training plan confirmed by
relevant parties, to ensure that they have capacity to operate and maintain the projects;
3) Checking and inspecting actual operating and maintenance capacity of personnel of owners during
the actual operation of the railway, and promptly organizing training again for the deficiencies found and
ensure that they are qualified for their positions.
4) Organizing specialists to test personnel attending capacity building training before the handover of
the project, and ensure that the capacity building plan is thoroughly implemented.
Through the aforesaid measures, the training provided to owners for project operation and maintenance
has smoothly completed and won applauses from relevant parties.
Name: Xiao Kun Year: 2009 2014 Position: Assistant Manager of Planning and Operation
Management
Activity implemented:
Developing management standards in order to achieve the best turnover quality and efficiency of trains,
and working with other departments to develop railway transport plans with coherent strategic direction,
which have made outstanding contributions to Huzhun railway that had completed 120 million tons of
coal freight within five years.
Name: Wang Yunwu Year: 2009 2014 Position: Freight Assistant Manager
Activity implemented:
1). Planning, organizing and implementing all of the freight operation management;
2). Responsible for directing and coordinating the full implementation of the program and track of the
transport of goods;
3). Responsible for handling domestic rail transport accidents and the development of contingency
plans ;
4).Ensuring functions of plans, schemes, projects and operation management in accordance with the

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
general plan of railway network, to achieve the best turnover quality and efficiency.
5).Working with other departments to formulate railway lines and factory development plans with
consistent strategic direction.
Narrative description of project:

The Hohhot Jungar Railway is from the west station in north of the Hohhot to south of the Jungar, and

extends westward to Jungar Banner in Ordos City. The total track length is 124.18km and the total
amount of the investment is 1.632 billion Yuan. The designed transportation capacity is 26.7 million tons
per year. It is a local railway depending on the energy base in Erdos of the Inner Mongolia and
dominating by the coal transportation.

Description of Actual Services Provided by Your Staff:


CCECC was responsible for the maintenance and operation of the railway line from May 2009 to May
2014, including the maintenance of the railway line, electric power, electrification, signal facilities and
devices, and the safety inspection, train scheduling, vehicle maintenance and part procurement, cargo
transport, personnel training and the tasks related to the operations.
CCECC sent a total of 120 million tons of coal during the operation and well completed the repair and
maintenance to the relevant devices and facilities on the railway line. No safety accidents occurred
during operations.

Bidders name: China Civil Engineering Construction Corporation

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Assignment Name:
Approx. value of the contract (in current US$):
Inner Mongolia Linhe Ceke Railway 105,400,000 USD

Country: China
Duration of assignment (months): 60 months
Location within Country: Linhe - Ceke
Name of Client:
Total No. of staff-months:
Inner Mongolia Hohhot Rail Investment and
71520 staff- month
Development Center
Approx. value of the services provided by
Address: No. 26, Xincheng District, Hohhot City, your firm (in current US$):
Inner Mongolia 105,400,000 USD (for maintenance and
operation service)
Start Date (Month/Year): Completion Date (Month/Year):
December 2009 December 2014
No. of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Name: Li Ming Year: 2009 2014
Position: Overhaul and Machinery - Engineering Design Vice Manager, General Manager
Activity implemented:
1). Responsible for the entire maintenance , overhaul and mechanical maintenance work of railway and
the development of appropriate repair and maintenance program;
2). Establishing the appropriate repair and maintenance plan by making use of maintenance
management system;
3). Responsible for the daily maintenance and management work and inspecting continuously and
checking the implementation of various operations;
4). Analyzing regularly the maintenance and repair capacity/ the maintenance quality, and developing
appropriate improvement measures to effectively improve the quality of maintenance.
Name: Fu Xuedong Year: 2010 - 2015 Position: Sales and Business Development Manager
Activity implemented:
1 )Responsible for the plan and budget of viable work, ensuring the implementation results according
to market planning and operation of channel strategy;
2 )Responsible for leading other business development staff to develop their business channels to
promote and mobilize resources for the expansion of customer target market;
3 ) Analyzing the railway market operations, conducting deep research and active response according to
the needs of customers and market, developing appropriate marketing programs, customizing
personalized products to establish long-term cooperative relationship with customers;
4 ) Responsible for and Supervising planning and implementation of marketing activities.
Name: Huangfu Zhiguo Year: 2010 2014 Position: Container Sales Manager
Activity implemented:
1) Responsible for market investigation, and formulating sales plan in accordance with demand of
container transportation;
2) Actively contacting customers in need of containers, expanding market, making tailored products
according to customers' need, and building long term cooperation relationship with customers;
3) Taking different measures and channels to maximize sales of freight services.
4) Properly planning container freight business in future and ensuring that annual sales volume of

