DATE TIME DATA

2011/11/18 21:21 Main power supply Off.


2011/11/18 21:22 Main power supply On.
2011/11/19 02:23 Lead battery discharge test 11.8V in 23 sec
2011/11/20 00:00 Lead battery discharge test 11.8V in 45 sec
2011/11/20 00:15 Defrost End.
2011/11/21 00:00 Lead battery discharge test 11.8V in 56 sec
2011/11/21 07:15 Defrost End.
2011/11/21 07:27 Main power supply Off.
2011/11/21 07:30 Main power supply On.
2011/11/21 10:22 Voltage Surveillance - Max: 510V 63Hz Min: 265V 0Hz
2011/11/21 10:22 Main power supply Off.
2011/11/21 10:36 Main power supply On.
2011/11/22 00:01 Lead battery discharge test 11.8V in 105 sec
2011/11/22 14:17 Defrost End.
2011/11/23 00:03 Lead battery discharge test 11.9V in 212 sec
2011/11/23 23:18 Defrost End.
2011/11/24 00:03 Lead battery discharge test 12.0V in 212 sec
2011/11/24 02:12 Main power supply Off.
2011/11/24 04:46 Main power supply On.
2011/11/24 04:52 Main power supply Off.
2011/11/24 04:53 Main power supply On.
2011/11/25 00:03 Lead battery discharge test 12.0V in 212 sec
2011/11/26 00:03 Lead battery discharge test 12.0V in 212 sec
2011/11/26 03:15 Defrost End.
2011/11/26 14:43 Main power supply Off.
2011/11/26 14:43 Main power supply On.
2011/11/26 21:03 Main power supply Off.
2011/11/26 21:26 Main power supply On.
2011/11/27 02:30 Lead battery discharge test 12.0V in 212 sec
2011/11/28 00:03 Lead battery discharge test 12.1V in 212 sec
2011/11/28 06:19 Defrost End.
2011/11/28 16:14 Main power supply Off.
2011/11/28 23:46 Main power supply On.
2011/11/29 04:49 Lead battery discharge test 12.0V in 212 sec
2011/11/29 15:16 Main power supply Off.
2011/11/29 16:08 Main power supply On.
2011/11/30 00:03 Lead battery discharge test 12.0V in 212 sec
2011/11/30 15:31 Defrost End.
2011/11/30 18:08 Main power supply Off.
2011/11/30 21:24 Main power supply On.
2011/11/30 21:25 New controller setpoint From 0.0F. To 48.0F.
2011/11/30 21:32 New controller setpoint From 48.0F. To 20.0F.
2011/11/30 21:44 FULL PTI STARTED
2011/11/30 21:44 PTI Start.
2011/11/30 21:48 Probe Status.
2011/11/30 22:00 Value Sample - Economizer test 7.7 8.2 8.9 9.2 9.2 9.2 9.2
[A]
2011/11/30 22:04 PTI part 1 end.
2011/11/30 22:22 cdT:018m
2011/11/30 22:51 Probe Status.
2011/11/30 22:51 Defrost Start.
2011/11/30 23:01 Defrost End.
2011/11/30 23:43 pdT:041m
2011/11/30 23:43 PTI End.
2011/11/30 23:43 FULL PTI ENDED : PASSED
2011/11/30 23:43 New correction factors 0.0 0.0 0.0 C 'pt'
2011/11/30 23:43 Trip start activated
2011/12/01 00:29 New controller setpoint From 19.9F. To 58.0F.
2011/12/01 00:29 Defrost Start.
2011/12/01 00:38 Power Off.
2011/12/01 05:08 Main power supply On.
2011/12/01 05:09 Main power supply Off.
2011/12/06 05:17 Main power supply On.
2011/12/06 10:20 Lead battery discharge test 12.1V in 212 sec
2011/12/06 22:13 Temperature log dumped on the retriever port.
2011/12/06 22:14 Event log dumped on the retriever port.
2011/12/06 22:31 Power Off.
2011/12/06 23:33 Main power supply On.
2011/12/07 04:37 Lead battery discharge test 12.1V in 212 sec
2011/12/08 00:03 Lead battery discharge test 12.0V in 212 sec
2011/12/09 00:03 Lead battery discharge test 12.0V in 212 sec
2011/12/09 17:51 Power Off.
2011/12/09 17:52 Main power supply On.
2011/12/10 00:03 Lead battery discharge test 12.0V in 212 sec
2011/12/10 20:28 Main power supply Off.
2011/12/11 00:28 Main power supply On.
2011/12/11 00:29 AlarmNo: 18 Set : POWER SUPPLY PHASE ERROR.
2011/12/11 00:30 AlarmNo: 18 Cleared: POWER SUPPLY PHASE ERROR.
2011/12/11 00:30 Alarm Acknowledge - #18 POWER SUPPLY PHASE ERROR.
2011/12/11 00:31 Power Off.
2011/12/11 00:39 Main power supply On.
2011/12/11 05:42 Lead battery discharge test 12.0V in 212 sec
2011/12/12 00:03 Lead battery discharge test 12.1V in 212 sec
2011/12/12 06:43 Main power supply Off.
2011/12/12 08:50 Main power supply On.
2011/12/13 00:03 Lead battery discharge test 11.9V in 212 sec
2011/12/14 00:01 Lead battery discharge test 11.8V in 76 sec
2011/12/15 00:00 Lead battery discharge test 11.8V in 38 sec
2011/12/16 00:00 Lead battery discharge test 11.8V in 29 sec
2011/12/17 00:02 Lead battery discharge test 11.8V in 121 sec
2011/12/18 00:03 Lead battery discharge test 11.9V in 212 sec
2011/12/18 01:12 Main power supply Off.
2011/12/18 01:29 Main power supply On.
2011/12/19 00:44 Lead battery discharge test 11.8V in 68 sec
2011/12/20 00:26 Lead battery discharge test 11.8V in 63 sec
2011/12/21 00:00 Lead battery discharge test 11.8V in 14 sec
2011/12/22 00:00 Lead battery discharge test 11.8V in 11 sec
2011/12/22 21:36 Main power supply Off.
2011/12/22 22:09 Main power supply On.
2011/12/23 03:10 Lead battery discharge test 11.8V in 32 sec
2011/12/24 00:01 Lead battery discharge test 11.8V in 80 sec
2011/12/25 00:00 Lead battery discharge test 11.8V in 32 sec
2011/12/26 00:00 Lead battery discharge test 11.8V in 30 sec
2011/12/26 17:22 Main power supply Off.
2012/01/10 20:18 Main power supply On.
2012/01/10 20:19 New controller setpoint From 58.0F. To 20.0F.
2012/01/10 20:50 New controller setpoint From 20.0F. To 58.0F.
2012/01/10 20:50 BRIEF PTI STARTED
2012/01/10 20:50 PTI Start.
2012/01/10 20:53 Probe Status.
2012/01/10 20:58 Value Sample - Economizer test 9.1 9.5 10.3 10.7 10.7 10.8
10.8 [A]
2012/01/10 21:04 PTI part 1 end.
2012/01/10 21:04 PTI End.
2012/01/10 21:04 BRIEF PTI ENDED : PASSED
2012/01/10 21:04 New correction factors 0.0 0.0 0.0 C 'pt'
2012/01/10 21:04 Trip start activated
2012/01/10 21:30 Power Off.
2012/01/26 00:18 Main power supply On.
2012/01/26 00:19 Voltage Surveillance - Max: 515V 63Hz Min: 150V 0Hz
2012/01/26 00:19 Power Off.
2012/01/31 23:54 Main power supply On.
2012/02/01 00:00 Voltage Surveillance - Max: 520V 63Hz Min: 485V 0Hz
2012/02/01 04:58 Lead battery discharge test 12.1V in 212 sec
2012/02/01 19:05 Main power supply Off.
