Southern Region Installed Capacity in MW as on 31st July 2016
(As per CEA)
THERMAL
STATE HYDRO THERMAL NUCLEAR (W M+R.E.S)** TOTAL
COAL GAS DIESEL
TOTAL

Andhra Pradesh 1758.87 6075.91 3309.51 16.97 9402.39 0.00 3001.21 14162.47

Telangana 2135.66 5076.59 1570.89 19.83 6667.31 0.00 895.29 9698.26

Karnataka 3599.80 6280.00 0.00 234.42 6514.42 0.00 5115.38 15229.60

Kerala 1881.50 0.00 174.00 159.96 333.96 0.00 255.47 2470.93

Tamil Nadu 2182.20 7720.00 1027.18 411.66 9158.84 0.00 9777.30 21118.34

Puducherry 0.00 0.00 32.50 0.00 32.50 0.00 0.03 32.53

Central Sector 0.00 11890.00 359.58 0.00 12249.58 2320.00 0.00 14569.58

Southern Region 11558.03 37042.50 6473.66 842.84 44359.00 2320.00 19044.68 77281.71

The graphical representaion is in page IA

2. July 2016 Additions to Installed Capacity in MW


Capacity Date of Synchronising/
State Type Sector Station
(MW) commissioning
Tamil Nadu Wind Private Wind 16.85 July 2016
Hinduja National Power Corporation Ltd
Andhra Pradesh Thermal Private 520 COD from 00:00 Hrs of 03.07.2016
(HNPCL)
MW

10000
11000
12000
13000

1000
2000
3000
4000
5000
6000
7000
8000
9000

0
Hydro, 1,759
Thermal, 9402
Nuclear, 0
W.M + R.E.S, 3001

Andhra Pradesh
Hydro, 2,136
Thermal, 6667
Nuclear, 0

Telangana

Reference: Page No.1, Item No.1


W.M + R.E.S, 895

Hydro, 3,600
Thermal, 6514
Nuclear, 0

Karnataka
W.M + R.E.S, 5115

Hydro, 1,882
Thermal, 334
Nuclear, 0

Kerala
:2 :

W.M + R.E.S, 255

Hydro, 2,182
SR-Installed Capacity - July 2016

Thermal, 9159
States / Sectors

Nuclear, 0
Tamil Nadu

W.M + R.E.S, 9777

Hydro, 0
Thermal, 33
Nuclear, 0
Puducherry

W.M + R.E.S, 0

Hydro, 0
Thermal, 12250
Nuclear, 2,320
W.M + R.E.S, 0
Central Sector
:3:
3. Power Supply Position
3.1 Requirement Vs Availability
3.1.1 ( ) Ex-Bus Demand (MW)
from revised PSP
SL No. Description Andhra Pradesh Telangana Karnataka Kerala T.N. Puducherry S. Region

Ex-Bus Peak Demand


a) 7175 6883 8300 3372 14517 358 36215
(Maximum Unrestricted Requirement )

b) Ex -Bus Peak Met(Actuals) 7175 6890 8302 3369 14467 358 36172

c) Shortfall 0 7 2 -3 -50 -1 -43

d) %age shortfall 0% 0% 0% 0% 0% 0% 0%

e) Average of daily max shortage -19 -18 -23 -9 -35 -1 -105

f) Maximum of daily max shortage -56 -53 -69 -26 -105 -11 -312

Note: Item Nos.a, b & c are not for same day/hour.

3.1.2 Demand
Maximum & Minimum Demand and Peak Demand Met (MW)
SL No. Description A.P. Telangana Karnataka Kerala T.N. Puducherry S. Region

Max Unresrticted
a) 7452 7079 8527 3376 14736 358 37037
Requirement (PSP: Gross) #

b) $ 7452 7086 8529 3373 14686 358 36994


Gross Peak Met(Actual)
(Ex-bus) 7175 6890 8302
Date
15-Jul-16 29-Jul-16 19-Jul-16 26-Jul-16 14-Jul-16 12-Jul-16 13-Jul-16

c) Unrestricted Requirement (LGBR) 7283 7326 9342 3700 13929 350 40078

d) Minimum Demand 3984 3896 4259 1602 9021 168 25451

Date 10-Jul-16 10-Jul-16 31-Jul-16 3-Jul-16 31-Jul-16 21-Jul-16 1-Jul-16


Maximum Demand
e) 7114 6670 8916 3395 13766 344 37384
(July 2015)
(Ex-bus) 6847 6480 8705

Date 07-Jul-15 31-Jul-15 17-Jul-15 28-Jul-15 2-Jul-15 11-Jul-15 16-Jul-15


Note: Item Nos. a & b are not for same day/hour.
The hourly Southern Regional Grid Demand for the maximum and minimum demand days are shown in Annexures-II A, II B & II C.

# Frequency Correction , Effect of Load Shedding and Power Cuts taken into account.
$ Actual figures for AP & Karnataka are ex-bus, for Kerala, TN, Puducherry & SR actual figures are gross
Note: State-wise daily Maximun & Minimum Demand and load factor has been shown in Annexure-I A, B, C, D &
Load pattern of Southern Region on maximum and minimum demand day in Annexure-II A, B & C
:4:

Maximum & Minimum Demand and Peak Demand Met in July 2016

37,037

36,994
40000

35000

30000

25,451
25000
MW

20000

14,736

14,686
15000

9,021
8,529
8,527
7,452

7,452

7,079

7,086

10000 4,259
3,984

3,896

3,376

3,373
5000

1,602

358

358

168
0
A.P. Telangana Karnataka Kerala T.N. Puducherry S. Region

Max Unresrticted Gross Peak Met(Actual) $ Minimum Demand


Requirement (PSP: Gross) #
Reference: Page No.2, Item No.3.1.2
:5:
3.2.1. (-) Energy (Ex-Bus) - (PSP Figures)
Figures in MU
State A.P. TS Karnataka Kerala T.N. Puducherry S. Region
a) Unrestricted Energy
4,251.97 4,048.70 4,441.05 1,882.14 9,001.41 227.21 23,852.48
requirement
b) Actual Energy Supplied 4,253.89 4,050.51 4,443.42 1,883.03 9,005.02 227.26 23,863.14

c) Surplus+/Deficit- 1.92 1.81 2.37 0.89 3.61 0.06 10.66

d) Percentage 0.05 0.04 0.05 0.05 0.04 0.02 0.04

3.2.2
Gross Energy Consumption (in MU) - (Constituent figures)

Puducherry Southern
State AP TS Karnataka Kerala Tamil Nadu
** Region
## ## ##
Unrestricted Requirement # 4414 4222 4693 1858 9190 227 24605

Unrestricted Requirement (LGBR ) 4732 4497 5630 1969 9275 222 26405

Actual 4416 4254 4224 4092 4696 4618 1859 9194 227 24615

Average/ Day 142 137 136 132 151 149 60 297 7 794

Actual -July 2015 4752 4569 4479 4374 5548 5421 1840 9088 221 25929

Average/ Day
153 147 144 141 179 175 59 293 7 836
July 2015
AP consumption includes Srisailam Pump Mode consumption of 0 MU
Kadamparai Pump mode consumption is 2.95 MU
## Ex-bus figure
# Frequency Correction , Effect of Load Shedding and Power Cuts taken into account.
** Puducherry Energy Consumption Actual (Gross) is REA/ABT figure
: 6:

Energy Requirement Vs Availability - July 2016

30000

23,863
23,852
25000

20000
MU

15000

9,005
9,001
10000
4,441
4,443
4,254
4,252

4,051
4,049

5000

1,882
1,883

227

227
0
A.P. TS Karnataka Kerala T.N. Puducherry S. Region
a) Unrestricted Energy b) Actual Energy Supplied
requirement

Reference: Page No.3, Item No.3.2.1


: :7 :
Gross Energy Consumption (Actual) July 2016

10000

9000
Energy Consumption- MU

8000

7000

9194
6000

5000

4000

3000

4696
4416

4224

2000

1859

227
1000

0
AP TS Karnataka Kerala Tamil Nadu Puducherry**
** Puducherry Energy Consumption Actual (Gross) is REA/ABT figure
Reference: Page No.3, Item No.3.2.2
:8:
3.3 , Load shedding in MU

Andhra Tamil Puducherr Southern


State Telangana Karnataka Kerala
Pradesh Nadu y Region

Load Shedding (MU) 0.00 0.00 0.00 0.00 0.00 0.04 0.04

Load Shedding (MW) 0 0 0 0 0 0

3.4 Central Generating Stations

Generation & Relief to the Grid


Local Loads + Auxiliaries
STATION Gross Generation(MU) Relief to the Grid(MU)
(Actuals) MU
ISGS/CGS
NTPC
Ramagundam STPS,NTPC 1373.04 1276.87 96.17
Talcher Stage II NTPC 1333.16 1256.10 77.06
Simhadri Stage -I NTPC
641.315 607.83 33.49
(for Andra Pradesh & Telangana)
Simhadri Stage II NTPC 576.42 543.85 32.57

Vallur JV, NTECL(NTPC_TANGEDCO) 582.03 534.09 47.94

RGCCPP 0.000 0.00 0.00


NLC
Neyveli TS-I(CGS)
310.175 248.19 61.99
(for Tamil Nadu)
Neyveli TS-II 836.45 684.98 151.48
Neyveli TS I Expn 293.80 269.12 24.68
Neyveli TS II Expn. 181.68 148.03 33.65
NTPL(JV_NLC & TANGEDCO) 478.17 443.19 34.97
NPCIL
MAPS 286.57 245.89 40.68
Kaiga GS 509.87 464.73 45.14
Kudankulam NPP 748.73 695.94 52.78
:9:

3.5 Schedule (as per LGBR), Actuals And Ex-Bus Consumption of Energy in MU (as per PSP)

Schedule as per LGBR (ex Bus)

STATE AP TS KAR KER TN PUDU Southern Region

/ Hydro 187 175 1071 616 477 2526


/Thermal 1867 1667 1285 1 2072 6892
/ Diesel 0 0 5 5
/ Gas 32 26 0 144 202
Sim(AP)/RGCCPP, KYM(KER)/
233
NLC TS-I(TN) 283 331 847
IPPs 733 66 1464 762 3012 6037
Captive Plants 0 0 10 10
Wind Mill 0 0 0 0 2390 2390
Allocation of power from ISGS 704 796 1710 769 2445 6424
ER/ Bilateral 755 1220 707 22 236 2940
Total 4561 4281 6242 2148 10805 236 28273

ACTUALS (Gross)

/ Hydro 105.57 42.78 470.50 453.30 242.22 1314.38

/Thermal 1764.92 1457.64 790.49 1804.53 5817.57

/ Diesel 0.22 0.22

/ Gas 33.21 130.60 163.81


Total 1903.69 1500.42 1260.99 453.52 2177.35 7295.97


/ Actual Energy Supplied in MU
Hydro Ex-bus 104.51 42.36 465.80 448.77 239.80 0.00 1301.23

Thermal Ex-bus 1606.08 1326.45 717.15 0.00 1642.12 0.00 5291.80

Diesel Ex-bus 0.21 0.21


Gas Ex-bus 32.21 126.68 158.89
Sim(AP)/RGCCPP, KYM(KER)/ NLC TS-I(TN) 607.83 0.00 248.19 856.02

IPPs Ex-bus 665.65 181.34 702.27 0.00 184.56 1733.82

Captive Plants Ex-bus 170.28 14.50 9.58 4.01 757.85 956.23


Wind Mill 410.10 28.00 685.82 11.94 2245.28 3381.13
Total 3596.66 1592.64 2580.62 464.93 5444.48 0.00 13679.34
Actual Drawls from CPSUs +Bilateral Power+Inter-
Regional Power (Ex-bus including losses)** 657.22 2457.87 1862.80 1418.10 3560.54 227.26 10183.80

Total Actual Energy Supplied in MU 4253.89 4050.51 4443.42 1883.03 9005.02 227.26 23863.14
** Losses are transmission losses in CTU / wheeling losses.
: 10 :

4.

Notified Power Cuts and Restrictions on Power Supply to Agricultural Sector in Southern Region

The details of notified power cuts and restrictions on power supply to the agricultural sector for the month of July 2016 as reported by the constituents in
respect of Southern Region are given below :

I
Notified Power Cuts

1 Andhra Pradesh NIL

2 Telangana NIL

3 Karnataka NIL

4 Kerala NIL

5 Tamil Nadu NIL

II , 2016

Daily Power Supply to Agricultural Consumers in July 2016

Per Day Values in Hr/

State

7 hrs 3-phase
Andhra Pradesh 7
9 hrs 3-phase
Telangana 9
Karnataka 6 (6-12) other hrs

Kerala 24 0 0
Tamil Nadu 9 hrs three phase supply is ensured(6hrs during day time
and 3 hrs during night time)
:11:

5.0
Energy Exchanges
5.1 Intra regional energy exchanges in MU using ISTS (Annexure-III) ( )

5.2 Inter Regional Energy Exchanges using ISTS -



EXPORT IN MU
July-16 Cum. From April 2016
From
At State Periphery
Andhra Pradesh 0.000 0.000

Telangana 0.000 0.000

Karnataka 0.000 0.000

Kerala 0.000 0.000

Tamil Nadu 0.000 0.000

IPPs/CPPs / 42.390 50.970

Total Southern Region () 42.390 50.970


IMPORT IN MU
July-16 Cum. From April 2016
To
At State Periphery
Andhra Pradesh 132.510 387.075
Telangana 11.820 359.510
Karnataka 231.760 1071.090
Kerala 568.600 2104.008
Tamil Nadu 1040.127 4239.712
IPPs/CPPs / 10.160 37.410
Total Southern Region () 1994.977 8198.805
:12 :

5. 3 ENERGY EXCHANGES THROUGH IEX & PXI


EXPORT IN MU TO IEX & PXI
July-16 Cum. from April 2016
From At Seller Periphery
To Power Exchanges
1 Andhra Pradesh 16.652 56.317
2 Telangana 63.489 215.154
3 Karnataka 26.352 48.464
4 Kerala 40.363 61.057
5 Tamil Nadu 35.107 45.738
IPPs/CPPs
6 LKPPL 0.587 0.587
7 SEPL 76.372 242.566
8 MEPL 84.384 426.672
9 TPCIL 48.988 167.309
10 Coastal Energen 4.806 4.806
10 IL & FS 1.021 1.021
10 Total Southern Region () 398.121 1269.689
IMPORT IN MU FROM IEX & PXI
July-16 Cum. from April 2016
To At Seller Periphery
From Power Exchanges
1 Andhra Pradesh 195.585 672.787
2 Telangana 298.815 873.152
3 Karnataka 209.764 692.895
4 Kerala 38.258 217.678
5 Tamil Nadu 23.262 85.242
6 Puducherry 3.102 3.102
IPPs/CPPs
7 LANCO 0.000 0.000
8 SEPL 0.000 0.000
9 MEPL 0.000 0.000
10 TOTAL SOUTHERN REGION () 768.787 2544.856
Note: Energy Exchanges includes the Exports/Imports by IPPs/CPPs and State Sector.
:13:

6. , / / -
6. TOTAL ENTITLEMENT/SCHEDULE/ACTUAL DRAWAL INCLUDING BILATERAL IN MU

Actual Drawl from


Net Schedule from Grid(including
Constutuent Entitlement from Grid(ISGS) Total Schedule from Grid(ISGS) Grid including Grid
Bilaterals)
Loss (MU):REA figures

Andhra Pradesh 803.171 729.056 636.912 657.221


Telangana 865.448 782.578 2434.495 2457.865
Karnataka 1621.524 1455.698 1844.536 1862.803
Kerala 878.122 828.586 1372.144 1418.103
Tamil Nadu 2733.557 2377.717 3638.298 3560.545
Puducherry 251.972 229.015 232.249 227.264
Goa 54.572 54.477 54.096 55.938
Orissa 137.166 137.110 137.110 137.110
PGCIL 4.004 4.001 4.001 1.924
Total 7349.536 6598.237 10353.841 10378.774
Note
Entitlement : includes entitlements from RSTPS-NTPC, Neyveli II Stage I & II, Neyveli TS I Expansion, Neyveli TS II Expansion,NTPL.
Talcher Stage II, Simhadri stage II & NTECL Vallur & schedules of ER/NR Power and actuals of MAPS , KGS & KKNPP
This does not include bilateral exchanges.
Schedule : includes schedules from RSTPS-NTPC, Neyveli II Stage I & II,NTPL, Neyveli TS I Expansion, Neyveli TS II Expansion, Talcher Stage II, Simhadri stage II & NTECL Vallur & ER/NR
Power and actuals of MAPS, KGS and KKNPP.
Total schedule does not include of bilateral exchanges.
Net schedule includes schedule of bilateral exchanges.
Actuals: 1. Goa actuals include schedule at Chandrapur West Bus (wheeled via WR)
2. Actuals are at Generator Ex bus periphery.
7. Meetings held in the month of July 2016
Sl.No. Meeting Place Date
st
1 121 OCC Meeting SRPC,Bengaluru 12.07.2016
2 MOM of Protection System Analysis Group 16 SRPC,Bengaluru 18.07.2016
3 56th Protection Coardination Sub Committee Meeting SRPC,Bengaluru 28.07.2016
:14:

Actual Drawal - July 2016


4000

3,638
3,561
3500

2,734
3000

2,458
2,434

2,378
2500

1,863
1,845
2000

1,622
MU

1,456

1,418
1,372
1500

878
865

829
803

783

1000
729

657
637

500

252

232
229

227
0
Andhra Telangana Karnataka Kerala Tamil Nadu Puducherry
Pradesh
Entitlement from Grid(ISGS)
Reference: Page No.8, Total Schedule from Grid(ISGS)
Item No.6
Net Schedule from Grid(including Bilaterals)
Actual Drawl from Grid including Grid Loss (MU):REA figures
8. (Station Wise Generation)

Effective Cumulative
Power Station Installed Capacity Gen. Gen.
Capacity Generation

As on 31st July 2016 Jul-15 Jul-16 From April 2016

MW MU MU
Andhra Pradesh
Hydro(State)
3x23 + 3x17 = 120x0.7
84 26.27 31.46 113.75
1 Machkund (70% share)
8 x 9 = 72 x 0.8(80% share) 57.6 4.47 2.6183 6.74
2 T.B. Dam & Hampi
3 Upper Sileru 4 x 60 240 48.58 21.522 57.94
4 Donkarai 1 x 25 25 12.70 0 1.28
5 Lower Sileru 4 x115 460 108.69 48.265 166.24
6 Srisailam RB 4x110 + 3x110 770 0.01 0.048 6.75
7 Penna Ahobilam 2 x 10 20 0.00 0 0.00
8 Nagarjunasagar RCPH 3 x 30 90 0.00 0 0.00
9 Mini Hydro 1 0.01 0.29 0.41
Total Hydro(State) 1747.6 200.73 104.20 353.10
Thermal (State) 0.00
1 Vijayawada 1 2 x 210 420 250.610 202.98 839.54
2 Vijayawada 2 2 x 210 420 268.020 127.23 798.09
3 Vijayawada 3 2 x 210 420 215.810 215.76 942.79
4 Vijayawada 4 1x500 500 311.130 305.53 1238.13
5 Rayalaseema A 2 x 210 420 197.050 230.16 929.06
6 Rayalaseema B 2x210 420 263.270 155.42 873.30
7 Rayalaseema Stg-III Unit V 1 x 210 210 130.230 119.35 476.91
Krishnapatanam(SDSTPS)
800 800 302.270 1449.34
8 Unit - I 0
Krishnapatanam
9 (SDSTPS) Unit II 800 800 0.000 405 1274.07
Total Thermal (State) 4410 1938.39 1761.93 8821.23
Wind 2 2 0 0
Solar State
Total (State) 6159.6 2139.12 1866.13 9174.33
Joint Venture
Gas
1 Vijjeswaram stage II 172 172 65.000 33.824 242.28
2 Vijjeswaram stage I 2x33 + 1x34 100 0.270 0 0.00
Total Joint Venture 272 65.270 33.824 242.28
Private Sector
Gas
1 Jegurupadu - I 2x45.8+1x48.9+1x75.5 216.82 77.650 77.68 227.15

2 Jegurupadu - II 220 220 0.000 0 0.00

3 Spectrum 1x46.8+2x46.1+1x68.88 208.31 49.390 89.88 243.12

4 Kondapalli (LANCO) 2x115+1x121.49 351.49 17.820 58.77 169.73

5 Reliance (BSES) 1x140+1x80 220 0.000 0 0.00

6 GMR Vemagiri 1x137+1x233 370 0.200 73.940 443.43

7 Gowthami 2x145+1x174 464 0.000 0 0.00

8 Konaseema 2x145+1x174 444.08 0.010 0 0.00

Total Gas Private 2494.7 145.07 300.27 1083.43

Private Sector 0.00


Hinduja Unit I 520 520 0 238.63 502.36

Hinduja Unit II 126.75 321.24

Total Private Others 520 0 365.38 823.60

Total Private Sector 3014.7 145.07 665.65 1907.03


0.00
1 Wind(Private) 1397.89 476.550 429.13 1085.86
2 Other Mini Hydels 89.1 6.150 9.88 35.77

Other Bio-mass co gen, Biomass 198.95+171.25+50.94 421.14 39.630 32.22 137.21


3 Power Projects , Bagasse group

4 Other Mini Power Plants 78.79 4.350 11.70 64.69

Other purchases from CPPs


(Muncipal waste based Power 6.15+26.51+27.04 59.7 262.710 11.08 453.48
projects, Industrial waste based
5 power projects), Isolated gas wells

Solar Energy(RPSSGP,NVVN,Grid 544.14 0.730 93.16 326.03


6 Interactive)
40.85 0.000 0.00
7 Solar Energy(AP State Solar Policy) 0
Total Others 2631.61 790.12 587.168 2103.04
Total AP 12075.91 3139.580 3152.77 13426.68
TELANGANA
Hydro
1 Srisailam LBPH 6x150 900 0.000 10.768 10.77
2 Nagarjunasagar 1x110 + 7x100 .8 815.6 0.000 0.0031 16.49
3 Nagarjunasagar LCPH 2 x 30 60 0.000 0 0.00
4 Nizamsagar 2x5 10 0.610 0 0.00
5 Pochampad 4x9 36 0.000 0 0.00
6 Singuru 2x7.5 15 0.090 0 0.00
7 Priyadarsini Jurala 6x39 234 0.000 22.65 22.65
8 Paleru MH 0.000 0 0.00
9 Peddapalli MH 0.000 0 0.00

10 Upper Jurala 2x40 80 9.13 9.13

Total Hydro 2150.6 0.70 42.548 59.03


1 Kothagudem A 4 x 60 240 112.120 132.83 527.01
2 Kothagudem B 2 x 120 240 81.710 119.39 492.06
3 Kothagudem C 2 x 120 240 126.370 107.53 410.63
4 Kothagudem D 2 x 250 500 310.710 251.89 1186.20
5 Kothagudem E 1X500 500 271.900 268.63 1054.48
6 Ramagundam B 1 x 62.5 62.5 41.430 38.58 169.87
7 Kakatiya TPP Stage I Unit I 1x500 500 338.030 266.85 996.00
8 Kakatiya TPP Stage I Unit II 1x800 800 259.18 1026.57
Total Thermal 3082.5 1282.27 1444.879 5862.83
Wind Mill (State) 0.000 0.00
Solar(State) 1 0 0.000 0.00
Total Satae 5234.1 1282.97 1487.426 5921.86
1 Wind(Private) 28.020 28.58 68.07
2 Solar(Private) 336.87 7.550 76.91 283.92
3 Singareni collieries TPS 25.030 67.20 125.03
4 Other NCES group 0.000 32.85 78.26
5 Other purchases from CPPs 225.870 68.71 403.05
Total Purchase 336.87 286.470 274.25 958.34
Total Telangana 5570.97 1569.44 1761.675 6880.20
Karnataka
Hydro
1 Sharavathi 10 x 103.5 1035 338.450 135.97 692.78
2 Linganamakki Dam PH 2 x 27.5 55 12.190 1.26 23.68
3 Jog (MGHES) 4x21.6 + 4x13.2 139.2 28.440 13.19 172.11
4 Nagjhari 5x150+1x135 885 262.680 57.57 435.46
5 Supa 2 x 50 100 44.490 3.74 61.41
6 Varahi 2 x 115 230 105.230 80.85 289.68
7 Varahi UGPH 2 x 115 230 0.000 0.00 0.00
8 Bhadra 1x7+ 2x12 + 1x2+6 39 2.440 0.10 2.59
9 Sivasamudram 6x3 + 4x6 42 27.030 29.13 52.91
10 Shimsha 2 x 8.6 17.2 7.850 6.94 10.34
11 Munirabad 2 x 9+10 28 1.590 2.49 2.49
12 T.B.Dam & Hampi 8 x 9 (20% share) 14.4 1.600 3.47 4.53
13 Ghataprabha 2 x 16 32 3.320 0.00 2.29
14 Mani Dam 2 x 4.5 9 0.470 0.506 4.57
15 Mini Hydro 1.40 + 0.35+0.27 4.45 0.000 0.000 0.00
16 Mallapur 2 x 4.5 9 0.000 0.000 0.00
17 Kadra 3x50 150 38.310 24.01 61.95
18 Kodasalli 3x40 120 28.930 12.23 53.25
4x60 240 39.060 83.35
19 Gerusoppa (SharavathiTail Race) 18.93
20 Almatti 1X15+5X55 290 24.720 64.74 65.28
21 Jural Share 0.000 15.38 15.38
Total Hydro 3669.25 966.800 470.50 2034.08

