You are on page 1of 198

RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All safety equipments shall be installed in buildings


DESAL FG
1 7A 1
STATION
MECH ALL 1 and process area as per approved drawings &
SOW
DESAL FG
2 7A 2
STATION
MECH ALL 1 Wind socks are to be installed
DESAL FG Station sign boards, warning sign boards and
3 7A 3 CIVIL ALL 1
STATION safety sign boards shall be installed
DESAL FG Safety chain or bar are to be installed in ladders of
4 7A 4 MECH ALL 1
STATION all valve operating platforms to avoid trip & fall
DESAL FG First Aid kit to be provided and verify the content
5 7A 5 MECH ALL 1
STATION with Dukhan Medical
DESAL FG
6 7A 6
STATION
MECH ALL 1 Eye wash to be provided in battery room
DESAL FG All emergency gates are to be painted as per
7 7A 7 MECH ALL 1
STATION safety requirements.
DESAL FG Emergency torch light as per QP specification shall
8 7A 8 ELEC ALL 1
STATION be provided in LV Room & DG Building
DESAL FG
9 7A 9
STATION
CIVIL ALL 1 All building sign boards are to provided
DESAL FG
10 7A 10
STATION
MECH ALL 1 All valves shall be painted as per QP specification

DESAL FG Cross over platform is to be provided wherever


11 7A 11 MECH ALL 1
STATION required
DESAL FG Platform is to be provided to operate SRV isolation
12 7A 12 MECH ALL 1
STATION valve

DESAL FG Jib cranes shall be load tested , STI approval shall


13 7A 13 MECH ALL 1
STATION be obtained and reports shall be submitted to QP

DESAL FG
14 7A 14
STATION
MECH ALL 1 SRV's alignment to be done
DESAL FG Stenciling & color coding shall be done on piping &
15 7A 15 MECH ALL 1
STATION pipeline
DESAL FG Corroded bolts shall be replaced in flowmeter skid
16 7A 16 MECH ALL 1
STATION & pig traps
DESAL FG
17 7A 17
STATION
MECH ALL 1 Drain pits shall be cleaned and grating to be fixed

DESAL FG All missing valve handles shall be installed and


18 7A 18 MECH ALL 1
STATION painted
DESAL FG Pipeline identification stenciling shall be done in
19 7A 19 MECH ALL 1
STATION fence inside & outside
DESAL FG Insulation kit is to be provided wherever SS & CS
20 7A 20 MECH ALL 1
STATION connection exists
DESAL FG All short bolts are to be replaced with correct length
21 7A 21 MECH ALL 1
STATION bolts
DESAL FG All spectacle blinds shall be painted as per QP
22 7A 22 MECH ALL 1
STATION specification
DESAL FG
23 7A 23
STATION
INST ALL 1 Impulse tubing shall be hydrotested
DESAL FG
24 7A 24
STATION
INST ALL 1 Pig signaller is to be functional tested
DESAL FG
25 7A 25
STATION
MECH ALL 1 All valve tags are to be provided in SS material
DESAL FG Corrosion fittings are to be offered for OEI
26 7A 26 MECH ALL 1
STATION inspection
DESAL FG Personnel protection (Insulation) is to be provided
27 7A 27 MECH ALL 1
STATION for vent lines as per P & ID
DESAL FG All valves shall be greased for the free operation of
28 7A 28 MECH ALL 1
STATION handles
DESAL FG Yellow and black strips shall be painted wherever
29 7A 29 MECH ALL 1
STATION the tripping hazards exists
DESAL FG
30 7A 30
STATION
MECH ALL 1 All shims shall be full welded
DESAL FG All flanges shall be tightened with proper torque
31 7A 31 MECH ALL 1
STATION and reports shall be provided to QP
DESAL FG Grouting is to done for pipe supports and other
32 7A 32 CIVIL ALL 1
STATION structures
DESAL FG
33 7A 33
STATION
MECH ALL 1 Housekeeping is to be done
DESAL FG Tie-in connections with correct bolts & gaskets
34 7A 34 MECH ALL 1
STATION shall be done at Desal Metering point
DESAL FG Air vessels shall be replaced with the approved
35 7A 35 MECH ALL 1
STATION materials
DESAL FG Piping works shall be dried & nitrogen purged as
36 7A 36 MECH ALL 1
STATION per project specifications

Wherever a spectacle blind is provided, drilling and


DESAL FG
37 7A 37
STATION
MECH ALL 1 tapping of holes for the jack screws in the flange
shall be provided as per project specification
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Vendor pipe work painting shall be matched with


38 7A 38 MECH ALL 1
STATION other as per QP spec
All piping works painting shall be checked for
DESAL FG
39 7A 39
STATION
MECH ALL 1 damages & repaired. Painting reports shall be
submitted to QP review.
DESAL FG Fence openings @ pipe entry shall be reinstated
40 7A 40 MECH ALL 1
STATION properly
Provide double nuts in pipe supports and other
DESAL FG
41 7A 41
STATION
MECH ALL 1 structures (Jib crane, equipment foundations etc)
as per the requirements
DESAL FG Extra length in foundation/ structure bolts shall be
42 7A 42 MECH ALL 1
STATION cut smoothly & rectified
DESAL FG Diesel tank P&ID shall be as-built as per the
43 7A 43 MECH ALL 1
STATION approved vendor drawing
DESAL FG
44 7A 44
STATION
MECH ALL 1 Painting damage in diesel tank shall be rectified
DESAL FG Diesel storage tank top platform hand rail safety
45 7A 45 MECH ALL 1
STATION chain is to be provided to avoid tripping hazard
DESAL FG Flame arrestor is to be installed at diesel storage
46 7A 46 MECH ALL 1
STATION tank
DESAL FG
47 7A 47
STATION
MECH ALL 1 Dip hatch is to be installed at diesel storage tank

DESAL FG 5K-PVRV-0001 is to be installed at Nozzle N5


48 7A 48 MECH ALL 1
STATION diesel storage tank
DESAL FG Internal inspection of diesel storage tank is to be
49 7A 49 MECH ALL 1
STATION offered to end user before filling the diesel
DESAL FG
50 7A 50
STATION
MECH ALL 1 Strainer blind is to be installed @ diesel tank
DESAL FG All veep holes are to be plugged with approved
51 7A 51 MECH ALL 1
STATION sealent material
DESAL FG
52 7A 52
STATION
MECH ALL 1 Drain pit @ diesel tank is to be cleaned
DESAL FG
53 7A 53
STATION
MECH ALL 1 Spectacle blind is to be installed at BV-0071
DESAL FG 2" drain line single step platform is to be provided
54 7A 54 MECH ALL 1
STATION for avoiding tripping hazard
DESAL FG
55 7A 55
STATION
MECH ALL 1 All U-clamp double nuts are to be provided
DESAL FG
56 7A 56
STATION
MECH ALL 1 DG exhaust line silencer painting to be done
DESAL FG
57 7A 57
STATION
MECH ALL 1 DG exhaust line flapper is to be installed
DESAL FG
58 7A 58
STATION
MECH ALL 1 DG Exhaust line concrete opening is to be closed
DESAL FG
59 7A 59
STATION
MECH ALL 1 DG Exhaust line is to be updated in P&ID
DESAL FG LI-001 is to be installed in such a way that it shall
60 7A 60 INST ALL 1
STATION be visible from road tanker connection
DESAL FG Monorail @ DG building shall be load tested, STI
61 7A 61 MECH ALL 1
STATION approved & submitted to QP

DESAL FG The conflict in the capacity mentioned in monorail


62 7A 62 MECH ALL 1
STATION (7 ton) and chain block (8 ton) is to be rectified

DESAL FG Corroded materials used in louers @ DG building


63 7A 63 MECH ALL 1
STATION shall be replaced with correct materials
DESAL FG Redline mark-up drawings shall be submitted after
64 7A 64 MECH ALL 1
STATION commissioning for QP approval
DESAL FG All test packs 'B' punch items (including 4' & 6"
65 7A 65 MECH ALL 1
STATION pipelines) shall be cleared & signed off by QP
66 7A 1 DPS/DESAL CIVIL ALL 1 JIB crane grouting is to be done

67 7A 2 DPS/DESAL MECH ALL 1 Grating is to be installed in pig traps drain pit

68 7A 3 DPS/DESAL MECH ALL 1 Hinged flapper is to be installed in 2" vent line


Insulation kit is to be provided wherever SS & CS
69 7A 4 DPS/DESAL MECH ALL 1
connection exists
70 7A 5 DPS/DESAL MECH ALL 1 Khuff gas tie-in to be completed
Existing fence is to be removed after
71 7A 6 DPS/DESAL CIVIL ALL 1
commissioning of Desal / DPS valve station
72 7A 7 DPS/DESAL MECH ALL 1 All valves shall be painted as per QP specification

Stenciling & color coding shall be done on piping &


73 7A 8 DPS/DESAL MECH ALL 1
pipeline
Piping works shall be dried & nitrogen purged as
74 7A 9 DPS/DESAL MECH ALL 1
per project specifications
All missing valve handles shall be installed and
75 7A 10 DPS/DESAL MECH ALL 1
painted
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All valves shall be greased for the free operation of


76 7A 11 DPS/DESAL MECH ALL 1
handles
77 7A 12 DPS/DESAL MECH ALL 1 Wind sock is to be installed
All short bolts are to be replaced with correct length
78 7A 13 DPS/DESAL MECH ALL 1
bolts
All spectacle blinds shall be painted as per QP
79 7A 14 DPS/DESAL MECH ALL 1
specification
80 7A 15 DPS/DESAL INST ALL 1 Pig signaller is to be functional tested

81 7A 16 DPS/DESAL MECH ALL 1 All valve tags are to be provided in SS material

82 7A 17 DPS/DESAL MECH ALL 1 All shims shall be full welded

All piping works painting shall be checked for


83 7A 18 DPS/DESAL MECH ALL 1 damages & repaired. Painting reports shall be
submitted to QP review.
Fence openings @ pipe entry shall be reinstated
84 7A 19 DPS/DESAL MECH ALL 1
properly
All flanges shall be tightened with proper torque
85 7A 20 DPS/DESAL MECH ALL 1
and reports shall be provided to QP
All supports grouting are to be done wherever it is
86 7A 21 DPS/DESAL CIVIL ALL 1
required
Station sign boards, warning sign boards and
87 7A 22 DPS/DESAL CIVIL ALL 1
safety sign boards shall be installed
All emergency gates are to be painted as per
88 7A 23 DPS/DESAL MECH ALL 1
safety requirements.
All safety equipments shall be installed in buildings
89 7A 24 DPS/DESAL MECH ALL 1 and process area as per approved drawings &
SOW
90 7A 25 DPS/DESAL CIVIL ALL 1 Housekeeping is to be done
Pipeline identification stenciling shall be done in
91 7A 26 DPS/DESAL MECH ALL 1
fence inside & outside
Redline mark-up drawings shall be submitted after
92 7A 27 DPS/DESAL MECH ALL 1
commissioning for QP approval
All test packs 'B' punch items (including 4' & 6"
93 7A 28 DPS/DESAL MECH ALL 1
pipelines) shall be cleared & signed off by QP
VAL STN
94 7A 1
KSDGS
MECH ALL 1 JIB crane is to be installed
VAL STN
95 7A 2
KSDGS
MECH ALL 1 Grating is to be installed in pig traps drain pit
VAL STN Insulation kit is to be provided wherever SS & CS
96 7A 3 MECH ALL 1
KSDGS connection exists
VAL STN Existing fence is to be removed after
97 7A 4 CIVIL ALL 1
KSDGS commissioning of new valve station
VAL STN
98 7A 5
KSDGS
MECH ALL 1 All valves shall be painted as per QP specification

VAL STN Stenciling & color coding shall be done on piping &
99 7A 6 MECH ALL 1
KSDGS pipeline

VAL STN Piping works (including KSDS inside) shall be dried


100 7A 7 MECH ALL 1
KSDGS & nitrogen purged as per project specifications

VAL STN All missing valve handles shall be installed and


101 7A 8 MECH ALL 1
KSDGS painted
VAL STN All valves shall be greased for the free operation of
102 7A 9 MECH ALL 1
KSDGS handles
VAL STN
103 7A 10
KSDGS
MECH ALL 1 Wind sock is to be installed
VAL STN All short bolts are to be replaced with correct length
104 7A 11 MECH ALL 1
KSDGS bolts
VAL STN All spectacle blinds shall be painted as per QP
105 7A 12 MECH ALL 1
KSDGS specification
VAL STN
106 7A 13
KSDGS
INST ALL 1 Pig signaller is to be functional tested
VAL STN
107 7A 14
KSDGS
MECH ALL 1 All valve tags are to be provided in SS material
VAL STN
108 7A 15
KSDGS
MECH ALL 1 All shims shall be full welded
VAL STN All flanges shall be tightened with proper torque
109 7A 16 MECH ALL 1
KSDGS and reports shall be provided to QP
VAL STN All supports grouting are to be done wherever it is
110 7A 17 CIVIL ALL 1
KSDGS required
All piping works painting shall be checked for
VAL STN
111 7A 18
KSDGS
MECH ALL 1 damages & repaired. Painting reports shall be
submitted to QP review.
VAL STN Fence openings @ pipe entry shall be reinstated
112 7A 19 MECH ALL 1
KSDGS properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
113 7A 20
KSDGS
CIVIL ALL 1 Existing marker pole is to be restored
VAL STN
114 7A 21
KSDGS
MECH ALL 1 Flare tie-in to be completed
VAL STN Station sign boards, warning sign boards and
115 7A 22 CIVIL ALL 1
KSDGS safety sign boards shall be installed
All safety equipments shall be installed in buildings
VAL STN
116 7A 23
KSDGS
MECH ALL 1 and process area as per approved drawings &
SOW
VAL STN All emergency gates are to be painted as per
117 7A 24 MECH ALL 1
KSDGS safety requirements.
VAL STN
118 7A 25
KSDGS
MECH ALL 1 Housekeeping is to be done
VAL STN Pipeline identification stenciling shall be done in
119 7A 26 MECH ALL 1
KSDGS fence inside & outside
VAL STN Redline mark-up drawings shall be submitted after
120 7A 27 MECH ALL 1
KSDGS commissioning for QP approval
VAL STN All test packs 'B' punch items (including KSDS
121 7A 28 MECH ALL 1
KSDGS inside) shall be cleared & signed off by QP
DESAL FG
122 7D 1
STATION
MECH ALL 1 Diesel outlet line from tank drain line plug .

DESAL FG
123 7D 2
STATION
CIVIL ALL 1 Generator foundation bolts on skid altred .

DESAL FG
124 7D 3
STATION
MECH ALL 1 Provied tray for the oil drain line .

DESAL FG
125 7D 4
STATION
MECH ALL 1 Provied ladder for water/oil level .

DESAL FG Pig receiver by pass line valve handle missing


126 7D 5 MECH ALL 1
STATION 2nos .

DESAL FG
127 7D 6
STATION
MECH ALL 1 Pig receiver door rachet spanner missing .

DESAL FG Connect drain of pig receiver to drain pit to be fixed


128 7D 7 MECH ALL 1
STATION .

DESAL FG Foundation bolt for air vessal V-


129 7D 8 MECH ALL 1
STATION 0005A/B/C/D.missing .

DESAL FG Provide mobile air compressor connecting point to


130 7D 9 MECH ALL 1
STATION air recevier

DESAL FG
131 7D 10
STATION
MECH ALL 1 Safety lock for air receiver platform to be fixed .

DESAL FG
132 7D 11
STATION
MECH ALL 1 Safety valve plug of isolation valve to be provided .

DESAL FG
133 7D 12
STATION
MECH ALL 1 Isolation valve plug to be providad .
Manual lifting equipment inside compressor room
to be provided
DESAL FG
134 7D 13 MECH ALL 1
STATION

DESAL FG Proper provision to be made for placing mobile air


135 7D 14 MECH ALL 1
STATION compressor

DESAL FG
136 7B 1
STATION
MECH ALL 1 Mechanical Pipework Incomplete inside the station.

DESAL FG
137 7B 2
STATION
CIVIL ALL 1 Area civil works incomplete.

DESAL FG Various Valves & Instruments not installed due to


138 7B 3 MECH ALL 1
STATION Pre commissioning work.

DESAL FG
139 7B 4
STATION
MECH ALL 1 All Isolation valves to be lubricated.

DESAL FG Painting, Flow direction & Stenciling of Pipes to be


140 7B 5 MECH ALL 1
STATION carried out. Stickers to be removed.

DESAL FG
141 7B 6
STATION
MECH ALL 1 Undersize & Rusted bolts to be replaced.

DESAL FG Missing Valve Handles to be provided & Rusted


142 7B 7 MECH ALL 1
STATION Handles to be painted.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Cable Tray in plant to be secured with proper size


143 7B 8 INST ALL 1
STATION bolts.

DESAL FG Drain lines of Inst Air tanks to be routed to safe


144 7B 9 INST ALL 1
STATION points.
DESAL FG
145 7B 10
STATION
MECH ALL 1 Temporary Inst Air Tanks to be replaced.
DESAL FG Inst Air compressor house lighting to be relocated
146 7B 11 ELEC ALL 1
STATION for proper lighting in the house.
Isolation valve U/S of Diesel Generator Fuel inlet
DESAL FG
147 7B 12
STATION
MECH ALL 1 5K-LCV-0005 to be provided to prevent diesel
spillage during valve Maintenance.

DESAL FG Fire Extinguisher to be provided in Transformer


148 7B 13 INST ALL 1
STATION Bay.
DESAL FG QP approved BA Apparatus and Fire extinguishers
149 7B 14 INST ALL 1
STATION to be installed around the plant.
DESAL FG All extinguishers to be labeled with Inspection
150 7B 15 INST ALL 1
STATION dates.

DESAL FG
151 7B 16
STATION
MECH ALL 1 Roof Access ladders to be provided with Safety Bar.

DESAL FG SDV-0004 flame proof Box to be modified for Hand


152 7B 17 INST ALL 1
STATION Jack Operation.

DESAL FG Mobile Pig Launcher & Receiver to have fixed drain


153 7B 18 MECH ALL 1
STATION lines to pit.

DESAL FG Noise level Boards to be installed at Inst Air


154 7B 19 CIVIL ALL 1
STATION Building.

DESAL FG All cable entry points in control room building


155 7B 20 INST ALL 1
STATION through floors & wall to be sealed.

DESAL FG All Electrical switch breakers to be provided with


156 7B 21 ELEC ALL 1
STATION padlocks.

DESAL FG
157 7B 22
STATION
ELEC ALL 1 Key-box to be provided as required.

All Floor plates in switch room should be aligned


DESAL FG
158 7B 23
STATION
MECH ALL 1 properly and damaged & missing tiles in control
room be replaced.

DESAL FG Open end of valves and Flanges should be


159 7B 24 MECH ALL 1
STATION plugged or blinded as required.

Plant sign boards with QP instructions & station


DESAL FG Name to be installed at the entrance and all
160 7B 25 CIVIL ALL 1
STATION approved sign boards in the building and door
identification should be fixed.

DESAL FG Assembly point to be identified and sign board


161 7B 26 CIVIL ALL 1
STATION installed.

DESAL FG Plant Emergency Gate locks should be modified to


162 7B 27 MECH ALL 1
STATION prevent unauthorized access from outside.

DESAL FG Valve key Rack (T-Type) with 4 welded holding


163 7B 28 MECH ALL 1
STATION Rings to be provided near control room.

DESAL FG Plant Ground area should be layed with Interlock


164 7B 29 CIVIL ALL 1
STATION bricks.

Pipe sections in contact with pipe supports should


DESAL FG be padded or protection plate provided to prevent
165 7B 30 MECH ALL 1
STATION wear & Tear during movements caused by weather
conditions..

DESAL FG
166 7B 31
STATION
MECH ALL 1 All vessels should be stenciled with their Tag-Nos.

DESAL FG
167 7B 32
STATION
MECH ALL 1 P&ID to be updated.

DESAL FG Weatherproof Cover box to be installed for SDV-


168 7B 33 INST ALL 1
STATION 0003 local control panel.

DESAL FG Sunshades to be provided for all field Junction


169 7B 34 INST ALL 1
STATION boxes.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Crash Barriers to be Installed around Assets to


DESAL FG
170 7B 35
STATION
CIVIL ALL 1 prevent damages during vehicle movement for
Maintenance or Pigging.

171 7B 1 DPS/DESAL MECH ALL 1 Mechanical Pipework incomplete.

172 7B 2 DPS/DESAL CIVIL ALL 1 Civil works incomplete.

Pig Launcher & Receiver to have proper fixed drain


173 7B 3 DPS/DESAL MECH ALL 1
lines to pit.

174 7B 4 DPS/DESAL MECH ALL 1 All Isolation valves to be lubricated.

Valves & Instruments not installed due to Pre


175 7B 5 DPS/DESAL MECH ALL 1
commissioning work

Painting, Flow direction & Stenciling of Pipes to be


176 7B 6 DPS/DESAL MECH ALL 1
carried out.

All extinguishers to be labeled with Inspection


177 7B 7 DPS/DESAL INST ALL 1
dates.

Missing Valve Handles to be provided & Rusted


178 7B 8 DPS/DESAL MECH ALL 1
Handles to be painted.

Crash Barriers to be Installed around Assets to


179 7B 9 DPS/DESAL CIVIL ALL 1 prevent damages during vehicle movement for
Maintenance or Pigging.

180 7B 10 DPS/DESAL INST ALL 1 Documents for operation of valves to be provided.

Plant sign boards with QP instructions & station


181 7B 11 DPS/DESAL CIVIL ALL 1 Name to be installed at the entrance and all
approved sign boards

Plant Ground area should be layed with Interlock


182 7B 12 DPS/DESAL CIVIL ALL 1
bricks.

Pipe sections in contact with pipe supports should


be padded or protection plate provided to prevent
183 7B 13 DPS/DESAL MECH ALL 1
wear & Tear during movements caused by weather
conditions.

Valve key Rack (T-Type) with 4 welded holding


184 7B 14 DPS/DESAL MECH ALL 1
Rings to be provided.

Plant Emergency Gate locks should be modified to


185 7B 15 DPS/DESAL MECH ALL 1
prevent unauthorized access from outside.

Assembly point to be identified and sign board


186 7B 16 DPS/DESAL CIVIL ALL 1
installed.

QP approved BA Apparatus and Fire extinguishers


187 7B 17 DPS/DESAL INST ALL 1
to be installed around the plant.

VAL STN
188 7B 1
KSDGS
MECH ALL 1 Mechanical Pipework incomplete.

VAL STN
189 7B 2
KSDGS
CIVIL ALL 1 Civil works incomplete.

VAL STN Pig Launcher & Receiver to have proper fixed drain
190 7B 3 MECH ALL 1
KSDGS lines to pit.

VAL STN
191 7B 4
KSDGS
MECH ALL 1 All Isolation valves to be lubricated.

VAL STN Valves & Instruments not installed due to Pre


192 7B 5 MECH ALL 1
KSDGS commissioning work

VAL STN Painting, Flow direction & Stenciling of Pipes to be


193 7B 6 MECH ALL 1
KSDGS carried out.

VAL STN Missing Valve Handles to be provided & Rusted


194 7B 7 MECH ALL 1
KSDGS Handles to be painted.

VAL STN Assembly point to be identified and sign board


195 7B 8 CIVIL ALL 1
KSDGS installed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Plant sign boards with QP instructions & station


VAL STN
196 7B 9
KSDGS
CIVIL ALL 1 Name to be installed at the entrance and all
approved sign boards

VAL STN Plant Ground area should be layed with Interlock


197 7B 10 CIVIL ALL 1
KSDGS bricks.

Pipe sections in contact with pipe supports should


VAL STN be padded or protection plate provided to prevent
198 7B 11 MECH ALL 1
KSDGS wear & Tear during movements caused by weather
conditions..

VAL STN Valve key Rack (T-Type) with 4 welded holding


199 7B 12 MECH ALL 1
KSDGS Rings to be provided.

VAL STN Plant Emergency Gate locks should be modified to


200 7B 13 MECH ALL 1
KSDGS prevent unauthorized access from outside.

Crash Barriers to be Installed around Assets to


VAL STN
201 7B 14
KSDGS
CIVIL ALL 1 prevent damages during vehicle movement for
Maintenance or Pigging.

VAL STN QP approved BA Apparatus and Fire extinguishers


202 7B 15 MECH ALL 1
KSDGS to be installed around the plant.

5K-HCP-0001-01, A/C and Battery room Exhaust


DESAL FG SWITCH GEAR
203 7F 1.1
STATION
ELEC
ROOM
1 Fan control panel cable remaining to be
terminated.

DESAL FG SWITCH GEAR 5K-DB-000101, Ltg and Small power DB,


204 7F 1.2 ELEC 1
STATION ROOM temporary cable to be removed.

DESAL FG SWITCH GEAR 5K-DB-0001-02 Outdoor lighting DB timer


205 7F 1.3 ELEC 1
STATION ROOM connections are remaining to complete.

DESAL FG SWITCH GEAR Engraved tags to be provided to all equipments in


206 7F 1.4 ELEC 1
STATION ROOM the switch gear room

DESAL FG SWITCH GEAR All the cable / conduit entry holes on the wall to be
207 7F 1.5 ELEC 1
STATION ROOM sealed properly

Cable trench cover at the back of switch board 5K-


DESAL FG SWITCH GEAR
208 7F 1.6
STATION
ELEC
ROOM
1 SB-0001-01 and 110 & 24V DC UPS to be placed
properly .

DESAL FG SWITCH GEAR Rubber sheet to be provided infront of the switch


209 7F 1.7 ELEC 1
STATION ROOM board 5K-SB-0001-1 and 11 KV metering panel.

DESAL FG SWITCH GEAR Earthing bus bar in the switch gear cubicle, missing
210 7F 1.9 ELEC 1
STATION ROOM bolts to be fixed

DESAL FG SWITCH GEAR Circular box on the conduit above the exit door to
211 7F 1.10 ELEC 1
STATION ROOM be plugged.

DESAL FG SWITCH GEAR Laptop and software to be porvided for Sepam


212 7F 1.11 ELEC 1
STATION ROOM Relay setting

A Ducted Ventilation to be provided to the radiator


DESAL FG GENERATOR of the standby Generator as hot air from the
213 7F 2.1 MECH 1
STATION ROOM radiator is circulating inside the generator room
which cause high temperature inside gen room.

The louvre fitted outside the radiator side wall to be


DESAL FG GENERATOR replaced with a suitable one as it is blocking the
214 7F 2.2 MECH 1
STATION ROOM hot air from the radiator, which leads the generator
to trip on high temperature while running on load.

The exhaust rubber hose below the radiator to be


DESAL FG GENERATOR
215 7F 2.3
STATION
MECH
ROOM
1 extended to outside wall to avoid smoke inside the
generator room.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG GENERATOR A stand to be provided for the battery cable of the


216 7F 2.4 ELEC 1
STATION ROOM standby generator

DESAL FG GENERATOR Cable tray covers above the standby generator to


217 7F 2.5 ELEC 1
STATION ROOM be fixed with proper clamping.

DESAL FG GENERATOR 5K-DB-0001-07 at Standby generator room, cable


218 7F 2.6 ELEC 1
STATION ROOM termination is not completed.

5K-HCP-0001-02, Exhaust Fan control panel at


DESAL FG GENERATOR
219 7F 2.7
STATION
ELEC
ROOM
1 Generator room cable termination is not
completed.

DESAL FG GENERATOR Air inlet filters in the Generator room, edges to be


220 7F 2.8 MECH 1
STATION ROOM sealed with proper Sealant.

A/C duct to be re-located to the left side wall as it is


DESAL FG
221 7F 3.1
STATION
HVAC BATTERY ROOM 1 very close to the battery stand, as checking of the
battery will be difficult.

DESAL FG Circuilar box on a conduit to be covered and


222 7F 3.2 ELEC BATTERY ROOM 1
STATION plugged.

DESAL FG
223 7F 3.3
STATION
CIVIL BATTERY ROOM 1 Spare pipes on the floor to be covered properly.

DESAL FG
224 7F 3.4
STATION
CIVIL BATTERY ROOM 1 Damaged floor tiles to be replaced.

DESAL FG Circular box on a conduit outside battery room to


225 7F 3.5 ELEC BATTERY ROOM 1
STATION be plugged.

INSTRUMENT Lighting is not sufficient as the light fittings are


DESAL FG AIR
226 7F 4.1
STATION
ELEC
COMPRESSOR
1 installed in the lower area and the upper area will
ROOM not be visible at night.

INSTRUMENT
DESAL FG AIR
227 7F 4.2
STATION
ELEC
COMPRESSOR
1 Earth connections to be tightened
ROOM

Lighting is not sufficient at the left side of the


entrace gate and at the back of instrument air
DESAL FG compressor shelter. One more light fitting can be
228 7F 5.1 ELEC GENERAL 1
STATION added to the lighting pole LP-10 and LP-04 and
focused to the entrance and at the back of
instrument air compressor shelter.

DESAL FG All the cable entry holes on the wall to be sealed


229 7F 5.2 ELEC GENERAL 1
STATION properly.

DESAL FG
230 7F 5.3
STATION
MECH GENERAL 1 Wind socks to be provided at the plant area.

DESAL FG All the earthing termianal at the plant area to be


231 7F 5.4 ELEC GENERAL 1
STATION checked.

DESAL FG
232 7F 5.5
STATION
ELEC GENERAL 1 All the metal doors to be earthed properly.

DESAL FG All the entrance doors to be labelled with engraved


233 7F 5.6 CIVIL GENERAL 1
STATION labels.

All the cable trenches to be checked and clear of


DESAL FG
234 7F 5.7
STATION
MECH GENERAL 1 all unwanted materials and the covers should be
aligned properly.

DESAL FG Tele metering


235 7J 1
STATION
INST
Room
1 Drawing to be updated as built DSFG 5K-4-52-0001
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Tele metering HSSD -03-0001&2, cable 5k-ELP-0004 and cable


236 7J 2 INST 1
STATION Room tray 5k-ELP-0037 to be readdress.

DESAL FG Tele metering 5K-MAC-03-0004&1 name tag to be fixed and


237 7J 3 INST 1
STATION Room cable loop readdress.

DESAL FG Tele metering Transformer room Heat detector 5K-HD-03-0001 to


238 7J 4 INST 1
STATION Room be fixed in lower position.

DESAL FG Tele metering Diesel General Room 5K-XL-02-0001&2 tag plate


239 7J 5 INST 1
STATION Room should have a larger font size like the others.

DESAL FG Tele metering Diesel General Room 5K-HD-02-0001,2&3 should


240 7J 6 INST 1
STATION Room be lower then the exhaust fans.

All JBs and PANELS TBs & Terminal Numbers and


DESAL FG Tele metering
241 7J 7
STATION
INST
Room
1 drawing (Control room and field) should be
updated as built.

DESAL FG Tele metering Flow Meter indicator name tag plate should have a
242 7J 8 INST 1
STATION Room larger font size and fixed on the panel plate.

DESAL FG Tele metering Ethernet switch and cable should be correctly


243 7J 9 INST 1
STATION Room labelled.
DESAL FG Tele metering Table should be provided for PC (HMI of flow
244 7J 10 INST 1
STATION Room meter).
DESAL FG Tele metering
245 7J 11
STATION
INST
Room
1 Panel earth cable to be fixed properly.

DESAL FG Tele metering 5K-SC-0001 SCADA main supply feeder is broken;


246 7J 12 INST 1
STATION Room protection cover to be replaced.

DESAL FG Tele metering


247 7J 13
STATION
INST
Room
1 RS-1,2,3&4 labelled properly

DESAL FG Tele metering Panel tube light is faulty and needs to be replaced
248 7J 14 INST 1
STATION Room by SCADA and F&G panels.

DESAL FG Temp Dial Gauge SK-TI-0002&4 does not need


249 7J 1 INST Air compressor 1
STATION extra support and should be removed.

DESAL FG Air compressor to Vessel pipe needs support and


250 7J 2 MECH Air compressor 1
STATION clamp. Should not be hanging.

DESAL FG Auto water drain trap to be fixed in Vessel drain


251 7J 3 INST Air compressor 1
STATION line.

DESAL FG Plugs in Vent valves are missing and need to be


252 7J 4 MECH Air compressor 1
STATION fixed in place.

DESAL FG SRV vent are very near to roof sheet. (Pressure 7


253 7J 5 MECH Air compressor 1
STATION to 8.5 Bar).

Fire and Gas (MAC & FDI) detectors are not


DESAL FG available in the air compressor room. Needs to be
254 7J 6 INST Air compressor 1
STATION checked to ensure the detectors are not missing
from the design plan or scope of work.
All air compressor panel cable metal labels (sharp
DESAL FG
255 7J 7
STATION
INST Air compressor 1 and dangerous) must be replaced with Tai cable
labels.

DESAL FG Main power cable IE-24 VDC should be fixed


256 7J 8 ELEC Air compressor 1
STATION properly.

DESAL FG Air compressor panel and cable trays require


257 7J 9 INST Air compressor 1
STATION repainting.

Mobile compressor connection to be provided with


DESAL FG
258 7J 10
STATION
MECH Air compressor 1 valve and nipple.Same provision to be given at
knock out vessel and plant out let.
5K-PCV-0005A,B,C&D back up air vessel should
DESAL FG Field Process
259 7J 1
STATION
MECH
Area
1 be painted and requires isolating valve in air supply
line.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

5K-TT&PT-0001&2AB transmitter back cover is too


DESAL FG Field Process
260 7J 2
STATION
INST
Area
1 close to the support bracket; access to work is
cramped. Needs more space to work safely.

DESAL FG Field Process


261 7J 3
STATION
INST
Area
1 All Pig receiver limit switches gap to be adjusted.

DESAL FG Field Process 5K-LCP-0001&3 field control panel requires sun


262 7J 4 INST 1
STATION Area and rain shelter.

DESAL FG Field Process


263 7J 5
STATION
MECH
Area
1 5k-SDV-0002 valve needs to be put in process line.

DESAL FG Field Process


264 7J 6
STATION
INST
Area
1 All instruments impulse line needs to be fixed.

DESAL FG Field Process


265 7J 7
STATION
MECH
Area
1 Pig launcher door handle to be fixed.

DESAL FG SFG MEETRING


266 7C 1
STATION
MECH
STATION
1 House keeping required along the line

DESAL FG SFG MEETRING Touch up painting to be done for all weld joints and
267 7C 2 MECH 1
STATION STATION damaged areas of the pipe & all supports .

DESAL FG SFG MEETRING Line identification to be done and flow direction to


268 7C 3 MECH 1
STATION STATION be marked with arrows & Tagging to be done.

DESAL FG SFG MEETRING


269 7C 4
STATION
MECH
STATION
1 Remaining air accumulators to be installed.

DESAL FG SFG MEETRING Cross over plateform to be provided where ever it


270 7C 5 MECH 1
STATION STATION is required.

DESAL FG SFG MEETRING Fire extinguisher to provided around the plant and
271 7C 6 INST 1
STATION STATION to be labled with inspection date.

DESAL FG SFG MEETRING All valves and their handles to be painted and
272 7C 7 MECH 1
STATION STATION remaining handles to be installed on the V/Vs.

DESAL FG SFG MEETRING Corroded,short bolts and washer for the foundation
273 7C 8 MECH 1
STATION STATION bolts to be replaced.

DESAL FG SFG MEETRING


274 7C 9
STATION
MECH
STATION
1 All ladder's plates to be modified for proper griping

DESAL FG SFG MEETRING Grouting to be done for 4"& 6"pigs receiver and gib
275 7C 10 CIVIL 1
STATION STATION cranes foundation.

DESAL FG SFG MEETRING


276 7C 11
STATION
CIVIL
STATION
1 Gravels to be put for remaining areas.

DESAL FG SFG MEETRING


277 7C 12
STATION
MECH
STATION
1 All 6" valves to be installed.

DESAL FG SFG MEETRING


278 7C 13
STATION
MECH
STATION
1 Tie -in to be completed.

DESAL FG AIR All ladder's plates to be modified for proper


279 7C 1 MECH 1
STATION COMPRESSOR griping& side rail to be provided on plate form .

DESAL FG AIR Condansate trap's drain to be connected to vessel


280 7C 2 MECH 1
STATION COMPRESSOR drain line.

DESAL FG AIR Gap to be filled with foam between out let pipe and
281 7C 3 MECH 1
STATION COMPRESSOR wall of building.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG AIR
282 7C 4
STATION
MECH
COMPRESSOR
1 Missing plug to provided for vent valve.

DESAL FG AIR SRV dishcharge to close to roof sheet to be


283 7C 5 MECH 1
STATION COMPRESSOR rectified since discharge pressure is high.

DESAL FG AIR Piping from compressor to vessel to be supported


284 7C 6 MECH 1
STATION COMPRESSOR and clamped.

DESAL FG
285 7C 1
STATION
ELEC DG SET 1 Tagging to be done

DESAL FG Hot air from radiator fan to atmoshphere the gap


286 7C 2 MECH DG SET 1
STATION between wall and radiator to be sealed properly

DESAL FG
287 7C 3
STATION
MECH DG SET 1 flapper to be provided at exhaust line

DESAL FG End caps for filling and drain line to diesal tank to
288 7C 4 MECH DG SET 1
STATION be tied with proper chain

DESAL FG Extra length anchor bolts to be removed and


289 7C 5 MECH DG SET 1
STATION double nut to be provided

DESAL FG
290 7C 1
STATION
MECH 4" KG PIPELINE 1 Housekeeping to be carried out.

DESAL FG
291 7C 2
STATION
MECH 4" KG PIPELINE 1 Tie-in to be completed

DESAL FG Touch up painting to be done for all weld joints and


292 7C 3 MECH 4" KG PIPELINE 1
STATION damaged areas of the pipe & anchor support .

DESAL FG Fence rings shall be provided at pipeline/fence


293 7C 4 MECH 4" KG PIPELINE 1
STATION interface and fencing repaired.

DESAL FG
294 7C 5
STATION
MECH 4" KG PIPELINE 1 Line identification to be done.

DESAL FG "CP" system to be provided a allt track crossing


295 7C 6 CIVIL 4" KG PIPELINE 1
STATION and back filling to be done.

DESAL FG
296 7C 7
STATION
CIVIL 4" KG PIPELINE 1 Cross barrier to be provided at all culverts.

DESAL FG 6" SFG PIPE


297 7C 1
STATION
MECH
LINE
1 Housekeeping to be carried out.

DESAL FG 6" SFG PIPE


298 7C 2
STATION
MECH
LINE
1 Tie-in to be completed

DESAL FG 6" SFG PIPE Touch up painting to be done for all weld joints and
299 7C 3 MECH 1
STATION LINE damaged areas of the pipe & anchor support .

DESAL FG 6" SFG PIPE Fence rings shall be provided at pipeline/fence


300 7C 4 MECH 1
STATION LINE interface and fencing repaired.

DESAL FG 6" SFG PIPE


301 7C 5
STATION
MECH
LINE
1 Line identification to be done.

DESAL FG 6" SFG PIPE "CP" system to be provided a allt track crossing
302 7C 6 CIVIL 1
STATION LINE and back filling to be done.

DESAL FG 6" SFG PIPE


303 7C 7
STATION
CIVIL
LINE
1 Cross barrier to be provided at all culverts.

DESAL FG 6" SFG PIPE


304 7C 8
STATION
CIVIL
LINE
1 All anchor supports to be grouted.

F&G / NEW
DESALINATION
FG STATION
DESAL FG
305 7K 1
STATION
INST AND VALVE 1 Fibre optic cable lebelling to be done.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG 5K-SC-0001: PVC protection cover for 24V DC
306 7K 2 INST AND VALVE 1
STATION broken. Shall be replace.
STATION
INSTRUMENTAT
ION
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

F&G / NEW
DESALINATION
FG STATION
DESAL FG Flow computer unit: Workstation table & chair shall
307 7K 3 INST AND VALVE 1
STATION be provided.
STATION
INSTRUMENTAT
ION

F&G / NEW
DESALINATION
FG STATION
DESAL FG Power supply unit: Tag number shall be provided
308 7K 4 INST AND VALVE 1
STATION for main power supply cable.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG 5K-I-JB-A-002: One cable tag missing. Shall be
309 7K 5 INST AND VALVE 1
STATION provided.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Administrator and operator password and IP
310 7K 6 INST AND VALVE 1
STATION addresses shall be notified to QP.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
311 7K 7
STATION
INST AND VALVE 1 5K-LCP=0001: JB tag number shall be provided.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
312 7K 8
STATION
INST AND VALVE 1 5K-LCP-0001: Plug to be provided in gland plate.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION 5K-FE/FET-0002A: Tag number correction to be
DESAL FG
313 7K 9
STATION
INST AND VALVE 1 done on canopy and power supply cable ferruling
STATION shall be done.
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Data sheets shall be provided for F&G and field
314 7K 10 INST AND VALVE 1
STATION mounted instruments.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Tag No. shall be provided for MAC in LV room and
315 7K 11 INST AND VALVE 1
STATION the device to be shown in graphics page.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
316 7K 12
STATION
INST AND VALVE 1 Open wires in the DG set to be covered.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
317 7K 13
STATION
INST AND VALVE 1 KSDS valve station: Pig signaller shall be installed.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION DPS/DESAL Valve station: 67-SC-0001: Cable No.
DESAL FG
318 7K 14
STATION
ELEC AND VALVE 1 67-ECP-0001 cable shall be replace because one
STATION wire insulation is stripped.
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG DPS/DESAL valve station: Pending tag number for
319 7K 15 INST AND VALVE 1
STATION the cables shall be provided.
STATION
INSTRUMENTAT
ION
DESAL FG Control Room &
320 7L 1
STATION
INST
Field
2 IA compressor logic to be checked / verified
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Control Room & Electrical hardware/modbus signals to be tested at


321 7L 2 INST 2
STATION Field LOC and verified at MOC WHTP- B & D
DESAL FG Control Room & All Loop shall be verified at LOC and verified at
322 7L 3 INST 2
STATION Field MOC WHTP- B & D and DIC
DESAL FG Control Room &
323 7L 4
STATION
INST
Field
2 Battery room exhaust fan logic to be tested
DESAL FG Control Room &
324 7L 5
STATION
INST
Field
2 PMS power supply shall be from UPS
DESAL FG Control Room &
325 7L 6
STATION
INST
Field
2 PMS table to be provided
DESAL FG Control Room &
326 7L 7
STATION
INST
Field
2 HVAC trip signal from F&G to be verified

DESAL FG Control Room &


327 7L 8
STATION
INST
Field
2 HSSD pipes to be rearranged and tagged

DESAL FG Control Room &


328 7L 9
STATION
INST
Field
2 HSSD to be powered from UPS

DESAL FG Control Room &


329 7L 10
STATION
INST
Field
2 HSSD sample points to be marked

DESAL FG Control Room &


330 7L 11
STATION
INST
Field
2 HSSD cables and unit to be tagged

DESAL FG Control Room &


331 7L 12
STATION
INST
Field
2 5K-AT-0001 to be commissioned

DESAL FG Control Room & System panels to be powered from permanent


332 7L 13 INST 2
STATION Field UPS power supply
DESAL FG Control Room &
333 7L 14
STATION
INST
Field
2 Red line mark up drawings to be submitted

DESAL FG Control Room &


334 7L 15
STATION
INST
Field
2 F&G tags to be RED back ground

DESAL FG Control Room &


335 7L 16
STATION
INST
Field
2 All tag's to fixed with SS screws

DESAL FG Control Room &


336 7L 17
STATION
CIVIL
Field
2 Drain pit falling on cable trench to be relocated

DESAL FG Control Room &


337 7L 18
STATION
INST
Field
2 All transmitter drain to be extended up to ground
DESAL FG Control Room &
338 7L 19
STATION
INST
Field
2 Pipe sleeve under JB's to be raised above ground
DESAL FG Control Room &
339 7L 20
STATION
INST
Field
2 All cables to be tagged with proper strip size
DESAL FG Control Room &
340 7L 21
STATION
INST
Field
2 Cable tray cover to be fixed properly

DESAL FG Control Room &


341 7L 22
STATION
INST
Field
2 Cable route marker to be installed

DESAL FG Control Room &


342 7L 23
STATION
INST
Field
2 GI plates used for tag plate fixing to be painted
DESAL FG Control Room &
343 7L 24
STATION
HVAC
Field
2 DP transmitter for HVAC to be calibrated

DESAL FG Control Room & GI bolts and clamps for transmitter and manifold's
344 7L 25 INST 2
STATION Field to be replaced with SS
TELECOM :
DESAL FG
345 7M 1
STATION
INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure.
CABLE
TELECOM :
DESAL FG
346 7M 2
STATION
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
DESAL FG
347 7M 3
STATION
INST FIBER OPTIC 1 FOPP Open/Close to be operate Properly.
CABLE
TELECOM :
DESAL FG
348 7M 4
STATION
INST FIBER OPTIC 1 Telecom Manhole to be labeled.
CABLE
TELECOM :
DESAL FG
349 7M 5
STATION
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
DESAL FG
350 7M 6
STATION
INST FIBER OPTIC 1 All Crossing Area Fo cable to be Tagged.
CABLE
TELECOM :
Fo Cable & FOPP to be tagged as per QP tagging
351 7M 1 DPS/DESAL INST FIBER OPTIC 1
CABLE procedure.

TELECOM :
352 7M 2 DPS/DESAL INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

TELECOM :
353 7M 3 DPS/DESAL INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
354 7M 4 DPS/DESAL INST FIBER OPTIC 1 All Crossing Area Fo cable to be Tagged.
CABLE
TELECOM :
355 7M 5 DPS/DESAL INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN Fo Cable & FOPP to be tagged as per QP tagging
356 7M 1 INST FIBER OPTIC 1
KSDGS procedure.
CABLE

TELECOM :
VAL STN
357 7M 2
KSDGS
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE

TELECOM :
VAL STN
358 7M 3
KSDGS
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
359 7M 4
KSDGS
INST FIBER OPTIC 1 All Crossing Area Fo cable to be Tagged.
CABLE
TELECOM :
DESAL FG Power supply Power supply Wiring Diagram to be Provided &
360 7M 1 INST 1
STATION (Battery charger) also paste to the inside of the Rack.
Rack & Cabling
TELECOM :
DESAL FG Power supply Incomming Power Supply Cable to be Tagged &
361 7M 2 INST 1
STATION (Battery charger) Labeled.
Rack & Cabling

TELECOM :
DESAL FG Power supply
362 7M 3
STATION
INST
(Battery charger)
1 All Circuit Breaker to be Labeled.
Rack & Cabling

TELECOM :
DESAL FG Power supply
363 7M 4
STATION
INST
(Battery charger)
1 Power Supply Alarm Monitoring to be done.
Rack & Cabling

TELECOM :
DESAL FG Power supply
364 7M 5
STATION
INST
(Battery charger)
1 Rack shall be cleaned and made free from dust.
Rack & Cabling
TELECOM :
DESAL FG Telecom
365 7M 1
STATION
INST
Transmission
1 Telecom RACK to be Tagged.
Rack & Cabling
TELECOM :
DESAL FG Telecom
366 7M 2
STATION
INST
Transmission
1 Incomming Power Cabling to be Tagged & Labeled.
Rack & Cabling
TELECOM :
DESAL FG Telecom
367 7M 3
STATION
INST
Transmission
1 Rack to be cleaned and made free from dust.
Rack & Cabling

TELECOM : Complete Network & Block drawing for the


DESAL FG Telecom Ruggedcom Switch system cabling as well as
368 7M 4 INST 1
STATION Transmission within rack cabling to be provided & pasted at the
Rack & Cabling inside of the door rack.

TELECOM : Complete Network & Block drawing for the


Telecom Ruggedcom Switch system cabling as well as
369 7M 1 DPS/DESAL INST 1
Transmission within rack cabling to be provided & pasted at the
Rack & Cabling inside of the door rack.

TELECOM :
Telecom
370 7M 2 DPS/DESAL INST
Transmission
1 Incomming Power Cabling to be Tagged & Labeled.
Rack & Cabling
TELECOM :
Telecom
371 7M 3 DPS/DESAL INST
Transmission
1 Ruggedcom Switch to be Tagged.
Rack & Cabling

TELECOM : Complete Network & Block drawing for the


VAL STN Telecom Ruggedcom Switch system cabling as well as
372 7M 1 INST 1
KSDGS Transmission within rack cabling to be provided & pasted at the
Rack & Cabling inside of the door rack.

TELECOM :
VAL STN Telecom
373 7M 2
KSDGS
INST
Transmission
1 Incomming Power Cabling to be Tagged & Labeled.
Rack & Cabling
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

TELECOM
PUNCHLIST :
VAL STN
374 7N 1
KSDGS
INST NOKIATransmissi 1 Telecom NOKIA RACK to be tagged
on Rack &
Cabling
TELECOM
PUNCHLIST :
VAL STN
375 7N 2
KSDGS
INST NOKIATransmissi 1 Incoming power cabling to be labeled
on Rack &
Cabling
TELECOM
PUNCHLIST :
VAL STN
376 7N 3
KSDGS
INST NOKIATransmissi 1 Rack to be cleaned and made free from dust
on Rack &
Cabling
TELECOM
PUNCHLIST :
VAL STN AC Installed for telecom system is to be
377 7N 4 INST NOKIATransmissi 1
KSDGS commissioned
on Rack &
Cabling
Feeder to 11kV A copy of FAT and SAT reports to be submitted and
DESAL FG 5K-SB-0001-01
378 7H 1.01
STATION
ELEC
Desal FG
1 demonstrate all comments have been closed prior
Substation to energization.

Feeder to 11kV To provide label for control MCBs of which clearly


DESAL FG 5K-SB-0001-01 indicate their function. Label shall be installed on
379 7H 1.02 ELEC 1
STATION Desal FG the fixed part of the assembly and not on the
Substation component itself.

Feeder to 11kV To replace the selector switches for Trip/Off/Close


DESAL FG 5K-SB-0001-01 (S55) and Local/Remote (S60) with the heavy duty
380 7H 1.03 ELEC 1
STATION Desal FG type selector switch (please refer to existing
Substation installation).

Feeder to 11kV
DESAL FG 5K-SB-0001-01 To perform the switchgear functional test including
381 7H 1.04 ELEC 1
STATION Desal FG the rack-in/rack-out operation.
Substation
Feeder to 11kV
DESAL FG 5K-SB-0001-01 To perform the functional and operation test of the
382 7H 1.05 ELEC 1
STATION Desal FG busbar and circuit earthing facilities.
Substation

Feeder to 11kV To provide switching and earthing operation


DESAL FG 5K-SB-0001-01 procedures. Procedures to be engraved in a
383 7H 1.06 ELEC 1
STATION Desal FG white/black/white traffolyte and fixed on the
Substation switchgear where it can be easily visible.
Feeder to 11kV To include the busbar earth interlock key of the
DESAL FG 5K-SB-0001-01
384 7H 1.07
STATION
ELEC
Desal FG
1 extension panel to existing interlock key station
Substation box.
Feeder to 11kV
DESAL FG 5K-SB-0001-01 To provide upstream and downstream interlock
385 7H 1.08 ELEC 1
STATION Desal FG keys station box .
Substation
Neutral cable connection to be made properly. At
DESAL FG
386 7G 1
STATION
ELEC LV S/Board 1 present, it is stressed in the Neutral contactor and
frame.
DESAL FG Inter trips and Generator interface cable to be
387 7G 2 ELEC LV S/Board 1
STATION tested prior to trip test.
Bus bar chamber enclosure shall be closed
DESAL FG
388 7G 3
STATION
ELEC LV S/Board 1 properly and the bus bar supports removed for
torquing to be fixed properly.
DESAL FG Interpanel wiring and damaged ammeter
389 7G 4 ELEC LV S/Board 1
STATION replacement to be completed.
DESAL FG Type type certificate for similar configuration switch
390 7G 5 ELEC LV S/Board 1
STATION board to be provided.
LV and control cable dressing to be done
DESAL FG
391 7G 6
STATION
ELEC LV S/Board 1 properly.Also, cleaning of the trench to be
completed.

CT installation was carried out with metallic


fastners fixed at CT and at Bus bar. As CT's were
DESAL FG
392 7G 7
STATION
ELEC LV S/Board 1 installed one above the other phase CT's, it is
stressed.BCEC/Vendor to confirm the safety during
open circuit of CT.

As per specification, the earthing configuration


DESAL FG
393 7G 8
STATION
ELEC LV S/Board 1 shall be TN-S, PEN labelling in earth bus is
confusing.
Out door cable tie rope shall be made up of PVC
DESAL FG
394 7G 9
STATION
ELEC LV S/Board 1 coated SS and manufacturer details shall be as per
PVL.

DESAL FG Missing CT related to 51G and wiring modification


395 7G 10 ELEC LV S/Board 1
STATION related to interface with sepam to be completed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Ougoing feeder cable termination/ cable testing to


396 7G 11 ELEC LV S/Board 1
STATION be completed.
DESAL FG Some cables are not terminated due to lack of
397 7G 12 ELEC LV S/Board 1
STATION power terminals.
Balance testing activities related to LV S/Board
DESAL FG
398 7G 13
STATION
ELEC LV S/Board 1 and synchronization test with Generator to be
completed.
LV Transformer /Generator Incomer cable to be
DESAL FG
399 7G 14
STATION
ELEC LV S/Board 1 terminated neatly and dressed properly with
suitable clamps.
DESAL FG Modbus wiring and DCS verification of Alarms to
400 7G 15 ELEC LV S/Board 1
STATION be completed.
DESAL FG
401 7G 16
STATION
ELEC LV S/Board 1 F&G trip verification to be completed.
DESAL FG IR Test , phasing verification and Torquing for
402 7G 17 ELEC LV S/Board 1
STATION incomer cables at LV S/Board to be completed.
DESAL FG Earthing connection shall be made at cable box
403 7G 18 ELEC LV S/Board 1
STATION beneath the LV Incomer .
Prior to AC Hipot , cleaning of breaker
DESAL FG
404 7G 19
STATION
ELEC LV S/Board 1 compartment and bus bar compartment to be
done.
DESAL FG F&G trip verification to be completed ans HSSD to
405 7G 20 ELEC LV S/Board 1
STATION be ready for commissioning
11KV S/Board &
DESAL FG HV panel Bus bar compartment and breaker
406 7G 1 ELEC 11KV cable 1
STATION compartment to be cleaned neatly.
trench
11KV S/Board & Balance interface cable termination with LV
DESAL FG
407 7G 2
STATION
ELEC 11KV cable 1 S/Board and 11KV metering panel to be
trench completed.
11KV S/Board & Gap in the gland plate to be sealed properly. Cable
DESAL FG
408 7G 3
STATION
ELEC 11KV cable 1 trays/ladder beneath the HV panel shall be
trench fabricated neatly.
11KV S/Board &
DESAL FG
409 7G 4
STATION
ELEC 11KV cable 1 Heater to be installed properly with proper clamps.
trench
11KV S/Board &
DESAL FG
410 7G 5
STATION
ELEC 11KV cable 1 Mechanical interlock verification to be completed.
trench
11KV S/Board & After testing of HV cable, torquing at S/S-15 ,
DESAL FG
411 7G 6
STATION
ELEC 11KV cable 1 Desal S/S and for transformer side to be
trench completed.
11KV S/Board &
DESAL FG Relay testing through seconndary /primary injection
412 7G 7 ELEC 11KV cable 2
STATION to be comepleted.
trench
11KV S/Board &
DESAL FG Intertrips and F&G trip verification to be
413 7G 8 ELEC 11KV cable 2
STATION completed.
trench
11KV S/Board &
DESAL FG HV cable trench compaction to be completed
414 7G 9 CIVIL 11KV cable 1
STATION between S/S-15 to Desal .
trench
11KV S/Board &
DESAL FG
415 7G 10
STATION
ELEC 11KV cable 1 Routemarker installation to be completed
trench
11KV S/Board &
DESAL FG Depth of top layer HV cable trench shall be
416 7G 11 CIVIL 11KV cable 1
STATION maintained as per AFC drawing
trench
11KV S/Board &
DESAL FG Integrity of earth measurment for HV panel to be
417 7G 12 ELEC 11KV cable 2
STATION completed
trench
DESAL FG
418 7G 1
STATION
ELEC Transformer 2 Transformer Box up and Torquing to be completed.
DESAL FG LV outgoing termination shall be done properly with
419 7G 2 ELEC Transformer 1
STATION neat dressing arrangements.
DESAL FG Tightness of earthing connections and integrity of
420 7G 3 ELEC Transformer 1
STATION earthing connections to be confirmed.
DESAL FG Neutral earth pit resistance measurement to be
421 7G 4 ELEC Transformer 1
STATION completed and shall be linked with other pits.
DESAL FG
422 7G 5
STATION
ELEC Transformer 1 HV cable support earthing to be completed.
Transformer protection trips cable test report to be
DESAL FG
423 7G 6
STATION
ELEC Transformer 1 completed prior to verification of transformer
protection trips and report to be submitted.
Earth Bar installation at transformer bay to be done
DESAL FG
424 7G 7
STATION
ELEC Transformer 1 properly. At present, the cable is stressed and the
length of copper bar shall be supported.
DESAL FG
425 7G 8
STATION
ELEC Transformer 1 Transformer Gate earthing to be completed.

All spare cores in transformer Transformer


DESAL FG
426 7G 9
STATION
ELEC Transformer 1 marshalling cabinet to be terminated in spare
terminals with ferrules.
DESAL FG Cable tray covers to be installed properly and PVC
427 7G 10 ELEC Transformer 1
STATION coated SS cable ties to be installed
DESAL FG
428 7G 11
STATION
ELEC Transformer 1 HV/LV cable tag installation to be completed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG DC System Test reports for Battery charger / discharge test for
429 7G 1 ELEC 2
STATION (24V/110V)DC. batteries and cable test report to be submitted.

DESAL FG DC System HVAC Duct to be re-routed as space for


430 7G 2 HVAC 1
STATION (24V/110V)DC. maintenance access is very small.

DESAL FG DC System For out going feeders , earth leakage alarm to be


431 7G 3 ELEC 2
STATION (24V/110V)DC. provided.

DESAL FG DC System Wiring for boost charge inhibition, incase of failure


432 7G 4 ELEC 2
STATION (24V/110V)DC. of Ventilation fans to be completed.
DESAL FG DC System Cable trench benath the charger to be cleaned and
433 7G 5 ELEC 1
STATION (24V/110V)DC. cable to be dressed neatly.
DESAL FG DC System Integrity of earthing for Battery /Charger to be
434 7G 6 ELEC 2
STATION (24V/110V)DC. completed.
DESAL FG DC System VERIFICATION OF F&G tripping as per approved
435 7G 7 ELEC 2
STATION (24V/110V)DC. caution and Effect chart to be verified.
DESAL FG DC System
436 7G 8
STATION
ELEC
(24V/110V)DC.
1 Tag nos for Battery banks to be provided
DESAL FG DC System Arrangement of Battery banks details to be
437 7G 9 ELEC 1
STATION (24V/110V)DC. provided.
DESAL FG DC System
438 7G 10
STATION
ELEC
(24V/110V)DC.
2 Installation of eye wash to be completed.

DESAL FG DC System
439 7G 11
STATION
HVAC
(24V/110V)DC.
1 Testing of Exhaust fan to be completed.

Cable Trench
DESAL FG indoor and Route markers to be installed at outdoor cable
440 7G 1 ELEC 1
STATION outdoor & cable trench.
tray
Cable Trench
DESAL FG indoor and Control cable dressing beneath the LV S/Gear to
441 7G 2 ELEC 1
STATION outdoor & cable be completed.
tray
Cable Trench
DESAL FG indoor and
442 7G 3
STATION
ELEC
outdoor & cable
1 Cable entry to S/S building to be sealed
tray
Cable Trench
DESAL FG indoor and Cleaning of concrte cable trench at LV /Control
443 7G 4 ELEC 1
STATION outdoor & cable /Diesel generator Room to be completed.
tray
Cable Trench Cutting edges of cable tray suppport to be painted
DESAL FG indoor and
444 7G 5
STATION
ELEC
outdoor & cable
1 and cable tray cover to be provided for outdoor
tray trays.
Cable Trench
DESAL FG indoor and cable tray earthing to be connected to earthing grid
445 7G 6 ELEC 1
STATION outdoor & cable at minimum two location for each run
tray
Integrity of earthing system verification to be
DESAL FG
446 7G 1
STATION
ELEC Earthing System 1 completed including all field earthing and lightning
system.
DESAL FG Marshalling bar for earthing to be supported with
447 7G 2 ELEC Earthing System 1
STATION additional insulator due to its additional length.

DC clamps installed for lightning system are found


DESAL FG
448 7G 3
STATION
ELEC Earthing System 1 to be of different material at different locations, it
shall be standardized.

DESAL FG Lightning arrestor fastneners provided are already


449 7G 4 ELEC Earthing System 1
STATION rusted and to be replaced with suitable material.

As built drawing for lighting system to be


DESAL FG
450 7G 5
STATION
ELEC Earthing System 1 completed based on integrity verification of
earthing system.
DESAL FG Fence earthing and field earthing connections to
451 7G 6 ELEC Earthing System 1
STATION be completed.
DESAL FG Earth pit to be cleaned and individual earth pit
452 7G 7 ELEC Earthing System 2
STATION resistance to be measured
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG All exposed copper bar shall be protected with


453 7G 8 ELEC Earthing System 1
STATION denso tape.
DESAL FG
454 7G 9
STATION
ELEC Earthing System 1 Earth pit tag no to be provided.
DESAL FG Cable tray earthing to be connected to main earth
455 7G 10 ELEC Earthing System 1
STATION at two locations in all rooms
DESAL FG
456 7G 11
STATION
ELEC Earthing System 1 Structural earthing to be completed
DESAL FG
457 7G 1
STATION
ELEC DG Room 1 Earthing of DG to be done correctly.
DESAL FG DG room concrete cable trench to be cleaned and
458 7G 2 ELEC DG Room 1
STATION cable entry to be sealed.
DESAL FG
459 7G 3
STATION
ELEC DG Room 2 Testing of DG to be completed as per J17966-9297

DESAL FG Lighting cables to be dressed neatly in cable


460 7G 4 ELEC DG Room 1
STATION ladders
DESAL FG Earthing for exhaust fans and JB to be done
461 7G 5 ELEC DG Room 1
STATION properly and loop earthing is not permitted
DESAL FG
462 7G 6
STATION
HVAC DG Room 1 Testing of exhaust fan to be completed
DESAL FG Functional verification of HVAC panel to be
463 7G 7 HVAC DG Room 1
STATION complet ed
DESAL FG Compressor Testing of incomer cable and tightness verification
464 7G 1 ELEC 1
STATION Room to be completed.
DESAL FG Compressor Integrity of earthing system verification to be
465 7G 2 ELEC 1
STATION Room completed
DESAL FG Compressor
466 7G 3
STATION
ELEC
Room
1 cable entry to compressor room to be sealed
DESAL FG Compressor Gland plate earthing to be completed and
467 7G 4 ELEC 1
STATION Room continuity to be maintained.
DESAL FG Compressor
468 7G 5
STATION
ELEC
Room
2 compressor motor/unit testing to be completed
DESAL FG Compressor
469 7G 6
STATION
ELEC
Room
2 list of alarams configured in DCS to be verified
DESAL FG Compressor Integrity of earthing for compressor system to be
470 7G 7 ELEC 1
STATION Room completed
DESAL FG Out door lighting DB shall be equipped with timer
471 7G 1 ELEC Lighting System 1
STATION and photocell function.
DESAL FG Testing of lighting DB and metering to be
472 7G 2 ELEC Lighting System 1
STATION completed.
Testing of lighting circuits including grounding
DESAL FG
473 7G 3
STATION
ELEC Lighting System 2 continuity and ELCB tripping verification to be
completed.
DESAL FG Balance outdoor lighting installation including
474 7G 4 ELEC Lighting System 1
STATION photocell to be completed.
DESAL FG
475 7G 5
STATION
ELEC Lighting System 1 Exit light at DG building as per AFC drawing
DESAL FG
476 7G 6
STATION
ELEC Lighting System 1 Lighting installation at Control room to be completed

DESAL FG Functional verification of Lighting DB to be


477 7G 7 ELEC Lighting System 2
STATION completed

DESAL FG Lux measurement to be completed in all rooms and


478 7G 8 ELEC Lighting System 1
STATION in outdoor process area

DESAL FG Some cable terminations are found loose and


479 7G 1 HVAC HVAC 1
STATION termination shall be done properly.
DESAL FG
480 7G 2
STATION
HVAC HVAC 1 Only JB used shall have QP approval
DESAL FG
481 7G 3
STATION
HVAC HVAC 1 Cable tie rope shall be PVC coated SS
DESAL FG
482 7G 4
STATION
HVAC HVAC 1 Gland earthing to be done properly
DESAL FG
483 7G 5
STATION
HVAC HVAC 1 Termination to be done with cross reference ferrule.

DESAL FG IR testing and continuity verification to be


484 7G 6 HVAC HVAC 1
STATION completed.
DESAL FG
485 7G 7
STATION
HVAC HVAC 1 Damages in enclosure covers to be rectified
DESAL FG
486 7G 8
STATION
HVAC HVAC 1 Routing of cables to JB to be done properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Incomer cable termination to be done properly with


DESAL FG
487 7G 9
STATION
HVAC HVAC 1 proper bending radius and balance termination
works to be completed.
DESAL FG Conrtol cables at HVAC unit to be done with
488 7G 10 HVAC HVAC 1
STATION suitable gland size and to be done neatly.
DESAL FG Holes made for additional cable entries to be
489 7G 11 HVAC HVAC 1
STATION sealed with dummy
DESAL FG Compressor unit cable termination to be completed
490 7G 12 HVAC HVAC 1
STATION by vendor
DESAL FG Heat extracting fan covers to be painted as the
491 7G 13 HVAC HVAC 1
STATION present one is rusted.
DESAL FG Tripping verification related F&G caution chart to
492 7G 14 HVAC HVAC 2
STATION be completed.
DESAL FG Earthing at roof top for equipments and cable tray
493 7G 15 HVAC HVAC 1
STATION to be done properly
DESAL FG
494 7G 16
STATION
HVAC HVAC 1 Spare cores to be terminated in spare terminals

DESAL FG DPS/KS VALVE Earthing Installation to be done properly as per QP


495 7G 1 ELEC 1
STATION STATION specification

DESAL FG DPS/KS VALVE Termination in battery to be done neatly with cable


496 7G 2 ELEC 1
STATION STATION Identificattion and with suitable lugs

The cable inside battery container to be dressed


DESAL FG DPS/KS VALVE
497 7G 3
STATION
ELEC
STATION
1 neatly and it shall be protected with suitable
material

DESAL FG DPS/KS VALVE it is found during testing of solar panel batteries,it


498 7G 4 ELEC 1
STATION STATION is failed.to be replaced with suitable battery

DESAL FG DPS/KS VALVE


499 7G 5
STATION
CIVIL
STATION
1 Earth pit cover to be installed

DESAL FG DPS/KS VALVE


500 7G 6
STATION
ELEC
STATION
1 Earth pit Tag installation works to be completed

DESAL FG DPS/KS VALVE cable identification tag installationworks to be


501 7G 7 ELEC 1
STATION STATION completed

DESAL FG DPS/KS VALVE cable termination shall be done with cross


502 7G 8 ELEC 1
STATION STATION reference ferrules
DESAL FG DPS/KS VALVE suitable enclosure for solar control panel to be
503 7G 9 ELEC 1
STATION STATION provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

A copy of all FAT and SAT report to be submitted


DESAL FG 11kV switchgear prior to energization including appropriate
504 7HA 1.01 ELEC 1
STATION (5K-SB-0001-01) documents such as built drawings marked-up SLD
and schematic diagram .
To complete the functional testing including CB /
DESAL FG 11kV switchgear
505 7HA 1.02
STATION
ELEC
(5K-SB-0001-01)
1 VT rack in rack out and earthing operation prior to
energization.

DESAL FG 11kV switchgear


506 7HA 1.03
STATION
ELEC
(5K-SB-0001-01)
1 To complete 11kV cable termination and Hi-pot test.

To complete the final box-up ande ensure cable


DESAL FG 11kV switchgear
507 7HA 1.04
STATION
ELEC
(5K-SB-0001-01)
1 connections are tighten as per manufacturers
recommended torque.
To check the alignment of transformer feeder H1
DESAL FG 11kV switchgear
508 7HA 1.05
STATION
ELEC
(5K-SB-0001-01)
1 LV and CB compartment door. Circuit breaker
compartment door is difficult to open.

To replace the selector switches for Trip/Off/Close


DESAL FG 11kV switchgear
509 7HA 1.06
STATION
ELEC
(5K-SB-0001-01)
1 (S55) and Local/Remote (S60) with the heavy duty
type selector switch .

Each power, earthing and control cables shall be


DESAL FG 11kV switchgear
510 7HA 1.07
STATION
ELEC
(5K-SB-0001-01)
1 identified with cable tag and traceable in updated
red line mark-up/as-built cable schedule.

The spare cores of control cable shall be clearly


identified with ferrules, terminated on the spare
DESAL FG 11kV switchgear
511 7HA 1.08
STATION
ELEC
(5K-SB-0001-01)
1 terminal blocks and traceable in the cable
termination schedule. Control cable dressing is
required.

DESAL FG 11kV switchgear Cables shall be appropriately clamped on the cable


512 7HA 1.09 ELEC 1
STATION (5K-SB-0001-01) support using an approved type of cable clamp.

To complete the connection of control cables. As a


DESAL FG 11kV switchgear standard all spare cores shall be terminated on the
513 7HA 1.10 ELEC 1
STATION (5K-SB-0001-01) spare terminal blocks and traceable in the cable
termination schedule.

DESAL FG 11kV switchgear To provide a large label (Equipment tag number)


514 7HA 1.11 ELEC 1
STATION (5K-SB-0001-01) installed on top center of the 11kV panel

Provide earthing switch interlock procedure


DESAL FG 11kV switchgear installed on each dedicated panel. Procedure shall
515 7HA 1.12 ELEC 1
STATION (5K-SB-0001-01) be engraved on a white/black/white traffolyte or
cover with clear perspex.

The cable trench cover for the future extension


DESAL FG 11kV switchgear
516 7HA 1.13
STATION
ELEC
(5K-SB-0001-01)
1 panel shall avoid/prevent the tripping hazard to the
personnel.

To rectify the cofiguration of Trip/Off/Close (S55) .


DESAL FG 11kV switchgear Close shall be clockwise and trip anti clockwise.
517 7HA 1.14 ELEC 1
STATION (5K-SB-0001-01) Label shall be updated and replaced with traffolyte
(sticker is not acceptable).
The label for fire and gas alarm installed in 5K-TR-
DESAL FG 11kV switchgear 0001-01 transformer feeder panel H1 and spare
518 7HA 1.15 ELEC 1
STATION (5K-SB-0001-01) transformer feeder panel H3 shall be replaced with
Tx oil/winding alarms.
A copy of all FAT and SAT report related to each
DESAL FG 5K-TR-0001-01 transformer including protections and tap changer
519 7HA 2.01 ELEC 1
STATION Transformer bay operations are to be submitted prior to
energization.

To provide earth bonding for all non-current


carrying metal parts within the transformer room
DESAL FG 5K-TR-0001-01
520 7HA 2.02
STATION
ELEC
Transformer bay
1 (i.e. cable supports, chequered plate
supports,cable trays, and transformer room gates).
All bonding cable shall be minimum of 25mm2.

The spare cores of control cable shall be clearly


DESAL FG 5K-TR-0001-01 identified with ferrules, terminated on the spare
521 7HA 2.03 ELEC 1
STATION Transformer bay terminal blocks and traceable in the cable
termination schedule.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

To provide copy of laminated wiring and


DESAL FG 5K-TR-0001-01
522 7HA 2.04
STATION
ELEC
Transformer bay
1 termination drawing in the transformer marshaling
box.

To do final boxing up ensure all termination are


tighten and manufacturer reccomended torque has
DESAL FG 5K-TR-0001-01
523 7HA 2.05
STATION
ELEC
Transformer bay
1 been applied, boxes are clean and free from any
tools , no missing bolts around the box cover and
all bolts and washers are made of stainless steel.

DESAL FG 5K-TR-0001-01 All used and spares ducts shall be sealed with an
524 7HA 2.06 ELEC 1
STATION Transformer bay approved sealant.

DESAL FG 5K-TR-0001-01
525 7HA 2.07
STATION
ELEC
Transformer bay
1 To provide denso tape on the earth bar connection.

Any rusty cable supports and cut edges of the


DESAL FG 5K-TR-0001-01
526 7HA 2.08
STATION
ELEC
Transformer bay
1 cable trays shall be cold galvanizing using
galvafoid paint.

DESAL FG 5K-TR-0001-01 All outdoor cable tags shall be tied with stainless
527 7HA 2.09 ELEC 1
STATION Transformer bay steel PVC coated cable ties.

DESAL FG 5K-TR-0001-01 To provide protective sleeve on the sharp edges of


528 7HA 2.10 ELEC 1
STATION Transformer bay the cable tray and tray shall be covered.

To provide transformer tag with rating and warning


DESAL FG 5K-TR-0001-01
529 7HA 2.11
STATION
ELEC
Transformer bay
1 plate installed on the transformer bay gates. Label
shall be of standard font size .

DESAL FG 5K-TR-0001-01 Transformer bay gap shall be closed to avoid birds


530 7HA 2.12 MECH 1
STATION Transformer bay entry.

DESAL FG 5K-TR-0001-01 To touch-up on all damaged paint of the


531 7HA 2.13 ELEC 1
STATION Transformer bay transformer.

DESAL FG 5K-TR-0001-01 To ensure the cable trench is clean and free from
532 7HA 2.14 ELEC 1
STATION Transformer bay any construction debris.

To ensure the operation of the tap changer knob is


DESAL FG 5K-TR-0001-01
533 7HA 2.15
STATION
ELEC
Transformer bay
1 free and smooth, set it to the required setting and
provide padlock prior to energisation.
A copy of all FAT and SAT report to be submitted
11 kV Metering
DESAL FG prior to energization including appropriate
534 7HA 3.01 ELEC Panel (5K-MP- 1
STATION documents such as drawings schematic diagram
0001-01)
etc.
11 kV Metering
DESAL FG To provide the engraved panel tag number on
535 7HA 3.02 ELEC Panel (5K-MP- 1
STATION traffolyte.
0001-01)
11 kV Metering
DESAL FG To provide drawing pouch inside the panel with as
536 7HA 3.03 ELEC Panel (5K-MP- 1
STATION built schematic drawing.
0001-01)
11 kV Metering To complete the functional operation of phase
DESAL FG
537 7HA 3.04
STATION
ELEC Panel (5K-MP- 1 sequence alarms and verification of spare auxiliary
0001-01) contacts.

QPAA 11 kV
SWGR Extension A copy of all FAT and SAT report to be submitted
DESAL FG panel H9 Feeder prior to energization including appropriate
538 7HA 4.01 ELEC 1
STATION to Desal FG 11kV documents such as built drawings marked-up SLD
switchgear (5K- and schematic diagram .
SB-0001-01)

QPAA 11 kV
SWGR Extension To complete the functional test of CB / VT rack in
DESAL FG panel H9 Feeder
539 7HA 4.02
STATION
ELEC
to Desal FG 11kV
1 rack out and downstream-upstream earthing
switchgear (5K- interlock.
SB-0001-01)

QPAA 11 kV
SWGR Extension
DESAL FG panel H9 Feeder
540 7HA 4.03
STATION
ELEC
to Desal FG 11kV
1 To ensure that the glanding plate is properly tighten.
switchgear (5K-
SB-0001-01)
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

QPAA 11 kV
SWGR Extension
DESAL FG panel H9 Feeder To replace TCS healty indication lamp with white
541 7HA 4.04 ELEC 1
STATION to Desal FG 11kV indication lamp.
switchgear (5K-
SB-0001-01)

QPAA 11 kV
SWGR Extension To provide earthing switch interlock with
DESAL FG panel H9 Feeder
542 7HA 4.05
STATION
ELEC
to Desal FG 11kV
1 downstream operation procedure is engraved in
switchgear (5K- traffolyte.
SB-0001-01)

QPAA 11 kV
SWGR Extension To rectify the cofiguration of Trip/Off/Close (S55) .
DESAL FG panel H9 Feeder Close shall be clockwise and trip anti clockwise.
543 7HA 4.06 ELEC 1
STATION to Desal FG 11kV Label shall be updated and replaced with traffolyte
switchgear (5K- (sticker is not acceptable).
SB-0001-01)

QPAA 11 kV
SWGR Extension
DESAL FG panel H9 Feeder
544 7HA 4.07
STATION
MECH
to Desal FG 11kV
1 To install and properly align the cable trench cover.
switchgear (5K-
SB-0001-01)

DESAL FG Protection To complete the functional test of incomer feeder


545 7HA 5.01 ELEC 1
STATION Related panel H1.

To check and verify intertripping and interlocking


DESAL FG Protection
546 7HA 5.02
STATION
ELEC
Related
1 between Panel H1 of 5K-SB-0001-01 and panel H9
of 88-SWG-0015-01.

To complete the operation and funtional test of


DESAL FG Protection
547 7HA 5.03
STATION
ELEC
Related
1 cable earthing switch interlock between QPAA
panel H9 feeder and Desal FG incomer panel H2.

To verify the operation of Bus earthing switch key


DESAL FG Protection
548 7HA 5.04
STATION
ELEC
Related
1 interlock for panel H9 of 88-SWG-0015-01 at
QPAA.

To complete the intertripping and interlocking test


DESAL FG Protection
549 7HA 5.05
STATION
ELEC
Related
1 between Desal FG 11kV incomer panel H2 and
415V incomer.

DESAL FG Protection
550 7HA 5.06
STATION
ELEC
Related
1 To complete the stability test of 415V REF scheme.

DESAL FG Protection To complete transformer protection functional and


551 7HA 5.07 ELEC 1
STATION Related trip test.

DESAL FG Protection To implement and verify the final approved relay


552 7HA 5.08 ELEC 1
STATION Related configuration and setting.

DESAL FG Protection To ensure two NC spare contact are available for


553 7HA 5.09 ELEC 1
STATION Related Lockout relay (86).

DESAL FG Protection To comp[lete the wiring of AC/DC failure alarm


554 7HA 5.10 ELEC 1
STATION Related through relay.

DESAL FG Protection To complete the wiring of communication module


555 7HA 5.11 ELEC 1
STATION Related API ACE949-2.

To provide CT's function description label (i.e. O/C


& E/Fprotection, Differential protection and
DESAL FG Protection
556 7HA 5.12
STATION
ELEC
Related
1 Metering) next to each test block. Label shall be
engraved in a white/black/white traffolyte and fix
with screws.

DESAL FG Protection To provide label to all MCB's and clearly indicate


557 7HA 5.13 ELEC 1
STATION Related respective function.

To provide the alternative or solution as the cable


DESAL FG trench cover is made of concrete cast which are
558 7HA 6.01 MECH Others 1
STATION too heavy and the require lifting equipment during
maintenance.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Transformer steel gates are too heavy and


DESAL FG
559 7HA 6.02
STATION
MECH Others 1 provided with dust filter. BCEC to provide
approved drawing and materials approval.
To rectify the transformer oil catchment pits as they
DESAL FG
560 7HA 6.03
STATION
CIVIL Others 1 are connected directly to cable trench instead oil
sump pit.
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Grouting to be completed for the support
561 7E 1 CIVIL 1
STATION (KS) SFG/KG TO foundations
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Surface preparation and above ground painting for
562 7E 2 CIVIL 1
STATION (KS) SFG/KG TO the support foundatins to be completed
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Pipe sleepers are resting in the ditches to be
563 7E 3 CIVIL 1
STATION (KS) SFG/KG TO rectified.
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Between the sleeper pad area backfilled and
564 7E 4 CIVIL 1
STATION (KS) SFG/KG TO compact it properly.
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Backfilling & installation of protection slab to be
565 7E 5 CIVIL 1
STATION (KS) SFG/KG TO completed for pipe crossing at all track crossing.
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Loose soil to be removed from suroundings of the
566 7E 6 CIVIL 1
STATION (KS) SFG/KG TO support foundations and compact it properly.
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Identification slab to be provided at the existing
567 7E 7 CIVIL 1
STATION (KS) SFG/KG TO pipe crossing
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Rectification of the damaged sleepers & painting to
568 7E 8 CIVIL 1
STATION (KS) SFG/KG TO be completed for the installed pipe sleepers.
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION
569 7E 9
STATION
CIVIL
(KS) SFG/KG TO
1 Installation of Sign boards
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION
570 7E 10
STATION
CIVIL
(KS) SFG/KG TO
1 Backfilling of Ramp for the Culvert to be completed
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION Surface preparatin and painting for the culvert
571 7E 11 CIVIL 1
STATION (KS) SFG/KG TO inside & side protection to be completed
DESAL FG
STATION
6" & 4" PIPE
LINE FROM
DESAL FG VALVE STATION
572 7E 12
STATION
CIVIL
(KS) SFG/KG TO
1 Crash barrior to be provided for the culvert areas
DESAL FG
STATION
DESAL FG COLD VENT Grouting for the support foundations to be
573 7E 1 CIVIL 1
STATION STACK AREA completed
DESAL FG COLD VENT Leveling & proper compaction for inside fence area
574 7E 2 CIVIL 1
STATION STACK AREA & Gravel laying.
DESAL FG COLD VENT
575 7E 3
STATION
CIVIL
STACK AREA
1 Main gate and emergency gate to be installed
DESAL FG COLD VENT Surface preparation and painting for the support
576 7E 4 CIVIL 1
STATION STACK AREA foundations
DESAL FG COLD VENT
577 7E 5
STATION
CIVIL
STACK AREA
1 Touch up paint for the gate post & fence post
DESAL FG COLD VENT Proper cleaning for the chain link fence and
578 7E 6 CIVIL 1
STATION STACK AREA housekeeping
DESAL FG COMPRESSOR Gap between wall and frame of sand trap inlet
579 7E 1 CIVIL 1
STATION SHELTER louver to be closed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG COMPRESSOR Final coat painting for the wall inside & outside to
580 7E 2 CIVIL 1
STATION SHELTER be completed.
DESAL FG COMPRESSOR
581 7E 3
STATION
CIVIL
SHELTER
1 Painting for the floor & Compressor foundation.
DESAL FG COMPRESSOR
582 7E 4
STATION
CIVIL
SHELTER
1 Door touch up painting to be done.
DESAL FG COMPRESSOR
583 7E 5
STATION
CIVIL
SHELTER
1 Cleaning and finishing for the provided joint sealant.
DESAL FG COMPRESSOR Painting for the drain pit backside of Compressor
584 7E 6 CIVIL 1
STATION SHELTER shelter to be completed.
DG BUILDING &
DESAL FG DIESEL Surface preparation and Painting for the floor in &
585 7E 1 CIVIL 1
STATION STORAGE TANK outside and DG foundation to be completed.
AREA
DG BUILDING &
DESAL FG DIESEL All the holes in wall to be closed with appropriate
586 7E 2 CIVIL 1
STATION STORAGE TANK material and touch up paint for the wall & door.
AREA
DG BUILDING &
DESAL FG DIESEL Gap between wall and frame of sand trap inlet
587 7E 3 CIVIL 1
STATION STORAGE TANK louver to be closed.
AREA
DG BUILDING &
DESAL FG DIESEL Joint sealant to be provided on the floor & cleaning
588 7E 4 CIVIL 1
STATION STORAGE TANK for the provided sealant at DG room.
AREA
DG BUILDING &
DESAL FG DIESEL Gap between roof slab and rain water down pipe to
589 7E 5 CIVIL 1
STATION STORAGE TANK be closed with appropriate material
AREA
DG BUILDING &
DESAL FG DIESEL
590 7E 6
STATION
CIVIL
STORAGE TANK
1 Painting for the rain water down pipe.
AREA
DG BUILDING &
DESAL FG DIESEL Painting for the floor, dike wall and support
591 7E 7 CIVIL 1
STATION STORAGE TANK foundation at Diesel stotage tank area.
AREA
DG BUILDING &
DESAL FG DIESEL Joint sealant to be provided on the floor of Diesel
592 7E 8 CIVIL 1
STATION STORAGE TANK storage tank area.
AREA
DG BUILDING &
DESAL FG DIESEL
593 7E 9
STATION
CIVIL
STORAGE TANK
1 Cover for the sump pit to be provided
AREA
DESAL FG LV ROOM & Rectification of the installed trench cover for the LV
594 7E 1 MECH 1
STATION BATTERY ROOM room
DESAL FG LV ROOM & Extra holes / damaged portions on the wall to be
595 7E 2 CIVIL 1
STATION BATTERY ROOM rectified with appropriate material for LV room
DESAL FG LV ROOM & Joint sealant to be provided on the floor for the
596 7E 3 CIVIL 1
STATION BATTERY ROOM balance area of LV room

DESAL FG LV ROOM & Finishing for the provided joint sealant on the wall
597 7E 4 CIVIL 1
STATION BATTERY ROOM & touch up paint for the wall & door of LV rm

DESAL FG LV ROOM & Cover for the Eye wash drain pipe to be provided
598 7E 5 CIVIL 1
STATION BATTERY ROOM in the battery room
DESAL FG LV ROOM & Cleaning of Acid resistant tiles for floor & wall of
599 7E 6 CIVIL 1
STATION BATTERY ROOM battery room
PROCESS
DESAL FG AREA, FENCE Leveling & proper compaction for inside & outside
600 7E 1 CIVIL 1
STATION INSIDE & of the fence area.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Gravel laying for the unpaved area within station
601 7E 2 CIVIL 1
STATION INSIDE & fence limits to be completed.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Cover to be provided for the Instrumentation and
602 7E 3 CIVIL 1
STATION INSIDE & spill pit at process area.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
603 7E 4
STATION
CIVIL
INSIDE &
1 Painting for the Earth pit and cover to be provided
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Elevation for the earth pit & drain pit to be
604 7E 5 CIVIL 1
STATION INSIDE & maintained and match with the GL.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Installed paver blocks at personal gate to be
605 7E 6 CIVIL 1
STATION INSIDE & rectified.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Surface preparation and painting for the exposed
606 7E 7 CIVIL 1
STATION INSIDE & concrete surface
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Joint sealant to be provided and painting for the
607 7E 8 CIVIL 1
STATION INSIDE & kerb stone.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
608 7E 9
STATION
CIVIL
INSIDE &
1 Car shed works to be completed
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
609 7E 10
STATION
CIVIL
INSIDE &
1 Construction of the Asphalt road to be completed.
OUTSIDE
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PROCESS
DESAL FG AREA, FENCE Construction of the Track road outside of the fence
610 7E 11 CIVIL 1
STATION INSIDE & to be completed.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Sign boards to be provided for all the required
611 7E 12 CIVIL 1
STATION INSIDE & areas
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Touch up paint for the gate both sideds and fence
612 7E 13 CIVIL 1
STATION INSIDE & post
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
613 7E 14
STATION
CIVIL
INSIDE &
1 Removal of excavated material dumped outside
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
614 7E 15
STATION
CIVIL
INSIDE &
1 Proper clealing for the chain link fence
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
615 7E 16
STATION
CIVIL
INSIDE &
1 Proper housekeeping
OUTSIDE
TELEMATORY &
DESAL FG False ceiling to be aligned with fixed lighting frame
616 7E 1 CIVIL AIR LOCK 1
STATION & HVAC duct outlet grill.
ROOM
TELEMATORY &
DESAL FG
617 7E 2
STATION
CIVIL AIR LOCK 1 Final alignment and inspection for the false ceiling
ROOM

TELEMATORY &
DESAL FG
618 7E 3
STATION
CIVIL AIR LOCK 1 Final alignment and inspection for the raised floor
ROOM

TELEMATORY &
DESAL FG Holes in wall to be closed with appropriate material
619 7E 4 CIVIL AIR LOCK 1
STATION and touch up paint for the wall and door.
ROOM
TELEMATORY &
DESAL FG Cleaning and finishing for the provided joint sealant
620 7E 5 CIVIL AIR LOCK 1
STATION in the wall of telematory room
ROOM
DESAL FG TRANSFORMER
621 7E 1
STATION
CIVIL
BAY
1 Cover slab to be provided for the trench
DESAL FG TRANSFORMER Rectification for the damaged portion of trench wall
622 7E 2 CIVIL 1
STATION BAY and painting to be completed
DESAL FG TRANSFORMER
623 7E 3
STATION
CIVIL
BAY
1 Final coat painting for the floor to be completed
DESAL FG TRANSFORMER Extra holes to be closed with appropriate material
624 7E 4 CIVIL 1
STATION BAY and touch up paint for the wall inside
DESAL FG TRANSFORMER
625 7E 5
STATION
CIVIL
BAY
1 Gravel to be provided on the floor.

