Professional Documents
Culture Documents
September 2016
North Aqaba STP Volume (1) - Bidding & Contract Requirements
Request for Proposal-Section 1
Table of Contents
SECTION1:REQUESTFORPROPOSALS ......................................................................... 1
1. SubmittalDate(DueDate/Time)forPROPOSALS ........................................... 1
2. PlaceofSubmission ............................................................................................ 1
3. Distribution ......................................................................................................... 1
4. AWContactPerson............................................................................................. 1
5. ProjectOverview ................................................................................................ 1
SECTION1:REQUESTFORPROPOSALS
AqabaWater(AW)theEmployer,aPublicOwnedCompany,andrequestssealedPROPOSALS
fromtheinterestedBiddersforPlantandDesign,Build,forNorthAqabaWastewaterTreatment
Plant.
The intent is to award a Design Build plus Operate (DB + O) Contract for the subject facilities
utilizingathreeenvelopesbiddingprocedure.Thethreeseparateandsealedenvelopesare:
- EnvelopeNo.1containsthebidsecurity,thenameandaddressoftheBidder,
- EnvelopeNo.2containstheTechnicalProposal,and
- EnvelopeNo.3containstheFinancialProposal,
ThethreeseparatedandsealedenvelopesaretobeinsertedinasinglesealedEnvelopeNo.4(The
PROPOSAL)andsubmittedatthedate,timeandplacedescribedbelow.
ThePROPOSALshallbedeliveredtothefollowingaddressbeforethesubmittaldeadline.After
reviewoftheTechnicalProposals,Biddersmaybenotifiedoftheplace,dateandtimeofopening
oftheFinancialProposals.
1. SubmittalDate(DueDate/Time)forPROPOSALS
AsstatedintheLetterofInvitation.
2. PlaceofSubmission
Address1:
AqabaWater
AqabaHashemiteKingdomeofJordan
Telephone:+(962)(3)2030826
Facsimile:+(962)(3)2030823
3. Distribution
OriginalandFive(5)CopiesofthePROPOSALshallbesubmittedtoAddress1
above.
4. AWContactPerson
AsstatedintheLetterofInvitation.
5. ProjectOverview
ThecomponentsforwhichthePROPOSALisrequestedinclude:
1. Preliminary and Detailed design and construction, for North Aqaba Wastewater
Treatment Plant Expansion including the associated wastewater sludge treatment
facilities.
2. Investigateanddotherequiredworktorehabilitatetheexistingmechanical
treatmentplant
3. Emptying,dryingandmaintainingtheexistingnaturalponds(lagoons)tobeusedfor
emergency
4. Operationandmaintenanceofallfacilitiesincludingtheexistingmechanical
treatmentplantforten(10)yearsperiod.
TheProjectislocatedinAqabaSpecialEconomicZone330kmofAmman,HashemiteKingdomof
JordanasshowninFigure1.
Theabovedetailsarepresentedasanoutlinefortherequiredworks.Fordetails,theBiddershould
consultVolume(II)BasisofDesignReportandVolume(III)MinimumTechnicalRequirements,
includedwiththisREQUESTFORPROPOSALS(RFP).
APreBidMeetingandsitevisitwillbeconductedasstatedintheLetterofInvitation.Allbidders
shallconveneatAqabaWaterOffice.TheBiddersshallmakeallarrangementsandpayfortheir
ownaccommodation,mealsandtransportationtoandfromtheAWOfficeandallothercostsfor
attendingthePreBidMeetingandSitevisit.
WrittenquestionsregardingtheRFPshallbesenttoTheEmployerbyfacsimileorhandatAddress
1above.TheEmployershallissuewrittenresponsesnolessthanfourteen(14)dayspriortothe
dateofsubmission,toquestionsreceivedinwritingnolessthantwentyone(21)dayspriortothe
dateforsubmissionofthePROPOSAL.OralinstructionsorexplanationsgiventotheBiddersshall
notbebinding.
PROPOSAL (Envelope 4) in response to this RFP, which shall include the sealed separated
envelopes:theBidSecurity,thenameandaddressoftheBidder(Envelope1),TechnicalProposal
(Envelope2),andFinancialProposal(Envelope3),shallbeaccepteduntilthetimeandonthedue
date,atAddress1withdistributionasnotedabove.
PROPOSAL shall be clearly identified as being for this particular RFP. Fax and electronic
transmissionswillnotbeaccepted.Tobeeligibleforconsideration,PROPOSALshallberesponsive
toalltheitemsinthisRFP.
Biddersshallnotethathanddeliveredresponsepackagesshallnotbeleftatthereceptiondeskof
theEmployer.
Toensuretimelyreceiptofhanddeliveredresponsepackages,BiddersshallcontactAWContact
Persontoarrangeforofficialreceiptofthepackage.
PROPOSALS received after the closing date and time shall not be accepted regardless of the
reasonforthedelay.Biddersshallthereforetaketheappropriatemeasurestoensurethattheir
packagesaredeliveredontime.
ThisRFPconsistsofthefollowingdocuments:
VolumeI BiddingandContractRequirements
VolumeII BasisofDesignReport,and
VolumeIII MinimumTechnicalRequirements
The successful Bidder shall enter into a contract with the Employer and shall be contractually
responsibleforprojectdesign,construction,management,operation,andmaintenance.
Figure1:AqabaNorthWastewaterTreatmentPlantLocationPlan
SECTION2:INSTRUCTIONSTOBIDDERS .................................................................... 1
1. SUMMARYOFWORK .................................................................................................................................... 1
2. SCOPEOFWORK .......................................................................................................................................... 1
3. QUALIFICATIONSOFBIDDERS........................................................................................................................ 2
4. SOURCEANDORIGINOFMATERIALS,EQUIPMENTANDSERVICES.................................................................... 2
5. OBLIGATIONSOFBIDDER .............................................................................................................................. 2
6. PREBIDMEETING ........................................................................................................................................ 2
7. PROCUREMENTOFTENDERDOCUMENTS ...................................................................................................... 3
8. RECEIPTOFTHEPROPOSALS ..................................................................................................................... 3
9. PARTIALPROPOSALS................................................................................................................................ 3
10. INTERPRETATIONSANDADDENDA ................................................................................................................. 3
11. MODIFICATIONORWITHDRAWALOFPROPOSAL ......................................................................................... 4
12. PREPARATIONOFPROPOSALS .................................................................................................................. 4
13. TECHNICALPROPOSAL ................................................................................................................................. 5
14. FINANCIALPROPOSAL .................................................................................................................................. 8
15. SIGNATUREOFPROPOSALS ...................................................................................................................... 9
16. CONTRACTPRICE,CURRENCYANDPAYMENT ................................................................................................ 9
17. SUPPLEMENTALDATA .................................................................................................................................. 9
18. BIDSECURITY ............................................................................................................................................ 10
19. SUBMISSIONOFPROPOSAL ..................................................................................................................... 10
20. PROPOSALSOPENINGS.......................................................................................................................... 11
21. PERIODOFVALIDITY ................................................................................................................................... 12
22. EVALUATIONOFPROPOSALS .................................................................................................................. 12
23. EVALUATIONOFTECHNICALPROPOSALS..................................................................................................... 13
24. EVALUATIONOFFINANCIALPROPOSALS...................................................................................................... 23
25. SELECTIONOFPREFERREDBIDDER .............................................................................................................. 25
26. EXECUTIONOFCONTRACTAGREEMENT....................................................................................................... 26
27. PROPRIETARYINFORMATION....................................................................................................................... 26
28. SPECIALCONCEPTUALDESIGNCONSIDERATIONS ........................................................................................ 26
29. LISTOFTENDERDOCUMENTS ..................................................................................................................... 27
SECTION2:INSTRUCTIONSTOBIDDERS
1. SummaryofWork
a) TheAqabaWater(TheEmployer)areundertakingamajorprogramforPlantandDesignBuild
plusOperate(DB+O)contractfortheExpansionofNorthAqabaWastewaterTreatmentPlant
b) ThisprocurementwillbesubjecttotherequirementsineffectatthedueDate/Timeforthe
PROPOSALS(SubmittalDateforPROPOSALS).
c) Athreeenvelopesbiddingprocedurewillbeutilized.SealedEnvelope1shallincludetheBid
Security,thenameandaddressoftheBidder,sealedEnvelope2shallincludetheTechnical
Proposal,andsealedEnvelope3,shallincludetheFinancialProposal.Envelopes1,2and3
shall be submitted in sealed Envelope 4 termed The PROPOSAL. The Technical and
FinancialProposalsshallbeopenedforthosewhosubmitanacceptableBidSecurityandshall
beevaluatedseparatelyasdescribedinArticle20following.
d) TheunitratesandpricesshallbequotedbytheBidderinJordanianDinars(JD).Payments
shallbemadeinthecurrencyofJD.
e) TheseInstructionstoBiddersareintendedtoaidBidderinthepreparationofhisPROPOSAL.
ThisdocumentshallbereadtogetherwithallotherTenderDocumentsasstipulatedinthe
Agreementandasmaybeamendedorsupplementedbyaddenda.
f) Thetimeperiodsnamedinthe(RFP)shallbeconsecutivecalendardays,exceptifaduedate
fallsonanonworkday,theduedatewillbethenextworkingday.Jordanworkingdaysshall
applytotheWorkandoccurSaturdaythroughThursday
g) Bidders will not be reimbursed for any costs incurred in connection with preparation or
submissionoftheirPROPOSALS.
h) TermsusedintheseInstructionstoBiddersshallhavethemeaningsassignedintheGeneral
Conditions,ParticularConditions,andtheSpecialConditionsifany.
2. ScopeofWork
TheWorkshallbeassetforthintheTenderDocuments,listedinArticle29.
Capital Work includes preparing preliminary and detailed process and engineering design,
rehabilitateexistingmechanicaltreatmentplant,emptying,dryingandmaintaintheexisting
natural treatment plant (lagoons) and furnishing all labour, equipment and materials
necessary to build and provide the Employer with fully operational complete facilities and
successfullypassingtheperformancetestingfortheWastewaterTreatmentPlant.
Operational Work includes the operation and maintenance of North Aqaba Wastewater
TreatmentPlantfacilitiesfortheten(10)years.
TheWorkshallincludetrainingtheEmployer'sstaffduringtheLastyearoftheOperation
ServicePeriod.
GeneraldescriptionandoutlinedesignoftheWorktobeperformedunderthisContractis
definedin:
VolumeII BasisofDesignReport,
VolumeIII MinimumTechnicalRequirements.
3. QualificationsofBidders
TheEmployerwillonlyreceivePROPOSALSfromFirstGradeWastewaterTreatmentPlantsand
First Grade Electromechanical Bidders as per the latest classification of the Ministry of Public
WorksandHousing.
4. SourceandOriginofMaterials,EquipmentandServices
a) Nationality,sourceandorigin,andcargopreferenceshallbeconsistentwiththeprovisionsof
theGeneral,Particular,andSpecialConditions,ifany.
b) DatashallbefurnishedtotheEmployersRepresentativeforanevaluationofthesuitabilityof
proposed materials and equipment with the technical requirements before any goods,
materials,orcommoditiesareincorporatedintotheWork.TheEmployerretainsfinalapproval
rightsforanygoods,materials,orcommoditiesincorporated,orservicesutilizedintheWork.
5. ObligationsofBidder
a) PriortosubmittingthePROPOSAL,Biddershall:
Be thoroughly familiar with the Tender Documents and other information available to
Bidders.
Be thoroughly familiar with local conditions that may in any manner affect the cost,
schedule,orperformanceoftheWork.
Beinformedastothelocalavailabilityoflabour,equipment,andmaterials.
BethoroughlyfamiliarwithJordancustoms,ordinances,laws,rules,andregulationsthat
mayinanymanneraffectthecost,schedule,orperformanceoftheWork.
b) FailureoromissionbytheBiddertoreceiveorexamineanyform,instrument,ordocument
shallnotrelievehimfromanyobligationwithrespecttohisPROPOSAL.
c) The information presented in the Tender Documents is derived from sources presently
availabletotheEmployer.Allsuchinformationisfurnishedsolelyfortheconvenienceofthe
Bidder.Theinformationitselfshallnotbeconsideredrepresentativeofactualconditionsas
other conditions may be encountered. The Bidder is responsible for making his own site
investigationsanddrawinghisownconclusionsforBidpurposes.
6. PreBidMeeting
a) APreBidMeetingandsitevisitwillbeheldatatime,dateandlocationasdefinedintheRFP.
b) BidderswishingtosubmitPROPOSALSshallarrangeandpayfortheirownaccommodations,
meals,transportationandallothercostsfor attendance atthe PreBid MeetingandSite(s)
visit.TheEmployerdoesnotholdanyresponsibilitywhatsoeverincaseofanyaccidentsthat
mayaffectBiddersrepresentativethroughSite(s)visit.
c) MinutesofthePreBidMeetingshallrecordtheBiddersattending.Oralquestionsraisedinthe
meetingwillberecordedandrespondedtoinwriting.Theoralresponsesgivenarenotbinding
totheEmployerandshallnotbeincludedinthePreBidMinutesofMeeting.
d) AnymodificationstotheTenderDocumentsthatmaybecomenecessaryasaresultofthePre
BidMeetingortheraisedquestionsshallbemadebytheEmployerthroughtheissuanceof
Addenda(s)andnotthroughtheminutesofthePreBidMeetingreferencedabove.
e) FailureofanyBiddertoascertainthenatureoftheWork,orthegeneralandlocalconditions
thatmayaffecttheWorkoritscost,schedule,orperformance,shallnotrelievetheBidder
fromresponsibilityforproperlyestimatingthecostofperformingtheWork.
7. ProcurementofTenderDocuments
TenderDocumentsshallbeobtainedfromtheEmployerattheaddressasindicatedintheRFP.
8. ReceiptofthePROPOSALS
a) TheEmployershallreceivesealedPROPOSALSonlyfromBiddersattheplace,date,andtime
specifiedintheRFP.
b) TheEmployershallopenFinancialProposalsonlyforTechnicalProposalsthatpasstheCriteria
inArticle23.
9. PartialPROPOSALS
a) Bidders shall submit a complete PROPOSALS for all of the Work as presented in the RFP
including
b) PROPOSALScoveringonlyaportionoftheWorkshallbeconsiderednoncompliantandshall
berejected.
10. InterpretationsandAddenda
b) ResponsetoBidderquestionsorrequestsforinterpretationsorclarificationsshallbeissuedto
allBiddersbytheEmployerintheformofAddenda(s)tothisRFPatleastfourteen(14)days
priortothesubmittaldateforthePROPOSALS.
c) Onlyquestions,interpretations,orclarificationsaddressedinformalwrittenAddenda(s)shall
bebindingontheEmployer.Oralorothercommunicationsshallnotbebinding.
11. ModificationorWithdrawalofPROPOSAL
a) BiddershallnotmodifyorwithdrawhisPROPOSALsubmittedpriortothesubmittaldate(due
date/timeforPROPOSALS)listedintheRFP(theSubmittalDateforPROPOSALS)without
approvaloftheEmployer.
b) BiddermayclarifyhisPROPOSALafterPROPOSALSopeningbysubmissionofclarifications
orsupplementalinformation,onlyinresponsetoarequestfromtheEmployer.
c) Clarifications shall be limited to those reasonably necessary to respond to the Employers
requests.
d) IntheeventthattheBidderbecomesawareofanerrorthattheEmployerhasnotidentified,
butwhich,intheBidder'sopinion,requiresamodificationofitsPROPOSAL,theBiddershall
sonotifytheEmployerinwriting.
e) AnyeffortbytheBiddertounilaterallymodifyitsPROPOSALaftertheSubmittalDatemay
resultinadeterminationofnoncompliance.
12. PreparationofPROPOSALS
a) The PROPOSAL shall consist of three separate envelopes: The Bid Security, the Technical
ProposalandtheFinancialProposal,
b) EachoftheBidSecurity,theTechnicalProposal,andtheFinancialProposal,shallbeprepared
intheEnglishlanguageandinsertedinseparatesealedenvelopes,whichshallbeinsertedinto
afourthenvelope(ThePROPOSAL).
c) The original set of PROPOSAL shall be clearly identified as the ORIGINAL by a suitable
notation or stamp on the first and last pages. Copies sets of PROPOSAL shall be clearly
identifiedasCOPYbyasuitablenotationorstamponthefirstandlastpages.Incaseofany
discrepancy,thecopymarkedORIGINALshallgovern.
d) BiddersshallusetheformsprovidedintheTenderDocumentsasfaraspossible.However,if
thisisnotpossibleandtheformsaretoberetyped,Biddersshallusethesameformatand
arrangementshereinandnotdeveloptheirownformat.Anyexceptionordeviationfromthe
specifiedlanguage,formatandcontentsoftheBidFormswillbesufficientgroundsforthe
rejectionofthePROPOSAL.
e) AllblankspacesontheBidFormsshallbecompletelyfilledin.AllinsertionsontheBidForms
andallrequiredsubmittalsshallbetypewrittenorlegiblyhandwritteninink.
f) The Bid Forms shall be dated and signed in the appropriate blanks. Signatures shall be
handwritteninindelibleink,preferablyblueink,andshallbefullylegiblewhenphotocopied.
The names of person(s) signing shall also be legibly typed or printed below the signature
whereveritappearsontheBidForms.
g) The PROPOSAL shall have no interlineations or erasures except those consistent with
instructionsissuedbytheEmployerorasnecessarytocorrecterrorsmadebytheBidders,in
whichcasesuchcorrectionsshallbeinitialledbytheperson(s)signingthePROPOSAL.
h) The Bidder shall prepare its PROPOSAL entirely at its own cost. The Employer shall not
reimburseanyexpensesincurredbytheBidderinconnectionwithpreparationorsubmission
ofthePROPOSAL.
i) ThePROPOSALshallbeevaluatedwithotherPROPOSALSsubmittedbyotherBidders.The
EmployerathisdiscretionmayconsideralternativePROPOSALsubmittedbytheBidderwho
hasthepreferredPROPOSAL.
13. TechnicalProposal
a) The Technical Proposal shall be submitted in looseleaf binders with locking rings in the
following format with all Appendices and Attachments as required hereinafter and shall
consistofthefollowing:
CoverPageidentifyingtheProjectTitle,Date,andtheNameoftheBidder.TheCoverPageshall
alsobeclearlyidentifiedastheTECHNICALPROPOSALforNorthAqabaWastewaterTreatment
Plant.
AcopyoftheLetterofInvitation
LetterofTransmittal.
OrganizationArrangementsincluding:
TypeofOrganization(SingleFirm,ConsortiumorJointVenture)andProposedStructure;
ParticularsofIndividualsCompanies;
PowerofAttorneyDesignatingLeadFirmandContactPerson;
NotarizedStatementindicatingthatallmembersoftheTeamshallbejointlyandseverally
liabletowardstheEmployerforthePROPOSAL.
