PUBLIC WORKS DEPARTMENT

Project: Alamo Ranch Parkway


Traffic Signals

Precinct: 1 & 2

Location / Limits:
Next intersections:
- Alamo Ranch Parkway at
Alamo Parkway Pct 1.
- Alamo Ranch Parkway at Lone
Star Parkway Pct 1.
- Shaenfield Rd at Wildhorse
Parkway Pct 2.

Scope:
Project involves the study, design
and construction of traffic signals
at four intersections .

Status: Complete

Additional Information:
Consultant: Klotz Associates Bid Opening: September 11, 2015
Contractor: EZ Bel Construction Start Date: 1 Q 2016
Construction Cost : $ 865,344 Construction End Date: 3 Q 2016
Joint Bid: N/A
PUBLIC WORKS DEPARTMENT

Project: Alamo Ranch Parkway at


Westwood Loop Traffical Signal

Precinct: 1

Location / Limits:
Intersection of Alamo Ranch Pkwy
and Westwood Loop.

Scope:
Project for the construction of a
traffic signal at the intersection of
Alamo Ranch Parkway at
Westwood Loop.

Status: Complete

Additional Information:
Consultant: Klotz Associates Bid Opening: October 10, 2015
Contractor: EZ Bel Construction Start Date: 4 Q 2016
Construction Cost : $ 436,662.53 Construction End Date: 1 Q 2017
Joint Bid: N/A
PUBLIC WORKS DEPARTMENT

Project: Big Country Phase V

Precinct: 1
Location / Limits:
Blue Mesa, Fort Wayne, Black
River, Hatchet Pass, Jarbo
Pass, Cache Path, Yurba Trail,
Two Wells, Fish Springs, Olney
Springs, Potter Valley, Muddy
Peak, Crescent Peak and Mud
Lake.

Scope:
Improvement will include new
sidewalks on both sides of the
street for the entire lane of the
project. Driveways approaches will
be replaced to match the proposed
street grade. New driveways slopes
will lifted to match existing slopes or
be improved.

Status: Construction (99 %)

Additional Information:
Consultant: LNV Bid Opening: May 3, 2013
Contractor: Olmos Equipment, Inc. Construction Start : 3 Q 2013
Roadway Construction Cost: $ 5,743,410.27 Construction End Date: 4 Q 2017
Joint Bid : SAWS
PUBLIC WORKS DEPARTMENT

Project: Fischer Rd Phase II

Precinct: 1

Location / Limits:
From IH 35 to Somerset Road.

Scope:
Project will reconstruct the
existing two-lane rural roadway
section to a urban roadway
section consisting of 12-foot
travel lanes in each direction and
4 ft. shoulders within an 86
ROW (typical).

Status: Final Design

Additional Information:
Consultants: LNV, Inc. Advertise Date: 4 Q 2017
Contractor: TBD Construction Start Date: 4 Q 2017
Construction Cost: $ 4,600,000 Construction End Date: 4 Q 2018
Joint Bid: SAWS Project ARMA with Vehicle Registration
Fee
PUBLIC WORKS DEPARTMENT

Project: FM 471 (Culebra Rd)

Precinct: 1 & 2

Location / Limits:
From FM 471 to Old FM 1560

Scope:
The construction will complete
the capacity gap that currently
exists on FM 471 from FM
1560 to Old FM 471. The
proposed improvements will
widen Culebra Road from its
existing two-lane configuration
to a four-lane divided roadway
with anticipated bicycle and
pedestrian amenities.

Status: Construction (41 %)

Additional Information:
Consultant : CP&Y Advertise Date: March 11, 2016
Contractor: Curran Contracting Construction Start Date: August 15, 2016
Construction Cost: $ 14,542,273 Construction End Date: 3 Q 2018
Joint Bid: SAWS, CPS Gas. Pass Thru Project (TX DOT)
PUBLIC WORKS DEPARTMENT

Project: WT Montgomery Extension

Precinct: 1

Location / Limits:
From US 90 to Canthree Dr.

Scope:
The project is to extend WT
Montgomery Rd from Air Force
Village to Canthree Dr with a 4-
lane two 12-foot lanes each
direction, 14-foot median curb
and drainage as necessary..

Status: Planning

Additional Information:
Consultant: TBD Advertise Date: TBD
Contractor: TBD Construction Start Date: TBD
Construction Cost: TBD Construction End Date: TBD
Joint Bid: TBD
PUBLIC WORKS DEPARTMENT

Project: FM 1957 (Potranco Rd)

Precinct: 1

Location / Limits:
Just west of SH 211 to Loop 1604

Scope:
Construction will provide for
enhanced connection between
two western relief routes of SH
211 and Loop 1604. The
proposed improvements will
expand the existing two-lane rural
roadway section to an urban
roadway section consisting of two
11-foot lanes, and two 14-foot
shared use lanes, continuous left
turn lane or 10-foot raised center
median within an 80 ROW
(Minimum).

Status: Construction (40 %)

Additional Information:
Consultant: Pape-Dawson Advertise Date: November 20, 2015
Contractor: Texas Sterling Construction Construction Start Date: May 9, 2016
Construction Cost: $ 46,305,602 Construction End Date: 4 Q 2018
Joint Bid: CPS , SAWS Pass Thru Project (TX DOT)
PUBLIC WORKS DEPARTMENT

Project: Fischer Rd Phase I

Precinct: 1

Location / Limits:
From Quintana Rd to IH 35 S

Scope:
Project will expand the existing
two-lane rural roadway section
to an urban roadway section
with reinforced concrete
pavement consisting of two 16-
foot travel lanes in each
direction with 6 ft. shoulders
with, curbs and sidewalks within
an 86 ROW (typical).

