On The Job Training Project: Block A Project Prepared : Annis Khoiri Wibowo
Name (Company): JGC Indonesia Departement : MED
On The Job Training Schedule : September-October Date : 25-Aug-2017
TIME SCHEDULE
September October
NO.
SUBJECTS DISCRIPTIONS REMARKS
1st week 2nd week 3rd week 4th week 1st week 2nd week 3rd week 4th week
A ACHE
1 Component per each part of ACHE and comparing engineering drawing with actual construction
Possibility issue during ACHE Construction until already installed such as : Preservation,
4
material shortage, interference, bolting cannot installed, discrepancy with drawing etc.
Inspection, Erection and Installation for Internal Part, such as : Tray, Packing, Ceramic Ball, and
8
Vane Separator
9 Component per each part and comparing Vendor drawing with actual construction
Knowledge about Construction method, procedure and Instalation accecories of Field Erected
10
Tank
Inspection and Hydrotest for atmospheric Tank (ATM condition & Annex F with design pressure
12
18 Kpa)
13 Application internal and eksternal coating on Tank & Inspection internal and eksternal coating
E INSULATION