State Load Despatch Center,Airoli (MSETCL) Annexure-2
Hourly Load Data As on 13/Oct/2017
1 4012 96 273 4381 50 4466 0 0 5221 5305 -1391 12811 0 12811 2384 15195 49.90
2 4094 181 285 4560 39 4406 0 0 4905 4994 -1132 12867 0 12867 2127 14994 49.93
3 4126 76 275 4477 51 4650 0 0 4747 4703 -1028 12853 0 12853 2026 14879 49.96
4 4123 91 275 4489 72 4707 0 0 4674 4469 -940 12797 0 12797 1938 14735 49.94
5 4129 81 286 4496 78 4708 0 0 4647 4755 -924 13113 0 13113 1922 15035 49.94
6 4144 263 274 4681 94 4701 0 0 5006 5009 -982 13503 0 13503 2010 15513 49.91
7 4191 251 275 4717 102 4679 0 8 5563 5575 -823 14258 0 14258 2125 16383 49.88
8 4164 156 286 4606 91 4643 0 96 5645 5461 -898 13999 0 13999 2338 16337 49.92
9 4278 148 274 4700 29 4659 0 228 5815 5553 -1166 14003 0 14003 2573 16576 49.99
10 4404 161 270 4835 61 4731 0 293 5959 5164 -1558 13526 0 13526 3046 16572 49.99
11 4466 153 268 4887 63 4664 0 344 6134 5495 -1837 13616 0 13616 3243 16859 49.98
12 4457 81 265 4803 65 4646 0 348 6256 5467 -1882 13447 0 13447 3298 16745 49.95
13 4371 80 266 4717 105 4486 0 275 6176 5507 -1987 13103 0 13103 3261 16364 49.93
14 4208 85 265 4558 62 4373 0 290 6090 5575 -1872 12986 0 12986 3082 16068 50.00
15 4161 85 255 4501 85 4296 0 304 6131 5743 -1961 12968 0 12968 3131 16099 49.95
16 4205 80 267 4552 208 4223 0 123 6099 5465 -1986 12585 0 12585 3158 15743 49.95
17 4200 155 279 4634 187 4259 0 73 5339 5266 -1857 12562 0 12562 3117 15679 49.91
18 4459 306 268 5033 187 4627 0 24 5457 4910 -1568 13213 0 13213 3132 16345 49.85
19 4513 706 276 5495 168 4789 0 0 5670 5335 -1368 14419 0 14419 3117 17536 49.88
20 4492 502 276 5270 124 4790 0 0 6102 5620 -1242 14562 0 14562 3036 17598 49.91
21 4461 291 289 5041 147 4728 0 0 5870 5476 -1187 14205 0 14205 2815 17020 49.97
22 4378 163 278 4819 141 4479 0 0 5669 5407 -1141 13705 0 13705 2690 16395 49.97
23 4274 268 278 4820 154 4130 0 0 5282 5434 -1090 13448 0 13448 2554 16002 49.96
24 4353 154 288 4795 176 4090 0 0 5161 5097 -1257 12901 0 12901 2496 15397 49.98
102.6
MUs 4.61 6.59 113.87 2.54 108.93 0.00 2.41 133.62 126.79 -33.08 321.45 0.00 321.45 64.62 386.07 49.94
6
NOTE : ALL VALUES IN MW
Mumbai Net Exch is shown with reference to MSETCL system and (-) sign indicates MSETCL periphery to Mumbai system.
3 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 13/Oct/2017
Position as on 6.30 Hrs of 14/Oct/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date
PLANNED OUTAGE
MSPGCL Khaparkheda Unit 2 210 25/09/2017 06.50 13/10/2017 23.48 Coal Shortage
MSPGCL Uran Unit 7 108 05/10/2017 00.06 Continued. Gas Turbine Work
4 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 13/Oct/2017
Position as on 6.30 Hrs of 14/Oct/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date
MSPGCL Uran Unit B0 120 05/10/2017 00.11 Continued. Gas Turbine Work
Problem in submerged
IPP RPL(AMT) U-1 270 06/10/2017 00.45 Continued.
Scrapper chain
MSPGCL Chandrapur Unit 6 500 07/10/2017 00.35 13/10/2017 23.00 Boiler Tube Leakage
MSPGCL Nasik Unit 3 210 10/10/2017 13.35 14/10/2017 05.00 Boiler Tube Leakage
IPP VIPL U-1 300 11/10/2017 19.12 Continued. Boiler Tube Leakage
5 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 13/Oct/2017
Position as on 6.30 Hrs of 14/Oct/2017
Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type
Koradi Bhilai InterState 13/10/2017 08.50 13/10/2017 20.37 PO Line Maintenance work
Chandrapur - Parli IntraState 12/10/2017 09.13 13/10/2017 21.08 PO Line Maintenance work
New Koyna - Dabhol-I IntraState 12/10/2017 13.43 13/10/2017 10.15 T Distance Protection
400/220kv 315 Mva ICT I @Karad IntraState 13/10/2017 23.30 14/10/2017 00.29 T LBB operated
Parli 3 (Old Gcr)-Osmanabad IntraState 10/10/2017 02.50 10/10/2017 Continued. T Bus Bar Protection Operated
New Koyna - Pedambe IntraState 12/10/2017 08.35 13/10/2017 18.00 HT Heavy Sparking on Isolator
Pophali - New Koyna IntraState 12/10/2017 17.05 13/10/2017 15.50 T Wave Trap Conductor Snapped
Main Bus Section-I@ Pedambe IntraState 13/10/2017 06.30 13/10/2017 14.05 PO Routine Maintenance Work
Nashik-Airoli Knowledge Park IntraState 13/10/2017 09.18 13/10/2017 19.09 PO Routine Maintenance Work
Line Insulator String replacement
Padghe - Nalasopara IntraState 13/10/2017 09.35 13/10/2017 21.14 PO
work
Malegaon-Sayne IntraState 13/10/2017 10.08 13/10/2017 18.05 PO Isolator Maint.work
Bableshwar- Alephata ckt I IntraState 13/10/2017 10.40 13/10/2017 19.18 PO NIT Switch replacement work
Trombay - Mulund IntraState 13/10/2017 12.28 13/10/2017 18.49 PO Line Maintenance work
HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage
6 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 13/Oct/2017
Position as on 6.30 Hrs of 14/Oct/2017
Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type
Parli 3 (Oldgcr)-Harangul Ckt 2 IntraState 13/10/2017 17.24 13/10/2017 18.28 T Distance Protection
B Phase LA Burst at
Sadawaghapur Karad Ckt 2 IntraState 13/10/2017 23.30 Continued. T
Sadawaghapur
Karad(400kv) - Ogalewadi Ckt 1 IntraState 13/10/2017 23.30 14/10/2017 00.20 T LBB operated
Karad(400kv) - Ogalewadi Ckt 2 IntraState 13/10/2017 23.30 14/10/2017 00.23 T LBB operated
220/33 Kv 100 Mva Bbl Ptr 2 @Valve IntraState 13/10/2017 10.30 13/10/2017 15.31 PO Quarterly Maintainance Work
220/132 Kv 200 Mva Vijay Ict 1
IntraState 13/10/2017 13.38 13/10/2017 16.25 PO Tan Delta Measurment of CTs
@Chalisgaon
132 KV LINE Outages/Trippings
HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage