You are on page 1of 29
Ennployers Name YR wae ABS A] CTCI CORPORATION ALSTOM ALSTOM TALIN POWER PLANT RENEWAL PROJECT 2x800MW BOILER UNITS Revision History ev. | Revsion Dale | Created Checked Approved by Deseroton (00 | Bec.10, 2012. Lt LFYUE ZEAENG Foi PO. Mar 2b. 2013 | Tie Le rom Paricpant ALSTOM | = ee: TTT Orainaior ‘Bocurient Type | Pisjeet Decament Code ALSTOM | | Tile, Suite eee MATERIAL REQUISITION FOR FABRICATED Se SUPPORT STEEL ‘AQGS Project Dos. No. ‘TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 n First Issue Dec. 10, 2012 ALSTOM| serve rojet2etoi ster uns |Fe ee O oo Page 2.0f28 Fabricated Support Steel ISSUE RECORD Date Description Prepared by Checked by Approved by 00 Dec.10, 2012 For PO Ju LFYUE ZW. WANG ‘AQGS Project Doo. No. ‘TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 FirstIssue Dec.10, 2012 ALSTOM| roma ronct-zaonmyeaiune |i BoA tool Routine Page 3.0f29 Fabricated Support Stee! Al of the following parts considered as a whole shall comprise this Specification. In case of conflict between any Specification and/or Drawings, the Drawings shall take precedence. Compliance to this specification shall not release the Supplier from following good engineering and industry practices. TABLE OF CONTENTS 1, INTRODUCTION... 2, GENERAL. 3. PLANT DAT: 4. SCOPE OF SUPPLY .. 5, BATTERY LIMITS & EXCLUSIONS... 6, DESIGN REQUIREMENTS 7. FABRICATION REQUIREMENTS. & ERECTION, COMMISSIONING & START-UP REQUIREMENTS. GUARANTEES. 10, QUALITY AND “INSPECTION & TEST” REQUIREMENTS. 11, GENERAL REQUIREMENTS. 12, TRANSMISSION AND HANDLING .. 13, REQUIRED DOCUMENTS. 14, ATTACHMENTS .. ‘AQGS Project Dos. No. TAL Powgsr Plans 100103-0-SW21000-01-STSPE-0001 ALSTOM| renees rns -Deonnr ese uns [FRESE ESO. Material Requisition For 40129 Fabricated Support Steel =e = 4. INTRODUCTION This Material Requisition is divided into three sections. The first section, tem nos. 1 to 9 ‘addresses the technical requirements. The second section, item no. 10 specifies the quality control aspects and the third section, item nos. 11 to 14 lists the document requirements, In case of conflict between any Specification and/or Drawings, the Drawings shall take precedence. PART A - TECHNICAL SECTION 2. GENERAL 24, Scope “This MR (Material Requisition) describes the requirements for supply of materials/equipment listed in section 4. (Scope of supply) “This MR specification covers the requirements for procurement, handling, fabrication, testing, and shipping, It is not intended to provide all the detailed requirements of these processes. The materials included in this specification are not to be construed to represent an exhaustive list of approved materials for equipment. Nelther is the intention of this specification to be selection guide for materials based on corrosion performance in these applications. “The Supplier shall assume sole responsibilty for the design, fabrication, testing, supply and performance of the equipment with accessories, and shall ensure that the equipment with accessories are in conformance with this MR, as well as other documents which form pert of this MR or Purchase Order/Contract Inspections by the Buyer shall not relieve the Supplier in any way of his obligation to maintain @n adequate test, inspection and documentation program of his own, and shall not relieve the Supoler of any obligation under this MR. Furthermore, any inadvertent overlook of deviations from some requirements of this MR shall not constitute @ waiver of these requirements, or of the Supplier's obligation to correct the condition when itis discovered, or of any other obligation under the MR, ‘This MR only states the lowest technical requirement, neither specifying all technical detalls, nor referring to the pertaining code and standard fully. itis the Supplier's responsibilty to ensure that the complete delivery complies with all relevant codes, standards and specifications. ‘The Supplier shall include a list of exceptions and/or clarifications to this specification This list of exceptions shall include the specification reference number, the clause in question, and @ detailed explanation of the deviation. No deviation from this specification and its referenced documents is permissible without documented approval from the Buyer. ‘AQGS Project Doe. No. TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 FirstIssue Dec.10, 2012 ALSTOM | reoous roc manomiyeaie-uni [FREE O50 200 Page 50129 Fabricated Support Steel = Even if the Buyer specifies the quality, material and making of the equipment with accessories, this does not in any way affect the Supplier's guarantee and complete responsibility for the performance. The same applies if the Buyer accepts any changes to the specifications, Conflicts between this MR and any ofits attachments shall be brought to the attention of Buyer for resolution. The Supplier's notice to Buyer must be written, and the Supplier shall take no action on affected items until receiving in writing either, a resolution of the conflict or a specific waiver exempting them from the requirement of this paragraph for each and every conflict. The resolution of such conflicts shall be at the sole discretion of Buyer. Any and all additional costs resulting from such resolutions shall be to the Supplier's account unless the Supplier made written notification prior to the date of the Purchase Order or the conflict occurred as a result of changes made Py Buyer after the date of the Purchase Order. 2.2. Abbreviations — Definitions The following terms used in this specification are defined as follows: Buyer ‘Alstom Technical Services (Shanghai) Co., Ltd, Final Customer | Taiwan Power Company ‘Supplier ‘The Supplier of the Support Stee! ‘Sub-Supplier | Supplier of Equipment and/or Services to Supplier SWFGD ‘Seawater Flue Gas Desulfurization ROC Republic of China Different terminology or definitions may be used in some specification attachments. The Buyer will provide clarification at request of Supplier. Compliance to this specification shall not release the Supplier from following good engineering and industry practices. 2.3. Contract language ‘All documents related to bidding the scope of supply of this Material Requisition andlor to the deployment of the related Purchase Order shall be written in a English Standard technical bulletin sheet can be written in English. ‘AQCS Project Dos. No. ‘TALIN Power Plant 100103-0-8W21000-01-STSPE-0001 I = First Issue Dec. 10, 2012 ALSTOM| rereva rope sie unis [Fue De6d0 208 Page 80129 Fabricated Suppor Steel ae 3. PLANT DATA 3.1. Plant description Taiwan Power Company (TPC) is planning to build two (2) X 800MW coal-fired power generating units for Talin Power Plant Renewal Project. The plant site is selected at Kaohsiung Harbor, which is on southwestern coast of Kaohsiung City in Taiwan. This requisition is for equipment for two (2) units. The Seawater Flue Gas Desulphurization (SWFGD) system will be installed to clean SO2 created during boiler combustion. In a SWFGD system flue gas is scrubbed in an absorber and cleaned from acid gases (S02) by ‘means of an intimate contact with seawater. 