2012/02/01 19:07 Main power supply On.
2012/02/01 19:08 Voltage Surveillance - Max: 505V 61Hz Min: 300V 0Hz
2012/02/01 19:08 Power Off.
2012/02/01 21:57 Main power supply On.
2012/02/01 23:19 Temperature log dumped on the retriever port.
2012/02/01 23:19 Event log dumped on the retriever port.
2012/02/02 01:26 Main power supply Off.
2012/02/02 01:37 Main power supply On.
2012/02/02 06:41 Lead battery discharge test 12.0V in 212 sec
2012/02/02 13:01 Main power supply Off.
2012/02/02 14:45 Main power supply On.
2012/02/03 00:04 Lead battery discharge test 12.0V in 212 sec
2012/02/04 00:03 Lead battery discharge test 12.0V in 212 sec
2012/02/05 00:03 Lead battery discharge test 12.0V in 212 sec
2012/02/06 00:03 Lead battery discharge test 12.0V in 212 sec
2012/02/06 03:54 Main power supply Off.
2012/02/06 06:12 Main power supply On.
2012/02/07 00:01 Lead battery discharge test 11.8V in 34 sec
2012/02/08 00:00 Lead battery discharge test 11.8V in 28 sec
2012/02/08 14:05 Main power supply Off.
2012/02/08 15:29 Main power supply On.
2012/02/09 00:00 Lead battery discharge test 11.8V in 24 sec
2012/02/10 00:01 Lead battery discharge test 11.8V in 81 sec
2012/02/10 13:41 Main power supply Off.
2012/02/10 13:42 Main power supply On.
2012/02/11 00:00 Lead battery discharge test 11.8V in 23 sec
2012/02/12 00:46 Lead battery discharge test 11.8V in 36 sec
2012/02/12 11:16 Main power supply Off.
2012/02/23 15:26 Main power supply On.
2012/02/23 15:28 New controller setpoint From 58.0F. To 20.0F.
2012/02/23 16:29 New controller setpoint From 20.0F. To 58.0F.
2012/02/23 16:29 BRIEF PTI STARTED
2012/02/23 16:29 PTI Start.
2012/02/23 16:30 Probe Status.
2012/02/23 16:49 Value Sample - Economizer test 9.0 9.4 10.3 10.9 11.1 11.3
11.4 [A]
2012/02/23 16:57 PTI part 1 end.
2012/02/23 16:58 PTI End.
2012/02/23 16:58 BRIEF PTI ENDED : PASSED
2012/02/23 16:58 New correction factors 0.0 0.0 0.0 C 'nt'
2012/02/23 16:58 Trip start activated
2012/02/23 18:03 Main power supply Off.
2012/02/26 15:13 Main power supply On.
2012/02/26 15:18 Voltage Surveillance - Max: 510V 63Hz Min: 145V 0Hz
2012/02/26 15:18 Main power supply Off.
2012/02/27 23:44 Main power supply On.
2012/02/28 00:00 Voltage Surveillance - Max: 510V 63Hz Min: 435V 0Hz
2012/02/28 04:47 Lead battery discharge test 11.8V in 200 sec
2012/02/28 17:37 Voltage Surveillance - Max: 490V 65Hz Min: 235V 58Hz
2012/02/28 17:37 Power Off.
2012/02/28 17:41 Temperature log dumped on the retriever port.
2012/02/28 17:42 Event log dumped on the retriever port.
2012/02/28 17:59 Main power supply On.
2012/02/29 00:03 Lead battery discharge test 12.0V in 212 sec
2012/03/01 00:01 Lead battery discharge test 11.8V in 66 sec
2012/03/01 06:18 Main power supply Off.
2012/03/01 07:16 Main power supply On.
2012/03/01 14:45 Water Cooled Condenser ON.
2012/03/02 00:03 Lead battery discharge test 12.1V in 212 sec
2012/03/02 11:57 Water Cooled Condenser OFF.
2012/03/03 00:02 Lead battery discharge test 11.8V in 139 sec
2012/03/04 00:03 Lead battery discharge test 12.0V in 212 sec
2012/03/05 00:00 Lead battery discharge test 11.8V in 11 sec
2012/03/05 03:19 Main power supply Off.
2012/03/05 04:23 Main power supply On.
2012/03/06 00:44 Lead battery discharge test 11.8V in 33 sec
2012/03/06 20:18 Main power supply Off.
2012/03/06 20:20 Main power supply On.
2012/03/06 20:20 Voltage Surveillance - Max: 525V 0Hz Min: 520V 0Hz
2012/03/07 00:00 Voltage Surveillance - Max: 520V 63Hz Min: 480V 0Hz
2012/03/07 01:34 Lead battery discharge test 11.8V in 38 sec
2012/03/08 00:00 Voltage Surveillance - Max: 505V 64Hz Min: 475V 58Hz
2012/03/08 00:38 Lead battery discharge test 11.8V in 38 sec
2012/03/08 08:36 Voltage Surveillance - Max: 510V 64Hz Min: 345V 52Hz
2012/03/08 08:35 Main power supply Off.
2012/03/08 23:39 Main power supply On.
2012/03/08 23:41 New controller setpoint From 58.0F. To 0.0F.
2012/03/08 23:41 Voltage Surveillance - Max: 525V 64Hz Min: 495V 0Hz
2012/03/09 00:00 Voltage Surveillance - Max: 520V 64Hz Min: 490V 59Hz
2012/03/09 04:39 Lead battery discharge test 11.8V in 14 sec
2012/03/09 05:30 Voltage Surveillance - Max: 525V 65Hz Min: 380V 59Hz
2012/03/09 05:30 Main power supply Off.
2012/03/09 15:18 Main power supply On.
2012/03/09 16:12 Voltage Surveillance - Max: 525V 64Hz Min: 485V 0Hz
2012/03/09 20:50 Defrost Start.
2012/03/09 21:04 Defrost End.
2012/03/09 21:43 Voltage Surveillance - Max: 525V 65Hz Min: 380V 59Hz
2012/03/09 21:43 Main power supply Off.
2012/03/09 21:44 Main power supply On.
2012/03/10 01:17 Defrost End.
2012/03/10 02:45 Lead battery discharge test 11.8V in 23 sec
2012/03/10 11:16 Defrost End.
2012/03/11 00:59 Lead battery discharge test 11.8V in 48 sec
2012/03/11 02:14 Defrost End.
2012/03/12 00:00 Lead battery discharge test 11.8V in 25 sec
2012/03/12 00:14 Defrost End.
2012/03/12 15:07 Main power supply Off.
2012/03/12 15:18 Main power supply On.
2012/03/13 00:00 Lead battery discharge test 11.8V in 30 sec
2012/03/13 04:14 Defrost End.
2012/03/14 00:53 Lead battery discharge test 12.1V in 212 sec
2012/03/14 09:14 Defrost End.
2012/03/15 00:00 Lead battery discharge test 11.8V in 20 sec
2012/03/15 20:14 Defrost End.
2012/03/16 00:00 Voltage Surveillance - Max: 505V 62Hz Min: 425V 0Hz
2012/03/16 00:03 Lead battery discharge test 12.0V in 212 sec
2012/03/16 08:56 Main power supply Off.
2012/03/16 09:56 Main power supply On.
2012/03/17 00:03 Lead battery discharge test 12.0V in 212 sec
2012/03/17 17:13 Defrost End.
2012/03/17 21:28 Main power supply Off.
2012/03/17 22:08 Main power supply On.
2012/03/18 03:11 Lead battery discharge test 12.0V in 212 sec
2012/03/19 00:03 Lead battery discharge test 12.0V in 212 sec
2012/03/19 17:14 Defrost End.
