Professional Documents
Culture Documents
boosters
solution outline
the challenge
5
he need for energy savings has led to approach to solution design and selection, booster
t 1
broad acceptance of variable speed tech-
nology for use with booster systems.
However, the inclusion of digital controllers adds
suction
solutions that are contractor-friendly
connection
friendly are hard to find. Designers
and owner-
c maxleft to guess
are
at required capacity, contractors struggle with on
grooved standard 6" & 8"
complexity to the sizing, installation, commissioning installation and building owners are often left with a 9 7
a an integrated
and operation of boosters. Lacking booster that fails to deliver on promised benefits.
g h
100 water d em and p ercent c apac ity
rmstrong Design
A Envelope boosters
address the water
delivery challenges presented
75 Stable flow for every
activity throughout
by high-rise buildings by com-
bining high-efficiency Vertical
50 your day
Multistage pumps (6800) or
dualArm pumps (6900) with 25
modern variable speed controls. zz
zz
0
zz
midnight 4:00 8:00 noon 4:00 8:00
zz zz
Changes to fixtures
up to
70%
Changes to building design
Installation of backflow
energy kWh preventer
savings
Pipe corrosion and scaling
at 50% design flow
4
2 11 6
78
5
11
suction
1 connection
grooved standard on 6" & 8"
a
s.a. armstrong is prohibited.
without the written permission of
material 8 7 reproduction in part or as a whole
6 o not scale
s.a. armstrong . any
asme y14.5-1994 drawing is the sole property of
dimensioning and tolerancing per: the information contained in this
key benefits
three place decimal 0.250 proprietary and confidential
two place decimal 0.25
angular: mach 0.5 bend 0
fractional 1/4
tolerances:
weight in pounds
dimensions are in inches
f
unless otherwise specified:
e
minimal Armstrong Design Envelope boosters lead the
industry with a compact package design that
footprint minimizes floor space requirements and sim-
plifies on-site delivery.
Design Envelope 6800 Competing models Design Envelope 6900 Competing models
68" 40" 77" 48" 44" 33" 64" 44"
d easy
commissioning
6 4 7 1 7
on
connection ori
5 4
check valves e 3 8 on
pressure gauges zone 7
rev. de
original relea
base & panel support 6 e
friendly
tools for performance analysis and
notes:
max
product selection.
50.13 1273.18
36.
1 - dimensions are based on factor
for other than standard consu
key features
see note 6
3
8
connection orien
intuitive industry-
on 7
interface leading
suction
left hand - std. as shown
software
3.4 inch alphanumeric touch-
8 16mb flash
screen with capabilities
discharge
memory supports four left hand - std. as shown
languages: English, French,
Portuguese and Spanish.
3 7 1 4
8 7 6
data
ers provide data storage and detailed
f reports on booster operation.
service contact
d
4 1 7
screens
Stores and presents contact information
3 4 for maintenance and service personnel. j
76.00 1930.40 2 11 6
7
c
9 78
5
5 4 3
zone rev. de
original relea
8 discharge
warranty
pumps and booster systems
are supported by an industry-
leading 3-year warranty
three years
booster application range
5 B F
4
3
2 J
Systems can
be flexibly
combined in
2 to 5 pumps
bangalore
+91 (0) 80 4906 3555
shanghai
+86 21 3756 6696
a r m s t r o n g f lu i d t e c h n o lo g y
established 1934 a r m s t r o n g f lu i d t e c h n o lo g y. c o m
tm