3.2. Site conditions See Chapter 14 - Attachments (point 14H) — Site Conditions and Utilities. 33. Utilities See Chapter 14 - Attachments (point 14H) — Site Conditions and Utilties. 4, SCOPE OF SUPPLY 4.4. Fabricated Steel - WBS: 21000 The Scope of Supply with extent of delivery, destination of delivery, and delivery time for prefabricated steel required from Supplier is described in this Material Requisition. Preliminary ‘amount of Steelwork will be given in Contract and from design drawing drawings made by Buyer. 4.2. Steelwork Supply > Steel support for duct work. > Steel support for GGH. > Monorails. > Platforms, walkways, stairs, handrails and ladders. > Shelters. All bolts, washers and nuts for erection of steelwork. v ‘Anchor bolts for foundation. v |AQCS Project, Dos. No. ALIN Power Plant 100103-0-SW21000-01-STSPE-0001 ‘ . First issue De0.10, 2012 ALSTOM | renewal Project-2xs0omw Boiler Units | RO pate 00 / Dee 10, 2012 Material Requisition For Pe Toft Fabricated Support Steel = ie 4.3, Shop Drawing Converting ‘The design drawings shall be interpreted and translated into shop drawing by the Supplier. The shop drawings shall give complete instructions for cutting, punching, drilling, welding, assembling and field erection. ‘The shop drawing design shall be based on workshop fabrication of components to the greatest possible extent, and, care shall be taken tothe difficult space conditions for site erection. This has to be agreed upon with the Buyer. ‘The detail requirements of shop drawing transfer please refer to 100103-0-SW11501-01-CISPE- 0001 5. BATTERY LIMITS & EXCLUSIONS 5.1. Battery limits Not applicable 6.2. Exclusions Structural design, preliminary weight calculations, final stress analysis and detail design drawings will be performed by Buyer. 6. DESIGN REQUIREMENTS 6.1. Design Codes & Standards ‘All codes and standards referred in this section shall form a part of this spectfication. The latest issues of the codes and standards shall apply to all design and fabrication of the steel work. The local codes and regulations from local government or industrial district shall be complied, Including latest published case rulings, interpretations, and addenda in force at the date of award to the ‘Supplier, Should there be any confict inthe reguiations, the stricter regulations shall be adopted Allengineering, fabrication provided by Supplier shall be in accordance with applicable codes and standards, regulations and guides consist of the CNS, R.O.C code, standards and regulations Codes and standards which can ensure higher quality than R.O.C regulation required will also be acceptable. Differences between the standards specified and the proposed alternative standards rust be fully described in writing by the Supplier and submitted to Final Customer engineer at least one and half (1.5) months prior to the day when the Supplier desires the Final Customer engineer's approval. In the event Final Customer engineer determines that such proposed deviations do not ensure equal or higher quality, the Supplier shall fuly comply with R.O.C standards and regulations. "AQGS Project Doc. No. -TALINLFoRa Platt 00103-0-Sw21000-01-STSPE-0001 , is ng | Fietiesue Dec-10, 2012 ALSTOM | renewai Project 2x800MW Boiler Units | pay ;pate 00/ Dec 10, 2012 Material Requisition For Pi 30123 Fabricated Support Stee! = 6.1.1, The structural steel shall be designed, detailed, fabricated and erected in accordance with BTR, DSSSB, CSSSB and the Specfication for Structural Stee! Buildings or the Code of Standard Practice for Steel Buildings and Bridges of the AISC, unless noted otherwise. 6.1.2. Structural steel shall be as defined in the Chinese National Standards (CNS 13612 63262) "Steels for Building Structure” latest edition, and also defined as plate and sheet steel. 6.1.3. The fabrication shall conform to the R.O.C steel code "Design Specification for Steel Structure Building" latest editions and supplements. 6:14. Connections and materials for high-strength steel bolts shall be in accordance with the "Spectfications for Structural Joints Using ASTM A325 type 3 or A490 type 3 Bolts’, latest edition by the Research Council on Riveted and Bolted Structural Joints of the Engineering Foundation. All welding shall be in accordance with the "Structural Welding Code," latest edition, published by AWS, plus any addenda and supplements. 6.4.5. The Supplier is responsible for compliance with all National and Local Building Codes or Laws. G6. Reference is made to Chapter 14 - Attachments (point 140) ~ Civil & Structural Desian Criteria, (point 14R)Requirements of Shop Drawing Transfer and Attachments (point 141) ~ Surface Preparation & Painting of Equipment & Steelwork. 6.1.7. Units of measurement for correspondence, technical schedules, drawings, calculations and other documents shall be in accordance with the International System (Le. metric) of Units (SI). 6.2. Materials Specifications 62.1. Structural Stee! Materials ‘All structural steel members and connection plates (except C type member) unless noted “therwiee shall conform to CNS 13812 63262 SN400C/490C (for t >16mm) or SN400B/4908\ fort 16mm), Channel stringer of stair unless noted otherwise shall conform to CNS 2947 3087 sMi400 or ASTMA36. Base plate unless noted otherwise shall conform to ASTM A36 or ASTM A872 Gr. 50. ther miscellaneous stee! unless noted otherwise shall be ASTM A36/A572 or CNS 2047 3057 ‘SM400/SM490. o Rp \ ‘AQCS Project Doe. No. TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 , a rity | Fest issue Dec. 10, 2012 AALSTOM| renova ret -2aoonw sor Unt | FSGS Das 0.2002 ‘Material Requisition For Page 90f 29 Fabricated Support Steel ‘All materials shall be new; material that have lost effective thickness due to rust or indentation of the surface shall not be used. ‘All steel members shall be new and free from radiation pollution, the Supplier shall provide "No Radiation-Pollution Cerificate” of Structural Steel according to "Notes for Signature of No Raziation- Pollution Certificate’ Committee of Atomic Energy, The Executive Yuan. If Buyer ‘engineer questions the origin of structural steel, Buyer will entrust qualified third-party in radiation reconnaissance and inspection to perform the verification. All additional fees and the cost of remedial action shall be paid by the Supplier in case structural steel incur radiation pollution, on the contrary it wll be paid by Buyer. For details of structural steel shapes and plate, supplier need refer to design drawings by buyer. 