Thermal
1 Raichur TPS (Gross) 7 x 210+1 x 250 1720 897.350 570.67 3145.91
2 Bellari TPS 2 x 500 1000 640.830 219.82 1759.66
3 Bellari Unit III(infirm power) 0.000 23.57
Total Thermal 2720.0 1538.18 790.49 4929.13
Diesel
Yelahanka Diesel 6 x 21.3 127.8 0 0.000 0.00
Total Diesel 127.8 0 0.000 0.00
1 Kappatagudda 4.55 4.55 1.310 0.997 2.83
2 Solar 25 25 2.590 2.265 10.20
Total State 6546.6 2508.880 1264.25 6976.24
2 Co Generation 1053 1053 1040.060
3 Bio Mass 133.5 133.5 0.000
908.330 1916.68
4 Mini Hydel 728.25 728.25 0.000
5 Wind Mill 2174 2174 0.000
6 Jindal 2x130+4x300 1460 316.790 9.582 1040.21
7 UPCL 2*600 1200 625.810 477.49 2421.09
8 Solar 0.00
Total Purchase 6748.75 1982.660 1395.40 6286.313
Total 13295.35 4491.540 2659.66 13262.556
Kerala
Hydro(State)
1 Kuttiadi+KES+KAES 3 x 25+ 1 x 50 + 2 x 50 225 89.530 64.98 180.62
2 Sholayar 3 x 18 54 2.390 1.29 62.52
3 Poringalkuthu 4x8 32 25.150 26.07 38.48
4 Poringalkuthu LBE 1x16 16 11.900 11.98 37.72
5 Pallivasal 3x5 + 3x7.5 37.5 19.730 20.02 67.67
6 Sengulam 4 x 12 48 19.460 19.96 50.25
7 Panniar 2 x 16 32 18.500 15.08 28.34
8 Neriamangalam + NES 3 x 17.5 + 25 77.5 50.860 48.81 93.62
9 Sabarigiri 4 x 55 + 2x60 340 108.590 39.83 298.66
10 Idukki 3 x 130 + 3 x 130 780 203.100 56.49 544.56
11 Idamalayar 2 x 37.5 75 25.090 4.24 59.92
12 Kallada 2 x 7.5 15 3.110 6.70 22.35
13 Peppara 3 3 0.000 0.12 0.72
14 Madupetty 1x2 2 0.000 0.00 1.55
15 Malampuzha 1 x 2.5 2.5 0.000 0.00 0.00
16 Lower Periyar 3 x 60 180 90.630 88.47 150.66
17 Kakkad 2 x 25 50 19.020 11.05 53.41
18 Chembukadav 09 x 3+1.25 x 3 6.45 2.480 2.91 4.33
19 Urumi I & II 3 x 1.25 + 3 x 0.8 6.15 2.560 3.18 5.23
20 Malankara 3 x 3.5 10.5 3.550 2.81 10.78
21 Lower Meenmutty 2 x1.5 + 0.5 3.5 0.760 0.49 1.49
22 Kuttiyadi Tail race 3 x 1.25 3.75 1.120 0.72 2.49
23 Poozhithode 3x1.6 4.8 2.550 2.97 4.58
24 Rani Perunadu 2x2 4 0.880 0.79 2.48
25 Peechi 1x1.25 1.25 0.000 0.00 0.12
26 Chimney 0.00 0.00

27 Adiyanpara 1.34 1.78

7.5 7.5 6.48


28 Vilangad 4.70
0.37
29 Vellathuval 0.37
1.22
30 Barapole 1.22
2017.4 700.96 436.56 1732.38
Total Hydro(State)
Hydro(Private) 0.00
1 Ullumkal 2x3.5 7 2.170 1.701 5.69
2 Iruttukanam 3x1.5 4.5 4.220 4.177 7.86
3 Karikkayam 3x3.5 10.5 3.140 3.320 10.27
4 Meenvallam 1x3 3 1.120 1.785 2.67
6 Parambikkulam Mini Hydro 0.11 0.11 3.440 0 0.00
Total Private 25.11 14.090 10.9830 26.49
Captive 0.00
1 Maniyar (Captive) 3x4 12 4.200 3.84 10.41
2 Kuthungal (Captive) 3x7 21 3.740 1.92 11.07
Total Captive 33 7.94 5.76 21.48
Total Hydro(Pvt+CPP) 58.11 22.03 16.74 47.97
Total Hydro 2075.51 722.99 453.30 1780.35
Diesel
1 Brahmapuram 1x21.32 21.32 1.000 0.000 5.49
2 Kozhikode 4x16 64 8.900 0.217 35.49
Total Diesel 85.32 9.90 0.217 40.99
Wind Mill State 9x0.225 2.025 0.110 0.206 0.59

Solar State 0.094 0.43

Total State 2162.855 733.00 453.819 1822.36


Kayamkulam RGCCPP, NTPC##
2 x 116.6 + 1x126.38 359.58 0 0 15.40
(Combined Cycle )
Private
3x7.31 21.93 0.000 0.00
1 Kasargode Power Corporation Ltd. 0
2 MPS Steel 1x10 10 0.000 0.000 0.00
3 Philips Carbon Black Ltd(PCBL) 10 10 3.690 4.013 16.09
Ramakkelmedu 19x0.75 14.25 5.920 3.215 10.16
Agali 31x0.600 18.6 5.080 4.946 13.49
Ahalya 8.4 8.4 2.062 4.02

Solar 1.41 5.76


Total Purchase 83.18 14.690 15.65 49.53
Total Kerala 2246.035 747.690 469.47 1871.89
Tamil Nadu
Hydro
Pykara 3x6.65 +1x11 + 2x14 58.95 3.500 5.676 6.66
Pykara Micro 1x2 2 0.640 0.121 1.72
Pykara Ultimate Stage (PUSHEP) 3x50 150 19.390 7.287 104.03
Moyar 3 x 12 36 8.180 4.117 33.15
Apravakandi Micro 1 x 0.75 0.75 0.070 0.012 0.11
Kundah I 3 x 20 60 19.120 8.082 76.58
Kundah II 5 x 35 175 52.100 27.157 199.94
Kundah III 3 x 60 180 30.470 14.554 106.92
Kundah IV 2 x 50 100 14.270 13.185 32.05
Kundah V 2 x 20 40 1.760 0.395 16.74
Suruliyar 1 x 35 35 4.900 5.087 16.49
Kadamparai 4 x 100 400 30.170 10.365 77.09
Aliyar 1 x 60 60 18.840 4.617 28.22
Poonachi 1x2 2 0.630 0.716 1.06
Mettur Dam 4 x 12.5 50 11.470 6.196 19.28
Mettur Tunnel 4 x 50 200 5.400 4.132 4.13
Lower Mettur HEP I 2 x 15 30 3.590 2.334 3.55
Lower Mettur HEP II 2 x 15 30 3.340 2.421 4.56
Lower Mettur HEP III 2 x 15 30 3.480 2.694 4.40
Lower Mettur HEP IV 2 x 15 30 2.790 2.241 4.42
Bhavani Sagar-Micro 4x2 8 3.810 0.000 1.54
Periyar 4 x 35 140 79.780 20.584 23.99
Vaigai 2x3 6 1.580 0.000 0.17
Papanasam 4x8 32 15.410 15.508 35.31
Servalar 1 x 20 20 4.700 4.514 8.67
Sarkarpathy 1 x 30 30 0.000 0.000 7.67
Sholayar I 2 x 35 70 36.610 49.330 55.73
Sholayar II 1 x 25 25 10.000 11.522 13.74
Kodayar I 1 x 60 60 3.880 9.973 49.99
Kodayar II 1 x 40 40 3.390 4.118 18.99
Lower Bhavani RBC 2*4 8 0.000 0.000 0.00
Sathanur 1x7.5 7.5 0.000 0.002 2.10
Parson's Valley 1x30 30 2.860 0.181 8.82
Mukurthi Micro 2x0.35 0.7 0.000 0.000 0.00
Thirumoorthy 0.65x3 1.95 0.000 0.000 0.23
Lower Aliyar 2x1.25 2.5 0.640 0.000 0.00
Bhavani Kattalai Barrage 2x15 30 5.610 4.329 7.00
Amaravathi Micro 2x2 4 0.870 0.774 0.77
Perunchani Micro 2x0.65 1.3 0.630 0.000 0.00
Periyar Vaigai Micro Hydel 2x2 4 3.620 0 0.00
Total Hydro 2190.65 407.50 242.223 975.82
Thermal
Ennore 2x60 + 3x110 450 39.540 24.42 119.80
Tuticorin 5 x 210 1050 593.280 375.52 2125.12
Mettur 4 x 210 840 429.630 421.40 1916.48
North Chennai 3 x 210 630 380.160 379.64 1516.16
MTPP Stage III 1x600 600 310.200 207.88 881.13
NCTPP Stage II 2x600 1200 365.070 395.668 2176.17
Total Coal 4770 2117.88 1804.526 8734.86
Gas
Basin Bridge 4 x 30 120 1.280 0.404 5.79
Kovil Kalappal 1x70+1x37 107.88 39.750 34.404 152.73
Valathur Stage I 1X60+1X34 94 65.820 61.235 228.07
Valathur Stage II 1x59.8+1X32.4 92.2 0.000 0.000 0.00
Kuttalam 1x64+1x37 101 48.460 34.556 114.32
Total Gas 515.08 155.31 130.599 500.91
Wind Mill (State) 17.465 17.555 0.000 0 0.00
Solar (State) 0.000 0 0.00
Total State Sector 7493.285 2680.69 2177.348 10323.61
Private
GMR Vasavi 4x49 196 0.000 0 0.00
Samalpatty 7x15 105.66 0.370 0 0.00
Madurai PCPL 105.66 0.410 0.381 10.46
Pillai Perumal Nallur 330.5 -0.600 20.750 141.81
Wind Mill 7376.8 7376.8 2122.66 2245.280 5663.05
TCPL 63.5 0.000 0.00
HITEC 15 0.000 0.00
Manali 0.000 0.00
Neyveli STCMS Unit 250 148.360 89.92 408.63
Lanco Tanjore Power Company
1x74.1+1x38.81 113.21 53.930 182.37
ABAN 38.50
Cogeneration 0 0.000 0.00
Solar 246.6 2.140 109.84 453.81
Others + CPPs 0 906.260 648.01 3128.88
52.8 33.200 128.73
Arkay Energy Ltd.(PENNA)PIONEER 35.01
Total Purchase 8855.73 3266.73 3187.69 10117.73
Total State 16349.015 5947.42 5365.04 20441.34
Neyveli TPS I 6x50 + 3x100 600 302.09 310.18 1273.09
16949.015 6249.51 5675.21 21714.43
Kadamparai (Pump mode) 19.340 2.950 74.97
Karaikal Combined Cycle Gas Power
1x32.5 32.5 0.000 0.00
Plant
ISGS Stations
Ramagundam STPS 3x200 + 4x500 2600 1557.210 1373.04 6277.57
Talcher Stage II-NTPC 4x500 2000 1375.750 1333.16 5300.17
Simhadri Stage II-NTPC 2x500 1000 678.370 576.42 2398.55
Simhadri Stage I-NTPC 2x500 1000 638.810 641.32 2544.80
Total NTPC 6600 4250.14 3923.93 16521.10
NLC 0.00
Neyveli TS II 7 x 210 1470 898.550 836.45 3645.97
Neyveli TPS - I Exp. 2x210 420 307.140 293.799 1089.93
Neyveli TS II Expansion 1x210 210 101.350 181.681 494.49
Total NLC 2100 1307.04 1311.93 5230.38
Joint Venture
Vallur NTECL(TNEB-NTPC) 3x500 1500 588.070 582.03 2587.69
NTPL(TNEB-NLC) 2x500 1000 109.760 478.17 1942.66
Toatl Joint Venture 2500 697.83 1060.20 4530.35
NPCIL
MAPS (Kalpakkam) 2 x 220 440 306.890 286.57 1052.15
Kaiga GS 4x220 880 637.120 509.87 1902.11
KKNPP 1x1000 1000 0.000 748.73 2898.63
TOTAL 2320 944.010 1545.17 5852.90

Merchant Power Plants directly 0.00


connected to ISTS(400 kV System)
LANCO(AP) (1x233+1x133)+(2x371) 1108 0.000 0 0.00
Simhapuri(AP) 3X150 450 354.570 121.285 976.94
Meenakshi(AP) 2X150 300 179.280 113.41 610.12
Costalenergen(TN) 2x600 1200 312.390 184.09 1485.47
TPCIL 2x660 1320 419.39 809.94 2800.80

IL & FS 2x600 1200 183.25 1210.17


0.00
Total MPPs 5578 1265.630 1411.975 7083.50

State Sector

Hydro-Total 11775.5 2276.69 1296.03 5154.41


Thermal-Total 14982.5 6876.72 5801.82 28348.05
Gas 787.08 220.58 164.42 743.18
Diesel 213.12 9.9 0.22 40.99
Wind Mill 26.13 1.42 1.20 3.42
Solar 26 2.59 2.36 10.63
Private Sector 0.00
Gas 2494.7 145.07 300.270 1083.43
Wind Mill 10989.94 2638.230 2713.212 6844.66
Solar 1168.46 10.420 281.336 1069.52
State Purchase- Total(co-gen, Mini
7100.96 3703.11 2791.518 12373.79
Hydel, Bio-mass etc)
ISGS-Coal/Lignite-Total+NLC TS-I
12159.58 6557.1 6606.236 27570.32
+Kayamkulam
ISGS Nuclear- Total 2320 944.010 1545.168 5852.90
TOTAL MPPs** 5578 1265.63 1411.975 7083.50
TOTAL SR $ 69621.97 24651.47 22915.770 96178.81
:24:

9. Storage Position in Major Hydel Reservoirs


As on 31st July-16 As as on 31st Jul-15
Energy in Cumulative
F.R.L.in MDDL in Energy Inflow Energy in Inflow in
Reservoir MU at Level in M inflow from Level in M
mtrs. M in MU in MU MU MU
FRL April 16
Andhra Pradesh/Telangana
Jalaput 838.40 532 818.39 826.92 131.44 149.00 226 830.63 231.46 38
Srisailam 270.70 268.8 243.84 238.20 117.00 244.66 7.45
Nagarjunasagar 179.90 179.8 156.97 153.77 155.69 7.50
.
Linganamakki 554.50 4547 522.73 542.82 1686.46 825.00 1109 543.47 1800.57 29.00
Supa+Bommanhalli+Tattihalli 564.00 3152 495.00 535.23 1095.11 410.00 513 539.40 1318.41 438.00
Kerala
Idukki 732.43 2190 694.94 714.54 900.16 405.26 689 719.19 1178.39 416.92
Kakki+Pampa 981.45 916 908.30 967.60 490.62 224.99 410 961.13 370.76 211.37
Total (Including all other
Reservoirs)
4131 1883.07 1058.68 1811 2128.99 1065.29

Tami Nadu
Nilgiris 1504 - 384 327 622 - 1034 243
Total 2182.87 - 604 561 1047 - 1445 448
Mettur 240.79 210.02 - 12 30 34 - 113 63
:25:

PERFORMANCE OF IMPORTANT THERMAL/NUCLEAR PLANTS IN JULY 2016


STATE/ STATION Installed Capacity (MW) Plant Load Factor (%) Plant Availability Factor (%)

ANDHRA PRADESH
Vijayawada 1760.00 65.03 80.14
Rayalaseema 1050.00 64.64 81.30
Krishnapatanam Unit I 1600.00 34.06 88.84
TELANGANA
Kothagudam(Unit I-X) 1220.00 65.18 94.69
Kothagudam Unit XI 500.00 70.14 99.25
Kakathiya TPP I 500.00 67.29 100.00
KARNATAKA
Raichur 1720.00 44.59 79.78
Bellari 1000.00 29.55 94.46
TAMIL NADU
Ennore 450.00 7.29 23.60
Tuticorin 1050.00 48.07 57.90
Mettur 840.00 67.43 76.90
North Chennai Stage I 630.00 80.99 96.84
North Chennai Stage II 1200.00 44.32 60.66
Mettur Stage II 600.00 46.57 64.89
ISGS/JV
NTPC
Ramagundam STPS 2600.00 70.98 82.98
Talcher Stage II 2000.00 89.59 98.35
Simhadri Stage I 1000.00 86.20 100.00
Simhadri Stage II 1000.00 77.48 100.00
Vallur TPS JV(TNEB & NTPC) 1500.00 52.15 60.36
NLC
Neyveli TS II 1470.00 76.48 84.49
Neyveli TS I Expansion 420.00 94.02 100.00
Neyveli TS II Expansion 250.00 48.84 47.846
NTPL (JV - TNEB & NLC) 500.00 64.27 72.50
NPCIL
MAPS (Nuclear) 440.00 87.54 100.00
Kaiga GS (Nuclear) 880.00 77.88 100.00
Kudankulam NPP 1000.00 100.64 100.00
CGS/Dedicated
Neyveli TS I 600.00 69.48 90.90
RGCPP, Kayamkulam 359.68 100.00
MPPs- Connected to 400 kV Network
Simhapuri 600.00 27.17 36.14
Meenakshi 300.00 50.81
Coastal Energen 1200.00 20.62 57.15
Thermal Powerteck(TPCIL) 1320.00 82.47 88.27
IL & FS 600.00 20.53 100.00
28

11. Regional Grid Operation


11.1 Frequency Profile
The grid frequency profile is as follows:
Percentage of time when frequency was between
49.9 50.00 50.05 IEGC( 49.9 to
Range < 49.5 49.5 &<49.7 49.7 &< 49.9 >50.2
&<50.00 &<50.05 &<50.20 50.05 Hz)
Jul-16 0.00 0.00 4.58 38.70 33.52 23.11 0.08 72.22
Jul-15 0.00 0.13 11.84 43.24 26.88 17.62 0.28 70.12
Maximum 50.35 09th July 2016
Minimum 49.69 7th & 13th July 2016
Average 50.01
11.2 VOLTAGE PROFILE AT IMPORTANT 400 kV NODES OF REGIONAL GRID IN KV

July-16 June-16
400 KV Station Average of Average of
MAX MIN MAX MIN
Hyderabad 426 407 426 409
Ramagundam 424 411 423 413
Nagarjunasagar 410 408 410 408
Cuddapah 424 406 427 410
Vijayawada 424 414 424 413
Gooty 426 406 426 408
Gazuwaka 406 400 406 400
Bangalore 413 400 410 399
Kolar 423 409 421 407
Narendra 425 405 427 409
Thiruvananthapuram 413 376 411 389
Thrissur 421 388 418 391
Chennai 417 390 414 399
Hosur 416 376 415 387
Neyveli II 329 321 407 397
Nellore PS 765 796 771 797 774
Kurnool 765 807 772 807 773
Raichur 765 808 769 810 771
30

Operation of Tie Lines

The availability of the transmission elements as furnished by PGCIL is given below:

Element Name Percentage Availability for


July - 2016
1 Intra Regional AC System 99.96

Intra Regional HVDC System 100.00


2 HVDC Talcher-Kolar System.
Inter Regional AC System (SR-WR)
3 100.00
Ramagundem_Chandrapur I & II
Inter Regional AC System (SR-ER)
4 98.60
Jeypore-Gazuwaka I & II
Inter Regional HVDC System (SR-WR)
5 98.53
Bhadravathi Back to Back I & II
Inter Regional HVDC System (SR-ER)
6 99.96
VSP(Gazuwaka) back to Back I & II
7 Kayamkulam System 100.00
11.4 Status of Capacitor Installation as on 31.07.2016
All figures are in MVAR
State / UT / System Installed Additional Addition Actual Addition Balance
as on Requirement during April 2016 during 2016-17
31.07.2016 during 2016-17 upto 30.04.2016
A B C D
* (D = B-C)
Andhra Pradesh 6622.200 26.200 0.000 0.000 26.200
Karnataka 4484.324 56.310 0.000 0.000 56.310
Kerala 995.000 10.000 0.000 0.000 10.000
Tamil Nadu 3590.410 122.400 2.400 2.400 120.000
Puducherry 77.017 0.000 0.000 0.000 0.000
Total (SR) 15768.951 214.910 0.000 0.000 212.510
* These figures are carried forward from previous years
12.1
12.1 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region
/ Name of the State : / Andhra Pradesh
2016-17 2016-17 2016-17

. / Commissioned
/ Station Capacity Commissioning
Sl. No Progress / Status Scheduled for During 2016-17 scheduled beyond
(MW) 2016 - 17 (MW) (MW) 2016-17 (MW)

A / Hydro ( / State) :
1 Nagarjunasagar Tail Pond HEP, 2 x 25 = 50 Plant is ready. But not synchronised with Grid due 50
Guntur (Dist) to lack of water. Expected by July, 2016
2 Polavaram HEP, West Godavari District 12x80 = 960 2017-18 onwards 960
3 Dummugudem, Khammam District 320 2016-17 320
B (a) / Thermal ( / State) :
1 Rayalaseema TPP Stage- IV, Unit 6 1 x 600 = 600 Unit-VI (600MW) Commissioning by August, 2016 & 600
Muddanuru, Kadapa (Dist) CoD by Dec, 2016
2 Dr. NTTPS, Vijayawada (Stg - V) 1 x 800 = 800 2016-17 800
3 NTPC Pudimadaka, Vizag Dedicated Plant 4x1000 =4000 4000
4 Vadarevu Ultra Mega Power Project 5 x 800 = 4000 U - 1 : 2017-18 ; U - 2 : 2017-18 ; U - 3 : 2018-19 4000
Stage I (U-1,2) & Stage II (U-3,4,5) Unit - 4 : 2019-20 ; Unit - 5 : 2020-21
B (b) / Thermal ( / Joint Venture) :
1 Krishnapattanam TPP Stage - II (U-3) 1 x 800 = 800 2016-17 800
2 Srikakulam TPS (JV) 4 x 600 = 2400 To be tied up 2400
B (c) / Thermal ( / Private) :
1 Bhavanapadu TPP (East Coast Energy (2x660) Phase I U 1 : 2016-17, U 2 : 2016-17 2640
Ltd), Kakarapalli, Srikakulam (Dist) + Phase II 2016-17
(2x660)
2 Paloncha (Nava Bharat), Khammam 150 150
3 Painampuram TPP by Thermal Powertech 1x660 = 660 Unit 3 Mar 2017 660
(TPCIL), Nellore (Dt) (U - 1&2 CoD
[ Unit : 3 ] done)
4 Krishnapattanam UMPP 6x660 = 3960 Project may be delayed. Developer has stopped 3960
the work. Case at Delhi High Court
5 Hinduja TPP by HNPCL, Pavalavasa, 520 Synchronized on 31.03.2016 520 520
Vizag [ Unit 2 ] CoD by 2016-17
6 Gunupudi (Surya Chakra TEPL) 660 + 660 1320
7 Thamminapatnam TPP(Ph-II : Unit-1&2) 2 x 350 = 700 Unit 1 Sep 2016, Unit 2 Dec 2016 700
[MEPL - Coastal Thermal Project]
2016-17 2016-17 2016-17

. / Commissioned
/ Station Capacity Commissioning
Sl. No Progress / Status Scheduled for During 2016-17 scheduled beyond
(MW) 2016 - 17 (MW) (MW) 2016-17 (MW)

8 Thamminapatnam TPP(Ph-III : Unit-2) 2x660 = 1320 2016-17 1320


[MEPL - Coastal Thermal Project]
9 NCCL (Sembcorp) Phase I, Unit 1&2, by 2x660 = 1320 Unit 1 Synchronised on 26.05.2016 1320 660
Nagarjuna Construction Company Ltd Unit 2 synchronisation by Sep, 2016
(SGPL)
C / Nuclear ( / State JV) :
1 Kadappa Nuclear Power Plant 2x1000=2000 To be tied up 2000
D (a) / Gas Based ( / State) :
Integrated gassification combined 182
1 1 x 182 = 182 Unit 8 by , 2017-18
cycle (IGCC) plant at Dr. NTTPS (JV)
D (b) / Gas Based ( / Private) :
1 Peddapuram (SPP Ltd), EG (Dist) 2262.00 2262
2 Chigurukota (Sriba Industries), 13.60 13.6
Krishna (Dt)
3 Gautami CCPP Stage-II, Peddapuram 2 x 400 = 800 800
4 GVK Phase-III, Jegurupadu 2 x 400 = 800 800
5 Konaseema Phase-II, Ravulapalem 820.00 820

6 Lanco Phase - III, Kondapalli, Unit 3B 1 x 371 = 371 Achieved full load on 05.09.2015 371 371

7 Chandaparu, WG (Dist) - RVR 20.00 20


8 Vetlapalem, EG Dist (Greenco) 60 + 60 = 120 120
9 GMR Vemagiri, EG Dist, Stg - 2 [ GRETL ] 2 x 384 = 768 U1 achieved full Load on 12.09.2015 768 768
U2 under progress
2x16.735
10 Gurrampalem, Vizag Dist (LVS) + Depends on permission of APEPDCL 52.93
2x9.73 = 52.93
76+120 486
11 RVK, Jegurupadu, EG Dist
+ (2x120) + 50
12 Thamminapatnam (K.Patnam PCL), Nellore 1320 + 660 1980
13 Reliance Samalkot Power 2400.00 Held up for want of gas 2400
E / Renewable Energy Sources (RES) :
Municipal Waste based :
1 M/s. Jindal Urban Waste management 6.00 2016-17 6.00
(Tirupati) Ltd
2 M/s. Jindal Urban Waste management 15.00 2016-17 15.00
(Guntur) Ltd
2016-17 2016-17 2016-17

. / Commissioned
/ Station Capacity Commissioning
Sl. No Progress / Status Scheduled for During 2016-17 scheduled beyond
(MW) 2016 - 17 (MW) (MW) 2016-17 (MW)

Industrial waste (Poultry Litter based) :


1 M/s Annapurna Renewables Pvt Ltd 7.50 2016-17 7.50

F / Wind ( / Private) :
1 Private Wind Mills 499.10 2016-17 499.10

G / Mini Power Plants :


H (a) / Solar ( / State) :
1 NTPC Solar Projects 1000.00 Expected during 2017-18 1000
2 NP Kunta, Anantapur by NTPC (200+50) MW 200 MW commissioned on 09.05.2016 and 50 MW 250 200
within 6 months

H (b) / Solar ( / Private) :


1 Private Solar Projects as per PPA Condition 145.00 Expected during 2016-17 145.00
2 First Solar Power India Pvt Ltd 40.00 Commissioned on 09.05.2016 40 40
3 Acme Clean Tech Solutions Ltd 20.00 Commissioned on 12.05.2016 20 20
4 Acme Clean Tech Solutions Ltd 30.00 Commissioned on 02.04.2016 30 30