TechnicalProposalFormsincluding:
AppendicestotheTechnicalProposalForms:
Appendix Title
TPA ApproximatePercentageofSubcontractedWork
TPB ListofSubcontractors
TPC OutlineProgramandWorkSchedule
TPD FacilitiesLayoutandOpportunitiesforFutureExpansion
TPE ContractorsQualityControlProgram
TPF SafetyMeasures
TPG LandscapingPlan
TPH DetailsofFirm(s)ProvidingDesignEngineeringServices
TPI Details of Firm(s)/staff Providing Operation and
MaintenanceServices
TPJ OperationandMaintenancePlan
TPK TechnologyTransferandTrainingPlan
TPL EquipmentDataForms
TPM OrganizationandStaffing
TPN ExceptionsandVariations
b) All pages comprising the Appendices and Attachments to the Technical Proposal shall be
numbered sequentially with appendix label and page number (e.g., A1, A2B1, B2) or
attachmentlabelandpagenumber(e.g.,Attachment11,Attachment12),asappropriate.
c) Technical Proposals shall not contain any reference to prices. Any Technical Proposal
containingsuchreferencemaybejudgednoncompliantatthediscretionoftheEmployer.
d) TheBasisofDesignReportandMinimumTechnicalRequirementsincludedinthisRFPconvey
theintendeddesignbasesandconceptsfortheProject.
e) TheBiddershallreviewallofthedocumentsassociatedwiththisRFPanddescribeinthespace
providedontheAppendixtotheTechnicalProposalForm(AppendixTPN)anyexceptionsor
variationstotheConceptualDesignthattheBidderproposesinordertofacilitatehisdesign,
construction,oroperation,ifawardedtheContract[Generally,exceptionsandvariationswill
seek to change Volume III Minimum Technical Requirements]. The list of exceptions and
variations shall be supplemented with different conceptual design drawings and technical
specificationsthatcompletelydescribetheexceptionsandvariationsbeingproposedandthe
reasonsandrationaleforsuchPROPOSALS.MarkupsoftheoriginalConceptDrawingsand
MinimumTechnicalRequirementsmaybeusedtodescribetheexceptionsandvariations,as
supplemental drawings and specifications provided that all exceptions and variations are
clearlyshownanddescribed.
f) TheBiddershallnotproposeanymaterialmodificationstothedocumentsastheseshallnot
be considered. Material modifications are ones that affect in anyway, the scope, quality or
deliverydatesoftheservicetobeprovidedorlimitsinanywaytheresponsibilities,dutiesor
liabilitiesoftheBidderortherightsoftheEmployer,EmployersRepresentativeorFinancier.
Material modifications will generally seek to modify Volume I, Bidding and Contract
RequirementsandVolumeII,BasisofDesignReport.
g) The Bidder shall submit his design that covers hydraulics, process loading and equipment
needed.
h) TheBidderacknowledges,bysubmissionofhisTechnicalProposalthat,ifawardedaContract,
he shall complete the Design consistent with the Design Criteria, Minimum Technical
RequirementsandconceptsincludedinthisRFP,unlessspecificexceptionsandvariationsto
theConceptualDesignareidentifiedanddescribedwithhisProposal,asdescribedabove,and
suchareacceptedandapprovedforimplementationbytheEmployer.
i) All exceptions and variations shall be specific in nature with references to the applicable
Sectionnumber/title,pagenumber,andarticlenumberinthisRFP.Exceptionsandvariations
that are general or nonspecific, that make reference to the Bidders standard terms and
conditions,orthatmakereferencetotheBiddersdescriptiveinformationasawholeshallnot
beconsidered.
j) IftheBiddertakesnoexceptionsorvariationstothisRFP,heshallwriteNONEinthespace
providedontheTechnicalProposalForm.
k) The Bidder shall submit information concerning proposed equipment and materials on the
EquipmentDataForms.DatasubmittedshallbeconsistentwiththeTenderDocumentsissued
exceptincaseswhereexceptionsorvariationshavebeenproposedbytheBidder.Inthiscase,
theBiddershallsubmitinformationconsistentwithhisproposedexceptionsorvariationsand
informationondesignmodificationsproposed,newspecifications,preliminarydrawings,and
other descriptive information to support his Proposal. Information submitted shall be in
sufficient details to show the size, arrangement, and operation of component devices,
performancecharacteristics,andotherpertinentdatanecessarytodescribetheequipment
andmaterialsheproposestofurnish.
l) TheBiddermaysubmitonealternativeproposalthatshallachievethetreatedwastewater
qualityrequirementsandothermandatoryrequirementsrequiredbytheRFP.TheEmployer
athisdiscretionmayconsiderthealternativeproposalfortheBidderwhosehasthePreferred
PROPOSAL.
m) EquipmentDataFormsshallbesupplementedwithcataloguedatasheetsandinformation.
n) TheTechnicalProposalshallbebasedonnewequipmentandmaterialsthatcomplywiththe
minimumtechnicalrequirementsand/ortheexceptionsorvariationsproposedbytheBidder
asdescribedabove.
o) Any Technical Proposal not having sufficient descriptive data to accurately describe the
equipment or materials proposed may be considered noncompliant and rejected unless
sufficient supporting data is submitted upon request of the Employer. Drawings and data
submittedbythesuccessfulBidderwillberetainedbytheEmployer.Anydeparturefromthese
drawingsanddata as submittedwillnotbepermittedwithoutwrittenpermissionfromthe
Employer.
p) The Bidder shall submit a preliminary schedule for implementation of the Works, showing
milestones and completion dates for each section of the Works, including the testing
arrangements, supply of all major equipment and materials, conceptual and final design
submittals and reviews, shop drawing submittals and reviews, procurement, mobilization,
major construction elements, equipment installation, and commissioning. The successful
Bidder shall be required to submit to the Employer a critical path schedule covering all
activitiesofWorkasdescribedinVolumeIIIMinimumTechnicalRequirements.
14. FinancialProposal
a) TheFinancialProposalshallconsistofthefollowing:
I. CompletedFinancialProposalForm,
II. CompletedScheduleofContractPrices,
III. CopyofBidSecurity,and
IV. ContractData
b) AftertheTechnicalProposalshavebeenevaluatedandallambiguitiesclarified,eachBidder
whosubmitsanacceptableTechnicalProposalmaybenotifiedoftheplace,timeanddateof
openingoftheFinancialProposals.
c) AllblankspacesontheFinancialProposalFormandtheScheduleofContractPricesshallbe
filled.ABidpriceshallbeindicatedforeachsection,item,unitprice,oradjustmentprice,or
thewordsNOCHARGE,orotherappropriatephraseshallbeentered.Proposalsreceived
withoutsuchitemscompletedmaybeconsiderednoncompliant.
d) TheBiddershallacknowledgereceiptofallAddenda(s),thenumbersanddatesofwhichshall
beincludedintheFinancialProposalForm.
e) TheContractPricesforalltheitemsintheScheduleofContractPricesshallbethetotalPrice
forthatitemandshallbeinsertedinfiguresandwordsontheBidFormwhereindicated.
f) TheEmployerwillreviewtheFinancialProposalforarithmeticerrorsandforconsistencywith
the General Conditions, the Particular Conditions and the Special Conditions. Any errors
identifiedbytheEmployerthatresultincorrectionstothepriceshallbecarriedforwardtothe
FinancialProposalFormbytheEmployer.TheBiddershallbeinformedofsuchcorrectionsand
unlessdisputedshallbebindingontheBidder.
g) TheContractPriceintheScheduleofContractPricesshallbethefullinclusivevalueofthe
finishedWork,overheadandprofit,andallobligationsasdefinedintheTenderthatshallbe
bornebythesuccessfulBidder.
15. SignatureofPROPOSALS
a) The original and copies of both the Technical Proposal and the Financial Proposal shall be
signed using indelible ink, preferably blue ink,by the person(s) duly authorized to bind the
BiddertotheContract.ProofofauthorizationshallbefurnishedintheformofawrittenPower
ofAttorney,whichshallaccompanythePROPOSAL.
b) Thenamesofperson(s)signingshallalsobelegiblytypedorprintedbelowthesignature.
c) A PROPOSAL by a person(s) who affixes to a signature the word President, Secretary,
Agent,orotherdesignationwithoutdisclosingthefirmsidentity(s)maybeheldtobethe
Proposaloftheindividual(s)signing.
d) PROPOSALSbycorporationsshallbeexecutedinthecorporatenamebythePresident,Vice
President,orotherdulyauthorizedcorporateofficer,andthecorporatesealshallbeaffixed
and attested to by the Secretary or Assistant Secretary of the corporation. The State of
Incorporationshallbeshownbelowthecorporatename.
e) PROPOSALSbyJointVentures(JV)shallbeexecutedbytheLeadMemberoftheJV.Inthis
case,Items1through4aboveshallalsoapplytotheLeadfirmasappropriate.
16. ContractPrice,CurrencyandPayment
a) TheContractPriceshallincludeallcoststobeincurredbytheContractorundertheContract,
plusoverheadandprofit,inordertocompletetheWorkasspecifiedfortheDesignBuildand
Operation Services for the specified periods, including but not limited to: wages, salaries,
travelof/toJordanandnonJordanianpersonnel,allmaterialsandequipmentincludingcost,
insurance,andfreight,sparepartsconsumablesrequiredforOperationandMaintenanceof
the facilities, and other materials properly imported by the Contractor into Jordan for the
Work,andtheinsuranceandfreightonthereturnofallContractorsequipmentfromJordan
upon completion of the Work, and overhead costs including those outside Jordan, interest
charges on financing, premiums on securities and insurance, and any other direct and
administrativeexpensesproperlyincurred.
b) Whereindicated,ContractPriceshallbeenteredintotheFinancialProposalFormexpressed
inbothfiguresandwords.Discrepanciesbetweenfiguresandwordsshallberesolvedinfavour
ofwords.
c) AnyBidItemagainstwhichnorateorsumisquotedshallnotbepaidforseparatelywhenthe
Workdescribedthereinisexecutedanditshallbedeemedtobecoveredbyotherratesand
sumsintheScheduleofContractPrice.
17. SupplementalData
a) AllsupplementaldatarequiredbythePROPOSALFormsshallbecompletedandprovided.
b) Supportingmaterialshallbesubmittedforallsupplementaldataprovided.
c) Thesupportingmaterialshouldbeasextensiveandascompleteaspossibletoenablean
objectiveevaluationwiththeminimumnecessitytorequestadditionalinformation.
d) TheContract,ifawarded,willbebasedonthetypeofequipmentandmaterialsidentifiedon
the Equipment data sheets provided by the Bidder, including possible exceptions and
variationsasdescribedabove.AwardingtheContractshallnotrelievetheContractorfrom
supplyingequipmentandmaterialsthatpassedtheminimumtechnicalrequirementsunless
exceptionorvariationisstatedclearly.
18. BidSecurity
a) ABidSecurity,denominatedinJDintheamountsofJD300,000shallbesubmittedina
separateenvelope(Envelope1).
b) TheBidSecurityshallbepayabletotheEmployerand,attheBiddersoption,beinoneof
thefollowingforms:
I. BankguaranteeissuedbyaforeignbankandendorsedbyalocalbankinJordan.
II. Bankguaranteeissuedbyaforeignbankthathasabranchbankcurrentlyoperatingwithin
theJordan.
III. BankguaranteeissuedbyalocalbankinJordan.
c) TheBidSecurityshallbeconsistentwiththesampleformofBidSecurityincludedwiththis
RFP.IssuancedateandexpirydateshallbeshownontheBidSecurity.Thevalidityperiod
oftheBidSecurityshallbe180daysfromdateofSubmittal/OpeningofPROPOSALS.
d) AnyPROPOSALnotaccompaniedbyanacceptableBidSecuritywillberejectedbythe
Employerasnoncompliant.TheBidSecurityshallbeenclosedinEnvelope1marked"Bid
Security"andshallbeincludedinEnvelope4.
e) All Bid Securities shall be returned within one week after the date that the Contract
AgreementisratifiedbyAqabaWater(AW).
f) ABidSecuritymaybeforfeitedif:
I. ABidderwithdrawshisPROPOSALafterthedateofsubmission,duringtheperiodofBid
validity.
II. ThesuccessfulBidderfailstoexecutetheContract,withinthespecifiedperiod.
III. The successful Bidder fails to furnish the required Performance Guarantee within the
specifiedperiod.
19. SubmissionofPROPOSAL
a) TheentirePROPOSAL,includingtheTechnicalProposalandtheFinancialProposalandthe
BidSecurity,willbesubmittedconsistentwiththerequirementslistedintheRFP.
b) Alldocumentsshallbedeliveredinsealed,opaqueenvelopesorpackaging,marked:
PROPOSALforDesign,Build,plusOperationforNorthAqabaWastewaterTreatment
Plant
DONOTOPENBEFORETHETENDEROPENINGTIME{Date&Time}
NameofBidder _____________________________
AddressofBidder_____________________________
c) WhenthePROPOSALissentthrougharegistereddeliverysystem,thesealedenvelopeor
packageshallbeenclosedinaseparateenvelopeorpackageaddressedtoTheEmployeras
indicatedintheRFPandwiththenotationPROPOSALENCLOSEDonthefacethereof.
d) BiddershallberesponsibleforensuringthatitsPROPOSALisreceivedconsistentwiththe
instructionshereinandalatePROPOSALshallnotbeconsideredevenifthelatenesswasa
resultofcircumstancesbeyondtheBidderscontrol.
20. PROPOSALSOpenings
a) The evaluation process shall begin with the Bidders submission of the PROPOSALS as
stipulatedherein.
b) The PROPOSALS shall be opened after the close of the Due date/time for PROPOSALS
(submittaldate),asspecifiedintheRFP.
c) TheBidSecurityvalue,source,issuancedate,expirydateandvalidityperiodshallbechecked
for conformity with requirements. Noncompliance of Bid Security as specified and to
requirementsshallleadtostopfurthertheevaluation.
d) Inclosedsession,theTechnicalProposalswillbeevaluated:
I. Todeterminecompleteness.`
II. If found complete, the Technical Proposals will be evaluated as specified herein and
BidderswhosesubmittalsareacceptedinaccordancewiththerequirementsofArticle(23)
below,willhavetheirFinancialProposalsopened.
e) The Financial Proposal opening will be at a location and time to be determined by the
Employer.
f) At the Financial Proposal opening, the Employer will document the Bidders name, the
ContractPrices,andothersuchdetailsastheEmployerconsidersappropriate.
g) Any submittal of a Financial Proposal that is unsolicited or associated with a Technical
Proposalthathasnotbeenacceptedwillnotbeconsidered.
h) TheEmployershallprepare,forhisownrecords,minutesoftheFinancialProposalopening,
includinginformationdisclosedtothosepresent.
21. PeriodofValidity
a) The PROPOSALS shall remain valid and open for acceptance for 180 days from date of
Submittal/ Opening of PROPOSALS. PROPOSALS valid for a shorter period or with
conditionsshallberejectedbytheEmployerasnoncompliant.
b) AllContractPricesshallbefirmandshallremainfirmwithoutvariationforacceptanceat
any time within the Bid validity period and thereafter until the Letter of Acceptance is
issuedtotheSuccessfulTenderer.
c) In exceptional circumstances, prior to expiration of the original validity period, the
EmployermayrequestthattheBidderextendtheperiodofvalidityforaspecifiedperiodof
time. The request and the responses thereto shall be made in writing by facsimile,
electronic mail, courier service, or registered mail. A Bidder may refuse the Employers
request for extending the period of validity without forfeiting its Bid Security. A Bidder
agreeingtotherequestwillnotberequirednorpermittedtomodifyitsPROPOSAL,but
willberequiredtoextendthevalidityofhisBidSecuritycorrespondingly.Theprovisions
regardingdischargeandforfeitureoftheBidSecurity shallcontinueto applyduringthe
extendedperiodofvalidity.
22. EvaluationofPROPOSALS
a) Theobjectiveoftheevaluationprocessistoselect,inafairandtransparentprocess,the
BidderwhosePROPOSALissubstantiallycompliant,technicallysound,andisjudgedtobe
themosteconomicallyadvantageoustotheEmployer.
b) TheevaluationwillbecarriedoutbyaCommitteeappointedbytheEmployer,assistedby
technical,financial,andlegaladvisorsasthecasemayrequire.
c) TheEmployerreservestherighttoacceptorrejectanyPROPOSALandtocanceltheBidding
Process and reject all PROPOSALS at any time prior to the award of Contract without
incurring any liability to the affected Bidder(s) or any obligation to inform the affected
Bidder(s)ofthegroundsforitsaction.
d) Theevaluationwillbegenerallyconductedasfollows:
e) TheEmployermaywaiveanyminorinformality,nonconformity,orirregularityinaTechnical
orFinancialProposalthatdoesnotconstituteamaterialdeviation,providedthatsuchwaiver
doesnotprejudiceoraffecttherelativerankingofanyBidder.
23. EvaluationofTechnicalProposals
Foreachlistedcriteria,pointsshallbeawardedfrom0tothemaximumstatedwith0meaning
unacceptable.Thesumofthepointsshallgiveascoreof0to1000andshallreflecttheextentto
whichtheTechnicalProposalsmeettherequirementsoftheEmployer.
ForaTechnicalProposaltobeconsideredacceptable,aminimumscoreof700pointsoutof1000
shallbeobtainedbeforenormalizationofthescores.IfaTechnicalProposalscoreslessthan700,
it shall be considered noncompliant. Only the Financial Proposals of Bidders with acceptable
TechnicalProposalsshallbeopened.
Thescoresshallbenormalizedusingtheformula
Actual Score of Firm
Normalized Technical Score (TS ) x1000
Highest Score of Firms Evaluated
ThusthefirmscoringhighestshallreceiveaNormalizedTechnicalScoreof1000pointsandthe
otherfirms,alowerTechnicalScore.
Forthelistedcriteria,individualscoresshallbeawardedasfollows:
I. AverageAnnualTurnoverinlast5years(TotalTurnover/5years)
JD7millionormoreperyearPass
LessthanJD7millionperyearFail.Applicationrejected
Iftheapplicant(orleaderofJointVenture/Consortium)passestheturnovercriteria,the
applicationwillbeevaluatedagainstthefollowingcriteria.
II. CompletenessofTechnicalProposal25pointsmaximum.
ThemaximumscoreshallbeawardedifalloftheitemslistedunderArticle13aboveare
submittedinacceptableformatandwithsufficientdetailasrequested
III. Financialstatement
AuditedFinancialStatementInformationTotal50points
IV. PreviousExperienceinConstructionfortheJointventure
EXPERIENCEINCONSTRUCTION Total 100 points available
DesignandBuildExperienceinlast10years
Points
Perproject2points,max10points 10
Experience in Construction ofWastewater Treatment Points
Plantwithassociatedequipment projects inMiddleEast (ME)
includingJordan
Perproject5points,max20points 20
Summary
Points
Available Obtained
Description
Design/BuildExperienceinlast10year 30
WWTPcontractvaluesinlast5years 30
Int. experienceinConstruction ofWWTP 10
ClientReferencesforWWTPexecuted 10
MiddleEastexperienceinConstructionofWWTP 20
TOTALPOINTS 100
V. OutlineProgramandWorkSchedule25pointsmaximum.
Ascoreof0to25shallbeidentifieddependingonthelevelofdetailandcompleteness
oftheoutlineprogramandworkschedule.Asaminimumtheoutlineprogramand
work schedule shall indicate the sequence of works, detailing the start and finish
datesofkeyactivitiesandkeymilestones.
