Professional Documents
Culture Documents
Name
xi. Three pole 220kV C.B Foundation as per specification & drawing No.PDW/CG-441
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 9.02 Cum 223.05 2,013
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Page 1 of 14
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.58 Cum 5478.35 3,156
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 4.89 Cum 13291.36 65,021
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 18.13 sqm 97.91 1,775
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 423.83 Kg 110.29 46,745
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 6.77 Cum 192.82 1,305
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 3.84 Cum 47.21 181
WCSR-2013 Item No. 15-b-ii P 2-3
Total 120,196
Name
xii. 220kV High Level Gantry Foundation (18.5 m) as per specification & drawing No.PDW/CG-33
of Item
Amount
Item # Description. Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 208.89 Cum 223.05 46,592
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 7.46 Cum 5478.35 40,868
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 100.82 Cum 13291.36 1,339,996
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 117.62 sqm 97.91 11,516
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 3058.99 kg 110.29 337,376
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 156.67 Cum 192.82 30,208
WCSR-2013 Item No. 25 P 2-5
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 37.30 Cum 47.21 1,761
WCSR-2013 Item No. 15-b-ii P 2-3
Total 1,808,319
Name
xiv. 220kV L.L Gantry foundation (13+4 m) as per specification & drawing No.PDW/CG-34
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 151.94 Cum 223.05 33,889
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 5.63 Cum 5478.35 30,827
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 74.76 Cum 13291.36 993,630
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 89.92 Sqm 97.91 8,804
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 2494.17 kg 110.29 275,082
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 113.95 Cum 192.82 21,972
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 28.14 Cum 47.21 1,328
WCSR-2013 Item No. 15-b-ii P 2-3
Page 2 of 14
Total 1,365,533
Name
1. 132kV high level gantry (13.8+3.1) as per specification & drawing No.PDW/TS-2001
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 40.00 Cum 223.05 8,922
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 2.00 Cum 5478.35 10,957
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 14.25 Cum 13291.36 189,369
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 35.83 sqm 97.91 3,508
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 482.24 Kg 110.29 53,187
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 26.80 Cum 192.82 5,168
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 10.00 Cum 47.21 472
WCSR-2013 Item No. 15-b-ii P 2-3
Total 271,581
Name
ii. 132kV low level gantry (10+3.1m) as per specification & drawing No.PDW/TS-1974
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 41.97 Cum 223.05 9,362
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 1.66 Cum 5478.35 9,078
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 13.96 Cum 13291.36 185,494
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 44.00 sqm 97.91 4,308
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 534.64 Kg 110.29 58,965
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 31.48 Cum 192.82 6,070
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 11.05 Cum 47.21 521
WCSR-2013 Item No. 15-b-ii P 2-3
Total 273,798
Name
iii. 132kV Bus/Line Isolators as per specification & drawing No.PDW/CG-443
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 2.32 Cum 223.05 518
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.13 Cum 5478.35 696
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 1.07 Cum 13291.36 14,245
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 5.14 Sqm 97.91 503
WCSR-2013 Item No. 10 P 12-4
Page 3 of 14
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 51.04 kg 110.29 5,630
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.56 Cum 192.82 300
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.85 Cum 47.21 40
WCSR-2013 Item No. 15-b-ii P 2-3
Total 21,932
Name
iv. 132kV C.B Foundation as per specification & drawing No.PDW/CG-444
of Item
Amount
Item # Description. Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 10.11 Cum 223.05 2,255
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.56 Cum 5478.35 3,079
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 4.33 Cum 13291.36 57,583
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 15.85 sqm 97.91 1,552
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 225.50 kg 110.29 24,871
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 7.58 Cum 192.82 1,462
WCSR-2013 Item No. 25 P 2-5
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 3.75 Cum 47.21 177
WCSR-2013 Item No. 15-b-ii P 2-3
Total 90,979
Name
v. 132kV Single phase Lighting Arrestor as per specification & drawing No.PDW/CG-272
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 1.52 Cum 223.05 338
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.08 Cum 5478.35 455
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.83 Cum 13291.36 11,045
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 4.20 Sqm 97.91 411
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 28.98 kg 110.29 3,197
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.02 Cum 192.82 196
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.55 Cum 47.21 26
WCSR-2013 Item No. 15-b-ii P 2-3
Total 15,668
0 Foundation for 132 kv circuit breaker as per specification and drawing No. PDD/CG-144
Amount
Item # Description. Qty Unit Rate
(Rs.)