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
containers can be reached.
Name: Qi Shuai Year: 2010 2014 Position: Sales and Business Development Manager
Activity implemented:
1) Responsible for the plan and budget of viable work, ensuring the implementation results according
to market planning and operation of channel strategy;
2) Responsible for leading other business development staff to develop their business channels to
promote and mobilize resources for the expansion of customer target market;
3 ) Analyzing the railway market operations, conducting deep research and active response according to
the needs of customers and market, developing appropriate marketing programs, customizing
personalized products to establish long-term cooperative relationship with customers;
4) Responsible for and Supervising planning and implementation of marketing activities.
Name: Gao Junxiu Year: 2009 2014 Position: Manager of Vehicle Cleaning and Maintenance
Activity implemented:
1 ) the operation status inspection and the maintenance work of locomotive trains and other vehicles,
ensuring the good running status of each vehicle with flexible and rapid response capabilities;
2 ) Responsible for the daily maintenance and management work of locomotives and other types of
vehicle equipment, inspecting continuously and checking the implementation of various operations;
3) Checking on vehicle spare parts inventory, if they're out of stock, purchasing timely to guarantee
normal operations.
4). Checking and analyzing regularly the maintenance and repair capacity/ the maintenance quality, and
developing appropriate improvement measures to effectively improve the quality of maintenance.
Name: Li Hongxin Year: 2010 2014 Position: Technical Manager of Depot Maintenance Department
Activity implemented:
1 ) the operation status inspection and the maintenance work of locomotive trains and other vehicles,
ensuring the good running status of each vehicle with flexible and rapid response capabilities;
2 ) Responsible for the daily maintenance and management work of locomotives and other types of
vehicle equipment, inspecting continuously and checking the implementation of various operations;
3). Checking and analyzing regularly the maintenance and repair capacity/ the maintenance quality, and
developing appropriate improvement measures to effectively improve the quality of maintenance.
4 ) Responsible for establishing the service instruction, the technical standards and the operating
procedures of the equipment;
5 ) Implementing the maintenance operations of the equipment and facilities according to the operating
procedures on the basis of security controls;
6 ) Responsible for emergency maintenance of the locomotive equipment and the Engineering Vehicles;
7 ) Developing the technical standards and regulations of vehicle maintenance operations.
Narrative description of project:

The Linhe Ceke Railway began in Linhe and ended in Ceke. The total track length is 780km. it is a

local railway depending on the energy base in Erdos of the Inner Mongolia and dominating by the coal
transportation.

Description of Actual Services Provided by Your Staff:


CCECC was responsible for the maintenance and operation of the railway line from December 2009 to
December 2014 and the operation period is 5 years, including the maintenance of the railway line,
electric power, electrification, signal facilities and devices, and the safety inspection, train scheduling,
vehicle maintenance and part procurement, cargo transport, personnel training and the tasks related to
the operations.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
CCECC sent a total of 6.7 million tons of coal during the operation and well completed the repair and
maintenance to the relevant devices and facilities on the railway line. No safety accidents occurred
during operations.

Bidders name: China Civil Engineering Construction Corporation

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current US$):


Inner Mongolia South Railway (Xinjie- Wushenqi) 29,300,000 USD
Country: China Duration of assignment (months):
Location within Country: Xinjie - Wushenqi 60 months
Name of Client:
Total No. of staff-months:
Inner Mongolia Hohhot Rail Investment and
20100staff-month
Development Center
Approx. value of the services provided by your
Address: No. 26, Xincheng District, Hohhot City, firm (in current US$):
Inner Mongolia 29,300,000 USD (for maintenance and operation
service)
Start Date (Month/Year): Completion Date (Month/Year):
May 2014 May 2019
No. of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Name: Xiao Kun Year:2014-2015 Position: Freight Manager
Activity implemented:
1). Arranging department staff plan, organizing and implementing all of the freight operation
management;
2). Responsible for directing and coordinating the full implementation of the program and track of the
transport of goods;
3). Responsible for handling domestic rail transport accidents and the development of contingency
plans ;
4). Ensuring functions of plans, schemes, projects and operation management in accordance with the
general plan of railway network to achieve the best turnover quality and efficiency.
5). Working with other departments to formulate railway lines and factory development plans with
consistent strategic direction.
Name: Wang Yunwu Year:2014-2015 Position: Manager of Planning and Operation Management
Department
Activity implemented:
1) Ensuring functions of plans, schemes, projects and operation management in accordance with the
general plan of railway network, to achieve the best turnover quality and rate of trains.
2) Supervising and formulating management standards to achieve the best turnover quality and
efficiency.
3) Working with other departments to formulate railway lines and factory development plans in line with
the strategy.
4) Ensuring implementation of product contracts and maintaining project investment, ensuring
supplement and upgrade of infrastructure facilities, to meet the development demand of technology and
yearly plans.
Name: Gao Junxiu Year:2014-2015 Position: Technical Manager of Depot Maintenance Department in