VI. FacilitiesLayoutandOpportunitiesforFutureExpansion50pointsmaximum.
Amaximumscoreof50pointsshallbeawardedforsubmittalofaconceptualsketch
showingtheproposedgeneralarrangementofallfacilitiescomprisingtheprojectand
thespecificlayoutoftheWastewaterTreatmentPlantdemonstratingopportunities
forfutureexpansionofthetreatmentplant.Ifthegeneralarrangementsprovidedon
theConceptDrawingsareacceptabletotheContractorandshallbeutilizedasfaras
possible,thenastatementtothiseffectshallbeacceptablealongwithaschematic
layout of the Wastewater Treatment Plant to demonstrate the opportunities for
expansion.
VII. ContractorsQualityControlProgram25pointsmaximum.
Ascoreshallbeidentifieduptoamaximumof25pointsbasedonthequalifications
andexperience of theproposed quality controlmanager; the completenessof the
proposed quality control program and other staff identified for quality control on
boththeCapitalWorksandOperationandMaintenancecomponentsoftheproject.
VIII. SafetyMeasures25pointsmaximum.
Amaximumscoreof25pointsshallbeawardedforinformationontheoutlinehealth
andsafetyplanandthegeneralapproachestosafetythattheContractorwillutilize
inthedesign,constructionandoperationandmaintenanceofthefacilities.
IX. LandscapingPlan25pointsmaximum
Pointsshallbeawardeduptoamaximumof25fordetailsregardingtheproposed
landscapingplansatthetreatmentplantsite.
X. EngineeringDesignFirm100pointsmaximum.
EngineeringDesignfirmshouldbeclassifiedasGradeAorequivalentinwaterand
wastewater design as per the latest classification of the Governorate Tender
directorate. The experience of the firm in similar projects involving wastewater
treatmentplantsshallbeevaluatedandascoreassigned.Experienceasadesigneron
previous Design Build plus Operate Projects shall contribute to a higher score.
Provisionofdetailsconcerningproposedkeypersonnelwhowillbeassignedtothe
projectwillalsocontributetoahigherscore.
SIMILAREXPERIENCEINDESIGN Total 30 points available
DesignandBuildExperienceinlast10years
Points
Summary
Points
Available Obtained
Description
Design/BuildExperienceinlast10year 10
WWTPsinlast10years 20
TOTALPOINTS 30
Project/Design Management ExpertiseTotal70 pointsavailable
insimilarprojects asdescribedinthisdocument
>10yearsexperiencedetails 10 >5projectsapplicable 10
provided experience
510yearsorlimitedorin 5 35projectsapplicable 5
complete experience experience
detailsprovided
<5yearsorinadequate 0 <3projectsapplicable 0
experience detailsprovided experience
ContractKeyPositionNominees KeyPositionNomineeAdequacy
ContractKeyPosition Points KeyPositionsExperience Points
Detailsprovided
Fullexperiencedetails 10 All nomineesexperienced 10
provided particularlyinsimilarprojects
Limited or 5 Some nominee 8
incompleteexperience experience inadequate
Inadequate 0 Limitedorincompletenominee 5
experiencedetailsprovided experiencedetailsprovided
Inadequate nominee 0
experience details provided
Design Manager Experience Design Manager Projects (project ofvalue>
JD5.Mio.)inthelast10years
DesignManagerDetails Points Projects of Applicable Points
provided Experience
>10 years experience 10 > 5 projectsapplicable 20
detailsprovided experience
510yearsorlimitedorin 5 35 projects applicable 10
complete experience experience
detailsprovided
< 5 years or 0 < 3 projects 0
inadequateexperience applicableexperience
detailsprovided
Summary
Points
Description
Available Obtained
ProjectManagerExperience 10
ProjectManagerProjects 10
ContractKeyPositionNominees 10
KeyPositionNomineeAdequacy 10
Design Manager Experience 10
Design Manager Projects 20
TOTALPOINTS 70
MinimumrequirementsforProjectManager:CivilEngineerwhohaveservedinthe
roleofprojectmanagerforthefirmforatleast5yearsandwhohasatleast10years
professionalEngineeringexperience
XI. OperationandMaintenanceFirm/Staff100pointsmaximum.
TheexperienceoftheFirm/Staffinoperatingandmaintainingawastewatertreatment
plantshallleadtoahighscoreforthiscriterion.Additionalpointsshallbeawardedfor
O&MexperiencewithstationsandanintegratedSCADAsystemuptothemaximum
of100points.
Summary
Points
Available Obtained
Description
ContractsforO&MofWWTPs 20
ClientReferencesforO&MofWWTP 10
TOTALPOINTS 30
Experienceofstaff:Operation a n d m a i n t e n a n c e Management ExpertiseTotal
70 pointsavailable
PlantManagerExperience PlantM a n a g e r P r o j e c t s ( capacityof
Plant)
Points Points
ProjectManager ProjectsofApplicable
De ta ils provided Experience
>15yearsexperiencedetails 10 >5Plantsapplicable 20
provided experience
Inadequate nominee 0
experience details provided
Design Manager Experience Design Manager Projects (project ofvalue>
JD5.Mio.)inthelast10years
Sludge/ProcessEngineer Points Projects of Applicable Points
Detailsprovided Experience
>10 years experience 10 > 5 projectsapplicable 10
detailsprovided experience
510yearsorlimitedorin 5 35 projects applicable 10
complete experience experience
detailsprovided
< 5 years or 0 < 3 projects 0
inadequateexperience applicableexperience
detailsprovided
Summary
Points
Description
Available Obtained
PlantManagerExperience 10
PlantManagerProjects 20
ContractKeyPositionNominees 10
KeyPositionNomineeAdequacy 10
Sludge/processengineer Experience 10
Sludge/Processengineer Projects 10
TOTALPOINTS 70
XII. OperationandMaintenancePlan50points
Amaximumof50pointsshallalsobeawardedforthePreliminaryO&MPlan,which
shallclearlydemonstratetheresourcesandapproachtooperationandmaintenance
ofthecompletedfacilitiesincludingthesludgetreatmentfacilities.
XIII. TechnologyTransferandTrainingplan25pointsmaximum
Points shall be awarded for ample description of the program that the Contractor
shallundertaketotraintheEmployersstaffintheoperationandmaintenanceofthe
wastewatertreatmentplants.
XIV. ProcessdesignforProposedFacilities150pointstotalmaximum
PreliminaryTreatmentFacility20pointsmaximumshallbeawardedfor
theoverallsuitabilityoftheproposeddesignforpretreatmentfacilities
anditsabilitytomeettheprescribedscreening, gritandoilremoval
rates, and flow measurement; proposed mechanism for removal ,
conveyingandstorage,andtoproduceacceptableforthenextprocess.
Secondary (Biological) Treatment Facility 65 points maximum shall be
awardedforcompletenessofplantproposalandwhethertheproposed
processdesignhasbeendemonstratedinsimilarcircumstances.Ability
to meet required BOD, SS, Bacteriological removal and denitrification
rates.
Piping10pointsmaximumshallbeawardedforacceptablepipelines
with adequate wall thickness, lining and coating systems and with
acceptablesurgeandcorrosioncontrolarrangementsifneeded.
SCADASystem60pointsmaximumshallbeawardedforacomplete
SCADAproposalthatmeetsthedesigncriteriaandminimumtechnical
requirements. The suitability, robustness and general efficiency of
proposedSCADAsystemcomponentswillalsobeevaluated.
XVI. OrganizationandStaffing50pointsmaximum
50Pointsmaximumshallbeawardedfortheorganizationandstaffing
proposedfortheproject,specificexperienceofstaffmembersshallbean
asset. Local experience of proposed staff in Jordan will also be scored
higher.
Numberofyearsinbusiness20
PersonnelResources30
PersonnelResources Total 30 points available
Number ofconstructionsupervisorswith Number of Employers Representatives
more than 10 years specificprofessional with more than
experienceinthewastewater treatment 7 years specific professional experience
plan sector inthewastewatertreatmentplansector
Numberof Points Numberof Employers Points
construction Representatives
supervisors
Morethan4 20 Morethan6 10
Between2and4 10 Between3and6 5
Lessthan2 0 Lessthan3 0
Summary
Description
Available Obtained
Numberofconstruction supervisors 20
Numberof EmployersRepresentatives 10
TOTALPOINTS 30
24. EvaluationofFinancialProposals
a. TheEmployerwillexaminetheFinancialProposaltoconfirmthatitconformstoallterms,
conditionsandspecificationscontainedintheRFPwithoutdeviationandthat:
I. Itiscomplete.
II. Ithasbeenproperlyexecuted.
III. ItisaccompaniedbyacopyoftherequiredBidSecurity.
b. Bidders shall not modify their Technical or Financial Proposals after opening of the
TechnicalProposals;however,theEmployermayrequestaBiddertoclarifyitsProposal
aslongasnomaterialmodificationismade.Anyrequestforclarificationandtheresponse
shallbeinwriting,orbyfaxfollowedbyaletter,butnomaterialchangeintheContract
Prices,qualityorsubstanceoftheProposalshallbesought,offered,orpermitted,except
as may be required to confirm the correction of arithmetic or obvious clerical and/or
typographicalerrorsassetforthherein.
c. EachcompliantFinancialProposalshallbecheckedbytheEmployerforarithmeticerrors.
ErrorswillbecorrectedbytheEmployerasfollows:
I. Wherethereisadiscrepancybetweentheamountsinfiguresandinwords,
theamountinwordsshallgovern.
II. Wherethereisadiscrepancybetweentheunitpriceandthetotalpricethat
is obtainedby multiplying the unit price and the quantity, the unit price
shallgovernandthetotalpricecorrected.
III. Wherethereisadiscrepancybetweenasumandtheconstituentsofthe
sum,theconstituentsshallgovernandthesumcorrected.
IV. If,intheopinionoftheEmployer,thereisanobviousmisplacementofa
decimalpointintheunitpriceorinaconstituentofasum,thetotalprice
or the sum shall govern and the unit price or constituent of the sum
corrected.
e. If the Bidder does not accept the corrected amounts, its Financial Proposal shall be
rejectedandtheBidSecurityshallbeforfeited.
f. Forthisproject,TheComparableBidPricewillbecomputedastheCapitalCostand(50%)
fiftypercentoftheOperation&Maintenance(OM)cost,plus30%ofElectricityCostfor
(20)twentyyears.
ForthepurposeofevaluationtheComparableBidPriceonly:
OMcostfor20years=
2x(OMperiod)
twentyfourhoursatarateof0.10JD/kwhrfor20years.TheBidder
shall submit a list showing name and number of equipment, and the
nominalpower.
Table:A.1
AverageWasteWaterFlowstoNorthAqabaWWTP
YearofOperation AverageWastewaterInfluentFlows(m3/d)
Year1(2018) 20,000
Year2(2019) 22,000
Year3(2020) 24,000
Year4(2021) 26,000
Year5(2022) 28,000
Year6(2023) 30,000
Year7(2024) 32000
Year8(2025) 34,000
Year9(2026) 36,000
Year10(2027) 40,000
g. TheComparableBidPricewillbecomputedinJDforallcompliantPROPOSALS.
h. ScoreswillbeevaluatedfortheFinancialProposalasfollows:
ThusthefirmscoringhighestwillreceiveaNormalizedFinancialScoreof1000pointsand
theotherfirms,alowerFinancialScore.
25. SelectionofPreferredBidder
a. TheBasicPROPOSAListheonlyPROPOSALsubjectedtoevaluation.TheEmployerathis
discretion may consider alternative proposal submitted by the Bidder who has the
preferredBasicPROPOSAL.
b. In identifying the preferred bidder, both the scores for the Technical and Financial
Evaluationwillbeconsidered.ThescorefortheTechnicalProposalwillcountfor70%of
theoverallscoreandthescorefortheFinancialProposalwillcountfor30%oftheoverall
score.
Thus,TotalScore= (TSx0.7)+(FSx0.3)
where TS = NormalizedScoreforTechnicalEvaluation
and
FS = NormalizedScoreforFinancialEvaluation
c. TheContractwillbeawardedtotheBidderwiththehighestTotalScore.TheContractto
beawardedwillbefortheWorkstobecarriedoutduringtheConstructionPeriod,which
includes design, procurement, construction and startup, of all Capital Works and
OperationandMaintenanceofsaidCapitalWorks
d. TheEmployerreservestherighttorejectanyorallPROPOSALSandtowaiveinformalities
andirregularitiesinthePROPOSALSreceivedifitappearsintheEmployersbestinterest
todoso.
26. ExecutionofContractAgreement
a. Prior to expiration of the period of tender validity prescribed by the Employer, the
EmployershallprepareaContractAgreementandnotifytheprospectivesuccessfulBidder
byfax,confirmedbyregisteredletter,accordingly.
b. ThePartieswillproceedtosigntheContractAgreement
c. Prior to the expiration of the period of tender validity the Contract Agreement will be
ratifiedbytheAqabaWater(AW).ThedateuponwhichAqabaWaterratifiestheContract
AgreementshallbethedatethattheContractbecomeseffective.IfAqabaWaterfailsto
ratifytheContractAgreementthantheContractisnoteffective.
d. UponthefurnishingbythesuccessfulBidderofaPerformanceSecurity,theEmployerwill
promptlynotifytheotherBiddersthattheirTendershavebeenunsuccessful.
27. ProprietaryInformation
e. TheTenderDocumentsandalldatacontainedtherein,orappendedorrelatedthereto,are
the property of the Employer and are delivered only for the purpose of enabling each
potentialBiddertoprepareandsubmitaProposalinresponsethereto.Theinformation
contained or referred to in the Tender Documents or appended thereto is not to be
disclosednorreleasedforanyotheruseorpurpose.
28. SpecialConceptualDesignConsiderations
a. TheBasisofDesignReportandtheMinimumTechnicalRequirementsthatformapartof
the Bidding Documents define the Outline Design developed and establish minimum
requirementsforperformanceandqualityuponwhichthesuccessfulBiddersFinalDesign
shallbebased.Theaccuracy,completeness,andqualityoftheFinalDesignshallbethe
soleresponsibilityofthesuccessfulBidder.
b. BiddersmayproposeintheirTechnicalProposalsexceptionsandvariationswhichdescribe
alternativematerials,equipment,andprocesses withinthelimitsdefinedintheTender
Documents provided these exceptions and variations maintain or improve the quality,
reliability,oroperationaleffectivenessofthecompletedworks.
29. ListofTenderDocuments
a. ThesetofTenderDocumentsissuedforthepurposeofbiddingconsistsofthefollowing
componentstogetherwithallAddenda:
VolumeIBiddingandContractRequirements
BiddingRequirements:
Section1:RequestforProposals
Section2:InstructionstoBidders
ConditionsofContract
Section3:GeneralConditions
Section4:ParticularConditions
Section5:SpecialConditionsofContract,ifany
BiddingDocuments
Section6:TechnicalProposalForm
Section7:FinancialProposalForm,including:
SignatureSheet
PreambletoScheduleofContractPrice
ScheduleofContractPrices
ContractData
ContractForms
Section8:ContractAgreementForm
VolumeIIBasisofDesignReport.
VolumeIIIMinimalTechnicalRequirements
SECTION3:GENERALCONDITIONS
ConditionsofContract
Design,BuildandOperateProjects
FirstEdition2008asissuedbyFIDICandwhichcanbeobtainedfrom:
FIDIC
WorldTradeCentre
P.O.Box311,1215Geneva15,Switzerland
Telephone +41(22)7994905
Fax +41(22)7994901
Email fidic.pub@fidic.org
Web www.fidic.org
Thecontractorshallincludeacopyofthefrontcoverofthisdocumentinhisofferandshallsign
thatpagetoconfirmhisagreementtotheConditionsofContract
Particular Conditions
CONTENTS
PREAMPLE
Introduction
DB+OWastewaterTreatmentPlant 1
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
Preamble
The Conditions of Contract comprise the General Conditions, which form part of the
Conditions of Contract for Design, Build and Operate Projects First Edition 2008 published by
the Federation Internationale des Ingenieurs-Conseils (FIDIC), Particular Conditions Part A
Contract Data and Particular Conditions Part B special Provisions, which include
amendments and additions to such General Conditions.
DB+OWastewaterTreatmentPlant 2
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
The following Sub-Clauses modify or supplement, or both, the Sub-Clauses of the General
Conditions. In case of conflict or discrepancy between the Particular Conditions and the General
Conditions, the Sub-Clauses of the Particular Conditions shall prevail. Sub-Clauses of the General
Conditions not specifically modified or supplemented herein shall remain in effect. Sub-clauses in
this Particular Conditions are numbered consistent with the Sub-Clauses affected in the General
Conditions and therefore may not be sequential. References in the General Conditions to Particular
Conditions mean this Particular Conditions.