ELECTRICAL &
DESAL FG DG BUILDING Gap between roof slab and rain water down pipe to
626 7E 1 CIVIL 1
STATION OUTSIDE & be closed with appropriate material
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Painting for the rain water down pipe to be
627 7E 2 CIVIL 1
STATION OUTSIDE & completed
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Cleaning & finishing for the provided joint sealant
628 7E 3 CIVIL 1
STATION OUTSIDE & and touch up paint for the bldg outside wall
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING
629 7E 4
STATION
CIVIL
OUTSIDE &
1 Painting for the coridoor floor slab to be completed
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING All exposed Separation layer on the roof top to be
630 7E 5 CIVIL 1
STATION OUTSIDE & covered properly
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Joint sealant to be provided for the access ladder
631 7E 6 CIVIL 1
STATION OUTSIDE & area
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Joint sealant to be provided & Epoxy painting for
632 7E 7 CIVIL 1
STATION OUTSIDE & the cover slab of HVAC duct opening
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Damaged concrete surface of the parapet wall to
633 7E 8 CIVIL 1
STATION OUTSIDE & be repaired & touchup paint.
ROOF TOP

ELECTRICAL &
DESAL FG DG BUILDING
634 7E 9
STATION
CIVIL
OUTSIDE &
1 Over size stone to be removed from the roof top.
ROOF TOP
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

6" PIPE LINE


FROM KSDGS
TO VALVE
DESAL FG Pipe sleepers are resting in the ditches to be
635 7E 1 CIVIL STATION (KS) 1
STATION rectified
SFG/KG &
STATION
6" PIPE
KSDGSLINE
FROM KSDGS
TO VALVE
DESAL FG between the sleeper pad area backfilled and
636 7E 2 CIVIL STATION (KS) 1
STATION compact it properly.
SFG/KG &
STATION
6" PIPE
KSDGSLINE
FROM KSDGS
TO VALVE
DESAL FG Surface preparation and above ground painting for
637 7E 3 CIVIL STATION (KS) 1
STATION the support foundatins to be completed
SFG/KG &
STATION
6" PIPE
KSDGSLINE
FROM KSDGS
TO VALVE
DESAL FG Surface preparatin and painting for the culvert
638 7E 4 CIVIL STATION (KS) 1
STATION inside & side protection to be completed
SFG/KG &
STATION
6" PIPE
KSDGSLINE
FROM KSDGS
TO VALVE
DESAL FG Crash barrior to be re-instated and rectification
639 7E 5 CIVIL STATION (KS) 1
STATION required for the installed crash barrior (Culvert)
SFG/KG &
STATION
6" PIPE
KSDGSLINE
FROM KSDGS
TO VALVE
DESAL FG
640 7E 6
STATION
CIVIL STATION (KS) 1 Installation of Sign boards for the required areas
SFG/KG &
STATION
KSDGS
Main gate, personnel gate and emergency gate to
641 7E 1 DPS/DESAL CIVIL ALL 1
be installed
Installation of cover for earth pit, splicing pit & spill
642 7E 2 DPS/DESAL CIVIL ALL 1
pit
Excavated material to be removed, backfilling,
643 7E 3 DPS/DESAL CIVIL ALL 1
leveling, proper compaction & Gravel laying.
644 7E 4 DPS/DESAL CIVIL ALL 1 Track road inside the fence area to be completed

645 7E 5 DPS/DESAL CIVIL ALL 1 Crash barrior for the track road inside the fence

646 7E 6 DPS/DESAL CIVIL ALL 1 Fixing of Inter lock paver tiles for the personal gate

Protection slab for the existing cable trench at main


647 7E 7 DPS/DESAL CIVIL ALL 1
gate area
648 7E 8 DPS/DESAL CIVIL ALL 1 Access road from existing road to the main gate

649 7E 9 DPS/DESAL CIVIL ALL 1 Installation of Sign boards

650 7E 10 DPS/DESAL CIVIL ALL 1 Touch up paint for the gate post & fence post

651 7E 11 DPS/DESAL CIVIL ALL 1 Removal of existing fence

652 7E 12 DPS/DESAL CIVIL ALL 1 Proper cleaning for the fence & Hoesekeeping
VAL STN Main gate, personal gate and emergency gate to
653 7E 1 MECH ALL 1
KSDGS be installed
VAL STN
654 7E 2
KSDGS
CIVIL ALL 1 Installation of cover for earth pit, & spill pit
VAL STN Excavated material to be removed, backfilling,
655 7E 3 CIVIL ALL 1
KSDGS leveling, proper compaction & Gravel laying.
VAL STN
656 7E 4
KSDGS
CIVIL ALL 1 Track road inside the fence area to be completed
VAL STN
657 7E 5
KSDGS
CIVIL ALL 1 Crash barrior for the track road inside the fence
VAL STN
658 7E 6
KSDGS
CIVIL ALL 1 Fixing of Inter lock paver tiles for the personal gate
VAL STN Protection slab for the existing cable trench at main
659 7E 7 CIVIL ALL 1
KSDGS gate area
VAL STN
660 7E 8
KSDGS
CIVIL ALL 1 Access road from existing road to the main gate
VAL STN
661 7E 9
KSDGS
CIVIL ALL 1 Installation of Sign boards
VAL STN
662 7E 10
KSDGS
MECH ALL 1 Touch up paint for the gate post & fence post
VAL STN
663 7E 11
KSDGS
CIVIL ALL 1 Removal of existing fence
VAL STN
664 7E 12
KSDGS
CIVIL ALL 1 Proper cleaning for the fence & Hoesekeeping

DESAL FG 5K-PI-00015A/B/C, Please create Fault indication


665 7O 1 INST LOOP CHECK 2
STATION on Schematic and alarm summary
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG 6K-PI-0004A/B/C Fault indication not onalarm


666 7O 2 INST LOOP CHECK 2
STATION summary

DESAL FG
667 7O 3
STATION
INST LOOP CHECK 2 5K-HSSD alarm should be latch in graphic page

DESAL FG 5K-PI-0006A/B alarm fault not shown on other


668 7O 4 INST LOOP CHECK 2
STATION graphic page

DESAL FG 5K-PI-0005A/B/C/D fault indication not showing on


669 7O 5 INST LOOP CHECK 2
STATION graphic and alarm summary

DESAL FG 5K-PI-0005A range deference between transmitter


670 7O 6 INST LOOP CHECK 2
STATION and SLPC controller.

DESAL FG
671 7O 7
STATION
INST LOOP CHECK 2 5K-SDV-0001,2,3,4 Can not operated from MOC

DESAL FG 5K-SDV-0002 &0004 closing from LOC & MOC


672 7O 8 INST LOOP CHECK 2
STATION while on local selection

DESAL FG Close Command for SDV should be given


673 7O 9 INST LOOP CHECK 2
STATION deference alarm operate from LOC, MOC, & field

DESAL FG 5K-PI-0003A/B/C , LL alarm always latch before


674 7O 10 INST LOOP CHECK 2
STATION resetted and will effected to logic

DESAL FG 5K-LI-0001, need Fault indication on Schematic


675 7O 11 INST LOOP CHECK 2
STATION and alarm summary

DESAL FG
676 7O 12
STATION
INST LOOP CHECK 2 6K-PI-0003A/B/C provide individual override facility

DESAL FG 2 of 3 interlock symbols should be normal if


677 7O 13 INST LOOP CHECK 2
STATION condition already available

DESAL FG 5K-LAH-0005 should be more dominant to close


678 7O 14 INST LOOP CHECK 2
STATION LCV-0005.incase of low alarm fault.

HVAC Schematic, description "HVAC SYSTEM


DESAL FG
679 7O 15
STATION
INST LOOP CHECK 2 NORMAL/OVERRIDE" change to "HVAC SYSTEM
MANUA/AUTO as per actual label on field.

DESAL FG
680 7O 16
STATION
INST LOOP CHECK 2 Relative humidity not included in graphic

DESAL FG
681 7O 17
STATION
INST LOOP CHECK 2 5K-PI-0014, provide Fault alarm

DESAL FG UPS Digital Status, Status for UPS Breaker are


682 7O 18 INST LOOP CHECK 2
STATION opposite with actual.

Schematic " DESAL FG-ESD-OVERVIEW-2"


DESAL FG
683 7O 19
STATION
INST LOOP CHECK 2 should be modify because not represent actual
situation

DESAL FG
684 7O 20
STATION
INST LOOP CHECK 2 Logic 2 of 3 for Heat Detector system not function

DESAL FG FI-U-0001A/1B/2A/2B fault alarm indication not


685 7O 21 INST LOOP CHECK 2
STATION available

DESAL FG For all transmitters in fault condition should


686 7O 22 INST LOOP CHECK 2
STATION represent actual value.

For all Pressure Controller on Input PV Fault,


DESAL FG should be go to manual mode and keep output on
687 7O 23 INST LOOP CHECK 2
STATION last position control should be go to manual and
output remain should be remain in last position.

DESAL FG Control Philosophy for LOC/MOC remote operation


688 7P 1 INST LOOP CHECK 2
STATION needed to be corrected and verified.

Not Authorized message needed to be configured


in SCADA Remote close SDV command and
Needed to be appearing if Control Philosophy not
DESAL FG satisfied.Not Authorized message needed to be
689 7P 2 INST LOOP CHECK 2
STATION configured in SCADA Remote close SDV
command and Needed to be appearing if Control
Philosophy not satisfied.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

From SCADA overview page should able to


DESAL FG navigate to individual Pages which contains
690 7P 3 INST LOOP CHECK 2
STATION detailed graphic of particular Equipment /Device by
clicking that Equipment /Devices (Provide Links).

SDV-0001 is able to close from loc even if the


DESAL FG control is in MOC B. need to be corrected.If the
691 7P 4 INST LOOP CHECK 2
STATION control is in MOC B the Loc operator should get
Not Authorized message.
The alarm for SDV close command from SCADA
needed to be corrected to Close Command
DESAL FG
692 7P 5
STATION
INST LOOP CHECK 2 Initiated From SCADA or Close Command from
SCADA currently it showing only Close
Command.
unimportant alarms can be removed like Lamp on.
DESAL FG
693 7P 6
STATION
INST LOOP CHECK 2 Many Lamp status related alarms appears in
SCADA MOC.

DESAL FG SDV reset command from SCADA alarm needed


694 7P 7 INST LOOP CHECK 2
STATION to be configured.

SDV-0004 is able to close from the SCADA even if


DESAL FG the Local/Remote switch on the local panel is in
695 7P 8 INST LOOP CHECK 2
STATION LOCAL.SCADA close command should be enable
only when the switch is in REMOTE Mode.

SDV-0003 Remote close command from SCADA


DESAL FG
696 7P 9
STATION
INST LOOP CHECK 2 not working and Alarms not appearing ,needed to
be corrected.
PI-0015 A/B/C when two out of three Logic is
DESAL FG
697 7P 10
STATION
INST LOOP CHECK 2 satisfied color for the 2oo3 symbol should be
change to green.currently it is in Red colour.

DESAL FG Exhaust fan Hand/Auto Description needed to be


698 7P 11 INST LOOP CHECK 2
STATION change to AUTO/MANUAL in LOC/MOC.

DESAL FG NEB Description should change to NEW ELEC


699 7P 12 INST LOOP CHECK 2
STATION Building.

DESAL FG PDI-0007 Description should corrected .currently


700 7P 13 INST LOOP CHECK 2
STATION written PI-0007.

Fault alarms not configured for the instrument s for


DESAL FG
701 7P 14
STATION
INST LOOP CHECK 2 I/a compressor which is connect to SCADA through
Modbus
In SCADA F & G Mimic panel status page HSSD
DESAL FG status is categorized in to two it should change to
702 7P 15 INST LOOP CHECK 2
STATION one and four alarm (Level 1 to Level 4) status
should come under it.

DESAL FG
703 7P 16
STATION
INST LOOP CHECK 2 P & ID graphic page needed to be correctd.

In SCADA when open a faceplate needed to


DESAL FG manually close the faceplate which is previously
704 7P 17 INST LOOP CHECK 2
STATION opened .It should configured as the new one
automatically replace the previously opened one.

IN SCADA for Pressure control need to make a


DESAL FG combined pressure controller faceplate for the four
705 7P 18 INST LOOP CHECK 2
STATION controllers PIC-0005A/B/C/D and PIC-
0006A/B/C/D.

DESAL FG SCADA MOC Time needed to be corrected and


706 7P 19 INST LOOP CHECK 2
STATION should be synchronized with LOC.

DESAL FG Rectify floor surface at the entrance and provide


707 7EA 1.01 CIVIL LV ROOM 1
STATION proper groove filled with sealant.

DESAL FG
708 7EA 1.02
STATION
CIVIL LV ROOM 1 Provide touch-up epoxy paint to the floor concrete.

DESAL FG
709 7EA 1.03
STATION
CIVIL LV ROOM 1 Unwanted holes on the floor to be sealed.

Rectify and provide good floor contraction joint's


DESAL FG
710 7EA 1.04
STATION
CIVIL LV ROOM 1 grooves and fill with sealant properly wherever
necessary.

DESAL FG
711 7EA 1.05
STATION
ELEC LV ROOM 1 Provide covers for all electrical trucks

DESAL FG
712 7EA 1.06
STATION
MECH LV ROOM 1 Align the chequered plate covers properly.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Retify floor edge cracks along chequered plate


713 7EA 1.07 CIVIL LV ROOM 1
STATION covers wherever necessary.

DESAL FG Unwanted holes on the floor to be sealed and


714 7EA 1.08 CIVIL LV ROOM 1
STATION apply paint matching with wall colour.

DESAL FG
715 7EA 1.09
STATION
CIVIL LV ROOM 1 Apply touch-up paint on internal walls.

DESAL FG
716 7EA 1.10
STATION
CIVIL LV ROOM 1 Remove paint spots/ drop wherever necessary.

DESAL FG
717 7EA 1.11
STATION
ELEC LV ROOM 1 HVAC ducts to be cleaned.

DESAL FG
718 7EA 1.12
STATION
ELEC LV ROOM 1 Remove all temporary installations.

DESAL FG
719 7EA 1.13
STATION
CIVIL LV ROOM 1 Signplates shall be provided as per AFC drawing.

DESAL FG
720 7EA 1.14
STATION
CIVIL LV ROOM 1 Check the algnment of doors.

DESAL FG
721 7EA 1.15
STATION
CIVIL LV ROOM 1 Apply touch-up paint on doors and jambs.

DESAL FG
722 7EA 1.16
STATION
CIVIL LV ROOM 1 Funtional test for doors to be carried-out.

DESAL FG
723 7EA 1.17
STATION
CIVIL LV ROOM 1 Keep the area clean and tidy.

DESAL FG Rectify floor surface at the entrance and provide


724 7EA 2.01 CIVIL Telemetry Room 1
STATION proper groove filled with sealant.

DESAL FG
725 7EA 2.02
STATION
CIVIL Telemetry Room 1 Loose floor tiles shall fixed properly.

DESAL FG
726 7EA 2.03
STATION
CIVIL Telemetry Room 1 Make the floor tiles properly levelled.

DESAL FG Earthing cable to be properly installed through floor


727 7EA 2.04 ELEC Telemetry Room 1
STATION tile.

Rectify and provide good floor contraction joint's


DESAL FG
728 7EA 2.05
STATION
CIVIL Telemetry Room 1 grooves and fill with sealant properly wherever
necessary.

DESAL FG
729 7EA 2.06
STATION
CIVIL Telemetry Room 1 Remove paint spots/ drop wherever necessary.

DESAL FG
730 7EA 2.07
STATION
CIVIL Telemetry Room 1 Ceiling and floor tiles to be cleaned.

DESAL FG Unwanted holes on the wall to be sealed and apply


731 7EA 2.08 CIVIL Telemetry Room 1
STATION paint matching with wall colour.

DESAL FG
732 7EA 2.09
STATION
CIVIL Telemetry Room 1 Apply touch-up paint on the doors and jambs.

DESAL FG
733 7EA 2.10
STATION
HVAC Telemetry Room 1 Remove all temporary installations.

DESAL FG
734 7EA 2.11
STATION
CIVIL Telemetry Room 1 Provide signplates as per AFC drawing.

DESAL FG
735 7EA 2.12
STATION
CIVIL Telemetry Room 1 Check the algnment of doors.

DESAL FG
736 7EA 2.13
STATION
CIVIL Telemetry Room 1 Apply touch-up paint on the doors and jambs.

DESAL FG
737 7EA 2.14
STATION
CIVIL Telemetry Room 1 Funtional test for doors to be carried-out.

DESAL FG
738 7EA 2.15
STATION
CIVIL Telemetry Room 1 Keep the area clean and tidy.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Diesel Generator Third party certificate for O/H crane shall be
739 7EA 3.01 MECH 2
STATION Building provided.

DESAL FG Diesel Generator Installation and associated works for exhaust and
740 7EA 3.02 MECH 1
STATION Building muffler to be completed.

DESAL FG Diesel Generator Remove and replace any damaged/ broken RC


741 7EA 3.03 CIVIL 1
STATION Building cable trench covers.

DESAL FG Diesel Generator Provide approved compressible joint filler between


742 7EA 3.04 CIVIL 1
STATION Building concrete grade slab and RC cable trench covers.

DESAL FG Diesel Generator RC slab cover lifting hooks to be sealed with


743 7EA 3.05 CIVIL 1
STATION Building appropriate materials.

DESAL FG Diesel Generator


744 7EA 3.06
STATION
MECH
Building
1 Align the chequered plate covers properly.

DESAL FG Diesel Generator Rectify floor edge cracks along RC slab covers and
745 7EA 3.07 CIVIL 1
STATION Building chequered plate covers wherever necessary.

DESAL FG Diesel Generator Rectify and provide good floor contraction joint's
746 7EA 3.08 CIVIL 1
STATION Building grooves and fill with sealant properly.

DESAL FG Diesel Generator


747 7EA 3.09
STATION
CIVIL
Building
1 Provide touch-up epoxy paint to the floor concrete.

DESAL FG Diesel Generator


748 7EA 3.10
STATION
MECH
Building
1 Damaged sand trap louver filters to be replaced.

DESAL FG Diesel Generator


749 7EA 3.11
STATION
ELEC
Building
1 Fill all cable spaces and ducts with foam properly.

All exposed concrete surfaces such as slab,


DESAL FG Diesel Generator ramps, retaining wall, plinths, pedestal and
750 7EA 3.12 CIVIL 1
STATION Building supports shall be coated with epoxy paint as per
QCS standards.

DESAL FG Diesel Generator


751 7EA 3.13
STATION
CIVIL
Building
1 Apply touch up painting on the internal walls.

DESAL FG Diesel Generator


752 7EA 3.14
STATION
CIVIL
Building
1 Remove paint spots/ drop wherever necessary.

DESAL FG Diesel Generator Apply touch up paint on the structural steel


753 7EA 3.15 MECH 1
STATION Building members, pipes and supports.

DESAL FG Diesel Generator


754 7EA 3.16
STATION
CIVIL
Building
1 Remove all temporary installations.

DESAL FG Diesel Generator


755 7EA 3.17
STATION
CIVIL
Building
1 Provide signplates as per AFC drawing.

DESAL FG Diesel Generator


756 7EA 3.18
STATION
CIVIL
Building
1 Check the algnment of doors.

DESAL FG Diesel Generator


757 7EA 3.19
STATION
CIVIL
Building
1 Apply touch-up paint on doors and jambs.

DESAL FG Diesel Generator


758 7EA 3.20
STATION
CIVIL
Building
1 Funtional test for doors to be carried-out.

DESAL FG Diesel Generator


759 7EA 3.21
STATION
CIVIL
Building
1 Keep the area clean and tidy.

DESAL FG
760 7EA 4.01
STATION
CIVIL Battery Room 1 Eye wash to be fixed and tested.

DESAL FG
761 7EA 4.02
STATION
CIVIL Battery Room 1 Provide good floor surface at the entrance door.

DESAL FG
762 7EA 4.03
STATION
CIVIL Battery Room 1 Unwanted holes on the floor to be sealed.

DESAL FG
763 7EA 4.04
STATION
CIVIL Battery Room 1 Remove paint spots/ drop wherever necessary.

DESAL FG Unwanted holes on the wall to be sealed and apply


764 7EA 4.05 CIVIL Battery Room 1
STATION paint matching with wall colour.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG
765 7EA 4.06
STATION
CIVIL Battery Room 1 Floor and wall tiles to be cleaned.

DESAL FG
766 7EA 4.07
STATION
CIVIL Battery Room 1 Remove all temporary installations.

DESAL FG
767 7EA 4.08
STATION
CIVIL Battery Room 1 Provide signplates as per AFC drawing.

DESAL FG
768 7EA 4.09
STATION
CIVIL Battery Room 1 Check the algnment of doors.

DESAL FG
769 7EA 4.10
STATION
CIVIL Battery Room 1 Apply touch-up paint on doors and jambs.

DESAL FG
770 7EA 4.11
STATION
CIVIL Battery Room 1 Funtional test for doors to be carried-out.

DESAL FG
771 7EA 4.12
STATION
CIVIL Battery Room 1 Keep the area clean and tidy.

DESAL FG Transformer
772 7EA 5.01
STATION
MECH
Room
1 Roof water leak test to be carried out.

DESAL FG Transformer
773 7EA 5.02
STATION
MECH
Room
1 Replaced the damaged/ deformed roof sheets.

DESAL FG Transformer
774 7EA 5.03
STATION
MECH
Room
1 Provide fascias for cladding and roof sheet.

DESAL FG Transformer Roof fascia sheet grooves to be sealed with


775 7EA 5.04 MECH 1
STATION Room polysulfide sealant.

DESAL FG Transformer
776 7EA 5.05
STATION
MECH
Room
1 Rain water gutter and downspout to be provided.

DESAL FG Transformer
777 7EA 5.06
STATION
MECH
Room
1 PVC rain pipe spigot to be provided.

DESAL FG Transformer
778 7EA 5.07
STATION
MECH
Room
1 Provide concrete slab covers and align properly.

All exposed concrete surfaces such as slab,


DESAL FG Transformer ramps, retaining wall, plinths, pedestal and
779 7EA 5.08 CIVIL 1
STATION Room supports shall be coated with epoxy paint as per
QCS standards.

DESAL FG Transformer Rectify floor surface at the entrance and provide


780 7EA 5.09 CIVIL 1
STATION Room proper groove filled with sealant.

DESAL FG Transformer Unwanted holes on the wall to be sealed and apply


781 7EA 5.10 CIVIL 1
STATION Room paint matching with wall colour.

DESAL FG Transformer
782 7EA 5.11
STATION
CIVIL
Room
1 Apply touch-up paint on internal walls.

DESAL FG Transformer
783 7EA 5.12
STATION
MECH
Room
1 Apply touch up on all structural steel members.

DESAL FG Transformer
784 7EA 5.13
STATION
ELEC
Room
1 Remove all temporary installations.

DESAL FG Transformer
785 7EA 5.14
STATION
CIVIL
Room
1 Provide signplates as per AFC drawing.

DESAL FG Transformer
786 7EA 5.15
STATION
MECH
Room
1 Rectify the deformed door frames.

DESAL FG Transformer
787 7EA 5.16
STATION
MECH
Room
1 Damaged sand trap louver filters to be replaced.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Transformer
788 7EA 5.17
STATION
MECH
Room
1 Check the algnment of doors.

DESAL FG Transformer
789 7EA 5.18
STATION
CIVIL
Room
1 Apply touch-up paint on doors and jambs.
DESAL FG Transformer
790 7EA 5.19
STATION
CIVIL
Room
1 Funtional test for doors to be carried-out.

DESAL FG Transformer
791 7EA 5.20
STATION
CIVIL
Room
1 Keep the area clean and tidy.

DESAL FG
792 7EA 6.01
STATION
ELEC Roof 1 Earthing works to be completed.

All exposed concrete surfaces such as slab,


DESAL FG ramps, retaining wall, plinths, pedestal and
793 7EA 6.02 CIVIL Roof 1
STATION supports shall be coated with epoxy paint as per
QCS standards.

DESAL FG
794 7EA 6.03
STATION
CIVIL Roof 1 Filling of wall grooves with sealant to be completed.

DESAL FG
795 7EA 6.04
STATION
ELEC Roof 1 Provide covers for all electrical trunks

DESAL FG
796 7EA 6.05
STATION
CIVIL Roof 1 Walkway tiling work shall be completed.

DESAL FG
797 7EA 6.06
STATION
CIVIL Roof 1 Provide proper chamfer for HVAC stand platform.

DESAL FG
798 7EA 6.07
STATION
HVAC Roof 1 Remove all temporary installations.

DESAL FG
799 7EA 6.08
STATION
CIVIL Roof 1 Aggregates to be spreaded properly.

DESAL FG
800 7EA 6.09
STATION
CIVIL Roof 1 Keep the area clean and tidy.

DESAL FG Compressor
801 7EA 7.01
STATION
CIVIL
Shelter
1 Roof water leak test to be carried out.

DESAL FG Compressor Replaced and rectify cladding sheets at the


802 7EA 7.02 MECH 1
STATION Shelter entrance and emergency access.
DESAL FG Compressor
803 7EA 7.03
STATION
MECH
Shelter
1 Replaced all dilipadated gutter sheets.

DESAL FG Compressor
804 7EA 7.04
STATION
MECH
Shelter
1 All loose screws to be tighten.

DESAL FG Compressor
805 7EA 7.05
STATION
MECH
Shelter
1 Damaged sand trap louver filters to be replaced.

DESAL FG Compressor Rectify sand trap ventilation gaps wherever


806 7EA 7.06 MECH 1
STATION Shelter necessary.

DESAL FG Compressor Unwanted cladding wall holes to be sealed and


807 7EA 7.07 MECH 1
STATION Shelter cleaned.

DESAL FG Compressor
808 7EA 7.08
STATION
MECH
Shelter
1 Align the chequered plate covers properly.

DESAL FG Compressor Apply touch up paint on all structural steel


809 7EA 7.09 MECH 1
STATION Shelter members, pipes and supports.

DESAL FG Compressor
810 7EA 7.10
STATION
CIVIL
Shelter
1 Remove all temporary installations.

DESAL FG Compressor
811 7EA 7.11
STATION
CIVIL
Shelter
1 Provide signplates as per AFC drawing.

DESAL FG Compressor
812 7EA 7.12
STATION
CIVIL
Shelter
1 Check the algnment of doors.

DESAL FG Compressor
813 7EA 7.13
STATION
CIVIL
Shelter
1 Apply touch-up paint on doors and jambs.

DESAL FG Compressor
814 7EA 7.14
STATION
CIVIL
Shelter
1 Funtional test for doors to be carried-out.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG Compressor
815 7EA 7.15
STATION
CIVIL
Shelter
1 Keep the area clean and tidy.

DESAL FG Third party certificate for JIB crane shall be


816 7EA 8.01 MECH External Works 1
STATION provided.
DESAL FG
817 7EA 8.02
STATION
CIVIL External Works 1 Associated works for car parking to be completed.

DESAL FG Aspalt pavement and associated works shall be


818 7EA 8.03 CIVIL External Works 1
STATION done.

DESAL FG
819 7EA 8.04
STATION
CIVIL External Works 1 Track road and associated works shall be done.

DESAL FG Fill and provide sloped and compacted roads


820 7EA 8.05 CIVIL External Works 1
STATION shoulder by using approved materials.
DESAL FG Road signs and road marking to be provided
821 7EA 8.06 CIVIL External Works 1
STATION according to QTM and project specifications.
DESAL FG
822 7EA 8.07
STATION
MECH External Works 1 Windsock and accessories to be completed.

Provide proper gap between concrete pedestrals/


DESAL FG
823 7EA 8.08
STATION
CIVIL External Works 1 foundation and base plates and to be filled with
grouts whenever necessary.
All exposed concrete surfaces such as slab,
DESAL FG ramps, retaining wall, plinths, pedestal and
824 7EA 8.09 CIVIL External Works 1
STATION supports shall be coated with epoxy paint as per
QCS standards.

DESAL FG Apply touch up paints on all structural steel


825 7EA 8.10 MECH External Works 1
STATION members, pipes and supports

DESAL FG
826 7EA 8.11
STATION
CIVIL External Works 1 Provide proper chamfer for pig launcher platforms.

DESAL FG Manhole cover lifting hooks to be sealed with


827 7EA 8.12 CIVIL External Works 1
STATION appropriate materials.

DESAL FG Provide interlock paving at the pedestrian entrance


828 7EA 8.13 CIVIL External Works 1
STATION access.

DESAL FG Provide kerbstones instead of concrete cast at


829 7EA 8.14 CIVIL External Works 1
STATION some locations.

DESAL FG Kerbstones at the corners shall be properly


830 7EA 8.15 CIVIL External Works 1
STATION installed.

DESAL FG
831 7EA 8.16
STATION
CIVIL External Works 1 Kerbstones shall be painted.

Fill all the unwanted loose gaps to the wall with


DESAL FG
832 7EA 8.17
STATION
CIVIL External Works 1 approved materials i.e. Interlock tiles, duct/ rain
pipe and etc.

DESAL FG Fill all cable ducts on the wall with foam and apply
833 7EA 8.18 ELEC External Works 1
STATION paint matching with wall colour.

DESAL FG Check and rectify the concrete steps for LV and


834 7EA 8.19 CIVIL External Works 1
STATION Telemetry exit doors.

DESAL FG Unwanted installation of cable tray's pipe sleeves


835 7EA 8.20 CIVIL External Works 1
STATION to be rectified.

DESAL FG
836 7EA 8.21
STATION
CIVIL External Works 1 Apply touch-up paint on external walls.

DESAL FG
837 7EA 8.22
STATION
MECH External Works 1 Platform ladders railings shall be vertically aligned.

DESAL FG Cable chambers/ earthing manhole top surfaces to


838 7EA 8.23 CIVIL External Works 1
STATION be levelled up to the interlock surfaces.

Concrete pipe support pedestal outside DG


DESAL FG
839 7EA 8.24
STATION
CIVIL External Works 1 building. To be raised up to the interlock surface
level.

DESAL FG Remove unused concrete pipe support pedestal


840 7EA 8.25 CIVIL External Works 1
STATION from walkway outside DG building.

Rectify unwanted opening covers at DG building


DESAL FG
841 7EA 8.26
STATION
MECH External Works 1 external wall and apply paint matching with wall
colour.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG
842 7EA 8.27
STATION
MECH External Works 1 Base plates at diesel storage area shall be rectified.

DESAL FG
843 7EA 8.28
STATION
CIVIL External Works 1 Apply touch-up paint on main and pedestrian gates.

DESAL FG Check the gate installation and provide true


844 7EA 8.29 CIVIL External Works 1
STATION alignment.

DESAL FG Fasten and tighten all loose barbed wire and


845 7EA 8.30 CIVIL External Works 1
STATION chainlink.

DESAL FG
846 7EA 8.31
STATION
CIVIL External Works 1 Provide pins/ padlocks for gate hasp locks.

DESAL FG Backfilling and compaction along fence shall be


847 7EA 8.32 CIVIL External Works 1
STATION properly carried out.

DESAL FG
848 7EA 8.33
STATION
CIVIL External Works 1 Aggregates to be spreaded properly.

DESAL FG
849 7EA 8.34
STATION
CIVIL External Works 1 Remove all temporary installations.

DESAL FG
850 7EA 8.35
STATION
CIVIL External Works 1 Keep the area clean and tidy.

DESAL FG DPS/ DESAL and Third party certificate for JIB crane shall be
851 7EA 9.01 MECH 1
STATION (KS) SFG/KG provided.

DESAL FG DPS/ DESAL and


852 7EA 9.02
STATION
CIVIL
(KS) SFG/KG
1 Track road and associated works shall be done.

DESAL FG DPS/ DESAL and


853 7EA 9.03
STATION
MECH
(KS) SFG/KG
1 Windsock and accessories to be completed.

All exposed concrete surfaces such as slab,


DESAL FG DPS/ DESAL and ramps, retaining wall, plinths, pedestal and
854 7EA 9.04 CIVIL 1
STATION (KS) SFG/KG supports shall be coated with epoxy paint as per
QCS standards.
Provide proper gap between concrete pedestrals/
DESAL FG DPS/ DESAL and
855 7EA 9.05
STATION
CIVIL
(KS) SFG/KG
1 foundation and base plates and to be filled with
grouts whenever necessary.

DESAL FG DPS/ DESAL and


856 7EA 9.06
STATION
CIVIL
(KS) SFG/KG
1 Provide proper chamfer for pig launcher platforms.

DESAL FG DPS/ DESAL and Crash barrier installation and painting works to be
857 7EA 9.07 CIVIL 1
STATION (KS) SFG/KG completed.

DESAL FG DPS/ DESAL and Compact and level around crash barriers
858 7EA 9.08 CIVIL 1
STATION (KS) SFG/KG foundations.

DESAL FG DPS/ DESAL and Provide interlock paving at the pedestrian entrance
859 7EA 9.09 CIVIL 1
STATION (KS) SFG/KG access.

DESAL FG DPS/ DESAL and Provide kerbstones instead of concrete cast at


860 7EA 9.10 CIVIL 1
STATION (KS) SFG/KG some locations.

DESAL FG DPS/ DESAL and Kerbstones at the corners shall be properly


861 7EA 9.11 CIVIL 1
STATION (KS) SFG/KG installed.

DESAL FG DPS/ DESAL and


862 7EA 9.12
STATION
CIVIL
(KS) SFG/KG
1 Kerbstones to be painted.

DESAL FG DPS/ DESAL and


863 7EA 9.13
STATION
ELEC
(KS) SFG/KG
1 Earthing manhole to be completed.

DESAL FG DPS/ DESAL and Apply touch up paint on all structural steel
864 7EA 9.14 MECH 1
STATION (KS) SFG/KG members, pipes and supports.

DESAL FG DPS/ DESAL and


865 7EA 9.15
STATION
ELEC
(KS) SFG/KG
1 Provide covers for all electrical trucks .

DESAL FG DPS/ DESAL and


866 7EA 9.16
STATION
MECH
(KS) SFG/KG
1 Platform ladders works to be completed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG DPS/ DESAL and


867 7EA 9.17
STATION
MECH
(KS) SFG/KG
1 Platform ladders railings shall be vertically aligned.

DESAL FG DPS/ DESAL and


868 7EA 9.18
STATION
CIVIL
(KS) SFG/KG
1 Aggregates to be spreaded properly.

DESAL FG DPS/ DESAL and


869 7EA 9.19
STATION
CIVIL
(KS) SFG/KG
1 Remove all temporary installations.

DESAL FG DPS/ DESAL and


870 7EA 9.20
STATION
CIVIL
(KS) SFG/KG
1 Apply touch up paint on main and pedestrian gates.

DESAL FG DPS/ DESAL and Check the gate installation and provide true
871 7EA 9.21 CIVIL 1
STATION (KS) SFG/KG alignment.

DESAL FG DPS/ DESAL and Fasten and tighten all loose barbed wire and
872 7EA 9.22 CIVIL 1
STATION (KS) SFG/KG chainlink.

DESAL FG DPS/ DESAL and


873 7EA 9.23
STATION
CIVIL
(KS) SFG/KG
1 Provide pins/ padlocks for gate hasp locks.

DESAL FG DPS/ DESAL and Backfilling and compaction along fence to be


874 7EA 9.24 CIVIL 1
STATION (KS) SFG/KG carried out.

DESAL FG DPS/ DESAL and


875 7EA 9.25
STATION
CIVIL
(KS) SFG/KG
1 Keep the area clean and tidy.

DESAL FG 6" and 4" Hydrostatic and pressure test for pipes to be
876 7EA 10.01 MECH Pipelines 1
STATION carried out.

DESAL FG 6" and 4"


877 7EA 10.02
STATION
ELEC Pipelines 1 Cathodic protection works to be done.

Installation works for concrete slabs serve as


DESAL FG 6" and 4"
878 7EA 10.03
STATION
CIVIL Pipelines 1 pipeline protection when crossing the track roads
to be done.
All exposed concrete surfaces such as slab,
DESAL FG 6" and 4" ramps, retaining wall, plinths, pedestal and
879 7EA 10.04 CIVIL Pipelines 1
STATION supports shall be coated with epoxy paint as per
QCS standards.
DESAL FG 6" and 4"
880 7EA 10.05
STATION
MECH Pipelines 1 Apply touch up paint on pipes and supports.

DESAL FG 6" and 4"


881 7EA 10.06
STATION
CIVIL Pipelines 1 Keep the area clean and tidy.

DESAL FG
882 7FB 1
STATION
MECH General 2 Vehical parking not provided

Safety sign boards to be fixed at main


DESAL FG
883 7FB 2
STATION
CIVIL General 2 gate,emergency gate,MCC room,control room,
generator room etc.

DESAL FG
884 7FB 3
STATION
CIVIL General 2 Flood light pole base coating to be done

DESAL FG
885 7FB 4
STATION
MECH General 2 All mechanical valves tags to be fixed

DESAL FG Handrail to be provided where ever chains are


886 7FB 5 MECH General 2
STATION fixed.

DESAL FG
887 7FB 6
STATION
MECH General 2 Diesel loading point adaptors to be secured

DESAL FG Adjustable handrail lever to be provided instead of


888 7FB 7 MECH General 2
STATION chain

DESAL FG
889 7FB 8
STATION
MECH General 2 Instrument air line painting to be done

DESAL FG
890 7FB 9
STATION
MECH General 2 All valve flanges shall be balaned bolted.

DESAL FG
891 7FB 10
STATION
MECH General 2 Chain blocks color coding to be done

DESAL FG
892 7FB 11
STATION
INST General 2 Heat detector Tag to be made readable

DESAL FG
893 7FB 12
STATION
MECH General 2 DG exhaust system bolting to be done properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DESAL FG HVAC system cable are lying on roof


894 7FB 13 ELEC General 2
STATION unattended,earthing cables to be fixed.
DESAL FG
895 7FB 14
STATION
ELEC General 2 MCC room SLD to be fixed with A1 size
DESAL FG
896 7FB 15
STATION
MECH General 2 Eye wash to be provided in battery room

DESAL FG Permanent tag plates to be fixed on Transformer,,


897 7FB 16 ELEC General 2
STATION mains cable inside trench sleeve to be refixed.

DESAL FG
898 7FB 17
STATION
INST General 2 Air volume tank details plate need proper stensiled

DESAL FG HVAC-NEW
899 7FA 1
STATION
HVAC
SUBSTATION
1 Traffolyte tags to be provided as per AFC
DESAL FG HVAC-NEW
900 7FA 2
STATION
HVAC
SUBSTATION
1 HVAC ID andflow tags to be completed
DESAL FG HVAC-NEW
901 7FA 3
STATION
HVAC
SUBSTATION
1 Duct supports not properly allign
DESAL FG HVAC-NEW Non return damper need to be fix in Generator
902 7FA 4 HVAC 1
STATION SUBSTATION room
DESAL FG HVAC-NEW
903 7FA 5
STATION
HVAC
SUBSTATION
1 Provide filters and clamps for DPS tubes
DESAL FG HVAC-NEW
904 7FA 6
STATION
HVAC
SUBSTATION
1 Clean all ducts diffusers and grills
DESAL FG HVAC-NEW
905 7FA 7
STATION
HVAC
SUBSTATION
1 Check Control panel cables termination
DESAL FG HVAC-NEW
906 7FA 8
STATION
HVAC
SUBSTATION
1 All ducts openings in wall/slab to be sealed
DESAL FG HVAC-NEW
907 7FA 9
STATION
HVAC
SUBSTATION
1 AHU drain pipe to be insulated
DESAL FG HVAC-NEW
908 7FA 10
STATION
HVAC
SUBSTATION
1 Internal and external cleaning of PAC
DESAL FG HVAC-NEW
909 7FA 11
STATION
HVAC
SUBSTATION
1 Final foster coating to be applied after pre-com
DESAL FG HVAC-NEW
910 7FC 1
STATION
HVAC
SUBSTATION
1 PAC corroded guard / panel to be painted
DESAL FG HVAC-NEW
911 7FC 2
STATION
HVAC
SUBSTATION
1 DPT for S/G room interface with HVAC CP
DESAL FG HVAC-NEW
912 7FC 3
STATION
HVAC
SUBSTATION
1 HVAC CP & PAC all wiring to be terminated
DESAL FG HVAC-NEW
913 7FC 4
STATION
HVAC
SUBSTATION
1 ALL HVAC instruments to be securely installed
DESAL FG HVAC-NEW
914 7FC 5
STATION
HVAC
SUBSTATION
1 Roof Duct insulation sagging to be rectified
DESAL FG HVAC-NEW
915 7FC 6
STATION
HVAC
SUBSTATION
1 All DUCT openings in wall /slab to be sealed
DESAL FG HVAC-NEW
916 7FC 7
STATION
HVAC
SUBSTATION
1 All Return Air Duct to be insulated
DESAL FG HVAC-NEW
917 7FC 8
STATION
HVAC
SUBSTATION
1 All SA branch duct require VCD for balancing
DESAL FG HVAC-NEW
918 7FC 9
STATION
HVAC
SUBSTATION
1 Fire Damper to be provided for Fire rated wall
DESAL FG HVAC-NEW
919 7FC 10
STATION
HVAC
SUBSTATION
1 All Duct supports hard insulation to be provided
DESAL FG HVAC-NEW
920 7FC 11
STATION
HVAC
SUBSTATION
1 PAC Drain pipe with insulation to be complted
DESAL FG HVAC-NEW
921 7FC 12
STATION
HVAC
SUBSTATION
1 All the cable glands to be tightened
DESAL FG HVAC-NEW
922 7FC 13
STATION
HVAC
SUBSTATION
1 HVAC CP & F&G interface to be completed
DESAL FG HVAC-NEW
923 7FC 14
STATION
HVAC
SUBSTATION
1 Provide appropriate damper to maintain+
DESAL FG HVAC-NEW
924 7FC 15
STATION
HVAC
SUBSTATION
1 HVAC ID &Flow tags to be provided
DESAL FG HVAC-NEW HVAC CP instruments / switches / dampers
925 7FC 16 HVAC 1
STATION SUBSTATION protection cover to be provided
DESAL FG HVAC-NEW
926 7FC 17
STATION
HVAC
SUBSTATION
1 HVAC SLD to be provided in CP / PAC

Proper rachet to be provided for all pig launchers


927 7C 1 DPS/DESAL MECH 6"/4" PIPELINE 1
and receivers

IN Manual mode for closing the CB, it has to check


DESAL FG
928 7GA 1
STATION
ELEC LV Switch Board 2 only the breaker to close is in service mode and
with other necessary conditions.
During manual synchronization, once close
command given to breaker-A , after
mommmentary parallel with incomer B, the
DESAL FG
929 7GA 2
STATION
ELEC LV Switch Board 2 breaker-B to be opened by itself. At present , the
operator has to open the breaker-B through
selector switch and time for mommentary parallel is
exceeding the limit.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

F&G Trip provided at Generator MCCB through trip


DESAL FG coil. The standard practise is , the F&G relay
930 7GA 3 ELEC LV Switch Board 2
STATION contact to be provided in parallel with the trip
circuit at LV S/Board Generator incomer.

DESAL FG DESAL FG NEW PAC # 1 condenser fan motor vibration to be


931 7IA 1 HVAC 2
STATION SUB STATION rectifed

DESAL FG DESAL FG NEW All condenser guards damaged rubber bushes to


932 7IA 2 HVAC 2
STATION SUB STATION be replaced

DESAL FG DESAL FG NEW


933 7IA 3
STATION
HVAC
SUB STATION
2 PAC# 1 & 2 Blower bearings to be replaced

DESAL FG DESAL FG NEW PAC# 1 & 2 Blower drive alignment to be rectified


934 7IA 4 HVAC 2
STATION SUB STATION to reduce vibration & noise level

DESAL FG DESAL FG NEW Provide FA Intake STL handle and ease of sand
935 7IA 5 HVAC 2
STATION SUB STATION removel

DESAL FG DESAL FG NEW


936 7IA 6
STATION
HVAC
SUB STATION
2 Roof Duct insulation sagging to be rectified

DESAL FG DESAL FG NEW PAC# 1& 2 Supply Air Dampers leakage to be


937 7IA 7 HVAC 2
STATION SUB STATION rectified

DESAL FG DESAL FG NEW


938 7IA 8
STATION
HVAC
SUB STATION
2 Replaced all broken door lacthes

DESAL FG DESAL FG NEW Supply Air temperature of both units are not
939 7IA 9 HVAC 2
STATION SUB STATION achieved as per design temp.

DESAL FG DESAL FG NEW


940 7IA 10
STATION
HVAC
SUB STATION
2 HVAC CP Operating Software to be provided

DESAL FG DESAL FG NEW


941 7IA 11
STATION
HVAC
SUB STATION
2 HVAC ID& Flow Tags to be provided

DESAL FG DESAL FG NEW PAC# 1& 2 require cleaning and removel of sand &
942 7IA 12 HVAC 2
STATION SUB STATION dirts

DESAL FG DESAL FG NEW Removable flters to be provided for air intake at


943 7IA 13 HVAC 2
STATION SUB STATION generator room
4" & 6" SFG line
DESAL FG CP system installation completed.carried out.check
944 7I 1 ELEC Road xings DPS 1
STATION on insulating joints at road croosings
valve stn to Km1
4" & 6" SFG line
DESAL FG Details/description plates on all location junction
945 7I 2 ELEC Road xings DPS 1
STATION boxes-14 nos
valve stn to Km1
4" & 6" SFG line
DESAL FG
946 7I 3
STATION
ELEC Road xings DPS 1 Identification cable tags on all connection cables
valve stn to Km1
4" & 6" SFG line
DESAL FG TP-IJ-05-6" line at Km4 -Need to be rechecked
947 7I 4 ELEC Road xings DPS 1
STATION after the polaraization
valve stn to Km1
4" & 6" SFG line Submission of final reports/survey readings
DESAL FG
948 7I 5
STATION
ELEC Road xings DPS 1 including drawings/locatiobn maps after the
valve stn to Km1 polaraization of system.

949 7-24E 1 WHTP-D ELEC KHUFF-D 1 Electrical JB to be shifted out side the fence

All ESD and F & G related JBs and Instrument Tag


950 7-24F 1 WHTP-D INST KHUFF-D 1
plates should be in red colour.

951 7-24F 2 WHTP-D INST KHUFF-D 1 6D-PCV-0574 Air connection needed to be fixed

952 7-24F 3 WHTP-D INST KHUFF-D 1 6D-PCV-0574 positioner gauge glass broken.

6D-PCV-0574 stem found rusted need to be


953 7-24F 4 WHTP-D INST KHUFF-D 1
cleaned.

954 7-24F 5 WHTP-D INST KHUFF-D 1 Tag no. And canopy not installed for PSL-0565

All transmitter impulse lines/air lines for valves


955 7-24F 6 WHTP-D INST KHUFF-D 1 fittings found loose /not tighten properly. needed to
be tighten.

All JBs TB terminations need to be tighten properly,


956 7-24F 7 WHTP-D INST KHUFF-D 1
terminations found Loose.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
957 7-18E 1
WHTP-D
INST VAL STN 1 Re tubing required for PI-0565

VAL STN
958 7-18E 2
WHTP-D
INST VAL STN 1 No FDIs provided

VAL STN
959 7-18E 3
WHTP-D
INST VAL STN 1 SDV-0565 Name plate required

VAL STN Inst Air header line needed to be fixed. not


960 7-18E 4 INST VAL STN 1
WHTP-D complete.

VAL STN
961 7-18E 5
WHTP-D
INST VAL STN 1 Provide Keys for the Instrument JBs.

LCP-0565 required Tag No., Tag no. Missing for


VAL STN
962 7-18E 6
WHTP-D
INST VAL STN 1 open/close lamps, reset and Test push buttons
missing.

VAL STN
963 7-18E 7
WHTP-D
INST VAL STN 1 TBs (Inside JBs) required tag.

Flexible earthing connections to be provided for


EARTHING
964 7-24C 1 WHTP-D ELEC
SYSTEM
1 Mobile pig launcher with suitable clamps for
temporary connections.

EARTHING
965 7-24C 2 WHTP-D ELEC
SYSTEM
1 Approved AFC drawing to be available.

EARTHING Integrity of existing earthing system to be verified


966 7-24C 3 WHTP-D ELEC 1
SYSTEM before making connections with existing one.

EARTHING Missing washers to be provided in earthing


967 7-24C 4 WHTP-D ELEC 1
SYSTEM connections

VAL STN
968 7-16H 1
WHTP-A
CIVIL GENERAL 1 Tighten the fence material wherever necessary

VAL STN
969 7-16H 2
WHTP-A
MECH GENERAL 1 Touch-up paint on all structural members

VAL STN Cable entry opening to be filled with appropriate


970 7-16H 3 ELEC GENERAL 1
WHTP-A materials

VAL STN Complete the application of epoxy on the pig


971 7-16H 4 CIVIL GENERAL 1
WHTP-A launcher hard stand

VAL STN Rectify the surface of the sub base for track road
972 7-16H 5 CIVIL GENERAL 1
WHTP-A within the station

VAL STN RTU solar panel roof shade sandwich panel edge
973 7-16H 6 MECH GENERAL 1
WHTP-A to be covered properly

VAL STN
974 7-16H 7
WHTP-A
MECH GENERAL 1 provide and install wind sock

VAL STN Complete the access road as per project


975 7-16H 8 CIVIL GENERAL 1
WHTP-A specification

VAL STN
976 7-16H 9
WHTP-A
MECH GENERAL 1 Provide and fix pad lock

VAL STN Grade, backfill and compact the batter around the
977 7-16H 10 CIVIL GENERAL 1
WHTP-A station

VAL STN General cleaning to be done in and around the


978 7-16H 11 CIVIL GENERAL 1
WHTP-A valve
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Complete the asphalt road within the station as per


979 7-24H 1 WHTP-D CIVIL GENERAL 1
project specification

980 7-24H 2 WHTP-D MECH GENERAL 1 provide and install wind sock

981 7-24H 3 WHTP-D CIVIL GENERAL 1 Existing fence to be removed

982 7-24H 4 WHTP-D MECH GENERAL 1 Tighten the fence material wherever necessary

983 7-24H 5 WHTP-D MECH GENERAL 1 Touch-up paint on all structural members

Rectify the surface of the sub base for track road


984 7-24H 6 WHTP-D CIVIL GENERAL 1
within the station

Grade, backfill and compact the batter around the


985 7-24H 7 WHTP-D CIVIL GENERAL 1
station

Complete the access road as per project


986 7-24H 8 WHTP-D CIVIL GENERAL 1
specification

987 7-24H 9 WHTP-D MECH GENERAL 1 Provide and fix pad lock

General cleaning to be done in and around the


988 7-24H 10 WHTP-D CIVIL GENERAL 1
valve

VAL STN
989 7-12D 1
FSDS
INST GENERAL 1 All cables to be tagged with proper strip size

VAL STN GI bolts and clamps for transmitter and manifold's


990 7-12D 2 INST GENERAL 1
FSDS to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
991 7-12D 3 INST GENERAL 1
FSDS with CS / GI supports
VAL STN
992 7-12D 4
FSDS
INST GENERAL 1 Metering skid cables to tagged

VAL STN
993 7-12D 5
FSDS
INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap

VAL STN Proper foam to be filled in pipe sleeves under RTU


994 7-12D 6 INST GENERAL 1
FSDS panel
VAL STN
995 7-12D 7
FSDS
INST GENERAL 1 FO cable route marker to be installed

VAL STN
996 7-12D 8
FSDS
INST GENERAL 1 Red line mark up drawings to be submitted

VAL STN Calibration and configuration of MV Flow Tx to be


997 7-12D 9 INST GENERAL 1
FSDS verified
VAL STN
998 7-12D 10
FSDS
INST GENERAL 1 RTU panel cards to be tagged properly

VAL STN
999 7-18D 1
WHTP-D
INST GENERAL 1 All cables to be tagged with proper strip size

VAL STN GI bolts and clamps for transmitter and manifold's


1000 7-18D 2 INST GENERAL 1
WHTP-D to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
1001 7-18D 3 INST GENERAL 1
WHTP-D with CS / GI supports
VAL STN
1002 7-18D 4
WHTP-D
INST GENERAL 1 Metering skid cables to tagged

VAL STN
1003 7-18D 5
WHTP-D
INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap

VAL STN Proper foam to be filled in pipe sleeves under RTU


1004 7-18D 6 INST GENERAL 1
WHTP-D panel
VAL STN
1005 7-18D 7
WHTP-D
INST GENERAL 1 FO cable route marker to be installed

VAL STN
1006 7-18D 8
WHTP-D
INST GENERAL 1 Red line mark up drawings to be submitted

VAL STN Calibration and configuration of MV Flow Tx to be


1007 7-18D 9 INST GENERAL 1
WHTP-D verified
VAL STN
1008 7-18D 10
WHTP-D
INST GENERAL 1 RTU panel cards to be tagged properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1009 7-16D 1
WHTP-A
INST GENERAL 1 All cables to be tagged with proper strip size

VAL STN GI bolts and clamps for transmitter and manifold's


1010 7-16D 2 INST GENERAL 1
WHTP-A to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
1011 7-16D 3 INST GENERAL 1
WHTP-A with CS / GI supports
VAL STN
1012 7-16D 4
WHTP-A
INST GENERAL 1 Metering skid cables to tagged

VAL STN
1013 7-16D 5
WHTP-A
INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap

VAL STN Proper foam to be filled in pipe sleeves under RTU


1014 7-16D 6 INST GENERAL 1
WHTP-A panel
VAL STN
1015 7-16D 7
WHTP-A
INST GENERAL 1 FO cable route marker to be installed

VAL STN
1016 7-16D 8
WHTP-A
INST GENERAL 1 Red line mark up drawings to be submitted

VAL STN Calibration and configuration of MV Flow Tx to be


1017 7-16D 9 INST GENERAL 1
WHTP-A verified
VAL STN
1018 7-16D 10
WHTP-A
INST GENERAL 1 RTU panel cards to be tagged properly

1019 7-24D 1 WHTP-D INST GENERAL 1 All cables to be tagged with proper strip size

GI bolts and clamps for transmitter and manifold's


1020 7-24D 2 WHTP-D INST GENERAL 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
1021 7-24D 3 WHTP-D INST GENERAL 1
with CS / GI supports

1022 7-24D 4 WHTP-D INST GENERAL 1 Red line mark up drawings to be submitted

1023 7-24D 5 WHTP-D INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap

Calibration and configuration of MV Flow Tx to be


1024 7-24D 6 WHTP-D INST GENERAL 1
verified

1025 7-24D 7 WHTP-D INST GENERAL 1 All instruments to be tagged

1026 7-24D 8 WHTP-D INST GENERAL 1 Cable tray installed for cables to be covered

Cable tray installed for cables to be supported and


1027 7-24D 9 WHTP-D INST GENERAL 1
clamped properly

1028 7-24D 10 WHTP-D INST GENERAL 1 Proper access to be provided for instruments

Calibration to be done for all instruments and F&G


1029 7-24D 11 WHTP-D INST GENERAL 1
devices

1030 7-24D 12 WHTP-D INST GENERAL 1 Cable route markers to be installed

VAL STN
1031 7-16G 1
WHTP-A
MECH GENERAL 1 Housekeeping to be carried out.

VAL STN
1032 7-16G 2
WHTP-A
MECH GENERAL 1 Greasing/molycote to be done for all bolts

VAL STN Rubber caps for the handle of the valves to be


1033 7-16G 3 MECH GENERAL 1
WHTP-A replaced by new one. where ever is required.

VAL STN UV protection tape to be wrapped at exposed


1034 7-16G 4 MECH GENERAL 1
WHTP-A wrapping areas of the pipe .

VAL STN
1035 7-16G 5
WHTP-A
MECH GENERAL 1 At 6" Tie-in point(Sag Line) to be painted.

1036 7-24G 1 WHTP-D MECH GENERAL 1 Housekeeping to be carried out.

1037 7-24G 2 WHTP-D MECH GENERAL 1 Greasing/molycote to be done for all bolts

Rubber caps for the handle of the valves to be


1038 7-24G 3 WHTP-D MECH GENERAL 1
replaced by new one. where ever is required.

1039 7-24G 4 WHTP-D MECH GENERAL 1 Tie-in to be done.


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

1040 7-24G 5 WHTP-D CIVIL GENERAL 1 Asphalt road be done.

VAL STN
1041 7-18H 1
WHTP-D
MECH GENERAL 1 Housekeeping to be carried out.

VAL STN
1042 7-18H 2
WHTP-D
MECH GENERAL 1 Greasing/molycote to be done for all bolts

VAL STN Rubber caps for the handle of the valves to be


1043 7-18H 3 MECH GENERAL 1
WHTP-D replaced by new one. where ever is required.

VAL STN
1044 7-12E 1
FSDS
CIVIL GENERAL 1 Housekeeping to be carried out.

VAL STN
1045 7-12E 2
FSDS
MECH GENERAL 1 Greasing/molycote to be done for all bolts

VAL STN Rubber caps for the handle of the valves to be


1046 7-12E 3 MECH GENERAL 1
FSDS replaced by new one. where ever is required.

VAL STN Tag numbering to be confirmed, existing starting


1047 7-18G 1 MECH GENERAL 1
WHTP-D with 5D, instead of 6D for Khuff Plant.

VAL STN Installation of BV-0003 & PI-0001 are not align with
1048 7-16I 1 MECH GENERAL 1
WHTP-A the piping

VAL STN
1049 7-16I 2
WHTP-A
MECH GENERAL 1 Pipe support bolt loosen at D/S of BV-0014

VAL STN
1050 7-16E 1
WHTP-A
INST GENERAL 1 5A-XS-0001 switch gap to adjusted.

VAL STN 5A-PI-0001 should be use one bush 1/2"M x 1/2"


1051 7-16E 2 INST GENERAL 2
WHTP-A FM instead of nipple & socket.

VAL STN Earth protect bolts to tight and both JB tag are
1052 7-16E 3 INST GENERAL 2
WHTP-A missing.

VAL STN 5A-FT-0001 impulse line isolating valve lock screw


1053 7-16E 4 INST GENERAL 2
WHTP-A are missing.

VAL STN
1054 7-16E 5
WHTP-A
INST GENERAL 2 Loop drawing provide for local panel.

VAL STN
1055 7-18F 1
WHTP-D
MECH GENERAL 1 2nos Platform hand rails to be provided

VAL STN Pig launcher foundation to be painted, to avoid


1056 7-18F 2 CIVIL GENERAL 1
WHTP-D hazard trip.

VAL STN Asphalt road to be provided on the existing road in


1057 7-18F 3 CIVIL GENERAL 1
WHTP-D side the valve station.

VAL STN Main and man way gates to be painted with green
1058 7-18F 4 MECH GENERAL 1
WHTP-D color.

VAL STN
1059 7-18F 5
WHTP-D
CIVIL GENERAL 1 Splicing pit cover to be painted with black color.

VAL STN Modify the emergency gates to avoid for opening


1060 7-18F 6 MECH GENERAL 1
WHTP-D he gate from out side.

VAL STN Hazard sign board to be provided on the battery


1061 7-18F 7 ELEC GENERAL 1
WHTP-D box at valve station

VAL STN Tagging to be provided on the battery for identify


1062 7-18F 8 ELEC GENERAL 1
WHTP-D the equipment at the side.

VAL STN
1063 7-16F 1
WHTP-A
MECH GENERAL 1 2nos Platform hand rails to be provided

VAL STN Pig launcher foundation to be painted, to avoid


1064 7-16F 2 CIVIL GENERAL 1
WHTP-A hazard trip.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Asphalt road to be provided on the existing road in


1065 7-16F 3 CIVIL GENERAL 1
WHTP-A side the valve station.

VAL STN Main and man way gates to be painted with green
1066 7-16F 4 MECH GENERAL 1
WHTP-A color.

VAL STN
1067 7-16F 5
WHTP-A
CIVIL GENERAL 1 Splicing pit cover to be painted with black color.

VAL STN Modify the emergency gates to avoid for opening


1068 7-16F 6 MECH GENERAL 1
WHTP-A he gate from out side.

VAL STN Hazard sign board to be provided on the battery


1069 7-16F 7 ELEC GENERAL 1
WHTP-A box at valve station

VAL STN Tagging to be provided on the battery for identify


1070 7-16F 8 ELEC GENERAL 1
WHTP-A the equipment at the side.

VAL STN
1071 7-16F 9
WHTP-A
MECH GENERAL 1 Wind sock to be provided at the side.

VAL STN Check the gate installation and provide true


1072 7-12B 1 MECH 1
FSDS alignment

VAL STN Rectification shall be done for the track road inside
1073 7-12B 2 CIVIL 1
FSDS the fence

VAL STN Backfilling up to the edge of grading, compaction


1074 7-12B 3 CIVIL 1
FSDS and proper slope to be provided

VAL STN Rectification of the spill pit and top surface to be


1075 7-12B 4 CIVIL 1
FSDS prepared smoothly

VAL STN
1076 7-12B 5
FSDS
CIVIL 1 Access road from main gate to ROW shall be done

VAL STN
1077 7-12B 6
FSDS
CIVIL 1 Painting to be done for kerb stone

VAL STN
1078 7-12B 7
FSDS
MECH PAINTING 1 Apply touchup paint for gate and fence post

VAL STN
1079 7-12B 8
FSDS
CIVIL 1 Joint sealant for the required areas to be done

VAL STN Cover for the splicing pit and spill pit shall be
1080 7-12B 9 MECH 1
FSDS provided
VAL STN
1081 7-12B 10
FSDS
CIVIL 1 Proper cleaning to be done for fence and gate

VAL STN Remove all temporary facilities and house keeping


1082 7-12B 11 CIVIL 1
FSDS to be done

Rectification of the damaged concrete surface and


VAL STN
1083 7-16B 1
WHTP-A
CIVIL 1 the above ground coating with epoxy paints shall
be completed

VAL STN Rectification shall be done for the track road inside
1084 7-16B 2 CIVIL 1
WHTP-A the fence

VAL STN Backfilling up to the edge of grading, compaction


1085 7-16B 3 CIVIL 1
WHTP-A and proper slope to be provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1086 7-16B 4
WHTP-A
CIVIL 1 Ladder foundation to be installed

VAL STN
1087 7-16B 5
WHTP-A
CIVIL 1 Access road from main gate to ROW shall be done

VAL STN
1088 7-16B 6
WHTP-A
MECH 1 Wind sock to be provided

VAL STN
1089 7-16B 7
WHTP-A
MECH 1 Apply touchup paint for gate and fence post

VAL STN Rectification of damage area existing ROW shall


1090 7-16B 8 CIVIL 1
WHTP-A be done

VAL STN Touchup paint for the installed pipe sleeper to be


1091 7-16B 9 CIVIL 1
WHTP-A done

VAL STN Between the sleeper pad area backfill and compact
1092 7-16B 10 CIVIL 1
WHTP-A it properly

VAL STN
1093 7-16B 11
WHTP-A
CIVIL 1 Proper cleaning to be done for fence and gate

VAL STN
1094 7-16B 12
WHTP-A
CIVIL 1 Bund to be provided as per drawing

Asphalt road and associated work shall be done for


1095 7-24B 1 WHTP-D CIVIL 1
inside the fence

Backfilling up to the edge of grading, compaction


1096 7-24B 2 WHTP-D CIVIL 1
and proper slope to be provided

1097 7-24B 3 WHTP-D CIVIL 1 Ladder foundation to be installed

1098 7-24B 4 WHTP-D CIVIL 1 Access road from main gate to ROW shall be done

1099 7-24B 5 WHTP-D MECH 1 Wind sock to be provided

1100 7-24B 6 WHTP-D MECH 1 Apply touchup paint for gate and fence post

1101 7-24B 7 WHTP-D CIVIL 1 Spill pit top surface to be prepared smoothly

1102 7-24B 8 WHTP-D CIVIL 1 Kerb stone at the corners shall be properly installed

1103 7-24B 9 WHTP-D CIVIL 1 Painting to be done for kerb stone

Existing fence to be removed after getting approval


1104 7-24B 10 WHTP-D CIVIL 1
from client

1105 7-24B 11 WHTP-D CIVIL 1 Joint sealant for the required areas to be done

1106 7-24B 12 WHTP-D CIVIL 1 Proper cleaning to be done for fence and gate
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Check the gate installation and provide true


1107 7-24B 13 WHTP-D MECH 1
alignment
Gate drop bolt arrester to be provided as per
1108 7-24B 14 WHTP-D CIVIL 1
drawing

1109 7-24B 15 WHTP-D CIVIL 1 Fasten and tighten all lose barbed wire

Remove all temporary facilities and house keeping


1110 7-24B 16 WHTP-D CIVIL 1
to be done
Rectification of the damaged concrete surface and
VAL STN
1111 7-18B 1
WHTP-D
CIVIL 1 the above ground coating with epoxy paints shall
be completed
VAL STN Rectification shall be done for the track road inside
1112 7-18B 2 CIVIL 1
WHTP-D the fence

VAL STN Backfilling up to the edge of grading, compaction


1113 7-18B 3 CIVIL 1
WHTP-D and proper slope to be provided

VAL STN
1114 7-18B 4
WHTP-D
CIVIL 1 Spill pit top surface to be prepared smoothly

VAL STN
1115 7-18B 5
WHTP-D
CIVIL 1 Access road from main gate to ROW shall be done

VAL STN
1116 7-18B 6
WHTP-D
CIVIL 1 Painting to be done for kerb stone

VAL STN
1117 7-18B 7
WHTP-D
MECH 1 Apply touchup paint for gate and fence post

VAL STN
1118 7-18B 8
WHTP-D
CIVIL 1 Joint sealant for the required areas to be done

VAL STN Cover for the splicing pit and spill pit shall be
1119 7-18B 9 CIVIL 1
WHTP-D provided

VAL STN
1120 7-18B 10
WHTP-D
CIVIL 1 Proper cleaning to be done for fence and gate

VAL STN Remove all temporary facilities and house keeping


1121 7-18B 11 CIVIL 1
WHTP-D to be done

VAL STN Pig trap and accessories to be installed for the


1122 7-11G 1.01 MECH 1
FNLGCS alignment.

VAL STN JIB crane to be installed/ Third party certificate to


1123 7-11G 1.02 MECH 1
FNLGCS be provided.

VAL STN RTU solar roof fascia's insulation sheet to be


1124 7-11G 1.03 MECH 1
FNLGCS sealed properly.

VAL STN Keep the earth pit chamber chequered plate


1125 7-11G 1.04 ELEC 1
FNLGCS covers stabled, aligned and leveled.

All exposed concrete surfaces such as slab,


VAL STN
1126 7-11G 1.05
FNLGCS
CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

VAL STN Apply touch up paint on all structural steels, gate/


1127 7-11G 1.06 MECH 1
FNLGCS fence posts, pipes and supports.

VAL STN
1128 7-11G 1.07
FNLGCS
MECH 1 Apply molycoat grease oil on all bolts and nuts.

VAL STN Gate hasp locks to be checked and aligned/


1129 7-11G 1.08 MECH 1
FNLGCS Provide pins/ padlocks.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1130 7-11G 1.09
FNLGCS
CIVIL 1 Gate drop bolt eyes to be provided.

VAL STN Chain link collar plate for pipe opening to be


1131 7-11G 1.10 MECH 1
FNLGCS provided.

VAL STN Slab cover lifting hooks to be sealed with


1132 7-11G 1.11 CIVIL 1
FNLGCS appropriate materials.

VAL STN
1133 7-11G 1.12
FNLGCS
MECH 1 Windsock to be provided.

VAL STN
1134 7-11G 1.13
FNLGCS
CIVIL 1 Keep the area clean and tidy.

Pig trap and accessories to be installed for the


1135 7-3D 2.01 FNLGCS MECH 1
alignment.

JIB crane to be installed/ Third party certificate to


1136 7-3D 2.02 FNLGCS MECH 1
be provided.

1137 7-3D 2.03 FNLGCS CIVIL 1 Asphalt road and associated works not done.

All exposed concrete surfaces such as slab,


1138 7-3D 2.04 FNLGCS CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

Apply touch up paint on all structural steels, gate/


1139 7-3D 2.05 FNLGCS MECH 1
fence posts, pipes and supports.

1140 7-3D 2.06 FNLGCS MECH 1 Apply molycoat grease oil on all bolts and nuts.

Gate hasp locks to be checked and aligned/


1141 7-3D 2.07 FNLGCS MECH 1
Provide pins/ padlocks.

1142 7-3D 2.08 FNLGCS CIVIL 1 Gate drop bolt eyes to be provided.

Chain link collar plate for pipe opening to be


1143 7-3D 2.09 FNLGCS MECH 1
provided.

1144 7-3D 2.1 FNLGCS MECH 1 Crash barrier and kerbstones to be painted

1145 7-3D 2.11 FNLGCS MECH 1 Windsock to be provided.

1146 7-3D 2.12 FNLGCS CIVIL 1 Keep the area clean and tidy.

Pig trap and accessories to be installed for the


1147 7-21G 3.01 WHTP-A MECH 1
alignment.

JIB crane to be installed/ Third party certificate to


1148 7-21G 3.02 WHTP-A MECH 1
be provided.

1149 7-21G 3.03 WHTP-A CIVIL 1 Asphalt road and associated works not done.

All exposed concrete surfaces such as slab,


1150 7-21G 3.04 WHTP-A CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

Apply touch up paint on all structural steels, gate/


1151 7-21G 3.05 WHTP-A MECH 1
fence posts, pipes and supports.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Gate hasp locks to be checked and aligned/


1152 7-21G 3.06 WHTP-A MECH 1
Provide pins/ padlocks.

1153 7-21G 3.07 WHTP-A CIVIL 1 Gate drop bolt eyes to be provided.

1154 7-21G 3.08 WHTP-A CIVIL 1 Remove existing chain link fencing near station.

1155 7-21G 3.09 WHTP-A CIVIL 1 New chain link fence netting to be provided.

Chain link collar plate for pipe opening to be


1156 7-21G 3.10 WHTP-A MECH 1
provided.

1157 7-21G 3.11 WHTP-A MECH 1 Spill pit grating to be installed properly

1158 7-21G 3.12 WHTP-A CIVIL 1 Rectify concrete cracks around spill pit grating.

1159 7-21G 3.13 WHTP-A MECH 1 Apply molycoat grease oil on all bolts and nuts.

1160 7-21G 3.14 WHTP-A MECH 1 Crash barrier and kerbstones to be painted

1161 7-21G 3.15 WHTP-A CIVIL 1 Fasten and tighten loose chain link.

1162 7-21G 3.16 WHTP-A MECH 1 Windsock to be provided.

1163 7-21G 3.17 WHTP-A CIVIL 1 Keep the area clean and tidy.

VAL STN Pig trap and accessories to be installed for the


1164 7-17H 4.01 MECH 1
WHTP-B alignment.

VAL STN JIB crane to be installed/ Third party certificate to


1165 7-17H 4.02 MECH 1
WHTP-B be provided.

VAL STN RTU solar roof fascia's insulation sheet to be


1166 7-17H 4.03 MECH 1
WHTP-B sealed properly.

All exposed concrete surfaces such as slab,


VAL STN
1167 7-17H 4.04
WHTP-B
CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

VAL STN Apply touch up paint on all structural steels, gate/


1168 7-17H 4.05 MECH 1
WHTP-B fence posts, pipes and supports.

VAL STN
1169 7-17H 4.06
WHTP-B
MECH 1 Apply molycoat grease oil on all bolts and nuts.

VAL STN Gate hasp locks to be checked and aligned/


1170 7-17H 4.07 MECH 1
WHTP-B Provide pins/ padlocks.

VAL STN
1171 7-17H 4.08
WHTP-B
CIVIL 1 Gate drop bolt eyes to be provided.

VAL STN Chain link collar plate for pipe opening to be


1172 7-17H 4.09 MECH 1
WHTP-B provided.

VAL STN
1173 7-17H 4.10
WHTP-B
MECH 1 Windsock to be provided.

VAL STN
1174 7-17H 4.11
WHTP-B
CIVIL 1 Keep the area clean and tidy.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Pig trap and accessories to be installed for the


1175 7-22G 5.01 WHTP-B MECH 1
alignment.

JIB crane to be installed/ Third party certificate to


1176 7-22G 5.02 WHTP-B MECH 1
be provided.

Cable earthing trench backfilling and compaction


1177 7-22G 5.03 WHTP-B CIVIL 1
works to be completed

1178 7-22G 5.04 WHTP-B MECH 1 Cross- over ladder works to be completed.

All exposed concrete surfaces such as slab,


1179 7-22G 5.05 WHTP-B CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

Apply touch up paint on all structural steels, gate/


1180 7-22G 5.06 WHTP-B MECH 1
fence posts, pipes and supports.

Gate hasp locks to be checked and aligned/


1181 7-22G 5.07 WHTP-B MECH 1
Provide pins/ padlocks.

1182 7-22G 5.08 WHTP-B CIVIL 1 Gate drop bolt eyes to be provided.

1183 7-22G 5.09 WHTP-B CIVIL 1 Remove existing chain link fencing near station.

1184 7-22G 5.10 WHTP-B CIVIL 1 New chain link fence netting to be provided.

Chain link collar plate for pipe opening to be


1185 7-22G 5.11 WHTP-B MECH 1
provided.

1186 7-22G 5.12 WHTP-B MECH 1 Apply molycoat grease oil on all bolts and nuts.

1187 7-22G 5.13 WHTP-B CIVIL 1 Aggregates to be spreaded properly.

1188 7-22G 5.14 WHTP-B CIVIL 1 Pipe support to be filled with grout.

1189 7-22G 5.15 WHTP-B CIVIL 1 Fasten and tighten loose barbed wires.

1190 7-22G 5.16 WHTP-B MECH 1 Windsock to be provided.

1191 7-22G 5.17 WHTP-B CIVIL 1 Keep the area clean and tidy.

Pig trap and accessories to be installed for the


1192 7-23G 6.01 WHTP-C MECH 1
alignment.

JIB crane to be installed/ Third party certificate to


1193 7-23G 6.02 WHTP-C MECH 1
be provided.

1194 7-23G 6.03 WHTP-C CIVIL 1 Asphalt road and associated works not done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All exposed concrete surfaces such as slab,


1195 7-23G 6.04 WHTP-C CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

Apply touch up paint on all structural steels, gate/


1196 7-23G 6.05 WHTP-C MECH 1
fence posts, pipes and supports.

Gate hasp locks to be checked and aligned/


1197 7-23G 6.06 WHTP-C MECH 1
Provide pins/ padlocks.

1198 7-23G 6.07 WHTP-C CIVIL 1 Gate drop bolt eyes to be provided.

1199 7-23G 6.08 WHTP-C CIVIL 1 Remove existing chain link fencing near station.

1200 7-23G 6.09 WHTP-C CIVIL 1 New chain link fence netting to be provided.

Chain link collar plate for pipe opening to be


1201 7-23G 6.10 WHTP-C MECH 1
provided.

1202 7-23G 6.11 WHTP-C MECH 1 Apply molycoat grease oil on all bolts and nuts.

1203 7-23G 6.12 WHTP-C MECH 1 Crash barrier and kerbstones to be painted

1204 7-23G 6.13 WHTP-C CIVIL 1 Fasten and tighten loose barbed wires.

1205 7-23G 6.14 WHTP-C MECH 1 Windsock to be provided.

1206 7-23G 6.15 WHTP-C CIVIL 1 Keep the area clean and tidy.

VAL STN Rectify the surface of the sub base for track road
1207 7-18I 1 CIVIL 1
WHTP-D within the station

VAL STN Rectify the damage on the surface of the splicing


1208 7-18I 2 CIVIL 1
WHTP-D pit using proprietary repairing materials

VAL STN
1209 7-18I 3
WHTP-D
CIVIL 1 Tighten the fence material wherever necessary

VAL STN
1210 7-18I 4
WHTP-D
MECH 1 Touch-up paint on all structural members

VAL STN Complete the access road as per project


1211 7-18I 5 CIVIL 1
WHTP-D specification

VAL STN
1212 7-18I 6
WHTP-D
MECH 1 Provide and fix pad lock

VAL STN Grade, backfill and compact the batter around the
1213 7-18I 7 CIVIL 1
WHTP-D station
VAL STN RTU solar panel roof shade sandwich panel edge
1214 7-18I 8 MECH 1
WHTP-D to be covered properly

VAL STN General cleaning to be done in and around the


1215 7-18I 9 CIVIL 1
WHTP-D valve stations

VAL STN Rectify the surface of the sub base for track road
1216 7-12F 1 CIVIL 1
FSDS within the station

VAL STN Cable entry opening to be filled with appropriate


1217 7-12F 2 ELEC 1
FSDS materials
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1218 7-12F 3
FSDS
CIVIL 1 Tighten the fence material wherever necessary

VAL STN
1219 7-12F 4
FSDS
MECH 1 Touch up paint on all structural members

VAL STN Complete the access road as per project


1220 7-12F 5 CIVIL 1
FSDS specification

VAL STN
1221 7-12F 6
FSDS
MECH 1 Provide and fix pad lock

VAL STN Grade, backfill and compact the batter around the
1222 7-12F 7 CIVIL 1
FSDS station

VAL STN RTU solar panel roof shade sandwich panel edge
1223 7-12F 8 MECH 1
FSDS to be covered properly

VAL STN General cleaning to be done in and around valve


1224 7-12F 9 CIVIL 1
FSDS station

Crash barrier painting to be provided for pig trap


1225 7-21F 1 WHTP-A MECH Manifold 1
foundation

1226 7-21F 2 WHTP-A CIVIL Manifold 1 Asphalt road to be provided

1227 7-21F 3 WHTP-A MECH Manifold 1 Main and man gates to be painted with green color.

Main and man way gates to be painted with green


1228 7-21F 4 WHTP-A MECH Manifold 1
color.

1229 7-21F 5 WHTP-A CIVIL Manifold 1 Splicing pit cover to be painted with black color.

Touch painting to be carried out for some of the


1230 7-21F 6 WHTP-A MECH Manifold 1
pipe line and valves

Tag no's to be provided for all instrument and


1231 7-21F 7 WHTP-A MECH Manifold 1
mechanical equipment

1232 7-21F 8 WHTP-A MECH Manifold 1 Wind sock to be provided

Crash barrier painting to be provided for pig trap


1233 7-22F 1 WHTP-B CIVIL Manifold 1
foundation

1234 7-22F 2 WHTP-B CIVIL Manifold 1 Asphalt road to be provided

1235 7-22F 3 WHTP-B MECH Manifold 1 Main and man gates to be painted with green color.

Main and man way gates to be painted with green


1236 7-22F 4 WHTP-B MECH Manifold 1
color.

1237 7-22F 5 WHTP-B CIVIL Manifold 1 Splicing pit cover to be painted with black color.

Touch painting to be carried out for some of the


1238 7-22F 6 WHTP-B MECH Manifold 1
pipe line and valves

Tag no's to be provided for all instrument and


1239 7-22F 7 WHTP-B MECH Manifold 1
mechanical equipment

1240 7-22F 8 WHTP-B MECH Manifold 1 Wind sock to be provided


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1241 7-17E 1
WHTP-B
MECH 1 2nos Platform hand rails to be provided

VAL STN Pig launcher foundation to be painted, to avoid


1242 7-17E 2 CIVIL 1
WHTP-B hazard trip.

VAL STN Asphalt road to be provided on the existing road in


1243 7-17E 3 CIVIL 1
WHTP-B side the valve station.

VAL STN Main and man way gates to be painted with green
1244 7-17E 4 MECH 1
WHTP-B color.

VAL STN
1245 7-17E 5
WHTP-B
CIVIL 1 Splicing pit cover to be painted with black color.

VAL STN Modify the emergency gates to avoid for opening


1246 7-17E 6 MECH 1
WHTP-B he gate from out side.

VAL STN Hazard sign board to be provided on the battery


1247 7-17E 7 ELEC 1
WHTP-B box at valve station

VAL STN Tagging to be provided on the battery for identify


1248 7-17E 8 ELEC 1
WHTP-B the equipment at the side.

VAL STN
1249 7-17E 9
WHTP-B
MECH 1 Tag no to be provided for all mechanical equipment

VAL STN
1250 7-17E 10
WHTP-B
INST 1 Tag no to be provided for all instrument equipment

VAL STN
1251 7-17E 11
WHTP-B
CIVIL 1 Crash painting of pig trap foundation to be made

Crash barrier painting to be provided for pig trap


1252 7-23F 1 WHTP-C MECH 1
foundation

1253 7-23F 2 WHTP-C CIVIL 1 Asphalt road to be provided

1254 7-23F 3 WHTP-C MECH 1 Main and man gates to be painted with green color.

Main and man way gates to be painted with green


1255 7-23F 4 WHTP-C MECH 1
color.

1256 7-23F 5 WHTP-C CIVIL 1 Splicing pit cover to be painted with black color.

Touch painting to be carried out for some of the


1257 7-23F 6 WHTP-C MECH 1
pipe line and valves

Tag no's to be provided for all instrument and


1258 7-23F 7 WHTP-C MECH 1
mechanical equipments

1259 7-23F 8 WHTP-C MECH 1 Wind sock to be provided

EARTHING
VAL STN Missing washers to be provided in earthing
1260 7-16C 1 ELEC SYSTEM AND 1
WHTP-A connections
SOLAR PANEL

EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1261 7-16C 2 ELEC SYSTEM AND 1
WHTP-A to be completed
SOLAR PANEL

EARTHING
VAL STN Cable termination in Solar control panel to be
1262 7-16C 3 ELEC SYSTEM AND 1
WHTP-A done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1263 7-16C 4 ELEC SYSTEM AND 1
WHTP-A provided as per QP approval
SOLAR PANEL
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

EARTHING
VAL STN
1264 7-16C 5
WHTP-A
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL

EARTHING Components installed inside the controlled panel


VAL STN
1265 7-16C 6
WHTP-A
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure
EARTHING Flexible earthing connections to be provided for
VAL STN
1266 7-16C 7
WHTP-A
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.

EARTHING
VAL STN
1267 7-16C 8
WHTP-A
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1268 7-16C 9 ELEC SYSTEM AND 1
WHTP-A proven
SOLAR PANEL

EARTHING
VAL STN Missing washers to be provided in earthing
1269 7-18C 1 ELEC SYSTEM AND 1
WHTP-D connections
SOLAR PANEL

EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1270 7-18C 2 ELEC SYSTEM AND 1
WHTP-D to be completed
SOLAR PANEL

EARTHING
VAL STN Cable termination in Solar control panel to be
1271 7-18C 3 ELEC SYSTEM AND 1
WHTP-D done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1272 7-18C 4 ELEC SYSTEM AND 1
WHTP-D provided as per QP approval
SOLAR PANEL

EARTHING
VAL STN
1273 7-18C 5
WHTP-D
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL

EARTHING Components installed inside the controlled panel


VAL STN
1274 7-18C 6
WHTP-D
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure

EARTHING Flexible earthing connections to be provided for


VAL STN
1275 7-18C 7
WHTP-D
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.

EARTHING
VAL STN
1276 7-18C 8
WHTP-D
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1277 7-18C 9 ELEC SYSTEM AND 1
WHTP-D proven
SOLAR PANEL

EARTHING
VAL STN Missing washers to be provided in earthing
1278 7-12C 1 ELEC SYSTEM AND 1
FSDS connections
SOLAR PANEL

EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1279 7-12C 2 ELEC SYSTEM AND 1
FSDS to be completed
SOLAR PANEL

EARTHING
VAL STN Cable termination in Solar control panel to be
1280 7-12C 3 ELEC SYSTEM AND 1
FSDS done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1281 7-12C 4 ELEC SYSTEM AND 1
FSDS provided as per QP approval
SOLAR PANEL

EARTHING
VAL STN
1282 7-12C 5
FSDS
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL

EARTHING Components installed inside the controlled panel


VAL STN
1283 7-12C 6
FSDS
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure

EARTHING Flexible earthing connections to be provided for


VAL STN
1284 7-12C 7
FSDS
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

EARTHING
VAL STN
1285 7-12C 8
FSDS
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1286 7-12C 9 ELEC SYSTEM AND 1
FSDS proven
SOLAR PANEL

Asphalt road and associated works shall be done


1287 7-4B 1 FSDS CIVIL 1
inside the fence

1288 7-4B 2 FSDS CIVIL 1 Painting to be done for the kerb stone

1289 7-4B 3 FSDS CIVIL 1 Joint sealant for the required areas to be done

Check the gate installation and provide true


1290 7-4B 4 FSDS MECH 1
alignment

Gate drop bolt arrested to be provided as per the


1291 7-4B 5 FSDS CIVIL 1
drawing

1292 7-4B 6 FSDS MECH 1 Apply touchup paint for the gate and fence post

Backfilling up to required level,grading,proper


1293 7-4B 7 FSDS CIVIL 1 compaction and gravel laying shall be done for the
balance area of in side the fence

Existing fence to be removed after getting the


1294 7-4B 8 FSDS CIVIL 1
approval from client

Preparation of the top surface of spill pit wall and


1295 7-4B 9 FSDS CIVIL 1
cover to be provided

Grouting and epoxy coating to be done for all


1296 7-4B 10 FSDS CIVIL 1
remaining foundation
Backfilling to be completed for the earthing cable
1297 7-4B 11 FSDS CIVIL 1
trench

1298 7-4B 12 FSDS CIVIL 1 Barbed wire on top of the gate to be completed

Existing plant level and extended area level to be


1299 7-4B 13 FSDS CIVIL 1
maintained
Remove all temporary facilities and house keeping
1300 7-4B 14 FSDS CIVIL 1
to be done
Asphalt road and associated works shall be done
1301 7-1B 1 FNDS CIVIL 1
inside the fence

1302 7-1B 2 FNDS CIVIL 1 Painting to be done for the kerb stone

1303 7-1B 3 FNDS CIVIL 1 Joint sealant for the required areas to be done

Fence opening at pipe entry shall be reinstated


1304 7-1B 4 FNDS MECH 1
properly

Gate drop bolt arrested to be provided as per the


1305 7-1B 5 FNDS CIVIL 1
drawing

Touch up paint to be completed for the structural


1306 7-1B 6 FNDS MECH 1
member
Remove all temporary facilities and house keeping
1307 7-1B 7 FNDS CIVIL 1
to be done

VAL STN Corrosion injection component shall be installed in


1308 7-12A 1 MECH VAL STN 1
FSDS the presence of OEI prior to commissioning

VAL STN
1309 7-12A 2
FSDS
INST VAL STN 1 Pig signaler is to be functional tested
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1310 7-12A 3
FSDS
MECH VAL STN 1 Jib crane to be installed.

VAL STN All safety equipments shall be installed as per


1311 7-12A 4 MECH VAL STN 1
FSDS approved drawings and SOW

VAL STN Pig trap shall be installed to ensure the alignment


1312 7-12A 5 MECH VAL STN 1
FSDS level

VAL STN All hydro test record shall be shown to substantiate


1313 7-12A 6 MECH VAL STN 1
FSDS the complete system

VAL STN
1314 7-12A 7
FSDS
MECH VAL STN 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


1315 7-12A 8 MECH VAL STN 1
FSDS per project specifications
VAL STN Final painting report certified by QP QAC shall be
1316 7-12A 9 MECH VAL STN 1
FSDS provided
VAL STN
1317 7-12A 10
FSDS
MECH VAL STN 1 Stenciling and colour coding shall be done

All flanges shall be applied molycoat, tightened


VAL STN
1318 7-12A 11
FSDS
MECH VAL STN 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
1319 7-12A 12 MECH VAL STN 1
FSDS commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
1320 7-12A 13 MECH VAL STN 1
FSDS signed off by QP
VAL STN Temporary support by beam clamp shall be
1321 7-16A 1 MECH VAL STN 1
WHTP-A removed at PS-55A010206
Flange at downstream or upstream of PI-0001 shall
VAL STN
1322 7-16A 2
WHTP-A
MECH VAL STN 1 be unbolted and checked for alignment / free of
stress
VAL STN
1323 7-16A 3
WHTP-A
MECH VAL STN 1 Vent pipe is to be vertically aligned properly

VAL STN Corrosion injection component shall be installed in


1324 7-16A 4 MECH VAL STN 1
WHTP-A the presence of OEI prior to commissioning

VAL STN
1325 7-16A 5
WHTP-A
INST VAL STN 1 Pig signaler is to be functional tested

VAL STN All safety equipments shall be installed as per


1326 7-16A 7 MECH VAL STN 1
WHTP-A approved drawings and SOW

VAL STN Safety chain or bar are to be installed in ladders of


1327 7-16A 8 MECH VAL STN 1
WHTP-A all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


1328 7-16A 9 MECH VAL STN 1
WHTP-A the complete system

VAL STN
1329 7-16A 10
WHTP-A
MECH VAL STN 1 Stenciling & color coding shall be done

VAL STN
1330 7-16A 11
WHTP-A
MECH VAL STN 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


1331 7-16A 12 MECH VAL STN 1
WHTP-A per project specifications
VAL STN Final painting report certified by QP QAC shall be
1332 7-16A 13 MECH VAL STN 1
WHTP-A provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All flanges shall be applied molycoat, tightened


VAL STN
1333 7-16A 14
WHTP-A
MECH VAL STN 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
1334 7-16A 15 MECH VAL STN 1
WHTP-A commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
1335 7-16A 16 MECH VAL STN 1
WHTP-A signed off by QP
VAL STN Pig trap shall be installed to ensure the alignment
1336 7-16A 17 MECH VAL STN 1
WHTP-A level

Pipeline number and flow direction to be marked as


1337 7-21E 1 WHTP-A MECH 1
per QP standard

Tag number for all isolation valves, COSASCO


1338 7-21E 2 WHTP-A MECH 1
fittings are to be provided

1339 7-21E 3 WHTP-A MECH 1 BV-0459 Valve operating handle is missing

Tie-in total 3 nos. in piping to be completed before


1340 7-21E 4 WHTP-A MECH 1
commissioning activities

Pipeline number and flow direction to be marked as


1341 7-22E 1 WHTP-B MECH 1
per QP standard

Tag number for all isolation valves, COSASCO


1342 7-22E 2 WHTP-B MECH 1
fittings are to be provided

PLG-0393, BV-0397 and PLG-0392 valve


1343 7-22E 3 WHTP-B MECH 1
operating handles are missing

Tie-in of 8 inch flare line and 1" Air line to SDV-


1344 7-22E 4 WHTP-B MECH 1 0071 are to be completed before commissioning
activities

Provide plug on the vent valves of BV-0410 and


1345 7-22E 5 WHTP-B MECH 1
BV-0414

VAL STN Pipeline number and flow direction to be marked as


1346 7-17F 1 MECH 1
WHTP-B per QP standard

VAL STN Tag number for all isolation valves, COSASCO


1347 7-17F 2 MECH 1
WHTP-B fittings are to be provided

Pipeline number and flow direction to be marked as


1348 7-23E 1 WHTP-C MECH 1
per QP standard

Tag number for all isolation valves, COSASCO


1349 7-23E 2 WHTP-C MECH 1
fittings are to be provided

BV-0408, BV-0420, BV-0445 and PLG-0405 Valve


1350 7-23E 3 WHTP-C MECH 1
operating handle is missing

Tie-in total of 8 nos. pipe sizes 1", 2" 3" & 4" are to
1351 7-23E 4 WHTP-C MECH 1
be completed before commissioning activities

VAL STN Pipeline number and flow direction to be marked as


1352 7-26C 1 MECH VAL STN 1
FNDS per QP standard

VAL STN
1353 7-26C 2
FNDS
MECH 1 Tag number for all isolation valves is to be provided

VAL STN Coating of isolation valves to be done to QP


1354 7-26C 3 MECH VAL STN 1
FNDS standards

VAL STN Pipeline number and flow direction to be marked as


1355 7-11E 1 MECH VAL STN 1
FNLGCS per QP standard

VAL STN
1356 7-11E 2
FNLGCS
MECH VAL STN 1 Tag number for all isolation valves is to be provided

VAL STN Stenciling of mobile pig launcher tag number to QP


1357 7-11E 3 MECH VAL STN 1
FNLGCS standard

1358 7-24A 1 WHTP-D MECH 1 Flare line slope and alignment shall be rectified

1359 7-24A 2 WHTP-D MECH 1 SRV's alignments are to be proved

Instrument air line is not aligned completely - to be


1360 7-24A 3 WHTP-D MECH 1
rectified
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Corrosion fittings shall be installed in the presence


1361 7-24A 4 WHTP-D MECH 1
of OEI prior to commissioning

1362 7-24A 5 WHTP-D MECH 1 Pig signaler is to be functional tested

1363 7-24A 6 WHTP-D MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


1364 7-24A 7 WHTP-D MECH 1
approved drawings and SOW
Safety chain or bar are to be installed in ladders of
1365 7-24A 8 WHTP-D MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


1366 7-24A 9 WHTP-D MECH 1
the complete system

1367 7-24A 10 WHTP-D MECH 1 Stenciling and colour coding shall be done

1368 7-24A 11 WHTP-D MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


1369 7-24A 12 WHTP-D MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1370 7-24A 13 WHTP-D MECH 1
provided
All flanges shall be applied molycoat, tightened
1371 7-24A 14 WHTP-D MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1372 7-24A 15 WHTP-D MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1373 7-24A 16 WHTP-D MECH 1
signed off by QP

Personnel protective insulation is to be installed as


1374 7-24A 17 WHTP-D MECH 1
per P&ID

Platform is to be extended for the access of online


1375 7-24A 18 WHTP-D MECH 1
SRV testing are to be demonstrated, if not required

Corrosion fittings retrieval tool kit shall be handed


1376 7-24A 19 WHTP-D MECH 1 over to QP (this item is to be maintained as
common for the whole Project)
No photography sign board is to be relocated
1377 7-24A 20 WHTP-D MECH 1
outside
Pig trap shall be installed to ensure the alignment
1378 7-24A 21 WHTP-D MECH 1
level

VAL STN Corrosion injection component shall be installed in


1379 7-18A 1 MECH VAL STN 1
WHTP-D the presence of OEI prior to commissioning

VAL STN
1380 7-18A 2
WHTP-D
INST VAL STN 1 Pig signaler is to be functional tested

VAL STN
1381 7-18A 3
WHTP-D
MECH VAL STN 1 JIB crane is to be installed

VAL STN All safety equipments shall be installed as per


1382 7-18A 4 MECH VAL STN 1
WHTP-D approved drawings and SOW
VAL STN Pig trap shall be installed to ensure the alignment
1383 7-18A 5 MECH VAL STN 1
WHTP-D level

VAL STN All hydro test record shall be shown to substantiate


1384 7-18A 6 MECH VAL STN 1
WHTP-D the complete system

VAL STN
1385 7-18A 7
WHTP-D
MECH VAL STN 1 All valve tags are to be provided in SS material
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Piping works shall be dried & nitrogen purged as


1386 7-18A 8 MECH VAL STN 1
WHTP-D per project specifications
VAL STN Final painting report certified by QP QAC shall be
1387 7-18A 9 MECH VAL STN 1
WHTP-D provided
VAL STN
1388 7-18A 10
WHTP-D
MECH VAL STN 1 Stenciling and colour coding shall be done

All flanges shall be applied molycoat, tightened


VAL STN
1389 7-18A 11
WHTP-D
MECH VAL STN 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
1390 7-18A 12 MECH VAL STN 1
WHTP-D commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
1391 7-18A 13 MECH VAL STN 1
WHTP-D signed off by QP
complete network & Block drawing for the
Ruggedcom Switch management system cabling
1392 7-29A 1 DOMB PABX INST TELECOM 2
as well as within rack cabling to be provided &
pasted at the inside of the door rack.

Ruggedcom,switch,server,UPS &Telecom rack to


1393 7-29A 2 DOMB PABX INST TELECOM 2
be tagged & labeled

Ruggedcom server operating system should be


windows 2008 & also NMS server software version
1394 7-29A 3 DOMB PABX INST TELECOM 2
1.4 to be installed ( same as Dukhan PABX
Ruggedcom server)

Ruggedcom server & Ruggedcom switch power


1395 7-29A 4 DOMB PABX INST TELECOM 2
breaker to be installed separately
TELECOM :
VAL STN 1- FOPP to be tagged as per QP tagging
1396 7-9A 1 INST FIBER OPTIC 1
FMDS procedure/labeled
CABLE
TELECOM :
VAL STN 1-
1397 7-9A 2
FMDS
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN 1- FO cable complete network & Block drawing to be
1398 7-9A 3 INST FIBER OPTIC 1
FMDS provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN 1-
1399 7-9A 4
FMDS
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN 1-
1400 7-9A 5
FMDS
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN 1-
1401 7-9A 6
FMDS
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN 1- Fiber optic enclosure to be fixed (inside of the
1402 7-9A 7 INST FIBER OPTIC 1
FMDS manhole
CABLE
TELECOM :
1403 7-5A 1 FSP INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure
CABLE
TELECOM :
1404 7-5A 2 FSP INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
FO cable complete network & Block drawing to be
1405 7-5A 3 FSP INST FIBER OPTIC 1
CABLE provided & pasted at the inside of the door rack

TELECOM :
1406 7-5A 4 FSP INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
1407 7-5A 5 FSP INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
1408 7-8A 1 STATION-N INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure
CABLE
TELECOM :
1409 7-8A 2 STATION-N INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
FO cable complete network & Block drawing to be
1410 7-8A 3 STATION-N INST FIBER OPTIC 1
CABLE provided & pasted at the inside of the door rack

TELECOM :
1411 7-8A 4 STATION-N INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
1412 7-8A 5 STATION-N INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

TELECOM :
1413 7-6A 1 KNDS INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure
CABLE
TELECOM :
1414 7-6A 2 KNDS INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
FO cable complete network & Block drawing to be
1415 7-6A 3 KNDS INST FIBER OPTIC 1
CABLE provided & pasted at the inside of the door rack

TELECOM :
1416 7-6A 4 KNDS INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
1417 7-6A 5 KNDS INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN FOPP to be tagged as per QP tagging
1418 7-18J 1 INST FIBER OPTIC 1
WHTP-D procedure/labeled
CABLE
TELECOM :
VAL STN
1419 7-18J 2
WHTP-D
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN FO cable complete network & Block drawing to be
1420 7-18J 3 INST FIBER OPTIC 1
WHTP-D provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN
1421 7-18J 4
WHTP-D
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN
1422 7-18J 5
WHTP-D
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
1423 7-18J 6
WHTP-D
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN FIBEr optic enclosure to be fixed (inside of the
1424 7-18J 7 INST FIBER OPTIC 1
WHTP-D manhole
CABLE
TELECOM :
VAL STN FOPP to be tagged as per QP tagging
1425 7-16J 1 INST FIBER OPTIC 1
WHTP-A procedure/labeled
CABLE
TELECOM :
VAL STN
1426 7-16J 2
WHTP-A
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN FO cable complete network & Block drawing to be
1427 7-16J 3 INST FIBER OPTIC 1
WHTP-A provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN
1428 7-16J 4
WHTP-A
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN
1429 7-16J 5
WHTP-A
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
1430 7-16J 6
WHTP-A
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN Fiber optic enclosure to be fixed (inside of the
1431 7-16J 7 INST FIBER OPTIC 1
WHTP-A manhole
CABLE
TELECOM :
VAL STN FOPP to be tagged as per QP tagging
1432 7-17I 1 INST FIBER OPTIC 1
WHTP-B procedure/labeled
CABLE
TELECOM :
VAL STN
1433 7-17I 2
WHTP-B
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN FO cable complete network & Block drawing to be
1434 7-17I 3 INST FIBER OPTIC 1
WHTP-B provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN
1435 7-17I 4
WHTP-B
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN
1436 7-17I 5
WHTP-B
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
1437 7-17I 6
WHTP-B
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN Fiber optic enclosure to be fixed (inside of the
1438 7-17I 7 INST FIBER OPTIC 1
WHTP-B manhole
CABLE
Excavated material and dune sand to be removed
PIPELINE - 4'' 4"-VAL STN-D to
1439 7-7A 1
WHTP-D
CIVIL
WHTP-D
1 from surroundings of the support foundations and
compact it properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Backfilling up to the required level,grating,proper


PIPELINE - 4'' 4"-VAL STN-D to compaction and compaction test to be carried out
1440 7-7A 2 CIVIL 1
WHTP-D WHTP-D for ROW along with preparation of shoulder from
valve station-D to station WHTP-D
PIPELINE - 4'' 4"-VAL STN-D to
1441 7-7A 3
WHTP-D
CIVIL
WHTP-D
1 Crash barrier to be provided for the culvert areas
PIPELINE - 4'' 4"-VAL STN-D to concrete surface preparation ,epoxy coating and
1442 7-7A 4 CIVIL 1
WHTP-D WHTP-D joint sealant to be done for inside the culvert
The end of the culvert mouth shall be coated and
PIPELINE - 4'' 4"-VAL STN-D to
1443 7-7A 5
WHTP-D
CIVIL
WHTP-D
1 covered with marine plywood of minimum
thickness 18mm
PIPELINE - 4'' 4"-VAL STN-D to Backfilling, leveling and compaction shall be done
1444 7-7A 6 CIVIL 1
WHTP-D WHTP-D for the mouth of the culverts
Pipe sleepers are resting in the ditches to be
PIPELINE - 4'' 4"-VAL STN-D to
1445 7-7A 7
WHTP-D
CIVIL
WHTP-D
1 rectified and between the sleeper pad area
backfilled and compact it properly
PIPELINE - 4'' 4"-VAL STN-D to Surface preparation and above ground epoxy
1446 7-7A 8 CIVIL 1
WHTP-D WHTP-D coating to be done for the support foundations
PIPELINE - 4'' 4"-VAL STN-D to Identification slab and protection slab to be
1447 7-7A 9 CIVIL 1
WHTP-D WHTP-D provided at the existing cable crossing
PIPELINE - 4'' 4"-VAL STN-D to Damaged paint on installed pipe supports to be
1448 7-7A 10 CIVIL 1
WHTP-D WHTP-D rectified

PIPELINE - 4'' 4"-VAL STN-D to Existing pipe is not resting properly on the support
1449 7-7A 11 CIVIL 1
WHTP-D WHTP-D foundations inside the new culvert to be rectified
PIPELINE - 4'' 4"-VAL STN-D to
1450 7-7A 12
WHTP-D
CIVIL
WHTP-D
1 Cleaning to be done inside the culverts
PIPELINE - 4'' 4"-VAL STN-D to Removal of unwanted materials and house
1451 7-7A 13 CIVIL 1
WHTP-D WHTP-D keeping shall be done
VAL STN
1452 7-10F 1
FNFIS
MECH VAL STN 1 Wind sock shall be installed

VAL STN
1453 7-10F 2
FNFIS
MECH VAL STN 1 painting/touch up painting required

VAL STN
1454 7-10F 3
FNFIS
MECH VAL STN 1 Tag# shall be stenciled on the piping

VAL STN All valves and instruments shall be provided with


1455 7-10F 4 MECH VAL STN 1
FNFIS large metal tags(large stamping)

VAL STN
1456 7-10F 5
FNFIS
MECH VAL STN 1 Missing valves shall be installed

VAL STN
1457 7-10F 6
FNFIS
MECH VAL STN 1 Missing flanges and vent shall be installed

VAL STN Spill pit is in the wrong location, it shall be under


1458 7-10F 7 MECH VAL STN 1
FNFIS pig trap door

VAL STN
1459 7-15F 1
WHTP H&L
MECH VAL STN 1 Wind sock shall be installed

VAL STN
1460 7-15F 2
WHTP H&L
MECH VAL STN 1 painting/touch up painting required

VAL STN
1461 7-15F 3
WHTP H&L
MECH VAL STN 1 Tag# shall be stenciled on the piping

VAL STN All valves and instruments shall be provided with


1462 7-15F 4 MECH VAL STN 1
WHTP H&L large metal tags(large stamping)

VAL STN Spill pit is in the wrong location, it shall be under


1463 7-15F 5 MECH VAL STN 1
WHTP H&L pig trap door

1464 7-2F 1 FNFIS MECH 1 All valves tag number to be provided.


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

1465 7-2F 2 FNFIS MECH 1 All foundation bolt tightness check to be done.

1466 7-2F 3 FNFIS MECH 1 All tie in valve connection to beto be done.

1467 7-2F 4 FNFIS MECH 1 Glycol heater platform locking chain to be rectified.

As per P&ID BV-0945 Down stream 79-RO-1003


1468 7-2F 5 FNFIS MECH 1
to be provided.

6 BV-0912 valve to be installed with spectacle


1469 7-2F 6 FNFIS MECH 1
blind close condition.

Near fuel gas water bath heater handrail ladder


1470 7-2F 7 FNFIS MECH 1
support to be provided.

As per P&ID 79-LIT-0100 is not in place, Instead


1471 7-2F 8 FNFIS INST 1
installed 4LG header line.

Termination box cover to be closed on Glycol


1472 7-2F 9 FNFIS ELEC 1
heater.

1473 7-2F 10 FNFIS MECH 1 Instrument air tie in to be done.

1474 7-2F 11 FNFIS MECH 1 LG-1001 line connection is in improper condition.

3 Quick connection valve spectacle blind to be


1475 7-2F 12 FNFIS MECH 1
installed.

1476 7-2F 13 FNFIS MECH 1 PCV-2202 B and PCV-2202A to be installed.

6BV-0929 and 2BV-0930 Valve handle is not


1477 7-2F 14 FNFIS MECH 1
working need to repair.

All Instrument air line U clamp tightness check to


1478 7-2F 15 FNFIS MECH 1
done.

Instrument air line U clamp to be provided Near


1479 7-2F 16 FNFIS MECH 1
79-TE-0200.

2 PLG 0906 and PLG -0910 valve handle to be


1480 7-2F 17 FNFIS MECH 1
modified.

1481 7-2F 18 FNFIS MECH 1 2 BV-0945 and 2BV-0905 Handle to be provided.

Electrical power cable tray cover to be provided on


1482 7-2F 19 FNFIS ELEC 1
Glycol heater

Mobile launcher connection 6"BV-0009 down


VAL STN
1483 7-10E 1
FNFIS
MECH 1 stream spectacle blind to be reversed to close
position. BV - 0009 end blind to installed.

VAL STN BV -0010 down stream 2" PLG -0001 valve handle
1484 7-10E 2 MECH 1
FNFIS to be installed

VAL STN BV -0010 down stream vent to safe location


1485 7-10E 3 MECH 1
FNFIS pipeline to be installed

VAL STN
1486 7-10E 4
FNFIS
MECH 1 2" kicker line end blind to be installed.

VAL STN BV-0005 up stream spectacle blind to be installed


1487 7-10E 5 MECH 1
FNFIS to close position.

VAL STN
1488 7-10E 6
FNFIS
MECH 1 2" BV-0006 End blind to be installed.

VAL STN 6" BV- 0001 bypass valve 2" PLG-0002 to be


1489 7-10E 7 MECH 1
FNFIS installed

VAL STN 6"BV-0001 Bypass valve 2" BV-0014 down stream


1490 7-10E 8 MECH 1
FNFIS spectacle blind to be installed to close position.

VAL STN
1491 7-10E 9
FNFIS
MECH 1 Wind sock to be provided.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Mobile pig launcher connection 4" BV -0010 end


1492 7-15E 1 MECH 1
WHTP H&L blind to be installed.

VAL STN
1493 7-15E 2
WHTP H&L
MECH 1 2" Kicker line end blind to be installed.

VAL STN
1494 7-15E 3
WHTP H&L
MECH 1 2" BV-0007 End blind to be installed

VAL STN 4"BV-0002 Down stream spectacle blind to be


1495 7-15E 4 MECH 1
WHTP H&L installed to open position

VAL STN 4" BV -0002 Bypass 2" BV-0001 spectacle to be


1496 7-15E 5 MECH 1
WHTP H&L installed to close position

VAL STN
1497 7-15E 6
WHTP H&L
MECH 1 Wind sock to be provided.

VAL STN 4 " spectacle blind for down stream BV-002 to be


1498 7-14E 1 MECH 1
WHTP E&G provided as per P&ID.
VAL STN 2" spectacle blind for down stream BV-0011 to be
1499 7-14E 2 MECH 1
WHTP E&G provided as per P&ID.
VAL STN
1500 7-14E 3
WHTP E&G
MECH 1 Missing handle valve at 4" BV-0009 to be provided.
VAL STN
1501 7-14E 4
WHTP E&G
MECH 1 Name plate for all valve to be provided
VAL STN Short bolt at spectacle blind to replaced with
1502 7-14E 5 MECH 1
WHTP E&G proper size at BV-0006
VAL STN Short bolt at spectacle blind to replaced with
1503 7-14E 6 MECH 1
WHTP E&G proper size at BV-0011
VAL STN
1504 7-14E 7
WHTP E&G
MECH 1 Fire extinguisher to be provided
VAL STN
1505 7-14E 8
WHTP E&G
MECH 1 Wind sock to be provided.

VAL STN 4" spectacle blind for down stream BV-0004 to be


1506 7-13E 1 MECH 1
KNMP provided as per P&ID.

VAL STN
1507 7-13E 2
KNMP
MECH 1 Name plate for all valve to be provided

VAL STN
1508 7-13E 3
KNMP
MECH 1 Fire extinguisher to be provided

VAL STN
1509 7-13E 4
KNMP
MECH 1 Wind sock to be provided.

EARTHING Missing washers to be provided in earhing


VAL STN
1510 7-10C 1
FNFIS
ELEC SYSTEM AND 1 connections. Also, Some earthing bolts are broken
SOLAR PANEL to be rectified.

EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1511 7-10C 2 ELEC SYSTEM AND 1
FNFIS to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1512 7-10C 3 ELEC SYSTEM AND 1
FNFIS done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1513 7-10C 4 ELEC SYSTEM AND 1
FNFIS provided as per QP approval
SOLAR PANEL

EARTHING
VAL STN
1514 7-10C 5
FNFIS
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL

EARTHING Components installated inside the controlled panel


VAL STN
1515 7-10C 6
FNFIS
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure

EARTHING Flexible earthing connections to be provided for


VAL STN
1516 7-10C 7
FNFIS
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.

EARTHING
VAL STN
1517 7-10C 8
FNFIS
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

EARTHING
VAL STN Integrity of earthing connections to be verified and
1518 7-10C 9 ELEC SYSTEM AND 1
FNFIS proven
SOLAR PANEL

EARTHING
VAL STN Dummy glands and spare holes to be closed with
1519 7-10C 10 ELEC SYSTEM AND 1
FNFIS IP rated dummies.
SOLAR PANEL

EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1520 7-10C 11 ELEC SYSTEM AND 1
FNFIS supports, to be installed with suitable fastensers
SOLAR PANEL

EARTHING Missing washers to be provided in earhing


VAL STN
1521 7-15C 1
WHTP H&L
ELEC SYSTEM AND 1 connections. Also, Some earthing bolts are broken
SOLAR PANEL to be rectified.

EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1522 7-15C 2 ELEC SYSTEM AND 1
WHTP H&L to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1523 7-15C 3 ELEC SYSTEM AND 1
WHTP H&L done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1524 7-15C 4 ELEC SYSTEM AND 1
WHTP H&L provided as per QP approval
SOLAR PANEL

EARTHING
VAL STN
1525 7-15C 5
WHTP H&L
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL

EARTHING Components installated inside the controlled panel


VAL STN
1526 7-15C 6
WHTP H&L
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure

EARTHING Flexible earthing connections to be provided for


VAL STN
1527 7-15C 7
WHTP H&L
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.

EARTHING
VAL STN
1528 7-15C 8
WHTP H&L
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1529 7-15C 9 ELEC SYSTEM AND 1
WHTP H&L proven
SOLAR PANEL

EARTHING
VAL STN Dummy glands and spare holes to be closed with
1530 7-15C 10 ELEC SYSTEM AND 1
WHTP H&L IP rated dummies.
SOLAR PANEL

EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1531 7-15C 11 ELEC SYSTEM AND 1
WHTP H&L supports, to be installed with suitable fastensers
SOLAR PANEL

EARTHING Missing washers to be provided in earhing


VAL STN
1532 7-13C 1
KNMP
ELEC SYSTEM AND 1 connections. Also, Some earthing bolts are broken
SOLAR PANEL to be rectified.

EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1533 7-13C 2 ELEC SYSTEM AND 1
KNMP to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1534 7-13C 3 ELEC SYSTEM AND 1
KNMP done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1535 7-13C 4 ELEC SYSTEM AND 1
KNMP provided as per QP approval
SOLAR PANEL

EARTHING
VAL STN
1536 7-13C 5
KNMP
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL

EARTHING Components installated inside the controlled panel


VAL STN
1537 7-13C 6
KNMP
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure

EARTHING Flexible earthing connections to be provided for


VAL STN
1538 7-13C 7
KNMP
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

EARTHING
VAL STN
1539 7-13C 8
KNMP
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1540 7-13C 9 ELEC SYSTEM AND 1
KNMP proven
SOLAR PANEL

EARTHING
VAL STN Dummy glands and spare holes to be closed with
1541 7-13C 10 ELEC SYSTEM AND 1
KNMP IP rated dummies.
SOLAR PANEL

EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1542 7-13C 11 ELEC SYSTEM AND 1
KNMP supports, to be installed with suitable fastensers
SOLAR PANEL

EARTHING
VAL STN Duct entry to be sealed. Dressing of cables to be
1543 7-13C 12 ELEC SYSTEM AND 1
KNMP done neatly
SOLAR PANEL

Flexible earthing connections to be provided for


EARTHING
1544 7-19C 1 WHTP-H ELEC
SYSTEM
1 mobile pig launcher with suitable clamps for
temporary connections.

EARTHING
1545 7-19C 2 WHTP-H ELEC
SYSTEM
1 Approved AFC drawing to be available.

EARTHING Integrity of existing earthing system to be verified


1546 7-19C 3 WHTP-H ELEC 1
SYSTEM before making connections with existing one.

EARTHING Missing washers to be provided in earthing


1547 7-19C 4 WHTP-H ELEC 1
SYSTEM connections
EARTHING
1548 7-19C 5 WHTP-H ELEC
SYSTEM
1 Construction inspection not completed

EARTHING Missing washers to be provided in earhing


VAL STN
1549 7-14C 1
WHTP E&G
ELEC SYSTEM AND 1 connections. Also, Some earthing bolts are broken
SOLAR PANEL to be rectified.
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1550 7-14C 2 ELEC SYSTEM AND 1
WHTP E&G to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1551 7-14C 3 ELEC SYSTEM AND 1
WHTP E&G done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1552 7-14C 4 ELEC SYSTEM AND 1
WHTP E&G provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1553 7-14C 5
WHTP E&G
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING Components installated inside the controlled panel
VAL STN
1554 7-14C 6
WHTP E&G
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure
EARTHING Flexible earthing connections to be provided for
VAL STN
1555 7-14C 7
WHTP E&G
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections.
EARTHING
VAL STN
1556 7-14C 8
WHTP E&G
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1557 7-14C 9 ELEC SYSTEM AND 1
WHTP E&G proven
SOLAR PANEL
EARTHING
VAL STN Dummy glands and spare holes to be closed with
1558 7-14C 10 ELEC SYSTEM AND 1
WHTP E&G IP rated dummies.
SOLAR PANEL
EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1559 7-14C 11 ELEC SYSTEM AND 1
WHTP E&G supports, to be installed with suitable fastensers
SOLAR PANEL
EARTHING
VAL STN Duct entry to be sealed. Dressing of cables to be
1560 7-14C 12 ELEC SYSTEM AND 1
WHTP E&G done neatly
SOLAR PANEL

Lighting System Light fitting installation including pole fasteners


1561 7-2C 1 FNFIS ELEC 1
for Glycol Skid installation to be completed in all aspects
Lighting System
1562 7-2C 2 FNFIS ELEC
for Glycol Skid
1 Tag number for DB, Cable to be completed
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Lighting System
1563 7-2C 3 FNFIS ELEC
for Glycol Skid
1 Cable entry to light fitting to sealed

Lighting System
1564 7-2C 4 FNFIS ELEC
for Glycol Skid
1 Cable tray cover to be installed

Lighting System
1565 7-2C 5 FNFIS ELEC
for Glycol Skid
1 Cutting edges of supports to be painted

Earthing
System,UPS ,LV Power supply cable from UPS panel to Glycol
1566 7-2C 1 FNFIS ELEC 1
DB and Glycol panel to be clamped properly.
Panel
Earthing
System,UPS ,LV
1567 7-2C 2 FNFIS ELEC
DB and Glycol
1 Tightness of earthing connection to be completed
Panel
Earthing
System,UPS ,LV Earthing activities in mobilie pig launcher to be
1568 7-2C 3 FNFIS ELEC 1
DB and Glycol completed
Panel
Earthing
System,UPS ,LV
1569 7-2C 4 FNFIS ELEC
DB and Glycol
1 Tag installation for earthing cable to be completed
Panel
Earthing
System,UPS ,LV Earthing connection in mobile pig launcher area to
1570 7-2C 5 FNFIS ELEC 1
DB and Glycol be done with flexible connections
Panel
Earthing
System,UPS ,LV Denso tape installation to be completed after
1571 7-2C 6 FNFIS ELEC 1
DB and Glycol tightness verification in all earting connections
Panel
Earthing
System,UPS ,LV
1572 7-2C 7 FNFIS ELEC
DB and Glycol
1 Cable tray earthing to be completed
Panel
Earthing
System,UPS ,LV
1573 7-2C 8 FNFIS ELEC
DB and Glycol
1 Route marker installation to be completed
Panel
Earthing Supports to be installed properly and insulation of
System,UPS ,LV
1574 7-2C 9 FNFIS ELEC
DB and Glycol
1 cable to be protected from sharp edges at both
Panel sides.

Earthing
System,UPS ,LV LV feeder side identification tag to be provided for
1575 7-2C 10 FNFIS ELEC 1
DB and Glycol alloted one and supplied spare with all details
Panel
Earthing
System,UPS ,LV Tigtness verification for heater cable to be
1576 7-2C 11 FNFIS ELEC 1
DB and Glycol completed at both ends
Panel
Earthing IP rating details not available in the heater power
System,UPS ,LV
1577 7-2C 12 FNFIS ELEC
DB and Glycol
1 supply JB at top of the skid. Necessary information
Panel to be provided.

Flexible earthing connections to be provided for


1578 7-27B 1 WHTP E ELEC Earthing System 1 mobile pig launcher with suitable clamps for
temporary connections.

1579 7-27B 2 WHTP E ELEC Earthing System 1 Approved AFC drawing to be available.

Integrity of existing earthing system to be verified


1580 7-27B 3 WHTP E ELEC Earthing System 1
before making connections with existing one.

Missing washers to be provided in earthing


1581 7-27B 4 WHTP E ELEC Earthing System 1
connections

1582 7-27B 5 WHTP E ELEC Earthing System 1 Construction inspection not completed

VAL STN
1583 7-13F 1
KNMP
MECH VAL STN 1 Wind sock shall be installed.

VAL STN
1584 7-13F 2
KNMP
MECH VAL STN 1 Painting/touch-up painting required.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1585 7-13F 3
KNMP
MECH VAL STN 1 Tag # shall be stencilled on the piping.

VAL STN All valves and instruments shall be provided with


1586 7-13F 4 MECH VAL STN 1
KNMP large metal tags (large stamping).

VAL STN All studbolts shall be of correct size and properly


1587 7-13F 5 MECH VAL STN 1
KNMP tightened.

VAL STN Sunshade panels shall be properly finished to


1588 7-13F 6 MECH VAL STN 1
KNMP contain and protect the insulation.

VAL STN
1589 7-13F 7
KNMP
MECH VAL STN 1 Fence ring shall be installed for protuding pipes

VAL STN
1590 7-13F 8
KNMP
MECH VAL STN 1 BV-008 valve & spectacle blind to be installed

VAL STN
1591 7-13F 9
KNMP
MECH VAL STN 1 Spectacle blind on BV-004 valve to be installed

VAL STN Replace solar panel support structure bolting with


1592 7-13F 10 MECH VAL STN 1
KNMP galvanized.
VAL STN
1593 7-14F 1
WHTP E&G
MECH VAL STN 1 Wind sock shall be installed.
VAL STN
1594 7-14F 2
WHTP E&G
MECH VAL STN 1 Painting/touch-up painting required.
VAL STN
1595 7-14F 3
WHTP E&G
MECH VAL STN 1 Tag # shall be stencilled on the piping.
VAL STN All valves and instruments shall be provided with
1596 7-14F 4 MECH VAL STN 1
WHTP E&G large metal tags (large stamping).
VAL STN All studbolts shall be of correct size and properly
1597 7-14F 5 MECH VAL STN 1
WHTP E&G tightened.
VAL STN Sunshade panels shall be properly finished to
1598 7-14F 6 MECH VAL STN 1
WHTP E&G contain and protect the insulation.
Complete the approach road as per SOW and
1599 7-20F 1 WHTP-L CIVIL 1
project specification

1600 7-20F 2 WHTP-L MECH 1 Apply structural paint on platforms and piping

1601 7-20F 3 WHTP-L CIVIL 1 Apply paint on kerb stones

Lifting hook holes of protection slab to be filled with


1602 7-20F 4 WHTP-L CIVIL 1
appropriate material

1603 7-20F 5 WHTP-L MECH 1 Apply paint on crash barriers

1604 7-20F 6 WHTP-L CIVIL 1 Grading and lelelling of surrounding area

Rectify the surface cracks on the supports and


1605 7-20F 7 WHTP-L CIVIL 1
plinths wherever necessary

1606 7-20F 8 WHTP-L CIVIL 1 Aggregate spreading to be completed

1607 7-20F 9 WHTP-L CIVIL 1 General cleaning to be done

1608 7-19F 10 WHTP-H MECH 1 Apply structural paint on platforms and piping

1609 7-19F 11 WHTP-H MECH 1 Install ring at the pipe crossing area through fence

Apply paint on steel supports of compressed air


1610 7-19F 12 WHTP-H MECH 1
line

Rectify the surface cracks on the supports and


1611 7-19F 13 WHTP-H CIVIL 1
plinths wherever necessary

VAL STN Backfill, grade and compact the surface and batter
1612 7-15G 14 CIVIL VAL STN 1
WHTP H&L of approach road

VAL STN
1613 7-15G 15
WHTP H&L
MECH VAL STN 1 Touch up paint on all structural member
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1614 7-15G 16
WHTP H&L
MECH VAL STN 1 provide and install wind sock

VAL STN Fill all the cable entry opening with appropriate
1615 7-15G 17 ELEC VAL STN 1
WHTP H&L material

VAL STN
1616 7-15G 18
WHTP H&L
CIVIL VAL STN 1 Re-instate the pit to connect the line with 18" line

VAL STN
1617 7-15G 19
WHTP H&L
CIVIL VAL STN 1 General cleaning to be done

VAL STN
1618 7-10G 20
FNFIS
MECH VAL STN 1 Provide and install wind sock

VAL STN
1619 7-10G 21
FNFIS
MECH VAL STN 1 Install cover on spill pit

VAL STN
1620 7-10G 22
FNFIS
MECH VAL STN 1 Install ring at the pipe crossing area through fence

VAL STN
1621 7-10G 23
FNFIS
MECH VAL STN 1 Apply paint on crash barrier

VAL STN
1622 7-10G 24
FNFIS
MECH VAL STN 1 Touch up paint on pipe line

VAL STN
1623 7-10G 25
FNFIS
CIVIL VAL STN 1 Gereral cleaning to be done

1624 7-25B 1 Station-U ELEC LV Switch Board 1 Missing CT installation to be completed


Interpanel wiring, bus bar torquing , protection
1625 7-25B 2 Station-U ELEC LV Switch Board 2 relay test, F&G trip test and function verification to
be completed.
Torquing of incomer cables and outgoing cables to
1626 7-25B 3 Station-U ELEC LV Switch Board 1
be completed
Spare holes shall be sealed with suitable dummy
1627 7-25B 4 Station-U ELEC LV Switch Board 1
plug
1628 7-25B 5 Station-U ELEC LV Switch Board 1 SCS cable termination to be completed.
Wiring modification related to LV scheme to be
1629 7-25B 6 Station-U ELEC LV Switch Board 1
completed before proceding for testing
33KV Switch
1630 7-25B 1 Station-U ELEC Board & Metering 1 Installation of side covers to be completed
panel
33KV Switch
HV cable termination /Gland earthingto be
1631 7-25B 2 Station-U ELEC Board & Metering 1
panel completed

33KV Switch
1632 7-25B 3 Station-U ELEC Board & Metering 1 Earthing for suppports to be completed
panel

33KV Switch
1633 7-25B 4 Station-U ELEC Board & Metering 1 Duct entries to the building to be sealed
panel
33KV Switch Interpanel wiring, bus bar torquing , protection
1634 7-25B 5 Station-U ELEC Board & Metering 2 relay test, F&G trip test and function verification to
panel be completed.
33KV Switch
1635 7-25B 6 Station-U ELEC Board & Metering 1 Torquing for all outgoing cables to be completed
panel
33KV Switch
Castle lock key interlock verification to be
1636 7-25B 7 Station-U ELEC Board & Metering 1
panel completed
33KV Switch
1637 7-25B 8 Station-U ELEC Board & Metering 1 SCS cable termination to be completed
panel
33KV Switch
1638 7-25B 9 Station-U ELEC Board & Metering 2 SCS verification to be completed
panel
33KV Switch
1639 7-25B 10 Station-U ELEC Board & Metering 2 Testing of metering panel to be completed
panel

1640 7-25B 1 Station-U ELEC Lighting System 1 Photocell installation to be completed

Relocation of light fitting near by MOV DB to be


1641 7-25B 2 Station-U ELEC Lighting System 1
completed
Testing of cables and loop verification to be
1642 7-25B 3 Station-U ELEC Lighting System 2
completed
1643 7-25B 4 Station-U ELEC Lighting System 2 Testing of MCCB and ELCB to be completed
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

1644 7-25B 5 Station-U ELEC Lighting System 2 Lux measurement to be completed


1645 7-25B 6 Station-U ELEC Lighting System 2 Exit identification installation to be completed
Identification tags to be completed for JB, light
1646 7-25B 7 Station-U ELEC Lighting System 1
fitting, siwtches
Transformer Box up and Torquing of cables at
1647 7-25B 1 Station-U ELEC Transformer 1
HV/LV side to be completed.

Tightness of earthing connections and integrity of


1648 7-25B 2 Station-U ELEC Transformer 1
earthing connections to be confirmed.

1649 7-25B 3 Station-U ELEC Transformer 1 HV cable support earthing to be completed.

Transformer protection trips cable test report to be


1650 7-25B 4 Station-U ELEC Transformer 2 completed prior to verification of transformer
protection trips and report to be submitted.

DC System Test reports for Battery charger / discharge test for


1651 7-25B 1 Station-U ELEC 2
(110V)DC batteries and cable test report to be submitted.

DC System For out going feeders , earth leakage alarm to be


1652 7-25B 2 Station-U ELEC 2
(110V)DC provided.

DC System Wiring for boost charge inhibition, incase of failure


1653 7-25B 3 Station-U ELEC 2
(110V)DC of Ventilation fans to be completed.
DC System Verification of F&G tripping as per approved
1654 7-25B 4 Station-U ELEC 2
(110V)DC caution and Effect chart to be completed.
DC System
1655 7-25B 5 Station-U ELEC
(110V)DC
1 Tag nos for Battery banks to be provided
DC System
1656 7-25B 6 Station-U ELEC
(110V)DC
1 Tag nos for Battery banks,cables, to be provided
DC System Arrangement of Battery banks details to be
1657 7-25B 7 Station-U ELEC 1
(110V)DC provided.

DC System
1658 7-25B 8 Station-U ELEC
(110V)DC
1 Installation of eye wash to be completed.

DC System
1659 7-25B 9 Station-U HVAC
(110V)DC
2 Testing of Exhaust fan to be completed.
DC System
1660 7-25B 10 Station-U ELEC
(110V)DC
1 SCS wiring and termination to be completed
DC System Permanent power supply cable to be completed
1661 7-25B 11 Station-U ELEC 2
(110V)DC after permanent energization
DC System
1662 7-25B 12 Station-U ELEC
(110V)DC
1 Damage display screen to be rectified

Cable Trench
indoor and Route markers to be installed at outdoor cable
1663 7-25B 1 Station-U ELEC 1
outdoor & cable trench.
tray & Common

Cable Trench
indoor and Cable trays earthing to be connected to earthing
1664 7-25B 2 Station-U ELEC 1
outdoor & cable grid at minimum two locations for each run.
tray & Common

Cable Trench
indoor and
1665 7-25B 3 Station-U ELEC
outdoor & cable
1 Cable entry to S/S building to be sealed
tray & Common
Cable Trench
indoor and Cleaning of concrete cable trench at LV
1666 7-25B 4 Station-U ELEC 1
outdoor & cable /Control /Diesel generator Room to be completed.
tray & Common

Cable Trench Cutting edges of cable tray suppport to be painted


indoor and
1667 7-25B 5 Station-U ELEC
outdoor & cable
1 and cable tray cover to be provided for outdoor
tray & Common trays.

Cable Trench Identification tag for earth pit, LV panels, metering


indoor and
1668 7-25B 6 Station-U ELEC
outdoor & cable
1 panel, Lighting DB, earth bar, DG, control panels to
tray & Common be completed

Integrity of earthing system and tightness


1669 7-25B 1 Station-U ELEC Earthing System 2 verification to be completed including all field
earthing and lightning system.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Earth pit to be cleaned and individual earth pit


1670 7-25B 2 Station-U ELEC Earthing System 2
resistance to be measured

Material used for lightning system installation are


1671 7-25B 3 Station-U ELEC Earthing System 1 found to be of different brand it shall be
standardized.

Structural earthing, fence earthing and cable tray


1672 7-25B 4 Station-U ELEC Earthing System 1
earthing to be completed

All exposed copper bar shall be protected with


1673 7-25B 5 Station-U ELEC Earthing System 1
denso tape.
1674 7-25B 6 Station-U ELEC Earthing System 1 Earth pit tag no to be provided.

1675 7-25B 1 Station-U ELEC DG Room 1 Earthing of DG to be completed.

DG room concrete cable trench to be cleaned and


1676 7-25B 2 Station-U ELEC DG Room 1
cable entry to be sealed.
1677 7-25B 3 Station-U ELEC DG Room 2 Testing of DG to be completed as per

1678 7-25B 4 Station-U ELEC DG Room 1 Battery Installation and wiring to be completed

1679 7-25B 5 Station-U ELEC DG Room 2 Testing of exhaust fan to be completed


Functional verification of HVAC panel to be
1680 7-25B 6 Station-U ELEC DG Room 2
completed
VAL STN
1681 7-11H 1
FNLGCS
CIVIL VAL STN 1 Housekeeping to be carried out.

VAL STN
1682 7-11H 2
FNLGCS
MECH VAL STN 1 Greasing/molycote to be done for all bolts

VAL STN Rubber caps for the handle of the valves to be


1683 7-11H 3 MECH VAL STN 1
FNLGCS removed and all handles to be painted.

VAL STN Fence rings shall be provided at pipeline/fence


1684 7-11H 4 MECH VAL STN 1
FNLGCS interface and fencing repaired.

VAL STN
1685 7-11H 5
FNLGCS
MECH VAL STN 1 Tagging to be done

VAL STN
1686 7-11H 6
FNLGCS
MECH VAL STN 1 At pig launcher 3" blind flanges to be painted

All pipe work shall be alligned properly after the tie-


1687 7-21A 1 WHTP-A MECH 1 ins and bolting connections to be done without any
stress

1688 7-21A 2 WHTP-A MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


1689 7-21A 3 WHTP-A MECH 1
level
Corrosion fittings shall be installed in the presence
1690 7-21A 4 WHTP-A MECH 1
of OEI prior to commissioning

1691 7-21A 5 WHTP-A MECH 1 Pig signaler is to be functional tested

1692 7-21A 6 WHTP-A MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


1693 7-21A 7 WHTP-A MECH 1
approved drawings and SOW
Safety chain or bar are to be installed in ladders of
1694 7-21A 8 WHTP-A MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


1695 7-21A 9 WHTP-A MECH 1
the complete system

1696 7-21A 10 WHTP-A MECH 1 Stencling and colour coding shall be done

1697 7-21A 11 WHTP-A MECH 1 All valve tags are to be provided in SS material
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Piping works shall be dried & nitrogen purged as


1698 7-21A 12 WHTP-A MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1699 7-21A 13 WHTP-A MECH 1
provided
All flanges shall be applied molycoat, tightened
1700 7-21A 14 WHTP-A MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1701 7-21A 15 WHTP-A MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1702 7-21A 16 WHTP-A MECH 1
signed off by QP

Personnel protective insulation is to be installed as


1703 7-21A 17 WHTP-A MECH 1
per P&ID

Platform is to be extended for the access of online


1704 7-21A 18 WHTP-A MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


1705 7-21A 19 WHTP-A CIVIL 1
to commissioning)

1706 7-21A 20 WHTP-A MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


1707 7-22A 1 WHTP-B MECH 1 ins and bolting connections to be done without any
stress

1708 7-22A 2 WHTP-B MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


1709 7-22A 3 WHTP-B MECH 1
level
Corrosion fittings shall be installed in the presence
1710 7-22A 4 WHTP-B MECH 1
of OEI prior to commissioning

1711 7-22A 5 WHTP-B MECH 1 Pig signaler is to be functional tested

1712 7-22A 6 WHTP-B MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


1713 7-22A 7 WHTP-B MECH 1
approved drawings and SOW
Safety chain or bar are to be installed in ladders of
1714 7-22A 8 WHTP-B MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


1715 7-22A 9 WHTP-B MECH 1
the complete system

1716 7-22A 10 WHTP-B MECH 1 Stencling and colour coding shall be done

1717 7-22A 11 WHTP-B MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


1718 7-22A 12 WHTP-B MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1719 7-22A 13 WHTP-B MECH 1
provided
All flanges shall be applied molycoat, tightened
1720 7-22A 14 WHTP-B MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1721 7-22A 15 WHTP-B MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1722 7-22A 16 WHTP-B MECH 1
signed off by QP

Personnel protective insulation is to be installed as


1723 7-22A 17 WHTP-B MECH 1
per P&ID

Platform is to be extended for the access of online


1724 7-22A 18 WHTP-B MECH 1
SRV testing are to be demonstrated, if not required
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Housekeeping shall be done (to be checked prior


1725 7-22A 19 WHTP-B CIVIL 1
to commissioning)

1726 7-22A 20 WHTP-B MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


1727 7-23A 1 WHTP-C MECH 1 ins and bolting connections to be done without any
stress

1728 7-23A 2 WHTP-C MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


1729 7-23A 3 WHTP-C MECH 1
level
Corrosion fittings shall be installed in the presence
1730 7-23A 4 WHTP-C MECH 1
of OEI prior to commissioning

1731 7-23A 5 WHTP-C MECH 1 Pig signaler is to be functional tested

1732 7-23A 6 WHTP-C MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


1733 7-23A 7 WHTP-C MECH 1
approved drawings and SOW
Safety chain or bar are to be installed in ladders of
1734 7-23A 8 WHTP-C MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


1735 7-23A 9 WHTP-C MECH 1
the complete system

1736 7-23A 10 WHTP-C MECH 1 Stencling and colour coding shall be done

1737 7-23A 11 WHTP-C MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


1738 7-23A 12 WHTP-C MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1739 7-23A 13 WHTP-C MECH 1
provided
All flanges shall be applied molycoat, tightened
1740 7-23A 14 WHTP-C MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1741 7-23A 15 WHTP-C MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1742 7-23A 16 WHTP-C MECH 1
signed off by QP

Personnel protective insulation is to be installed as


1743 7-23A 17 WHTP-C MECH 1
per P&ID

Platform is to be extended for the access of online


1744 7-23A 18 WHTP-C MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


1745 7-23A 19 WHTP-C CIVIL 1
to commissioning)

1746 7-23A 20 WHTP-C MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


VAL STN
1747 7-17A 1
WHTP-B
MECH 1 ins and bolting connections to be done without any
stress

VAL STN
1748 7-17A 2
WHTP-B
MECH 1 SRV's alignments are to be proved

VAL STN Pig trap shall be installed to ensure the alignment


1749 7-17A 3 MECH 1
WHTP-B level
VAL STN Corrosion fittings shall be installed in the presence
1750 7-17A 4 MECH 1
WHTP-B of OEI prior to commissioning

VAL STN
1751 7-17A 5
WHTP-B
MECH 1 Pig signaler is to be functional tested
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1752 7-17A 6
WHTP-B
MECH 1 JIB crane is to be installed

VAL STN All safety equipments shall be installed as per


1753 7-17A 7 MECH 1
WHTP-B approved drawings and SOW
VAL STN Safety chain or bar are to be installed in ladders of
1754 7-17A 8 MECH 1
WHTP-B all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


1755 7-17A 9 MECH 1
WHTP-B the complete system

VAL STN
1756 7-17A 10
WHTP-B
MECH 1 Stencling and colour coding shall be done

VAL STN
1757 7-17A 11
WHTP-B
MECH 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


1758 7-17A 12 MECH 1
WHTP-B per project specifications
VAL STN Final painting report certified by QP QAC shall be
1759 7-17A 13 MECH 1
WHTP-B provided
All flanges shall be applied molycoat, tightened
VAL STN
1760 7-17A 14
WHTP-B
MECH 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
1761 7-17A 15 MECH 1
WHTP-B commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
1762 7-17A 16 MECH 1
WHTP-B signed off by QP
VAL STN Personnel protective insulation is to be installed as
1763 7-17A 17 MECH 1
WHTP-B per P&ID

VAL STN Platform is to be extended for the access of online


1764 7-17A 18 MECH 1
WHTP-B SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


1765 7-17A 19 CIVIL 1
WHTP-B to commissioning)
VAL STN
1766 7-17A 20
WHTP-B
MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


1767 7-3A 1 FNLGCS MECH 1 ins and bolting connections to be done without any
stress

1768 7-3A 2 FNLGCS MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


1769 7-3A 3 FNLGCS MECH 1
level

Corrosion fittings shall be installed in the presence


1770 7-3A 4 FNLGCS MECH 1
of OEI prior to commissioning

1771 7-3A 5 FNLGCS INST 1 Pig signaler is to be functional tested

1772 7-3A 6 FNLGCS MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


1773 7-3A 7 FNLGCS MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


1774 7-3A 8 FNLGCS MECH 1
all valve operating platforms to avoid trip & fall
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All hydro test record shall be shown to substantiate


1775 7-3A 9 FNLGCS MECH 1
the complete system

1776 7-3A 10 FNLGCS MECH 1 Stencling and colour coding shall be done

1777 7-3A 11 FNLGCS MECH 1 All valve tags are to be provided in SS material
Piping works shall be dried & nitrogen purged as
1778 7-3A 12 FNLGCS MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1779 7-3A 13 FNLGCS MECH 1
provided
All flanges shall be applied molycoat, tightened
1780 7-3A 14 FNLGCS MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1781 7-3A 15 FNLGCS MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1782 7-3A 16 FNLGCS MECH 1
signed off by QP
Personnel protective insulation is to be installed as
1783 7-3A 17 FNLGCS MECH 1
per P&ID

Platform is to be extended for the access of online


1784 7-3A 18 FNLGCS MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


1785 7-3A 19 FNLGCS CIVIL 1
to commissioning)

1786 7-3A 20 FNLGCS MECH 1 All spectacle blinds shall be painted

1787 7-3A 21 FNLGCS MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


VAL STN
1788 7-11A 1
FNLGCS
MECH VAL STN 1 ins and bolting connections to be done without any
stress
VAL STN
1789 7-11A 2
FNLGCS
MECH VAL STN 1 SRV's alignments are to be proved

VAL STN Pig trap shall be installed to ensure the alignment


1790 7-11A 3 MECH VAL STN 1
FNLGCS level

VAL STN Corrosion fittings shall be installed in the presence


1791 7-11A 4 MECH VAL STN 1
FNLGCS of OEI prior to commissioning

VAL STN
1792 7-11A 5
FNLGCS
INST VAL STN 1 Pig signaler is to be functional tested

VAL STN
1793 7-11A 6
FNLGCS
MECH VAL STN 1 JIB crane is to be installed

VAL STN All safety equipments shall be installed as per


1794 7-11A 7 MECH VAL STN 1
FNLGCS approved drawings and SOW

VAL STN Safety chain or bar are to be installed in ladders of


1795 7-11A 8 MECH VAL STN 1
FNLGCS all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


1796 7-11A 9 MECH VAL STN 1
FNLGCS the complete system

VAL STN
1797 7-11A 10
FNLGCS
MECH VAL STN 1 Stencling and colour coding shall be done

VAL STN
1798 7-11A 11
FNLGCS
MECH VAL STN 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


1799 7-11A 12 MECH VAL STN 1
FNLGCS per project specifications
VAL STN Final painting report certified by QP QAC shall be
1800 7-11A 13 MECH VAL STN 1
FNLGCS provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All flanges shall be applied molycoat, tightened


VAL STN
1801 7-11A 14
FNLGCS
MECH VAL STN 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
1802 7-11A 15 MECH VAL STN 1
FNLGCS commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
1803 7-11A 16 MECH VAL STN 1
FNLGCS signed off by QP
VAL STN Personnel protective insulation is to be installed as
1804 7-11A 17 MECH VAL STN 1
FNLGCS per P&ID

VAL STN Platform is to be extended for the access of online


1805 7-11A 18 MECH VAL STN 1
FNLGCS SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


1806 7-11A 19 CIVIL VAL STN 1
FNLGCS to commissioning)
VAL STN
1807 7-11A 20
FNLGCS
MECH VAL STN 1 All spectacle blinds shall be painted

VAL STN
1808 7-11A 21
FNLGCS
MECH VAL STN 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


VAL STN
1809 7-26A 1
FNDS
MECH VAL STN 1 ins and bolting connections to be done without any
stress

VAL STN
1810 7-26A 2
FNDS
MECH VAL STN 1 SRV's alignments are to be proved

VAL STN Pig trap shall be installed to ensure the alignment


1811 7-26A 3 MECH VAL STN 1
FNDS level
VAL STN Corrosion fittings shall be installed in the presence
1812 7-26A 4 MECH VAL STN 1
FNDS of OEI prior to commissioning

VAL STN
1813 7-26A 5
FNDS
INST VAL STN 1 Pig signaler is to be functional tested

VAL STN
1814 7-26A 6
FNDS
MECH VAL STN 1 JIB crane is to be installed

VAL STN All safety equipments shall be installed as per


1815 7-26A 7 MECH VAL STN 1
FNDS approved drawings and SOW

VAL STN Safety chain or bar are to be installed in ladders of


1816 7-26A 8 MECH VAL STN 1
FNDS all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


1817 7-26A 9 MECH VAL STN 1
FNDS the complete system

VAL STN
1818 7-26A 10
FNDS
MECH VAL STN 1 Stencling and colour coding shall be done

VAL STN
1819 7-26A 11
FNDS
MECH VAL STN 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


1820 7-26A 12 MECH VAL STN 1
FNDS per project specifications
VAL STN Final painting report certified by QP QAC shall be
1821 7-26A 13 MECH VAL STN 1
FNDS provided
All flanges shall be applied molycoat, tightened
VAL STN
1822 7-26A 14
FNDS
MECH VAL STN 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
1823 7-26A 15 MECH VAL STN 1
FNDS commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
1824 7-26A 16 MECH VAL STN 1
FNDS signed off by QP

VAL STN Personnel protective insulation is to be installed as


1825 7-26A 17 MECH VAL STN 1
FNDS per P&ID

VAL STN Platform is to be extended for the access of online


1826 7-26A 18 MECH VAL STN 1
FNDS SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


1827 7-26A 19 CIVIL VAL STN 1
FNDS to commissioning)
VAL STN
1828 7-26A 20
FNDS
MECH VAL STN 1 All spectacle blinds shall be painted
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1829 7-26A 21
FNDS
MECH VAL STN 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


1830 7-1A 1 FNDS MECH 1 ins and bolting connections to be done without any
stress

1831 7-1A 2 FNDS MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


1832 7-1A 3 FNDS MECH 1
level
Corrosion fittings shall be installed in the presence
1833 7-1A 4 FNDS MECH 1
of OEI prior to commissioning
1834 7-1A 5 FNDS INST 1 Pig signaler is to be functional tested
1835 7-1A 6 FNDS MECH 1 JIB crane is to be installed
All safety equipments shall be installed as per
1836 7-1A 7 FNDS MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


1837 7-1A 8 FNDS MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


1838 7-1A 9 FNDS MECH 1
the complete system

1839 7-1A 10 FNDS MECH 1 Stencling and colour coding shall be done

1840 7-1A 11 FNDS MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


1841 7-1A 12 FNDS MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1842 7-1A 13 FNDS MECH 1
provided
All flanges shall be applied molycoat, tightened
1843 7-1A 14 FNDS MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1844 7-1A 15 FNDS MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1845 7-1A 16 FNDS MECH 1
signed off by QP

Personnel protective insulation is to be installed as


1846 7-1A 17 FNDS MECH 1
per P&ID

Platform is to be extended for the access of online


1847 7-1A 18 FNDS MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


1848 7-1A 19 FNDS CIVIL 1
to commissioning)

1849 7-1A 20 FNDS MECH 1 All spectacle blinds shall be painted

1850 7-1A 21 FNDS MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


1851 7-4A 1 FSDS MECH 1 ins and bolting connections to be done without any
stress

1852 7-4A 2 FSDS MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


1853 7-4A 3 FSDS MECH 1
level

Corrosion fittings shall be installed in the presence


1854 7-4A 4 FSDS MECH 1
of OEI prior to commissioning

1855 7-4A 5 FSDS INST 1 Pig signaler is to be functional tested

1856 7-4A 6 FSDS MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


1857 7-4A 7 FSDS MECH 1
approved drawings and SOW
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Safety chain or bar are to be installed in ladders of


1858 7-4A 8 FSDS MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


1859 7-4A 9 FSDS MECH 1
the complete system

1860 7-4A 10 FSDS MECH 1 Stencling and colour coding shall be done

1861 7-4A 11 FSDS MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


1862 7-4A 12 FSDS MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1863 7-4A 13 FSDS MECH 1
provided
All flanges shall be applied molycoat, tightened
1864 7-4A 14 FSDS MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1865 7-4A 15 FSDS MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1866 7-4A 16 FSDS MECH 1
signed off by QP

Personnel protective insulation is to be installed as


1867 7-4A 17 FSDS MECH 1
per P&ID

Platform is to be extended for the access of online


1868 7-4A 18 FSDS MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


1869 7-4A 19 FSDS CIVIL 1
to commissioning)

1870 7-4A 20 FSDS MECH 1 All spectacle blinds shall be painted

1871 7-4A 21 FSDS MECH 1 Tie-ins to be done (as applicable)

EARTHING
VAL STN Missing washers to be provided in earthing
1872 7-11C 1 ELEC SYSTEM AND 1
FNLGCS connections
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable, earth pit and solar panel to
1873 7-11C 2 ELEC SYSTEM AND 1
FNLGCS be completed
SOLAR PANEL
EARTHING
VAL STN
1874 7-11C 3
FNLGCS
ELEC SYSTEM AND 1 Solar panel supports to be installed properly
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1875 7-11C 4 ELEC SYSTEM AND 1
FNLGCS provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1876 7-11C 5
FNLGCS
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING Components installed inside the controlled panel
VAL STN
1877 7-11C 6
FNLGCS
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure
EARTHING Flexing earthing connections to be provided for
VAL STN
1878 7-11C 7
FNLGCS
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections

EARTHING
VAL STN
1879 7-11C 8
FNLGCS
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1880 7-11C 9 ELEC SYSTEM AND 1
FNLGCS proven
SOLAR PANEL
EARTHING
VAL STN Cable entry conduit is filled with sand to be
1881 7-11C 10 ELEC SYSTEM AND 1
FNLGCS removed and sealed with suitable material
SOLAR PANEL

EARTHING
VAL STN Missing washers to be provided in earthing
1882 7-17C 1 ELEC SYSTEM AND 1
WHTP-B connections
SOLAR PANEL

EARTHING Tagging for earth cable, earth pit and solar panel to
VAL STN
1883 7-17C 2
WHTP-B
ELEC SYSTEM AND 1 be completed. Also earth pit cover to be painted
SOLAR PANEL with G/Yellow
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

EARTHING
VAL STN Cable termination in Solar control panel to be
1884 7-17C 3 ELEC SYSTEM AND 1
WHTP-B done with proper lugs and ferrules
SOLAR PANEL

EARTHING
VAL STN Additional enclosure for battery enclosure to be
1885 7-17C 4 ELEC SYSTEM AND 1
WHTP-B provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1886 7-17C 5
WHTP-B
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING Components installed inside the controlled panel
VAL STN
1887 7-17C 6
WHTP-B
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure

EARTHING Flexing earthing connections to be provided for


VAL STN
1888 7-17C 7
WHTP-B
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections

EARTHING
VAL STN
1889 7-17C 8
WHTP-B
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL

EARTHING
VAL STN Integrity of earthing connections to be verified and
1890 7-17C 9 ELEC SYSTEM AND 1
WHTP-B proven
SOLAR PANEL
EARTHING
VAL STN Bird spike installation for solar panel to be
1891 7-17C 10 ELEC SYSTEM AND 1
WHTP-B completed
SOLAR PANEL
EARTHING
VAL STN Solar panel supports to be cleaned and cable entry
1892 7-17C 11 ELEC SYSTEM AND 1
WHTP-B to be cleaned and sealed with suitable material
SOLAR PANEL
EARTHING Missing washers to be provided in earthing
1893 7-21C 1 WHTP-A ELEC 1
SYSTEM connections
EARTHING Tagging for earth cable, earth pit and solar panel to
1894 7-21C 2 WHTP-A ELEC 1
SYSTEM be completed
EARTHING Earthing cable to be routed properly at main entry
1895 7-21C 3 WHTP-A ELEC 1
SYSTEM gate
EARTHING Tie-in with existing earthing system to be
1896 7-21C 4 WHTP-A ELEC 1
SYSTEM completed
EARTHING Copper bar contact with earth electrode is not
1897 7-21C 5 WHTP-A ELEC 1
SYSTEM good- to be done properly
EARTHING
1898 7-21C 6 WHTP-A ELEC
SYSTEM
1 Earthing termination in field shall be dressed neatly

Flexible earthing connections to be provided for


EARTHING
1899 7-21C 7 WHTP-A ELEC
SYSTEM
1 mobile pig launcher with suitable clamps for
temporary connections
EARTHING
1900 7-21C 8 WHTP-A ELEC
SYSTEM
1 Approved AFC drawing to be available.
EARTHING Integrity of earthing connections to be verified and
1901 7-21C 9 WHTP-A ELEC 1
SYSTEM proven
EARTHING Missing washers to be provided in earthing
1902 7-22C 1 WHTP-B ELEC 1
SYSTEM connections
EARTHING Tagging for earth cable, earth pit and solar panel to
1903 7-22C 2 WHTP-B ELEC 1
SYSTEM be completed
EARTHING Earthing cable to be routed properly at main entry
1904 7-22C 3 WHTP-B ELEC 1
SYSTEM gate
EARTHING Tie-in with existing earthing system to be
1905 7-22C 4 WHTP-B ELEC 1
SYSTEM completed
EARTHING Copper bar contact with earth electrode is not
1906 7-22C 5 WHTP-B ELEC 1
SYSTEM good- to be done properly
EARTHING
1907 7-22C 6 WHTP-B ELEC
SYSTEM
1 Earthing termination in field shall be dressed neatly

Flexible earthing connections to be provided for


EARTHING
1908 7-22C 7 WHTP-B ELEC
SYSTEM
1 mobile pig launcher with suitable clamps for
temporary connections
EARTHING
1909 7-22C 8 WHTP-B ELEC
SYSTEM
1 Approved AFC drawing to be available.
EARTHING Integrity of earthing connections to be verified and
1910 7-22C 9 WHTP-B ELEC 1
SYSTEM proven
EARTHING Missing washers to be provided in earthing
1911 7-23C 1 WHTP-C ELEC 1
SYSTEM connections
EARTHING Tagging for earth cable, earth pit and solar panel to
1912 7-23C 2 WHTP-C ELEC 1
SYSTEM be completed
EARTHING Earthing cable to be routed properly at main entry
1913 7-23C 3 WHTP-C ELEC 1
SYSTEM gate
EARTHING Tie-in with existing earthing system to be
1914 7-23C 4 WHTP-C ELEC 1
SYSTEM completed
EARTHING Copper bar contact with earth electrode is not
1915 7-23C 5 WHTP-C ELEC 1
SYSTEM good- to be done properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

EARTHING
1916 7-23C 6 WHTP-C ELEC
SYSTEM
1 Earthing termination in field shall be dressed neatly

Flexible earthing connections to be provided for


EARTHING
1917 7-23C 7 WHTP-C ELEC
SYSTEM
1 mobile pig launcher with suitable clamps for
temporary connections
EARTHING
1918 7-23C 8 WHTP-C ELEC
SYSTEM
1 Approved AFC drawing to be available.
EARTHING Integrity of earthing connections to be verified and
1919 7-23C 9 WHTP-C ELEC 1
SYSTEM proven
Flexible earthing connections to be provided for
EARTHING
1920 7-3C 1 FNLGCS ELEC
SYSTEM
1 mobile pig launcher with suitable clamps for
temporary connections
EARTHING
1921 7-3C 2 FNLGCS ELEC
SYSTEM
1 Approved AFC drawing to be available.

EARTHING Integrity of existing earthing system to be verified


1922 7-3C 3 FNLGCS ELEC 1
SYSTEM before making connections with existing one.

EARTHING Tie-in with existing earthing system to be


1923 7-3C 4 FNLGCS ELEC 1
SYSTEM completed
Rectification to be done for the damaged support
1924 7-19B 1 WHTP-H CIVIL 1
foundation

1925 7-19B 2 WHTP-H CIVIL 1 Damaged paint on concrete surface to be rectified

All unpaved area within station fence limits to be


1926 7-19B 3 WHTP-H CIVIL 1
finished with 20mm nominal size aggregate 100 thk

Remove all temporary facilities and house keeping


1927 7-19B 4 WHTP-H CIVIL 1
to be done
VAL STN Rectification shall be done for the damaged
1928 7-15B 1 CIVIL VAL STN 1
WHTP H&L portion of track road inside the fence
VAL STN
1929 7-15B 2
WHTP H&L
CIVIL VAL STN 1 Access road from main gate to ROW shall be done

VAL STN Backfilling upto the edge of grading, compaction


1930 7-15B 3 CIVIL VAL STN 1
WHTP H&L and proper slope to be provided
VAL STN
1931 7-15B 4
WHTP H&L
MECH VAL STN 1 Wind sock to be provided

VAL STN
1932 7-15B 5
WHTP H&L
MECH VAL STN 1 Apply touchup paint for the gate and fence post

VAL STN
1933 7-15B 6
WHTP H&L
CIVIL VAL STN 1 Proper cleaning to be done for the fence and gate

VAL STN Remove all temporary facilities and house keeping


1934 7-15B 7 CIVIL VAL STN 1
WHTP H&L to be done
VAL STN
1935 7-10B 1
FNFIS
MECH 1 Cover for the spill pit to be provided

VAL STN Rectification shall be done for the damaged


1936 7-10B 2 CIVIL 1
FNFIS portion of track road inside the fence
VAL STN
1937 7-10B 3
FNFIS
CIVIL 1 Access road from main gate to ROW shall be done

VAL STN Backfilling upto the edge of grading, compaction


1938 7-10B 4 CIVIL 1
FNFIS and proper slope to be provided
VAL STN
1939 7-10B 5
FNFIS
MECH 1 Wind sock to be provided

VAL STN
1940 7-10B 6
FNFIS
MECH 1 Apply touchup paint for the gate and fence post

VAL STN
1941 7-10B 7
FNFIS
CIVIL 1 Proper cleaning to be done for the fence and gate

VAL STN Fence opening at pipe entry shall be reinstated


1942 7-10B 8 MECH 1
FNFIS properly
VAL STN Remove all temporary facilities and house keeping
1943 7-10B 9 CIVIL 1
FNFIS to be done
VAL STN Backfilling up to the edge of grading, compaction
1944 7-11B 1 CIVIL 1
FNLGCS and proper slope to be provided
VAL STN Rectification shall be done for the damaged
1945 7-11B 2 CIVIL 1
FNLGCS portion of track road inside the fence

Track road for crane access outside the fence and


VAL STN
1946 7-11B 3
FNLGCS
CIVIL 1 access road from both sides gate to existing track
road shall be done as per the drawing

VAL STN Level of the spill pit cover to be maintained to


1947 7-11B 4 CIVIL 1
FNLGCS match with the hard standing slab
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
1948 7-11B 5
FNLGCS
MECH 1 Wind sock to be provided

VAL STN
1949 7-11B 6
FNLGCS
CIVIL 1 Proper cleaning to be done for the fence and gate

VAL STN Fasten and tighten all loose barbed wire & to be
1950 7-11B 7 CIVIL 1
FNLGCS rectified for the damaged barbed wire
VAL STN Fence opening at pipe entry shall be reinstated
1951 7-11B 8 MECH 1
FNLGCS properly
VAL STN
1952 7-11B 9
FNLGCS
CIVIL 1 Remove all temporary facilities and house keeping
4" PIG
Asphalt road and asssociated works shall be done
1953 7-3B 1 FNLGCS CIVIL LAUNCHER 1
STATION for inside the fence
4" PIG
1954 7-3B 2 FNLGCS CIVIL LAUNCHER 1 Painting to be done for the kerb stone
STATION
4" PIG
1955 7-3B 3 FNLGCS CIVIL LAUNCHER 1 Joint sealant for the required areas to be done
STATION

4" PIG
1956 7-3B 4 FNLGCS MECH LAUNCHER 1 Wind sock to be provided
STATION

4" PIG
1957 7-3B 5 FNLGCS CIVIL LAUNCHER 1 Damaged paint on concrete surface to be rectified
STATION
4" PIG
Check the gate installation and provide true
1958 7-3B 6 FNLGCS MECH LAUNCHER 1
STATION alignment
4" PIG
Gate drop bolt arrester to be provided as per the
1959 7-3B 7 FNLGCS CIVIL LAUNCHER 1
STATION drawing
4" PIG
1960 7-3B 8 FNLGCS CIVIL LAUNCHER 1 Missed barbed wire to be provided on top of gate
STATION
4" PIG
1961 7-3B 9 FNLGCS MECH LAUNCHER 1 Apply touchup paint for the gate and fence post
STATION
4" PIG
1962 7-3B 10 FNLGCS CIVIL LAUNCHER 1 Proper cleaning to be done for the fence and gate
STATION
4" PIG
1963 7-3B 11 FNLGCS CIVIL LAUNCHER 1 Access road to be provided to the main gate
STATION
4" PIG
1964 7-3B 12 FNLGCS CIVIL LAUNCHER 1 Remove all temporary facilities and house keeping
STATION
Asphalt road and asssociated works shall be done
1965 7-21B 1 WHTP-A CIVIL 1
for inside the fence

1966 7-21B 2 WHTP-A CIVIL 1 Painting to be done for the kerb stone

1967 7-21B 3 WHTP-A MECH 1 Wind sock to be provided

Existing fence is to be removed after getting


1968 7-21B 4 WHTP-A CIVIL 1
approval from client

1969 7-21B 5 WHTP-A MECH 1 Apply touchup paint for the gate and fence post

Check the gate installation and provide true


1970 7-21B 6 WHTP-A MECH 1
alignment
Gate drop bolt arrester to be provided as per the
1971 7-21B 7 WHTP-A CIVIL 1
drawing

1972 7-21B 8 WHTP-A CIVIL 1 Proper cleaning to be done for the fence and gate

Rectification of access road from main gate to


1973 7-21B 9 WHTP-A CIVIL 1
existing Asphalt road shall be done

1974 7-21B 10 WHTP-A CIVIL 1 Remove all temporary facilities and house keeping

Grouting to be done after the erection of platform


1975 7-22B 1 WHTP-B CIVIL 1
structure
Preparation and coating with epoxy paint shall be
1976 7-22B 2 WHTP-B CIVIL 1
completed for the exposed concrete surface
Elevation of the foundation to be maintained to
1977 7-22B 3 WHTP-B CIVIL 1
match with the hard standing.
Damaged epoxy paint on concrete surface shall be
1978 7-22B 4 WHTP-B CIVIL 1
rectified

1979 7-22B 5 WHTP-B MECH 1 Apply touchup paint for the gate and fence post
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

1980 7-22B 6 WHTP-B CIVIL 1 Remove all temporary facilities and house keeping

VAL STN Rectification shall be done for the damaged


1981 7-17B 1 CIVIL 1
WHTP-B portion of track road inside the fence
VAL STN Check the gate installation and provide true
1982 7-17B 2 MECH 1
WHTP-B allignment
VAL STN
1983 7-17B 3
WHTP-B
MECH 1 Wind sock to be provided
VAL STN
1984 7-17B 4
WHTP-B
MECH 1 Apply touchup paint for the gate and fence post
VAL STN Rectification of access road from main gate to
1985 7-17B 5 CIVIL 1
WHTP-B ROW shall be done
VAL STN
1986 7-17B 6
WHTP-B
CIVIL 1 Proper cleaning to be done for the fence and gate

VAL STN Remove all temporary facilities and house keeping


1987 7-17B 7 CIVIL 1
WHTP-B to be done.
Asphalt road and asssociated works shall be done
1988 7-23B 1 WHTP-C CIVIL 1
for inside the fence

1989 7-23B 2 WHTP-C MECH 1 Wind sock to be provided

1990 7-23B 3 WHTP-C CIVIL 1 Painting to be done for the kerb stone

Existing fence is to be removed after getting


1991 7-23B 4 WHTP-C CIVIL 1
approval from client

1992 7-23B 5 WHTP-C CIVIL 1 Joint sealant for the required areas to be done

1993 7-23B 6 WHTP-C MECH 1 Apply touchup paint for the gate and fence post

Check the gate installation and provide true


1994 7-23B 7 WHTP-C MECH 1
alignment
Gate drop bolt arrester to be provided as per the
1995 7-23B 8 WHTP-C MECH 1
drawing

1996 7-23B 9 WHTP-C CIVIL 1 Proper cleaning to be done for the fence and gate

Access road from main gate to existing asphalt


1997 7-23B 10 WHTP-C CIVIL 1
road shall be done

1998 7-23B 11 WHTP-C CIVIL 1 Remove all temporary facilities and house keeping

Asphalt road and associated works shall be done


1999 7-20B 1 WHTP-L CIVIL 1
inside the fence

2000 7-20B 2 WHTP-L CIVIL 1 Painting to be done for the kerb stone

2001 7-20B 3 WHTP-L CIVIL 1 Joint sealant for the required areas to be done

2002 7-20B 4 WHTP-L CIVIL 1 Damaged paint on concrete surface to be rectified

Pocket for the lifting hook on protection slab to be


2003 7-20B 5 WHTP-L CIVIL 1
cleaned and filled with sand cement mix
Remove all temporary facilities and house keeping
2004 7-20B 6 WHTP-L CIVIL 1
to be done

VAL STN
2005 7-26B 1
FNDS
CIVIL VAL STN 1 Housekeeping to be carried out.

VAL STN
2006 7-26B 2
FNDS
MECH VAL STN 1 Greasing/molycote to be done for all bolts

VAL STN Rubber caps for the handle of the valves to be


2007 7-26B 3 MECH VAL STN 1
FNDS removed and all handles to be painted.