/ Total 11882 2609 29727


12.2
12.2 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region
/ Name of the State : / Karnataka
2016-17
2016-17
2016-17
. Capacity / Commissioned
/ Station Scheduled for
During 2016-17
Commissioning
Sl. No (MW) Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) 2016-17 (MW)

A / Hydro ( / State) :
1 Gundia Hydro Electric Project (Phase - I) 200 Environmental Clearance awaited from MOEF. 200
Hassan, Dakshina Kannada District TEC cleared by CEA on 25.04.2015
2 Gundia Hydro Electric Proj. (Phase - II) 200 After getting Environmental Clearance from MoEF for Phase- 200
Hassan, Dakshina Kannada District I, Survry, Invetigation works & EIA Studies will be made for
Phase-II
3 Shivasamudram Run-of-the River Project 345 Allotment of land is awaited. DPR has been submitted to 345
CEA and observations of CEA are being attended.
4 Gangavali Stage - II Scheme (Bedthi) 400 Pre Feasibility Report (PFR) submitted to CEA 400

5 Kali - Stage III (KHEP) Hydro Electric 300 DPR could not be taken up, as this project is within wild life 300
Project sanctuary
6 Aghanashini (Tadri) Hydro Electric Project 600 KPCL submitted DPR to CEA vide their letter dated 600
29.10.2007
7 Pumped Storage Schemes : 600
(i) Kali 600 NOCs received from Fisheries Dept. and Archaeological
Survey of India. Investigation works are stopped due to local
protest.
(ii) Sharavathy 900 NOCs received from Fisheries Dept. and Archaeological 900
Survey of India. FRL survey work completed. Investigation
works are stopped due to local protest.

iii) Varahi 700 Survey & Investigation works are in progress. 700
8 Mahadayi Hydro Electric Project 200 A revised proposal is being worked out 200

9 Additional Unit at Munirabad PH 10 LoA has been issued on 04-02-2012 to M/s. Allonward- 10
SSIPL-KR & Co. Site Clearance received.
Expected by July, 2016
10 Additional units at Ghataprabha Dam 2 x 10 = 20 New NIT with revised PQR has been approved. PQR under 20
(Right Bank) review

B (a) / Thermal ( / State) :


1 Bellary TPS, Stage I, Unit - 3 700 Synchronised on 25.12.2015. 700 700
(Super Critical) - Kudatini Achieved full load on 01.03.2016
CoD by June, 2016
2016-17
2016-17
2016-17
. Capacity / Commissioned
/ Station Scheduled for
During 2016-17
Commissioning
Sl. No (MW) Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) 2016-17 (MW)

2 RTPS Stg - II : a) Yermarus TPS 2 x 800 = 1600 Unit 2 :Jan -17, Clearance awaited. 1600 800
Unit 1 first synch.on 09.02.2016, Full Load on 29.03.16

b) Edlapur TPS 800 Proposed to be set up in the available land at RTPS mill 800
reject area
Clearance from MoEF is awaited. (By 2016-17)
3 Mangalore TPS 1600 12th Plan 1600
4 Chattisgarh Super Critical T.P.P, Godhna, 2 x 800 = 1600 Applied for Coal for allotment and environmental 1600
Janjgir-Champa Dist, Chattisgarh clearancecation from Ministry. Commissioning by 2016-17

B (b) / Thermal ( / Private) :

1 Annechakanahalli Phase I 1000 12th Plan 1000


2 Kalgurki Phase I 1000 12th Plan 1000
3 Yadagiri Phase I 1000 12th Plan 1000

B (c) / Renewable Energy Sources (RES) :


1 Bio Mass 6 + 9 + 5 = 20 MW Expected by November, 2015 20
2 Co Generation 50 MW Expected during 2016-17 50
3 Small Hydro (Bhadragiri,Sai, Kare, Mount, 29.25 MW Expected by March, 2017 29.25
Devar)
4 Wind (Pvt) 418.8 MW Expected by March, 2017 418.8
5 Solar (Pvt) 74 MW Expected by March, 2017 74
6 / Wind ( / Joint Venture)
500 MW Wind Energy Projects by KPTCL 500 GoK approved for the development of 500 MW Wind Energy 383.5
in JV with NTPC Projects. Sites identified for Kappatagudda (39.5 MW-KPCL),
( NTPC 400 MW + KPCL 100 MW ) Guledagudda (100 MW-NTPC). Requested for allotment of
Forest Land. Expected in XII plan. 116.5 MW commissioned
during 2013-14

Wind potential measurements to be carried out for 2


years
C / Gas Based ( / State) :
1 Yelahanka Combined Cycle Power Plant 350 LOI is issued on 14.01.2015 to BHEL for Supply and Service 350
(YCCPP, Yelahanka, Bangalore) 20 % for EPC works. Survey Works completed.

2 Bidadi Combined Cycle Power Plant 700 All Clearances are obtained including MoEF. 700
20 % EPC Tender stalled by Court.
2016-17
2016-17
2016-17
. Capacity / Commissioned
/ Station Scheduled for
During 2016-17
Commissioning
Sl. No (MW) Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) 2016-17 (MW)

3 Tadadi Combined Cycle Power Plant 2100 Pre Feasibility Report (PFR) prepared & action has been 2100
taken for obtaining statuatory clearences. KIADB allotted
400 cares of land.

D / Solar ( / State) :
Nil

/ Total 9250.55 1500 8650


12.3
12.3 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region
/ Name of the State : / Kerala
2016-17
2016-17
2016-17
. / Commissioned
/ Station Capacity Scheduled for
During 2016-17
Commissioning
Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) (MW) 2016-17 (MW)

A / Hydro ( / State) :
1 Chattankottunada Stg-II , Kozhikode 3x2=6 6.00
2 Pallivasal Extension 2 x 30 = 60 60.00
3 Thottiyar 30 + 10 = 40 40.00
4 Anakkayam H.E. Project 7.50 7.50
5 Perumthenaruvi Project 2x3=6 Expected by October, 2016 6.00
6 Vellathooval SHEP 2x1.8=3.6 Expected during 2016-17 3.60
7 Poringalkuthu SHEP 2x12=24 Expected by October, 2016 24.00
8 Bhoothathankettu Hydro Project, 3x8=24 Expected by August, 2016 24.00
Pindimana, Kothamangalam,
Ernakulam Dist
9 Kakkayam SHEP, Kozhikode 2x1.5=3 Prposed date of commissioning : November, 2016 3.00
B / Augumentation :
Nil
C / Gas Based ( / State) :
1 Brahmapuram Gas Power Plant 39.86 Prposed date of commissioning : March, 2017 39.86
D .. / IPP ( / Hydro) :
Nil

E / Solar ( / State) :
1 Solar Park, Kasargode 100.00 Prposed date of commissioning : March, 2017 100.00
2 Solar PV Projects at various locations 10.00 Prposed date of commissioning : March, 2017 10.00
of KSEB
/ Total 210.46 0.00 113.50
12.4
12.4 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region
/ Name of the State : / Tamil Nadu
2016-17
2016-17
2016-17
. / Commissioned
/ Station Capacity Scheduled for
During 2016-17
Commissioning
Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) (MW) 2016-17 (MW)

A / Hydro ( / State) :
1 Kundah Pumped Storage HEP 1x125 = 125 Expected by 2016 125
Phase I (4x125 MW)
2 Kundah Pumped Storage HEP 3x125 = 375 Expected by 2016 375
Phase II (3x125 MW)
3 Mettur Pumped Storage HEP 500 Preliminary Stage 500

4 Vellimalai Pumped Storage HEP 200 Preliminary Stage 200


5 Small HEP proposed to be developed 118 Preliminary Stage 118
by Private Promoters
6 Moyar Ultimate Stage HEP 25 Preliminary Stage 25
7 Sholayar Phase I (Unit 1) 7.0 (35 to 42) Uprating from 35 MW to 42 MW 7
8 Sholayar Phase I (Unit 2) 7.0 (35 to 42) Uprating from 35 MW to 42 MW 7
9 Kollimalai HEP 520 Preliminary Stage 520

B (a) / Thermal ( / State) :


1 North Chennai TPS Stage -III 1x800=800 Expected by 2019-20 800
2 North Chennai TPS Stage -IV 2x800=1600 Expected after Stg III 1600
3 Ennore TPS Expansion Project 1x660=660 Expected by January, 2018 660
4 Replacement of existing 40 year old 1x660=660 Expected by January, 2018 660
ETPS
5 Ennore (SEZ) Super Critical Thermal Power 2x 660=1320 Case pending in Supreme Court 1320
Project, Kattupalli
B (b) / Thermal ( / Private) :
1 Cheyyur UMPP (Coastal Tamil Nadu Power Ltd) 5x800 = 4000 Expected by 2017-18. Draft of rapid EIA Report 4000
Subsidiary of Govt of India, PFC completed
2 IL & FS, Cuddalore IPP (ITPCL), Unit 2 1 x 600 MW Unit 2 : First synchronised on 13.04.2016 600 600
(Unit 1 CoD was during 2015-16, 29.09.2015) Full Load on 18.04.2016, CoD on 28.04.2016
3 Tuticorin Thermal Power Project by Ind Bharath 1x150=150 Stg - II, Unit under progress 150
at Swaminathan & Ottaipidaram Village

B (c) / Thermal ( / Joint Venture) :


1 Udangudi Power Project (Stage 1) 2x660 = 1320 Expected by 2019-20 1320
2016-17
2016-17
2016-17
. / Commissioned
/ Station Capacity Scheduled for
During 2016-17
Commissioning
Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) (MW) 2016-17 (MW)

C / Gas Based ( / State) :


1 Basin Bridge Closed loop conversion 100 Subject to availability of gas 100
(120 MW to 220 MW)
D / Renewable Energy Sources (RES) :
1 Establishment of Co-generation plants in 10 Nos. 6 x 15.5 = 93 183
Co-operative and 2 Nos Public Sector Sugar Mills 5 x 15.0 =75
in Tamil Nadu along with Sugar Mill 1 x 15.0 =15
Modernization. = 183
2 Wind (P) 35.3 35.3
3 Bio-Mass 10 10
4 Solar - Kamudhi 1000 By September, 2016 1000
E ... / Tariff Based Competitive Bidding Route :
1 Uppur TPP, Tiruvadanai, Ramanathapuram Dt 2x800 = 1600 Expected by 2019-20 1600

/ Total 2492 635.30 13423


12.5
12.5 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region
/ Name of the State : / Telangana
2016-17
2016-17
2016-17
. / Commissioned
/ Station Capacity Scheduled for
During 2016-17
Commissioning
Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) (MW) 2016-17 (MW)

A / Hydro ( / State) :
1 Lower Jurala HEP, Gundala, 4 x 40 = 160 Unit 3 : synchronised on 04.01.2016, CoD by Aug 16 160
Mahaboobnagar (Dist) (Unit - 3 to 6) Unit 4 : synchronised on 03.03.2016, CoD by Aug 16
Unit 5 : CoD schedule 01.08.2016, CoD by Aug 2016
Unit 6 : CoD schedule 01.08.2016, CoD by Sep 2016
2 Pulichintala HEP, Vazinepally, Nalgonda (Dist) 4 x 30 = 120 Unit - 1 : Aug, 2016 ; Unit - 2 : Sep, 2016 120
Unit - 3 : Nov, 2016 ; Unit - 4 : Dec, 2016
3 Kanthanapally, Warangal District 450 150 MW 2016-17, 300 MW 2016-17 450
B (a) / Thermal ( / State) :
1 Kakatiya TPP Stage-III 1 x 800 = 800 2017-18 onwards 800
2 Ramagunderm TPS 2 x 660 = 1320 2017-18 onwards 1320
3 Sattupalli TPS 1 x 600 = 600 to be tied up 600
4 Singareddipalli 5 x 40 = 200 U-I , U-2 , U-3 200
U-4 , U-5March 2014
5 Kothagudem TPS (Stg - VII), Paloncha 1 x 800 = 800 CoD by 31.12.2017 800
Khammam District
6 Yadadri TPS (5x800 MW), Vazinepally, 5 x 800 = 4000 By 2018-19 4000
Dameracherla, Nalgonda (Dist)
7 NTPC Dedicated Plant, Ramagundam 2 x 800 = 1600 1600

8 Bhadradri TPS, Manuguru 4 x 270 = 1080 Expected CoD by : 270 810


Khammam (District) Unit 1 - 20.03.2017, Unit 2 - 20.05.2017
Unit 3 - 20.07.2017, Unit 4 - 20.09.2017
B (b) / Thermal ( / Private) :
1 Singareni Collieries Thermal Power 2x600 = 1200 Unit 1 : April, 2016,Syn 12.03.16, F.Load on 1200 600
Projects (STPP), Jaipur, Adilabad (Dist) 13.03.2016, CoD by Aug 16 Unit 2 : Oct, 2016
C (a) / Gas Based ( / State) :
1 Shankarpally Gas Power Plant 1x1000=1000 2016-17 1000

Combined cycle gas based project 1x700 = 700 Unit - 1 : 2016-17 ; Unit - 2 : 2017-18 700 1400
2
near Karimnagar 2x700 = 1400 Unit - 3 : 2018-19
2016-17
2016-17
2016-17
. / Commissioned
/ Station Capacity Scheduled for
During 2016-17
Commissioning
Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) (MW) 2016-17 (MW)

D (b) / Gas Based ( / Private) :


1 Patancheru (Astha PCPL), Medak (Dt) 28.00 2016-17 28
2 Mathya Giri (Vasavi), Nalgonda (Dist) 210.00 2016-17 210
3 Guggilla, Karimnagar (Dist) - Elgen 350 + 350 2016-17 700
E / Renewable Energy Sources (RES) :

F / Wind ( / Private) : Nil


G / Mini Power Plants :
1 Mini Power Plants 516.51 2016-17 516.51

H (a) / Solar ( / State) :


1 Nil
H (b) / Solar ( / Private) : 752.68 2016-17 752.68

/ Total 6107 600 11530


12.6
12.6 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region
/ Name of the Entity : / Central Sector
2016-17
2016-17
2016-17
. / Commissioned
/ Station Capacity Scheduled for
During 2016-17
Commissioning
Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond
(MW) (MW) 2016-17 (MW)

I / Central Sector ( / Thermal) :


1 Kudgi Super Thermal Power Project, 3x800 =2400 Unit I by Mar 2017, Unit 2 by March 2017, & 1600 800
Bijapur (Stage - I), NTPC Unit 3 Dec 2017
2 Kudgi Super Thermal Power Project, 2x800 =1600 Expected during 13th Plan (2017-22) 1600
Bijapur (Stage - II), NTPC
3 NLC - New Thermal Power Project, 2x500 =1000 Unit 1 : CoD by 2017 1000
Neyveli Unit 2 : CoD by April 2018
4 Sirkali TPP, NLC 3x660=1980 From GoI approval 1980
Unit 1 :52 months
Unit 2 : 58 months
Unit 3: 64 months
(PPA has been signed)

II / Central Sector ( / Nueclear) :


1 Kalpakkam (PFBR) 500 Synchronisation by March, 2017. CoD by August, 500
2017. Infirm Power from March, 2017
2 Kudankulam (NPCIL) 2x1000=2000 Unit I COD on 31.12.2014 1000
Unit II: Date of Criticality : 10.07.2016, CoD
by January, 2017.

III / Central Sector ( / Gas Based) :


1 Kayamkulam CCPP Module : 1 to 3 1050/1950 12th Plan 1950
(NTPC)

/ Total 2600 0 7830


13.1 400 220 ..
13.1 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR
/ Name of the State : / Andhra Pradesh
2016-17
2016-17
2016-17
.

Energised
Sl. Stringing Proposed
Name of the Transmission Line Remarks during
No Length in completed in Original Revised for 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
A 400 KV (Lines) :
1 Evacuation of Power from HNPCL (1040 MW) Dec-15 Dec-16
Power Plant :
1.1 400 KV Twinmoose DC Line from M/s. HNPCL
PO issued on 11.08.2014
Switchyard - Proposed Kamavarapukota SS 152 62.236 Dec-15 Dec-16 152
Tower Erection under progress
Lot-I : [ HNPCL - Ramabhadrapuram, EG Dist ]
Lot - II : Ramabhadrapuram, EG Dist - N.T. 148 45.512 Dec-15 Dec-16 PO issued on 21.07.2014 148
Rajapuram Tower Erection under progress
Lot - III : N.T. Rajapuram, EG Dist - 187.6 65.868 Jun-15 Dec-16 The work awarded on 19.02.2014 and 187.6
Kamavarapukota under progress
2 400 KV Quad Moose DC Line from Proposed New Line proposed
Kamavarapukota SS - Proposed Suryapet SS :
2.1 400 KV Twinmoose DC Line from Proposed 178.712 178.712 Sep-15 Aug-16 All works completed 178.712
Kamavarapukota SS - Proposed 400 KV Chinna
Korukondi SS
3 400 KV Quad Moose DC Line from Proposed New Line proposed
Kamavarapukota SS - Proposed Suryapet SS :
3.1 400 KV Twinmoose DC Line from Proposed 200 Apr-17 Apr-17 LOI issued on 04.09.2015 200
Kamavarapukota SS - 400 KV Vemagiri SS Purchase Order issued on 03.11.2015
4 Rayalaseema Power Transmission Scheme :
4.1 RTPP (Stage - IV) - Chittoor Twin Moose DC Line 216.03 101.848 May-15 Dec-16 Work awarded on 02.04.2014 and under 216.03
(a). RTPP - Pedda Jamgam Palli (P.J.Palli) progress
(b). P.J. Palli-Chittoor 212.694 89.48 May-15 Dec-16 Work awarded on 02.04.2014 and under 212.694
progress
(c). 220 kV Muddanur (RTPP) - Chinakampally 121 121 Dec-14 Jul-16 Commissioned on 16.06.2016 121 121

5 Evacuation of Wind Power in Kadappa,


Anantpur & Kurnool Districts of AP (Phase - I) :
5.1 (a). 400 KV Quad DC Tungabhadra River - 43.536 40.92 Jul-15 Jul-16 Work awarded on 13.12.2013 & Work 43.536
Yemmignoor Line nearing completion
(b). 400 KV Quad DC Yemmignoor - Uravakonda 205.2 205.2 Jul-15 Jul-16 Work awarded on 16.12.2013 & stringing 205.2
Line completed. Statutory Inspection going on

5.2 400 kV (Q) Uravakonda - Mahaboobnagar 190 Oct-15 2016-17 KfW funding 36th SCPSPSR 190
5.3 Jammalamadugu - Uravakonda Quad DC Line 255.244 255.244 Jul-15 Jul-16 Idle charged on 15.07.2016 255.244 255.244
2016-17
2016-17
2016-17
.

Energised
Sl. Stringing Proposed
Name of the Transmission Line Remarks during
No Length in completed in Original Revised for 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
6 Evacuation of Wind Power in Kadappa,
Anantpur & Kurnool Districts of AP (Phase - II) :
6.1 400 kV Uravakonda - Kondapur 35th SCPSPSR

6.2 400 kV Kondapur - Kurnool 35th SCPSPSR

6.3 400 kV QMDC Line from Hindupur S/S to the 240 2016-17 Oct-17 Purchase Order issued on 01.04.2016 240
proposed 400 kV Uravakonda S/S (130 km)
7 Transmission System Improvement Scheme at
Vizianagaram & Srikakulam Districts :
7.1 400 KV Quad DC Line from 400/220 KV Kalpaka 226 29.092 Mar-16 Aug-16 PO issued on 25.08.2014. Work under 226
S/Sto 400/220 KV Maradam (Garividi) S/S progress
8 System strengthening works in 400/220 kV Sub-
Station, Prakasam District on stand alone basis

8.1 400 kV Twin Moose DC Line from 400/220 kV 220 Nov-16 Nov-16 Purchase Order issued on 27.07.2015
Sattenapalli S/S to the proposed 400/220 kV Podili Works under progress 220
S/S (110 km)
9 System Improvement at 400 kV Kalikiri,
Chittoor District, along with the connected
network :
9.1 LILO of both the circuits of 400 kV RTPP - Chittoor 52 Feb-17 Feb-17 LOI issued on 16.09.2015 Purchase
at the proposed 400 kV Kalikiri S/S Order issued in Nov-2015 52

10 1000 MW Wind Power Evacuation at Aspiri : 38 SCPSPSR


10.1 400 kV Aspiri - Uravakonda (Q) D/C Line

11 Renewables KfW Hindupur, Uravakonda & Jammalamadugu (Kondapuram) :

11.1 400 kV Jammalamadugu - Kurnool (Q) D/C Line 125 125 2016-17 2016-17 Commissioned on 29.06.2016 125 125
12 400 kV Transmission Scheme for evacuation of 34 0 Aug-16 Nov-16
1000 MW Power from Solar Park at Ghani /
Panyam S/S, Kurnool District :
12.1 400 kV QMDC Line from existing 400 kV Narnoor 34 Aug-16 Nov-16 Purchase Order issued on 27.07.2015 34
S/S (Kurnool) to the proposed 400 kV Ghani / Works under progress
Panyam S/S

B 220 KV (Lines) :
(a) Transmission Lines covered under various Lift Irrigation Schemes :
1 D/C line from Yellanur - Gaddamvaripalli 9.334 9.214 Dec-10 2016-17 Works under progress. 9.334
2 D/C line from Gaddamvaripalli - Goddumarai 18.23 Sep-11 2016-17 Works under progress. 18.23
2016-17
2016-17
2016-17
.

Energised
Sl. Stringing Proposed
Name of the Transmission Line Remarks during
No Length in completed in Original Revised for 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
(b) Transmission Lines covered under other Schemes :
1 220 kV LILO Line (Both Circuits) from 220 kV 78 Dec-14 Aug-16 Works under progress 78
Hindupur to Pulivendula D/C Line to the
proposed 220 kV Gollapuram S/S
2 220 kV DC Line from Pulichintala HES to the 72 Mar-15 2016-17 Works to be commenced 72
proposed 220 kV Huzurnaga S/S
3 (a). 220 KV DC line from Pendurthy 220KV SS to 56.46 Jul-12 2016-17 Works under progress 56.46
proposed ADR Palem (Appannadorepalem)
Switching Station (Two Circuits)
(b). 220 KV DC line from ADR Palem Switching 24.71 Jul-12 2016-17 Works under progress 24.71
Station to Bheem Singh Village (Reach-I) for
the proposed 220 KV SS Bobbili (2nd circuit)
(c). Erection of 220 kV DC line from Bheemsing (V) 28.6 Jul-12 2016-17 Works under progress 28.6
to Champa River (Reach-2) for the proposed
220/132 kV SS at Bobbili (2nd circuit)
(d). Erection of 220 kV DC line from Chamba River 28.24 2016-17 2016-17 Works under progress 28.24
to Bobbili Growth Centre (Reach-3) for the
proposed 220/132 kV SS at Bobbili (2nd
circuit)
4 220 kV LILO of existing 220 kV Garividi - 115 Mar-17 Mar-17 Work commenced 115
Pendurthy DC line to proposed 400 kV SS at
Garividi (Maradam)
5 220 kV LILO of both the circuits of 220 kV ADR 8 Mar-17 Mar-17 Work commenced 8
Palem - Bobbili DC line from Loc NO.43 to
proposed 400 kV SS at Garividi
6 Erection of 220kV DC line from 220kV Garividi SS 78 11.6 Jul-12 Dec-16 Works under progress 78
to proposed 220/132 kV SS at Bobbili (2 circuits)
7 220 kV D/C Line from proposed 400 kV 174.5 163.5 Mar-15 May-17 Remaining Works pending due to RoW 174.5
Talamanchipatnam S/S near Jammalamadugu to Issue
220 kV Chakrayapeta S/S
8 220 kV D/C Line from proposed 400 kV 200 173 Mar-15 Sep-16 Works under progress 200
Talamanchipatnam S/S near Jammalamadugu to Forest clearance is pending
220 kV Porumamilla S/S
9 220kV Jammalamadugu - Betamcherla D/C Line 68 68

10 220 kV Jammalamadugu - Tadipatri D/C Line 40 40

11 220 kV DC line from 220 kV Palamaneru SS to 131 Feb-17 Feb-17 Works under progress 131
proposed 220 kV Kuppam SS
2016-17
2016-17
2016-17
.