DB+OWastewaterTreatmentPlant 3
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 4
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
CONTRACT DATA
1.1.26 Cut Off Date (number of days after the Time for
Completion) 30 days
DB+OWastewaterTreatmentPlant 5
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 6
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
8.2 Period of the Operation Service 10 years minus the Time for
Completion of Design-Build
9.2 Time for Completion of Design-Build 550 days
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 8
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 9
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 10
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 11
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 12
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
TableofContents
1.1...............................................................................................................................................................15
Definitions...................................................................................................................................................15
1.1.25..........................................................................................................................................................15
1.1.50..........................................................................................................................................................15
1.1.84..........................................................................................................................................................15
1.5Priorityofdocuments...........................................................................................................................15
1.6ContractAgreement.............................................................................................................................15
2.4EmployerFinancialarrangements................................................................................................15
3.1EmployersRepresentativeDutiesandAuthority.................................................................................17
3.3InstructionsoftheEmployersRepresentative....................................................................................18
4.THETCONTRACTOR.................................................................................................................................18
4.2PerformanceSecurity............................................................................................................................18
4.4Subcontractors......................................................................................................................................19
4.9QualityAssurance.................................................................................................................................19
4.16TransporttoGoods.............................................................................................................................19
Additionalsubclauses................................................................................................................................21
6.STAFFANDLABOUR................................................................................................................................23
6.1EngagementofStaffandLabour..........................................................................................................24
6.2RatesofWagesandConditionsofLabour............................................................................................27
6.5WorkingHours......................................................................................................................................27
AdditionalsubClauses................................................................................................................................27
6.12ForeignPersonnel...............................................................................................................................28
6.13FuneralArrangements........................................................................................................................28
6.14EmploymentRecordsofWorkers.......................................................................................................28
6.15Epidemics............................................................................................................................................28
6.16AdequateHygienicConditions............................................................................................................28
6.17ReportingofAccidents........................................................................................................................29
6.18EmploymentofPersonintheServiceofEmployersRepresentative................................................29
11Testing.....................................................................................................................................................30
DB+OWastewaterTreatmentPlant 13
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
11.4FailuretoPassTestsonCompletionofDesignBuild..........................................................................30
11.8JointInspectionsPriortoContractCompletion..................................................................................30
14ContractPriceandPayment..................................................................................................................30
14.2AdvancePayment...............................................................................................................................30
14.3applicationforAdvanceandInterimPaymentCertificates................................................................30
14.5AssetReplacementSchedule..............................................................................................................31
14.8Payment..............................................................................................................................................31
14.10PaymentofRetentionMoney...........................................................................................................31
14.11ApplicationforFinalPaymentCertificateDesignBuild....................................................................31
14.12IssueofFinalPaymentCertificateDesignBuild...............................................................................31
14.18AssetReplacementFund..................................................................................................................31
Additionalsubclauses:...............................................................................................................................31
14.16EmployersRepresentativeLiabilityforPaymentDueContractor...........................................31
14.17PaymentofContractorsObligations........................................................................................32
14.18Taxationanddues.....................................................................................................................32
15TerminationbyEmployer.......................................................................................................................32
AdditionalSubClauses...............................................................................................................................32
15.8CorruptorFraudulentPractices..................................................................................................33
15.9ConditionsofHireofContractor'sEquipment............................................................................34
15.10CostsforthePurposeofClause15.9........................................................................................34
17Riskallocation........................................................................................................................................36
AdditionalSubClause.................................................................................................................................36
17.13UseofEmployersAccommodation/Facilities..........................................................................36
19Insurance................................................................................................................................................36
AdditionalSubClauses...............................................................................................................................36
19.4WorkersCompensationInsurance.............................................................................................36
19.5UmbrellaLiabilityInsurance.......................................................................................................37
19.6AdditionalInsurancesOperationServices...............................................................................37
19.7PatentRights...............................................................................................................................38
19.8SourceofInsurance....................................................................................................................38
DB+OWastewaterTreatmentPlant 14
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
1.1
Definitions
CountrymeanstheHashemitekingdomofJordan
1.1.25
LocalCurrencymeansthecurrencyofHashemitekingdomofJordan(JD)
1.1.50
AddthefollowingSubClause
SafetyRegulationmeanstheEmployerssafetyregulationsexistingonthe
1.1.84 Sitewhichthecontractorisrequiredtofollow
Delete(a)to(i)andreplacewithasfollows
1.5Priorityof
documents a. TheContractAgreement;
b. TheLetterofAcceptance;
c. TheLetterofTender
d. TheSpecialConditions;ifany
e. TheParticularConditions;PartAContractData
f. TheParticularConditions;PartBSpecialProvisions
g. TheFIDICConditionsofcontractforDesign,Buildand
operateprojects,FirstEdition2009
h. AnyContractualCorrespondenceattachedandboundinto
theContract;
i. TheEmployersRequirements;
j. TheSchedulesand
k. TheContractorsProposals.
DeleteUnlesstheyagreeotherwiseattheendofthefirstsentence.
1.6Contract
Agreement
2.4Employer AddnewsecondparagraphtoSubClause(2.4):
Financial
arrangements
DB+OWastewaterTreatmentPlant 15
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
TheEmployerwillpaytheContractorthefollowingannualinstalments
to cover part of the Capital cost paid by the Contractor (Design Build
Period) in addition to the calculated Operation and Maintenance cost
based on base charge and variable charge defined in the Contract
considering the treated influent quantity meets the Employer
Requirements:
year JD(million)
2018(whenissuing
5.5
CommissioningCertificate)
2019(secondyearofOperation
4.50
ServicePeriod)
2020(thirdyearofOperation
4.50
ServicePeriod)
ForthelastsevenyearsoftheOperationServicePeriodfrom2021
(fourthyearofOperationServicePeriod)till2027(theendofthe
OperationServicePeriod),theEmployerwillpaytheContractorannual
equalinstalmentstocovertherestoftheCapitalCost(ifany)in
additiontoquarterlypaymentstocoverhisOperationand
Maintenancecostcalculatedconsideringtheinfluentflowquantity
meetstheEmployersRequirementsandbasedonthebasechargeand
variablecharge.
Contractorshallsubmitnonbindingestimatesofthepaymentswhichhe
expects to become due during each quarterly period according to his
financialmodelandtheestimatedinfluentflow.Revisedestimatesshall
be submitted at quarterly intervals until the Contract Completion
Certificatehasbeenissued.Thiswillbebaseforrecalculatingtheannual
instalments.
Contractor shall allow for this in his financial and financing
arrangements.
DB+OWastewaterTreatmentPlant 16
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 17
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
3.3Instructions Insertafterthesecondparagraph:
oftheEmployers
Representative InstructionsgivenbytheEmployersRepresentativeshallbeinwriting,
providedthatifforanyreasontheEmployersRepresentativeconsiders
it necessary to give any such instruction orally, the Contractor shall
comply with such instruction. Confirmation in writing of such oral
instructiongivenbytheEmployersRepresentative,whetherbeforeor
after the carrying out of the instruction, shall be deemed to be an
instructionwithinthemeaningofthisSubClause.
Provided further that if the Contractor, within (7) days, confirms in
writing to the Employers Representative any oral instruction of the
EmployersRepresentativeandsuchconfirmationisnotcontradictedin
writing within (7) days by the Employers Representative, it shall be
deemedtobeaninstructionoftheEmployersRepresentative.
It is understood and agreed by both parties that the Employers
Representativeshallnotbeliableforanyopinionsrenderedinregardto
whetheradefaultexistsundertheContract,whensuchopinionshave
been made by the Employers Representative in good faith and in
accordancewithgoodengineeringpractice,andneitherpartyshallbring
or maintain any legal or administrative action based on any such
opinion(s).
4.THE
TCONTRACTOR
4.2Performance Insertafterthefirstparagraph:
Security
ThePerformanceSecurityshallbeintheformofaBankGuarantee
issuedby;
a) Aforeignbankendorsedbyanauthorisedlocalbankinthe
HashemiteKingdomofJordan
b) AforeignbankwhichhasanoperatingbranchinJordan
c) AlocalbankinJordan
DB+OWastewaterTreatmentPlant 18
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
Insertafterparagraph(c):
4.4
Subcontractors (a) The total value of all subcontracted work shall not
exceed20percentofthevalueoftheCapitalWorksincludingthecostof
materialsandequipmentsupplied
Insert at the end of the Sub-Clause:
4.9Quality
Assurance TheContractPriceshallincludetheemploymentofathirdpartiesto
checktheconsistencyofmaterialandrequiredproductentriesandthe
mechanical, electrical and electronic products (like pipes, valves,
equipment, control systems and starting systems) for the required
specifications
The Contractor must present a written request for approval to the
Employers Representative attaching the information that testifies the
ability,experienceandspecialtyofeachofthirdpartyinthefieldandits
readinesstodoso.Iftheproposedthirdpartyisrejected,theContractor
mustproposedfurthercandidatesuntilapprovalisgranted.
Thethirdpartiesundertakesthefollowing:
(i)Checkmethodsandconducttestingforworkmanshipinaccordance
withtherequirementoftheContractSpecification
(ii)Checkthemanufacturingmethodsandsuperviseandassurequality
control implemented at the plant to testify the ability of the
manufacturing firm to manufacture the product according to the
requiredspecifications.
(iii)Inspectthequalitycontrolduringmanufacturing.
(iv)Inspecttheproductbeforewrappingandthemethodofwrapping
andpackingandloadingforshipment.
(v)Presentacertificatethatincludesthetestsmadeontheproduct,the
results and comparing them with the Specification and witness the
wrapping of the product, packing, loading, unloading, shipment with
dates.
Insert at the end of the Sub-Clause
4.16Transportto ThecontractorshallobtainpermissioninwritingfromtheEmployers
Goods RepresentativepriortodeliveringanyitemofGoodstotheSite.No
Goodsshallbedeliveredwithoutthepermission,whichshallnotrelief
theContractorfromanyobligation
4.20Employer's Insert at the end of the Sub-Clause
Equipmentand
DB+OWastewaterTreatmentPlant 19
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
FreeIssue TheContractorshallinvestigateandconsidertheuseofthefollowing
Material EmployersequipmentandutilitiesinhisOperationandMaintenance
Plan:
41
3
41828 3 3
458143 4
5
6
447782 7
44
8
11355
)+( 9
10
SCADA 11
MP2 12
13
14
15
DB+OWastewaterTreatmentPlant 20
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
TheContractorshallberesponsibleforeverythingwhichisrequiredfor
theperformanceoftheServices,evenifnotspecifiedinthisAgreement.
ItemsexcludedfromtheContractorsresponsibilitiesareonlysuchitems
expresslyspecifiedinthisAgreementasbeingtheresponsibilityofthe
Employer.
(b) TheContractorshallprovideuninterruptedoperationofthePlant,
inacosteffective,safeandbusinesslikemannerandinaccordancewith
all Statutory Requirements, Good Industry Practice and the standards
andotherrequirementsofthisAgreement.
(c) The Contractor shall store and dispose the dried sludge and any
othermaterialresultingfromorarisingoutoftheoperationofthePlant.
Thecontractorshallsubmithisproposalforthis.
(d) TheContractorshallperformallcorrective,predictive,preventive
androutinemaintenance,repairandrenovationofthePlant,insuchway
astooptimizetheirlifeandperformanceandtomaintainatalltimesthe
treatment plant and associated materials and equipment in a safe,
operative and sound condition and in compliance with all Statutory
RequirementsandGoodIndustryPracticeandthestandardsandother
requirementsoftheAgreement.
DB+OWastewaterTreatmentPlant 21
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
(f) DuringtheOperationServicePeriod,theContractorshallnotcarry
outanymaterialmodificationswithoutapprovaloftheEmployer.
(g) TheContractorshall:
(1) perform the Services using all the skill, care, diligence, efficiency
and economy to be expected of a professional wastewater utility
operator working in accordance with Good Industry Practice;
(2) The Contractor shall, in all matters arising in the performance of the
Contract, comply with and give all notices under the provisions of
any national or state statute, ordinance or other law, or any
regulation of any legally constituted public authority having
jurisdiction over the Services.
DB+OWastewaterTreatmentPlant 22
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
(8) use only appropriate advanced technology and safe and effective
methods;
(9) use only equipment, machinery, materials and goods which are new,
unused and of sound and merchantable quality, workmanship,
manufacture and fabrication and fit for their intended purpose;
(10) ensure that all persons employed in performing the Services shall be
properly qualified and supervised;
(11) keep the Site, the Plant and other facilities in a neat and clean
condition and in conformity with all Statutory Requirements and
Good Industry Practice; and
(12) Comply with all the requirements of and satisfy the performance
criteria set out in this Agreement.
(h) TheContractorshallcarryoutallinspectionsandtests,including
laboratorytestsandanalysesofwastewatersamples,asaresetoutin
thetenderdocumentsorasmayberequestedbytheEmployer.
Neitherinspectionsortestsorwitnessingoftestsorinspectionbythe
Employer nor its instructions, directions, comments, consents or
approvalsshallrelievetheContractorofanyofitsobligationsorliabilities
underthisAgreement.
6.STAFFAND
LABOUR
DB+OWastewaterTreatmentPlant 23
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 24
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
2
3
4
5
6
6
8
9
DB+OWastewaterTreatmentPlant 25
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
) (
10
) ABC(
11
) (
12
13
/ 14
15
16
DB+OWastewaterTreatmentPlant 26
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 27
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
TheContractormaybringintotheCountryanyforeignpersonnelwho
6.12Foreign arenecessaryfortheexecutionoftheWorkstotheextentallowedby
Personnel the applicable Laws. The Contractor shall ensure that these personnel
are provided with the requiredresidence visasand work permits. The
Employerwill,ifrequestedbytheContractor,usehisbestendeavoursin
atimelyandexpeditiousmannertoassisttheContractorinobtainingany
local,state,national,orgovernmentpermissionrequiredforbringingin
theContractorspersonnel.
TheContractorshallberesponsibleforthereturnofthesepersonnelto
theplacewheretheywererecruitedortotheirdomicile.Intheeventof
thedeathintheCountryofanyofthesepersonnelormembersoftheir
families, the Contractor shall similarly be responsible for making the
appropriatearrangementsfortheirreturnorburial.
The Contractor shall be responsible, to the extent required by local
6.13Funeral regulations, for making any funeral arrangements for any of his local
Arrangements employeeswhomaydiewhileengagedupontheWorks.
6.14Employment The Contractor shall keep complete and accurate records of the
Recordsof employmentoflabourattheSite.Therecordsshallincludethenames,
Workers ages, genders, hours worked and wages paid to all workers. These
recordsshallbesummarizedonamonthlybasisandshallbeavailable
forinspectionbytheEmployersRepresentativeduringnormalworking
hours.Theserecordsshallbeincludedinthedetailstobesubmittedby
theContractorunderSubClause6.10[RecordsofContractorsPersonnel
andEquipment].
In the event of any outbreak of illness of an epidemic nature, the
6.15Epidemics Contractorshallcomplywithandcarryoutsuchregulations,ordersand
requirementsasmaybemadebytheGovernmentorthePublicHealth
Authoritiesoranyotherofficialbodyforthepurposeofdealingwithand
overcoming the same, and shall provide all necessary preventive
precautions.
TheContractorshallprovideadequatehygienicconditionsinrespectof
6.16Adequate garbage collection and sewage disposal for the living quarters of
Hygienic labourersandemployeesonthesite.
Conditions
DB+OWastewaterTreatmentPlant 28
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
TheContractorshallreporttotheEmployersRepresentativedetailsof
6.17Reportingof anyaccidentonorabouttheSiteorinconnectionwiththeexecutionof
Accidents theWorks,assoonaspossibleand,inanyeventwithin24hoursafterits
occurrence. The Contractor shall also report such accident to the
appropriateauthoritywheneversuchreportisrequiredbylaw.Inthe
caseofanyfatalityorseriousaccident,theContractorshall,inaddition,
notify the Employers Representative immediately by the quickest
availablemeans.
TheContractorshallnotrecruitorattempttorecruithisstaffandlabour
6.18Employment from among the persons in the service of the employers
ofPersoninthe Representative.
Serviceof
Employers
Representative
8.7 Handback Insert at the end of Sub-Clause:
Requirements
OnthedateofexpirationofthisAgreement,orintheeventofitsprior
cancellation or termination, the Plant and the AW Property shall be
transferredtotheAWpursuanttotheProjectAgreement.
When the Plant and the AW Property is transferred to the AW the
Contractoristofulfilthefollowingrequirements:
CapacitytotreatthedesignwastewaterquantityasstatedinVolumeII
BasisofDesignReport,orchangesagreedduringtheOperationService
Period.
FulfilmentoftheEffluentRequirementsasstatedinVolumeIIBasisof
DesignReport,orchangesagreedduringtheOperationServicePeriod.
Allassets(includingstandbyequipment)shallbefullyoperationalandin
properworkingorder
A remaining service life of at least five (5) years for the main
electromechanical equipment at the Plant which have an individual
powerunitabove15kWandwhichhavealifetimeof(5)yearsminimum.
DB+OWastewaterTreatmentPlant 29
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
11Testing
Insertafter(b):
11.4Failureto (c)issuethecommissioningCertificatetotheContractorsubjecttothe
PassTestson payment of the nonperformance damages specified in the Contract
Completionof Data.
DesignBuild
Insert at the end of Sub-Clause:
11.8Joint
InspectionsPrior Not less than thirty (18) months and not more than thirtysix (24)
toContract monthsbeforetheendofthetermoftheProjectaninspectionistobe
Completion madebyanindependentengineermutuallyagreedandjointlyappointed
by AW and the Contractor. The objective of this inspection is to
determinethestateofrepairofthePlantandtheAWProperty,andto
developahandovertransitionplan.Thishandovertransitionplanisto
be made for maintenance work, repairs, replacements etc. that are
necessary to achieve the required minimum 5 year service life after
transferofthePlantandtheAWProperty.Thisassessmentwillbemade
undertheassumptionthatafterthetransferAWcontinuestherepair
andrenewalprogrammeastheContractorwouldhavedone.
WithoutinanywaylimitingtherightsofAW,duringthefinalsixmonths
of this Agreement the AW may make all inspections, tests and/or
appraisalswhichitdeemsappropriatetoverifythegoodworkingorder
andmaintenanceofthePlant.Theappraisalmaysetforthworktobe
doneonthePlanttorenderitinastateandconditioninfullcompliance
with a fit for purpose Plant. The Contractor shall perform such work
beforetheexpirationofthisagreement.
14ContractPrice
andPayment
DeleteSubClause14.2andreplaceby:
14.2Advance NoAdvancePaymentwillbemadebytheEmployer
Payment
DeletethefirstParagraphWhensubmitting..theadvancepayment)
14.3application
forAdvanceand
InterimPayment
Certificates
DB+OWastewaterTreatmentPlant 30
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DeleteSubclause14.5andrenumberthefollowingSubclauses
14.5Asset accordingly.
Replacement
Schedule
Delete(a)theadvancePayment..InterimPaymentCertificate)
14.8Payment
DeleteSubclause14.10andrenumberthefollowingSubclauses
14.10Paymentof accordingly.
RetentionMoney
DeleteSubclause14.11andrenumberthefollowingSubclauses
14.11Application accordingly.
forFinalPayment
Certificate
DesignBuild
DeleteSubclause14.12andrenumberthefollowingSubclauses
14.12Issueof accordingly.
FinalPayment
Certificate
DesignBuild
DeleteSubclause14.18andrenumberthefollowingSubclauses
14.18Asset accordingly.
Replacement
Fund
AddthefollowingSubClausesafterSubClause14.15:
Additionalsub
clauses:
14.16 Employers Representative Liability for Payment Due
Contractor
The relationship between the Employer and the employers
Representative shall not place any liability upon the Employers
RepresentativeforanypaymentduetotheContractorfororinrespect
oftheWorksorotherobligationsoftheContract.
DB+OWastewaterTreatmentPlant 31
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
15Termination
byEmployer
Add the following Sub-Clauses:
AdditionalSub
Clauses
DB+OWastewaterTreatmentPlant 32
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 33
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
IntheeventoftheEmployerenteringintoanyagreementforthe
hire of Contractor's Equipment pursuant to Clause 7, all sums
properly paid by the Employer under the provisions of any such
agreement and all costs incurred by him in entering into such
agreementshallbedeemed,forthepurposeofClause15,tobepart
of the cost of executing and completing the Works and the
remedyingofanydefectstherein.
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
therightsandinterestoftheContractorintheProjectAssetsandthe
TangiblePropertyfreefromallEncumbrancestoAW;
the Contractor shall comply with all other requirements as may be
prescribedunderStatutoryRequirementstocompletethetransferand
assignmentofalltherightsandinterestoftheContractorintheProject
AssetsandtheTangiblePropertyfreefromallEncumbrancestoAW.