VAL STN
2008 7-26B 4
FNDS
MECH VAL STN 1 Valves of 2" kicker to be cleaned and painted

VAL STN
2009 7-26B 5
FNDS
MECH VAL STN 1 Tagging to be done

VAL STN
2010 7-26B 6
FNDS
CIVIL VAL STN 1 Aspalt road to be completed

VAL STN
2011 7-10D 1
FNFIS
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2012 7-10D 2 INST VAL STN 1
FNFIS to be replaced with SS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN SS valve manifold installed for FT shall not intact


2013 7-10D 3 INST VAL STN 1
FNFIS with CS / GI supports
VAL STN
2014 7-10D 4
FNFIS
INST VAL STN 1 Metering skid cables to tagged
VAL STN
2015 7-10D 5
FNFIS
INST VAL STN 1 Cable to be tied with SS PVC coated tie wrap
VAL STN Proper foam to be filled in pipe sleeves under RTU
2016 7-10D 6 INST VAL STN 1
FNFIS panel
VAL STN
2017 7-10D 7
FNFIS
INST VAL STN 1 FO cable route marker to be installed
VAL STN
2018 7-10D 8
FNFIS
INST VAL STN 1 Red line mark up drawings to be submitted
VAL STN Calibration and configuration of MV Flow Tx to be
2019 7-10D 9 INST VAL STN 1
FNFIS verified
VAL STN
2020 7-10D 10
FNFIS
INST VAL STN 1 RTU panel cards to be tagged properly
VAL STN
2021 7-11D 1
FNLGCS
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2022 7-11D 2 INST VAL STN 1
FNLGCS to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
2023 7-11D 3 INST VAL STN 1
FNLGCS with CS / GI supports
VAL STN
2024 7-11D 4
FNLGCS
INST VAL STN 1 Metering skid cables to tagged
VAL STN
2025 7-11D 5
FNLGCS
INST VAL STN 1 Cable to be tied with SS PVC coated tie wrap
VAL STN Proper foam to be filled in pipe sleeves under RTU
2026 7-11D 6 INST VAL STN 1
FNLGCS panel
VAL STN
2027 7-11D 7
FNLGCS
INST VAL STN 1 FO cable route marker to be installed
VAL STN
2028 7-11D 8
FNLGCS
INST VAL STN 1 Red line mark up drawings to be submitted
VAL STN Calibration and configuration of MV Flow Tx to be
2029 7-11D 9 INST VAL STN 1
FNLGCS verified
VAL STN
2030 7-11D 10
FNLGCS
INST VAL STN 1 RTU panel cards to be tagged properly
VAL STN
2031 7-13D 1
KNMP
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2032 7-13D 2 INST VAL STN 1
KNMP to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
2033 7-13D 3 INST VAL STN 1
KNMP with CS / GI supports
VAL STN
2034 7-13D 4
KNMP
INST VAL STN 1 Metering skid cables to tagged
VAL STN
2035 7-13D 5
KNMP
INST VAL STN 1 Cable to be tied with SS PVC coated tie wrap
VAL STN Proper foam to be filled in pipe sleeves under RTU
2036 7-13D 6 INST VAL STN 1
KNMP panel
VAL STN
2037 7-13D 7
KNMP
INST VAL STN 1 FO cable route marker to be installed
VAL STN
2038 7-13D 8
KNMP
INST VAL STN 1 Red line mark up drawings to be submitted
VAL STN Calibration and configuration of MV Flow Tx to be
2039 7-13D 9 INST VAL STN 1
KNMP verified
VAL STN
2040 7-13D 10
KNMP
INST VAL STN 1 RTU panel cards to be tagged properly
VAL STN
2041 7-17D 1
WHTP-B
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2042 7-17D 2 INST VAL STN 1
WHTP-B to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
2043 7-17D 3 INST VAL STN 1
WHTP-B with CS / GI supports
VAL STN
2044 7-17D 4
WHTP-B
INST VAL STN 1 Metering skid cables to tagged
VAL STN
2045 7-17D 5
WHTP-B
INST VAL STN 1 Cable to be tied with SS PVC coated tie wrap
VAL STN Proper foam to be filled in pipe sleeves under RTU
2046 7-17D 6 INST VAL STN 1
WHTP-B panel
VAL STN
2047 7-17D 7
WHTP-B
INST VAL STN 1 FO cable route marker to be installed
VAL STN
2048 7-17D 8
WHTP-B
INST VAL STN 1 Red line mark up drawings to be submitted
VAL STN Calibration and configuration of MV Flow Tx to be
2049 7-17D 9 INST VAL STN 1
WHTP-B verified
VAL STN
2050 7-17D 10
WHTP-B
INST VAL STN 1 RTU panel cards to be tagged properly
VAL STN
2051 7-14D 1
WHTP E&G
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2052 7-14D 2 INST VAL STN 1
WHTP E&G to be replaced with SS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN SS valve manifold installed for FT shall not intact


2053 7-14D 3 INST VAL STN 1
WHTP E&G with CS / GI supports
VAL STN
2054 7-14D 4
WHTP E&G
INST VAL STN 1 Metering skid cables to tagged
VAL STN
2055 7-14D 5
WHTP E&G
INST VAL STN 1 Cable to be tied with SS PVC coated tie wrap
VAL STN Proper foam to be filled in pipe sleeves under RTU
2056 7-14D 6 INST VAL STN 1
WHTP E&G panel
VAL STN
2057 7-14D 7
WHTP E&G
INST VAL STN 1 FO cable route marker to be installed
VAL STN
2058 7-14D 8
WHTP E&G
INST VAL STN 1 Red line mark up drawings to be submitted
VAL STN Calibration and configuration of MV Flow Tx to be
2059 7-14D 9 INST VAL STN 1
WHTP E&G verified
VAL STN
2060 7-14D 10
WHTP E&G
INST VAL STN 1 RTU panel cards to be tagged properly
VAL STN
2061 7-15D 1
WHTP H&L
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2062 7-15D 2 INST VAL STN 1
WHTP H&L to be replaced with SS
VAL STN SS valve manifold installed for FT shall not intact
2063 7-15D 3 INST VAL STN 1
WHTP H&L with CS / GI supports
VAL STN
2064 7-15D 4
WHTP H&L
INST VAL STN 1 Metering skid cables to tagged
VAL STN
2065 7-15D 5
WHTP H&L
INST VAL STN 1 Cable to be tied with SS PVC coated tie wrap
VAL STN Proper foam to be filled in pipe sleeves under RTU
2066 7-15D 6 INST VAL STN 1
WHTP H&L panel
VAL STN
2067 7-15D 7
WHTP H&L
INST VAL STN 1 FO cable route marker to be installed
VAL STN
2068 7-15D 8
WHTP H&L
INST VAL STN 1 Red line mark up drawings to be submitted
VAL STN Calibration and configuration of MV Flow Tx to be
2069 7-15D 9 INST VAL STN 1
WHTP H&L verified
VAL STN
2070 7-15D 10
WHTP H&L
INST VAL STN 1 RTU panel cards to be tagged properly

2071 7-21D 1 WHTP-A INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2072 7-21D 2 WHTP-A INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2073 7-21D 3 WHTP-A INST 1
with CS / GI supports
2074 7-21D 4 WHTP-A INST 1 Red line mark up drawings to be submitted
2075 7-21D 5 WHTP-A INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2076 7-21D 6 WHTP-A INST 1
verified
2077 7-21D 7 WHTP-A INST 1 All instruments to be tagged
2078 7-21D 8 WHTP-A INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2079 7-21D 9 WHTP-A INST 1
clamped properly
2080 7-21D 10 WHTP-A INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2081 7-21D 11 WHTP-A INST 1
devices
2082 7-21D 12 WHTP-A INST 1 Cable route markers to be installed

2083 7-22D 1 WHTP-B INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2084 7-22D 2 WHTP-B INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2085 7-22D 3 WHTP-B INST 1
with CS / GI supports
2086 7-22D 4 WHTP-B INST 1 Red line mark up drawings to be submitted
2087 7-22D 5 WHTP-B INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2088 7-22D 6 WHTP-B INST 1
verified
2089 7-22D 7 WHTP-B INST 1 All instruments to be tagged
2090 7-22D 8 WHTP-B INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2091 7-22D 9 WHTP-B INST 1
clamped properly
2092 7-22D 10 WHTP-B INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2093 7-22D 11 WHTP-B INST 1
devices
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2094 7-22D 12 WHTP-B INST 1 Cable route markers to be installed

2095 7-23D 1 WHTP-C INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2096 7-23D 2 WHTP-C INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2097 7-23D 3 WHTP-C INST 1
with CS / GI supports
2098 7-23D 4 WHTP-C INST 1 Red line mark up drawings to be submitted
2099 7-23D 5 WHTP-C INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2100 7-23D 6 WHTP-C INST 1
verified
2101 7-23D 7 WHTP-C INST 1 All instruments to be tagged
2102 7-23D 8 WHTP-C INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2103 7-23D 9 WHTP-C INST 1
clamped properly
2104 7-23D 10 WHTP-C INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2105 7-23D 11 WHTP-C INST 1
devices
2106 7-23D 12 WHTP-C INST 1 Cable route markers to be installed

2107 7-19D 1 WHTP-H INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2108 7-19D 2 WHTP-H INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2109 7-19D 3 WHTP-H INST 1
with CS / GI supports
2110 7-19D 4 WHTP-H INST 1 Red line mark up drawings to be submitted
2111 7-19D 5 WHTP-H INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2112 7-19D 6 WHTP-H INST 1
verified
2113 7-19D 7 WHTP-H INST 1 All instruments to be tagged
2114 7-19D 8 WHTP-H INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2115 7-19D 9 WHTP-H INST 1
clamped properly
2116 7-19D 10 WHTP-H INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2117 7-19D 11 WHTP-H INST 1
devices
2118 7-19D 12 WHTP-H INST 1 Cable route markers to be installed

2119 7-20D 1 WHTP-L INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2120 7-20D 2 WHTP-L INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2121 7-20D 3 WHTP-L INST 1
with CS / GI supports
2122 7-20D 4 WHTP-L INST 1 Red line mark up drawings to be submitted
2123 7-20D 5 WHTP-L INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2124 7-20D 6 WHTP-L INST 1
verified
2125 7-20D 7 WHTP-L INST 1 All instruments to be tagged
2126 7-20D 8 WHTP-L INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2127 7-20D 9 WHTP-L INST 1
clamped properly
2128 7-20D 10 WHTP-L INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2129 7-20D 11 WHTP-L INST 1
devices
2130 7-20D 12 WHTP-L INST 1 Cable route markers to be installed

Pig trap and accessories to be installed for the


2131 7-1D 1.1 FNDS MECH 1
alignment

2132 7-1D 1.2 FNDS MECH 1 Pig trap anchor bolt slightly bent to be rectified

2133 7-1D 1.3 FNDS CIVIL 1 Asphalt road and associated works not done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Demolish and remove relocation of existing


2134 7-1D 1.4 FNDS CIVIL 1 chemical storage shelter RC floor foundation near
pig launcher area to level and lay aggregate

2135 7-1D 1.5 FNDS MECH 1 Apply molycote /grease/oil on all bolt nuts

All exposed concrete surfaces such as slab,


2136 7-1D 1.6 FNDS CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

Rectify RC floor cracks and provide and install


2137 7-1D 1.7 FNDS CIVIL 1
expansion joint flexcell board every 3M interval

2138 7-1D 1.8 FNDS CIVIL 1 Install crash barrier east side of pig launcher area

2139 7-1D 1.9 FNDS MECH 1 Crash barrier and kerbstones to be painted

2140 7-1D 1.10 FNDS CIVIL 1 Rectify concrete cracks around spill pit grating.

2141 7-1D 1.11 FNDS CIVIL 1 Keep the area clean and tidy.

2142 7-4D 2.01 FSDS CIVIL 1 Asphalt road and associated works not done.

Burried pipe line cross over RC slab to be elevated


2143 7-4D 2.02 FSDS CIVIL 1
before laying asphalt

Remove all existing chainlink fencing near pig


2144 7-4D 2.03 FSDS CIVIL 1
launcher new impact wall area

Provide and lay concrete in between old and new


2145 7-4D 2.04 FSDS CIVIL 1
cross over \rc slab

All exposed concrete surfaces such as slab,


2146 7-4D 2.05 FSDS CIVIL 1 retaining wall, plinths, pedestals and supports to be
coated with epoxy paint as per QCS standards.

Provide and install cross barrier existing gate


2147 7-4D 2.06 FSDS CIVIL 1
location

Lifting crane not installed and grouting works not


2148 7-4D 2.07 FSDS CIVIL 1
done

Rectify level veriation between existing fence to pig


2149 7-4D 2.08 FSDS CIVIL 1 launcher area and aggregates to be spreaded
properly

Apply touch up paint on all structural steels,


2150 7-4D 2.09 FSDS MECH 1
gate/fence posts, pipes and supports.

Gate hasp locks to be checked and aligned/


2151 7-4D 2.10 FSDS MECH 1
Provide pins/ padlocks.

2152 7-4D 2.11 FSDS CIVIL 1 Gate drop bolt eyes to be provided

2153 7-4D 2.12 FSDS CIVIL 1 Provide and install grating cover for spill pit.

2154 7-4D 2.13 FSDS MECH 1 Crash barrier and kerbstones to be painted

2155 7-4D 2.14 FSDS MECH 1 Wind sock to be provided

2156 7-4D 2.15 FSDS CIVIL 1 Keep the area clean and tidy.

Wall sockets 220&415v of new building needs to


2157 7-25D 1 Station-U ELEC 1
Provide proper TAGS.

AC/DC ups distribution drawing needs to provide


2158 7-25D 2 Station-U ELEC 1
and paste on door.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

415v switchboad panel COLUMN numbers needs


2159 7-25D 3 Station-U ELEC 1
To provide same frount & back doors.

Entrance doors of MCC,Battery,Transformer &


2160 7-25D 4 Station-U CIVIL 1
Generator needs to provide boards.

Battery room Exhaust fans isolaters needs to


2161 7-25D 5 Station-U ELEC 1
provide TAGS.

2162 7-25D 6 Station-U ELEC 1 Battery cells needs to provide numbers

2163 7-25D 7 Station-U ELEC 1 All Exit door lights needs to provide proper TAGS.

Generator& Exhaust fan panels needs to provide


2164 7-25D 8 Station-U ELEC 1
proper TAGS.

Complete the approach road as per SOW and


2165 7-2G 1 FNFIS CIVIL 1
project specification

2166 7-2G 2 FNFIS MECH 1 Apply structural paint on platforms and piping

2167 7-2G 3 FNFIS CIVIL 1 Apply paint on kerb stones

2168 7-2G 4 FNFIS CIVIL 1 Plinth for structural support to be painted

2169 7-2G 5 FNFIS MECH 1 Apply paint on crash barrier

2170 7-2G 6 FNFIS CIVIL 1 Grading and leveling of surrounding area

Rectify the surface cracks on the supports and


2171 7-2G 7 FNFIS CIVIL 1
plinths wherever necessary

2172 7-2G 8 FNFIS CIVIL 1 Aggregate spreading to be completed

2173 7-2G 9 FNFIS CIVIL 1 General cleaning to be done

VAL STN
2174 7-14G 10
WHTP E&G
MECH 1 Apply structural paint on platforms and piping
VAL STN Backfill, grade and compact the surface and batter
2175 7-14G 11 CIVIL 1
WHTP E&G of surrounding
VAL STN Touch up paint on main and emergaency gates
2176 7-14G 12 MECH 1
WHTP E&G and fence posts
VAL STN Rectify the surface cracks on the supports and
2177 7-14G 13 CIVIL 1
WHTP E&G plinths wherever necessary
VAL STN Remove the temporary site faciities , project and
2178 7-14G 14 CIVIL 1
WHTP E&G safety sign boards
VAL STN
2179 7-14G 15
WHTP E&G
MECH 1 Provide nad install wind sock
VAL STN
2180 7-14G 16
WHTP E&G
CIVIL 1 General cleaning to be done

VAL STN
2181 7-13G 17
KNMP
CIVIL 1 grouting of JIB crane foundation to be completd

VAL STN Apply structural paint on structural members and


2182 7-13G 18 MECH 1
KNMP piping

VAL STN
2183 7-13G 19
KNMP
MECH 1 Privide and install wind sock

VAL STN Fill all the cable entry opening with appropriate
2184 7-13G 20 ELEC 1
KNMP material

VAL STN Backfill, grade and compact the surface and batter
2185 7-13G 21 CIVIL 1
KNMP of surrounding

VAL STN Remove the temporary site faciities , project and


2186 7-13G 22 CIVIL 1
KNMP safety sign boards

VAL STN
2187 7-13G 23
KNMP
MECH 1 Apply paint on crash barrier
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
2188 7-13G 24
KNMP
CIVIL 1 Gereral cleaning to be done

TAG Labeling to be corrected The stickers , hand


ESD,FAG ,
2189 7-3E 1 FNLGCS INST
SCADA systeM
1 written labels/tag to be removed ,appropriate
engraved ,printed standard tags to be fixed

ESD,FAG , graphics to be implemented in all HMI's the script


2190 7-3E 2 FNLGCS INST 1
SCADA systeM errors to be checked and corrected

ESD,FAG , ESD modifications to be checked and to be


2191 7-3E 3 FNLGCS INST 1
SCADA systeM implemented as per existing philosopy

ESD,FAG , Tags, Graphics in plantscape to be transferred to


2192 7-3E 4 FNLGCS INST 1
SCADA systeM new expersion SCADA

ESD,FAG ,
2193 7-3E 5 FNLGCS INST
SCADA systeM
1 ESD & FAG system SOE to be updated

ESD,FAG ,
2194 7-3E 6 FNLGCS INST
SCADA systeM
1 Logs/Reports Trends to be configured

Flexible earthing connections to be provided for


2195 7-1C 1 FNDS ELEC ALL 1 mobile pig launcher with suitable clamps for
temporary connections

Earthing connections shall be dressed neatly


2196 7-1C 2 FNDS ELEC ALL 1 before making field connections and at present it is
posing a trip hazard

Integrity of existing earthing system to be verified


2197 7-1C 3 FNDS ELEC ALL 1
before making connections with existing one.

Missing washers to be provided in earthing


2198 7-1C 4 FNDS ELEC ALL 1 connections and the tightness of earthing
cinnection to be verified

Exposed connections shall be protected with


2199 7-1C 5 FNDS ELEC ALL 1
Denso tape

The earthing termination shall be free from coating


2200 7-1C 6 FNDS ELEC ALL 1
of paint

The tagging of the instruments to be as per QP


2201 7-21H 1 WHTP-A INST 1
standard Philosopy (QPR DKN 05)

The tagging of the instruments to be as per QP


2202 7-22H 1 WHTP-B INST 1
standard Philosopy (QPR DKN 05)

The tagging of the instruments to be as per QP


2203 7-23H 1 WHTP-C INST 1
standard Philosopy (QPR DKN 05)

Flexible earthing connections to be provided for


EARTHING
2204 7-20C 1 WHTP-L ELEC
SYSTEM
1 mobile pig launcher with suitable clamps for
temporary connections.

EARTHING
2205 7-20C 2 WHTP-L ELEC
SYSTEM
1 Approved AFC drawing to be available.

EARTHING Integrity of existing earthing system to be verified


2206 7-20C 3 WHTP-L ELEC 1
SYSTEM before making connections with existing one.

EARTHING Missing washers to be provided in earthing


2207 7-20C 4 WHTP-L ELEC 1
SYSTEM connections
EARTHING
2208 7-20C 5 WHTP-L ELEC
SYSTEM
1 Construction inspection not completed

All pipe work shall be alligned properly after the tie-


2209 7-27A 1 WHTP E MECH 1 ins and bolting connections to be done without any
stress

2210 7-27A 2 WHTP E MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


2211 7-27A 3 WHTP E MECH 1
level
Corrosion fittings shall be installed in the presence
2212 7-27A 4 WHTP E MECH 1
of OEI prior to commissioning

2213 7-27A 5 WHTP E MECH 1 Pig signaler is to be functional tested


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2214 7-27A 6 WHTP E MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


2215 7-27A 7 WHTP E MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


2216 7-27A 8 WHTP E MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


2217 7-27A 9 WHTP E MECH 1
the complete system

2218 7-27A 10 WHTP E MECH 1 Stencling and colour coding shall be done

2219 7-27A 11 WHTP E MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


2220 7-27A 12 WHTP E MECH 1
per project specifications
Final painting report certified by QP QAC shall be
2221 7-27A 13 WHTP E MECH 1
provided
All flanges shall be applied molycoat, tightened
2222 7-27A 14 WHTP E MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
2223 7-27A 15 WHTP E MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
2224 7-27A 16 WHTP E MECH 1
signed off by QP

Personnel protective insulation is to be installed as


2225 7-27A 17 WHTP E MECH 1
per P&ID

Platform is to be extended for the access of online


2226 7-27A 18 WHTP E MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


2227 7-27A 19 WHTP E CIVIL 1
to commissioning)

2228 7-27A 20 WHTP E MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


2229 7-28A 1 WHTP G MECH 1 ins and bolting connections to be done without any
stress

2230 7-28A 2 WHTP G MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


2231 7-28A 3 WHTP G MECH 1
level
Corrosion fittings shall be installed in the presence
2232 7-28A 4 WHTP G MECH 1
of OEI prior to commissioning
2233 7-28A 5 WHTP G INST 1 Pig signaler is to be functional tested
2234 7-28A 6 WHTP G MECH 1 JIB crane is to be installed
All safety equipments shall be installed as per
2235 7-28A 7 WHTP G MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


2236 7-28A 8 WHTP G MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


2237 7-28A 9 WHTP G MECH 1
the complete system

2238 7-28A 10 WHTP G MECH 1 Stencling and colour coding shall be done

2239 7-28A 11 WHTP G MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


2240 7-28A 12 WHTP G MECH 1
per project specifications
Final painting report certified by QP QAC shall be
2241 7-28A 13 WHTP G MECH 1
provided
All flanges shall be applied molycoat, tightened
2242 7-28A 14 WHTP G MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
2243 7-28A 15 WHTP G MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
2244 7-28A 16 WHTP G MECH 1
signed off by QP
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Personnel protective insulation is to be installed as


2245 7-28A 17 WHTP G MECH 1
per P&ID

Platform is to be extended for the access of online


2246 7-28A 18 WHTP G MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


2247 7-28A 19 WHTP G CIVIL 1
to commissioning)

2248 7-28A 20 WHTP G MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


VAL STN
2249 7-14A 1
WHTP E&G
MECH 1 ins and bolting connections to be done without any
stress
VAL STN
2250 7-14A 2
WHTP E&G
MECH 1 SRV's alignments are to be proved
VAL STN Pig trap shall be installed to ensure the alignment
2251 7-14A 3 MECH 1
WHTP E&G level
VAL STN Corrosion fittings shall be installed in the presence
2252 7-14A 4 MECH 1
WHTP E&G of OEI prior to commissioning
VAL STN
2253 7-14A 5
WHTP E&G
INST 1 Pig signaler is to be functional tested
VAL STN
2254 7-14A 6
WHTP E&G
MECH 1 JIB crane is to be installed
VAL STN All safety equipments shall be installed as per
2255 7-14A 7 MECH 1
WHTP E&G approved drawings and SOW
VAL STN Safety chain or bar are to be installed in ladders of
2256 7-14A 8 MECH 1
WHTP E&G all valve operating platforms to avoid trip & fall
VAL STN All hydro test record shall be shown to substantiate
2257 7-14A 9 MECH 1
WHTP E&G the complete system
VAL STN
2258 7-14A 10
WHTP E&G
MECH 1 Stencling and colour coding shall be done
VAL STN
2259 7-14A 11
WHTP E&G
MECH 1 All valve tags are to be provided in SS material
VAL STN Piping works shall be dried & nitrogen purged as
2260 7-14A 12 MECH 1
WHTP E&G per project specifications
VAL STN Final painting report certified by QP QAC shall be
2261 7-14A 13 MECH 1
WHTP E&G provided
All flanges shall be applied molycoat, tightened
VAL STN
2262 7-14A 14
WHTP E&G
MECH 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
2263 7-14A 15 MECH 1
WHTP E&G commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
2264 7-14A 16 MECH 1
WHTP E&G signed off by QP
VAL STN Personnel protective insulation is to be installed as
2265 7-14A 17 MECH 1
WHTP E&G per P&ID

VAL STN Platform is to be extended for the access of online


2266 7-14A 18 MECH 1
WHTP E&G SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


2267 7-14A 19 CIVIL 1
WHTP E&G to commissioning)
VAL STN
2268 7-14A 20
WHTP E&G
MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


VAL STN
2269 7-13A 1
KNMP
MECH 1 ins and bolting connections to be done without any
stress

VAL STN
2270 7-13A 2
KNMP
MECH 1 SRV's alignments are to be proved

VAL STN Pig trap shall be installed to ensure the alignment


2271 7-13A 3 MECH 1
KNMP level
VAL STN Corrosion fittings shall be installed in the presence
2272 7-13A 4 MECH 1
KNMP of OEI prior to commissioning

VAL STN
2273 7-13A 5
KNMP
INST 1 Pig signaler is to be functional tested

VAL STN
2274 7-13A 6
KNMP
MECH 1 JIB crane is to be installed

VAL STN All safety equipments shall be installed as per


2275 7-13A 7 MECH 1
KNMP approved drawings and SOW
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Safety chain or bar are to be installed in ladders of


2276 7-13A 8 MECH 1
KNMP all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


2277 7-13A 9 MECH 1
KNMP the complete system

VAL STN
2278 7-13A 10
KNMP
MECH 1 Stencling and colour coding shall be done

VAL STN
2279 7-13A 11
KNMP
MECH 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


2280 7-13A 12 MECH 1
KNMP per project specifications
VAL STN Final painting report certified by QP QAC shall be
2281 7-13A 13 MECH 1
KNMP provided
All flanges shall be applied molycoat, tightened
VAL STN
2282 7-13A 14
KNMP
MECH 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
2283 7-13A 15 MECH 1
KNMP commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
2284 7-13A 16 MECH 1
KNMP signed off by QP
VAL STN Personnel protective insulation is to be installed as
2285 7-13A 17 MECH 1
KNMP per P&ID

VAL STN Platform is to be extended for the access of online


2286 7-13A 18 MECH 1
KNMP SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


2287 7-13A 19 CIVIL 1
KNMP to commissioning)
VAL STN
2288 7-13A 20
KNMP
MECH 1 Tie-ins to be done (as applicable)

Flexible earthing connections to be provided for


2289 7-28B 1 WHTP G ELEC Earthing System 1 mobile pig launcher with suitable clamps for
temporary connections.

2290 7-28B 2 WHTP G ELEC Earthing System 1 Approved AFC drawing to be available.

Integrity of existing earthing system to be verified


2291 7-28B 3 WHTP G ELEC Earthing System 1
before making connections with existing one.

Missing washers to be provided in earthing


2292 7-28B 4 WHTP G ELEC Earthing System 1
connections

2293 7-28B 5 WHTP G ELEC Earthing System 1 Construction inspection not completed

VAL STN
2294 7-11F 1
FNLGCS
MECH 1 All valve must be installed with name plate

VAL STN
2295 7-11F 2
FNLGCS
MECH 1 To be provide fire extinguiser

All pipe work shall be alligned properly after the tie-


2296 7-2A 1 FNFIS MECH 1 ins and bolting connections to be done without any
stress

2297 7-2A 2 FNFIS MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


2298 7-2A 3 FNFIS MECH 1
level
Corrosion fittings shall be installed in the presence
2299 7-2A 4 FNFIS MECH 1
of OEI prior to commissioning

2300 7-2A 5 FNFIS INST 1 Pig signaler is to be functional tested


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2301 7-2A 6 FNFIS MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


2302 7-2A 7 FNFIS MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


2303 7-2A 8 FNFIS MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


2304 7-2A 9 FNFIS MECH 1
the complete system

2305 7-2A 10 FNFIS MECH 1 Stencling and colour coding shall be done

2306 7-2A 11 FNFIS MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


2307 7-2A 12 FNFIS MECH 1
per project specifications
Final painting report certified by QP QAC shall be
2308 7-2A 13 FNFIS MECH 1
provided
All flanges shall be applied molycoat, tightened
2309 7-2A 14 FNFIS MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
2310 7-2A 15 FNFIS MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
2311 7-2A 16 FNFIS MECH 1
signed off by QP

Personnel protective insulation is to be installed as


2312 7-2A 17 FNFIS MECH 1
per P&ID

Platform is to be extended for the access of online


2313 7-2A 18 FNFIS MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


2314 7-2A 19 FNFIS CIVIL 1
to commissioning)

Insulation gasket shall be installed in all dissimilar


2315 7-2A 20 FNFIS MECH 1
material connection

Vendor piping shall be coated as per project


2316 7-2A 21 FNFIS MECH 1
specification

2317 7-2A 22 FNFIS MECH 1 Spectacle blind shall be painted

2318 7-2A 23 FNFIS MECH 1 Correct bolts shall be installed in SS flanges

2319 7-2A 24 FNFIS MECH 1 SS to CS instrument connection shall be justified

2320 7-2A 25 FNFIS MECH 1 Control valve shall be installed

2321 7-2A 26 FNFIS MECH 1 Tie ins are to be installed

All pipe work shall be alligned properly after the tie-


VAL STN
2322 7-10A 1
FNFIS
MECH 1 ins and bolting connections to be done without any
stress
VAL STN
2323 7-10A 2
FNFIS
MECH 1 SRV's alignments are to be proved
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Pig trap shall be installed to ensure the alignment


2324 7-10A 3 MECH 1
FNFIS level
VAL STN Corrosion fittings shall be installed in the presence
2325 7-10A 4 MECH 1
FNFIS of OEI prior to commissioning

VAL STN
2326 7-10A 5
FNFIS
INST 1 Pig signaler is to be functional tested

VAL STN
2327 7-10A 6
FNFIS
MECH 1 JIB crane is to be installed

VAL STN All safety equipments shall be installed as per


2328 7-10A 7 MECH 1
FNFIS approved drawings and SOW

VAL STN Safety chain or bar are to be installed in ladders of


2329 7-10A 8 MECH 1
FNFIS all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


2330 7-10A 9 MECH 1
FNFIS the complete system

VAL STN
2331 7-10A 10
FNFIS
MECH 1 Stencling and colour coding shall be done

VAL STN
2332 7-10A 11
FNFIS
MECH 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


2333 7-10A 12 MECH 1
FNFIS per project specifications
VAL STN Final painting report certified by QP QAC shall be
2334 7-10A 13 MECH 1
FNFIS provided
All flanges shall be applied molycoat, tightened
VAL STN
2335 7-10A 14
FNFIS
MECH 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
2336 7-10A 15 MECH 1
FNFIS commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
2337 7-10A 16 MECH 1
FNFIS signed off by QP
VAL STN Personnel protective insulation is to be installed as
2338 7-10A 17 MECH 1
FNFIS per P&ID

VAL STN Platform is to be extended for the access of online


2339 7-10A 18 MECH 1
FNFIS SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


2340 7-10A 19 CIVIL 1
FNFIS to commissioning)

VAL STN Insulation gasket shall be installed in all dissimilar


2341 7-10A 20 MECH 1
FNFIS material connection

VAL STN Vendor piping shall be coated as per project


2342 7-10A 21 MECH 1
FNFIS specification
VAL STN
2343 7-10A 22
FNFIS
MECH PAINTING 1 Spectacle blind shall be painted

VAL STN
2344 7-10A 23
FNFIS
MECH 1 Correct bolts shall be installed in SS flanges

VAL STN
2345 7-10A 24
FNFIS
MECH 1 SS to CS instrument connection shall be justified

VAL STN
2346 7-10A 25
FNFIS
MECH 1 Control valve shall be installed

VAL STN
2347 7-10A 26
FNFIS
MECH 1 Tie ins are to be installed

Flexible earthing connections to be provided for


2348 7-4C 1 FSDS ELEC Earthing System 1 mobile pig launcher with suitable clamps for
temporary connections
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Integrity of existing earthing system to be verified


2349 7-4C 2 FSDS ELEC Earthing System 1
before making connections with existing one.

Missing washers to be provided in earthing


2350 7-4C 3 FSDS ELEC Earthing System 1 connections and the tightness of earthing
cinnection to be verified
Exposed connections shall be protected with
2351 7-4C 4 FSDS ELEC Earthing System 1
Denso tape

2352 7-19E 1 WHTP-H MECH 1 SRV to be installed

2353 7-19E 2 WHTP-H MECH 1 painting to be completed

2354 7-20E 1 WHTP-L MECH 1 SRV to be installed

2355 7-20E 2 WHTP-L MECH 1 painting to be completed

All pipe work shall be alligned properly after the tie-


2356 7-19A 1 WHTP-H MECH 1 ins and bolting connections to be done without any
stress

2357 7-19A 2 WHTP-H MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


2358 7-19A 3 WHTP-H MECH 1
level
Corrosion fittings shall be installed in the presence
2359 7-19A 4 WHTP-H MECH 1
of OEI prior to commissioning

2360 7-19A 5 WHTP-H MECH 1 Pig signaler is to be functional tested

2361 7-19A 6 WHTP-H MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


2362 7-19A 7 WHTP-H MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


2363 7-19A 8 WHTP-H MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


2364 7-19A 9 WHTP-H MECH 1
the complete system

2365 7-19A 10 WHTP-H MECH 1 Stencling and colour coding shall be done

2366 7-19A 11 WHTP-H MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


2367 7-19A 12 WHTP-H MECH 1
per project specifications
Final painting report certified by QP QAC shall be
2368 7-19A 13 WHTP-H MECH 1
provided
All flanges shall be applied molycoat, tightened
2369 7-19A 14 WHTP-H MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
2370 7-19A 15 WHTP-H MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
2371 7-19A 16 WHTP-H MECH 1
signed off by QP

Personnel protective insulation is to be installed as


2372 7-19A 17 WHTP-H MECH 1
per P&ID

Platform is to be extended for the access of online


2373 7-19A 18 WHTP-H MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


2374 7-19A 19 WHTP-H CIVIL 1
to commissioning)

2375 7-19A 20 WHTP-H MECH 1 Tie-ins to be done (as applicable)


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All pipe work shall be alligned properly after the tie-


2376 7-20A 1 WHTP-L MECH 1 ins and bolting connections to be done without any
stress

2377 7-20A 2 WHTP-L MECH 1 SRV's alignments are to be proved

Pig trap shall be installed to ensure the alignment


2378 7-20A 3 WHTP-L MECH 1
level
Corrosion fittings shall be installed in the presence
2379 7-20A 4 WHTP-L MECH 1
of OEI prior to commissioning

2380 7-20A 5 WHTP-L INST 1 Pig signaler is to be functional tested

2381 7-20A 6 WHTP-L MECH 1 JIB crane is to be installed

All safety equipments shall be installed as per


2382 7-20A 7 WHTP-L MECH 1
approved drawings and SOW

Safety chain or bar are to be installed in ladders of


2383 7-20A 8 WHTP-L MECH 1
all valve operating platforms to avoid trip & fall

All hydro test record shall be shown to substantiate


2384 7-20A 9 WHTP-L MECH 1
the complete system

2385 7-20A 10 WHTP-L MECH 1 Stencling and colour coding shall be done

2386 7-20A 11 WHTP-L MECH 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


2387 7-20A 12 WHTP-L MECH 1
per project specifications
Final painting report certified by QP QAC shall be
2388 7-20A 13 WHTP-L MECH 1
provided
All flanges shall be applied molycoat, tightened
2389 7-20A 14 WHTP-L MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
2390 7-20A 15 WHTP-L MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
2391 7-20A 16 WHTP-L MECH 1
signed off by QP

Personnel protective insulation is to be installed as


2392 7-20A 17 WHTP-L MECH 1
per P&ID

Platform is to be extended for the access of online


2393 7-20A 18 WHTP-L MECH 1
SRV testing are to be demonstrated, if not required

Housekeeping shall be done (to be checked prior


2394 7-20A 19 WHTP-L CIVIL 1
to commissioning)

2395 7-20A 20 WHTP-L MECH 1 Tie-ins to be done (as applicable)

All pipe work shall be alligned properly after the tie-


VAL STN
2396 7-15A 1
WHTP H&L
MECH 1 ins and bolting connections to be done without any
stress
VAL STN
2397 7-15A 2
WHTP H&L
MECH 1 SRV's alignments are to be proved

VAL STN Pig trap shall be installed to ensure the alignment


2398 7-15A 3 MECH 1
WHTP H&L level
VAL STN Corrosion fittings shall be installed in the presence
2399 7-15A 4 MECH 1
WHTP H&L of OEI prior to commissioning

VAL STN
2400 7-15A 5
WHTP H&L
INST 1 Pig signaler is to be functional tested

VAL STN
2401 7-15A 6
WHTP H&L
MECH 1 JIB crane is to be installed
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN All safety equipments shall be installed as per


2402 7-15A 7 MECH 1
WHTP H&L approved drawings and SOW

VAL STN Safety chain or bar are to be installed in ladders of


2403 7-15A 8 MECH 1
WHTP H&L all valve operating platforms to avoid trip & fall

VAL STN All hydro test record shall be shown to substantiate


2404 7-15A 9 MECH 1
WHTP H&L the complete system

VAL STN
2405 7-15A 10
WHTP H&L
MECH 1 Stencling and colour coding shall be done

VAL STN
2406 7-15A 11
WHTP H&L
MECH 1 All valve tags are to be provided in SS material

VAL STN Piping works shall be dried & nitrogen purged as


2407 7-15A 12 MECH 1
WHTP H&L per project specifications
VAL STN Final painting report certified by QP QAC shall be
2408 7-15A 13 MECH 1
WHTP H&L provided
All flanges shall be applied molycoat, tightened
VAL STN
2409 7-15A 14
WHTP H&L
MECH 1 with proper torque and report shall be provided to
QP
VAL STN Red line mark up drawings to be submitted after
2410 7-15A 15 MECH 1
WHTP H&L commissioning for QP approval
VAL STN All Test Pack B Punch items shall be cleared and
2411 7-15A 16 MECH 1
WHTP H&L signed off by QP
VAL STN Personnel protective insulation is to be installed as
2412 7-15A 17 MECH 1
WHTP H&L per P&ID

VAL STN Platform is to be extended for the access of online


2413 7-15A 18 MECH 1
WHTP H&L SRV testing are to be demonstrated, if not required

VAL STN Housekeeping shall be done (to be checked prior


2414 7-15A 19 CIVIL 1
WHTP H&L to commissioning)
VAL STN
2415 7-15A 20
WHTP H&L
MECH 1 Tie-ins to be done (as applicable)

VAL STN Grouting and painting to be done for the remaining


2416 7-13B 1 CIVIL 1
KNMP support foundation
VAL STN
2417 7-13B 2
KNMP
MECH 1 Wind sock to be provided

VAL STN
2418 7-13B 3
KNMP
CIVIL 1 Cleaning is required for inside the spill pit

VAL STN Rectification shall be done for the damaged


2419 7-13B 4 CIVIL 1
KNMP portion of track road inside the fence
VAL STN
2420 7-13B 5
KNMP
CIVIL 1 Access road from maingate to ROW shall be done

VAL STN Backfilling upto the edge of grading,compaction


2421 7-13B 6 CIVIL 1
KNMP and proper slope to be provided
VAL STN Apply touchup paint for the gate and fence post to
2422 7-13B 7 MECH 1
KNMP be done
VAL STN Fence opeining at pipe entry shall be reinstated
2423 7-13B 8 MECH 1
KNMP properly
VAL STN
2424 7-13B 9
KNMP
CIVIL 1 Proper cleaning to be done for the fence and gate

VAL STN Remove all temporary facilities and house keeping


2425 7-13B 10 CIVIL 1
KNMP to be done.
VAL STN
2426 7-14B 1
WHTP E&G
MECH 1 Wind sock to be provided
VAL STN Rectification shall be done for the damaged
2427 7-14B 2 CIVIL 1
WHTP E&G portion of track road inside the fence
VAL STN Backfilling upto the edge of grading,compaction
2428 7-14B 3 CIVIL 1
WHTP E&G and proper slope to be provided
VAL STN Gravel to be provided and match with the track
2429 7-14B 4 CIVIL 1
WHTP E&G road level inside the fence area
VAL STN
2430 7-14B 5
WHTP E&G
CIVIL 1 Access road from main gate to ROW shall be done
VAL STN
2431 7-14B 6
WHTP E&G
CIVIL 1 Cleaning is required for inside the spill pit
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN
2432 7-14B 7
WHTP E&G
MECH 1 Apply touchup paint for the gate and fence post
VAL STN
2433 7-14B 8
WHTP E&G
MECH 1 Proper cleaning to be done for the fence and gate

VAL STN Remove all temporary faciilities and house keeping


2434 7-14B 9 CIVIL 1
WHTP E&G to be done
Asphalt road and associated works shall be
2435 7-2B 1 FNFIS CIVIL 1
completed

2436 7-2B 2 FNFIS CIVIL 1 Painting to be done for the kerb stone

Joint sealant for the kerb stone and other required


2437 7-2B 3 FNFIS CIVIL 1
areas to be done
Preparation and coating with epoxy paint shall be
2438 7-2B 4 FNFIS CIVIL 1
done for the support foundations
Aggregates laying to be completed for the
2439 7-2B 5 FNFIS CIVIL 1
remaining area
Remove all temporary facilities and house keeping
2440 7-2B 6 FNFIS CIVIL 1
to be done

VAL STN
2441 7-17G 1
WHTP-B
CIVIL 1 Housekeeping to be carried out

VAL STN
2442 7-17G 2
WHTP-B
MECH 1 Greasing/molycote to be done for all bolts

VAL STN Rubber grip(caps) for the handle of all valves to be


2443 7-17G 3 MECH 1
WHTP-B removed and handle to be painted

Glycol heater main power feeders 415v needs to


2444 7-2D 1 FNFIS ELEC 1
provide TAGS with description in MCC room

Glycol heater control panel needs to provide TAGS


2445 7-2D 2 FNFIS ELEC 1
on panel doors Elect/Inst MCC room

New lighting pole near the instrument air comp;


2446 7-2D 3 FNFIS ELEC 1
skid needs to provide TAG

TT-100, 100A1&2, 100B1&2 range should be same


2447 7-2E 1 FNFIS INST 2
in PLC and DCS document should need

2448 7-2E 2 FNFIS INST 2 console timing should be correct

2449 7-2E 3 FNFIS INST 2 TT-100 high trip alarm not appeared in DCS

TT-100, 100A1&2, 100B1&2 alarm not appeared in


2450 7-2E 4 FNFIS INST 2
DCS graphic and alarm summary

2451 7-2E 5 FNFIS INST 2 Field instrument tag are missing

2452 7-2E 6 FNFIS INST 1 PCV-2202A&B valves and I/P conv still not fixed

Flow magnetic meter shroud are missing and gland


2453 7-2E 7 FNFIS INST 1
should be S/steel

Historical alarm list should not be reset with alarm


2454 7-2E 8 FNFIS INST 2
summary alarm list

2455 7-2E 9 FNFIS INST 1 PLC panel cable tag are missing

All alarm sitting DCS & PLC should be correct and


2456 7-2E 10 FNFIS INST 2
also to be correct the document setting list

Provide all document( PI&D/loop / C&E/Alrm


2457 7-2E 11 FNFIS INST 2 setting/Logic /JBs /PLC Panel/DCS and field
instrument manual
12 inch PIG Asphalt road and asssociated works shall be done
2458 7-3B 1 FNLGCS CIVIL 1
Launcher station for inside the fence.
12 inch PIG Backfilling up to the edge of grading, compaction
2459 7-3B 2 FNLGCS CIVIL 1
Launcher station and proper slope to be provided.
12 inch PIG
2460 7-3B 3 FNLGCS CIVIL
Launcher station
1 Painting to be done for the kerb stone.

12 inch PIG
2461 7-3B 4 FNLGCS CIVIL
Launcher station
1 Joint sealant for the required areas to be done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

12 inch PIG Crane access to be completed outside fence area


2462 7-3B 5 FNLGCS CIVIL 1
Launcher station as per the drawing.
12 inch PIG
2463 7-3B 6 FNLGCS CIVIL
Launcher station
1 Damaged paint on concrete surface to be rectified

12 inch PIG Rectification to be done for the existing corner post


2464 7-3B 7 FNLGCS CIVIL 1
Launcher station and brabed wire of fence both sides of new entry.

12 inch PIG
2465 7-3B 8 FNLGCS CIVIL
Launcher station
1 Proper cleaning to be done for the fence and gate

12 inch PIG Remove all temporary facilites and house keeping


2466 7-3B 9 FNLGCS CIVIL 1
Launcher station to be done.

Pipe support on steel structure to be arranged


2467 7-1E 1 FNDS MECH ALL 1
properly

Trip hazzard paint to be applied around


2468 7-1E 2 FNDS CIVIL ALL 1
foundations on receiver hard standing platform

Piping to be laid for chemical injection to inhibitor


2469 7-1E 3 FNDS MECH ALL 1
from storage shelter

2470 7-1E 4 FNDS MECH ALL 1 Eye wash unit to be relocated

Ramp to be provided for forklift access in chemical


2471 7-1E 5 FNDS CIVIL ALL 1
storage shelter

2472 7-1E 6 FNDS CIVIL ALL 1 Spill protection to be around shelter

2473 7-4E 1 FSDS MECH ALL 1 Cosmetic paint to be applied

Protection to be provided on Emergency gate to


2474 7-4E 2 FSDS MECH ALL 1
avoid opening from outside

Kicker line stud bolts to be rectified with equal


2475 7-4E 3 FSDS MECH ALL 1
projection

Platform anchor bolt to be rectified with minimum 2


2476 7-4E 4 FSDS CIVIL ALL 1
treads projection

Barrier to be provided to avoid wind sock pole


2477 7-4E 5 FSDS MECH ALL 1
fauling on pipeline while maintanance

2478 7-4E 6 FSDS MECH ALL 1 Plotform protection chain to be adjusted

Khuff A,B,C - FE-0301 orifice tag plate details not


2479 7-21I 1 WHTP-A INST ALL 1
clear.

Update drawing, actual connected to 6C-LCP-


2480 7-21I 2 WHTP-A INST ALL 2
0072, but in the drawing tagging 6C-LP-0071

FI-0001, Local tag name FI-0001 on the drawing


2481 7-21I 3 WHTP-A INST ALL 2
FI-1001

Update the drawing, because termination cable


2482 7-21I 4 WHTP-A INST ALL 2
number still not correct.

Tag number for similar devices should be same e.g


2483 7-21I 5 WHTP-A INST ALL 1
Solenoid given with SOV and XY

Khuff A,B,C - FE-0301 orifice tag plate details not


2484 7-22I 1 WHTP-B INST 1
clear.

Update drawing, actual connected to 6C-LCP-


2485 7-22I 2 WHTP-B INST 1
0072, but in the drawing tagging 6C-LP-0071

FI-0001, Local tag name FI-0001 on the drawing


2486 7-22I 3 WHTP-B INST 1
FI-1001

Update the drawing, because termination cable


2487 7-22I 4 WHTP-B INST 1
number still not correct.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Tag number for similar devices should be same e.g


2488 7-22I 5 WHTP-B INST 1
Solenoid given with SOV and XY

Khuff A,B,C - FE-0301 orifice tag plate details not


2489 7-23I 1 WHTP-C INST 1
clear.

Update drawing, actual connected to 6C-LCP-


2490 7-23I 2 WHTP-C INST 1
0072, but in the drawing tagging 6C-LP-0071

FI-0001, Local tag name FI-0001 on the drawing


2491 7-23I 3 WHTP-C INST 1
FI-1001

Update the drawing, because termination cable


2492 7-23I 4 WHTP-C INST 1
number still not correct.

Tag number for similar devices should be same e.g


2493 7-23I 5 WHTP-C INST 1
Solenoid given with SOV and XY

2494 7-1F 1 FNDS CIVIL 1 Access road job is incomplete

2495 7-1F 2 FNDS MECH 1 Few block valves handles are missing

2496 7-1F 3 FNDS MECH 1 Flare line tie in valve - No access

Instrument air header at FN to be provided with


2497 7-1F 4 FNDS MECH 1
blind flange

2498 7-1F 5 FNDS MECH 1 Touch up painting on weld joints to be done

2499 7-1F 6 FNDS MECH 1 Instrument air line tie in to main header to be done

2500 7-4F 1 FSDS CIVIL 1 Access road job is incomplete

2501 7-4F 2 FSDS MECH 1 Few block valves handles are missing

2502 7-4F 3 FSDS MECH 1 Flare line tie in valve - No access

Instrument air header at FN to be provided with


2503 7-4F 4 FSDS MECH 1
blind flange

2504 7-4F 5 FSDS MECH 1 Touch up painting on weld joints to be done

2505 7-4F 6 FSDS MECH 1 Instrument air line tie in to main header to be done

Pipe line No. & flow direction to be marked on the


2506 7-25G 1 Station-U MECH 1
pipe as per QP std.

2507 7-25G 2 Station-U MECH 1 Pipe coating on welded joints not done.

Provide Tag Nos. on all valves & stencil tag Nos.


2508 7-25G 3 Station-U MECH 1 on all MOVs, SDV & PIG LAUNCHER/RECEIVER
as per QP std.

2509 7-25G 4 Station-U MECH 1 SDV-0014, SRV-0289 not installed yet.

Replace the spade with spectacle on 12" Plug


2510 7-25G 5 Station-U MECH 1
valve PLG-0462 as per P & ID.

All the stud bolts threads are to be coated with


2511 7-25G 6 Station-U MECH 1
molycoat grease.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

The P& ID is to be revised as per the latest revised


2512 7-25G 7 Station-U MECH 1 G.A. We found that some lines are not
constructed as per the given P & ID.

PACU equipment to be serviced and clear from


2513 7-30A 1 UMMBAB-B HVAC 1
internal dust and sand particles

Check duct construction integrity (Ducting and


2514 7-30A 2 UMMBAB-B HVAC 1
insulation)

Ensure all duct dampers and other accessories are


2515 7-30A 3 UMMBAB-B HVAC 1
air tight and selaed

Ensure pressurization level accordance with QP


2516 7-30A 4 UMMBAB-B HVAC 1
philoshopy for fire and safety (QP-phl-S-001 Rev.3)

Need all RAD access doors properly sealed to stop


2517 7-30A 5 UMMBAB-B HVAC 1
external particles way in

All exposed Sa/Ra duct to be cladded with


2518 7-30A 6 UMMBAB-B HVAC 1
aluminum cladding

The HVAC control panel and field devices wiring to


2519 7-30A 7 UMMBAB-B HVAC 1
be fully completed

Provide wheather proof box for all outdoor HVAC


2520 7-30A 8 UMMBAB-B HVAC 1 field electrical instrument such as damper
actuators/pressure switches etc.

Access door for fire dampers shall be accessible


2521 7-30A 9 UMMBAB-B HVAC 1
for maintenance

2522 7-30A 10 UMMBAB-B HVAC 1 All thermal glands to be tightened

2523 7-30A 11 UMMBAB-B HVAC 1 All DUCT openings in wall /slab to be sealed

2524 7-30A 12 UMMBAB-B HVAC 1 Approved material submittal copy to be submitted

2525 7-30A 13 UMMBAB-B HVAC 1 HVAC permenant ID and flow tags to be fixed

2526 7-30A 14 UMMBAB-B HVAC 1 Fire damper to be provided for fire rated wall

Carry out duct cleaning for the entire HVAC duct


2527 7-30A 15 UMMBAB-B HVAC 1
system

2528 7-30A 16 UMMBAB-B HVAC 1 All motorized damper leaks to be to arrested

2529 7-30A 17 UMMBAB-B HVAC 1 Approved AFC as built drawing to be provided

PACU equipment to be serviced and clear from


2530 7-25I 1 Station-U HVAC 1
internal dust and sand particles

Check duct construction integrity (Ducting and


2531 7-25I 2 Station-U HVAC 1
insulation)

Ensure all duct dampers and other accessories are


2532 7-25I 3 Station-U HVAC 1
air tight and selaed

Ensure pressurization level accordance with QP


2533 7-25I 4 Station-U HVAC 1
philoshopy for fire and safety (QP-phl-S-001 Rev.3)
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Need all RAD access doors properly sealed to stop


2534 7-25I 5 Station-U HVAC 1
external particles way in

All exposed Sa/Ra duct to be cladded with


2535 7-25I 6 Station-U HVAC 1
aluminum cladding

The HVAC control panel and field devices wiring to


2536 7-25I 7 Station-U HVAC 1
be fully completed

Provide wheather proof box for all outdoor HVAC


2537 7-25I 8 Station-U HVAC 1 field electrical instrument such as damper
actuators/pressure switches etc.

Access door for fire dampers shall be accessible


2538 7-25I 9 Station-U HVAC 1
for maintenance

2539 7-25I 10 Station-U HVAC 1 All therminal glands to be tightened

2540 7-25I 11 Station-U HVAC 1 Provide adequate SA duct supports

2541 7-25I 12 Station-U HVAC 1 Approved material submittal copy to be submitted

2542 7-25I 13 Station-U HVAC 1 HVAC permenant ID and flow tags to be fixed

2543 7-25I 14 Station-U HVAC 1 Fire damper to be provided for fire rated wall

Carry out duct cleaning for the entire HVAC duct


2544 7-25I 15 Station-U HVAC 1
system

2545 7-25I 16 Station-U HVAC 1 All motorized damper leaks to be to arrested

2546 7-25I 17 Station-U HVAC 1 Approved AFC as built drawing to be provided

PACU equipment to be serviced and clear from


2547 7-31A 1 KSFGSS HVAC 1
internal dust and sand particles

Check duct construction integrity (Ducting and


2548 7-31A 2 KSFGSS HVAC 1
insulation)

Ensure all duct dampers and other accessories are


2549 7-31A 3 KSFGSS HVAC 1
air tight and selaed

Ensure pressurization level accordance with QP


2550 7-31A 4 KSFGSS HVAC 1
philoshopy for fire and safety (QP-phl-S-001 Rev.3)

Need all RAD access doors properly sealed to stop


2551 7-31A 5 KSFGSS HVAC 1
external particles way in

All exposed Sa/Ra duct to be cladded with


2552 7-31A 6 KSFGSS HVAC 1
aluminum cladding

The HVAC control panel and field devices wiring to


2553 7-31A 7 KSFGSS HVAC 1
be fully completed

Provide wheather proof box for all outdoor HVAC


2554 7-31A 8 KSFGSS HVAC 1 field electrical instrument such as damper
actuators/pressure switches etc.

Access door for fire dampers shall be accessible


2555 7-31A 9 KSFGSS HVAC 1
for maintenance
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2556 7-31A 10 KSFGSS HVAC 1 All thermal glands to be tightened

2557 7-31A 11 KSFGSS HVAC 1 All DUCT openings in wall /slab to be sealed

2558 7-31A 12 KSFGSS HVAC 1 Approved material submittal copy to be submitted

2559 7-31A 13 KSFGSS HVAC 1 HVAC permenant ID and flow tags to be fixed

2560 7-31A 14 KSFGSS HVAC 1 Fire damper to be provided for fire rated wall

Carry out duct cleaning for the entire HVAC duct


2561 7-31A 15 KSFGSS HVAC 1
system

2562 7-31A 16 KSFGSS HVAC 1 All motorized damper leaks to be to arrested

2563 7-31A 17 KSFGSS HVAC 1 Approved AFC as built drawing to be provided

Marking of flow direction, stenceling, identification


2564 7-31B 1 KSFGSS MECH 1
of lines to be carried out.

Many valves handle removed condition, its to be


2565 7-31B 2 KSFGSS MECH 1
fixed back.

Many valves & flanges missing nuts & bolts to be


2566 7-31B 3 KSFGSS MECH 1
fixed back.

Personnal protection (Insulation) to be installed


2567 7-31B 4 KSFGSS MECH 1 down stream of 55-RO-0001. ( De pressurising line
of Point N to Khatiyah 18" header)

55-PI-0001 & 0002 should be readble from the


2568 7-31B 5 KSFGSS INST 1
kicker line valves.

55-BV-0008 (Up stream of MOV - 0002) end blind


2569 7-31B 6 KSFGSS MECH 1
to be installed.

Inter lock system to be installed on all vent, drain


2570 7-31B 7 KSFGSS MECH 1
vales and pig door of 55-Z-0001

Pig receiver 55-Z-0001 atmosphere vent T flange


2571 7-31B 8 KSFGSS MECH 1
blind to be installed.

2572 7-31B 9 KSFGSS MECH 1 55-BV-0023 ball valve end blind to be installed.

55-BV-0026 (Nitrogen purge connection) not


2573 7-31B 10 KSFGSS MECH 1
blinded.

Instrument air line support and incompleted


2574 7-31B 11 KSFGSS MECH 1
connection to SDV to be provided.

Chemical injection nipple and valves to be provided


2575 7-31B 12 KSFGSS MECH 1
on 55-CI-0001 COSASCO type fittings.

Pig receiver 55-Z-0001 old tag number to be


2576 7-31B 13 KSFGSS MECH 1
replaced.

Flare condensate boot bottom 55-GLV-0001 down


2577 7-31B 14 KSFGSS MECH 1
stream spectical blind is missing.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

55-BV-0072 (Condensate drain tank) blind to be


2578 7-31B 15 KSFGSS MECH 1
installed.

Incomplete installation of Instrument cable JBs to


2579 7-31B 16 KSFGSS INST 1
be installed for all flow meters.

55-BV-0061 (Future connection line from manifold)


2580 7-31B 17 KSFGSS MECH 1
down stream blind to be provided.

55- BV-0048 down stream spectical blind to be


2581 7-31B 18 KSFGSS MECH 1
installed.

Chemical injection nipple and valves to be provided


2582 7-31B 19 KSFGSS MECH 1
on 55-CI-0003 COSASCO type fittings.

55-BV-0054 (FNDGS supply line) down stream


2583 7-31B 20 KSFGSS MECH 1
spectical blind to be installed.

Chemical injection nipple and valves to be provided


2584 7-31B 21 KSFGSS MECH 1
on 55-CI-0004 COSASCO type fittings.

Chemical injection nipple and valves to be provided


2585 7-31B 22 KSFGSS MECH 1
on 55-CI-0002 COSASCO type fittings.

55-BV-34 (Kicker line of mobile receiver - Khuff C


2586 7-31B 23 KSFGSS MECH 1
flow line) end blind to be installed.

Personnal protection (Insulation) to be installed


2587 7-31B 24 KSFGSS MECH 1 down stream of 55-RO-0002. ( De pressurising line
of KSFGSS to Khuff-C 4" header)

Pig receiver tag number to be stencilled as per P&


2588 7-31C 1 KSFGSS MECH 1
Id

Pig receiver vent and drain valves and the door -


2589 7-31C 2 KSFGSS MECH 1
mechanical interlocks to be installed.

Valve mechanical interlock keys to be placed in


the key box installed at a suitable location in the
2590 7-31C 3 KSFGSS MECH 1
telemetry building along with the sequence of
operation displayed beside.

SRV calibration certificates to be produced for


2591 7-31C 4 KSFGSS MECH 1
verification.

Alignment of flange joints provided with with


2592 7-31C 5 KSFGSS MECH 1
spectacle blinds to be verified.

2593 7-31C 6 KSFGSS MECH 1 Alignment of the pig trolley to be verified.

2594 7-31C 7 KSFGSS MECH 1 Jib crane to be load tested and stenciled.

2595 7-31C 8 KSFGSS MECH 1 CI-0001/2/3/4 - installation incomplete.

2596 7-31C 9 KSFGSS MECH 1 Nitrogen purge connection- blind flange missing.

Personal protection insulation to be provided on


2597 7-31C 10 KSFGSS MECH 1
the depressurization line D/s RO-0001/0002

2598 7-31C 11 KSFGSS MECH 1 PT-0005 A/B/C access to be provided.

PI-0001 to be re-oriented as per note-10 of the P&


2599 7-31C 12 KSFGSS MECH 1
Id.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2600 7-31C 13 KSFGSS MECH 1 IA line construction incomplete.

2601 7-31C 14 KSFGSS MECH 1 Wrench marks on the IA line to be filed smooth.

Ladders to the access platfoms to be provided with


2602 7-31C 15 KSFGSS MECH 1
safety bars or chains.

Foundation bolts to be cut to such a length that


2603 7-31C 16 KSFGSS MECH 1
only 3 to 4 threads are exposed.

Tubing to SDV-0001 air accumulator poses


2604 7-31C 17 KSFGSS MECH 1
tripping hazard.

2605 7-31C 18 KSFGSS MECH 1 Valves to be coated to match piping color code.

2606 7-31C 19 KSFGSS MECH 1 All missing valve handles to be installed.

2607 7-31C 20 KSFGSS MECH 1 Touch-up painting and color banding.

2608 7-31C 21 KSFGSS MECH 1 Station emergency escape gate not accessable.

2609 7-31C 22 KSFGSS MECH 1 Valves and instrument tagging

2610 7-31C 23 KSFGSS MECH 1 Stencilling to be completed before commissioning.

All stud bolts to be lubricated with approved


2611 7-31C 24 KSFGSS MECH 1
lubricant

2612 7-31C 25 KSFGSS MECH 1 Valves to be greased.

Top blind flange missing on the flare condensate


2613 7-31C 26 KSFGSS MECH 1
boot.

All piping restriction and guide supports to be


2614 7-31C 27 KSFGSS MECH 1
completed.

2615 7-31C 28 KSFGSS MECH 1 All missing blind flanges and bolts to be installed.

FE-0004 nipples are to be painted and properly


2616 7-31C 29 KSFGSS MECH 1
fixed.

2617 7-31C 30 KSFGSS MECH 1 55-S 0001 piping to be completed

2618 7-31C 31 KSFGSS MECH 1 55-S-0001 internal cleaning to be verified.

2619 7-31C 32 KSFGSS MECH 1 Spectacle blinds missing on BV-31,48 &54.

Structural platfor and fence earthing to be


2620 7-31C 33 KSFGSS MECH 1
completed.

Pipe support to be added U/s MOV-0001 to enable


2621 7-31C 34 KSFGSS MECH 1
breaking the flange for spading.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2622 7-31C 35 KSFGSS MECH 1 6" SAG line tie-ins to be completed.

2623 7-31C 36 KSFGSS MECH 1 2" IA line tie-in to be completed.

The rubber packings used the supports for the IA


2624 7-31C 37 KSFGSS MECH 1
line to be replaced with suitable durable material.

Soil backfilling and compaction around the 6" SAG


2625 7-31C 38 KSFGSS CIVIL 1
line support foundn. to be completed.

Fence rings to be installed at fence crossing points


2626 7-31C 39 KSFGSS MECH 1
for the 6" SAG and flare lines.

6" Flare line to be aligned properly where it is laid


2627 7-31C 40 KSFGSS MECH 1
on concrete sleepers.

Guides on the sleepers to be welded as per


2628 7-31C 41 KSFGSS MECH 1
support drawings

2629 7-31C 42 KSFGSS CIVIL 1 Pipe support grouting for the 6" flare line.

2630 7-31C 43 KSFGSS CIVIL 1 Soil to be properly compacted under the sleepers.

All long bolts on pipe support foundations to be cut


2631 7-31C 44 KSFGSS MECH 1
to correct length.

6" Flare line not touching sleeper at some


2632 7-31C 45 KSFGSS CIVIL 1 locations; packing plates provided shall be welded
all around.

Drain points on the 6" lines to be properly boxed


2633 7-31C 46 KSFGSS MECH 1
-up.

6" Flare line tie-in spool and nearby supports


2634 7-31C 47 KSFGSS MECH 1
missing.

Cathodic protection for the 6" flare line at the road


2635 7-31C 48 KSFGSS ELEC 1
crossing to be completed.

Remove all surplus material and debris lying on


2636 7-31C 49 KSFGSS MECH 1
the pipeline route.

Pig signaller XS-0001 is too close to the barred


2637 7-31C 50 KSFGSS MECH 1 tee. To be suitably relocated to staisfy the
requirement as per note- 3 of the P&Id.

2638 7-31D 1 KSFGSS MECH 1 Tag no to be change on pig receiver

2639 7-31D 2 KSFGSS MECH 1 Bolt to be completed on 55-PI-0002

2640 7-31D 3 KSFGSS MECH 1 Blind flange to be installed at nozzle N6

2641 7-31D 4 KSFGSS MECH 1 Missing valve handles to be installed in all area

2642 7-31D 5 KSFGSS MECH 1 Bolt to be completed on 55-FT-0001

2643 7-31D 6 KSFGSS MECH 1 Purging connection to be blinded on 55-MOV-0004


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Bolt to be completed on by pass line of 55-SDV-


2644 7-31D 7 KSFGSS MECH 1
0001 & 55-MOV-0001

Blind flange to be installed at 55-BV-0062 & access


2645 7-31D 8 KSFGSS MECH 1
ladder to be installed properly.

Spectacle blind to be installed at D/S of 55-BV-


2646 7-31D 9 KSFGSS MECH 1
0048 & 55-BV-0054

2647 7-31D 10 KSFGSS MECH 1 Bolt to be completed on 55-ESDV-0003

Instrument air line to be completed on accumulator


2648 7-31D 11 KSFGSS MECH 1
tank of 55-ESDV-0003

2649 7-31D 12 KSFGSS MECH 1 Bolt to be completed on 55-XS-0003

Final painting to be completed on structural, pipe


2650 7-31D 13 KSFGSS MECH 1
line & paltform.

All bolts & nuts to be coated with approved coating


2651 7-31D 14 KSFGSS MECH 1
material

PIG LAUNCHER/
2652 7-25F 1 Station-U MECH RECEIVER 1 P & ID need to be updated. it is in mismacth.
AREA

PIG LAUNCHER/
All mov s and pipeline to be stenciled with their
2653 7-25F 2 Station-U MECH RECEIVER 1
AREA Tag-Nos

PIG LAUNCHER/
2654 7-25F 3 Station-U MECH RECEIVER 1 All correct size bolt to be installed
AREA

PIG LAUNCHER/
Temporary support to be removed down side of
2655 7-25F 4 Station-U MECH RECEIVER 1
AREA pipeline near 62-PI-70.
PIG LAUNCHER/
All valve handle need to be installed and tightening
2656 7-25F 5 Station-U MECH RECEIVER 1
AREA is required
PIG LAUNCHER/
2657 7-25F 6 Station-U MECH RECEIVER 2 All vent line/pipeline to be connected
AREA
PIG LAUNCHER/
2658 7-25F 7 Station-U MECH RECEIVER 1 62-SRV-0289 to be installed
AREA
PIG LAUNCHER/
2659 7-25F 8 Station-U MECH RECEIVER 1 All valves tag nos to be provided
AREA
PIG LAUNCHER/
2660 7-25F 9 Station-U MECH RECEIVER 1 2" BV - 0550 Rusted Handle to be painted
AREA
PIG LAUNCHER/
2661 7-25F 10 Station-U MECH RECEIVER 1 62 - PI- 69 Bolt is missing to be provided
AREA
PIG LAUNCHER/
2662 7-25F 11 Station-U MECH RECEIVER 1 62 -SDV -0014 bypass is not connected.
AREA
PIG LAUNCHER/
2663 7-25F 12 Station-U MECH RECEIVER 1 62 -RO -0009 to be installed
AREA
PIG LAUNCHER/
2664 7-25F 13 Station-U MECH RECEIVER 1 Platforms bolts to be verified .
AREA
DIESEL
2665 7-25F 1 Station-U MECH STORAGE TANK 1 All valves tag no to be provided.
AREA
DIESEL
2666 7-25F 2 Station-U MECH STORAGE TANK 1 3" BV - 0553 and BV -0555 Handle to be installed
AREA

DIESEL
2667 7-25F 3 Station-U MECH STORAGE TANK 1 P & ID need to be updated. it is in mismacth.
AREA
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DIESEL
2668 7-25F 4 Station-U MECH STORAGE TANK 1 62 -LG -0006 Tag no is incorrect
AREA
DIESEL
2669 7-25F 5 Station-U MECH STORAGE TANK 1 62 - PVRV - 0271 is not in place.
AREA

DIESEL
2670 7-25F 6 Station-U MECH STORAGE TANK 1 62 - BV - 0536 U/S bolt to be tighten
AREA

DIESEL
2671 7-25F 7 Station-U MECH STORAGE TANK 1 Label to be provided for fire extingushers
AREA
DIESEL
2" BV -0536 D/S drain line "U" clamp to be
2672 7-25F 8 Station-U MECH STORAGE TANK 1
AREA provided
DIESEL
Near Diesel storage tank fire extinguisher is not
2673 7-25F 9 Station-U INST STORAGE TANK 1
AREA available in side the box.
DIESEL
2674 7-25F 10 Station-U MECH STORAGE TANK 1 platforms bolts to be verified .
AREA
SUBSTATION
Work station with HMI, printers and accessories
2675 7-25H 1 Station-U ELEC CONTROL 1
SYSTEM shall be installed, label and cables to be terminated

SUBSTATION
Digital output cables for Becon and Siren shall be
2676 7-25H 2 Station-U ELEC CONTROL 1
SYSTEM terminate in 1x2A

SUBSTATION
Antenna for GPS to be installed and its cable to be
2677 7-25H 3 Station-U ELEC CONTROL 1
SYSTEM tagged

SUBSTATION To provide justification for providing modbus


2678 7-25H 4 Station-U ELEC CONTROL 1 instead of IEC 61850 communication protocal
SYSTEM which is available with sepam 80 series

SUBSTATION
UPS and batteryn rackshall be installed in 62-SCS-
2679 7-25H 5 Station-U ELEC CONTROL 1
SYSTEM 6203 SCS panel and its cable to be terminate

SUBSTATION 1FEC1 & 1FEC2 shall be installed in 62-SCS


2680 7-25H 6 Station-U INST CONTROL 1 -6203 and its power cable to be terminate . FC-LC
SYSTEM patch cord to be terminate in FEC & FOPP
SUBSTATION Ferrules shall be replace for communication cable
2681 7-25H 7 Station-U ELEC CONTROL 1 by proper size in communication modules in 62-
SYSTEM RCP-6203-01
SUBSTATION
for KVM switch permanent power supply with
2682 7-25H 8 Station-U ELEC CONTROL 1
SYSTEM circuit breaker shall be provided

SUBSTATION communication cables to be terminate in ethernet


2683 7-25H 9 Station-U ELEC CONTROL 1 switch, relay and metering panel and to be label
SYSTEM /tagged
SUBSTATION
GPS clock alarm cable shall be terminate in GPS
2684 7-25H 10 Station-U ELEC CONTROL 1
SYSTEM clock and wire shall be replace by 0.5 sq.mm

SUBSTATION
2685 7-25H 11 Station-U ELEC CONTROL 1 PLC drop cable shall be labelled
SYSTEM
SUBSTATION
2686 7-25H 12 Station-U INST CONTROL 1 FOPP cable tagging to be done
SYSTEM
DIESEL
2687 7-25C 1 Station-U MECH STORAGE TANK 1 All bolts / nuts to be coated properly
AREA
DIESEL
Touch up painting to be done on pipe line and
2688 7-25C 2 Station-U MECH STORAGE TANK 1
AREA vessel
DIESEL
Blind flange for spare nozzle to be installed
2689 7-25C 3 Station-U MECH STORAGE TANK 1
AREA properly.
DIESEL
2690 7-25C 4 Station-U MECH STORAGE TANK 1 Ladder support to tightened.
AREA
DIESEL
2691 7-25C 5 Station-U ELEC STORAGE TANK 1 Earthing bolts to be tightened.
AREA
DIESEL
Stud bolts / nuts at D/S strainer of supply line to be
2692 7-25C 6 Station-U MECH STORAGE TANK 1
AREA changed.
DIESEL
62-LCV-0003, drain line clearance to the ground to
2693 7-25C 7 Station-U INST STORAGE TANK 1
AREA be increased.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DIESEL
2694 7-25C 8 Station-U INST STORAGE TANK 1 62-LCV-0003, vent line of SRV to be re-routed.
AREA
DIESEL
2695 7-25C 9 Station-U MECH STORAGE TANK 1 Emergency exit door handle at outside is missing
AREA

2696 7-25C 1 Station-U CIVIL TIE-IN HEADER 1 62-FE-0008 : Concrete for ladder support damage

2697 7-25C 2 Station-U MECH TIE-IN HEADER 1 All bolts / nuts to be coated properly

2698 7-25C 3 Station-U MECH TIE-IN HEADER 1 62-PI-0069 : flange bolts are loosen

2699 7-25C 4 Station-U MECH TIE-IN HEADER 1 62-PT-0032C : flange bolts to be changed

2700 7-25C 5 Station-U MECH TIE-IN HEADER 1 62-SDV-0014 : Access ladder bolts are loosen.

2701 7-25C 6 Station-U MECH TIE-IN HEADER 1 Tag no's to be installed on all valves

62-PLG-0462 : Blind spade to be changed with


2702 7-25C 7 Station-U MECH TIE-IN HEADER 1
spectacle as per PID

2703 7-25C 8 Station-U MECH TIE-IN HEADER 1 62-SRV-0289 to installed after calibration

62-Z-6205 : chain block for jib crane to be installed


2704 7-25C 9 Station-U MECH TIE-IN HEADER 1
after calibration

2705 7-25C 10 Station-U CIVIL TIE-IN HEADER 1 62-Z-6205 : Trap support to be grouted.

2 X 100% Parallel reduntant system configuration


VAL STN shall be provided as per AFC drawings.
2706 7-13H 1 ELEC 1
KNMP Dcoc.NO.DGEN-2-54-001 & Doc No DGEN--2-23-
0014

Charge regulator/ controller shall be provided with


VAL STN
2707 7-13H 2
KNMP
ELEC 1 lighting arrester on the input side and blocking
diode on the output side as oer specification

Voltage and current measuring instrument for


VAL STN
2708 7-13H 3
KNMP
ELEC 1 photovoltaic array, battery and distribution board
shall be provided

VAL STN battery sizing calculation, data sheet and test


2709 7-13H 4 ELEC 1
KNMP certificate shall be provided

VAL STN complete solar panal AFC wiring diagram shall be


2710 7-13H 5 ELEC 1
KNMP provided

VAL STN
2711 7-13H 6
KNMP
INST 1 Pressure gauge shall be calibrated

VAL STN Manufacturer data sheet, test certifacates shall be


2712 7-13H 7 ELEC 1
KNMP provided for all installed devices

VAL STN Panel doors shall be provided for solar module


2713 7-13H 8 ELEC 1
KNMP support

VAL STN Tilting arrangement shall be provided for solar


2714 7-13H 9 ELEC 1
KNMP module support

Special tools for progarmming Tri loop device,


VAL STN
2715 7-13H 10
KNMP
INST 1 PLC,charge regulator and calibtration of variable
flow tranmitter shall be provided

VAL STN Tag for pig signallar and pressure gauge shakk be
2716 7-13H 11 ELEC 1
KNMP provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Unferrulated wires shall be ferruled in solar & TRU


2717 7-13H 12 ELEC 1
KNMP Panels

VAL STN Data sheet for panel and battery enclosure shakk
2718 7-13H 13 ELEC 1
KNMP be provided

2 X 100% Parallel reduntant system configuration


VAL STN shall be provided as per AFC drawings.
2719 7-14H 1 ELEC 1
WHTP E&G Dcoc.NO.DGEN-2-54-001 & Doc No DGEN--2-23-
0014

Charge regulator/ controller shall be provided with


VAL STN
2720 7-14H 2
WHTP E&G
ELEC 1 lighting arrester on the input side and blocking
diode on the output side as oer specification

Voltage and current measuring instrument for


VAL STN
2721 7-14H 3
WHTP E&G
ELEC 1 photovoltaic array, battery and distribution board
shall be provided
VAL STN battery sizing calculation, data sheet and test
2722 7-14H 4 ELEC 1
WHTP E&G certificate shall be provided
VAL STN complete solar panal AFC wiring diagram shall be
2723 7-14H 5 ELEC 1
WHTP E&G provided
VAL STN
2724 7-14H 6
WHTP E&G
INST 1 Pressure gauge shall be calibrated
VAL STN Manufacturer data sheet, test certifacates shall be
2725 7-14H 7 ELEC 1
WHTP E&G provided for all installed devices
VAL STN Panel doors shall be provided for solar module
2726 7-14H 8 ELEC 1
WHTP E&G support
VAL STN Tilting arrangement shall be provided for solar
2727 7-14H 9 ELEC 1
WHTP E&G module support
Special tools for progarmming Tri loop device,
VAL STN
2728 7-14H 10
WHTP E&G
ELEC 1 PLC,charge regulator and calibtration of variable
flow tranmitter shall be provided
VAL STN Tag for pig signallar and pressure gauge shakk be
2729 7-14H 11 ELEC 1
WHTP E&G provided
VAL STN Unferrulated wires shall be ferruled in solar & TRU
2730 7-14H 12 ELEC 1
WHTP E&G Panels
VAL STN Data sheet for panel and battery enclosure shakk
2731 7-14H 13 ELEC 1
WHTP E&G be provided
All pipe work shall be aligned properly after the tie-
2732 7-25A 1 Station-U MECH ALL 1 ins and bolting connections to be done without any
stress.
SRVs calibrated/ installed and alignment is to be
2733 7-25A 2 Station-U MECH ALL 1
proved
Pig trap/ trolley alignment/ level to be checked and
2734 7-25A 3 Station-U MECH ALL 1
shown
Corrosion fittings shall be installed in the presence
2735 7-25A 4 Station-U MECH ALL 2
of OEI prior to commissioning

2736 7-25A 5 Station-U INST ALL 1 Pig signaller is to be functional tested

2737 7-25A 6 Station-U MECH ALL 1 Jib crane shall be certified by QP-STI.
All safety equipments shall be installed as per
2738 7-25A 7 Station-U MECH ALL 1
approved drawings & SOW
Safety chain or bar are to be installed in ladders of
2739 7-25A 8 Station-U MECH ALL 1
all valve operating platforms to avoid trip & fall

All hydrotest records shall be shown to


2740 7-25A 9 Station-U MECH ALL 1
substantiate the complete system

2741 7-25A 10 Station-U MECH ALL 1 Stenciling & color coding shall be done

2742 7-25A 11 Station-U MECH ALL 1 All valve tags are to be provided in SS material

Piping works shall be dried & nitrogen purged as


2743 7-25A 12 Station-U MECH ALL 2
per project specifications
Final painting report certified by QP-QAC shall be
2744 7-25A 13 Station-U MECH ALL 1
provided
All flanges shall be applied molycoat, tightened
2745 7-25A 14 Station-U MECH ALL 1 with proper torque and reports shall be provided to
QP
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Redline mark-up drawings shall be submitted after


2746 7-25A 15 Station-U MECH ALL 1
commissioning for QP approval
All test packs 'B' punch items shall be cleared &
2747 7-25A 16 Station-U MECH ALL 1
signed off by QP

Personnel protective insulation is to be installed as


2748 7-25A 17 Station-U MECH ALL 1
per P & ID

1" IA line fall trip hazard shall be painted for


2749 7-25A 18 Station-U MECH ALL 1
warning sign
House keeping shall be done (to be checked prior
2750 7-25A 19 Station-U CIVIL ALL 1
to commissioning)
2751 7-25A 20 Station-U MECH ALL 1 All valve handles shall be installed
2752 7-25A 21 Station-U CIVIL ALL 1 Drain pit at Diesel storage tank shall be cleaned
2753 7-25A 22 Station-U MECH ALL 1 PRV to be installed with proper painting finish
2754 7-25A 23 Station-U MECH ALL 1 Dip hatch to be installed
2755 7-25A 24 Station-U MECH ALL 1 Painting touch-up is to be done in DG louvers
2756 7-25A 25 Station-U MECH ALL 1 Insulation is to be done for DG exhaust line
2757 7-25A 26 Station-U MECH ALL 1 Isolation valve in DG inlet line is to be provided

2758 7-25A 27 Station-U MECH ALL 1 DG monorail crane shall be certified by QP-STI.
Transformer gate side plate is bent. Need suitable
2759 7-25A 28 Station-U MECH ALL 1
alternate reinforcement.
2760 7-25A 29 Station-U MECH ALL 1 Transformer gate is totally corroded. To be rectified.

2761 7-25A 30 Station-U MECH ALL 2 Tie-ins are to be completed.

Existing station boards are to be removed /


2762 7-25A 31 Station-U CIVIL ALL 1
relocated.
2763 7-25A 32 Station-U MECH ALL 1 ESDV is to be installed

2764 7-25A 33 Station-U MECH ALL 1 Stenciling on monorail & Jib crane is to be done

2765 7-25A 34 Station-U CIVIL ALL 1 Pig trap area paving is to be cleaned
2766 7-25A 35 Station-U CIVIL ALL 1 Crash barrier is to be installed near pig trap
Extra threads on structural bolts are to be cut
2767 7-25A 36 Station-U MECH ALL 1
smoothly
2768 7-25A 37 Station-U MECH ALL 1 CC pit height to be checked for adequacy
Insulation joint IR test report to be provided (after
2769 7-25A 38 Station-U ELEC ALL 1
installation)
2770 7-5B 1 FSP ELEC ALL 1 Power supply DB to be tagged
2771 7-5B 2 FSP INST ALL 1 Telecom cabling to be tagged
2772 7-5B 3 FSP INST ALL 1 Telecom cabling to be dressed neatly
2773 7-25E 1 Station-U INST ALL 1 All Tube Fittings needed to be tighten properly.
2774 7-25E 2 Station-U INST ALL 1 SDV-0014 not installed.
2775 7-25E 3 Station-U INST ALL 1 XS-0002 cable tag needed to be fixed.
2776 7-25E 4 Station-U INST ALL 1 XS-0002 Proximity Switch gap need to adjust.
2777 7-25E 5 Station-U INST ALL 1 XS-0002 bolts not tighten

All MOV cables obstructing valve rotation,need to


2778 7-25E 6 Station-U INST ALL 1
reroute cables.

2779 7-25E 7 Station-U INST ALL 1 MOV-0309 Tag need to be painted on the valve.

2780 7-25E 8 Station-U INST ALL 1 MOV-0309 Cable tag is missing.

2781 7-25E 9 Station-U INST ALL 1 XS-0002 no tag provided for the device.

XS-0002/PI-0069 mounting location not as per P &


2782 7-25E 10 Station-U INST ALL 1
ID.

2783 7-25E 11 Station-U INST ALL 1 PI-0069 Zero needed to be corrected.

2784 7-25E 12 Station-U INST ALL 1 PI-0069 flange bolts not tighten.

2785 7-25E 13 Station-U INST ALL 1 IRC panel terminations not complete (electrical).
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

IRC panel spare core TB tag should provide and


2786 7-25E 14 Station-U INST ALL 1
show in the drawing.

2787 7-25E 15 Station-U INST ALL 1 Keys should provide for IRC panel and MAC

HSSD-05-0001/0002 trip relay wiring/resistance


2788 7-25E 16 Station-U INST ALL 1
should protect with sleeve

HSSD-05-0001/0002 power supply tag


2789 7-25E 17 Station-U INST ALL 1 required/door need to be fixed/battery need to
install.

2790 7-25E 18 Station-U INST ALL 1 MAC-05-0001 Tag need to replace.

2791 7-25E 19 Station-U INST ALL 1 MOV-0310 tag is missing

2792 7-25E 20 Station-U INST ALL 1 Drawing should provide in the JB.

Paint should removed from MOV-0307 Display


2793 7-25E 21 Station-U INST ALL 1
window.

2794 7-25E 22 Station-U INST ALL 1 TE-608 Tag and sunshade missing.

2795 7-25E 23 Station-U INST ALL 1 PT/TT-008 Tags are missing

2796 7-25E 24 Station-U INST ALL 1 FT-008 Field JB cable and Tray need to be fix.

LT-003 Local indicator not visible from out side


2797 7-25E 25 Station-U INST ALL 1
fence for the Diesel Truck Driver.

LCV-0002 Air regulator pressure gauge need to be


2798 7-25E 26 Station-U INST ALL 1
replaced.

LCV-0002 volume tank drain tube should be


2799 7-25E 27 Station-U INST ALL 1
extended up drain trench.

2800 7-28C 1 WHTP G MECH 1 SRV To be installed.

Chain link Collar plate to be provided @ fence pipe


2801 7-28C 2 WHTP G MECH 1
opening.
Corrosion fittings to be installed prior to
2802 7-28C 3 WHTP G MECH 1
commissioning.
Painting/Touch up painting to be done on all
2803 7-28C 4 WHTP G MECH 1
structural and pipe works.
Instrument Air tank and PSL impulse drain line to
2804 7-28C 5 WHTP G INST 1
be modified.
2805 7-28C 6 WHTP G MECH 1 Fire extinguiser to be provided as per SOW
All flange bolts/nuts shall be applied with molycote
2806 7-28C 7 WHTP G MECH 1 & tighten with proper torque and report shall be
provided.

2807 7-28C 8 WHTP G MECH 1 Tie-in to be completed.

2808 7-28C 9 WHTP G MECH 1 Chain link required at cross over platform

2809 7-28C 10 WHTP G MECH 1 Missing valve handles to be provided/painted.

2810 7-28C 11 WHTP G MECH 1 Wind sock to be provided.

Access platform all gratings should be at the same


2811 7-28C 12 WHTP G MECH 1
level near ladders.
2812 7-28C 13 WHTP G MECH 1 Welding area @ gratings to be painted.

Spool to be rotated near the tie-in of 4'' line as per


2813 7-28C 14 WHTP G MECH 1
drawing.
Cross barriers to be provided around the 4''
2814 7-28C 15 WHTP G MECH 1 pipeline entry/and provide additional cross over
platform near pipe entry.
The support foundation which is touching the
2815 7-28C 16 WHTP G MECH 1 existing 2'' drain line to be shifted 150mm distance
from the drain line.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

2816 7-28C 17 WHTP G MECH 1 Tie-in spools to be installed.

2817 7-28C 18 WHTP G MECH 1 All valve tags to be provided in S.S material.
Insulation gasket kid shall be installed in all
2818 7-28C 19 WHTP G MECH 1
dissimilar material connection.

2819 7-28C 20 WHTP G MECH 1 Instrument Air line to be painted.

Shorten bolts to be replace with correct size


2820 7-28C 21 WHTP G MECH 1
wherever necessary.

2821 7-28C 22 WHTP G CIVIL 1 Existing fence to be removed.

Emergency gate to be modified to avoid out side


2822 7-28C 23 WHTP G MECH 1
opening

2823 7-28C 24 WHTP G CIVIL 1 Housekeeping to be done prior to commissioning

2824 7-28C 25 WHTP G CIVIL 1 Asphalt road to be completed.


Main gate bottom bolts to be provided after the
2825 7-28C 26 WHTP G MECH 1
asphalt and door alignment to be verified.
2826 7-28C 27 WHTP G MECH 1 All structural bolts to be tighten.
Earthing connection for steel structure to be
2827 7-28C 28 WHTP G ELEC 1
completed

2828 7-27C 1 WHTP E MECH 1 SRV To be installed.

Chain link Collar plate to be provided @ fence pipe


2829 7-27C 2 WHTP E MECH 1
opening.
Corrosion fittings to be installed prior to
2830 7-27C 3 WHTP E MECH 1
commissioning.
Painting/Touch up painting to be done on all
2831 7-27C 4 WHTP E MECH 1
structural and pipe works.
Instrument Air tank and PSL impulse drain line to
2832 7-27C 5 WHTP E INST 1
be modified.
2833 7-27C 6 WHTP E MECH 1 Fire extinguiser to be provided as per SOW

All flange bolts/nuts shall be applied with molycote


2834 7-27C 7 WHTP E MECH 1 & tighten with proper torque and report shall be
provided.

2835 7-27C 8 WHTP E MECH 1 Tie-in to be completed.