Energised
Sl. Stringing Proposed
Name of the Transmission Line Remarks during
No Length in completed in Original Revised for 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
12 220 kV DC line from proposed 400 kV Podili SS to 114 Feb-17 Feb-17 Works under progress 114
proposed 220 kV SS Kandukur
13 Evacuation of Wind Power in Kadappa,
Anantpur & Kurnool Districts of AP :
(a). 220 kV DC Twin Moose Line from 400 kV 32.5 32.5 Mar-15 2016-17 Commissioned on 14.07.2016 32.5 32.5
Uravakonda S/S to 220 kV Vajra Karur S/S
(b). 220 kV D/C Line from 400 kV Uravakonda 100 4.5 Mar-15 Aug-16 Works under progress 100
S/S to 220 kV Kalyandurg S/S
(c). LILO of both the circuits of 220 kV 10 36 SCPSPSR 10
Uravakonda - Kalyan Durg at 220 kV
Borampalli SS
(d). 220 kV DC Moose Line from 400 kV 53 Mar-15 Aug-16 Preliminary Works under progress 53
Jammalamadugu (Konda Puram) S/S to 220
Thirumalaipally S/S
(e). 220 kV twin moose D/C Line from proposed 67 Nov-14 Aug-16 Works under progress 67
400 kV Uravakonda S/S to proposed 220
kV Borampalli S/S
14 220 kV DC line from the proposed 400/220 kV 9 Sep-16 Sep-16 Works under progress 9
Kamavarapukota SS to the existing 220 kV
Kamavarapukota SS
15 (a) 220 kV Hindupur-Penukonda D/C Line 50 36 SCPSPSR 50
(b) 220 kV Hindupur to Pampanur Tanda ( TM ) 90 36 SCPSPSR 90
D/C Line
(c) 220kV D/C Line from Hindupur 400 kV SS - 20 36 SCPSPSR 20
Hindupur 220 kV SS

/ Total 3790.09 533.74 892.50


13.2 400 220 ..
13.2 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR
/ Name of the State : / Karnataka
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Length in Stringing Remarks during 2016-
No 2016-17 Beyond
Original Revised 17
Circuit completed ckt. Kms 2016-17
Target Date Target date ckt. Kms
Kms. in Ckt.Kms ckt. Kms
A 400 KV (Lines) :
1 BTPS to Madhugiri Line (765/400 kV V.N.Pura 295.262 Aug-17 Aug-17 LOI issued to L&T on 19.10.2015 295.262
S/S (PGCIL) Tumkur to Rampura Limits) :
(a). Construction of 400 kV MC Line (5.138 km)
and 400 kV DC Line (137.355 km) totally for a
route length of 142.493 km with Quad Moose ACSR
from YTPS to proposed 400 kV Bellary Pooling
Station (BPS)
(b). Construction of 400 kV MC Line with Quad 172.072 Apr-17 Apr-17 Work under progress 172.072
Moose ACSR from proposed 400 kV Bellary
Pooling Station(BPS) to Ramapura Limits
(Kelagina Kanavi) to link the proposed 765 kV
Vasanthanarasapura S/S & 400 kV Chikka
Nayakanahally Switching Stations (43.018 km)

(c). Construction of proposed 400 kV DC Line with 377.48 284.6 Dec-16 Dec-16 Work under progress 377.48
Quad Moose ACSR from proposed 765/400 kV
Vasanthanarsapura (PGCIL) Station at Tumkur
to Kelaginakanive Village limits (Rampua)
towards proposed 400 kV BTPS Pooling Station in
Bellary District (188.74 km)

2 Yermarus TPS - Gulbarga 400 kV D/C line (QM) Estimate is umder preparation

3 LILO of both the circuits of Nelamangala Land Acquisition is under progress


Talaguppa 400 kV lines to the proposed pooling
station near CN Halli.
4 Bellary Pooling Station - C.N.Hally 400 kV D/C line 360 To be tendered 360
with quad moose conductor
5 LILO of 400 kV Bellary Pool Madhugiri D/C 60 60
(Quad) (both circuits) [KPTCL line] at Tumkur PS
6 400 kV BTPS-Guttur D/C line (QM) Agreed in 39th SCPSPSR
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Length in Stringing Remarks during 2016-
No 2016-17 Beyond
Original Revised 17
Circuit completed ckt. Kms 2016-17
Target Date Target date ckt. Kms
Kms. in Ckt.Kms ckt. Kms
7 LILO of 400 kV Guttur - Guddanahalli S/C at 26.798 26.798
Gadag (Doni)
8 400 kV Tumkur P S (190 km) - Hiriyur D/C Line 110 110
(Tumkur - Hiriyur - Mysore de-LILOed)
9 LILO of 400kV Gooty Madhugiri D/C at Tumkur 5 Transmission System for Tumkur Ultra 5
(Pavagada) PS Mega Solar Park (1000 MW)

10 400 kV Tumkur PS- Devanhally (KPTCL) D/C 125 before Phase-II at Ultra Mega Solar 125
(Quad) Power Park

B 220 KV (Lines) :
1 Kudgi UMPP Evacuation Line (A) : 72.656 39.22 Mar-15 Jan-17 Work under progress 72.656
220 kV MC Line from proposed Kudgi 400 kV
STPP to LILO to the existing 220 kV B.Bagewadi -
Bijapur DC Line 18.16 km (72.656 ckm)
2 Kudgi UMPP Evacuation Line (B) : 158.84 Feb-17 Feb-17 Work under progress 158.84
220 kV DC Line from proposed Kudgi 400 kV
STPP of NTPC to 220 kV Vajramatti SS along with
220 kV TBs at 220 kV Vajramatti SS in Bijapur
Taluk of Bagalkot District

3 Nimhans 220 KV Cable: For running of S/C of 220 10.68 9 May-10 Nov-16 BBMB Approval awaited 10.68
kV 1000 Sq mm copper u/g cable for a route length
of 10.68 km. from the 220 kV HSR layout station to
the proposed 220 kV Nimhans station.
4 220 kV DC line to Hoskote (Pillaguppa) by 26.24 0.35 Apr-08 Mar-17 Work under progress. Court case being 26.24
constructing LILO of Hoody-Kolar SC line pursued
5 Shifting of 220 kV DC line passing through 35.34 21.95 Feb-08 Feb-17 Court Case. Forest clearance received on 35.34
proposed Airport land near Boovanahally limits by 03.02.2016
constructing new 220 kV LILO line from Shimoga
- Mysore LILO line from Dandiganahally limits in Work under progress
Hassan Taluk, Hassan District for a distance of
17.67 kms
6 Vikas Tech Park (VTP) : Construction of 220 kV 18.4 12 Jul-11 Mar-17 Work under progress. Local RoW 18.4
MC Line from one of the circuits of the proposed problems
220 kV D/C Somanahalli-Malur line to the proposed
VTP S/s for a distance of 4.6 km
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Length in Stringing Remarks during 2016-
No 2016-17 Beyond
Original Revised 17
Circuit completed ckt. Kms 2016-17
Target Date Target date ckt. Kms
Kms. in Ckt.Kms ckt. Kms
7 Magadi Line :
(a) 220 kV DC Line from proposed Magadi SS to
LILO one of the circuits of 220 kV Nelamangala - 30.9 Jul-14 Nov-16 Work under progress 30.9
Anchepalya Line
(b) 220 kV DC Line from 400/220 kV Bidathi 64.378 Jul-14 Nov-16 Work under progress 64.378
(PGCIL) SS to proposed 220 kV Magadi SS Line
8 Mittemari Line : Construction of 220 kV DC Line 91 Jun-17 2017-18 Work under progress 91
from 220 kV Gowribidanur to Mittemari for a
distance of 45.5 km
9 1) 2 nos of 220 kV DC lines from 400 kV PGCIL 1) 7.14*2*2
station to LILO the existing Shimoga-Mysore 220 = 28.56
kV DC M1 & M2 lines near Melgodu limits -7.14 Contract terminated vide letter dated
kms 8.916 Sep-09 Dec-16 44.08
12.05.2016. Work to be recommenced.
2) 220 kV DC line from Shantigrama station to 2) 7.76*2
existing B4 line near Hedanahalli limits -7.76 kms = 15.52
10 DC line from Somanahalli to Kolar via Malur 136 100 Mar-08 Aug-16 Kolar - Malur line charged. Malur - 136
Somanahalli partly charged, upto
stringing. RoW problem being pursued in
court
11 Jigani 220 kV Line: Construction of 220 kV and 23.4 Oct-08 2016-17 Line work short closed vide OM dated 23.4
220-66 kV multi circuit lines from the proposed 220 12.08.2015
kV Somanahalli Malur I& II lines to the proposed
220 kV Jigani S/s
12 Ramnagar/ Channapatna (Kothipura)
a) DC line from 220kV Tubinkere S/s 68.82 kM (a). 137.64 (a). 87.00 Work under progress. Delay due to RoW
b) 220-66kV MC line from 220kV Bidadi S/s Feb-08 2016-17 210.108
(b). 72.468 (b). _ _ _ problem.
18.117 km
13 Construction of 220 kV D/C link line from 39.28 Mar-11 Mar-17 Work terminated on 19.09.2015 and to 39.28
220/66/11 kV Vajmangala S/s to the existing be retendered for the balance works
Kadakola S/s
14 Koppal 220 KV Line (Halavarthi) : 0.244 Feb-14 To be re-tendered 0.244
Construction of 220 KV DC Line (0.03 km) from
existing 220 KV Munirabad Station to proposed
Halvarthi Stattion
15 Vajamangala - Varun Limits Line : 18.12 8 May-15 Nov-16 Work under progress 18.12
(1) Construction of 220/66 kV MCMV Line from
location No. 04 (3) to 20 along the proposed 66 kV
Vajamangala - Kadakola DC Line Corridor in
Vajamangala - Varun Limits (4.53 km)
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Length in Stringing Remarks during 2016-
No 2016-17 Beyond
Original Revised 17
Circuit completed ckt. Kms 2016-17
Target Date Target date ckt. Kms
Kms. in Ckt.Kms ckt. Kms
16 Kudigi (Badeladaku) Line : 65.272 May-14 Dec-16 Work under progress 65.272
220 KV DC Line from existing 220 KV Station
Ittagi to the proposed Station at Kudigi for a
distance of 32.636 Km with 2 TBs at Kudigi Stattion

17 Pavagada 220 KV Line : 120.988 18 Jul-14 Nov-16 LOI issued on 16.01.2013. Work under 120.988
Construction of 220 KV DC Line from existing 220 progress.
KV Madhugiri R/S to proposed Pavagada Station
for a distance of 60.49 km
18 Mallat (Manvi) 220 KV Line : 5.76 5.5 Aug-14 Dec-16 LOI issued on 12.02.2013. 5.76
Construction of 220 KV LILO from 220 KV RTPS Work under progress
-Lingasugur SC Line to the proposed 220 KV
Station at Mallat for a distance of 2.88 Kms with
TBs at Kavital and Byagwat existing stations
and 110 KV SC/DC Evacuation Lines
19 Thallak Balance Work : 40.96 Aug-07 Mar-17 Station commissioned on 30.01.2009 by 40.96
Construction of 220 KV DC Line for a distance of M/s. Areva T&D. Line partially
60.481 km from 400/220 KV Beerenahalli SS to commissioned upto 40 km
proposed 220/66 KV Thallak Sub-Station (Chitra Work restarted from 30.11.2013 and
Durga Dist). Erection of Balance portion of line under progress.
for 20.48 km (73 Towers)
20 220 kV Hiriyur - Chitradurga D/C Line 40 40

21 Vasanthanarasapura - Antharasanahally 220 kV 37.604 25.47 Jan-16 Nov-16 Work under progress 37.604
Line :
Construction of 220 KV DC Line for a distance of
18.802 km from proposed 764/400/220 KV PGCIL
SS 220 kV SS at Vasanthanarasapurato existing
Antharasanahalli along with 2 terminal bays at
Antharasanahally 220/66/11 kV SS and
dismantling of 66 kV Antharasanahally
Antharasanahally Korategere SC for a route
length of 4.495 kms for construction of 220/66 kV
MCMV Line in Tumkur Taluk and district

22 LILO of 220 kV Gadag-Lingapur D/C at Gadag 2.775 2.775


(Doni)
23 LILO of 220 kV BTPS CN Halli at Jagalur M/C 40 40

24 220 kV Jagalur-Thallak (Drake) 40 40


2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Length in Stringing Remarks during 2016-
No 2016-17 Beyond
Original Revised 17
Circuit completed ckt. Kms 2016-17
Target Date Target date ckt. Kms
Kms. in Ckt.Kms ckt. Kms
25 220 kV Jagalur-Kudligi (Drake) 50 50

26 220 kV Jagalur-Chitradurga D/C 50 50


27 LILO of 220 kV Narendra- Haveri at Bidnal 26 26

28 220 kV Hiriyur (PG) Hiriyur 220/110/66 kV S/C 0


on D/C towers
29 220 kV Shivanasamudra TK Halli D/C Line 1.5 1.5

30 220 kV Shivanasamudra Madhuvanahalli D/C Line 1.5 1.5

31 LILO of 220 kV Ghatprabha - Chikkodi D/C at 40 40


Mughalkod
32 220 kV DC UG Cable Line from 400/220 kV 11.75 Jan-17 Jan-17 Tender evaluation under process 11.75
Singanayakanahally (Yelahanka PG) to the proposed
220/66/11 kV Yelahanka DG Plant Station
33 220 kV DB Pura BIAL (Yelahanka) to 400/220 kV DPR to be prepared
Singanayakanahally (Yelahanka PG)DC 220 kV Line

34 220 kV D/C Hootagally -Vajamangala- T.K.Halli S/ 76 76


C corridor with Drake including LILO to
35 220/66/11kV
Vasanthanarasapura - Madhugiri Line : 88.962 25.96 Jul-16 Aug-16 Work under progress 88.962
Construction of 220 KV DC Line with Moose
ACSR for a distance of 44.481 km partly on
multi circuit towers from proposed 765/220/66
kV Vasanthanarasapura PGCIL SS to existing
220 kV Madhugiri SS along with terminal bays

/ Total 1625.448 0 1624.9


13.3 400 220 ..
13.3 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR
/ Name of the State : / Kerala
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original Revised 2016-17 Beyond
2016-17
Circuit Kms. completed Target ckt. Kms 2016-17
Target date ckt. Kms
in Ckt.Kms Date ckt. Kms
A 220 KV (Lines) :
1 LILO of one circuit of the 220 KV 62.06 2016-17 Work in progress. 62.06
Kayamkulam - New Pallom DC feeder
2 220 kV Pothencode - Kattakada (DC) Line 57.00 28.02.2015 2016-17 Work in progress. 70% completed. 57.00
Retendered for balance work
3 Pallivasal Extension HEP Scheme : 1.00 2016-17 Work in progress. 1.00
LILO of 220 KV Udumalpet - Iduki S/C Line

4 Evacuating Power from Thottiyar HEP : 1.00 2016-17 Work in progress. 1.00
LILO of one of the 220 kV Lower Periyar -
Madakathara D/C Line
5 220 kV Brahmapuram - Kaloor (DC) Line 2016-17
(OH + UG)
6 LILO to 220 kV Kuyilmala from 220 KV 2016-17
Udumalpet - Idukki feeder
7 220 kV Kattakada - Balaramapuram M/C 44.00 1.19 29.07.2014 30.09.2016 37 % completed 44.00
Line (11 km)
8 220 kV Balaramapuram - Vizhinjam 20.00 1.6 15.08.2014 30.09.2016 24 % completed 20.00
Double Circuit Line
9 LILO of 220 kV Madakkathara - 2016-17
Elappully at 220 KV Shornur S/S
10 Upgradation of 66 kV Kalamassery - Aluva 2016-17
Line to 220/110 kV using multicircuit, multi
voltage towers
11 220 kV Areakode - Kanhirode D/C Line 2017-18

/ Total 185.06 0.00 0.00


13.4 400 230 ..
13.4 Review of Progress of Works on new 400 KV and 230 KV Transmission Lines under State Sector in SR
/ Name of the State : / Tamil Nadu
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Stringing 2016-17 Beyond
Length in Original Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
765 KV (Lines) :
1 765 kv Ariyalur SS to 765/400 kV Thiruvalam 320 2018-19 Tender opened and under 320
PGCIL SS D/C Line with Hexa Zebra process
conductor

A 400 KV (Lines) :
1 400 KV Kalivanthapattu SS - 400 KV 52 30.69 28.02.2014 31.10.2016 Case at National Green 52
Sholinganallur (Ottiyampakkam) SS DC Tribunal
Judgement awaited
2 400 KV D/C Line from MTPS - Singarapet 400 200 2016-17 2016-17 Tender will be floated on 200
KV S/S acquiring the land for the S/S

3 400 kV Thoppakundu 400/110 kV Wind SS -


Kamuthi 400/230-110 kV S/S
4 400 kV Kamuthi Solar park - Kamuthi 400/230-
110 kV S/S
5 400 kV DC Line on DC Tower with Quad 220 86.3 13.07.2016 31.12.2016 Work awarded and under 220
Moose Conductor from 400kV Karaikudi SS progress. Railway crossing
(PGCIL) to proposed 400 kV Kamudhi SS approval awaited

6 (a). 400 KV D/C Line on multi circuit towers 74.4 2015-16 31.03.2017 Work awarded to M/s. 74.4
with twin moose conductor from the proposed SEW Aster JV on
Thervaikandikai 400 KV SS to the prposed 30.03.2015 and under
Korattur 400 KV SS and Manali 400 KV SS progress
upto the common point (P.7)
(b). Erection of 400 KV SC Line on multi 4.6 29.03.2016 31.03.2017 Work awarded to M/s. 4.6
circuit tower with twin moose conductor from SEW Aster JV on
the common point A to the proposed Common 30.03.2015 and under
Point B Korattur 400 KV SS to accommodate progress
Thervaikandigai - Korattur & NCTPS-Manali
SC Line
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
(c). Erection of 400 KV SC Line on DC 4.4 14.09.2015 31.12.2016 Work awarded and under 4.4
Towers with twin moose conductor from the progress
LILO Point D of 400 kV NCTPS - Alamathy
DC Line to the Common Point B to
accommodate 400 kV NCTPS - Manali SC
Line & 400 kV Alamathy - Korattur SC Line
Line
22.2 4.755 14.09.2015 31.12.2016 Work under progress 22.2
(d) Erection of 400 KV DC line on DC tower
with twin moose conductor from common point
B to common point C towards the proposed
Korattur 400 KV SS to accommodate 400 KV
Thervaikandigai-Korattur SC line and 400 KV
Alamathy-Korattur SC line.(P.8) 8b2

7 (a) Laying of 400 kV 1 X 2500 sqmm D/C UG 18 Retender will be floated 18


Cable Feeder from the Common Point C to the after JICA concurrence
proposed 400 kV Korattur SS to accommodate
400 kV Thervaikandigai - Karattur S/C Circuit
Line and 400 kV Alamatty - Korattur S/C Line
(400 kV Korattur SS Line)

(b) Erection of 400 KV DC line on DC tower 60 12.701 14.09.2015 30.09.2016 Work awarded and under 60
with twin moose conductor from common point progress
A of Thervaikandigai to the proposed Manali
400 KV SS to accommodate 400 KV
Thervaikandigai -Manali SC line and 400 KV
NCTPS-Manali SC line for a distance of 34
kms (superceeding the original sanction
accorded for Thervaikandigai 400 KV
Substation)(P.8) 8a

(c) Erection of 400 KV DC line on with twin 11.4 14.09.2015 30.09.2016 Work awarded and under 11.4
moose/HTLS conductor from the proposed progress
Manali 400 KV SS to Manjakuppam point
(towards proposed Korattur 400 KV
Substation) 8c
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
8 Laying of 400 kV 1 X 2500 sqmm D/C UG 22 2017-18 2017-18 Retender will be floated 22
Cable Feeder from Manjakuppam Point to the after JICA concurrence
proposed 400 kV Korattur SS (Included in 400
kV Manali SS associated Line P6)
9 400 KV Line (4 Nos. circuits on multi circuit 160 101.6 27.04.2016 31.12.2016 Work awarded to M/s. 160
towers) with twin moose conductor from L&T on 28.04.2015 and
proposed Karamadai 400 KV SS to LILO the work under progress
"400 KV MTPS Stage III - PGCIL Arasur Line"
Court Case involved
10 400 KV D/C Line on Towers with Quad Moose 31 19.6 04.03.2015 31.08.2016 Work awarded on 31
from Tirunelveli SS (Ahishekapatty) to the 20.08.2014 and under
proposed Kanarpatty 400 KV SS progress
11 Erection of 400 KV Line on DC Tower with 358 358 10.03.2015 31.10.2016 Line work completed 358
twin moose conductor from the proposed and will be
Thappukundu SS to 400 KV Anaikadavu SS commissioned along with
Sub-Station
12 LILO of one circuit of 400 KV Thappakundu 30 2016-17 2016-17 Tender opened and under 30
SS to Anaikadavu SS at 400 kV Udumalpet process
(PGCIL) SS
13 Erection of 400 KV Line on DC Tower with 77.342 77.342 08.08.2014 31.10.2016 Work completed and will 77.342
twin moose conductor from the proposed be commissioned with SS
Rasipalayam SS to 400 KV Anaikadavu SS
14 (a). Erection of 400 KV DC Line on DC towers 390 368.36 03.04.2015 31.07.2016 Work under progress 390
with quad moose conductor from 400 kV RoW Issues
Rasipalayam SS to 400 kV Dharmapuri SS by
superceeding already sanctioned 400 kV DC
Line from 400 kV Rasipalayam SS to 765/400
kV Salem SS
(b). Erection of 400 kV DC Line on DC towers 390 31.03.2016 30.06.2017 Work awarded to M/s. 390
with quad moose conductor from Rasipalayam - KPTL on 21.12.2015 and
Dharmapuri DC Line at 765/400 Dharmapuri under progress
SS (kfw)
15 400 kV Salem - Palvadi (Singarpet) D/C Quad 90 As agreed in 36 SCPSPSR 90
Line
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
16 400 kV Vagarai - Udumalpet (PGCIL) Twin
DC Line
17 (a). Erection of 400 KV DC Line on the DC 9 2017-18 Specification is under 9
Tower with twin moose conductor from the preparation for floating
proposed 400 kV Manali SS and NCTPS Stage - tender
II to Tondaiyarpet point (400 kV Pulianthoppu
SS)
(b). Erection of 400 KV SC Line on the DC 40 2017-18 Specification is under 40
Tower with twin moose conductor from the preparation for floating
proposed 400 kV Manali SS and NCTPS Stage - tender
II to Tondaiyarpet point (400 kV
Pulianthoppu SS)
(c). Laying of 400 kV, 1x2500 sq.mm DC UG 10.8 31.08.2016 31.03.2017 Work awarded on 10.8
Cable Feeder from Tondaiyarpet point to the 10.02.2016 and is being
proposed 400 kV Pulianthope SS (Manali and taken up
NCTPS Stage - II
18 (a) 400 kV D/C Line with Quad Moose 1 1 31.03.2017 30.09.2016 Line Work completed. 1
conductor by making LILO in circuit 1 of Linking with the terminal
MTPS III - Thiruvalam DC Line for 400 kV will be matched with 400
Dharmapuri SS kV Dharmapuri SS

(b) 400 kV D/C Line with Quad Moose 1 1 31.03.2017 30.09.2016 Line Work completed. 1
conductor by making LILO in circuit 2 of Linking with the terminal
MTPS III - Thiruvalam DC Line for 400 kV will be matched with 400
Dharmapuri SS kV Dharmapuri SS

19 400 kV D/C Line with Quad Moose conductor 190 2017-18 2017-18 Estimate is under process 190
by making LILO in Feeder 1 of Karakudi -
Pugalur DC Line at the proposed 400 kV
Vellalaviduthi SS
20 Erection of 400 KV DC Line on DC tower with 16 31.03.2017 31.03.2017 Work is being awarded to 16
twin moose conductor by making LILO in one M/s. ECC
of the 400 KV Sunguvarchatram-Alamathy DC
line upto Vellavedu towards Guindy (10)
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
21 Erection of 400 KV SC on DC tower with twin 40 2016-17 2017-18 Work is being awarded to 40
moose conductor from sanctioned M/s. ECC
Sholinganallur 400 KV SS upto Perumbakkam
Jn towards Guindy 400 KV Substation (10)
22 (a). Laying of 400 kV, 1x2500 sq.mm DC UG 40 2016-17 23017-18 Re-tender is being floated 40
Cable Feeder from Vellavedu to the proposed after getting JICA
400 kV Guindy SS concurrence
(b). Laying of 400 kV, 1x2500 sq.mm DC UG 12 2016-17 23017-18 Board Note is under 12
Cable Feeder from OH Portion (Perumbakkam approval for placing of
Jn from the sanctioned 400 kV Sholinganallur order
SS) to the proposed 400 kV Guindy SS (P 34)

23 400 kV DC Line on DC Towers with twin 24 17.28 04.03.2015 31.08.2016 RoW Issues. Enter upon 24
moose conductor from sanctioned 400 kV Permission awaited from
Kanarpatti S/S to 400 kV Kayathar S/S Collector
24 400 kV Pavoorchatram (Thenampatty) - 112 2017-18 2017-18 Tender under process 112
Kayathar Quad DC Line with Quad Moose
conductor
25 (a) 400 kV Kayathar - PGCIL 765 kV 110 2017-18 2017-18 Under scope of reduction 110
Kovilpatti Pooling Station Quad Moose DC from Kayathar to
Line Thenampatty
(b) 400 kV Udankudi - Samugarangapuram Land to be identified
DC Line
(c) LILO of 230 kV Kudankulam SR Pudur
S/C at Samugarengapuram
(d) LILO of 230 kV Udayathur Sankaneri at
Samugarengapuram
(b) 230 kV Samugarengapuram Muppandal
D/C
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms

B 230 KV (Lines) :
1 230 KV UG Cable Mylapore - Tharamani S/S 25 31.03.2015 30.09.2016 Work under progress 25

2 (a) Laying of 230 kV, 1x1200 sq.mm SC UG 1.8 31.08.2016 31.03.2017 Work awarded on 1.8
Cable Feeder from proposed 230 kV 10.02.2016 and is being
Vyasarpadi to 400 kV Pulianthope SS. taken up
(b) Laying of 230 kV, 1x2500 sq.mm SC UG 5.4 31.08.2016 31.03.2017 Work awarded on 5.4
Cable Feeder from 230 kV Tondaiyarpet point 10.02.2016 and is being
to the proposed 400 kV Pulianthope SS taken up
(Manali and NCTPS Stage - II)
(c) Laying of 230 KV, 1x1200 sq.mm SC UG 1.5 31.12.2016 31.12.2016 Work awarded on 1.5
cable feeder from the Basin Bridge 230 KV SS 10.02.2016 and is being
to the proposed Pulianthope 400 KV SS taken up

3 230 KV DC Line on DC tower by Making 2.08 2.08 2015-16 Apr-16 Line energised on 2.08 2.08
LILO of Gummidipoondi - M/s Michelin Tyres 15.04.2016
Feeder at Thervaikandigai 400 KV SS
4 Changing of conductor in Sriperumbudur - 20.27 12 2012-13 Line work is under 20.27
Korattur S/C Line (Improvement) modification & Admn
approval under process
5 Erection of 230 kV DC Line on DC Towers 70 31.5 31.03.2015 31.12.2016 Work under progress 70
with Zebra Conductor from 400 kV
Ottiyambakkam SS to Proposed 230 kV Omega
SS
6 230 kV Cuddalore - SP Koil (Veerapuram) DC 347.99 31.12.2016 31.03.2017 Work under progress 347.99
Line via Neyveli (kfw)
7 230 kV UG Cable Line from Basin bridge 230 23.1 2013-14 Tender to be floated. 23.1
KV S/S (GMR Vasavi) to TNEB HQ 230 KV
S/S
8 Laying of 230 KV SC 1X1200 sq.mm XLPE 9.2 30.09.2012 31.03.2017 Work awarded to M/S CCI 9.2
UG Cable from Guindy 230 KV SS to and to be commenced
Koyembedu(AIS) 230 kV SS
9 LILO of 230 KV Sriperumpudur - Arni Line at 12 31.12.2011 Court Case pending. 12
Sunguvarchatram 400 KV S/S with Zebra Approval for revised route
Conductor is under scrutiny
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
10 LILO of 230 KV Siruseri - Taramani (Kids 4.8 4.8 31.03.2015 31.07.2016 Work completed 4.8
Park) Line at proposed Ottiyambakkam 400
KV S/S
11 230 KV D/C Line from Ottiyambakkam to 24 15.6 31.03.2015 31.08.2016 Work under progress 24
KITS 230 KV S/S
12 Additional Source from Alamathy (400 KV) -
Koyambedu (230 KV) Line :
a) Construction of 230 KV DC line from 28 24 2012-13 August, 2016 Work under progress 28
Koladi point to PH Road
b) Laying of 230 KV 1 x 1200 sq mm UG cable 1.35 2012-13 Sep-16 Work under process 1.35
from PH Road to 230 kV Koyambedu
13 Erection of 230 kV DC Line on DC Towers with 4 2016-17 Work awarded and check 4
Zebra Conductor for connecting the proposed 400 kV survey is under progress
Karamadai to the PUSHEP Feeder (Modification at LILO needed)