The transfer requirements set forth in (a) shall be effected by the
ContractorimmediatelyuponreceiptbyitoftheTerminationPayment
and any other undisputed amount of the proposed Termination
Payment. If the Contractor fails to supply AW with a Termination
PaymentCalculationwithinthe21days,thetransferrequirementsset
forthaboveshall,however,beeffectedbytheContractorimmediately
uponexpirationofsuchperiodoftime.
(b)UponterminationofthisAgreementthetransferrequirementsset
forthaboveshallbeeffectedbytheContractorimmediatelyuponreceipt
byitofthecompensationforOutstandingDebt,EquityCompensation
and Termination Costs. If the Contractor fails to supply AW with a
Termination Payment Calculation within 21 days, the transfer
requirements set forth above shall, however, be effected by the
Contractorimmediatelyuponexpirationofsuchperiodoftime.Forthe
avoidanceofdoubt,thetransferrequirementssetforthaboveshallnot
beeffectedbytheContractorinsuchsituationuntiltheresolutionofany
disputeswithrespecttothepaymentoftheterminationcompensation.
(c)AssoonastheContractor,intheContractor'sopinion,hasconformed
toalltransferrequirementssetoutin(a)andhashandedovertheactual
and constructive possession of the Project Assets and the Tangible
Property to AW, the Contractor shall immediately so notify AW in
writing.
DB+OWastewaterTreatmentPlant 35
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
17Riskallocation
17.13 Use of Employers Accommodation/Facilities
AdditionalSub
Clause TheContractorshalltakefullcareofEmployersFacilitiesand
belongingsfromthedateofuseoroccupationbytheContractoruntil
thedateonwhichsuchuseoroccupationisrevestedintheEmployer.
IfanylossordamagehappenstoanyofEmployersFacilitiesand
belongingswhilsttheContractorisresponsiblefortheircare,arising
fromanycauseotherthanacauseforwhichtheemployeris
responsibleorliable,thecontractorshall,athisowncost,rectifysuch
lossordamagetotheconditionpriortosuchlossordamageoccurring
19Insurance
Add the following Sub-Clauses:
AdditionalSub
Clauses
19.4 Workers Compensation Insurance
WorkersCompensationInsuranceshallcomplywiththefollowing:
(a)TheContractorshallprovideandthereaftermaintainWorker's
CompensationInsurancewithrespecttoandpriortothedeparturefor
overseasemploymentunderthisContractofallemployeeswhoare
hiredoutsidethehostcounty.
(b)TheContractoragreestoprovideemployeeswhoarenotcitizensof,
residentsof,orhiredwithworker'scompensationbenefitsasrequired
bythelawsofthecountryinwhichtheemployeesareworking,orby
lawsoftheemployee'snativecountry,whicheveroffersgreater
benefits,orintheabsenceofsuchlaw,employer'sliabilityinsurance.
(c)Withrespecttoallemployeeswhoarehiredforemployment
outsidethecountryinwhichtheyaretobeemployed,thisinsurance
coverageshallbeprovidedpriortothedepartureforoverseas
employmentunderthisContract.
(d)TheContractorshallinsertaclausesimilarto(a)to(c)above,
includingthissentence,inallpermittedsubcontractsexceptthose
exclusivelyforfurnishingequipmentand/ormaterials.
DB+OWastewaterTreatmentPlant 36
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 37
ArabtechJardaneh
NorthAqabaSTP Volume(1)Bidding&ContractRequirements
ParticularConditionsSection4
DB+OWastewaterTreatmentPlant 38
ArabtechJardaneh
TABLE OF CONTENTS
SECTION 5: SPECIAL CONDITIONS
NO SPECIAL CONDITIONS
The Special Conditions modify or supplement, or both, the Sub-Clauses of the General Conditions and
the Particular Conditions, and shall be read together with these Clauses. In case of conflict or
discrepancy between the Special Conditions, the Particular Conditions and the General Conditions, the
order of preference shall be:
Sub-Clauses in this Special Conditions are numbered consistent with the Sub-Clauses affected in the
General Conditions and the Particular Conditions and therefore may not be sequential. References in the
General Conditions or Particular Conditions to Special Conditions mean this Special Conditions.
Table of Contents
SECTION6:TECHNICALPROPOSALFORM .................................................................... 1
SIGNATURESHEET .......................................................................................................... 2
CompanyDataSheet ........................................................................................................ 4
Affidavit 5
FORMOFAFFIDAVIT........................................................................................................ 6
APPENDICESTOTECHNICALPROPOSAL ..................................................................... 8
1. TPA:APPROXIMATEPERCENTAGEOFSUBCONTRACTEDWORK .................... 8
2. TPB:LISTOFSUBCONTRACTORSNotrequiredwithBid .................................. 9
3. TPC:OUTLINEPROGRAMANDWORKSCHEDULE ........................................... 10
4. TPD:FACILITIESLAYOUTANDOPPORTUNITIESFORFUTUREEXPANSION . 11
5. TPE:CONTRACTORSQUALITYCONTROLPROGRAM ..................................... 12
6. TPF:SAFETYMEASURES ..................................................................................... 13
7. TPG:LANDSCAPINGPLAN .................................................................................. 14
8. TPH:DETAILSOFFIRM(s)PROVIDINGDESIGNENGINEERINGSERVICES ...... 15
9. TPI:DETAILSOFFIRMPROVIDINGOPERATIONANDMAINTENANCE
SERVICES,IFANY ....................................................................................... 16
10. TPJ:OPERATIONANDMAINTENANCEPLAN .................................................... 17
11. TPK:TECHNOLOGYTRANSFERANDTRAININGPLAN ..................................... 18
12. TPL:EQUIPMENTDATAFORMS ......................................................................... 19
EQUIPMENTDATAFORMS ........................................................................................... 20
13. TPM:ORGANIZATIONANDSTAFFING .............................................................. 22
14. TPN:EXCEPTIONSandVARIATIONS .................................................................. 23
SECTION6:TECHNICALPROPOSALFORM
LETTEROFTENDER
TO:AqabaWater,CityofAqaba,HashemiteKingdomofJordan
THE UNDERSIGNED BIDDER, having familiarized itself with the Work required by the Tender
Documents,theSiteswheretheWorkistobeperformedandalllocalcontractingconditionsand
otherfactorsaffectingtheperformanceoftheWork.
HEREBYsubmitsforyourconsiderationthisTechnicalProposalthatincludesallvariations,and
exceptionstothedrawingsandspecificationsincludedwiththeRFP,acompletedescriptionof
equipment data, a complete listing of our design and construction support services, proposed
constructionschedule,proposedqualitycontrolprogram,proposedoperationandmaintenance
program, a listing of our subcontractors and consultants, and all other data and information
listedintheInstructionsforBidders.
The undersigned Bidder declares that it is the intent of this Bidder that the Work shall be
performedgenerallyinaccordancewiththeTenderDocuments.
TheundersignedBidderdeclaresthetotalvalueofsubcontractedworktoanyonesubcontractor
shallnotexceed20percentofthevalueoftheCapitalWorksandthatportionsoftheWorkshall
besubletintheapproximateportionslistedintheattachmentstothisTechnicalProposalForm.
The undersigned declares that this Technical Proposal Form, all appendices, annexes and
attachments,comprisetheTechnicalProposal,asrequiredbytheInstructionstoBidders.
TheundersignedBidderacknowledgesandacceptsthatthisTechnicalProposal,ifacceptedby
theEmployer,formsthebasisfortheFinancialProposal.
The undersigned Bidder further acknowledges and accepts that after acceptance by the
Employer, no portion of the Technical Proposal, including subcontractors, key personnel, and
technicalelements,maybealteredwithoutthewrittenconsentoftheEmployer.Anyunilateral
changesonthepartoftheBidderintheTechnicalProposal,afteracceptanceoftheTechnical
Proposal,maybegroundsfordeterminingtheBidderasnonresponsive.
IntheeventthattheBidderisaconsortiumorJointVenture,theBiddershallsubmitdetailsofall
Individual Team Members and a Power of Attorney form designating the lead member and
indicatingthatallfirmsshallbejointlyandseverallyliabletotheEmployerfortheProposal.
SIGNATURESHEET
(ForaJointVentureorConsortium)
LeadFirmName: ____________________________ (SEAL)
Signatureof
AuthorizedIndividual:__________________________ (SEAL)
BusinessAddress: ____________________________
____________________________
____________________________
(IfanIndividual)
BusinessAddress: ____________________________
____________________________
____________________________
(IfaPartnership)
BusinessAddress: ____________________________
____________________________
____________________________
AttachNamesandAddressesofAllMembersoftheFirmandPowerofAttorney
(IfaCorporation)
BusinessAddress: ____________________________
____________________________
____________________________
____________________________
AttachNamesofPresident,Secretary,Officers,andTreasurer.
(CORPORATESEAL)Attest: ____________________
Secretary
COMPANYDATASHEET
(AttachedtoTechnicalProposalForm)
ProvidethefollowinginformationforanindividualCompanyorallmembersofaConsortiumor
JointVenture.
NameofFirm:
Address:
PlaceofIncorporation(ifdifferent):
TelephoneNo.:
FaxNo.:
ContactPerson:
Position:
EmailAddress:
AFFIDAVIT
AllfirmsshallprovideanAffidavitsignedbylegallyauthorizedsignatoryinaformsimilartothe
one below. Each person signing the Form shall also include a Power of Attorney authorizing
themtosignonbehalfoftheCompany.
FORMOFAFFIDAVIT
Mr./Ms.beingdulysworn,deposesandsaysthat:
[fullname]
(a) He/sheis____________________of________________________(theCompany);
[title] [fullnameoffirm]
(b) [The consortium of which] the Company [is a member] will submit a PROPOSAL and
documents in response to the Request for Proposal issued by the The Hashemite
Kingdom of Jordan, represented by the Ministry of Housing and Construction, for the
developmentof(theProject);WastewaterTreatmentPlantatJdaydetArtouz.
Alt.1(ProspectiveBidderconsistsofonefirm)
(c) The Company is eligible in accordance with the nationality criteria established for the
Projectassetforthintheabovedocuments.
(d) He/she is duly authorized to make the foregoing affidavit and that he/she makes it on
behalfoftheCompany.
(e) He/sheisempoweredtosigntheaffidavitonbehalfoftheCompany
Alt.2(ProspectiveBidderisaconsortiumorJointVenture)
(f) The Company, all other members of the consortium or Joint Venture (JV), and the
consortiumorJVitself,areeligibleinaccordancewiththenationalitycriteriaestablished
fortheProjectassetforthintheabovedocuments,
(g) He/she is duly authorized to make the foregoing affidavit and that he/she makes it on
behalfoftheCompany,allothermembersoftheconsortium,andtheconsortiumitself.
(h) InaccordancewiththerequirementsoftheRFP,weherebyidentify____________asthe
leadmemberoftheconsortiumorJointVenture.
(i) WeunderstandandagreethatallmembersoftheConsortiumorJointVenture(JV)shall
beliablejointlyandseverallytotheAqabaWaterforthePROPOSAL,
Signature:________________________________
Name:________________________________
Title:________________________________
IhaveseenaPowerofAttorneythatstatesthatHe/sheisempoweredtosigntheaffidaviton
behalfoftheCompany(PowerofAttorneyisattached).
Swornbeforemethis________dayof__________2016
Mycommissionexpires:
(Seal):
APPENDICESTOTECHNICALPROPOSAL
1. TPA:APPROXIMATEPERCENTAGEOFSUBCONTRACTEDWORK
TheundersignedBidderproposesthatportionsoftheConstructionworknotperformedbythe
undersignedwillbesubcontractedinthefollowingapproximatepercentages:
DescriptionofWorktobeSubcontracted PercentageofContract
(Addadditionalpagesasrequired)
The undersigned bidder hereby certifies that the total value of Work sublet to any one
subcontractorshallnotexceed20percentofthevalueoftheCapitalWorksincludingthecostof
materialsandequipmentsupplied.
ThetotalvalueofallsubcontractedworkshallnotexceedthelimitsstatedinSubClause4.4of
theParticularConditions.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
2. TPB:LISTOFSUBCONTRACTORS NotrequiredwithBid
Tobeusedwhenapplyingforapprovalof
SubcontractorsafterAwardofContract.
AttachalistofsubcontractorsandtypeofworkhereindicatingtheNameoftheFirm;andfor
Jordanian Contractors if any; the Classification Status; the Contractors Capacity Ceiling and a
statementofcompliancewithalllegalrequirementsinJordan.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
3. TPC:OUTLINEPROGRAMANDWORKSCHEDULE
ProvideaNarrativeOutlineandGeneralworkscheduletoindicatehowtheproposedworkwill
be accomplished within the times specified. Periods for completion of Design, Equipment
acquisition,StartandCompletionofConstructionofspecificitemsandothercriticalitemsshall
behighlighted.Contractorsshalldemonstratehowthetestingprogramwillbeintegratedinthe
overallprogramoftheworksandwhatmeasureswillbetakentoensurethatthetestingresults
areintegratedintothesystemdesign.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
4. TPD:FACILITIESLAYOUTANDOPPORTUNITIESFORFUTUREEXPANSION
Provideaconceptualsketchshowingtheproposedgeneralarrangementsofallfacilitiesandthe
specific layout of the Wastewater Treatment Plant, demonstrating opportunities for future
expansion of the Wastewater Treatment Plant. If the general arrangements provided on the
ConceptDrawingsareacceptabletotheContractorandshallbeutilizedasfaraspossible,thena
statement to this effect will be acceptable along with a schematic layout of the Wastewater
TreatmentPlantsitetodemonstratetheopportunitiesforexpansion.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
5. TPE:CONTRACTORSQUALITYCONTROLPROGRAM
RefertoSection01030ofVolume(III)MinimumTechnicalRequirementsandprovidedetailsof
theQualificationsandExperienceoftheProposedQualityControlManagerandotherstaff;and
anoutlineoftheproposedQualityControlProgramforboththeCapitalWorksandOperation
andMaintenancecomponentsoftheproject.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
6. TPF:SAFETYMEASURES
ProvideinformationonthegeneralizedapproachestosafetythattheContractorwillutilizeand
incorporateinthedesign,constructionandoperationandmaintenanceofthefacilities.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
7. TPG:LANDSCAPINGPLAN
Provide details regarding the proposed landscaping plans at the Wastewater Treatment Plant
Site.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
8. TPH:DETAILSOFFIRM(S)PROVIDINGDESIGNENGINEERINGSERVICES
Provide details of the Firm(s) providing Design Engineering Services for the Project. (Add
additionalpagesuptoamaximumof10pages,asrequired.)
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
9. TPI:DETAILSOFFIRMPROVIDINGOPERATIONANDMAINTENANCESERVICES,IF
ANY
Provide details of the Firm(s) providing Operation and Maintenance Services for the Project.
(Addadditionalpagesuptoamaximumof10pages,asrequired.)
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
10. TPJ:OPERATIONANDMAINTENANCEPLAN
ProvidedetailsofthePreliminaryO&MPlan,whichshallclearlydemonstratetheresourcesand
approach to Operation and Maintenance of the completed facilities. Add additional Pages as
required.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
11. TPK:TECHNOLOGYTRANSFERANDTRAININGPLAN
ProvideadescriptionoftheprogramthattheContractorshallundertaketotraintheEmployers
staffontheoperationandmaintenanceoftheWastewaterTreatmentPlantduringthelastyear
ofOperationServicePeriod.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
12. TPL:EQUIPMENTDATAFORMS
The Bidders shall enter in the spaces provided the names of the manufacturers or suppliers of
equipment,anddescriptiveandengineeringdataforequipmentthatitproposestofurnish.The
requirements for information contained herein are basic requirements and not a full and
inclusivelist.TheBidderisresponsibleforinsuringthatthelistofequipmentiscomplete.This
form shall be supplemented with catalogue information. Additional information shall be
provided as requested by the Employer. Preliminary acceptance of the equipment listed by
manufacturer'snameshallnotinanywayconstituteawaiverofthespecificationscoveringsuch
equipment;finalacceptancewillbebasedonfullconformitywiththeContractDocuments.
Failure to furnish all information requested in the Equipment Data Forms may be cause for
rejectionoftheTechnicalProposal.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
EQUIPMENTDATAFORMS
Item Address
Manufacturer
ControlValves
IsolationValves
CheckValves
PumpMotors
ElectricalControlPanel
MotorControlCentre
CircuitBreakers.
CombinationStarters.
ElectromagneticFlowMeters
UltrasonicFlowMeters
SamplingFridge
Transportable
PHMeasuringDevices
OxygenMeasuringDevices
FlowChartRecorder
CablesandWires
AutomaticControlSystem
Marshallingand
InstrumentationCabinet
LaptopPCAsProgrammable
unit
UninterruptiblePowerSupply
(UPS)
ControlCentreStation
Item Address
Manufacturer
LowVoltageSwitchgears
Electricallyoperated0.4kV
CircuitBreakers
ElectricallyoperatedMotor
Starter
SurgeArresters
PowerFactorCorrection
Capacitors
CoarseScreens
FineScreens
Grit&GreaseRemovalSystem
ParshallFlume
PrimeDieselGenerator
Pumps
GasChlorination/Leak
detection/alarm
DiffusedAerationsystem
Scrapers
SubmersibleMixers
SludgeThickener
Compactors
Classifiers
Penstocks
SlideGates
13. TPM:ORGANIZATIONANDSTAFFING
Provide a narrative description of the organization and staffing arrangements for the Project
withanorganizationalchart.ProvidedetailsforboththeCapitalworksandtheOperationand
Maintenancecomponents.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
14. TPN:EXCEPTIONSANDVARIATIONS
RefertotheInstructionsforBidders.Addadditionalpagesasrequired.
Contractors shall use this appendix to present the supporting information for all proposed
exceptionsandvariations.
The Employer shall review the proposed variations and exceptions and accept them or
otherwise.
NameofFirmorConsortium: ________________________________
AuthorizedSignature : ________________________________
SECTION7:FINANCIALPROPOSALFORM...................................................................... 1
SIGNATURESHEET ............................................................................................................. 3
SCHEDULEOFCONTRACTPRICE ..................................................................................... 5
PRICINGPREAMBLE ........................................................................................................... 5
SCHEDULEOFCONTRACTPRICEFORNORTHAQABASTP ........................................ 7
CapitalCosts..Continued ........................................................................................................................... 8
CapitalCosts..Continued ........................................................................................................................... 9
SUMMARYPAGEFORSCHEDULEOFCONTRACTPRICEFORNORTHAQABASTP 28
APPENDIXTOTENDER ..................................... ERROR! BOOKMARK NOT DEFINED.
FORMOFBIDSECURITY .................................................................................................. 33
FORMOFCOVENANTOFINTEGRITY ............................................................................ 57
DECLERATIONFORPROHIBITEDPAYMENTS .............................................................. 57
PERFORMANCESECURITYDEMANDGUARANTEE ...... ERROR! BOOKMARK NOT
DEFINED.
PERFORMANCESECURITYFIVEYEAROPTIONALOPERATIONALAND
MAINTENANCEREQUIREMENTSDEMANDGUARANTEEERROR! BOOKMARK NOT
DEFINED.
ADVANCEPAYMENTGUARANTEE ................. ERROR! BOOKMARK NOT DEFINED.
SECTION7:FINANCIALPROPOSALFORM
TO: AqabaWater,HashemiteKingdomeofJordan
THEUNDERSIGNEDBIDDERhavingfamiliarizedhimselfwiththeWorkrequiredby
theContractDocuments,theSiteswheretheWorkistobeperformed(includingthe
neighbourhoodsnearthesites),locallabourconditionsandalllaws,regulationsand
otherfactorsaffectingperformanceoftheWork,andhavingsatisfiedhimselfofthe
expenseanddifficultiesattendingperformanceoftheWork.
HEREBYproposesandagrees,ifthisFinancialProposalisaccepted,toenterintoan
Agreement with the Employer on the form included in the Contract Documents to
perform all Works including (1) the assumption of all obligations, duties and
responsibilitiesnecessaryforthesuccessfulcompletionoftheContract;(2)tofurnish
engineeringdesign,drawingsandshopdrawings,plans,transportation,spareparts
and special labour, labour supervision, administration, management, temporary
works, and construction, operation and maintenance services, studies and reports
andutilities,andanyotherancillaryservicesasrequiredtoperformtheWork;(3)to
furnish securities, insurance, and submittals; all as indicated or specified in the
Contract Documents to be performed or furnished by the Contractor for the total
pricesasfollows:
(AllblankspacesontheFinancialProposalFormaretobefilledinbytheBidder)
1) NorthAqabaWastewaterTreatmentPlant
(a) ContractPrice:CapitalCostTotalplusOperationandMaintenanceCostsfor10
yearsasperTableA1includingprovisionalsums.
_______________________________________JD
(Amountinwords)
_______________________________________JD
(Amountinfigures)
TABLEA1
CapitalWorks:Design&ConstructionCostfortheWorks,
1.
Complete.
TOTAL
(b) Fixed and Variable Operation and Maintenance Costs for the ten (10) years
periodasperTableA2
_______________________________________JD
(Amountinwords)
_______________________________________JD
(Amountinfigures)
TABLEA2
1. FixedandOperationCostfortheten(10)yearsperiod
VariableOperation&MaintenanceCostfortheten(10)years
2.
period
TOTAL
1. InsubmittingthisFinancialProposal,theundersignedBidderrepresentsthathehasstudied
carefullyallreportsanddrawingsofphysicalconditionswhichareidentifiedintheContract
Documents and accepts the determination set forth of the extent of the technical data
containedinsuchreportsanddrawingsuponwhichtheBidderisentitledtorely.
2. The undersigned Bidder hereby certifies that he is not included on any list of suspended,
debarred,orineligibleContractors.
3. TheundersignedBiddercertifiesthathemeetsthenationalityrequirementssetforthinthe
ContractDocuments.
4. The undersigned Bidder accepts all of the conditions of the Instructions to Bidders and
agreestoabidebythisFinancialProposalfortheWholeoftheWorksfortheperiodstatedin
theAppendixtoTender,anditshallremainbindingandmaybeacceptedatanytimebefore
theexpirationofthatperiod.
5. UntilaformalContractAgreementispreparedandexecuted,thissignedFinancialProposal
shallconstituteabindingoffer.
6. TheundersignedBidderunderstandsthattheEmployerreservestherighttorejectanyorall
BidsandtowaiveinformalitiesandirregularitiesifitappearsinEmployersbestinterestto
doso.
7. TheundersignedBidderacknowledgesreceiptofthefollowingAddenda(s),whichhavebeen
consideredinpreparationofthisFinancialProposal:
8. TheundersignedBidderdeclaresthathehasvisitedtheSitesoftheWorkandrevieweddata
andhasfamiliarizedhimselfwiththeconditionsaffectingtheWork.
SIGNATURESHEET
(ForaConsortiumorJointVenture)
LeadFirmName: ____________________________ (SEAL)
Signatureof
AuthorizedIndividual:___________________________ (SEAL)
BusinessAddress: ____________________________
____________________________
____________________________
____________________________
(IfanIndividual)
BusinessAddress: ____________________________
____________________________
____________________________
____________________________
(IfaPartnership)
BusinessAddress: ____________________________
____________________________
____________________________
____________________________
AttachNamesandAddressesofallMembersoftheFirmandtherespectivePowersofAttorney
(IfaCorporation)
AttachNamesofPresident,Secretary,Officers,andTreasurer.
(CORPORATESEAL)Attest: ____________________
Secretary
SCHEDULEOFCONTRACTPRICE
PRICINGPREAMBLE
CONTRACTNAME: ___________________________________________
CONTRACTNUMBER: ___________________________________________
1. ThePricingDocumentsconsistofthefollowingdocuments
a) ScheduleofContractPrice
2. In the Schedule of Contract Price the subheadings and item descriptions identify the
work covered by the respective items. The exact nature and extent of the work to be
performedshallbeascertainedbyreferencetotheContract.
ThepricesenteredinthisScheduleshallincludeforallworksshownordescribedinthe
Contractasawholeandforallworksnotdescribedbutapparentasbeingnecessaryfor
the complete and proper execution of the Works unless otherwise stated within the
Contract.
3. ThepricesinsertedintotheScheduleofContractPricebytheTenderershallincludeand
shallbedeemedtoinclude(interalia)thefollowingwhethertheyareseparatelyitemised
orspecificallyreferredtointheScheduleofContractPrice:
a) Allliabilities,obligations,contingenciesandrisksimposedbyeachandeveryone
oftheContractDocuments;
b) StrictcompliancewitheachandeveryprovisionoftheContract;
c) The full cost, overhead and profit of all design, supply, works and services and
everythingnecessaryforthedueexecution,completionandDefectsNotification
PeriodoftheWorks;
d) ThepricesinsertedbytheTenderershallbefullyinclusiveofalltaxes,liabilities,
expenses, Customs and other import duties. The Tenderer shall note where
import duties or taxes are refundable it shall be the responsibility of the
Contractor to pay all such duties and taxes and to seek subsequent repayment
and no liability whatsoever for such duties and taxes or subsequent repayment
shallfallontheEmployer.
4. The prices inserted shall include, but not be limited to Guarantees and Securities,
Insurances,SiteEstablishmentincludingrunningcostsandsitelandrentalcostsand
removal of the Site Establishment, Supervision and staff, all equipment, Facilities
and Vehicles for the Employers Representative and all other requirements as
specifiedintheTenderDocuments.
5. ALumpSumisafixedsumthathasbeenenteredintheScheduleofContractPrice.
TheSumcannotbeamendedordeleted.
6. AnyerrorsintheScheduleofContractPriceoromissionsthereof,shallnotvitiatethe
ContractnorreleasetheContractorfromtheexecutionofthewholeoranypartof
theWorksorfromanyofhisobligationsundertheContract.
7. The Tenderer is cautioned that the completed Schedule of Contract Price shall be
usedforevaluationandbasedontheConditionsofContract,shallalsobeusedto
paytheContractorbasedonmonthlyprogressofthedescribedworks.
8. All Provisional Sums can only be expended in whole or in part at the direction and
discretion of the Engineer in accordance with Clause 13.5 of the Conditions of
Contract.
9. Notwithstandingitems1to7ThepricesinsertedintheScheduleofContractPricefor
Operation and Maintenance of the Works shall deemed to include for all costs
relating to the Operation and Maintenance of the Works inter alia, all supervision,
labour, equipment, materials, chemicals, electricity, fuel, chlorine, lubrications,
greasing,laboratorytesting,routinemaintenance,majormaintenance,specialtools
and all items whatsoever necessary for the Operation and Maintenance of the
Works.
SCHEDULEOFCONTRACTPRICEFORNorthAqabaSTP
(i)CAPITALCOSTS
TotalPrice
Item Description JD
Words Figures
1 PROVISIONALSUM:
1.1 ProvisionalSumforelectricitysupplyfromtheJordanian 50,000.00
commongridexcludingtransformers
ProvisionalSumCarriedtoCapitalCostsTotal
2 PRELIMINARYTREATMENTSYSTEMSincludingdesign,construction,qualitycontrol,supply,thirdpartyqualityassurance/control,erection,
commissioningandperformancetestfor:InfluentDistribution&DiversionChambers,Septageunloadingstation;distributionboxes,Coarse
Screens;FineScreens;Grit&GreaseRemovalSystem;FlowMeasurement(ParshallFlumes),Primarysedimentationtanks;primarysludge
pumps;DistributionchambersandInternalsandReturnPumpsandblowerbuilding.
2.1 InfluentDistributionanddiversionChambers:
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofInfluentdistributionanddiversionChamberCarriedtoSubtotalPreliminaryTreatmentSystem
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
2.2 CoarseScreens:
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofCoarseScreensCarriedtoSubtotalPreliminaryTreatmentSystem
2.3 FineScreens:
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofFinescreensCarriedtoSubtotalPreliminaryTreatmentSystem
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
2.4 Grit&OilRemovalSystem:
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofGrit&GreaseRemovalSystemCarriedtoSubtotalPreliminaryTreatmentSystem
2.5 FlowMeasurement;ParshallFlumes:
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofFlowMeasurement:CarriedtoSubtotalPreliminaryTreatmentSystem
LumpSumofLowLiftPS:CarriedtoSubtotalPreliminary
TreatmentSystem
2.6 SeptageUnLoadingstation
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofSeptageUnLoadingstation:CarriedtoSubtotal
PreliminaryTreatmentSystem
2.7 PrimarySedimentationTanks
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofPrimarySedimentationTanks:Carriedto
SubtotalPreliminaryTreatmentSystem
2.8 PrimarySludgePumps
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofPrimarySludgePumps:CarriedtoSubtotal
PreliminaryTreatmentSystem
2.9 Blowerbuildings
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofBlowerBuildings:CarriedtoSubtotal
PreliminaryTreatmentSystem
2.10 DistributionBoxes
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofPrimarySludgePumps:CarriedtoSubtotal
PreliminaryTreatmentSystem
SubtotalofPreliminaryWastewaterTreatmentPlantCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
3 CONVENTIONAL ACTIVATED SLUDGE SYSTEM including design, construction, quality control, supply, third party quality
assurance/control,erection,commissioningandperformancetestfor:anoxiczones;secondaryclarifiers;Bioreactors:OxidationsDitchesand
Internals; diffused aeration system, Dissolved Oxygen Control and other devices and Weirs with Internals; blowers building , liquor Ps and
WeirswithInternals,RASPumpingStations,WASPumpingStations.
3.1 Anoxiczones
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofAnoxicZonesCarriedtoSubtotalExtendedActivatedSludgeSystem
3.2 SecondaryClarifiers
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,Panels,Protection,
b
Detection,Controls,GroundingandLighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofSecondaryClarifiersCarriedtoSubtotalExtendedActivatedSludgeSystem
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
3.3 BioreactorsOxidationsDitches,DissolvedOxygenControlandWeirswithInternals
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofBioReactorsOxidationsDitches,DissolvedOxygenControlandWeirswithInternalsCarriedtoSubtotal
ExtendedActivatedSludgeSystem
3.4 DiffusedaerationsystemandDissolvedOxygenControlandWeirswithInternals
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofDiffusedaerationsystemCarriedtoSubtotalExtendedActivatedSludgeSystem
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
3.5 ReturnActivatedSludgePumpingStations,WasteActivatedSludgePumpingStations
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,Panels,Protection,
b
Detection,Controls,GroundingandLighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofReturnActivatedSludgePumpingStations,WasteActivatedSludgePumpingStationsCarried
toSubtotalExtendedActivatedSludgeSystem
3.6 LiquorPumpingStation
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,Panels,Protection,
b
Detection,Controls,GroundingandLighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LiquorPumpingStationCarriedtoSubtotalExtendedActivatedSludgeSystem
3.7 BlowerBuildings
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,Panels,Protection,
b
Detection,Controls,GroundingandLighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
BlowerBuildingsCarriedtoSubtotalExtendedActivatedSludgeSystem
SubtotalofConventionalActivatedSludgePumpingStationsCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
4 CHLORINATIONincluding:CylindersRoom;Cl2Cylinders,chlorinefeedlinesforDutyandStandby,autooperatingextractventilationfans
onautoleakdetection,andaudiblevisiblealarmsheatingradiators,Cylindersrunway,4directions3000kgcapacityelectricallydrivenlifting
crane;ChlorinatorsRoom,situationswithautomaticCl2changeoverdevice,dutyandstandbyChlorinatorswithautomaticfeedaccordingto
flowandaccordingtoCl2residue,autooperatingextractventilationfansonautoleakdetection,heatingradiators,andaudiblevisiblealarms
,Cylindersrepairkits,BaffledChlorinationTanksstructure&Internals;DutyandStandbyPumpsandChlorinationsolutiontransfer,metering
equipmentandBaffledChlorineContacttanks,Gasejectorandcheckvalveassembly,Handlingequipmentandsafetydevices,motivewater
(boosterpumps)andallotheraccessoriesandmeasuringdevices
4.1 FullyEquippedChlorinatorsRoom
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
detection,controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofChlorinatorsRoomandSystemCarriedtoSubtotalChlorinationSystem
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
FullyEquippedCylindersRoom,DutyandStandbyPumpsforChlorinationSolutionTransferFlowMeteringandBaffledChlorine
4.2
ContactTanks.
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofCylindersRoom,DutyandStandbyPumpsforChlorinationsolutiontransferandBaffledChlorineContact
Tanks.CarriedtoSubtotalChlorinationSystem
SubTotalofChlorinationSystemCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
EFFLUENTTANKincludingdesign,construction,supply,erection,commissionandtest:FinalEffluentTank&Internalsandpipelinefrom
5
EffluentTanktoexistingreclaimedwatersystempumpsoremergencynaturallagoons.
5.1 EffluentTank&Internals,Pumpsanddischargelinetodisposaltoreclaimedwatersystem/Naturallagoons.
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofEffluentTank&Internals,PumpsandDischargeLinetoDisposalatAdjacentWaterCourseCarriedto
SubtotalFinalEffluentTank
SubTotalofFinalEffluentTankCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
6 NonpotableWATERSYSTEMSforflushingincluding:design,construction,supply,erection,commissionandtest
6.1 NonpotableWATERSYSTEMS
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofNonpotableWATERSYSTEMSCarriedtoSubtotalServiceWaterSystems
SubTotalofServiceWaterSystemCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
SLUDGEHANDLINGSYSTEMincludingdesign,construction,supply,erection,commissionandtest:SludgegravityBeltThickeners,
7 Supernatanttransfertotreatment;Pumptoanaerobicdigester,andWAS&SludgemixingandholdingtanksandSludgeTransferPumpsto
ThickenedSludgeHoldingTanks.
7.1 SludgeThickeners,SupernatantDecanttoTreatment
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofSludgeThickeners,PicketFence,SupernatantDecanttoTreatmentCarriedtoSubtotalSludgeHandling
Systems
7.2 Anaerobicdigestersincludingheatexchanger,boilers,Gasholders,flareandgasequipmenthome
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumforAnaerobicdigestersincludingheatexchanger,boilers,Gasholders,flareandgasequipmenthome
CarriedtoSubtotalSludgeHandlingSystem
SubTotalofSludgeHandlingSystemCarriedtoCapitalCostsTotal
BeltFilterPressIncludingdesign,construction,supply,erection,commissionandtest:structures,,Sludgefeeddistributionpiping,Pumps,
8
Duty/StandbysupernatantliquidPumps,boilerpumpsandpipingtoheadwork.
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofBeltFilterPressCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
SITEWORKSwithintheTreatmentPlaneSiteincluding:allcivilworks,structuralitems,DistributionChambers,roads,pavements,open
9 areas,lighting,ElectricFeedingCables,controlcable,DistributionPanels,sludgedryingyard,stormdrainage,landscaping,andallother
worksforcompletejob.
a CivilWorksincludingallStructuralitems
Equipment,Cabling,Electricaldrives,panels,protection,
b
controls,groundingandlighting
c Instrumentation
MechanicalEquipmentandWorksincludingpipingand
d
Valves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofSiteWorksCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
EmptyingandCleaningNaturalWWTPwithintheTreatmentPlaneSiteincludingbutnotlimitedto:emptyingtheplant,cleaningtheplant,
10
filtersandpumpstoreturnthewatertothereclaimedwatersysteminadditiontoallworksrequiredtocompletejob.
a CivilWorksincludingallStructuralitems
b Equipment,Cabling,Electricaldrives,panels,protection,controls,groundingandlighting
c Instrumentation
d MechanicalEquipmentandWorksincludingpipingandValves
e Inlet,internalandoutletPipingandValves
f Allotherworksforacompleteunits
LumpSumofSiteWorksCarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
11 Generator(s)Building(s)andElectricalBuildingincluding:completeGeneratingSetswithPanels,AutoTransferSwitchAndAlarm
a CivilWorksincludingallStructuralitems
b Drainagesystem
Equipment,Cabling,Electricaldrives,panels,protection,
c
controls,groundingandlighting
d AutomaticChangeover
e Genset(s)operatedbyCIengine
f TelephonesystemWorks
g LiftingCrane
h Allotherworksforacompleteunits
LumpSumofGenerator(s)Building(s)andelectricalBuildingCarriedtoCapitalcostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
12 SCADAincludingdesign,construction,supply,erection,
commissionandtest:centralizedanddecentralized
operation,monitoringandcontrolandmaintenance
programforcivil,electricalandmechanicalequipmentand
works,sparepartslistandinventorylist,computers,printers
andscanners.