6.2.2. Connection 6.2.2.1. Bolting > High strength bolts (H.S.B.) ‘All connection belts shall conform to ASTM A825 type 3 or ASTM A490 type 3 hexgon high strength tension controlled bolts with one ASTM AS63 Gr. DH hexagon nut and one ASTM F436 washer unless otherwise noted. Al botted structural connections shall be slip-crtical type connections unless otherwise noted AIH.S.B. shall be dacrotized and conform to JDIS K 6311 > Machine bolts (M.B.) ASTM A3O7M Gr. A botts shall be used for ladders, siairtreads, handrail posts, etc. AI MLB. shall be HotDip Galvanized, minimum weight of Hot-Dip Galvanized coating 's 300g/m2 > Anchor bolts (A.B.) ‘All anchor bolts shall conform to ASTM A36 or A307 Gr. C, with ASTM A863 Gr. DH heavy hexagon nuts and ASTM F436 washer unless otherwise noted. ‘All anchor bolt shall be Hot-Dip Galvanized, minimum weight of Hol-Dip Galvanized coating Is 300gim2. 6.2.2.2. Welding a : LP 4 AQGS Project Doc. No. CTALIN Power Piatt 100103-0-SW21000-01-STSPE-0001 alee States "Dee 10,2012 ALSTGM| rerevatreies- 2m sot nts | Fetssue Dee 202 Marten For P 10.0f20 Fabricated Support Stee! ae e Welds shall be designed utilizing ES0XX conforming to CNS Z7038 or E7OXX conforming to AWS 'AS.1, Only low-hydrogen type electrodes shall be used. All welding of structural steel may be by the shield metal arc, submerged arc, gas metal arc or flux-cored arc welding processes. ‘The Charpy V-Notch Impact value of welding electrode shall be not less than 27J at -291C for earthquake-resistant steel ‘All unspecified welds shall be continuous filet welds, minimum weld dimension (a-dim) to be Sm, weld must be ground smooth and free of pits and slag inclusions. Field welding symbol identified in the drawings is only for reference, it could be changed according to construction procedure by contractor. Stifen and brace components to prevent bending, warping and damage during shipping and handling 6.2.3. Miscellaneous Steel 6.2.3.1. Purlins and Girts All stee! framing purlins and girts shall conform to CNS G3057 SM400, ASTM A36. 6.2.3.2. Handrails Pipe raling shall be stee! pipe and conform to ASTM AS3 unless noted otherwise, 62.3.3. Kick plates Kick plates shall conform to CNS G3057 SM400 or ASTM A36. 6234. Grating Grating and grating treads shall conform to the requirements of NAAMM Type W-19-4 steel with welded spacer bars. Grating steel shall conform to CNS G3057 SM00 or ASTM A36. Grating stair tread shall have a nosing, The nosing shall be CNS G3057 SM400 or ASTM A36 checkered plate. 6.2.35. Steel Stair ‘The channel stringers of stair shall conform to CNS G3057 SM400 or ASTM A36. 6.2.3.6. Ladder Indoor ladders and cages shall be steel conforming to ASTM A36. Stainless steel SUS 316 material shall be used for outdoor ladders, ‘AQCS Project Doe. No. TAL pene 100103-0-8W21000-01-STSPE-0001 First Issue Dec. 10, 2012 ALSTOM senewa'erjct 2caoomu Boies Unis | Fetissue Bee. 200 Meter! Requistion For P 11 0f 29 Fabricated Support Stee! ai : 6.2.3.7. Checkered plate Checkered plate shall conform to CNS G3057 SM400 or ASTM A36 6.2.3.8. Base Plate Column base plates shall be ASTM A36/A572 solid steel plates. The maximum allowable bearing pressure on foundation shall be in accordance with the AISC specification. 6.2.4. The through-thickness properties of structural steel shall also meet the requirements of R.O.C codes and standards. 625. _ Final customer requirements: See Chapter 14 - Attachments (point 144) — Specification for SWFGD system, and Civil, structural and Architectural work 7. FABRICATION REQUIREMENTS 7A. General Requirements 7.4.1. The structural steel shall be designed, detailed, fabricated and erected in accordance with BTR, DSSSB, CSSSB and the Specification for Structural Steel Buildings or the Code of Standard Practice for Steel Buildings and Bridges of the AISC, unless noted otherwise. (latest editions in effect at time of Purchase Order), 7.4.2. Allwworking points indicated on the design drawings shall be adhered to in the detailing of the Work. 7.13, The Buyer's final Design Drawings shall govern the type of connection to be used, i.e., bolted or welded, Detailing and fabrication shall be in strict accordance with the final Design Drawings. 7.1.4. Connections shall be detailed per Sections 7.3, 7.4, and 7.5 of this Specification. 7.1.5. Allwelding shall be done in accordance with Section 7.6. 7.4.8. Pieces shall be formed to the shapes and sizes shown on the drawings. Shearing and punching shall produce clean, true lines and surfaces. Witers shall be filed smooth and neatly fitted. All cutting, drilling, and welding shall have burrs removed 7.1.7. Ailforming, rolling, and bending shall be done by pressure tools and not by blows. 7.4.8. All bends shall be free of fractures and cracking. ‘AQGS Project ‘Dot. No. “TALI Power Pia 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 ALSTOM| serous eons mooi sien [IN POSTE 2 Material Requisition For 12.0f29 Fabricated Support Stee! os ee 7.1, Torch cutting shall not be permitted on exposed work, or where it may affect tolerances. No holes may be flame cut. Plasma arc is considered flame and is not permitted as @ means to cut holes, (Exception: Anchor bolt holes larger than 26mm diameter may be flame cut in base plates.) All shapes shall be saw cut to length unless otherwise approved in writing by Buyer: 7-140, Unless otherwise specified, hole cutting shall be in accordance with the jatest edition of the AISC Manual of Stee! Construction Section M2.6, Fabrication /Assembly for High Strength Bolted Construction and Specification for Structural Joints Using ASTM A325 type 3 or A490 type 3 Bolts, Section 3(c) Hole Types for Bolted Parts 7.1.11. Compression joints depending upon contact bearing shall have the bearing surfaces prepared to a common plane by milling or sawing, 7.1.12, The Supplier shall provide holes to suit future work and the work of other Sup shown on the Design Drawings. Additionally, fitup holes to be included on al fabricator supplied material for erection purposes. 7.1.13, Substitutions of sections or modifications of design details shall be made only as approved in writing by the Buyer. All design changes proposed By tne Supplier must be Slouded on the field erection and Shop Drawings and bils of material and contain the note: "ALSTOM to verify". TA14, Plate layout shall be accomplished to minimize the number of splices The Supplier shall provide the sizes of all plates to be used in the fabrication of this work with its proposal, The Buyer reserves to its sole discretion the right to reject he use of plate sizes which would result in an excessive number of splices. 7.1.15. Splces resulting in the intersection of four plates at any point are not permitted. The mrinimnum offset of splices in adjoining plates shal be eight (6) times the thickness of the thickest plate at the joint. 7.1.16. Splices shall also not be made under any attachment tothe plate unless shown as such on the Buyer's drawings for whatever reason, or unless they form a part of @ field joint required by the Suppliers shipping imitations and are detalled on the Buyer approved ‘Shop Drawings. 7.1.17. _ Splicing of fat, and rolled, bent and otherwise formed plate in any combination including Recombination with other shapes as a substitute for roled, drawn or otherwise prefabricated structural shapes, pipe, and tubing specified on the project drawings is not permitted even in cases where prefabricated welded or seamed shapes, pipe or tubing are specified unless approved in writing by Buyer. 