14 230 KV S/C Line on D/C Towers from 137 116 31.12.2011 30.09.2016 Balance Work awarded 137
Karaikudi 400 KV S/S to Sembatty 230 KV and to be taken up
S/S with Zebra conductor
15 Erection of 230 kV D/C Line upto Location B 68 68 31.03.2015 31.07.2016 Work completed. 68
from Cuddalore Auto S/S to make LILO of the Panel awaited
proposed Ulundurpet - STCMS Line at
Ulundurpet 230 kV S/S
16 Erection of 230 KV S/C Line from Villupuram 55 31.03.2012 2016-17 Termination Notice issued to 55
230 KV S/S to the proposed Ulundurpet 230 the old Contractor. Tender to
KV S/S with Zebra Conductor be floated after election

17 Erection of 230 KV S/C Line on D/C Tower 40 40 2012-13 2015-16 Work Completed 40
with Zebra Conductor from Gobi 230 KV S/S
towards Thingalur upto common point of 230
KV D/C Line
18 (a). Erection of D/C Line on D/C Towers with 0.7 0.35 31.12.2015 2016-17 Work completed 0.7
Zrbra Conductor for making LILO of existing
230 KV SP Koil - Thiruvalam Line at the
proposed Kanchipuram 230 KV SS
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
(b). Erection of D/C Line on D/C Towers with 15.69 6.68 31.12.2015 2016-17 Work Completed 15.69
Zrbra Conductor for making LILO of existing
230 KV Sunguvarchatram - Arni Line at
proposed 230 KV Kanchipuram SS
19 LILO of 230 kV Thatchankurichi - Eachangadu 20 31.03.2016 2016-17 Re-tender awarded on 20
Line at proposed 230 kV Poiyur SS 03.09.2015 and under
progress
20 Erection of D/C Line on D/C Towers with 12.86 12.86 2014-15 2016-17 Work Completed 12.86
Zebra Conductor for making LILO of existing
230 KV Tuticorin SIPCOT - Checkanurani
Line at the proposed Savasapuram 230 KV SS

21 230 kV Kayathar - Tuticorin (Auto) DC Line 130 30.06.2015 31.03.2017 Work awarded on 30.06.15 130
(kfw) and under progress
22 230 kV Veeranam - Tirunelveli (PGCIL- 50 30.09.2016 31.03.2017 Work awarded on 30.06.15 50
Abhishekapatty) SC Line on DC Towers and under progress
23 230 kV Veeranam - Kodikuruichi SC Line on 25 31.12.2016 31.03.2017 Work awarded on 30.06.15 25
DC Towers (Partly dismantling the existing and under progress
Line)
24 (a). Erection of 230 KV D/C Line on D/C Towers 1.854 31.07.2016 30.09.2016 Work awarded on 1.854
with Zebra Conductor for making LILO of existing 03.03.2016 and under
230 KV Checkanurani - TTPS I Feeder at the progress
proposed Kinnimangalam 230 KV SS
(b). Erection of 230 KV D/C Line on D/C Towers 1.854 31.07.2016 30.09.2016 Work awarded on 1.854
with Zebra Conductor for making LILO of existing 03.03.2016 and under
230 KV Checkanurani - Kayathar Feeder at the progress
proposed Kinnimangalam 230 KV SS
25 230 kV Ingur - Arasur 400 kV (PGCIL) SC 60 30.06.2015 31.03.2017 Work awarded on 60
Line on DC Towers (Kfw) 30.06.2015 and under
progress
26 230 kV Arasur 400 kV (PGCIL) - Gobi (kfw) 55 31.03.2012 31.03.2017 Work awarded on 55
SC Line on DC Towers 30.06.2015 and under
progress
27 Erection of 230 KV S/C Line on D/C Towers 62 34 31.03.2014 31.03.2017 Work under progress 62
with Zebra Conductor between Palladam - Court Case at Perundurai
Ingur 230 KV SS
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
28 LILO of 230 KV Arasur - Palladam Line at 24 7 13.08.2015 31.12.2016 Work awarded on 14.08.2014 24
proposed Tiruppur 230 KV S/S and under progress

29 LILO of 230 KV Arasur - Karamadai Line at 90 27.5 13.08.2015 30.09.2016 Work awarded on 14.08.2014 90
proposed Shenbagapudur 230 KV S/S and RoW issue is being solved

30 230 KV S/C Line on D/C Towers from 31.36 02.09.2016 31.03.2017 Work awarded and under 31.36
Shenbagapudur 230 KV S/S to the proposed progress
Karuvalur 230 KV SS
31 Replacement of Kunda Conductor with Zebra 39.9 31.03.2015 31.03.2017 Work under progress. 39.9
conductor in the existing Neyveli-Eachengadu 230
KV S/C Line on DC Tower
32 230 kV Otta Kal Mandapam - Thudiyalur DC Line 28 As agreed in 36 SCPSPSR 28
33 230 kV Villupuram - Neyveli DC Line 40 As agreed in 36 SCPSPSR 40
34 (a). Erection of DC Line on DC tower with Zebra 62 54 31.03.2015 31.10.2016 Work awarded on 62
Conductor for making LILO of existing 230 kV 29.11.2014 and under
Ingur - Palladam Line at the proposed 230 kV progress
Kurukathi SS
(b). Erection of DC Line on DC tower with Zebra 62 5.2 30.11.2014 31.12.2016 Work under progress. 62
conductor for making LILO of existing 230 kV
Myvady - Pugalur Line at the proposed 230 kV
Kurukathi SS
(c) 230 KV DC line on DC tower with Zebra 2 31.03.2017 31.03.2017 Estimate is under process 2
conductor for making LILO of the existing 230 KV
Myvady -Othakalmandapam feeder-I at sanctioned
Anaikadavu 400KV SS
(d) 230 KV DC line on DC tower with Zebra 40 31.03.2017 31.03.2017 Estimate is under process 40
conductor for making LILO of the existing 230 KV
Myvady -Kurukathi - Pugalur feeder at sanctioned
Rasipalayam 400 KV SS
(e) 230 KV DC line on DC tower with Zebra 50 31.03.2017 31.03.2017 Estimate is under process 50
conductor for making LILO of the existing 230 KV
Ingur -Kurukathi - Palladam feeder at sanctioned
Rasipalayam 400 KV SS
35 Laying of 230 kV 1X1200 Sq.mm, XLPE UG 10 31.03.2015 31.10.2016 Work under progress 10
Cable from the proposed 230 kV Thiruverkadu SS
to the Sanctioned 230 kV Ambattur 3rd Main Road
SS
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
36 Erection of DC Line on DC tower with Zebra 53.64 26.67 31.03.2015 31.12.2016 Work under progress 53.64
conductor for making LILO of existing 230 KV
Trichy - Perambalur Line at the proposed 230 kV
Jambunathapuram SS
37 Erection of 230 kV DC Line on DC towers with 4 31.03.2016 30.09.2016 Work awarded and under 4
Zebra conductor by making LILO in 230 KV progress
Korattur - CMRL Koyembedu feeder to the
rd
proposed 230 kV Ambattur 3 Main Road SS
38 (a) LILO of existing 230 kV Paramathi - Alandur 59.68 4 31.12.2015 31.12.2016 Work awarded and under 59.68
Line at theproposed 230 kV Valayapatty SS, by progress
erecting DC Line on DC Tower with Zebra
Conductor
(b) Erection of DC Line from Deviakurichy - 52 52 31.12.2015 31.12.2016 Work completed 52
Pudhansanthai line at Valayapatty 230 kV SS
39 Laying of SC 230 kV, 1x1200 sq.mm, XLPE UG 10 2016-17 2017-18 Retender to be floated 10
Cable feeder from 230 kV Kilpauk SS 7 and TNEB
HQ 230 kV SS 3 to the proposed CMRL Central
jail Complex Substation
40 (a). Laying of DC 230 kV 1 x 1200 sq.mm, XLPE 7 31.12.2015 31.03.2017 Work awarded and 7
UG Cable Feeder by making LILO in 230 KV Drawing approval under
Mylapore - Taramani Feeder at proposed RA process
puram Substation
(b). Laying of SC 230 KV, 1 x 1200 sq.mm XLPE 8.1 31.12.2015 31.03.2017 Work awarded and being 8.1
UG cable Feeder from the sanctioned Guindy 400 commenced
KV Substation to the proposed 230 kV R.A.Puram
Substation
41 Erection of 230 kV DC Line on DC tower with 23.52 23.52 07.04.2016 31.07.2016 Work completed 23.52
Zebra conductor for making LILO of existing 230
kV Kalpakkam - Arani Line at the proposed 230
kV Echur SS (Purisai)
42 Erection of 230 kV SC Line on DC towers with 57.57 19.02.2017 31.12.2016 Work awarded and to be 57.57
Zebra conductor from 400/230/110 kV Dharmapuri commenced
SS to the proposed 230 kV Gurubarapally SS
(Associated line of Dharmapuri 400 KV SS
NABARD)
2016-17 2016-17
2016-17

.
Energised
Sl. Proposed for
Name of the Transmission Line Remarks during
No Length in Stringing Original 2016-17 Beyond
Revised 2016-17
completed ckt. Kms 2016-17
Circuit Kms. Target Date Target date ckt. Kms
in Ckt.Kms ckt. Kms
43 Erection of 230 kV SC Line on DC towers with 3.2 2015-16 2016-17 Work awarded on 3.2
Zebra conductor from LILO of 230 kV Mettur - 21.05.2016 and under
Karimangalam Line (Associated line of progress
Dharmapuri 400 KV SS)
44 (a). Erection of 230 kV S/C Line on Multi Circuit 20.863 20.863 13.08.2015 31.07.2016 Line energised on 20.863
Towers with Zebra Conductor from Karamadai 400 08.07.2016
kV S/S up to common point
(b). Erection of 230 kV SC Line on DC Towers 37 13.08.2015 30.09.2016 Work awarded on 37
with Zebra Conductor from the common point to 14.08.2014 and under
230 kV Thudialur SS progress
45 Erection of 230 kV DC Line on DC Towers from 74.4 3 31.08.2016 Work under progress 74.4
230 kV Muthuramalingapuram S/S to Kamudhi

46 LILO of 230 KV Thiruvarur - Kadalangudi Line at 40 31.08.2016 31.03.2017 Work awarded and being 40
230 kV Kumbakonam S/S commenced
47 Erection of additional 230 kV link Lines from 400 46.3 2016-17 31.03.2017 Tender will be floated 46.3
kV Shoolagiri S/S to 230 kV Hosur S/S after election
48 Erection of 230 kV SC Line on DC Towers from 170 100 04.03.2015 31.10.2016 Work under progress. 170
the existing 230 kV Kavanoor SS to the existing Held up by cultivation &
230 kV Karaikudi SS Raillway crossing approval
49 230 kV Kamuthi - Kavanoor Line Sep-16 0
50 (a) LILO of 230 kV Kudankulam SR Pudur S/C Land to be identified
at Samugarengapuram
(b) LILO of 230 kV Udayathur Sankaneri at Land to be identified
Samugarengapuram
(c) 230 kV Samugarengapuram Muppandal D/C Land to be identified
Line

/ Total 4044.75 2.08 1210.37


13.5 400 220 ..
13.5 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR
/ Name of the State : / Telangana
2016-17 2016-17
2016-17

.
Energised
Sl. Stringing Proposed for
Name of the Transmission Line Remarks during
No Length in completed in Original Revised 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms

A 400 KV (Lines) :
1 Ring Main Transmission Scheme :
1.1 Yeddumailaram (Shankarapally) - Edulapally (DC) 82.344 Dec-13 2016-17 New Tenders called for and PO issued on 82.344
04.02.2014
1.2 Idulapally to LILO point of Srisailam - Hyderabad 74.438 7.00 Dec-13 2016-17 New Tenders called for and PO issued on 74.438
line 04.02.2014
1.3 Yeddumailaram (Shakarapally) to LILO point of 158 156.616 Oct-14 2016-17 PO issued on 04.02.2014 and work under 158
Srisailam - Hyderabad Line (Ckt-I) progress
2 Evacuation of Power from HNPCL (1040 MW)
Power Plant :
2.1 400 KV Quad DC Line from Suryapet SS - 240.042 240.042 Mar-15 2016-17 Test charged on 28.07.2016 240.042 240.042
Nandiwanaparthi SS
2.2 400 KV Quad DC Line from Nandiwanaparthi SS - 222 132.52 Mar-15 2016-17 Awarded in Sep-13 and under progress. 222
Shankarapally SS
3 400 KV Quad Moose DC Line from Proposed New Line proposed
Kamavarapukota SS - Proposed Suryapet SS :
3.1 400 KV Twinmoose DC Line from Proposed Chinna 170.364 165.364 Sep-15 2016-17 Work awarded in March, 2014 170.364
Korukondi -Proposed 400 KV Suryapet SS 5 km of OPGW work only pending

4 Jaipur Power Transmission Scheme :


4.1 Jaipur TPP - Rangampet Quad DC Line 149.636 149.636 May-15 2015-16 Commissioned on 13.11.2015 149.636 149.636
(Reported during May, 2016 vide AR
data)
4.2 Rangampet - Gajwel Quad DC Line 174.848 174.848 May-15 2015-16 Commissioned on 13.11.2015 174.848 174.848
(Reported during May, 2016 vide AR
data)
5 Wind Power Evacuation Scheme :
5.1 (a). 400 KV Quad DC Veltoor - Tungabhadra 146.69 116.674 Jul-15 Jun-16 Work awarded in March, 2014 & Work under 146.69
River Line Crossing progress
6 Nirmal Power Transmission Scheme :
6.1 400 kV Quad Moose DC Line from STPP, Jaipur - 142 2.89 2016-17 2016-17 Work awarded on November, 2015 and 142
Jagityal (Package- I) under progress
6.2 400 kV Quad Moose DC Line from Jagityal - 148.176 106.448 2016-17 2016-17 Work awarded on Octoberber, 2015 and 148.176
Proposed Nirmal SS (Package- II) under progress
2016-17 2016-17
2016-17

.
Energised
Sl. Stringing Proposed for
Name of the Transmission Line Remarks during
No Length in completed in Original Revised 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
7 Bhadradri Thermal Transmission Scheme :
7.1 400 kV Quad Moose DC Line from 400 kV 112.954 10.834 2016-17 2016-17 Work awarded on December, 2015 and 112.954
Julurupadu SS to Burgampadu (Common Point), under progress
Khammam of length 56.186 approx.
7.2 400 kV Quad Moose DC Line from Burgampadu 108.636 8.288 2016-17 2016-17 Work awarded on December, 2015 and 108.636
(Common Point), Khammam District to 400 kV under progress
Switch Yard at Manuguru Plant of length 54.318
kms approx.
7.3 400 kV Quad Moose DC Line from 400 kV 214.812 2016-17 2016-17 Work awarded on December, 2015 and 214.812
Julurupadu SS to400 kV Suryapet SS, Nalgonda under progress
District of length 107.406 km approx
8 KTPS Stage - VII (1 x 800 MW) Power Evacuation cheme :
8.1 400 kV Quad Moose DC Line from 400 kV 77.202 2016-17 2016-17 Work awarded on December, 2015 and 77.202
Julurupadu SS to KTPS (Stage - VII) Switching under progress
Station in Khammam District of length 38.601 km
approx.
9 System Improvement Transmission Scheme :
9.1 400 kV Quad Moose DC Line LILO from 400/220 5.034 2016-17 2016-17 LOI issued on 02.03.2016 and under 5.034
kV SS Dindi to Srisailam - Mamidipally 400 kV DC progress
Line, 2.517 km
10 Indira Sagar Rudramakota Lift Irrigation
Scheme :
10.1 400 KV DC Line from LILO Point of Vizag 34 33.554 Jan-14 2016-17 Work awarded on 18.05.2013 and under 34
(Kalpaka),Khammam to 400 KV Asupaka SS progress
(OPGW Cable)
B 220 KV (Lines) :
(a) Transmission Lines covered under other Schemes :
1 Laying of 220 kV XLPE UG Cable from Marripally 14.44 10.6 May-13 2016-17 Works under progress. 14.44
(Common Point) near Nagole to proposed
220/132/33 kV Hayathnagar S/S
2 220kV Multi Circuit Line from 220 kV Ghanapur 36 33 Jun-13 2016-17 Works under progress 36
SS to proposed 220/33 kV SS at Hayathnagar upto
terminal tower at Marripally (18 km) : 59 Nos of
Multi Circuit and 4 Nos of Normal Towers
3 220 KV DC line from 400/220 KV Mamidipally S/s 11.32 11.32 Jan-11 2016-17 OPGW Works to be taken up 11.32
to M/s K.S.K. Photovoltaic Ltd.(Near Fabcity
Ravirala)
2016-17 2016-17
2016-17

.
Energised
Sl. Stringing Proposed for
Name of the Transmission Line Remarks during
No Length in completed in Original Revised 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
4 220 kV LILO to Moulali S/S from kV Ghanapur - 18 7 Sep-14 2016-17 Work under progress 18
Malkaram D/C Line (One Circuit)
5 220 KV DC line from 220KV SS at Upper Jurala to 22 3.2 Sep-12 2016-17 Commissioned on 29.04.2016 22 22
Lower Jurala Hydro Electric project
6 220 KV D/C XLPE UG cable from 220 KV GIS S/s 9.5 9.5 Jun-11 2016-17 All works completed. Connected SS 9.5
at Chandrayanagutta to proposed 220 KV GIS S/s works are under progress
Imlibun
7 220kV LILO from 220kV Gachiboli - Shapurnagar 6 Jun-14 2016-17 Works commenced 6
line to the proposed 220kV Miyapur S/S with XLPE
UG Cable
8 220 KV LILO from 220 KV Wanaparthy - 10.416 10.412 Jul-12 2016-17 Nearing completion 10.416
Ramanagadda Line to proposed 220/33 KV Sub-
Station at Singotham Cross Road
9 220 KV LILO to Manikonda from Mamidipally - 0.6 0 Jul-12 Court Case. Work stopped. 0.6
Gachibowli Line
10 (a) 220 kV DC Line for LILO of one of the 24.15 15.2 Feb-15 Jun-16 Work under progress 24.15
circuits Chilakallu - Narketpally DC line to the
proposed Huzurnagar S/S
(b) LILO of one circuit of Chilakallu - 23.41 16 Feb-15 Jun-16 Work under progress 23.41
Narkatpally DC line to the proposed
400/220/132 kV Suryapet SS (12 KM)
11 220 kV DC Line from 400 kV Suryapet S/S to 100 2015-16 2016-17 Tenders to be called 100
220 kV Narketpally S/S
12 220 kV D/C Line from the proposed 220 kV Parigi 80.092 80.092 Oct-15 2016-17 Commissioned on 04.07.2016 80.092 80.092
S/S to the proposed 220/132 KV Kosigi S/S
13 (a). 220 KV DC Line from 400 KV Veltoor S/S to 80 76 May-15 2016-17 P.O issued on 25.08.2011. Works 80
the proposed 220 KV Switching Station at commenced.
Thimmajipet.
(b). 220 KV LILO Line from 220 KV Boothpur - 2 0 May-15 2016-17 P.O issued on 25.08.2011. Works 2
Kalwakurthy Circuit 1 to the proposed 220 commenced.
KV Switching Station at Thimmajipet.
(c). 220 KV LILO Line from 220 KV Boothpur - 2 0 May-15 2016-17 P.O issued on 25.08.2011. Works 2
Kalwakurthy Circuit 2 to the proposed 220 commenced.
KV Switching Station at Thimmajipet.
14 220 KV Overhead Line from last multi circuit tower 3.2 3.2 Dec-13 2016-17 Works Completed. Multi Circuit Line 3.2
to cable termination tower for Uppal (Nagole) S/S Works are under progress.

15 220 kV DC line from 220/132 KV SS at Upper 22 22 Sep-12 Apr-16 Charged on 29.04.2016 22 22


Jurala to Lower jurala hydro electric project
(11KM)
2016-17 2016-17
2016-17

.
Energised
Sl. Stringing Proposed for
Name of the Transmission Line Remarks during
No Length in completed in Original Revised 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
(c) Transmission Lines planned beyond 2014-15 :
1 220 kV Line with 4 Circuits on Multi Circuit 40 2015-16 2016-17 Investment Approval (IA) to be received 40
Towers for LILO of both the Circuits of 220 kV from APERC
Warangal - Boodidampadu DC Line at proposed
220 kV SS, Ayyagaripally
2 220 kV DC line with Moose ACSR on Galvanised 124 2015-16 2016-17 Investment Approval (IA) to be received 124
Towers from 400/220 kV Oglapur SS to the from APERC
proposed 220 kV Jangaon SS
3 220 kV DC line with Moose ACSR on Galvanised 80 2015-16 2016-17 Investment Approval (IA) to be received 80
Towers from 220 kV SS, Durshed to the proposed from APERC
220 kV SS, Sircilla
4 220 kV LILO to the proposed 220 kV SS at 90 50 Jul-16 Aug-16 Work under progress 90
Suryapet from 220kV Budidampadu (Khammam) -
Miryalaguda DC line (Both circuits)
5 Erection of 220 kV DC line from the proposed 120 2015-16 2016-17 Tenders to be called 120
400/220 kV Nirmal S/S to the existing 220kV
Jagityal S/S
6 Erection of 220 kV DC line from the proposed 20 2015-16 2016-17 Tenders to be called 20
400/220 kV Nirmal S/S to the existing 220 kV
Nirmal S/S
7 Erection of 220 kV DC Line from the proposed 200 2015-16 2016-17 Tenders to be called 200
400/220 kV Nirmal S/S to the proposed upgraded
220/132 kV Renzal S/S (100 km)
8 220 kV DC Line radially from proposed 220 kV 40 2015-16 2016-17 Tenders to be called 40
Thimmajipet Switching Station to the proposed
220/132 kV Jadcherla substation
9 220 kV DC Line with Moose ACSR on Galvanised 40 2015-16 2016-17 Investment Approval (IA) to be received 40
towers from the proposed 400/220 kV SS, from APERC
Maheswaram to the proposed 220 kV SS, Kothur
10 Erection of 2nd circuit from 220 kV SS 3 2015-16 2016-17 Investment Approval (IA) to be received 3
Shivarampally to Asifnagar S/S by laying 220 kV from APERC
XLPE UG Cable
11 220 kV LILO UG XPLE cable to the proposed 220 8 2015-16 2016-17 Tenders to be called 8
kV Raidurg SS from 220 kV Gachibowli -
Shapurnagar Line
12 Erection of 220 kV Line with 4 Circuits on Multi 40 2015-16 2016-17 Investment Approval (IA) to be received 40
Circuit Towers for LILO of both the Circuits of 220 from APERC
kV Gachibowli - Sivarampally SS at proposed
400/220 kV Manikonda SS
2016-17 2016-17
2016-17

.
Energised
Sl. Stringing Proposed for
Name of the Transmission Line Remarks during
No Length in completed in Original Revised 2016-17 Beyond
2016-17
Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms 2016-17
ckt. Kms
ckt. Kms
13 Erection of 220 kV DC Line With Moose ACSR on 40 2015-16 2016-17 Investment Approval (IA) to be received 40
Galvanised Towers from the proposed 400/220 kV from APERC
Maheswaram SS to the proposed 220/132kV
Bonguluru SS
14 220 kV 2nd circuits (3rd & 4th circuit) stringing 8 2015-16 2016-17 Tenders to be called 8
from Loc. No. 12 on the existing narrow based M/C
towers up to 220/132 kV Fab city on the 220 kV DC
line from 400/220 kV Mamidipally SS to 220/132
kV Fab city (circuit 1 & 2 are already covered
under Fab city line) - 4 km
15 (a). 220 kV DC line from Pulichintala Hydro 15.74 15.74 Feb-15 Aug-16 Work completed 15.74
Electric Station switch yard to 132KV
Sitapuram
(b). 220 kVswitching
DC220 KV station
DC line from 132 kV 58.62 30 Feb-15 Sep-16 Work under progress 58.62
Sitapuram Switching station to 220/132KV
Huzurnagar SS
16 220 kV LILO to the proposed 220/132 kV 10.27 0 26.11.2015 2016-17 Works under progress 10.27
Huzurabad SS for 220 kV Durshed - Oglapur Line
17 LILO of 220 kV Regumanugadda - Gudipalligattu 4.064 0 Nov-16 Sep-16 Works under progress 4.064
water grid SS line to 220/11 kV Substation Yelluru
along with metering arrangements for water Grid (5
KM) M/s.Vertex Engineers, Hyderabad

18 2nd ckt from 400 kV Gajwel to Loc. No.34 of 132 10 10 2016-17 2016-17 Commissioned on 08.06.2016 10 10
kV Line from Gajwel to Thumki Bolarum Line
19 220 kV LILO to Bonguluru SS from 220 kV Dindi - 2 2 Apr-15 Apr-15 Charged on 02.04.2015 2 2
Chandrayanagutta, Rangareddy District

/ Total 3532.71 700.62 147.29


14.1 400 220/230 ..
14.1 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations
/ Name of the State : / Andhra Pradesh
2016-17 2016-17
2016-17
.

