EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
14 7A 14
STATION
MECH ALL 1 SRV's alignment to be done
DESAL FG Stenciling & color coding shall be done on piping &
15 7A 15 MECH ALL 1
STATION pipeline
DESAL FG Corroded bolts shall be replaced in flowmeter skid
16 7A 16 MECH ALL 1
STATION & pig traps
DESAL FG
17 7A 17
STATION
MECH ALL 1 Drain pits shall be cleaned and grating to be fixed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN Stenciling & color coding shall be done on piping &
99 7A 6 MECH ALL 1
KSDGS pipeline
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
113 7A 20
KSDGS
CIVIL ALL 1 Existing marker pole is to be restored
VAL STN
114 7A 21
KSDGS
MECH ALL 1 Flare tie-in to be completed
VAL STN Station sign boards, warning sign boards and
115 7A 22 CIVIL ALL 1
KSDGS safety sign boards shall be installed
All safety equipments shall be installed in buildings
VAL STN
116 7A 23
KSDGS
MECH ALL 1 and process area as per approved drawings &
SOW
VAL STN All emergency gates are to be painted as per
117 7A 24 MECH ALL 1
KSDGS safety requirements.
VAL STN
118 7A 25
KSDGS
MECH ALL 1 Housekeeping is to be done
VAL STN Pipeline identification stenciling shall be done in
119 7A 26 MECH ALL 1
KSDGS fence inside & outside
VAL STN Redline mark-up drawings shall be submitted after
120 7A 27 MECH ALL 1
KSDGS commissioning for QP approval
VAL STN All test packs 'B' punch items (including KSDS
121 7A 28 MECH ALL 1
KSDGS inside) shall be cleared & signed off by QP
DESAL FG
122 7D 1
STATION
MECH ALL 1 Diesel outlet line from tank drain line plug .
DESAL FG
123 7D 2
STATION
CIVIL ALL 1 Generator foundation bolts on skid altred .
DESAL FG
124 7D 3
STATION
MECH ALL 1 Provied tray for the oil drain line .
DESAL FG
125 7D 4
STATION
MECH ALL 1 Provied ladder for water/oil level .
DESAL FG
127 7D 6
STATION
MECH ALL 1 Pig receiver door rachet spanner missing .
DESAL FG
131 7D 10
STATION
MECH ALL 1 Safety lock for air receiver platform to be fixed .
DESAL FG
132 7D 11
STATION
MECH ALL 1 Safety valve plug of isolation valve to be provided .
DESAL FG
133 7D 12
STATION
MECH ALL 1 Isolation valve plug to be providad .
Manual lifting equipment inside compressor room
to be provided
DESAL FG
134 7D 13 MECH ALL 1
STATION
DESAL FG
136 7B 1
STATION
MECH ALL 1 Mechanical Pipework Incomplete inside the station.
DESAL FG
137 7B 2
STATION
CIVIL ALL 1 Area civil works incomplete.
DESAL FG
139 7B 4
STATION
MECH ALL 1 All Isolation valves to be lubricated.
DESAL FG
141 7B 6
STATION
MECH ALL 1 Undersize & Rusted bolts to be replaced.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
151 7B 16
STATION
MECH ALL 1 Roof Access ladders to be provided with Safety Bar.
DESAL FG
157 7B 22
STATION
ELEC ALL 1 Key-box to be provided as required.
DESAL FG
166 7B 31
STATION
MECH ALL 1 All vessels should be stenciled with their Tag-Nos.
DESAL FG
167 7B 32
STATION
MECH ALL 1 P&ID to be updated.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
188 7B 1
KSDGS
MECH ALL 1 Mechanical Pipework incomplete.
VAL STN
189 7B 2
KSDGS
CIVIL ALL 1 Civil works incomplete.
VAL STN Pig Launcher & Receiver to have proper fixed drain
190 7B 3 MECH ALL 1
KSDGS lines to pit.
VAL STN
191 7B 4
KSDGS
MECH ALL 1 All Isolation valves to be lubricated.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG SWITCH GEAR All the cable / conduit entry holes on the wall to be
207 7F 1.5 ELEC 1
STATION ROOM sealed properly
DESAL FG SWITCH GEAR Earthing bus bar in the switch gear cubicle, missing
210 7F 1.9 ELEC 1
STATION ROOM bolts to be fixed
DESAL FG SWITCH GEAR Circular box on the conduit above the exit door to
211 7F 1.10 ELEC 1
STATION ROOM be plugged.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
223 7F 3.3
STATION
CIVIL BATTERY ROOM 1 Spare pipes on the floor to be covered properly.
DESAL FG
224 7F 3.4
STATION
CIVIL BATTERY ROOM 1 Damaged floor tiles to be replaced.
INSTRUMENT
DESAL FG AIR
227 7F 4.2
STATION
ELEC
COMPRESSOR
1 Earth connections to be tightened
ROOM
DESAL FG
230 7F 5.3
STATION
MECH GENERAL 1 Wind socks to be provided at the plant area.
DESAL FG
232 7F 5.5
STATION
ELEC GENERAL 1 All the metal doors to be earthed properly.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG Tele metering Flow Meter indicator name tag plate should have a
242 7J 8 INST 1
STATION Room larger font size and fixed on the panel plate.
DESAL FG Tele metering Panel tube light is faulty and needs to be replaced
248 7J 14 INST 1
STATION Room by SCADA and F&G panels.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG SFG MEETRING Touch up painting to be done for all weld joints and
267 7C 2 MECH 1
STATION STATION damaged areas of the pipe & all supports .
DESAL FG SFG MEETRING Fire extinguisher to provided around the plant and
271 7C 6 INST 1
STATION STATION to be labled with inspection date.
DESAL FG SFG MEETRING All valves and their handles to be painted and
272 7C 7 MECH 1
STATION STATION remaining handles to be installed on the V/Vs.
DESAL FG SFG MEETRING Corroded,short bolts and washer for the foundation
273 7C 8 MECH 1
STATION STATION bolts to be replaced.
DESAL FG SFG MEETRING Grouting to be done for 4"& 6"pigs receiver and gib
275 7C 10 CIVIL 1
STATION STATION cranes foundation.
DESAL FG AIR Gap to be filled with foam between out let pipe and
281 7C 3 MECH 1
STATION COMPRESSOR wall of building.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG AIR
282 7C 4
STATION
MECH
COMPRESSOR
1 Missing plug to provided for vent valve.
DESAL FG
285 7C 1
STATION
ELEC DG SET 1 Tagging to be done
DESAL FG
287 7C 3
STATION
MECH DG SET 1 flapper to be provided at exhaust line
DESAL FG End caps for filling and drain line to diesal tank to
288 7C 4 MECH DG SET 1
STATION be tied with proper chain
DESAL FG
290 7C 1
STATION
MECH 4" KG PIPELINE 1 Housekeeping to be carried out.
DESAL FG
291 7C 2
STATION
MECH 4" KG PIPELINE 1 Tie-in to be completed
DESAL FG
294 7C 5
STATION
MECH 4" KG PIPELINE 1 Line identification to be done.
DESAL FG
296 7C 7
STATION
CIVIL 4" KG PIPELINE 1 Cross barrier to be provided at all culverts.
DESAL FG 6" SFG PIPE Touch up painting to be done for all weld joints and
299 7C 3 MECH 1
STATION LINE damaged areas of the pipe & anchor support .
DESAL FG 6" SFG PIPE "CP" system to be provided a allt track crossing
302 7C 6 CIVIL 1
STATION LINE and back filling to be done.
F&G / NEW
DESALINATION
FG STATION
DESAL FG
305 7K 1
STATION
INST AND VALVE 1 Fibre optic cable lebelling to be done.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG 5K-SC-0001: PVC protection cover for 24V DC
306 7K 2 INST AND VALVE 1
STATION broken. Shall be replace.
STATION
INSTRUMENTAT
ION
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
F&G / NEW
DESALINATION
FG STATION
DESAL FG Flow computer unit: Workstation table & chair shall
307 7K 3 INST AND VALVE 1
STATION be provided.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Power supply unit: Tag number shall be provided
308 7K 4 INST AND VALVE 1
STATION for main power supply cable.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG 5K-I-JB-A-002: One cable tag missing. Shall be
309 7K 5 INST AND VALVE 1
STATION provided.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Administrator and operator password and IP
310 7K 6 INST AND VALVE 1
STATION addresses shall be notified to QP.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
311 7K 7
STATION
INST AND VALVE 1 5K-LCP=0001: JB tag number shall be provided.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
312 7K 8
STATION
INST AND VALVE 1 5K-LCP-0001: Plug to be provided in gland plate.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION 5K-FE/FET-0002A: Tag number correction to be
DESAL FG
313 7K 9
STATION
INST AND VALVE 1 done on canopy and power supply cable ferruling
STATION shall be done.
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Data sheets shall be provided for F&G and field
314 7K 10 INST AND VALVE 1
STATION mounted instruments.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG Tag No. shall be provided for MAC in LV room and
315 7K 11 INST AND VALVE 1
STATION the device to be shown in graphics page.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
316 7K 12
STATION
INST AND VALVE 1 Open wires in the DG set to be covered.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG
317 7K 13
STATION
INST AND VALVE 1 KSDS valve station: Pig signaller shall be installed.
STATION
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION DPS/DESAL Valve station: 67-SC-0001: Cable No.
DESAL FG
318 7K 14
STATION
ELEC AND VALVE 1 67-ECP-0001 cable shall be replace because one
STATION wire insulation is stripped.
INSTRUMENTAT
ION
F&G / NEW
DESALINATION
FG STATION
DESAL FG DPS/DESAL valve station: Pending tag number for
319 7K 15 INST AND VALVE 1
STATION the cables shall be provided.
STATION
INSTRUMENTAT
ION
DESAL FG Control Room &
320 7L 1
STATION
INST
Field
2 IA compressor logic to be checked / verified
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG Control Room & GI bolts and clamps for transmitter and manifold's
344 7L 25 INST 2
STATION Field to be replaced with SS
TELECOM :
DESAL FG
345 7M 1
STATION
INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure.
CABLE
TELECOM :
DESAL FG
346 7M 2
STATION
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
DESAL FG
347 7M 3
STATION
INST FIBER OPTIC 1 FOPP Open/Close to be operate Properly.
CABLE
TELECOM :
DESAL FG
348 7M 4
STATION
INST FIBER OPTIC 1 Telecom Manhole to be labeled.
CABLE
TELECOM :
DESAL FG
349 7M 5
STATION
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
DESAL FG
350 7M 6
STATION
INST FIBER OPTIC 1 All Crossing Area Fo cable to be Tagged.
CABLE
TELECOM :
Fo Cable & FOPP to be tagged as per QP tagging
351 7M 1 DPS/DESAL INST FIBER OPTIC 1
CABLE procedure.
TELECOM :
352 7M 2 DPS/DESAL INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
TELECOM :
353 7M 3 DPS/DESAL INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
354 7M 4 DPS/DESAL INST FIBER OPTIC 1 All Crossing Area Fo cable to be Tagged.
CABLE
TELECOM :
355 7M 5 DPS/DESAL INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN Fo Cable & FOPP to be tagged as per QP tagging
356 7M 1 INST FIBER OPTIC 1
KSDGS procedure.
CABLE
TELECOM :
VAL STN
357 7M 2
KSDGS
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN
358 7M 3
KSDGS
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
359 7M 4
KSDGS
INST FIBER OPTIC 1 All Crossing Area Fo cable to be Tagged.
CABLE
TELECOM :
DESAL FG Power supply Power supply Wiring Diagram to be Provided &
360 7M 1 INST 1
STATION (Battery charger) also paste to the inside of the Rack.
Rack & Cabling
TELECOM :
DESAL FG Power supply Incomming Power Supply Cable to be Tagged &
361 7M 2 INST 1
STATION (Battery charger) Labeled.
Rack & Cabling
TELECOM :
DESAL FG Power supply
362 7M 3
STATION
INST
(Battery charger)
1 All Circuit Breaker to be Labeled.
Rack & Cabling
TELECOM :
DESAL FG Power supply
363 7M 4
STATION
INST
(Battery charger)
1 Power Supply Alarm Monitoring to be done.
Rack & Cabling
TELECOM :
DESAL FG Power supply
364 7M 5
STATION
INST
(Battery charger)
1 Rack shall be cleaned and made free from dust.
Rack & Cabling
TELECOM :
DESAL FG Telecom
365 7M 1
STATION
INST
Transmission
1 Telecom RACK to be Tagged.
Rack & Cabling
TELECOM :
DESAL FG Telecom
366 7M 2
STATION
INST
Transmission
1 Incomming Power Cabling to be Tagged & Labeled.
Rack & Cabling
TELECOM :
DESAL FG Telecom
367 7M 3
STATION
INST
Transmission
1 Rack to be cleaned and made free from dust.
Rack & Cabling
TELECOM :
Telecom
370 7M 2 DPS/DESAL INST
Transmission
1 Incomming Power Cabling to be Tagged & Labeled.
Rack & Cabling
TELECOM :
Telecom
371 7M 3 DPS/DESAL INST
Transmission
1 Ruggedcom Switch to be Tagged.
Rack & Cabling
TELECOM :
VAL STN Telecom
373 7M 2
KSDGS
INST
Transmission
1 Incomming Power Cabling to be Tagged & Labeled.
Rack & Cabling
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
TELECOM
PUNCHLIST :
VAL STN
374 7N 1
KSDGS
INST NOKIATransmissi 1 Telecom NOKIA RACK to be tagged
on Rack &
Cabling
TELECOM
PUNCHLIST :
VAL STN
375 7N 2
KSDGS
INST NOKIATransmissi 1 Incoming power cabling to be labeled
on Rack &
Cabling
TELECOM
PUNCHLIST :
VAL STN
376 7N 3
KSDGS
INST NOKIATransmissi 1 Rack to be cleaned and made free from dust
on Rack &
Cabling
TELECOM
PUNCHLIST :
VAL STN AC Installed for telecom system is to be
377 7N 4 INST NOKIATransmissi 1
KSDGS commissioned
on Rack &
Cabling
Feeder to 11kV A copy of FAT and SAT reports to be submitted and
DESAL FG 5K-SB-0001-01
378 7H 1.01
STATION
ELEC
Desal FG
1 demonstrate all comments have been closed prior
Substation to energization.
Feeder to 11kV
DESAL FG 5K-SB-0001-01 To perform the switchgear functional test including
381 7H 1.04 ELEC 1
STATION Desal FG the rack-in/rack-out operation.
Substation
Feeder to 11kV
DESAL FG 5K-SB-0001-01 To perform the functional and operation test of the
382 7H 1.05 ELEC 1
STATION Desal FG busbar and circuit earthing facilities.
Substation
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG DC System Test reports for Battery charger / discharge test for
429 7G 1 ELEC 2
STATION (24V/110V)DC. batteries and cable test report to be submitted.
DESAL FG DC System
439 7G 11
STATION
HVAC
(24V/110V)DC.
1 Testing of Exhaust fan to be completed.
Cable Trench
DESAL FG indoor and Route markers to be installed at outdoor cable
440 7G 1 ELEC 1
STATION outdoor & cable trench.
tray
Cable Trench
DESAL FG indoor and Control cable dressing beneath the LV S/Gear to
441 7G 2 ELEC 1
STATION outdoor & cable be completed.
tray
Cable Trench
DESAL FG indoor and
442 7G 3
STATION
ELEC
outdoor & cable
1 Cable entry to S/S building to be sealed
tray
Cable Trench
DESAL FG indoor and Cleaning of concrte cable trench at LV /Control
443 7G 4 ELEC 1
STATION outdoor & cable /Diesel generator Room to be completed.
tray
Cable Trench Cutting edges of cable tray suppport to be painted
DESAL FG indoor and
444 7G 5
STATION
ELEC
outdoor & cable
1 and cable tray cover to be provided for outdoor
tray trays.
Cable Trench
DESAL FG indoor and cable tray earthing to be connected to earthing grid
445 7G 6 ELEC 1
STATION outdoor & cable at minimum two location for each run
tray
Integrity of earthing system verification to be
DESAL FG
446 7G 1
STATION
ELEC Earthing System 1 completed including all field earthing and lightning
system.
DESAL FG Marshalling bar for earthing to be supported with
447 7G 2 ELEC Earthing System 1
STATION additional insulator due to its additional length.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG 5K-TR-0001-01 All used and spares ducts shall be sealed with an
524 7HA 2.06 ELEC 1
STATION Transformer bay approved sealant.
DESAL FG 5K-TR-0001-01
525 7HA 2.07
STATION
ELEC
Transformer bay
1 To provide denso tape on the earth bar connection.
DESAL FG 5K-TR-0001-01 All outdoor cable tags shall be tied with stainless
527 7HA 2.09 ELEC 1
STATION Transformer bay steel PVC coated cable ties.
DESAL FG 5K-TR-0001-01 To ensure the cable trench is clean and free from
532 7HA 2.14 ELEC 1
STATION Transformer bay any construction debris.
QPAA 11 kV
SWGR Extension A copy of all FAT and SAT report to be submitted
DESAL FG panel H9 Feeder prior to energization including appropriate
538 7HA 4.01 ELEC 1
STATION to Desal FG 11kV documents such as built drawings marked-up SLD
switchgear (5K- and schematic diagram .
SB-0001-01)
QPAA 11 kV
SWGR Extension To complete the functional test of CB / VT rack in
DESAL FG panel H9 Feeder
539 7HA 4.02
STATION
ELEC
to Desal FG 11kV
1 rack out and downstream-upstream earthing
switchgear (5K- interlock.
SB-0001-01)
QPAA 11 kV
SWGR Extension
DESAL FG panel H9 Feeder
540 7HA 4.03
STATION
ELEC
to Desal FG 11kV
1 To ensure that the glanding plate is properly tighten.
switchgear (5K-
SB-0001-01)
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
QPAA 11 kV
SWGR Extension
DESAL FG panel H9 Feeder To replace TCS healty indication lamp with white
541 7HA 4.04 ELEC 1
STATION to Desal FG 11kV indication lamp.
switchgear (5K-
SB-0001-01)
QPAA 11 kV
SWGR Extension To provide earthing switch interlock with
DESAL FG panel H9 Feeder
542 7HA 4.05
STATION
ELEC
to Desal FG 11kV
1 downstream operation procedure is engraved in
switchgear (5K- traffolyte.
SB-0001-01)
QPAA 11 kV
SWGR Extension To rectify the cofiguration of Trip/Off/Close (S55) .
DESAL FG panel H9 Feeder Close shall be clockwise and trip anti clockwise.
543 7HA 4.06 ELEC 1
STATION to Desal FG 11kV Label shall be updated and replaced with traffolyte
switchgear (5K- (sticker is not acceptable).
SB-0001-01)
QPAA 11 kV
SWGR Extension
DESAL FG panel H9 Feeder
544 7HA 4.07
STATION
MECH
to Desal FG 11kV
1 To install and properly align the cable trench cover.
switchgear (5K-
SB-0001-01)
DESAL FG Protection
550 7HA 5.06
STATION
ELEC
Related
1 To complete the stability test of 415V REF scheme.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG COMPRESSOR Final coat painting for the wall inside & outside to
580 7E 2 CIVIL 1
STATION SHELTER be completed.
DESAL FG COMPRESSOR
581 7E 3
STATION
CIVIL
SHELTER
1 Painting for the floor & Compressor foundation.
DESAL FG COMPRESSOR
582 7E 4
STATION
CIVIL
SHELTER
1 Door touch up painting to be done.
DESAL FG COMPRESSOR
583 7E 5
STATION
CIVIL
SHELTER
1 Cleaning and finishing for the provided joint sealant.
DESAL FG COMPRESSOR Painting for the drain pit backside of Compressor
584 7E 6 CIVIL 1
STATION SHELTER shelter to be completed.
DG BUILDING &
DESAL FG DIESEL Surface preparation and Painting for the floor in &
585 7E 1 CIVIL 1
STATION STORAGE TANK outside and DG foundation to be completed.
AREA
DG BUILDING &
DESAL FG DIESEL All the holes in wall to be closed with appropriate
586 7E 2 CIVIL 1
STATION STORAGE TANK material and touch up paint for the wall & door.
AREA
DG BUILDING &
DESAL FG DIESEL Gap between wall and frame of sand trap inlet
587 7E 3 CIVIL 1
STATION STORAGE TANK louver to be closed.
AREA
DG BUILDING &
DESAL FG DIESEL Joint sealant to be provided on the floor & cleaning
588 7E 4 CIVIL 1
STATION STORAGE TANK for the provided sealant at DG room.
AREA
DG BUILDING &
DESAL FG DIESEL Gap between roof slab and rain water down pipe to
589 7E 5 CIVIL 1
STATION STORAGE TANK be closed with appropriate material
AREA
DG BUILDING &
DESAL FG DIESEL
590 7E 6
STATION
CIVIL
STORAGE TANK
1 Painting for the rain water down pipe.
AREA
DG BUILDING &
DESAL FG DIESEL Painting for the floor, dike wall and support
591 7E 7 CIVIL 1
STATION STORAGE TANK foundation at Diesel stotage tank area.
AREA
DG BUILDING &
DESAL FG DIESEL Joint sealant to be provided on the floor of Diesel
592 7E 8 CIVIL 1
STATION STORAGE TANK storage tank area.
AREA
DG BUILDING &
DESAL FG DIESEL
593 7E 9
STATION
CIVIL
STORAGE TANK
1 Cover for the sump pit to be provided
AREA
DESAL FG LV ROOM & Rectification of the installed trench cover for the LV
594 7E 1 MECH 1
STATION BATTERY ROOM room
DESAL FG LV ROOM & Extra holes / damaged portions on the wall to be
595 7E 2 CIVIL 1
STATION BATTERY ROOM rectified with appropriate material for LV room
DESAL FG LV ROOM & Joint sealant to be provided on the floor for the
596 7E 3 CIVIL 1
STATION BATTERY ROOM balance area of LV room
DESAL FG LV ROOM & Finishing for the provided joint sealant on the wall
597 7E 4 CIVIL 1
STATION BATTERY ROOM & touch up paint for the wall & door of LV rm
DESAL FG LV ROOM & Cover for the Eye wash drain pipe to be provided
598 7E 5 CIVIL 1
STATION BATTERY ROOM in the battery room
DESAL FG LV ROOM & Cleaning of Acid resistant tiles for floor & wall of
599 7E 6 CIVIL 1
STATION BATTERY ROOM battery room
PROCESS
DESAL FG AREA, FENCE Leveling & proper compaction for inside & outside
600 7E 1 CIVIL 1
STATION INSIDE & of the fence area.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Gravel laying for the unpaved area within station
601 7E 2 CIVIL 1
STATION INSIDE & fence limits to be completed.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Cover to be provided for the Instrumentation and
602 7E 3 CIVIL 1
STATION INSIDE & spill pit at process area.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
603 7E 4
STATION
CIVIL
INSIDE &
1 Painting for the Earth pit and cover to be provided
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Elevation for the earth pit & drain pit to be
604 7E 5 CIVIL 1
STATION INSIDE & maintained and match with the GL.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Installed paver blocks at personal gate to be
605 7E 6 CIVIL 1
STATION INSIDE & rectified.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Surface preparation and painting for the exposed
606 7E 7 CIVIL 1
STATION INSIDE & concrete surface
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Joint sealant to be provided and painting for the
607 7E 8 CIVIL 1
STATION INSIDE & kerb stone.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
608 7E 9
STATION
CIVIL
INSIDE &
1 Car shed works to be completed
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
609 7E 10
STATION
CIVIL
INSIDE &
1 Construction of the Asphalt road to be completed.
OUTSIDE
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PROCESS
DESAL FG AREA, FENCE Construction of the Track road outside of the fence
610 7E 11 CIVIL 1
STATION INSIDE & to be completed.
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Sign boards to be provided for all the required
611 7E 12 CIVIL 1
STATION INSIDE & areas
OUTSIDE
PROCESS
DESAL FG AREA, FENCE Touch up paint for the gate both sideds and fence
612 7E 13 CIVIL 1
STATION INSIDE & post
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
613 7E 14
STATION
CIVIL
INSIDE &
1 Removal of excavated material dumped outside
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
614 7E 15
STATION
CIVIL
INSIDE &
1 Proper clealing for the chain link fence
OUTSIDE
PROCESS
DESAL FG AREA, FENCE
615 7E 16
STATION
CIVIL
INSIDE &
1 Proper housekeeping
OUTSIDE
TELEMATORY &
DESAL FG False ceiling to be aligned with fixed lighting frame
616 7E 1 CIVIL AIR LOCK 1
STATION & HVAC duct outlet grill.
ROOM
TELEMATORY &
DESAL FG
617 7E 2
STATION
CIVIL AIR LOCK 1 Final alignment and inspection for the false ceiling
ROOM
TELEMATORY &
DESAL FG
618 7E 3
STATION
CIVIL AIR LOCK 1 Final alignment and inspection for the raised floor
ROOM
TELEMATORY &
DESAL FG Holes in wall to be closed with appropriate material
619 7E 4 CIVIL AIR LOCK 1
STATION and touch up paint for the wall and door.
ROOM
TELEMATORY &
DESAL FG Cleaning and finishing for the provided joint sealant
620 7E 5 CIVIL AIR LOCK 1
STATION in the wall of telematory room
ROOM
DESAL FG TRANSFORMER
621 7E 1
STATION
CIVIL
BAY
1 Cover slab to be provided for the trench
DESAL FG TRANSFORMER Rectification for the damaged portion of trench wall
622 7E 2 CIVIL 1
STATION BAY and painting to be completed
DESAL FG TRANSFORMER
623 7E 3
STATION
CIVIL
BAY
1 Final coat painting for the floor to be completed
DESAL FG TRANSFORMER Extra holes to be closed with appropriate material
624 7E 4 CIVIL 1
STATION BAY and touch up paint for the wall inside
DESAL FG TRANSFORMER
625 7E 5
STATION
CIVIL
BAY
1 Gravel to be provided on the floor.
ELECTRICAL &
DESAL FG DG BUILDING Gap between roof slab and rain water down pipe to
626 7E 1 CIVIL 1
STATION OUTSIDE & be closed with appropriate material
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Painting for the rain water down pipe to be
627 7E 2 CIVIL 1
STATION OUTSIDE & completed
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Cleaning & finishing for the provided joint sealant
628 7E 3 CIVIL 1
STATION OUTSIDE & and touch up paint for the bldg outside wall
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING
629 7E 4
STATION
CIVIL
OUTSIDE &
1 Painting for the coridoor floor slab to be completed
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING All exposed Separation layer on the roof top to be
630 7E 5 CIVIL 1
STATION OUTSIDE & covered properly
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Joint sealant to be provided for the access ladder
631 7E 6 CIVIL 1
STATION OUTSIDE & area
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Joint sealant to be provided & Epoxy painting for
632 7E 7 CIVIL 1
STATION OUTSIDE & the cover slab of HVAC duct opening
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING Damaged concrete surface of the parapet wall to
633 7E 8 CIVIL 1
STATION OUTSIDE & be repaired & touchup paint.
ROOF TOP
ELECTRICAL &
DESAL FG DG BUILDING
634 7E 9
STATION
CIVIL
OUTSIDE &
1 Over size stone to be removed from the roof top.
ROOF TOP
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
645 7E 5 DPS/DESAL CIVIL ALL 1 Crash barrior for the track road inside the fence
646 7E 6 DPS/DESAL CIVIL ALL 1 Fixing of Inter lock paver tiles for the personal gate
650 7E 10 DPS/DESAL CIVIL ALL 1 Touch up paint for the gate post & fence post
652 7E 12 DPS/DESAL CIVIL ALL 1 Proper cleaning for the fence & Hoesekeeping
VAL STN Main gate, personal gate and emergency gate to
653 7E 1 MECH ALL 1
KSDGS be installed
VAL STN
654 7E 2
KSDGS
CIVIL ALL 1 Installation of cover for earth pit, & spill pit
VAL STN Excavated material to be removed, backfilling,
655 7E 3 CIVIL ALL 1
KSDGS leveling, proper compaction & Gravel laying.
VAL STN
656 7E 4
KSDGS
CIVIL ALL 1 Track road inside the fence area to be completed
VAL STN
657 7E 5
KSDGS
CIVIL ALL 1 Crash barrior for the track road inside the fence
VAL STN
658 7E 6
KSDGS
CIVIL ALL 1 Fixing of Inter lock paver tiles for the personal gate
VAL STN Protection slab for the existing cable trench at main
659 7E 7 CIVIL ALL 1
KSDGS gate area
VAL STN
660 7E 8
KSDGS
CIVIL ALL 1 Access road from existing road to the main gate
VAL STN
661 7E 9
KSDGS
CIVIL ALL 1 Installation of Sign boards
VAL STN
662 7E 10
KSDGS
MECH ALL 1 Touch up paint for the gate post & fence post
VAL STN
663 7E 11
KSDGS
CIVIL ALL 1 Removal of existing fence
VAL STN
664 7E 12
KSDGS
CIVIL ALL 1 Proper cleaning for the fence & Hoesekeeping
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
667 7O 3
STATION
INST LOOP CHECK 2 5K-HSSD alarm should be latch in graphic page
DESAL FG
671 7O 7
STATION
INST LOOP CHECK 2 5K-SDV-0001,2,3,4 Can not operated from MOC
DESAL FG
676 7O 12
STATION
INST LOOP CHECK 2 6K-PI-0003A/B/C provide individual override facility
DESAL FG
680 7O 16
STATION
INST LOOP CHECK 2 Relative humidity not included in graphic
DESAL FG
681 7O 17
STATION
INST LOOP CHECK 2 5K-PI-0014, provide Fault alarm
DESAL FG
684 7O 20
STATION
INST LOOP CHECK 2 Logic 2 of 3 for Heat Detector system not function
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
703 7P 16
STATION
INST LOOP CHECK 2 P & ID graphic page needed to be correctd.
DESAL FG
708 7EA 1.02
STATION
CIVIL LV ROOM 1 Provide touch-up epoxy paint to the floor concrete.
DESAL FG
709 7EA 1.03
STATION
CIVIL LV ROOM 1 Unwanted holes on the floor to be sealed.
DESAL FG
711 7EA 1.05
STATION
ELEC LV ROOM 1 Provide covers for all electrical trucks
DESAL FG
712 7EA 1.06
STATION
MECH LV ROOM 1 Align the chequered plate covers properly.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
715 7EA 1.09
STATION
CIVIL LV ROOM 1 Apply touch-up paint on internal walls.
DESAL FG
716 7EA 1.10
STATION
CIVIL LV ROOM 1 Remove paint spots/ drop wherever necessary.
DESAL FG
717 7EA 1.11
STATION
ELEC LV ROOM 1 HVAC ducts to be cleaned.
DESAL FG
718 7EA 1.12
STATION
ELEC LV ROOM 1 Remove all temporary installations.
DESAL FG
719 7EA 1.13
STATION
CIVIL LV ROOM 1 Signplates shall be provided as per AFC drawing.
DESAL FG
720 7EA 1.14
STATION
CIVIL LV ROOM 1 Check the algnment of doors.
DESAL FG
721 7EA 1.15
STATION
CIVIL LV ROOM 1 Apply touch-up paint on doors and jambs.
DESAL FG
722 7EA 1.16
STATION
CIVIL LV ROOM 1 Funtional test for doors to be carried-out.
DESAL FG
723 7EA 1.17
STATION
CIVIL LV ROOM 1 Keep the area clean and tidy.
DESAL FG
725 7EA 2.02
STATION
CIVIL Telemetry Room 1 Loose floor tiles shall fixed properly.
DESAL FG
726 7EA 2.03
STATION
CIVIL Telemetry Room 1 Make the floor tiles properly levelled.
DESAL FG
729 7EA 2.06
STATION
CIVIL Telemetry Room 1 Remove paint spots/ drop wherever necessary.
DESAL FG
730 7EA 2.07
STATION
CIVIL Telemetry Room 1 Ceiling and floor tiles to be cleaned.
DESAL FG
732 7EA 2.09
STATION
CIVIL Telemetry Room 1 Apply touch-up paint on the doors and jambs.
DESAL FG
733 7EA 2.10
STATION
HVAC Telemetry Room 1 Remove all temporary installations.
DESAL FG
734 7EA 2.11
STATION
CIVIL Telemetry Room 1 Provide signplates as per AFC drawing.
DESAL FG
735 7EA 2.12
STATION
CIVIL Telemetry Room 1 Check the algnment of doors.
DESAL FG
736 7EA 2.13
STATION
CIVIL Telemetry Room 1 Apply touch-up paint on the doors and jambs.
DESAL FG
737 7EA 2.14
STATION
CIVIL Telemetry Room 1 Funtional test for doors to be carried-out.
DESAL FG
738 7EA 2.15
STATION
CIVIL Telemetry Room 1 Keep the area clean and tidy.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG Diesel Generator Third party certificate for O/H crane shall be
739 7EA 3.01 MECH 2
STATION Building provided.
DESAL FG Diesel Generator Installation and associated works for exhaust and
740 7EA 3.02 MECH 1
STATION Building muffler to be completed.
DESAL FG Diesel Generator Rectify floor edge cracks along RC slab covers and
745 7EA 3.07 CIVIL 1
STATION Building chequered plate covers wherever necessary.
DESAL FG Diesel Generator Rectify and provide good floor contraction joint's
746 7EA 3.08 CIVIL 1
STATION Building grooves and fill with sealant properly.
DESAL FG
760 7EA 4.01
STATION
CIVIL Battery Room 1 Eye wash to be fixed and tested.
DESAL FG
761 7EA 4.02
STATION
CIVIL Battery Room 1 Provide good floor surface at the entrance door.
DESAL FG
762 7EA 4.03
STATION
CIVIL Battery Room 1 Unwanted holes on the floor to be sealed.
DESAL FG
763 7EA 4.04
STATION
CIVIL Battery Room 1 Remove paint spots/ drop wherever necessary.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
765 7EA 4.06
STATION
CIVIL Battery Room 1 Floor and wall tiles to be cleaned.
DESAL FG
766 7EA 4.07
STATION
CIVIL Battery Room 1 Remove all temporary installations.
DESAL FG
767 7EA 4.08
STATION
CIVIL Battery Room 1 Provide signplates as per AFC drawing.
DESAL FG
768 7EA 4.09
STATION
CIVIL Battery Room 1 Check the algnment of doors.
DESAL FG
769 7EA 4.10
STATION
CIVIL Battery Room 1 Apply touch-up paint on doors and jambs.
DESAL FG
770 7EA 4.11
STATION
CIVIL Battery Room 1 Funtional test for doors to be carried-out.
DESAL FG
771 7EA 4.12
STATION
CIVIL Battery Room 1 Keep the area clean and tidy.
DESAL FG Transformer
772 7EA 5.01
STATION
MECH
Room
1 Roof water leak test to be carried out.
DESAL FG Transformer
773 7EA 5.02
STATION
MECH
Room
1 Replaced the damaged/ deformed roof sheets.
DESAL FG Transformer
774 7EA 5.03
STATION
MECH
Room
1 Provide fascias for cladding and roof sheet.
DESAL FG Transformer
776 7EA 5.05
STATION
MECH
Room
1 Rain water gutter and downspout to be provided.
DESAL FG Transformer
777 7EA 5.06
STATION
MECH
Room
1 PVC rain pipe spigot to be provided.
DESAL FG Transformer
778 7EA 5.07
STATION
MECH
Room
1 Provide concrete slab covers and align properly.
DESAL FG Transformer
782 7EA 5.11
STATION
CIVIL
Room
1 Apply touch-up paint on internal walls.
DESAL FG Transformer
783 7EA 5.12
STATION
MECH
Room
1 Apply touch up on all structural steel members.
DESAL FG Transformer
784 7EA 5.13
STATION
ELEC
Room
1 Remove all temporary installations.
DESAL FG Transformer
785 7EA 5.14
STATION
CIVIL
Room
1 Provide signplates as per AFC drawing.
DESAL FG Transformer
786 7EA 5.15
STATION
MECH
Room
1 Rectify the deformed door frames.
DESAL FG Transformer
787 7EA 5.16
STATION
MECH
Room
1 Damaged sand trap louver filters to be replaced.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG Transformer
788 7EA 5.17
STATION
MECH
Room
1 Check the algnment of doors.
DESAL FG Transformer
789 7EA 5.18
STATION
CIVIL
Room
1 Apply touch-up paint on doors and jambs.
DESAL FG Transformer
790 7EA 5.19
STATION
CIVIL
Room
1 Funtional test for doors to be carried-out.
DESAL FG Transformer
791 7EA 5.20
STATION
CIVIL
Room
1 Keep the area clean and tidy.
DESAL FG
792 7EA 6.01
STATION
ELEC Roof 1 Earthing works to be completed.
DESAL FG
794 7EA 6.03
STATION
CIVIL Roof 1 Filling of wall grooves with sealant to be completed.
DESAL FG
795 7EA 6.04
STATION
ELEC Roof 1 Provide covers for all electrical trunks
DESAL FG
796 7EA 6.05
STATION
CIVIL Roof 1 Walkway tiling work shall be completed.
DESAL FG
797 7EA 6.06
STATION
CIVIL Roof 1 Provide proper chamfer for HVAC stand platform.
DESAL FG
798 7EA 6.07
STATION
HVAC Roof 1 Remove all temporary installations.
DESAL FG
799 7EA 6.08
STATION
CIVIL Roof 1 Aggregates to be spreaded properly.
DESAL FG
800 7EA 6.09
STATION
CIVIL Roof 1 Keep the area clean and tidy.
DESAL FG Compressor
801 7EA 7.01
STATION
CIVIL
Shelter
1 Roof water leak test to be carried out.
DESAL FG Compressor
804 7EA 7.04
STATION
MECH
Shelter
1 All loose screws to be tighten.
DESAL FG Compressor
805 7EA 7.05
STATION
MECH
Shelter
1 Damaged sand trap louver filters to be replaced.
DESAL FG Compressor
808 7EA 7.08
STATION
MECH
Shelter
1 Align the chequered plate covers properly.
DESAL FG Compressor
810 7EA 7.10
STATION
CIVIL
Shelter
1 Remove all temporary installations.
DESAL FG Compressor
811 7EA 7.11
STATION
CIVIL
Shelter
1 Provide signplates as per AFC drawing.
DESAL FG Compressor
812 7EA 7.12
STATION
CIVIL
Shelter
1 Check the algnment of doors.
DESAL FG Compressor
813 7EA 7.13
STATION
CIVIL
Shelter
1 Apply touch-up paint on doors and jambs.
DESAL FG Compressor
814 7EA 7.14
STATION
CIVIL
Shelter
1 Funtional test for doors to be carried-out.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG Compressor
815 7EA 7.15
STATION
CIVIL
Shelter
1 Keep the area clean and tidy.
DESAL FG
819 7EA 8.04
STATION
CIVIL External Works 1 Track road and associated works shall be done.
DESAL FG
826 7EA 8.11
STATION
CIVIL External Works 1 Provide proper chamfer for pig launcher platforms.
DESAL FG
831 7EA 8.16
STATION
CIVIL External Works 1 Kerbstones shall be painted.
DESAL FG Fill all cable ducts on the wall with foam and apply
833 7EA 8.18 ELEC External Works 1
STATION paint matching with wall colour.
DESAL FG
836 7EA 8.21
STATION
CIVIL External Works 1 Apply touch-up paint on external walls.
DESAL FG
837 7EA 8.22
STATION
MECH External Works 1 Platform ladders railings shall be vertically aligned.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
842 7EA 8.27
STATION
MECH External Works 1 Base plates at diesel storage area shall be rectified.
DESAL FG
843 7EA 8.28
STATION
CIVIL External Works 1 Apply touch-up paint on main and pedestrian gates.
DESAL FG
846 7EA 8.31
STATION
CIVIL External Works 1 Provide pins/ padlocks for gate hasp locks.
DESAL FG
848 7EA 8.33
STATION
CIVIL External Works 1 Aggregates to be spreaded properly.
DESAL FG
849 7EA 8.34
STATION
CIVIL External Works 1 Remove all temporary installations.
DESAL FG
850 7EA 8.35
STATION
CIVIL External Works 1 Keep the area clean and tidy.
DESAL FG DPS/ DESAL and Third party certificate for JIB crane shall be
851 7EA 9.01 MECH 1
STATION (KS) SFG/KG provided.
DESAL FG DPS/ DESAL and Crash barrier installation and painting works to be
857 7EA 9.07 CIVIL 1
STATION (KS) SFG/KG completed.
DESAL FG DPS/ DESAL and Compact and level around crash barriers
858 7EA 9.08 CIVIL 1
STATION (KS) SFG/KG foundations.
DESAL FG DPS/ DESAL and Provide interlock paving at the pedestrian entrance
859 7EA 9.09 CIVIL 1
STATION (KS) SFG/KG access.
DESAL FG DPS/ DESAL and Apply touch up paint on all structural steel
864 7EA 9.14 MECH 1
STATION (KS) SFG/KG members, pipes and supports.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG DPS/ DESAL and Check the gate installation and provide true
871 7EA 9.21 CIVIL 1
STATION (KS) SFG/KG alignment.
DESAL FG DPS/ DESAL and Fasten and tighten all loose barbed wire and
872 7EA 9.22 CIVIL 1
STATION (KS) SFG/KG chainlink.
DESAL FG 6" and 4" Hydrostatic and pressure test for pipes to be
876 7EA 10.01 MECH Pipelines 1
STATION carried out.
DESAL FG
882 7FB 1
STATION
MECH General 2 Vehical parking not provided
DESAL FG
884 7FB 3
STATION
CIVIL General 2 Flood light pole base coating to be done
DESAL FG
885 7FB 4
STATION
MECH General 2 All mechanical valves tags to be fixed
DESAL FG
887 7FB 6
STATION
MECH General 2 Diesel loading point adaptors to be secured
DESAL FG
889 7FB 8
STATION
MECH General 2 Instrument air line painting to be done
DESAL FG
890 7FB 9
STATION
MECH General 2 All valve flanges shall be balaned bolted.
DESAL FG
891 7FB 10
STATION
MECH General 2 Chain blocks color coding to be done
DESAL FG
892 7FB 11
STATION
INST General 2 Heat detector Tag to be made readable
DESAL FG
893 7FB 12
STATION
MECH General 2 DG exhaust system bolting to be done properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG
898 7FB 17
STATION
INST General 2 Air volume tank details plate need proper stensiled
DESAL FG HVAC-NEW
899 7FA 1
STATION
HVAC
SUBSTATION
1 Traffolyte tags to be provided as per AFC
DESAL FG HVAC-NEW
900 7FA 2
STATION
HVAC
SUBSTATION
1 HVAC ID andflow tags to be completed
DESAL FG HVAC-NEW
901 7FA 3
STATION
HVAC
SUBSTATION
1 Duct supports not properly allign
DESAL FG HVAC-NEW Non return damper need to be fix in Generator
902 7FA 4 HVAC 1
STATION SUBSTATION room
DESAL FG HVAC-NEW
903 7FA 5
STATION
HVAC
SUBSTATION
1 Provide filters and clamps for DPS tubes
DESAL FG HVAC-NEW
904 7FA 6
STATION
HVAC
SUBSTATION
1 Clean all ducts diffusers and grills
DESAL FG HVAC-NEW
905 7FA 7
STATION
HVAC
SUBSTATION
1 Check Control panel cables termination
DESAL FG HVAC-NEW
906 7FA 8
STATION
HVAC
SUBSTATION
1 All ducts openings in wall/slab to be sealed
DESAL FG HVAC-NEW
907 7FA 9
STATION
HVAC
SUBSTATION
1 AHU drain pipe to be insulated
DESAL FG HVAC-NEW
908 7FA 10
STATION
HVAC
SUBSTATION
1 Internal and external cleaning of PAC
DESAL FG HVAC-NEW
909 7FA 11
STATION
HVAC
SUBSTATION
1 Final foster coating to be applied after pre-com
DESAL FG HVAC-NEW
910 7FC 1
STATION
HVAC
SUBSTATION
1 PAC corroded guard / panel to be painted
DESAL FG HVAC-NEW
911 7FC 2
STATION
HVAC
SUBSTATION
1 DPT for S/G room interface with HVAC CP
DESAL FG HVAC-NEW
912 7FC 3
STATION
HVAC
SUBSTATION
1 HVAC CP & PAC all wiring to be terminated
DESAL FG HVAC-NEW
913 7FC 4
STATION
HVAC
SUBSTATION
1 ALL HVAC instruments to be securely installed
DESAL FG HVAC-NEW
914 7FC 5
STATION
HVAC
SUBSTATION
1 Roof Duct insulation sagging to be rectified
DESAL FG HVAC-NEW
915 7FC 6
STATION
HVAC
SUBSTATION
1 All DUCT openings in wall /slab to be sealed
DESAL FG HVAC-NEW
916 7FC 7
STATION
HVAC
SUBSTATION
1 All Return Air Duct to be insulated
DESAL FG HVAC-NEW
917 7FC 8
STATION
HVAC
SUBSTATION
1 All SA branch duct require VCD for balancing
DESAL FG HVAC-NEW
918 7FC 9
STATION
HVAC
SUBSTATION
1 Fire Damper to be provided for Fire rated wall
DESAL FG HVAC-NEW
919 7FC 10
STATION
HVAC
SUBSTATION
1 All Duct supports hard insulation to be provided
DESAL FG HVAC-NEW
920 7FC 11
STATION
HVAC
SUBSTATION
1 PAC Drain pipe with insulation to be complted
DESAL FG HVAC-NEW
921 7FC 12
STATION
HVAC
SUBSTATION
1 All the cable glands to be tightened
DESAL FG HVAC-NEW
922 7FC 13
STATION
HVAC
SUBSTATION
1 HVAC CP & F&G interface to be completed
DESAL FG HVAC-NEW
923 7FC 14
STATION
HVAC
SUBSTATION
1 Provide appropriate damper to maintain+
DESAL FG HVAC-NEW
924 7FC 15
STATION
HVAC
SUBSTATION
1 HVAC ID &Flow tags to be provided
DESAL FG HVAC-NEW HVAC CP instruments / switches / dampers
925 7FC 16 HVAC 1
STATION SUBSTATION protection cover to be provided
DESAL FG HVAC-NEW
926 7FC 17
STATION
HVAC
SUBSTATION
1 HVAC SLD to be provided in CP / PAC
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DESAL FG DESAL FG NEW Provide FA Intake STL handle and ease of sand
935 7IA 5 HVAC 2
STATION SUB STATION removel
DESAL FG DESAL FG NEW Supply Air temperature of both units are not
939 7IA 9 HVAC 2
STATION SUB STATION achieved as per design temp.
DESAL FG DESAL FG NEW PAC# 1& 2 require cleaning and removel of sand &
942 7IA 12 HVAC 2
STATION SUB STATION dirts
949 7-24E 1 WHTP-D ELEC KHUFF-D 1 Electrical JB to be shifted out side the fence
951 7-24F 2 WHTP-D INST KHUFF-D 1 6D-PCV-0574 Air connection needed to be fixed
952 7-24F 3 WHTP-D INST KHUFF-D 1 6D-PCV-0574 positioner gauge glass broken.
954 7-24F 5 WHTP-D INST KHUFF-D 1 Tag no. And canopy not installed for PSL-0565
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
957 7-18E 1
WHTP-D
INST VAL STN 1 Re tubing required for PI-0565
VAL STN
958 7-18E 2
WHTP-D
INST VAL STN 1 No FDIs provided
VAL STN
959 7-18E 3
WHTP-D
INST VAL STN 1 SDV-0565 Name plate required
VAL STN
961 7-18E 5
WHTP-D
INST VAL STN 1 Provide Keys for the Instrument JBs.
VAL STN
963 7-18E 7
WHTP-D
INST VAL STN 1 TBs (Inside JBs) required tag.
EARTHING
965 7-24C 2 WHTP-D ELEC
SYSTEM
1 Approved AFC drawing to be available.
VAL STN
968 7-16H 1
WHTP-A
CIVIL GENERAL 1 Tighten the fence material wherever necessary
VAL STN
969 7-16H 2
WHTP-A
MECH GENERAL 1 Touch-up paint on all structural members
VAL STN Rectify the surface of the sub base for track road
972 7-16H 5 CIVIL GENERAL 1
WHTP-A within the station
VAL STN RTU solar panel roof shade sandwich panel edge
973 7-16H 6 MECH GENERAL 1
WHTP-A to be covered properly
VAL STN
974 7-16H 7
WHTP-A
MECH GENERAL 1 provide and install wind sock
VAL STN
976 7-16H 9
WHTP-A
MECH GENERAL 1 Provide and fix pad lock
VAL STN Grade, backfill and compact the batter around the
977 7-16H 10 CIVIL GENERAL 1
WHTP-A station
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
980 7-24H 2 WHTP-D MECH GENERAL 1 provide and install wind sock
982 7-24H 4 WHTP-D MECH GENERAL 1 Tighten the fence material wherever necessary
983 7-24H 5 WHTP-D MECH GENERAL 1 Touch-up paint on all structural members
987 7-24H 9 WHTP-D MECH GENERAL 1 Provide and fix pad lock
VAL STN
989 7-12D 1
FSDS
INST GENERAL 1 All cables to be tagged with proper strip size
VAL STN
993 7-12D 5
FSDS
INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap
VAL STN
996 7-12D 8
FSDS
INST GENERAL 1 Red line mark up drawings to be submitted
VAL STN
999 7-18D 1
WHTP-D
INST GENERAL 1 All cables to be tagged with proper strip size
VAL STN
1003 7-18D 5
WHTP-D
INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap
VAL STN
1006 7-18D 8
WHTP-D
INST GENERAL 1 Red line mark up drawings to be submitted
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1009 7-16D 1
WHTP-A
INST GENERAL 1 All cables to be tagged with proper strip size
VAL STN
1013 7-16D 5
WHTP-A
INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap
VAL STN
1016 7-16D 8
WHTP-A
INST GENERAL 1 Red line mark up drawings to be submitted
1019 7-24D 1 WHTP-D INST GENERAL 1 All cables to be tagged with proper strip size
1022 7-24D 4 WHTP-D INST GENERAL 1 Red line mark up drawings to be submitted
1023 7-24D 5 WHTP-D INST GENERAL 1 Cable to be tied with SS PVC coated tie wrap
1026 7-24D 8 WHTP-D INST GENERAL 1 Cable tray installed for cables to be covered
1028 7-24D 10 WHTP-D INST GENERAL 1 Proper access to be provided for instruments
VAL STN
1031 7-16G 1
WHTP-A
MECH GENERAL 1 Housekeeping to be carried out.
VAL STN
1032 7-16G 2
WHTP-A
MECH GENERAL 1 Greasing/molycote to be done for all bolts
VAL STN
1035 7-16G 5
WHTP-A
MECH GENERAL 1 At 6" Tie-in point(Sag Line) to be painted.
1037 7-24G 2 WHTP-D MECH GENERAL 1 Greasing/molycote to be done for all bolts
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1041 7-18H 1
WHTP-D
MECH GENERAL 1 Housekeeping to be carried out.
VAL STN
1042 7-18H 2
WHTP-D
MECH GENERAL 1 Greasing/molycote to be done for all bolts
VAL STN
1044 7-12E 1
FSDS
CIVIL GENERAL 1 Housekeeping to be carried out.
VAL STN
1045 7-12E 2
FSDS
MECH GENERAL 1 Greasing/molycote to be done for all bolts
VAL STN Installation of BV-0003 & PI-0001 are not align with
1048 7-16I 1 MECH GENERAL 1
WHTP-A the piping
VAL STN
1049 7-16I 2
WHTP-A
MECH GENERAL 1 Pipe support bolt loosen at D/S of BV-0014
VAL STN
1050 7-16E 1
WHTP-A
INST GENERAL 1 5A-XS-0001 switch gap to adjusted.
VAL STN Earth protect bolts to tight and both JB tag are
1052 7-16E 3 INST GENERAL 2
WHTP-A missing.
VAL STN
1054 7-16E 5
WHTP-A
INST GENERAL 2 Loop drawing provide for local panel.
VAL STN
1055 7-18F 1
WHTP-D
MECH GENERAL 1 2nos Platform hand rails to be provided
VAL STN Main and man way gates to be painted with green
1058 7-18F 4 MECH GENERAL 1
WHTP-D color.
VAL STN
1059 7-18F 5
WHTP-D
CIVIL GENERAL 1 Splicing pit cover to be painted with black color.
VAL STN
1063 7-16F 1
WHTP-A
MECH GENERAL 1 2nos Platform hand rails to be provided
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN Main and man way gates to be painted with green
1066 7-16F 4 MECH GENERAL 1
WHTP-A color.
VAL STN
1067 7-16F 5
WHTP-A
CIVIL GENERAL 1 Splicing pit cover to be painted with black color.
VAL STN
1071 7-16F 9
WHTP-A
MECH GENERAL 1 Wind sock to be provided at the side.
VAL STN Rectification shall be done for the track road inside
1073 7-12B 2 CIVIL 1
FSDS the fence
VAL STN
1076 7-12B 5
FSDS
CIVIL 1 Access road from main gate to ROW shall be done
VAL STN
1077 7-12B 6
FSDS
CIVIL 1 Painting to be done for kerb stone
VAL STN
1078 7-12B 7
FSDS
MECH PAINTING 1 Apply touchup paint for gate and fence post
VAL STN
1079 7-12B 8
FSDS
CIVIL 1 Joint sealant for the required areas to be done
VAL STN Cover for the splicing pit and spill pit shall be
1080 7-12B 9 MECH 1
FSDS provided
VAL STN
1081 7-12B 10
FSDS
CIVIL 1 Proper cleaning to be done for fence and gate
VAL STN Rectification shall be done for the track road inside
1084 7-16B 2 CIVIL 1
WHTP-A the fence
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1086 7-16B 4
WHTP-A
CIVIL 1 Ladder foundation to be installed
VAL STN
1087 7-16B 5
WHTP-A
CIVIL 1 Access road from main gate to ROW shall be done
VAL STN
1088 7-16B 6
WHTP-A
MECH 1 Wind sock to be provided
VAL STN
1089 7-16B 7
WHTP-A
MECH 1 Apply touchup paint for gate and fence post
VAL STN Between the sleeper pad area backfill and compact
1092 7-16B 10 CIVIL 1
WHTP-A it properly
VAL STN
1093 7-16B 11
WHTP-A
CIVIL 1 Proper cleaning to be done for fence and gate
VAL STN
1094 7-16B 12
WHTP-A
CIVIL 1 Bund to be provided as per drawing
1098 7-24B 4 WHTP-D CIVIL 1 Access road from main gate to ROW shall be done
1100 7-24B 6 WHTP-D MECH 1 Apply touchup paint for gate and fence post
1101 7-24B 7 WHTP-D CIVIL 1 Spill pit top surface to be prepared smoothly
1102 7-24B 8 WHTP-D CIVIL 1 Kerb stone at the corners shall be properly installed
1105 7-24B 11 WHTP-D CIVIL 1 Joint sealant for the required areas to be done
1106 7-24B 12 WHTP-D CIVIL 1 Proper cleaning to be done for fence and gate
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1109 7-24B 15 WHTP-D CIVIL 1 Fasten and tighten all lose barbed wire
VAL STN
1114 7-18B 4
WHTP-D
CIVIL 1 Spill pit top surface to be prepared smoothly
VAL STN
1115 7-18B 5
WHTP-D
CIVIL 1 Access road from main gate to ROW shall be done
VAL STN
1116 7-18B 6
WHTP-D
CIVIL 1 Painting to be done for kerb stone
VAL STN
1117 7-18B 7
WHTP-D
MECH 1 Apply touchup paint for gate and fence post
VAL STN
1118 7-18B 8
WHTP-D
CIVIL 1 Joint sealant for the required areas to be done
VAL STN Cover for the splicing pit and spill pit shall be
1119 7-18B 9 CIVIL 1
WHTP-D provided
VAL STN
1120 7-18B 10
WHTP-D
CIVIL 1 Proper cleaning to be done for fence and gate
VAL STN
1128 7-11G 1.07
FNLGCS
MECH 1 Apply molycoat grease oil on all bolts and nuts.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1130 7-11G 1.09
FNLGCS
CIVIL 1 Gate drop bolt eyes to be provided.
VAL STN
1133 7-11G 1.12
FNLGCS
MECH 1 Windsock to be provided.
VAL STN
1134 7-11G 1.13
FNLGCS
CIVIL 1 Keep the area clean and tidy.
1137 7-3D 2.03 FNLGCS CIVIL 1 Asphalt road and associated works not done.
1140 7-3D 2.06 FNLGCS MECH 1 Apply molycoat grease oil on all bolts and nuts.
1142 7-3D 2.08 FNLGCS CIVIL 1 Gate drop bolt eyes to be provided.
1144 7-3D 2.1 FNLGCS MECH 1 Crash barrier and kerbstones to be painted
1146 7-3D 2.12 FNLGCS CIVIL 1 Keep the area clean and tidy.
1149 7-21G 3.03 WHTP-A CIVIL 1 Asphalt road and associated works not done.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1153 7-21G 3.07 WHTP-A CIVIL 1 Gate drop bolt eyes to be provided.
1154 7-21G 3.08 WHTP-A CIVIL 1 Remove existing chain link fencing near station.
1155 7-21G 3.09 WHTP-A CIVIL 1 New chain link fence netting to be provided.
1157 7-21G 3.11 WHTP-A MECH 1 Spill pit grating to be installed properly
1158 7-21G 3.12 WHTP-A CIVIL 1 Rectify concrete cracks around spill pit grating.
1159 7-21G 3.13 WHTP-A MECH 1 Apply molycoat grease oil on all bolts and nuts.
1160 7-21G 3.14 WHTP-A MECH 1 Crash barrier and kerbstones to be painted
1161 7-21G 3.15 WHTP-A CIVIL 1 Fasten and tighten loose chain link.
1163 7-21G 3.17 WHTP-A CIVIL 1 Keep the area clean and tidy.
VAL STN
1169 7-17H 4.06
WHTP-B
MECH 1 Apply molycoat grease oil on all bolts and nuts.
VAL STN
1171 7-17H 4.08
WHTP-B
CIVIL 1 Gate drop bolt eyes to be provided.
VAL STN
1173 7-17H 4.10
WHTP-B
MECH 1 Windsock to be provided.
VAL STN
1174 7-17H 4.11
WHTP-B
CIVIL 1 Keep the area clean and tidy.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1178 7-22G 5.04 WHTP-B MECH 1 Cross- over ladder works to be completed.
1182 7-22G 5.08 WHTP-B CIVIL 1 Gate drop bolt eyes to be provided.
1183 7-22G 5.09 WHTP-B CIVIL 1 Remove existing chain link fencing near station.
1184 7-22G 5.10 WHTP-B CIVIL 1 New chain link fence netting to be provided.
1186 7-22G 5.12 WHTP-B MECH 1 Apply molycoat grease oil on all bolts and nuts.
1188 7-22G 5.14 WHTP-B CIVIL 1 Pipe support to be filled with grout.
1189 7-22G 5.15 WHTP-B CIVIL 1 Fasten and tighten loose barbed wires.
1191 7-22G 5.17 WHTP-B CIVIL 1 Keep the area clean and tidy.
1194 7-23G 6.03 WHTP-C CIVIL 1 Asphalt road and associated works not done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1198 7-23G 6.07 WHTP-C CIVIL 1 Gate drop bolt eyes to be provided.
1199 7-23G 6.08 WHTP-C CIVIL 1 Remove existing chain link fencing near station.
1200 7-23G 6.09 WHTP-C CIVIL 1 New chain link fence netting to be provided.
1202 7-23G 6.11 WHTP-C MECH 1 Apply molycoat grease oil on all bolts and nuts.
1203 7-23G 6.12 WHTP-C MECH 1 Crash barrier and kerbstones to be painted
1204 7-23G 6.13 WHTP-C CIVIL 1 Fasten and tighten loose barbed wires.
1206 7-23G 6.15 WHTP-C CIVIL 1 Keep the area clean and tidy.
VAL STN Rectify the surface of the sub base for track road
1207 7-18I 1 CIVIL 1
WHTP-D within the station
VAL STN
1209 7-18I 3
WHTP-D
CIVIL 1 Tighten the fence material wherever necessary
VAL STN
1210 7-18I 4
WHTP-D
MECH 1 Touch-up paint on all structural members
VAL STN
1212 7-18I 6
WHTP-D
MECH 1 Provide and fix pad lock
VAL STN Grade, backfill and compact the batter around the
1213 7-18I 7 CIVIL 1
WHTP-D station
VAL STN RTU solar panel roof shade sandwich panel edge
1214 7-18I 8 MECH 1
WHTP-D to be covered properly
VAL STN Rectify the surface of the sub base for track road
1216 7-12F 1 CIVIL 1
FSDS within the station
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1218 7-12F 3
FSDS
CIVIL 1 Tighten the fence material wherever necessary
VAL STN
1219 7-12F 4
FSDS
MECH 1 Touch up paint on all structural members
VAL STN
1221 7-12F 6
FSDS
MECH 1 Provide and fix pad lock
VAL STN Grade, backfill and compact the batter around the
1222 7-12F 7 CIVIL 1
FSDS station
VAL STN RTU solar panel roof shade sandwich panel edge
1223 7-12F 8 MECH 1
FSDS to be covered properly
1227 7-21F 3 WHTP-A MECH Manifold 1 Main and man gates to be painted with green color.
1229 7-21F 5 WHTP-A CIVIL Manifold 1 Splicing pit cover to be painted with black color.
1235 7-22F 3 WHTP-B MECH Manifold 1 Main and man gates to be painted with green color.
1237 7-22F 5 WHTP-B CIVIL Manifold 1 Splicing pit cover to be painted with black color.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1241 7-17E 1
WHTP-B
MECH 1 2nos Platform hand rails to be provided
VAL STN Main and man way gates to be painted with green
1244 7-17E 4 MECH 1
WHTP-B color.
VAL STN
1245 7-17E 5
WHTP-B
CIVIL 1 Splicing pit cover to be painted with black color.
VAL STN
1249 7-17E 9
WHTP-B
MECH 1 Tag no to be provided for all mechanical equipment
VAL STN
1250 7-17E 10
WHTP-B
INST 1 Tag no to be provided for all instrument equipment
VAL STN
1251 7-17E 11
WHTP-B
CIVIL 1 Crash painting of pig trap foundation to be made
1254 7-23F 3 WHTP-C MECH 1 Main and man gates to be painted with green color.
1256 7-23F 5 WHTP-C CIVIL 1 Splicing pit cover to be painted with black color.
EARTHING
VAL STN Missing washers to be provided in earthing
1260 7-16C 1 ELEC SYSTEM AND 1
WHTP-A connections
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1261 7-16C 2 ELEC SYSTEM AND 1
WHTP-A to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1262 7-16C 3 ELEC SYSTEM AND 1
WHTP-A done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1263 7-16C 4 ELEC SYSTEM AND 1
WHTP-A provided as per QP approval
SOLAR PANEL
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EARTHING
VAL STN
1264 7-16C 5
WHTP-A
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING
VAL STN
1267 7-16C 8
WHTP-A
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1268 7-16C 9 ELEC SYSTEM AND 1
WHTP-A proven
SOLAR PANEL
EARTHING
VAL STN Missing washers to be provided in earthing
1269 7-18C 1 ELEC SYSTEM AND 1
WHTP-D connections
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1270 7-18C 2 ELEC SYSTEM AND 1
WHTP-D to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1271 7-18C 3 ELEC SYSTEM AND 1
WHTP-D done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1272 7-18C 4 ELEC SYSTEM AND 1
WHTP-D provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1273 7-18C 5
WHTP-D
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING
VAL STN
1276 7-18C 8
WHTP-D
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1277 7-18C 9 ELEC SYSTEM AND 1
WHTP-D proven
SOLAR PANEL
EARTHING
VAL STN Missing washers to be provided in earthing
1278 7-12C 1 ELEC SYSTEM AND 1
FSDS connections
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1279 7-12C 2 ELEC SYSTEM AND 1
FSDS to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1280 7-12C 3 ELEC SYSTEM AND 1
FSDS done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1281 7-12C 4 ELEC SYSTEM AND 1
FSDS provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1282 7-12C 5
FSDS
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EARTHING
VAL STN
1285 7-12C 8
FSDS
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1286 7-12C 9 ELEC SYSTEM AND 1
FSDS proven
SOLAR PANEL
1288 7-4B 2 FSDS CIVIL 1 Painting to be done for the kerb stone
1289 7-4B 3 FSDS CIVIL 1 Joint sealant for the required areas to be done
1292 7-4B 6 FSDS MECH 1 Apply touchup paint for the gate and fence post
1298 7-4B 12 FSDS CIVIL 1 Barbed wire on top of the gate to be completed
1302 7-1B 2 FNDS CIVIL 1 Painting to be done for the kerb stone
1303 7-1B 3 FNDS CIVIL 1 Joint sealant for the required areas to be done
VAL STN
1309 7-12A 2
FSDS
INST VAL STN 1 Pig signaler is to be functional tested
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1310 7-12A 3
FSDS
MECH VAL STN 1 Jib crane to be installed.
VAL STN
1314 7-12A 7
FSDS
MECH VAL STN 1 All valve tags are to be provided in SS material
VAL STN
1325 7-16A 5
WHTP-A
INST VAL STN 1 Pig signaler is to be functional tested
VAL STN
1329 7-16A 10
WHTP-A
MECH VAL STN 1 Stenciling & color coding shall be done
VAL STN
1330 7-16A 11
WHTP-A
MECH VAL STN 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Tie-in total of 8 nos. pipe sizes 1", 2" 3" & 4" are to
1351 7-23E 4 WHTP-C MECH 1
be completed before commissioning activities
VAL STN
1353 7-26C 2
FNDS
MECH 1 Tag number for all isolation valves is to be provided
VAL STN
1356 7-11E 2
FNLGCS
MECH VAL STN 1 Tag number for all isolation valves is to be provided
1358 7-24A 1 WHTP-D MECH 1 Flare line slope and alignment shall be rectified
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1367 7-24A 10 WHTP-D MECH 1 Stenciling and colour coding shall be done
1368 7-24A 11 WHTP-D MECH 1 All valve tags are to be provided in SS material
VAL STN
1380 7-18A 2
WHTP-D
INST VAL STN 1 Pig signaler is to be functional tested
VAL STN
1381 7-18A 3
WHTP-D
MECH VAL STN 1 JIB crane is to be installed
VAL STN
1385 7-18A 7
WHTP-D
MECH VAL STN 1 All valve tags are to be provided in SS material
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
TELECOM :
1406 7-5A 4 FSP INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
1407 7-5A 5 FSP INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
1408 7-8A 1 STATION-N INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure
CABLE
TELECOM :
1409 7-8A 2 STATION-N INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
FO cable complete network & Block drawing to be
1410 7-8A 3 STATION-N INST FIBER OPTIC 1
CABLE provided & pasted at the inside of the door rack
TELECOM :
1411 7-8A 4 STATION-N INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
1412 7-8A 5 STATION-N INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
TELECOM :
1413 7-6A 1 KNDS INST FIBER OPTIC 1 FOPP to be tagged as per QP tagging procedure
CABLE
TELECOM :
1414 7-6A 2 KNDS INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
FO cable complete network & Block drawing to be
1415 7-6A 3 KNDS INST FIBER OPTIC 1
CABLE provided & pasted at the inside of the door rack
TELECOM :
1416 7-6A 4 KNDS INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
1417 7-6A 5 KNDS INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN FOPP to be tagged as per QP tagging
1418 7-18J 1 INST FIBER OPTIC 1
WHTP-D procedure/labeled
CABLE
TELECOM :
VAL STN
1419 7-18J 2
WHTP-D
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN FO cable complete network & Block drawing to be
1420 7-18J 3 INST FIBER OPTIC 1
WHTP-D provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN
1421 7-18J 4
WHTP-D
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN
1422 7-18J 5
WHTP-D
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
1423 7-18J 6
WHTP-D
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN FIBEr optic enclosure to be fixed (inside of the
1424 7-18J 7 INST FIBER OPTIC 1
WHTP-D manhole
CABLE
TELECOM :
VAL STN FOPP to be tagged as per QP tagging
1425 7-16J 1 INST FIBER OPTIC 1
WHTP-A procedure/labeled
CABLE
TELECOM :
VAL STN
1426 7-16J 2
WHTP-A
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN FO cable complete network & Block drawing to be
1427 7-16J 3 INST FIBER OPTIC 1
WHTP-A provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN
1428 7-16J 4
WHTP-A
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN
1429 7-16J 5
WHTP-A
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
1430 7-16J 6
WHTP-A
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN Fiber optic enclosure to be fixed (inside of the
1431 7-16J 7 INST FIBER OPTIC 1
WHTP-A manhole
CABLE
TELECOM :
VAL STN FOPP to be tagged as per QP tagging
1432 7-17I 1 INST FIBER OPTIC 1
WHTP-B procedure/labeled
CABLE
TELECOM :
VAL STN
1433 7-17I 2
WHTP-B
INST FIBER OPTIC 1 Telecom Cable Route marker Post to be installed.
CABLE
TELECOM :
VAL STN FO cable complete network & Block drawing to be
1434 7-17I 3 INST FIBER OPTIC 1
WHTP-B provided & pasted at the inside of the door rack
CABLE
TELECOM :
VAL STN
1435 7-17I 4
WHTP-B
INST FIBER OPTIC 1 All crossing area FO cable to be tagged
CABLE
TELECOM :
VAL STN
1436 7-17I 5
WHTP-B
INST FIBER OPTIC 1 FOPP shall be cleaned and made free from dust.
CABLE
TELECOM :
VAL STN
1437 7-17I 6
WHTP-B
INST FIBER OPTIC 1 Telecom Manhole to be Covered & labeled.
CABLE
TELECOM :
VAL STN Fiber optic enclosure to be fixed (inside of the
1438 7-17I 7 INST FIBER OPTIC 1
WHTP-B manhole
CABLE
Excavated material and dune sand to be removed
PIPELINE - 4'' 4"-VAL STN-D to
1439 7-7A 1
WHTP-D
CIVIL
WHTP-D
1 from surroundings of the support foundations and
compact it properly
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4'' 4"-VAL STN-D to Existing pipe is not resting properly on the support
1449 7-7A 11 CIVIL 1
WHTP-D WHTP-D foundations inside the new culvert to be rectified
PIPELINE - 4'' 4"-VAL STN-D to
1450 7-7A 12
WHTP-D
CIVIL
WHTP-D
1 Cleaning to be done inside the culverts
PIPELINE - 4'' 4"-VAL STN-D to Removal of unwanted materials and house
1451 7-7A 13 CIVIL 1
WHTP-D WHTP-D keeping shall be done
VAL STN
1452 7-10F 1
FNFIS
MECH VAL STN 1 Wind sock shall be installed
VAL STN
1453 7-10F 2
FNFIS
MECH VAL STN 1 painting/touch up painting required
VAL STN
1454 7-10F 3
FNFIS
MECH VAL STN 1 Tag# shall be stenciled on the piping
VAL STN
1456 7-10F 5
FNFIS
MECH VAL STN 1 Missing valves shall be installed
VAL STN
1457 7-10F 6
FNFIS
MECH VAL STN 1 Missing flanges and vent shall be installed
VAL STN
1459 7-15F 1
WHTP H&L
MECH VAL STN 1 Wind sock shall be installed
VAL STN
1460 7-15F 2
WHTP H&L
MECH VAL STN 1 painting/touch up painting required
VAL STN
1461 7-15F 3
WHTP H&L
MECH VAL STN 1 Tag# shall be stenciled on the piping
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1465 7-2F 2 FNFIS MECH 1 All foundation bolt tightness check to be done.
1466 7-2F 3 FNFIS MECH 1 All tie in valve connection to beto be done.
1467 7-2F 4 FNFIS MECH 1 Glycol heater platform locking chain to be rectified.
VAL STN BV -0010 down stream 2" PLG -0001 valve handle
1484 7-10E 2 MECH 1
FNFIS to be installed
VAL STN
1486 7-10E 4
FNFIS
MECH 1 2" kicker line end blind to be installed.
VAL STN
1488 7-10E 6
FNFIS
MECH 1 2" BV-0006 End blind to be installed.
VAL STN
1491 7-10E 9
FNFIS
MECH 1 Wind sock to be provided.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1493 7-15E 2
WHTP H&L
MECH 1 2" Kicker line end blind to be installed.
VAL STN
1494 7-15E 3
WHTP H&L
MECH 1 2" BV-0007 End blind to be installed
VAL STN
1497 7-15E 6
WHTP H&L
MECH 1 Wind sock to be provided.
VAL STN
1507 7-13E 2
KNMP
MECH 1 Name plate for all valve to be provided
VAL STN
1508 7-13E 3
KNMP
MECH 1 Fire extinguisher to be provided
VAL STN
1509 7-13E 4
KNMP
MECH 1 Wind sock to be provided.
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1511 7-10C 2 ELEC SYSTEM AND 1
FNFIS to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1512 7-10C 3 ELEC SYSTEM AND 1
FNFIS done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1513 7-10C 4 ELEC SYSTEM AND 1
FNFIS provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1514 7-10C 5
FNFIS
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING
VAL STN
1517 7-10C 8
FNFIS
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EARTHING
VAL STN Integrity of earthing connections to be verified and
1518 7-10C 9 ELEC SYSTEM AND 1
FNFIS proven
SOLAR PANEL
EARTHING
VAL STN Dummy glands and spare holes to be closed with
1519 7-10C 10 ELEC SYSTEM AND 1
FNFIS IP rated dummies.
SOLAR PANEL
EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1520 7-10C 11 ELEC SYSTEM AND 1
FNFIS supports, to be installed with suitable fastensers
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1522 7-15C 2 ELEC SYSTEM AND 1
WHTP H&L to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1523 7-15C 3 ELEC SYSTEM AND 1
WHTP H&L done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1524 7-15C 4 ELEC SYSTEM AND 1
WHTP H&L provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1525 7-15C 5
WHTP H&L
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING
VAL STN
1528 7-15C 8
WHTP H&L
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1529 7-15C 9 ELEC SYSTEM AND 1
WHTP H&L proven
SOLAR PANEL
EARTHING
VAL STN Dummy glands and spare holes to be closed with
1530 7-15C 10 ELEC SYSTEM AND 1
WHTP H&L IP rated dummies.
SOLAR PANEL
EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1531 7-15C 11 ELEC SYSTEM AND 1
WHTP H&L supports, to be installed with suitable fastensers
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable , earth pit and solar panel
1533 7-13C 2 ELEC SYSTEM AND 1
KNMP to be completed
SOLAR PANEL
EARTHING
VAL STN Cable termination in Solar control panel to be
1534 7-13C 3 ELEC SYSTEM AND 1
KNMP done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1535 7-13C 4 ELEC SYSTEM AND 1
KNMP provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1536 7-13C 5
KNMP
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EARTHING
VAL STN
1539 7-13C 8
KNMP
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1540 7-13C 9 ELEC SYSTEM AND 1
KNMP proven
SOLAR PANEL
EARTHING
VAL STN Dummy glands and spare holes to be closed with
1541 7-13C 10 ELEC SYSTEM AND 1
KNMP IP rated dummies.
SOLAR PANEL
EARTHING
VAL STN Rusting in the bolts observed used for Solar panel
1542 7-13C 11 ELEC SYSTEM AND 1
KNMP supports, to be installed with suitable fastensers
SOLAR PANEL
EARTHING
VAL STN Duct entry to be sealed. Dressing of cables to be
1543 7-13C 12 ELEC SYSTEM AND 1
KNMP done neatly
SOLAR PANEL
EARTHING
1545 7-19C 2 WHTP-H ELEC
SYSTEM
1 Approved AFC drawing to be available.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Lighting System
1563 7-2C 3 FNFIS ELEC
for Glycol Skid
1 Cable entry to light fitting to sealed
Lighting System
1564 7-2C 4 FNFIS ELEC
for Glycol Skid
1 Cable tray cover to be installed
Lighting System
1565 7-2C 5 FNFIS ELEC
for Glycol Skid
1 Cutting edges of supports to be painted
Earthing
System,UPS ,LV Power supply cable from UPS panel to Glycol
1566 7-2C 1 FNFIS ELEC 1
DB and Glycol panel to be clamped properly.
Panel
Earthing
System,UPS ,LV
1567 7-2C 2 FNFIS ELEC
DB and Glycol
1 Tightness of earthing connection to be completed
Panel
Earthing
System,UPS ,LV Earthing activities in mobilie pig launcher to be
1568 7-2C 3 FNFIS ELEC 1
DB and Glycol completed
Panel
Earthing
System,UPS ,LV
1569 7-2C 4 FNFIS ELEC
DB and Glycol
1 Tag installation for earthing cable to be completed
Panel
Earthing
System,UPS ,LV Earthing connection in mobile pig launcher area to
1570 7-2C 5 FNFIS ELEC 1
DB and Glycol be done with flexible connections
Panel
Earthing
System,UPS ,LV Denso tape installation to be completed after
1571 7-2C 6 FNFIS ELEC 1
DB and Glycol tightness verification in all earting connections
Panel
Earthing
System,UPS ,LV
1572 7-2C 7 FNFIS ELEC
DB and Glycol
1 Cable tray earthing to be completed
Panel
Earthing
System,UPS ,LV
1573 7-2C 8 FNFIS ELEC
DB and Glycol
1 Route marker installation to be completed
Panel
Earthing Supports to be installed properly and insulation of
System,UPS ,LV
1574 7-2C 9 FNFIS ELEC
DB and Glycol
1 cable to be protected from sharp edges at both
Panel sides.
Earthing
System,UPS ,LV LV feeder side identification tag to be provided for
1575 7-2C 10 FNFIS ELEC 1
DB and Glycol alloted one and supplied spare with all details
Panel
Earthing
System,UPS ,LV Tigtness verification for heater cable to be
1576 7-2C 11 FNFIS ELEC 1
DB and Glycol completed at both ends
Panel
Earthing IP rating details not available in the heater power
System,UPS ,LV
1577 7-2C 12 FNFIS ELEC
DB and Glycol
1 supply JB at top of the skid. Necessary information
Panel to be provided.
1579 7-27B 2 WHTP E ELEC Earthing System 1 Approved AFC drawing to be available.
1582 7-27B 5 WHTP E ELEC Earthing System 1 Construction inspection not completed
VAL STN
1583 7-13F 1
KNMP
MECH VAL STN 1 Wind sock shall be installed.
VAL STN
1584 7-13F 2
KNMP
MECH VAL STN 1 Painting/touch-up painting required.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1585 7-13F 3
KNMP
MECH VAL STN 1 Tag # shall be stencilled on the piping.
VAL STN
1589 7-13F 7
KNMP
MECH VAL STN 1 Fence ring shall be installed for protuding pipes
VAL STN
1590 7-13F 8
KNMP
MECH VAL STN 1 BV-008 valve & spectacle blind to be installed
VAL STN
1591 7-13F 9
KNMP
MECH VAL STN 1 Spectacle blind on BV-004 valve to be installed
1600 7-20F 2 WHTP-L MECH 1 Apply structural paint on platforms and piping
1608 7-19F 10 WHTP-H MECH 1 Apply structural paint on platforms and piping
1609 7-19F 11 WHTP-H MECH 1 Install ring at the pipe crossing area through fence
VAL STN Backfill, grade and compact the surface and batter
1612 7-15G 14 CIVIL VAL STN 1
WHTP H&L of approach road
VAL STN
1613 7-15G 15
WHTP H&L
MECH VAL STN 1 Touch up paint on all structural member
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1614 7-15G 16
WHTP H&L
MECH VAL STN 1 provide and install wind sock
VAL STN Fill all the cable entry opening with appropriate
1615 7-15G 17 ELEC VAL STN 1
WHTP H&L material
VAL STN
1616 7-15G 18
WHTP H&L
CIVIL VAL STN 1 Re-instate the pit to connect the line with 18" line
VAL STN
1617 7-15G 19
WHTP H&L
CIVIL VAL STN 1 General cleaning to be done
VAL STN
1618 7-10G 20
FNFIS
MECH VAL STN 1 Provide and install wind sock
VAL STN
1619 7-10G 21
FNFIS
MECH VAL STN 1 Install cover on spill pit
VAL STN
1620 7-10G 22
FNFIS
MECH VAL STN 1 Install ring at the pipe crossing area through fence
VAL STN
1621 7-10G 23
FNFIS
MECH VAL STN 1 Apply paint on crash barrier
VAL STN
1622 7-10G 24
FNFIS
MECH VAL STN 1 Touch up paint on pipe line
VAL STN
1623 7-10G 25
FNFIS
CIVIL VAL STN 1 Gereral cleaning to be done
33KV Switch
1632 7-25B 3 Station-U ELEC Board & Metering 1 Earthing for suppports to be completed
panel
33KV Switch
1633 7-25B 4 Station-U ELEC Board & Metering 1 Duct entries to the building to be sealed
panel
33KV Switch Interpanel wiring, bus bar torquing , protection
1634 7-25B 5 Station-U ELEC Board & Metering 2 relay test, F&G trip test and function verification to
panel be completed.
33KV Switch
1635 7-25B 6 Station-U ELEC Board & Metering 1 Torquing for all outgoing cables to be completed
panel
33KV Switch
Castle lock key interlock verification to be
1636 7-25B 7 Station-U ELEC Board & Metering 1
panel completed
33KV Switch
1637 7-25B 8 Station-U ELEC Board & Metering 1 SCS cable termination to be completed
panel
33KV Switch
1638 7-25B 9 Station-U ELEC Board & Metering 2 SCS verification to be completed
panel
33KV Switch
1639 7-25B 10 Station-U ELEC Board & Metering 2 Testing of metering panel to be completed
panel
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DC System
1658 7-25B 8 Station-U ELEC
(110V)DC
1 Installation of eye wash to be completed.
DC System
1659 7-25B 9 Station-U HVAC
(110V)DC
2 Testing of Exhaust fan to be completed.
DC System
1660 7-25B 10 Station-U ELEC
(110V)DC
1 SCS wiring and termination to be completed
DC System Permanent power supply cable to be completed
1661 7-25B 11 Station-U ELEC 2
(110V)DC after permanent energization
DC System
1662 7-25B 12 Station-U ELEC
(110V)DC
1 Damage display screen to be rectified
Cable Trench
indoor and Route markers to be installed at outdoor cable
1663 7-25B 1 Station-U ELEC 1
outdoor & cable trench.
tray & Common
Cable Trench
indoor and Cable trays earthing to be connected to earthing
1664 7-25B 2 Station-U ELEC 1
outdoor & cable grid at minimum two locations for each run.
tray & Common
Cable Trench
indoor and
1665 7-25B 3 Station-U ELEC
outdoor & cable
1 Cable entry to S/S building to be sealed
tray & Common
Cable Trench
indoor and Cleaning of concrete cable trench at LV
1666 7-25B 4 Station-U ELEC 1
outdoor & cable /Control /Diesel generator Room to be completed.
tray & Common
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1678 7-25B 4 Station-U ELEC DG Room 1 Battery Installation and wiring to be completed
VAL STN
1682 7-11H 2
FNLGCS
MECH VAL STN 1 Greasing/molycote to be done for all bolts
VAL STN
1685 7-11H 5
FNLGCS
MECH VAL STN 1 Tagging to be done
VAL STN
1686 7-11H 6
FNLGCS
MECH VAL STN 1 At pig launcher 3" blind flanges to be painted
1696 7-21A 10 WHTP-A MECH 1 Stencling and colour coding shall be done
1697 7-21A 11 WHTP-A MECH 1 All valve tags are to be provided in SS material
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1716 7-22A 10 WHTP-B MECH 1 Stencling and colour coding shall be done
1717 7-22A 11 WHTP-B MECH 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1736 7-23A 10 WHTP-C MECH 1 Stencling and colour coding shall be done
1737 7-23A 11 WHTP-C MECH 1 All valve tags are to be provided in SS material
VAL STN
1748 7-17A 2
WHTP-B
MECH 1 SRV's alignments are to be proved
VAL STN
1751 7-17A 5
WHTP-B
MECH 1 Pig signaler is to be functional tested
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1752 7-17A 6
WHTP-B
MECH 1 JIB crane is to be installed
VAL STN
1756 7-17A 10
WHTP-B
MECH 1 Stencling and colour coding shall be done
VAL STN
1757 7-17A 11
WHTP-B
MECH 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1776 7-3A 10 FNLGCS MECH 1 Stencling and colour coding shall be done
1777 7-3A 11 FNLGCS MECH 1 All valve tags are to be provided in SS material
Piping works shall be dried & nitrogen purged as
1778 7-3A 12 FNLGCS MECH 1
per project specifications
Final painting report certified by QP QAC shall be
1779 7-3A 13 FNLGCS MECH 1
provided
All flanges shall be applied molycoat, tightened
1780 7-3A 14 FNLGCS MECH 1 with proper torque and report shall be provided to
QP
Red line mark up drawings to be submitted after
1781 7-3A 15 FNLGCS MECH 1
commissioning for QP approval
All Test Pack B Punch items shall be cleared and
1782 7-3A 16 FNLGCS MECH 1
signed off by QP
Personnel protective insulation is to be installed as
1783 7-3A 17 FNLGCS MECH 1
per P&ID
VAL STN
1792 7-11A 5
FNLGCS
INST VAL STN 1 Pig signaler is to be functional tested
VAL STN
1793 7-11A 6
FNLGCS
MECH VAL STN 1 JIB crane is to be installed
VAL STN
1797 7-11A 10
FNLGCS
MECH VAL STN 1 Stencling and colour coding shall be done
VAL STN
1798 7-11A 11
FNLGCS
MECH VAL STN 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1808 7-11A 21
FNLGCS
MECH VAL STN 1 Tie-ins to be done (as applicable)
VAL STN
1810 7-26A 2
FNDS
MECH VAL STN 1 SRV's alignments are to be proved
VAL STN
1813 7-26A 5
FNDS
INST VAL STN 1 Pig signaler is to be functional tested
VAL STN
1814 7-26A 6
FNDS
MECH VAL STN 1 JIB crane is to be installed
VAL STN
1818 7-26A 10
FNDS
MECH VAL STN 1 Stencling and colour coding shall be done
VAL STN
1819 7-26A 11
FNDS
MECH VAL STN 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1829 7-26A 21
FNDS
MECH VAL STN 1 Tie-ins to be done (as applicable)
1839 7-1A 10 FNDS MECH 1 Stencling and colour coding shall be done
1840 7-1A 11 FNDS MECH 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1860 7-4A 10 FSDS MECH 1 Stencling and colour coding shall be done
1861 7-4A 11 FSDS MECH 1 All valve tags are to be provided in SS material
EARTHING
VAL STN Missing washers to be provided in earthing
1872 7-11C 1 ELEC SYSTEM AND 1
FNLGCS connections
SOLAR PANEL
EARTHING
VAL STN Tagging for earth cable, earth pit and solar panel to
1873 7-11C 2 ELEC SYSTEM AND 1
FNLGCS be completed
SOLAR PANEL
EARTHING
VAL STN
1874 7-11C 3
FNLGCS
ELEC SYSTEM AND 1 Solar panel supports to be installed properly
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1875 7-11C 4 ELEC SYSTEM AND 1
FNLGCS provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1876 7-11C 5
FNLGCS
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING Components installed inside the controlled panel
VAL STN
1877 7-11C 6
FNLGCS
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure
EARTHING Flexing earthing connections to be provided for
VAL STN
1878 7-11C 7
FNLGCS
ELEC SYSTEM AND 1 mobile pig launcher with suitable clamps for
SOLAR PANEL temporary connections
EARTHING
VAL STN
1879 7-11C 8
FNLGCS
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1880 7-11C 9 ELEC SYSTEM AND 1
FNLGCS proven
SOLAR PANEL
EARTHING
VAL STN Cable entry conduit is filled with sand to be
1881 7-11C 10 ELEC SYSTEM AND 1
FNLGCS removed and sealed with suitable material
SOLAR PANEL
EARTHING
VAL STN Missing washers to be provided in earthing
1882 7-17C 1 ELEC SYSTEM AND 1
WHTP-B connections
SOLAR PANEL
EARTHING Tagging for earth cable, earth pit and solar panel to
VAL STN
1883 7-17C 2
WHTP-B
ELEC SYSTEM AND 1 be completed. Also earth pit cover to be painted
SOLAR PANEL with G/Yellow
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EARTHING
VAL STN Cable termination in Solar control panel to be
1884 7-17C 3 ELEC SYSTEM AND 1
WHTP-B done with proper lugs and ferrules
SOLAR PANEL
EARTHING
VAL STN Additional enclosure for battery enclosure to be
1885 7-17C 4 ELEC SYSTEM AND 1
WHTP-B provided as per QP approval
SOLAR PANEL
EARTHING
VAL STN
1886 7-17C 5
WHTP-B
ELEC SYSTEM AND 1 Battery installation to be completed.
SOLAR PANEL
EARTHING Components installed inside the controlled panel
VAL STN
1887 7-17C 6
WHTP-B
ELEC SYSTEM AND 1 are very hot due to sun rays , it is necessary to be
SOLAR PANEL enclosed in suitable enclosure
EARTHING
VAL STN
1889 7-17C 8
WHTP-B
ELEC SYSTEM AND 1 Approved AFC drawing to be available.
SOLAR PANEL
EARTHING
VAL STN Integrity of earthing connections to be verified and
1890 7-17C 9 ELEC SYSTEM AND 1
WHTP-B proven
SOLAR PANEL
EARTHING
VAL STN Bird spike installation for solar panel to be
1891 7-17C 10 ELEC SYSTEM AND 1
WHTP-B completed
SOLAR PANEL
EARTHING
VAL STN Solar panel supports to be cleaned and cable entry
1892 7-17C 11 ELEC SYSTEM AND 1
WHTP-B to be cleaned and sealed with suitable material
SOLAR PANEL
EARTHING Missing washers to be provided in earthing
1893 7-21C 1 WHTP-A ELEC 1
SYSTEM connections
EARTHING Tagging for earth cable, earth pit and solar panel to
1894 7-21C 2 WHTP-A ELEC 1
SYSTEM be completed
EARTHING Earthing cable to be routed properly at main entry
1895 7-21C 3 WHTP-A ELEC 1
SYSTEM gate
EARTHING Tie-in with existing earthing system to be
1896 7-21C 4 WHTP-A ELEC 1
SYSTEM completed
EARTHING Copper bar contact with earth electrode is not
1897 7-21C 5 WHTP-A ELEC 1
SYSTEM good- to be done properly
EARTHING
1898 7-21C 6 WHTP-A ELEC
SYSTEM
1 Earthing termination in field shall be dressed neatly
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EARTHING
1916 7-23C 6 WHTP-C ELEC
SYSTEM
1 Earthing termination in field shall be dressed neatly
VAL STN
1932 7-15B 5
WHTP H&L
MECH VAL STN 1 Apply touchup paint for the gate and fence post
VAL STN
1933 7-15B 6
WHTP H&L
CIVIL VAL STN 1 Proper cleaning to be done for the fence and gate
VAL STN
1940 7-10B 6
FNFIS
MECH 1 Apply touchup paint for the gate and fence post
VAL STN
1941 7-10B 7
FNFIS
CIVIL 1 Proper cleaning to be done for the fence and gate
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
1948 7-11B 5
FNLGCS
MECH 1 Wind sock to be provided
VAL STN
1949 7-11B 6
FNLGCS
CIVIL 1 Proper cleaning to be done for the fence and gate
VAL STN Fasten and tighten all loose barbed wire & to be
1950 7-11B 7 CIVIL 1
FNLGCS rectified for the damaged barbed wire
VAL STN Fence opening at pipe entry shall be reinstated
1951 7-11B 8 MECH 1
FNLGCS properly
VAL STN
1952 7-11B 9
FNLGCS
CIVIL 1 Remove all temporary facilities and house keeping
4" PIG
Asphalt road and asssociated works shall be done
1953 7-3B 1 FNLGCS CIVIL LAUNCHER 1
STATION for inside the fence
4" PIG
1954 7-3B 2 FNLGCS CIVIL LAUNCHER 1 Painting to be done for the kerb stone
STATION
4" PIG
1955 7-3B 3 FNLGCS CIVIL LAUNCHER 1 Joint sealant for the required areas to be done
STATION
4" PIG
1956 7-3B 4 FNLGCS MECH LAUNCHER 1 Wind sock to be provided
STATION
4" PIG
1957 7-3B 5 FNLGCS CIVIL LAUNCHER 1 Damaged paint on concrete surface to be rectified
STATION
4" PIG
Check the gate installation and provide true
1958 7-3B 6 FNLGCS MECH LAUNCHER 1
STATION alignment
4" PIG
Gate drop bolt arrester to be provided as per the
1959 7-3B 7 FNLGCS CIVIL LAUNCHER 1
STATION drawing
4" PIG
1960 7-3B 8 FNLGCS CIVIL LAUNCHER 1 Missed barbed wire to be provided on top of gate
STATION
4" PIG
1961 7-3B 9 FNLGCS MECH LAUNCHER 1 Apply touchup paint for the gate and fence post
STATION
4" PIG
1962 7-3B 10 FNLGCS CIVIL LAUNCHER 1 Proper cleaning to be done for the fence and gate
STATION
4" PIG
1963 7-3B 11 FNLGCS CIVIL LAUNCHER 1 Access road to be provided to the main gate
STATION
4" PIG
1964 7-3B 12 FNLGCS CIVIL LAUNCHER 1 Remove all temporary facilities and house keeping
STATION
Asphalt road and asssociated works shall be done
1965 7-21B 1 WHTP-A CIVIL 1
for inside the fence
1966 7-21B 2 WHTP-A CIVIL 1 Painting to be done for the kerb stone
1969 7-21B 5 WHTP-A MECH 1 Apply touchup paint for the gate and fence post
1972 7-21B 8 WHTP-A CIVIL 1 Proper cleaning to be done for the fence and gate
1974 7-21B 10 WHTP-A CIVIL 1 Remove all temporary facilities and house keeping
1979 7-22B 5 WHTP-B MECH 1 Apply touchup paint for the gate and fence post
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
1980 7-22B 6 WHTP-B CIVIL 1 Remove all temporary facilities and house keeping
1990 7-23B 3 WHTP-C CIVIL 1 Painting to be done for the kerb stone
1992 7-23B 5 WHTP-C CIVIL 1 Joint sealant for the required areas to be done
1993 7-23B 6 WHTP-C MECH 1 Apply touchup paint for the gate and fence post
1996 7-23B 9 WHTP-C CIVIL 1 Proper cleaning to be done for the fence and gate
1998 7-23B 11 WHTP-C CIVIL 1 Remove all temporary facilities and house keeping
2000 7-20B 2 WHTP-L CIVIL 1 Painting to be done for the kerb stone
2001 7-20B 3 WHTP-L CIVIL 1 Joint sealant for the required areas to be done
VAL STN
2005 7-26B 1
FNDS
CIVIL VAL STN 1 Housekeeping to be carried out.
VAL STN
2006 7-26B 2
FNDS
MECH VAL STN 1 Greasing/molycote to be done for all bolts
VAL STN
2008 7-26B 4
FNDS
MECH VAL STN 1 Valves of 2" kicker to be cleaned and painted
VAL STN
2009 7-26B 5
FNDS
MECH VAL STN 1 Tagging to be done
VAL STN
2010 7-26B 6
FNDS
CIVIL VAL STN 1 Aspalt road to be completed
VAL STN
2011 7-10D 1
FNFIS
INST VAL STN 1 All cables to be tagged with proper strip size
VAL STN GI bolts and clamps for transmitter and manifold's
2012 7-10D 2 INST VAL STN 1
FNFIS to be replaced with SS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2071 7-21D 1 WHTP-A INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2072 7-21D 2 WHTP-A INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2073 7-21D 3 WHTP-A INST 1
with CS / GI supports
2074 7-21D 4 WHTP-A INST 1 Red line mark up drawings to be submitted
2075 7-21D 5 WHTP-A INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2076 7-21D 6 WHTP-A INST 1
verified
2077 7-21D 7 WHTP-A INST 1 All instruments to be tagged
2078 7-21D 8 WHTP-A INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2079 7-21D 9 WHTP-A INST 1
clamped properly
2080 7-21D 10 WHTP-A INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2081 7-21D 11 WHTP-A INST 1
devices
2082 7-21D 12 WHTP-A INST 1 Cable route markers to be installed
2083 7-22D 1 WHTP-B INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2084 7-22D 2 WHTP-B INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2085 7-22D 3 WHTP-B INST 1
with CS / GI supports
2086 7-22D 4 WHTP-B INST 1 Red line mark up drawings to be submitted
2087 7-22D 5 WHTP-B INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2088 7-22D 6 WHTP-B INST 1
verified
2089 7-22D 7 WHTP-B INST 1 All instruments to be tagged
2090 7-22D 8 WHTP-B INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2091 7-22D 9 WHTP-B INST 1
clamped properly
2092 7-22D 10 WHTP-B INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2093 7-22D 11 WHTP-B INST 1
devices
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2095 7-23D 1 WHTP-C INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2096 7-23D 2 WHTP-C INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2097 7-23D 3 WHTP-C INST 1
with CS / GI supports
2098 7-23D 4 WHTP-C INST 1 Red line mark up drawings to be submitted
2099 7-23D 5 WHTP-C INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2100 7-23D 6 WHTP-C INST 1
verified
2101 7-23D 7 WHTP-C INST 1 All instruments to be tagged
2102 7-23D 8 WHTP-C INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2103 7-23D 9 WHTP-C INST 1
clamped properly
2104 7-23D 10 WHTP-C INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2105 7-23D 11 WHTP-C INST 1
devices
2106 7-23D 12 WHTP-C INST 1 Cable route markers to be installed
2107 7-19D 1 WHTP-H INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2108 7-19D 2 WHTP-H INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2109 7-19D 3 WHTP-H INST 1
with CS / GI supports
2110 7-19D 4 WHTP-H INST 1 Red line mark up drawings to be submitted
2111 7-19D 5 WHTP-H INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2112 7-19D 6 WHTP-H INST 1
verified
2113 7-19D 7 WHTP-H INST 1 All instruments to be tagged
2114 7-19D 8 WHTP-H INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2115 7-19D 9 WHTP-H INST 1
clamped properly
2116 7-19D 10 WHTP-H INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2117 7-19D 11 WHTP-H INST 1
devices
2118 7-19D 12 WHTP-H INST 1 Cable route markers to be installed
2119 7-20D 1 WHTP-L INST 1 All cables to be tagged with proper strip size
GI bolts and clamps for transmitter and manifold's
2120 7-20D 2 WHTP-L INST 1
to be replaced with SS
SS valve manifold installed for FT shall not intact
2121 7-20D 3 WHTP-L INST 1
with CS / GI supports
2122 7-20D 4 WHTP-L INST 1 Red line mark up drawings to be submitted
2123 7-20D 5 WHTP-L INST 1 Cable to be tied with SS PVC coated tie wrap
Calibration and configuration of MV Flow Tx to be
2124 7-20D 6 WHTP-L INST 1
verified
2125 7-20D 7 WHTP-L INST 1 All instruments to be tagged
2126 7-20D 8 WHTP-L INST 1 Cable tray installed for cables to be covered
Cable tray installed for cables to be supported and
2127 7-20D 9 WHTP-L INST 1
clamped properly
2128 7-20D 10 WHTP-L INST 1 Proper access to be provided for instruments
Calibration to be done for all instruments and F&G
2129 7-20D 11 WHTP-L INST 1
devices
2130 7-20D 12 WHTP-L INST 1 Cable route markers to be installed
2132 7-1D 1.2 FNDS MECH 1 Pig trap anchor bolt slightly bent to be rectified
2133 7-1D 1.3 FNDS CIVIL 1 Asphalt road and associated works not done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2135 7-1D 1.5 FNDS MECH 1 Apply molycote /grease/oil on all bolt nuts
2138 7-1D 1.8 FNDS CIVIL 1 Install crash barrier east side of pig launcher area
2139 7-1D 1.9 FNDS MECH 1 Crash barrier and kerbstones to be painted
2140 7-1D 1.10 FNDS CIVIL 1 Rectify concrete cracks around spill pit grating.
2141 7-1D 1.11 FNDS CIVIL 1 Keep the area clean and tidy.
2142 7-4D 2.01 FSDS CIVIL 1 Asphalt road and associated works not done.
2152 7-4D 2.11 FSDS CIVIL 1 Gate drop bolt eyes to be provided
2153 7-4D 2.12 FSDS CIVIL 1 Provide and install grating cover for spill pit.
2154 7-4D 2.13 FSDS MECH 1 Crash barrier and kerbstones to be painted
2156 7-4D 2.15 FSDS CIVIL 1 Keep the area clean and tidy.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2163 7-25D 7 Station-U ELEC 1 All Exit door lights needs to provide proper TAGS.
2166 7-2G 2 FNFIS MECH 1 Apply structural paint on platforms and piping
VAL STN
2174 7-14G 10
WHTP E&G
MECH 1 Apply structural paint on platforms and piping
VAL STN Backfill, grade and compact the surface and batter
2175 7-14G 11 CIVIL 1
WHTP E&G of surrounding
VAL STN Touch up paint on main and emergaency gates
2176 7-14G 12 MECH 1
WHTP E&G and fence posts
VAL STN Rectify the surface cracks on the supports and
2177 7-14G 13 CIVIL 1
WHTP E&G plinths wherever necessary
VAL STN Remove the temporary site faciities , project and
2178 7-14G 14 CIVIL 1
WHTP E&G safety sign boards
VAL STN
2179 7-14G 15
WHTP E&G
MECH 1 Provide nad install wind sock
VAL STN
2180 7-14G 16
WHTP E&G
CIVIL 1 General cleaning to be done
VAL STN
2181 7-13G 17
KNMP
CIVIL 1 grouting of JIB crane foundation to be completd
VAL STN
2183 7-13G 19
KNMP
MECH 1 Privide and install wind sock
VAL STN Fill all the cable entry opening with appropriate
2184 7-13G 20 ELEC 1
KNMP material
VAL STN Backfill, grade and compact the surface and batter
2185 7-13G 21 CIVIL 1
KNMP of surrounding
VAL STN
2187 7-13G 23
KNMP
MECH 1 Apply paint on crash barrier
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2188 7-13G 24
KNMP
CIVIL 1 Gereral cleaning to be done
ESD,FAG ,
2193 7-3E 5 FNLGCS INST
SCADA systeM
1 ESD & FAG system SOE to be updated
ESD,FAG ,
2194 7-3E 6 FNLGCS INST
SCADA systeM
1 Logs/Reports Trends to be configured
EARTHING
2205 7-20C 2 WHTP-L ELEC
SYSTEM
1 Approved AFC drawing to be available.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2218 7-27A 10 WHTP E MECH 1 Stencling and colour coding shall be done
2219 7-27A 11 WHTP E MECH 1 All valve tags are to be provided in SS material
2238 7-28A 10 WHTP G MECH 1 Stencling and colour coding shall be done
2239 7-28A 11 WHTP G MECH 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2270 7-13A 2
KNMP
MECH 1 SRV's alignments are to be proved
VAL STN
2273 7-13A 5
KNMP
INST 1 Pig signaler is to be functional tested
VAL STN
2274 7-13A 6
KNMP
MECH 1 JIB crane is to be installed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2278 7-13A 10
KNMP
MECH 1 Stencling and colour coding shall be done
VAL STN
2279 7-13A 11
KNMP
MECH 1 All valve tags are to be provided in SS material
2290 7-28B 2 WHTP G ELEC Earthing System 1 Approved AFC drawing to be available.
2293 7-28B 5 WHTP G ELEC Earthing System 1 Construction inspection not completed
VAL STN
2294 7-11F 1
FNLGCS
MECH 1 All valve must be installed with name plate
VAL STN
2295 7-11F 2
FNLGCS
MECH 1 To be provide fire extinguiser
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2305 7-2A 10 FNFIS MECH 1 Stencling and colour coding shall be done
2306 7-2A 11 FNFIS MECH 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2326 7-10A 5
FNFIS
INST 1 Pig signaler is to be functional tested
VAL STN
2327 7-10A 6
FNFIS
MECH 1 JIB crane is to be installed
VAL STN
2331 7-10A 10
FNFIS
MECH 1 Stencling and colour coding shall be done
VAL STN
2332 7-10A 11
FNFIS
MECH 1 All valve tags are to be provided in SS material
VAL STN
2344 7-10A 23
FNFIS
MECH 1 Correct bolts shall be installed in SS flanges
VAL STN
2345 7-10A 24
FNFIS
MECH 1 SS to CS instrument connection shall be justified
VAL STN
2346 7-10A 25
FNFIS
MECH 1 Control valve shall be installed
VAL STN
2347 7-10A 26
FNFIS
MECH 1 Tie ins are to be installed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2365 7-19A 10 WHTP-H MECH 1 Stencling and colour coding shall be done
2366 7-19A 11 WHTP-H MECH 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2385 7-20A 10 WHTP-L MECH 1 Stencling and colour coding shall be done
2386 7-20A 11 WHTP-L MECH 1 All valve tags are to be provided in SS material
VAL STN
2400 7-15A 5
WHTP H&L
INST 1 Pig signaler is to be functional tested
VAL STN
2401 7-15A 6
WHTP H&L
MECH 1 JIB crane is to be installed
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2405 7-15A 10
WHTP H&L
MECH 1 Stencling and colour coding shall be done
VAL STN
2406 7-15A 11
WHTP H&L
MECH 1 All valve tags are to be provided in SS material
VAL STN
2418 7-13B 3
KNMP
CIVIL 1 Cleaning is required for inside the spill pit
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2432 7-14B 7
WHTP E&G
MECH 1 Apply touchup paint for the gate and fence post
VAL STN
2433 7-14B 8
WHTP E&G
MECH 1 Proper cleaning to be done for the fence and gate
2436 7-2B 2 FNFIS CIVIL 1 Painting to be done for the kerb stone
VAL STN
2441 7-17G 1
WHTP-B
CIVIL 1 Housekeeping to be carried out
VAL STN
2442 7-17G 2
WHTP-B
MECH 1 Greasing/molycote to be done for all bolts
2449 7-2E 3 FNFIS INST 2 TT-100 high trip alarm not appeared in DCS
2452 7-2E 6 FNFIS INST 1 PCV-2202A&B valves and I/P conv still not fixed
2455 7-2E 9 FNFIS INST 1 PLC panel cable tag are missing
12 inch PIG
2461 7-3B 4 FNLGCS CIVIL
Launcher station
1 Joint sealant for the required areas to be done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
12 inch PIG
2465 7-3B 8 FNLGCS CIVIL
Launcher station
1 Proper cleaning to be done for the fence and gate
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2495 7-1F 2 FNDS MECH 1 Few block valves handles are missing
2499 7-1F 6 FNDS MECH 1 Instrument air line tie in to main header to be done
2501 7-4F 2 FSDS MECH 1 Few block valves handles are missing
2505 7-4F 6 FSDS MECH 1 Instrument air line tie in to main header to be done
2507 7-25G 2 Station-U MECH 1 Pipe coating on welded joints not done.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2523 7-30A 11 UMMBAB-B HVAC 1 All DUCT openings in wall /slab to be sealed
2525 7-30A 13 UMMBAB-B HVAC 1 HVAC permenant ID and flow tags to be fixed
2526 7-30A 14 UMMBAB-B HVAC 1 Fire damper to be provided for fire rated wall
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2542 7-25I 13 Station-U HVAC 1 HVAC permenant ID and flow tags to be fixed
2543 7-25I 14 Station-U HVAC 1 Fire damper to be provided for fire rated wall
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2557 7-31A 11 KSFGSS HVAC 1 All DUCT openings in wall /slab to be sealed
2559 7-31A 13 KSFGSS HVAC 1 HVAC permenant ID and flow tags to be fixed
2560 7-31A 14 KSFGSS HVAC 1 Fire damper to be provided for fire rated wall
2572 7-31B 9 KSFGSS MECH 1 55-BV-0023 ball valve end blind to be installed.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2594 7-31C 7 KSFGSS MECH 1 Jib crane to be load tested and stenciled.
2596 7-31C 9 KSFGSS MECH 1 Nitrogen purge connection- blind flange missing.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2601 7-31C 14 KSFGSS MECH 1 Wrench marks on the IA line to be filed smooth.
2605 7-31C 18 KSFGSS MECH 1 Valves to be coated to match piping color code.
2608 7-31C 21 KSFGSS MECH 1 Station emergency escape gate not accessable.
2615 7-31C 28 KSFGSS MECH 1 All missing blind flanges and bolts to be installed.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2629 7-31C 42 KSFGSS CIVIL 1 Pipe support grouting for the 6" flare line.
2630 7-31C 43 KSFGSS CIVIL 1 Soil to be properly compacted under the sleepers.
2641 7-31D 4 KSFGSS MECH 1 Missing valve handles to be installed in all area
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIG LAUNCHER/
2652 7-25F 1 Station-U MECH RECEIVER 1 P & ID need to be updated. it is in mismacth.
AREA
PIG LAUNCHER/
All mov s and pipeline to be stenciled with their
2653 7-25F 2 Station-U MECH RECEIVER 1
AREA Tag-Nos
PIG LAUNCHER/
2654 7-25F 3 Station-U MECH RECEIVER 1 All correct size bolt to be installed
AREA
PIG LAUNCHER/
Temporary support to be removed down side of
2655 7-25F 4 Station-U MECH RECEIVER 1
AREA pipeline near 62-PI-70.
PIG LAUNCHER/
All valve handle need to be installed and tightening
2656 7-25F 5 Station-U MECH RECEIVER 1
AREA is required
PIG LAUNCHER/
2657 7-25F 6 Station-U MECH RECEIVER 2 All vent line/pipeline to be connected
AREA
PIG LAUNCHER/
2658 7-25F 7 Station-U MECH RECEIVER 1 62-SRV-0289 to be installed
AREA
PIG LAUNCHER/
2659 7-25F 8 Station-U MECH RECEIVER 1 All valves tag nos to be provided
AREA
PIG LAUNCHER/
2660 7-25F 9 Station-U MECH RECEIVER 1 2" BV - 0550 Rusted Handle to be painted
AREA
PIG LAUNCHER/
2661 7-25F 10 Station-U MECH RECEIVER 1 62 - PI- 69 Bolt is missing to be provided
AREA
PIG LAUNCHER/
2662 7-25F 11 Station-U MECH RECEIVER 1 62 -SDV -0014 bypass is not connected.
AREA
PIG LAUNCHER/
2663 7-25F 12 Station-U MECH RECEIVER 1 62 -RO -0009 to be installed
AREA
PIG LAUNCHER/
2664 7-25F 13 Station-U MECH RECEIVER 1 Platforms bolts to be verified .
AREA
DIESEL
2665 7-25F 1 Station-U MECH STORAGE TANK 1 All valves tag no to be provided.
AREA
DIESEL
2666 7-25F 2 Station-U MECH STORAGE TANK 1 3" BV - 0553 and BV -0555 Handle to be installed
AREA
DIESEL
2667 7-25F 3 Station-U MECH STORAGE TANK 1 P & ID need to be updated. it is in mismacth.
AREA
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DIESEL
2668 7-25F 4 Station-U MECH STORAGE TANK 1 62 -LG -0006 Tag no is incorrect
AREA
DIESEL
2669 7-25F 5 Station-U MECH STORAGE TANK 1 62 - PVRV - 0271 is not in place.
AREA
DIESEL
2670 7-25F 6 Station-U MECH STORAGE TANK 1 62 - BV - 0536 U/S bolt to be tighten
AREA
DIESEL
2671 7-25F 7 Station-U MECH STORAGE TANK 1 Label to be provided for fire extingushers
AREA
DIESEL
2" BV -0536 D/S drain line "U" clamp to be
2672 7-25F 8 Station-U MECH STORAGE TANK 1
AREA provided
DIESEL
Near Diesel storage tank fire extinguisher is not
2673 7-25F 9 Station-U INST STORAGE TANK 1
AREA available in side the box.
DIESEL
2674 7-25F 10 Station-U MECH STORAGE TANK 1 platforms bolts to be verified .
AREA
SUBSTATION
Work station with HMI, printers and accessories
2675 7-25H 1 Station-U ELEC CONTROL 1
SYSTEM shall be installed, label and cables to be terminated
SUBSTATION
Digital output cables for Becon and Siren shall be
2676 7-25H 2 Station-U ELEC CONTROL 1
SYSTEM terminate in 1x2A
SUBSTATION
Antenna for GPS to be installed and its cable to be
2677 7-25H 3 Station-U ELEC CONTROL 1
SYSTEM tagged
SUBSTATION
UPS and batteryn rackshall be installed in 62-SCS-
2679 7-25H 5 Station-U ELEC CONTROL 1
SYSTEM 6203 SCS panel and its cable to be terminate
SUBSTATION
2685 7-25H 11 Station-U ELEC CONTROL 1 PLC drop cable shall be labelled
SYSTEM
SUBSTATION
2686 7-25H 12 Station-U INST CONTROL 1 FOPP cable tagging to be done
SYSTEM
DIESEL
2687 7-25C 1 Station-U MECH STORAGE TANK 1 All bolts / nuts to be coated properly
AREA
DIESEL
Touch up painting to be done on pipe line and
2688 7-25C 2 Station-U MECH STORAGE TANK 1
AREA vessel
DIESEL
Blind flange for spare nozzle to be installed
2689 7-25C 3 Station-U MECH STORAGE TANK 1
AREA properly.
DIESEL
2690 7-25C 4 Station-U MECH STORAGE TANK 1 Ladder support to tightened.
AREA
DIESEL
2691 7-25C 5 Station-U ELEC STORAGE TANK 1 Earthing bolts to be tightened.
AREA
DIESEL
Stud bolts / nuts at D/S strainer of supply line to be
2692 7-25C 6 Station-U MECH STORAGE TANK 1
AREA changed.
DIESEL
62-LCV-0003, drain line clearance to the ground to
2693 7-25C 7 Station-U INST STORAGE TANK 1
AREA be increased.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DIESEL
2694 7-25C 8 Station-U INST STORAGE TANK 1 62-LCV-0003, vent line of SRV to be re-routed.
AREA
DIESEL
2695 7-25C 9 Station-U MECH STORAGE TANK 1 Emergency exit door handle at outside is missing
AREA
2696 7-25C 1 Station-U CIVIL TIE-IN HEADER 1 62-FE-0008 : Concrete for ladder support damage
2697 7-25C 2 Station-U MECH TIE-IN HEADER 1 All bolts / nuts to be coated properly
2698 7-25C 3 Station-U MECH TIE-IN HEADER 1 62-PI-0069 : flange bolts are loosen
2699 7-25C 4 Station-U MECH TIE-IN HEADER 1 62-PT-0032C : flange bolts to be changed
2700 7-25C 5 Station-U MECH TIE-IN HEADER 1 62-SDV-0014 : Access ladder bolts are loosen.
2701 7-25C 6 Station-U MECH TIE-IN HEADER 1 Tag no's to be installed on all valves
2703 7-25C 8 Station-U MECH TIE-IN HEADER 1 62-SRV-0289 to installed after calibration
2705 7-25C 10 Station-U CIVIL TIE-IN HEADER 1 62-Z-6205 : Trap support to be grouted.
VAL STN
2711 7-13H 6
KNMP
INST 1 Pressure gauge shall be calibrated
VAL STN Tag for pig signallar and pressure gauge shakk be
2716 7-13H 11 ELEC 1
KNMP provided
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN Data sheet for panel and battery enclosure shakk
2718 7-13H 13 ELEC 1
KNMP be provided
2737 7-25A 6 Station-U MECH ALL 1 Jib crane shall be certified by QP-STI.
All safety equipments shall be installed as per
2738 7-25A 7 Station-U MECH ALL 1
approved drawings & SOW
Safety chain or bar are to be installed in ladders of
2739 7-25A 8 Station-U MECH ALL 1
all valve operating platforms to avoid trip & fall
2741 7-25A 10 Station-U MECH ALL 1 Stenciling & color coding shall be done
2742 7-25A 11 Station-U MECH ALL 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2758 7-25A 27 Station-U MECH ALL 1 DG monorail crane shall be certified by QP-STI.
Transformer gate side plate is bent. Need suitable
2759 7-25A 28 Station-U MECH ALL 1
alternate reinforcement.
2760 7-25A 29 Station-U MECH ALL 1 Transformer gate is totally corroded. To be rectified.
2764 7-25A 33 Station-U MECH ALL 1 Stenciling on monorail & Jib crane is to be done
2765 7-25A 34 Station-U CIVIL ALL 1 Pig trap area paving is to be cleaned
2766 7-25A 35 Station-U CIVIL ALL 1 Crash barrier is to be installed near pig trap
Extra threads on structural bolts are to be cut
2767 7-25A 36 Station-U MECH ALL 1
smoothly
2768 7-25A 37 Station-U MECH ALL 1 CC pit height to be checked for adequacy
Insulation joint IR test report to be provided (after
2769 7-25A 38 Station-U ELEC ALL 1
installation)
2770 7-5B 1 FSP ELEC ALL 1 Power supply DB to be tagged
2771 7-5B 2 FSP INST ALL 1 Telecom cabling to be tagged
2772 7-5B 3 FSP INST ALL 1 Telecom cabling to be dressed neatly
2773 7-25E 1 Station-U INST ALL 1 All Tube Fittings needed to be tighten properly.
2774 7-25E 2 Station-U INST ALL 1 SDV-0014 not installed.
2775 7-25E 3 Station-U INST ALL 1 XS-0002 cable tag needed to be fixed.
2776 7-25E 4 Station-U INST ALL 1 XS-0002 Proximity Switch gap need to adjust.
2777 7-25E 5 Station-U INST ALL 1 XS-0002 bolts not tighten
2779 7-25E 7 Station-U INST ALL 1 MOV-0309 Tag need to be painted on the valve.
2781 7-25E 9 Station-U INST ALL 1 XS-0002 no tag provided for the device.
2784 7-25E 12 Station-U INST ALL 1 PI-0069 flange bolts not tighten.
2785 7-25E 13 Station-U INST ALL 1 IRC panel terminations not complete (electrical).
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2787 7-25E 15 Station-U INST ALL 1 Keys should provide for IRC panel and MAC
2792 7-25E 20 Station-U INST ALL 1 Drawing should provide in the JB.
2794 7-25E 22 Station-U INST ALL 1 TE-608 Tag and sunshade missing.
2796 7-25E 24 Station-U INST ALL 1 FT-008 Field JB cable and Tray need to be fix.
2808 7-28C 9 WHTP G MECH 1 Chain link required at cross over platform
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2817 7-28C 18 WHTP G MECH 1 All valve tags to be provided in S.S material.
Insulation gasket kid shall be installed in all
2818 7-28C 19 WHTP G MECH 1
dissimilar material connection.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIG LAUNCHER/
RECEIVER & Rectification required for the gap between
2846 7-25J 8 Station-U CIVIL OUTSIDE 1 protection slab, level difference and painting to be
ELECTRICAL/DG done for the exposed portion
BUILDING
PIG LAUNCHER/
RECEIVER &
Painting to be done for the instrument air pipeline
2847 7-25J 9 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG support foundation
BUILDING
PIG LAUNCHER/
RECEIVER & Check the gate installation and provide true
2848 7-25J 10 Station-U MECH OUTSIDE 1
ELECTRICAL/DG allignment
BUILDING
PIG LAUNCHER/
RECEIVER &
Gate drop bolt arrester to be provided as per the
2849 7-25J 11 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG drawing
BUILDING
PIG LAUNCHER/
RECEIVER &
2850 7-25J 12 Station-U MECH OUTSIDE 1 Apply touch up paint for the gate and fence post
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
Existing fence to be removed after getting approval
2851 7-25J 13 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG from asset holder
BUILDING
PIG LAUNCHER/
RECEIVER &
2852 7-25J 14 Station-U CIVIL OUTSIDE 1 Track road and associated work shall be done
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
2853 7-25J 15 Station-U CIVIL OUTSIDE 1 Painting to be done for the earthing pit
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
Painting to be done for the sock away pit manhole
2854 7-25J 16 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG cover
BUILDING
PIG LAUNCHER/
RECEIVER & Assembly point to be identified and installed sign
2855 7-25J 17 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG boards
BUILDING
PIG LAUNCHER/
RECEIVER & Lifting hook to be filled with appropriate material
2856 7-25J 18 Station-U CIVIL OUTSIDE 1 and apply painting for the cable entry pit and cover
ELECTRICAL/DG slab
BUILDING
PIG LAUNCHER/
RECEIVER &
2857 7-25J 19 Station-U CIVIL OUTSIDE 1 Ladder foudation to be painted
ELECTRICAL/DG
BUILDING
PIG LAUNCHER/
RECEIVER &
Remove all temporary facilities and house keeping
2858 7-25J 20 Station-U CIVIL OUTSIDE 1
ELECTRICAL/DG to be done
BUILDING
ELECTRICAL
Provide sign plates for the rooms as per AFC
2859 7-25J 1 Station-U CIVIL BUILDING 1
EXTERNAL drawing.
ELECTRICAL
Rectification of damaged surface and apply touch-
2860 7-25J 2 Station-U CIVIL BUILDING 1
EXTERNAL up paint for the external wall
ELECTRICAL
2861 7-25J 3 Station-U CIVIL BUILDING 1 Damaged door lock to be replaced
EXTERNAL
ELECTRICAL
2862 7-25J 4 Station-U CIVIL BUILDING 1 Wall opening to be sealed with appropriate material
EXTERNAL
AIR LOCK /
2863 7-25J 1 Station-U CIVIL TELEMETRYRO 1 Damaged raised floor tiles to be replaced
OM
AIR LOCK /
2864 7-25J 2 Station-U CIVIL TELEMETRYRO 1 Proper alignment to be done for the raised floor tiles
OM
AIR LOCK /
Alignment & functional test for the doors to be
2865 7-25J 3 Station-U CIVIL TELEMETRYRO 1
OM carried-out
AIR LOCK /
2866 7-25J 4 Station-U CIVIL TELEMETRYRO 1 Painting to be done for the door
OM
AIR LOCK /
Rectification and painting to be done for the floor
2867 7-25J 5 Station-U CIVIL TELEMETRYRO 1
OM entrance portion
Alignment & functional test for the doors to be
2868 7-25J 1 Station-U CIVIL R & C ROOM 1
carried-out
2869 7-25J 2 Station-U CIVIL R & C ROOM 1 Painting to be done for the door
Unwanted holes on the floor & wall to be sealed
2870 7-25J 3 Station-U CIVIL R & C ROOM 1
and apply touch-up paint.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2912 7-25J 9 Station-U CIVIL MISC 1 To ensure proper gradient on the station platform
2913 7-28D 1 WHTP G CIVIL ALL 1 Asphalt road and associated works shall be done
2914 7-28D 2 WHTP G CIVIL ALL 1 Painting to be done for the kerbstone
2918 7-28D 6 WHTP G MECH ALL 1 Apply touch up paint for the gate and the fence post
Pipe entry pit for 4" dia pipeline from valve station
2919 7-28D 7 WHTP G MECH ALL 1
E&G to be covered with chequered plate
Stone pitching to be provided for the protection of
2920 7-28D 8 WHTP G CIVIL ALL 1
grading at asphalt road side
Check the gate installation and provide true
2921 7-28D 9 WHTP G MECH ALL 1
allignment
Gate drop bolt arrester to be provided as per
2922 7-28D 10 WHTP G CIVIL ALL 1
drawing
2926 7-28E 2 WHTP G MECH ALL 1 Apply structural paint on platforms and piping
2928 7-28E 4 WHTP G MECH ALL 1 Provide and install wind sock
2930 7-28E 6 WHTP G CIVIL ALL 1 Grading and leveling of surrounding area
2932 7-28E 8 WHTP G MECH ALL 1 Repair the damaged area of fence at pipe entry
2933 7-28E 9 WHTP G MECH ALL 1 Install ring at the pipe crossing area through fence
2935 7-28E 11 WHTP G CIVIL ALL 1 Protect the batter/slopy area close to the main road
2936 7-28E 12 WHTP G CIVIL ALL 1 Remove the scafolding material from the site
2938 7-28F 1 WHTP G INST 1 All cables to be tagged with proper SS strip
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
2942 7-28F 5 WHTP G INST 1 Cables to be tied with SS PVC coated tie wrap
2944 7-28F 7 WHTP G INST 1 F & G detectors to be with red color name plate
2947 7-28F 10 WHTP G INST 1 Cable tray installed for cables to be covered
2950 7-27D 14 WHTP E MECH ALL 1 Apply structural paint on platforms and piping
2951 7-27D 15 WHTP E MECH ALL 1 Install ring at the pipe crossing area through fence
2953 7-27E 1 WHTP E INST 1 All cables to be tagged with proper SS strip
2957 7-27E 5 WHTP E INST 1 Cables to be tied with SS PVC coated tie wrap
2959 7-27E 7 WHTP E INST 1 F & G detectors to be with red color name plate
2962 7-27E 10 WHTP E INST 1 Cable tray installed for cables to be covered
VAL STN 1- VALVE STATION Bypass line for the pipeline isolation valve to be
2965 7-9B 1 MECH 2
FMDS FMDS 1 installed
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN 1- VALVE STATION Piping spool to be installed upstream of the 6"
2966 7-9B 2 MECH 2
FMDS FMDS 1 valve prior to commissioning
VAL STN 1- VALVE STATION Piping and touch up painting to be done on all
2967 7-9B 3 MECH 1
FMDS FMDS 1 location
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
2994 7-12G 1
FSDS
MECH ALL 1 ORIFICE plate direction to be checked.
VAL STN
2995 7-12G 2
FSDS
MECH ALL 1 All Valves to be Tagged with their Tag-Nos
VAL STN
2997 7-12G 4
FSDS
MECH ALL 1 Valves to be eased for easy operation.
VAL STN
2998 7-12G 5
FSDS
MECH ALL 1 JIB crane not installed.
VAL STN
2999 7-12G 6
FSDS
ELEC ALL 1 Earthing cable not connected.
VAL STN
3001 7-12G 8
FSDS
MECH ALL 1 Pig Launcher Door Handle Missing.
VAL STN
3002 7-12G 9
FSDS
MECH ALL 1 Painting and Touchup required.
VAL STN
3003 7-12G 10
FSDS
MECH ALL 1 Updated P&ID to be provided.
VAL STN 1- VALVE STATION Backfilling upto the edge of grading compaction
3006 7-9D 3 CIVIL 1
FMDS FMDS 1 and proper slope to be provided
VAL STN 1- VALVE STATION Rectification to be done for the damaged concrete
3008 7-9D 5 CIVIL 1
FMDS FMDS 1 surface and apply touch up paint
VAL STN 1- VALVE STATION Remove all temporary facilities and house heeping
3010 7-9D 7 CIVIL 1
FMDS FMDS 1 to be done
VAL STN 2- VALVE STATION Grouting and epoxy coating to be done for the
3011 7-9B1 1 CIVIL 1
FMDS FMDS 2 support foundation outside the fence
VAL STN 2- VALVE STATION Backfilling upto the edge of grading compaction
3013 7-9B1 3 CIVIL 1
FMDS FMDS 2 and proper slope to be provided
VAL STN 2- VALVE STATION Rectification to be done for the damaged concrete
3015 7-9B1 5 CIVIL 1
FMDS FMDS 2 surface and apply touch up paint
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN 2- VALVE STATION Remove all temporary facilities and house keeping
3017 7-9B1 7 CIVIL 1
FMDS FMDS 2 to be done for inside the building
3020 7-8B 3 STATION-N MECH 1 All MOVs to be stenciled with their tag Nos
3022 7-8B 5 STATION-N MECH 1 All Extinguishers to be labeled with inspection date
3026 7-8B 9 STATION-N MECH 1 Wind sock to be installed at south side of the plant
3032 7-8B 15 STATION-N MECH 1 Mechanical works and civil works are incomplete
3033 7-8B 16 STATION-N MECH 1 All valves missing tag Numbers to be provided
BV- 373,BV-374,BV-375,BV-376,BV-377,BV-378
3042 7-8B 25 STATION-N MECH 1 Valves handles to be modified due to touching on
the pipeline
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3043 7-8B 26 STATION-N MECH 1 SRV -202 A,B Platform work is incomplete
3050 7-8B 33 STATION-N MECH 1 MOV -285 Bypass 2 line spec.blind to be provided
3054 7-8B 37 STATION-N MECH 1 As per P&ID BV-385 D/S spade to be installed
3057 7-8B 40 STATION-N MECH 1 SRV-204 Platform all bolts need to be tighten
3059 7-8B 42 STATION-N MECH 1 BV-410 U/S and D/S spacer to be verified
3064 7-8B 47 STATION-N MECH 1 61-Z- 9010 name plate should be visible
3065 7-8B 48 STATION-N MECH 1 BV-439 and PLG-360 spectacle blind to be installed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3070 7-8B 53 STATION-N MECH 1 BV-351 D/S of the pipeline U clamp to be tighten
3072 7-8B 55 STATION-N MECH 1 MOV-289 U/S and D/S spacer to be provided
3077 7-8B 60 STATION-N MECH 1 61-Z-9012 SRV access platform bolts missing
3080 7-8C 1 STATION-N INST 1 Cable tray to be fixed properly for MOV-0283
All instrument and MOV's to be tagged and fixed
3081 7-8C 2 STATION-N INST 1
on alluminium base plate
SS valve manifold installed for PS AND PI for SDV
3082 7-8C 3 STATION-N INST 1
shall not intact with CS / GI supports
3083 7-8C 4 STATION-N INST 1 Instrument and PI's drain to be fixed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3108 7-8D 5 STATION-N MECH 1 Provide Temp. indicators as per IFC drawings.
3116 7-8E 1 STATION-N ELEC 1 Proper TAGS to BE provided for all MOV units.
3117 7-8E 2 STATION-N ELEC 1 Earthing cables to be dressed properly all MOV
3118 7-8E 3 STATION-N ELEC 1 Earthing cables to be tighted properly all MOV.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3137 7-8F 17 STATION-N MECH 1 Final painting to be completed on all pipe line.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3168 7-25K 6 Station-U CIVIL ALL 1 Install standard/ approved kerb stones at the corner
3171 7-25K 9 Station-U CIVIL ALL 1 Provide stone pitches at both sides of the culverts
3173 7-25K 11 Station-U CIVIL ALL 1 Install markers at road crossing duct bank
3174 7-25K 12 Station-U CIVIL ALL 1 Remove temporary fence at asphalt road area
3177 7-25K 15 Station-U CIVIL ALL 1 Remove all excess material/ debris from roads
3178 7-25K 16 Station-U CIVIL ALL 1 General cleaning required for all roads
33kV Relay
Contro Panel Lockout relay not available for spare transformer
3182 7-25L 1.04 Station-U ELEC 1
62-RCP-6203- feeder cubicle. To be provided.
01
Column # 2 & # 3 have two feeders on each
33kV Relay
column, the terminal blocks and MCBs are mixed
Contro Panel
3183 7-25L 1.05 Station-U ELEC 1 inside the column. Provide corresponding
62-RCP-6203-
identification and label for its function on MCBs,
01
auxiliary relays and terminal blocks.
33kV Relay
Contro Panel Standard size tag number to be provided at RCP
3184 7-25L 1.06 Station-U ELEC 1
62-RCP-6203- side.
01
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
33kV Relay
Sepam relays (S82 & T87) label and function to be
Contro Panel
3185 7-25L 1.07 Station-U ELEC 1 provided and fixed with standard size at the bottom
62-RCP-6203-
side of the relay.
01
33kV
Standard size tag number to be provided at
3187 7-25L 2.02 Station-U ELEC Switchgear side 1
switchgear side (62-SB-6203-01).
62-SB-6203-01
33kV
Panel number as mentioned in the SLD, to be
3189 7-25L 2.04 Station-U ELEC Switchgear side 1
provided on each feeder.
62-SB-6203-01
33kV
Provide panel number & feeder identification at the
3190 7-25L 2.05 Station-U ELEC Switchgear side 1
back side of the switchgear.
62-SB-6203-01
33kV
CB operating handles to be provided with proper
3191 7-25L 2.06 Station-U ELEC Switchgear side 1
handling board.
62-SB-6203-01
33kV
Provide CT & VT data at the back side of the panel
3192 7-25L 2.07 Station-U ELEC Switchgear side 1
cover on each feeders.
62-SB-6203-01
33kV
Provide SLD, P & Metering Diagram board on
3193 7-25L 2.08 Station-U ELEC Switchgear side 1
either RCP or switchgear side.
62-SB-6203-01
3196 7-8H 1 STATION-N INST ALL 1 61-XS-0273 to be adjusted with limit switches.
3197 7-8H 2 STATION-N INST ALL 1 61-XS-0274 to be adjusted with limit switches
3198 7-8H 3 STATION-N INST ALL 1 PI-0277 Traffolyte tag plate is missing.
3203 7-8H 8 STATION-N INST ALL 1 61-PT-0275 A/B/C earthing cable to be connected.
3204 7-8H 9 STATION-N INST ALL 1 61-SDV-273 fire box cover plate requires handle.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3215 7-8H 20 STATION-N INST ALL 1 PT-0183 vents tubing to be clamped properly.
3218 7-8H 23 STATION-N INST ALL 1 Sun shade to be fixed for GDT-0001.
3222 7-8H 27 STATION-N INST ALL 1 Earth cable to be fixed for LS-0272.
3225 7-8I 3 STATION-N CIVIL ALL 1 Joint sealant for the required areas to be done
3226 7-8I 4 STATION-N CIVIL ALL 1 Emergency gate to be provided as per the drawing
3230 7-8I 8 STATION-N MECH ALL 1 Apply touchup paint for the gate and fence post
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3239 7-8I 17 STATION-N CIVIL ALL 1 Fencing to be completed for the balance portion
3243 7-8I 21 STATION-N CIVIL ALL 1 Track road and associated works shall be done.
3247 7-8I 25 STATION-N CIVIL ALL 1 Installed spill pit cover to be modified
3255 7-8J 6 STATION-N CIVIL ALL 1 Install standard/approved kerb stones at corners
3256 7-8J 7 STATION-N CIVIL ALL 1 Provide sealant at asphalt joints with trench covers
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3259 7-8J 10 STATION-N CIVIL ALL 1 Install remaining crash barrier and fish tales
3260 7-8J 11 STATION-N CIVIL ALL 1 Install markers at road crossing duct banks
3261 7-8J 12 STATION-N CIVIL ALL 1 Remove temporary fence at asphalt road area
3262 7-8J 13 STATION-N CIVIL ALL 1 Drainage pipe top to be repaired properly
3263 7-8J 14 STATION-N CIVIL ALL 1 Remove all excess materials/debris from roads
3264 7-8J 15 STATION-N CIVIL ALL 1 General Cleaning required for all roads
3282 7-31E 2 KSFGSS INST ALL 1 Cable trays to be aligned and leveled properly.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3284 7-31E 4 KSFGSS ELEC ALL 1 Tag plates to be changed to traffolyte tag plates
3287 7-31E 7 KSFGSS MECH ALL 1 Checker plates to be aligned and fixed properly
3289 7-31E 9 KSFGSS ELEC ALL 1 Emergency light fitting identification to be provided
3290 7-31E 1 KSFGSS MECH ALL 1 Instrument air header not connected
3292 7-31E 3 KSFGSS INST ALL 1 SDV air supply line to be supported properly
3294 7-31E 5 KSFGSS INST ALL 1 Wrong Instrument tag name plates to be corrected
3297 7-31E 8 KSFGSS INST ALL 1 Broken Panel indication lamp caps to be replaced.
3301 7-2H 4 FNFIS MECH ALL 1 Touch up painting to be completed on all area.
3303 7-20H 2 WHTP-L MECH ALL 1 RO-0122 & RO-0124 to be installed as per P&ID.
3304 7-20H 3 WHTP-L MECH ALL 1 Spectacle blind to be installed at D/S of BV-0467.
3308 7-20H 7 WHTP-L MECH ALL 1 Personal protection to be provided as per P&ID.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3311 7-19H 2 WHTP-H MECH ALL 1 FE-0301 , bolt length not sufficient.
3316 7-19H 7 WHTP-H MECH ALL 1 Personal protection to be provided as per P&ID.
3317 7-24I 1 WHTP-D INST ALL 2 SFG overview graphic in SCADA not complete.
PCV open/Transit/Close
3331 7-24I 15 WHTP-D INST ALL 2 (Green/yellow/Red)indications need to be
configured properly in SCADA/DCS.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3336 7-24I 20 WHTP-D INST ALL 2 Partial stroke successful alarm not available.
3338 7-24I 22 WHTP-D INST ALL 2 Canopy not installed for SDV-LCP
3339 7-24I 23 WHTP-D INST ALL 2 partial stroke permissive lamp not available on LCP.
3340 7-24I 24 WHTP-D INST ALL 2 permanent tag should install for 6D-XL-0565
3342 7-24I 26 WHTP-D INST ALL 2 PI-0574 "HI" alarm doesn't appear in DCS/MSI.
3346 7-24I 30 WHTP-D INST ALL 2 6D-PI-0565 button size should increase in SCADA.
3353 7-19G 1 WHTP-H INST ALL 2 SFG overview graphic in SCADA not complete.
3356 7-19G 4 WHTP-H INST ALL 2 FI-0301 range need to confirm in SCADA/MSI
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3365 7-19G 13 WHTP-H INST ALL 2 Partial stroke successful alarm not available.
3367 7-19G 15 WHTP-H INST ALL 2 Canopy not installed for SDV-LCP
3368 7-19G 16 WHTP-H INST ALL 2 partial stroke permissive lamp not available on LCP.
3381 7-19G 29 WHTP-H INST ALL 2 6H-HS-0565 Tag in ACP should correct
3382 7-20G 1 WHTP-L INST ALL 2 SFG overview graphic in SCADA not complete.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3385 7-20G 4 WHTP-L INST ALL 2 PAL-0313 alarm in alarm page showing PAL-0213.
PCV-0267open/Transit/Close
3389 7-20G 8 WHTP-L INST ALL 2 (Green/yellow/Red)indications need to be
configured properly in SCADA/DCS.
3394 7-20G 13 WHTP-L INST ALL 2 Partial stroke successful alarm not available.
3396 7-20G 15 WHTP-L INST ALL 2 Canopy not installed for SDV-LCP
3397 7-20G 16 WHTP-L INST ALL 2 partial stroke permissive lamp not available on LCP.
3398 7-20G 17 WHTP-L INST ALL 2 XL-0213 Trip indication lamp Tag should correct.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3416 7-31F 4 KSFGSS INST ALL 1 Proper access to be provided for PT_0005 A/B/C
3419 7-31F 7 KSFGSS INST ALL 1 HSSD batteries to be installed in control room
3420 7-31F 8 KSFGSS INST ALL 1 Impulse and drain tubing to be supported
3422 7-31F 10 KSFGSS INST ALL 1 Cable screen to be connected properly in all J.B
3425 7-31F 1 KSFGSS INST ALL 1 All Junction box fixing bolts to be proper sized
3427 7-31F 3 KSFGSS INST ALL 1 FDI convertors to be installed in marshalling panel
3428 7-31F 4 KSFGSS INST ALL 1 All drain tubing to be plugged properly
3429 7-31F 5 KSFGSS INST ALL 1 I/A line to be hooked up for SDV-0001
3431 7-31F 7 KSFGSS INST ALL 1 Instrument tag to be fixed on proper plate
3432 7-31F 8 KSFGSS INST ALL 1 Cable trench route marker to be installed
3433 7-31F 9 KSFGSS INST ALL 1 IT cabinet to be insttaled and fixed properly
3434 7-31F 10 KSFGSS INST ALL 1 Cable trermination to be completed for all MOV's
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - Bund to be provided for 4'' buried pipe line from 12''
3446 7-32A 10 CIVIL 12" N TO FSP 1
12" N TO FSP line to V.stn-D
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3469 7-25N 3 Station-U CIVIL ALL 1 Touch up paint on gate and fence post
3470 7-25N 4 Station-U CIVIL ALL 1 Complete the track road and associated works
3474 7-25N 8 Station-U CIVIL ALL 1 Provide and fix cap for sign plate post.
3475 7-25N 9 Station-U CIVIL ALL 1 Pipe entry through fence to be re-instated properly
3476 7-25N 10 Station-U CIVIL ALL 1 Apply paint to the cable entry pit
3478 7-25N 12 Station-U CIVIL ALL 1 Remove all temporary facilities from site
3480 7-25N 14 Station-U CIVIL ALL 1 Grade backfill and compact the area properly
Provide and fix sign plates for building and all the
3482 7-25N 16 Station-U CIVIL ALL 1
rooms
3483 7-25N 17 Station-U CIVIL ALL 1 Replace the damaged door lock
3484 7-25N 18 Station-U CIVIL ALL 1 Touch up wall internally and externally
3485 7-25N 19 Station-U CIVIL ALL 1 Replace the damaged raised floor tiles
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3486 7-25N 20 Station-U CIVIL ALL 1 Raised floor tiles to be aligned properly
3487 7-25N 21 Station-U CIVIL ALL 1 Performs functional test for all the doors
3497 7-25N 31 Station-U CIVIL ALL 1 Rectify the damage at the edge of cable trench.
3498 7-25N 32 Station-U CIVIL Battery Room 1 Perform functional test for the door.
3499 7-25N 33 Station-U CIVIL Battery Room 1 Apply paint on the door
3500 7-25N 34 Station-U CIVIL Battery Room 1 Floor and wall tiles to be cleaned.
Transformer
3502 7-25N 36 Station-U CIVIL
Room
1 Complete the installation of cable trench cover.
Transformer
3503 7-25N 37 Station-U CIVIL
Room
1 Perform functional test for the door.
Transformer
3504 7-25N 38 Station-U CIVIL
Room
1 Apply final coat of paint on internal wall
3505 7-25N 39 Station-U CIVIL LV Room 1 Perform functional test for the door.
3509 7-25N 43 Station-U CIVIL LV Room 1 Rectify the damage at the edge of cable trench.
3510 7-25N 44 Station-U CIVIL LV Room 1 Remove all temporary facilities from site
3511 7-25N 45 Station-U CIVIL LV Room 1 General cleaning to be done within the building.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
DG Building and
3512 7-25N 46 Station-U CIVIL Diesel storage 1 Perform functional test for all doors.
tank area
DG Building and
3513 7-25N 47 Station-U CIVIL Diesel storage 1 Apply paint on the door
tank area
DG Building and
3514 7-25N 48 Station-U CIVIL Diesel storage 1 Replace the door lock
tank area
DG Building and
3515 7-25N 49 Station-U CIVIL Diesel storage 1 Complete the installation of cable trench cover.
tank area
DG Building and
3516 7-25N 50 Station-U CIVIL Diesel storage 1 Touch up paint on sand trap inlet Louvre.
tank area
DG Building and
3517 7-25N 51 Station-U CIVIL Diesel storage 1 Provide the TPI certification for crane.
tank area
DG Building and
Rectify the damaged concrete surface at the diesel
3518 7-25N 52 Station-U CIVIL Diesel storage 1
tank area storage tank area.
DG Building and
General cleaning to be done in and outside the
3519 7-25N 53 Station-U CIVIL Diesel storage 1
tank area building.
PIPELINE -
3522 7-32B 3
12" N TO FSP
ELEC 12" N TO FSP 1 Identification cable tags on all connectioncables
PIPELINE - 6" 6" FNFIS TO VAL Details/Description plates on all locations at TP, DP
3526 7-33A 2 ELEC 1
FNFIS STN FNFIS & junction boxes.
PIPELINE - 6" 6" FNFIS TO VAL Need to be rechecked after commissioning ICCP
3528 7-33A 4 ELEC 1
FNFIS STN FNFIS system.
PIPELINE - 4" 4" VAL STN HL Details/Description plates on all locations at TP, DP
3531 7-34A 2 ELEC 1
WHTP-L TO STN L & junction boxes.
PIPELINE - 4" 4" VAL STN HL Need to be rechecked after commissioning ICCP
3533 7-34A 4 ELEC 1
WHTP-L TO STN L system.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Pig Launcher
Receiver area
3538 7-31G 4 KSFGSS CIVIL
and the external
1 complete the grouting for the concrete supports
works
Pig Launcher
Receiver area Epoxy coating to be completed for all above
3539 7-31G 5 KSFGSS CIVIL 1
and the external ground concrete surface.
works
Pig Launcher
Receiver area Rectify the damaged concrete surface wherever
3540 7-31G 6 KSFGSS CIVIL 1
and the external necessary.
works
Pig Launcher
Receiver area
3541 7-31G 7 KSFGSS CIVIL
and the external
1 Provide and install cover for earth pit and spill pit
works
Pig Launcher
Receiver area
3542 7-31G 8 KSFGSS MECH
and the external
1 Provide and install wind sock
works
Pig Launcher
Receiver area
3543 7-31G 9 KSFGSS CIVIL
and the external
1 Aggregate spreading to be completed properly
works
Pig Launcher
Receiver area
3544 7-31G 10 KSFGSS CIVIL
and the external
1 Install station name plate and safety sign plate
works
Pig Launcher
Receiver area Fence opening at pipe entry to be re-instated
3545 7-31G 11 KSFGSS MECH 1
and the external properly.
works
Pig Launcher
Receiver area Assembly point to be identified and install sign
3546 7-31G 12 KSFGSS CIVIL 1
and the external board.
works
Pig Launcher
Receiver area
3547 7-31G 13 KSFGSS MECH
and the external
1 Touch-up paint on main gate and fence post
works
Pig Launcher
Receiver area
3548 7-31G 14 KSFGSS MECH
and the external
1 Fix holding bolt arrester for main gate.
works
Pig Launcher
Receiver area Lifting hook of slab to be filled with appropriate
3549 7-31G 15 KSFGSS CIVIL 1
and the external material
works
Pig Launcher
Receiver area
3550 7-31G 16 KSFGSS MECH
and the external
1 TPI report of Crane submitted
works
Pig Launcher
Receiver area
3551 7-31G 17 KSFGSS MECH
and the external
1 Apply structural paint on platforms and pipes
works
Pig Launcher
Receiver area
3552 7-31G 18 KSFGSS CIVIL
and the external
1 Apply sealant around crane post foundation
works
Pig Launcher
Receiver area
3553 7-31G 19 KSFGSS CIVIL
and the external
1 Remove all temporary site facilities
works
Pig Launcher
Receiver area
3554 7-31G 20 KSFGSS CIVIL
and the external
1 General cleaning to be completed
works
3555 7-31G 21 KSFGSS CIVIL Electrical Building 1 Provide and fix sign plates for the rooms
3556 7-31G 22 KSFGSS CIVIL Electrical Building 1 Replace the damage door lock
3557 7-31G 23 KSFGSS CIVIL Electrical Building 1 Epoxy painting on corridor to be completed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3564 7-31G 30 KSFGSS MECH Electrical Building 1 Provide and fix trench cover at LV room
3565 7-31G 31 KSFGSS CIVIL Electrical Building 1 Rectify the surface at the door sill of main entrance
3566 7-31G 32 KSFGSS CIVIL Electrical Building 1 Perform functional test for all the door
3567 7-31G 33 KSFGSS CIVIL Electrical Building 1 Apply pint on the door
3568 7-31G 34 KSFGSS CIVIL Electrical Building 1 Opening on the battery room floor to be filled
3570 7-31G 36 KSFGSS CIVIL Electrical Building 1 Clean the floor and wall tiles in battery room
3571 7-31G 37 KSFGSS MECH Electrical Building 1 Complete the construction of car park shed
3574 7-31G 40 KSFGSS MECH Electrical Building 1 Install landing platform at the top of monkey ladder
3575 7-31G 41 KSFGSS CIVIL Electrical Building 1 Perform leak test on the building roof
PIPELINE -
36'' STN-U TO ROW level to be maintained as per the
3577 7-35A 1 36" STN U TO CIVIL 1
STN-N requirement approx. CH: 0+170 to 0+220
N
PIPELINE -
36'' STN-U TO Crossing marker pole surroundings to be
3578 7-35A 2 36" STN U TO CIVIL 1
STN-N compacted properly near station-U
N
PIPELINE -
36'' STN-U TO ROW merging with existing asphalt road at approx.
3579 7-35A 3 36" STN U TO CIVIL 1
STN-N CH: 1+335 to be diverted to suit the site condition
N
PIPELINE -
36'' STN-U TO Excavated material dumped at approx. CH: 0+500
3580 7-35A 4 36" STN U TO CIVIL 1
STN-N to 0+880 to be removed
N
PIPELINE -
36'' STN-U TO ROW shoulder to be provided properly from
3581 7-35A 5 36" STN U TO CIVIL 1
STN-N approx. CH: 0+880 to 0+940
N
PIPELINE - Existing rocky surface cut and remove for the
36'' STN-U TO
3582 7-35A 6 36" STN U TO CIVIL
STN-N
1 required width of ROW shoulder from CH: 1+100 to
N 1+250
PIPELINE - Removal all temporary support and re-instatement
36'' STN-U TO
3583 7-35A 7 36" STN U TO CIVIL
STN-N
1 to be done for the support of existing pipe line at
N CH: 1+340
PIPELINE -
36'' STN-U TO ROW shoulder to be provided from approx. CH:
3584 7-35A 8 36" STN U TO CIVIL 1
STN-N 1+800 to 2+000
N
PIPELINE -
36'' STN-U TO Excavated material dumped near over head line
3585 7-35A 9 36" STN U TO CIVIL 1
STN-N crossing OHX-003 to be removed
N
PIPELINE -
36'' STN-U TO Damaged area of ROW to be rectified from existing
3586 7-35A 10 36" STN U TO CIVIL 1
STN-N asphalt road to approx. CH: 2+120
N
PIPELINE -
36'' STN-U TO
3587 7-35A 11 36" STN U TO CIVIL
STN-N
1 ROW to be provided from CH: 2+540 to 2+650
N
PIPELINE -
36'' STN-U TO Dumped material to be removed from CH: 3+800
3588 7-35A 12 36" STN U TO CIVIL 1
STN-N to 4+000 between 36'' pipe line and asphalt road.
N
PIPELINE -
36'' STN-U TO K.M marker pole and pipe line identification marker
3589 7-35A 13 36" STN U TO CIVIL 1
STN-N pole to be provided from station-U to N
N
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE -
36'' STN-U TO ROW shoulder to be prepared properly at sabkha
3590 7-35A 14 36" STN U TO CIVIL 1
STN-N are approx. CH: 5+640 to 6+300
N
PIPELINE -
36'' STN-U TO Damaged area of ROW to be rectified from existing
3591 7-35A 15 36" STN U TO CIVIL 1
STN-N asphalt road to approx. CH: 3+390
N
PIPELINE -
36'' STN-U TO ROW to be provided up to the existing pipe line
3592 7-35A 16 36" STN U TO CIVIL 1
STN-N from CH: 4+100 to 4+180
N
PIPELINE -
36'' STN-U TO Lifting hook pocket for the protection slab to be
3593 7-35A 17 36" STN U TO CIVIL 1
STN-N filled with appropriate material
N
PIPELINE -
36'' STN-U TO Removal of unwanted materials and house
3594 7-35A 18 36" STN U TO CIVIL 1
STN-N keeping to be done from RXS-001 to Station-N
N
PIPELINE -
36'' STN-U TO Cable route marker to be provided from
3595 7-35A 19 36" STN U TO INST 1
STN-N station-U to N
N
PIPELINE -
36'' STN-U TO Excavated material dumped from approx. CH:
3596 7-35A 20 36" STN U TO CIVIL 1
STN-N 4+185 to 4+700 to be removed
N
PIPELINE -
36'' STN-U TO Excavated material and excess protection slab to
3597 7-35A 21 36" STN U TO CIVIL 1
STN-N be removed from near TXU-005
N
PIPELINE - Rectification of the backfilled area and installation
36'' STN-U TO
3598 7-35A 22 36" STN U TO CIVIL
STN-N
1 of crossing marker pole to be done for crossing
N TXU-005
PIPELINE -
36'' STN-U TO Existing rocky surface cut and remove for the
3599 7-35A 23 36" STN U TO CIVIL 1
STN-N required width of ROW Shoulder from CH: 5+700
N
PIPELINE - Excess soil to be removed from the ROW shoulder
36'' STN-U TO
3600 7-35A 24 36" STN U TO CIVIL
STN-N
1 and prepared properly from approx. CH: 5+500 to
N 5+640
PIPELINE -
36'' STN-U TO ROW merging with existing asphalt road near
3601 7-35A 25 36" STN U TO CIVIL 1
STN-N RXS-001 to be diverted to suit the site condition
N
PIPELINE -
36'' STN-U TO
3602 7-35A 26 36" STN U TO CIVIL
STN-N
1 ROW to be provided from CH: 2+650 to 2+750
N
PIPELINE -
36'' STN-U TO Rectification shall be done for the damaged ROW
3603 7-35A 27 36" STN U TO CIVIL 1
STN-N from approx. CH: 3+500 to 4+080
N
PIPELINE -
36'' STN-U TO
3607 7-35A 31 36" STN U TO CIVIL
STN-N
1 Bund at CP location to be rectified at KM 6+000
N
PIPELINE -
36'' STN-U TO
3608 7-35A 32 36" STN U TO CIVIL
STN-N
1 ROW to be provided below overhead line area
N
PIPELINE -
36'' STN-U TO Exposed concrete surface for CP & marker pole
3609 7-35A 33 36" STN U TO CIVIL 1
STN-N foundation to be painted
N
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE -
36'' STN-U TO ROW to be provided for the access of
3616 7-35A 40 36" STN U TO CIVIL 1
STN-N valve station-FSDS
N
PIPELINE - Remove temporary goal post and to be provided
36'' STN-U TO
3617 7-35A 41 36" STN U TO CIVIL
STN-N
1 new goal post for over head line crossing OHX-
N 003, OHX-004
PIPELINE -
36'' STN-U TO
3618 7-35A 42 36" STN U TO CIVIL
STN-N
1 ROW to be provided from RXA-006 to station-N
N
PIPELINE -
36'' STN-U TO Rectification shall be done for the damaged ROW
3619 7-35A 43 36" STN U TO CIVIL 1
STN-N and shoulder from CH: 2+380 to 2+550
N
PIPELINE -
36'' STN-U TO Crossing marker pole and pipe line warning marker
3620 7-35A 44 36" STN U TO CIVIL 1
STN-N to be installed at RXS-001 & RXS-001A
N
Power supply
Power supply wiring diagram to be provided & also
3621 7-5A 1 FSP INST (Battery charger) 1
rack & cabling paste to the inside to the rack.
Power supply
Incomming power supply cable to be tagged &
3622 7-5A 2 FSP INST (Battery charger) 1
rack & cabling Labeled.
Power supply
3623 7-5A 3 FSP INST (Battery charger) 1 All Circuit braker to be Labeled.
rack & cabling
Power supply
3624 7-5A 4 FSP INST (Battery charger) 1 Power supply Alarm Monitoring to be done.
rack & cabling
Power supply
3625 7-5A 5 FSP INST (Battery charger) 1 Rack shall be cleaned and made free from dust.
rack & cabling
Power supply
3626 7-5A 6 FSP INST (Battery charger) 1 Petroleum jelly to be applied for all batteries.
rack & cabling
Complete Network & Block drawing for the
Telecom
Ruggedcom Switch system cabling as well as
3627 7-5A 1 FSP INST Transmission 1
Rack & cabling within rack cabling to be provided & pasted at the
inside of the door rack.
Telecom
Incomming power supply cable to be tagged &
3628 7-5A 2 FSP INST Transmission 1
Rack & cabling Labeled.
Telecom
3629 7-5A 3 FSP INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
Telecom
Power terminal Block to be covered (inside of the
3630 7-5A 4 FSP INST Transmission 1
Rack & cabling Telecom Rack)
EARTHING
For the balance three MOV installation and cable
3631 7-8K 1 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL termination to be completed.
EARTHING
3632 7-8K 2 STATION-N ELEC SYSTEM AND 1 Cable Route marker installation to be completed
SOLAR PANEL
EARTHING
Trafoltye identification tag to be provided MOV DB
3633 7-8K 3 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL feeder in LV S/Board
EARTHING
It is observed that changes in the rating of MOV,
3634 7-8K 4 STATION-N ELEC SYSTEM AND 2
SOLAR PANEL BCEC to confirm its adequacy requirment.
EARTHING
3635 7-8K 5 STATION-N ELEC SYSTEM AND 2 Testing of MOVs and all LV cables to be completed
SOLAR PANEL
EARTHING
Installed welding socket is rated for 3 Phase supply
3636 7-8K 6 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL and not singly phase supply.
EARTHING
In MOV-77 area the backfilling of cable trench to
3637 7-8K 7 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL be done properly (inside plan)
EARTHING
Demolished old OHL pole foundation to be
3638 7-8K 8 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL removed
EARTHING
3639 7-8K 9 STATION-N ELEC SYSTEM AND 1 Dismantled OHL materials to be handed over to QP
SOLAR PANEL
EARTHING
To be clarified about missing cable (61-ELP-057)
3640 7-8K 10 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL as per drawing KGPN-2-54-0005
EARTHING
In two light poles located near by MOV-77, the
3641 7-8K 11 STATION-N ELEC SYSTEM AND 1
SOLAR PANEL thread of the foundation of bolt to be visible.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Telecom
VAL STN
3647 7-10H 3
FNFIS
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
VAL STN
3649 7-10H 2
FNFIS
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
VAL STN
3651 7-10H 4
FNFIS
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged
VAL STN
3652 7-10H 5
FNFIS
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
VAL STN
3653 7-10H 6
FNFIS
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.
VAL STN
3659 7-11I 2
FNLGCS
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
VAL STN
3661 7-11I 4
FNLGCS
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged
VAL STN
3662 7-11I 5
FNLGCS
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
VAL STN
3663 7-11I 6
FNLGCS
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Telecom
VAL STN
3666 7-12H 2
FSDS
INST Transmission 1 Incomming power cable to tagged & labeled.
Rack & cabling
Telecom
VAL STN
3667 7-12H 3
FSDS
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
VAL STN
3669 7-12H 2
FSDS
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
VAL STN
3671 7-12H 4
FSDS
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged
VAL STN
3672 7-12H 5
FSDS
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
VAL STN
3673 7-12H 6
FSDS
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.
Telecom
VAL STN
3677 7-13I 3
KNMP
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
VAL STN
3679 7-13I 2
KNMP
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
VAL STN
3681 7-13I 4
KNMP
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged
VAL STN
3682 7-13I 5
KNMP
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
VAL STN
3683 7-13I 6
KNMP
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.
VAL STN
3685 7-13I 8
KNMP
INST Fiber Optic Cable 1 FOPP open/close to be operate properly.
Telecom
VAL STN
3688 7-14I 3
WHTP E&G
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
VAL STN
3690 7-14I 2
WHTP E&G
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
3692 7-14I 4
WHTP E&G
INST Fiber Optic Cable 1 All crossing area FO cable to be tagged
VAL STN
3693 7-14I 5
WHTP E&G
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
VAL STN
3694 7-14I 6
WHTP E&G
INST Fiber Optic Cable 1 Telecome manhole to be covered & labeled.
VAL STN
3696 7-14I 8
WHTP E&G
INST Fiber Optic Cable 1 FOPP open/close to be operate properly.
Telecom
VAL STN
3699 7-15H 3
WHTP H&L
INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
VAL STN
3701 7-15H 2
WHTP H&L
INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
VAL STN
3703 7-15H 4
WHTP H&L
INST Fiber Optic Cable 1 All crossing area FO cable to be labeled.
VAL STN
3704 7-15H 5
WHTP H&L
INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
VAL STN
3705 7-15H 6
WHTP H&L
INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.
Telecom
3710 7-25O 4 Station-u INST Transmission 1 Ruggedcom switch to tagged & labeled.
Rack & cabling
3712 7-25O 2 Station-u INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
3714 7-25O 4 Station-u INST Fiber Optic Cable 1 All crossing area FO cable to be labeled.
3715 7-25O 5 Station-u INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3716 7-25O 6 Station-u INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.
3718 7-25O 2 Station-u INST Fiber Optic Cable 1 Telecome cable route marker post to be installed.
3720 7-25O 4 Station-u INST Fiber Optic Cable 1 All crossing area FO cable to be labeled.
3721 7-25O 5 Station-u INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
3722 7-25O 6 Station-u INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.
33kv Relay
AC/DC power supply circuit not yet check and
3725 7-25P 1.03 Station-U ELEC control 62-RCP- 1
6203-01 verify for ferruling number.
33kv Relay
Cross checking of ferruling number after
3726 7-25P 1.04 Station-U ELEC control 62-RCP- 1
6203-01 replacement with corrected one.
33kv Relay
Provide red mark up document including relays
3727 7-25P 1.05 Station-U ELEC control 62-RCP- 1
6203-01 setting and configuration at Sub station.
33kv Relay
3728 7-25P 1.06 Station-U ELEC control 62-RCP- 1 Space heater circuit not yet tested.
6203-01
33kv switchgear
3729 7-25P 2.01 Station-U ELEC side 62-SB-6203- 1 Interlock keys for earthing truck not yet installed.
01
33kv switchgear
No external control wire from spare switchgear
3730 7-25P 2.02 Station-U ELEC side 62-SB-6203- 1
01 cubicle to spare RCP cubicle.
33kv switchgear
AC/DC power supply circuit not yet check and
3731 7-25P 2.03 Station-U ELEC side 62-SB-6203- 1
01 verify for ferruling number.
33kv switchgear
Cross checking of ferruling number after
3732 7-25P 2.04 Station-U ELEC side 62-SB-6203- 1
01 replacement with corrected one.
33kv switchgear
3733 7-25P 2.05 Station-U ELEC side 62-SB-6203- 1 Space heater and lighting circuit not yet tested.
01
33kv switchgear
3734 7-25P 2.06 Station-U ELEC side 62-SB-6203- 1 Primary injection test for CT's and VT's circuit.
01
33kv switchgear
Provide logic interlock scheme for incomer to Umm
3735 7-25P 2.07 Station-U ELEC side 62-SB-6203- 1
01 bab main intake sub station panel 13.
33kv switchgear
Provide logic interlock scheme for outgoing feeder
3736 7-25P 2.08 Station-U ELEC side 62-SB-6203- 1
01 UBMS-B to new 33kv S/S at UBMS-B area.
33kv switchgear
Provide logic interlock scheme for station
3737 7-25P 2.09 Station-U ELEC side 62-SB-6203- 1
01 transformer feeder to LV incomer SWBD 415V.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3742 7-25P 4.01 Station-U ELEC Miscellaneous 1 Provide CT & VT cable test relays.
3743 7-25P 4.02 Station-U ELEC Miscellaneous 1 Provide communication cable for SEPAM relay.
3745 7-25P 4.04 Station-U ELEC Miscellaneous 1 Provide latest version of SEPAM software.
3748 7-30B 2 UMMBAB-B INST Fiber Optic Cable 1 Telecom Cable Route marker Post to be installed.
3750 7-30B 4 UMMBAB-B INST Fiber Optic Cable 1 All crossing area FO cable to be tagged.
3751 7-30B 5 UMMBAB-B INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
3752 7-30B 6 UMMBAB-B INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.
UMMBAB-B
3754 7-30B 2 UMMBAB-B INST
Sub Station
1 Telecom Cable Route marker Post to be installed.
UMMBAB-B
3756 7-30B 4 UMMBAB-B INST
Sub Station
1 All crossing area FO cable to be tagged.
UMMBAB-B
3757 7-30B 5 UMMBAB-B INST
Sub Station
1 FOPP shall be cleaned and made free from dust.
UMMBAB-B
3758 7-30B 6 UMMBAB-B INST
Sub Station
1 Telecom Manhole to be Covered & labeled.
Telecom
3762 7-30B 4 UMMBAB-B INST Transmission 1 Ruggedcom switch to be tagged & labeled.
Rack & cabling
3764 7-31H 2 KSFGSS ELEC ALL 2 Torquing for incomer cables to be completed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3768 7-31H 6 KSFGSS ELEC ALL 2 Timer to be provided for outdoor lighting DB
Telecom
Teleco Rack shall be cleaned and made free from
3773 7-31I 5 KSFGSS INST Transmission 1
Rack & cabling dust.
3775 7-31I 2 KSFGSS INST Fiber Optic Cable 1 Telecom Cable Route marker Post to be installed.
3777 7-31I 4 KSFGSS INST Fiber Optic Cable 1 All crossing area FO cable to be tagged.
3778 7-31I 5 KSFGSS INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
3779 7-31I 6 KSFGSS INST Fiber Optic Cable 1 FOPP open/close to be operate properly.
3780 7-31I 7 KSFGSS INST Fiber Optic Cable 1 Telecom Manhole to be Covered & labeled.
3781 7-31I 8 KSFGSS INST Fiber Optic Cable 1 FO cable dressing to be done properly.
Power supply
Power supply wiring diagram to be provided & also
3782 7-31I 1 KSFGSS INST (Battery charger) 1
rack & cabling paste to the inside to the rack.
Power supply
Incomming power supply cable to be tagged &
3783 7-31I 2 KSFGSS INST (Battery charger) 1
rack & cabling Labeled.
Power supply
3784 7-31I 3 KSFGSS INST (Battery charger) 1 All Circuit braker to be Labeled.
rack & cabling
Power supply
3785 7-31I 4 KSFGSS INST (Battery charger) 1 Power supply Alarm Monitoring to be done.
rack & cabling
Power supply
3786 7-31I 5 KSFGSS INST (Battery charger) 1 Rack shall be cleaned and made free from dust.
rack & cabling
Power supply
3787 7-31I 6 KSFGSS INST (Battery charger) 1 Petroleum jelly to be applied for all batteries.
rack & cabling
Power supply
Telecome power supply radck cable entry spare
3788 7-31I 7 KSFGSS INST (Battery charger) 1
rack & cabling hole to be done for future use.
3790 7-36A 2 KNMP INST Fiber Optic Cable 1 Telecom Cable Route marker Post to be installed.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3792 7-36A 4 KNMP INST Fiber Optic Cable 1 All crossing area FO cable to be tagged.
3793 7-36A 5 KNMP INST Fiber Optic Cable 1 FOPP shall be cleaned and made free from dust.
3794 7-36A 6 KNMP INST Fiber Optic Cable 1 FOPP open/close to be operate properly.
Telecom
3798 7-36A 3 KNMP INST Transmission 1 Ruggedcom switch LAN cable to be Labeled.
Rack & cabling
3801 7-5C 3 FSP CIVIL Station-FSP 1 Joint sealant for the required areas to be done
3804 7-5C 6 FSP CIVIL Station-FSP 1 Apply touchup paint for the gate and fence post
3812 7-31J 1 KSFGSS MECH 6'' Flare Line 1 Housekeeping to be carried out.
3813 7-31J 2 KSFGSS MECH 6'' Flare Line 1 Line identification to be done.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3817 7-31J 6 KSFGSS MECH 6'' Flare Line 1 Crash barrier to be provided at culvert,
3818 7-31J 7 KSFGSS MECH 6'' Flare Line 1 CP system to be installed at track crossing.
Pig Launcher/
Reveiver and Asphalt road to be completed for outside the
3819 7-31K 1 KSFGSS CIVIL 1
outside Elect. fence area
Building
Pig Launcher/
3820 7-31K 2 KSFGSS CIVIL
Reveiver and
1
Road signs and road marking to be provided
outside Elect. as per the requirement
Building
Pig Launcher/
3821 7-31K 3 KSFGSS CIVIL
Reveiver and
1
Rectification required for the damaged kerb
outside Elect. stone and painting to be done.
Building
Pig Launcher/
Reveiver and
3822 7-31K 4 KSFGSS CIVIL
outside Elect.
1 Joint sealant for the required areas to be done
Building
Pig Launcher/
Reveiver and Grouting to be done for the remaining support
3823 7-31K 5 KSFGSS CIVIL 1
outside Elect. foundations
Building
Pig Launcher/
Reveiver and Fence opening at pipe entry shall be re-
3824 7-31K 6 KSFGSS CIVIL 1
outside Elect. instated properly
Building
Pig Launcher/
Reveiver and Backfilling up to the edge of grading,
3825 7-31K 7 KSFGSS CIVIL 1
outside Elect. compaction and proper slope to be provided
Building
Pig Launcher/
Reveiver and
3826 7-31K 8 KSFGSS CIVIL
outside Elect.
1 Gravel to be spreaded properly
Building
Pig Launcher/
Reveiver and
3827 7-31K 9 KSFGSS CIVIL
outside Elect.
1 Wind sock to be provided
Building
Pig Launcher/
3828 7-31K 10 KSFGSS CIVIL
Reveiver and
1
Epoxy coating to be done for the exposed
outside Elect. concrete surface
Building
Pig Launcher/
Reveiver and Rectification to be done for the exposed
3829 7-31K 11 KSFGSS CIVIL 1
outside Elect. concrete surface and apply touch-up paint
Building
Pig Launcher/
Reveiver and Cover to be provided for the earth pit and spill
3830 7-31K 12 KSFGSS CIVIL 1
outside Elect. pit.
Building
Pig Launcher/
3831 7-31K 13 KSFGSS MECH
Reveiver and
1
Check the gate installation and provided true
outside Elect. alignment.
Building
Pig Launcher/
Reveiver and Gate drop bolt arrester to be provided as per
3832 7-31K 14 KSFGSS CIVIL 1
outside Elect. the drawing.
Building
Pig Launcher/
Reveiver and Apply touchup paint for the gate and fence
3833 7-31K 15 KSFGSS MECH 1
outside Elect. post
Building
Pig Launcher/
Reveiver and Station name board and safety instruction board to
3834 7-31K 16 KSFGSS CIVIL 1
outside Elect. be installed
Building
Pig Launcher/
Reveiver and Assembly point to be identified and installed sign
3835 7-31K 17 KSFGSS CIVIL 1
outside Elect. boards
Building
Pig Launcher/
Reveiver and Painting to be done for the sock away pit manhole
3836 7-31K 18 KSFGSS CIVIL 1
outside Elect. cover
Building
Pig Launcher/
Reveiver and
3837 7-31K 19 KSFGSS CIVIL
outside Elect.
1 Track road and associated works shall be done.
Building
Pig Launcher/ Lifting hook pocket to be filled with appropriate
Reveiver and
3838 7-31K 20 KSFGSS CIVIL
outside Elect.
1 material and apply painting for the cable entry pit
Building and cover slab
Pig Launcher/
Reveiver and
3839 7-31K 21 KSFGSS MECH
outside Elect.
1 Car parking work to be completed
Building
Pig Launcher/
Reveiver and Removal all temporary facilities and house keeping
3840 7-31K 22 KSFGSS CIVIL 1
outside Elect. to be done.
Building
Electrical Building Provide sign plates for the rooms as per the
3841 7-31K 1 KSFGSS CIVIL 1
Inside / Outside drawings.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Electrical Building
3842 7-31K 2 KSFGSS CIVIL
Inside / Outside
1 Damaged door locks to be replaced
Electrical Building
3843 7-31K 3 KSFGSS CIVIL
Inside / Outside
1 Epoxy coating to be done for the corridor
Electrical Building
3846 7-31K 6 KSFGSS CIVIL
Inside / Outside
1 Provide joint sealant for the external wall and floor
Electrical Building Provide joint sealant for the floor of air lock room
3848 7-31K 8 KSFGSS CIVIL 1
Inside / Outside and LV room
Electrical Building Painting to be done for the floor of air lock room
3849 7-31K 9 KSFGSS CIVIL 1
Inside / Outside and LV room.
Electrical Building
3850 7-31K 10 KSFGSS CIVIL
Inside / Outside
1 Cable trench cover to be provided for the LV room
Electrical Building
3852 7-31K 12 KSFGSS CIVIL
Inside / Outside
1 Painting to be done for the doors.
Electrical Building Proper cleaning to be done for the floor & wall tiles
3856 7-31K 16 KSFGSS CIVIL 1
Inside / Outside of battery room
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
6'' Pipeline
PIPELINE - 6" Re-instatement of asphalt road to be done for the
3868 7-33B 7 CIVIL VSTN-FNFIS to 1
FNFIS culvert RXS-001
FNFIS
6'' Pipeline
PIPELINE - 6" Lifting holes on PGB near loop to be filled and
3869 7-33B 8 CIVIL VSTN-FNFIS to 1
FNFIS apply touch-up paint
FNFIS
6'' Pipeline
PIPELINE - 6" Fence opening at pipe entry shall be re-instated
3870 7-33B 9 MECH VSTN-FNFIS to 1
FNFIS properly
FNFIS
6'' Pipeline
PIPELINE - 6" Backfilling to be done for the crash barrier
3871 7-33B 10 CIVIL VSTN-FNFIS to 1
FNFIS foundation at culvert RXS-001
FNFIS
6'' Pipeline
PIPELINE - 6" Removal of unwanted materials and house
3872 7-33B 11 CIVIL VSTN-FNFIS to 1
FNFIS keeping shall be done.
FNFIS
6'' Pipeline
PIPELINE - 6"
3873 7-33C 1
FNFIS
CIVIL VSTN-FNFIS to 1 Housekeeping to be carried out.
FNFIS
6'' Pipeline
PIPELINE - 6"
3874 7-33C 2
FNFIS
MECH VSTN-FNFIS to 1 Line inentification to be done.
FNFIS
6'' Pipeline
PIPELINE - 6" Touch-up painting to be done for all weld joints and
3875 7-33C 3 MECH VSTN-FNFIS to 1
FNFIS damaged areas of the pipe & anchor.
FNFIS
4'' Pipeline Surface preparation and epoxy coating to be done
PIPELINE - 4"
3876 7-34B 1
WHTP-L
CIVIL VSTN-H&L to 1 for the exposed concrete surface of the support
Station-L foundation
4'' Pipeline
PIPELINE - 4"
3877 7-34B 2
WHTP-L
CIVIL VSTN-H&L to 1 Track road to be prepared properly
Station-L
4'' Pipeline
PIPELINE - 4" Rectification of the damaged concrete surface and
3878 7-34B 3 CIVIL VSTN-H&L to 1
WHTP-L apply touch-up paint.
Station-L
4'' Pipeline
PIPELINE - 4" Dune sand to be removed form the surroundings of
3879 7-34B 4 CIVIL VSTN-H&L to 1
WHTP-L the pipe line near existing culvert FM-32
Station-L
4'' Pipeline
PIPELINE - 4" Damaged epoxy coating to be rectified for the
3880 7-34B 5 CIVIL VSTN-H&L to 1
WHTP-L concrete surface of support foundations
Station-L
4'' Pipeline
PIPELINE - 4" Backfilling to be done properly for the support
3881 7-34B 6 CIVIL VSTN-H&L to 1
WHTP-L foundations near station-L
Station-L
4'' Pipeline
PIPELINE - 4" Removal of unwanted materials and house
3882 7-34B 7 CIVIL VSTN-H&L to 1
WHTP-L keeping shall be done.
Station-L
4'' Pipeline
PIPELINE - 4"
3883 7-34C 1
WHTP-L
CIVIL VSTN-H&L to 1 Housekeeping to be carried out.
Station-H&L
4'' Pipeline
PIPELINE - 4"
3884 7-34C 2
WHTP-L
CIVIL VSTN-H&L to 1 Line identification to be done.
Station-H&L
4'' Pipeline
PIPELINE - 4" Touch-up painting to be done for all weld joints and
3885 7-34C 3 MECH VSTN-H&L to 1
WHTP-L damaged areas of the pipe & anchor.
Station-H&L
4'' Pipeline
PIPELINE - 4"
3886 7-34C 4
WHTP-L
CIVIL VSTN-H&L to 1 Pipe is not resting on the support, to be rectified.
Station-H&L
3889 7-36B 3 KNMP CIVIL KNMP Station 1 Joint sealant for the required areas to be done
3892 7-36B 6 KNMP MECH KNMP Station 1 Apply touchup paint for the gate and fence post
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4'' Pipeline
PIPELINE - 4'' Epoxy coating to be done for the installed pipe
3904 7-37A 1 CIVIL VSTN-FNDS to 1
FNDS sleepers near FNDS
Station-FNDS
4'' Pipeline Bitumen coating, backfilling and proper compaction
PIPELINE - 4''
3905 7-37A 2
FNDS
CIVIL VSTN-FNDS to 1 to be done for the pipe sleepers wherever resting
Station-FNDS in the ditches
4'' Pipeline Surface preparation and epoxy coating to be done
PIPELINE - 4''
3906 7-37A 3
FNDS
CIVIL VSTN-FNDS to 1 for the exposed concrete surface of the pipe
Station-FNDS support foundations
4'' Pipeline
PIPELINE - 4'' Re-instatement of asphalt road, kerb stone and
3907 7-37A 4 CIVIL VSTN-FNDS to 1
FNDS crash barrier to be done for culvert RXS-001
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Pipe is not resting properly on the pipe sleeper to
3911 7-37A 8 CIVIL VSTN-FNDS to 1
FNDS be rectified near existing culvert FN-02
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Damaged paint on installed pipe supports to be
3912 7-37A 9 CIVIL VSTN-FNDS to 1
FNDS rectified
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Pipe sleepers to be aligned to the centre of the
3913 7-37A 10 CIVIL VSTN-FNDS to 1
FNDS pipe line for inside the existing culvert.
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Track road from TXU-001 to Valve station-FNDS to
3914 7-37A 11 CIVIL VSTN-FNDS to 1
FNDS be completed
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Pipe line identification marker and KM marker to be
3915 7-37A 12 CIVIL VSTN-FNDS to 1
FNDS installed
Station-FNDS
4'' Pipeline
PIPELINE - 4'' Removal of unwanted materials and house
3916 7-37A 13 CIVIL VSTN-FNDS to 1
FNDS keeping shall be done.
Station-FNDS
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4'' Pipeline
PIPELINE - 4'' 4'' SFG Pipeline welding joint blasting & painting to
3929 7-39A 1 MECH Khuff-A to SFG 1
WHTP-A be carried out in all locations
mainfold
4'' Pipeline
PIPELINE - 4'' Pipeline color coding & number stenciling to be
3930 7-39A 2 MECH Khuff-A to SFG 1
WHTP-A carried out in all locations
mainfold
4'' Pipeline
PIPELINE - 4''
3931 7-39A 3
WHTP-A
MECH Khuff-A to SFG 1 Provide pipe support gates as supports
mainfold
4'' Pipeline
PIPELINE - 4'' All SFG pipeline culverts to be closed with wooden
3932 7-39A 4 CIVIL Khuff-A to SFG 1
WHTP-A boards.
mainfold
4'' Pipeline
PIPELINE - 4''
3933 7-39A 5
WHTP-A
CIVIL Khuff-A to SFG 1 All pipeline support need to align properly
mainfold
4'' Pipeline
PIPELINE - 4''
3934 7-39A 6
WHTP-A
CIVIL Khuff-A to SFG 1 All SFG culverts need to be cleaned
mainfold
4'' Pipeline
PIPELINE - 4''
3935 7-39A 7
WHTP-A
CIVIL Khuff-A to SFG 1 Crash barriers to be provided for loops
mainfold
4'' Pipeline
PIPELINE - 4'' Pipeline cross over line support, guide to be
3936 7-39A 8 MECH Khuff-A to SFG 1
WHTP-A provided
mainfold
4'' Pipeline
PIPELINE - 4'' 4'' SFG from tie in from KN header, under line to be
3937 7-39A 9 MECH Khuff-A to SFG 1
WHTP-A wrapped properly.
mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG Sand to be removed under Khuff-B culvert stone
3938 7-40A 1 CIVIL 1
WHTP-B valve station to pitching to be carried out. Need barrier.
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG Pipeline color coding & number stenciling to be
3939 7-40A 2 MECH 1
WHTP-B valve station to carried out near plant inlet & culverts
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3940 7-40A 3
WHTP-B
MECH
valve station to
1 Provide pipe support gates at supports
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG All SFG pipeline culverts to be closed with wooden
3941 7-40A 4 CIVIL 1
WHTP-B valve station to boards.
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3942 7-40A 5
WHTP-B
CIVIL
valve station to
1 All pipeline support need to align properly
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3943 7-40A 6
WHTP-B
MECH
valve station to
1 All SFG culverts need to be cleaned
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3944 7-40A 7
WHTP-B
CIVIL
valve station to
1 Crash barrier to be provided for loops
SFG mainfold
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG Pipeline cross over line support, guide to be
3945 7-40A 8 MECH 1
WHTP-B valve station to provided.
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG 4'' SFG Pipeline welding joint blasting & painting to
3946 7-40A 9 MECH 1
WHTP-B valve station to be carried out in all locations
SFG mainfold
4'' Pipeline
PIPELINE - 4'' Khuff-B SFG
3947 7-40A 10
WHTP-B
CIVIL
valve station to
1 Housekeeping to be carried out.
SFG mainfold
4'' Pipeline
PIPELINE - 4''
3948 7-41A 1
WHTP-C
CIVIL KSFGSS valve 1 Provide concrete cover for culvert near to road
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3949 7-41A 2
WHTP-C
CIVIL KSFGSS valve 1 Heavy duty safety barrier to be provided
station to Khuff-C
4'' Pipeline
PIPELINE - 4'' Pipeline color coding & number stenciling to be
3950 7-41A 3 MECH KSFGSS valve 1
WHTP-C carried out near plant inlet & culverts
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3951 7-41A 4
WHTP-C
MECH KSFGSS valve 1 Provide pipeline support gates at supports
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3952 7-41A 5
WHTP-C
CIVIL KSFGSS valve 1 Anchor support grouting not completed
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3953 7-41A 6
WHTP-C
MECH KSFGSS valve 1 Wrapping damage near truck road crossing.
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3954 7-41A 7
WHTP-C
CIVIL KSFGSS valve 1 Safety barriers to be provided at truck road cross
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3955 7-41A 8
WHTP-C
MECH KSFGSS valve 1 All pipeline support need to align properly
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3956 7-41A 9
WHTP-C
CIVIL KSFGSS valve 1 Crash barriers to be provided for loops
station to Khuff-C
4'' Pipeline
PIPELINE - 4'' Pipeline cross over line support, guide to be
3957 7-41A 10 MECH KSFGSS valve 1
WHTP-C provided
station to Khuff-C
4'' Pipeline
PIPELINE - 4'' 4'' SFG Pipeline welding joint blasting & painting to
3958 7-41A 11 MECH KSFGSS valve 1
WHTP-C be carried out in all locations
station to Khuff-C
4'' Pipeline
PIPELINE - 4''
3959 7-41A 12
WHTP-C
MECH KSFGSS valve 1 Fence net touching at pipeline exit.
station to Khuff-C
4'' Pipeline Valve
PIPELINE - 4''
3960 7-39B 1.01
WHTP-A
MECH station Khuff-A to 1 Apply touch up paint on pipes and supports
Khuff-A
4'' Pipeline Valve
PIPELINE - 4''
3961 7-39B 1.02
WHTP-A
CIVIL station Khuff-A to 1 Provide additional concrete support near the culvert
Khuff-A
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4'' Pipeline
PIPELINE - 4'' New culverts including crash barriers to be
3984 7-41B 3.02 CIVIL KSFGSS to 1
WHTP-C completed.
Khuff-C
4'' Pipeline
PIPELINE - 4'' All concrete plinths to be exposed and coated with
3985 7-41B 3.03 CIVIL KSFGSS to 1
WHTP-C epoxy paint.
Khuff-C
4'' Pipeline
PIPELINE - 4''
3986 7-41B 3.04
WHTP-C
MECH KSFGSS to 1 Apply touch up paint on pipes and supports
Khuff-C
4'' Pipeline
PIPELINE - 4'' Reinstate/reposition any disturbed existing pipe
3987 7-41B 3.05 CIVIL KSFGSS to 1
WHTP-C supports.
Khuff-C
4'' Pipeline
PIPELINE - 4'' Slopes outside culvert to be protected with stone
3988 7-41B 3.06 CIVIL KSFGSS to 1
WHTP-C pitching.
Khuff-C
4'' Pipeline
PIPELINE - 4'' ROW as per AFC and SOW to be
3989 7-41B 3.07 CIVIL KSFGSS to 1
WHTP-C reinstated/completed
Khuff-C
4'' Pipeline
PIPELINE - 4'' Extend pipe wrapping at least 1.00 meter behind
3990 7-41B 3.08 MECH KSFGSS to 1
WHTP-C from the ground.
Khuff-C
4'' Pipeline
PIPELINE - 4'' Provide stone pitching before and after new ROW's
3991 7-41B 3.09 CIVIL KSFGSS to 1
WHTP-C crossing wherever necessary.
Khuff-C
4'' Pipeline
PIPELINE - 4''
3992 7-41B 3.10
WHTP-C
CIVIL KSFGSS to 1 Marker poles work to be completed.
Khuff-C
4'' Pipeline
PIPELINE - 4''
3993 7-41B 3.11
WHTP-C
MECH KSFGSS to 1 Rectify the chainlink fence collar plate apertures.
Khuff-C
4'' Pipeline
PIPELINE - 4'' Debris and other excess construction materials to
3994 7-41B 3.12 CIVIL KSFGSS to 1
WHTP-C be removed from site.
Khuff-C
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
3998 7-5D 4 FSP INST ALL 1 All cables to be tagged with SS plate.
3999 7-5D 5 FSP INST ALL 1 Wire ferrule to be corrected for FT-0057
4002 7-5D 8 FSP INST ALL 1 SRV-1112 vent to be routed to safe direction.
4004 7-5D 10 FSP INST ALL 1 FDI-29-0016 Spare cable entry to be plugged
4010 7-5E 4 FSP MECH ALL 1 Double nuts are to provided in all supports
4019 7-5E 13 FSP MECH ALL 1 All valve tags are to be provided in SS material
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4031 7-5E 25 FSP MECH ALL 1 All reinstatement works shall be done.
4043 7-5E 37 FSP MECH ALL 1 Air tank is not installed as per AFC GA for SDV
4044 7-38B 1 FMDS CIVIL ALL 1 Existing support foundation shall be removed
4045 7-38B 2 FMDS MECH ALL 1 Additional support needed for 2'' vent line.
4046 7-38B 3 FMDS MECH ALL 1 Spec blind shall be installed at T-07A
4047 7-38B 4 FMDS MECH ALL 1 Double nuts are to provided in all supports
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4052 7-38B 9 FMDS MECH ALL 1 All valve tags are to be provided in SS material
4059 7-38B 16 FMDS MECH ALL 1 Air tank is not installed as per AFC GA for SDV
4060 7-38B 17 FMDS MECH ALL 1 All reinstatement works shall be done.
VAL STN 2- VAL STN 2- Line identification to be done and flow direction to
4069 7-9C1 2 MECH 1
FMDS FMDS be marked with arrows.
VAL STN 1- VAL STN 1- Line identification to be done and flow direction
4072 7-9E 2 MECH 1
FMDS FMDS to be marked with arrows.
VAL STN 1- VAL STN 1- Touch up painting to be done for all weld joints and
4073 7-9E 3 MECH 1
FMDS FMDS damaged areas of the pipe & anchor support
VAL STN 1- VAL STN 1- 2" By pass line installation to be done as per AFC
4074 7-9E 4 MECH 1
FMDS FMDS drawing.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE -
PIPELINE- 36'' Pipeline identification board to be provided in
4075 7-35B 1 36" STN U TO CIVIL 1
STN U TO N inside / outside of the fence..
N
PIPELINE -
PIPELINE- 36''
4076 7-35B 2 36" STN U TO ELEC
STN U TO N
2 CP installation shall be completed
N
PIPELINE -
PIPELINE- 36''
4077 7-35B 3 36" STN U TO CIVIL
STN U TO N
1 ROW shall be done as per AFC
N
PIPELINE -
PIPELINE- 36''
4079 7-35B 5 36" STN U TO MECH
STN U TO N
2 Location identification markers shall be installed
N
PIPELINE -
PIPELINE- 36''
4080 7-35B 6 36" STN U TO CIVIL
STN U TO N
1 Final bund/ berm shall be completed as per AFC
N
PIPELINE -
PIPELINE- 36'' Pig traps shall be checked for alignment as per
4081 7-35B 7 36" STN U TO MECH 1
STN U TO N drawing
N
PIPELINE -
PIPELINE- 36''
4082 7-35B 8 36" STN U TO MECH
STN U TO N
1 2" bypass line to be installed
N
PIPELINE -
PIPELINE- 36''
4083 7-35B 9 36" STN U TO MECH
STN U TO N
1 Tray for spacer/ spades shall be provided
N
PIPELINE -
PIPELINE- 36'' Old wind sock pole exists near to the jib crane shall
4084 7-35B 10 36" STN U TO CIVIL 1
STN U TO N be removed
N
PIPELINE -
PIPELINE- 36'' Kilometer markers and crossing markers shall be
4085 7-35B 11 36" STN U TO CIVIL 1
STN U TO N installed as per requirement.
N
PIPELINE -
PIPELINE- 36'' The bolts on ESDV flange are shorter than the
4086 7-35B 12 36" STN U TO MECH 1
STN U TO N requirement. Need to be replaced.
N
PIPELINE -
PIPELINE- 36'' All test packs 'B' punch items shall be cleared &
4087 7-35B 13 36" STN U TO MECH 1
STN U TO N signed off by QP
N
PIPELINE -
PIPELINE- 36'' Housekeeping shall be done throughout the
4088 7-35B 14 36" STN U TO CIVIL 1
STN U TO N pipeline ROW
N
PIPELINE -
PIPELINE- 36'' Interlock facility for pig traps shall be provided as
4089 7-35B 15 36" STN U TO MECH 2
STN U TO N per QP standard
N
PIPELINE -
PIPELINE- 36''
4090 7-35B 16 36" STN U TO MECH
STN U TO N
1 Pig trolley stopper to be installed
N
PIPELINE -
PIPELINE- 36'' Extended thread lengths protruding out of nuts
4091 7-35B 17 36" STN U TO MECH 1
STN U TO N shall be protected as per QP standard.
N
PIPELINE -
PIPELINE- 36'' All bolts shall be applied molicoat, tensioned and
4092 7-35B 18 36" STN U TO MECH 1
STN U TO N reports shall be submitted to QP
N
PIPELINE -
PIPELINE- 36''
4093 7-35B 19 36" STN U TO MECH
STN U TO N
1 Redline mark-up drawings shall be submitted
N
PIPELINE- 4''
PIPELINE - 4''
4094 7-37B 1
FNDS
CIVIL VSTN FNLGCS 1 Housekeeping to be carried out.
to FNDS
PIPELINE- 4''
PIPELINE - 4'' Line identification to be done and flow direction to
4095 7-37B 2 MECH VSTN FNLGCS 1
FNDS be marked with arrows.
to FNDS
PIPELINE- 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4096 7-37B 3 MECH VSTN FNLGCS 1
FNDS damaged areas of the pipe &anchor support.
to FNDS
PIPELINE- 12''
PIPELINE -
4097 7-42A 1
12'' KNMP
CIVIL VSTN KNMP to 1 Housekeeping to be carried out.
KNMP
PIPELINE- 12''
PIPELINE - Line identification to be done and flow direction to
4098 7-42A 2 MECH VSTN KNMP to 1
12'' KNMP be marked with arrows.
KNMP
PIPELINE- 12''
PIPELINE - Fence rings shall be provided at pipeline/fence
4099 7-42A 3 MECH VSTN KNMP to 1
12'' KNMP interface and fencing repaired.
KNMP
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE- 12''
PIPELINE -
4100 7-42A 4
12'' KNMP
CIVIL VSTN KNMP to 1 ROW to be done as per AFC drawing.
KNMP
PIPELINE- 12''
PIPELINE - Edges of the angle plates of guide supports are
4101 7-42A 5 MECH VSTN KNMP to 1
12'' KNMP rubbiig the pipe line to be rectified.
KNMP
PIPELINE- 12''
PIPELINE - Touch up painting to be done for all weld joints and
4102 7-42A 6 MECH VSTN KNMP to 1
12'' KNMP damaged areas of the pipe & anchor support.
KNMP
PIPELINE- 12''
PIPELINE -
4103 7-43A 1
12'' FNLGCS
CIVIL VSTN FNLGCS 1 Housekeeping to be carried out.
TO FNLGCS
PIPELINE- 12''
PIPELINE - Line identification to be done and flow direction to
4104 7-43A 2 MECH VSTN FNLGCS 1
12'' FNLGCS be marked with arrows.
TO FNLGCS
PIPELINE- 12''
PIPELINE - Edges of the angle plates of guide supports are
4105 7-43A 3 MECH VSTN FNLGCS 1
12'' FNLGCS rubbing the pipe line to be rectified.
TO FNLGCS
PIPELINE-4''
PIPELINE - 4''
4106 7-44A 1
WHTP-G
CIVIL VSTN E&G to 1 Housekeeping to be carried out.
KHUFF-G
PIPELINE-4''
PIPELINE - 4'' Line identification to be done and flow direction to
4107 7-44A 2 MECH VSTN E&G to 1
WHTP-G be marked with arrows.
KHUFF-G
PIPELINE-4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4108 7-44A 3 MECH VSTN E&G to 1
WHTP-G damaged areas of the pipe & anchor support
KHUFF-G
PIPELINE-6''
PIPELINE - 6''
4109 7-45A 1
FSDS
CIVIL VSTN FSDS to 1 Housekeeping to be carried out.
FSDS
PIPELINE-6''
PIPELINE - 6''
4110 7-45A 2
FSDS
MECH VSTN FSDS to 1 Line identification to be done.
FSDS
PIPELINE-6''
PIPELINE - 6'' Touch up painting to be done for all weld joints and
4111 7-45A 3 MECH VSTN FSDS to 1
FSDS damaged areas of the pipe & anchor support
FSDS
PIPELINE-6''
PIPELINE - 6''
4112 7-45A 4
FSDS
CIVIL VSTN FSDS to 1 ROW to be done as per AFC drawing.
FSDS
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4113 7-7B 1 MECH VSTN-WHTP-D 1
WHTP-D inside / outside of the fence..
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4114 7-7B 2
WHTP-D
ELEC VSTN-WHTP-D 1 CP installation shall be completed
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4115 7-7B 3
WHTP-D
CIVIL VSTN-WHTP-D 1 ROW shall be done as per AFC
to WHTP-D
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4117 7-7B 5 MECH VSTN-WHTP-D 1
WHTP-D signed off by QP
to WHTP-D
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4118 7-7B 6 MECH VSTN-WHTP-D 1
WHTP-D pipeline ROW
to WHTP-D
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4119 7-7B 7 MECH VSTN-WHTP-D 1
WHTP-D QP-QAC.
to WHTP-D
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4120 7-7B 8 MECH VSTN-WHTP-D 1
WHTP-D inlet & outlet
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4121 7-7B 9
WHTP-D
CIVIL VSTN-WHTP-D 1 All supports shall be checked for proper seating
to WHTP-D
PIPELINE - 4''
PIPELINE - 4''
4122 7-7B 10
WHTP-D
MECH VSTN-WHTP-D 1 All crossings shall be reinstated properly
to WHTP-D
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4''
4125 7-7B 13
WHTP-D
MECH VSTN-WHTP-D 1 Redline mark-up drawings shall be submitted
to WHTP-D
PIPELINE - 6''
PIPELINE - 6" Pipeline identification board to be provided in
4126 7-33D 1 MECH VSTN-FNFIS 1
FNFIS inside / outside of the fence..
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4127 7-33D 2
FNFIS
ELEC VSTN-FNFIS 1 CP installation shall be completed
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4128 7-33D 3
FNFIS
CIVIL VSTN-FNFIS 1 ROW shall be done as per AFC
to FNFIS
Separate sign boards to be installed at the entry
PIPELINE - 6''
PIPELINE - 6" point to the ROW from the main road cautioning
4129 7-33D 4 CIVIL VSTN-FNFIS 1
FNFIS the private vehicles that the road usage is
to FNFIS
restricted only to QP and authorized vehicles.