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Wushen Banner
Activity implemented:
1 ) the operation status inspection and the maintenance work of locomotive trains and other vehicles,
ensuring the good running status of each vehicle with flexible and rapid response capabilities;
2 ) Responsible for the daily maintenance and management work of locomotives and other types of
vehicle equipment, inspecting continuously and checking the implementation of various operations;
3). Checking and analyzing regularly the maintenance and repair capacity/ the maintenance quality, and
developing appropriate improvement measures to effectively improve the quality of maintenance.
4 ) Responsible for establishing the service instruction, the technical standards and the operating
procedures of the equipment;
5 ) Implementing the maintenance operations of the equipment and facilities according to the operating
procedures on the basis of security controls;
6 ) Responsible for emergency maintenance of the locomotive equipment and the Engineering Vehicles;
7 ) Developing the technical standards and regulations of vehicle maintenance operations.
Name: Li Hongxin Year:2014-2015 Position: Vehicle Cleaning and Maintenance Manager in Wushen
Banner
Activity implemented:
1 ) the operation status inspection and the maintenance work of locomotive trains and other vehicles,
ensuring the good running status of each vehicle with flexible and rapid response capabilities;
2 ) Responsible for the daily maintenance and management work of locomotives and other types of
vehicle equipment, inspecting continuously and checking the implementation of various operations;
3). Checking on vehicle spare parts inventory, if they're out of stock, purchasing timely to guarantee
normal operations.
4). Checking and analyzing regularly the maintenance and repair capacity/ the maintenance quality, and
developing appropriate improvement measures to effectively improve the quality of maintenance.

Narrative description of project:


The south railway began in the Xinjie and ended in the Jungar Banner. The total track length is 172km.
the total amount of the investment is 2.251 billion Yuan. It is a local railway depending on the energy
base in Erdos of the Inner Mongolia and dominating by the coal transportation.

Description of Actual Services Provided by Your Staff:


CCECC was responsible for the maintenance and operation of the railway line from May 2014 to this day
and the operation period is 5 years, including the maintenance of the railway line, electric power,
electrification, signal facilities and devices, and the safety inspection, train scheduling, vehicle
maintenance and part procurement, cargo transport, personnel training and the tasks related to the
operations.
Up to now, CCECC sent a total of 200,000 tons of coal and 1.3 million tons of fertilizer during the
operation and well completed the repair and maintenance to the relevant devices and facilities on the
railway line. No safety accidents occurred during operations.

Bidders name: China Civil Engineering Construction Corporation

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Assignment Name:
Extension of the railway from Lunsar to Tonkolili Approx. value of the contract (in current US$)
(including construction service and maintenance USD 32,454,462.29
service)
Duration of assignment (months):
Country: Sierra Leone
27 months for construction+36months for
Location within Country: Lunsar, Tonkolili maintenance and operation
Name of Client: Total No. of staff-months:
African Railway and Port Service (SL) Limited 8505 staff-mouth
Approx. value of the services provided by your
Address: Lunsar, Sierra Leone firm (in current US$): USD 5,950,000.00 (for
maintenance and operation service)
Start Date (Month/Year): Completion Date (Month/Year):
January 2011 construction April 2013construction
No. of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:

Name: Xie Hui Year2010-2015 Position: Manager of Infrastructure Department

Activity implemented:
1). Managing the Sierra Leone Mine Railway Project, ensuring the smooth operation of new line
tracklaying and old line track replacement.
2). Responsible for infrastructure facilities maintenance and safety management of the Sierra Leone
Mine Railway;
3). Formulating relevant maintenance schemes in accordance with actual situation (including preventive
maintenance schemes), and supervising and implementing relevant maintenance schemes.
Narrative description of project: It is the extension of the railway from Lunsar to Tonkolili project,
including construction service and maintenance service. The construction service began in January
2011, with an amount of USD 26,504,462.29, including the track laying of 125KM main line and three
shunting tracks. The maintenance service began in April 2013, with amount of USD 5,950,000.00,
including railway check, maintenance of subgrade and railway track, and emergency repair.
Description of Actual Services Provided by Your Staff:

The special railway line is a special line for the transportation of the iron ore in the Sierra Leone. The
design speed is 60km per hour and the railroad rail is a narrow gauge railway with the thickness of
1,067mm. The welding technology and techniques use Chinese railway standards. CCECC was
responsible for contracting to build this project on January 2011 and for undertaking the track laying of
the new lines with 125km and for exchanging the track of the old lines with 33km, including the laying of
the railway ballast, sleeper, steel rail, track switch, welding steel track and tamping the line, etc. The
project has been completed on April, 2013. At present, CCECC is assisting owner to carry out the
operation during the maintenance.

Bidders name: China Civil Engineering Construction Corporation

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Assignment Name: Approx. value of the contract (in current US$):
Tanzania to Zambia Railway 150,000,000 USD
Duration of assignment (months):
Country: Tanzania--Zambia
69 months constructionCCECCs assists in
Location within Country:Dar-Es-Salaam --Kapiri
Mposhi maintenance and operation never stops since
handover
Name of Client: Total No. of staff-months:
Tanzania Government and Zambia Government 552,000 staff-month
Approx. value of the services provided by your
Address: Dar-Es-Salaam Tanzania--Kapiri Mposhi firm (in current US$):
Zambia 50,000,000 USD (for maintenance and operation
service)
Start Date (Month/Year): Completion Date (Month/Year): July 1976
October 1970 (construction) (construction)
No. of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Name: Zhao Yi Year: 2009-2010 Position: Business and Operation Plan Manager
Activity implemented:
1) Formulating management standard, improving operation utilization rate and turnover rate of vehicle
and equipment;
2) Training relevant operation personnel and improving passenger transport service standard;
3) Optimizing operation plans, enhancing advertisement promotion and encouraging passengers to
travel by train;
Name: Li Haifeng Year: 2010-2015 Position: Operation Assistant Manager, Manager
Activity implemented:
1) Ensuring functions of plans, schemes, projects and operation management in accordance with the
general plan of railway network, to achieve the best turnover quality and rate of trains.
2) Formulating management standards to achieve the best utilization and turnover rate of trains.
3) Working with other departments to formulate railway lines and factory development plans in line with
the strategy.
4) Ensuring implementation of product contracts and maintaining project investment, ensuring
supplement and upgrade of infrastructure facilities, to meet the development demand of technology and
yearly plans.
Name: Liao Li Year: 2014-2015 Position: Engineering Maintenance and Purchase Manager
Activity implemented:
1) the operation status inspection and the maintenance work of locomotive trains and other vehicles,
ensuring the good running status of each vehicle;
2 ) Responsible for the daily maintenance and management work and inspecting continuously and
checking the implementation of various operations;
3) Checking on vehicle spare parts inventory, if they're out of stock, purchasing timely to guarantee
normal operations.
4) Checking and analyzing regularly the maintenance and repair capacity/ the maintenance quality, and

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
developing appropriate improvement measures to effectively improve the quality of maintenance.

Narrative description of project:


The railway passes through a part of the high mountain, gorge, torrential river and dense forests
from the Tanzania to Zambia. The foundation soils of some roadbeds, bridges and tunnels are made of
sludge and quicksand. There are no human habitations at many areas along the railway and there are
many gregarious animals. A full range of the project is very vast and the complicated construction
technology will be required. The construction conditions are extremely difficult. There are 320 bridges on
the Tanzam railway in total. The total meters of the extensions are 16,520m.There are 22 tunnels and
The total meters of the extensions are 8, 898m. There are 93 new railway stations. The total area of
building house is 376,000 square meters. The project was surveyed and designed on May 1968 and
formally constructed on October 1970, and fully completed and delivered on July 1976.
In order to build this railway, the Chinese government provided RMB 988 million Yuan of the interest
free credit and delivered a total of 1 million tons of the various devices and materials.
Description of Actual Services Provided by Your Staff:

CCECC, as an aid construction representative unit of Chinese government, has dispatched nearly
50,000 engineering and technical staff. There are up to 16,000 engineering and technical staff at the
construction site during the high peaking period. During the engineering construction and subsequent
technology cooperation, there were 66 people who gave their valuable lives in there engineering and
technical staff. After the completion of the railway, the right of competency of the railway has been
delivered to the railway bureau established by the Tanzania and Zambia government for the common
management. After that, in order to ensure the normal operation of the railway, the Chinese government
continued to provide the interest-free loans and offer the technical cooperation assistance, dispatch
CCECC experts and technicians to carry out the vehicle maintenance or provide the consultation and
participate in the operation management. By the end of 1999, Chinese government has accumulatively
dispatched the nearly 3,000 people times of the experts and technicians.
In assistance of CCECC, by the end of 2011, the Tanzam railway has completed 27.46 million tons
of the freight transportation and 44.5 million person times of the passenger transportation.

Bidders name: China Civil Engineering Construction Corporation

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Bidders Experience
CREC

[Using the format below, provide information on relevant assignments carried out in the last
eight years which best illustrate your experience, where your firm/entity (and each
associate for the assignment) provided services similar to the ones requested under this
assignment.
In particular, please list any useful information to show Experience and proficiency in the
direct management of Freight rail services and to show Experience and proficiency in the
direct management of intermodal Freight services and logistics.]

Approx. value of the contract (in current


Assignment Name:
US$)
Shenchi-Huanghua Railway integrated
RMB 9,704,988,077.00
operation and maintenance Contract
Equiv. to USD 1,540,474,298.00
Country: China
Duration of assignment (months):
Location within Country: Huanghua Port of
183 months
Hebei Province
Name of Client:
Total No of staff-months:
Shenchi-Huanghua Railway Development
366,000 man-months
Co., Ltd
Approx. value of the services provided by
Address: Blog #16, #6 of Hefang Road, your firm (in current US$)
Huanghua, Hebei Province, China RMB 9,704,988,077.00
Equiv. to ETB 32,435,040,655.00
Start Date (Month/Year): Completion Date (Month/Year):
Feb 1, 2000 Jan 31, 2015
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
1. Project Director
Name: Wen Feng
Scope of responsibility: take charge of the operation and maintenance of the whole railway
line; coordinate infrastructure department and transportation department for operation and
maintenance, to ensure efficiency; ensure the performance of all contract works;
communicate and cooperate with the employer to ensure efficiency and operation revenue;
supervise the performance of every department and staff, so as to ensure the compliance
with national safety regulations and put safety management system into effect.