2012/03/19 19:37 Main power supply Off.
2012/03/19 19:39 Main power supply On.
2012/03/20 00:42 Lead battery discharge test 11.9V in 212 sec
2012/03/20 20:04 Main power supply Off.
2012/03/20 20:43 Main power supply On.
2012/03/21 01:46 Lead battery discharge test 11.9V in 212 sec
2012/03/21 16:50 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2012/03/21 17:32 Power Off.
2012/03/21 17:33 Main power supply On.
2012/03/21 17:33 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2012/03/21 17:33 Main power supply Off.
2012/03/26 16:22 Main power supply On.
2012/03/26 16:23 New controller setpoint From 0.0F. To 20.0F.
2012/03/26 16:23 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2012/03/26 17:25 New controller setpoint From 20.0F. To 57.0F.
2012/03/26 17:26 BRIEF PTI STARTED
2012/03/26 17:26 PTI Start.
2012/03/26 17:27 Probe Status.
2012/03/26 17:45 Value Sample - Economizer test 9.0 9.5 10.4 10.9 11.0 11.0
11.1 [A]
2012/03/26 17:53 PTI part 1 end.
2012/03/26 17:53 PTI End.
2012/03/26 17:53 BRIEF PTI ENDED : PASSED
2012/03/26 17:53 New correction factors 0.0 0.0 0.0 C 'nt'
2012/03/26 17:53 Trip start activated
2012/03/26 19:35 Main power supply Off.
2012/03/30 05:22 SetpView
2012/03/30 19:50 Main power supply On.
2012/03/30 19:57 Main power supply Off.
2012/03/30 20:24 Main power supply On.
2012/03/31 01:28 Lead battery discharge test 12.2V in 212 sec
2012/04/01 00:03 Lead battery discharge test 12.1V in 212 sec
2012/04/02 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/02 20:42 Main power supply Off.
2012/04/02 20:43 Main power supply On.
2012/04/03 01:47 Lead battery discharge test 12.0V in 212 sec
2012/04/03 21:38 Main power supply Off.
2012/04/03 21:38 Main power supply On.
2012/04/04 02:39 Lead battery discharge test 11.8V in 84 sec
2012/04/04 06:32 Main power supply Off.
2012/04/04 07:41 Main power supply On.
2012/04/04 14:26 Main power supply Off.
2012/04/04 15:54 Main power supply On.
2012/04/05 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/06 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/06 03:48 Main power supply Off.
2012/04/06 05:13 Main power supply On.
2012/04/06 13:51 Water Cooled Condenser ON.
2012/04/07 00:03 Lead battery discharge test 12.1V in 212 sec
2012/04/08 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/09 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/09 06:29 Main power supply Off.
2012/04/09 10:56 Main power supply On.
2012/04/09 10:56 Water Cooled Condenser OFF.
2012/04/10 00:01 Lead battery discharge test 11.8V in 94 sec
2012/04/11 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/12 00:03 Lead battery discharge test 12.0V in 212 sec
2012/04/12 20:24 Main power supply Off.
2012/05/02 01:22 Main power supply On.
2012/05/02 01:26 Power Off.
2012/05/03 23:03 Main power supply On.
2012/05/03 23:40 New controller setpoint From 57.0F. To 20.0F.
2012/05/03 23:41 FULL PTI STARTED
2012/05/03 23:41 PTI Start.
2012/05/03 23:42 Probe Status.
2012/05/03 23:46 Value Sample - Economizer test 8.5 8.8 9.5 9.9 10.0 10.0
10.1 [A]
2012/05/03 23:49 PTI part 1 end.
2012/05/04 00:02 cdT:013m
2012/05/04 00:31 Probe Status.
2012/05/04 00:31 Defrost Start.
2012/05/04 00:40 Defrost End.
2012/05/04 01:33 pdT:052m
2012/05/04 01:33 PTI End.
2012/05/04 01:33 FULL PTI ENDED : PASSED
2012/05/04 01:33 New correction factors 0.0 0.0 0.0 C 'nt'
2012/05/04 01:33 Trip start activated
2012/05/04 01:39 New controller setpoint From 19.9F. To 57.0F.
2012/05/04 02:58 Power Off.
2012/05/04 20:54 Main power supply On.
2012/05/04 20:55 Main power supply Off.
2012/05/06 04:35 Main power supply On.
2012/05/06 09:37 Lead battery discharge test 11.8V in 142 sec
2012/05/06 20:20 Power Off.
2012/05/06 20:43 Main power supply On.
2012/05/07 01:44 Lead battery discharge test 11.8V in 56 sec
2012/05/07 13:54 Temperature log dumped on the retriever port.
2012/05/07 13:54 Event log dumped on the retriever port.
2012/05/08 00:01 Lead battery discharge test 11.8V in 94 sec
2012/05/09 00:37 Lead battery discharge test 11.8V in 25 sec
2012/05/10 00:01 Lead battery discharge test 11.8V in 47 sec
2012/05/10 12:20 Main power supply Off.
2012/05/10 15:07 Main power supply On.
2012/05/11 00:00 Lead battery discharge test 11.8V in 29 sec
2012/05/12 00:00 Lead battery discharge test 11.8V in 51 sec
2012/05/13 00:00 Lead battery discharge test 11.8V in 23 sec
2012/05/14 00:00 Lead battery discharge test 11.8V in 57 sec
2012/05/14 12:16 Main power supply Off.
2012/05/14 14:05 Main power supply On.
2012/05/15 00:02 Lead battery discharge test 11.8V in 123 sec
2012/05/16 00:03 Lead battery discharge test 12.1V in 212 sec
2012/05/17 00:03 Lead battery discharge test 12.0V in 212 sec
2012/05/18 00:03 Lead battery discharge test 12.0V in 212 sec
2012/05/18 18:21 Main power supply Off.
2012/05/25 15:04 Main power supply On.
2012/05/25 15:17 New controller setpoint From 57.0F. To 20.0F.
2012/05/25 15:18 Main power supply Off.
2012/05/25 15:19 Main power supply On.
2012/05/25 15:19 Voltage Surveillance - Max: 525V 0Hz Min: 510V 0Hz
2012/05/25 15:41 Voltage Surveillance - Max: 525V 60Hz Min: 420V 0Hz
2012/05/25 15:41 Main power supply Off.
2012/05/25 15:42 Main power supply On.
2012/05/25 16:30 BRIEF PTI STARTED
2012/05/25 16:30 PTI Start.
2012/05/25 16:32 Probe Status.
2012/05/25 16:50 Value Sample - Economizer test 9.0 9.5 10.4 11.1 11.2 11.2
11.3 [A]
2012/05/25 16:58 PTI part 1 end.
2012/05/25 16:58 PTI End.
2012/05/25 16:58 BRIEF PTI ENDED : PASSED
2012/05/25 16:58 New correction factors 0.0 0.0 0.0 C 'nt'
2012/05/25 16:58 Trip start activated
2012/05/25 17:54 Voltage Surveillance - Max: 510V 62Hz Min: 210V 0Hz
2012/05/25 17:54 Main power supply Off.
2012/05/25 17:55 Main power supply On.
2012/05/25 17:55 Voltage Surveillance - Max: 525V 0Hz Min: 515V 0Hz
2012/05/25 18:49 New controller setpoint From 20.0F. To 57.0F.
2012/05/25 18:52 Voltage Surveillance - Max: 535V 61Hz Min: 255V 0Hz
2012/05/25 18:52 Main power supply Off.
2012/05/29 03:00 Main power supply On.
2012/05/29 03:00 Main power supply Off.
2012/05/30 07:32 Main power supply On.
2012/05/30 11:29 Main power supply Off.
2012/05/30 11:30 Main power supply On.
2012/05/30 13:27 Main power supply Off.
2012/05/30 13:56 Main power supply On.