Missing kicker plate to be provided at the


2836 7-27C 9 WHTP E MECH 1
access platform.
Earthing connction for steel structure to be
2837 7-27C 10 WHTP E ELEC 1
completed.
U bolts to provided for the supports of 2'' gas inlet
2838 7-27C 11 WHTP E MECH 1
line
PIG LAUNCHER/
RECEIVER &
Road sign and road marking to be provided as per
2839 7-25J 1 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG the requirement
BUILDING
PIG LAUNCHER/
RECEIVER & Rectification required for damaged kerb stone and
2840 7-25J 2 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG painting to be done
BUILDING
PIG LAUNCHER/
RECEIVER &
2841 7-25J 3 Station-U CIVIL OUTSIDE 1 Joint sealant for the required areas to be done
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER & Existing light pole foundation near impact valve to
2842 7-25J 4 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG be relocated
BUILDING
PIG LAUNCHER/
RECEIVER &
Fence opeining at pipe entry shall be reinstated
2843 7-25J 5 Station-U MECH OUTSIDE 1
ELECTRICAL/DG properly
BUILDING
PIG LAUNCHER/
RECEIVER &
Backfilling upto the edge of grading compaction
2844 7-25J 6 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG and proper slope to be provided
BUILDING
PIG LAUNCHER/
RECEIVER & All unpaved area within station fence limits to be
2845 7-25J 7 Station-U CIVIL OUTSIDE 1 finished with 20mm nominal size aggregate 100 thk
ELECTRICAL/DG for the remaining areas
BUILDING
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIG LAUNCHER/
RECEIVER & Rectification required for the gap between
2846 7-25J 8 Station-U CIVIL OUTSIDE 1 protection slab, level difference and painting to be
ELECTRICAL/DG done for the exposed portion
BUILDING
PIG LAUNCHER/
RECEIVER &
Painting to be done for the instrument air pipeline
2847 7-25J 9 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG support foundation
BUILDING
PIG LAUNCHER/
RECEIVER & Check the gate installation and provide true
2848 7-25J 10 Station-U MECH OUTSIDE 1
ELECTRICAL/DG allignment
BUILDING
PIG LAUNCHER/
RECEIVER &
Gate drop bolt arrester to be provided as per the
2849 7-25J 11 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG drawing
BUILDING
PIG LAUNCHER/
RECEIVER &
2850 7-25J 12 Station-U MECH OUTSIDE 1 Apply touch up paint for the gate and fence post
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
Existing fence to be removed after getting approval
2851 7-25J 13 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG from asset holder
BUILDING
PIG LAUNCHER/
RECEIVER &
2852 7-25J 14 Station-U CIVIL OUTSIDE 1 Track road and associated work shall be done
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
2853 7-25J 15 Station-U CIVIL OUTSIDE 1 Painting to be done for the earthing pit
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
Painting to be done for the sock away pit manhole
2854 7-25J 16 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG cover
BUILDING
PIG LAUNCHER/
RECEIVER & Assembly point to be identified and installed sign
2855 7-25J 17 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG boards
BUILDING
PIG LAUNCHER/
RECEIVER & Lifting hook to be filled with appropriate material
2856 7-25J 18 Station-U CIVIL OUTSIDE 1 and apply painting for the cable entry pit and cover
ELECTRICAL/DG slab
BUILDING
PIG LAUNCHER/
RECEIVER &
2857 7-25J 19 Station-U CIVIL OUTSIDE 1 Ladder foudation to be painted
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
Remove all temporary facilities and house keeping
2858 7-25J 20 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG to be done
BUILDING
ELECTRICAL
Provide sign plates for the rooms as per AFC
2859 7-25J 1 Station-U CIVIL BUILDING 1
EXTERNAL drawing.

ELECTRICAL
Rectification of damaged surface and apply touch-
2860 7-25J 2 Station-U CIVIL BUILDING 1
EXTERNAL up paint for the external wall
ELECTRICAL
2861 7-25J 3 Station-U CIVIL BUILDING 1 Damaged door lock to be replaced
EXTERNAL
ELECTRICAL
2862 7-25J 4 Station-U CIVIL BUILDING 1 Wall opening to be sealed with appropriate material
EXTERNAL
AIR LOCK /
2863 7-25J 1 Station-U CIVIL TELEMETRYRO 1 Damaged raised floor tiles to be replaced
OM
AIR LOCK /
2864 7-25J 2 Station-U CIVIL TELEMETRYRO 1 Proper alignment to be done for the raised floor tiles
OM
AIR LOCK /
Alignment & functional test for the doors to be
2865 7-25J 3 Station-U CIVIL TELEMETRYRO 1
OM carried-out
AIR LOCK /
2866 7-25J 4 Station-U CIVIL TELEMETRYRO 1 Painting to be done for the door
OM
AIR LOCK /
Rectification and painting to be done for the floor
2867 7-25J 5 Station-U CIVIL TELEMETRYRO 1
OM entrance portion
Alignment & functional test for the doors to be
2868 7-25J 1 Station-U CIVIL R & C ROOM 1
carried-out
2869 7-25J 2 Station-U CIVIL R & C ROOM 1 Painting to be done for the door
Unwanted holes on the floor & wall to be sealed
2870 7-25J 3 Station-U CIVIL R & C ROOM 1
and apply touch-up paint.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Rectification and painting to be done for the floor


2871 7-25J 4 Station-U CIVIL R & C ROOM 1
entrance portion
SWITCHGEAR Alignment & functional test for the doors to be
2872 7-25J 1 Station-U CIVIL 1
ROOM carried-out
SWITCHGEAR
2873 7-25J 2 Station-U CIVIL
ROOM
1 Painting to be done for the door
SWITCHGEAR Chequered plate for the cable trench cover to be
2874 7-25J 3 Station-U MECH 1
ROOM aligned properly
SWITCHGEAR Unwanted holes on the floor & wall to be sealed
2875 7-25J 4 Station-U CIVIL 1
ROOM and apply touch-up paint.
SWITCHGEAR Rectification and painting to be done for the floor
2876 7-25J 5 Station-U CIVIL 1
ROOM entrance portion
SWITCHGEAR Retify floor edge cracks along chequered plate
2877 7-25J 6 Station-U CIVIL 1
ROOM covers wherever necessary.
Alignment & functional test for the doors to be
2878 7-25J 1 Station-U CIVIL BATTERY ROOM 1
carried-out
Rectification of the damaged door panel and
2879 7-25J 2 Station-U CIVIL BATTERY ROOM 1
painting to be done
2880 7-25J 3 Station-U CIVIL BATTERY ROOM 1 Cleaning of installed wall and floor tiles
Unwanted holes on the wall to be sealed and apply
2881 7-25J 4 Station-U CIVIL BATTERY ROOM 1
touch-up paint.
Rectification of damaged concrete surface and
TRANSFORMER
2882 7-25J 1 Station-U CIVIL
ROOM
1 touch-up paint to be done for the trench wall and
foundation
TRANSFORMER Provide cable trench cover for the balance portion
2883 7-25J 2 Station-U MECH 1
ROOM and to be aligned properly
TRANSFORMER
2884 7-25J 3 Station-U CIVIL
ROOM
1 Apply touch-up paint for the internal wall
Alignment & functional test for the doors to be
2885 7-25J 1 Station-U CIVIL LV ROOM 1
carried-out
2886 7-25J 2 Station-U CIVIL LV ROOM 1 Painting to be done for the door
Rectification and painting to be done for the floor
2887 7-25J 3 Station-U CIVIL LV ROOM 1
entrance portion
Chequered plate for the cable trench cover to be
2888 7-25J 4 Station-U MECH LV ROOM 1
aligned properly
Unwanted holes on the floor & wall to be sealed
2889 7-25J 5 Station-U CIVIL LV ROOM 1
and apply touch-up paint.
Rectify floor edge cracks along chequered plate
2890 7-25J 6 Station-U CIVIL LV ROOM 1
covers wherever necessary.
Remove all temporary facilities and house keeping
2891 7-25J 7 Station-U CIVIL LV ROOM 1
to be done for inside the building
Unwanted holes to be sealed and apply touch-up
2892 7-25J 1 Station-U CIVIL ROOF 1
paint.
2893 7-25J 2 Station-U CIVIL ROOF 1 Aggregates to be spread properly
Alignment & functional test for the doors to be
2894 7-25J 1 Station-U CIVIL DG BUILDING 1
carried-out
2895 7-25J 2 Station-U CIVIL DG BUILDING 1 Painting to be done for the door

2896 7-25J 3 Station-U CIVIL DG BUILDING 1 Damaged door lock to be replaced


Unwanted holes on the floor, foundation & wall to
2897 7-25J 4 Station-U CIVIL DG BUILDING 1 be sealed with appropriate material and apply
touch-up paint.
Cover for the balance portion of cable trench to be
2898 7-25J 5 Station-U MECH DG BUILDING 1
provided
Lifting hook to be filled with appropriate material,
2899 7-25J 6 Station-U CIVIL DG BUILDING 1 rectification for the damaged portion and apply
painting for the cable trench cover slab
Unwanted holes to be sealed and apply touch-up
2900 7-25J 7 Station-U CIVIL DG BUILDING 1
paint for the external wall and roof top
Touch-up paint to be done for the sand trap inlet
2901 7-25J 8 Station-U MECH DG BUILDING 1
louver
2902 7-25J 9 Station-U CIVIL DG BUILDING 1 Aggregate to be spread properly on roof top
Rectfication to be done for the damaged concrete
2903 7-25J 10 Station-U CIVIL DG BUILDING 1 surface and apply touch-up paint to the diesel
storage tank area
To relocate existing NO Photograph sign at
2904 7-25J 1 Station-U CIVIL MISC 1
apprppriate location outside of the plant
To remove existing fence around existing telemetry
2905 7-25J 2 Station-U CIVIL MISC 1
building
To touch up the car parking sheiter- structural
2906 7-25J 3 Station-U MECH MISC 1
member
2 pipe crossing culvert at both end - marine
2907 7-25J 4 Station-U CIVIL MISC 1
plywood cover to be install
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

ROW connecting access for existing 36"line ti


2908 7-25J 5 Station-U CIVIL MISC 1
station U1 to be done
2909 7-25J 6 Station-U CIVIL MISC 1 To make good all station platform slope
make good the ramp at culvert area -surface and
2910 7-25J 7 Station-U CIVIL MISC 1
side
2911 7-25J 8 Station-U CIVIL MISC 1 To install sign boards as per the AFC drawing

2912 7-25J 9 Station-U CIVIL MISC 1 To ensure proper gradient on the station platform

2913 7-28D 1 WHTP G CIVIL ALL 1 Asphalt road and associated works shall be done

2914 7-28D 2 WHTP G CIVIL ALL 1 Painting to be done for the kerbstone

2915 7-28D 3 WHTP G MECH ALL 1 Windsock to be provided

Fence opening at pipe entry shall be reinstated


2916 7-28D 4 WHTP G MECH ALL 1
properly
Rectification of the damaged concrete surface and
2917 7-28D 5 WHTP G CIVIL ALL 1
apply touch up paint

2918 7-28D 6 WHTP G MECH ALL 1 Apply touch up paint for the gate and the fence post

Pipe entry pit for 4" dia pipeline from valve station
2919 7-28D 7 WHTP G MECH ALL 1
E&G to be covered with chequered plate
Stone pitching to be provided for the protection of
2920 7-28D 8 WHTP G CIVIL ALL 1
grading at asphalt road side
Check the gate installation and provide true
2921 7-28D 9 WHTP G MECH ALL 1
allignment
Gate drop bolt arrester to be provided as per
2922 7-28D 10 WHTP G CIVIL ALL 1
drawing

Existing fence to be removed after getting approval


2923 7-28D 11 WHTP G CIVIL ALL 1
from asset holder

Remove all temporary facilities and housekeeping


2924 7-28D 12 WHTP G CIVIL ALL 1
to be done
Complete the approach road as per SOW and
2925 7-28E 1 WHTP G CIVIL ALL 1
project specification

2926 7-28E 2 WHTP G MECH ALL 1 Apply structural paint on platforms and piping

2927 7-28E 3 WHTP G CIVIL ALL 1 Apply paint on kerb stones

2928 7-28E 4 WHTP G MECH ALL 1 Provide and install wind sock

2929 7-28E 5 WHTP G MECH ALL 1 Apply paint on crash barrier

2930 7-28E 6 WHTP G CIVIL ALL 1 Grading and leveling of surrounding area

Rectify the damaged surface of epoxt coating of


2931 7-28E 7 WHTP G CIVIL ALL 1
pig launcher area

2932 7-28E 8 WHTP G MECH ALL 1 Repair the damaged area of fence at pipe entry

2933 7-28E 9 WHTP G MECH ALL 1 Install ring at the pipe crossing area through fence

Remove the existing chain link fence connectiong


2934 7-28E 10 WHTP G CIVIL ALL 1
the new area

2935 7-28E 11 WHTP G CIVIL ALL 1 Protect the batter/slopy area close to the main road

2936 7-28E 12 WHTP G CIVIL ALL 1 Remove the scafolding material from the site

2937 7-28E 13 WHTP G CIVIL ALL 1 General claning to be done

2938 7-28F 1 WHTP G INST 1 All cables to be tagged with proper SS strip
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

GI bolts and clamps for transmitter and manifold's


2939 7-28F 2 WHTP G INST 1
to be replaced with SS

Proper sun shed to be installed for all instruments


2940 7-28F 3 WHTP G INST 1
to protect from direct sun radiation

2941 7-28F 4 WHTP G INST 1 All instrument to be tagged properly

2942 7-28F 5 WHTP G INST 1 Cables to be tied with SS PVC coated tie wrap

Proper foam to be filled in pipe sleeves under all


2943 7-28F 6 WHTP G INST 1
instruments

2944 7-28F 7 WHTP G INST 1 F & G detectors to be with red color name plate

2945 7-28F 8 WHTP G INST 1 Red line mark up drawings to be submitted

Calibration and configuration of MV Flow Tx to be


2946 7-28F 9 WHTP G INST 1
verified

2947 7-28F 10 WHTP G INST 1 Cable tray installed for cables to be covered

All process and pneumatic tubing lines to be


2948 7-28F 11 WHTP G INST 1
supported properly

Proper rubber to be provided to prevent contact of


2949 7-28F 12 WHTP G INST 1
dissimilar materials

2950 7-27D 14 WHTP E MECH ALL 1 Apply structural paint on platforms and piping

2951 7-27D 15 WHTP E MECH ALL 1 Install ring at the pipe crossing area through fence

2952 7-27D 16 WHTP E CIVIL ALL 1 General claning to be done

2953 7-27E 1 WHTP E INST 1 All cables to be tagged with proper SS strip

GI bolts and clamps for transmitter and manifold's


2954 7-27E 2 WHTP E INST 1
to be replaced with SS

Proper sun shed to be installed for all instruments


2955 7-27E 3 WHTP E INST 1
to protect from direct sun radiation

2956 7-27E 4 WHTP E INST 1 All instrument to be tagged properly

2957 7-27E 5 WHTP E INST 1 Cables to be tied with SS PVC coated tie wrap

Proper foam to be filled in pipe sleeves under all


2958 7-27E 6 WHTP E INST 1
instruments

2959 7-27E 7 WHTP E INST 1 F & G detectors to be with red color name plate

2960 7-27E 8 WHTP E INST 1 Red line mark up drawings to be submitted

Calibration and configuration of MV Flow Tx to be


2961 7-27E 9 WHTP E INST 1
verified

2962 7-27E 10 WHTP E INST 1 Cable tray installed for cables to be covered

All process and pneumatic tubing lines to be


2963 7-27E 11 WHTP E INST 1
supported properly

Proper rubber to be provided to prevent contact of


2964 7-27E 12 WHTP E INST 1
dissimilar materials

VAL STN 1- VALVE STATION Bypass line for the pipeline isolation valve to be
2965 7-9B 1 MECH 2
FMDS FMDS 1 installed
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN 1- VALVE STATION Piping spool to be installed upstream of the 6"
2966 7-9B 2 MECH 2
FMDS FMDS 1 valve prior to commissioning

VAL STN 1- VALVE STATION Piping and touch up painting to be done on all
2967 7-9B 3 MECH 1
FMDS FMDS 1 location

VAL STN 1- VALVE STATION


2968 7-9B 4 MECH 1 Valve to be greased for smooth operation
FMDS FMDS 1

VAL STN 1- VALVE STATION


2969 7-9B 5 MECH 1 Wind Sock to be installed
FMDS FMDS 1

VAL STN 1- VALVE STATION


2970 7-9B 6 MECH 1 COSSASCO probe to be installed
FMDS FMDS 1

VAL STN 1- VALVE STATION


2971 7-9B 7 MECH 1 All Valve tag to be installed
FMDS FMDS 1

VAL STN 1- VALVE STATION


2972 7-9B 8 MECH 1 Bolts to be applied with molykot
FMDS FMDS 1

VAL STN 1- VALVE STATION


2973 7-9B 9
FMDS
CIVIL
FMDS 1
1 Marker post to be installed

VAL STN 2- VALVE STATION


2974 7-9A1 1 CIVIL 1 Marker post to be installed
FMDS FMDS 2

VAL STN 2- VALVE STATION


2975 7-9A1 2 MECH 1 Wind sock to be installed
FMDS FMDS 2

VAL STN 2- VALVE STATION


2976 7-9A1 3 MECH 1 Piping painting to be done
FMDS FMDS 2

VAL STN 2- VALVE STATION


2977 7-9A1 4 MECH 1 Touch up painting for structural to be done
FMDS FMDS 2

VAL STN 2- VALVE STATION


2978 7-9A1 5 MECH 1 Bolts to be applied with molykot
FMDS FMDS 2

VAL STN 2- VALVE STATION


2979 7-9A1 6 MECH 1 All valve tags to be installed
FMDS FMDS 2

VAL STN 2- VALVE STATION


2980 7-9A1 7 MECH 1 Valve to be greased for smooth operation
FMDS FMDS 2

VAL STN 2- VALVE STATION


2981 7-9A1 8 MECH 1 Tie in to be completed
FMDS FMDS 2

VAL STN 2- VALVE STATION


2982 7-9A1 9 MECH 1 COSSASCO Coupon to be installed
FMDS FMDS 2

VAL STN 2- VALVE STATION


2983 7-9A1 10 CIVIL 1 Back Filling to be done out side fence
FMDS FMDS 2

VAL STN 2- VALVE STATION


2984 7-9A1 11 ELEC 1 CP system to be commissioned
FMDS FMDS 2

VAL STN 2- VALVE STATION Concrete sleeper to be kept over compacted


2985 7-9A1 12 CIVIL 1
FMDS FMDS 2 location

VAL STN 1- VALVE STATION


2986 7-9C 1 MECH 1 ORIFICE plate direction to be checked .
FMDS FMDS 1

VAL STN 1- VALVE STATION


2987 7-9C 2 MECH 1 All Valves to be Tagged with their Tag-Nos
FMDS FMDS 1

VAL STN 1- VALVE STATION 2 Bypass line PL-0003-GF-CS1-300-4 not


2988 7-9C 3 MECH 2
FMDS FMDS 1 connected.

VAL STN 1- VALVE STATION


2989 7-9C 4 MECH 1 Valves to be eased for easy operation.
FMDS FMDS 1

VAL STN 1- VALVE STATION


2990 7-9C 5 MECH 1 Windsock to be provided.
FMDS FMDS 1
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN 1- VALVE STATION Emergency Gate to be provided with Plate to


2991 7-9C 6 MECH 1
FMDS FMDS 1 prevent opening from outside.

VAL STN 1- VALVE STATION


2992 7-9C 7 MECH 1 Painting and Touchup required.
FMDS FMDS 1

VAL STN 1- VALVE STATION


2993 7-9C 8 MECH 1 Updated P&ID to be provided.
FMDS FMDS 1

VAL STN
2994 7-12G 1
FSDS
MECH ALL 1 ORIFICE plate direction to be checked.

VAL STN
2995 7-12G 2
FSDS
MECH ALL 1 All Valves to be Tagged with their Tag-Nos

VAL STN 2 Bypass line PL-0004-GF-CS1-300-4 not


2996 7-12G 3 MECH ALL 1
FSDS connected.

VAL STN
2997 7-12G 4
FSDS
MECH ALL 1 Valves to be eased for easy operation.

VAL STN
2998 7-12G 5
FSDS
MECH ALL 1 JIB crane not installed.

VAL STN
2999 7-12G 6
FSDS
ELEC ALL 1 Earthing cable not connected.

VAL STN Emergency Gate to be provided with Plate to


3000 7-12G 7 MECH ALL 1
FSDS prevent opening from outside.

VAL STN
3001 7-12G 8
FSDS
MECH ALL 1 Pig Launcher Door Handle Missing.

VAL STN
3002 7-12G 9
FSDS
MECH ALL 1 Painting and Touchup required.

VAL STN
3003 7-12G 10
FSDS
MECH ALL 1 Updated P&ID to be provided.

VAL STN 1- VALVE STATION


3004 7-9D 1 CIVIL 1 Asphalt road and associated works to be completed
FMDS FMDS 1

VAL STN 1- VALVE STATION


3005 7-9D 2 CIVIL 1 Existing guard wore pole foundation to be relocated
FMDS FMDS 1

VAL STN 1- VALVE STATION Backfilling upto the edge of grading compaction
3006 7-9D 3 CIVIL 1
FMDS FMDS 1 and proper slope to be provided

VAL STN 1- VALVE STATION


3007 7-9D 4 MECH 1 wind sock to be provided
FMDS FMDS 1

VAL STN 1- VALVE STATION Rectification to be done for the damaged concrete
3008 7-9D 5 CIVIL 1
FMDS FMDS 1 surface and apply touch up paint

VAL STN 1- VALVE STATION


3009 7-9D 6 MECH 1 Apply touchup paint for the gate and fence post
FMDS FMDS 1

VAL STN 1- VALVE STATION Remove all temporary facilities and house heeping
3010 7-9D 7 CIVIL 1
FMDS FMDS 1 to be done

VAL STN 2- VALVE STATION Grouting and epoxy coating to be done for the
3011 7-9B1 1 CIVIL 1
FMDS FMDS 2 support foundation outside the fence

VAL STN 2- VALVE STATION Crossing marker pole foundation to be relocated


3012 7-9B1 2 CIVIL 1
FMDS FMDS 2 from inside the fence

VAL STN 2- VALVE STATION Backfilling upto the edge of grading compaction
3013 7-9B1 3 CIVIL 1
FMDS FMDS 2 and proper slope to be provided

VAL STN 2- VALVE STATION


3014 7-9B1 4 MECH 1 wind sock to be provided
FMDS FMDS 2

VAL STN 2- VALVE STATION Rectification to be done for the damaged concrete
3015 7-9B1 5 CIVIL 1
FMDS FMDS 2 surface and apply touch up paint

VAL STN 2- VALVE STATION


3016 7-9B1 6 MECH 1 Apply touchup paint fro the gate and the fence post
FMDS FMDS 2
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN 2- VALVE STATION Remove all temporary facilities and house keeping
3017 7-9B1 7 CIVIL 1
FMDS FMDS 2 to be done for inside the building

All NRVS Direction not visible should be marked


3018 7-8B 1 STATION-N MECH 1
clearly

All missing valve handles to be provided & rusted


3019 7-8B 2 STATION-N MECH 1
handle to be painted

3020 7-8B 3 STATION-N MECH 1 All MOVs to be stenciled with their tag Nos

3021 7-8B 4 STATION-N INST 1 Instrument and Electrical work is incomplete

3022 7-8B 5 STATION-N MECH 1 All Extinguishers to be labeled with inspection date

Qp approved BA (Breathing Apparatus) to be


3023 7-8B 6 STATION-N INST 1
installed around the plant

All pipelines Painting, flow direction and stenciling


3024 7-8B 7 STATION-N MECH 1
to be carried out

All NRVs direction to be verified due to marking is


3025 7-8B 8 STATION-N MECH 1
invisible

3026 7-8B 9 STATION-N MECH 1 Wind sock to be installed at south side of the plant

SRV -202A ,SRV-202B and SRV-204 Platforms


3027 7-8B 10 STATION-N MECH 1 vertical ladder safety bar to be provided instead of
chain

Near 61-Z-910 12 Line PI -280 installed platform


3028 7-8B 11 STATION-N MECH 1
no useful

3029 7-8B 12 STATION-N MECH 1 All platforms painting to be done

TI-271 is not installed and no access to reach the


3030 7-8B 13 STATION-N MECH 1
same
MOV-271 valve handle touching the platform
3031 7-8B 14 STATION-N MECH 1 modification is required
Note: must be change tag no.

3032 7-8B 15 STATION-N MECH 1 Mechanical works and civil works are incomplete

3033 7-8B 16 STATION-N MECH 1 All valves missing tag Numbers to be provided

3034 7-8B 17 STATION-N MECH 1 BV-306 No access to operate the valve

MOV -274 power cable not connected and tag no


3035 7-8B 18 STATION-N ELEC 1
not provided

3036 7-8B 19 STATION-N MECH 1 NRV -269 Flow direction to be confirmed

3037 7-8B 20 STATION-N MECH 1 CI-0003,CP-0003,CC-0003 to be installed

PLG -311, BV-322, PLG-312 valve handles hard to


3038 7-8B 21 STATION-N MECH 1
operate

61-Z-9011 Access platform ladder foundation lock


3039 7-8B 22 STATION-N MECH 1
bolt to be provided

3040 7-8B 23 STATION-N MECH 1 61-Z-9011 foundation bolt to be tighten

61-Z-9011 Jib crane chain block not installed and


3041 7-8B 24 STATION-N MECH 1
tag no should be visible

BV- 373,BV-374,BV-375,BV-376,BV-377,BV-378
3042 7-8B 25 STATION-N MECH 1 Valves handles to be modified due to touching on
the pipeline
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3043 7-8B 26 STATION-N MECH 1 SRV -202 A,B Platform work is incomplete

SRV-202 A,B tag numbers to be provided to the


3044 7-8B 27 STATION-N MECH 1
right place

PCV -272 A,B,C,D,E around the area valve


3045 7-8B 28 STATION-N MECH 1
handles, tag numbers not provided

29. PCV -272 A,B,C,D,E around the area NRV


3046 7-8B 29 STATION-N MECH 1
direction to be verified

3047 7-8B 30 STATION-N MECH 1 P&ID to be updated

3048 7-8B 31 STATION-N MECH 1 BV-338 U/S pipeline U clamp to be provided

PLG- 382 and near MOV -278 U clamp to be


3049 7-8B 32 STATION-N MECH 1
tighten

3050 7-8B 33 STATION-N MECH 1 MOV -285 Bypass 2 line spec.blind to be provided

Between MOV-281 and MOV-278, MOV-279


3051 7-8B 34 STATION-N MECH 1
access stair to be provided

3052 7-8B 35 STATION-N MECH 1 BV-379 end blind to be installed

PLG-378,BV-480 bolts to be tighten and valve


3053 7-8B 36 STATION-N MECH 1 handle not access to operate modification is
required

3054 7-8B 37 STATION-N MECH 1 As per P&ID BV-385 D/S spade to be installed

3055 7-8B 38 STATION-N MECH 1 BV-387 end blind to be installed

Near 61- Z-9010 all foundation lock bolt to be


3056 7-8B 39 STATION-N MECH 1
provided

3057 7-8B 40 STATION-N MECH 1 SRV-204 Platform all bolts need to be tighten

All instrument air pipelines at U clamp rubber pad


3058 7-8B 41 STATION-N MECH 1
to be provided

3059 7-8B 42 STATION-N MECH 1 BV-410 U/S and D/S spacer to be verified

4 line after the BV- 409 personnel protection


3060 7-8B 43 STATION-N MECH 1
insulation not provided

61-Z-9010 foundation and platform bolts to be


3061 7-8B 44 STATION-N MECH 1
tighten

61-Z 9010 Jip crane chain block not installed and


3062 7-8B 45 STATION-N MECH 1
name plate is not visible

3063 7-8B 46 STATION-N MECH 1 BV-406 valve handle to be modified

3064 7-8B 47 STATION-N MECH 1 61-Z- 9010 name plate should be visible

3065 7-8B 48 STATION-N MECH 1 BV-439 and PLG-360 spectacle blind to be installed

3066 7-8B 49 STATION-N MECH 1 BV-452 bolts is missing

3067 7-8B 50 STATION-N MECH 1 NRV- 280 to be changed to right position

3068 7-8B 51 STATION-N MECH 1 BV-431,BV-444 blind to be installed

3069 7-8B 52 STATION-N MECH 1 CI-0006, plug to be provided


RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3070 7-8B 53 STATION-N MECH 1 BV-351 D/S of the pipeline U clamp to be tighten

3071 7-8B 54 STATION-N MECH 1 BV- 482 spectacle blind to be installed

3072 7-8B 55 STATION-N MECH 1 MOV-289 U/S and D/S spacer to be provided

61- Z - 9012 all 18 pipe line permanent gasket to


3073 7-8B 56 STATION-N MECH 1
be provided after hydro testing

3074 7-8B 57 STATION-N MECH 1 61- SDV-274 protection box to be provided

18 PIG Launcher/ Receiver stenciling to be


3075 7-8B 58 STATION-N MECH 1
changed to 61-Z-9012

61-Z-9012 D/S of SRV-205 3 flare line valve to be


3076 7-8B 59 STATION-N MECH 1
rectified

3077 7-8B 60 STATION-N MECH 1 61-Z-9012 SRV access platform bolts missing

3078 7-8B 61 STATION-N MECH 1 61-Z-9012 foundation bolts to be tighten

3079 7-8B 62 STATION-N MECH 1 61-Z-9012 JIB cranes tag on to be corrected.

3080 7-8C 1 STATION-N INST 1 Cable tray to be fixed properly for MOV-0283
All instrument and MOV's to be tagged and fixed
3081 7-8C 2 STATION-N INST 1
on alluminium base plate
SS valve manifold installed for PS AND PI for SDV
3082 7-8C 3 STATION-N INST 1
shall not intact with CS / GI supports
3083 7-8C 4 STATION-N INST 1 Instrument and PI's drain to be fixed

3084 7-8C 5 STATION-N INST 1 All instrument to be grounded


Proper sun shed to be installed for all instruments
3085 7-8C 6 STATION-N INST 1
to protect from direct sun radiation
3086 7-8C 7 STATION-N INST 1 Pressure Sw spare entry to be plugged at SDV

3087 7-8C 8 STATION-N INST 1 Impulse and drain tubing to be supported


Wire ferrule sleeves to be proper sized in all
3088 7-8C 9 STATION-N INST 1
junction boxes
3089 7-8C 10 STATION-N INST 1 Cable screen to be connected properly in all J.B
T.B no in IJBA-002 and tag for IJBF-0422 to be
3090 7-8C 11 STATION-N INST 1
corrected
Proper rubber to be provided to avoid intact of
3091 7-8C 12 STATION-N INST 1
dissimilar materials
3092 7-8C 1 STATION-N INST 1 Impulse and drain tubing to be supported
Air line tubing for SDV-0271 to be installed and
3093 7-8C 2 STATION-N INST 1
ptotected with cable tray

Access plate form to be provided for SRV and PI


3094 7-8C 3 STATION-N INST 1
installed on volume tank for SDV-0271

3095 7-8C 4 STATION-N INST 1 All drain tubing to be plugged properly

3096 7-8C 5 STATION-N INST 1 SRV vent to be routed to safe place


Impulse and drain line tubing for all instruments to
3097 7-8C 6 STATION-N INST 1
be supported and fixed properly
3098 7-8C 7 STATION-N INST 1 Cable trench route marker to be installed

3099 7-8C 8 STATION-N INST 1 Instrument tag to be fixed on proper plate


ALL ultrsonic flow meter flow direction to be verify
3100 7-8C 9 STATION-N INST 1
and corrected.
3101 7-8C 10 STATION-N INST 1 Wire ferrule required heat shrink for all J.B'
Rusty bolts and name plate fixing supports to be
3102 7-8C 11 STATION-N INST 1
replaced
Loop check and functional check to be done at
3103 7-8C 12 STATION-N INST 2
LOC, MOC and DIC at WHTP-B & D
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Pipe line No. & flow direction to be marked on the


3104 7-8D 1 STATION-N MECH 1
pipe as per QP std.

Coating on pipe welded joints & also final coating


3105 7-8D 2 STATION-N MECH 1
of entire facilities to be done.

Provide Tag Nos. on all valves & stencil tag Nos.in


3106 7-8D 3 STATION-N MECH 1 bold letters on all MOVs, SDVs, PCVs & PIG
LAUNCHER/RECEIVER as per QP std.

Provide Valve handles. Many valves do not have


3107 7-8D 4 STATION-N MECH 1
handles to operate.

3108 7-8D 5 STATION-N MECH 1 Provide Temp. indicators as per IFC drawings.

All the stud bolts threads are to be coated with


3109 7-8D 6 STATION-N MECH 1
molycoat grease

The P& ID is to be revised as per the latest revised


3110 7-8D 7 STATION-N MECH 1 G.A. We found that some lines are not
constructed as per the given P & ID.

Personnel protection on piping has not provided as


3111 7-8D 8 STATION-N MECH 1
per P & ID. Refer note: 29 in the P & ID drawings.

Provide Blind flanges on vent valve/nozzles as


3112 7-8D 9 STATION-N MECH 1
these are remaining open to atmosphere.

Drw. No. SFG-KGPN-6-50-0008 SHT.1. Tie-ins


06A & 06B not done yet. SDV-0272, Refer Drw.
3113 7-8D 10 STATION-N MECH 1
No. KGPN-6-50-0002 SHT.1 has not been
installed.

Chain blocks on Jib crane for 12" & 36" Pig


3114 7-8D 11 STATION-N MECH 1
receiver/Launcher not provided.

Provide Neoprene rubber sheet packing between


3115 7-8D 12 STATION-N MECH 1
the 'U' clamps & 2" common drain line/1" Air line.

3116 7-8E 1 STATION-N ELEC 1 Proper TAGS to BE provided for all MOV units.

3117 7-8E 2 STATION-N ELEC 1 Earthing cables to be dressed properly all MOV

3118 7-8E 3 STATION-N ELEC 1 Earthing cables to be tighted properly all MOV.

61-MOV-0289 main cable(Yellow) put proper


3119 7-8E 4 STATION-N ELEC 1
seleve and to be connceted in terminal box.

All MOV control switch&display to be lubrecated


3120 7-8E 5 STATION-N ELEC 1
and cleaned.

61-Z-9010, Guide support lock nut missing & some


3121 7-8F 1 STATION-N MECH 1
of them loosen

3122 7-8F 2 STATION-N MECH 1 Tag No. to be painted on pig launcher

3123 7-8F 3 STATION-N MECH 1 Name plate to be cleared

3124 7-8F 4 STATION-N MECH 1 Missing valve handles to be installed.

3125 7-8F 5 STATION-N MECH 1 All bolts / nuts to be coated

Access platform at CP/CI-0005 to be confirmed for


3126 7-8F 6 STATION-N MECH 1
location and type

3127 7-8F 7 STATION-N MECH 1 61-Z-9011, bolts support to be tightened

3128 7-8F 8 STATION-N MECH 1 Tag No. to be painted on pig launcher

3129 7-8F 9 STATION-N MECH 1 Name plate to be cleared

Bolt support of access ladder on pig trap to be


3130 7-8F 10 STATION-N MECH 1
changed due to unsufficient in length
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3131 7-8F 11 STATION-N MECH 1 Hand rail at location of BV-0312 to be modified

3132 7-8F 12 STATION-N INST 1 PI-0272 to be installed

Flange connection to be completed on by pass


3133 7-8F 13 STATION-N MECH 1
valve of MOV-0271

3134 7-8F 14 STATION-N MECH 1 TI-0271 to be installed

3135 7-8F 15 STATION-N MECH 1 All spare nozzles to be properly blinded

MOV-0272/0273 & SDV-0271 are not sitting


3136 7-8F 16 STATION-N MECH 1
properly on its support

3137 7-8F 17 STATION-N MECH 1 Final painting to be completed on all pipe line.

3138 7-8G 1 STATION-N MECH 2 Spacer to be installed for MOV 0277


All vent holes made on supports./pads to be
3139 7-8G 2 STATION-N MECH 1
sealed with mastic
PTFE pads to be installed properly as shown in the
3140 7-8G 3 STATION-N MECH 1
approved drawing
3141 7-8G 4 STATION-N INST 1 Enclosure firebox to be installed in all SDV'S

3142 7-8G 5 STATION-N MECH 1 Wind sock to be installed


Fire extingusihers to be inspected and approved by
3143 7-8G 6 STATION-N INST 1
HSE department
3144 7-8G 7 STATION-N INST 1 Missing pressure gauges to be installed

3145 7-8G 8 STATION-N MECH 1 Missing Valve Handles to be installed


Missing blinds to be installed in all the drains and
3146 7-8G 9 STATION-N MECH 1
Vents
3147 7-8G 10 STATION-N MECH 1 Insulation to be provided as per Drg.
All the temporary gaskets provided on 18" piping to
3148 7-8G 11 STATION-N MECH 1
be repalced with permanent one
3149 7-8G 12 STATION-N MECH 1 Load test for Jib Crane to be completed

3150 7-8G 13 STATION-N MECH 1 Corrosion coupons to be installed


All Air intake vessel MIR approval copies to be
3151 7-8G 14 STATION-N MECH 1
submitted for verification
Missing tags to be installed for valves and
3152 7-8G 15 STATION-N MECH 1
Instruments
3153 7-8G 16 STATION-N MECH 1 18" pipeline section to be tested

3154 7-8G 17 STATION-N MECH 1 Blasting/painting to be completed


Provide neoprene sheets in between u clamps and
3155 7-8G 18 STATION-N MECH 1
supports
3156 7-8G 19 STATION-N MECH 1 Balance Flare tie-ins to be completed

3157 7-8G 20 STATION-N MECH 1 Bolts to be greased upw ith Molykote

3158 7-8G 21 STATION-N MECH 1 Direction of NRV and flowmeter to be verified

3159 7-8G 22 STATION-N MECH 1 Colour coding to be done


2" and above valve tested certificate copies to be
3160 7-8G 23 STATION-N MECH 2
submitted for verification
3161 7-8G 24 STATION-N MECH 1 Red line mark ups to be submitted
All inspection documents to be verified for
3162 7-8G 25 STATION-N MECH 2
completeness
Road making to be completed as per the
3163 7-25K 1 Station-U CIVIL ALL 1
requirement

Road sinnboard to be installation to be completed


3164 7-25K 2 Station-U CIVIL ALL 1
as per the requirement

Asphalt core test to be conducted and produce test


3165 7-25K 3 Station-U CIVIL ALL 1
report
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Kerb stone painting to be completed as per the


3166 7-25K 4 Station-U CIVIL ALL 1
requirement

Crash barrier painting to be completed as per the


3167 7-25K 5 Station-U MECH ALL 1
requirement

3168 7-25K 6 Station-U CIVIL ALL 1 Install standard/ approved kerb stones at the corner

Provide sealant at asphalt joint6s with trench


3169 7-25K 7 Station-U CIVIL ALL 1
covers

Road shoulder to to be completed as per the


3170 7-25K 8 Station-U CIVIL ALL 1
project AFC drawing

3171 7-25K 9 Station-U CIVIL ALL 1 Provide stone pitches at both sides of the culverts

Existing old asphalt to be removed from inside


3172 7-25K 10 Station-U CIVIL ALL 1
station

3173 7-25K 11 Station-U CIVIL ALL 1 Install markers at road crossing duct bank

3174 7-25K 12 Station-U CIVIL ALL 1 Remove temporary fence at asphalt road area

leveling grading and compaction required at all


3175 7-25K 13 Station-U CIVIL ALL 1
track roads as per project AFC drawing

existing no photography sign board to be relocated


3176 7-25K 14 Station-U CIVIL ALL 1
to out side station fence corner

3177 7-25K 15 Station-U CIVIL ALL 1 Remove all excess material/ debris from roads

3178 7-25K 16 Station-U CIVIL ALL 1 General cleaning required for all roads

RCP is not standard & purpose built relay control


panel as supplied by Schneider France for 33kV
33kV Relay
system at UmmBab and also procured by M/s.
Contro Panel
3179 7-25L 1.01 Station-U ELEC 1 Black Cat under Produced water project-II.
62-RCP-6203-
Comments already raised during review stage as
01
this panel are not as per QP standard Practice. To
be clarified and rectified if required.

Control switches (TNC & Local/Remote) provided


33kV Relay
at RCP is not of robust type (as supplied from
Contro Panel
3180 7-25L 1.02 Station-U ELEC 1 existing installation & substations) and operated by
62-RCP-6203-
key. To be clarified and reviewed for project
01
specified material.

Column number to be provided on each column


33kV Relay with its cubicle series number. (Each column has 5
Contro Panel numbers cubicle. This column and cubicle number
3181 7-25L 1.03 Station-U ELEC 1
62-RCP-6203- will provide distinction of each 5 numbers feeder
01 available in the RCP. And note that in column # 2 &
3, two feeders are available in each column).

33kV Relay
Contro Panel Lockout relay not available for spare transformer
3182 7-25L 1.04 Station-U ELEC 1
62-RCP-6203- feeder cubicle. To be provided.
01
Column # 2 & # 3 have two feeders on each
33kV Relay
column, the terminal blocks and MCBs are mixed
Contro Panel
3183 7-25L 1.05 Station-U ELEC 1 inside the column. Provide corresponding
62-RCP-6203-
identification and label for its function on MCBs,
01
auxiliary relays and terminal blocks.
33kV Relay
Contro Panel Standard size tag number to be provided at RCP
3184 7-25L 1.06 Station-U ELEC 1
62-RCP-6203- side.
01
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

33kV Relay
Sepam relays (S82 & T87) label and function to be
Contro Panel
3185 7-25L 1.07 Station-U ELEC 1 provided and fixed with standard size at the bottom
62-RCP-6203-
side of the relay.
01

No control switch (T-N-C & Local/remote) provided


33kV
at switchgear side. With this condition, there is no
3186 7-25L 2.01 Station-U ELEC Switchgear side 1
electrical testing facility on each feeder circuit
62-SB-6203-01
breaker. To be clarified and rectified.

33kV
Standard size tag number to be provided at
3187 7-25L 2.02 Station-U ELEC Switchgear side 1
switchgear side (62-SB-6203-01).
62-SB-6203-01

33kV Provide label or function description for MCBs and


3188 7-25L 2.03 Station-U ELEC Switchgear side 1 auxiliary relays for each feeders. (5 numbers
62-SB-6203-01 panels).

33kV
Panel number as mentioned in the SLD, to be
3189 7-25L 2.04 Station-U ELEC Switchgear side 1
provided on each feeder.
62-SB-6203-01

33kV
Provide panel number & feeder identification at the
3190 7-25L 2.05 Station-U ELEC Switchgear side 1
back side of the switchgear.
62-SB-6203-01

33kV
CB operating handles to be provided with proper
3191 7-25L 2.06 Station-U ELEC Switchgear side 1
handling board.
62-SB-6203-01

33kV
Provide CT & VT data at the back side of the panel
3192 7-25L 2.07 Station-U ELEC Switchgear side 1
cover on each feeders.
62-SB-6203-01

33kV
Provide SLD, P & Metering Diagram board on
3193 7-25L 2.08 Station-U ELEC Switchgear side 1
either RCP or switchgear side.
62-SB-6203-01

Transformer Water is noticed available at the HV cable trench at


3194 7-25L 3.01 Station-U ELEC Yard 62-TR- 1 the transformer yard. Maybe due to heavy rain on
6203 20.11.2013. To be rectified.

Transformer Main earthing connection (two numbers) to be fixed


3195 7-25L 3.02 Station-U ELEC Yard 62-TR- 1 and connected at the surface of the transformer
6203 main tank not on the bolts & washer

3196 7-8H 1 STATION-N INST ALL 1 61-XS-0273 to be adjusted with limit switches.

3197 7-8H 2 STATION-N INST ALL 1 61-XS-0274 to be adjusted with limit switches

3198 7-8H 3 STATION-N INST ALL 1 PI-0277 Traffolyte tag plate is missing.

All crossing pipe line bridges needs step ladders


3199 7-8H 4 STATION-N MECH ALL 1
and not monkey ladders.

61-PI-280 pressure gauge to be fixed to drain


3200 7-8H 5 STATION-N INST ALL 1
tubes.

61-PI-277 pressure gauge to be fixed to drain


3201 7-8H 6 STATION-N INST ALL 1
tubes.

61-PI-278 pressure gauge to be fixed to drain


3202 7-8H 7 STATION-N INST ALL 1
tubes.

3203 7-8H 8 STATION-N INST ALL 1 61-PT-0275 A/B/C earthing cable to be connected.

3204 7-8H 9 STATION-N INST ALL 1 61-SDV-273 fire box cover plate requires handle.

Air reservoir tank SDV-273 needs plug to be fixed


3205 7-8H 10 STATION-N INST ALL 1
on the valves and drain line.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

61-XS-0272 pig receiver switch flange bolt to be


3206 7-8H 11 STATION-N INST ALL 1
fixed.

All JBS blind material is PVC plastic, to be


3207 7-8H 12 STATION-N INST ALL 1
replaced with SS material.

F&G JB tag should be changed as per new


3208 7-8H 13 STATION-N INST ALL 1
version.

SDV-271 fire box cover is too heavy and cannot


be approached to open. Requires platform.Earth
3209 7-8H 14 STATION-N INST ALL 1
cable needs to be fixed. Fix plug to be connected
to the drain valve of the volume tank.

3210 7-8H 15 STATION-N ELEC ALL 1 MOV-274 power cable to be connected.

3211 7-8H 16 STATION-N ELEC ALL 1 MOV-288 power cable to be connected.

MOV-0272 power cable is loose and touches the


3212 7-8H 17 STATION-N ELEC ALL 1
moving parts of the mechanical indication.

MOV-0273 power cable is loose and touches the


3213 7-8H 18 STATION-N ELEC ALL 1
moving parts of the mechanical indication.

UFM-JB to be installed. Flow meter gland to be


3214 7-8H 19 STATION-N INST ALL 1
replaced with SS material and with shroud.

3215 7-8H 20 STATION-N INST ALL 1 PT-0183 vents tubing to be clamped properly.

MOV-0285 local indication plate not same as other


3216 7-8H 21 STATION-N INST ALL 1
MOVs. To be replaced identically.

3217 7-8H 22 STATION-N INST ALL 1 PI-0276 Traffolyte tag to be fixed.

3218 7-8H 23 STATION-N INST ALL 1 Sun shade to be fixed for GDT-0001.

PCV-272E air supply tube is too long which is why


3219 7-8H 24 STATION-N INST ALL 1 it needs support in the middle of tube to stop it
from hanging.
Need isolating valve to be placed in between PSV
3220 7-8H 25 STATION-N INST ALL 1 and volume tank of all SDVs. Similar to PCV
control volume tank.

All PCV control valves volume tank needs drain


3221 7-8H 26 STATION-N INST ALL 1
valves to be fixed.

3222 7-8H 27 STATION-N INST ALL 1 Earth cable to be fixed for LS-0272.

Road signs and road marking to be provided as


3223 7-8I 1 STATION-N CIVIL ALL 1
per the requirement

Rectfication required for the damaged kerb stone


3224 7-8I 2 STATION-N CIVIL ALL 1
and painting to be done

3225 7-8I 3 STATION-N CIVIL ALL 1 Joint sealant for the required areas to be done

3226 7-8I 4 STATION-N CIVIL ALL 1 Emergency gate to be provided as per the drawing

Assemply point to be identified and installed sign


3227 7-8I 5 STATION-N CIVIL ALL 1
boards

Check the gate installation and provide true


3228 7-8I 6 STATION-N MECH ALL 1
alignment.

Gate drop bolt arrester to be provided as per the


3229 7-8I 7 STATION-N CIVIL ALL 1
drawing

3230 7-8I 8 STATION-N MECH ALL 1 Apply touchup paint for the gate and fence post

Lifting hook pocket to be filled, rectification


3231 7-8I 9 STATION-N CIVIL ALL 1 required for the damaged surface and maintained
the level defference for the protection slab
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All unpaved area within station fence limits to be


3232 7-8I 10 STATION-N CIVIL ALL 1 finished with 20mm nominal size aggregate 100
thk. for the remaining area

Existing fence to be removed after getting approval


3233 7-8I 11 STATION-N CIVIL ALL 1
from client

Contrction joint to be provided for the hard


3234 7-8I 12 STATION-N CIVIL ALL 1
standing slab

Cover to be provided for the splicing pit and apply


3235 7-8I 13 STATION-N CIVIL ALL 1
painting

Epoxy coating to be done for the exposed concrete


3236 7-8I 14 STATION-N CIVIL ALL 1
surface of the support foundation

Removal of existing higher level surface, maintain


3237 7-8I 15 STATION-N CIVIL ALL 1 proper slope and associated work shall be
completed as per the drawing

3238 7-8I 16 STATION-N CIVIL ALL 1 Crash barrier to be provided

3239 7-8I 17 STATION-N CIVIL ALL 1 Fencing to be completed for the balance portion

Surface preparation, chamfer to be provided and


3240 7-8I 18 STATION-N CIVIL ALL 1
apply touch-up paint for the CP foundations

Painting to be done for the manhole cover of


3241 7-8I 19 STATION-N CIVIL ALL 1
condensate drain tank

3242 7-8I 20 STATION-N CIVIL ALL 1 Ladder foundation to be provided

3243 7-8I 21 STATION-N CIVIL ALL 1 Track road and associated works shall be done.

3244 7-8I 22 STATION-N CIVIL ALL 1 Damaged existing bund to be re-instated

3245 7-8I 23 STATION-N MECH ALL 1 Wind sock to be provided

Rectification of damaged concrete surface and


3246 7-8I 24 STATION-N CIVIL ALL 1
apply touch-up paint

3247 7-8I 25 STATION-N CIVIL ALL 1 Installed spill pit cover to be modified

Fence opeining at pipe entry shall be reinstated


3248 7-8I 26 STATION-N MECH ALL 1
properly

Remove all temporary facilities and house keeping


3249 7-8I 27 STATION-N CIVIL ALL 1
to be done

Road making to be completed as per the


3250 7-8J 1 STATION-N CIVIL ALL 1
requirement

Road signboard installation to be completed as per


3251 7-8J 2 STATION-N CIVIL ALL 1
the requirement

Asphalt core test to be conducted and produce test


3252 7-8J 3 STATION-N CIVIL ALL 1
report

Kerb stone painting to be completed as per the


3253 7-8J 4 STATION-N CIVIL ALL 1
requirement

Crash barrier painting to be completed as per the


3254 7-8J 5 STATION-N MECH ALL 1
requirement

3255 7-8J 6 STATION-N CIVIL ALL 1 Install standard/approved kerb stones at corners

3256 7-8J 7 STATION-N CIVIL ALL 1 Provide sealant at asphalt joints with trench covers

Road shoulder to be completed as per project AFC


3257 7-8J 8 STATION-N CIVIL ALL 1
drawing
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Provide stone pitches as pig launcher area


3258 7-8J 9 STATION-N CIVIL ALL 1
embankment

3259 7-8J 10 STATION-N CIVIL ALL 1 Install remaining crash barrier and fish tales

3260 7-8J 11 STATION-N CIVIL ALL 1 Install markers at road crossing duct banks

3261 7-8J 12 STATION-N CIVIL ALL 1 Remove temporary fence at asphalt road area

3262 7-8J 13 STATION-N CIVIL ALL 1 Drainage pipe top to be repaired properly

3263 7-8J 14 STATION-N CIVIL ALL 1 Remove all excess materials/debris from roads

3264 7-8J 15 STATION-N CIVIL ALL 1 General Cleaning required for all roads

A copy of all FAT and SAT report to be submitted to


33 KV SWITCH
3265 7-25M 1.01 Station-U ELEC
GEAR
1 energization including appropriate documents such
as drawings schematic diagram etc.

33 KV SWITCH Hi-pot, termination and final torquing of 33 KV


3266 7-25M 1.02 Station-U ELEC 1
GEAR cable to be done prior to energization.
Main earthing at both end are loose due to small
33 KV SWITCH size of bolt (M8) used for the 240sqmm size of
3267 7-25M 1.03 Station-U ELEC 1
GEAR cable. Bolts to be replaced and proper torque to be
applied.
33 KV SWITCH The actual size of circuit breaker 1250A does not
3268 7-25M 1.04 Station-U ELEC 1
GEAR matching to the size on the SLD which are 630A

33 KV SWITCH To provide panel cubicle number on each tier and it


3269 7-25M 1.05 Station-U ELEC 1
GEAR shall be reflected on the SLD.

33 KV SWITCH To complete the boxing up of the control cable top


3270 7-25M 1.06 Station-U ELEC 1
GEAR cover, ensure that all bolts are fitted back.

Standard size of equipment tag shall install on


33 KV SWITCH
3271 7-25M 1.07 Station-U ELEC
GEAR
1 center top of the switchgear and cubicle number
shall be provided.
RELAY Standard size of requirement tag shall install on
3272 7-25M 2.01 Station-U ELEC CONTROL 1 center top of the panel, and column and cubicle
PANEL number shall be provided.
Main earthing connection point shall be clean and
3273 7-25M 3.01 Station-U ELEC TRANSFORMER 1 free from sing of rust smear with contact grease
and protect with denso tape.
A copy of all FAT and SAT report to be submitted
prior to energization including appropriate
3274 7-25M 3.02 Station-U ELEC TRANSFORMER 1
documents such as drawings schematic diagram
etc.
Hi-pot, termination and final torquing of 33 KV
3275 7-25M 3.03 Station-U ELEC TRANSFORMER 1
cable to be done prior to energization.

Termination and final torquing of for primary and


3276 7-25M 3.04 Station-U ELEC TRANSFORMER 1 secondary sides of the transformer to be done prior
to energization.

As per standard transformer bay shall have oil


3277 7-25M 3.05 Station-U ELEC TRANSFORMER 1
containment pit.

To provide danger sign board on the steel gate and


3278 7-25M 3.06 Station-U ELEC TRANSFORMER 1
the transformer tag and voltage rating.

33KV CABLE Cable route makers to be provided with proper


3279 7-25M 4.01 Station-U ELEC 1
ROUTE identification tag.

33KV CABLE An updated cable route drawing to be submitted


3280 7-25M 4.02 Station-U ELEC 1
ROUTE prior to energization.

Cable tray clamps to be replaced with proper


3281 7-31E 1 KSFGSS INST ALL 1
leveled clamps.

3282 7-31E 2 KSFGSS INST ALL 1 Cable trays to be aligned and leveled properly.

Electrical Drawings to be kept inside DB drawings


3283 7-31E 3 KSFGSS ELEC ALL 1
holder.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3284 7-31E 4 KSFGSS ELEC ALL 1 Tag plates to be changed to traffolyte tag plates

3285 7-31E 5 KSFGSS ELEC ALL 1 Exingusher mounting to be secured.

Wall through holes for HSSD pipes to be filled and


3286 7-31E 6 KSFGSS INST ALL 1
cover.

3287 7-31E 7 KSFGSS MECH ALL 1 Checker plates to be aligned and fixed properly

3288 7-31E 8 KSFGSS ELEC ALL 1 AI size as built SLD to be fixed.

3289 7-31E 9 KSFGSS ELEC ALL 1 Emergency light fitting identification to be provided

3290 7-31E 1 KSFGSS MECH ALL 1 Instrument air header not connected

3291 7-31E 2 KSFGSS MECH ALL 1 Missing valve handles to be fixed

3292 7-31E 3 KSFGSS INST ALL 1 SDV air supply line to be supported properly

3293 7-31E 4 KSFGSS INST ALL 1 Ultrasonic flow meter JB to be fixed

3294 7-31E 5 KSFGSS INST ALL 1 Wrong Instrument tag name plates to be corrected

Instrument cable earth connection to be done


3295 7-31E 6 KSFGSS INST ALL 1
around the plant

As built drawings to be kept inside panel drawing


3296 7-31E 7 KSFGSS INST ALL 1
holder

3297 7-31E 8 KSFGSS INST ALL 1 Broken Panel indication lamp caps to be replaced.

Spool pipe drawing between BV-0911 and PLG-


3298 7-2H 1 FNFIS MECH ALL 1 0905 to be shown on P&ID
( pig receiver area ).

Spool pipe drawing between BV-0923 and PLG-


3299 7-2H 2 FNFIS MECH ALL 1
0907 to be shown on P&ID ( glycol heater area ).

Spool pipe drawing between BV-0946 and PLG-


3300 7-2H 3 FNFIS MECH ALL 1
0908 to be shown on P&ID ( glycol heater area ).

3301 7-2H 4 FNFIS MECH ALL 1 Touch up painting to be completed on all area.

Nuts to be installed on mobile pigging support &


3302 7-20H 1 WHTP-L MECH ALL 1
earthing cable to be connected / installed.

3303 7-20H 2 WHTP-L MECH ALL 1 RO-0122 & RO-0124 to be installed as per P&ID.

3304 7-20H 3 WHTP-L MECH ALL 1 Spectacle blind to be installed at D/S of BV-0467.

3305 7-20H 4 WHTP-L MECH ALL 1 SRV-0419 A/B to be installed.

3306 7-20H 5 WHTP-L MECH ALL 1 Spool pipe to be installed at GLV-0420.

General painting to be completed on pipe line &


3307 7-20H 6 WHTP-L MECH ALL 1
structural.

3308 7-20H 7 WHTP-L MECH ALL 1 Personal protection to be provided as per P&ID.

Tag no to be clarified between P&ID and the actual


3309 7-20H 8 WHTP-L MECH ALL 1
for FI-0001.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All bolts & nuts to be coated with approved coating


3310 7-19H 1 WHTP-H MECH ALL 1
material

3311 7-19H 2 WHTP-H MECH ALL 1 FE-0301 , bolt length not sufficient.

3312 7-19H 3 WHTP-H MECH ALL 1 6H-SRV-0006A/B to be installed

3313 7-19H 4 WHTP-H MECH ALL 1 Blind flange to be installed at BV-0487

3314 7-19H 5 WHTP-H MECH ALL 1 PLG-0465 to be installed.

General painting to be completed on pipe line &


3315 7-19H 6 WHTP-H MECH ALL 1
structural.

3316 7-19H 7 WHTP-H MECH ALL 1 Personal protection to be provided as per P&ID.

3317 7-24I 1 WHTP-D INST ALL 2 SFG overview graphic in SCADA not complete.

PI-0573A/B/C "PAH" text should be removed from


3318 7-24I 2 WHTP-D INST ALL 2
MSI graphic hence it is not SD.

PI-0573A/B/C Under range alarm not configured in


3319 7-24I 3 WHTP-D INST ALL 2
SCADA.

Mos input status for PI-0573C not changing in


3320 7-24I 4 WHTP-D INST ALL 2
DCS/MSI

PI-0573A/B/C override alarms are not appearing in


3321 7-24I 5 WHTP-D INST ALL 2
MSI

For PAL-0645 alarm page object tag should


3322 7-24I 6 WHTP-D INST ALL 2
correct.it is showing PAL-0565 instead PAL- 0645

SDV-0565 open/close alarm in DCS/MSI should


3323 7-24I 7 WHTP-D INST ALL 2
correct to ZSC/ZSO instead EZSC/EZSO

PI-0573A/B/C override switches tags should


3324 7-24I 8 WHTP-D INST ALL 2
correct.

SDV-0565 ESD alarms (push button/SOV Trip) not


3325 7-24I 9 WHTP-D INST ALL 2
appearing in MSI-ESD alarm filter.

Partial stroke alarm doesn't appear in MSI-DCS


3326 7-24I 10 WHTP-D INST ALL 2
alarm filter.

MSI all instrument Trend windows background


3327 7-24I 11 WHTP-D INST ALL 2 colour should be corrected.hence texts are not
visible.

SDV-0565 During partial stroke indication not


3328 7-24I 12 WHTP-D INST ALL 2
changing from green to yellow.

PI-0573A/B/C 'H' alarm in DCS alarm page


3329 7-24I 13 WHTP-D INST ALL 2
Showing 'HH' need to correct.

PI-0573A/B/C Tag Description in SCADA not


3330 7-24I 14 WHTP-D INST ALL 2
matching with DCS/MSI

PCV open/Transit/Close
3331 7-24I 15 WHTP-D INST ALL 2 (Green/yellow/Red)indications need to be
configured properly in SCADA/DCS.

PI-0573A/B/C "LL" alarm not showing in MSI when


3332 7-24I 16 WHTP-D INST ALL 2
value is zero or below zero.

GDF-0134/0135/0136/0137 when under range/fault


3333 7-24I 17 WHTP-D INST ALL 2
state gives Hi alarm indication in DCS.

In DCS graphics cause and effect page for GDF


3334 7-24I 18 WHTP-D INST ALL 2 inhibit GDF-0134-0137 Tags missing in effect
column.

No alarm available for SDV-Local shutdown push


3335 7-24I 19 WHTP-D INST ALL 2
button.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3336 7-24I 20 WHTP-D INST ALL 2 Partial stroke successful alarm not available.

Partial stroke in progress lamp on LCP is not


3337 7-24I 21 WHTP-D INST ALL 2
visible.

3338 7-24I 22 WHTP-D INST ALL 2 Canopy not installed for SDV-LCP

3339 7-24I 23 WHTP-D INST ALL 2 partial stroke permissive lamp not available on LCP.

3340 7-24I 24 WHTP-D INST ALL 2 permanent tag should install for 6D-XL-0565

Fault/Underrange indication (Cross) not available


3341 7-24I 25 WHTP-D INST ALL 2
for Flow Triloop and PI-0574 in DCS.

3342 7-24I 26 WHTP-D INST ALL 2 PI-0574 "HI" alarm doesn't appear in DCS/MSI.

When PT-0574 is in fault condition and PCV-0574


3343 7-24I 27 WHTP-D INST ALL 2 in auto mode valve should go to the fail safe
position,close or change to manual mode.

FC (fail close ) text should provide for the PCV in


3344 7-24I 28 WHTP-D INST ALL 2
DCS.

For GDF-0136 "HH" alarm not appearing in the


3345 7-24I 29 WHTP-D INST ALL 2
faceplate override tab.

3346 7-24I 30 WHTP-D INST ALL 2 6D-PI-0565 button size should increase in SCADA.

Permanent tag should install for GDF


3347 7-24I 31 WHTP-D INST ALL 2
overrides/lamps on F & G panel.

SDV-0565 tag should correct from ESDV to SDV in


3348 7-24I 32 WHTP-D INST ALL 2
cause & Effect page.

SDV-0565 2OO3 logic (Diamond symbol) colour


3349 7-24I 33 WHTP-D INST ALL 2
should change according to the ESD status.

In SCADA PCV PY value should connect between


3350 7-24I 34 WHTP-D INST ALL 2
PT and PCV,Tag should show also.

PT-0573A/B/C override/LL 2OO3 logic status


3351 7-24I 35 WHTP-D INST ALL 2 colours (Green/Red) in the cause & effect page
need to confirm.

"Plant ESD/Trip command" alarm in SCADA should


3352 7-24I 36 WHTP-D INST ALL 2
correct.

3353 7-19G 1 WHTP-H INST ALL 2 SFG overview graphic in SCADA not complete.

PI-0266A/B/C "PAH" text should be removed from


3354 7-19G 2 WHTP-H INST ALL 2
MSI graphic hence it is not SD.

PI-0266A/B/C Under range alarm not configured in


3355 7-19G 3 WHTP-H INST ALL 2
SCADA.

3356 7-19G 4 WHTP-H INST ALL 2 FI-0301 range need to confirm in SCADA/MSI

When GDF-120 goes to 50% and come back to 49


3357 7-19G 5 WHTP-H INST ALL 2 % gives "HH" alarm,graphic (DCS) symbol also
change to red colour even when override present.

for PCV-0267 commands were not able to give


3358 7-19G 6 WHTP-H INST ALL 2 from Khuff D MSI by remote desktop.expected
khuff d local DCS issue.need to verify.
SDV-0301 open/close alarm in DCS/MSI should
3359 7-19G 7 WHTP-H INST ALL 2
correct to ZSC/ZSO instead EZSC/EZSO
PCV-0267open/Transit/Close
3360 7-19G 8 WHTP-H INST ALL 2 (Green/yellow/Red)indications need to be
configured properly in SCADA/DCS.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PAL-0301(Inst air pressure low) tag is similar to the


3361 7-19G 9 WHTP-H INST ALL 2
PT-0301

GDF-0119/120 when under range/fault state gives


3362 7-19G 10 WHTP-H INST ALL 2
Hi alarm indication in DCS.
In DCS graphics cause and effect page for GDF
3363 7-19G 11 WHTP-H INST ALL 2 inhibit GDF-0119/120 Tags missing in effect
column.
No alarm available for SDV-Local shutdown push
3364 7-19G 12 WHTP-H INST ALL 2
button.

3365 7-19G 13 WHTP-H INST ALL 2 Partial stroke successful alarm not available.

Partial stroke in progress lamp on LCP is not


3366 7-19G 14 WHTP-H INST ALL 2
visible.

3367 7-19G 15 WHTP-H INST ALL 2 Canopy not installed for SDV-LCP

3368 7-19G 16 WHTP-H INST ALL 2 partial stroke permissive lamp not available on LCP.

PT-0266A/B/C override tags should correct as in


the drawing,permanent tags should install and
3369 7-19G 17 WHTP-H INST ALL 2
confirm the tags given in MOS/Cause & Effect
page.

Fault/Underrange indication (Cross) not available


3370 7-19G 18 WHTP-H INST ALL 2
for Flow Triloop and PI-0267 in DCS.

Partial stroke permissive alarm not appearing in


3371 7-19G 19 WHTP-H INST ALL 2
the MSI-DCS alarm filter.

When PT-0267 is in fault condition and PCV-0267


3372 7-19G 20 WHTP-H INST ALL 2 in auto mode valve should go to the fail safe
position,close or change to manual mode.

FC (fail close ) text should provide for the PCV in


3373 7-19G 21 WHTP-H INST ALL 2
DCS.
Open circuit/underrange creates "HH" alarm for
3374 7-19G 22 WHTP-H INST ALL 2 GDF-0119/120.Graphic symbol also shows red
colour.

SDV-0301Trip,PALL-0266A/B/C override alarms


3375 7-19G 23 WHTP-H INST ALL 2 not available in MSI-ESD alarm filter.it is available
in the "ALL ALARM"

PT-0266A/B/C override/LL 2OO3 logic status


3376 7-19G 24 WHTP-H INST ALL 2 colours (Green/Red) in the cause & effect page
need to confirm.

For HS-0301 Trip push button alarms not available


3377 7-19G 25 WHTP-H INST ALL 2
in the MSI-ESD alarm filter.

"Plant ESD/Trip command" alarm in SCADA should


3378 7-19G 26 WHTP-H INST ALL 2
correct.

SDV-0301 2OO3 logic (Diamond symbol) colour


3379 7-19G 27 WHTP-H INST ALL 2
should change according to the ESD status.

In SCADA PCV PY value should connect between


3380 7-19G 28 WHTP-H INST ALL 2
PT and PCV,Tag should show also.

3381 7-19G 29 WHTP-H INST ALL 2 6H-HS-0565 Tag in ACP should correct

3382 7-20G 1 WHTP-L INST ALL 2 SFG overview graphic in SCADA not complete.

PI-0266A/B/C "PAH" text should be removed from


3383 7-20G 2 WHTP-L INST ALL 2
MSI graphic hence it is not SD.

PI-0266A/B/C Under range alarm not configured in


3384 7-20G 3 WHTP-L INST ALL 2
SCADA.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3385 7-20G 4 WHTP-L INST ALL 2 PAL-0313 alarm in alarm page showing PAL-0213.

SFG graphic for Khuff D could be incorporated in


3386 7-20G 5 WHTP-L INST ALL 2
single page.

SFG graphic for Khuff L could be incorporated in


3387 7-20G 6 WHTP-L INST ALL 2
single page.

SDV-213 open/close alarm in DCS/MSI should


3388 7-20G 7 WHTP-L INST ALL 2
correct to ZSC/ZSO instead EZSC/EZSO

PCV-0267open/Transit/Close
3389 7-20G 8 WHTP-L INST ALL 2 (Green/yellow/Red)indications need to be
configured properly in SCADA/DCS.

SFG graphic for Khuff G could be incorporated in


3390 7-20G 9 WHTP-L INST ALL 2
single page.

GDF-0119/120/121 when under range/fault state


3391 7-20G 10 WHTP-L INST ALL 2
gives Hi alarm indication in DCS.

In DCS graphics cause and effect page for GDF


3392 7-20G 11 WHTP-L INST ALL 2 inhibit GDF-0119/120/121 Tags missing in effect
column.

No alarm available for SDV-Local shutdown push


3393 7-20G 12 WHTP-L INST ALL 2
button.

3394 7-20G 13 WHTP-L INST ALL 2 Partial stroke successful alarm not available.

Partial stroke in progress lamp on LCP is not


3395 7-20G 14 WHTP-L INST ALL 2
visible.

3396 7-20G 15 WHTP-L INST ALL 2 Canopy not installed for SDV-LCP

3397 7-20G 16 WHTP-L INST ALL 2 partial stroke permissive lamp not available on LCP.

3398 7-20G 17 WHTP-L INST ALL 2 XL-0213 Trip indication lamp Tag should correct.

Fault/Underrange indication (Cross) not available


3399 7-20G 18 WHTP-L INST ALL 2
for Flow Triloop and PI-0267 in DCS.

In scada graphics WHTP-L SFG mobile pig receive


3400 7-20G 19 WHTP-L INST ALL 2 page text should change from "WHTP-H ESDV
control unit" to "TO WHTP-H SDV-0301 Inlet"

When PT-0267 is in fault condition and PCV-0267


3401 7-20G 20 WHTP-L INST ALL 2 in auto mode valve should go to the fail safe
position,close or change to manual mode.

FC (fail close ) text should provide for the PCV in


3402 7-20G 21 WHTP-L INST ALL 2
DCS.

Open circuit/underrange creates "HH" alarm for


3403 7-20G 22 WHTP-L INST ALL 2 GDF-0119/120/121.Graphic symbol also shows red
colour.

PT-0266A/B/C override alarm doesn't appear in


3404 7-20G 23 WHTP-L INST ALL 2
MSI.

PT-0266A/B/C override/LL 2OO3 logic status


3405 7-20G 24 WHTP-L INST ALL 2 colours (Green/Red) in the cause & effect page
need to confirm.

PALL alarm Description in SCADA should correct


3406 7-20G 25 WHTP-L INST ALL 2
(KHUFF L).

"Plant ESD/Trip command" alarm in SCADA should


3407 7-20G 26 WHTP-L INST ALL 2
correct.

SDV-0213 2OO3 logic (Diamond symbol) colour


3408 7-20G 27 WHTP-L INST ALL 2
should change according to the ESD status.

In SCADA PCV PY value should connect between


3409 7-20G 28 WHTP-L INST ALL 2
PT and PCV,Tag should show also.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

In cause & Effect page bubble colour for 2OO3


3410 7-20G 29 WHTP-L INST ALL 2
voting is configured reverse.

PT-0266 A/B/C fault alarm doesn't appear in


3411 7-20G 30 WHTP-L INST ALL 2
DCS/MSI faceplate and alarm page.

PT-0266 C tag should correct in cause & Effect


3412 7-20G 31 WHTP-L INST ALL 2
page.

3413 7-31F 1 KSFGSS INST ALL 1 All instruments to be tagged properly

All instrument and MOV's to be tagged and fixed


3414 7-31F 2 KSFGSS INST ALL 1
on aluminum base plate

Junction box for Ultra Sonic flowmeter to be


3415 7-31F 3 KSFGSS INST ALL 1
installed and cables to be connected

3416 7-31F 4 KSFGSS INST ALL 1 Proper access to be provided for PT_0005 A/B/C

3417 7-31F 5 KSFGSS INST ALL 1 All instrument to be grounded

Proper sun shed to be installed for all instruments


3418 7-31F 6 KSFGSS INST ALL 1
to protect from direct sun radiation

3419 7-31F 7 KSFGSS INST ALL 1 HSSD batteries to be installed in control room

3420 7-31F 8 KSFGSS INST ALL 1 Impulse and drain tubing to be supported

Wire ferrule sleeves to be proper sized in all


3421 7-31F 9 KSFGSS INST ALL 1
junction boxes

3422 7-31F 10 KSFGSS INST ALL 1 Cable screen to be connected properly in all J.B

SDV-0001 air tubing from volume tank to be


3423 7-31F 11 KSFGSS INST ALL 1
supported with cable tray

Proper rubber to be provided to avoid intact of


3424 7-31F 12 KSFGSS INST ALL 1
dissimilar materials

3425 7-31F 1 KSFGSS INST ALL 1 All Junction box fixing bolts to be proper sized

Access plate form to be provided for SRV and PI


3426 7-31F 2 KSFGSS INST ALL 1
installed on volume tank for SDV-0271

3427 7-31F 3 KSFGSS INST ALL 1 FDI convertors to be installed in marshalling panel

3428 7-31F 4 KSFGSS INST ALL 1 All drain tubing to be plugged properly

3429 7-31F 5 KSFGSS INST ALL 1 I/A line to be hooked up for SDV-0001

Loop check and functional check to be done at


3430 7-31F 6 KSFGSS INST ALL 1
LOC, MOC and DIC at WHTP-B & D

3431 7-31F 7 KSFGSS INST ALL 1 Instrument tag to be fixed on proper plate

3432 7-31F 8 KSFGSS INST ALL 1 Cable trench route marker to be installed

3433 7-31F 9 KSFGSS INST ALL 1 IT cabinet to be insttaled and fixed properly

3434 7-31F 10 KSFGSS INST ALL 1 Cable trermination to be completed for all MOV's
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All building devices to be powered up,


3435 7-31F 11 KSFGSS INST ALL 1
commissioned and functionally checked

Calibration and configuration of MV Flow Tx to be


3436 7-31F 12 KSFGSS INST ALL 1
verified

PIPELINE - Bund to be provided at PXA-008,009,010 & 011


3437 7-32A 1 CIVIL 12" N TO FSP 1
12" N TO FSP existing pipe removed area.

PIPELINE - Re-instatement of existing crossing marker pole to


3438 7-32A 2 CIVIL 12" N TO FSP 1
12" N TO FSP be done at RXS-001

PIPELINE - Culvert mouth shall be coated and covered with


3439 7-32A 3 CIVIL 12" N TO FSP 1
12" N TO FSP marine plywood of minimum thickness 18mm

PIPELINE - Asphalt road to be re-instated at road crossing


3440 7-32A 4 CIVIL 12" N TO FSP 1
12" N TO FSP TXU-003

Proper backfilling to be done over the protection


PIPELINE -
3441 7-32A 5
12" N TO FSP
CIVIL 12" N TO FSP 1 slab for existing pipe line between culvert RXA-011
& 013
Excavated soil and unwanted material to be
PIPELINE -
3442 7-32A 6
12" N TO FSP
CIVIL 12" N TO FSP 1 removed, area leveling and house keeping near
RXA-011

PIPELINE - Installed crossing marker pole to be removed from


3443 7-32A 7 CIVIL 12" N TO FSP 1
12" N TO FSP crossing RXA-010

PIPELINE - Area leveling and cleaning to be done near


3444 7-32A 8 CIVIL 12" N TO FSP 1
12" N TO FSP crossing RXA-010

PIPELINE - Existing bund to be re-instated, area leveling and


3445 7-32A 9 CIVIL 12" N TO FSP 1
12" N TO FSP house keeping required near V.stn-D

PIPELINE - Bund to be provided for 4'' buried pipe line from 12''
3446 7-32A 10 CIVIL 12" N TO FSP 1
12" N TO FSP line to V.stn-D

PIPELINE - Excess materials to be removed and properly


3447 7-32A 11 CIVIL 12" N TO FSP 1
12" N TO FSP provided shoulder for ROW near RXA-09A

PIPELINE - Identification slab to be provided and backfilling for


3448 7-32A 12 CIVIL 12" N TO FSP 1
12" N TO FSP PXA-003

PIPELINE - Vehicle "U" turn to be provided for ROW and


3449 7-32A 13 CIVIL 12" N TO FSP 1
12" N TO FSP unwanted materials removed near TXU-002

PIPELINE - Excavated materials to be removed from sides of


3450 7-32A 14 CIVIL 12" N TO FSP 1
12" N TO FSP the ROW approx. CH: 0+760 to 0+860

PIPELINE - Demolished protection slab kept near TXU-001 is


3451 7-32A 15 CIVIL 12" N TO FSP 1
12" N TO FSP to be removed.

PIPELINE - Excavated materials to be removed from sides of


3452 7-32A 16 CIVIL 12" N TO FSP 1
12" N TO FSP the ROW near. RXA-003

PIPELINE - Protection slab lifting hook pocket to be filled with


3453 7-32A 17 CIVIL 12" N TO FSP 1
12" N TO FSP appropriate material.

Backfilling to be completed over idenfification slab


PIPELINE -
3454 7-32A 18
12" N TO FSP
CIVIL 12" N TO FSP 1 at PXA-002 and re-instatement of existing pipe
sleepers
Backfilling to be done properly for the ROW and
PIPELINE -
3455 7-32A 19
12" N TO FSP
CIVIL 12" N TO FSP 1 crossing marker pole to be provided at
TXU-002

PIPELINE - identification slab to be provided and backfilling


3456 7-32A 20 CIVIL 12" N TO FSP 1
12" N TO FSP works to be done at PXU-002

PIPELINE - ROW slope to be provided properly and side filling


3457 7-32A 21 CIVIL 12" N TO FSP 1
12" N TO FSP required from RXA-001 to RXA-003

PIPELINE - Rectification for ROW to be done at RXA-001


3458 7-32A 22 CIVIL 12" N TO FSP 1
12" N TO FSP crossing

PIPELINE - Painting to be done for the installed crossing


3459 7-32A 23 CIVIL 12" N TO FSP 1
12" N TO FSP marker pole at RXA-001

ROW at TXU-001 backfilling required up to the


PIPELINE -
3460 7-32A 24
12" N TO FSP
CIVIL 12" N TO FSP 1 crash barrier and increase the width for smooth
vehicle movement.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - Rectification required for the ROW from approx.


3461 7-32A 25 CIVIL 12" N TO FSP 1
12" N TO FSP CH:0+370 to 0+760

Backfilling and surface to be prepared properly,


PIPELINE - installation of crossing marker pole and re-
3462 7-32A 26 CIVIL 12" N TO FSP 1
12" N TO FSP instatement of existing marker poles
at TXU-001

PIPELINE - ROW and shoulder to be provided as the drawing


3463 7-32A 27 CIVIL 12" N TO FSP 1
12" N TO FSP from CH:1+630 to 1+910

PIPELINE - Exposed concrete surface of crash barrier


3464 7-32A 28 CIVIL 12" N TO FSP 1
12" N TO FSP foundation to be painted.

PIPELINE - Cable route marker to be provided from


3465 7-32A 29 INST 12" N TO FSP 1
12" N TO FSP station-N to FSP

Bund level to be maintained as per the drawing


PIPELINE -
3466 7-32A 30
12" N TO FSP
CIVIL 12" N TO FSP 1 requirement minimum 1.00m approx.
CH:0+260 to 0+360

3467 7-25N 1 Station-U CIVIL ALL 1 Remove the existing fence.

3468 7-25N 2 Station-U CIVIL ALL 1 Main gate to be aligned properly

3469 7-25N 3 Station-U CIVIL ALL 1 Touch up paint on gate and fence post

3470 7-25N 4 Station-U CIVIL ALL 1 Complete the track road and associated works

Assembly point to be identified and installed sign


3471 7-25N 5 Station-U CIVIL ALL 1
plate.

Rectify the damaged surface of concrete and apply


3472 7-25N 6 Station-U CIVIL ALL 1
paint at pig launcher area.

3473 7-25N 7 Station-U CIVIL ALL 1 Existing sign boards to be relocated/removed.

3474 7-25N 8 Station-U CIVIL ALL 1 Provide and fix cap for sign plate post.

3475 7-25N 9 Station-U CIVIL ALL 1 Pipe entry through fence to be re-instated properly

3476 7-25N 10 Station-U CIVIL ALL 1 Apply paint to the cable entry pit

Lifting hook for cable pit MH to e filed with


3477 7-25N 11 Station-U CIVIL ALL 1
appropriate material

3478 7-25N 12 Station-U CIVIL ALL 1 Remove all temporary facilities from site

Fix landing platform on top end of monkey ladder


3479 7-25N 13 Station-U CIVIL ALL 1
connecting to ----

3480 7-25N 14 Station-U CIVIL ALL 1 Grade backfill and compact the area properly

3481 7-25N 15 Station-U CIVIL ALL 1 General cleaning to be done.

Provide and fix sign plates for building and all the
3482 7-25N 16 Station-U CIVIL ALL 1
rooms

3483 7-25N 17 Station-U CIVIL ALL 1 Replace the damaged door lock

3484 7-25N 18 Station-U CIVIL ALL 1 Touch up wall internally and externally

3485 7-25N 19 Station-U CIVIL ALL 1 Replace the damaged raised floor tiles
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3486 7-25N 20 Station-U CIVIL ALL 1 Raised floor tiles to be aligned properly

3487 7-25N 21 Station-U CIVIL ALL 1 Performs functional test for all the doors

3488 7-25N 22 Station-U CIVIL ALL 1 Apply paint on the door

Rectify the damaged portion of floor at the


3489 7-25N 23 Station-U CIVIL ALL 1
entrance.

Perform functional test for all the door


3490 7-25N 24 Station-U CIVIL ALL 1
(R and C room)

3491 7-25N 25 Station-U CIVIL ALL 1 Apply paint on the door

Rectify the damaged portion of floor at the


3492 7-25N 26 Station-U CIVIL ALL 1
entrance.

Perform functional test for all the door (Switchgear


3493 7-25N 27 Station-U CIVIL ALL 1
room)

3494 7-25N 28 Station-U CIVIL ALL 1 Apply paint on the door

chequered plate on the cable trench to be aligned


3495 7-25N 29 Station-U MECH ALL 1
properly.

Rectify the damaged portion of floor at the


3496 7-25N 30 Station-U CIVIL ALL 1
entrance.

3497 7-25N 31 Station-U CIVIL ALL 1 Rectify the damage at the edge of cable trench.

3498 7-25N 32 Station-U CIVIL Battery Room 1 Perform functional test for the door.

3499 7-25N 33 Station-U CIVIL Battery Room 1 Apply paint on the door

3500 7-25N 34 Station-U CIVIL Battery Room 1 Floor and wall tiles to be cleaned.

Transformer Rectify the damaged concrete surface wherever


3501 7-25N 35 Station-U CIVIL 1
Room necessary.

Transformer
3502 7-25N 36 Station-U CIVIL
Room
1 Complete the installation of cable trench cover.

Transformer
3503 7-25N 37 Station-U CIVIL
Room
1 Perform functional test for the door.

Transformer
3504 7-25N 38 Station-U CIVIL
Room
1 Apply final coat of paint on internal wall

3505 7-25N 39 Station-U CIVIL LV Room 1 Perform functional test for the door.

3506 7-25N 40 Station-U CIVIL LV Room 1 Apply paint on the door

chequered plate on the cable trench to be aligned


3507 7-25N 41 Station-U MECH LV Room 1
properly.

Rectify the damaged portion of floor at the


3508 7-25N 42 Station-U CIVIL LV Room 1
entrance.

3509 7-25N 43 Station-U CIVIL LV Room 1 Rectify the damage at the edge of cable trench.

3510 7-25N 44 Station-U CIVIL LV Room 1 Remove all temporary facilities from site

3511 7-25N 45 Station-U CIVIL LV Room 1 General cleaning to be done within the building.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DG Building and
3512 7-25N 46 Station-U CIVIL Diesel storage 1 Perform functional test for all doors.
tank area
DG Building and
3513 7-25N 47 Station-U CIVIL Diesel storage 1 Apply paint on the door
tank area
DG Building and
3514 7-25N 48 Station-U CIVIL Diesel storage 1 Replace the door lock
tank area
DG Building and
3515 7-25N 49 Station-U CIVIL Diesel storage 1 Complete the installation of cable trench cover.
tank area

DG Building and
3516 7-25N 50 Station-U CIVIL Diesel storage 1 Touch up paint on sand trap inlet Louvre.
tank area
DG Building and
3517 7-25N 51 Station-U CIVIL Diesel storage 1 Provide the TPI certification for crane.
tank area

DG Building and
Rectify the damaged concrete surface at the diesel
3518 7-25N 52 Station-U CIVIL Diesel storage 1
tank area storage tank area.

DG Building and
General cleaning to be done in and outside the
3519 7-25N 53 Station-U CIVIL Diesel storage 1
tank area building.

Galvanic CP system installation completed.


PIPELINE -
3520 7-32B 1
12" N TO FSP
ELEC 12" N TO FSP 1 Carriedout checks on TP, DP & Insulating joints at
road xings

PIPELINE - Details/Description plates on all locations at TP, DP


3521 7-32B 2 ELEC 12" N TO FSP 1
12" N TO FSP & junction boxes.

PIPELINE -
3522 7-32B 3
12" N TO FSP
ELEC 12" N TO FSP 1 Identification cable tags on all connectioncables

PIPELINE - Need to be rechecked after commissioning ICCP


3523 7-32B 4 ELEC 12" N TO FSP 1
12" N TO FSP system.

Submission of final reports/survey readings


PIPELINE -
3524 7-32B 5
12" N TO FSP
ELEC 12" N TO FSP 1 including drawings/locatiobn maps after the
polaraization of system.
Galvanic CP system installation completed.
PIPELINE - 6" 6" FNFIS TO VAL
3525 7-33A 1
FNFIS
ELEC
STN FNFIS
1 Carriedout checks on TP, DP & Insulating joints at
road xings

PIPELINE - 6" 6" FNFIS TO VAL Details/Description plates on all locations at TP, DP
3526 7-33A 2 ELEC 1
FNFIS STN FNFIS & junction boxes.

PIPELINE - 6" 6" FNFIS TO VAL


3527 7-33A 3
FNFIS
ELEC
STN FNFIS
1 Identification cable tags on all connectioncables

PIPELINE - 6" 6" FNFIS TO VAL Need to be rechecked after commissioning ICCP
3528 7-33A 4 ELEC 1
FNFIS STN FNFIS system.