LumpSumofSCADACarriedtoCapitalCostsTotal
13 MAINELECTRICSTEPDOWNTRANSFORMER(S)11KV/
0.4KVincludingdesign,construction,supply,erection,
commissionandtest:CivilStructure,Transformer(s),
connectiontotheAutomaticChangeoveratGenerator(s)
andmainSwitchgear(s)
a CivilWorksincludingallStructuralitems
b Drainagesystem
c Fencing
Equipment,Cabling,Electricaldrives,panels,protection,
d
controls,groundingandlighting
e Instrumentation
f Allotherworksforacompleteunits
LumpSumofMainElectricStepdownTransformer(s)CarriedtoCapitalCostsTotal
CapitalCosts..Continued
TotalPrice
Item Description JD
Words Figures
TECHNOLOGYTRANSFERANDTRAININGTHE
14
EMPLOYERS'STAFF
LumpSumTechnologyTransferandTrainingTheEmployers'StaffCarriedtoCapitalCostsTotal
15 VEHICLESFORTHEENGINEERSANDEMPLOYERS'
STAFF
LumpSumofVehiclesfortheEmployersRepresentativeStaffCarriedtoCapitalCostsTotal
16 TAXESANDDUESTOBEFILLEDBYTHECONTRACTOR
LumpSumofTaxesandDuesCarriedtoCapitalCostsTotal
SUMMARYPAGEFORSCHEDULEOFCONTRACTPRICEFORNorthAqabaSTP
(i)CAPITALCOSTS
TotalPrice
Item Description JD
Words Figures
1
PROVISIONALSUM:
2 PRELIMINARYTREATMENTSYSTEMS
3 CONVENTIONALACTIVATEDSLUDGESYSTEM
4 CHLORINATION
5 EFFLUENTTANK
6 NONPOTABLEWATERSYSTEMS
7 SLUDGEHANDLINGSYSTEM
8 BELTFILTERPRESS
9 SITEWORKS
10 EMPTYINGANDCLEANINGNATURALWWTP
GENERATORANDELECTRICALBUILDINGS&
11
EQUIPMENT
12 SCADA
MAINELECTRICSTEPDOWNTRANSFORMER(S)11KV/
13
0.4KV
TECHNOLOGYTRANSFERANDTRAININGTHE
14
EMPLOYERS'STAFF
VEHICLESFORTHEENGINEERSANDEMPLOYERS'
15
STAFF
16 TAXESANDDUESTOBEFILLEDBYTHECONTRACTOR
CAPITALCOSTTOTAL
(ii)FixedandVariableOperationandMaintenanceCostsfortheTENyearsPeriod
TotalPrice
Item Description JD
Words Figures
a.1 TotalFixedOperationandMaintenanceCosts
Year1
TotalVariableOperationandMaintenanceCosts
b.1
Year1
a.2 TotalFixedOperationandMaintenanceCosts
Year2
b.2 TotalVariableOperationandMaintenanceCosts
Year2
a.3 TotalFixedOperationandMaintenanceCosts
Year3
b.3 TotalVariableOperationandMaintenanceCosts
Year3
a.4 TotalFixedOperationandMaintenanceCosts
Year4
b.4 TotalVariableOperationandMaintenanceCosts
Year
a.5 TotalFixedOperationandMaintenanceCosts
Year5
b.5 TotalVariableOperationandMaintenanceCosts
Year5
a.6 TotalFixedOperationandMaintenanceCosts
Year6
b.6 TotalVariableOperationandMaintenanceCosts
Year6
a.7 TotalFixedOperationandMaintenanceCosts
Year7
b.7 TotalVariableOperationandMaintenanceCosts
Year7
a.8 TotalFixedOperationandMaintenanceCosts
Year8
b.8 TotalVariableOperationandMaintenanceCosts
Year8
a.9 TotalFixedOperationandMaintenanceCosts
Year9
b.9 TotalVariableOperationandMaintenanceCosts
Year9
a.10 TotalFixedOperationandMaintenanceCosts
Year10
b.10 TotalVariableOperationandMaintenanceCosts
Year10
FIXEDANDVARIABLEOPERATIONANDMAINTENANCECOSTSforTENYearsPeriodSUBTOTAL
ProfitSum@5%
FIXEDANDVARIABLEOPERATIONANDMAINTENANCECOSTSforTENYearsPeriodTOTAL
BaseMonthlyCharge:
VariableChargeperm3oftreatedwastewater
CONTRACTPRICEFORAQABANORTHWWTP
A CAPITALCOSTTOTAL
B.FIXEDANDVARIABLEOPERATIONANDMAINTENANCECOSTSfortenYears
PeriodTOTALtobecarriedtoFinancialProposalForm
VariableO&MCostsmustbebasedonthefollowingAverageInfluentWastewaterFlows:
ForNorthAqabaWWTP
YearofOperation InfluentWastewaterFlows(m3/d)
Year1(2018) 20,000
Year2(2019) 22,000
Year3(2020) 24,000
Year4(2021) 26,000
Year5(2022) 28,000
Year6(2023) 30,000
Year7(2024) 32,000
Year8(2025) 34,000
Year9(2026) 36,000
Year10(2027) 40,000
SampleFormsforTenderandAgreement
LetterofTender
LetterofAcceptance
ContractAgreement
AgreementforDisputeAdjudicationBoardMembers
AgreementforOperationServiceDisputeAdjudicationBoard
OperatingLicence
SampleformsofSecurityandGuarantee
TenderSecurity
ParentCompanyGuarantee
PerformanceSecurityDemandGuarantee
AdvancePaymentGuarantee
MaintenanceRetentionGuarantee
FORMOFCOVENANTOFINTEGRITY(DECLERATIONFORPROHIBITEDPAYMENTS)
LETTEROFTENDER
NameofContract:
...............................................................................................................................
ContractNo.:
To:
WehaveexaminedtheConditionsofContract,EmployersRequirements,Schedules,
ContractData,andtheattachedAppendicesandAddendaNos
..fortheabovenamedContract.We
haveunderstoodandcheckedthesedocumentsandhaveascertainedthattheycontain
noerrorsorotherdefectsexceptasidentifiedinourTender.Weaccordinglyofferto
design,executeandcompletetheWorksandremedyanddefectsthereinsothattheyare
fitforthepurposesdefinedintheContract,andoperateandmaintainthefacilityunder
licensefromtheEmployerfortheperiodandconformitywithtermsandconditions
containedintheContractforthelumpsumamountof:
(currencyandamountinfigures)
(currencyandamountinwords)
orsuchotheramountasmaybedeterminedinaccordancewiththeContract.
Thisamountismadeupofthefollowingcomponents:
FortheDesignBuildoftheWorks,theamountof:
(currency and amount in
figures)
..
(currency and amount in
words)
FortheOperationService,theamountof:
(currencyandamountin
figures)
..
(currency and amount in
words)
FortheAssetReplacementFund,theamountof:.
(currencyandamountin
figures)
..
(currency and amount in
words)
We agree to abide by this Tender until ...... (date) and it shall remain binding
uponusandmaybeacceptedatanytimebeforethatdate.
If this offer is accepted, we will provide the required performance Security, and
commence and complete the Works, and provide the Operation Service, in accordance
withtheabovenameddocumentsandtheagreedprogramme.
We further undertake, together with the Employer, to jointly appoint the DAB and the
AuditingBodyinaccordancewiththerequirementsoftheContract.
Unless and until a formal Contract Agreement is prepared and executed, this Letter of
Tender, together with your written acceptance thereof, shall constitute a binding
Contractbetweenus.
We understand that you are not bound to accept the lowest or any tender you may
receive.
Signedby: ..
(signature)
Inthecapacityof: ..
Dulyauthorizedtosigntendersforandonbehalfof:
Address:
.
Date:
LETTEROFACCEPTANCE
NameofContract:
...............................................................................................................................
ContractNumber:..
To:
Date:
YourReference:
OurReference:
WethankyouforyourTenderdated....forthedesign,executionand
completionoftheWorkscomprisingtheabovenamedContractandremedyingofdefects
thereinsothattheyarefitforthepurposesdefinedintheContract,andfortheoperation
and maintenance thereof under licence for the period of
.. years, all in conformity with the terms and
conditionscontainedintheContractasamendedbytheattachedMemorandum,signed
bytheyouandourselves.
WehavepleasureinacceptingyourTender(ascorrected/adjustedinaccordancewiththe
Memorandum)fortheAcceptedContractAmountof:
..
(currencyandamountinfigures)
(currencyandamountinwords)
Thisamountismadeupofthefollowingcomponents:
FortheDesignBuildoftheWorks,theamountof:
(currencyandamountinfigures)
..
(currencyandamountinwords)
FortheOperationService,theamountof:
(currencyandamountinfigures)
..
(currencyandamountinwords)
FortheAssetReplacementFund,theamountof:
(currencyandamountinfigures)
..
currencyandamountinwords
InconsiderationofyourproperlyandtrulyperformingtheContract,weagreetopayyou
the Accepted Contract Amount or such other sums to which you may become entitled
underthetermsofContract,atsuchtimesandasprescribedbytheContract.
We acknowledge that this Letter of Acceptance creates a binding Contract between us,
andweundertaketofulfilallourobligationsanddutiesinaccordancewiththetermsof
thisContract.
Signedby: .
(signature)
Forandbehalfof:
Date: .
CONTRACTAGREEMENT
ThisAgreementmadethe..dayof.,20....,
between.(nameofEmployer)
of(addressofEmployer)
(hereincalledtheEmployer),oftheonepart,
and ...(nameofContractor)
of(addressofEmployer)
(hereincalledtheContractor),oftheotherpart,
WhereastheEmployerdesiresthattheWorksknownas
(nameoftheContact)
shouldbedesigned,executedandoperatedbytheContractorandhasacceptedaTender
from the Contractor for the design, execution, completion and operation and
maintenanceoftheseWorks,andtheremedyingofanydefectstherein,
TheEmployerandtheContractoragreeasfollows:
1. In this Agreement, the words and expressions shall have the same meaning as are
respectivelyassignedtothemintheConditionsofContracthereinafterreferredto.
2. Thefollowingdocumentsshallbedeemedtoformandbereadandconstruedasapart
ofthisAgreement:
(a) TheLetterofAcceptancedated
(b) TheLetterofTenderdated..
(c) TheAddendaNos...
(d) TheConditionsofContract
(e) TheEmployersRequirements
(f) ThecompletedSchedules
(g) TheOperatingLicence,and
(h) TheContractorsProposal
3. In consideration of the payments to be made by the Employer to the Contractor as
hereinafter mentioned, the Contractor hereby covenants with the Employer to
design,execute,complete,operateandmaintaintheWorksandremedyanydefects
therein conformity with the provisions of the Contract and the Operating Licence
grantedbytheEmployer.
4. TheEmployerherebycovenantstopaytheContractor,inconsiderationofthedesign,
execution,completion,operationandmaintenanceoftheWorksandtheremedying
ofdefectstherein,theContractPriceatthetimesandinthemannerprescribedby
the Contract, and to grant the Contractor a royaltyfree licence to enable him to
operateandmaintaintheWorksduringtheOperationServicePeriod.
InwitnesswhereofthePartiesheretohavecausedthisAgreementtobeexecutedonthe
dayandyearfirstabovewritten.
AGREEMENTFORDISPUTEADJUDICATIONBOARDMEMBERS
[Allitalicisedtextandanyenclosingsquarebracketsisforuseinpreparingtheformand
shouldbedeletedfromthefinalproduct].
NameofContract:
ThisAgreementmadethedayof.,20,between
NameandaddressofEmployer:
NameandaddressofContractor:..
NameandaddressofDABMember:
WhereastheEmployerandtheContractorhaveenteredintoaContractanddesirejointly
toappointtheabovenamedMembertoactontheDABas[deletewherenotapplicable]
soleadjudicator/oneofthreeadjudicators/chairmanoftheDAB,
AndWhereastheMemberacceptstheappointment.
TheEmployer,ContractorandMemberjointlyagreeasfollows:
6. ThisDisputeAdjudicationAgreementshallbegovernedbythelawof:
Signedby: Signedby:.. Signedby:
(signature) (signature) (signature)
AGREEMENTFOROPERATIONSERVICEDISPUTEADJUDICATIONBOARD
[Allitalicisedtextandanyenclosingsquarebracketsisforuseinpreparingtheformand
shouldbedeletedfromthefinalproduct].
NameofContract:
ThisAgreement madethedayof.,20
,between
NameandaddressofEmployer:
NameandaddressofContractor:
..
NameandaddressofDABMember:
WhereastheEmployerandtheContractorhaveenteredintoaContractanddesirejointly
to appoint the abovenamed Member to act as the sole adjudicator on the Operation
ServiceDABforaperiodoffive(5)yearsfromthedateofthisAgreement.
AndWhereastheMemberacceptstheappointment.
TheEmployer,ContractorandMemberjointlyagreeasfollows:
capacityabovementionedinaccordancewiththetermsofthisDisputeAdjudication
Agreement.
5. TheEmployerandtheContractorjointlyandseverallyundertaketopaytheMemberin
consideration for his acting as the DAB Member as aforementioned in accordance
withthisDisputeAdjudicationAgreement.
6. ThisDisputeAdjudicationAgreementshallbegovernedbythelawof:..
Signedby: Signedby: Signedby:
..
(signature) (signature) (signature)
OPERATINGLICENCE
AideMemoire
TheoperatingLicenceisadocumentwhichisissuedbytheEmployertotheContractorat
the time of issuing the Letter of Acceptance in accordance with the SubClause 1.7
[OperatingLicence]oftheConditionsofContract,althoughitwillnotcomeintoeffectuntil
theissueoftheCommissioningCertificate.
ThepurposeoftheOperatingLicenceistogivetheContractorunhinderedlegalaccessto
theWorksandthefacility,andthelegalrighttooperatethefacilityduringtheOperation
ServicePeriodincompliancewithhisobligationsunderhisContractwiththeEmployer.
Thetermsofthelicencemustensurethatitisroyaltyfreeandisissuedwithoutcosttothe
Contractor. It will automatically come into full force and effect upon the issue of the
CommissioningCertificate,anditshallremaininfullforceandeffectuntiltheissueofthe
ContractCompletionCertificate.
The proposed format and wording of the licence should be included in the tender
documentssotenderersknowhowitwillfunctionduringtheOperationServicePeriod.
The natureandformatoftheOperatingLicencemustclearlydefinetherequirementsof
theEmployerand mustbealegally securecommitment from theEmployertoallowthe
Contractor unhindered access to the facility for the duration of the Operation Service
Period,whateverthenameorstatusofthedocumentwhichtheEmployerprovidesforhis
purpose,all referencesin the Contract to OperatingLicence shall be deemed to refer to
thatdocument.
_________________________________________________________________________
____________
SampleFormsofSecurityandGuarantee
TENDERSECURITY
NameofContract/ContractNo.:
NameandaddressofBeneficiary(theEmployer):.
Wehavebeeninformedthat:..
(nameofTenderer)
(hereinaftercalledthePrincipal)issubmittinganofferfortheabovenamedContractin
responsetoyourinvitation,andtheconditionsofyourinvitationrequirethathisofferis
supportedbyatendersecurity.
AttherequestofthePrincipal,we:
(nameofbank)
herebyirrevocablyundertaketopayyou,theBeneficiary/Employer,anysumorsumsnot
exceedingintotaltheamountof(inwords:)
uponreceiptbyusofyourdemandinwritingandyourwrittenstatement(inthedemand)
statingthat:
(a) thePrincipalhas,withoutyouragreement,withdrawnhisofferthelatesttime
specifiedforitssubmissionandbeforetheexpiryofitperiodorvalidity,or
(b) thePrincipalhasrefusedtoacceptthecorrectionoferrorsinhisofferin
accordancewiththeconditionsofyourinvitation,or
(c) youawardedtheContracttothePrincipalandhehasfailedtocomplywithSub
Clause1.6[ContractAgreement]oftheConditionsofContract,or
(d) youawardedtheContracttothePrincipalandhehasfailedtocomplywithSub
Clause4.2[PerformanceSecurity]oftheConditionsofContract
Anydemandforpaymentmustcontainyoursignature(s)whichmustbeauthenticatedby
your bankers or by a notary public. The authenticated demand and statement must be
receivedbyusatthisofficeonorbefore.(thedate35days
after the expiry of the validity of the Letter of Tender) .,
whenthisguaranteeshallexpireandshallbereturnedtous.
This guarantee is subject to the Uniform Rules for Demand Guarantees, published as
number458bytheInternationalChamberofCommerce,exceptasstatedabove.
. .
(name) (name)
Date:
PARENTCOMPANYGUARANTEE
NameofContract/ContractNo.:
NameandaddressofEmployer:.
(togetherwithsuccessorsandassigns).
Wehavebeeninformedthat:..(nameofContractor)
(hereinaftercalledtheContractor)issubmittinganofferforsuchContractinresponse
toyourinvitation,andthatconditionsofyourinvitationrequirehisoffertobesupported
byaparentcompanyguarantee.
Inconsiderationofyou,theEmployer,awardingtheContracttotheContractor,we
.(nameofparentcompany)
Irrevocablyandunconditionallyguaranteetoyou,asaprimaryobligation,thedue
performanceofalltheContactorsobligationsandliabilitiesundertheContract,including
theContractorscompliancewithallitstermsandconditionsaccordingtotheirtrue
intentandmeaning.
If the Contractor fails to so perform his obligations and liabilities and comply with the
Contract, we will indemnify the Employer against and from all damages, losses and
expenses(includinglegalfeesandexpenses)whicharisefromanysuchfailureforwhich
thecontractorisliabletotheEmployerundertheContract.
This guarantee shall come into full force and effect when the Contract comes into full
forceandeffect.IftheContractdoesnotcomeintofullforceandeffectwithinayearof
thedateofthisguarantee,orifyoudemonstratethatyoudonotintendtoenterintothe
ContractwiththeContractor,thisguaranteeshallbevoidandineffective.Thisguarantee
shall continue in full force and effect until all the Contractors obligations and liabilities
undertheContracthavebeendischarged,whenthisguaranteeshallexpireandshallbe
returnedtous,andourliabilityhereundershallbedischargedabsolutely.
ThisguaranteeshallapplyandbesupplementaltotheContractasamendedorvariedby
theEmployerandtheContractorfromtimetotime.Weherebyauthorizethemtoagree
any such amendment or variation, the due performance of which and compliance with
whichbytheContractorarelikewiseguaranteedhereunder.Ourobligationsandliabilities
under this guarantee shall not be discharged by any allowance of time or other
indulgence whatsoever by the Employer to the Contractor, or by any variation or
suspensionoftheworkstobeexecutedundertheContract,orbyanyamendmentstothe
Contract or to the constitution of the Contractor or the Employer, or by any other
matters,whetherwithorwithoutourknowledgeorconsent.
Thisguaranteeshallbegovernedbythelawofthesamecountry(orotherjurisdiction)as
that which governs the Contract and any dispute under this guarantee shall be finally
settledundertheRulesofArbitrationoftheInternationalChamberofCommercebyone
ormorearbitratorsappointedinaccordancewithsuchRules.Weconfirmthatthebenefit
of this guarantee may be assigned subject only to the provisions for assignment of the
Contract.
Signedby: Signedby:
.. .
(signature) (signature)
. .
(name) (name)
.
.
(positioninparentcompany) (positioninparentcompany)
Date:
PERFORMANCESECURITYDEMANDGUARANTEE
NameofContract/ContractNo.:
NameandaddressofBeneficiary(theEmployer):
Wehavebeeninformedthat:..(nameofContractor)
(hereinaftercalledthePrincipal)isyourcontractorfortheabovenamedContractwhich
requireshimtoobtainaperformancesecurity.
AttherequestofthePrincipal,we:(nameofbank)
undertaketopayyou,theBeneficiary/Employer,anysumorsumsnotexceedingintotal
theamountof(amountinwords:)(the
guaranteedamount)uponreceiptbyusofyourdemandinwritingwithyourwritten
statementstating:
(a) thatthePrincipalisinbreachofhisobligationsunderthecontract,and
(b) therespectinwhichthePrincipalisinbreach.
