You are on page 1of 14

NATIONAL TRANSMISSION AND DESPATCH COMPANY LTD

WCSR-2013 Vetted/Reviewed Rate


Item # Description Qty Unit Amount
Rate Rate
(Rs.)
iv. 220/132kV, 250MVA Auto Transformer foundation as per specification and drawing No.PDD/CG-419
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 123.05 Cum 223.05 27,445
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 5.59 Cum 5478.35 30,640
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 68.67 Cum 13291.36 912,771
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 133.58 sqm 97.91 13,079
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 9230.40 Kg 110.29 1,018,021
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 92.28 Cum 192.82 17,794
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 37.29 Cum 47.21 1,760
WCSR-2013 Item No. 15-b-ii P 2-3
MS Flat Iron (22-10/370)
8 107.08 Kg 97.20 10,408
WCSR-2013 Item No. 370 P 22-10 (Add 20% contractors profit)
Rail 132.6 Kg per metre (90Lbs per foot)
9 28.40 m 4729.20 134,309
WCSR-2013 Item No. 75a P 23-12 (Add 20% contractors profit)
Fabrication of heavy steel work with angles, tees, flat iron and sheet iron for making trusses
girders, tanks etc including cutting, drilling, riveting, handling, assemblinga nd fixing but
10 3872.92 Kg 32.78 126,954
excluding erection in position.
WCSR-2013 Item No. 5 P 20-1
Total 2,293,182

v. 220kV CT as per Specification & drawing No. PDW/CG-299


Name vi. 220kV PI as per Specification & drawing No. PDW/CG-299
of Item vii. 220kV CCVT&CVT as per Specification & drawing No. PDW/CG-299
viii. 220kV LA as per Specification & drawing No. PDW/CG-299
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 2.16 Cum 223.05 481
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.15 Cum 5478.35 805
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.96 Cum 13291.36 12,707
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 5.09 sqm 97.91 498
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 78.23 Kg 110.29 8,627
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.62 Cum 192.82 312
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.98 Cum 47.21 46
WCSR-2013 Item No. 15-b-ii P 2-3
Total 23,476

Name
xi. Three pole 220kV C.B Foundation as per specification & drawing No.PDW/CG-441
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 9.02 Cum 223.05 2,013
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5

Page 1 of 14
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.58 Cum 5478.35 3,156
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 4.89 Cum 13291.36 65,021
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 18.13 sqm 97.91 1,775
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 423.83 Kg 110.29 46,745
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 6.77 Cum 192.82 1,305
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 3.84 Cum 47.21 181
WCSR-2013 Item No. 15-b-ii P 2-3
Total 120,196

Name
xii. 220kV High Level Gantry Foundation (18.5 m) as per specification & drawing No.PDW/CG-33
of Item
Amount
Item # Description. Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 208.89 Cum 223.05 46,592
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 7.46 Cum 5478.35 40,868
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 100.82 Cum 13291.36 1,339,996
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 117.62 sqm 97.91 11,516
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 3058.99 kg 110.29 337,376
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 156.67 Cum 192.82 30,208
WCSR-2013 Item No. 25 P 2-5
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 37.30 Cum 47.21 1,761
WCSR-2013 Item No. 15-b-ii P 2-3
Total 1,808,319

Name
xiv. 220kV L.L Gantry foundation (13+4 m) as per specification & drawing No.PDW/CG-34
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 151.94 Cum 223.05 33,889
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 5.63 Cum 5478.35 30,827
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 74.76 Cum 13291.36 993,630
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 89.92 Sqm 97.91 8,804
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 2494.17 kg 110.29 275,082
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 113.95 Cum 192.82 21,972
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 28.14 Cum 47.21 1,328
WCSR-2013 Item No. 15-b-ii P 2-3

Page 2 of 14
Total 1,365,533

Name
1. 132kV high level gantry (13.8+3.1) as per specification & drawing No.PDW/TS-2001
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 40.00 Cum 223.05 8,922
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 2.00 Cum 5478.35 10,957
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 14.25 Cum 13291.36 189,369
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 35.83 sqm 97.91 3,508
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 482.24 Kg 110.29 53,187
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 26.80 Cum 192.82 5,168
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 10.00 Cum 47.21 472
WCSR-2013 Item No. 15-b-ii P 2-3
Total 271,581