Submission of final reports/survey readings


PIPELINE - 6" 6" FNFIS TO VAL
3529 7-33A 5
FNFIS
ELEC
STN FNFIS
1 including drawings/locatiobn maps after the
polaraization of system.
Galvanic CP system installation completed.
PIPELINE - 4" 4" VAL STN HL
3530 7-34A 1
WHTP-L
ELEC
TO STN L
1 Carriedout checks on TP, DP & Insulating joints at
road xings

PIPELINE - 4" 4" VAL STN HL Details/Description plates on all locations at TP, DP
3531 7-34A 2 ELEC 1
WHTP-L TO STN L & junction boxes.

PIPELINE - 4" 4" VAL STN HL


3532 7-34A 3
WHTP-L
ELEC
TO STN L
1 Identification cable tags on all connectioncables

PIPELINE - 4" 4" VAL STN HL Need to be rechecked after commissioning ICCP
3533 7-34A 4 ELEC 1
WHTP-L TO STN L system.

Submission of final reports/survey readings


PIPELINE - 4" 4" VAL STN HL
3534 7-34A 5
WHTP-L
ELEC
TO STN L
1 including drawings/locatiobn maps after the
polaraization of system.
Pig Launcher
Receiver area Complete the asphalt road to station as per SOW /
3535 7-31G 1 KSFGSS CIVIL 1
and the external project specification.
works
Pig Launcher
Receiver area Replace the damage kerb stone wherever
3536 7-31G 2 KSFGSS CIVIL 1
and the external necessary
works
Pig Launcher
Receiver area
3537 7-31G 3 KSFGSS CIVIL
and the external
1 Apply paint on kerb stones
works
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Pig Launcher
Receiver area
3538 7-31G 4 KSFGSS CIVIL
and the external
1 complete the grouting for the concrete supports
works
Pig Launcher
Receiver area Epoxy coating to be completed for all above
3539 7-31G 5 KSFGSS CIVIL 1
and the external ground concrete surface.
works
Pig Launcher
Receiver area Rectify the damaged concrete surface wherever
3540 7-31G 6 KSFGSS CIVIL 1
and the external necessary.
works
Pig Launcher
Receiver area
3541 7-31G 7 KSFGSS CIVIL
and the external
1 Provide and install cover for earth pit and spill pit
works
Pig Launcher
Receiver area
3542 7-31G 8 KSFGSS MECH
and the external
1 Provide and install wind sock
works
Pig Launcher
Receiver area
3543 7-31G 9 KSFGSS CIVIL
and the external
1 Aggregate spreading to be completed properly
works
Pig Launcher
Receiver area
3544 7-31G 10 KSFGSS CIVIL
and the external
1 Install station name plate and safety sign plate
works
Pig Launcher
Receiver area Fence opening at pipe entry to be re-instated
3545 7-31G 11 KSFGSS MECH 1
and the external properly.
works
Pig Launcher
Receiver area Assembly point to be identified and install sign
3546 7-31G 12 KSFGSS CIVIL 1
and the external board.
works
Pig Launcher
Receiver area
3547 7-31G 13 KSFGSS MECH
and the external
1 Touch-up paint on main gate and fence post
works
Pig Launcher
Receiver area
3548 7-31G 14 KSFGSS MECH
and the external
1 Fix holding bolt arrester for main gate.
works
Pig Launcher
Receiver area Lifting hook of slab to be filled with appropriate
3549 7-31G 15 KSFGSS CIVIL 1
and the external material
works
Pig Launcher
Receiver area
3550 7-31G 16 KSFGSS MECH
and the external
1 TPI report of Crane submitted
works
Pig Launcher
Receiver area
3551 7-31G 17 KSFGSS MECH
and the external
1 Apply structural paint on platforms and pipes
works
Pig Launcher
Receiver area
3552 7-31G 18 KSFGSS CIVIL
and the external
1 Apply sealant around crane post foundation
works
Pig Launcher
Receiver area
3553 7-31G 19 KSFGSS CIVIL
and the external
1 Remove all temporary site facilities
works
Pig Launcher
Receiver area
3554 7-31G 20 KSFGSS CIVIL
and the external
1 General cleaning to be completed
works

3555 7-31G 21 KSFGSS CIVIL Electrical Building 1 Provide and fix sign plates for the rooms

3556 7-31G 22 KSFGSS CIVIL Electrical Building 1 Replace the damage door lock

3557 7-31G 23 KSFGSS CIVIL Electrical Building 1 Epoxy painting on corridor to be completed

Fill all the unwanted holes on external walls with


3558 7-31G 24 KSFGSS CIVIL Electrical Building 1
appropriate material

Rectify the damage surface of external wall and


3559 7-31G 25 KSFGSS CIVIL Electrical Building 1
apply pint

Complete the application of sealant for external


3560 7-31G 26 KSFGSS CIVIL Electrical Building 1
wall and corridor

Complete the application of sealant for the floor of


3561 7-31G 27 KSFGSS CIVIL Electrical Building 1
airlock room and LV room

Cable and pipe entry openings at telemetry room


3562 7-31G 28 KSFGSS CIVIL Electrical Building 1 LV room and air lock rooms to be filled with
appropriate material

Complete the painting of air lock room and LV


3563 7-31G 29 KSFGSS CIVIL Electrical Building 1
room floor
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3564 7-31G 30 KSFGSS MECH Electrical Building 1 Provide and fix trench cover at LV room

3565 7-31G 31 KSFGSS CIVIL Electrical Building 1 Rectify the surface at the door sill of main entrance

3566 7-31G 32 KSFGSS CIVIL Electrical Building 1 Perform functional test for all the door

3567 7-31G 33 KSFGSS CIVIL Electrical Building 1 Apply pint on the door

3568 7-31G 34 KSFGSS CIVIL Electrical Building 1 Opening on the battery room floor to be filled

Fill all the unwanted holes on external walls with


3569 7-31G 35 KSFGSS CIVIL Electrical Building 1
appropriate material

3570 7-31G 36 KSFGSS CIVIL Electrical Building 1 Clean the floor and wall tiles in battery room

3571 7-31G 37 KSFGSS MECH Electrical Building 1 Complete the construction of car park shed

Fix "Push bar to open" sticker on all emergency


3572 7-31G 38 KSFGSS ELEC Electrical Building 1
doors

3573 7-31G 39 KSFGSS MECH Electrical Building 1 Touch-up on monkey ladder

3574 7-31G 40 KSFGSS MECH Electrical Building 1 Install landing platform at the top of monkey ladder

3575 7-31G 41 KSFGSS CIVIL Electrical Building 1 Perform leak test on the building roof

3576 7-31G 42 KSFGSS CIVIL Electrical Building 1 General cleaning to be completed

PIPELINE -
36'' STN-U TO ROW level to be maintained as per the
3577 7-35A 1 36" STN U TO CIVIL 1
STN-N requirement approx. CH: 0+170 to 0+220
N

PIPELINE -
36'' STN-U TO Crossing marker pole surroundings to be
3578 7-35A 2 36" STN U TO CIVIL 1
STN-N compacted properly near station-U
N
PIPELINE -
36'' STN-U TO ROW merging with existing asphalt road at approx.
3579 7-35A 3 36" STN U TO CIVIL 1
STN-N CH: 1+335 to be diverted to suit the site condition
N
PIPELINE -
36'' STN-U TO Excavated material dumped at approx. CH: 0+500
3580 7-35A 4 36" STN U TO CIVIL 1
STN-N to 0+880 to be removed
N

PIPELINE -
36'' STN-U TO ROW shoulder to be provided properly from
3581 7-35A 5 36" STN U TO CIVIL 1
STN-N approx. CH: 0+880 to 0+940
N
PIPELINE - Existing rocky surface cut and remove for the
36'' STN-U TO
3582 7-35A 6 36" STN U TO CIVIL
STN-N
1 required width of ROW shoulder from CH: 1+100 to
N 1+250
PIPELINE - Removal all temporary support and re-instatement
36'' STN-U TO
3583 7-35A 7 36" STN U TO CIVIL
STN-N
1 to be done for the support of existing pipe line at
N CH: 1+340
PIPELINE -
36'' STN-U TO ROW shoulder to be provided from approx. CH:
3584 7-35A 8 36" STN U TO CIVIL 1
STN-N 1+800 to 2+000
N

PIPELINE -
36'' STN-U TO Excavated material dumped near over head line
3585 7-35A 9 36" STN U TO CIVIL 1
STN-N crossing OHX-003 to be removed
N
PIPELINE -
36'' STN-U TO Damaged area of ROW to be rectified from existing
3586 7-35A 10 36" STN U TO CIVIL 1
STN-N asphalt road to approx. CH: 2+120
N
PIPELINE -
36'' STN-U TO
3587 7-35A 11 36" STN U TO CIVIL
STN-N
1 ROW to be provided from CH: 2+540 to 2+650
N

PIPELINE -
36'' STN-U TO Dumped material to be removed from CH: 3+800
3588 7-35A 12 36" STN U TO CIVIL 1
STN-N to 4+000 between 36'' pipe line and asphalt road.
N
PIPELINE -
36'' STN-U TO K.M marker pole and pipe line identification marker
3589 7-35A 13 36" STN U TO CIVIL 1
STN-N pole to be provided from station-U to N
N
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE -
36'' STN-U TO ROW shoulder to be prepared properly at sabkha
3590 7-35A 14 36" STN U TO CIVIL 1
STN-N are approx. CH: 5+640 to 6+300
N
PIPELINE -
36'' STN-U TO Damaged area of ROW to be rectified from existing
3591 7-35A 15 36" STN U TO CIVIL 1
STN-N asphalt road to approx. CH: 3+390
N
PIPELINE -
36'' STN-U TO ROW to be provided up to the existing pipe line
3592 7-35A 16 36" STN U TO CIVIL 1
STN-N from CH: 4+100 to 4+180
N
PIPELINE -
36'' STN-U TO Lifting hook pocket for the protection slab to be
3593 7-35A 17 36" STN U TO CIVIL 1
STN-N filled with appropriate material
N

PIPELINE -
36'' STN-U TO Removal of unwanted materials and house
3594 7-35A 18 36" STN U TO CIVIL 1
STN-N keeping to be done from RXS-001 to Station-N
N
PIPELINE -
36'' STN-U TO Cable route marker to be provided from
3595 7-35A 19 36" STN U TO INST 1
STN-N station-U to N
N

PIPELINE -
36'' STN-U TO Excavated material dumped from approx. CH:
3596 7-35A 20 36" STN U TO CIVIL 1
STN-N 4+185 to 4+700 to be removed
N

PIPELINE -
36'' STN-U TO Excavated material and excess protection slab to
3597 7-35A 21 36" STN U TO CIVIL 1
STN-N be removed from near TXU-005
N
PIPELINE - Rectification of the backfilled area and installation
36'' STN-U TO
3598 7-35A 22 36" STN U TO CIVIL
STN-N
1 of crossing marker pole to be done for crossing
N TXU-005
PIPELINE -
36'' STN-U TO Existing rocky surface cut and remove for the
3599 7-35A 23 36" STN U TO CIVIL 1
STN-N required width of ROW Shoulder from CH: 5+700
N
PIPELINE - Excess soil to be removed from the ROW shoulder
36'' STN-U TO
3600 7-35A 24 36" STN U TO CIVIL
STN-N
1 and prepared properly from approx. CH: 5+500 to
N 5+640
PIPELINE -
36'' STN-U TO ROW merging with existing asphalt road near
3601 7-35A 25 36" STN U TO CIVIL 1
STN-N RXS-001 to be diverted to suit the site condition
N
PIPELINE -
36'' STN-U TO
3602 7-35A 26 36" STN U TO CIVIL
STN-N
1 ROW to be provided from CH: 2+650 to 2+750
N

PIPELINE -
36'' STN-U TO Rectification shall be done for the damaged ROW
3603 7-35A 27 36" STN U TO CIVIL 1
STN-N from approx. CH: 3+500 to 4+080
N

PIPELINE - Existing rocky surface cut and remove for the


36'' STN-U TO
3604 7-35A 28 36" STN U TO CIVIL
STN-N
1 required width of ROW shoulder at approx. CH:
N 4+000
PIPELINE - Remove all temporary supports and replace with
36'' STN-U TO
3605 7-35A 29 36" STN U TO CIVIL
STN-N
1 new permanent support for the existing pipe line at
N CH: 4+184
PIPELINE -
36'' STN-U TO RW culvert mouth area at ROW to be prepared
3606 7-35A 30 36" STN U TO CIVIL 1
STN-N properly for smooth flow of water
N

PIPELINE -
36'' STN-U TO
3607 7-35A 31 36" STN U TO CIVIL
STN-N
1 Bund at CP location to be rectified at KM 6+000
N
PIPELINE -
36'' STN-U TO
3608 7-35A 32 36" STN U TO CIVIL
STN-N
1 ROW to be provided below overhead line area
N
PIPELINE -
36'' STN-U TO Exposed concrete surface for CP & marker pole
3609 7-35A 33 36" STN U TO CIVIL 1
STN-N foundation to be painted
N

PIPELINE - Blinding and concrete protection to be done for KM


36'' STN-U TO
3610 7-35A 34 36" STN U TO CIVIL
STN-N
1 marker pole, pipe identification marker pole and
N crossing marker pole foundations.
PIPELINE -
36'' STN-U TO Exposed pipe line at sabkha area to be backfilled
3611 7-35A 35 36" STN U TO CIVIL 1
STN-N from approx. CH: 6+305 to 6+395
N
PIPELINE - Installation of crossing marker pole and end cap
36'' STN-U TO
3612 7-35A 36 36" STN U TO CIVIL
STN-N
1 stone size 200 to 300mm for the bund to be
N completed at TXU-007
PIPELINE - Bund height to be maintained from RXA-006 to
36'' STN-U TO
3613 7-35A 37 36" STN U TO CIVIL
STN-N
1 Station-N as per the drawing requirement minimum
N 1.00m from GL
PIPELINE -
36'' STN-U TO Rectification of Bund at CP location and remove all
3614 7-35A 38 36" STN U TO CIVIL 1
STN-N steel peg from the bund near RXA-006
N
PIPELINE - Installation of crossing marker pole and end cap
36'' STN-U TO
3615 7-35A 39 36" STN U TO CIVIL
STN-N
1 stone size 200 to 300mm for the bund to be
N completed at TXN-001 & TXN-002
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE -
36'' STN-U TO ROW to be provided for the access of
3616 7-35A 40 36" STN U TO CIVIL 1
STN-N valve station-FSDS
N
PIPELINE - Remove temporary goal post and to be provided
36'' STN-U TO
3617 7-35A 41 36" STN U TO CIVIL
STN-N
1 new goal post for over head line crossing OHX-
N 003, OHX-004
PIPELINE -
36'' STN-U TO
3618 7-35A 42 36" STN U TO CIVIL
STN-N
1 ROW to be provided from RXA-006 to station-N
N
PIPELINE -
36'' STN-U TO Rectification shall be done for the damaged ROW
3619 7-35A 43 36" STN U TO CIVIL 1
STN-N and shoulder from CH: 2+380 to 2+550
N

PIPELINE -
36'' STN-U TO Crossing marker pole and pipe line warning marker
3620 7-35A 44 36" STN U TO CIVIL 1
STN-N to be installed at RXS-001 & RXS-001A
N
Power supply
Power supply wiring diagram to be provided & also
3621 7-5A 1 FSP INST (Battery charger) 1
rack & cabling paste to the inside to the rack.

Power supply
Incomming power supply cable to be tagged &
3622 7-5A 2 FSP INST (Battery charger) 1
rack & cabling Labeled.

Power supply
3623 7-5A 3 FSP INST (Battery charger) 1 All Circuit braker to be Labeled.
rack & cabling
Power supply
3624 7-5A 4 FSP INST (Battery charger) 1 Power supply Alarm Monitoring to be done.
rack & cabling
Power supply
3625 7-5A 5 FSP INST (Battery charger) 1 Rack shall be cleaned and made free from dust.
rack & cabling
Power supply
3626 7-5A 6 FSP INST (Battery charger) 1 Petroleum jelly to be applied for all batteries.
rack & cabling
Complete Network & Block drawing for the
Telecom
Ruggedcom Switch system cabling as well as
3627 7-5A 1 FSP INST Transmission 1
Rack & cabling within rack cabling to be provided & pasted at the
inside of the door rack.
Telecom
Incomming power supply cable to be tagged &
3628 7-5A 2 FSP INST Transmission 1
Rack & cabling Labeled.

Telecom
3629 7-5A 3 FSP INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

Telecom
Power terminal Block to be covered (inside of the
3630 7-5A 4 FSP INST Transmission 1
Rack & cabling Telecom Rack)

EARTHING
For the balance three MOV installation and cable
3631 7-8K 1 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL termination to be completed.

EARTHING
3632 7-8K 2 STATION-N ELEC SYSTEM AND 1 Cable Route marker installation to be completed
SOLAR PANEL

EARTHING
Trafoltye identification tag to be provided MOV DB
3633 7-8K 3 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL feeder in LV S/Board

EARTHING
It is observed that changes in the rating of MOV,
3634 7-8K 4 STATION-N ELEC SYSTEM AND 2
SOLAR PANEL BCEC to confirm its adequacy requirment.

EARTHING
3635 7-8K 5 STATION-N ELEC SYSTEM AND 2 Testing of MOVs and all LV cables to be completed
SOLAR PANEL

EARTHING
Installed welding socket is rated for 3 Phase supply
3636 7-8K 6 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL and not singly phase supply.

EARTHING
In MOV-77 area the backfilling of cable trench to
3637 7-8K 7 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL be done properly (inside plan)

EARTHING
Demolished old OHL pole foundation to be
3638 7-8K 8 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL removed

EARTHING
3639 7-8K 9 STATION-N ELEC SYSTEM AND 1 Dismantled OHL materials to be handed over to QP
SOLAR PANEL

EARTHING
To be clarified about missing cable (61-ELP-057)
3640 7-8K 10 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL as per drawing KGPN-2-54-0005

EARTHING
In two light poles located near by MOV-77, the
3641 7-8K 11 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL thread of the foundation of bolt to be visible.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

For the poles, where two light fittings are installed


EARTHING
the fitting shall be clamped firmly and the supports
3642 7-8K 12 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL shall be installed properly. Also the rusted bolts to
be removed.
EARTHING
Support Earthing cables shall be tigtened properly
3643 7-8K 13 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL in all locations

EARTHING Load calculation verification to be done for the


3644 7-8K 14 STATION-N ELEC SYSTEM AND 2 changes marked in red marked to verify the loop in
SOLAR PANEL not overloaded.
Complete Network & Block drawing for the
Telecom
VAL STN Ruggedcom Switch system cabling as well as
3645 7-10H 1 INST Transmission 1
FNFIS within rack cabling to be provided & pasted at the
Rack & cabling
inside of the door rack.
Telecom
VAL STN
3646 7-10H 2
FNFIS
INST Transmission 1 Incomming power cable to tagged & labeled.
Rack & cabling

Telecom
VAL STN
3647 7-10H 3
FNFIS
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

VAL STN FO cable & FOPP to be tagged as per QP tagging


3648 7-10H 1 INST Fiber Optic Cable 1
FNFIS procedure/labeled.

VAL STN
3649 7-10H 2
FNFIS
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

VAL STN FO cable complete network & Block drawing to be


3650 7-10H 3 INST Fiber Optic Cable 1
FNFIS provided & pasted at the inside of the door rack

VAL STN
3651 7-10H 4
FNFIS
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged

VAL STN
3652 7-10H 5
FNFIS
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

VAL STN
3653 7-10H 6
FNFIS
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.

VAL STN Fiber optic enclosure to be fixed (inside of the


3654 7-10H 7 INST Fiber Optic Cable 1
FNFIS manhole)

Complete Network & Block drawing for the


Telecom
VAL STN Ruggedcom Switch system cabling as well as
3655 7-11I 1 INST Transmission 1
FNLGCS within rack cabling to be provided & pasted at the
Rack & cabling
inside of the door rack.
Telecom
VAL STN
3656 7-11I 2
FNLGCS
INST Transmission 1 Incomming power cable to tagged & labeled.
Rack & cabling
Telecom
VAL STN
3657 7-11I 3
FNLGCS
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

VAL STN FO cable & FOPP to be tagged as per QP tagging


3658 7-11I 1 INST Fiber Optic Cable 1
FNLGCS procedure/labeled.

VAL STN
3659 7-11I 2
FNLGCS
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

VAL STN FO cable complete network & Block drawing to be


3660 7-11I 3 INST Fiber Optic Cable 1
FNLGCS provided & pasted at the inside of the door rack

VAL STN
3661 7-11I 4
FNLGCS
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged

VAL STN
3662 7-11I 5
FNLGCS
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

VAL STN
3663 7-11I 6
FNLGCS
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.

VAL STN Fiber optic enclosure to be fixed (inside of the


3664 7-11I 7 INST Fiber Optic Cable 1
FNLGCS manhole)

Complete Network & Block drawing for the


Telecom
VAL STN Ruggedcom Switch system cabling as well as
3665 7-12H 1 INST Transmission 1
FSDS within rack cabling to be provided & pasted at the
Rack & cabling
inside of the door rack.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Telecom
VAL STN
3666 7-12H 2
FSDS
INST Transmission 1 Incomming power cable to tagged & labeled.
Rack & cabling
Telecom
VAL STN
3667 7-12H 3
FSDS
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

VAL STN FO cable & FOPP to be tagged as per QP tagging


3668 7-12H 1 INST Fiber Optic Cable 1
FSDS procedure/labeled.

VAL STN
3669 7-12H 2
FSDS
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

VAL STN FO cable complete network & Block drawing to be


3670 7-12H 3 INST Fiber Optic Cable 1
FSDS provided & pasted at the inside of the door rack

VAL STN
3671 7-12H 4
FSDS
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged

VAL STN
3672 7-12H 5
FSDS
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

VAL STN
3673 7-12H 6
FSDS
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.

VAL STN Fiber optic enclosure to be fixed (inside of the


3674 7-12H 7 INST Fiber Optic Cable 1
FSDS manhole)

Complete Network & Block drawing for the


Telecom
VAL STN Ruggedcom Switch system cabling as well as
3675 7-13I 1 INST Transmission 1
KNMP within rack cabling to be provided & pasted at the
Rack & cabling
inside of the door rack.
Telecom
VAL STN
3676 7-13I 2
KNMP
INST Transmission 1 Incomming power cable to tagged & labeled.
Rack & cabling

Telecom
VAL STN
3677 7-13I 3
KNMP
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

VAL STN FO cable & FOPP to be tagged as per QP tagging


3678 7-13I 1 INST Fiber Optic Cable 1
KNMP procedure/labeled.

VAL STN
3679 7-13I 2
KNMP
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

VAL STN FO cable complete network & Block drawing to be


3680 7-13I 3 INST Fiber Optic Cable 1
KNMP provided & pasted at the inside of the door rack

VAL STN
3681 7-13I 4
KNMP
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged

VAL STN
3682 7-13I 5
KNMP
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

VAL STN
3683 7-13I 6
KNMP
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.

VAL STN Fiber optic enclosure to be fixed (inside of the


3684 7-13I 7 INST Fiber Optic Cable 1
KNMP manhole)

VAL STN
3685 7-13I 8
KNMP
INST Fiber Optic Cable 1 FOPP open/close to be operate properly.

Complete Network & Block drawing for the


Telecom
VAL STN Ruggedcom Switch system cabling as well as
3686 7-14I 1 INST Transmission 1
WHTP E&G within rack cabling to be provided & pasted at the
Rack & cabling
inside of the door rack.
Telecom
VAL STN
3687 7-14I 2
WHTP E&G
INST Transmission 1 Incomming power cable to tagged & labeled.
Rack & cabling

Telecom
VAL STN
3688 7-14I 3
WHTP E&G
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

VAL STN FO cable & FOPP to be tagged as per QP tagging


3689 7-14I 1 INST Fiber Optic Cable 1
WHTP E&G procedure/labeled.

VAL STN
3690 7-14I 2
WHTP E&G
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN FO cable complete network & Block drawing to be


3691 7-14I 3 INST Fiber Optic Cable 1
WHTP E&G provided & pasted at the inside of the door rack

VAL STN
3692 7-14I 4
WHTP E&G
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged

VAL STN
3693 7-14I 5
WHTP E&G
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

VAL STN
3694 7-14I 6
WHTP E&G
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.

VAL STN Fiber optic enclosure to be fixed (inside of the


3695 7-14I 7 INST Fiber Optic Cable 1
WHTP E&G manhole)

VAL STN
3696 7-14I 8
WHTP E&G
INST Fiber Optic Cable 1 FOPP open/close to be operate properly.

Complete Network & Block drawing for the


Telecom
VAL STN Ruggedcom Switch system cabling as well as
3697 7-15H 1 INST Transmission 1
WHTP H&L within rack cabling to be provided & pasted at the
Rack & cabling
inside of the door rack.
Telecom
VAL STN
3698 7-15H 2
WHTP H&L
INST Transmission 1 Incomming power cabling to be tagged & labeled.
Rack & cabling

Telecom
VAL STN
3699 7-15H 3
WHTP H&L
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

VAL STN FO cable & FOPP to be tagged as per QP tagging


3700 7-15H 1 INST Fiber Optic Cable 1
WHTP H&L procedure/labeled.

VAL STN
3701 7-15H 2
WHTP H&L
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

VAL STN FO cable complete network & Block drawing to be


3702 7-15H 3 INST Fiber Optic Cable 1
WHTP H&L provided & pasted at the inside of the door rack

VAL STN
3703 7-15H 4
WHTP H&L
INST Fiber Optic Cable 1 All crossing area FO cable to be labeled.

VAL STN
3704 7-15H 5
WHTP H&L
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

VAL STN
3705 7-15H 6
WHTP H&L
INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.

VAL STN Fiber optic enclosure to be fixed (inside of the


3706 7-15H 7 INST Fiber Optic Cable 1
WHTP H&L manhole)

Complete Network & Block drawing for the


Telecom
Ruggedcom Switch system cabling as well as
3707 7-25O 1 Station-u INST Transmission 1
Rack & cabling within rack cabling to be provided & pasted at the
inside of the door rack.
Telecom
3708 7-25O 2 Station-u INST Transmission 1 Incomming power cabling to be tagged & labeled.
Rack & cabling
Telecom
3709 7-25O 3 Station-u INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

Telecom
3710 7-25O 4 Station-u INST Transmission 1 Ruggedcom switch to tagged & labeled.
Rack & cabling

FO cable & FOPP to be tagged as per QP tagging


3711 7-25O 1 Station-u INST Fiber Optic Cable 1
procedure/labeled.

3712 7-25O 2 Station-u INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

FO cable complete network & Block drawing to be


3713 7-25O 3 Station-u INST Fiber Optic Cable 1
provided & pasted at the inside of the door rack

3714 7-25O 4 Station-u INST Fiber Optic Cable 1 All crossing area FO cable to be labeled.

3715 7-25O 5 Station-u INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

3716 7-25O 6 Station-u INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.

FO cable & FOPP to be tagged as per QP tagging


3717 7-25O 1 Station-u INST Fiber Optic Cable 1
procedure/labeled.

3718 7-25O 2 Station-u INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.

FO cable complete network & Block drawing to be


3719 7-25O 3 Station-u INST Fiber Optic Cable 1
provided & pasted at the inside of the door rack

3720 7-25O 4 Station-u INST Fiber Optic Cable 1 All crossing area FO cable to be labeled.

3721 7-25O 5 Station-u INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

3722 7-25O 6 Station-u INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.

33kv Relay No external control wire from spare transformer


3723 7-25P 1.01 Station-U ELEC control 62-RCP- 1 feeder and spare outgoing feeder at RCP to 33kv
6203-01 switchgear.
33kv Relay
Provide label or function description for MCB's for
3724 7-25P 1.02 Station-U ELEC control 62-RCP- 1
6203-01 each RCP cubicles.

33kv Relay
AC/DC power supply circuit not yet check and
3725 7-25P 1.03 Station-U ELEC control 62-RCP- 1
6203-01 verify for ferruling number.

33kv Relay
Cross checking of ferruling number after
3726 7-25P 1.04 Station-U ELEC control 62-RCP- 1
6203-01 replacement with corrected one.

33kv Relay
Provide red mark up document including relays
3727 7-25P 1.05 Station-U ELEC control 62-RCP- 1
6203-01 setting and configuration at Sub station.

33kv Relay
3728 7-25P 1.06 Station-U ELEC control 62-RCP- 1 Space heater circuit not yet tested.
6203-01

33kv switchgear
3729 7-25P 2.01 Station-U ELEC side 62-SB-6203- 1 Interlock keys for earthing truck not yet installed.
01

33kv switchgear
No external control wire from spare switchgear
3730 7-25P 2.02 Station-U ELEC side 62-SB-6203- 1
01 cubicle to spare RCP cubicle.

33kv switchgear
AC/DC power supply circuit not yet check and
3731 7-25P 2.03 Station-U ELEC side 62-SB-6203- 1
01 verify for ferruling number.

33kv switchgear
Cross checking of ferruling number after
3732 7-25P 2.04 Station-U ELEC side 62-SB-6203- 1
01 replacement with corrected one.

33kv switchgear
3733 7-25P 2.05 Station-U ELEC side 62-SB-6203- 1 Space heater and lighting circuit not yet tested.
01
33kv switchgear
3734 7-25P 2.06 Station-U ELEC side 62-SB-6203- 1 Primary injection test for CT's and VT's circuit.
01
33kv switchgear
Provide logic interlock scheme for incomer to Umm
3735 7-25P 2.07 Station-U ELEC side 62-SB-6203- 1
01 bab main intake sub station panel 13.

33kv switchgear
Provide logic interlock scheme for outgoing feeder
3736 7-25P 2.08 Station-U ELEC side 62-SB-6203- 1
01 UBMS-B to new 33kv S/S at UBMS-B area.

33kv switchgear
Provide logic interlock scheme for station
3737 7-25P 2.09 Station-U ELEC side 62-SB-6203- 1
01 transformer feeder to LV incomer SWBD 415V.

During CT testing at panel#2 for Transformer


33kv switchgear
feeder 62-TR6203-01 on 26-11-2013, protection
3738 7-25P 2.10 Station-U ELEC side 62-SB-6203- 1
01 CT at R phase found low saturation value, need to
replaced.

Transformer Provide recommended setting for transformer


3739 7-25P 3.01 Station-U ELEC 1
Yard-62-TR-6203 protection equipment, i.e WTI & OTI

Transformer Test and verify transformerr protection function


3740 7-25P 3.02 Station-U ELEC 1
Yard-62-TR-6203 after setting applied.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Transformer Provide supporting document related with


3741 7-25P 3.03 Station-U ELEC 1
Yard-62-TR-6203 transformer and keep it on transformer bay.

3742 7-25P 4.01 Station-U ELEC Miscellaneous 1 Provide CT & VT cable test relays.

3743 7-25P 4.02 Station-U ELEC Miscellaneous 1 Provide communication cable for SEPAM relay.

Provide hard copy & soft copy of manual book for


3744 7-25P 4.03 Station-U ELEC Miscellaneous 1
SEPAM relay, lock out relay etc.

3745 7-25P 4.04 Station-U ELEC Miscellaneous 1 Provide latest version of SEPAM software.

Provide training class for SEPAM relay by


3746 7-25P 4.05 Station-U ELEC Miscellaneous 1
proffesional trainer.

FO cable & FOPP to be tagged as per QP tagging


3747 7-30B 1 UMMBAB-B INST Fiber Optic Cable 1
procedure/labeled.

3748 7-30B 2 UMMBAB-B INST Fiber Optic Cable 1 Telecom Cable Route marker Post to be installed.

FO cable complete network & Block drawing to be


3749 7-30B 3 UMMBAB-B INST Fiber Optic Cable 1
provided & pasted at the inside of the door rack

3750 7-30B 4 UMMBAB-B INST Fiber Optic Cable 1 All crossing area FO cable to be tagged.

3751 7-30B 5 UMMBAB-B INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

3752 7-30B 6 UMMBAB-B INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.

UMMBAB-B FO cable & FOPP to be tagged as per QP tagging


3753 7-30B 1 UMMBAB-B INST 1
Sub Station procedure/labeled.

UMMBAB-B
3754 7-30B 2 UMMBAB-B INST
Sub Station
1 Telecom Cable Route marker Post to be installed.

UMMBAB-B FO cable complete network & Block drawing to be


3755 7-30B 3 UMMBAB-B INST 1
Sub Station provided & pasted at the inside of the door rack

UMMBAB-B
3756 7-30B 4 UMMBAB-B INST
Sub Station
1 All crossing area FO cable to be tagged.

UMMBAB-B
3757 7-30B 5 UMMBAB-B INST
Sub Station
1 FOPP shall be cleaned and made free from dust.

UMMBAB-B
3758 7-30B 6 UMMBAB-B INST
Sub Station
1 Telecom Manhole to be Covered & labeled.

Complete Network & Block drawing for the


Telecom
Ruggedcom Switch system cabling as well as
3759 7-30B 1 UMMBAB-B INST Transmission 1
Rack & cabling within rack cabling to be provided & pasted at the
inside of the door rack.
Telecom
3760 7-30B 2 UMMBAB-B INST Transmission 1 Incomming power cabling to be tagged & labeled.
Rack & cabling
Telecom
3761 7-30B 3 UMMBAB-B INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

Telecom
3762 7-30B 4 UMMBAB-B INST Transmission 1 Ruggedcom switch to be tagged & labeled.
Rack & cabling

3763 7-31H 1 KSFGSS ELEC ALL 1 F&G cable termination to be completed

3764 7-31H 2 KSFGSS ELEC ALL 2 Torquing for incomer cables to be completed

For the poles, where two light fittings are installed


the fitting shall be clamped firmly and the supports
3765 7-31H 3 KSFGSS ELEC ALL 1
shall be installed properly. Also the rusted bolts to
be removed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Incomer cable termination at KM plant to be


3766 7-31H 4 KSFGSS ELEC ALL 1
completed

Testing of UPS and LV S/Board and lighting system


3767 7-31H 5 KSFGSS ELEC ALL 2
to be completed

3768 7-31H 6 KSFGSS ELEC ALL 2 Timer to be provided for outdoor lighting DB

Complete Network & Block drawing for the


Telecom
Ruggedcom Switch system cabling as well as
3769 7-31I 1 KSFGSS INST Transmission 1
Rack & cabling within rack cabling to be provided & pasted at the
inside of the door rack.
Telecom
3770 7-31I 2 KSFGSS INST Transmission 1 Incomming power cabling to be tagged & labeled.
Rack & cabling
Telecom
3771 7-31I 3 KSFGSS INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
Telecom
3772 7-31I 4 KSFGSS INST Transmission 1 Telecom Rack to be Tagged.
Rack & cabling

Telecom
Teleco Rack shall be cleaned and made free from
3773 7-31I 5 KSFGSS INST Transmission 1
Rack & cabling dust.

FO cable & FOPP to be tagged as per QP tagging


3774 7-31I 1 KSFGSS INST Fiber Optic Cable 1
procedure/labeled.

3775 7-31I 2 KSFGSS INST Fiber Optic Cable 1 Telecom Cable Route marker Post to be installed.

FO cable complete network & Block drawing to be


3776 7-31I 3 KSFGSS INST Fiber Optic Cable 1
provided & pasted at the inside of the door rack

3777 7-31I 4 KSFGSS INST Fiber Optic Cable 1 All crossing area FO cable to be tagged.

3778 7-31I 5 KSFGSS INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

3779 7-31I 6 KSFGSS INST Fiber Optic Cable 1 FOPP open/close to be operate properly.

3780 7-31I 7 KSFGSS INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.

3781 7-31I 8 KSFGSS INST Fiber Optic Cable 1 FO cable dressing to be done properly.

Power supply
Power supply wiring diagram to be provided & also
3782 7-31I 1 KSFGSS INST (Battery charger) 1
rack & cabling paste to the inside to the rack.

Power supply
Incomming power supply cable to be tagged &
3783 7-31I 2 KSFGSS INST (Battery charger) 1
rack & cabling Labeled.

Power supply
3784 7-31I 3 KSFGSS INST (Battery charger) 1 All Circuit braker to be Labeled.
rack & cabling
Power supply
3785 7-31I 4 KSFGSS INST (Battery charger) 1 Power supply Alarm Monitoring to be done.
rack & cabling
Power supply
3786 7-31I 5 KSFGSS INST (Battery charger) 1 Rack shall be cleaned and made free from dust.
rack & cabling

Power supply
3787 7-31I 6 KSFGSS INST (Battery charger) 1 Petroleum jelly to be applied for all batteries.
rack & cabling

Power supply
Telecome power supply radck cable entry spare
3788 7-31I 7 KSFGSS INST (Battery charger) 1
rack & cabling hole to be done for future use.

FO cable & FOPP to be tagged as per QP tagging


3789 7-36A 1 KNMP INST Fiber Optic Cable 1
procedure/labeled.

3790 7-36A 2 KNMP INST Fiber Optic Cable 1 Telecom Cable Route marker Post to be installed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

FO cable complete network & Block drawing to be


3791 7-36A 3 KNMP INST Fiber Optic Cable 1
provided & pasted at the inside of the door rack

3792 7-36A 4 KNMP INST Fiber Optic Cable 1 All crossing area FO cable to be tagged.

3793 7-36A 5 KNMP INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.

3794 7-36A 6 KNMP INST Fiber Optic Cable 1 FOPP open/close to be operate properly.

All Culvert area FO cable ducts to be Fixed with


3795 7-36A 7 KNMP INST Fiber Optic Cable 1
proper Gland.

Complete Network & Block drawing for the


Telecom
Ruggedcom Switch system cabling as well as
3796 7-36A 1 KNMP INST Transmission 1
Rack & cabling within rack cabling to be provided & pasted at the
inside of the door rack.
Telecom
3797 7-36A 2 KNMP INST Transmission 1 Incomming power cabling to be tagged & labeled.
Rack & cabling

Telecom
3798 7-36A 3 KNMP INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling

Road signs and road marking to be provided as


3799 7-5C 1 FSP CIVIL Station-FSP 1
per the requirement

Rectification required for the damaged kerb stone


3800 7-5C 2 FSP CIVIL Station-FSP 1
and painting to be done.

3801 7-5C 3 FSP CIVIL Station-FSP 1 Joint sealant for the required areas to be done

Check the gate installation and provided true


3802 7-5C 4 FSP CIVIL Station-FSP 1
alignment.

Gate drop bolt arrester to be provided as per the


3803 7-5C 5 FSP CIVIL Station-FSP 1
drawing.

3804 7-5C 6 FSP CIVIL Station-FSP 1 Apply touchup paint for the gate and fence post

Lifting hook pocket for the protection slab to be


3805 7-5C 7 FSP CIVIL Station-FSP 1
cleaned and filled with appropriate material

Preparation of the top surface of the spill pit wall


3806 7-5C 8 FSP CIVIL Station-FSP 1
and cover to be provided

Rectification to be done for the damaged concrete


3807 7-5C 9 FSP CIVIL Station-FSP 1
surface and apply touch-up paint

Grouting and epoxy coating to be done for the


3808 7-5C 10 FSP CIVIL Station-FSP 1
remaining support foundations

Existing plant level and extended area level to be


3809 7-5C 11 FSP CIVIL Station-FSP 1
maintained properly.

Fence opening at pipe entry shall be re-instated


3810 7-5C 12 FSP CIVIL Station-FSP 1
properly

Remove all temporary facilities and house keeping


3811 7-5C 13 FSP CIVIL Station-FSP 1
to be done.

3812 7-31J 1 KSFGSS MECH 6'' Flare Line 1 Housekeeping to be carried out.

3813 7-31J 2 KSFGSS MECH 6'' Flare Line 1 Line identification to be done.

Touch up painting to be done for all weld joints and


3814 7-31J 3 KSFGSS MECH 6'' Flare Line 1
damaged areas of the pipe & anchor support

UV protection tape to be wrapped at exposed area


3815 7-31J 4 KSFGSS MECH 6'' Flare Line 1
of tracks crossing.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Fence rings shall be provided at pipeline/fence


3816 7-31J 5 KSFGSS MECH 6'' Flare Line 1
interface and fencing repaired.

3817 7-31J 6 KSFGSS MECH 6'' Flare Line 1 Crash barrier to be provided at culvert,

3818 7-31J 7 KSFGSS MECH 6'' Flare Line 1 CP system to be installed at track crossing.

Pig Launcher/
Reveiver and Asphalt road to be completed for outside the
3819 7-31K 1 KSFGSS CIVIL 1
outside Elect. fence area
Building
Pig Launcher/
3820 7-31K 2 KSFGSS CIVIL
Reveiver and
1
Road signs and road marking to be provided
outside Elect. as per the requirement
Building
Pig Launcher/
3821 7-31K 3 KSFGSS CIVIL
Reveiver and
1
Rectification required for the damaged kerb
outside Elect. stone and painting to be done.
Building
Pig Launcher/
Reveiver and
3822 7-31K 4 KSFGSS CIVIL
outside Elect.
1 Joint sealant for the required areas to be done
Building
Pig Launcher/
Reveiver and Grouting to be done for the remaining support
3823 7-31K 5 KSFGSS CIVIL 1
outside Elect. foundations
Building
Pig Launcher/
Reveiver and Fence opening at pipe entry shall be re-
3824 7-31K 6 KSFGSS CIVIL 1
outside Elect. instated properly
Building
Pig Launcher/
Reveiver and Backfilling up to the edge of grading,
3825 7-31K 7 KSFGSS CIVIL 1
outside Elect. compaction and proper slope to be provided
Building
Pig Launcher/
Reveiver and
3826 7-31K 8 KSFGSS CIVIL
outside Elect.
1 Gravel to be spreaded properly
Building
Pig Launcher/
Reveiver and
3827 7-31K 9 KSFGSS CIVIL
outside Elect.
1 Wind sock to be provided
Building
Pig Launcher/
3828 7-31K 10 KSFGSS CIVIL
Reveiver and
1
Epoxy coating to be done for the exposed
outside Elect. concrete surface
Building
Pig Launcher/
Reveiver and Rectification to be done for the exposed
3829 7-31K 11 KSFGSS CIVIL 1
outside Elect. concrete surface and apply touch-up paint
Building
Pig Launcher/
Reveiver and Cover to be provided for the earth pit and spill
3830 7-31K 12 KSFGSS CIVIL 1
outside Elect. pit.
Building
Pig Launcher/
3831 7-31K 13 KSFGSS MECH
Reveiver and
1
Check the gate installation and provided true
outside Elect. alignment.
Building
Pig Launcher/
Reveiver and Gate drop bolt arrester to be provided as per
3832 7-31K 14 KSFGSS CIVIL 1
outside Elect. the drawing.
Building
Pig Launcher/
Reveiver and Apply touchup paint for the gate and fence
3833 7-31K 15 KSFGSS MECH 1
outside Elect. post
Building
Pig Launcher/
Reveiver and Station name board and safety instruction board to
3834 7-31K 16 KSFGSS CIVIL 1
outside Elect. be installed
Building
Pig Launcher/
Reveiver and Assembly point to be identified and installed sign
3835 7-31K 17 KSFGSS CIVIL 1
outside Elect. boards
Building
Pig Launcher/
Reveiver and Painting to be done for the sock away pit manhole
3836 7-31K 18 KSFGSS CIVIL 1
outside Elect. cover
Building
Pig Launcher/
Reveiver and
3837 7-31K 19 KSFGSS CIVIL
outside Elect.
1 Track road and associated works shall be done.
Building
Pig Launcher/ Lifting hook pocket to be filled with appropriate
Reveiver and
3838 7-31K 20 KSFGSS CIVIL
outside Elect.
1 material and apply painting for the cable entry pit
Building and cover slab
Pig Launcher/
Reveiver and
3839 7-31K 21 KSFGSS MECH
outside Elect.
1 Car parking work to be completed
Building
Pig Launcher/
Reveiver and Removal all temporary facilities and house keeping
3840 7-31K 22 KSFGSS CIVIL 1
outside Elect. to be done.
Building

Electrical Building Provide sign plates for the rooms as per the
3841 7-31K 1 KSFGSS CIVIL 1
Inside / Outside drawings.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Electrical Building
3842 7-31K 2 KSFGSS CIVIL
Inside / Outside
1 Damaged door locks to be replaced

Electrical Building
3843 7-31K 3 KSFGSS CIVIL
Inside / Outside
1 Epoxy coating to be done for the corridor

Electrical Building Unwanted holes and opening for cables to be filled


3844 7-31K 4 KSFGSS CIVIL 1
Inside / Outside with appropriate material for the external wall

Electrical Building Rectification of the damaged surface and apply


3845 7-31K 5 KSFGSS CIVIL 1
Inside / Outside touch-up paint for the external wall

Electrical Building
3846 7-31K 6 KSFGSS CIVIL
Inside / Outside
1 Provide joint sealant for the external wall and floor

Electrical Building Cable and pipe entry to be sealed with appropriate


3847 7-31K 7 KSFGSS CIVIL 1
Inside / Outside material for telemetry, LV and air lock room.

Electrical Building Provide joint sealant for the floor of air lock room
3848 7-31K 8 KSFGSS CIVIL 1
Inside / Outside and LV room

Electrical Building Painting to be done for the floor of air lock room
3849 7-31K 9 KSFGSS CIVIL 1
Inside / Outside and LV room.

Electrical Building
3850 7-31K 10 KSFGSS CIVIL
Inside / Outside
1 Cable trench cover to be provided for the LV room

Electrical Building Alignment and functional test for the doors to be


3851 7-31K 11 KSFGSS CIVIL 1
Inside / Outside carried out.

Electrical Building
3852 7-31K 12 KSFGSS CIVIL
Inside / Outside
1 Painting to be done for the doors.

Electrical Building Rectification and painting to be done for the floor


3853 7-31K 13 KSFGSS CIVIL 1
Inside / Outside entrance portion

Electrical Building Unwanted openings on the floor of battery to be


3854 7-31K 14 KSFGSS CIVIL 1
Inside / Outside closed.

Electrical Building Unwanted holes on the wall to be filled and apply


3855 7-31K 15 KSFGSS CIVIL 1
Inside / Outside touch-up paint.

Electrical Building Proper cleaning to be done for the floor & wall tiles
3856 7-31K 16 KSFGSS CIVIL 1
Inside / Outside of battery room

Electrical Building Removal of temporary facilities and house keeping


3857 7-31K 17 KSFGSS CIVIL 1
Inside / Outside to be done for inside the building.

PIPELINE - 12'' Pipeline


3858 7-32C 1
12" N TO FSP
CIVIL
Station-N to FSP
1 Housekeeping to be carried out.

PIPELINE - 12'' Pipeline Line identification to be done and flow direction to


3859 7-32C 2 MECH 1
12" N TO FSP Station-N to FSP be marked with arrows.

PIPELINE - 12'' Pipeline Fence rings shall be provided at pipeline/fence


3860 7-32C 3 MECH 1
12" N TO FSP Station-N to FSP interface and fencing repaired.

PIPELINE - 12'' Pipeline


3861 7-32C 4
12" N TO FSP
CIVIL
Station-N to FSP
1 Required post to be installed as per drawing.

6'' Pipeline Surface preparation and epoxy coating to be done


PIPELINE - 6"
3862 7-33B 1
FNFIS
CIVIL VSTN-FNFIS to 1 for the exposed concrete surface of KM and pipe
FNFIS line identification marker foundations
6'' Pipeline
PIPELINE - 6"
3863 7-33B 2
FNFIS
CIVIL VSTN-FNFIS to 1 Track road to be prepared properly
FNFIS
6'' Pipeline Surface preparation and epoxy coating to be done
PIPELINE - 6"
3864 7-33B 3
FNFIS
CIVIL VSTN-FNFIS to 1 for the concrete surface of the support foundations
FNFIS inside the culvert TXU-001 & RXS-01
6'' Pipeline
PIPELINE - 6"
3865 7-33B 4
FNFIS
CIVIL VSTN-FNFIS to 1 Cleaning to be done inside the culvert TXU-001
FNFIS

6'' Pipeline The end of culvert mouth shall be coated and


PIPELINE - 6"
3866 7-33B 5
FNFIS
CIVIL VSTN-FNFIS to 1 covered with marine plywood of minimum
FNFIS thickness 18mm for TXU-001 & RXS-001
6'' Pipeline
PIPELINE - 6"
3867 7-33B 6
FNFIS
CIVIL VSTN-FNFIS to 1 Cleaning to be done inside the culvert RXS-001
FNFIS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

6'' Pipeline
PIPELINE - 6" Re-instatement of asphalt road to be done for the
3868 7-33B 7 CIVIL VSTN-FNFIS to 1
FNFIS culvert RXS-001
FNFIS
6'' Pipeline
PIPELINE - 6" Lifting holes on PGB near loop to be filled and
3869 7-33B 8 CIVIL VSTN-FNFIS to 1
FNFIS apply touch-up paint
FNFIS
6'' Pipeline
PIPELINE - 6" Fence opening at pipe entry shall be re-instated
3870 7-33B 9 MECH VSTN-FNFIS to 1
FNFIS properly
FNFIS
6'' Pipeline
PIPELINE - 6" Backfilling to be done for the crash barrier
3871 7-33B 10 CIVIL VSTN-FNFIS to 1
FNFIS foundation at culvert RXS-001
FNFIS

6'' Pipeline
PIPELINE - 6" Removal of unwanted materials and house
3872 7-33B 11 CIVIL VSTN-FNFIS to 1
FNFIS keeping shall be done.
FNFIS
6'' Pipeline
PIPELINE - 6"
3873 7-33C 1
FNFIS
CIVIL VSTN-FNFIS to 1 Housekeeping to be carried out.
FNFIS

6'' Pipeline
PIPELINE - 6"
3874 7-33C 2
FNFIS
MECH VSTN-FNFIS to 1 Line inentification to be done.
FNFIS

6'' Pipeline
PIPELINE - 6" Touch-up painting to be done for all weld joints and
3875 7-33C 3 MECH VSTN-FNFIS to 1
FNFIS damaged areas of the pipe & anchor.
FNFIS
4'' Pipeline Surface preparation and epoxy coating to be done
PIPELINE - 4"
3876 7-34B 1
WHTP-L
CIVIL VSTN-H&L to 1 for the exposed concrete surface of the support
Station-L foundation
4'' Pipeline
PIPELINE - 4"
3877 7-34B 2
WHTP-L
CIVIL VSTN-H&L to 1 Track road to be prepared properly
Station-L
4'' Pipeline
PIPELINE - 4" Rectification of the damaged concrete surface and
3878 7-34B 3 CIVIL VSTN-H&L to 1
WHTP-L apply touch-up paint.
Station-L
4'' Pipeline
PIPELINE - 4" Dune sand to be removed form the surroundings of
3879 7-34B 4 CIVIL VSTN-H&L to 1
WHTP-L the pipe line near existing culvert FM-32
Station-L
4'' Pipeline
PIPELINE - 4" Damaged epoxy coating to be rectified for the
3880 7-34B 5 CIVIL VSTN-H&L to 1
WHTP-L concrete surface of support foundations
Station-L

4'' Pipeline
PIPELINE - 4" Backfilling to be done properly for the support
3881 7-34B 6 CIVIL VSTN-H&L to 1
WHTP-L foundations near station-L
Station-L

4'' Pipeline
PIPELINE - 4" Removal of unwanted materials and house
3882 7-34B 7 CIVIL VSTN-H&L to 1
WHTP-L keeping shall be done.
Station-L
4'' Pipeline
PIPELINE - 4"
3883 7-34C 1
WHTP-L
CIVIL VSTN-H&L to 1 Housekeeping to be carried out.
Station-H&L
4'' Pipeline
PIPELINE - 4"
3884 7-34C 2
WHTP-L
CIVIL VSTN-H&L to 1 Line identification to be done.
Station-H&L

4'' Pipeline
PIPELINE - 4" Touch-up painting to be done for all weld joints and
3885 7-34C 3 MECH VSTN-H&L to 1
WHTP-L damaged areas of the pipe & anchor.
Station-H&L
4'' Pipeline
PIPELINE - 4"
3886 7-34C 4
WHTP-L
CIVIL VSTN-H&L to 1 Pipe is not resting on the support, to be rectified.
Station-H&L

Road signs and road marking to be provided as


3887 7-36B 1 KNMP CIVIL KNMP Station 1
per the requirement

Rectification required for the damaged kerb stone


3888 7-36B 2 KNMP CIVIL KNMP Station 1
and painting to be done.

3889 7-36B 3 KNMP CIVIL KNMP Station 1 Joint sealant for the required areas to be done

Check the gate installation and provided true


3890 7-36B 4 KNMP MECH KNMP Station 1
alignment.

Gate drop bolt arrester to be provided as per the


3891 7-36B 5 KNMP CIVIL KNMP Station 1
drawing.

3892 7-36B 6 KNMP MECH KNMP Station 1 Apply touchup paint for the gate and fence post

Backfilling up to the edge of grading, compaction


3893 7-36B 7 KNMP CIVIL KNMP Station 1
and proper slope to be provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Backfilling up to the required level, grading, proper


3894 7-36B 8 KNMP CIVIL KNMP Station 1 compaction and gravel laying shall be done for the
remaining area

Rectification to be done damaged concrete surface


3895 7-36B 9 KNMP CIVIL KNMP Station 1
and apply touch-up paint.

Grouting and epoxy coating to be done for the


3896 7-36B 10 KNMP CIVIL KNMP Station 1
remaining support foundations

3897 7-36B 11 KNMP MECH KNMP Station 1 Wind sock to be provided

Existing fence to be removed after getting approval


3898 7-36B 12 KNMP CIVIL KNMP Station 1
from the asset holder.

Access road from the station gate and track road to


3899 7-36B 13 KNMP CIVIL KNMP Station 1
be completed.

Shoulder to be provided for the asphalt road and


3900 7-36B 14 KNMP CIVIL KNMP Station 1
track road

Crane access area to be prepared as per the


3901 7-36B 15 KNMP CIVIL KNMP Station 1
drawing.

Fence opening at pipe entry shall be re-instated


3902 7-36B 16 KNMP MECH KNMP Station 1
properly

Removal of temporary facilities and house keeping


3903 7-36B 17 KNMP CIVIL KNMP Station 1
to be done.

4'' Pipeline
PIPELINE - 4'' Epoxy coating to be done for the installed pipe
3904 7-37A 1 CIVIL VSTN-FNDS to 1
FNDS sleepers near FNDS
Station-FNDS
4'' Pipeline Bitumen coating, backfilling and proper compaction
PIPELINE - 4''
3905 7-37A 2
FNDS
CIVIL VSTN-FNDS to 1 to be done for the pipe sleepers wherever resting
Station-FNDS in the ditches
4'' Pipeline Surface preparation and epoxy coating to be done
PIPELINE - 4''
3906 7-37A 3
FNDS
CIVIL VSTN-FNDS to 1 for the exposed concrete surface of the pipe
Station-FNDS support foundations
4'' Pipeline
PIPELINE - 4'' Re-instatement of asphalt road, kerb stone and
3907 7-37A 4 CIVIL VSTN-FNDS to 1
FNDS crash barrier to be done for culvert RXS-001
Station-FNDS

4'' Pipeline The end of culvert mouth shall be coated and


PIPELINE - 4''
3908 7-37A 5
FNDS
CIVIL VSTN-FNDS to 1 covered with marine plywood of minimum
Station-FNDS thickness 18mm for RXS-001
4'' Pipeline
PIPELINE - 4'' Pipe entry area at culvert RXS-001 both sides to
3909 7-37A 6 CIVIL VSTN-FNDS to 1
FNDS be prepared properly
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Pipe is not resting properly on the pipe support to
3910 7-37A 7 CIVIL VSTN-FNDS to 1
FNDS be rectified for inside culvert RXS-001
Station-FNDS

4'' Pipeline
PIPELINE - 4'' Pipe is not resting properly on the pipe sleeper to
3911 7-37A 8 CIVIL VSTN-FNDS to 1
FNDS be rectified near existing culvert FN-02
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Damaged paint on installed pipe supports to be
3912 7-37A 9 CIVIL VSTN-FNDS to 1
FNDS rectified
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Pipe sleepers to be aligned to the centre of the
3913 7-37A 10 CIVIL VSTN-FNDS to 1
FNDS pipe line for inside the existing culvert.
Station-FNDS

4'' Pipeline
PIPELINE - 4'' Track road from TXU-001 to Valve station-FNDS to
3914 7-37A 11 CIVIL VSTN-FNDS to 1
FNDS be completed
Station-FNDS

4'' Pipeline
PIPELINE - 4'' Pipe line identification marker and KM marker to be
3915 7-37A 12 CIVIL VSTN-FNDS to 1
FNDS installed
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Removal of unwanted materials and house
3916 7-37A 13 CIVIL VSTN-FNDS to 1
FNDS keeping shall be done.
Station-FNDS

Grouting to be done for the remaining support


3917 7-38A 1 FMDS CIVIL Station-FMDS 1
foundations

Surface preparation and epoxy coating to be done


3918 7-38A 2 FMDS CIVIL Station-FMDS 1
for the exposed concrete surface.

Apply touchup paint for the emergency gate and


3919 7-38A 3 FMDS CIVIL Station-FMDS 1
fence post
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Backfilling and compaction to be done for the cable


3920 7-38A 4 FMDS CIVIL Station-FMDS 1
trench, fence post and support foundation

3921 7-38A 5 FMDS MECH Station-FMDS 1 Wind sock to be provided

Backfilling up to the required level, grading, proper


3922 7-38A 6 FMDS CIVIL Station-FMDS 1 compaction and gravel laying shall be done for the
remaining area

Fasten and tighten all loose barbed wire and fence


3923 7-38A 7 FMDS CIVIL Station-FMDS 1
wire

Backfilling, leveling and proper compaction shall be


3924 7-38A 8 FMDS CIVIL Station-FMDS 1
done for outside the fence area

Existing fence to be removed after getting approval


3925 7-38A 9 FMDS CIVIL Station-FMDS 1
for the asset holder.

Fence opening at pipe entry shall be re-instated


3926 7-38A 10 FMDS MECH Station-FMDS 1
properly

3927 7-38A 11 FMDS CIVIL Station-FMDS 1 Existing crash barrier to be re-instated.

Removal all temporary facilities and house keeping


3928 7-38A 12 FMDS CIVIL Station-FMDS 1
to be done.

4'' Pipeline
PIPELINE - 4'' 4'' SFG Pipeline welding joint blasting & painting to
3929 7-39A 1 MECH Khuff-A to SFG 1
WHTP-A be carried out in all locations
mainfold
4'' Pipeline
PIPELINE - 4'' Pipeline color coding & number stenciling to be
3930 7-39A 2 MECH Khuff-A to SFG 1
WHTP-A carried out in all locations
mainfold
4'' Pipeline
PIPELINE - 4''
3931 7-39A 3
WHTP-A
MECH Khuff-A to SFG 1 Provide pipe support gates as supports
mainfold
4'' Pipeline
PIPELINE - 4'' All SFG pipeline culverts to be closed with wooden
3932 7-39A 4 CIVIL Khuff-A to SFG 1
WHTP-A boards.
mainfold

4'' Pipeline
PIPELINE - 4''
3933 7-39A 5
WHTP-A
CIVIL Khuff-A to SFG 1 All pipeline support need to align properly
mainfold

4'' Pipeline
PIPELINE - 4''
3934 7-39A 6
WHTP-A
CIVIL Khuff-A to SFG 1 All SFG culverts need to be cleaned
mainfold
4'' Pipeline
PIPELINE - 4''
3935 7-39A 7
WHTP-A
CIVIL Khuff-A to SFG 1 Crash barriers to be provided for loops
mainfold
4'' Pipeline
PIPELINE - 4'' Pipeline cross over line support, guide to be
3936 7-39A 8 MECH Khuff-A to SFG 1
WHTP-A provided
mainfold

4'' Pipeline
PIPELINE - 4'' 4'' SFG from tie in from KN header, under line to be
3937 7-39A 9 MECH Khuff-A to SFG 1
WHTP-A wrapped properly.
mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG Sand to be removed under Khuff-B culvert stone
3938 7-40A 1 CIVIL 1
WHTP-B valve station to pitching to be carried out. Need barrier.
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG Pipeline color coding & number stenciling to be
3939 7-40A 2 MECH 1
WHTP-B valve station to carried out near plant inlet & culverts
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3940 7-40A 3
WHTP-B
MECH
valve station to
1 Provide pipe support gates at supports
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG All SFG pipeline culverts to be closed with wooden
3941 7-40A 4 CIVIL 1
WHTP-B valve station to boards.
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3942 7-40A 5
WHTP-B
CIVIL
valve station to
1 All pipeline support need to align properly
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3943 7-40A 6
WHTP-B
MECH
valve station to
1 All SFG culverts need to be cleaned
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3944 7-40A 7
WHTP-B
CIVIL
valve station to
1 Crash barrier to be provided for loops
SFG mainfold
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

4'' Pipeline
PIPELINE - 4'' Khuff-B SFG Pipeline cross over line support, guide to be
3945 7-40A 8 MECH 1
WHTP-B valve station to provided.
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG 4'' SFG Pipeline welding joint blasting & painting to
3946 7-40A 9 MECH 1
WHTP-B valve station to be carried out in all locations
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3947 7-40A 10
WHTP-B
CIVIL
valve station to
1 Housekeeping to be carried out.
SFG mainfold
4'' Pipeline
PIPELINE - 4''
3948 7-41A 1
WHTP-C
CIVIL KSFGSS valve 1 Provide concrete cover for culvert near to road
station to Khuff-C

4'' Pipeline
PIPELINE - 4''
3949 7-41A 2
WHTP-C
CIVIL KSFGSS valve 1 Heavy duty safety barrier to be provided
station to Khuff-C
4'' Pipeline
PIPELINE - 4'' Pipeline color coding & number stenciling to be
3950 7-41A 3 MECH KSFGSS valve 1
WHTP-C carried out near plant inlet & culverts
station to Khuff-C

4'' Pipeline
PIPELINE - 4''
3951 7-41A 4
WHTP-C
MECH KSFGSS valve 1 Provide pipeline support gates at supports
station to Khuff-C

4'' Pipeline
PIPELINE - 4''
3952 7-41A 5
WHTP-C
CIVIL KSFGSS valve 1 Anchor support grouting not completed
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3953 7-41A 6
WHTP-C
MECH KSFGSS valve 1 Wrapping damage near truck road crossing.
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3954 7-41A 7
WHTP-C
CIVIL KSFGSS valve 1 Safety barriers to be provided at truck road cross
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3955 7-41A 8
WHTP-C
MECH KSFGSS valve 1 All pipeline support need to align properly
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3956 7-41A 9
WHTP-C
CIVIL KSFGSS valve 1 Crash barriers to be provided for loops
station to Khuff-C
4'' Pipeline
PIPELINE - 4'' Pipeline cross over line support, guide to be
3957 7-41A 10 MECH KSFGSS valve 1
WHTP-C provided
station to Khuff-C

4'' Pipeline
PIPELINE - 4'' 4'' SFG Pipeline welding joint blasting & painting to
3958 7-41A 11 MECH KSFGSS valve 1
WHTP-C be carried out in all locations
station to Khuff-C

4'' Pipeline
PIPELINE - 4''
3959 7-41A 12
WHTP-C
MECH KSFGSS valve 1 Fence net touching at pipeline exit.
station to Khuff-C
4'' Pipeline Valve
PIPELINE - 4''
3960 7-39B 1.01
WHTP-A
MECH station Khuff-A to 1 Apply touch up paint on pipes and supports
Khuff-A
4'' Pipeline Valve
PIPELINE - 4''
3961 7-39B 1.02
WHTP-A
CIVIL station Khuff-A to 1 Provide additional concrete support near the culvert
Khuff-A

4'' Pipeline Valve


PIPELINE - 4'' ROW as per AFC and SOW to be
3962 7-39B 1.03 CIVIL station Khuff-A to 1
WHTP-A reinstated/completed
Khuff-A
4'' Pipeline Valve
PIPELINE - 4''
3963 7-39B 1.04
WHTP-A
CIVIL station Khuff-A to 1 Crash barriers to be provided for loop.
Khuff-A
4'' Pipeline Valve
PIPELINE - 4'' Fix and provide leveled and stabled pipe sleepers
3964 7-39B 1.05 CIVIL station Khuff-A to 1
WHTP-A at the loop.
Khuff-A

4'' Pipeline Valve


PIPELINE - 4''
3965 7-39B 1.06
WHTP-A
CIVIL station Khuff-A to 1 Kilometer markers work to be completed.
Khuff-A

4'' Pipeline Valve


PIPELINE - 4'' Extend pipe wrapping at least 1.00 meter behind
3966 7-39B 1.07 MECH station Khuff-A to 1
WHTP-A from the ground.
Khuff-A
4'' Pipeline Valve
PIPELINE - 4''
3967 7-39B 1.08
WHTP-A
MECH station Khuff-A to 1 Rectify the chainlink fence collar plate apertures.
Khuff-A
4'' Pipeline Valve
PIPELINE - 4'' Check and rectify the pipe supports inside culvert
3968 7-39B 1.09 MECH station Khuff-A to 1
WHTP-A as per standard.
Khuff-A

4'' Pipeline Valve


PIPELINE - 4''
3969 7-39B 1.10
WHTP-A
CIVIL station Khuff-A to 1 Housekeeping inside culvert to be done.
Khuff-A
4'' Pipeline Valve
PIPELINE - 4'' Debris and other excess construction materials to
3970 7-39B 1.11 CIVIL station Khuff-A to 1
WHTP-A be removed from site.
Khuff-A
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

4'' Pipeline Valve


PIPELINE - 4''
3971 7-40B 2.01
WHTP-B
MECH station Khuff-B 1 Apply touch up paint on pipes and supports
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4'' Check the pipe sleepers and PGB (Pipe guide
3972 7-40B 2.02 CIVIL station Khuff-B 1
WHTP-B before bends) and provide alignment.
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4'' Fix and provide leveled and stabled pipe sleepers
3973 7-40B 2.03 CIVIL station Khuff-B 1
WHTP-B at the loop.
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4''
3974 7-40B 2.04
WHTP-B
CIVIL station Khuff-B 1 Sand removal inside and outside culvert to be done.
to Khuff-B

4'' Pipeline Valve


PIPELINE - 4'' Slopes outside culvert to be protected with stone
3975 7-40B 2.05 CIVIL station Khuff-B 1
WHTP-B pitching.
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4'' Prevent any erosion and failing debris from head
3976 7-40B 2.06 CIVIL station Khuff-B 1
WHTP-B and wings of new culvert.
to Khuff-B

4'' Pipeline Valve


PIPELINE - 4''
3977 7-40B 2.07
WHTP-B
CIVIL station Khuff-B 1 Apply touch up paint inside new culvert.
to Khuff-B

4'' Pipeline Valve


PIPELINE - 4'' Plywood covers for new culvert's both ends to be
3978 7-40B 2.08 CIVIL station Khuff-B 1
WHTP-B provided.
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4'' ROW as per AFC and SOW to be
3979 7-40B 2.09 CIVIL station Khuff-B 1
WHTP-B reinstated/completed
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4'' All concrete plinths to be exposed and coated with
3980 7-40B 2.10 CIVIL station Khuff-B 1
WHTP-B epoxy paint.
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4''
3981 7-40B 2.11
WHTP-B
MECH station Khuff-B 1 Rectify the chainlink fence collar plate apertures.
to Khuff-B
4'' Pipeline Valve
PIPELINE - 4'' Debris and other excess construction materials to
3982 7-40B 2.12 CIVIL station Khuff-B 1
WHTP-B be removed from site.
to Khuff-B
4'' Pipeline
PIPELINE - 4'' All old and new buried pipes (S) across by the
3983 7-41B 3.01 CIVIL KSFGSS to 1
WHTP-C ROW to be protected.
Khuff-C

4'' Pipeline
PIPELINE - 4'' New culverts including crash barriers to be
3984 7-41B 3.02 CIVIL KSFGSS to 1
WHTP-C completed.
Khuff-C

4'' Pipeline
PIPELINE - 4'' All concrete plinths to be exposed and coated with
3985 7-41B 3.03 CIVIL KSFGSS to 1
WHTP-C epoxy paint.
Khuff-C
4'' Pipeline
PIPELINE - 4''
3986 7-41B 3.04
WHTP-C
MECH KSFGSS to 1 Apply touch up paint on pipes and supports
Khuff-C
4'' Pipeline
PIPELINE - 4'' Reinstate/reposition any disturbed existing pipe
3987 7-41B 3.05 CIVIL KSFGSS to 1
WHTP-C supports.
Khuff-C

4'' Pipeline
PIPELINE - 4'' Slopes outside culvert to be protected with stone
3988 7-41B 3.06 CIVIL KSFGSS to 1
WHTP-C pitching.
Khuff-C
4'' Pipeline
PIPELINE - 4'' ROW as per AFC and SOW to be
3989 7-41B 3.07 CIVIL KSFGSS to 1
WHTP-C reinstated/completed
Khuff-C
4'' Pipeline
PIPELINE - 4'' Extend pipe wrapping at least 1.00 meter behind
3990 7-41B 3.08 MECH KSFGSS to 1
WHTP-C from the ground.
Khuff-C

4'' Pipeline
PIPELINE - 4'' Provide stone pitching before and after new ROW's
3991 7-41B 3.09 CIVIL KSFGSS to 1
WHTP-C crossing wherever necessary.
Khuff-C

4'' Pipeline
PIPELINE - 4''
3992 7-41B 3.10
WHTP-C
CIVIL KSFGSS to 1 Marker poles work to be completed.
Khuff-C
4'' Pipeline
PIPELINE - 4''
3993 7-41B 3.11
WHTP-C
MECH KSFGSS to 1 Rectify the chainlink fence collar plate apertures.
Khuff-C
4'' Pipeline
PIPELINE - 4'' Debris and other excess construction materials to
3994 7-41B 3.12 CIVIL KSFGSS to 1
WHTP-C be removed from site.
Khuff-C

3995 7-5D 1 FSP INST ALL 1 All instruments to be tagged properly

Wire termination in all JB's should be crimped and


3996 7-5D 2 FSP INST ALL 1
tightened properly.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Rusty bolts and washers for both FDI's, XL-0531


3997 7-5D 3 FSP INST ALL 1
and for cable trays to be replaced.

3998 7-5D 4 FSP INST ALL 1 All cables to be tagged with SS plate.

3999 7-5D 5 FSP INST ALL 1 Wire ferrule to be corrected for FT-0057

Proper sun shed to be installed for ultra sonic flow


4000 7-5D 6 FSP INST ALL 1
meter to be protect from direct sun radiation.

4001 7-5D 7 FSP INST ALL 1 PT-0057 impulse tubing to be supported.

4002 7-5D 8 FSP INST ALL 1 SRV-1112 vent to be routed to safe direction.

Loop check and functional check to be done at


4003 7-5D 9 FSP INST ALL 2
FSP, Scada and DIC at WHTP-B&D

4004 7-5D 10 FSP INST ALL 1 FDI-29-0016 Spare cable entry to be plugged

SDV-1112 & 0087 air tubing from volume tank to be


4005 7-5D 11 FSP INST ALL 1
supported with cable tray.

FP-0145 A/B/C stanchion to be shifted close to


4006 7-5D 12 FSP INST ALL 1
impulse tapping point for proper tubing work.

All weep holes are to be plugged with approved


4007 7-5E 1 FSP MECH ALL 1
sealent material

Bare material used for support shall be painted


4008 7-5E 2 FSP MECH ALL 1
properly.

4009 7-5E 3 FSP MECH ALL 1 By pass spool to be installed

4010 7-5E 4 FSP MECH ALL 1 Double nuts are to provided in all supports

All spectacle blinds shall be painted as per QP


4011 7-5E 5 FSP MECH ALL 1
specification.

4012 7-5E 6 FSP INST ALL 1 Pig signaller is to be functional tested

Pipeline identification board to be provided in


4013 7-5E 7 FSP MECH ALL 1
inside/outside of the fence.

Painting & stenciling shall be done and certified by


4014 7-5E 8 FSP MECH ALL 1
QP-QAC.

4015 7-5E 9 FSP MECH ALL 1 Drain pit is to be cleaned.

Bolts on 14'' existing valve is not properly installed.


4016 7-5E 10 FSP MECH ALL 1
To be corrected.

Area around the 24'' tie-in is need to be properly


4017 7-5E 11 FSP CIVIL ALL 1
graded and restored.

24'' existing pipeline is to be demolished and blind


4018 7-5E 12 FSP MECH ALL 1
shall be installed.

4019 7-5E 13 FSP MECH ALL 1 All valve tags are to be provided in SS material

All missing valve handles shall be installed and


4020 7-5E 14 FSP MECH ALL 1
painted.

4021 7-5E 15 FSP MECH ALL 1 Tie-ins are to be done

Safety chain or bar are to be installed in ladders of


4022 7-5E 16 FSP MECH ALL 1
all valve operating platforms to avoid trip & fall.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

All hydrotest records shall be shown to


4023 7-5E 17 FSP MECH ALL 2
substantiate the complete system.

All test packs 'B' punch items shall be cleared &


4024 7-5E 18 FSP MECH ALL 1
singed off by QP

4025 7-5E 19 FSP MECH ALL 1 Unwanted support to be removed.

Corrosion fittings shall be installed in the presence


4026 7-5E 20 FSP MECH ALL 1
of QP prior to commissioning.

Spacer/spade identification as per QP standard


4027 7-5E 21 FSP MECH ALL 1
shall be done.

Safety chain or bar are to be installed in ladders of


4028 7-5E 22 FSP MECH ALL 1
all valve operating platforms to avoid trip & fall.

Interlock facility for pig traps shall be provided as


4029 7-5E 23 FSP MECH ALL 1
per QP standard.

Support (black material) installed for by pass line at


4030 7-5E 24 FSP MECH ALL 1
14'' SAG line shall be removed.

4031 7-5E 25 FSP MECH ALL 1 All reinstatement works shall be done.

Line not installed as per AFC near 6'' SFG tie-in


4032 7-5E 26 FSP MECH ALL 1
(inside)

Insulation kit is to be provided wherever SS & CS


4033 7-5E 27 FSP MECH ALL 1
connection exists.

Piping works shall be dried & nitrogen purged as


4034 7-5E 28 FSP MECH ALL 1
per project specifications.

All flanges shall be applied molycoat, tightened


4035 7-5E 29 FSP MECH ALL 1 with proper torque and reports shall be provided to
QP.

House keeping shall be done (to checked prior to


4036 7-5E 30 FSP MECH ALL 1
commissioning)

Redline mark-up drawings shall be submitted after


4037 7-5E 31 FSP MECH ALL 1
commissioning for QP approval

Personnel protective insulation is to be installed as


4038 7-5E 32 FSP MECH ALL 1
per P&ID

4039 7-5E 33 FSP MECH ALL 1 SRV alignment is to be proved

4040 7-5E 34 FSP MECH ALL 1 IA line is not vertically aligned.

Demolished materials shall be returned to QP


4041 7-5E 35 FSP MECH ALL 1
designated store.

Neoprene rubber sheets under the U-clamps are


4042 7-5E 36 FSP MECH ALL 1 found damaged and worn-out. Need to be replaced
suitably.

4043 7-5E 37 FSP MECH ALL 1 Air tank is not installed as per AFC GA for SDV

4044 7-38B 1 FMDS CIVIL ALL 1 Existing support foundation shall be removed

4045 7-38B 2 FMDS MECH ALL 1 Additional support needed for 2'' vent line.

4046 7-38B 3 FMDS MECH ALL 1 Spec blind shall be installed at T-07A

4047 7-38B 4 FMDS MECH ALL 1 Double nuts are to provided in all supports

All spectacle blinds shall be painted as per QP


4048 7-38B 5 FMDS MECH ALL 1
specification.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

4049 7-38B 6 FMDS INST ALL 1 Pig singaller is to be functional tested

Pipeline identification board to be provided in


4050 7-38B 7 FMDS MECH ALL 1
inside / outside of the fence.

Painting & stenciling shall be done and certified by


4051 7-38B 8 FMDS MECH ALL 1
QP-QAC

4052 7-38B 9 FMDS MECH ALL 1 All valve tags are to be provided in SS material

All missing valve handles shall be installed and


4053 7-38B 10 FMDS MECH ALL 1
painted.

4054 7-38B 11 FMDS MECH ALL 1 Tie-ins are to be done.

All hydrotest records shall be shown to


4055 7-38B 12 FMDS MECH ALL 1
substantiate the complete system.

Damage civil foundation (inside FMDS) shall be


4056 7-38B 13 FMDS CIVIL ALL 1
repaired & painted.

All test packs 'B' punch items shall be cleared and


4057 7-38B 14 FMDS MECH ALL 1
signed by QP.

Spacer/spade identification as per QP standard


4058 7-38B 15 FMDS MECH ALL 1
shall be done.

4059 7-38B 16 FMDS MECH ALL 1 Air tank is not installed as per AFC GA for SDV

4060 7-38B 17 FMDS MECH ALL 1 All reinstatement works shall be done.

Piping works shall be dried & nitrogen purged as


4061 7-38B 18 FMDS MECH ALL 2
per project specifications.

All flanges shall be applied molycoat, tightened


4062 7-38B 19 FMDS MECH ALL 1 with proper torque and reports shall be provided to
QP.

House keeping shall be done (to checked prior to


4063 7-38B 20 FMDS MECH ALL 1
commissioning)

Redline mark-up drawings shall be submitted after


4064 7-38B 21 FMDS MECH ALL 1
commissioning for QP approval

Personnel protective insulation is to be installed as


4065 7-38B 22 FMDS MECH ALL 1
per P&ID

Neoprene rubber sheets under the U-clamps are


4066 7-38B 23 FMDS MECH ALL 1 found damaged and worn-out. Need to be replaced
suitably.

Supports not installed for flare vent line (Inside


4067 7-38B 24 FMDS MECH ALL 1
FMDS)

VAL STN 2- VAL STN 2-


4068 7-9C1 1
FMDS
MECH
FMDS
1 Housekeeping to be carried out.

VAL STN 2- VAL STN 2- Line identification to be done and flow direction to
4069 7-9C1 2 MECH 1
FMDS FMDS be marked with arrows.

VAL STN 2- VAL STN 2- Fence rings shall be provided at pipeline/fence


4070 7-9C1 3 MECH 1
FMDS FMDS interface and fencing repaired.

VAL STN 1- VAL STN 1-


4071 7-9E 1
FMDS
MECH
FMDS
1 Housekeeping to be carried out.

VAL STN 1- VAL STN 1- Line identification to be done and flow direction
4072 7-9E 2 MECH 1
FMDS FMDS to be marked with arrows.

VAL STN 1- VAL STN 1- Touch up painting to be done for all weld joints and
4073 7-9E 3 MECH 1
FMDS FMDS damaged areas of the pipe & anchor support

VAL STN 1- VAL STN 1- 2" By pass line installation to be done as per AFC
4074 7-9E 4 MECH 1
FMDS FMDS drawing.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE -
PIPELINE- 36'' Pipeline identification board to be provided in
4075 7-35B 1 36" STN U TO CIVIL 1
STN U TO N inside / outside of the fence..
N
PIPELINE -
PIPELINE- 36''
4076 7-35B 2 36" STN U TO ELEC
STN U TO N
2 CP installation shall be completed
N
PIPELINE -
PIPELINE- 36''
4077 7-35B 3 36" STN U TO CIVIL
STN U TO N
1 ROW shall be done as per AFC
N

Separate sign boards to be installed at the entry


PIPELINE -
PIPELINE- 36'' point to the ROW from the main road cautioning
4078 7-35B 4 36" STN U TO CIVIL 1
STN U TO N the private vehicles that the road usage is
N
restricted only to QP and authorized vehicles.

PIPELINE -
PIPELINE- 36''
4079 7-35B 5 36" STN U TO MECH
STN U TO N
2 Location identification markers shall be installed
N
PIPELINE -
PIPELINE- 36''
4080 7-35B 6 36" STN U TO CIVIL
STN U TO N
1 Final bund/ berm shall be completed as per AFC
N
PIPELINE -
PIPELINE- 36'' Pig traps shall be checked for alignment as per
4081 7-35B 7 36" STN U TO MECH 1
STN U TO N drawing
N
PIPELINE -
PIPELINE- 36''
4082 7-35B 8 36" STN U TO MECH
STN U TO N
1 2" bypass line to be installed
N
PIPELINE -
PIPELINE- 36''
4083 7-35B 9 36" STN U TO MECH
STN U TO N
1 Tray for spacer/ spades shall be provided
N
PIPELINE -
PIPELINE- 36'' Old wind sock pole exists near to the jib crane shall
4084 7-35B 10 36" STN U TO CIVIL 1
STN U TO N be removed
N

PIPELINE -
PIPELINE- 36'' Kilometer markers and crossing markers shall be
4085 7-35B 11 36" STN U TO CIVIL 1
STN U TO N installed as per requirement.
N

PIPELINE -
PIPELINE- 36'' The bolts on ESDV flange are shorter than the
4086 7-35B 12 36" STN U TO MECH 1
STN U TO N requirement. Need to be replaced.
N
PIPELINE -
PIPELINE- 36'' All test packs 'B' punch items shall be cleared &
4087 7-35B 13 36" STN U TO MECH 1
STN U TO N signed off by QP
N

PIPELINE -
PIPELINE- 36'' Housekeeping shall be done throughout the
4088 7-35B 14 36" STN U TO CIVIL 1
STN U TO N pipeline ROW
N
PIPELINE -
PIPELINE- 36'' Interlock facility for pig traps shall be provided as
4089 7-35B 15 36" STN U TO MECH 2
STN U TO N per QP standard
N
PIPELINE -
PIPELINE- 36''
4090 7-35B 16 36" STN U TO MECH
STN U TO N
1 Pig trolley stopper to be installed
N
PIPELINE -
PIPELINE- 36'' Extended thread lengths protruding out of nuts
4091 7-35B 17 36" STN U TO MECH 1
STN U TO N shall be protected as per QP standard.
N
PIPELINE -
PIPELINE- 36'' All bolts shall be applied molicoat, tensioned and
4092 7-35B 18 36" STN U TO MECH 1
STN U TO N reports shall be submitted to QP
N

PIPELINE -
PIPELINE- 36''
4093 7-35B 19 36" STN U TO MECH
STN U TO N
1 Redline mark-up drawings shall be submitted
N
PIPELINE- 4''
PIPELINE - 4''
4094 7-37B 1
FNDS
CIVIL VSTN FNLGCS 1 Housekeeping to be carried out.
to FNDS

PIPELINE- 4''
PIPELINE - 4'' Line identification to be done and flow direction to
4095 7-37B 2 MECH VSTN FNLGCS 1
FNDS be marked with arrows.
to FNDS
PIPELINE- 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4096 7-37B 3 MECH VSTN FNLGCS 1
FNDS damaged areas of the pipe &anchor support.
to FNDS
PIPELINE- 12''
PIPELINE -
4097 7-42A 1
12'' KNMP
CIVIL VSTN KNMP to 1 Housekeeping to be carried out.
KNMP

PIPELINE- 12''
PIPELINE - Line identification to be done and flow direction to
4098 7-42A 2 MECH VSTN KNMP to 1
12'' KNMP be marked with arrows.
KNMP

PIPELINE- 12''
PIPELINE - Fence rings shall be provided at pipeline/fence
4099 7-42A 3 MECH VSTN KNMP to 1
12'' KNMP interface and fencing repaired.
KNMP
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE- 12''
PIPELINE -
4100 7-42A 4
12'' KNMP
CIVIL VSTN KNMP to 1 ROW to be done as per AFC drawing.
KNMP
PIPELINE- 12''
PIPELINE - Edges of the angle plates of guide supports are
4101 7-42A 5 MECH VSTN KNMP to 1
12'' KNMP rubbiig the pipe line to be rectified.
KNMP
PIPELINE- 12''
PIPELINE - Touch up painting to be done for all weld joints and
4102 7-42A 6 MECH VSTN KNMP to 1
12'' KNMP damaged areas of the pipe & anchor support.
KNMP
PIPELINE- 12''
PIPELINE -
4103 7-43A 1
12'' FNLGCS
CIVIL VSTN FNLGCS 1 Housekeeping to be carried out.
TO FNLGCS

PIPELINE- 12''
PIPELINE - Line identification to be done and flow direction to
4104 7-43A 2 MECH VSTN FNLGCS 1
12'' FNLGCS be marked with arrows.
TO FNLGCS
PIPELINE- 12''
PIPELINE - Edges of the angle plates of guide supports are
4105 7-43A 3 MECH VSTN FNLGCS 1
12'' FNLGCS rubbing the pipe line to be rectified.
TO FNLGCS

PIPELINE-4''
PIPELINE - 4''
4106 7-44A 1
WHTP-G
CIVIL VSTN E&G to 1 Housekeeping to be carried out.
KHUFF-G

PIPELINE-4''
PIPELINE - 4'' Line identification to be done and flow direction to
4107 7-44A 2 MECH VSTN E&G to 1
WHTP-G be marked with arrows.
KHUFF-G
PIPELINE-4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4108 7-44A 3 MECH VSTN E&G to 1
WHTP-G damaged areas of the pipe & anchor support
KHUFF-G
PIPELINE-6''
PIPELINE - 6''
4109 7-45A 1
FSDS
CIVIL VSTN FSDS to 1 Housekeeping to be carried out.
FSDS
PIPELINE-6''
PIPELINE - 6''
4110 7-45A 2
FSDS
MECH VSTN FSDS to 1 Line identification to be done.
FSDS
PIPELINE-6''
PIPELINE - 6'' Touch up painting to be done for all weld joints and
4111 7-45A 3 MECH VSTN FSDS to 1
FSDS damaged areas of the pipe & anchor support
FSDS
PIPELINE-6''
PIPELINE - 6''
4112 7-45A 4
FSDS
CIVIL VSTN FSDS to 1 ROW to be done as per AFC drawing.
FSDS

PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4113 7-7B 1 MECH VSTN-WHTP-D 1
WHTP-D inside / outside of the fence..
to WHTP-D

PIPELINE - 4''
PIPELINE - 4''
4114 7-7B 2
WHTP-D
ELEC VSTN-WHTP-D 1 CP installation shall be completed
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4115 7-7B 3
WHTP-D
CIVIL VSTN-WHTP-D 1 ROW shall be done as per AFC
to WHTP-D

Separate sign boards to be installed at the entry


PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4116 7-7B 4 CIVIL VSTN-WHTP-D 1
WHTP-D the private vehicles that the road usage is
to WHTP-D
restricted only to QP and authorized vehicles.

PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4117 7-7B 5 MECH VSTN-WHTP-D 1
WHTP-D signed off by QP
to WHTP-D

PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4118 7-7B 6 MECH VSTN-WHTP-D 1
WHTP-D pipeline ROW
to WHTP-D

PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4119 7-7B 7 MECH VSTN-WHTP-D 1
WHTP-D QP-QAC.
to WHTP-D
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4120 7-7B 8 MECH VSTN-WHTP-D 1
WHTP-D inlet & outlet
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4121 7-7B 9
WHTP-D
CIVIL VSTN-WHTP-D 1 All supports shall be checked for proper seating
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4122 7-7B 10
WHTP-D
MECH VSTN-WHTP-D 1 All crossings shall be reinstated properly
to WHTP-D

PIPELINE - 4'' Sufficient overlapping shall be done for wrapping


PIPELINE - 4''
4123 7-7B 11
WHTP-D
MECH VSTN-WHTP-D 1 for road crossings section transition areas (UG/AG
to WHTP-D intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4124 7-7B 12 MECH VSTN-WHTP-D 1
WHTP-D shall be done
to WHTP-D
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4''
4125 7-7B 13
WHTP-D
MECH VSTN-WHTP-D 1 Redline mark-up drawings shall be submitted
to WHTP-D
PIPELINE - 6''
PIPELINE - 6" Pipeline identification board to be provided in
4126 7-33D 1 MECH VSTN-FNFIS 1
FNFIS inside / outside of the fence..
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4127 7-33D 2
FNFIS
ELEC VSTN-FNFIS 1 CP installation shall be completed
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4128 7-33D 3
FNFIS
CIVIL VSTN-FNFIS 1 ROW shall be done as per AFC
to FNFIS
Separate sign boards to be installed at the entry
PIPELINE - 6''
PIPELINE - 6" point to the ROW from the main road cautioning
4129 7-33D 4 CIVIL VSTN-FNFIS 1
FNFIS the private vehicles that the road usage is
to FNFIS
restricted only to QP and authorized vehicles.
PIPELINE - 6''
PIPELINE - 6" All test packs 'B' punch items shall be cleared &
4130 7-33D 5 MECH VSTN-FNFIS 1
FNFIS signed off by QP
to FNFIS

PIPELINE - 6''
PIPELINE - 6" Housekeeping shall be done throughout the
4131 7-33D 6 CIVIL VSTN-FNFIS 1
FNFIS pipeline ROW
to FNFIS

PIPELINE - 6''
PIPELINE - 6" Painting & stenciling shall be done and certified by
4132 7-33D 7 MECH VSTN-FNFIS 1
FNFIS QP-QAC.
to FNFIS
PIPELINE - 6''
PIPELINE - 6" Stenciling shall be done in all crossings / culverts
4133 7-33D 8 MECH VSTN-FNFIS 1
FNFIS inlet & outlet
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4134 7-33D 9
FNFIS
CIVIL VSTN-FNFIS 1 All supports shall be checked for proper seating
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4135 7-33D 10
FNFIS
CIVIL VSTN-FNFIS 1 All crossings shall be reinstated properly
to FNFIS
PIPELINE - 6'' Sufficient overlapping shall be done for wrapping
PIPELINE - 6"
4136 7-33D 11
FNFIS
MECH VSTN-FNFIS 1 for road crossings section transition areas (UG/AG
to FNFIS intersection)
PIPELINE - 6''
PIPELINE - 6" Spacer/ spade identification as per QP standard
4137 7-33D 12 MECH VSTN-FNFIS 1
FNFIS shall be done
to FNFIS

PIPELINE - 6''
PIPELINE - 6"
4138 7-33D 13
FNFIS
MECH VSTN-FNFIS 1 Redline mark-up drawings shall be submitted
to FNFIS

PIPELINE - 4''
PIPELINE - 4" Pipeline identification board to be provided in
4139 7-34D 1 MECH VSTN-WHTP 1
WHTP-L inside / outside of the fence..
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4140 7-34D 2
WHTP-L
ELEC VSTN-WHTP 1 CP installation shall be completed
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4141 7-34D 3
WHTP-L
CIVIL VSTN-WHTP 1 ROW shall be done as per AFC
H&L to WHTP-L
Separate sign boards to be installed at the entry
PIPELINE - 4''
PIPELINE - 4" point to the ROW from the main road cautioning
4142 7-34D 4 CIVIL VSTN-WHTP 1
WHTP-L the private vehicles that the road usage is
H&L to WHTP-L
restricted only to QP and authorized vehicles.
PIPELINE - 4''
PIPELINE - 4" All test packs 'B' punch items shall be cleared &
4143 7-34D 5 MECH VSTN-WHTP 1
WHTP-L signed off by QP
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4" Housekeeping shall be done throughout the
4144 7-34D 6 CIVIL VSTN-WHTP 1
WHTP-L pipeline ROW
H&L to WHTP-L

PIPELINE - 4''
PIPELINE - 4" Painting & stenciling shall be done and certified by
4145 7-34D 7 MECH VSTN-WHTP 1
WHTP-L QP-QAC.
H&L to WHTP-L

PIPELINE - 4''
PIPELINE - 4" Stenciling shall be done in all crossings / culverts
4146 7-34D 8 MECH VSTN-WHTP 1
WHTP-L inlet & outlet
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4147 7-34D 9
WHTP-L
CIVIL VSTN-WHTP 1 All supports shall be checked for proper seating
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4148 7-34D 10
WHTP-L
CIVIL VSTN-WHTP 1 All crossings shall be reinstated properly
H&L to WHTP-L

PIPELINE - 4'' Sufficient overlapping shall be done for wrapping


PIPELINE - 4"
4149 7-34D 11
WHTP-L
MECH VSTN-WHTP 1 for road crossings section transition areas (UG/AG
H&L to WHTP-L intersection)
PIPELINE - 4''
PIPELINE - 4" Spacer/ spade identification as per QP standard
4150 7-34D 12 MECH VSTN-WHTP 1
WHTP-L shall be done
H&L to WHTP-L
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4"
4151 7-34D 13
WHTP-L
MECH VSTN-WHTP 1 Redline mark-up drawings shall be submitted
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4152 7-37C 1 MECH VSTN-FNDS to 1
FNDS inside / outside of the fence..
FNDS
PIPELINE - 4''
PIPELINE - 4''
4153 7-37C 2
FNDS
ELEC VSTN-FNDS to 1 CP installation shall be completed
FNDS
PIPELINE - 4''
PIPELINE - 4''
4154 7-37C 3
FNDS
CIVIL VSTN-FNDS to 1 ROW shall be done as per AFC
FNDS

Separate sign boards to be installed at the entry


PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4155 7-37C 4 CIVIL VSTN-FNDS to 1
FNDS the private vehicles that the road usage is
FNDS
restricted only to QP and authorized vehicles.

PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4156 7-37C 5 MECH VSTN-FNDS to 1
FNDS signed off by QP
FNDS
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4157 7-37C 6 CIVIL VSTN-FNDS to 1
FNDS pipeline ROW
FNDS

PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4158 7-37C 7 MECH VSTN-FNDS to 1
FNDS QP-QAC.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4159 7-37C 8 MECH VSTN-FNDS to 1
FNDS inlet & outlet
FNDS

PIPELINE - 4''
PIPELINE - 4''
4160 7-37C 9
FNDS
CIVIL VSTN-FNDS to 1 All supports shall be checked for proper seating
FNDS
PIPELINE - 4''
PIPELINE - 4''
4161 7-37C 10
FNDS
CIVIL VSTN-FNDS to 1 All crossings shall be reinstated properly
FNDS

PIPELINE - 4'' Sufficient overlapping shall be done for wrapping


PIPELINE - 4''
4162 7-37C 11
FNDS
MECH VSTN-FNDS to 1 for road crossings section transition areas (UG/AG
FNDS intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4163 7-37C 12 MECH VSTN-FNDS to 1
FNDS shall be done
FNDS
PIPELINE - 4''
PIPELINE - 4''
4164 7-37C 13
FNDS
MECH VSTN-FNDS to 1 Redline mark-up drawings shall be submitted
FNDS

PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4165 7-39C 1 MECH VSTN-WHTP-A 1
WHTP-A inside / outside of the fence..
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4166 7-39C 2
WHTP-A
ELEC VSTN-WHTP-A 1 CP installation shall be completed
to WHTP-A

PIPELINE - 4''
PIPELINE - 4''
4167 7-39C 3
WHTP-A
CIVIL VSTN-WHTP-A 1 ROW shall be done as per AFC
to WHTP-A
Separate sign boards to be installed at the entry
PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4168 7-39C 4 CIVIL VSTN-WHTP-A 1
WHTP-A the private vehicles that the road usage is
to WHTP-A
restricted only to QP and authorized vehicles.
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4169 7-39C 5 MECH VSTN-WHTP-A 1
WHTP-A signed off by QP
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4170 7-39C 6 CIVIL VSTN-WHTP-A 1
WHTP-A pipeline ROW
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4171 7-39C 7 MECH VSTN-WHTP-A 1
WHTP-A QP-QAC.
to WHTP-A

PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4172 7-39C 8 MECH VSTN-WHTP-A 1
WHTP-A inlet & outlet
to WHTP-A

PIPELINE - 4''
PIPELINE - 4''
4173 7-39C 9
WHTP-A
CIVIL VSTN-WHTP-A 1 All supports shall be checked for proper seating
to WHTP-A

PIPELINE - 4''
PIPELINE - 4''
4174 7-39C 10
WHTP-A
CIVIL VSTN-WHTP-A 1 All crossings shall be reinstated properly
to WHTP-A

PIPELINE - 4'' Sufficient overlapping shall be done for wrapping


PIPELINE - 4''
4175 7-39C 11
WHTP-A
MECH VSTN-WHTP-A 1 for road crossings section transition areas (UG/AG
to WHTP-A intersection)
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4176 7-39C 12 MECH VSTN-WHTP-A 1
WHTP-A shall be done
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4177 7-39C 13
WHTP-A
MECH VSTN-WHTP-A 1 Redline mark-up drawings shall be submitted
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4178 7-40C 1 MECH VSTN-WHTP-B 1
WHTP-B inside / outside of the fence..
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4179 7-40C 2
WHTP-B
ELEC VSTN-WHTP-B 1 CP installation shall be completed
to WHTP-B

PIPELINE - 4''
PIPELINE - 4''
4180 7-40C 3
WHTP-B
CIVIL VSTN-WHTP-B 1 ROW shall be done as per AFC
to WHTP-B

Separate sign boards to be installed at the entry


PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4181 7-40C 4 CIVIL VSTN-WHTP-B 1
WHTP-B the private vehicles that the road usage is
to WHTP-B
restricted only to QP and authorized vehicles.

PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4182 7-40C 5 MECH VSTN-WHTP-B 1
WHTP-B signed off by QP
to WHTP-B

PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4183 7-40C 6 CIVIL VSTN-WHTP-B 1
WHTP-B pipeline ROW
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4184 7-40C 7 MECH VSTN-WHTP-B 1
WHTP-B QP-QAC.
to WHTP-B

PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4185 7-40C 8 MECH VSTN-WHTP-B 1
WHTP-B inlet & outlet
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4186 7-40C 9
WHTP-B
CIVIL VSTN-WHTP-B 1 All supports shall be checked for proper seating
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4187 7-40C 10
WHTP-B
CIVIL VSTN-WHTP-B 1 All crossings shall be reinstated properly
to WHTP-B

PIPELINE - 4'' Sufficient overlapping shall be done for wrapping


PIPELINE - 4''
4188 7-40C 11
WHTP-B
MECH VSTN-WHTP-B 1 for road crossings section transition areas (UG/AG
to WHTP-B intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4189 7-40C 12 MECH VSTN-WHTP-B 1
WHTP-B shall be done
to WHTP-B

PIPELINE - 4''
PIPELINE - 4''
4190 7-40C 13
WHTP-B
MECH VSTN-WHTP-B 1 Redline mark-up drawings shall be submitted
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4191 7-41C 1 MECH VSTN-KSFGSS 1
WHTP-C inside / outside of the fence..
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4192 7-41C 2
WHTP-C
ELEC VSTN-KSFGSS 1 CP installation shall be completed
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4193 7-41C 3
WHTP-C
CIVIL VSTN-KSFGSS 1 ROW shall be done as per AFC
to WHTP-C

Separate sign boards to be installed at the entry


PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4194 7-41C 4 CIVIL VSTN-KSFGSS 1
WHTP-C the private vehicles that the road usage is
to WHTP-C
restricted only to QP and authorized vehicles.

PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4195 7-41C 5 MECH VSTN-KSFGSS 1
WHTP-C signed off by QP
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4196 7-41C 6 CIVIL VSTN-KSFGSS 1
WHTP-C pipeline ROW
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4197 7-41C 7 MECH VSTN-KSFGSS 1
WHTP-C QP-QAC.
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4198 7-41C 8 MECH VSTN-KSFGSS 1
WHTP-C inlet & outlet
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4199 7-41C 9
WHTP-C
CIVIL VSTN-KSFGSS 1 All supports shall be checked for proper seating
to WHTP-C
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4''
4200 7-41C 10
WHTP-C
CIVIL VSTN-KSFGSS 1 All crossings shall be reinstated properly
to WHTP-C
PIPELINE - 4'' Sufficient overlapping shall be done for wrapping
PIPELINE - 4''
4201 7-41C 11
WHTP-C
MECH VSTN-KSFGSS 1 for road crossings section transition areas (UG/AG
to WHTP-C intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4202 7-41C 12 MECH VSTN-KSFGSS 1
WHTP-C shall be done
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4203 7-41C 13
WHTP-C
MECH VSTN-KSFGSS 1 Redline mark-up drawings shall be submitted
to WHTP-C

PIPELINE - 12''
PIPELINE - Pipeline identification board to be provided in
4204 7-42B 1 MECH VSTN-KNMP 1
12'' KNMP inside / outside of the fence..
to KNMP
PIPELINE - 12''
PIPELINE -
4205 7-42B 2
12'' KNMP
ELEC VSTN-KNMP 1 CP installation shall be completed
to KNMP

PIPELINE - 12''
PIPELINE -
4206 7-42B 3
12'' KNMP
CIVIL VSTN-KNMP 1 ROW shall be done as per AFC
to KNMP

Separate sign boards to be installed at the entry


PIPELINE - 12''
PIPELINE - point to the ROW from the main road cautioning
4207 7-42B 4 CIVIL VSTN-KNMP 1
12'' KNMP the private vehicles that the road usage is
to KNMP
restricted only to QP and authorized vehicles.

PIPELINE - 12''
PIPELINE - All test packs 'B' punch items shall be cleared &
4208 7-42B 5 MECH VSTN-KNMP 1
12'' KNMP signed off by QP
to KNMP
PIPELINE - 12''
PIPELINE - Housekeeping shall be done throughout the
4209 7-42B 6 CIVIL VSTN-KNMP 1
12'' KNMP pipeline ROW
to KNMP

PIPELINE - 12''
PIPELINE - Painting & stenciling shall be done and certified by
4210 7-42B 7 MECH VSTN-KNMP 1
12'' KNMP QP-QAC.
to KNMP

PIPELINE - 12''
PIPELINE - Stenciling shall be done in all crossings / culverts
4211 7-42B 8 MECH VSTN-KNMP 1
12'' KNMP inlet & outlet
to KNMP
PIPELINE - 12''
PIPELINE -
4212 7-42B 9
12'' KNMP
CIVIL VSTN-KNMP 1 All supports shall be checked for proper seating
to KNMP

PIPELINE - 12''
PIPELINE -
4213 7-42B 10
12'' KNMP
CIVIL VSTN-KNMP 1 All crossings shall be reinstated properly
to KNMP
PIPELINE - 12'' Sufficient overlapping shall be done for wrapping
PIPELINE -
4214 7-42B 11
12'' KNMP
MECH VSTN-KNMP 1 for road crossings section transition areas (UG/AG
to KNMP intersection)
PIPELINE - 12''
PIPELINE - Spacer/ spade identification as per QP standard
4215 7-42B 12 MECH VSTN-KNMP 1
12'' KNMP shall be done
to KNMP
PIPELINE - 12''
PIPELINE -
4216 7-42B 13
12'' KNMP
MECH VSTN-KNMP 1 Redline mark-up drawings shall be submitted
to KNMP
PIPELINE - 12''
PIPELINE - Pipeline identification board to be provided in
4217 7-43B 1 MECH VSTN-FNLGCS 1
12'' FNLGCS inside / outside of the fence..
to FNLGCS

PIPELINE - 12''
PIPELINE -
4218 7-43B 2
12'' FNLGCS
ELEC VSTN-FNLGCS 1 CP installation shall be completed
to FNLGCS
PIPELINE - 12''
PIPELINE -
4219 7-43B 3
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 ROW shall be done as per AFC
to FNLGCS
Separate sign boards to be installed at the entry
PIPELINE - 12''
PIPELINE - point to the ROW from the main road cautioning
4220 7-43B 4 CIVIL VSTN-FNLGCS 1
12'' FNLGCS the private vehicles that the road usage is
to FNLGCS
restricted only to QP and authorized vehicles.
PIPELINE - 12''
PIPELINE - All test packs 'B' punch items shall be cleared &
4221 7-43B 5 MECH VSTN-FNLGCS 1
12'' FNLGCS signed off by QP
to FNLGCS
PIPELINE - 12''
PIPELINE - Housekeeping shall be done throughout the
4222 7-43B 6 CIVIL VSTN-FNLGCS 1
12'' FNLGCS pipeline ROW
to FNLGCS

PIPELINE - 12''
PIPELINE - Painting & stenciling shall be done and certified by
4223 7-43B 7 MECH VSTN-FNLGCS 1
12'' FNLGCS QP-QAC.
to FNLGCS

PIPELINE - 12''
PIPELINE - Stenciling shall be done in all crossings / culverts
4224 7-43B 8 MECH VSTN-FNLGCS 1
12'' FNLGCS inlet & outlet
to FNLGCS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 12''
PIPELINE -
4225 7-43B 9
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 All supports shall be checked for proper seating
to FNLGCS
PIPELINE - 12''
PIPELINE -
4226 7-43B 10
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 All crossings shall be reinstated properly
to FNLGCS
PIPELINE - 12'' Sufficient overlapping shall be done for wrapping
PIPELINE -
4227 7-43B 11
12'' FNLGCS
MECH VSTN-FNLGCS 1 for road crossings section transition areas (UG/AG
to FNLGCS intersection)
PIPELINE - 12''
PIPELINE - Spacer/ spade identification as per QP standard
4228 7-43B 12 MECH VSTN-FNLGCS 1
12'' FNLGCS shall be done
to FNLGCS

PIPELINE - 12''
PIPELINE -
4229 7-43B 13
12'' FNLGCS
MECH VSTN-FNLGCS 1 Redline mark-up drawings shall be submitted
to FNLGCS
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4230 7-44B 1 MECH VSTN-WHTP- 1
WHTP-G inside / outside of the fence..
E&G to WHTP-G

PIPELINE - 4''
PIPELINE - 4''
4231 7-44B 2
WHTP-G
ELEC VSTN-WHTP- 1 CP installation shall be completed
E&G to WHTP-G

PIPELINE - 4''
PIPELINE - 4''
4232 7-44B 3
WHTP-G
CIVIL VSTN-WHTP- 1 ROW shall be done as per AFC
E&G to WHTP-G
Separate sign boards to be installed at the entry
PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4233 7-44B 4 CIVIL VSTN-WHTP- 1
WHTP-G the private vehicles that the road usage is
E&G to WHTP-G
restricted only to QP and authorized vehicles.
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4234 7-44B 5 MECH VSTN-WHTP- 1
WHTP-G signed off by QP
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4235 7-44B 6 CIVIL VSTN-WHTP- 1
WHTP-G pipeline ROW
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4236 7-44B 7 MECH VSTN-WHTP- 1
WHTP-G QP-QAC.
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4237 7-44B 8 MECH VSTN-WHTP- 1
WHTP-G inlet & outlet
E&G to WHTP-G

PIPELINE - 4''
PIPELINE - 4''
4238 7-44B 9
WHTP-G
CIVIL VSTN-WHTP- 1 All supports shall be checked for proper seating
E&G to WHTP-G

PIPELINE - 4''
PIPELINE - 4''
4239 7-44B 10
WHTP-G
CIVIL VSTN-WHTP- 1 All crossings shall be reinstated properly
E&G to WHTP-G
PIPELINE - 4'' Sufficient overlapping shall be done for wrapping
PIPELINE - 4''
4240 7-44B 11
WHTP-G
MECH VSTN-WHTP- 1 for road crossings section transition areas (UG/AG
E&G to WHTP-G intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4241 7-44B 12 MECH VSTN-WHTP- 1
WHTP-G shall be done
E&G to WHTP-G

PIPELINE - 4''
PIPELINE - 4''
4242 7-44B 13
WHTP-G
MECH VSTN-WHTP- 1 Redline mark-up drawings shall be submitted
E&G to WHTP-G
PIPELINE - 6''
PIPELINE - 6'' Pipeline identification board to be provided in
4243 7-45B 1 MECH VSTN-FSDS 1
FSDS inside / outside of the fence..
to FSDS
PIPELINE - 6''
PIPELINE - 6''
4244 7-45B 2
FSDS
ELEC VSTN-FSDS 2 CP installation shall be completed
to FSDS

PIPELINE - 6''
PIPELINE - 6''
4245 7-45B 3
FSDS
CIVIL VSTN-FSDS 1 ROW shall be done as per AFC
to FSDS
Separate sign boards to be installed at the entry
PIPELINE - 6''
PIPELINE - 6'' point to the ROW from the main road cautioning
4246 7-45B 4 CIVIL VSTN-FSDS 1
FSDS the private vehicles that the road usage is
to FSDS
restricted only to QP and authorized vehicles.
PIPELINE - 6''
PIPELINE - 6'' All test packs 'B' punch items shall be cleared &
4247 7-45B 5 MECH VSTN-FSDS 1
FSDS signed off by QP
to FSDS
PIPELINE - 6''
PIPELINE - 6'' Housekeeping shall be done throughout the
4248 7-45B 6 CIVIL VSTN-FSDS 1
FSDS pipeline ROW
to FSDS

PIPELINE - 6''
PIPELINE - 6'' Painting & stenciling shall be done and certified by
4249 7-45B 7 MECH VSTN-FSDS 1
FSDS QP-QAC.
to FSDS
PIPELINE - 6''
PIPELINE - 6'' Stenciling shall be done in all crossings / culverts
4250 7-45B 8 MECH VSTN-FSDS 1
FSDS inlet & outlet
to FSDS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 6''
PIPELINE - 6''
4251 7-45B 9
FSDS
CIVIL VSTN-FSDS 1 All supports shall be checked for proper seating
to FSDS
PIPELINE - 6''
PIPELINE - 6''
4252 7-45B 10
FSDS
CIVIL VSTN-FSDS 1 All crossings shall be reinstated properly
to FSDS
PIPELINE - 6'' Sufficient overlapping shall be done for wrapping
PIPELINE - 6''
4253 7-45B 11
FSDS
MECH VSTN-FSDS 1 for road crossings section transition areas (UG/AG
to FSDS intersection)
PIPELINE - 6''
PIPELINE - 6'' Spacer/ spade identification as per QP standard
4254 7-45B 12 MECH VSTN-FSDS 1
FSDS shall be done
to FSDS

PIPELINE - 6''
PIPELINE - 6''
4255 7-45B 13
FSDS
MECH VSTN-FSDS 1 Redline mark-up drawings shall be submitted
to FSDS

SDV-277 tubing to be completed .SDV actuator


4256 7-38C 1 FMDS INST ALL 1
other side access to instrument to be checked.

4257 7-38C 2 FMDS INST ALL 1 PT-4040/PDIT-4040 tubing to be connected

BV-9814 platform grating to be clamped for


4258 7-38C 3 FMDS MECH ALL 1
Securing.

BV-9814 platform earthing to be completed and


4259 7-38C 4 FMDS ELEC ALL 1 BV-9815 platform/FT-0271 down stream cross over
earthing to be done.

4260 7-38C 5 FMDS CIVIL ALL 1 Old fence near BV-0231 to be removed

4261 7-38C 6 FMDS MECH ALL 1 14" line painting /touch up near SDV

4262 7-38C 7 FMDS MECH ALL 1 4" vent line touch-up painting

4263 7-38C 8 FMDS MECH ALL 1 4" vent line cold insulation

4264 7-38C 9 FMDS MECH ALL 1 4" vent line purging B/V to be provided

4" vent line 3 supports to be installed ( Near


4265 7-38C 10 FMDS MECH ALL 1
Dehydration bypass bypass valve)

4" line passing through main fence one point to be


4266 7-38C 11 FMDS MECH ALL 1
provided ring repair

4267 7-38C 12 FMDS MECH ALL 1 Z- 4040 SRV outlet to be connected to vent line.

PIPELINE -
PIPELINE - 36'' Kilometer not mention on K.M post at entire pipe
4268 7-35C 1 36" STN U TO CIVIL 1
STN-U to STN-N line.
N
PIPELINE -
PIPELINE - 36'' Pipe line service name not mention on service tag
4269 7-35C 2 36" STN U TO CIVIL 1
STN-U to STN-N post at entire pipe line.
N
PIPELINE -
PIPELINE - 36'' Not provided warning sign and goal post for Over
4270 7-35C 3 36" STN U TO CIVIL 1
STN-U to STN-N head line at K.M 2.3
N
PIPELINE -
PIPELINE - 36'' ROW construction to be completed at back side of
4271 7-35C 4 36" STN U TO CIVIL 1
STN-U to STN-N valve station FSDGS
N
PIPELINE -
PIPELINE - 36'' Not provided safety guard on C.P reference electro
4272 7-35C 5 36" STN U TO ELEC 1
STN-U to STN-N test post.
N
PIPELINE -
PIPELINE - 36'' Near K.M 6.9 (Point-N fence) K.M marker post &
4273 7-35C 6 36" STN U TO CIVIL 1
STN-U to STN-N service name tag post not installed.
N
PIPELINE -
PIPELINE - 36''
4274 7-35C 7 36" STN U TO MECH
STN-U to STN-N
1 Stenciling job to be carried out at entire pipeline.
N
PIPELINE - 4''
PIPELINE - 4'' Above ground 4" entire pipeline painting job is
4275 7-37D 1 MECH VSTN-FNDS to 1
FNDS remaining.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Kilometer not mention on K.M post at entire pipe
4276 7-37D 2 CIVIL VSTN-FNDS to 1
FNDS line.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Pipe line service name not mention on service tag
4277 7-37D 3 MECH VSTN-FNDS to 1
FNDS post at entire pipe line.
FNDS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4'' Near FNDS fence missed pipe support to be
4278 7-37D 4 MECH VSTN-FNDS to 1
FNDS installed.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Near FNDS fence one sleeper pipe support not
4279 7-37D 5 MECH VSTN-FNDS to 1
FNDS touch with pipe line.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Near FNDS culvert area one pipe support not
4280 7-37D 6 MECH VSTN-FNDS to 1
FNDS touch with pipe line.
FNDS
PIPELINE - 4'' 4" under ground pipeline near FNLGS road
PIPELINE - 4''
4281 7-37D 7
FNDS
ELEC VSTN-FNDS to 1 crossing area 2 Nos. CP test post tag to be
FNDS installed.
PIPELINE - 4''
PIPELINE - 4'' Crash barrier to be provided on each expansion
4282 7-37D 8 CIVIL VSTN-FNDS to 1
FNDS loop at ROW side. (12" pipeline)
FNDS
PIPELINE - 4''
PIPELINE - 4'' Near FNLGS valve station road crossing crash
4283 7-37D 9 CIVIL VSTN-FNDS to 1
FNDS barrier is incomplete. (Culvert)
FNDS
PIPELINE - 12''
PIPELINE - Above ground 4" entire pipeline painting job is
4284 7-43C 1 MECH VSTN-FNLGCS 1
12'' FNLGCS remaining.
to FNLGCS
PIPELINE - 12''
PIPELINE - Kilometer not mention on K.M post at entire pipe
4285 7-43C 2 CIVIL VSTN-FNLGCS 1
12'' FNLGCS line.
to FNLGCS
PIPELINE - 12''
PIPELINE - Pipe line service name not mention on service tag
4286 7-43C 3 MECH VSTN-FNLGCS 1
12'' FNLGCS post at entire pipe line.
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNDS fence missed pipe support to be
4287 7-43C 4 MECH VSTN-FNLGCS 1
12'' FNLGCS installed.
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNDS fence one sleeper pipe support not
4288 7-43C 5 MECH VSTN-FNLGCS 1
12'' FNLGCS touch with pipe line.
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNDS culvert area one pipe support not
4289 7-43C 6 MECH VSTN-FNLGCS 1
12'' FNLGCS touch with pipe line.
to FNLGCS
PIPELINE - 12'' 4" under ground pipeline near FNLGS road
PIPELINE -
4290 7-43C 7
12'' FNLGCS
ELEC VSTN-FNLGCS 1 crossing area 2 Nos. CP test post tag to be
to FNLGCS installed.
PIPELINE - 12''
PIPELINE - Crash barrier to be provided on each expansion
4291 7-43C 8 CIVIL VSTN-FNLGCS 1
12'' FNLGCS loop at ROW side. (12" pipeline)
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNLGS valve station road crossing crash
4292 7-43C 9 CIVIL VSTN-FNLGCS 1
12'' FNLGCS barrier is incomplete. (Culvert)
to FNLGCS
PIPELINE - 12''
PIPELINE - Kilometer not mention on K.M post at entire pipe
4293 7-42C 1 CIVIL VSTN-KNMP to 1
12'' KNMP line.
KNMP
PIPELINE - 12''
PIPELINE - Pipe line service name not mention on service tag
4294 7-42C 2 CIVIL VSTN-KNMP to 1
12'' KNMP post at entire pipe line.
KNMP
PIPELINE - 12''
PIPELINE -
4295 7-42C 3
12'' KNMP
MECH VSTN-KNMP to 1 Stenciling job to be carried out at entire pipeline.
KNMP
PIPELINE - 12''
PIPELINE - Above ground 12" entire pipeline painting job is
4296 7-42C 4 MECH VSTN-KNMP to 1
12'' KNMP remaining.
KNMP
PIPELINE - 12''
PIPELINE - C.P test post name tag to be installed at all road
4297 7-42C 5 ELEC VSTN-KNMP to 1
12'' KNMP crossing areas.
KNMP
PIPELINE - 12''
PIPELINE - Road crossing crash barrier to be installed near
4298 7-42C 6 CIVIL VSTN-KNMP to 1
12'' KNMP KNMP valve station
KNMP
PIPELINE - 12''
PIPELINE - Road crossing identification post installation is
4299 7-42C 7 CIVIL VSTN-KNMP to 1
12'' KNMP incomplete.
KNMP
PIPELINE - 4''
PIPELINE - 4'' Kilometer not mention on K.M post at entire pipe
4300 7-44C 1 CIVIL VSTN-E&G to 1
WHTP-G line.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Pipe line service name not mention on service tag
4301 7-44C 2 CIVIL VSTN-E&G to 1
WHTP-G post at entire pipe line.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Near Khuff G plant one sleeper support not touch
4302 7-44C 3 CIVIL VSTN-E&G to 1
WHTP-G with pipe line.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Above ground 4" entire pipeline painting job is
4303 7-44C 4 MECH VSTN-E&G to 1
WHTP-G remaining.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4304 7-44C 5
WHTP-G
MECH VSTN-E&G to 1 Stenciling job to be carried out at entire pipeline.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' C.P test post name tag to be installed at all road
4305 7-44C 6 ELEC VSTN-E&G to 1
WHTP-G crossing areas.
KHUFF-G
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4'' Identification post to be installed road crossing
4306 7-44C 7 CIVIL VSTN-E&G to 1
WHTP-G area near E&G valve station area.
KHUFF-G
PIPELINE - 6''
PIPELINE - 6'' Above ground 6" entire pipeline painting job is
4307 7-45C 1 MECH VSTN-FSDS to 1
FSDS remaining.
FSDS
PIPELINE - 6''
PIPELINE - 6'' C.P test post name tag to be installed at all road
4308 7-45C 2 ELEC VSTN-FSDS to 1
FSDS crossing areas.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4309 7-45C 3
FSDS
CIVIL VSTN-FSDS to 1 K.M post to be installed at entire pipe line.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Pipe line service tag post to be installed at entire
4310 7-45C 4 CIVIL VSTN-FSDS to 1
FSDS pipe line.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4311 7-45C 5
FSDS
MECH VSTN-FSDS to 1 Stenciling job to be carried out at entire pipeline.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Crash barrier to be provided on each expansion
4312 7-45C 6 CIVIL VSTN-FSDS to 1
FSDS loop at ROW side.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Not provided warning sign and goal post for Over
4313 7-45C 7 CIVIL VSTN-FSDS to 1
FSDS head electric line.
FSDS
PIPELINE - 6''
PIPELINE - 6'' ROW construction to be completed at entire line,
4314 7-45C 8 CIVIL VSTN-FSDS to 1
FSDS including culvert construction.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Crash barrier to be provided on each road crossing
4315 7-45C 9 CIVIL VSTN-FSDS to 1
FSDS area.
FSDS
PIPELINE - 4''
PIPELINE - 4''
4316 7-39D 1
WHTP-A
CIVIL VSTN-KUFF-A 1 House keeping to be carried out.
to KUFF-A
PIPELINE - 4''
PIPELINE - 4''
4317 7-39D 2
WHTP-A
MECH VSTN-KUFF-A 1 Line identification to be done.
to KUFF-A
PIPELINE - 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4318 7-39D 3 MECH VSTN-KUFF-A 1
WHTP-A damaged areas of the pipe & anchor.
to KUFF-A
PIPELINE - 4''
PIPELINE - 4''
4319 7-40D 1
WHTP-B
CIVIL VSTN-KUFF-B 1 House keeping to be carried out.
to KUFF-B
PIPELINE - 4''
PIPELINE - 4''
4320 7-40D 2
WHTP-B
MECH VSTN-KUFF-B 1 Line identification to be done.
to KUFF-B
PIPELINE - 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4321 7-40D 3 MECH VSTN-KUFF-B 1
WHTP-B damaged areas of the pipe & anchor.
to KUFF-B
PIPELINE - 4''
PIPELINE - 4''
4322 7-41D 1
WHTP-C
CIVIL KUFF-C to 1 House keeping to be carried out.
VSTN-KSFGSS
PIPELINE - 4''
PIPELINE - 4''
4323 7-41D 2
WHTP-C
MECH KUFF-C to 1 Line identification to be done.
VSTN-KSFGSS
PIPELINE - 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4324 7-41D 3 MECH KUFF-C to 1
WHTP-C damaged areas of the pipe & anchor.
VSTN-KSFGSS
PIPELINE - 4''
PIPELINE - 4''
4325 7-41D 4
WHTP-C
CIVIL KUFF-C to 1 Grouting to be done for Anchor support.
VSTN-KSFGSS
PIPELINE - 6''
4326 7-9F 1 FMDS MECH VSTN-FMDS 1 Pipe line welding joints painting not completed.
(NEW)
PIPELINE - 6''
4327 7-9F 2 FMDS MECH VSTN-FMDS 1 Identification & Stenciling not completed.
(NEW)
PIPELINE - 6''
House keeping around wellhead area to be done
4328 7-9F 3 FMDS MECH VSTN-FMDS 1
(NEW) properly.
PIPELINE -
PIPELINE - 36'' OHL high restriction goalposts and associated
4329 7-35D 1.01 36" STN U TO CIVIL 1
STN-U to STN-N works to be done.
N
PIPELINE -
PIPELINE - 36'' Apply touch up paint on pipes, supports and pole
4330 7-35D 1.02 36" STN U TO CIVIL 1
STN-U to STN-N markers.
N
PIPELINE -
PIPELINE - 36'' Bundwall to be reinstated/completed as per AFC
4331 7-35D 1.03 36" STN U TO CIVIL 1
STN-U to STN-N and SOW.
N
PIPELINE - Provide appropriate grouts for kilometer, pipeline
PIPELINE - 36''
4332 7-35D 1.04 36" STN U TO CIVIL
STN-U to STN-N
1 warning markers and CP box/post's concrete
N foundation.
PIPELINE -
PIPELINE - 36'' All exposed concrete plinths to be coated with
4333 7-35D 1.05 36" STN U TO CIVIL 1
STN-U to STN-N epoxy paint.
N
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE -
PIPELINE - 36'' ROW and approaches to be completed and free
4334 7-35D 1.06 36" STN U TO CIVIL 1
STN-U to STN-N form any obstructions wherever necessary.
N
PIPELINE -
PIPELINE - 36'' Pipe concrete slab protection lifting hooks to be
4335 7-35D 1.07 36" STN U TO CIVIL 1
STN-U to STN-N sealed with appropriate materials.
N
PIPELINE -
PIPELINE - 36''
4336 7-35D 1.08 36" STN U TO CIVIL
STN-U to STN-N
1 Pole markers to be completed.
N
PIPELINE -
PIPELINE - 36''
4337 7-35D 1.09 36" STN U TO CIVIL
STN-U to STN-N
1 Rock cap to be reinstated/completed properly.
N
PIPELINE -
PIPELINE - 36'' Extend buried pipe wrapping at least 1.00 meter
4338 7-35D 1.10 36" STN U TO MECH 1
STN-U to STN-N behind from the ground.
N
PIPELINE -
PIPELINE - 36'' Check and modify beam along sabkha area as per
4339 7-35D 1.11 36" STN U TO CIVIL 1
STN-U to STN-N AFC and SOW.
N
PIPELINE -
PIPELINE - 36''
4340 7-35D 1.12 36" STN U TO CIVIL
STN-U to STN-N
1 Remove any temporary installations.
N
PIPELINE -
PIPELINE - 36''
4341 7-35D 1.13 36" STN U TO MECH
STN-U to STN-N
1 Rectify the chainlink fence collar plate apertures.
N
PIPELINE -
PIPELINE - 36'' Debris and other excess construction materials to
4342 7-35D 1.14 36" STN U TO CIVIL 1
STN-U to STN-N be removed from site.
N
PIPELINE - 6''
PIPELINE - 6'' OHL high restriction goalposts and associated
4343 7-45D 2.01 CIVIL VSTN-FSDS to 1
FSDS works to be done.
FSDS
PIPELINE - 6''
PIPELINE - 6'' All exposed concrete plinths to be coated with
4344 7-45D 2.02 CIVIL VSTN-FSDS to 1
FSDS epoxy paint.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Slopes outside culvert to be protected with stone
4345 7-45D 2.03 CIVIL VSTN-FSDS to 1
FSDS pitching wherever necessary.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Reinstate/reposition any disturbed existing
4346 7-45D 2.04 CIVIL VSTN-FSDS to 1
FSDS concrete barriers.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Extend buried pipe wrapping at least 1.00 meter
4347 7-45D 2.05 MECH VSTN-FSDS to 1
FSDS behind from the ground.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4348 7-45D 2.06
FSDS
CIVIL VSTN-FSDS to 1 Crash barriers to be provided for the loop.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4349 7-45D 2.07
FSDS
CIVIL VSTN-FSDS to 1 Fix the loop pipe sleepers properly leveled.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Apply touch up paint on pipe, supports and pole
4350 7-45D 2.08 MECH VSTN-FSDS to 1
FSDS markers.
FSDS
PIPELINE - 6''
PIPELINE - 6'' New culverts and associated works to be
4351 7-45D 2.09 CIVIL VSTN-FSDS to 1
FSDS completed.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4352 7-45D 2.10
FSDS
CIVIL VSTN-FSDS to 1 ROW as per AFC and SOW to be completed.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4353 7-45D 2.11
FSDS
CIVIL VSTN-FSDS to 1 Pole markers to be completed.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Provide appropriate grouts for kilometer and
4354 7-45D 2.12 CIVIL VSTN-FSDS to 1
FSDS pipeline warning marker's concrete foundation.
FSDS
PIPELINE - 6'' Surrounds 2.00 Nos. PGB (pipe guide before
PIPELINE - 6''
4355 7-45D 2.13
FSDS
CIVIL VSTN-FSDS to 1 bends) foundations need to be backfilled and
FSDS compacted.
PIPELINE - 6'' Gap between pipe concrete slab protection and
PIPELINE - 6''
4356 7-45D 2.14
FSDS
CIVIL VSTN-FSDS to 1 asphalt road cutted to be filled with bituminous
FSDS base/wearing course properly.
PIPELINE - 6''
PIPELINE - 6'' All exposed concrete plinths to be coated with
4357 7-45D 2.15 CIVIL VSTN-FSDS to 1
FSDS epoxy paint.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4358 7-45D 2.16
FSDS
CIVIL VSTN-FSDS to 1 Remove any temporary installations.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4359 7-45D 2.17
FSDS
MECH VSTN-FSDS to 1 Rectify the chainlink fence collar plate apertures.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Debris and other excess construction materials to
4360 7-45D 2.18 CIVIL VSTN-FSDS to 1
FSDS be removed from site.
FSDS
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4361 7-37E 1.01 MECH FNLGCS to 1
FNDS markers.
FNDS
PIPELINE - 4''
PIPELINE - 4''
4362 7-37E 1.02
FNDS
CIVIL FNLGCS to 1 Install road crash barrier at both ends of culvert.
FNDS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4'' Culvert faces to be properly covered with plywood
4363 7-37E 1.03 CIVIL FNLGCS to 1
FNDS to avoid sand intrusion.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Install stone pitching at surrounding bell mouth at
4364 7-37E 1.04 CIVIL FNLGCS to 1
FNDS both ends of culvert.
FNDS
PIPELINE - 4'' Remove concrete paving at culvert crossing and
PIPELINE - 4''
4365 7-37E 1.05
FNDS
CIVIL FNLGCS to 1 re-instate asphalt laying as per QCS road
FNDS specification.
PIPELINE - 4''
PIPELINE - 4'' Pipe line should be properly placed on the
4366 7-37E 1.06 CIVIL FNLGCS to 1
FNDS supports at culvert.
FNDS
PIPELINE - 4'' Provide appropriate grouts for kilometer, pipe line
PIPELINE - 4''
4367 7-37E 1.07
FNDS
CIVIL FNLGCS to 1 warning markers and CP box/post's concrete
FNDS foundations.
PIPELINE - 4''
PIPELINE - 4'' Remove all construction materials and site
4368 7-37E 1.08 CIVIL FNLGCS to 1
FNDS clearance.
FNDS
PIPELINE - 4''
PIPELINE - 4''
4369 7-37E 5.01
FNDS
CIVIL FNLGCS to 1 Remove all construction materials.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4370 7-37E 5.02 MECH FNLGCS to 1
FNDS markers.
FNDS
PIPELINE - 4''
PIPELINE - 4'' All exposed concrete plinths to be coated with
4371 7-37E 5.03 CIVIL FNLGCS to 1
FNDS epoxy paint.
FNDS
PIPELINE - 4''
PIPELINE - 4''
4372 7-37E 5.04
FNDS
CIVIL FNLGCS to 1 General site clearance.
FNDS
PIPELINE - 12''
PIPELINE - Crash barrier installation to be completed at all
4373 7-43D 2.01 CIVIL VSTN-FNLGCS 1
12'' FNLGCS culverts.
to FNLGCS
PIPELINE - 12''
PIPELINE - Remove drift sand, grade, level and compact
4374 7-43D 2.02 CIVIL VSTN-FNLGCS 1
12'' FNLGCS embankment at culvert near valve station.
to FNLGCS
PIPELINE - 12''
PIPELINE - Install stone pitching at surrounding bell mouth at
4375 7-43D 2.03 CIVIL VSTN-FNLGCS 1
12'' FNLGCS both ends of culvert.
to FNLGCS
PIPELINE - 12''
PIPELINE - Culvert faces to be properly covered with plywood
4376 7-43D 2.04 CIVIL VSTN-FNLGCS 1
12'' FNLGCS to avoid sand intrusion.
to FNLGCS
PIPELINE - 12''
PIPELINE -
4377 7-43D 2.05
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 Complete pipe support epoxy coating at culverts.
to FNLGCS
PIPELINE - 12''
PIPELINE - Remove the excess/unwanted materials from in
4378 7-43D 2.06 CIVIL VSTN-FNLGCS 1
12'' FNLGCS and around the culverts.
to FNLGCS
PIPELINE - 12'' Provide appropriate grouts for kilometer, pipeline
PIPELINE -
4379 7-43D 2.07
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 warning markers and CP box/post's concrete
to FNLGCS foundation.
PIPELINE - 12''
PIPELINE -
4380 7-43D 2.08
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 Crash barriers to be provided for the loops.
to FNLGCS
PIPELINE - 12''
PIPELINE - Debris and other excess construction materials to
4381 7-43D 2.09 CIVIL VSTN-FNLGCS 1
12'' FNLGCS be removed from site.
to FNLGCS
PIPELINE - 12''
PIPELINE -
4382 7-43D 5.01
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 Remove all construction materials.
to FNLGCS
PIPELINE - 12''
PIPELINE - Apply touch up paint on pipe, supports and pole
4383 7-43D 5.02 MECH VSTN-FNLGCS 1
12'' FNLGCS markers.
to FNLGCS
PIPELINE - 12''
PIPELINE - All exposed concrete plinths to be coated with
4384 7-43D 5.03 CIVIL VSTN-FNLGCS 1
12'' FNLGCS epoxy paint.
to FNLGCS
PIPELINE - 12''
PIPELINE -
4385 7-43D 5.04
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 General site clearance.
to FNLGCS
PIPELINE - 4''
PIPELINE - 4'' Install stone pitching at surrounding bell mouth at
4386 7-44D 3.01 CIVIL VSTN-E&G to 1
WHTP-G both ends of culvert.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Install road crash barrier at culverts and track road
4387 7-44D 3.02 CIVIL VSTN-E&G to 1
WHTP-G crossing.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4388 7-44D 3.03
WHTP-G
CIVIL VSTN-E&G to 1 Pole markers to be completed.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Grade, level and compact pipe crossing area at
4389 7-44D 3.04 CIVIL VSTN-E&G to 1
WHTP-G track road.
KHUFF-G
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE - 4''
PIPELINE - 4'' Complete protection barrier works at pipe line
4390 7-44D 3.05 CIVIL VSTN-E&G to 1
WHTP-G crossing.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Pipe supports to be aligned properly wherever
4391 7-44D 3.06 CIVIL VSTN-E&G to 1
WHTP-G necessary.
KHUFF-G
PIPELINE - 4'' Provide appropriate grouts for kilometer, pipe line
PIPELINE - 4''
4392 7-44D 3.07
WHTP-G
CIVIL VSTN-E&G to 1 warning markers and CP box/post's concrete
KHUFF-G foundations.
PIPELINE - 4''
PIPELINE - 4'' Culvert faces to be properly covered with plywood
4393 7-44D 3.08 CIVIL VSTN-E&G to 1
WHTP-G to avoid sand intrusion.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4394 7-44D 3.09 MECH VSTN-E&G to 1
WHTP-G markers.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Remove all construction materials and site
4395 7-44D 3.10 CIVIL VSTN-E&G to 1
WHTP-G clearance.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4396 7-44D 5.01
WHTP-G
CIVIL VSTN-E&G to 1 Remove all construction materials.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4397 7-44D 5.02 CIVIL VSTN-E&G to 1
WHTP-G markers.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' All exposed concrete plinths to be coated with
4398 7-44D 5.03 CIVIL VSTN-E&G to 1
WHTP-G epoxy paint.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4399 7-44D 5.04
WHTP-G
CIVIL VSTN-E&G to 1 General site clearance.
KHUFF-G
PIPELINE - 12''
PIPELINE -
4400 7-42D 4.01
12'' KNMP
CIVIL VSTN-KNMP to 1 Pole markers to be completed.
KNMP
PIPELINE - 12''
PIPELINE -
4401 7-42D 4.02
12'' KNMP
CIVIL VSTN-KNMP to 1 Anchor support cracks to be repaired.
KNMP
PIPELINE - 12''
PIPELINE - Crash barrier installation to be completed at army
4402 7-42D 4.03 CIVIL VSTN-KNMP to 1
12'' KNMP road crossing.
KNMP
PIPELINE - 12''
PIPELINE - Apply touch up paint on pipe, supports and pole
4403 7-42D 4.04 MECH VSTN-KNMP to 1
12'' KNMP markers.
KNMP
PIPELINE - 12''
PIPELINE - Complete protection barrier works at pipe line
4404 7-42D 4.05 CIVIL VSTN-KNMP to 1
12'' KNMP crossing.
KNMP
PIPELINE - 12''
PIPELINE - Pipe concrete slab protection lifting hooks to be
4405 7-42D 4.06 CIVIL VSTN-KNMP to 1
12'' KNMP sealed with appropriate materials.
KNMP
PIPELINE - 12''
PIPELINE - ROW to be completed as per SOW and
4406 7-42D 4.07 CIVIL VSTN-KNMP to 1
12'' KNMP specification.
KNMP
PIPELINE - 12''
PIPELINE -
4407 7-42D 4.08
12'' KNMP
MECH VSTN-KNMP to 1 Provide chinlink fence collar plate aperture.
KNMP
PIPELINE - 12''
PIPELINE - Extend crash barrier to protect QP pipe lines at
4408 7-42D 4.09 CIVIL VSTN-KNMP to 1
12'' KNMP asphalt road.
KNMP
PIPELINE - 12''
PIPELINE -
4409 7-42D 5.01
12'' KNMP
CIVIL VSTN-KNMP to 1 Remove all construction materials.
KNMP
PIPELINE - 12''
PIPELINE - Apply touch up paint on pipe, supports and pole
4410 7-42D 5.02 MECH VSTN-KNMP to 1
12'' KNMP markers.
KNMP
PIPELINE - 12''
PIPELINE - All exposed concrete plinths to be coated with
4411 7-42D 5.03 CIVIL VSTN-KNMP to 1
12'' KNMP epoxy paint.
KNMP
PIPELINE - 12''
PIPELINE -
4412 7-42D 5.04
12'' KNMP
CIVIL VSTN-KNMP to 1 General site clearance.
KNMP
Road marking and traffic sign board to be provided
4413 7-30C 1 UMMBAB-B CIVIL UBMS-B 1
as per requirement.
Rectification required for the damaged kerb stone
4414 7-30C 2 UMMBAB-B CIVIL UBMS-B 1
and painting to be done.

4415 7-30C 3 UMMBAB-B CIVIL UBMS-B 1 Joint sealant to be provided for the kerb stone.

4416 7-30C 4 UMMBAB-B CIVIL UBMS-B 1 Shoulder to be provided for the road both sides.

Backfilling up to the edge of grading, compaction


4417 7-30C 5 UMMBAB-B CIVIL UBMS-B 1
and proper slope to be provided.

4418 7-30C 6 UMMBAB-B MECH UBMS-B 1 Car parking shed to be completed.

Surface preparation and epoxy coating to be done


4419 7-30C 7 UMMBAB-B CIVIL UBMS-B 1 for the exposed concrete surface of earthing pit,
stair case foundation and drain pit.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Rectification to be done for the damaged concrete


4420 7-30C 8 UMMBAB-B CIVIL UBMS-B 1
surface and apply touch-up paint.
Painting to be done for the soak away pit manhole
4421 7-30C 9 UMMBAB-B CIVIL UBMS-B 1
cover.
Final coat painting to be done for the gate and
4422 7-30C 10 UMMBAB-B CIVIL UBMS-B 1
boundary wall.
Backfilling and proper compaction to be done for
4423 7-30C 11 UMMBAB-B CIVIL UBMS-B 1
the electrical cable trench.
Check the gate installation and provide true
4424 7-30C 12 UMMBAB-B CIVIL UBMS-B 1
alignment.
Gate drop bolt arrester to be provided as per the
4425 7-30C 13 UMMBAB-B CIVIL UBMS-B 1
drawing.
Station name board and safety instruction board to
4426 7-30C 14 UMMBAB-B CIVIL UBMS-B 1
be installed
Assembly point to be identified and installed sign
4427 7-30C 15 UMMBAB-B CIVIL UBMS-B 1
boards.
Unwanted holes to be sealed and final coat
4428 7-30C 16 UMMBAB-B CIVIL UBMS-B 1
painting for the building inside and outside.
Provide sign plates for the rooms as per the
4429 7-30C 17 UMMBAB-B CIVIL UBMS-B 1
drawing.

4430 7-30C 18 UMMBAB-B CIVIL UBMS-B 1 Damaged door lock to be replaced.

4431 7-30C 19 UMMBAB-B CIVIL UBMS-B 1 Painting to be done for the doors.

Cable tray and pipe entry to be closed with


4432 7-30C 20 UMMBAB-B CIVIL UBMS-B 1
appropriate material for the building inside.

4433 7-30C 21 UMMBAB-B CIVIL UBMS-B 1 Joint sealant to be provided for the external wall.

Gap between roof slab and rain water down pipe to


4434 7-30C 22 UMMBAB-B CIVIL UBMS-B 1
be closed with appropriate material.
Proper alignment to be done for the installed
4435 7-30C 23 UMMBAB-B MECH UBMS-B 1
chequered plate.
Rectification and cleaning to be done for the
4436 7-30C 24 UMMBAB-B CIVIL UBMS-B 1
applied joint sealant.
Housekeeping and gravel to be spreaded properly
4437 7-30C 25 UMMBAB-B CIVIL UBMS-B 1
on roof slab.
Removal of unwanted materials, temporary
4438 7-30C 26 UMMBAB-B CIVIL UBMS-B 1
facilities and housekeeping to be done.
Stencilling and color code for all pipes and
4439 7-5F 1 FSP MECH ALL 1
equipment.

4440 7-5F 2 FSP MECH ALL 1 To fix all missing valve wheels and handle.

Painting touch-up for many pipe joints and some


4441 7-5F 3 FSP MECH ALL 1
areas of platforms.
To provide cathodic protection cables with cable
4442 7-5F 4 FSP ELEC ALL 1
tray.
To rotate three isolation valves of PT-0571A/B/C
4443 7-5F 5 FSP MECH ALL 1
180deg.

4444 7-5F 6 FSP MECH ALL 1 One bolt of air volume is loose.

To remove extra L shape beam welded on the


4445 7-5F 7 FSP MECH ALL 1
Structure near air and drain pipes.

4446 7-5F 8 FSP INST ALL 1 To correct tag description of TI-0825 and TI-0826.

4447 7-5F 9 FSP MECH ALL 1 To fix missing clamps on drain line.

4448 7-5F 10 FSP MECH ALL 1 Handle of BV-7217 to be oriented to east side.

To provide missing rubber for vent and drain pipe's


4449 7-5F 11 FSP MECH ALL 1
clamp.

4450 7-5F 12 FSP MECH ALL 1 Atms vent clamp is loose.

4451 7-5F 13 FSP MECH ALL 1 Z-4042 name plate is not clear.

4452 7-5F 14 FSP MECH ALL 1 To provide Z-4042 door with handle.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

4453 7-5F 15 FSP INST ALL 1 To provide drain pipe for PI-5066.

To provide three concrete foundation for ladders of


4454 7-5F 16 FSP MECH ALL 1
crossover near SDV-1112
To provide bolts for steps of platform near
4455 7-5F 17 FSP MECH ALL 1
corrosion coupons.

4456 7-5F 18 FSP MECH ALL 1 Impact wall is not as per existing.

NRV of nitrogen connection should be as per P&ID


4457 7-5F 19 FSP MECH ALL 1
U/S isolation.
To plug spare inst air leg under crossover near
4458 7-5F 20 FSP MECH ALL 1
SDV-1112.

4459 7-5F 21 FSP INST ALL 1 Provide Extinguishers in empty boxes.

To provide additional support for ladder to SRV


4460 7-5F 22 FSP MECH ALL 1
near first platform.

4461 7-5F 23 FSP MECH ALL 1 To fix missing accoustic insulation on 6'' flare line.

To provide crash barrier at both sides of asphalted


4462 7-5F 24 FSP MECH ALL 1
access.

4463 7-5F 25 FSP MECH ALL 1 Provide ramp over 14'' line D/S of SDV-0087

4464 7-5F 26 FSP MECH ALL 1 Provide inst air line clamps with rubber packing.

PIPELINE - 36'' Sweet fuel


4465 7-35E 1 36" STN U TO CIVIL gas Burried 1 Housekeeping to be carried out.
N Pipeline
PIPELINE - 36'' Sweet fuel
Line identification to be done and flow direction to
4466 7-35E 2 36" STN U TO MECH gas Burried 1
N Pipeline be marked with arrows.
PIPELINE - 36'' Sweet fuel
4467 7-35E 3 36" STN U TO CIVIL gas Burried 1 ROW to be done as per AFC drawing.
N Pipeline
PIPELINE - 36'' Sweet fuel
4468 7-35E 4 36" STN U TO ELEC gas Burried 1 CP system to be installed.
N Pipeline
PIPELINE - 36'' Sweet fuel
4469 7-35E 5 36" STN U TO CIVIL gas Burried 1 Sign board to be provided where ever required
N Pipeline
Pig Launcher Rectify the damaged concrete surface wherever
4470 7-8L 1 STATION-N CIVIL 1
Area necessary.
Pig Launcher
4471 7-8L 2 STATION-N MECH
Area
1 Complete the installation of platforms as per AFC

Pig Launcher
4472 7-8L 3 STATION-N MECH
Area
1 Remove temporary scaffolding.

Pig Launcher
4473 7-8L 4 STATION-N MECH
Area
1 Apply paint on all the structural members.

Pig Launcher Remove the temporary fencing between station


4474 7-8L 5 STATION-N CIVIL 1
Area and the extended part.
Pig Launcher
4475 7-8L 6 STATION-N MECH
Area
1 Touchup paint on pipe supports.

Pig Launcher
4476 7-8L 7 STATION-N CIVIL
Area
1 General cleaning to be done.

VAL STN 1-
4477 7-9G 8
FMDS
MECH ALL 1 Apply paint on all the structural members.

VAL STN 1-
4478 7-9G 9
FMDS
MECH ALL 1 Remove temporary scaffolding.

VAL STN 1-
4479 7-9G 10
FMDS
MECH ALL 1 General cleaning to be done.

Pig Launcher
4480 7-5G 11 FSP MECH
Area
1 Apply paint on all the structural members.

Pig Launcher
4481 7-5G 12 FSP MECH
Area
1 Remove temporary scaffolding.

Pig Launcher
4482 7-5G 13 FSP MECH
Area
1 General cleaning to be done.

VAL STN 2-
4483 7-9D1 14
FMDS
CIVIL ALL 1 Grade and compact around the station properly.

VAL STN 2- Provide and fix ring at the location of pipe entry
4484 7-9D1 15 MECH ALL 1
FMDS through fence.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN 2-
4485 7-9D1 16
FMDS
MECH ALL 1 Remove temporary scaffolding.

VAL STN 2- Remove the temporary scaffolding from the FMDS


4486 7-9D1 17 MECH ALL 1
FMDS site.
VAL STN 2-
4487 7-9D1 18
FMDS
MECH ALL 1 General cleaning to be done.

PIPELINE - 4"
PIPELINE - 4"
4488 7-34E 19
WHTP-L
MECH VSTN-H&L to 1 Complete the painting of pipes.
WHTP-L
PIPELINE - 4"
PIPELINE - 4" Apply paint on concrete supports wherever
4489 7-34E 20 CIVIL VSTN-H&L to 1
WHTP-L necessary.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4490 7-34E 21
WHTP-L
CIVIL VSTN-H&L to 1 Rectify the damaged surface of concrete support.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4491 7-34E 22
WHTP-L
MECH VSTN-H&L to 1 Apply paint on all the structural members.
WHTP-L
PIPELINE - 4"
PIPELINE - 4" Removal all construction debris and boulders from
4492 7-34E 23 CIVIL VSTN-H&L to 1
WHTP-L beneath the pipe line.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4493 7-34E 24
WHTP-L
MECH VSTN-H&L to 1 Remove temporary scaffolding.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4494 7-34E 25
WHTP-L
CIVIL VSTN-H&L to 1 Complete the installation of identification marker.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4495 7-34E 26
WHTP-L
MECH VSTN-H&L to 1 Complete the stenciling on pipes.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4496 7-34E 27
WHTP-L
CIVIL VSTN-H&L to 1 Grade and compact the area wherever necessary.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4497 7-34E 28
WHTP-L
CIVIL VSTN-H&L to 1 General cleaning to be done.
WHTP-L
PIPELINE - 6"
PIPELINE - 6" Complete the stenciling of identification marker and
4498 7-33E 29 CIVIL VSTN-FNFIS to 1
FNFIS warning marker.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Apply structural paint on pipes and structural
4499 7-33E 30 MECH VSTN-FNFIS to 1
FNFIS members.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4500 7-33E 31
FNFIS
CIVIL VSTN-FNFIS to 1 Apply paint on concrete supports.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4501 7-33E 32
FNFIS
CIVIL VSTN-FNFIS to 1 Grade and compact the area wherever necessary.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Complete the covering of culvert mouth on both
4502 7-33E 33 CIVIL VSTN-FNFIS to 1
FNFIS sides with plywood to avoid the sand intrusion.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4503 7-33E 34
FNFIS
CIVIL VSTN-FNFIS to 1 Grade backfill and compact the road batter properly.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4504 7-33E 35
FNFIS
CIVIL VSTN-FNFIS to 1 Protect the culvert mouths thru stone pitching.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Complete the re-instatement of asphalt road above
4505 7-33E 36 CIVIL VSTN-FNFIS to 1
FNFIS the culvert.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Remove the extended part of flexcell board below
4506 7-33E 37 CIVIL VSTN-FNFIS to 1
FNFIS the culvert units.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Remove the unwanted construction materials from
4507 7-33E 38 CIVIL VSTN-FNFIS to 1
FNFIS site.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4508 7-33E 39
FNFIS
CIVIL VSTN-FNFIS to 1 General cleaning to be completed.
FNFIS

4509 7-38D 14 FMDS CIVIL ALL 1 Grade and compact around the station properly.

Provide and fix ring at the location of pipe entry


4510 7-38D 15 FMDS MECH ALL 1
through fence.

4511 7-38D 16 FMDS MECH ALL 1 Remove temporary scaffolding.

Remove the temporary scaffolding from the FMDS


4512 7-38D 17 FMDS MECH ALL 1
site.

4513 7-38D 18 FMDS CIVIL ALL 1 General cleaning to be done.

PIPELINE -
4514 7-32D 1
12" N TO FSP
CIVIL ALL 1 Final bund/ berm shall be completed as per AFC

PIPELINE - Pig traps shall be checked for alignment as per


4515 7-32D 2 CIVIL ALL 1
12" N TO FSP drawing.
PIPELINE - Kilometer markers and crossing markers shall be
4516 7-32D 3 CIVIL ALL 1
12" N TO FSP installed as per requirement.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE -
4517 7-32D 4
12" N TO FSP
MECH ALL 2 Location identification markers shall be installed

PIPELINE - All test packs 'B' punch items shall be cleared &
4518 7-32D 5 MECH ALL 1
12" N TO FSP signed off by QP
PIPELINE - Housekeeping shall be done throughout the
4519 7-32D 6 CIVIL ALL 1
12" N TO FSP pipeline ROW
PIPELINE - Interlock facility for pig traps shall be provided as
4520 7-32D 7 MECH ALL 2
12" N TO FSP per QP standard.
PIPELINE -
4521 7-32D 8
12" N TO FSP
MECH ALL 1 Pig trolley stopper to be installed

PIPELINE - Extended thread length protruding out of nuts shall


4522 7-32D 9 MECH ALL 1
12" N TO FSP be protected as per QP standard.
PIPELINE - All bolts shall be applied molicoat, tensioned and
4523 7-32D 10 MECH ALL 1
12" N TO FSP reports shall be submitted to QP
PIPELINE -
4524 7-32D 11
12" N TO FSP
MECH ALL 1 Redline mark-up drawing shall be submitted.

PIPELINE - Pipeline identification board to be provided in


4525 7-32D 12 CIVIL ALL 1
12" N TO FSP inside / outside of the fence.
PIPELINE -
4526 7-32D 13
12" N TO FSP
ELEC ALL 2 CP installation shall be completed

Local remote switch not available in the LV


33kv switchgear
4527 7-30D 1.01 UMMBAB-B ELEC
33-SB-3304
1 compartment. (found the slot for L/R switch is
covered with masking tape) to be provided.

33kv switchgear Provide label or function description for all MCB's


4528 7-30D 1.02 UMMBAB-B ELEC 1
33-SB-3304 available in the feeder (AC, DC, & VT MCBs)

33kv switchgear Provide LV compartment door stopper with locking


4529 7-30D 1.03 UMMBAB-B ELEC 1
33-SB-3304 mechanism in fully open condition.
33kv switchgear Provide approved SLD, P&M, diagram shall be
4530 7-30D 1.04 UMMBAB-B ELEC 1
33-SB-3304 posted inside the switchgear room.
Framed single line diagram (SLD) and M&P
33kv switchgear
4531 7-30D 1.05 UMMBAB-B ELEC
33-SB-3304
1 diagram shall be posted inside the switchgear
room.

Earthing key and CB interlock scheme to be


reviewed and intertrip test to be carried out
33kv switchgear between station U to UBMS-B 33kv S/S (33-SS-
4532 7-30D 1.06 UMMBAB-B ELEC 1
33-SB-3304 3304 and between UMBS-B 33kv S/S (33-SS-
3304) to UBMS-B station (33-TR-3302-01 & 11kv
RMU incoming feeder as per approved scheme.

All related sepam relay testing accessories i.e. CT


33kv switchgear
4533 7-30D 1.07 UMMBAB-B ELEC
33-SB-3304
1 VT test plugs, sepam relay communication cable,
software, manual, book to be provided by BCEC.

A copy of per-commissioning dossier including all


33kv switchgear
4534 7-30D 1.08 UMMBAB-B ELEC
33-SB-3304
1 test report and energization request to be
submitted prior to energization.
F & G trip signals shall be made traceable in all
33kv switchgear
4535 7-30D 1.09 UMMBAB-B ELEC
33-SB-3304
1 related drawings. Verify its tripping function during
pre-commissioning test.

33kv switchgear Control switches for trip/off/close and local/remote


4536 7-30D 1.10 UMMBAB-B ELEC 1
33-SB-3304 are to be pistol grip and locking key.

Line VT device, information and data are not


33kv switchgear
shown on both SLD & protection and metering
4537 7-30D 2.01 UMMBAB-B ELEC 33-SB-3304 1
(Drawing) diagram. See drawing # UBAB-2-54-0001 Sht-1,
Rev.A & UBAB-2-56-0002 Sht-1, Rev.A
Earth switch representation and its interlock on
33kv switchgear
both SLD, it is interlock with line cable while in
4538 7-30D 2.02 UMMBAB-B ELEC 33-SB-3304 1
(Drawing) P&M it is interlock with load side. To be clarified
and corrected.
Protection CT representation on SLD, protection
33kv switchgear coordination SLD & P&M drawing are not similar.
4539 7-30D 2.03 UMMBAB-B ELEC 33-SB-3304 1 To be clarified and corrected. In SLD, it is shown in
(Drawing) line side while in P&M it is shown in load side. To
be clarified and corrected.

Provide interface drawing with detailed terminal


block, connections and circuit between 33kv feeder
33kv switchgear
to transformer 33-TR-3302-01 and 11kv RMU
4540 7-30D 2.04 UMMBAB-B ELEC 33-SB-3304 1
(Drawing) incomer for interlocking, CB&ES interlocking
scheme and transformer alarm & tripping signals
(pressure, oil & winding temperature)
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

33kv switchgear
4541 7-30D 3.01 UMMBAB-B ELEC 33-SB-3304 1 First aid box to be provided inside S/S
(General)

33kv switchgear
4542 7-30D 3.02 UMMBAB-B ELEC 33-SB-3304 1 33kv SLD drawing board to be provided inside S/S
(General)

33kv switchgear
For 33kv S/S cable trench access, permanent
4543 7-30D 3.03 UMMBAB-B ELEC 33-SB-3304 1
(General) ladder to be provided inside trench.

33kv switchgear
Aldrop latch to be provided for S/S single door for
4544 7-30D 3.04 UMMBAB-B ELEC 33-SB-3304 1
(General) padlocking.

33kv switchgear
4545 7-30D 3.05 UMMBAB-B ELEC 33-SB-3304 1 Identification labels to be provided for all S/S doors.
(General)

33kv switchgear
S/S boundary wall bottom area all holes to be
4546 7-30D 3.06 UMMBAB-B ELEC 33-SB-3304 1
(General) covered.

33kv switchgear
S/S chequered plates needs painting, marking &
4547 7-30D 3.07 UMMBAB-B ELEC 33-SB-3304 1
(General) provide correct size.

33kv switchgear
All testing works needs to complete (for cable,
4548 7-30D 3.08 UMMBAB-B ELEC 33-SB-3304 1
(General) swgr, relays & earth pits) as per QP standard.

33kv switchgear
S/S lighting, sockets & external lighting needs to
4549 7-30D 3.09 UMMBAB-B ELEC 33-SB-3304 1
(General) test.

33kv switchgear
4550 7-30D 3.10 UMMBAB-B ELEC 33-SB-3304 1 S/S fire alarm system needs to test.
(General)

33kv switchgear
4551 7-30D 3.11 UMMBAB-B ELEC 33-SB-3304 1 S/S HVAC unit needs to test.
(General)

33kv switchgear
Complete set of updated schematic drawings to be
4552 7-30D 3.12 UMMBAB-B ELEC 33-SB-3304 1
(General) provided inside S/S.

33kv switchgear
4553 7-30D 3.13 UMMBAB-B ELEC 33-SB-3304 1 Operating tool stand to be provided.
(General)

Trend scale range to be modified for the metering


4554 7-25Q 1 STATION-U ELEC ALL 1
parameters.

For additional terminals in 1X2A (DO) and gateway


4555 7-25Q 2 STATION-U ELEC ALL 1
switch XMB terminal detail drg. Shall be provided.

Engineering station (Laptop) shall be handed over


4556 7-25Q 3 STATION-U ELEC ALL 1
to QP.
The address list and IP settings shall be provided
4557 7-25Q 4 STATION-U ELEC ALL 1
to QP.
Password for KVM, OISM and OISR shall be
4558 7-25Q 5 STATION-U ELEC ALL 1
provided to QP.
33kv feeders and energy meters power
consumption shall be configured in excel format
4559 7-25Q 6 STATION-U ELEC ALL 1
showing hourly, daily, weekly, monthly and yearly
readings.
Remote switching of the feeders with user access
level- Engineer and above with password
4560 7-25Q 7 STATION-U ELEC ALL 1
protection shall be provided (only for 33kv feeders)
and same shall be notified to QP.
St-N process over view C graphic 10" line AGPR to
4561 7-8M 1 STATION-N INST ALL 2
flare header missed

Low pressure alarm to 61-PI-0271-A/B/C is


4562 7-8M 2 STATION-N INST ALL 2
required before 2oo3 Low Low trip alarm 10 barg

Low pressure alarm to 61-PI-0275-A/B/C is


4563 7-8M 3 STATION-N INST ALL 2
required before 2oo3 Low Low trip alarm 10 barg
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Low pressure alarm to 61-PI-0276-A/B/C is


4564 7-8M 4 STATION-N INST ALL 2
required before 2oo3 Low Low troip alarm 10 barg

High pressure alarm to 61-PI-0274-A/B/C is


4565 7-8M 5 STATION-N INST ALL 2
required before 2oo3High High trip alarm 47.7 barg

Pressure control valve High High trip setting is the


4566 7-8M 6 STATION-N INST ALL 2
same setting of SRV 0202A/B

61-PI-184 setting: Low 23 barg High 36 barg and


4567 7-8M 7 STATION-N INST ALL 2
process working pressure is 55-60 barg

Zone-6 icon relocate beside the zone1&2


4568 7-8M 8 STATION-N INST ALL 2
(control room )

VAL STN
4569 7-15I 2
WHTP H&L
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Damaged neoprene rubber sheets shall be


4570 7-15I 4 MECH ALL 2
WHTP H&L replaced.
VAL STN All valve drains removed during air drying shall be
4571 7-15I 5 MECH ALL 2
WHTP H&L ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4572 7-15I 6 MECH ALL 2
WHTP H&L safety sign boards shall be installed.
interlock facility shall be provided as per project
4573 7-1G 1 FNDS MECH ALL 2
requirement.

4574 7-1G 2 FNDS MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4575 7-1G 3 FNDS MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4576 7-1G 4 FNDS MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4577 7-1G 5 FNDS MECH ALL 2
ensured for proper reinstatement.
Station sign boards, warning sing boards and
4578 7-1G 6 FNDS MECH ALL 2
safety sign boards shall be installed.

4579 7-2I 2 FNFIS MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4580 7-2I 4 FNFIS MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4581 7-2I 5 FNFIS MECH ALL 2
ensured for proper reinstatement.

4582 7-3F 2 FNLGCS MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4583 7-3F 3 FNLGCS MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4584 7-3F 4 FNLGCS MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4585 7-3F 5 FNLGCS MECH ALL 2
ensured for proper reinstatement.

4586 7-4G 2 FSDS MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4587 7-4G 4 FSDS MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4588 7-4G 5 FSDS MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4589 7-5H 1 FSP MECH ALL 2
requirement.

4590 7-5H 2 FSP MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4591 7-5H 3 FSP MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4592 7-5H 4 FSP MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4593 7-5H 5 FSP MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4594 7-8N 1 STATION-N MECH ALL 2
requirement.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

4595 7-8N 2 STATION-N MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4596 7-8N 3 STATION-N MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4597 7-8N 4 STATION-N MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4598 7-8N 5 STATION-N MECH ALL 2
ensured for proper reinstatement.
Station sign boards, warning sing boards and
4599 7-8N 6 STATION-N MECH ALL 2
safety sign boards shall be installed.
VAL STN 2-
4600 7-9E1 2
FMDS
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN 2- Damaged neoprene rubber sheets shall be


4601 7-9E1 4 MECH ALL 2
FMDS replaced.
VAL STN 2- All valve drains removed during air drying shall be
4602 7-9E1 5 MECH ALL 2
FMDS ensured for proper reinstatement.
VAL STN 2- Station sign boards, warning sing boards and
4603 7-9E1 6 MECH ALL 2
FMDS safety sign boards shall be installed.
VAL STN 1-
4604 7-9H 2
FMDS
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN 1- Damaged neoprene rubber sheets shall be


4605 7-9H 4 MECH ALL 2
FMDS replaced.
VAL STN 1- All valve drains removed during air drying shall be
4606 7-9H 5 MECH ALL 2
FMDS ensured for proper reinstatement.
VAL STN 1- Station sign boards, warning sing boards and
4607 7-9H 6 MECH ALL 2
FMDS safety sign boards shall be installed.
VAL STN
4608 7-10I 2
FNFIS
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Damaged neoprene rubber sheets shall be


4609 7-10I 4 MECH ALL 2
FNFIS replaced.
VAL STN All valve drains removed during air drying shall be
4610 7-10I 5 MECH ALL 2
FNFIS ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4611 7-10I 6 MECH ALL 2
FNFIS safety sign boards shall be installed.
VAL STN
4612 7-11J 2
FNLGCS
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Spacer/ spade identification shall be done as per


4613 7-11J 3 MECH ALL 2
FNLGCS QP spec.
VAL STN Damaged neoprene rubber sheets shall be
4614 7-11J 4 MECH ALL 2
FNLGCS replaced.
VAL STN All valve drains removed during air drying shall be
4615 7-11J 5 MECH ALL 2
FNLGCS ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4616 7-11J 6 MECH ALL 2
FNLGCS safety sign boards shall be installed.
VAL STN
4617 7-12I 2
FSDS
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Damaged neoprene rubber sheets shall be


4618 7-12I 4 MECH ALL 2
FSDS replaced.
VAL STN All valve drains removed during air drying shall be
4619 7-12I 5 MECH ALL 2
FSDS ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4620 7-12I 6 MECH ALL 2
FSDS safety sign boards shall be installed.
VAL STN interlock facility shall be provided as per project
4621 7-13J 1 MECH ALL 2
KNMP requirement.
VAL STN
4622 7-13J 2
KNMP
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Spacer/ spade identification shall be done as per


4623 7-13J 3 MECH ALL 2
KNMP QP spec.
VAL STN Damaged neoprene rubber sheets shall be
4624 7-13J 4 MECH ALL 2
KNMP replaced.
VAL STN All valve drains removed during air drying shall be
4625 7-13J 5 MECH ALL 2
KNMP ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4626 7-13J 6 MECH ALL 2
KNMP safety sign boards shall be installed.
VAL STN
4627 7-14J 2
WHTP E&G
MECH ALL 2 Valves shall be greased for smooth operation.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Damaged neoprene rubber sheets shall be


4628 7-14J 4 MECH ALL 2
WHTP E&G replaced.
VAL STN All valve drains removed during air drying shall be
4629 7-14J 5 MECH ALL 2
WHTP E&G ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4630 7-14J 6 MECH ALL 2
WHTP E&G safety sign boards shall be installed.
VAL STN
4631 7-16L 2
WHTP-A
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Damaged neoprene rubber sheets shall be


4632 7-16L 4 MECH ALL 2
WHTP-A replaced.
VAL STN All valve drains removed during air drying shall be
4633 7-16L 5 MECH ALL 2
WHTP-A ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4634 7-16L 6 MECH ALL 2
WHTP-A safety sign boards shall be installed.
VAL STN
4635 7-17J 2
WHTP-B
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Damaged neoprene rubber sheets shall be


4636 7-17J 4 MECH ALL 2
WHTP-B replaced.
VAL STN All valve drains removed during air drying shall be
4637 7-17J 5 MECH ALL 2
WHTP-B ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4638 7-17J 6 MECH ALL 2
WHTP-B safety sign boards shall be installed.
VAL STN interlock facility shall be provided as per project
4639 7-18K 1 MECH ALL 2
WHTP-D requirement.
VAL STN
4640 7-18K 2
WHTP-D
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Spacer/ spade identification shall be done as per


4641 7-18K 3 MECH ALL 2
WHTP-D QP spec.
VAL STN Damaged neoprene rubber sheets shall be
4642 7-18K 4 MECH ALL 2
WHTP-D replaced.
VAL STN All valve drains removed during air drying shall be
4643 7-18K 5 MECH ALL 2
WHTP-D ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4644 7-18K 6 MECH ALL 2
WHTP-D safety sign boards shall be installed.
interlock facility shall be provided as per project
4645 7-19I 1 WHTP-H MECH ALL 2
requirement.

4646 7-19I 2 WHTP-H MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4647 7-19I 4 WHTP-H MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4648 7-19I 5 WHTP-H MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4649 7-20I 1 WHTP-L MECH ALL 2
requirement.

4650 7-20I 2 WHTP-L MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4651 7-20I 4 WHTP-L MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4652 7-20I 5 WHTP-L MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4653 7-21J 1 WHTP-A MECH ALL 2
requirement.

4654 7-21J 2 WHTP-A MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4655 7-21J 4 WHTP-A MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4656 7-21J 5 WHTP-A MECH ALL 2
ensured for proper reinstatement.

4657 7-22J 2 WHTP-B MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4658 7-22J 4 WHTP-B MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4659 7-22J 5 WHTP-B MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4660 7-23J 1 WHTP-C MECH ALL 2
requirement.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

4661 7-23J 2 WHTP-C MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4662 7-23J 4 WHTP-C MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4663 7-23J 5 WHTP-C MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4664 7-24J 1 WHTP-D MECH ALL 2
requirement.

4665 7-24J 2 WHTP-D MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4666 7-24J 4 WHTP-D MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4667 7-24J 5 WHTP-D MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4668 7-25R 1 STATION-U MECH ALL 2
requirement.

4669 7-25R 2 STATION-U MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4670 7-25R 3 STATION-U MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4671 7-25R 4 STATION-U MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4672 7-25R 5 STATION-U MECH ALL 2
ensured for proper reinstatement.
Station sign boards, warning sing boards and
4673 7-25R 6 STATION-U MECH ALL 2
safety sign boards shall be installed.
First aid kit to be provided and verify the content
4674 7-25R 7 STATION-U MECH ALL 2
with QP Medical in station-U / KSFGSS.
Emergency torch light as per QP specification shall
4675 7-25R 8 STATION-U ELEC ALL 2 be provided in LV Room & DG Building at Station-
U / KSFGSS
VAL STN
4676 7-26D 2
FNDS
MECH ALL 2 Valves shall be greased for smooth operation.

VAL STN Damaged neoprene rubber sheets shall be


4677 7-26D 4 MECH ALL 2
FNDS replaced.
VAL STN All valve drains removed during air drying shall be
4678 7-26D 5 MECH ALL 2
FNDS ensured for proper reinstatement.
VAL STN Station sign boards, warning sing boards and
4679 7-26D 6 MECH ALL 2
FNDS safety sign boards shall be installed.
interlock facility shall be provided as per project
4680 7-27F 1 WHTP E MECH ALL 2
requirement.

4681 7-27F 2 WHTP E MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4682 7-27F 3 WHTP E MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4683 7-27F 4 WHTP E MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4684 7-27F 5 WHTP E MECH ALL 2
ensured for proper reinstatement.
Station sign boards, warning sing boards and
4685 7-27F 6 WHTP E MECH ALL 2
safety sign boards shall be installed.
interlock facility shall be provided as per project
4686 7-28G 1 WHTP G MECH ALL 2
requirement.

4687 7-28G 2 WHTP G MECH ALL 2 Valves shall be greased for smooth operation.

Damaged neoprene rubber sheets shall be


4688 7-28G 4 WHTP G MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4689 7-28G 5 WHTP G MECH ALL 2
ensured for proper reinstatement.
Station sign boards, warning sing boards and
4690 7-28G 6 WHTP G MECH ALL 2
safety sign boards shall be installed.
interlock facility shall be provided as per project
4691 7-31L 1 KSFGSS MECH ALL 2
requirement.

4692 7-31L 2 KSFGSS MECH ALL 2 Valves shall be greased for smooth operation.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Spacer/ spade identification shall be done as per


4693 7-31L 3 KSFGSS MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4694 7-31L 4 KSFGSS MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4695 7-31L 5 KSFGSS MECH ALL 2
ensured for proper reinstatement.
Station sign boards, warning sing boards and
4696 7-31L 6 KSFGSS MECH ALL 2
safety sign boards shall be installed.
First aid kit to be provided and verify the content
4697 7-31L 7 KSFGSS MECH ALL 2
with QP Medical in station-U / KSFGSS.
Emergency torch light as per QP specification shall
4698 7-31L 8 KSFGSS MECH ALL 2 be provided in LV Room & DG Building at Station-
U / KSFGSS
interlock facility shall be provided as per project
4699 7-36C 1 KNMP MECH ALL 2
requirement.

4700 7-36C 2 KNMP MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4701 7-36C 3 KNMP MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4702 7-36C 4 KNMP MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4703 7-36C 5 KNMP MECH ALL 2
ensured for proper reinstatement.
interlock facility shall be provided as per project
4704 7-38E 1 FMDS MECH ALL 2
requirement.

4705 7-38E 2 FMDS MECH ALL 2 Valves shall be greased for smooth operation.

Spacer/ spade identification shall be done as per


4706 7-38E 3 FMDS MECH ALL 2
QP spec.
Damaged neoprene rubber sheets shall be
4707 7-38E 4 FMDS MECH ALL 2
replaced.
All valve drains removed during air drying shall be
4708 7-38E 5 FMDS MECH ALL 2
ensured for proper reinstatement.
6'' Pipeline
Surface preparation and epoxy coating to be done
4709 7-31M 1 KSFGSS CIVIL KSFGSS to 1
KMDS for the exposed concrete surface.

6'' Pipeline Crash barrier/concrete blocks with black & yellow


4710 7-31M 2 KSFGSS CIVIL KSFGSS to 1 paint to be provided for the existing pipe line loop
KMDS near culvert 55-RXS-01
6'' Pipeline
Backfilling and compaction to be done for the
4711 7-31M 3 KSFGSS CIVIL KSFGSS to 1
KMDS support foundations.
6'' Pipeline
Pipe sis not resting properly on the pipe support
4712 7-31M 4 KSFGSS CIVIL KSFGSS to 1
KMDS foundations to be rectified.