Energised
Sl. Target date Proposed for
Name of Sub-Station Voltage Ratio Capacity (MVA) Original Remarks during 2016-17 Beyond 2016-17
No for 2016-17
MVA MVA
(KV) Target Date MVA
completion
A 400 KV (Sub-Stations) :
Short Gestation Power Transmission Scheme -II :
1 Bay Extentions :
1.1 400 KV Bays at Narsaraopet, pertaining Mar-14 2016-17
to VTS-Srisailam Line
2 Evacuation of Wind Power in Kadapa, Anantapur and Kurnool Districts (Phase - I) :
2.1 Uravakonda Substation (with 2 Quad 400/220 4x315 Jun-15 Jul-16 PTR 1 on 15.07.2016, PTR 2 on
Bays at 400/220 Veltoor S/S) 26.07.2016 1260 630

2.2 Kondapuram Substation 400/220/132 (4x315) + (2x160) Feb-15 Jul-16 Bus 1 charged on 29.06.2016
950
[Jammalamadugu]
3 Evacuation of Wind Power in Kadapa, Anantapur and Kurnool Districts (Phase - II) :
3.1 400 kV Hindupur Sub-Station 400/220 3x315 Aug-17 Sep-17 PO issued on 01.04.2016 945
4 Evacuation of Power from HNPCL (1040 MW) Power Plant :
4.1 Kamavarapukota Substation 400/220 2x315 Mar-16 Dec-16 Purchase Order issued on 13.03.2014.
630
Work under progress
5 Rayalaseema Power Transmission Scheme :
5.1 2 Nos. of 400 KV Bays at Chittoor Feeder - II Bay charged on 22.05.16
Feeder - I Bay under progress
6 System strengthening works in
400/220 kV SS, Prakasam District
on stand alone basis
6.1 400/220 kV Podili Sub-Station 400/220 3x315 Feb-17 Feb-17 LOI issued issued on 16.09.2015.
945
Purchase Order issued in Nov-15
7 Transmission System Improvement Scheme at Vizianagaram & Srikakulam Districts :
7.1 400/220 KV S/S at Maradam (Garividi) 400/220 2x315 Feb-16 Aug-16 Purchase order issued on 15.11.2014
along with 2 Nos. 400 KV Quad Bays at Work under progress
the existing 400/220 KV Kalpaka S/S
8 System Improvement at 400 kV Kalikiri, Chittoor District, along with the connected network :
8.1 400 kV Sub-Station at Kalikiri 400/220 2x315 Feb-17 Feb-17 Site handed over on 23.06.2016 630
2016-17 2016-17
2016-17
.

Energised
Sl. Target date Proposed for
Name of Sub-Station Voltage Ratio Capacity (MVA) Original Remarks during 2016-17 Beyond 2016-17
No for 2016-17
MVA MVA
(KV) Target Date MVA
completion
9 1000 MW Wind Power Evacuation at Aspiri :
9.1 400/220 kV Substation in Aspiri 400/220 (3x315) + (2x125) 38th SCPSPSR 1195
10 400 kV Transmission Scheme for Aug-16 Nov-16
evacuation of 1000 MW Power
from Solar Park at Ghani /
Panyam S/S, Kurnool District :
10.1 400 kV Sub-Station at Ghani 400 3x500 Aug-16 Nov-16 Purchase Order issued on 27.07.2015 1500

B 220 KV (Sub-Stations) :
(a) Sub-Stations covered under various Lift Irrigation Schemes :
1 Gaddamvaripalli 220/11 2x25 2016-17 Work under progress. 50
2 Goddumarri 220/11 2 x 50 2016-17 Work under progress. 100
3 Nansuralla 220/11 3x25 2016-17 2x25 MVA charged on 03.12.2011 25

(b) Sub-Stations covered under other Schemes :


1 APIIC Growth Centre, Bobbilli, 220/132 3 x 100 Dec-12 2016-17 One Transformer commissioned during 200
Vizianagarm 15-16. Balance 2 Transformers under
progress
2 Chakrayapeta 220/132 (2x100) + (2x31.5) Mar-15 Apr-17 Works under progress 263

3 Porumamilla 220/132 2x100 Mar-15 Sep-16 Works under progress 200


4 Vajrakarur 220/132 1x100 Mar-15 Jul-16 Commissioned on 14.07.2016 100 100
5 Tirumalayapally 220/132 2x160 Apr-15 Aug-16 Works under progress 320
6 Borrampalli 220/132 1x100 Sep-15 Sep-16 Works under progress 100
7 Kuppam 220/132 2x100 Feb-17 Feb-17 Works under progress 200
8 Kandukuru 220/132 3x100 Feb-17 Feb-17 Works under progress 300
9 Penukonda (Renewables KfW Hindupur) 220/132 2x100 36 SCPSPSR 200

10 Pampanur Tanda (Renewables KfW 220/132 2x100 36 SCPSPSR 263


Hindupur)
11 Betamcherla 220/132/33 (2x100) + (2x31.5) 36 SCPSPSR 263

12 Gollapuram 220/132/33 (2x100) + (2x50) Dec-14 Aug-16 Works under progress 300

- / Sub-Total 8073.00 730.00 2866.00


2016-17 2016-17
2016-17
.

Energised
Sl. Target date Proposed for
Name of Sub-Station Voltage Ratio Capacity (MVA) Original Remarks during 2016-17 Beyond 2016-17
No for 2016-17
MVA MVA
(KV) Target Date MVA
completion
C 220 .. / New 220 kV Sub-Stations Planned :
Nil
D / Augumenatation :
1 400/220 KV Chittoor & Nellore S/S : 400/220 (2x315)(3x315) @ Chittoor & 2016-17 3rd PTR at Chittoor charged on 315 315
Augmentation of 3rd 315 MVA PTR (3rd = 315 MVAR Nellore each 02.05.2016
PTR in Nellore idle charged on
31.01.2016 from 400 kV side)
2 220 kV Renigunta SS, Chittoor District 220 (3x100) 2016-17 2016-17 Commissioned on 01.04.2016 60 60
(2x100) + (1x160)
= 360 MVAR
3 220 kV Chinakampally SS, YSR 220 (1x100) 2016-17 2016-17 Commissioned on 02.04.2016 160 160
Cuddappah District (1x100) + (1x160)
= 260 MVAR
4 220 kV Kondapally SS, Krishna District 220 (3x100) 2016-17 2016-17 Commissioned on 25.04.2016 60 60
(2x100) + (1x160)
= 360 MVAR
5 220 kV Nagari SS, Chittoor District 220 (2x100) (3x100) 2016-17 Commissioned on 15.07.2016 100 100
= 300 MVAR
6 400 Sattenapalli S/S : Augmentation of 400 (2x315)(3x315) 2016-17 LOI issued on 16.09.2015. Purchase 315
3rd 315 MVA PTR = 315 MVAR order issued in Nov-15
7 220 kV Pendurthy SS, Visakhapatnam 220 (2x100) + (1x160) 2016-17 2016-17 Commissioned on 31.07.2016 60 60
District (1x100) + (2x160)
= 420 MVAR
8 Vemagiri SS 400 1 x 315 2016-17 2016-17 Work yet to be commenced 315
9 220/132 kV S/S at Renzal with 2x100 220/132 2 x 100 2015-16 2016-17 Tenders to be called 200
MVA Transformer (up gradation from
132/33 kV)

/ Total (MVA) 9458 1485 3066


2016-17 2016-17
2016-17
.

Energised
Sl. Target date Proposed for
Name of Sub-Station Voltage Ratio Capacity (MVA) Original Remarks during 2016-17 Beyond 2016-17
No for 2016-17
MVA MVA
(KV) Target Date MVA
completion
E / Reactor Scheme :
1 Kalpaka Bus Reactor 125 MVAR 2015-16 Jun-17 PO issued on 18.06.2016 125

2 Vemagiri Bus Reactor (1x80 + 1x125) 2015-16 Jun-17 PO issued on 18.06.2016 205

3 Kurnool Bus Reactor 125 MVAR 2015-16 Jun-17 PO issued on 18.06.2016 125

4 Chittoor Bus Reactor 125 MVAR Mar-17 Mar-17 Approved in 39th SC. 125
Fresh Tenders opened on 28.03.2016
5 VTPS Stage-IV Bus Reactor 125 MVAR Mar-17 Mar-17 Approved in 39th SC. 125
Fresh Tenders opened on 28.03.2016
6 Vijayawada Bus Reactor - III 400 125 MVAR Mar-17 Mar-17 Commissioned on 19.06.2016 125 125

7 Uravakonda Bus Reactor 400 80 MVAR Jun-15 Aug-16 Work under progress, being done by 80
M/s TEEECL
8 Ghani / Panyam Bus Reactor 400/220 2 x 125 MVAR Aug-16 Nov-16 P.O issued on 27.07.2015 250

9 Hindupur Bus Reactor 400/220 80 MVAR 36 SCPSPSR 80


10 Jammalamadugu Bus Reactor 400/220/132 80 MVAR 36 SCPSPSR 80
(Kondapuram)
/ Total (MVAR) 1160 125 160
14.2 400 220/230 ..
14.2 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations
/ Name of the State : / Karnataka
2016-17 2016-17
2016-17

. Energised

Sl. Target date Proposed for during Beyond 2016-
Name of Sub-Station Voltage Capacity (MVA) Original Target Remarks 2016-17 17
No for 2016-17
Ratio (KV) Date MVA MVA
completion MVA

A 400 KV (Sub-Stations) :
1 Bellary PS : Bellary 400 Jul-16 Aug-16 Works under progress
400 kV Pooling Station
near BTPS
2 400/220 kV Gulbarga SS 400/220 2 x 500 Estimate under preparation 1000
3 400 kV SS at 400/220 2 x 500 Land Acquisition is under
Chikkanayakanahalli (C.N progress
Halli) near LILO point on
the Nelamangala
Talaguppa 400 kV lines to
Hassan
4 400/220 kV substation at 400/220 before Phase-II at Ultra Mega
Devanahally Solar Power Park
5 Third 400/220 kV Tumkur 400/220 3 x 500 1500
(Vasantnarsapur)
6 400/220 kV Gadag (Doni) 400/220 2 x 500 1000
SS, Mundaragi Taluk,
Gadag District
7 400/220 kV Jagalur SS, 400/220 2 x 500 1000
Davanagere District
8 Electronics City 400/220 2 x 500 Sep-14 Court Case 1000

B 220 KV (Sub-Stations) :
1 Jigani: At Anekal Taluk 220/66 2x150 Oct-08 2016-17 PC Tests to be completed. 300
Source Line awaited
2016-17 2016-17
2016-17

. Energised

Sl. Target date Proposed for during Beyond 2016-
Name of Sub-Station Voltage Capacity (MVA) Original Target Remarks 2016-17 17
No for 2016-17
Ratio (KV) Date MVA MVA
completion MVA

2 Magadi : 2x100 MVA, 220/66 2x100 May-15 Nov-16 Work under progress 200
220/66/11 kV and 1x12.5
MVA, 66/11 kV SS at
Magadi
3 Mittemari : 2x100 MVA, 220/66 2x100 Jul-15 Jan-17 Work under progress 200
220/66/11 kV SS at
Mittemari
4 Ramnagar (Kothipura):East 220/66 2x100 Dec-07 2016-17 Source Line awaited. 200
5 Vikas Tech Park 220/66 2x150 Oct-11 Mar-17 PC Tests on Power Transformers and 300
Batteries will be done during
commissioning. Source Line awaited.

6 Koppal 220 KV (Halavarthi) : 220/110 2x100 Feb-14 2016-17 Work short closed. To be 200
2 x 100 MVA ; 220 / 110 KV & rtendered
1 x 10 MVA ; 110 / 11 KV S/S
7 Kudigi (Bedeladaku) : 220/66 2x100 May-14 Nov-16 LOI issued on 20.11.12 & 200
Est 2x100 MVA, 220/66 DWA on 02.01.13. Work
KV Station under progress.
8 Pavagada : 220/66 2x100 Jul-14 Nov-16 LOI issued on 16.01.2013. 200
Est of 1x100 MVA ; 220 / 66 KV Cable Laying Work under
Station progress.
9 220/110 KV & 110/11 KV 220/110-11 (2x100) + (1x10) 210
Mughalkod SS, Raibag Taluk,
Belgaum District
10 220/66 kV and 66/11kV 220/66-11 (2x100)+(1x12.5) 212.5
Hosadurga SS, Chitradurga
district
11 220/66 kV & 66/11 kV 220/66 (2x100) + (1 x 8) 208
Shivanasamudra S/S, Malavalli
taluk, Mandya district
12 Mallat (Manvi) : 220/66 2x100 Aug-14 Dec-16 LOI issued on 12.02.2013. 200
Est of 2x100 MVA ; 220 / 110 Work under progress
KV Station and 1x10 MVA, 110
/ 11 KV Sub-station

- / Sub-Total 2000 0 6130.5


2016-17 2016-17
2016-17

. Energised

Sl. Target date Proposed for during Beyond 2016-
Name of Sub-Station Voltage Capacity (MVA) Original Target Remarks 2016-17 17
No for 2016-17
Ratio (KV) Date MVA MVA
completion MVA

C 220 . / 220 KV Sub-Station Augmentations :


1 Gowribidanur : 220 1x100 Nov-12 Aug-16 Transformer supplied by 100
Providing 3rd Additional KPTCL on 11.05.2016
100 MVA, 220/66/11 kV Work under progress
Transformer
2 Chinthamani : 220 1x100 Jul-16 Aug-16 Work under progress 100
Providing 3rd Additional
100 MVA, 220/66/11 kV
Transformer
3 Kanakapura : 220 1x100 Mar-15 Aug-16 Work under progress 100
100 MVA, 220/66/11 kV
Transformer
/ Total 2300 0 6130.5
D .. Reactors / ICTs :
1 Kaiga Reactor (NPCIL) 2x125 As agreed in the Standing 250
Committee.
2 Hoody BR 1x63 Sep-16 Oct-16 Approved in 22nd SC 63
3 Nelamangala BR 1x63 Jun-16 Jul-16 Approved in 22nd SC 63
4 Davangere BR 1x125 Approved in 39th SC 125
5 Talguppa BR 1x125 Approved in 39th SC 125

6 Tumkur BR 400/220 2x125 250

7 Hiriyur - Mysore LR @ 400/220 2x63


Mysore
8 Udupi Bus Reactor (Adani) 2x125 Approved in 39th SC 250

/ Total 2426 0 7130.5


14.3 400 220/230 ..
14.3 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations
/ Name of the State : / Kerala

2016-17 2016-17
2016-17

.
Energised
Sl. Target date Proposed for Beyond 2016-
Name of Sub-Station Voltage Capacity (MVA) Remarks during 2016-
No for 2016-17 17
Ratio (KV) 17
completion MVA MVA
MVA
A 220 KV (Sub-Stations) :

/ Upgradation :
1 Upgradation of Punnapra S/S from 220/110 2 x 200 2016-17 1x200 MVA Transformer 100
110 kV to 220 kV S/S commissioned on 18.08.2014.
Other one under progress

2 Upgradation of Kattakkada S/S 220/110 2 x 200 2016-17 Work under progress 400
from 110 kV to 220 kV S/S 95% completed

3 220 KV S/S at Kothamangalam 2016-17

4 Upgradation of Kaloor S/S to 220 2016-17


kV

5 220 KV S/S at Chalakudy 2016-17

6 220 KV S/S at Aluva 2016-17

/ Total 500 0 0
14.4 765, 400 220/230 ..
14.4 Review of Progress of Works on new 765 KV, 400 KV & 220 KV Sub-Stations
/ Name of the State : / Tamil Nadu
2016-17 2016-17
2016-17

. Energised

Sl. Voltage Ratio Target date Proposed for during Beyond 2016-
Name of Sub-Station Capacity (MVA) Original Target Remarks 17
No (KV) for 2016-17 2016-17
Date MVA MVA
completion MVA

A 765 KV (Sub-Stations) :
1 Ariyalur 765/400 2 x 1500 2018-19 Estimate is under preparation 3000
2 North Chennai Pooling 765/400 3 x 1500 2019-20 Estimate is under preparation 4500
Station
B 400 KV (Sub-Stations) :
1 Thervaigandigai 400/230-110 (2x315) + (1x200) 03.03.2014 2016-17 Back Charged on 15.04.2016 at 230 830 830
kV level
2 Sholinganallur (JICA) 400/230-110 (2x315)+(1x100) 18.06.2015 31.09.2016 Nearing completion and Testing 730
under progress
3 Thappu Kundu, Theni 400/110 3x200 04.12.2014 31.10.2016 Work awarded and under progress 600
4 Anaikadavu 400/230-110 (2x315)+(2x200) 04.12.2014 31.10.2016 Work awarded and under progress 1030
5 Rasipalayam 400/230-110 (2x315)+(2x200) 15.11.2015 31.10.2016 Work awarded on 16.05.2014 and 1030
under progress
6 Palavadi (Dharmapuri) 400/230-110 (2x315)+(2x200) 25.11.2015 31.12.2016 Work awarded on 26.09.2014 and 1030
under progress
7 Kanarapatty 400/230-110 (2x500)+(4x200) 11.06.2015 31.12.2016 Work awarded and under progress 1800
8 Pulianthope (GIS) 400/230 3 x 315 2015-16 2017-18 Retender opened on 28.09.2015 and 945
under process
9 Manali 400/230-111 (2x315)+(2x200) 24.09.2016 31.03.2017 Work awarded andunder progress 1030
10 Kamudhi 400/230-110 (2x315)+(3x200) 02.07.2016 31.08.2016 Work handed over on 23.07.2015 and 1230
under progress
11 Pavoorchatram 400/230-110 (2x315)+(2x200) 31.07.2017 2017-18 Work awarded on 25.01.2016 and 1030
(Thenampatty), Tirunelveli under progress
12 Vellalaviduthi (Pudukottai) 400/230-110 (2x315)+(2x200) 2018-19 2018-19 Estimate is under preparation 830

13 Edayarpalayam (Under AC 400/230 2 x 500 Scheme awarded on 03.03.2015 1000


System Strengthening at
Pugalur)
2016-17 2016-17
2016-17

. Energised

Sl. Voltage Ratio Target date Proposed for during Beyond 2016-
Name of Sub-Station Capacity (MVA) Original Target Remarks 2016-17 17
No (KV) for 2016-17
Date MVA MVA
completion MVA

14 Vagarai, Udumalpet 400/230-110


15 Bay Extension at Udumalpet 09.05.2014 Agreement signed between
(PGCIL) S/S for LILO of one TANTRANSCO and PGCIL. Work
circuit of Thappukundu- to be executed by PGCIL
Anaikadavu DC Line
16 Bay Provision at Kayathar, Kovilpatty Tender floated for Bay provision at
for 400 kV Pavoorchatram Line Kayathar and Singarapet.
Udumalpet for Vagarai Line
Salem for Palavady Line
Palavady (Singarapet) for
Rasipalayam Line
17 Samugarengapuram SS 400/230-110 (3x315)+(2x200) Land to be identified 1345

C 230 KV (Sub-Stations) :
1 Singapuram 230/110 2x100 14.09.2013 31.05.2016 Test Charged on 02.05.2016 with 200 100
1x100 MVA Auto Transformer.
Other one under progress
2 Kumbakonam (JICA) 230/110 2x100 19.08.2015 31.03.2017 All works completed and Testing 200
under progress
3 Kinnimangalam (JICA) 230/110 3x100 19.08.2015 30.06.2016 Work awarded on 20.08.2014 and 300
completed
4 Poyyur (JICA) 230/110 2x100 20.08.2015 31.12.2016 All works completed and will be 200
commissioned with Lines
5 Echur, (Purisai - JICA) 230/110 2x100 17.09.2015 31.08.2016 Work awarded on 17.09.2014 and 200
under progress
6 Ambattur 3rd Main Road 230/110 2x100 02.03.2015 31.12.2016 Work awarded on 03.03.2014 and 200
(JICA) under progress
7 Kanchipuram (JICA) 230/110/11 (2x100) + (1x16) 2014-15 31.03.2017 Works under progress 216

8 Savasapuram (JICA) 230/110 2x100 2014-15 31.03.2017 Retender awarded and work under 200
progress
9 Tiruppur (JICA) 230/110 2x100 15.04.2016 31.03.2017 Work awarded on 16.04.2015 and 200
under progress
10 Shenpagapudur (JICA) 230/110 2x100 15.04.2016 31.03.2017 Work awarded on 16.04.2015 and 200
under progress
2016-17 2016-17
2016-17

. Energised

Sl. Voltage Ratio Target date Proposed for during Beyond 2016-
Name of Sub-Station Capacity (MVA) Original Target Remarks 2016-17 17
No (KV) for 2016-17
Date MVA MVA
completion MVA

11 RA Puram (GIS) UG - JICA 230/33 - 11 2x100 23.07.2015 31.03.2017 Court case cleared and work 200
commenced
12 Central CMRL (GIS) - JICA 230/110 2x100 19.08.2015 30.09.2016 Work awarded on 21.08.2014 and 200
testing under progress
13 Kurukathi 230/110 2x100 2015-16 31.12.2016 Work under progress 200

14 Tiruchuli (Muthuramalingapuram) 230/110 5x100 2015-16 31.08.2016 Work awarded and under progress 500

15 Jambunathapuram 230/110 2x100 20.04.2016 31.12.2016 Work awarded on 21.04.2015 and 200
under progress
16 Valayapatty 230/110 2x100 2015-16 31.03.2017 Works under progress 200

17 TNEB HQ (GIS) 230/33 2x100 2012-13 2017-18 Tender will be floated on completion 200
of HQ Building Works
18 Mambalam (GIS) 230/110 2x160 2016-17 2017-18 Work awarded on 02.01.2016 and 320
under progress
19 Porur (UG) 230/110-33 (2x100) + (2x50) 2016-17 2017-18 Tender opened on 23.09.2015 and 300
under process
20 Uddanapally 230/110 2x100 2016-17 2017-18 Estimate is under preparation 200

21 Mondipatti, TNPL Premises 230/110 2x100 2016-17 2017-18 Work awarded and under progress 200

22 Thuvakudy 230/110 2x100 2017-18 2018-19 Estimate is under preparation 200

23 Neyveli 230/110 3x160 2017-18 2018-19 Board Note submitted to call for NIT 480

24 Narimanam 230/110 2x100 2017-18 2018-19 Estimate is under preparation 200

25 Samayanallur 230/110 2x100 2017-18 2018-19 Estimate is under preparation 200

26 Sankarapuram 230/110 2x100 2018-19 2018-19 Estimate is under preparation 200

27 Thirupattur 230/110 2x100 2018-19 2018-19 Estimate is under preparation 200

28 OMEGA 230/110 3x100 18.05.2015 2016-17 1x100 MVA charged on 22.01.16. 200
Balance under progress
29 Anthiyur 230/110 2x100 2013-14 2016-17 1x100 MVA charged on 14.01.15. 100
Other one under progress
2016-17 2016-17
2016-17

. Energised

Sl. Voltage Ratio Target date Proposed for during Beyond 2016-
Name of Sub-Station Capacity (MVA) Original Target Remarks 2016-17 17
No (KV) for 2016-17
Date MVA MVA
completion MVA

30 Ulundurpet 230/110 2x100 30.06.2012 2016-17 1x100 MVA charged on 18.01.16 100
Other one under progress
31 Bay Provision at Tuticorin, Tender opened and under process
Tirunelveli (PGCIL),
Kodikurichi, Arasur (PGCIL),
Gobi, SP Koil

D / Additional Capacity :
1 Kids park (3rd Auto) 230/110 1x100 2016-17 2016-17 Commissioned on 28.04.2016 100 100
2 Guruparapally (2nd Auto) 230/110 1x100 2016-17 2016-17 Commissioned on 09.05.2016 100 100

E / Enhancement of Capacity :
1 Nil

F / Augumenatation :
1 Sembatty SS 230/110 2x100 2016-17 Feb-17 Tender opened and under process 200
2 Anuppankulam SS 230/110 2x100 2016-17 Feb-17 Tender opened and under process 200
3 Cuddalore SS 230/110 2x100 2016-17 Feb-17 Tender opened and under process 200
4 Pudukkottai SS 230/110 2x150 2016-17 Feb-17 Tender opened and under process 300
5 Tiruvannamalai SS 230/110 2x150 2016-17 Feb-17 Tender opened and under process 300
6 Villupuram SS 230/110 2x150 2016-17 Feb-17 Tender opened and under process 300

G / Reactor Scheme :
1 Mettur Bus Reactor 1x125 2016-17 2016-17 Appoved in the 39th SC 125
2 Almathy Bus Reactor 1x125 2016-17 2016-17 Appoved in the 39th SC 125
3 Kayathar Bus Reactor 1x125 2016-17 2016-17 Appoved in the 39th SC 125
4 Thappugundu Bus Reactor 400/110 1x63 2016-17 2016-17 Appoved in the 36th SC 63
5 Rasipalayam Bus Reactor 400/230-110 1x63 2016-17 2016-17 Appoved in the 36th SC 63
6 Edayarpalayam Bus Reactor 400/230 2x125 Scheme awarded on 10.12.2014 250

/ Total 15527.00 1130.00 8100.00


14.5 400 220/230 ..
14.5 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations
/ Name of the State : / Telangana
2016-17 2016-17
2016-17


.
Energised

Sl. Target date Proposed for Beyond
Name of Sub-Station Capacity (MVA) Remarks during
No Voltage Ratio Original 2016-17 2016-17
for 2016-17
(KV) Target Date MVA MVA
completion MVA

A 765 KV (Sub-Stations) :
Nil
B 400 KV (Sub-Stations) :
1 Evacuation of Power from HNPCL (1040 MW) Power Plant :
1.1 2 Nos. of 400 KV Bay Extentions at 400 400/220 2016-17 Work awarded in Sep-13 and under
KV Shankarapalli SS progress
2 Jaipur Power Transmission Scheme (Suryapet) :
2.1 400/220/132 kV SS at Narsapur, 400/220/132 1145 Dec-16 Dec-16 Work awarded in June, 2015 and under
1145
Medak District progress
3 Nirmal Power Transmission Scheme :
3.1 400 / 220 kV Sub-Station at Nirmal, 400/220 945 Jun-17 Jun-17 Work awarded on Dec'2015.
Adilabad District Foundation Work under progress 945