2. Budget and Control Manager


Name: Wang Yongyi

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
In charge of preparation and execution of budget, financial plan for income and expense,
loan plan, proposed plan for fund raising and expense for effective use of fund; establishing
and improving economic accounting system, enhancing cost management, analyzing
business and operation for more profits; in charge of management of financial and
accounting department and staff allocation, organizing training and examination for
accountants; supporting accountant in using legal power; assisting project manager in
making decision for solving operation and business problems; participating in new product
development, technology reform, project study, decision on salary and bonus plan;
participating in study and examination of economic contract and agreement.

3. Capacity Building Manager


Name: Yang Minghui
Developed long-acting training system and plan for project personnel, organized training for
newly-recruited personnel, organized vocational training and promotion training for all
operators on the posts and examined the training results. Handover of all trainee to the due
position.

4. Maintenance Manager
Name: Song Wenbin
Make maintenance plan as per cargo transportation volume and corridor condition; make
maintenance work schedule; determine and implement plans for general repair,
comprehensive repair and complementary repair; prepare emergency preplan and risk
control for railway facilities maintenance; define detect, inspection and maintenance works
for route, overhead contact system, communication and signalling system; determine
working staff, personnel demand and training plan for maintenance organization; determine
workshift and workgroup of maintenance personnel.
Narrative Description of Project:
Train operation: responsible for the passenger transportation management of
Shenchi-Huanghua Railway's Shenchi North Station, Ningwu West Station, Longgong
Station, Huifeng Station, Dongye Station, Nanwan Station, Xiaojue Station, Guyue Station
and Xibaipo Station etc. 30 stations in total, and the operation section is 724.94km.
Locomotive and rolling stock: self purchased 120 electric locomotives to participate the
freight transportation and 20 locomotives for the passenger transporting, plus 12 diesel
locomotives to serve the section shunting operation. Locomotive and rolling stock
maintenance: Established Huifeng, Nanwai, and xibaipo maintenance and inspection
depots, responsible for the maintenance of the 724.94 km operations section of the
Shenchi-Huanghua Railway. Line maintenance: infrastructure maintenance and caring,
during the operation period, responsible for the maintenance and inspection of the
infrastructure within the operation section, to ensure the quality always meet the
transportation requirements, and to ensure the safety and smoothness of the transportation.
Training: During 2000 to 2005, trained total 2,000 staffs for us, including drivers, dispatcher,
operation personnel, machine repair, electric power, telecommunications, signals and other
technical jobs, which provide the technical platform for our employees to participate in the
follow-up joint operations. Technical cooperation and after-sale service: the after-sale
service period is from February, 2015 to January, 2017, during the which China Railway

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
handover all railway operations to us, and by the time we can operating independently,
China Railway then provide technical support.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structure, capacity building and training
for all employers operation stuff, technical and post-sale services.

Bidders name: China Railway Group Limited

Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Approx. value of the contract (in current


Assignment Name:
US$)
Ning-Dong Railway integrated operation
RMB 6,445,974,448
and maintenance Contract
Equiv. to USD 1,023,170,547
Country: China Duration of assignment (months):
Location within Country: Ningxia Province 173 months
Name of Client: Total No of staff-months:
Ningxia Ning-Dong Railway Co., Ltd 259,500 man-months
Approx. value of the services provided by
Address: C blog, No. 168 Beijing Central your firm (in current US$)
road, Yinchuan, Ningxia, China RMB 6,445,974,448
Equiv. to USD 1,023,170,547
Start Date (Month/Year): Completion Date (Month/Year):
Oct 4, 2000 Dec 5, 2014
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Li Jianfeng
Scope of responsibility:
take charge of the operation and maintenance of the whole railway line; coordinate
infrastructure department and transportation department for operation and maintenance, to
ensure efficiency; ensure the performance of all contract works; communicate and
cooperate with the employer to ensure efficiency and operation revenue; supervise the
performance of every department and staff, so as to ensure the compliance with national
safety regulations and put safety management system into effect.
Narrative Description of Project:
CREC and the Project Employer jointly operated Ningdong Railway from 2000 to 2014 with
the length of 559 km and 21 stations. The main operating scope is: passenger
transportation organization and receiving-departure work, freight and passenger
transportation establishment, arriving and dispatching of cargo and loading and unloading
of partial cargo, locomotive daily maintenance, overhaul, rail line infrastructure
maintenance, training for relevant personnel of the employer and after-sale service. The
contract price of operation is 6.45 billion CNY. The total transportation volume during the
operating period is 26.99 million tons, and accumulative passenger transportation is 87
million person-times.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structure, capacity building and training
for all employers operation stuff, technical and post-sale services.
Bidders name: China Railway Group Limited
Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current


Integrated operation and maintenance US$)
Contract for Ganqimaodu-Wanshuiquan RMB 2,566,622,625
Railway Equiv. to USD 407,400,417
Country: China Duration of assignment (months):
Location within Country: Inner Mongolia 24 months
Name of Client:
Total No of staff-months:
Shenhua Group Ganqimaodu-Wanshuiquan
26,400 man-months
Railway Co., Ltd
Approx. value of the services provided by
Address: Middle District, Bayan-zhuoer, your firm (in current US$)
Inner Mongolia, China RMB 2,566,622,625
Equiv. to USD 407,400,417
Start Date (Month/Year): Completion Date (Month/Year):
Jan 12, 2013 Dec 27, 2014
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Yang Zhigang
Scope of responsibility:
take charge of the operation and maintenance of the whole railway line; coordinate
infrastructure department and transportation department for operation and maintenance, to
ensure efficiency; ensure the performance of all contract works; communicate and
cooperate with the employer to ensure efficiency and operation revenue; supervise the
performance of every department and staff, so as to ensure the compliance with national
safety regulations and put safety management system into effect.

Narrative Description of Project:


China Railway Group Limited has participated the temporary operation management
project for the Ganqimaodu-Wanshuiquan Railway from January 2013 to December 2014,
the operation section is 331 km long with 18 stations. Operations scope are mainly:
establish passenger ticketing system, passenger transportation, establish freight operation
management system, rail freight handling; locomotives and rolling stock maintenance and
inspection, line and infrastructure maintenance, training of owner's operations personnel,
and after-sale service to the owner. The contract value is CNY 2.57 billion, the total freight
transportation volume reached 9.5 million tons and total passenger transportation volume
reached 39 million during the performance of the contract.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structure, capacity building and training
for all employers operation stuff.
Bidders name: China Railway Group Limited
Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current


Integrated operation and maintenance US$)
Contract for RMB 3,104,163,332
Guoerbenaibao-Baiyinmanglai Railway Equiv. to USD 492,724,338
Country: China Duration of assignment (months):
Location within Country: Inner Mongolia 76 months
Name of Client:
Inner Mongolia Total No of staff-months:
Guoerbenaibao-Baiyinmanglai Railway Co., 97,280 man-months
Ltd.
Approx. value of the services provided by
Address: Blog 10, Xuefukang Road,
your firm (in current US$)
University Western Road, Saihan District,
RMB 3,104,163,332
Hohehot, Inner Mongolia.
Equiv. to USD 492,724,338
Start Date (Month/Year): Completion Date (Month/Year):
Nov 2, 2009 Feb 20, 2016
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Huang Chengming
Scope of responsibility:
The overall management for the project. in line with contract conditions and on the basis of
project requirement establish and improve the organization and resources allocation of the
project for effective management; ensure railway serviceability and the coordination and
efficiency of different transportation systems; complete all works under the contract; comply
with safety operation regulation and implement safety management system.

Narrative Description of Project:


Guoerbenaibao-Baiyinmanglai Railway is connected to the Hohhot Railway Bureau's
Jining-Erlian Railway at the Guoerbenaobao Station, through the existing
Guoerbenaobao-Chagannuoer Railway to the North-East to the Baiyinwula, the operation
section is 425 km long. China Railway Group Limited is fully responsible for establish the
passenger and freight transportation system, rail freight handling, passenger organizations,
train departure and arrive, locomotives and rolling stock maintenance and inspection, line
and infrastructure maintenance, training of owner's operations personnel, and provide
after-sale service to the owner for the Guoerbenaibao-Baiyinmanglai Railway. The contract
value is CNY 3.104 billion, the total freight transportation volume reached 14.06 million tons
and total passenger transportation volume reached 41.35 million during the performance of
the contract.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structure, capacity building and training
for all employers operation stuff, technical and post-sale assistance.

Bidders name: China Railway Group Limited


Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current


Integrated operation and maintenance US$)
Contract for Datang International Togtoh RMB 3,190,916,185
Power Generation Railway Line Equiv. to USD 506,494,633
Country: China Duration of assignment (months):
Location within Country: Inner Mongolia 38 months
Name of Client:
Total No of staff-months:
Inner Mongolial Datang International Togtoh
76,000 man-months
Power Generation Co., Ltd.
Approx. value of the services provided by
Address: Yanshanying Village, Tuoketuo your firm (in current US$)
county, Hohehot, Inner Mongolia, China. RMB 3,190,916,185
Equiv. to USD 506,494,633
Start Date (Month/Year): Completion Date (Month/Year):
Jun 16, 2011 July 31, 2014
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Li Yanchun
Scope of responsibility:
in line with contract conditions and on the basis of project requirement establish and
improve the organization and resources allocation of the project for effective management;
Supervise and ensure railway serviceability; Supervise and ensure the coordination and
efficiency of different transportation systems; Complete all works under the contract;
Cooperate with ERC actively for good result and resolution to problems; Comply with local
safety operation regulation and implement safety management system.