2012/05/30 13:56 Main power supply Off.
2012/05/30 17:45 Main power supply On.
2012/05/30 18:38 Main power supply Off.
2012/05/30 20:17 Main power supply On.
2012/05/30 23:53 Main power supply Off.
2012/05/30 23:54 Main power supply On.
2012/05/31 01:11 Main power supply Off.
2012/05/31 01:11 Main power supply On.
2012/05/31 06:15 Lead battery discharge test 12.0V in 212 sec
2012/05/31 20:02 Voltage Surveillance - Max: 505V 61Hz Min: 220V 0Hz
2012/05/31 20:02 Main power supply Off.
2012/06/01 01:22 Main power supply On.
2012/06/01 03:18 Main power supply Off.
2012/06/01 04:13 Main power supply On.
2012/06/01 09:17 Lead battery discharge test 11.9V in 212 sec
2012/06/01 15:38 Main power supply Off.
2012/06/01 16:04 Main power supply On.
2012/06/02 00:03 Lead battery discharge test 12.1V in 212 sec
2012/06/03 00:03 Lead battery discharge test 12.1V in 212 sec
2012/06/04 00:03 Lead battery discharge test 12.1V in 212 sec
2012/06/04 09:34 Main power supply Off.
2012/06/04 15:54 Main power supply On.
2012/06/05 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/05 14:32 Main power supply Off.
2012/06/05 14:53 Main power supply On.
2012/06/06 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/06 13:32 Main power supply Off.
2012/06/06 14:25 Main power supply On.
2012/06/07 00:03 Lead battery discharge test 12.1V in 212 sec
2012/06/07 13:26 Main power supply Off.
2012/06/07 13:28 Main power supply On.
2012/06/07 13:38 Voltage Surveillance - Max: 505V 63Hz Min: 230V 0Hz
2012/06/07 13:38 Main power supply Off.
2012/06/07 13:51 Main power supply On.
2012/06/07 13:52 Power Off.
2012/06/15 08:17 Main power supply On.
2012/06/15 08:17 New controller setpoint From 57.0F. To 20.0F.
2012/06/15 08:19 Main power supply Off.
2012/06/15 11:12 Main power supply On.
2012/06/15 12:44 New controller setpoint From 20.0F. To 57.0F.
2012/06/15 12:44 Defrost Start.
2012/06/15 12:44 BRIEF PTI STARTED
2012/06/15 12:44 PTI Start.
2012/06/15 12:45 Probe Status.
2012/06/15 13:09 Value Sample - Economizer test 8.5 8.8 9.5 10.0 10.0 10.1
10.2 [A]
2012/06/15 13:19 PTI part 1 end.
2012/06/15 13:19 PTI End.
2012/06/15 13:19 BRIEF PTI ENDED : PASSED
2012/06/15 13:19 New correction factors 0.0 0.0 0.0 C 'pt'
2012/06/15 13:19 Trip start activated
2012/06/15 13:36 Main power supply Off.
2012/06/15 19:50 Main power supply On.
2012/06/15 19:58 Voltage Surveillance - Max: 510V 63Hz Min: 310V 0Hz
2012/06/15 19:58 Power Off.
2012/06/20 21:08 Main power supply On.
2012/06/21 00:00 Voltage Surveillance - Max: 515V 63Hz Min: 455V 0Hz
2012/06/21 02:11 Lead battery discharge test 12.0V in 212 sec
2012/06/21 12:48 Temperature log dumped on the retriever port.
2012/06/21 12:48 Event log dumped on the retriever port.
2012/06/21 13:28 Power Off.
2012/06/21 14:57 Main power supply On.
2012/06/22 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/23 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/24 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/25 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/25 09:20 Main power supply Off.
2012/06/25 11:20 Main power supply On.
2012/06/26 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/27 00:03 Lead battery discharge test 12.1V in 212 sec
2012/06/28 00:03 Lead battery discharge test 12.0V in 212 sec
2012/06/28 15:59 Main power supply Off.
2012/07/17 13:14 SetpView
2012/07/17 13:14 Main power supply On.
2012/07/17 13:14 New controller setpoint From 57.0F. To 2.0F.
2012/07/17 13:14 New controller setpoint From 2.0F. To 20.0F.
2012/07/17 14:40 New controller setpoint From 20.0F. To 57.0F.
2012/07/17 14:40 BRIEF PTI STARTED
2012/07/17 14:40 PTI Start.
2012/07/17 14:42 Probe Status.
2012/07/17 15:04 Value Sample - Economizer test 8.7 9.1 9.9 10.4 10.5 10.6
10.7 [A]
2012/07/17 15:14 PTI part 1 end.
2012/07/17 15:14 PTI End.
2012/07/17 15:14 BRIEF PTI ENDED : PASSED
2012/07/17 15:14 New correction factors 0.0 0.0 0.0 C 'nt'
2012/07/17 15:14 Trip start activated
2012/07/17 15:30 Power Off.
2012/07/18 15:07 Main power supply On.
2012/07/18 15:14 Power Off.
2012/07/20 04:19 Main power supply On.
2012/07/20 09:24 Lead battery discharge test 12.0V in 212 sec
2012/07/21 00:03 Lead battery discharge test 12.1V in 212 sec
2012/07/21 01:54 Temperature log dumped on the retriever port.
2012/07/21 01:54 Event log dumped on the retriever port.
2012/07/21 01:56 Power Off.
2012/07/21 02:51 Main power supply On.
2012/07/22 00:03 Lead battery discharge test 12.0V in 212 sec
2012/07/23 00:03 Lead battery discharge test 12.0V in 212 sec
2012/07/23 10:16 Main power supply Off.
2012/07/23 17:57 Main power supply On.
2012/07/24 00:03 Lead battery discharge test 12.0V in 212 sec
2012/07/25 00:03 Lead battery discharge test 12.0V in 212 sec
2012/07/26 00:03 Lead battery discharge test 12.0V in 212 sec
2012/07/26 06:05 Main power supply Off.
2012/07/26 08:54 Main power supply On.
2012/07/26 09:05 Main power supply Off.
2012/07/26 23:55 Main power supply On.
2012/07/27 05:47 Lead battery discharge test 11.8V in 97 sec
2012/07/28 00:58 Lead battery discharge test 11.8V in 45 sec
2012/07/29 00:00 Lead battery discharge test 11.8V in 33 sec
2012/07/30 00:00 Lead battery discharge test 11.8V in 54 sec
2012/07/30 03:48 Main power supply Off.
2012/07/30 07:21 Main power supply On.
2012/07/31 00:03 Lead battery discharge test 12.0V in 212 sec
2012/07/31 14:18 Main power supply Off.
2012/07/31 14:20 Main power supply On.
2012/07/31 15:13 Main power supply Off.
2012/08/11 21:54 Main power supply On.
2012/08/11 21:54 Main power supply Off.
2012/08/15 22:44 Main power supply On.
2012/08/15 22:44 New controller setpoint From 57.0F. To 20.0F.
2012/08/15 23:47 New controller setpoint From 20.0F. To 57.0F.
2012/08/15 23:48 BRIEF PTI STARTED
2012/08/15 23:48 PTI Start.
2012/08/15 23:49 Probe Status.
2012/08/15 23:50 AlarmNo: 58 Set : PHASE SENSOR ERROR.
2012/08/16 00:03 Value Sample - Economizer test 8.7 9.1 9.9 10.4 10.4 10.5
10.5 [A]
2012/08/16 00:07 Alarm Acknowledge - #58 PHASE SENSOR ERROR.
2012/08/16 00:11 PTI part 1 end.
2012/08/16 00:11 PTI End.
2012/08/16 00:11 BRIEF PTI ENDED : FAILED
2012/08/16 00:11 AlarmNo: 58 Cleared: PHASE SENSOR ERROR.