4 Bhadradri Thermal Transmission Scheme :

4.1 400/220 kV Sub-Station at Julurupadu 400/220 630 Jun-17 Jul-17 Work awarded on Dec'2015.
and 400 kV Bay extensions at Suryapet Foundation Work under progress 630
400/220/1320 kV Sub-Sation
5 System Improvement Transmission Scheme :
5.1 400/220 kV Dindi Sub-Station 400/220 1130 Mar-17 Mar-17 Work awarded on Dec'2015.
Foundation Work under progress 1130

6 Deposit Contribution Work :


6.1 2 Nos of 400 kV Bays at 400 kV 400 2016-17 2016-17 Work awarded in February, 2016 and
Dichpally SS under progress
7 765 kV Wardha Transmission Scheme :
7.1 400/220 kV Maheswaram Sub-Station , 400/220 1000 Jun-17 Jun-17 Work awarded in February, 2016 and
Ranga Reddy District under progress 1000

8 Indira Sagar Rudramakota Lift Irrigation Scheme :


8.1 400 KV Asupaka S/S 400/220 630 Sep-15 Sep-16 Purchase Order issued on 25.03.2014 630
Work under progress
2016-17 2016-17
2016-17


.
Energised

Sl. Target date Proposed for Beyond
Name of Sub-Station Capacity (MVA) Remarks during
No Voltage Ratio Original 2016-17 2016-17
for 2016-17
(KV) Target Date MVA MVA
completion MVA

C 220 KV (Sub-Stations) :

(a) Sub-Stations covered under other Schemes :


1 Singotham Cross Roads, 220/33 2 x 20 Feb-13 2016-17 Date of award : 25.01.2012 40
Mahaboobnagar Dist Work under progress.
2 Fabcity, Rangareddy Dist 220/132 (2x100) +(2x50) Jul-12 2016-17 Balance 100 MVA under progress 100
3 Manikonda 220/132/33 2x100+2x50 Jul-12 2016-17 Stay Order issued by Court and works 300
stopped
4 Hayathanagar, Rangareddy Dist 220/33 2x50 May-12 2016-17 Date of award : 08.02.2013. Work 100
under progress. By 2015-16
5 Imlibun - GIS, Hyderabad 220/132 2 x 160 Feb-12 2016-17 Date of award : 10.05.2013. Work 320
under progress.
6 Nagole, Rangareddy Dist 220/132/33 (2x100) + (2x31.5) Sep-13 2016-17 2nd PTR 31.5 MVA commissioned 200
22.06.2015. Balance under progress
7 Miyapur, Rangareddy Dist 220/132/33 (2x160) + (2x80) Jul-14 2016-17 240 MVA commissioned during 2014- 80
15. 160 MVA commissioned on
07.09.2015, Balance 80 MVA under
progress
8 Bonguluru, Rangareddy Dist 220/132/33 (2x100) + (2x50) Sep-14 2015-16 100 MVA : 02.04.2015. 100
100 MVA : 31.10.2015.
Balance works uner progress
9 Parigi 220/132 2x100 Dec-14 2016-17 1x100 MVA Transformer 100
commissioned on 04.03.2016
10 220 /11 kV Yelluru SS, Mahaboobnagar 220/11 2 x 50 Nov-16 2016-17 Work under progress 100
Dist
11 220 kV features at 132 kV Sitapuram 220/132 1 x 160 Oct-15 2016-17 Work under progress 160
Switching Station, Nalgonda Dist
12 Manthani 220/132 2x100 Oct-14 2016-17 Transformer 1 commissioned on 100
06.01.16. Balance under progress
- / Sub-Total 4605.00 0.00 2575.00
C 220 .. / New 220 kV Sub-Stations Planned :
220/132 kV substation at Ayyagaripally Investment Approval (IA) to be
1 220/132 2 x 100 2015-16 2016-17 200.00
(Comprehensive scheme) received from APERC
220/132 kV substation at Jangaon Investment Approval (IA) to be
2 220/132 2 x 100 2015-16 2016-17 200.00
(Comprehensive scheme) received from APERC
220/132 kV substation at Sircilla Investment Approval (IA) to be
3 220/132 3 x 100 2015-16 2016-17 300.00
(Comprehensive scheme) received from APERC
2016-17 2016-17
2016-17


.
Energised

Sl. Target date Proposed for Beyond
Name of Sub-Station Capacity (MVA) Remarks during
No Voltage Ratio Original 2016-17 2016-17
for 2016-17
(KV) Target Date MVA MVA
completion MVA
220/132/33 kV substation at
4 220/132/33 (2 x 100) + (2 x 31.5) May-17 May-17 Tenders called and under process 263.00
(Garidepally) Huzurnagar (Revised)
132/33kV features at 220kV Switching Tenders to be called
5 220/132/33 (2 x 100) + (2 x 31.5) 2015-16 2016-17 263.00
Station, Dindi (Revised)
220 kV features at proposed 132/33 kV 1 x 100 MVA commissioned on
6 220/132/33 2 x 100 2015-16 2016-17 200.00 100.00
Kosigi SS in Mahaboobnagar district. 04.07.2016
7 220/132 kV substation at Jadcherla 220/132 2 x 100 2015-16 2016-17 Tenders to be called 200.00
220/132 kV substation at Kothur Investment Approval (IA) to be
8 220/132 3 x 100 2015-16 2016-17 300.00
(Comprehensive scheme) received from APERC
220/132 kV substation at Thimmajipet Investment Approval (IA) to be
9 Switching Station (Comprehensive 220/132 - 2015-16 2016-17 received from APERC
scheme) Date of Award : 30.09.2013
Tenders to be called
10 220/132/33 kV Substation at Raidurg 220/132/33 (2 x 100) + (2 x 50) 2015-16 2016-17 300.00

D / Augumenatation :
1 220 kV Dichpally SS, Nizamabad 220 (1 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 06.04.2016 160 160
District
(2 x 160) + (2 x 100)
2 220 kV Bongiri SS, Nalgonda District 220 (2 x 100) (3 x 100) 2016-17 2016-17 Commissioned on 16.04.2016 100 100

3 220 kV Waddekothapally SS, Warangal 220 (2 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 25.04.2016 60 60
District
(3 x 160)
4 220 kV Miryalaguda SS, Nalgonda 220 (2 x 160) + (1 x 100) 2016-17 2016-17 Commissioned on 25.04.2016 100 100
District
(2 x 160) + (2 x 100)
5 Bay at 400/220 kV Veltoor SS 400/220 1 x 315 2016-17 Works under progress 315

6 220 kV Siddipet, Medak District 220/132 (2 x 100) 2016-17 2016-17 Commissioned on 13.05.2016 160 160

(1 x 160) + (2 x 100)
7 220 kV Minpur, Medak District 220/132 (1 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 14.05.2016 60 60

(2 x 160) + (1 x 100)
8 220 kV Narketpally, Nalgonda District 220/132 (1 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 20.05.2016 60 60

(2 x 160) + (1 x 100)
2016-17 2016-17
2016-17


.
Energised

Sl. Target date Proposed for Beyond
Name of Sub-Station Capacity (MVA) Remarks during
No Voltage Ratio Original 2016-17 2016-17
for 2016-17
(KV) Target Date MVA MVA
completion MVA
9 220 kV Warangal 220/132 (2 x 160) + (1 x 100) 2016-17 2016-17 Commissioned on 26.05.2016 60 60

(3 x 160)
10 220 kV Moulali SS, Rangareddy District 220/132 (2 x 80) + (1 x 50) 2016-17 2016-17 Commissioned on 22.06.2016 80 80

(3 x 80) + (1 x 50)
11 220 kV Jurala SS, Mahaboobnagar 220/132 (2 x 100) (3 x 100) 2016-17 2016-17 Commissioned on 21.06.2016 100 100

12 220 kV Kondamallepally, Nalgonda Dist 220/132 (3 x 100) (4 x 100) 2016-17 2016-17 Commissioned on 13.06.2016 100 100

13 220 kV Budidampadu, Khammam Dist 220/132 (1 x 160) + (1 x 100) 2016-17 2016-17 Commissioned on 08.06.2016 60 60

(2 x 160)
14 400/220/132 KV Gajwel S/S (Scheme- 400/220/132 1x315 2016-17 P.O issued on 04.07.2013 and work 315
II) with 2 Nos. of Quad moose Feeder completed. Bays charged in July,
Bays and 2 Nos. of Twin moose Feeder 2014. Equipment testing under
Bays (3rd 315 MVA) progress
/ Total (MVA)
3rd 315 MVA PTR 8561 1200 2575
E / Reactor Scheme :
1 Mamidipalli Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125
process
2 Gajwel Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125
process
3 Sankarapalli Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125
process
4 Mehaboobnagar Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125
process
5 Srisailam LB Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 39th SC. Tender under 125
process
/ Total 9186.00 1200.00 2575.00
14.6 400 220/230 ..
14.6 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations
/ Name of the State :
/ U.T. of Puducherry
2016-17 2016-17
2016-17


.
Energised

Sl. Target date Proposed for Beyond
Name of Sub-Station Capacity (MVA) Remarks during
No Voltage Ratio Original 2016-17 2016-17
for 2016-17
(KV) Target Date MVA MVA
completion MVA

A 230 KV (Sub-Stations) :

1 230/110 kV Karaikal Auto Sub-Station 230/110 2 x 100 Aug-16 Dec-17 Work under progress 200.00

/ Total 0.00 0.00 200.00


15.1
15.1 Review of Progress of Works of Power Grid Executed Central Transmission Lines under SR
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms

/ Multi Regional Systems :


1 Commom System Associated with Jun-12 552 Jun- 15 Dec-16 BPTA Schedule revised to
East Coast Energy Ltd. & NCC June, 2015
Projects Ltd LTOA Gen Proj. in
Srikakulam Area Part-A
1.1 765 KV D/C Srikakulam Pooling Jun-12 552 517 Jun- 15 Dec-16 Retender awarded in June, 2015 552
Station - Angul Line and matching with TBCB
1.2 Talcher II Behrampur (Odisha) 400 220 220
kV D/C Line
2 Transmission System Associated Feb-12 58 58 Oct- 14 Apr-16
with Krishnapatnam UMPP Part-B
2.1 LILO of 400 KV D/C Pune - Feb-12 58 58 Oct- 14 Apr-16 Line commissioned in April, 58 58
Aurangabad Line at Pune GIS 2016
(Including Multi Circuit)
3 765 kV Wardha - Hyderabad Links : Feb-15 1094 367 May-18 May-18
3.1 765 kV Wardha - Hyderabad D/C Line Feb-15 1072 367 May-18 May-18 Award placed in March, 2015 1072
Work commenced July, 2015
3.2 400 kV Nizamabad - Dichipalli D/C Line Feb-15 22 May-18 Mar-17 Award placed in March, 2015 22
and survey under progress
4 Green Energy Corridors : Inter State Apr-15 22 0 Apr-2017 Apr-17
Transmission Scheme (ISTS) - Part A
4.1 400 kV Tirunelveli (New) - Tuticorin PS Apr-15 11 Apr-2017 Apr-17 Award placed on April, 2015 11
D/C Line 1 (Q)
4.2 400 kV Tirunelveli (New) - Tuticorin PS Apr-15 11 Apr-2017 Apr-17 Award placed on April, 2015 11
D/C Line 2 (Q)
5 Commom System Associated with Mar-13 880 Dec-15 Jun-17 Revised BPTA Schedule - Dec,
East Coast Energy Ltd. & NCC 2015
Projects Ltd LTOA Gen Proj. in
Srikakulam Area Part-B
5.1 765 KV D/C Angul - Jharsauguda Line Mar-13 580 108 Dec-15 Jun-17 RoW being faced 580

5.2 765 KV D/C Jharsauguda - Mar-13 300 50 Dec-15 Jun-17 Award placed in May, 2014 300
Dharamjaygarh Line Huge forest involvement
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
II System Strengthening Scheme of WR for transfer of Power to SR :
1 Part B : Regional System 696 410 Mar-17
Strengthening in WR for Mundra
UMPP
1.1 400 KV D/C Wardha - Aurangabad 696 410 Oct-12 Mar-17 Work carried out by bifercating 696
Line (Upgradation 1200 KV S/C) two packages by fresh tender.
Contract riviewed in Feb, 2016
2 Transmission System Strengthening Nov-11 690 371 Jun-15 Dec-16 Revised BPTA Schedule :
in Western part of WR for IPP May-2015
Generation Projects in Chattisgarh -
Part D
2.1 400 KV D/C Aurangabad - Boisar Nov-11 690 371 Jun-15 Dec-16 Forest Clearance received. 690
Quad. Line Severe RoW problem
Critical
3 Transmission System Strengthening Dec-11 570 305 May-15 Mar-17 Revised BPTA Schedule :
in North/West part of WR for IPP May-2015
Projects in Chattisgarh - Part E

3.1 765 KV D/C Aurangabad (PGCIL) - Dec-11 570 305 May-15 Mar-17 Forest Clearance awaited. 570
Padghe (PGCIL) Line Critical
4 HVDC Bipole Link Between Nov-19 Nov-19
Western Region (Raigarh,
Chattishgarh) and Southern Region
(Pugalur, TN) - North Trichur
(Kerala) Scheme - I :
Raigarh - Pugalur 6000 MW HVDC
System
4.1 Raigarh (Chatisgarh) - Pugalur (TN) -
Trichur (Kerala)
5 Transmission System Strengthening Jan-12 712 566 Dec-15 Dec-16 Revised BPTA Schedule : Dec-
in Raipur - Wardha Corridor for 2015
IPP Generation Projects in
Chattisgarh - Part 6
5.1 765 KV D/C Raipur Pooling Station - Jan-12 712 566 Dec-15 Dec-16 Forest Clearance received in July & 712
Wardha Line II Dec, 2015. Work under progress
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms

/ Southern Regional Systems :


1 Transmission System for Ultra Mega May-15 21 21 May-16 Apr-16
Solar Park in Anantapur District,
Andhra Pradesh - Part A (Phase - I) :
1.1 LILO of Cuddappah - Kolar 400 kV S/C May-15 21 21 May-16 Apr-16 Commissioned on 28.04.2016 21 21
Line at NP Kunta Pooling Station

2 Kudankulam APP (2000 MW) May-05 297 29 Nov-08 Dec-17


Transmission System :
(Balance Lines)
2.1 Edamon (KSEB) - Moovattupuzha (PG) : 297 29 Nov-08 Dec-17 Govt of Kerala issued Revised G.O 297
Quad DC Line in Jan,2015, with enhanced
compensation
3 System Strengthening Scheme XII of SR Feb-10 34 25 Jun-12 Mar-17

3.1 LILO of ckts of Nelamangala- Hoodi 34 25 Jun-12 Mar-17 ROW issue resolved by Karnataka 34
400kV S/C line at Yelahanka High Court on 31.07.2013.Work
stopped due to agitation.

4 Common system associated with Costal Sep ' 11 1102 741 Sep-14 Dec-16 Revised BPTA Schedule Dec-14
Energen Private Ltd & Ind-Barath
Power Ltd. (LTOA) Gen. Proj. in
Tuticorin area Part-B
4.1 765 kV D/C Tuticorian Pooling Station - 737 450 Dec-16 Work under progress 737
Salem Pooling Station line (initialy charged Contractual Issues
@ 400 kV
4.2 400 kV D/C Salem Pooling Station - Salem 120 120 Dec-16 Line Completed & commissioning 120
line (Quad) matching with Salem-Somanahalli
Line
4.3 765 kV S/C Salem Pooling Station 245 171 Dec-16 Stringing commenced from Mar '13 245
(Dharmapuri) - Madhugiri Pooling Station Severe RoW being faced
line (initialy charged @ 400 kV)

5 System Strenghtening-XIII of SR grid Oct-11 132 0 Jun-14 Mar-17 Completion schedule: 32 months
from investment approval.
5.1 400 kV D/C Madhugiri - Yelahanka Line. 132 Mar-17 Tower erection commenced from 132
March 2013. RoW being faced.
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
6 Scheme # 2: AC System strengthening at Scheme awarded on 10.12.2014
Pugalur end
6.1 Pugalur HVDC Station Pugalur (Existing)
400 kV (quad) D/C Line
6.2 Pugalur HVDC Station Arasur 400 kV
(quad) D/C Line.
6.3 Pugalur HVDC Station Thiruvalam 400
kV (quad) D/C Line
6.4 Pugalur HVDC Station - Edayarpalayam
400 kV (quad) D/C Line
6.5 Edayarpalayam Udumulpeta 400 kV
(quad) D/c line
7 Scheme # 3: Pugalur- Trichur 2000 MW Scheme awarded on 10.12.2014
VSC Based HVDC System
7.1 VSC based 2000 MW HVDC link between
Pugalur and North Trichur
7.2 LILO of North -Trichur Cochin 400 kV
(Quad) D/C Line at North Trichur HVDC
Stn
8 System Strenghtening-XIV of SR grid Dec-11 244 15 Aug-14 Sep-16 Compln sch : 32 months from
Investment approval
8.1 400 kV Dharmapuri (Salem New) - 244 171 Sep-16 Stringing commenced from Nov 244
Somanahalli Line 2013. RoW problem. 35 km in
Karnataka is pending

9 System Strengtheing of SR for import of Nov-14 37 Jun-14 Nov-17


Power from ER :

9.1 LILO of Gazuwaka - Vijayawada 400 KV Nov-14 37 Nov-17 Nov-17 RoW problem hampering 37
S/C Line at Vemagiri Pooling Station progress

10 Sub-Station work associated with Mar-15 7 0 Mar-18 Mar-18 Completion schedule : 36 months
Hyderanad (Maheshwaram) Pooling from Investment Approval (IA)
Station :
10.1 LILO of Hyderabad - Kurnool 400 kV S/C 7 Mar-18 Mar-18 Award placed in March, 2015 7
Line at Maheshwaram Sub Station
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
11 System Strengthening - XXIV in Jan-16 554 0 Jul-18 Jul-18 Completion schedule : 30 months
Southern Region from Investment Approval (IA)
11.1 LILO of 765 kV DC Kurnool - Thiruvalam 194 Jul-18 Jul-18 Award placed in February, 2016 194
Line at Cuddappah
11.2 400 kV DC Cuddappah - Hindupur Line (Q) 360 Jul-18 Jul-18 Award placed in January, 2016 360
12 Connectivity for Kudankulam 3&4 with Jan-16 133 0 May-18 May-18 Completion schedule : 28 months
Interstate Transmission System from Investment Approval (IA)
12.1 Extn. Of 400 kV DC Kudankulam APP - 133 May-18 May-18 Award placed in January, 2016 and 133
Tirunelveli Line (Q) work started
13 Transmission System for Ultra Mega Jan-16 36 0 Jul-18 Jul-18 Completion schedule : 16 LILO in
Solar Park in Anantapur District, & 30 LILO Out months from
Andhra Pradesh - Paret B (Phase-II) Investment Approval (IA)
13.1 LILO of 400 kV DC Cuddappah - Hindupur Line 19 May-17 May-17 Award placed in January, 2016 and 19
(Q) circuit - I at NP Kunta SS under progress
13.2 LILO of 400 kV DC Cuddappah - Hindupur Line 17 Jul-18 Jul-18 Award placed in January, 2016 and 17
(Q) circuit - II at NP Kunta SS under progress
14 Removal of constraints in 400 kV Bays Jan-16 116 0 Jul-18 Jul-18
Extn. At 400 kV Vemagiri Sub Station
14.1 Both circuits of first LILO D/C portion of 60 Jul-18 Jul-18 Award placed in March, 2016 and 60
400 kV Simhadri - Vijayawada Line at under progress
Vemagiri - I (AP) shall be LILOed at
Vemagiri - II )PG) - (D/C portion 1.8 km &
Multi Circuit portion 13.2 km)

14.2 Both circuits of second LILO D/C portion 56 Jul-18 Jul-18 Award placed in March, 2016 and 30
of 400 kV Simhadri - Vijayawada Line at under progress
Vemagiri - I (AP) shall be LILOed at
Vemagiri - II )PG). There shall be no loop
out. The open section of 400 kV D/C Line
from Vemagiri - I (AP) shall be used for
termination of 400 kV Kota Line.

15 Transmission System for Ultra Mega Solar Park Apr-16 221 0 Dec-18 Dec-18 Completion Schedule : 32 months
at Tumkur (Pavagada, Karnataka (Phase-I) from IA

15.1 400 kV DC Tumkur (Pavagada) Pool - 218 Dec-18 Dec-18 Award placed in June, 2016 218
Hiriyur Line
15.2 LILO of 400 kV DC Gooty - Tumkur 3 Dec-18 Dec-18 Award placed in June, 2016 3
(Vasantnarsapur) Line at Tumkur Pool
15.3 LILO of 400 kV DC Bellary - Tumkur 107 Dec-18 Dec-18 Award placed in June, 2016 107
(Vasantnarsapur) Line (Q) at Tumkur Pool
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
16 230 kV NLC - Karaikal D/C Line : Jul-16 0 0 Nov-17 Nov-17 Completion Schedule : 16 months
from IA
16.1 230 kV NLC - Karaikal D/C Line (through Nov-17 Nov-17 Award under progress
LILO of the 230 kV Neyveli - Bahour S/C
Line at Karaikal)

/ Total 1533 21 1482


15.2 765 400 .. ...
15.2 Review of Progress of Works on new 765 kV and 400 KV Transmission Lines under TBCB Route in SR
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
1 Transmission System Associated with Krishnapattnam UMPP Synchronous interconnection between SR and WR (Part-B) :
1.1 765 kV S/C Raichur - Solapur Line 16/12/2010 250 6-Jan-14 2016-17 Agency : RECTPCL 250
(LOI) TSP : M/S Patel Engineering
Ltd, M/S Simplex Infrastructure Ltd
and M/s B S Transcom Ltd
Status : Under Progress
2 Transmission System associated with IPPs of Vemagiri Area Package A :
2.1 765 kV D/C Vemagiri Pooling Station 20/03/2012 250 Apr-15 2016-17 Agency : RECTPCL 250
Khammam Line (Ckt - 1) (LOI) TSP : PGCIL
Status : Under Progress
2.2 765 kV D/C Khammam Hyderabad Line 20/03/2012 250 Apr-15 2016-17 Agency : RECTPCL 250
(Ckt - 1) (LOI) TSP : PGCIL
Status : Under Progress
3 System Strengthening in Southern Region for import of power from Eastern Region :
3.1 765 kV D/C Srikakulam PP Vemagiri-II 31/07/2013 668 532 30-Aug-16 Aug-16 Agency : RECTPCL 668
Pooling Station Line (LOI) TSP : PGCIL
Status : Under Progress
4 Transmission System required for evacuation of power from Kudgi TPS (3 x 800 MW in Phase-I) of NTPC Limited :
4.1 400 kV 2 x D/C Quad Kudgi TPS 31/07/2013 40 29-Dec-15 2016-17 Agency : RECTPCL 40
Narendra (New) Lines (LOI) TSP : M/s L&T
Status : Under Progress
4.2 765 kV D/C Narendra (New) - Madhugiri 31/07/2013 700 29-Dec-15 2016-17 Agency : RECTPCL 700
Lines (LOI) TSP : M/s L&T
Status : Under Progress
4.3 400 kV 2 x D/C Quad Madhugiri - Bidadi 31/07/2013 200 29-Dec-15 2016-17 Agency : RECTPCL 200
Lines (LOI) TSP : M/s L&T
Status : Under Progress
5 Connectivity Lines for 765/400 kV Maheshwaram (Hyderabad) Pooling S/S :
5.1 400 kV D/C Maheswaram (PG) Mehboob 200 2015-16 Agency : RECTPCL 200
Nagar Lines TSP :
Status : Revised RFP issued on
10.04.2015
5.2 400 kV D/C Nizamabad Yeddumailaram 316 2015-16 Agency : RECTPCL 316
(Shankarpalli) Lines TSP :
Status : Revised RFP issued on
10.04.2015
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
6 Strengthening of transmission system beyond Vemagiri :
6.1 765 kV D/C Vemagiri II Chilakaluripeta 06/04/2015 580 Apr-19 Agency : RECTPCL 580
Lines (SPV) TSP : PGCIL
Status : Work started in Jun-16
6.2 765 kV D/C Chilakaluripeta Cuddapah 06/04/2015 550 Apr-19 Agency : RECTPCL 550
Lines (SPV) TSP : PGCIL
Status : Work started in Jun-16
6.3 400 kV (quad) D/C Chilakaluripeta 06/04/2015 84 Apr-19 Agency : RECTPCL 84
Narsaraopeta Lines (SPV) TSP : PGCIL
Status : Award placed in Mar-16
6.4 400 kV (quad) D/C Cuddapah Madhugiri 06/04/2015 476 Apr-19 Agency : RECTPCL 476
Lines (SPV) TSP : PGCIL
Status : Award placed in Mar-16

6.5 400 kV (quad) D/C Cuddapah Hindupur 06/04/2015 360 Agency : RECTPCL 360
Lines (SPV) TSP :
Status : RFQ has been issued on
12.04.2017
6.6 400 kV (quad) D/C Srikaukulam Pooling 06/04/2015 286 Feb-19 Agency : RECTPCL 286
Station Garividi Lines (SPV) TSP : PGCIL
Status : Award placed in Mar-16

6.7 400 kV D/C Chilakaluripeta - 84 Feb-19 Agency : RECTPCL 84


Narasaraopeta Transmission Line (Q) TSP : PGCIL
Status : Award placed in Mar-16

7 Transmission System for evacuation of power from 2X500 MW Neyveli Lignite Corp. Ltd. TS-I (Replacement) (NNTPS) in Neyveli, Tamil Nadu :
7.1 400 kVD/C NNTPS Swithchyard 160 Agency : RECTPCL 160
Villupuram (Ginjee) Line TSP :
Status : RECTPCL has requested
CEA to reconsider the decision for
implementing
8 Transmission System associated with IPPs of Vemagiri Area Package B :
8.1 765 kV D/C Vemagiri Pooling Station 250 Agency : RECTPCL 250
Khammam Line (Ckt - 2) TSP :
Status : Under abeyance
8.2 765 kV D/C Khammam Hyderabad Line 250 2016-17 2016-17 Agency : RECTPCL 250
(Ckt - 2) TSP :
Status : Under Progress
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
9 Transmission System associated with IPPs of Vemagiri Area Package C :