Narrative Description of Project:


Datang International Togtoh Power Generation Railway Line is located in Togtoh, Lin
County and Qingshuihe County of Hohhot of the Inner Mongolia Autonomous Region with
the length of 760 km. China Railway Group Limited and our company had undertaken
operation of this railway from 2011 to 2014. During operation period, China Railway Group
Limited had invested 177 diesel locomotives and 30 passenger trains, and was in charge of
freight and passenger transportation, maintaining infrastructure of railway. Meanwhile,
China Railway Group Limited had trained more than 2000 technicians for us. Operation
period of this project had been completed in 2014 and 2014-2016 is after-sale period. The
contract price of this project is 3.19 billion CNY. During contract execution period, total
freight volume is 7.31 million tons, and accumulative passenger transportation is 33 million
person-times.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structure, capacity building and training
for all employers operation stuff, technical and post-sale assistance.

Bidders name: China Railway Group Limited


Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current


Integrated operation and maintenance US$)
Contract for Chifeng-Daban-Baiyinhua RMB 3,756,631,466
railway Equiv. to USD 596,290,709
Country: China Duration of assignment (months):
Location within Country: Inner Mongolia 82 months
Name of Client:
Total No of staff-months:
Inner Mongolia Xilinguole Baiyinhua Coal &
82,000 man-months
Power Co., Ltd.
Approx. value of the services provided by
Address: No. 103, Weifeng Road, Chifeng, your firm (in current US$)
Inner Mongolia, China RMB 3,756,631,466
Equiv. to USD 596,290,709
Start Date (Month/Year): Completion Date (Month/Year):
May 12, 2008 Feb 8, 2015
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Huang Yifu
Scope of responsibility:
in line with contract conditions and on the basis of project requirement establish and
improve the organization and resources allocation of the project for effective management;
Supervise and ensure railway serviceability; Supervise and ensure the coordination and
efficiency of different transportation systems; Complete all works under the contract;
Cooperate with ERC actively for good result and resolution to problems; Comply with local
safety operation regulation and implement safety management system.
Narrative Description of Project:
China Railway Group Limited has participated the operation contract and maintenance
services for the Chifeng-Daban-Baiyinhua railway during May, 2008 to February 2015, the
operation section is 361 km long and local standard Class I single-track railway, but line
conditions are reserved for double track development; using internal combustion traction,
electrification conditions are also reserved. There are total of 22 stations, including
Baiyinhua, Daban, Damutougou, and North Chifeng station which is a technical station, the
entire line using automatic section block. Operations scope are mainly: passenger
transportation, passenger and freight operations, establish management system,
passenger ticketing system, rail freight handling; locomotives and rolling stock
maintenance, overhaul, line and infrastructure maintenance, training of owner's operations
personnel, operation contract value: CNY 3.756 billion, the total freight transportation
volume reached 14.06 million tons and total passenger transportation volume reached
34,460,000 passengers during the performance of the contract.
Description of Actual Services Provided by Your Staff:

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structure, capacity building and training
for all employers operation stuff.

Bidders name: China Railway Group Limited


Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current


Integrated operation and maintenance US$)
Contract for dedicated railway line of RMB 1,806,621,301
Hequ Power Generation Factory. Equiv. to USD 286,765,286
Country: China Duration of assignment (months):
Location within Country: Shanxi Province 133 months
Name of Client:
Total No of staff-months:
Shanxi Luneng Hequ Power Generation
77,140 man-months
Co.,Ltd.
Approx. value of the services provided by
Address: Shanpan Village, Hequ county, your firm (in current US$)
Xinzhou City, Shanxi Province, China. RMB 1,806,621,301
Equiv. to USD 286,765,286
Start Date (Month/Year): Completion Date (Month/Year):
Jan 5, 2005 Dec 15, 2015
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Zhang Xuewen
Scope of responsibility:
in line with contract conditions and on the basis of project requirement establish and
improve the organization and resources allocation of the project for effective management;
Supervise and ensure railway serviceability; Supervise and ensure the coordination and
efficiency of different transportation systems; Complete all works under the contract;
Cooperate with ERC actively for good result and resolution to problems; Comply with local
safety operation regulation and implement safety management system.
Narrative Description of Project:
China Railway Group Limited has undertaken train dispatching, station management,
locomotive applying and overhaul, vehicle technology maintenance work, railway
maintenance, house repairing, equipment management of locomotive maintenance base
and training for employers personnel of 299.3km special railway line for Hequ Power
Generation Factory. The contract price of operation is 1.806 billion CNY. During contract
execution period, the total transportation volume was 20.84 million tons. There was no
accident up to C grade during the operation time.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structures including bridge, tunnel,
station, track-works subgrade, railway technology and integration systems, capacity
building and training for all employers operation stuff.