2012/08/16 01:46 Main power supply Off.
2012/09/03 17:55 Main power supply On.
2012/09/03 17:55 Main power supply Off.
2012/09/04 22:19 Main power supply On.
2012/09/04 22:30 Main power supply Off.
2012/09/04 22:42 Main power supply On.
2012/09/05 04:23 Lead battery discharge test 11.8V in 68 sec
2012/09/06 00:30 Lead battery discharge test 11.8V in 41 sec
2012/09/07 00:00 Lead battery discharge test 11.8V in 17 sec
2012/09/07 01:45 Main power supply Off.
2012/09/07 02:29 Main power supply On.
2012/09/08 00:00 Lead battery discharge test 11.8V in 37 sec
2012/09/09 00:09 Lead battery discharge test 11.8V in 23 sec
2012/09/10 00:04 Lead battery discharge test 11.8V in 30 sec
2012/09/10 13:38 Main power supply Off.
2012/09/10 15:16 Main power supply On.
2012/09/11 00:00 Lead battery discharge test 11.8V in 31 sec
2012/09/12 00:00 Lead battery discharge test 11.8V in 19 sec
2012/09/12 16:56 Main power supply Off.
2012/09/12 16:57 Main power supply On.
2012/09/13 00:00 Lead battery discharge test 11.8V in 13 sec
2012/09/14 00:27 Lead battery discharge test 11.8V in 24 sec
2012/09/14 19:01 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2012/09/14 21:32 Power Off.
2012/09/14 21:32 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2012/09/14 21:32 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2012/09/14 21:32 Main power supply On.
2012/09/14 21:33 Power Off.
2012/09/14 21:37 Main power supply On.
2012/09/14 21:39 Power Off.
2012/09/14 21:39 Main power supply On.
2012/09/15 02:39 Lead battery discharge test 11.8V in 17 sec
2012/09/16 00:33 Lead battery discharge test 11.8V in 20 sec
2012/09/17 00:34 Lead battery discharge test 11.8V in 11 sec
2012/09/17 14:21 Main power supply Off.
2012/09/17 14:24 Main power supply On.
2012/09/18 00:58 Lead battery discharge test 11.8V in 3 sec
2012/09/18 13:45 Main power supply Off.
2012/09/19 19:50 Main power supply On.
2012/09/19 20:03 Main power supply Off.
2012/10/15 13:07 Main power supply On.
2012/10/15 13:08 New controller setpoint From 57.0F. To 20.0F.
2012/10/15 13:08 Trip start activated
2012/10/15 13:23 Power Off.
2012/10/15 13:23 Main power supply On.
2012/10/15 14:38 New controller setpoint From 20.0F. To 57.0F.
2012/10/15 14:39 BRIEF PTI STARTED
2012/10/15 14:39 PTI Start.
2012/10/15 14:40 Probe Status.
2012/10/15 14:41 AlarmNo: 58 Set : PHASE SENSOR ERROR.
2012/10/15 15:04 Value Sample - Economizer test 8.7 9.1 9.8 10.3 10.4 10.4
10.4 [A]
2012/10/15 15:14 PTI part 1 end.
2012/10/15 15:14 PTI End.
2012/10/15 15:14 BRIEF PTI ENDED : FAILED
2012/10/15 15:14 AlarmNo: 58 Cleared: PHASE SENSOR ERROR.
2012/10/15 15:51 Power Off.
2012/10/15 16:04 Main power supply On.
2012/10/15 16:04 Alarm Acknowledge - #58 PHASE SENSOR ERROR.
2012/10/15 16:23 BRIEF PTI STARTED
2012/10/15 16:23 PTI Start.
2012/10/15 16:24 Probe Status.
2012/10/15 16:28 Value Sample - Economizer test 8.9 9.4 10.2 10.5 10.6 10.6
10.6 [A]
2012/10/15 16:33 PTI part 1 end.
2012/10/15 16:33 PTI End.
2012/10/15 16:33 BRIEF PTI ENDED : PASSED
2012/10/15 16:33 New correction factors 0.0 0.0 0.0 C 'pt'
2012/10/15 16:33 Trip start activated
2012/10/15 16:34 BRIEF PTI STARTED
2012/10/15 16:34 PTI Start.
2012/10/15 16:35 Probe Status.
2012/10/15 16:39 Value Sample - Economizer test 9.0 9.5 10.3 10.6 10.7 10.7
10.7 [A]
2012/10/15 16:44 PTI part 1 end.
2012/10/15 16:44 PTI End.
2012/10/15 16:44 BRIEF PTI ENDED : PASSED
2012/10/15 16:44 New correction factors 0.0 0.0 0.0 C 'pt'
2012/10/15 16:44 Trip start activated
2012/10/15 16:46 Main power supply Off.
2012/10/24 21:05 Main power supply On.
2012/10/24 21:06 New controller setpoint From 57.0F. To 20.0F.
2012/10/24 21:18 BRIEF PTI STARTED
2012/10/24 21:18 PTI Start.
2012/10/24 21:21 Probe Status.
2012/10/24 21:24 Value Sample - Economizer test 9.5 9.8 10.8 11.3 11.4 11.4
11.5 [A]
2012/10/24 21:29 PTI part 1 end.
2012/10/24 21:30 PTI End.
2012/10/24 21:30 BRIEF PTI ENDED : PASSED
2012/10/24 21:30 New correction factors 0.0 0.0 0.0 C 'pt'
2012/10/24 21:30 Trip start activated
2012/10/25 00:15 Defrost End.
2012/10/25 02:10 Lead battery discharge test 12.2V in 212 sec
2012/10/25 02:25 Power Off.
2012/10/25 12:51 Main power supply On.
2012/10/25 12:51 SetpView
2012/10/25 12:51 New controller setpoint From 20.0F. To 57.0F.
2012/10/25 13:25 Temperature log dumped on the retriever port.
2012/10/25 13:27 Temperature log dumped on the retriever port.
2012/10/25 13:27 Event log dumped on the retriever port.
2012/10/25 13:28 Power Off.
2012/10/29 14:43 Main power supply On.
2012/10/29 14:45 Voltage Surveillance - Max: 515V 62Hz Min: 285V 0Hz
2012/10/29 14:45 Main power supply Off.
2012/10/31 22:31 Main power supply On.
2012/11/01 00:00 Voltage Surveillance - Max: 515V 63Hz Min: 460V 0Hz
2012/11/01 03:35 Lead battery discharge test 12.2V in 212 sec
2012/11/01 19:48 Main power supply Off.
2012/11/01 21:31 Main power supply On.
2012/11/02 02:34 Lead battery discharge test 12.2V in 212 sec
2012/11/02 14:42 Main power supply Off.
2012/11/02 14:45 Main power supply On.
2012/11/02 16:53 Main power supply Off.
2012/11/02 17:04 Main power supply On.
2012/11/02 19:31 Main power supply Off.
2012/11/02 20:13 Main power supply On.
2012/11/03 01:16 Lead battery discharge test 12.2V in 212 sec
2012/11/04 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/05 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/05 02:32 Main power supply Off.
2012/11/05 02:35 Main power supply On.
2012/11/06 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/06 04:56 Main power supply Off.
2012/11/06 05:38 Main power supply On.
2012/11/06 05:40 Water Cooled Condenser ON.
2012/11/06 10:51 Water Cooled Condenser OFF.
2012/11/06 16:34 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2012/11/07 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/07 01:50 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2012/11/07 04:49 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2012/11/07 16:24 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2012/11/07 16:24 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2012/11/07 16:24 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2012/11/07 16:25 Power Off.
2012/11/07 16:27 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2012/11/07 16:27 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2012/11/07 16:27 Main power supply On.
2012/11/07 16:27 Power Off.
2012/11/07 16:28 Main power supply On.
2012/11/07 16:29 Power Off.
2012/11/07 16:30 Main power supply On.
2012/11/07 16:31 Power Off.
2012/11/07 16:33 Main power supply On.
2012/11/07 16:37 Main power supply Off.
2012/11/07 16:47 Main power supply On.
2012/11/08 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/09 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/10 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/10 05:25 New controller setpoint From 57.0F. To 58.0F.
2012/11/11 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/11 14:39 Water Cooled Condenser ON.
2012/11/11 17:57 Water Cooled Condenser OFF.
2012/11/12 00:03 Lead battery discharge test 12.3V in 212 sec
2012/11/12 16:22 Main power supply Off.
2012/11/12 22:47 Main power supply On.
2012/11/13 03:50 Lead battery discharge test 12.1V in 212 sec
2012/11/14 00:03 Lead battery discharge test 12.2V in 212 sec
2012/11/15 00:03 Lead battery discharge test 12.2V in 212 sec
2012/11/15 22:56 Main power supply Off.
2012/11/15 22:57 Main power supply On.
2012/11/16 00:00 Voltage Surveillance - Max: 505V 62Hz Min: 470V 0Hz
2012/11/16 04:01 Lead battery discharge test 12.2V in 212 sec
2012/11/16 19:37 Main power supply Off.
2012/11/20 16:39 Main power supply On.
2012/11/20 16:40 Voltage Surveillance - Max: 505V 62Hz Min: 280V 0Hz
2012/11/20 16:40 Main power supply Off.
2012/11/21 21:45 Main power supply On.
2012/11/21 21:54 Trip start activated
2012/11/21 21:54 New controller setpoint From 58.0F. To 57.0F.
2012/11/21 21:55 BRIEF PTI STARTED
2012/11/21 21:55 PTI Start.
2012/11/21 21:57 Probe Status.
2012/11/21 22:10 Value Sample - Economizer test 9.8 10.3 11.1 11.7 12.1 12.3
12.4 [A]
2012/11/21 22:16 PTI part 1 end.
2012/11/21 22:16 PTI End.
2012/11/21 22:16 BRIEF PTI ENDED : PASSED
2012/11/21 22:16 New correction factors 0.0 0.0 0.0 C 'pt'
2012/11/21 22:16 Trip start activated
2012/11/21 23:31 Power Off.
2012/12/06 12:40 Main power supply On.
2012/12/06 12:43 New controller setpoint From 57.0F. To 58.0F.
2012/12/06 12:44 Voltage Surveillance - Max: 510V 63Hz Min: 145V 0Hz
2012/12/06 12:44 Main power supply Off.
2012/12/08 02:21 Main power supply On.
2012/12/08 07:24 Lead battery discharge test 12.2V in 212 sec
2012/12/08 12:42 Temperature log dumped on the retriever port.
2012/12/08 12:42 Event log dumped on the retriever port.
2012/12/08 13:39 Voltage Surveillance - Max: 510V 64Hz Min: 435V 0Hz
2012/12/08 13:39 Main power supply Off.
2012/12/08 13:55 Main power supply On.
2012/12/09 00:03 Lead battery discharge test 12.2V in 212 sec
2012/12/10 00:03 Lead battery discharge test 12.2V in 212 sec
2012/12/10 20:16 Main power supply Off.
2012/12/10 22:08 Main power supply On.
2012/12/11 03:11 Lead battery discharge test 12.1V in 212 sec
2012/12/12 00:03 Lead battery discharge test 12.2V in 212 sec
2012/12/13 00:03 Lead battery discharge test 12.2V in 212 sec
2012/12/13 07:13 Main power supply Off.
2012/12/13 08:30 Main power supply On.
2012/12/14 00:03 Lead battery discharge test 12.3V in 212 sec
2012/12/15 00:03 Lead battery discharge test 12.3V in 212 sec
2012/12/16 00:03 Lead battery discharge test 12.3V in 212 sec
2012/12/17 00:03 Lead battery discharge test 12.3V in 212 sec
2012/12/17 07:39 Main power supply Off.
2012/12/17 08:40 Main power supply On.
2012/12/18 00:03 Lead battery discharge test 12.0V in 212 sec
2012/12/19 00:03 Lead battery discharge test 12.1V in 212 sec
2012/12/20 00:03 Lead battery discharge test 12.1V in 212 sec
2012/12/21 00:03 Lead battery discharge test 12.0V in 212 sec
2012/12/21 13:39 Main power supply Off.
2012/12/21 13:41 Main power supply On.
2012/12/21 13:41 Voltage Surveillance - Max: 540V 0Hz Min: 540V 0Hz
2012/12/21 19:42 Voltage Surveillance - Max: 540V 65Hz Min: 495V 0Hz
2012/12/22 00:00 Voltage Surveillance - Max: 515V 64Hz Min: 490V 59Hz
2012/12/22 00:03 Lead battery discharge test 12.0V in 212 sec
2012/12/22 23:13 Voltage Surveillance - Max: 520V 64Hz Min: 300V 44Hz
2012/12/22 23:13 Main power supply Off.
2012/12/23 07:42 Main power supply On.
2012/12/23 07:42 Voltage Surveillance - Max: 530V 0Hz Min: 530V 0Hz
2012/12/23 08:18 Voltage Surveillance - Max: 535V 64Hz Min: 145V 0Hz
2012/12/23 08:18 Main power supply Off.
2013/01/12 23:17 Main power supply On.
2013/01/12 23:19 Main power supply Off.
2013/01/15 22:24 Main power supply On.
2013/01/15 22:47 New controller setpoint From 58.0F. To 20.0F.
2013/01/15 22:49 FULL PTI STARTED
2013/01/15 22:49 PTI Start.
2013/01/15 22:52 Probe Status.
2013/01/15 22:56 Value Sample - Economizer test 8.4 8.8 9.6 10.0 10.1 10.2
10.3 [A]
2013/01/15 22:59 PTI part 1 end.
2013/01/15 23:14 cdT:014m
2013/01/15 23:42 Probe Status.
2013/01/15 23:42 Defrost Start.
2013/01/15 23:51 Defrost End.
2013/01/16 00:44 pdT:052m
2013/01/16 00:44 PTI End.
2013/01/16 00:44 FULL PTI ENDED : PASSED
2013/01/16 00:44 New correction factors 0.0 0.0 0.0 C 'nt'
2013/01/16 00:44 Trip start activated
2013/01/16 01:32 New controller setpoint From 19.9F. To 58.0F.
2013/01/16 01:36 Main power supply Off.
2013/01/23 21:35 Main power supply On.
2013/01/24 02:36 Lead battery discharge test 11.8V in 48 sec
2013/01/24 15:17 Temperature log dumped on the retriever port.
2013/01/24 15:17 Temperature log dumped on the retriever port.
2013/01/24 15:18 Event log dumped on the retriever port.
2013/01/24 15:30 Main power supply Off.
2013/01/24 15:58 Main power supply On.
2013/01/25 00:23 Lead battery discharge test 11.8V in 37 sec
2013/01/26 00:00 Lead battery discharge test 11.8V in 22 sec
2013/01/27 00:00 Lead battery discharge test 11.8V in 30 sec
2013/01/28 00:00 Lead battery discharge test 11.8V in 30 sec
2013/01/29 00:13 Lead battery discharge test 11.8V in 25 sec
2013/01/30 00:00 Lead battery discharge test 11.8V in 28 sec
2013/01/31 00:38 Lead battery discharge test 11.8V in 37 sec
2013/01/31 15:47 Main power supply Off.
2013/01/31 16:59 Main power supply On.
