NAME -RATNESH UPADHYAY DATE -3 AUG 2017 HQ- DLW VARANASI
Name of Reporting at Reporting at 1:00 Reporting at Reporting at Remark
Loco 10.30 AM PM 4:00 PM 5:30 PM Shed Went to Went to Went to Went to the workshop and Administrative administrative workshop and sheet metal shop Office and Design office and SIG Traction because there Office and meeting cell for the assembly Shop was a problem of with Mr. Madhukar closing the and meeting to thread in drain JE . He was asking complaint of Mr. Patel SSE- water outlet so about status of 40427 and TAS, Mo- pipe was not complaint of HVAC. 70505.a and 9794864648.it fitted in hole. He told me that to giving the joint was normal Meeting with SSE give daily report note of RCF of meeting. And ,S.K Amanda and about failure of HWH/DSL. watching TA .it ensured him that HVAC. talking to was putted in it will rectify soon. Jalaj Sir and told LAS. him to give all complaint update status .