Name
ii. 132kV low level gantry (10+3.1m) as per specification & drawing No.PDW/TS-1974
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 41.97 Cum 223.05 9,362
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 1.66 Cum 5478.35 9,078
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 13.96 Cum 13291.36 185,494
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 44.00 sqm 97.91 4,308
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 534.64 Kg 110.29 58,965
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 31.48 Cum 192.82 6,070
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 11.05 Cum 47.21 521
WCSR-2013 Item No. 15-b-ii P 2-3
Total 273,798

Name
iii. 132kV Bus/Line Isolators as per specification & drawing No.PDW/CG-443
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 2.32 Cum 223.05 518
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.13 Cum 5478.35 696
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 1.07 Cum 13291.36 14,245
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 5.14 Sqm 97.91 503
WCSR-2013 Item No. 10 P 12-4

Page 3 of 14
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 51.04 kg 110.29 5,630
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.56 Cum 192.82 300
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.85 Cum 47.21 40
WCSR-2013 Item No. 15-b-ii P 2-3
Total 21,932

Name
iv. 132kV C.B Foundation as per specification & drawing No.PDW/CG-444
of Item
Amount
Item # Description. Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 10.11 Cum 223.05 2,255
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.56 Cum 5478.35 3,079
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 4.33 Cum 13291.36 57,583
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 15.85 sqm 97.91 1,552
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 225.50 kg 110.29 24,871
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 7.58 Cum 192.82 1,462
WCSR-2013 Item No. 25 P 2-5
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 3.75 Cum 47.21 177
WCSR-2013 Item No. 15-b-ii P 2-3
Total 90,979

Name
v. 132kV Single phase Lighting Arrestor as per specification & drawing No.PDW/CG-272
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 1.52 Cum 223.05 338
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.08 Cum 5478.35 455
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.83 Cum 13291.36 11,045
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 4.20 Sqm 97.91 411
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 28.98 kg 110.29 3,197
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.02 Cum 192.82 196
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.55 Cum 47.21 26
WCSR-2013 Item No. 15-b-ii P 2-3
Total 15,668

Name vi. 132kV CT as per specification & drawing No.PDW/CG-271


of Item vii. 132kV Post Insulator as per specification & drawing No.PDW/CG-271
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 2.32 Cum 223.05 518
m & lift upto 1.50 m, in hard soil.
WCSR-2013 Item No. 22-c P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.13 Cum 5478.35 696
WCSR-2013 Item No. 2-d P 5-1
Page 4 of 14
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.92 Cum 13291.36 12,211
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 4.67 Sqm 97.91 457
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 53.61 kg 110.29 5,912
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.56 Cum 192.82 300
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.85 Cum 47.21 40
WCSR-2013 Item No. 15-b-ii P 2-3
Total 20,135

0 Foundation for 132 kv circuit breaker as per specification and drawing No. PDD/CG-144
Amount
Item # Description. Qty Unit Rate
(Rs.)
0
1 0.00 Cum 223.05 -
WCSR-2013 Item No. 22-c P 2-5
0
2 0.00 Cum 5478.35 -
WCSR-2013 Item No. 2-d P 5-1
0
3 0.00 Cum 13291.36 -
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 0.00 Sqm 97.91 -
WCSR-2013 Item No. 10 P 12-4
0
5 0.00 Kg 110.29 -
WCSR-2013 Item No. 6-a P 5-3
0
6 0.00 - 192.82 -
WCSR-2013 Item No. 25 P 2-5
0
7 0.00 Cum 47.21 -
WCSR-2013 Item No. 15-b-ii P 2-3
Total -

Name
i. Cable trench type-A (2x700mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 1.84 Cum 223.05 411
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.10 Cum 5478.35 520
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.62 Cum 13291.36 8,174
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 1.84 sqm 97.91 180
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 24.63 Kg 110.29 2,716
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 1.38 Cum 192.82 267
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.95 Cum 47.21 45
WCSR-2013 Item No. 15-b-ii P 2-3
Total 12,314

Name
ii. Cable trench type-B (700mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 1.02 Cum 223.05 227
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.05 Cum 5478.35 290
WCSR-2013 Item No. 2-d P 5-1

Page 5 of 14
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.37 Cum 13291.36 4,958
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 1.84 sqm 97.91 180
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 27.63 Kg 110.29 3,048
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.76 Cum 192.82 147
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.53 Cum 47.21 25
WCSR-2013 Item No. 15-b-ii P 2-3
Total 8,875