0
1 0.00 Cum 223.05 -
WCSR-2013 Item No. 22-c P 2-5
0
2 0.00 Cum 5478.35 -
WCSR-2013 Item No. 2-d P 5-1
0
3 0.00 Cum 13291.36 -
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 0.00 Sqm 97.91 -
WCSR-2013 Item No. 10 P 12-4
0
5 0.00 Kg 110.29 -
WCSR-2013 Item No. 6-a P 5-3
0
6 0.00 - 192.82 -
WCSR-2013 Item No. 25 P 2-5
0
7 0.00 Cum 47.21 -
WCSR-2013 Item No. 15-b-ii P 2-3
Total -
Name
i. Cable trench type-A (2x700mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 1.84 Cum 223.05 411
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.10 Cum 5478.35 520
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.62 Cum 13291.36 8,174
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 1.84 sqm 97.91 180
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 24.63 Kg 110.29 2,716
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.38 Cum 192.82 267
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.95 Cum 47.21 45
WCSR-2013 Item No. 15-b-ii P 2-3
Total 12,314
Name
ii. Cable trench type-B (700mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 1.02 Cum 223.05 227
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.05 Cum 5478.35 290
WCSR-2013 Item No. 2-d P 5-1
Page 5 of 14
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.37 Cum 13291.36 4,958
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 1.84 sqm 97.91 180
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 27.63 Kg 110.29 3,048
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.76 Cum 192.82 147
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.53 Cum 47.21 25
WCSR-2013 Item No. 15-b-ii P 2-3
Total 8,875
Name
iii. Cable trench type-C ( 500mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 0.43 Cum 223.05 97
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.04 Cum 5478.35 236
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.23 Cum 13291.36 3,030
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 0.92 sqm 97.91 90
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 17.89 Kg 110.29 1,973
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.33 Cum 192.82 63
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.43 Cum 47.21 20
WCSR-2013 Item No. 15-b-ii P 2-3
Total 5,509
Name
iv. Cable trench type-D (300mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 0.22 Cum 223.05 49
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.03 Cum 5478.35 164
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.14 Cum 13291.36 1,887
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 0.63 sqm 97.91 62
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 11.97 Kg 110.29 1,321
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.16 Cum 192.82 32
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.30 Cum 47.21 14
WCSR-2013 Item No. 15-b-ii P 2-3
Total 3,529
Name G. Construction of switchyard path 2000mm wide complete in all respects including blinding as per specification and drawing No.
of Item PDW/TV-203
Page 6 of 14
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 0.35 Cum 400.00 140
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.20 Cum 7000.00 1,400
WCSR-2013 Item No. 2-d P 5-1
Cement concrete plain including placing, compacting, finishing and curing complete
3 (including screening and washing of stone aggregate) without shuttering, Ratio 1:2:4. 0.15 Cum 9000.00 1,350
WCSR-2013 Item No. 2-b P 5-1
Expansion Joint
4 0.75 m 1500.00 1,125
WCSR-2013 Item No. 32 P 14-5
Road Edging Complete
5 2.00 m 83.40 167
WCSR-2013 Item No. 18 P 14-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.26 Cum 192.82 51
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 1.00 Cum 47.21 47
WCSR-2013 Item No. 15-b-ii P 2-3
Total 4,280
Page 7 of 14
Vetted/Reviewed Rate
Amount
(Rs.)
Amount
(Rs.)
-
-
Amount
(Rs.)
Page 8 of 14
-
-
-
Amount
(Rs.)
-
-
Amount
(Rs.)
Page 9 of 14
-
Amount
(Rs.)
-
-
Amount
(Rs.)
-
-
Amount
(Rs.)
Page 10 of 14
-
-
-
Amount
(Rs.)
-
-
Amount
(Rs.)
-
-
Amount
(Rs.)
Page 11 of 14
-
-
-
Amount
(Rs.)
-
-
-
Amount
(Rs.)
-
-
Amount
(Rs.)
Page 12 of 14
-
-
-
Amount
(Rs.)
-
-
Amount
(Rs.)
-
-
Page 13 of 14
Amount
(Rs.)
-
-
Page 14 of 14