7.1.18, 7.1.19. 7.1.20. 7A21. 7.4.22. 72. 724 192. 7.23. 724, 125 728. TET ALSTOM | reve roee arom aie nis |e oor bet Doe. No. 100103-0-SW21000-01-STSPE-0001 ‘AQGS Project ‘TALIN Power Plant (00 | Dec 10, 2012 Material Requisition For Page 430129 Fabricated Support Steel Splicing of a member is prohibited unless species on the drawings, means the member shall be cut from one piece, shall not be composed by pieces. Profiles shall be purchased with rounded corners, or treated as above Bolted connections shall be trial fitted in workshop and reported possible with photos, before delivery. ‘The Supplier shall acquaint himself and be familiar with the labor practices, conditions, procedures established and accepted in the building and construction trades industry prevailing n the area and applicable at the job site for the installation of similar types of work. Compliance with this specification does not release the Supplier from following usual and customary industry standards as 2 minimum, Tolerances and Shop Errors Final Design Drawings will not take into consideration normal erection tolerances. The Supplier shall consider such tolerances in his detailing of those items that must fit into ther work and make reasonable allowances for adjustment ofthe parts. Structural members consisting primarily of a single rolled shape shall, unless otherwise specified, be straight within the appropriate tolerances allovied by CNS 13812 63262, or as prescribed below. Built-up structural members fabricated by bolting or welding, nises othernise specified, shall be within the tolerances allowed for the wide flange shapes by CNS 13812 G3262 or by the requirements below Compression members shall not deviate from straightness by more than 4/1000 of the anial length between points which are to be laterally supported. Completed members shall be free from twists, bends, and open joints. Kinks or bends shall be cause for rejection of material. ‘A variation of 0.75mm is permissible in the overall length of members with both ends finished for contact bearing. Members without ends finished for contact bearing, which are te De framed to other stee! parts of the structure, may have a variation from the detailed length not greater than ebmm for members rine (2) meters of less in length and not greater than 3mm for members over nine (9) meters in length. Panels shall not vary more than +0 mm to -Smm from the nominal overall dimensions. 728. 7.29. 7.2.10. 7241 7.2.42. 7.2.13. 7.244. 73. 734 732. 74, TAA 742. ALSTOM | rerewa Project -2x800mW Boiler Units Dos. No. 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 ReviDate 00/ Dec 10, 2012 Page 140f29 ‘AQGS Project TALIN Power Plant Material Requisition For Fabricated Support Stee! Hole centres shall be 41.5 mm and a line of holes shall have a fotal maximum toleranée vets mm between the fist and last hole ofthe line unless ethersise specified In the drawings, In general, tolerances shall favor the underrun condition to allow for drawing and shimming of members. Work which does not conform to the requirements of the Design Drawings, or which misfits, due to the ‘Supplier's fabrication error or failure to allow for reasonable tolerance, shall be corrected at the sole expense of the Supplier. ‘The sum of the combined tolerances of the individual assemblies shall be within + 6mm. (Erection tolerance on overall length, wicth, out-of-plumb, ‘and out-of-shape is : 6mm). Nozzle flanges shall be shop installed to within & 1° plumb and rotation, to within + 3mm ofthe horizontal and vertical design location, and to within + 3mm in stick out. Flatness of the nozzle flanges shall be within + 1.5mm. Rectangular gas handling flange faces shall be held to within + ‘3mm on both lateral dimensions and diagonals at the open end only. “The Supplier shall use AISC "Code of Standard Practice” a8 @ supplement to determine allowable tolerances except as indicated herein and in the design drawings ‘Shop Connections Connections shall be as indicated on the Design Drawings. Shop connections for beams shall be in accordance with the ‘AISC manual and may be bolted or welded connections of equal strength unless otherwise noted on the Design Drawings. Bolted connections shall be made using high strength bolts and nuts (ASTM 14325 type 3 or A490 type 3, as required), with hardened washers Field Connections “The Supplier shall furnish bolts, nuts and washers in accordance with AISC "Code of Standard Practice for Steel Buildings and Bridges.” atest edition, The ‘Supplier shall include sufficient high tensile strength steel bolts, nuts and washers, fit-up bolts and nuts and machine bols of sizes for field connections as designated on shop drawings, plus ten (10) percent extra. Bots of different sizes must be separately packaged and marked, Field Bolt Lists will be prepared on Buyer supplied forms. Unless otherwise shown on the Design Drawings, al feld connections shall be made using high strength bolts (ASTM A325 type 3 or A490 type 3, as required) of the size ‘AGS Project Doe. No. TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 , - Firstissue Dec.10, 2012 ALSTOM | renewal Project-2x800mW Boiler Units | Rey pate 00, Dec 10, 2012 Material Requisition For Pi 150129 Fabricated Support Steel ni fl indicated. ASTM A307 bolts (16mm diameter) may be used for field fitup on sections that are later to be welded. 7.4.3. _ Noconnection shall be made with less than 2 bolts. 7.4.4, No connection shall be made with less than 2 rows of bolts unless noled otherwise in the design drawings. 7.45. _ Field welded connections will be permitted only where indicated on the Design Drawings or where specifically authorized by the Engineer. 7.5. High Strength Bolted Joints 7.5.1. Connection Type {Alljoins using high strength batts shall be considered to be "slp erical type", in which the threads ‘may be in the plane of shear unless otherwise specified in the Design Drawings 7.52. _ Boling Bolt dimensions shall conform to the current requirements of the American National Standards inatitute for Heavy Hex Structural Bolts, ANSI Standard B18.2.1. The length of bolts shall be such that the end of the bolt will be flush wit or outside the face of the nut when property installed {Al high strength bolts shall conform to ASTM A325 type 3 or ASTM A490 type 3 hexagon high strength tension controlled bolts with one ASTM A583 hexagon nut and one ‘ASTM F436 washer unless otherwise noted. ‘Allbolted structural connections shall be slip-rtical type connections unless otherwise noted All HSB. shall be Dacrotized and conform to JDIS K 5311, 7.5.3. Tightening ‘Assemblies using High Strength Botting shall be tightened by one of the folowing methods ‘Tum-of-the-Nut Method in accordance with Section 6.1 Load Indicator Washers in accordance with Section 6,1. and manufacturer's recommendations. 7.54, Faying Surface When assembled, al joint surfaces, including those adjacent to the bolt heads, nuts or washers, shall free of burrs. dit ol, grease, and other foreign material that will prevent solid seating of parts. ‘AQGS Project Dos. No. TALIN Power Plant 100103-0-8W21000-01-STSPE-0001 ' TANPowerPont | vette Desi 2012 ALSTOM| rorews reject 2uconn Bote-Unts | save Des 0202 va Ran Page 16 0f 28 Fabricated Support Steel = In noncoated joints, paint, including any inadvertent overspray, shall be excluded from areas loser than one bolt diameter but not less than 25mm from the edge of any hole and all areas within bolt pattern. Galvanized faying surfaces shall be hot dip galvanized in accordance with ASTM Specification 'A123 and shall be roughed by means of hand wire brushing. Power wire brushing is not permitted. 7.6. Machine Bolt 7.61. ASTM A307M Gr.A M46 machine bolts shall be used for ladders, stair treads, purins, girts, handrail posts and window frames. 7.6.2. _Allmachine bolts shall be hot-dip galvanized and conform to ASTM A153. 77. Welding 774, Applicable welding procedures shall be approved by the Buyer and Fabrication tolerances shall be according to the Buyer's drawings and the ASTM Standards. 7.7.2. _ Allwelding shall be in accordance with Section 6.1 773. Allwelding to be done by welders qualified in accordance with procedures in AWS D1.1 Documentation of welders’ AWS qualification shall be provided to Buyer. 7.1.4. Allwelding shall be performed by one of the following processes: 7.7.44, Shielded Metal-Arc Welding (SMAW) 7.7.4.2. Automatic or manual Submerged Arc Welding (SAW) 7.7.4.3. Gas Metal-Arc Welding (GMAW) (no short arc) 7.7.4.4, Automatic or manual tungsten inert gas shielded arc welding (GTAW) 7.7.45. Limitations regarding the above welding methods are as follows: > Low hydrogen electrodes must be used for shielded metal arc welding. > Alloy fortified flux shall not be used for submerged arc welding of low alloy steels. > Filler metal addition must be used with the gas tungsten arc process. > Short circuit arc welding may not be used to join materials greater than 6mm (1/4 inch) thickness. The process can be used to deposit the root pass and additional weld passes in the root region of butt joints up to a deposited weld metal thickness of 6 mm (1/4 inch). [ul ace ‘AQCS Project Doc: No. TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 ALSTOM | Renewal Project -2xc00mw Boiler Unis | EYStIssue Dec 10, 2012 ReviDate 00 Dec 10, 2012 Material Requisition For Page 17 0f 29 Fabricated Support Stee! 775, 778. 107. 7.78, 779, 77.10. TIM. 7.7.12, 77.13, 78. 784. 782 Cored wire, designed for operation without the use of externally supplied shielding gas (i e. air wire), is not allowed. Such wire is also not to be used with arc shielding gas. All welding materials and workmanship shall conform to the requirements of AWS D1.1 Welding electrodes for use with CNS13812 SN400C/SN490C or SN400B/SN4908 steel shall be of the E7OXX per AWS A5.1 for shielded metal arc welding (SMAW), or similar stress class for other welding methods. Only low-hydrogen type electrodes shall be used to weld high strength steel. Electrode for complete penetration welding shall have 27J@-29 °C charpy v-notch toughness. Weathering series electrode shall be used to weld A242 or A586 steel. Substitutions for material and electrodes must be approved in writing by Buyer. Each weld shall be uniform in width and size through its full length, Each layer of welding shall be smooth and free of siag, cracks, pinholes and undercut, and shall be completely fused to the adjacent weld beads and base metal. In addition, the cover pass shall be free of coarse ripples, high crown, and deep ridges or valleys between beads. Butt welds shall be slightly convex, of uniform height, and have full penetration. Fillet welds shall be of specific size with full throat and the legs of uniform length. Minimum weld dimension is 5mm unless noted otherwise on drawings Repair, chipping or grinding of welds shall be done in such a manner as not to gouge or reduce the base metal thickness. All full penetration welds used to splice structural shapes shall be verified by radiographic testing unless otherwise specified by Buyer. Splicing of shapes, angles, pipes and tubing shall not be permissible except where specifically noted on the design drawings or otherwise approved in writing by the Engineer. Clips, reinforcing pads, gusset plates and similar attachments on the wetted side of the components shall be fully seal welded. Surface Preparation, Painting and Galvanizing All surface preparation, coating and galvanizing will be in strict accordance with Coating Specification 100103-0-SW/11611-00-MESPE-0001 All surfaces where site welding is required shall be masked / taped in a distance of minimum 50 mm from welding area, prior to painting/galvanizing. The masking tape shall be removed immediately after painting/galvanizing is completed, or no later than ALSTOM | Renewat Project—2xe00mw Boiler Units | BNStISSue Dec 10,2012 ‘AQOS Project Doc. No. Tito 100103-0-SW21000-01-STSPE-0001 ReviDate 00/ Dec 10, 2012 Material Requisition For Page 18.0128 Fabricated Support Steel two hours after each layer, prior to delivery of the steelwork, as part of suppliers’ scope of work. The surfaces where site welding will be performed shall be protected by a weldable shop primer as per the requirement stated in the Specification 100103-0- ‘SW11611-00-MESPE-0001. 7.8. Weight Measurement Weight for measurement shall be calculated in accordance with the AISC "Code of Standard Practice for Stee! Buildings and Bridges," latest edition except as follows: All weights shall be calculated on the actual cut size. 7.10. Quality Assurance and Inspection ‘The Supplier shall furnish the Buyer with the following items: 7104 7.10.14 7101.2, 7.10.2. 7.10.21 7.10.2.2. 7.10.23. 7.10.24 7.10.3. Certified Copies of Mill Test Reports Reports shall cover chemical and physical properties of specified steel plates and structural shapes and be submitted prior to fabrication, Additionally, copies of mill test reports shall be provided for all fasteners provided as part of the work. The Supplier shall provide "No Radiation-Pollution Certificate of Structural Steel " according to "Notes for Signature of No Radiation-Pollution Certificate” Committee of Atomic Energy, the Executive Yuen 1995.05.01. If Buyer questions the origin of structural steel, Buyer should invite some person qualified in radiation reconnaissance and inspection to inspect. All additional fees and the cost of remedial action shall be paid by the Supplier in case structural steel incurs radiation pollution, on the contrary it will be paid by Buyer. Qualified Shop Welding Procedures Applicable welding procedures shall be approved by the Buyer. Welder qualification records shall be reviewed and approved by the Buyer. Only qualified welders certified in accordance with the latest applicable sections of AWS shall be employed under these Specifications. Electrode and Flux Combination Certification shall be reviewed and approved by the Buyer. Certified copies and records shall be submitted in accordance with the Documents Requirements in 100103-0-SW21000-01-DCLIS-0001, Supplier shall furnish, without charge, all labor necessary for the Buyer's inspectors and/or Owner's inspectors to gain access to and handle items requiring inspection in the ALSTOM | renewal Project - 2x800mW Boiler Units 7.10.4. 7.10.5. 7.10.6. Dac. No. 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 ReviDate 00/ Dec 10, 2012 Page 19 of 29 |AQCS Project, TALIN Power Plant Material Requisition For Fabricated Support Stee! ‘Supplier's shop. The Buyer, Owner and their agents shall have access for inspection to the Supplier's shop during all stages of fabrication. Buyer must be notified twenty days prior to all shipments for inspection and no shipments are allowed without "Approval or Waiver" by Buyer. Buyer shall have the option to reject any items of material or workmanship that fails to meet the quality standards consistent with this specification, the project drawings, or good fabrication practice. Such rejections shall prohibit shipment or installation of ejected items until such time as Buyer acceptance is obtained. The Supplier shall promptly replace or repair the work without cost to Buyer. Inspection by Buyer or Buyer’s representative does not relieve the Supplier of responsibilty or liability to conform with the requirements of this specification. 8. ERECTION, COMMISSIONING & START-UP REQUIREMENTS 84 8.2, 83. 84, If erection is to be done by the Supplier, Buyer will issue the marking instructions. Steel components prefabricated to be assembled & erected at Site shall be marked for identification. Each section shall be temporarily marked with relevant drawing number and item number. Lifting lugs, lifting beams, spreader bars, monorails and other lifting facilities shall be marked with SWL and orientation of item (North/South etc). They shall be painted yellow or yellow with black stripes unless noted otherwise. Escape routes shall be marked in accordance with safety procedures and painted yellow UNO. Other marking shall be done in accordance with relevant specifications and/or Buyers demands. 9. GUARANTEES ‘The guarantee requirements shall be as specified in the Contract. \\ fy ‘AQCS Project Dos. No. “TALIN Power Plant 100103-0-8W21000-01-STSPE-0001 First issue Dec.10, 2012 ALSTOM] runotrropt-ooniy strum | est Dae 2012 Material Requisition For Page 200f 29 Fabricated Support Steel PART B - QUALITY CONTROL 10. QUALITY AND “INSPECTION & TEST” REQUIREMENTS 10.1. Inspection & Test Requirements 10.1.1. Inspection and test requirements valid for this Contract are specified in the attached documents, 40.1.2. Supplier shall issue and submit, for approval, a specific Supplier QCP (Quality Control Plan), which shall comply with the Buyer's Quality Control Plan for Fabricated Steel. 10.1.3. All materials and assemblies shall be tested, as a minimum, according to the specific Quality Control Plan of Fabricated Steel, which detail the extent of the I&T activities as well as the notification / witnessing / cerfification requirements, 10.1.4. All tests and inspection activities shell be performed in accordance with The Buyer approved Supplier Quality Control Plan. 10.1.5, See Chapter 14 - Attachments (point 14U) ~ Quality Control Plan for Fabricated Steel 40.2. Marking & Tagging 10.2.1. Shall be permanently marked with following information: 1) Supplier's name or initials and identification code 2) Normal size 3) Pressure rating and temperature rating 4) Number and date of selected code 5) Resin and reinforcement type 10.2.2. Kits with adhesive and curing agent, and resins for site lamination joints shall be marked with trade name, supplier name, required storage conditions and date of expiry (or date of production and shelf life). These requirements also apply for spare part kits 10.2.3, Allthe text must be in English. 10.2.4. See Chapter 14 - Attachments (point 14WW) ~Packing and Shipping Instruction 10.3, Packing 10.3.1. All the materialicomponents/equipment shall be suitably packed (boxes and/or crates and/or cages, etc.) and duly protected for handling, transportation and storage purposes. 10.3.2. Adequate lifting lugs, saddles and/or frames shall be provided as necessary and shall be clearly indicated. ‘AQCS Project, Dos. No. TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 Rev/Date 00/ Dec 10, 2012 Page 24 of 29 Renewal Project ~ 2x800MW Boiler Units ‘Material Requisition For Fabricated Support Stee! 10.3.3. 10.3.4. 10.3.5. 10.3.6. 10.3.7. 10.3.8. 10.3.9. 10.3.10. 103.11 10.3.12. 10.3.13, 103.14, 10.3.15. 10.3.16. To facilitate field installation, all equipment shall be shop assembled to the maximum extent practicable, before shipment to the site. The maximum dimensions of the equipment and/or components shall be suitable for land transportation by trucks. Supplier must explicitly highlight need for oversized transport and ask for the Buyer's authorization to ship oversized equipment/components. Special handling instructions shall be visibly displayed on the exterior of the shipment. This shall include storage requirements for all supplier and Sub-supplier furnished equipment. Stacking restrictions must be clearly and indelibly marked on the containers) or item(s) shipped. Pieces and/or components showing the effect of rough handling and/or damage shall be rejected. ‘A packing list, prepared according to the Buyer's instructions, shall accompany the packing itself all along its trip. Shipping shall be as required by the purchase order shipping instructions. ‘See Chapter 14 - Attachments (point 14W) — Packing and Shipping Instruction Similar items purchased under separate Project Account Codes must be packaged and shipped in separate crates or on separate pallets to facilitate shipping. Crates and pallets shall be clearly labelled. NOTE: Where it facilitates shipping, small items that have been property packaged and identified per the above article may be shipped in a single larger package. Where items purchased under one Project Account Code require more than one crate or pallet for packaging, each crate or pallet shall be clearly identified by a number as "X of ye Metal straps, fasteners, or covers shall not be tack welded to any manufactured parts, without acceptance by the Buyer. Plate, tubular products, formed shapes, sheet metal work, and other equipment and material shall be properly loaded to prevent permanent deformation or crimps during transit and unloading ALSTOM | renewai Project -2x800Mw Boller Units 103.17. 10.3.18. 103.19. 10.3.20. 103.21 10.3.2. 10.3.23, Doc. No. 100103-0-8W21000-01-STSPE-0001 First issue Dec.10, 2012 Rev.iDate 00/ Dec 10, 2012 Page 22 of 29 ‘AQGS Project, ‘TALIN Power Plant Material Requisition For Fabricated Support Steel Assembled and internal parts shall be blocked, bolted, or otherwise restrained to prevent movement of and to prevent damage to internal parts where damage could resuit from normal handling during transit, unloading and erection. All flanges, openings, and nozzles shall be protected to prevent damage, corrosion, and entrance of foreign matter during shipment and storage. Special care shall be taken to ensure threaded connections are protected from damages. Covers, enclosures, padding, and other means to minimize corrosion, moisture damage, Physical damage, and accumulation of dirt in equipment during shipment and storage shall be utilized. Any repair, cleaning, or replacement of equipment due to inadequate Protection shall be at the Supplier's expense. Stainless steel and alloy surfaces shall be protected from carbon steel and other contamination. In addition, if stainless steel or alloy is to be handled and shipped, ‘supplier shall submit to buyer for acceptance, provisions for protecting these materials. If rubber materialsfinings are to be handled and shipped, special precautions shall be taken to prevent exposure to sunlight or oll (hydrocarbons), which may degrade the rubber materials. Such procedures and precautions shall be submitted to buyer for review and acceptance. If other non-metallic materials/iinings are to be handled and shipped, special precautions shall be taken to prevent exposure that may degrade the material The supplier shall prepare the equipment for a maximum of one (1) year of storage at the plant site. Primary storage at the plant site will be outdoors, uncovered. If long-term storage activity is required before the equipment is installed, the Supplier shall explain, in a separate document, how to open package, perform preservation activity and close again package. ‘Spare parts, start-up parts, and special tools shall be packaged each in separate packages. ‘AQCS Project Doe. No, ‘TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 | is unis | Fistlssue Dec.10, 2012 ALSTOM | renenaiProject-2xcoonw soir Unis | FISESSIE Dee tO. 2012 Material Requisiton For Page 23 of 29 Fabricated Support Stee! PART C —- DOCUMENTS 41. GENERAL REQUIREMENTS All supplier documents shall include the project front page. All supplier drawings shall use the project drawing template. All documents and drawings shall be identified with an Alstom document number. This document number will be issued to the supplier by Alstom. A document keeps the decument number throughout the project, and receives a new revision code when revised. The document numbers willbe listed in the return SMDL (ATTACHMENT 14E SMDL (Supplier Master Document List) after review and commented by the buyer. 12, TRANSMISSION AND HANDLING 12.1. General 12.4.1. The Supplier shall, if possible, submit documents and drawings by electronic mail Details regarding such submittal must be agreed with Buyer in advance; agreements of encryption and acceptable wrapping/unwrapping programs. 12.1.2. All documents which contain quality records shall be retained for at least 5 years after the date of commercial operation. Other documents which contain information related to administration of contracts shall be retained until 5 years after completion of the Project. 12.4.3. All verifying documents shall be stored in a safe manner by the Supplier. The documents shall be retrievable through a suitable fling system. 42.1.4. The manufacturing documentation shall be stored to the extent necessary in order to enable the Supplier to deliver spare parts or replace delivered equipment, or as agreed 42.1.5. Verifying documentation shall be stored for the warranty period, for at least 2 years. 12.2. Project E-mail/ Transmittals 12.2.1. _All;correspondence including transmitials shall be sent by email to the respective Alstom responsible person with a copy to the project mailbox; ap.talin@power.alstom.com 12.2.2. All Supplier documentation shall be sent by electronic mail to Alstom with a transmittal which identifies each document in the submittal and their revision codes, 12.2.3. Documents and drawings shall be delivered as one file only. 122.4. Allemail subject lines shall be in the form of and begin with ‘AQGS Project Doe. No. ‘TALIN Power Plent 100103-0-SW21000-01-STSPE-0001 Firstissue Dec.10, 2012 ALSTOM | renevarProjct—2reoomweoterunts | Fstlssie Decto,2012 Material Requisition For Pe 24 of 29 Fabricated Support Stee! at p 100103-vender name (abbreviation)-plus subject 12.3, Proprietary Documents 12.3.1. All technical documents, designs, drawings, technical information transmitted to the Buyer by the Supplier are the property of the Buyer. 12.3.2. The Buyer is authorized to use them at his discretion for his own use, for the use of the Engineers and Owner, also for projects other than that of the Order, with the sole ‘exception of the technical information protected by pre-existing patents. 12.3.3. All technical documents, designs, drawings, technical information transmitted to the Supplier by the Buyer or by the Engineers or the Owner are the property of the latter. 12.3.4. The Supplier is not authorized to make copy of them or use them for purposes other than the necessary for the performance of the Order, unless they are already of public knowledge. 12.3.5. Allthe documents shall be returned to the Buyer in good conditions as soon as they are no more needed by the Supplier. 12.3.6. Reference shall be made also to the applicable articles of API General Conditions of ‘Supply, latest edition. 12.4. Responsibility of the Supplier 12.4.1. The approval by the Buyer will not relieve the Supplier from its own responsibilty of ‘good workmanship and correct and proper execution of the contract, 12.42. If any hard copy is required, it shall be submittal addresses: Postal address: ALSTOM K.K. 3-4,Minatojima-nakamachi 2-chome Chuo-ku Kobe, Hyogo, Japan 650-0046 48. REQUIRED DOCUMENTS 13.1. Documentation to be submitted after order award All documents to be issued electronically as specified below. A we ALSTOM | renewal Proiect- 2xc00mw soir Units Material Requisition For ‘AQCS Project TALIN Power Plant Doe, No, 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 Rev/Date 00/ Dec 10, 2012 Page 26 of 29 Fabricated Support Stee! E = Electronic file: MS Word for text documents; MS Excel for tables; step’, “sat”, " sndf’,".iges”, “st”, dng’, ".dwa” for 3D drawings Use of html or other muitiformat document types to be agreed or tested with Buyer in advance. ‘The following documentations and data shall be submitted for acceptance to Buyer within the time indicated below: A ‘Scope and Submission Date afer osu Contract Effectual Date ‘Comments. cumontation weno Sonttact Effectual Date For For Review As Bt srnerspenr cornea enerenemnerenenreerennseel Seeing | COMERS, | RAEN a SUPPLIER MASTER Document list 1 Ponatzed | (Alstom form flled-in) (Attachment 8 WAO 146) List of Codes and Standards ener Ato fF AN nearer Technical Part fee : | Penalized | Fabricated/Shop Drawing xX |4WeTr Penalized | As Built Documentation x 4WAO Quality Part Detailed requirements, please refer ‘to the attached Quality Control Plan eee I, eerseneremyeeeereetetipeelsjenncetmemennnrenrsneleonne ui insbin ii Me | Reference List }4WAO x Cut off per Penaized | Progress Report |20th every month | ‘Supplier Master Document List eee (SMDL) nt month Sub-Supplers Penalized | Production Schedule x 6WAO activities Shall be inouded Penalized | Delivery Batch Table All delivery Penaized [Bill of Lading/Aiway Bill related Penalized | Summary and Detail Packing List documents 4 ‘AQCS Project TALIN Power Plant ALSTOM | renewal Project ~ 2x800MW Boiler Units Material Requisition For Dos. No. Rev.iDate Page 26 of 29, Fabricated Support Stee! 