Name
iii. Cable trench type-C ( 500mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 0.43 Cum 223.05 97
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.04 Cum 5478.35 236
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.23 Cum 13291.36 3,030
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 0.92 sqm 97.91 90
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 17.89 Kg 110.29 1,973
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.33 Cum 192.82 63
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.43 Cum 47.21 20
WCSR-2013 Item No. 15-b-ii P 2-3
Total 5,509

Name
iv. Cable trench type-D (300mm wide)
of Item
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 0.22 Cum 223.05 49
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.03 Cum 5478.35 164
WCSR-2013 Item No. 2-d P 5-1
Reinforced cement concrete work using coarse sand i/c all labour & marterial except the
cost of steel reinforcement & its labour for bending and binding, which will be paid
separately.This rate also includes all kinds of forms moulds, lifting shuttering, curing,
3 rendering & finishing the exposed surface (i/c screening & wahing of shingle), R.C. work in 0.14 Cum 13291.36 1,887
roof slabs, beams, columns, rafts, lintels and other structural members laid in-situ or
precact laid in position complete in all respects, Ratio 1:2:4.
WCSR-2013 Item No. 3-a-i P 5-1
Bitumen Coatings to Plaster or Cement Concrete Surface Using 0.60 kg/Sqm
4 0.63 sqm 97.91 62
WCSR-2013 Item No. 10 P 12-4
Supplying and fabrication of intermediate grade deformed reinforcement for R.C.C. in
beams columns and pile caps, i/c cutting, bending, laying in position i/c cost of binding wire
5 11.97 Kg 110.29 1,321
and removal of rust etc. 40,000 psi (276 Mpa) yield.
WCSR-2013 Item No. 6-a P 5-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.16 Cum 192.82 32
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 0.30 Cum 47.21 14
WCSR-2013 Item No. 15-b-ii P 2-3
Total 3,529

Name G. Construction of switchyard path 2000mm wide complete in all respects including blinding as per specification and drawing No.
of Item PDW/TV-203

Page 6 of 14
Amount
Item # Description Qty Unit Rate
(Rs.)
Excavation in foundation of buildings, bridges and other structures including dibbling
dressing refilling around structure with excavated earth watering and ramming lead upto 30
1 0.35 Cum 400.00 140
m & lift upto 1.50 m, in ordinary soil.
WCSR-2013 Item No. 22-b P 2-5
Cement concrete plain including placing, compacting, finishing and curing complete
2 (including screening and washing of stone aggregate) without shuttering, Ratio 1:4:8. 0.20 Cum 7000.00 1,400
WCSR-2013 Item No. 2-d P 5-1
Cement concrete plain including placing, compacting, finishing and curing complete
3 (including screening and washing of stone aggregate) without shuttering, Ratio 1:2:4. 0.15 Cum 9000.00 1,350
WCSR-2013 Item No. 2-b P 5-1
Expansion Joint
4 0.75 m 1500.00 1,125
WCSR-2013 Item No. 32 P 14-5
Road Edging Complete
5 2.00 m 83.40 167
WCSR-2013 Item No. 18 P 14-3
Refilling the excavated stuff in trenches in 150mm thick layers including watering, ramming
6 to compaction etc., complete 0.26 Cum 192.82 51
WCSR-2013 Item No. 13 P 2-3
Earthwork compaction (soft, ordinary or hard soil), Compaction by roller
7 1.00 Cum 47.21 47
WCSR-2013 Item No. 15-b-ii P 2-3
Total 4,280

Page 7 of 14
Vetted/Reviewed Rate
Amount
(Rs.)

Amount
(Rs.)

-
-

Amount
(Rs.)

Page 8 of 14
-

-
-

Amount
(Rs.)

-
-

Amount
(Rs.)

Page 9 of 14
-

Amount
(Rs.)

-
-

Amount
(Rs.)

-
-

Amount
(Rs.)

Page 10 of 14
-

-
-

Amount
(Rs.)

-
-

Amount
(Rs.)

-
-

Amount
(Rs.)

Page 11 of 14
-

-
-

Amount
(Rs.)
-

-
-

Amount
(Rs.)

-
-

Amount
(Rs.)

Page 12 of 14
-

-
-

Amount
(Rs.)

-
-

Amount
(Rs.)

-
-

Page 13 of 14
Amount
(Rs.)

-
-

Page 14 of 14

You might also like