2013/02/01 00:03 Lead battery discharge test 12.1V in 212 sec
2013/02/02 00:02 Lead battery discharge test 11.8V in 175 sec
2013/02/03 00:01 Lead battery discharge test 11.8V in 105 sec
2013/02/04 00:01 Lead battery discharge test 11.8V in 70 sec
2013/02/04 09:14 Main power supply Off.
2013/02/04 12:02 Main power supply On.
2013/02/04 13:48 Main power supply Off.
2013/02/04 13:49 Main power supply On.
2013/02/05 00:00 Lead battery discharge test 11.8V in 48 sec
2013/02/05 20:47 Defrost Start.
2013/02/05 20:51 Defrost End.
2013/02/06 00:00 Lead battery discharge test 11.8V in 26 sec
2013/02/06 14:23 Main power supply Off.
2013/03/03 15:13 Main power supply On.
2013/03/03 15:14 New controller setpoint From 58.0F. To 20.0F.
2013/03/03 15:14 Trip start activated
2013/03/03 15:15 Power Off.
2013/03/05 15:07 Main power supply On.
2013/03/05 15:08 Power Off.
2013/03/05 15:11 Main power supply On.
2013/03/05 15:52 New controller setpoint From 20.0F. To 58.0F.
2013/03/05 15:56 BRIEF PTI STARTED
2013/03/05 15:56 PTI Start.
2013/03/05 15:57 Probe Status.
2013/03/05 16:08 Value Sample - Economizer test 8.4 8.7 9.5 10.0 10.0 10.1
10.2 [A]
2013/03/05 16:17 PTI part 1 end.
2013/03/05 16:17 PTI End.
2013/03/05 16:17 BRIEF PTI ENDED : PASSED
2013/03/05 16:17 New correction factors 0.0 0.0 0.0 C 'pt'
2013/03/05 16:17 Trip start activated
2013/03/05 16:30 Main power supply Off.
2013/03/05 17:02 Main power supply On.
2013/03/05 17:11 New controller setpoint From 58.0F. To 50.0F.
2013/03/05 17:11 Voltage Surveillance - Max: 510V 63Hz Min: 360V 0Hz
2013/03/05 17:11 Power Off.
2013/03/05 17:11 Main power supply On.
2013/03/05 17:11 Voltage Surveillance - Max: 510V 0Hz Min: 90V 0Hz
2013/03/05 17:11 Power Off.
2013/03/07 20:01 Main power supply On.
2013/03/08 00:00 Voltage Surveillance - Max: 515V 63Hz Min: 450V 0Hz
2013/03/08 01:05 Lead battery discharge test 12.1V in 212 sec
2013/03/08 23:24 Power Off.
2013/03/08 23:56 Main power supply On.
2013/03/09 03:45 Temperature log dumped on the retriever port.
2013/03/09 03:46 Event log dumped on the retriever port.
2013/03/09 04:59 Lead battery discharge test 12.0V in 212 sec
2013/03/10 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/11 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/12 00:03 Lead battery discharge test 12.1V in 212 sec
2013/03/13 00:04 Lead battery discharge test 12.0V in 212 sec
2013/03/14 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/14 22:33 Main power supply Off.
2013/03/15 01:22 Main power supply On.
2013/03/15 06:26 Lead battery discharge test 12.0V in 212 sec
2013/03/16 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/17 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/18 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/18 15:39 Main power supply Off.
2013/03/18 18:42 Main power supply On.
2013/03/19 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/19 12:26 Main power supply Off.
2013/03/19 12:27 Main power supply On.
2013/03/19 13:39 Voltage Surveillance - Max: 520V 64Hz Min: 275V 0Hz
2013/03/19 13:39 Main power supply Off.
2013/03/19 19:32 Main power supply On.
2013/03/20 00:35 Lead battery discharge test 11.9V in 212 sec
2013/03/21 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/21 13:12 Main power supply Off.
2013/03/21 13:20 Main power supply On.
2013/03/22 00:03 Lead battery discharge test 12.0V in 212 sec
2013/03/22 20:59 New controller setpoint From 50.0F. To 58.0F.
2013/03/22 21:12 Main power supply Off.
2013/03/22 21:13 Main power supply On.
2013/03/22 21:24 Voltage Surveillance - Max: 520V 64Hz Min: 185V 0Hz
2013/03/22 21:24 Main power supply Off.
2013/03/25 16:18 Main power supply On.
2013/03/25 16:19 Voltage Surveillance - Max: 520V 63Hz Min: 325V 0Hz
2013/03/25 16:19 Main power supply Off.
2013/04/01 13:26 SetpView
2013/04/01 13:26 New controller setpoint From 58.0F. To 0.0F.
2013/04/01 13:26 New controller setpoint From 0.0F. To 20.0F.
2013/04/01 13:28 Main power supply On.
2013/04/01 16:14 Defrost End.
2013/04/01 16:21 Main power supply Off.
2013/04/01 16:27 Main power supply On.
2013/04/01 17:11 New controller setpoint From 20.0F. To 57.0F.
2013/04/01 17:11 BRIEF PTI STARTED
2013/04/01 17:11 PTI Start.
2013/04/01 17:13 Probe Status.
2013/04/01 17:13 AlarmNo: 58 Set : PHASE SENSOR ERROR.
2013/04/01 17:37 Value Sample - Economizer test 8.9 9.4 10.3 10.8 11.0 11.2
11.3 [A]
2013/04/01 17:47 PTI part 1 end.
2013/04/01 17:47 PTI End.
2013/04/01 17:47 BRIEF PTI ENDED : FAILED
2013/04/01 17:47 AlarmNo: 58 Cleared: PHASE SENSOR ERROR.
2013/04/01 19:49 Main power supply Off.
2013/04/04 05:05 Main power supply On.
2013/04/04 05:11 Alarm Acknowledge - #58 PHASE SENSOR ERROR.
2013/04/04 05:11 Voltage Surveillance - Max: 515V 64Hz Min: 350V 0Hz
2013/04/04 05:11 Power Off.
2013/04/04 05:12 Main power supply On.
2013/04/04 05:13 Voltage Surveillance - Max: 515V 64Hz Min: 350V 0Hz
2013/04/04 05:13 Main power supply Off.
2013/04/06 04:42 Main power supply On.
2013/04/06 09:46 Lead battery discharge test 12.1V in 212 sec
2013/04/07 00:00 Voltage Surveillance - Max: 520V 65Hz Min: 455V 0Hz
2013/04/07 00:03 Lead battery discharge test 12.1V in 212 sec
2013/04/07 13:06 Temperature log dumped on the retriever port.
2013/04/07 13:06 Event log dumped on the retriever port.
2013/04/07 13:18 Voltage Surveillance - Max: 495V 65Hz Min: 200V 60Hz
2013/04/07 13:18 Power Off.
2013/04/07 13:51 Main power supply On.
2013/04/08 00:01 Lead battery discharge test 11.8V in 60 sec
2013/04/08 21:28 Main power supply Off.
2013/04/08 22:01 Main power supply On.
2013/04/09 03:01 Lead battery discharge test 11.8V in 33 sec
2013/04/09 12:46 Main power supply Off.
2013/04/09 13:58 Main power supply On.
2013/04/09 19:20 Main power supply Off.
2013/04/09 20:27 Main power supply On.
2013/04/10 01:29 Lead battery discharge test 11.8V in 123 sec
2013/04/11 00:03 Lead battery discharge test 11.9V in 212 sec
2013/04/11 13:32 Main power supply Off.
2013/04/11 15:08 Main power supply On.
2013/04/11 15:09 Water Cooled Condenser ON.
2013/04/11 16:23 Water Cooled Condenser OFF.
2013/04/12 00:03 Lead battery discharge test 12.1V in 212 sec
2013/04/13 00:03 Lead battery discharge test 12.1V in 212 sec
2013/04/14 00:03 Lead battery discharge test 12.1V in 212 sec
2013/04/15 00:03 Lead battery discharge test 12.0V in 212 sec
2013/04/15 04:14 Main power supply Off.