6'' Pipeline The end of culvert mouth shall be coated and


4713 7-31M 5 KSFGSS CIVIL KSFGSS to 1 covered with marine plywood of minimum
KMDS thickness 18mm.
6'' Pipeline
Crash barrier to be provided for the track road
4714 7-31M 6 KSFGSS CIVIL KSFGSS to 1
KMDS sides of the culvert TXU-005.
6'' Pipeline
Rectification required for the provided stone
4715 7-31M 7 KSFGSS CIVIL KSFGSS to 1
KMDS pitching at under ground culvert TXU-005

6'' Pipeline
Loose soil to be removed, provide good material
4716 7-31M 8 KSFGSS CIVIL KSFGSS to 1
KMDS and compact it properly for TXU-005.
6'' Pipeline
4717 7-31M 9 KSFGSS CIVIL KSFGSS to 1 Crossing marker pole to be provided at TXU-004.
KMDS
6'' Pipeline
Removal of unwanted materials and house
4718 7-31M 10 KSFGSS CIVIL KSFGSS to 1
KMDS keeping shall be done.

As per revised drawing DGEN-2-54-0001, battery


VAL STN VAL STN WHTP-
4719 7-16M 1
WHTP-A
ELEC
A
2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN VAL STN WHTP- dis connection from the load when the battery
4720 7-16M 2 ELEC 2
WHTP-A A voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

The manufacturer data sheet for installed battery


VAL STN VAL STN WHTP- details shall be provided . The details such as
4721 7-16M 3 ELEC 2
WHTP-A A DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN VAL STN WHTP-
4722 7-16M 4
WHTP-A
ELEC
A
2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN VAL STN WHTP-
4723 7-16M 5
WHTP-A
ELEC
A
1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN VAL STN WHTP-
4724 7-16M 6
WHTP-A
INST
A
1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN VAL STN WHTP- Data sheet for battery and solar panel enclosure
4725 7-16M 7 ELEC 1
WHTP-A A shall be provided.
VAL STN VAL STN WHTP-
4726 7-16M 8
WHTP-A
INST
A
1 SPIR for Solar and RTU panels shall be provided.

VAL STN VAL STN WHTP- Pressure gage 5A-PI-0001 to be calibrate and
4727 7-16K 1 INST 1
WHTP-A A calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP- Multivariable transmitter to be calibrate and


4728 7-16K 2 INST 1
WHTP-A A calibration sticker and certificate shall be provided.
VAL STN VAL STN WHTP-
4729 7-16K 3
WHTP-A
INST
A
1 Analog barrier labelling bo be done as per drg.
VAL STN VAL STN WHTP-
4730 7-16K 4
WHTP-A
INST
A
1 Panel Lamp shall be provided inside RTU panel.
As per revised drawing DGEN-2-54-0001, battery
VAL STN VAL STN WHTP-
4731 7-17K 1
WHTP-B
ELEC
B
2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN VAL STN WHTP- dis connection from the load when the battery
4732 7-17K 2 ELEC 2
WHTP-B B voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN VAL STN WHTP- details shall be provided . The details such as
4733 7-17K 3 ELEC 2
WHTP-B B DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN VAL STN WHTP-
4734 7-17K 4
WHTP-B
ELEC
B
2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN VAL STN WHTP-
4735 7-17K 5
WHTP-B
ELEC
B
1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN VAL STN WHTP-
4736 7-17K 6
WHTP-B
INST
B
1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN VAL STN WHTP- Data sheet for battery and solar panel enclosure
4737 7-17K 7 ELEC 1
WHTP-B B shall be provided.
VAL STN VAL STN WHTP-
4738 7-17K 8
WHTP-B
INST
B
1 SPIR for Solar and RTU panels shall be provided.

VAL STN VAL STN WHTP- Pressure gage 5A-PI-0001 to be calibrate and
4739 7-17L 1 INST 1
WHTP-B B calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP- Multivariable transmitter to be calibrate and


4740 7-17L 2 INST 1
WHTP-B B calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP-


4741 7-17L 3
WHTP-B
INST
B
1 Analog barrier labelling bo be done as per drg.
VAL STN VAL STN WHTP-
4742 7-17L 4
WHTP-B
INST
B
1 Panel Lamp shall be provided inside RTU panel.

As per revised drawing DGEN-2-54-0001, battery


VAL STN VAL STN WHTP-
4743 7-18L 1
WHTP-D
ELEC
D
2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN VAL STN WHTP- dis connection from the load when the battery
4744 7-18L 2 ELEC 2
WHTP-D D voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN VAL STN WHTP- details shall be provided . The details such as
4745 7-18L 3 ELEC 2
WHTP-D D DOD, cut off voltage and cycle life shall be clearly
mentioned.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

As per specification ( Section 2.12.4, Page -25)


VAL STN VAL STN WHTP-
4746 7-18L 4
WHTP-D
ELEC
D
2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN VAL STN WHTP-
4747 7-18L 5
WHTP-D
ELEC
D
1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN VAL STN WHTP-
4748 7-18L 6
WHTP-D
INST
D
1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN VAL STN WHTP- Data sheet for battery and solar panel enclosure
4749 7-18L 7 ELEC 1
WHTP-D D shall be provided.
VAL STN VAL STN WHTP-
4750 7-18L 8
WHTP-D
INST
D
1 SPIR for Solar and RTU panels shall be provided.

VAL STN VAL STN WHTP- Pressure gage 5A-PI-0001 to be calibrate and
4751 7-18M 1 INST 1
WHTP-D D calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP- Multivariable transmitter to be calibrate and


4752 7-18M 2 INST 1
WHTP-D D calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP-


4753 7-18M 3
WHTP-D
INST
D
1 Analog barrier labelling bo be done as per drg.
VAL STN VAL STN WHTP-
4754 7-18M 4
WHTP-D
INST
D
1 Panel Lamp shall be provided inside RTU panel.
As per revised drawing DGEN-2-54-0001, battery
VAL STN VAL STN WHTP
4755 7-15J 1
WHTP H&L
ELEC
H&L
2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN VAL STN WHTP dis connection from the load when the battery
4756 7-15J 2 ELEC 2
WHTP H&L H&L voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN VAL STN WHTP details shall be provided . The details such as
4757 7-15J 3 ELEC 2
WHTP H&L H&L DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN VAL STN WHTP
4758 7-15J 4
WHTP H&L
ELEC
H&L
2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN VAL STN WHTP
4759 7-15J 5
WHTP H&L
ELEC
H&L
1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN VAL STN WHTP
4760 7-15J 6
WHTP H&L
INST
H&L
1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN VAL STN WHTP Data sheet for battery and solar panel enclosure
4761 7-15J 7 ELEC 1
WHTP H&L H&L shall be provided.
VAL STN VAL STN WHTP
4762 7-15J 8
WHTP H&L
INST
H&L
1 SPIR for Solar and RTU panels shall be provided.

VAL STN VAL STN WHTP Pressure gage 5A-PI-0001 to be calibrate and
4763 7-15K 1 INST 1
WHTP H&L H&L calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP Multivariable transmitter to be calibrate and


4764 7-15K 2 INST 1
WHTP H&L H&L calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP


4765 7-15K 3
WHTP H&L
INST
H&L
1 Analog barrier labelling bo be done as per drg.
VAL STN VAL STN WHTP
4766 7-15K 4
WHTP H&L
INST
H&L
1 Panel Lamp shall be provided inside RTU panel.

As per revised drawing DGEN-2-54-0001, battery


VAL STN VAL STN WHTP
4767 7-14K 1
WHTP E&G
ELEC
E&G
2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN VAL STN WHTP dis connection from the load when the battery
4768 7-14K 2 ELEC 2
WHTP E&G E&G voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN VAL STN WHTP details shall be provided . The details such as
4769 7-14K 3 ELEC 2
WHTP E&G E&G DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN VAL STN WHTP
4770 7-14K 4
WHTP E&G
ELEC
E&G
2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN VAL STN WHTP
4771 7-14K 5
WHTP E&G
ELEC
E&G
1 certificates shall be provided for all installed
devices.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Special tools for programming Tri loop device,


VAL STN VAL STN WHTP
4772 7-14K 6
WHTP E&G
INST
E&G
1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN VAL STN WHTP Data sheet for battery and solar panel enclosure
4773 7-14K 7 ELEC 1
WHTP E&G E&G shall be provided.
VAL STN VAL STN WHTP
4774 7-14K 8
WHTP E&G
INST
E&G
1 SPIR for Solar and RTU panels shall be provided.

VAL STN VAL STN WHTP Pressure gage 5A-PI-0001 to be calibrate and
4775 7-14L 1 INST 1
WHTP E&G E&G calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP Multivariable transmitter to be calibrate and


4776 7-14L 2 INST 1
WHTP E&G E&G calibration sticker and certificate shall be provided.

VAL STN VAL STN WHTP


4777 7-14L 3
WHTP E&G
INST
E&G
1 Analog barrier labelling bo be done as per drg.
VAL STN VAL STN WHTP
4778 7-14L 4
WHTP E&G
INST
E&G
1 Panel Lamp shall be provided inside RTU panel.
As per revised drawing DGEN-2-54-0001, battery
VAL STN
4779 7-10J 1
FNFIS
ELEC VAL STN FNFIS 2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN dis connection from the load when the battery
4780 7-10J 2 ELEC VAL STN FNFIS 2
FNFIS voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN details shall be provided . The details such as
4781 7-10J 3 ELEC VAL STN FNFIS 2
FNFIS DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN
4782 7-10J 4
FNFIS
ELEC VAL STN FNFIS 2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN
4783 7-10J 5
FNFIS
ELEC VAL STN FNFIS 1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN
4784 7-10J 6
FNFIS
INST VAL STN FNFIS 1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN Data sheet for battery and solar panel enclosure
4785 7-10J 7 ELEC VAL STN FNFIS 1
FNFIS shall be provided.
VAL STN
4786 7-10J 8
FNFIS
INST VAL STN FNFIS 1 SPIR for Solar and RTU panels shall be provided.

VAL STN Pressure gage 5A-PI-0001 to be calibrate and


4787 7-10K 1 INST VAL STN FNFIS 1
FNFIS calibration sticker and certificate shall be provided.

VAL STN Multivariable transmitter to be calibrate and


4788 7-10K 2 INST VAL STN FNFIS 1
FNFIS calibration sticker and certificate shall be provided.

VAL STN
4789 7-10K 3
FNFIS
INST VAL STN FNFIS 1 Analog barrier labelling bo be done as per drg.
VAL STN
4790 7-10K 4
FNFIS
INST VAL STN FNFIS 1 Panel Lamp shall be provided inside RTU panel.

As per revised drawing DGEN-2-54-0001, battery


VAL STN VAL STN
4791 7-11K 1
FNLGCS
ELEC
FNLGCS
2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN VAL STN dis connection from the load when the battery
4792 7-11K 2 ELEC 2
FNLGCS FNLGCS voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN VAL STN details shall be provided . The details such as
4793 7-11K 3 ELEC 2
FNLGCS FNLGCS DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN VAL STN
4794 7-11K 4
FNLGCS
ELEC
FNLGCS
2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN VAL STN
4795 7-11K 5
FNLGCS
ELEC
FNLGCS
1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN VAL STN
4796 7-11K 6
FNLGCS
INST
FNLGCS
1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN VAL STN Data sheet for battery and solar panel enclosure
4797 7-11K 7 ELEC 1
FNLGCS FNLGCS shall be provided.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN VAL STN


4798 7-11K 8
FNLGCS
INST
FNLGCS
1 SPIR for Solar and RTU panels shall be provided.

VAL STN VAL STN Pressure gage 5A-PI-0001 to be calibrate and


4799 7-11L 1 INST 1
FNLGCS FNLGCS calibration sticker and certificate shall be provided.

VAL STN VAL STN Multivariable transmitter to be calibrate and


4800 7-11L 2 INST 1
FNLGCS FNLGCS calibration sticker and certificate shall be provided.

VAL STN VAL STN


4801 7-11L 3
FNLGCS
INST
FNLGCS
1 Analog barrier labelling bo be done as per drg.
VAL STN VAL STN
4802 7-11L 4
FNLGCS
INST
FNLGCS
1 Panel Lamp shall be provided inside RTU panel.
As per revised drawing DGEN-2-54-0001, battery
VAL STN
4803 7-12J 1
FSDS
ELEC VAL STN FSDS 2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN dis connection from the load when the battery
4804 7-12J 2 ELEC VAL STN FSDS 2
FSDS voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN details shall be provided . The details such as
4805 7-12J 3 ELEC VAL STN FSDS 2
FSDS DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN
4806 7-12J 4
FSDS
ELEC VAL STN FSDS 2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN
4807 7-12J 5
FSDS
ELEC VAL STN FSDS 1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN
4808 7-12J 6
FSDS
INST VAL STN FSDS 1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN Data sheet for battery and solar panel enclosure
4809 7-12J 7 ELEC VAL STN FSDS 1
FSDS shall be provided.
VAL STN
4810 7-12J 8
FSDS
INST VAL STN FSDS 1 SPIR for Solar and RTU panels shall be provided.

VAL STN Pressure gage 5A-PI-0001 to be calibrate and


4811 7-12K 1 INST VAL STN FSDS 1
FSDS calibration sticker and certificate shall be provided.

VAL STN Multivariable transmitter to be calibrate and


4812 7-12K 2 INST VAL STN FSDS 1
FSDS calibration sticker and certificate shall be provided.

VAL STN
4813 7-12K 3
FSDS
INST VAL STN FSDS 1 Analog barrier labelling bo be done as per drg.
VAL STN
4814 7-12K 4
FSDS
INST VAL STN FSDS 1 Panel Lamp shall be provided inside RTU panel.

As per revised drawing DGEN-2-54-0001, battery


VAL STN
4815 7-13K 1
KNMP
ELEC VAL STN KNMP 2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
VAL STN dis connection from the load when the battery
4816 7-13K 2 ELEC VAL STN KNMP 2
KNMP voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
VAL STN details shall be provided . The details such as
4817 7-13K 3 ELEC VAL STN KNMP 2
KNMP DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
VAL STN
4818 7-13K 4
KNMP
ELEC VAL STN KNMP 2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
VAL STN
4819 7-13K 5
KNMP
ELEC VAL STN KNMP 1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
VAL STN
4820 7-13K 6
KNMP
INST VAL STN KNMP 1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
VAL STN Data sheet for battery and solar panel enclosure
4821 7-13K 7 ELEC VAL STN KNMP 1
KNMP shall be provided.
VAL STN
4822 7-13K 8
KNMP
INST VAL STN KNMP 1 SPIR for Solar and RTU panels shall be provided.

VAL STN Pressure gage 5A-PI-0001 to be calibrate and


4823 7-13L 1 INST VAL STN KNMP 1
KNMP calibration sticker and certificate shall be provided.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

VAL STN Multivariable transmitter to be calibrate and


4824 7-13L 2 INST VAL STN KNMP 1
KNMP calibration sticker and certificate shall be provided.

VAL STN
4825 7-13L 3
KNMP
INST VAL STN KNMP 1 Analog barrier labelling bo be done as per drg.
VAL STN
4826 7-13L 4
KNMP
INST VAL STN KNMP 1 Panel Lamp shall be provided inside RTU panel.
Substation
For KVM switch permanent power supply with
4827 7-30E 1 UMMBAB-B ELEC Control system 1
(SCS) circuit breaker shall be provided.
Substation
Spare 2 Nos. 230V AC power socket shall be
4828 7-30E 2 UMMBAB-B ELEC Control system 1
(SCS) provided near operator work station.

As per revised drawing DGEN-2-54-0001, battery


4829 7-36D 1 KNMP ELEC KNMP 2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
dis connection from the load when the battery
4830 7-36D 2 KNMP ELEC KNMP 2
voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
details shall be provided . The details such as
4831 7-36D 3 KNMP ELEC KNMP 2
DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
4832 7-36D 4 KNMP ELEC KNMP 2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
4833 7-36D 5 KNMP ELEC KNMP 1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
4834 7-36D 6 KNMP INST KNMP 1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
Data sheet for battery and solar panel enclosure
4835 7-36D 7 KNMP ELEC KNMP 1
shall be provided.
4836 7-36D 8 KNMP INST KNMP 1 SPIR for Solar and RTU panels shall be provided.

Pressure gage 5A-PI-0001 to be calibrate and


4837 7-36E 1 KNMP INST KNMP 1
calibration sticker and certificate shall be provided.

Multivariable transmitter to be calibrate and


4838 7-36E 2 KNMP INST KNMP 1
calibration sticker and certificate shall be provided.

4839 7-36E 3 KNMP INST KNMP 1 Analog barrier labelling bo be done as per drg.
4840 7-36E 4 KNMP INST KNMP 1 Panel Lamp shall be provided inside RTU panel.
As per revised drawing DGEN-2-54-0001, battery
4841 7Q 1 DPS/DESAL ELEC DPS/DESAL 2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
dis connection from the load when the battery
4842 7Q 2 DPS/DESAL ELEC DPS/DESAL 2
voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
details shall be provided . The details such as
4843 7Q 3 DPS/DESAL ELEC DPS/DESAL 2
DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
4844 7Q 4 DPS/DESAL ELEC DPS/DESAL 2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
4845 7Q 5 DPS/DESAL ELEC DPS/DESAL 1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
4846 7Q 6 DPS/DESAL INST DPS/DESAL 1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
Data sheet for battery and solar panel enclosure
4847 7Q 7 DPS/DESAL ELEC DPS/DESAL 1
shall be provided.
4848 7Q 8 DPS/DESAL INST DPS/DESAL 1 SPIR for Solar and RTU panels shall be provided.

Pressure gage 5A-PI-0001 to be calibrate and


4849 7R 1 DPS/DESAL INST DPS/DESAL 1
calibration sticker and certificate shall be provided.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Multivariable transmitter to be calibrate and


4850 7R 2 DPS/DESAL INST DPS/DESAL 1
calibration sticker and certificate shall be provided.

4851 7R 3 DPS/DESAL INST DPS/DESAL 1 Analog barrier labelling bo be done as per drg.

4852 7R 4 DPS/DESAL INST DPS/DESAL 1 Panel Lamp shall be provided inside RTU panel.

Loop check for


13-PIT-0147A: PAH Indication in DCS must be
4853 7-4H 1 FSDS INST DCS,ESD, 2
Himatrix & F&G second priority ( yellow color).
Loop check for
13-PIT-0147A: PAH Indication in DCS must be
4854 7-4H 2 FSDS INST DCS,ESD, 2
Himatrix & F&G second priority ( yellow color).
Loop check for
13-PIT-0147A: Location Tag at the field must be
4855 7-4H 3 FSDS INST DCS,ESD, 2
Himatrix & F&G Red color background.
Loop check for
4856 7-4H 4 FSDS INST DCS,ESD, 2 13-PIT-0147A: Alarm not appearing in Infi90 OIS.
Himatrix & F&G
Loop check for
13-PIT-0147B: PAH Indication in DCS must be
4857 7-4H 5 FSDS INST DCS,ESD, 2
Himatrix & F&G second priority ( yellow color).
Loop check for
13-PIT-0147B: PAH Indication in DCS must be
4858 7-4H 6 FSDS INST DCS,ESD, 2
Himatrix & F&G second priority ( yellow color).
Loop check for
13-PIT-0147B: Location Tag at the field must be
4859 7-4H 7 FSDS INST DCS,ESD, 2
Himatrix & F&G Red color background.

Loop check for


4860 7-4H 8 FSDS INST DCS,ESD, 2 13-PIT-0147B: Alarm not appearing in Infi90 OIS.
Himatrix & F&G
Loop check for
13-PIT-0147C: PAH Indication in DCS must be
4861 7-4H 9 FSDS INST DCS,ESD, 2
Himatrix & F&G second priority ( yellow color).
Loop check for
13-PIT-0147C: PAH Indication in DCS must be
4862 7-4H 10 FSDS INST DCS,ESD, 2
Himatrix & F&G second priority ( yellow color).
Loop check for
13-PIT-0147C: Location Tag at the field must be
4863 7-4H 11 FSDS INST DCS,ESD, 2
Himatrix & F&G Red color background.

Loop check for


4864 7-4H 12 FSDS INST DCS,ESD, 2 13-PIT-0147C: Alarm not appearing in Infi90 OIS.
Himatrix & F&G
Loop check for
13-SDV-0094: No partial stroke completed alarm
4865 7-4H 13 FSDS INST DCS,ESD, 2
Himatrix & F&G displayed in DCS after PST is initiated.
Loop check for
13-ESD-011 panel: Wrong tag number on trip push
4866 7-4H 14 FSDS INST DCS,ESD, 2
Himatrix & F&G button. It should be 13-HS-0144.
Loop check for
13-TI-199: During loop test ,Field & DCS
4867 7-4H 15 FSDS INST DCS,ESD, 2
Himatrix & F&G indications were not matching.

Loop check for 13-PAH/PAL-199,FAH/FAL-199 & TAH/TAL-199:


4868 7-4H 16 FSDS INST DCS,ESD, 2 Alarm indication Low/High in DCS must be second
Himatrix & F&G priority (Yellow color)
Loop check for
13-PAH/PAL-199,FAH/FAL-199 & TAH/TAL-199:
4869 7-4H 17 FSDS INST DCS,ESD, 2
Himatrix & F&G Alarms are not appearing in Infi90 OIS.
Loop check for
13-GDF-12-001, 002 & 003: High (H) alarm
4870 7-4H 18 FSDS INST DCS,ESD, 2
Himatrix & F&G indication on graphic shall be in yellow color.

Loop check for


13-GDF-12-001, 002 & 003: High-High (HH) alarm
4871 7-4H 19 FSDS INST DCS,ESD, 2
Himatrix & F&G indication on graphic shall be in red color.

Loop check for


13-GDF-12-001, 002 & 003: In alarm summary
4872 7-4H 20 FSDS INST DCS,ESD, 2
Himatrix & F&G page fault indication shall be in purple color.

Loop check for 13-GDF-12-001, 002 & 003: When fault comes,
4873 7-4H 21 FSDS INST DCS,ESD, 2 indication on graphic is not changing to purple
Himatrix & F&G color but stay healthy.
Loop check for
Loop drawing: On Sheet 7, the actual relay number
4874 7-4H 22 FSDS INST DCS,ESD, 2
Himatrix & F&G used is to be corrected/updated.

Loop check for


Visual alarm And Audible Alarm not coming on
4875 7-4H 23 FSDS INST DCS,ESD, 2
Himatrix & F&G graphic
Loop check for
XS-01-0001 Start FW pump not coming on alarm
4876 7-4H 24 FSDS INST DCS,ESD, 2
Himatrix & F&G summary
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Loop check for All intertrip signals to/from ESD & F&G system
4877 7-4H 25 FSDS INST DCS,ESD, 2 need to be tested and confirmed when the plant is
Himatrix & F&G down.
4878 7-8O 1 STATION-N INST STATION-N 1 61-I-JB-F-0420/421JB tag to be replaced.
61-GDF-06-0001 cable tag should be the only
4879 7-8O 2 STATION-N INST STATION-N 1
cable tag in drawing / in field is the only tag.
4880 7-8O 3 STATION-N INST STATION-N 1 61-FDI-06-0001,2 JB tag to be corrected.
Panel-61-FGP-6103 with TB6A tag not required
4881 7-8O 4 STATION-N INST STATION-N 1
cable no: follow existing
Panel-61-FGP-6103 termination cable tag is too
4882 7-8O 5 STATION-N INST STATION-N 1 long & cannot see it is cover in cable tray, thus
useless.
Panel FGP-6103 override switch D1 is ok but lamp
4883 7-8O 6 STATION-N INST STATION-N 1 does not show in drawing. Lamp output in drawing
to be added.
Override switch cable log not fixed properly, found
4884 7-8O 7 STATION-N INST STATION-N 1
loose.
61-GDF-06-0001 H/HH alarm not configured in
4885 7-8O 8 STATION-N INST STATION-N 1
scada local.
Scada face plate in override condition alarm does
4886 7-8O 9 STATION-N INST STATION-N 1
not appear in face plate / alarm summary.
DCS face plate trend should be enabled /
4887 7-8O 10 STATION-N INST STATION-N 1
seamless.
DCS device icon H alarm indication appears while
4888 7-8O 11 STATION-N INST STATION-N 1
reconnecting the device.
DCS face plate alarm/event: HH alarm does not
4889 7-8O 12 STATION-N INST STATION-N 1
appear in tag 61-GDF-0002,3.
DCS 61-GDF-0007 o/r put on alarm appears in
alarm & event with time on but o/r removing act to
4890 7-8O 13 STATION-N INST STATION-N 1
rechange ok but timing not config. Both timing o/r
on/off are same.
61-FGP-6102 & 6103 panel o/r switch tag not in
4891 7-8O 14 STATION-N INST STATION-N 1
sequence, to be corrected.
61-FGP-6102 & 6103 o/r switch tag to be fixed as
4892 7-8O 15 STATION-N INST STATION-N 1
existing material.
61-GDT-0001 scada faceplate scale range analog
4893 7-8O 16 STATION-N INST STATION-N 1
value unit is %, to be changed to ppm.
Fire & gas layout page's device icon arrow to have
4894 7-8O 17 STATION-N INST STATION-N 1
confirmed direction.
61-FDI-06-0001, 2, 3, 4 alarm icon colour
4895 7-8O 18 STATION-N INST STATION-N 1 appeared red in B but yellow in D & loc, to be
changed to red.
G&E chart line no. 8 tax tag to be changed from
4896 7-8O 19 STATION-N INST STATION-N 1
SIR-0001 to XL-0001
G&E chart hard copy should match with DCS soft
4897 7-8O 20 STATION-N INST STATION-N 1
copy.
SIR-06-0001, XL-06-0001 & 0002 light/siren
4898 7-8O 21 STATION-N INST STATION-N 1
direction should be towards plant - N/S to E/W.
SIR-06-0002, XL-06-0003,4 light/siren direction
should be towards plant as above, and pole to be
4899 7-8O 22 STATION-N INST STATION-N 1
relocated to centre of W side, currently in NW
corner.
61-MAC-06-0002/01 (condition) eng to be changed
4900 7-8O 23 STATION-N INST STATION-N 1
to alarm in alarm summary page.
61-MAC-06-0002 during o/r active alarm is
4901 7-8O 24 STATION-N INST STATION-N 1 appearing in faceplate while other GDF/GDT/FDI
does not have same philosophy.
61-GDT-06-0001, 2, 3 calibration not found ok.
4902 7-8O 25 STATION-N INST STATION-N 1 Device 90 ppm, cylinder 25 ppm & DCS/scada
indication is 12 ppm. Needs recalibration.
Page E&D overview-1 (ESD common reset) icon
4903 7-8O 26 STATION-N INST STATION-N 1
should be provided on each ESD valve page.
Follow up loop tag sequence: SDV-0271 & TX 61-
PI-0271 A/B/C ok, SDV-0273 & TX 61-PI-0275
4904 7-8O 27 STATION-N INST STATION-N 1
A/B/C ?, SDV-0274 & TX 61-PI-0276 A/B/C ?,
SDV-0272 & TX 61-PI-0274 A/B/C ?
61-PI-0274 A/B/C TX to be provided a page link for
4905 7-8O 28 STATION-N INST STATION-N 1
SDV-0272
61-PI-272 A/B/C/D/E HH alarm to be configured in
4906 7-8O 29 STATION-N INST STATION-N 1
graphic tag icon.
Scada faceplate & graphic all low/high alarm
4907 7-8O 30 STATION-N INST STATION-N 1
should be yellow & low low high high red.
61-PIC-273A-E dotter line TX connection to be
4908 7-8O 31 STATION-N INST STATION-N 1
corrected.
Panel 61-SC-0271 all perole to be corrected as per
4909 7-8O 32 STATION-N INST STATION-N 1
red line loop drawing.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

61-MOV-0282 (mov open/close command) alarm in


4910 7-8O 33 STATION-N INST STATION-N 1 faceplate should be removed after valve open or
close.

4911 7-8O 34 STATION-N INST STATION-N 1


61-MOV-0274 faceplate send command to be
made same, should be up not down.
61-PIC-0272 A-E diode or resistor should be fixed
4912 7-8O 35 STATION-N INST STATION-N 1
with lug/sleeve.
4913 7-8O 36 STATION-N INST STATION-N 1 ESD panel spare hole to be blind fixed.

61-MOV-0276 closing 0.62% error. To be removed.


4914 7-8O 37 STATION-N INST STATION-N 1
(All MOV on close position should be 0.0%)

All MOV during change, local/remote (common


4915 7-8O 38 STATION-N INST STATION-N 1
fault alarm) appears and should not.
61-MOV-0274 position CMD & position feedback
4916 7-8O 39 STATION-N INST STATION-N 1
3% error to be removed.
61-MOV-074 in send command valve is moving but
4917 7-8O 40 STATION-N INST STATION-N 1 in between, stop command is disabled and not
working. Requires to be enabled.
Scada input transmitter A/B selection to be config
4918 7-8O 41 STATION-N INST STATION-N 1
alarm.
61-PIC-0272 A-E controller current config data
4919 7-8O 42 STATION-N INST STATION-N 1
sheet to be provided.
4920 7-8O 43 STATION-N INST STATION-N 1 All transmitters data/cal sheet to be provided.
Provide the all field instrument alarm setting list &
4921 7-8O 44 STATION-N INST STATION-N 1
data cal sheet.
4922 7-8O 45 STATION-N INST STATION-N 1 FT-179 tag to be replaced with FT-183. PT-TT also.
PSL-0299 tag to be changed from field and scada
4923 7-8O 46 STATION-N INST STATION-N 1
graphic PSL-292A to E.
61-SRV-0202 A/B remove one line which is
4924 7-8O 47 STATION-N INST STATION-N 1
depressurizing direct.
Process flow overview A/B/C provide all complete
4925 7-8O 48 STATION-N INST STATION-N 1
tags.
4926 7-8O 49 STATION-N INST STATION-N 1 61-PI-0271 A/B/C (2003) signal line to be corrected.

4927 7-8O 50 STATION-N INST STATION-N 1 61-PI-0276 A/B/C (2003) signal line to be corrected.
61-MOV-0286 & 0287 in between shows nothing.
4928 7-8O 51 STATION-N INST STATION-N 1
Press going to flare. In graphic
Khuff gas tie in header existing tag are blind and
4929 7-8O 52 STATION-N INST STATION-N 1
alarm. Should be displayed with signal.

(Press control system) 61-PIC-0273A-E signal line


4930 7-8O 53 STATION-N INST STATION-N 1
to be corrected. PI-0274 A-E also to be corrected.

FT-179 flow meter JB power connection to be fixed


4931 7-8O 54 STATION-N INST STATION-N 1
safely.
61-I-JB-C-0446 to be fixed tag TB-X1, TB-X2, TB-
4932 7-8O 55 STATION-N INST STATION-N 1
X3
PCV-272 A-E air tank PSL-272 tag to be replaced
4933 7-8O 56 STATION-N INST STATION-N 1 with PSL-299 and to be calibrate as per document
setting.
PCV-272 A&C press regulator are found air leak to
4934 7-8O 57 STATION-N INST STATION-N 1
be replaced.

PCV-272 A-E on scada mode (cont.) on auto


output changing as per set change and same put
4935 7-8O 58 STATION-N INST STATION-N 1
on man but output still increasing/decreasing till full
output. Controller/parameter to be checked.

All flow meters JB (electronic card) require sun


4936 7-8O 59 STATION-N INST STATION-N 1
shade.
All flow meters PT and TT transmitters to be config
4937 7-8O 60 STATION-N INST STATION-N 1
fault alarm.
All flow meters flow data face plate only mmSCF/d
4938 7-8O 61 STATION-N INST STATION-N 1
found ok. Other 3 to be configured.
61-FI-182 H alarm in graphic not ok. To be config
4939 7-8O 62 STATION-N INST STATION-N 1
properly.
PSL-0271 of SDV-0271 setting cover not fixed. To
4940 7-8O 63 STATION-N INST STATION-N 1
be fixed with O-ring.
SDV-271 open son manual reset not good
4941 7-8O 64 STATION-N INST STATION-N 1
sufficient approachable on plate form.
Ready to open 61-XL-0271A loop resister to be
4942 7-8O 65 STATION-N INST STATION-N 1
fixed with lug.
4943 7-8O 66 STATION-N INST STATION-N 1 SDV-JB to be fixed TB tags.
PT-0271 A/B/C required needle isolating valves.
4944 7-8O 67 STATION-N INST STATION-N 1
Please do for all PTs.
All flow meter JB power cable lugs not fixed
4945 7-8O 68 STATION-N INST STATION-N 1
properly. Fix lug/insulated properly.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

SDV-0274 required plate form for approach


4946 7-8O 69 STATION-N INST STATION-N 1
panel/reset/hand pump.
All flow meter PT have needle valves only.
4947 7-8O 70 STATION-N INST STATION-N 1
Mech/insolating valve required.
DCS panel all redundant card to be tag
4948 7-8O 71 STATION-N INST STATION-N 1
primary/secondary.
RLY output drawing to be corrected. Shows the
4949 7-8O 72 STATION-N INST STATION-N 1
fuse and fuse number?
SDV-0272/0273/0274/0271 local mode valve
4950 7-8O 73 STATION-N INST STATION-N 1 getting closed from shade. Should be only in
remote mode.
SDV-0272 close PB should be disabled in face
4951 7-8O 74 STATION-N INST STATION-N 1
plate.
SDV- open or close command should disappear in
4952 7-8O 75 STATION-N INST STATION-N 1
face plate when valve gets open/close colour
61-XS-0275 & 0276 PIg signaler assembly to be
4953 7-8O 76 STATION-N INST STATION-N 1
installed back.
61-SDV-0274 face plate (ESD trip healthy) red
colour for alarm & green for normal. Change text
4954 7-8O 77 STATION-N INST STATION-N 1
(ESD trip healthy) for normal and (ESD trip
activated) for alarm.
F&G system fault XS-FGF to be added in C/E chart
4955 7-8O 78 STATION-N INST STATION-N 1
graphic.
61-SDV-0274 to be installed back, this valve is not
4956 7-8O 79 STATION-N INST STATION-N 1
tested or confirmed F&G.

FXA-0101 confirm fire & gas 0 signal loop should


4957 7-8O 80 STATION-N INST STATION-N 1 be ready and (alarm to fire station) future up to
termination should be ready. But wiring not found.

C&E chart in DCS monitor line no: 4 to add SIR-


4958 7-8O 81 STATION-N INST STATION-N 1
0002.
C&E chart in DCS monitor line no: 8 to correct SIR
4959 7-8O 82 STATION-N INST STATION-N 1
to XL 2
C&E chart in DCS monitor line no: 15 to add SDV
4960 7-8O 83 STATION-N INST STATION-N 1
tags.
C&E chart in DCS monitor line no: 17 to add F&G
4961 7-8O 84 STATION-N INST STATION-N 1
system fault.
C&E chart in DCS monitor line no: 13 toa dd
4962 7-8O 85 STATION-N INST STATION-N 1
PAGA.

Acknowledge/test/reset/buzzer/HH to have correct


4963 7-8O 86 STATION-N INST STATION-N 1
tag in alarm summary page as per document.

4964 7-8O 87 STATION-N INST STATION-N 1 Test push button to be added lamp.
61-ESD-0002 buzzer alarm to be removed from
4965 7-8O 88 STATION-N INST STATION-N 1
alarm summary page.
4966 7-8O 89 STATION-N INST STATION-N 1 61-LSH-272 to add level setting in alarm text.
Scada server control information page to be
4967 7-25S 1 STATION-U INST STATION-U 1
configured in UBMS-A
62-LI-0003 face plate EU should be written unit not
4968 7-25S 2 STATION-U INST STATION-U 1
1750 also add % scale in bar graph
4969 7-25S 3 STATION-U INST STATION-U 1 History trend not responding
62-LCP-0014 for ESOV-0014 TB 1 termination 1-
4970 7-25S 4 STATION-U INST STATION-U 1
12 tags to be fixed

ESDV-0014 fire box doors are too heavy and plate


4971 7-25S 5 STATION-U INST STATION-U 1
form is not suit to approach in side the valve

ESDV-0014 air volume tank PSV to be fixed


4972 7-25S 6 STATION-U INST STATION-U 1
isolating valve
As built drawing of JBs termination to be kept in
4973 7-25S 7 STATION-U INST STATION-U 1
field JBs

MOV-0308, 307, cable lugs to be replaced with


4974 7-25S 8 STATION-U INST STATION-U 1
proper size. Power cover screw to be fixed properly

LCV-0002 day tank of D. Gen should not operate


4975 7-25S 9 STATION-U INST STATION-U 1 on manual with operator password as per
philosophy
New GDF devices of zone 3 to be added in old
4976 7-25S 10 STATION-U INST STATION-U 1 mimic status page. To be conformed and correct
the old and new mimic page
Scada system mimic page HSSD Title to be
4977 7-25S 11 STATION-U INST STATION-U 1
changed to LV ROOM
62-GDF-0089 during loop check found
4978 7-25S 12 STATION-U INST STATION-U 1 disable/enable not configured for individual
override alarm. Applies to all
F&G mimic pane zone 3 LED light is faulty. To be
4979 7-25S 13 STATION-U INST STATION-U 1
replaced
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

F&G panel mimic in old control room flammable


4980 7-25S 14 STATION-U INST STATION-U 1 detection HH alarm appeared but sound buzzer not
working
F&G mimic panel old control room HSSD fault LED
4981 7-25S 15 STATION-U INST STATION-U 1
to be replaced
Disable /enable switch alarm should be appeared
in dual and device override switch alarm should be
4982 7-25S 16 STATION-U INST STATION-U 1
appeared in dual. Both alarms are appeared with
device override switch

In dual alarm GDF-0091 H & HH alarm appeared


4983 7-25S 17 STATION-U INST STATION-U 1 but with this one more alarm appear (Noze-3/20%
confirmed flammable gas detection) should not appear

GDF-05-0001, 2, 3 face plate HH alarms are


4984 7-25S 18 STATION-U INST STATION-U 1
missing in UBMS A only
GDF-05-0001, 2 & 3 HH alarm not appearing in
4985 7-25S 19 STATION-U INST STATION-U 1
Khuff B & D
GDF-05-004 & 005 face plate tag name to be
4986 7-25S 20 STATION-U INST STATION-U 1
corrected. Hydrogen flammable gas detection.
F&G system information page flame detection to
4987 7-25S 21 STATION-U INST STATION-U 1 be corrected and add confirmed flame as like gas
detection
62-mimic-05-ORD-Z common alarm zone 5 double
4988 7-25S 22 STATION-U INST STATION-U 1
time appears in alarm summary
Mimic panel heat detector to be add zone 5 alarms
4989 7-25S 23 STATION-U INST STATION-U 1
only
MAC-06-0001 during override alarm appears in
4990 7-25S 24 STATION-U INST STATION-U 1
mimic panel
62-FGP-0001 panel (Station-U old control room) to
4991 7-25S 25 STATION-U INST STATION-U 1
be added heat detector column

Zone 5 in old control room 02-HD-05-0001, 0002


4992 7-25S 26 STATION-U INST STATION-U 1
LED indications not appearing in mimic panel

Charger 1, 2 to be added (110 Vac) voltage output


4993 7-25S 27 STATION-U INST STATION-U 1
in tag
Alarm tag 62-HSSD-05-0001-01 should be removed
4994 7-25S 28 STATION-U INST STATION-U 1 and in description level-1 to be replaced with alert. And
also fire
Provide data sheet (program) sheet of HSSD-01 &
4995 7-25S 29 STATION-U INST STATION-U 1
02

HSSD-0001 to be confirmed program with Alert-


4996 7-25S 30 STATION-U INST STATION-U 1 2/fire 1 and fire 2 alarm fault alarm also appearing
while with Alert-1 alarm fault is not appearing

Face plate Alert-1 colour to be changed to yellow


4997 7-25S 31 STATION-U INST STATION-U 1
(currently red)
Face plate Alert-2 colour to be changed to red
4998 7-25S 32 STATION-U INST STATION-U 1
(currently violet)
4999 7-25S 33 STATION-U INST STATION-U 1
Note: required Alert-1, 2 yellow and fire 1, 2 red in
graphic face plate
HSSD-05-0002 fault should not appear in mimic
panel in alert & fire alarms (all levels) and should
5000 7-25S 34 STATION-U INST STATION-U 1
be reset from old control room mimic panel, not
with controller reset
5001 7-25S 35 STATION-U INST STATION-U 1 62-SC-0001 to be changed to tag 12-SCA-0004

5002 7-25S 36 STATION-U INST STATION-U 1


MOV-0310 send command ^ v down icon v to be
changed with
MOV-0310 face plate (fault feedback) alarm always
5003 7-25S 37 STATION-U INST STATION-U 1
appears on local mode
MOV-0310 face plate send indication to be remove
5004 7-25S 38 STATION-U INST STATION-U 1
point. 2.12345 only need 2.00 (two digit)
MOV-0310 sends set point and feedback indication
5005 7-25S 39 STATION-U INST STATION-U 1
0.61 % error to be corrected
MOV-0310 on local mode manual command is
5006 7-25S 40 STATION-U INST STATION-U 1 confirmed but not action is ok but if possible
message should come for wrong command
MOV-0310 fault feed back alarm appeared in face
5007 7-25S 41 STATION-U INST STATION-U 1
plate
MOV-0310 face plate in send command valve
5008 7-25S 42 STATION-U INST STATION-U 1
should accept stop command.
MOV-0310 valve is in close position and 50% open
5009 7-25S 43 STATION-U INST STATION-U 1
command send not accepted
MOV-0309 feedback indication not working. So test
5010 7-25S 44 STATION-U INST STATION-U 1
job is pending
5011 7-25S 45 STATION-U INST STATION-U 1 Tag name plate to be fixed on F&G and ESD panels
Heat detection alarm LED of zone 5&6 to be added
5012 7-25S 46 STATION-U INST STATION-U 1
in mimic panel in old controller room.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Main page (ESD alarm overview) in ESD alarm


5013 7-25S 47 STATION-U INST STATION-U 1 status to add fire confirmed (FDI) gas confirmed
(GDF), confirmed pressure low according to zones.

Pressure transmitter PT-00032 A/B/C voting icon


5014 7-25S 48 STATION-U INST STATION-U 1 (2003) to be replaced with green colour for normal
and red for alarm
Air low pressure alarm of SDV-0014 (PSL-0014)
always appering while operating the valve due to
5015 7-25S 49 STATION-U INST STATION-U 1
swith installed in valve panel (normally) switch
should be installed on air vessel)
SDV-0012 while testing open/close (partial stroke),
alarm and valve icom colour (blue) should not
5016 7-25S 50 STATION-U INST STATION-U 1
appear. Should be interlocked only with partial
stroke command.
SDV-0012 if on local mode and on face plate, close
5017 7-25S 51 STATION-U INST STATION-U 1
command button to be disabled.

SDV-0012 after completion partial stroke required


5018 7-25S 52 STATION-U INST STATION-U 1
alarm (partial stroke sequence completion)

SDV-0012 PT-0032A pressure alarm appears 2min


5019 7-25S 53 STATION-U INST STATION-U 1 late and valve close indicator alarm appears first.
Timing is noted 9.13 & 9.11 minutes.

SDV-0012 during partial stroke test on 90% partial


5020 7-25S 54 STATION-U INST STATION-U 1
stroke alarm should appear in alarm summary.

SDV-0012 penumatic diagram, panel wiring, test


5021 7-25S 55 STATION-U INST STATION-U 1
procedure drawing should be kept in panel.
FDI-006,67 legend colour yellow (H) FDI to be
5022 7-25S 56 STATION-U INST STATION-U 1
removed and added in red (HH).
62-GDF-05-0001,2,3 HVAC inlet test is completed
up to IRC panel relays but actual trip HVAC and
5023 7-25S 57 STATION-U INST STATION-U 1
scada mimic page. Alarm still pending due to
HVAC wiring/power.
62-GDF-05-0004,5 hydrogen gas detector tag and
5024 7-25S 58 STATION-U INST STATION-U 1
test to be corrected as built & also alarm.
5025 7-25S 59 STATION-U INST STATION-U 1 62-SIR-05 zone 05 all SI tag to be changed to SIR.

62-SI-05-0003 siren tag to be changed


5026 7-25S 60 STATION-U INST STATION-U 1 62-SL-05-0003 because same one with other SL
used in side room.

62-HSSD-05-0001 level 4 to be added in C7E new


5027 7-25S 61 STATION-U INST STATION-U 1 trip signal 62-XS-DC TRIP. Also to add in alarm
summary new alarm 62-GCP-0001/62-DB-6203-01

SCADA gets hanged when 62-LI-0003 Trend


5028 7-25T 1 STATION-U INST STATION-U 2
opens.
62-LCV-0002 manual operation should be only for
5029 7-25T 2 STATION-U INST STATION-U 2 maintenance purpose, it should be disabled during
operator login.
F & G zone 5 & 6 should add in the existing F & G
5030 7-25T 3 STATION-U INST STATION-U 2 mimic matrix page.Zone 3 alarms need to
configure in MIMIC page.
F & G Zone status text should change to F & G
5031 7-25T 4 STATION-U INST STATION-U 2
mimic matrix Zone 5 & 6.
5032 7-25T 5 STATION-U INST STATION-U 2 F & G zone status page title should correct.
F & G status page common alarm for zone 6 not
5033 7-25T 6 STATION-U INST STATION-U 2
configured.
F & G zone status page "Telemetry Room HSSD-
5034 7-25T 7 STATION-U INST STATION-U 2 05-0002 status" should change to "LV Room
HSSD-05-0002".
F & G zone status page: F & G alarm status "F G
5035 7-25T 8 STATION-U INST STATION-U 2 MOS status for zone 05" should change to "F & G
MOS enable switch status zone-05"
F & G zone status page: F & G alarm status "F G
5036 7-25T 9 STATION-U INST STATION-U 2 MOS status for zone 06" should change to "F & G
MOS enable switch status zone-06"
F & G detectors overrides should not be enabled
5037 7-25T 10 STATION-U INST STATION-U 2
unless zone enable switch is enabled.
New F & G Device alarms not configured in the
5038 7-25T 11 STATION-U INST STATION-U 2
existing station u mimic matrix page.
5039 7-25T 12 STATION-U INST STATION-U 2 Trends not available for the F & G devices.
Open circuit/short circuit alarms not available on
5040 7-25T 13 STATION-U INST STATION-U 2
the F & G detectors faceplates.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

"STUFN62GDF8288" zone 3 20% confirmed alarm


5041 7-25T 14 STATION-U INST STATION-U 2 is appearing even when one detector is activated
in zone 3.Alarm description should complete also.

F & G Zone numbers should mention on the main


5042 7-25T 15 STATION-U INST STATION-U 2
page buttons.
HH alarm setting for 62-GDF-0001/0002/0003 not
5043 7-25T 16 STATION-U INST STATION-U 2
available in the UBMSA loc.
62-GDF-05-0001/0002/0003 "HH" alarm not
5044 7-25T 17 STATION-U INST STATION-U 2
available in Khuff B/D SCADA.
62-GDF-05-0004/0005 Faceplate description
5045 7-25T 18 STATION-U INST STATION-U 2
should change to "Hydrogen gas detector"

In F & G zone status page flame column "Gas


5046 7-25T 19 STATION-U INST STATION-U 2
detected" text should change to "Flame detected".

In existing station u F &G mimic matrix page zone


5047 7-25T 20 STATION-U INST STATION-U 2 3 Fault alarms needed to be checked, as some
alarms already present it could not be checked.

All ESD related alarms like Confirmed


5048 7-25T 21 STATION-U INST STATION-U 2 gas,HSSD,Pressure Lo Lo voting should add In the
ESD alarm overview page
When override 62-MAC-06-0001 alarm not
5049 7-25T 22 STATION-U INST STATION-U 2
appearing in the mimic matrix page
For HSSD Alert 1/Alert 2 alarm indications should
5050 7-25T 23 STATION-U INST STATION-U 2 be in yellow in color and Fire 1 /Fire 2 should be in
Red color.
Zone 5 heat detection not configured in the mimic
5051 7-25T 24 STATION-U INST STATION-U 2 matrix page and Mimic Matrix on the F & G
panel.
62-HSSD-05-0001/0002 alert alarm appears in the
5052 7-25T 25 STATION-U INST STATION-U 2
mimic matrix page along with fault alarm.
For HSSD fault alarm appears along with
5053 7-25T 26 STATION-U INST STATION-U 2
alert 2.
62-MOV-0309/0310 when in the local mode "Fault
5054 7-25T 27 STATION-U INST STATION-U 2 feedback" alarm also appears need to rectify this
alarm.
5055 7-25T 28 STATION-U INST STATION-U 2 62-MOV-0310 not opening 100% need to rectify.
62-MOV-0310 faceplate "Manual Position input
5056 7-25T 29 STATION-U INST STATION-U 2
box" should not show feedback value.

62-MOV-0310 faceplate stop button is ineffective


5057 7-25T 30 STATION-U INST STATION-U 2
when the valve operated by inputting % values.

62-MOV-310 without open command Send


5058 7-25T 31 STATION-U INST STATION-U 2
command is inoperative.
5059 7-25T 32 STATION-U INST STATION-U 2 62-MOV-309, % feedback not working.
62-PI-0032A/B/C 2OO3 logic symbol color should
5060 7-25T 33 STATION-U INST STATION-U 2
change according to the status.
62-PI-0032A/B/C Real time trend not available in
5061 7-25T 34 STATION-U INST STATION-U 2
SCADA.
62-SDV-0014 when in Local mode "Close"
5062 7-25T 35 STATION-U INST STATION-U 2 command button on the face plate should be
disabled.

Alarm text for 62-SDV-0014 open permissive shall


5063 7-25T 36 STATION-U INST STATION-U 2
be "ON" and "OFF" instead of "Normal" "Alarm"

62-SDV-0014 close command from the SCADA


5064 7-25T 37 STATION-U INST STATION-U 2
alarm not available.
5065 7-25T 38 STATION-U INST STATION-U 2 Alarm for SDV reset not available in the SCADA.

5066 7-25T 39 STATION-U INST STATION-U 2 SL & SI not activating for MAC-05-0005/0006
5067 7-25T 40 STATION-U INST STATION-U 2 Hydrogen sensor Hi alarm color should be red.
62-HD-05-001/002 while override alarm not getting
5068 7-25T 41 STATION-U INST STATION-U 2
in mimic.
Zone 5 & 6 Heat detection not added in mimic
5069 7-25T 42 STATION-U INST STATION-U 2
page.
In SCADA MIMIC matrix page should be configure
5070 7-25T 43 STATION-U INST STATION-U 2
all the zone alarms.
All the Switches and Lamps should be Traffolyte
5071 7-25T 44 STATION-U INST STATION-U 2
tagged.
GDF 20% Confirmed alarm triggers 50% confirmed
5072 7-25T 45 STATION-U INST STATION-U 2 alarm (STUFNG62GDF0038288) also should
rectify.
GDF 20% Confirmed alarm appears when one
5073 7-25T 46 STATION-U INST STATION-U 2
GDF in Hi alarm.
5074 7-25T 47 STATION-U INST STATION-U 2 SDV Trip alarm should be "SDV-0014 Trip"
5075 7-25T 48 STATION-U INST STATION-U 2 Partial stroke 10% close alarm not available.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

"partial stroke permissive " should go off if partial


5076 7-25T 49 STATION-U INST STATION-U 2
stroke not initiated within a time period.
"ESD on flame dtection" alarm should correct to
5077 7-25T 50 STATION-U INST STATION-U 2
"ESD on flammable gas detection".
zone 5 & 6 alarm not muting when mimic panel
5078 7-25T 51 STATION-U INST STATION-U 2
mute button activated.
F & G Trip activated condition by overriding BPFG-
0001, Valve can be resetted.but when override
5079 7-25T 52 STATION-U INST STATION-U 2
removes valve not tripping open sov keeps
energized.
For 62-SDV-0014 Discrepancy alarm need to
5080 7-25T 53 STATION-U INST STATION-U 2
configure.
"STNUFNG62XA0021" and
"STNUFNG62FDI0003636S" alarm description
5081 7-25T 54 STATION-U INST STATION-U 2
shall be "Zone-3 confirmed flame detection 2 out of
5
Zone 5 confirmed 10% and 20% 2OO3 alarm not
5082 7-25T 55 STATION-U INST STATION-U 2
available in SCADA (NEB)
Data not available in mimic matrix F & G
5083 7-25T 56 STATION-U INST STATION-U 2 alarm statuscommon alarms zone 5 and
zone 6.
62-GDF-05-0004/0005 Hydrogen gas 10 %
confirmed alarm tags and action need to confirm
5084 7-25T 57 STATION-U INST STATION-U 2
and correct in C & F page 62-XS-CG-05,62-XS-
CG-05-1.
62-HD zone 5 & 6 not configured in UBMSA
5085 7-25T 58 STATION-U INST STATION-U 2
SCADA.
Zone 6 HDR heat detection confirm DG Trip (62-
5086 7-25T 59 STATION-U INST STATION-U 2
XS-CF-6) alarm not appear in the alarm page.
62-HSSD-05-0001/0002 level 4 switchgear trip
5087 7-25T 60 STATION-U INST STATION-U 2 alarm "62-XS-CF-05","62-XS-CF-05-1" description
need to be corrected as per C&F.
Alarm should appear on the faceplate when
5088 7-8P 1 STATION-N INST STATION-N 2
detector In override condition.
5089 7-8P 2 STATION-N INST STATION-N 2 GDT unit in the faceplate should change to PPM
5090 7-8P 3 STATION-N INST STATION-N 2 FDI alarm color in the graphic should be red.
In all the graphic pipe line color codes need to
5091 7-8P 4 STATION-N INST STATION-N 2
verify.
61-PI-0274 A/B/C transmitter tags shall be
5092 7-8P 5 STATION-N INST STATION-N 2 interchange with 61-PI-0276A/B/C inorder to match
PTs tags with SDV tag.
61-0272 should linked to 2OO3 voting transmitters
5093 7-8P 6 STATION-N INST STATION-N 2
in the graphic.
61-PI-0272 A/B/C/D/E "HH" alarm not appearing in
5094 7-8P 7 STATION-N INST STATION-N 2
the graphics.
61-PI-0274 A/B/C low alarm should be in yellow
5095 7-8P 8 STATION-N INST STATION-N 2
color.
PCV-0272 A/B/C/D/E open/transit/close indications
5096 7-8P 9 STATION-N INST STATION-N 2
shall be provided.

61PY-0272A/B/C/D/E status alarm in generating


5097 7-8P 10 STATION-N INST STATION-N 2
when control mode changes from SCADA to SLPC.

Common fault alarm appears along with "Local"


5098 7-8P 11 STATION-N INST STATION-N 2
feedback for the MOVs.
5099 7-8P 12 STATION-N INST STATION-N 2 MOV alarms need to clarify.
61-MOV-0274 open/closelstop and send
5100 7-8P 13 STATION-N INST STATION-N 2
operations need to verify.
61-MOV-0273 Local/Remote feedback alarm in
alarm page showing error since remote operation
5101 7-8P 14 STATION-N INST STATION-N 2
facility not given for this valve,this alarm shall be
removed.
5102 7-8P 15 STATION-N INST STATION-N 2 61-FT/PT/TT-179 tag should correct.
5103 7-8P 16 STATION-N INST STATION-N 2 Fault alarm not available for the floe transmitters.

61-FI/PI/TI-182 High and Low alarms need to


5104 7-8P 17 STATION-N INST STATION-N 2 configure correctly.they are showing high alarm
even when the value is zero.
61-FI/PI/TI-183 High and Low alarms need to
5105 7-8P 18 STATION-N INST STATION-N 2 configure correctly.they are showing high alarm
even when the value is zero.
SDV close/open command should go off after the
5106 7-8P 19 STATION-N INST STATION-N 2
close/open feedback received.
Close button on SDV faceplate should be disabled
5107 7-8P 20 STATION-N INST STATION-N 2
when the valve is in local mode.
"close command from SCADA" alarm not available
5108 7-8P 21 STATION-N INST STATION-N 2
for the SDVs.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Partial stroke Success or failed alarm not available


5109 7-8P 22 STATION-N INST STATION-N 2
for the SDVs.
In remote mode SDVs should not be able to close
5110 7-8P 23 STATION-N INST STATION-N 2
from the field.
For the Pig signaller respective Pig launcher
5111 7-8P 24 STATION-N INST STATION-N 2 /receiver tag shall be mention in the alarm
description.
5112 7-8P 25 STATION-N INST STATION-N 2 61-XS-0275/0276 not installed.
GDF 2OON 20%and 50% confirmed alarm not
5113 7-8P 26 STATION-N INST STATION-N 2
available.
61-HS-0001A alarm decription shall be "F &G mos
5114 7-8P 27 STATION-N INST STATION-N 2
for SFG process area"
61-SDV-0172 "confirmed F & G intertrip from fire
5115 7-8P 28 STATION-N INST STATION-N 2
and gas system" alarm need to verify.
5116 7-8P 29 STATION-N INST STATION-N 2 61-SDV-0274 not installed.
5117 7-8P 30 STATION-N INST STATION-N 2 GDT 2OON confirmed alarm not available.
5118 7-8P 31 STATION-N INST STATION-N 2 FDI 2OON confirmed alarm not available.
SCADA panel primary/Secondary ethernet cables
5119 7-8P 32 STATION-N INST STATION-N 2 need to interchange to match existing
primary/Secondary color coding philosophy.
Traffolyte tags should provide for the F & G
5120 7-8P 33 STATION-N INST STATION-N 2
override on ESD panel.
Dead leg appeared due to 14'' BV not used for
5121 7-38F 1 FMDS MECH FMDS 1 RAG flow, Please arrange to demolish with
associated pipe lines.
Loop Drawing for 55-FDI-01-0003 should be
5122 7-31N 1 KSFGSS INST KSFGSS 2
corrected as actual installation
Cable ferruls for 55-SI-01-0001/XL-01-0001/ SI-
5123 7-31N 2 KSFGSS INST KSFGSS 2 02-0001/XL-02-0001 should be corrected on
junction box side
Heat detector should be added on scada graphic
5124 7-31N 3 KSFGSS INST KSFGSS 2
"F&G SYSTEM INFORMATION"

Override Status for Zone 3 scada mimic graphic


5125 7-31N 4 KSFGSS INST KSFGSS 2
not updated on MOCB&MOCD

55-HSSD-03-0001 status not updated on scada


5126 7-31N 5 KSFGSS INST KSFGSS 2
faceplate

F&G Panel temperature High is updated on scada


5127 7-31N 6 KSFGSS INST KSFGSS 2
mimic graphic

Provide Cause & Effect graphic on scada for F&G


5128 7-31N 7 KSFGSS INST KSFGSS 2
system as well as for Process

Loop drawing for 55-XS-CG should be corrected


5129 7-31N 8 KSFGSS INST KSFGSS 2
because DI channel assignment wrong

F&G system fault (55-XS-FGF) should be not


5130 7-31N 9 KSFGSS INST KSFGSS 2 connected to Beacon&Sirene , pls corrected
C & E Chart
For alarm which not used for logic should be auto
5131 7-31N 10 KSFGSS INST KSFGSS 2
reset,

Pressure Transmitter for ESD should be giving


5132 7-31N 11 KSFGSS INST KSFGSS 2
FAULT indication while on overrange

Soft Button "ESD COMMON RESET" not function


5133 7-31N 12 KSFGSS INST KSFGSS 2
on MOCB & MOCD

Corrected loop drawing for 55-HS-0001-ACK/HS-


0001-RESET/HS-ESD-0001-TEST/55-XA-CG
5134 7-31N 13 KSFGSS INST KSFGSS 2
because DI because channel assignment not
match with actual

The cover door for 55-SDV-0001 make on hinges


5135 7-31N 14 KSFGSS INST KSFGSS 2
type

5136 7-31N 15 KSFGSS INST KSFGSS 2 Provide plateform for 55-SDV-0001

Overrange fault description not clear on alarm


5137 7-31N 16 KSFGSS INST KSFGSS 2
summary

Multi pairs cable perruls at junction box 55-I-JBF-


5138 7-31N 17 KSFGSS INST KSFGSS 2
007 should be corrected

Overrange & underrange fault indication should


5139 7-31N 18 KSFGSS INST KSFGSS 2
be configure fir all scada AI point
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

5140 7-31N 19 KSFGSS INST KSFGSS 2 PSL for 55-SDV-0004 still not working

Tag number for 55-XS-0002 should be consisten


5141 7-31N 20 KSFGSS INST KSFGSS 2
because in the other graphic tag 55-XA-0002

On graphic"KSFGSS-ESD OVERVIEW2" should


5142 7-31N 21 KSFGSS INST KSFGSS 2
be modify because not represent actual situation.

The graphic status of UPS-TRIP is opposite with


5143 7-31N 22 KSFGSS INST KSFGSS 2
actual

The description for 55-XS-HCP-0001-HA should be


5144 7-31N 23 KSFGSS INST KSFGSS 2
change to MANUAL/AUTO

On HSSD fire 1 should be not trip to Electrical


5145 7-31N 24 KSFGSS INST KSFGSS 2
Board

5146 7-31N 25 KSFGSS INST KSFGSS 2 HSSD fault status not generate on mimic panel

5147 7-31N 26 KSFGSS INST KSFGSS 2 While MOV on local selection fault alarm is appear.

PIPELINE- 18''
PIPELINE - Grouting and epoxy coating to be done for installed
5148 7-46A 1 CIVIL STATION-N to 1
18'' crossing marker pole from station-N to KSFGSS
KSFGSS
PIPELINE- 18''
PIPELINE - ROW to be provided from station-N to RXA-003 as
5149 7-46A 2 CIVIL STATION-N to 1
18'' per shown in the AFC drawing.
KSFGSS
PIPELINE- 18'' Removal of temporary protectionslab and re-instate
PIPELINE -
5150 7-46A 3
18''
CIVIL STATION-N to 1 the existing bound ofor pipe line near PXU-002 &
KSFGSS PXU-003
PIPELINE- 18''
PIPELINE - Unwanted materials to be removed and properly
5151 7-46A 4 CIVIL STATION-N to 1
18'' level the area from Station-N to RXS-001
KSFGSS
PIPELINE- 18''
PIPELINE - Epoxy coating to be done for the installed CP ost
5152 7-46A 5 CIVIL STATION-N to 1
18'' foundation from station-N to KSFGSS
KSFGSS
PIPELINE- 18'' Bound height to be maintained as per the dawing
PIPELINE -
5153 7-46A 6
18''
CIVIL STATION-N to 1 requirement min 1.00 m forom natural grade for the
KSFGSS trench area.
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5154 7-46A 7
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXS-
KSFGSS 001 to RXE-002
PIPELINE- 18''
PIPELINE - Installation of Kilometer marker pole shall be
5155 7-46A 8 CIVIL STATION-N to 1
18'' completed from Station-N to KSFGSS
KSFGSS
PIPELINE- 18''
PIPELINE - Rectification of the ROW and proper slope to be
5156 7-46A 9 CIVIL STATION-N to 1
18'' rpovided for the side of ROW at Sabkha area
KSFGSS
PIPELINE- 18''
PIPELINE - Bund open area at CP location to be re-instated
5157 7-46A 10 CIVIL STATION-N to 1
18'' from Station-N to KSFGSS
KSFGSS
Bund height to be maintained as per the drawing
PIPELINE- 18''
PIPELINE - requirmentnt min. 1.00m. From the top of pipe at
5158 7-46A 11 CIVIL STATION-N to 1
18'' chainage from 0+377 to 1+550 for the sabkha
KSFGSS
area
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5159 7-46A 12
18''
CIVIL STATION-N to 1 materials and housekeeping to be done form RXE-
KSFGSS 002 to RXA-007
PIPELINE- 18'' Rectification for the existing track crossing and
PIPELINE -
5160 7-46A 13
18''
CIVIL STATION-N to 1 installation of crossing marker pole to be done at
KSFGSS TXU-001
PIPELINE- 18'' Installation of crash barreier and embankment
PIPELINE -
5161 7-46A 14
18''
CIVIL STATION-N to 1 protection to be done for the culvert from station-N
KSFGSS to KSFGSS
PIPELINE- 18'' End of culvert mouth both sides to be coated and
PIPELINE -
5162 7-46A 15
18''
CIVIL STATION-N to 1 covered with marine plywood of minimum
KSFGSS thickness 18mm. From station-N to KSFGSS
PIPELINE- 18'' Lifting hook pocket of protection slab to be filled
PIPELINE -
5163 7-46A 16
18''
CIVIL STATION-N to 1 with appropriate materials for the crossings from
KSFGSS Station-N to KSFGSS
PIPELINE- 18'' Second layer for the ROW wherever required,
PIPELINE -
5164 7-46A 17
18''
CIVIL STATION-N to 1 compaction test and shoulder to be provided for
KSFGSS the trench area of 18'' pipe line.
PIPELINE- 18'' Installation of crossing marker pole and rectification
PIPELINE -
5165 7-46A 18
18''
CIVIL STATION-N to 1 shall be done for the existing track crossing TXU-
KSFGSS 003
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE- 18'' Removal of excavated material, construction


PIPELINE -
5166 7-46A 19
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RX-
KSFGSS 007 to RXS-02
PIPELINE- 18'' Removal of temporary road diversion, bund
PIPELINE -
5167 7-46A 20
18''
CIVIL STATION-N to 1 extention and crash barrier to be provided at RXS-
KSFGSS 002
PIPELINE- 18''
PIPELINE - Goal post to be provided for overhead line at ROW
5168 7-46A 21 CIVIL STATION-N to 1
18'' as per the drawing.
KSFGSS
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5169 7-46A 22
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXS-
KSFGSS 002 to valve station-FNFIS
PIPELINE- 18'' Rectification for the track crossing & crossing
PIPELINE -
5170 7-46A 23
18''
CIVIL STATION-N to 1 marker pole to be provided at track crossing TXU-
KSFGSS 004
PIPELINE- 18'' Installation of crash barreier and boulders to be
PIPELINE -
5171 7-46A 24
18''
CIVIL STATION-N to 1 provided on the sides of the high level area near
KSFGSS RXS-003
PIPELINE- 18'' Removal of loose material and proper compaction
PIPELINE -
5172 7-46A 25
18''
CIVIL STATION-N to 1 to be done for the ramp of new culvert RXA-011 &
KSFGSS 012
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5173 7-46A 26
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from valve
KSFGSS station FNFIS to Valve station-H&L
PIPELINE- 18'' Re-instate the support of existing above ground
PIPELINE -
5174 7-46A 27
18''
CIVIL STATION-N to 1 pipeline at crossing PXA-007
KSFGSS Chainage 5+168.3
PIPELINE- 18''
PIPELINE - Loose materials to be removed & compact it
5175 7-46A 28 CIVIL STATION-N to 1
18'' properly for the ramp of new culvert RXA-013
KSFGSS
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5176 7-46A 29
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from valve
KSFGSS station H&L to RXA-016
PIPELINE- 18''
PIPELINE - Rectification of track crossing and installation of
5177 7-46A 30 CIVIL STATION-N to 1
18'' crossing marker to be done at crossing TXN-001
KSFGSS
PIPELINE- 18'' Removal of loose materials, compaction and
PIPELINE -
5178 7-46A 31
18''
CIVIL STATION-N to 1 proper slope to be maintained for the ramp of new
KSFGSS culvert at RXA-014
PIPELINE- 18'' Garding and proper compaction to be done
PIPELINE -
5179 7-46A 32
18''
CIVIL STATION-N to 1 between bund & ROW area for the trench portion
KSFGSS from station-N to KSFGSS
PIPELINE- 18''
PIPELINE - Cleaning and epoxy coating to be done inside
5180 7-46A 33 CIVIL STATION-N to 1
18'' culvert from station-N to KSFGSS
KSFGSS
PIPELINE- 18'' Loose materials to be roemoved, properly prepared
PIPELINE -
5181 7-46A 34
18''
CIVIL STATION-N to 1 & installation of crossing marker at crossing TXU-
KSFGSS 006
PIPELINE- 18'' Backfilling for the identification slab, removal of
PIPELINE -
5182 7-46A 35
18''
CIVIL STATION-N to 1 temporary support and re-instate the support of
KSFGSS existing pipe line at crosssing PXA-014
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5183 7-46A 36
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXA-
KSFGSS 016 to Valve station FNLGCS
PIPELINE- 18'' Rectification of track crossing and installation of
PIPELINE -
5184 7-46A 37
18''
CIVIL STATION-N to 1 crossing marker to be done at crossing TXU-007 &
KSFGSS 008
PIPELINE- 18''
PIPELINE - Row marging with existing track road area to be
5185 7-46A 38 CIVIL STATION-N to 1
18'' prepared properly near valve station GNLGCS
KSFGSS
PIPELINE- 18''
PIPELINE -
5186 7-46A 39
18''
CIVIL STATION-N to 1 Bund to be provided for the balance area.
KSFGSS
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5187 7-46A 40
18''
CIVIL STATION-N to 1 materials and housekeeping to be done forom
KSFGSS valve station FNLGCS to RXE-005

PIPELINE- 18'' Removal of loose materials, proper compaction


PIPELINE -
5188 7-46A 41
18''
CIVIL STATION-N to 1 and installation of crossing marker to be done at
KSFGSS ceossing RXA-018, 019 & TXU-009

PIPELINE- 18''
PIPELINE - Re-instatement of existing bund and end cap to be
5189 7-46A 42 CIVIL STATION-N to 1
18'' provided at RXA-018
KSFGSS
PIPELINE- 18''
PIPELINE - Re-instatement for the existing bund to be done at
5190 7-46A 43 CIVIL STATION-N to 1
18'' PXU-009 & PXU-010
KSFGSS
PIPELINE- 18''
PIPELINE - Rectification for track road and crash barrier to be
5191 7-46A 44 CIVIL STATION-N to 1
18'' provided at RXE-004 RXE-005.
KSFGSS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

Backfilling for the identification slab, removal of


PIPELINE- 18''
PIPELINE - temporary support and to be provided permanent
5192 7-46A 45 CIVIL STATION-N to 1
18'' support for existing above ground pipeline at PXA-
KSFGSS
019
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5193 7-46A 46
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXE-
KSFGSS 005 to TXU-010
PIPELINE- 18'' Removal of loose materials, proper compaction
PIPELINE -
5194 7-46A 47
18''
CIVIL STATION-N to 1 and crossing marker pole to be provided at
KSFGSS crossing TXN-002, RXA-023 & 023A
PIPELINE- 18'' Backfilling to be done for the identification slab at
PIPELINE -
5195 7-46A 48
18''
CIVIL STATION-N to 1 existing above ground pipeline crossing at PXA-
KSFGSS 018 and PXA-20
PIPELINE- 18''
PIPELINE - Concrete protection, backfilling, epoxy cating and
5196 7-46A 49 CIVIL STATION-N to 1
18'' cover to be provided for the splicing pit.
KSFGSS
PIPELINE- 18''
PIPELINE - Cable route marker to be provided from Station-N
5197 7-46A 50 CIVIL STATION-N to 1
18'' to KSFGSS
KSFGSS
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5198 7-46A 51
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from TXU-
KSFGSS 010 to Valve station E&G.
PIPELINE- 18'' Removal of loose materials, proper compection
PIPELINE -
5199 7-46A 52
18''
CIVIL STATION-N to 1 and re-instatement of crash barrier to be done at
KSFGSS track crossing TXU-11
PIPELINE- 18'' Backfilling proper compilation and associated
PIPELINE -
5200 7-46A 53
18''
CIVIL STATION-N to 1 works shall be done at crossing TXN-003 & TXN-
KSFGSS 004
PIPELINE- 18''
PIPELINE - Sand and Rock mixtrue to be provided both sides
5201 7-46A 54 CIVIL STATION-N to 1
18'' of the bund at Sabkha area asper the drawing.
KSFGSS

PIPELINE- 18'' Re-instatement of the existing bund, end cap and


PIPELINE -
5202 7-46A 55
18''
CIVIL STATION-N to 1 crossing marker pole to be installed at RXA-024 &
KSFGSS RXA-025
PIPELINE- 18'' Removal of excavated materials, consturction
PIPELINE -
5203 7-46A 56
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from valve
KSFGSS station E&G to TXU-013
PIPELINE- 18'' ROW to be provided up to existing track road along
PIPELINE -
5204 7-46A 57
18''
CIVIL STATION-N to 1 both sides of existing 4'' above ground pipeline at
KSFGSS chainage 17+271 (Sabkha Area)
PIPELINE- 18'' Re-instatement of the existing bund, end cap and
PIPELINE -
5205 7-46A 58
18''
CIVIL STATION-N to 1 installation of crossing marker pole shall be done at
KSFGSS RXA-29
PIPELINE- 18''
PIPELINE - Rectification of the track, end cap for the bund and
5206 7-46A 59 CIVIL STATION-N to 1
18'' associated works shall be done at TXU-13
KSFGSS
PIPELINE- 18''
PIPELINE - Backfilling to be done for the identification slab at
5207 7-46A 60 CIVIL STATION-N to 1
18'' PXA-24A
KSFGSS
PIPELINE- 18'' Removal of excavated materials, consturction
PIPELINE -
5208 7-46A 61
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from TXU-
KSFGSS 013 to Valve station KNMP
Rectification of the existing track road & re-
PIPELINE- 18''
PIPELINE - instatement of crash barrier to be done for track
5209 7-46A 62 CIVIL STATION-N to 1
18'' road crossing for branch line from 18'' pipeline to
KSFGSS
Valve station KNMP
PIPELINE- 18''
PIPELINE -
5210 7-46A 63
18''
CIVIL STATION-N to 1 Crash barrier to be provided at RXS-004
KSFGSS
PIPELINE- 18''
PIPELINE - Existing crash barrier to be romoved near
5211 7-46A 64 CIVIL STATION-N to 1
18'' RXS-004
KSFGSS

PIPELINE- 18'' Removal of loose materials, compact it properly


PIPELINE -
5212 7-46A 65
18''
CIVIL STATION-N to 1 and re-instatement to be done for the existing
KSFGSS crossing marker pole at RXE-008
PIPELINE- 18''
PIPELINE - Installation of crossing marker pole shall be done
5213 7-46A 66 CIVIL STATION-N to 1
18'' at existing track crossing RXE-11
KSFGSS
PIPELINE- 18''
PIPELINE - Re-instatement of existing bund shall be done for
5214 7-46A 67 CIVIL STATION-N to 1
18'' under ground pipe line at PXU-021 and PXU-022
KSFGSS

PIPELINE- 18'' Removal of excavated materials, construction


PIPELINE -
5215 7-46A 68
18''
CIVIL STATION-N to 1 materials and housedeeping to be done from valve
KSFGSS station KNMP to RXE-011

PIPELINE- 18'' Re-instatement for the marker pole for the existing
PIPELINE -
5216 7-46A 69
18''
CIVIL STATION-N to 1 crosssing & installation of crossing marker pole for
KSFGSS the new track corssing TXU-015 shall be done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE- 18'' Removal of loose materials, compact it properly


PIPELINE -
5217 7-46A 70
18''
CIVIL STATION-N to 1 and installation of crossing marker pole shall be
KSFGSS done at existing track corssing TXU-016

PIPELINE- 18''
PIPELINE - ROW shall be provided from PXA-026A to PT-60
5218 7-46A 71 CIVIL STATION-N to 1
18'' as per the drawing.
KSFGSS
PIPELINE- 18'' Backfilling for the identification slab & re-
PIPELINE -
5219 7-46A 72
18''
CIVIL STATION-N to 1 instatement shall be done for the support of
KSFGSS existing above ground pipeline at PXA-026A
PIPELINE- 18'' Rectification of track road & installation of crossing
PIPELINE -
5220 7-46A 73
18''
CIVIL STATION-N to 1 marker pole shall be done at track crossing TXU-
KSFGSS 017
PIPELINE- 18'' Backfilling shall be done for the identification slab
PIPELINE -
5221 7-46A 74
18''
CIVIL STATION-N to 1 of existing above ground pipeline at
KSFGSS PXA-026, PXA-028 & PXA-029
PIPELINE- 18''
PIPELINE - Re-instatement of existing bund, end cap &
5222 7-46A 75 CIVIL STATION-N to 1
18'' crossing marker pole to be provided at RXA-035
KSFGSS
PIPELINE- 18'' Rectification of track crossing & crossing marker
PIPELINE -
5223 7-46A 76
18''
CIVIL STATION-N to 1 pole to be provided at crossing RXE-012 & RXA-
KSFGSS 036
PIPELINE- 18'' Backfilling shall be done for the identification slab
PIPELINE -
5224 7-46A 77
18''
CIVIL STATION-N to 1 of existing above ground pipeline at PXA-030, 031,
KSFGSS 033, 034 & 035
PIPELINE- 18''
PIPELINE - Concrete protection & backfilling shall be done for
5225 7-46A 78 CIVIL STATION-N to 1
18'' the splicing pit near RXE-012
KSFGSS
PIPELINE- 18''
PIPELINE - Backfilling shall be done for the identification slab
5226 7-46A 79 CIVIL STATION-N to 1
18'' at CXU-017 & PXA-036 to 042
KSFGSS
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5227 7-46A 80
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXE-
KSFGSS 011 to KSFGSS
PIPELINE- 18''
PIPELINE - Re-instate the support of existing above ground
5228 7-46A 81 CIVIL STATION-N to 1
18'' pipeline at crossing PXA-001 Chainage 0+360.18
KSFGSS

PIPELINE- 18'' Crash barrier and embankment protection to be


PIPELINE -
5229 7-46A 82
18''
CIVIL STATION-N to 1 provided thoughout the side of ROW at the high
KSFGSS level area from approx. CH: 1+830 to 1+930
Reduce the level, widen for ROW, installation of
PIPELINE- 18''
PIPELINE - crash barrier to be done at approx. Ch: 24+640
5230 7-46A 83 CIVIL STATION-N to 1
18'' and backfill the low level area to suit at site
KSFGSS
condition.
CP-TR-001-N @ station N should be barricated
PIPELINE- 18''
PIPELINE - (fenced)
5231 7-46B 1 ELEC STATION-N to 1
18'' Sun shade has to be provided for the TR @ station
KSFGSS
N

PIPELINE- 18'' CP-TR-002-KSFGSS should be barricated (fenced)


PIPELINE -
5232 7-46B 2
18''
ELEC STATION-N to 1 Sun shade has to be provided for the TR @
KSFGSS KSFGSS

PIPELINE- 18''
PIPELINE - AJB-1 and AJB-2 variable resistance to be
5233 7-46B 3 ELEC STATION-N to 1
18'' provided.
KSFGSS
PIPELINE- 18''
PIPELINE -
5234 7-46B 4
18''
ELEC STATION-N to 1 Cables at all FBB shall be connected.
KSFGSS
Km chainage has to be reflected on the pipeline
PIPELINE- 18'' Marker Post Need to be rechecked after
PIPELINE -
5235 7-46B 5
18''
ELEC STATION-N to 1 Commissioning ICCP System drawings/location
KSFGSS maps shall be submitted & Submission of final
reports/survey readings
PIPELINE- 18''
PIPELINE -
5236 7-46C 1
18''
MECH STATION-N to 1 Housekeeping to be carried out.
KSFGSS
PIPELINE- 18''
PIPELINE - Line identification to be done and flow direction to
5237 7-46C 2 MECH STATION-N to 1
18'' be marked with arrows.
KSFGSS
PIPELINE- 18''
PIPELINE - Remaining Bund wall & ROW to be constructed as
5238 7-46C 3 MECH STATION-N to 1
18'' per AFC drawing.
KSFGSS
PIPELINE- 18''
PIPELINE -
5239 7-46C 4
18''
MECH STATION-N to 1 Required post to be installed as per drawing .
KSFGSS
PIPELINE- 18''
PIPELINE -
5240 7-46C 5
18''
MECH STATION-N to 1 Km marker post to be installed as per drawing .
KSFGSS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

PIPELINE- 18''
PIPELINE -
5241 7-46C 6
18''
MECH STATION-N to 1 Crash barrier to be provided at all track crossing.
KSFGSS
PIPELINE- 18''
PIPELINE - Unidentified Pipeline KM and CP posts to be
5242 7-46D 1 MECH STATION-N to 1
18'' stencilled.
KSFGSS
PIPELINE- 18''
PIPELINE - CP-TR-001-N needs to be protected with a Fence
5243 7-46D 2 MECH STATION-N to 1
18'' (Point N-KM.0) and need to be toped up with oil.
KSFGSS
PIPELINE- 18''
PIPELINE - CP-TR-002-KSFGSS needs to be barricaded with
5244 7-46D 3 MECH STATION-N to 1
18'' a fence and need to be top up with oil.
KSFGSS
PIPELINE- 18''
PIPELINE -
5245 7-46D 4
18''
ELEC STATION-N to 1 Folding Box Board cable not connected at KM1.3
KSFGSS
PIPELINE- 18''
PIPELINE - CP and KM posts foundation backfilling
5246 7-46D 5 CIVIL STATION-N to 1
18'' incomplete.
KSFGSS
PIPELINE- 18''
PIPELINE -
5247 7-46D 6
18''
ELEC STATION-N to 1 CP cables to be connected
KSFGSS
PIPELINE- 18''
PIPELINE -
5248 7-46D 7
18''
ELEC STATION-N to 2 CP system to be completed and commissioned
KSFGSS
PIPELINE- 18''
PIPELINE -
5249 7-46D 8
18''
CIVIL STATION-N to 2 Pipeline bund wall to be completed.
KSFGSS
PIPELINE- 18''
PIPELINE -
5250 7-46D 9
18''
CIVIL STATION-N to 2 ROW to be completed as per AFC.
KSFGSS
PIPELINE- 18''
PIPELINE -
5251 7-46D 10
18''
CIVIL STATION-N to 2 Pipeline crossings to be completed as per AFC
KSFGSS
PIPELINE - 4''
PIPELINE - 4''
5252 7-39E 2
WHTP-A
ELEC VSTN-WHTP-A 1 Identification cable tags on all connection calbles.
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' SFG-4'' Line VSTN-WHTP-A to WHTP-A plant - no
5253 7-39E 3 ELEC VSTN-WHTP-A 1
WHTP-A CP system installed - surfaceline (above ground)
to WHTP-A

PIPELINE - 4'' Submission of Final reports/survey readings


PIPELINE - 4''
5254 7-39E 5
WHTP-A
ELEC VSTN-WHTP-A 1 including drawings/location maps after the
to WHTP-A polaraization of system.
PIPELINE - 4''
PIPELINE - 4''
5255 7-40E 2
WHTP-B
ELEC VSTN-WHTP-B 1 Identification cable tags on all connection calbles.
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' SFG-4'' Line VSTN-WHTP-B to WHTP-B plant - no
5256 7-40E 4 ELEC VSTN-WHTP-B 1
WHTP-B CP system installed - surfaceline (above ground)
to WHTP-B
PIPELINE - 4'' Submission of Final reports/survey readings
PIPELINE - 4''
5257 7-40E 5
WHTP-B
ELEC VSTN-WHTP-B 1 including drawings/location maps after the
to WHTP-B polaraization of system.

PIPELINE - 4'' Galvanic CP system installation completed on insulating


PIPELINE - 4''
5258 7-41E 1
WHTP-C
ELEC WHTP-C to 1 joints at Road xings KSFGSS to WHTP-C Testing &
KSFGSS commissioning pending.
PIPELINE - 4''
PIPELINE - 4''
5259 7-41E 2
WHTP-C
ELEC WHTP-C to 1 Identification cable tags on all connection calbles.
KSFGSS

PIPELINE - 4''
5260 7-41E 5
PIPELINE - 4''
ELEC WHTP-C to 1
Submission of Final reports/survey readings including
WHTP-C drawings/location maps after the polaraization of system.
KSFGSS

5261 7-31O 1 KSFGSS INST KSFGSS 1 All instruments to be tagged properly.

All instrument and Ultra sonic flow meter tags to be


5262 7-31O 2 KSFGSS INST KSFGSS 1
corrected.
Fiber optic cable route marker to be installed from
5263 7-31O 3 KSFGSS INST KSFGSS 1
station-N to KSFGSS & all valve station.

5264 7-31O 4 KSFGSS INST KSFGSS 1 Air instrument to be grounded

Proper sun shed to be installed for all instruments


5265 7-31O 5 KSFGSS INST KSFGSS 1
to protect from direct sun radiation

5266 7-31O 6 KSFGSS INST KSFGSS 1 Pig singaller cable to be connected.

Pig singaller to be checked and verified during


5267 7-31O 7 KSFGSS INST KSFGSS 1
pigging of pipe line.
Ultra sonic flow meter flow ultra sonic flow units to
5268 7-31O 8 KSFGSS INST KSFGSS 1
be corrected at scada and DCS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP

EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT

DCS / Scada graphics to be corrected at Station-N


5269 7-31O 9 KSFGSS INST KSFGSS 1
& U and MOC Khuff-B & D

Item shall be repaired, completed or corrected before the


CATEGORY 'A' ITEMS:
equipment/system can progress to the next stage

Item shall be repaired, completed or corrected at later date and


CATEGORY 'B' ITEMS: which allow the equipment/system to be operated without
jeopardizing plant, personnel or the environment