9.1 765 kV D/C Wardha Jabalpur Pooling 400 Agency : RECTPCL 400
Station TSP :
Status : Under abeyance
10 Transmission System associated with IPPs of Nagapattinam / Cuddalore Area Package A :

10.1 765 kV D/C Nagapattinam Pooling Station - 06/03/2012 406 305 29-Mar-15 Aug-16 Agency : PFCCL 406
Salem Line (LOI) TSP : PGCIL
Status : Work under progress
10.2 765 kV S/C Salem-Madhugiri Line 06/03/2012 219 37 29-Mar-15 Oct-16 Agency : PFCCL 219
(LOI) TSP : PGCIL
Status : RoW Problem

11 Additional inter- Regional AC link for import into Southern Region i.e. Warora Warangal and Chilakaluripeta - Hyderabad - Kurnool 765 kV link :

11.1 765 kV D/C Warora Pool Warangal 700 Agency : PFCCL 700
(New) Line TSP :
Status : Yet to commence
11.2 765 kV D/C Warangal (New) Hyderabad 320 Agency : PFCCL 320
Line TSP :
Status : Yet to commence
11.3 400 kV (quad) D/C Warangal (New) 20 Agency : PFCCL 20
Warangal (existing) Line TSP :
Status : Yet to commence
11.4 765 kV Hyderabad Kurnool D/C Line 340 Agency : PFCCL 340
TSP :
Status : Yet to commence
11.5 765 kV Hyderabad Kurnool D/C Line 340 Agency : PFCCL 340
TSP :
Status : Yet to commence
11.6 765 kVWarangal (New) Chilakaluripeta 500 Agency : PFCCL 500
D/c Line TSP :
Status : Yet to commence

11.7 400 kV (quad) Cuddapah Hoodi D/C Line 400 Agency : PFCCL 400
TSP :
Status : Yet to commence
2016-17 2016-17
2016-17
Date of
. investment

Energised

decision by Length in Stringing Original Proposed
Sl. No Name of the Transmission Line Revised Remarks during
completed in for 2016-17 Beyond
Plg. Comm. Circuit Target 2016-17
Target date ckt. Kms 2016-17
Kms. Ckt.Kms Date ckt. Kms ckt. Kms
12 Beyond Vemagiri Transmission System :
12.1 765 kV D/C Vemagiri - Chilakaluripeta Line 580 Apr-19 Apr-19 TSP : PGCIL 580
Status : Award placed in March,
2016
12.2 765 kV D/C Chilakaluripeta - Cuddappah 550 Apr-19 Apr-19 TSP : PGCIL 550
Line Status : Award placed in March,
2016
12.3 400 kV D/C Cuddappah - Madhugiri Line 476 Feb-19 Feb-19 TSP : PGCIL 476
(Q) Status : Award placed in March,
2016
12.4 400 kV D/C Srikakulam - Garividi Line (Q) 286 Feb-19 Feb-19 TSP : PGCIL 286
Status : Award placed in March,
2016
12.5 400 kV D/C Chilakaluripeta - 84 1-Apr-19 Apr-19 TSP : PGCIL 84
Narasaraopeta Line (Q) Status : Award placed in March,
2016
13 Transmission System associated with Gadarwada STPPS of NTPC (Part - B) :
13.1 765 kV D/C Warora Pool Parli Line 698 Jan-18 Jan-18 Agency : 698
TSP : PGCIL
Status : Award placed in Feb-16
13.2 765 kV D/C Parli Solapur Line 236 Jan-18 Jan-18 Agency : 236
TSP : PGCIL
Status : Award placed in Dec-15
13.3 400 kV D/C Parli Parli Line (Q) 36 Jan-18 Jan-18 Agency : 36
TSP : PGCIL
Status : Award under progress

/ Total 3233 0 9312


15.3
15.3 Review of Progress of Works of Power Grid Executed Sub-Stations under SR
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

/ Other Regional Systems :


I System Strengthening Scheme of IR for transfer of Power to SR :
1 Commom System Associated with Dec-15 Jun-17 Completion Schedule : 33
East Coast Energy Ltd. & NCC months from IA
Projects Ltd LTOA Gen Proj. in
Srikakulam Area Part-B
1.1 Extn. of 765/400 KV Angul Sub-Station 765 / 400 1 x 1500 Dec-15 Jun-17 Award placed in August, 2013. Engg. 1500
& Civil Works under progress
1.2 Extn. of 765/400 KV Jharsuguda Sub- 765 / 400 Dec-15 Jun-17 Award placed in August, 2013. Engg.
Station & Civil Works under progress
1.3 Extn. of 765/400 KV Dharamjaygarh Sub- 765 / 400 Dec-15 Jun-17 Award placed in August, 2013. Engg.
Station & Civil Works under progress
2 Commom System Associated with East Jun-15 Dec-16 Completion Schedule : 27
Coast Energy Ltd. & NCC Projects Ltd LTOA months from IA
Gen Proj. in Srikakulam Area Part-C
2.1 Srikakulam Pooling Station with 2 Nos. of 765 / 400 2 x 1500 Jun-15 Dec-16 Work under progress. Completion 3000
765 KV Bays. matching with Srikakulam -
(400 KV S/S : AIS, 765 KV S/S : GIS) Vemagiri TBCB Line
2.2 Extn. of 765/400 KV Angul Sub-Station 765 / 400 Jun-15 Dec-16 Completion matching with
Srikakulam - Vemagiri TBCB Line
3 765 kV Wardha - Hyderabad Links May-18 May-18 Completion Schedule : 40
months from IA
3.1 765/400 kV Nizamabad Sub-Station 765 / 400 2 x 1500 May-18 Mar-17 Award placed in May, 2015 and 3000
efforts are being made to finish by
2016-17
3.2 Extn. of 765/400 kV Hyderabad S/S 765 / 400 May-18 May-18 Award placed in May, 2015 and
under progress
3.3 Extn. of 765/400 kV Wardha S/S 765 / 400 May-18 Mar-17 Award placed in August, 2016 and
under progress
3.4 Extn. At 400 kV Dichpally S/S 765 / 400 May-18 Mar-17 Award placed in May, 2015
(APTRANSCO) Work executed by APTRANSCO
on deposit basis
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

4 Green Energy Corridors : Inter State Apr-17 Apr-17 Completion Schedule : 40


Transmission Scheme (ISTS) - Part A months from IA
4.1 400/230 kV Tirunelveli Pooling Station 400/230 2 x 500 Apr-17 Apr-17 Award placed in April, 2015 and 1000
(GIS) under progress
4.2 Extn. of 400/230 kV Tuticorin Pooling 400/230 Apr-17 Apr-17 Award placed in April, 2015 and
Station under progress
5 HVDC Bipole Link Between Western Region Nov-19 Nov-19 Completion Schedule : 42
(Raigarh, Chattishgarh) and Southern months from IA
Region (Pugalur, TN) - North Trichur
(Kerala) Scheme - I :
Raigarh - Pugalur 6000 MW HVDC System
5.1 800 kV HVDC Raigarh Station with 6000 800 6000 MW Nov-19 Nov-19 Awardplaced in June, 2016 and 6000
MW HVDC Terminal under court case
5.2 800 kV HVDC Pugalur Station with 6000 800 6000 MW Nov-19 Nov-19 Award under progress 6000
MW HVDC Terminal

II System Strengthening Scheme of WR for transfer of Power to SR :


1 Part B : Regional System Strengthening in Oct-12 Mar-17 Completion Schedule : 48
WR for Mundra UMPP months from IA
1.1 40 % Fixed Series Compensation on Oct-12 Mar-17 Award placed in Sep-12. Engg. & Civil works
Wardha - Aurangabad 400 KV D/C Line under progress. Completion matching with
Wardha - Aurangabad Line
2 Establishment of Pooling Station at Champa May-14 Oct-16 Revised BPTA Schedule :
and Raigarh (Near Tamnar) for IPP Nov-2013
Generation Projects in Chattisgarh - B
2.1 765/400 KV Champa Pooling Station 765 / 400 6 x 1500 May-14 Oct-16 Work awarded in Oct-2011. ICT 1 & 6000
ICT-II commissioned in 2015-16. Other
works under progress
3 Transmission System May-15 Mar-17 Revised BPTA Schedule :
Strengthening in North/West part May-2015
of WR for IPP Projects in
Chattisgarh - Part E
3.1 765/400 KV Padghe Sub-Station 765 / 400 2 x 1500 May-15 Mar-17 Award placed in May, 2012 3000
(GIS) Works under progress
3.2 Extn. at 765/400 KV Aurangabad 765 / 400 May-15 Mar-17 Award placed in Feb, 2012
Sub-Station Works under progress
3.3 Extn. at 400 KV Padghe Sub-Station May-15 Mar-17 Works under progress. Delay is
(MSETCL) due to re-tendering
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

4 Transmission System Dec-15 Dec-16 Revised BPTA Schedule :


Strengthening in Raipur - Wardha Dec-2015
Corridor for IPP Generation
Projects in Chattisgarh - Part 6
4.1 Extn. at 765 KV Raipur Pooling Station 765 / 400 Dec-15 Dec-16 Work under progress and matching
with Line
4.2 Extn. at 765 KV Wardha Sub-Station 765 / 400 Dec-15 Dec-16 Award placed in June, 2013
Works under progress
5 Transmission System Associated for Oct-15 Mar-17 Completion Schedule : 24
Sholapur STPP (2 x 660 MW) months from IA
Generation Projects
5.1 Extn. at 400/220 KV Sholapur Sub-Station 400 / 220 1 x 500 Oct-15 Mar-17 Award placed in June, 2015 500

6 Western Region Strengthening Mar-16 Feb-18 Completion schedule : 22


Scheme - XV months from IA (Under
TBCB)
6.1 Extn. at 765 kV Sholapur SS Jan-18 Jan-18 Award placed in Apr-16 and under
progress
6.2 Extn. at 400 kV Parli Switching Station Feb-18 Feb-18 Award placed in Apr-16 and under
progress

III System Strengthening Scheme of ER for transfer of Power to SR :


1 Power Grid Works associated with Apr-16 Apr-19 Apr-19 Completion schedule : 36
Common Transmission System for months from IA (2 No.400
Phase-II Generation Projects in kV Bays Under TBCB, 16
Odisha months from IA)
1.1 765/400 kV Jharsuguda SS 765/400 2x1500 Apr-19 Apr-19 Award under progress 3000
(Sundargarh) with Split Bus
Arrangement
1.2 765/400 kV Angul SS (Sundargarh) 765/400 2x1500 Apr-19 Apr-19 Award under progress 3000
with Split Bus Arrangement
1.3 400/220 kV Behrampaur Sub Station 400/220 2x315 Award under progress 630
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

/ Southern Regional Systems :


1 System Strengthening Scheme XII of SR Feb-10 Jun-12 Mar-17 Completion scheduled 28 months
from IA
1.1 400/ 220 KV Yelahanka Sub-station (GIS) 400/220 2 x 500 Jun-12 Mar-17 Uncertain. Completion matching 1000
with line, uncertain.

2 Common system associated with Costal Sep-11 Sep-14 Dec-16 Revised BPTA Schedule Dec-14
Energen Private Ltd & Ind-Barath
Power Ltd. (LTOA) Gen. Proj. in
Tuticorin Area Part B
2.1 765/400 KV Salem Pooling Station 765/400 Dec-16 Award placed in October 2011 and
(initially charged @ 400 kV) under progress
2.2 Extn. of 765/400 KV Tuticorin pooling Stn 765/400 Dec-16 Award placed in October 2011 and
under progress
2.3 Extn. of 765/400 KV Madhugiri pooling 765/400 Dec-16 Award placed in October 2011 and
Stn under progress
2.4 Extn. of 765/400 kV Salem Sub-Station 765/400 Dec-16 Award placed in October 2011 and
under progress
3 System Strengthening XIII of SR Grid Oct-11 Jun-14 Mar-17 Compln sch : 32 months from
Investment approval. Uncertain
3.1 Extn. At 400/220 kV Yelahanka GIS 400/220 Mar-17 Works under progress

4 System Strengthening XIV of SR Grid Dec-11 Aug-14 Dec-16 Compln sch : 32 months from IA

4.1 Extn. At 400/220 KV Somanahalli Sub 400/220 Dec-16 Engg & civil works in progress
Station.
4.2 Extn. At 400/220 KV Dharmapuri (Salem 400/220 Dec-16 Engg & civil works in progress
New) Sub Station
5 Sub Station Works associated with Dec-15 Sep-16 Completion Schedule : 22
Transmission System required for months from Investment
evacuation of Power from Kudgi TPS Approval (IA)
Phase - I (3 x 800 MW) of NTPC
5.1 Extn. of 400/220 KV Madhugiri Sub 400/220 Sep-16 Award placed in Dec,2014 and
Station work under progress
5.2 Extn. of 400/220 KV Bidadi Sub Station 400/220 Sep-16 Award placed in Dec,2014 and
(GIS) work under progress
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

6 System Strengthening in SR-XX 5870 Feb-17 Feb-17 Completion Schedule : 30


months from Investment
6.1 Extension at 400/220/33 kV Hyderabad 400/220/33 500 Feb-17 Feb-17 Approval
Award (IA)in September, 2014
placed 500
Sub Station Work under progress
6.2 Extension at 400/220/33 kV Warangal Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Station Work under progress
6.3 Extension at 400/220/33 kV Khammam 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Sub Station Work under progress
6.4 Extension at 400/220/33 kV Vijayawada 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Sub Station Work under progress
6.5 Extension at 400/220/33 kV Gooty Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Station Work under progress
6.6 Extension at 400/220/33 kV Cuddappah 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Sub Station Work under progress
6.7 Extension at 400/220/33 kV Somanahalli 400/220/33 500 Feb-17 Aug-16 Award placed in September, 500
Sub Station 2014. Testing under progress
6.8 Extension at 400/220/33 kV Mysore Sub 400/220/33 500 Feb-17 Sep-16 Award placed in September, 2014 500
Station Work under progress
6.9 Extension at 400/220/33 kV Pugalur Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Station Work under progress
6.10 Extension at 400/220/33 kV Trichy Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500
Station Work under progress
6.11 Replacement of Existing 2 x 315 MVA 400/220 370 Feb-17 Feb-17 Award placed in September, 2014 370
Transformer to 2 x 500 MVA Transformer Work under progress
at 400/220 kV Narendra SS
6.12 400/220/33 kV Melakottaiyur SS with 400/220 500 Jun-16 CoD on 22.07.2016 500 500
associated Bays and Equipments
6.13 Extn. at 400/220 KV Trissur Sub Station 400/220 - Feb-17 Feb-17 Award placed in September, 2014
(Conversion Line Reactors) Work under progress
7 Common Transmission Scheme May-17 May-17 Completion Schedule : 30
Associated with ISGS Projects in months from Investment
Nagapattinam / Cuddalore Area of Approval (IA)
Tamil Nadu - Part A1 (b)
7.1 Extn. at 2 Nos of Bays at 400 kV 400 Sep-16 Award placed in December, 2014
Nagapattinam Pooling Station (GIS) Nagapatnam PS Work
(Provision of one 63 MVAR Line Reactor) completed, balance progress
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

7.2 Extn. at 2+1 Nos of Bays at 400 kV New 400 May-17 Award placed in December, 2014
Salem (Dharmapuri) Station (Provision of one Work under progress
63 MVAR Line Reactor)
7.3 Extn. at No. of Bay at 400 kV Madhugiri 400 May-17 Award placed in December, 2014
S/S Work under progress
8 Scheme # 3: Pugalur- Trichur 2000 MW
VSC Based HVDC System
8.1 320 kV, 2000 MW VSC based HVDC 320 kV 2000 MW Scheme awarded on 10.12.2014 2000
terminal at Pugalur
8.2 320 kV, 2000 MW VSC based HVDC 320 kV 2000 MW 2000
terminal at North Trichur
9 Sub Station Works associated with Nov-17 Dec-18 Completion Schedule : 36
System Strengthening in SR for import months from Investment
of Power from ER Approval (IA)
9.1 765/400 kV Vemagiri Pooling Station (GIS) 765/400 2 x 1500 Nov-17 Nov-17 Award placed in December, 2014 3000
Work under progress
9.2 Extn. at 2 Nos of Bays each at 765 kV 765 Nov-17 Award placed in December, 2014
Vemagiri PS & Srikakulam PS Work under progress
10 System Strengthening in SR-XXIII Jul-17 Jul-17 Completion Schedule : 30
months from Investment
10.1 Extension at 400/220 kV Madugiri Sub- 400/220 500 Jul-17 Jul-17 Approval
Award (IA)in March, 2015
placed 500
Station Work under progress
10.2 Extension at 400/220 kV Somanahalli Sub- 400/220 Jul-17 Jul-17 Award placed in March, 2015
Statiom Sub-Station (Replacent of 7x167 Work under progress
MVA ICTs with 2x500 MVAR
11 Sub Station Works associated with Mar-18 Mar-18 Completion Schedule : 36
Hyderabad (Maheshwaeam ) Pooling months from Investment
Station : Approval (IA)
11.1 765/400 kV Hyderabad (Maheshwaram) 765/400 2 x 1500 Mar-18 Mar-18 Award placed in May, 2015 3000
Sation (GIS)
12 Transmission System for Ultra Mega Mar-15 May-16 Completion Schedule : 12
Solar Park in Anantapur District, months from Investment
Andhra Pradesh - Part A (Phase - I) : Approval (IA)
12.1 400 / 220 kV NP Kunta Pooling Station 400/220 3 x 500 Mar-15 May-16 ICT 1 commissioned on 28.04.2016, 1500 1500
ICT 2 on 02.06.2016 ICT 3 on
02.07.2016 (ICT 2&3 CoD on
11.07.2016)
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

13 System Strengthening - XXIV in Jul-18 Jul-18 Completion Schedule : 30


Southern Region months from IA
13.1 765/400 kV Cuddappah Sub-Station 765 2 x 1500 Jul-18 Jul-18 Award placed in February, 2016 3000
13.2 Extn. At 400 kV Hindupur Sub-Station 400 Jul-18 Jul-18 To be implemented by
APTRANSCO
14 Connectivity for Kudankulam 3&4 with May-18 May-18 Completion Schedule : 28
Interstate Transmission System months from IA
14.1 Extn. At 400 kV Tuticorin Pooling Station 400 May-18 May-18 Award placed in May, 2016

15 Transmission System for Ultra Mega Jul-18 Jul-18 Completion Schedule : 16/30
Solar Park in Anantapur District, months from Investment
Andhra Pradesh - Paret B (Phase-II) Approval (IA)
15.1 Extn. At 400/220 kV NP Kunta sub-Station 400/220 Jul-18 Jul-18 Work commenced from May, 2016

16 Removal of Constraints in 400 kV Bays 400 Dec-18 Dec-18 Completion Schedule : 30


Extn. At 400 kV Vemagiri Sub Station months from Investment
Approval (IA)
16.1 Extn. At 400 kV Vemagiri Sub Station 400 Jul-18 Jul-18 Award under progress
(PG)
17 Transmission System for Ultra Mega Dec-18 Dec-18 Completion Schedule : 32
Solar Park at Tumkur (Pavagada) months from IA
Phase -I
17.1 400 kV Tumkur (Pavagada) Pooling 400/220 2 x 500 Dec-18 Dec-18 Award under progress 1000
Station
17.2 Extn. at 400/220 kV Hiriyur Sub Station 400/220 Dec-18 Dec-18 Award under progress
18 Transmission System for Ultra Mega Jan-18 Nov-17 Completion Schedule : 19
Solar Park at Anantpur District, months from IA
Andhra Pradesh Part - C (Phase -III)
18.1 400/220 kV NP Kunta Sub Station 500 Jan-18 Nov-17 Award under progress

/ Total 23870 2000 35630


2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

Reactors in Sothern Regional Systems (PGCIL) :


1 Hyderabad (Maheshwaram) BR 765/400 2 x 240 2017-18 Mar-18 Award placed in May, 2015 480
2 Extension at 400 kV Bus Reactor at 400 1 x 125 Jul-17 Jul-17 Award placed in March, 2015 875
Gooty, Hassan, Khammam, Trivandrum, Each SS Work under progress
Nellore (existing), Narendra and
Nagarjunasagar Sub-Station (1x125
MVAR)
3 Extension at 400 kV Bus Reactor at 400 2 x 63 Jul-17 Jul-17 Award placed in March, 2015 126
Yelahanka Sub-Station (2x63 MVAR) Work under progress
4 Shifting of 2 Nos. of 63 MVAR Reactor 400 2 x 63 Jul-18 Jul-18 Award under progress 126
from Gazuwaka - Vemagiri II (PG) for
utilization on 400 kV Simhadri II -
Vemagiri II (PG) DC Line
5 Vijayawada BR 400 2 x 125 Oct-16 2016-17 125 MVAR commissioned on 250 125
19.06.2016, Balancer under
progress
6 Nellore NPS LR @ Nellore NPS - Gooty 400 2 x 63 Oct-16 2016-17 Approved in 37th SC 126
Line
7 LR @ Kudgi PG - Tumkur Line each end 400 4 x 63 Oct-16 2016-17 Approved in 36th SC 252
8 Cuddappah BR 400 50 125 Oct-16 2016-17 Approved in 39th SC 75
9 Thiruvalam BR 765 2 x 240 Oct-16 2016-17 Approved in 39th SC 480
10 Cuddappah BR 765 2 x 240 RFQ has been issued on 480
06.04.2015
11 LR @ 400 kV Pugalur HVDC Station 400 2 x 80 Scheme awared on 10.12.2014 160
12 LR @ 400 kV Thiruvalam Ckt - II 400 63 Scheme awared on 10.12.2014 63

13 2nd BR @ Tumkur PS 400 1 x 125 125


14 Switchable Line Reactor @ Mysore 400 1 x 80 80
15 Tirunelveli Pooling Station BR 400 3 x 125 Agreed in 37 SCPSPSR
16 NP Kunta Pooling Station BR, Ultra Mega 400/220 1 x 125 Mar-15 Jun-16 CoD on 11.07.2016 125 125
Solar Park, Anantapur District

/ Total 1308 250 2515


2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

/ Dynamic Compensation :
Sl Name of Bus SC MVA Dynamic
Reactor Capacitor 2016-17 2016-17 2016-17
GVA / KA
Compensation

(MVAR) MVAR MVAR Remarks Proposed for 2016- Energised during
17 2016-17 Beyond 2016-17
MVA MVA MVA

1 Hyderabad Bus 18.4 / 26.5 200 2 x 125 1 x 125 Appoved in the 36th SC. 375

2 Udumalpet Bus 19.4 / 28.0 200 2 x 125 1 x 125 Appoved in the 36th SC. 375

3 Trichy Bus 12.5 / 18.0 200 2 x 125 1 x 125 Appoved in the 36th SC. 375
4 NP Kunta Bus 100

/ Total 1308.00 250.00 3640.00


15.4 765 400 .. ...
15.4 Review of Progress of Works on new 765 kV and 400 KV Sub-Stations under TBCB Route in SR
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

1 Connectivity Lines for 765/400 kV Maheshwaram (Hyderabad) Pooling S/S :


1.1 2 No. of 400 kV line bays at Mehboob 400 2016-17
Nagar S/S of TSTRANSCO
1.2 2 No. of 400 kV line bays at 400 2016-17
Yeddumailaram S/S of TSTRANSCO
2 Strengthening of transmission system beyond Vemagiri :
2.1 400 kV Satenapalli (Narasaraopeta) & 400 Apr-19 Apr-19 Award under progress
Garividi Sub-Station
2.2 Establishment of substation at 765 / 400 7 x 500 Apr-19 Apr-19 Agency : RECTPCL 3500
Chilakaluripeta TSP : PGCIL
Status : Award under progress
3 Additional inter- Regional AC link for import into Southern Region i.e. Warora Warangal and Chilakaluripeta - Hyderabad - Kurnool 765 kV link :
3.1 Establishment of 765/400kV 765 / 400 2 x 1500 Agency : PFCCL 3000
substations at Warangal (New) with TSP :
2x1500 MVA transformers Status : Yet to commence
3.2 Establishment of 2x240 MVAR Bus 765 2 x 240 Agency : PFCCL 480
Reactors at 765/400kV Warangal TSP :
(New) S/S Status : Yet to commence
3.3 240 MVAR switchable Line Reactors 765 2 x 240 Agency : PFCCL 480
at both ends of 765kV Warora Pool TSP :
Warangal (New) Line Status : Yet to commence
3.4 330 MVAR switchable Line Reactor at 765 330 Agency : PFCCL 330
Warangal end of 765 kV D/C TSP :
Warangal (New) Hyderabad Line Status : Yet to commence
3.5 240 MVAR switchable Line Reactor at 765 240 Agency : PFCCL 240
Kurnool end of 765 kV Hyderabad TSP :
Kurnool D/C Line Status : Yet to commence
3.6 240 MVAR switchable Line Reactor at 765 2 x 240 Agency : PFCCL 480
both ends of 765 kVWarangal (New) TSP :
Chilakaluripeta D/c Line Status : Yet to commence
3.7 63 MVAR switchable Line Reactor at 400 2 x 63 Agency : PFCCL 126
both ends of 400 kV (quad) Cuddapah TSP :
Hoodi D/C Line Status : Yet to commence
2016-17 2016-17
2016-17

Energised
.
Capacity Proposed for during 2016- Beyond 2016-
Sl Name of Sub-Station Voltage Ratio Original Remarks 17
(MVA) Revised Date 2016-17 17
(KV) Target Date MVA MVA
MVA

4 Transmission system associated with Gadarawada STPPS of NTPC (Part - A & B) :


4.1 Warora Pooling Station 765 / 400 2 x 1500 Nov-17 Nov-17 Supply Package Award placed in Sep- 3000
2015 (Siemens) &work under progress

4.2 Establishment of substation at Parli 765 / 400 2 x 1500 Jan-18 Jan-18 Supply Package Award placed in Sep- 3000
2015 (Siemens) & work under
progress

/ Total 0 0 14636