2013/04/15 08:18 Main power supply On.
2013/04/16 00:03 Lead battery discharge test 11.9V in 212 sec
2013/04/16 12:36 Main power supply Off.
2013/04/16 13:15 Main power supply On.
2013/04/16 15:24 Main power supply Off.
2013/04/16 15:25 Main power supply On.
2013/04/17 00:00 Voltage Surveillance - Max: 515V 63Hz Min: 485V 0Hz
2013/04/17 00:03 Lead battery discharge test 11.9V in 212 sec
2013/04/17 03:31 Main power supply Off.
2013/04/17 08:23 Main power supply On.
2013/04/17 09:03 Voltage Surveillance - Max: 515V 63Hz Min: 195V 0Hz
2013/04/17 09:03 Main power supply Off.
2013/04/17 18:23 Main power supply On.
2013/04/17 18:24 New controller setpoint From 57.0F. To -10.0F.
2013/04/17 22:21 Defrost Start.
2013/04/17 22:34 Voltage Surveillance - Max: 510V 63Hz Min: 330V 0Hz
2013/04/17 22:34 Main power supply Off.
2013/04/18 14:57 Main power supply On.
2013/04/18 15:06 New controller setpoint From -10.0F. To 0.0F.
2013/04/18 15:50 Voltage Surveillance - Max: 515V 63Hz Min: 115V 0Hz
2013/04/18 15:50 Main power supply Off.
2013/04/18 15:52 Main power supply On.
2013/04/18 20:55 Lead battery discharge test 12.0V in 212 sec
2013/04/19 00:03 Lead battery discharge test 11.9V in 212 sec
2013/04/19 00:29 Defrost Start.
2013/04/19 01:41 Defrost End.
2013/04/19 06:16 Defrost End.
2013/04/19 17:21 Defrost End.
2013/04/20 00:00 Lead battery discharge test 11.8V in 23 sec
2013/04/20 14:22 Defrost End.
2013/04/21 00:01 Lead battery discharge test 11.8V in 105 sec
2013/04/21 14:22 Defrost End.
2013/04/22 00:02 Lead battery discharge test 11.8V in 129 sec
2013/04/22 06:56 Main power supply Off.
2013/04/22 17:56 Main power supply On.
2013/04/23 00:03 Lead battery discharge test 12.0V in 212 sec
2013/04/23 03:23 Defrost End.
2013/04/24 00:03 Lead battery discharge test 12.0V in 212 sec
2013/04/24 08:22 Defrost End.
2013/04/25 00:03 Lead battery discharge test 12.1V in 212 sec
2013/04/25 03:35 Main power supply Off.
2013/04/25 04:19 Main power supply On.
2013/04/25 17:22 Defrost End.
2013/04/26 00:03 Lead battery discharge test 12.0V in 212 sec
2013/04/26 09:47 Main power supply Off.
2013/04/26 10:54 Main power supply On.
2013/04/27 00:03 Lead battery discharge test 12.0V in 212 sec
2013/04/27 05:19 Defrost End.
2013/04/28 00:03 Lead battery discharge test 12.0V in 212 sec
2013/04/28 19:17 Defrost End.
2013/04/28 19:39 Main power supply Off.
2013/04/28 20:20 Main power supply On.
2013/04/29 01:24 Lead battery discharge test 12.0V in 212 sec
2013/04/29 03:29 Defrost Start.
2013/04/29 03:43 Defrost End.
2013/04/29 06:11 Defrost End.
2013/04/29 11:11 Defrost End.
2013/04/29 13:40 Power Off.
2013/04/29 13:40 Main power supply On.
2013/04/29 14:22 Defrost Start.
2013/04/29 14:32 Defrost End.
2013/04/29 18:48 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2013/04/29 19:13 Main power supply Off.
2013/04/29 20:00 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2013/04/29 21:00 Alarm Clear
2013/04/29 21:41 Main power supply On.
2013/04/29 21:41 Alarm Clear
2013/04/30 00:15 Defrost End.
2013/04/30 02:43 Lead battery discharge test 11.8V in 117 sec
2013/04/30 10:07 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2013/04/30 16:19 Defrost End.
2013/04/30 17:28 Main power supply Off.
2013/04/30 17:29 Main power supply On.
2013/04/30 18:48 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2013/04/30 19:17 Main power supply Off.
2013/04/30 19:54 Main power supply On.
2013/04/30 19:54 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2013/04/30 22:22 Main power supply Off.
2013/05/01 00:57 Main power supply On.
2013/05/01 02:13 Main power supply Off.
2013/05/01 02:17 Main power supply On.
2013/05/01 05:43 Main power supply Off.
2013/05/01 06:19 Main power supply On.
2013/05/01 06:21 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2013/05/01 11:20 Lead battery discharge test 11.8V in 81 sec
2013/05/01 13:21 Defrost End.
2013/05/01 18:57 AlarmNo: 19 Set : TEMP TOO FAR FROM SETPOINT.
2013/05/01 20:14 Defrost Start.
2013/05/01 20:28 Defrost End.
2013/05/01 20:55 AlarmNo: 19 Cleared: TEMP TOO FAR FROM SETPOINT.
2013/05/01 21:44 Power Off.
2013/05/01 21:45 Main power supply On.
2013/05/01 21:45 Alarm Acknowledge - #19 TEMP TOO FAR FROM SETPOINT.
2013/05/01 21:46 Function Test Start.
2013/05/01 21:46 Function Test End.
2013/05/01 21:46 Power Off.
2013/05/01 21:46 Main power supply On.
2013/05/01 21:48 Manual Function Test Start.
2013/05/01 21:49 Manual Function Test End.
2013/05/01 21:49 Manual Function Test Start.
2013/05/01 21:49 Manual Function Test End.
2013/05/01 21:49 Manual Function Test Start.
2013/05/01 21:49 Manual Function Test End.
2013/05/01 21:49 Manual Function Test Start.
2013/05/01 21:49 Manual Function Test End.
2013/05/01 21:49 Power Off.
2013/05/01 21:53 Main power supply On.
2013/05/01 21:54 Function Test Start.
2013/05/01 21:54 Function Test End.
2013/05/01 21:54 Power Off.
2013/05/01 21:55 Main power supply On.
2013/05/01 21:55 Manual Function Test Start.
2013/05/01 21:56 Manual Function Test End.
2013/05/01 21:56 Manual Function Test Start.
2013/05/01 21:57 Manual Function Test End.
2013/05/01 21:57 Manual Function Test Start.
2013/05/01 21:57 Manual Function Test End.
2013/05/01 21:58 Main power supply Off.
2013/05/01 22:08 Main power supply On.
2013/05/01 22:08 Manual Function Test Start.
2013/05/01 22:09 Manual Function Test End.
2013/05/01 22:09 Manual Function Test Start.
2013/05/01 22:09 Manual Function Test End.
2013/05/02 00:16 Main power supply Off.
2013/05/02 00:17 Main power supply On.
2013/05/02 00:23 Main power supply Off.
2013/05/02 00:28 Main power supply On.
2013/05/02 01:15 Main power supply Off.
2013/05/02 13:05 Main power supply On.
2013/05/03 00:21 Defrost End.
2013/05/03 01:00 Main power supply Off.
2013/05/03 13:35 Main power supply On.
2013/05/03 15:48 Main power supply Off.
2013/05/03 17:51 Main power supply On.
2013/05/03 20:19 Main power supply Off.
2013/05/04 21:40 Main power supply On.
2013/05/04 21:44 Temperature log dumped on the retriever port.
2013/05/04 21:48 Temperature log dumped on the retriever port.