Status: Final Design

Additional Information:
Consultants: Garza EMC Advertise Date: 4 Q 2017
Contractor: TBD Construction Start Date: 4 Q 2017
Construction Cost: $ 2,200,000 Construction End Date: 3 Q 2018
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT

Project: Highland Oaks Subdivision

Precinct: 1
Location / Limits:
Shellnut Dr, Wildroot Dr,
Pocahontas Dr, Deer Run Dr,
Black Willow St, Tea Rose Lane
and Little Walnur Dr. in the
Highland Oaks Subdivision.

Scope:
The project will include
construction of 32 rural
roadway section, reestablishing
roadway alignments,
reestablishing right-of-way and
restablishing positive roadway
drainage.
.

Status: Preliminary Design

Additional Information:
Consultants: CDS Muery Advertise Date: 1 Q 2018
Contractor: TBD Construction Start Date: TBD
Construction Cost: $2 - $3 million Construction End Date: TBD
Joint Bid: N/A
PUBLIC WORKS DEPARTMENT

Project: Old FM 471 & Talley Rd

Precinct: 1 & 2

Location / Limits:
Old FM 471 starting and ending
on FM 471 (Culebra Rd) and
Talley Rd from FM 471 (Culebra
Rd) to Old Talley Rd. (South
End).

Scope:
Roadway expansion from 2
lanes to 3 lanes with curbs,
sidewalks and drainage
improvements due to new
schools and development in
the area.

Status: Final Design

Additional Information:
Consultant: Dannenbaum Advertise Date: 4 Q 2017
Contractor: TBD Construction Start Date: 1 Q 2017
Construction Cost: $ 13,920,000 Construction End Date: 3 Q 2018
Joint Bid: TBD Project ARMA with Vehicle Registration Fee
PUBLIC WORKS DEPARTMENT

Project: Old Pleasanton Rd


Bridge Rehabilitation

Precinct: 1

Location / Limits:
Pleasanton Rd and Medina
River, inside of City of San
Antonio limits.

Scope:
Rehabilitation of Historical bridge.

Status: Inspections Complete.


Pending rehabilitation approval.

Additional Information:
Consultant: AECOM Advertise Date: 4 Q 2017
Contractor: TBD Construction Start Date: TBD
Construction Cost: $ 1,000,000 Construction End Date: TBD
Joint Bid: TBD
PUBLIC WORKS DEPARTMENT

Project: Roft Rd

Precinct: 1
Location / Limits:
From Culebra Rd to Rockwall
Mill Rd. (5,100 L.F.)

Scope:
This project will expand the
existing two-lane rural roadway
section to a mixed rural/urban
roadway section with curb &
sidewalks on the east side of the
roadway and drainage
improvements.

Status: Intermediate Design

Additional Information:
Consultant: ARCADIS Advertise Date: 2 Q 2018
Contractor: TBD Construction Start Date: 3 Q 2018
Construction Cost: $ 2,800,000 Construction End Date: 3 Q 2019
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT

Project: SH 211

Precinct: 1
Location / Limits:
From FM 1957 (Potranco Rd) to
FM 471 (Culebra Rd)

Scope:
The proposed project would
construct a new two-lane
roadway connecting the
existing sections of SH 211
from FM 471 (Culebra Road) to
FM 1957 (Potranco Road). The
purpose of the proposed project
is to improve connectivity and
mobility, and provide residents
a through alternative between
FM 1957 and FM 471. The total
length of the project is 7.6
miles.

Status: Final Design

Additional Information:
Consultant: Pape-Dawson / CM Foster Advertise Date: 4 Q 2017
Contractor: TBD Construction Start Date: 4 Q 2018
Construction Cost: $ 23,303,000 Construction End Date: 1 Q 2019
Joint Bid: N/A Pass Thru Project (TX DOT)
PUBLIC WORKS DEPARTMENT

Project: Talley Rd Phase I

Precinct: 1

Location / Limits:
From FM 1957 (Potranco Rd)
to Wiseman Blvd.

Scope:
Roadway expansion from 2 to 4
lanes with curbs, sidewalks, bike
lanes, turn lanes and drainage
improvements. Some ROW
acquisition will be required.

Status: Final Design.

Additional Information:
Consultant: CP & Y Advertise Date: 1 Q 2018
Contractor: TBD Construction Start Date: 2 Q 2018
Construction Cost: $ 12,500,000 Construction End Date: 2 Q 2020
Joint Bid: SAWS, CPS-GAS Project ARMA with Vehicle
Registration Fee
PUBLIC WORKS DEPARTMENT

Project: Watson Rd Phase I

Precinct: 1

Location / Limits:
From Somerset Road to SWISD

Scope:
Watson Rd is currently a 2 lane
rural roadway with 24 ft. wide
and 4,102 L.F. and will be
reconstructed to include 4-12
travel lanes, drainage
improvements and pedestrian
amenities.

Status: Preliminary Design

Additional Information:
Consultants: CEC Bid Opening: 4 Q 2018
Contractor: TBD Construction Start: TBD
Construction Cost: $ 3,500,000 Construction End Date: TBD
Joint Bid: TBD ARMA - MPO Project
PUBLIC WORKS DEPARTMENT

Project: WT Montgomery Road Phase I

Precinct: 1

Location / Limits:
IH 90 West to Lucas Creek
bridge.

Scope:
The main purpose of the project
is to provide much needed
drainage improvements and road
reconstruction on
WT Montgomery Road.

Status: Complete

Additional Information:
Consultant: IDC, Inc. Advertise Date: June 26, 2015
Contractor: Curran Contracting Construction Start Date: 3 Q 2015
Construction Cost: $ 6,209,403 Construction End Date: 2 Q 2017
Joint Bid: SAWS