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 00! Dec 10, 2012 ‘Scope and Submission Date after Soniect tomas) De. = “For [ ForReview | AS Bult slr ca nse seaietcsnanncceeennsy REEL cee eee | DCT Penalized | Certificate of Origin shall be Shipment Notification prrwilest according to Shipment Packing Drawing regrie Ba Oversize Goods List requirements Certificate for Transport of Goods De o Penalized | Material Safety Data Sheet (MSDS) RaCan Penalzed | Technical Description of Dangerous AND Goods in Package (By Local C!Q) SHIPPING Certification of Package INSTRUCT! Penalized | Performance for Export Goods (By ONto this Local Cla) wR. Penalized Certification of Dangerous Goods Package (By Local CIQ) Penalized Flash Point for CLASS 3 Fumigation Cerificate ‘Non-Wood Packing Declaration Penalized ‘Custom Clearance Documents Certificate of Ship Classification Penalized Truck Receipt! Warehouse Receipt Penalized ‘Commodity Inspection or Replacement Vouchers. Penalized Photos for Packing, Stuffing, and Loading Certificate of Quality Conformity Comments, ABBREVIATIONS NIA: Not applicable; i.. this document/documentation is not required in this work package Docum jents required for submi marked with the submission date in weeks as follows; Weeks After Firm Order (Contract Effectual Date) WAO = WPTF = Weeks Prior to Fabrication WPTT = — Weeks Prior to Testing WAT = — Weeks After Test jon either for review/comments or for information to Buyer are TAGS Project Do No GABE 100103-0-w21000-01-STSPE-0001 First Issue Dec.10, 2012 ALSTOM | renewal aha 2xG00MW Boller Units | Pose gree 10, 2012 aterial Requisition For a oe Fabricated Support Steel WPI = Weeks Prior to Installation at site WPS = — Weeks Prior to Shipment WPE = — Weeks Prior to Erection WPD = Weeks Prior to Delivery of the Works WAD = — Weeks After Delivery of the Works A penalty on submittal date shall be applied on documents marked with "Penalized" according to P.O. starting from buyer order date. ‘Other documents required elsewhere in this specification or in the attachments to this specification shall be made in the time frame indicated, or if no time frame indicated, in a timely manner. Documents issued by the Supplier as per above list will be commented/approved by the Buyer within 15 Working days from the supplier offical transmittal, Resubmit of documents that have been reviewed by the Buyer and retumed “Not Accepted” or “Accepted as Noted” shall be returned with corrections within 15 days from Buyer transmittal. Drawing size shall be in accordance with ISO A series as follow: AQ, A1, A2, A3, Ad. ‘The Buyer will in the Contract/Purchase Order state in which way he wants the documentation to be identified with project order number, equipment number and other codes for identification. For the documentation/drawings relating to the site installation and erection of equipment, 6 (six) electronic copies (DVD/CD) and 4 (four) hard copies shall be delivered to the buyer office prior to the equipment delivery via air express and 4 (four) hard copies and 6 (six) electric copies (PVDICD) shall be delivered with the equipment together with the O&M Manual. ‘The drawing head, document number and format of final version of drawing/documents shall be in accordance with Buyer's requirement. ‘Transmittal letters shall be used when issuing documents, KKS code will be applied in engineering and the coding rule will be provided by the Buyer. 13.2. Operation & Maintenance manuals 13.2.1. BINDING DETAILS ‘As built drawings, shop drawings and material lists shall be forwarded no later than 15 days after the end fabrication or otherwise advised with Work Package Engineer. ‘AQCS Project Dos: No. TALIN Power Plant 100103-0-SW21000-01-STSPE-0001 First Issue Dec.10, 2012 ALSTOM | renova pe 2eoomieoiaruns |Ftsue Dees0 207 Material Requisition For Page 280129 Fabricated Suppor Stee! _ c An index of all final documentation shall be submitted for approval by Buyer before the final documentation is submitted. The index shall contain electronic file names. Final documentation shall be provided by the supplier in unlocked pdf file format on a CD. In addition, the final docunentation shall be submitted in one hard copy (A4 binder). Material shall not be submitted in loose form but shall be completely fastened together and bound. Documents shall be submitted in Ad format and drawings in A3 All final documentation shall have an as-built revision unless otherwise agreed with Buyer. Supplier shall provide required quantity of sets complete with cover sheets. The O&M Manuals should be side punched and bound in books or hard covers, since they will be incorporated in plant operation and maintenance books, Alll pages of shipping, handling, storage and erection instruction will be in the contractual language (English) and will be A4 standard size. All drawing larger than A4 size will be folded and inserted in individual A4 size transparent plastic pockets/envelopes ‘Supplier shall submit 2 copies of drawings preferably in full size format and 2 copies in A3 format. 44. ATTACHMENTS ISSUER [NUMBER REV |TITLE/ DESCRIPTION ‘SEAWATER SCRUBBING FLUE GAS aaa! res [To PAM EDO ERM. 00 | DESULFURIZATION SYSTEM (SWFGD) | CIVIL, STRUCTURAL AND ARCHITECTURAL | "T0-1-PAA-S0001-00-08 i jeecre 148 146 14D a 14E [Alstom |100103-0-SW21000-01-DCLIS-0001 [00 _ | SMDL (SUPPLIER MASTER DOCUMENT LIST) 14F 146 44H__[Alstom _|100103-0-SW11602-00-MESPE.0001 [02 _| SITE CONDITIONS AND UTILITIES 141 14 { [aK ‘AQCS Project TALIN Power Plant ALSTOM | renewal Projet - 2x800MW Bole: Units Meterial Requisition For Fabricated Support Stee! Dos. No. 100103-0-SW21000-01-STSPE-0001 First issue Oec.10, 2012 ReviDate 00/ Dec 10, 2012 Page 29 0f 29 SURFACE PREPARATION & PAINTING OF tat [atstom |iootos-.sw'1611-00.mEsPE-0001 a [SURFACE PREPARATION & PAINTING OF aM aN 140. Alstom |100103-0-SW11401-01-STDES-0001 00 [DESIGN CRITERIA FOR CIVIL & STRUCTURE 1aP : 140 [Alstom _|100%03-0-Sw21003-07-STBOM-0001 [02 _[BILL OF MATERIAL FOR SUPPORT STEEL REQUIREMENTS OF SHOP DRAWING 14R_ |Aistom |iootas-o-swits01-07-cisPe-o001 [09 | REQUIREM! 78 14 ‘1 [astm oreo swareona-ccer coo fr [GURL CONTROL PLAN FOR SUPPORT 1a 14W _|Aistom —|100703-0-692020-00-GCREP-0002 02 _ | PACKING AND SHIPPING INSTRUCTION 44x [Alstom |100103-0-GS92020-00-QCREP-0001 [02 _ | STORAGE INSTRUCTION 14Y az N/A = not applicable

You might also like