Anydemandforpaymentmustcontainyoursignature(s)whichmustbeauthenticatedby
your bankers or by a notary public. The authenticated demand and statement must be
receivedbyusatthisofficeonorbefore.(thedate70
daysaftertheexpecteddateissueoftheCommissioningCertificate)(theexpirydate),
whenthisguaranteeshallexpireandbereturnedtous.
We have been informed that the Beneficiary may require the Principal to extend this
guarantee if the Commissioning Certificate has not been issued 28 days prior to such
expiry date and we hereby undertake to extend this guarantee until the date 70 days
after the actual date of issue of the Commissioning Certificate upon receipt of your
writtenstatementadvisingusoftheactualdateofissue,andthatthelateissuewasfor
reasons attributable to the Principal. In such a case, the expiry date shall be adjusted
accordingly.
Thisguaranteeshallbegovernedbythelawsof..,andshall
besubjecttotheUniformRulesforDemandGuarantees,publishedasanumber458by
theInternationalChamberofCommerce,exceptasstatedabove.
PERFORMANCESECURITYSURETYBOND
NameofContract/ContractNo.:
NameandaddressofBeneficiary(theEmployer):
Wehavebeeninformedthat:..(nameofContractor)
(hereinaftercalledthePrincipal)isyourcontractorfortheabovenamedContractwhich
requireshimtoobtainaperformancesecurity.
BythisBond,
(nameandaddressofContractor)
WhoistheContractorundertheabovenamedContract,asPrincipaland
(nameandaddressofGuarantor)
asGuarantor,areirrevocablyheldandfirmlyboundtotheBeneficiaryinthetotalamount
of....
......(amountinwords:.)(theBond
Amount)forthedueperformanceofallthePrincipalsobligationsandliabilityunderthe
abovenamedContract.
TheBondshallbecomeeffectiveontheCommencementDatedefinedintheContract.
Upon default by the Principal to perform any contractual obligation, or upon the
occurrence of any of the events and circumstances listed in SubClause 15.2 of the
ConditionsofContract,theGuarantorshallsatisfyanddischargethedamagessustained
bytheBeneficiaryduetosuchdefault,eventorcircumstances.However,thetotalliability
oftheGuarantorshallnotexceedtheBondAmount.
TheobligationsandliabilitiesoftheGuarantorshallnotbedischargedbyanyallowance
of time or other indulgence whatsoever by the Beneficiary to the Principal, or by any
variationorsuspensionoftheWorkstobeexecutedundertheContract,orbyanyother
matters,whetherwithorwithouttheknowledgeorconsentoftheGuarantor.
Any claim under this Bond must be received by the Guarantor on or before
.
(the date six month after the expected date of issue of the Commissioning Certificate),
(Theexpirydate),whenthisBondshallexpireandbereturnedtotheGuarantor.
ThebenefitsofthisBondmaybeassigned,subjecttotheprovisionsforassignmentofthe
Contract,andsubjecttoreceiptbytheGuarantorofevidenceoffullcompliancewithsuch
provisions.
ThisBondshallbegovernedbythelawsofbeingthesame
country(orotherjurisdiction)asthatwhichgovernstheContract).TheBondincorporates
andbesubjecttotheUniformRulesorContractBonds,publishedasnumber524bythe
InternationalChamberofCommerce,andwordsusedinthisBondshallbearthemeaning
setoutinsuchRules.
Whereas this Bond has been issued by the Principal and the Guarantor on this day of
.,20...
SignatureforandonbehalfofthePrincipal:
.
...
(signature) (signature)
.
(name) (name)
SignatureforandonbehalfoftheGuarantor:
.
(signature) (signature)
.
(name) (name)
ADVANCEPAYMENTGURANTEE
NameofContract/ContractNo.:
NameandaddressofBeneficiary(theEmployer):
Wehavebeeninformedthat:(nameofContractor)
(hereinaftercalledthePrincipal)isyourContractorfortheabovenamedContractand
wishestoreceiveanadvancepayment,forwhichtheContractrequireshimtoobtaina
guarantee.
AstherequestofthePrincipal,we:(nameofbank)
herebyirrevocablyundertaketopayyou,theBeneficiary/Employer,anysumorsumsnot
exceeding in total the amount of (amount in words:
) (the guaranteed amount) upon receipt by us of your
demandinwritingwithyourwrittenstatementstating:
(a) thatthePrincipalhasfailedtorepaytheadvancepaymentinaccordancewiththe
ConditionsofContract,and
(b) theamountwhichthePrincipalhasfailedtorepay.
This guarantee shall become effective upon receipt of the advance payment, or, where
applicable,the first installmentthereof, by the Principal. Such guaranteed amount shall
bereducedbytheamountoftheadvancepaymentrepaidtoyourfromtimetotimeas
evidenced by the Interim Payment Certificates issued under SubClause 14.7 of the
Conditions of Contract. Following receipt by us from the Principal of each Interim
PaymentCertificate,weshallpromptlynotifyyouoftherevisedguaranteedamount.
Anydemandforpaymentmustcontainyoursignature(s)whichmustbeauthenticatedby
your bankers or by a notary public. The authenticated demand and statement must be
received by us at this office on or before (the date 70 days after the expected date of
completionoftheDesignBuild)..
(theexpirydate),whenthisguaranteeshallexpireandbereturnedtous.
Iftheadvancepaymenthasbeenfullyrepaid28dayspriortoexpirydate,weundertake,
uponreceiptofyourwrittendemandandstatementthattheadvancepaymenthasnot
beenrepaid,topayyoutheguaranteedamountwithin28daysofyourdemand.
Thisguaranteeshallbegovernedbythelawsof,andshall
besubjecttotheUniformRulesforDemandGuarantees,publishedasnumber458bythe
InternationalChamberofCommerce,exceptasstatedabove.
Signedby: Signedby:
.. .
(signature) (signature)
. .
(name) (name)
.
.
Date:
MAINTENANCERETENTIONGUARANTEE
NameofContractand/orContractNo.:
NameandaddressofBeneficiary(theEmployer):
Wehavebeeninformedthat:..(nameofContractor)
(hereinaftercalledthePrincipal)isyourcontractorfortheabovenamedContractand
hasbeenchosentoprovideaMaintenanceRetentionGuarantee.
AttherequestofthePrincipal,we:(nameofbank)
herebyirrevocablyundertaketopayyou,theBeneficiary/Employer,anysumorsumsnot
exceeding 5% of the total the amount of all interim payments indicated on interim
paymentcertificatesthathavebeenpresentedtous(theguaranteedamount),subject
to the maximum guaranteed amount of .. (insert maximum amount stated in
theContactData,inwordsandindicatecurrency).
Anydemandpresentedunderthisguaranteeshallbeinwritingandshallbesupportedby
a written statement (whether in the demand itself or in a separate document
accompanyingandreferringtothedemand)stating:
(a) that the Principal has failed to carry out his maintenance obligation(s) under the
ContractafterhavingreceiveddueNotice(asdefinedintheContract)todoso,and
(b) thenatureofsuchfailure(s).
Any demand for payment, and the written statement if in a separate document, must
contain your signature(s) which must be authenticated by your bankers or by a notary
public.Theauthenticateddemandandstatementmustbereceivedbyusatthisofficeon
or before .. (the date 70 days after the expected date of
completionoftheOperationServicePeriod)(theexpirydate),whenthisguaranteeshall
expireandshallbereturnedtous.
We have been informed that the Beneficiary/Employer may require the Principal to
extendthisguaranteeiftheContractCompletionCertificateundertheContracthasnot
beenissuedbythedate28dayspriortosuchexpirydate.Weundertaketopayyousuch
guaranteedamountuponreceiptbyus,withinsuchperiodof28days,ofyourdemandin
writingandyourwrittenstatementthattheContractCompletionCertificatehasnotbeen
issued, for reasons attributable to the Principal, and this guarantee has not been
extended.
Thisguaranteeshallbegovernedbythelawsof..,andshall
besubjecttotheUniformRulesforDemandGuarantees,publishedasnumber758bythe
InternationalChamberofCommerce,exceptasstatedabove.
Signedby: Signedby:
.. .
(signature) (signature)
. .
(name) (name)
Date:
FORMOFCOVENANTOFINTEGRITY
DECLERATIONFORPROHIBITEDPAYMENTS
ToMessrs.:AqabaWater
"We,theundersignedbelow,declare
andcovenantthatneitherwenoranyone,includinganyofourdirectors,employeesoragents,
actingonourbehalfwithdueauthorityorwithourknowledgeorconsent,orfacilitatedbyus,has
engaged,orwillengage,inanyProhibitedPractice(asdefinedbelow)inconnectionwiththe
tenderingprocessorintheexecutionorsupplyofanyworks,goodsorservicesfor[specifythe
contractortenderinvitation](the"Contract")andcovenanttosoinformyouifanyinstanceof
anysuchProhibitedPracticeshallcometotheattentionofanypersoninourorganisationhaving
responsibilityforensuringcompliancewiththisCovenant.
Weshall,forthedurationofthetenderprocessand,ifwearesuccessfulinourtender,forthe
durationoftheContract,appointandmaintaininofficeanofficer,whoshallbeaperson
reasonablysatisfactorytoyouandtowhomyoushallhavefullandimmediateaccess,havingthe
duty,andthenecessarypowers,toensurecompliancewiththisCovenant.
If(i)wehavebeen,oranysuchdirector,employeeoragentactingasaforesaidhasbeen,
convictedinanycourtofanyoffenceinvolvingaProhibitedPracticeinconnectionwithany
tenderingprocessorprovisionofworks,goodsorservicesduringthefiveyearsimmediately
precedingthedateofthisCovenant,or(ii)anysuchdirector,employeeoragenthasbeen
dismissedorhasresignedfromanyemploymentonthegroundsofbeingimplicatedinany
ProhibitedPractice,wegivedetailsofthatconviction,dismissalorresignationbelow,together
withdetailsofthemeasuresthatwehavetaken,orshalltake,toensurethatneitherthis
companynoranyofourdirectors,employeesoragentscommitsanyProhibitedPracticein
connectionwiththeContract[givedetailsifnecessary].
IntheeventthatweareawardedtheContract,wegranttheProjectOwner,theAqabaWater
andauditorsappointedbythem,therightofinspectionofourrecords.
Weaccepttopreservetheserecordsgenerallyinaccordancewithapplicablelawbutinanycase
foratleastsixyearsfromthedateofsubstantialperformanceoftheContract."
ForthepurposeofthisCovenant,
NameofFirmorConsortium: ________________________________
AuthorizedSignature: ________________________________
TABLEOFCONTENTS
CONTRACTAGREEMENTFORM
Article1: DEFINITIONS .............................................................................................. 2
Article2: THEWORK ................................................................................................. 2
Article3: CONTRACTPRICE ...................................................................................... 2
Article4: CONTRACTDOCUMENTS.................................................................... 3
Article5: MISCELLANEOUS................................................................................. 3
Article6 PAYMENTSANDPENALTIES ....................................................................... 4
Article7 EFFECTIVEDATEOFAGREEMNET .............................................................. 5
CONTRACTAGREEMENTFORM
_________________________________________________________________________
______________________________________________________________referred to in these
ContractDocumentsas"Contractor":
THAT WHEREAS in accordance with law, the Employer has caused Bid Documents to be
preparedandaRequestforPROPOSALStobeissued,fortheDesignBuildPlusOperatefor:
NorthAqabaWastewaterTreatmentPlantProject
WHEREAS, the Contractor, in response to the Request For PROPOSALS, has submitted to the
Employer, in the manner, amounts and at the time specified, an original sealed Technical
ProposalandFinancialProposalalongwithsealedcopies;and
WHEREAS,theEmployer,inthemannerprescribedbylaw,haspubliclyopened,examined,and
canvassedtheFinancialProposalssubmitted,andhasdeterminedtheContractortobeonewith
the lowest Comparable Bid Price of those responsive and responsible prequalified Bidders for
theWorkanddulyawardedtotheContractoraContracttherefore,forthesumorsumsnamedin
theBidForm.
NOW,THEREFORE,inconsiderationofthecompensationtobepaidtotheContractorandofthe
mutual agreements herein contained, the parties to these presents have agreed and hereby
agree, the Employer for itself and its successors, and Contractor for itself, himself, herself, or
themselves,andits,his,her,ortheirsuccessorsandassigns,andits,his,herortheirexecutors
andadministrators,asfollows:
ARTICLE1:DEFINITIONS
1.1 InthisAgreementwordsandexpressionsshallhavethesamemeaningsasarerespectively
assignedtothemintheConditionsofContracthereinreferredto.
ARTICLE2:THEWORK
2.1 TheContractorshalldesign,build,complete,operateandmaintaintheWorksinconformity
andinallrespectswiththeprovisionsoftheContract.
ARTICLE3:CONTRACTPRICE
3.2 TheEmployerherebycovenantstopaytheContractor,inconsiderationoftheexecutionand
completion of the Works, operation and maintenance requirements and the remedying of
defects therein, the Contract Price at the times and in the manner prescribed by the
Contract.
ARTICLE4:CONTRACTDOCUMENTS
4.1Thefollowingdocumentsshallbedeemedtoformandbereadandconstruedaspartofthis
agreement:
a. TheLetterofAcceptancedated.
b. TheLetterofTenderdated
c. TheAddendaNos.
d. TheSpecialConditions,ifany
e. TheParticularConditions
f. TheFIDICDesign,BuildandOperateProjects.FirstEdition2008General
Conditions
g. AnyContractualCorrespondenceattachedandboundintotheContract;
h. TheEmployersRequirements(VolumeIIBasisofDesignReportand
VolumeIIIMinimumTechnicalRequirements)
i. TheCompletedSchedules
j. TheOperatingLicense,and
k. TheContractorsProposals.
ARTICLE5:MISCELLANEOUS
5.1 NoassignmentbyapartyheretoofanyrightsunderorinterestintheContractDocuments
willbebindingonanotherpartyheretowithoutthewrittenconsentofthepartysoughtto
bebound,exceptthatmoniesthataredueormaybecomedueunderthisContractmaybe
assignedtoafinancialinstitutionasapartofafinancingarrangementaslongastheyinno
manner affect therights, responsibilitiesand prerogatives of the parties to the Contract;
and,unlessspecificallystatedtothecontraryinanywrittenconsenttoanassignment,no
assignmentwillreleaseordischargetheassignorfromanydutyorresponsibilityunderthe
ContractDocuments.
5.2 TheEmployerandContractoreachbindsitself,itspartners,successors,assignsandlegal
representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, agreements and obligations contained in the
ContractDocuments.
5.3 Severability:Shouldanyprovisionofthisagreementbefoundinvalidorunenforceablebya
court of proper jurisdiction or an arbitral tribunal, such finding shall not invalidate the
remainingprovisionshereof,andsuchremainingprovisionsshallcontinueinfullforceand
effect.
5.4 Upon such finding of invalidity or unenforceability, the Parties shall immediately
renegotiate reasonably and in good faith the provision found to be invalid or
unenforceable,aswellasanyothertermsandprovisionshereof,asnecessarytoachieve
asnearly as possibletheirprocedural,economic,remedialand otherexpectationasset
forth herein, and to mitigate the impacts resultant from such finding of invalidity or
unenforceability.
5.5 Neither Party shall be deemed to have waived any of its rights under this Agreement
by participating in such renegotiation efforts, and may withdraw from same without
prejudice to its rights after a good faith effort to effectuate the purpose of this
Article(5.5).
ARTICLE6 PAYMENTSANDPENALTIES
6.1 The Contractor agrees that the Plant design and operation performance must take into
account the pollution loads stated in Volume IIBasis of Design Report of the tender
documents.
6.2 The Employer agrees that if the raw wastewater quality deteriorates to a level that the
whole biological process failed due to presence of toxic materials, the actual additional
cost incurred by the Contractor for remedy shall be paid by the Employer to the
Contractor. All activities shall be mutually agreed upon prior to starting remedy and all
relatedcostsshallbemutuallyagreedbasedondisclosedratesandamountsforremedies.
6.3 TheContractoragreesthatifthefinished/treatedeffluentofwastewaterqualitydoesnot
meetthelimitvaluesrequirementsstatedinTable3.1inVolumeIIBasisofDesignReport
of the RFP, then costs and charges for Operation and Maintenance, electricity, chlorine
andchemicalsduringthemalfunctionperiodshallbornebytheContractor.
6.4 TheContractoragreesthathisContractpriceincludesforhydraulicandbiologicaltesting
eachunitofthesystematdesigncapacityandthearrangementsrequiredtoprovidethe
designcapacityoftheunit.TheContractoralsoagreesthatremediesrequiredtoachieve
the design capacity shall be to the Employer's approval and shall be born by the
Contractor.
6.5 TheContractoragreesthatwastewaterqualityforinletandoutletofeachtreatmentunit
shall be conducted by an independent laboratory proposed by the contractor and
approved by the Employer. Not withstanding the laboratory available in the WWTP, the
performancetestscostshallbebornebytheContractorandincludedinTenderPrice.
7 ASSIGNMENTANDSECURITY
7.1 Assignment:TheContractormaynot,withoutthepriorwrittenconsentofAWassignor
transfer(i)theAgreement,(ii)anyofitsrightsorobligationshereunder,or(iii)anyofits
assets,otherthancash,deposits,orreceivables,requiredbyitfortheimplementationof
theProject.
7.2 AWmaynot,withoutthepriorwrittenconsentoftheContractorassignortransferthis
Agreementoranyofitsrightorobligationshereunder.
7.3 CreationofSecurity:NotwithstandingtheprovisionsofArticle7.1oranyotherprovision
ofthisAgreement,forthesolepurposeoffinancingthedesign,engineering,
procurement,construction,operationandmaintenanceoftheProject,theContractor
may,uponpriorwrittenapprovalofAWandtotheextentpermissibleunderapplicable
StatutoryRequirements,assignorcreateasecurityinteresttotheFinancier(s)pursuant
totheExpansionDebtfinancingDocumentsinitsrightsandinterestsin,underor
pursuantto(i)thisAgreementor(ii)therevenuesoranyoftherightsorassetsofthe
Contractor,
7.4 TheFinancier(s)rightsinrelationtothesubstitutionoftheContractorshouldbe
approvedbyAW.
ARTICLE8 EFFECTIVEDATEOFAGREEMNET
8.1 TheeffectivedateofthisAgreementshallbethedatethattheContractAgreementis
ratifiedbytheAqabaWater.
IN WITNESS WHEREOF, the parties hereto have signed this Agreement in quintuplicate. One
CounterparteachhasbeendeliveredtotheEmployer,Contractor,andEngineer.Allportionsof
theContractDocumentshavebeensignedoridentifiedbytheEmployerandContractor.
ThisAgreementshallbeeffectiveon______________,2017_________
Contractor Employer
________________________________ _________________________________
________________________________ _________________________________
By_____________________________ By_______________________________
Title___________________________ Title_____________________________
(Seal)___________________________ (Seal)____________________________
Attest___________________________ Attest____________________________
Addressforgivingnotices Addressforgivingnotices