Bidders name: China Railway Group Limited


Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name: Approx. value of the contract (in current


Integrated operation and maintenance US$)
RMB 1,785,808,303
Contract for Datong-Zhungeer Railway
Equiv. to USD 283,461,635
Country: China Duration of assignment (months):
Location within Country: Inner Mongolia 181 months
Name of Client: Total No of staff-months:
Shenhua Group Zhungeer Energy Co., Ltd 162,900 man-months
Approx. value of the services provided by
Address: Xuejiawan County, Zhungeer your firm (in current US$)
District, Inner Mongolia, China RMB 1,785,808,303
Equiv. to USD 283,461,635
Start Date (Month/Year): Completion Date (Month/Year):
Feb 1, 2000 Dec 30, 2014
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Liu Shiqiang
Scope of responsibility:
in line with contract conditions and on the basis of project requirement establish and
improve the organization and resources allocation of the project for effective management;
Supervise and ensure railway serviceability; Supervise and ensure the coordination and
efficiency of different transportation systems; Complete all works under the contract;
Cooperate with ERC actively for good result and resolution to problems; Comply with local
safety operation regulation and implement safety management system.
Narrative Description of Project:
Datong-Zhungeer Railway starts from the west of National Railway Datong East Satation
K12 + 662.78, main line total length is 296 km, the line connect to Jungar Qi-Dongshen
railway at the Xuejiawan station, and also connect to the in line with the coal dedicated
line of Togtoh Power Co., Ltd. at Erdaohe, there also a connection line to the Fengzhen
Station of National Beijing-Baotou Railway at the Danzhouying Station, Datong-Zhungeer
Railway is the westward extension of Datong-Qinhuangdao Railway's "transport coal from
west to east china" line, total contract value: CNY 1.785 billion.
China Railway Group Limited has participated in the operations of Datong-Zhungeer
Railway since 2000, currently there are 30 SS4G electric locomotives are been put into the
joint operation, and 3 intermediate stations, 1 main train inspection & repair depot and 2
train caring point are under their management and operating. During their management,
China Railway constantly strengthening their implementation of the rules and regulations,
while developed a comprehensive assessment system, and enhanced the monitoring and
inspection for the large amount transportation volume and frequent construction of
Datong-Zhungeer Railway. During the operation period, there is no incident above C Class
ordinary accident.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structures including bridge, tunnel,
station, track-works subgrade, railway technology and integration systems, capacity
building and training for all employers operation stuff.

Bidders name: China Railway Group Limited


Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures

Assignment Name:
Integrated operation and maintenance Approx. value of the contract (in current
Contract for dedicated railway section of US$)
RMB 583,972,480
Shaanxi Weihe Heavy Chemical Industry
Equiv. to USD 92,694,044
Co., Ltd
Country: China Duration of assignment (months):
Location within Country: Shaanxi Province 36 months
Name of Client:
Total No of staff-months:
Shaanxi Weihe Heavy Chemical Industry
16,200 man-months
Co., Ltd.
Approx. value of the services provided by
Address: Development zone of Weinan City, your firm (in current US$)
Shaanxi Province, China RMB 583,972,480
Equiv. to USD 92,694,044
Start Date (Month/Year): Completion Date (Month/Year):
Nov 25, 2010 Oct 12, 2013
No of professional staff-months provided by
Name of Associated Consultants, If Any:
associated Consultants:
N/A
N/A
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Position: Project Director
Name: Xu Zhiqin
Scope of responsibility:
in line with contract conditions and on the basis of project requirement establish and
improve the organization and resources allocation of the project for effective management;
Supervise and ensure railway serviceability; Supervise and ensure the coordination and
efficiency of different transportation systems; Complete all works under the contract;
Cooperate with ERC actively for good result and resolution to problems; Comply with local
safety operation regulation and implement safety management system.
Narrative Description of Project:
The total length of locomotive transportation railway for Shaanxi Weihe Heavy Chemical
Industry Co., Ltd. is 148 km. During November 2010 to October 2013, China Railway Group
Limited entirely undertaken operating management system establishment, arriving and
dispatching of cargo and loading and unloading of partial cargo, locomotive daily
maintenance, overhaul, rail line infrastructure maintenance. . The contract price of
operation is 583 million CNY. The total transportation volume during the operating period is
8.67 million tons.
Description of Actual Services Provided by Your Staff:
Establishment of operation management system for both freight and passenger
transportation; arrival, dispatching, loading and unloading of goods; shunting services,
maintenance for rolling stock and all infrastructure structures including bridge, tunnel,
station, track-works subgrade, railway technology and integration systems, capacity
building and training for all employers operation stuff.

Bidding Document for O&M Management Contractor for the Addis Ababa Djibouti Railway
a
Part1:Bidding Procedures
Certificate issued by the Project Employer refers to Technical Proposal C3.

Bidders Name: China Railway Group Limited (CREC)