PIPELINE - 6''
PIPELINE - 6" All test packs 'B' punch items shall be cleared &
4130 7-33D 5 MECH VSTN-FNFIS 1
FNFIS signed off by QP
to FNFIS
PIPELINE - 6''
PIPELINE - 6" Housekeeping shall be done throughout the
4131 7-33D 6 CIVIL VSTN-FNFIS 1
FNFIS pipeline ROW
to FNFIS
PIPELINE - 6''
PIPELINE - 6" Painting & stenciling shall be done and certified by
4132 7-33D 7 MECH VSTN-FNFIS 1
FNFIS QP-QAC.
to FNFIS
PIPELINE - 6''
PIPELINE - 6" Stenciling shall be done in all crossings / culverts
4133 7-33D 8 MECH VSTN-FNFIS 1
FNFIS inlet & outlet
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4134 7-33D 9
FNFIS
CIVIL VSTN-FNFIS 1 All supports shall be checked for proper seating
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4135 7-33D 10
FNFIS
CIVIL VSTN-FNFIS 1 All crossings shall be reinstated properly
to FNFIS
PIPELINE - 6'' Sufficient overlapping shall be done for wrapping
PIPELINE - 6"
4136 7-33D 11
FNFIS
MECH VSTN-FNFIS 1 for road crossings section transition areas (UG/AG
to FNFIS intersection)
PIPELINE - 6''
PIPELINE - 6" Spacer/ spade identification as per QP standard
4137 7-33D 12 MECH VSTN-FNFIS 1
FNFIS shall be done
to FNFIS
PIPELINE - 6''
PIPELINE - 6"
4138 7-33D 13
FNFIS
MECH VSTN-FNFIS 1 Redline mark-up drawings shall be submitted
to FNFIS
PIPELINE - 4''
PIPELINE - 4" Pipeline identification board to be provided in
4139 7-34D 1 MECH VSTN-WHTP 1
WHTP-L inside / outside of the fence..
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4140 7-34D 2
WHTP-L
ELEC VSTN-WHTP 1 CP installation shall be completed
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4141 7-34D 3
WHTP-L
CIVIL VSTN-WHTP 1 ROW shall be done as per AFC
H&L to WHTP-L
Separate sign boards to be installed at the entry
PIPELINE - 4''
PIPELINE - 4" point to the ROW from the main road cautioning
4142 7-34D 4 CIVIL VSTN-WHTP 1
WHTP-L the private vehicles that the road usage is
H&L to WHTP-L
restricted only to QP and authorized vehicles.
PIPELINE - 4''
PIPELINE - 4" All test packs 'B' punch items shall be cleared &
4143 7-34D 5 MECH VSTN-WHTP 1
WHTP-L signed off by QP
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4" Housekeeping shall be done throughout the
4144 7-34D 6 CIVIL VSTN-WHTP 1
WHTP-L pipeline ROW
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4" Painting & stenciling shall be done and certified by
4145 7-34D 7 MECH VSTN-WHTP 1
WHTP-L QP-QAC.
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4" Stenciling shall be done in all crossings / culverts
4146 7-34D 8 MECH VSTN-WHTP 1
WHTP-L inlet & outlet
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4147 7-34D 9
WHTP-L
CIVIL VSTN-WHTP 1 All supports shall be checked for proper seating
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4"
4148 7-34D 10
WHTP-L
CIVIL VSTN-WHTP 1 All crossings shall be reinstated properly
H&L to WHTP-L
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4"
4151 7-34D 13
WHTP-L
MECH VSTN-WHTP 1 Redline mark-up drawings shall be submitted
H&L to WHTP-L
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4152 7-37C 1 MECH VSTN-FNDS to 1
FNDS inside / outside of the fence..
FNDS
PIPELINE - 4''
PIPELINE - 4''
4153 7-37C 2
FNDS
ELEC VSTN-FNDS to 1 CP installation shall be completed
FNDS
PIPELINE - 4''
PIPELINE - 4''
4154 7-37C 3
FNDS
CIVIL VSTN-FNDS to 1 ROW shall be done as per AFC
FNDS
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4156 7-37C 5 MECH VSTN-FNDS to 1
FNDS signed off by QP
FNDS
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4157 7-37C 6 CIVIL VSTN-FNDS to 1
FNDS pipeline ROW
FNDS
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4158 7-37C 7 MECH VSTN-FNDS to 1
FNDS QP-QAC.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4159 7-37C 8 MECH VSTN-FNDS to 1
FNDS inlet & outlet
FNDS
PIPELINE - 4''
PIPELINE - 4''
4160 7-37C 9
FNDS
CIVIL VSTN-FNDS to 1 All supports shall be checked for proper seating
FNDS
PIPELINE - 4''
PIPELINE - 4''
4161 7-37C 10
FNDS
CIVIL VSTN-FNDS to 1 All crossings shall be reinstated properly
FNDS
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4165 7-39C 1 MECH VSTN-WHTP-A 1
WHTP-A inside / outside of the fence..
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4166 7-39C 2
WHTP-A
ELEC VSTN-WHTP-A 1 CP installation shall be completed
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4167 7-39C 3
WHTP-A
CIVIL VSTN-WHTP-A 1 ROW shall be done as per AFC
to WHTP-A
Separate sign boards to be installed at the entry
PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4168 7-39C 4 CIVIL VSTN-WHTP-A 1
WHTP-A the private vehicles that the road usage is
to WHTP-A
restricted only to QP and authorized vehicles.
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4169 7-39C 5 MECH VSTN-WHTP-A 1
WHTP-A signed off by QP
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4170 7-39C 6 CIVIL VSTN-WHTP-A 1
WHTP-A pipeline ROW
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4171 7-39C 7 MECH VSTN-WHTP-A 1
WHTP-A QP-QAC.
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4172 7-39C 8 MECH VSTN-WHTP-A 1
WHTP-A inlet & outlet
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4173 7-39C 9
WHTP-A
CIVIL VSTN-WHTP-A 1 All supports shall be checked for proper seating
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4174 7-39C 10
WHTP-A
CIVIL VSTN-WHTP-A 1 All crossings shall be reinstated properly
to WHTP-A
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4176 7-39C 12 MECH VSTN-WHTP-A 1
WHTP-A shall be done
to WHTP-A
PIPELINE - 4''
PIPELINE - 4''
4177 7-39C 13
WHTP-A
MECH VSTN-WHTP-A 1 Redline mark-up drawings shall be submitted
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4178 7-40C 1 MECH VSTN-WHTP-B 1
WHTP-B inside / outside of the fence..
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4179 7-40C 2
WHTP-B
ELEC VSTN-WHTP-B 1 CP installation shall be completed
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4180 7-40C 3
WHTP-B
CIVIL VSTN-WHTP-B 1 ROW shall be done as per AFC
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4182 7-40C 5 MECH VSTN-WHTP-B 1
WHTP-B signed off by QP
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4183 7-40C 6 CIVIL VSTN-WHTP-B 1
WHTP-B pipeline ROW
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4184 7-40C 7 MECH VSTN-WHTP-B 1
WHTP-B QP-QAC.
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4185 7-40C 8 MECH VSTN-WHTP-B 1
WHTP-B inlet & outlet
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4186 7-40C 9
WHTP-B
CIVIL VSTN-WHTP-B 1 All supports shall be checked for proper seating
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4187 7-40C 10
WHTP-B
CIVIL VSTN-WHTP-B 1 All crossings shall be reinstated properly
to WHTP-B
PIPELINE - 4''
PIPELINE - 4''
4190 7-40C 13
WHTP-B
MECH VSTN-WHTP-B 1 Redline mark-up drawings shall be submitted
to WHTP-B
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4191 7-41C 1 MECH VSTN-KSFGSS 1
WHTP-C inside / outside of the fence..
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4192 7-41C 2
WHTP-C
ELEC VSTN-KSFGSS 1 CP installation shall be completed
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4193 7-41C 3
WHTP-C
CIVIL VSTN-KSFGSS 1 ROW shall be done as per AFC
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4195 7-41C 5 MECH VSTN-KSFGSS 1
WHTP-C signed off by QP
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4196 7-41C 6 CIVIL VSTN-KSFGSS 1
WHTP-C pipeline ROW
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4197 7-41C 7 MECH VSTN-KSFGSS 1
WHTP-C QP-QAC.
to WHTP-C
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4198 7-41C 8 MECH VSTN-KSFGSS 1
WHTP-C inlet & outlet
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4199 7-41C 9
WHTP-C
CIVIL VSTN-KSFGSS 1 All supports shall be checked for proper seating
to WHTP-C
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4''
4200 7-41C 10
WHTP-C
CIVIL VSTN-KSFGSS 1 All crossings shall be reinstated properly
to WHTP-C
PIPELINE - 4'' Sufficient overlapping shall be done for wrapping
PIPELINE - 4''
4201 7-41C 11
WHTP-C
MECH VSTN-KSFGSS 1 for road crossings section transition areas (UG/AG
to WHTP-C intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4202 7-41C 12 MECH VSTN-KSFGSS 1
WHTP-C shall be done
to WHTP-C
PIPELINE - 4''
PIPELINE - 4''
4203 7-41C 13
WHTP-C
MECH VSTN-KSFGSS 1 Redline mark-up drawings shall be submitted
to WHTP-C
PIPELINE - 12''
PIPELINE - Pipeline identification board to be provided in
4204 7-42B 1 MECH VSTN-KNMP 1
12'' KNMP inside / outside of the fence..
to KNMP
PIPELINE - 12''
PIPELINE -
4205 7-42B 2
12'' KNMP
ELEC VSTN-KNMP 1 CP installation shall be completed
to KNMP
PIPELINE - 12''
PIPELINE -
4206 7-42B 3
12'' KNMP
CIVIL VSTN-KNMP 1 ROW shall be done as per AFC
to KNMP
PIPELINE - 12''
PIPELINE - All test packs 'B' punch items shall be cleared &
4208 7-42B 5 MECH VSTN-KNMP 1
12'' KNMP signed off by QP
to KNMP
PIPELINE - 12''
PIPELINE - Housekeeping shall be done throughout the
4209 7-42B 6 CIVIL VSTN-KNMP 1
12'' KNMP pipeline ROW
to KNMP
PIPELINE - 12''
PIPELINE - Painting & stenciling shall be done and certified by
4210 7-42B 7 MECH VSTN-KNMP 1
12'' KNMP QP-QAC.
to KNMP
PIPELINE - 12''
PIPELINE - Stenciling shall be done in all crossings / culverts
4211 7-42B 8 MECH VSTN-KNMP 1
12'' KNMP inlet & outlet
to KNMP
PIPELINE - 12''
PIPELINE -
4212 7-42B 9
12'' KNMP
CIVIL VSTN-KNMP 1 All supports shall be checked for proper seating
to KNMP
PIPELINE - 12''
PIPELINE -
4213 7-42B 10
12'' KNMP
CIVIL VSTN-KNMP 1 All crossings shall be reinstated properly
to KNMP
PIPELINE - 12'' Sufficient overlapping shall be done for wrapping
PIPELINE -
4214 7-42B 11
12'' KNMP
MECH VSTN-KNMP 1 for road crossings section transition areas (UG/AG
to KNMP intersection)
PIPELINE - 12''
PIPELINE - Spacer/ spade identification as per QP standard
4215 7-42B 12 MECH VSTN-KNMP 1
12'' KNMP shall be done
to KNMP
PIPELINE - 12''
PIPELINE -
4216 7-42B 13
12'' KNMP
MECH VSTN-KNMP 1 Redline mark-up drawings shall be submitted
to KNMP
PIPELINE - 12''
PIPELINE - Pipeline identification board to be provided in
4217 7-43B 1 MECH VSTN-FNLGCS 1
12'' FNLGCS inside / outside of the fence..
to FNLGCS
PIPELINE - 12''
PIPELINE -
4218 7-43B 2
12'' FNLGCS
ELEC VSTN-FNLGCS 1 CP installation shall be completed
to FNLGCS
PIPELINE - 12''
PIPELINE -
4219 7-43B 3
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 ROW shall be done as per AFC
to FNLGCS
Separate sign boards to be installed at the entry
PIPELINE - 12''
PIPELINE - point to the ROW from the main road cautioning
4220 7-43B 4 CIVIL VSTN-FNLGCS 1
12'' FNLGCS the private vehicles that the road usage is
to FNLGCS
restricted only to QP and authorized vehicles.
PIPELINE - 12''
PIPELINE - All test packs 'B' punch items shall be cleared &
4221 7-43B 5 MECH VSTN-FNLGCS 1
12'' FNLGCS signed off by QP
to FNLGCS
PIPELINE - 12''
PIPELINE - Housekeeping shall be done throughout the
4222 7-43B 6 CIVIL VSTN-FNLGCS 1
12'' FNLGCS pipeline ROW
to FNLGCS
PIPELINE - 12''
PIPELINE - Painting & stenciling shall be done and certified by
4223 7-43B 7 MECH VSTN-FNLGCS 1
12'' FNLGCS QP-QAC.
to FNLGCS
PIPELINE - 12''
PIPELINE - Stenciling shall be done in all crossings / culverts
4224 7-43B 8 MECH VSTN-FNLGCS 1
12'' FNLGCS inlet & outlet
to FNLGCS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 12''
PIPELINE -
4225 7-43B 9
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 All supports shall be checked for proper seating
to FNLGCS
PIPELINE - 12''
PIPELINE -
4226 7-43B 10
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 All crossings shall be reinstated properly
to FNLGCS
PIPELINE - 12'' Sufficient overlapping shall be done for wrapping
PIPELINE -
4227 7-43B 11
12'' FNLGCS
MECH VSTN-FNLGCS 1 for road crossings section transition areas (UG/AG
to FNLGCS intersection)
PIPELINE - 12''
PIPELINE - Spacer/ spade identification as per QP standard
4228 7-43B 12 MECH VSTN-FNLGCS 1
12'' FNLGCS shall be done
to FNLGCS
PIPELINE - 12''
PIPELINE -
4229 7-43B 13
12'' FNLGCS
MECH VSTN-FNLGCS 1 Redline mark-up drawings shall be submitted
to FNLGCS
PIPELINE - 4''
PIPELINE - 4'' Pipeline identification board to be provided in
4230 7-44B 1 MECH VSTN-WHTP- 1
WHTP-G inside / outside of the fence..
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4''
4231 7-44B 2
WHTP-G
ELEC VSTN-WHTP- 1 CP installation shall be completed
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4''
4232 7-44B 3
WHTP-G
CIVIL VSTN-WHTP- 1 ROW shall be done as per AFC
E&G to WHTP-G
Separate sign boards to be installed at the entry
PIPELINE - 4''
PIPELINE - 4'' point to the ROW from the main road cautioning
4233 7-44B 4 CIVIL VSTN-WHTP- 1
WHTP-G the private vehicles that the road usage is
E&G to WHTP-G
restricted only to QP and authorized vehicles.
PIPELINE - 4''
PIPELINE - 4'' All test packs 'B' punch items shall be cleared &
4234 7-44B 5 MECH VSTN-WHTP- 1
WHTP-G signed off by QP
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4'' Housekeeping shall be done throughout the
4235 7-44B 6 CIVIL VSTN-WHTP- 1
WHTP-G pipeline ROW
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4'' Painting & stenciling shall be done and certified by
4236 7-44B 7 MECH VSTN-WHTP- 1
WHTP-G QP-QAC.
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4'' Stenciling shall be done in all crossings / culverts
4237 7-44B 8 MECH VSTN-WHTP- 1
WHTP-G inlet & outlet
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4''
4238 7-44B 9
WHTP-G
CIVIL VSTN-WHTP- 1 All supports shall be checked for proper seating
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4''
4239 7-44B 10
WHTP-G
CIVIL VSTN-WHTP- 1 All crossings shall be reinstated properly
E&G to WHTP-G
PIPELINE - 4'' Sufficient overlapping shall be done for wrapping
PIPELINE - 4''
4240 7-44B 11
WHTP-G
MECH VSTN-WHTP- 1 for road crossings section transition areas (UG/AG
E&G to WHTP-G intersection)
PIPELINE - 4''
PIPELINE - 4'' Spacer/ spade identification as per QP standard
4241 7-44B 12 MECH VSTN-WHTP- 1
WHTP-G shall be done
E&G to WHTP-G
PIPELINE - 4''
PIPELINE - 4''
4242 7-44B 13
WHTP-G
MECH VSTN-WHTP- 1 Redline mark-up drawings shall be submitted
E&G to WHTP-G
PIPELINE - 6''
PIPELINE - 6'' Pipeline identification board to be provided in
4243 7-45B 1 MECH VSTN-FSDS 1
FSDS inside / outside of the fence..
to FSDS
PIPELINE - 6''
PIPELINE - 6''
4244 7-45B 2
FSDS
ELEC VSTN-FSDS 2 CP installation shall be completed
to FSDS
PIPELINE - 6''
PIPELINE - 6''
4245 7-45B 3
FSDS
CIVIL VSTN-FSDS 1 ROW shall be done as per AFC
to FSDS
Separate sign boards to be installed at the entry
PIPELINE - 6''
PIPELINE - 6'' point to the ROW from the main road cautioning
4246 7-45B 4 CIVIL VSTN-FSDS 1
FSDS the private vehicles that the road usage is
to FSDS
restricted only to QP and authorized vehicles.
PIPELINE - 6''
PIPELINE - 6'' All test packs 'B' punch items shall be cleared &
4247 7-45B 5 MECH VSTN-FSDS 1
FSDS signed off by QP
to FSDS
PIPELINE - 6''
PIPELINE - 6'' Housekeeping shall be done throughout the
4248 7-45B 6 CIVIL VSTN-FSDS 1
FSDS pipeline ROW
to FSDS
PIPELINE - 6''
PIPELINE - 6'' Painting & stenciling shall be done and certified by
4249 7-45B 7 MECH VSTN-FSDS 1
FSDS QP-QAC.
to FSDS
PIPELINE - 6''
PIPELINE - 6'' Stenciling shall be done in all crossings / culverts
4250 7-45B 8 MECH VSTN-FSDS 1
FSDS inlet & outlet
to FSDS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 6''
PIPELINE - 6''
4251 7-45B 9
FSDS
CIVIL VSTN-FSDS 1 All supports shall be checked for proper seating
to FSDS
PIPELINE - 6''
PIPELINE - 6''
4252 7-45B 10
FSDS
CIVIL VSTN-FSDS 1 All crossings shall be reinstated properly
to FSDS
PIPELINE - 6'' Sufficient overlapping shall be done for wrapping
PIPELINE - 6''
4253 7-45B 11
FSDS
MECH VSTN-FSDS 1 for road crossings section transition areas (UG/AG
to FSDS intersection)
PIPELINE - 6''
PIPELINE - 6'' Spacer/ spade identification as per QP standard
4254 7-45B 12 MECH VSTN-FSDS 1
FSDS shall be done
to FSDS
PIPELINE - 6''
PIPELINE - 6''
4255 7-45B 13
FSDS
MECH VSTN-FSDS 1 Redline mark-up drawings shall be submitted
to FSDS
4260 7-38C 5 FMDS CIVIL ALL 1 Old fence near BV-0231 to be removed
4261 7-38C 6 FMDS MECH ALL 1 14" line painting /touch up near SDV
4262 7-38C 7 FMDS MECH ALL 1 4" vent line touch-up painting
4263 7-38C 8 FMDS MECH ALL 1 4" vent line cold insulation
4264 7-38C 9 FMDS MECH ALL 1 4" vent line purging B/V to be provided
4267 7-38C 12 FMDS MECH ALL 1 Z- 4040 SRV outlet to be connected to vent line.
PIPELINE -
PIPELINE - 36'' Kilometer not mention on K.M post at entire pipe
4268 7-35C 1 36" STN U TO CIVIL 1
STN-U to STN-N line.
N
PIPELINE -
PIPELINE - 36'' Pipe line service name not mention on service tag
4269 7-35C 2 36" STN U TO CIVIL 1
STN-U to STN-N post at entire pipe line.
N
PIPELINE -
PIPELINE - 36'' Not provided warning sign and goal post for Over
4270 7-35C 3 36" STN U TO CIVIL 1
STN-U to STN-N head line at K.M 2.3
N
PIPELINE -
PIPELINE - 36'' ROW construction to be completed at back side of
4271 7-35C 4 36" STN U TO CIVIL 1
STN-U to STN-N valve station FSDGS
N
PIPELINE -
PIPELINE - 36'' Not provided safety guard on C.P reference electro
4272 7-35C 5 36" STN U TO ELEC 1
STN-U to STN-N test post.
N
PIPELINE -
PIPELINE - 36'' Near K.M 6.9 (Point-N fence) K.M marker post &
4273 7-35C 6 36" STN U TO CIVIL 1
STN-U to STN-N service name tag post not installed.
N
PIPELINE -
PIPELINE - 36''
4274 7-35C 7 36" STN U TO MECH
STN-U to STN-N
1 Stenciling job to be carried out at entire pipeline.
N
PIPELINE - 4''
PIPELINE - 4'' Above ground 4" entire pipeline painting job is
4275 7-37D 1 MECH VSTN-FNDS to 1
FNDS remaining.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Kilometer not mention on K.M post at entire pipe
4276 7-37D 2 CIVIL VSTN-FNDS to 1
FNDS line.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Pipe line service name not mention on service tag
4277 7-37D 3 MECH VSTN-FNDS to 1
FNDS post at entire pipe line.
FNDS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4'' Near FNDS fence missed pipe support to be
4278 7-37D 4 MECH VSTN-FNDS to 1
FNDS installed.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Near FNDS fence one sleeper pipe support not
4279 7-37D 5 MECH VSTN-FNDS to 1
FNDS touch with pipe line.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Near FNDS culvert area one pipe support not
4280 7-37D 6 MECH VSTN-FNDS to 1
FNDS touch with pipe line.
FNDS
PIPELINE - 4'' 4" under ground pipeline near FNLGS road
PIPELINE - 4''
4281 7-37D 7
FNDS
ELEC VSTN-FNDS to 1 crossing area 2 Nos. CP test post tag to be
FNDS installed.
PIPELINE - 4''
PIPELINE - 4'' Crash barrier to be provided on each expansion
4282 7-37D 8 CIVIL VSTN-FNDS to 1
FNDS loop at ROW side. (12" pipeline)
FNDS
PIPELINE - 4''
PIPELINE - 4'' Near FNLGS valve station road crossing crash
4283 7-37D 9 CIVIL VSTN-FNDS to 1
FNDS barrier is incomplete. (Culvert)
FNDS
PIPELINE - 12''
PIPELINE - Above ground 4" entire pipeline painting job is
4284 7-43C 1 MECH VSTN-FNLGCS 1
12'' FNLGCS remaining.
to FNLGCS
PIPELINE - 12''
PIPELINE - Kilometer not mention on K.M post at entire pipe
4285 7-43C 2 CIVIL VSTN-FNLGCS 1
12'' FNLGCS line.
to FNLGCS
PIPELINE - 12''
PIPELINE - Pipe line service name not mention on service tag
4286 7-43C 3 MECH VSTN-FNLGCS 1
12'' FNLGCS post at entire pipe line.
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNDS fence missed pipe support to be
4287 7-43C 4 MECH VSTN-FNLGCS 1
12'' FNLGCS installed.
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNDS fence one sleeper pipe support not
4288 7-43C 5 MECH VSTN-FNLGCS 1
12'' FNLGCS touch with pipe line.
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNDS culvert area one pipe support not
4289 7-43C 6 MECH VSTN-FNLGCS 1
12'' FNLGCS touch with pipe line.
to FNLGCS
PIPELINE - 12'' 4" under ground pipeline near FNLGS road
PIPELINE -
4290 7-43C 7
12'' FNLGCS
ELEC VSTN-FNLGCS 1 crossing area 2 Nos. CP test post tag to be
to FNLGCS installed.
PIPELINE - 12''
PIPELINE - Crash barrier to be provided on each expansion
4291 7-43C 8 CIVIL VSTN-FNLGCS 1
12'' FNLGCS loop at ROW side. (12" pipeline)
to FNLGCS
PIPELINE - 12''
PIPELINE - Near FNLGS valve station road crossing crash
4292 7-43C 9 CIVIL VSTN-FNLGCS 1
12'' FNLGCS barrier is incomplete. (Culvert)
to FNLGCS
PIPELINE - 12''
PIPELINE - Kilometer not mention on K.M post at entire pipe
4293 7-42C 1 CIVIL VSTN-KNMP to 1
12'' KNMP line.
KNMP
PIPELINE - 12''
PIPELINE - Pipe line service name not mention on service tag
4294 7-42C 2 CIVIL VSTN-KNMP to 1
12'' KNMP post at entire pipe line.
KNMP
PIPELINE - 12''
PIPELINE -
4295 7-42C 3
12'' KNMP
MECH VSTN-KNMP to 1 Stenciling job to be carried out at entire pipeline.
KNMP
PIPELINE - 12''
PIPELINE - Above ground 12" entire pipeline painting job is
4296 7-42C 4 MECH VSTN-KNMP to 1
12'' KNMP remaining.
KNMP
PIPELINE - 12''
PIPELINE - C.P test post name tag to be installed at all road
4297 7-42C 5 ELEC VSTN-KNMP to 1
12'' KNMP crossing areas.
KNMP
PIPELINE - 12''
PIPELINE - Road crossing crash barrier to be installed near
4298 7-42C 6 CIVIL VSTN-KNMP to 1
12'' KNMP KNMP valve station
KNMP
PIPELINE - 12''
PIPELINE - Road crossing identification post installation is
4299 7-42C 7 CIVIL VSTN-KNMP to 1
12'' KNMP incomplete.
KNMP
PIPELINE - 4''
PIPELINE - 4'' Kilometer not mention on K.M post at entire pipe
4300 7-44C 1 CIVIL VSTN-E&G to 1
WHTP-G line.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Pipe line service name not mention on service tag
4301 7-44C 2 CIVIL VSTN-E&G to 1
WHTP-G post at entire pipe line.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Near Khuff G plant one sleeper support not touch
4302 7-44C 3 CIVIL VSTN-E&G to 1
WHTP-G with pipe line.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Above ground 4" entire pipeline painting job is
4303 7-44C 4 MECH VSTN-E&G to 1
WHTP-G remaining.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4304 7-44C 5
WHTP-G
MECH VSTN-E&G to 1 Stenciling job to be carried out at entire pipeline.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' C.P test post name tag to be installed at all road
4305 7-44C 6 ELEC VSTN-E&G to 1
WHTP-G crossing areas.
KHUFF-G
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4'' Identification post to be installed road crossing
4306 7-44C 7 CIVIL VSTN-E&G to 1
WHTP-G area near E&G valve station area.
KHUFF-G
PIPELINE - 6''
PIPELINE - 6'' Above ground 6" entire pipeline painting job is
4307 7-45C 1 MECH VSTN-FSDS to 1
FSDS remaining.
FSDS
PIPELINE - 6''
PIPELINE - 6'' C.P test post name tag to be installed at all road
4308 7-45C 2 ELEC VSTN-FSDS to 1
FSDS crossing areas.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4309 7-45C 3
FSDS
CIVIL VSTN-FSDS to 1 K.M post to be installed at entire pipe line.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Pipe line service tag post to be installed at entire
4310 7-45C 4 CIVIL VSTN-FSDS to 1
FSDS pipe line.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4311 7-45C 5
FSDS
MECH VSTN-FSDS to 1 Stenciling job to be carried out at entire pipeline.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Crash barrier to be provided on each expansion
4312 7-45C 6 CIVIL VSTN-FSDS to 1
FSDS loop at ROW side.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Not provided warning sign and goal post for Over
4313 7-45C 7 CIVIL VSTN-FSDS to 1
FSDS head electric line.
FSDS
PIPELINE - 6''
PIPELINE - 6'' ROW construction to be completed at entire line,
4314 7-45C 8 CIVIL VSTN-FSDS to 1
FSDS including culvert construction.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Crash barrier to be provided on each road crossing
4315 7-45C 9 CIVIL VSTN-FSDS to 1
FSDS area.
FSDS
PIPELINE - 4''
PIPELINE - 4''
4316 7-39D 1
WHTP-A
CIVIL VSTN-KUFF-A 1 House keeping to be carried out.
to KUFF-A
PIPELINE - 4''
PIPELINE - 4''
4317 7-39D 2
WHTP-A
MECH VSTN-KUFF-A 1 Line identification to be done.
to KUFF-A
PIPELINE - 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4318 7-39D 3 MECH VSTN-KUFF-A 1
WHTP-A damaged areas of the pipe & anchor.
to KUFF-A
PIPELINE - 4''
PIPELINE - 4''
4319 7-40D 1
WHTP-B
CIVIL VSTN-KUFF-B 1 House keeping to be carried out.
to KUFF-B
PIPELINE - 4''
PIPELINE - 4''
4320 7-40D 2
WHTP-B
MECH VSTN-KUFF-B 1 Line identification to be done.
to KUFF-B
PIPELINE - 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4321 7-40D 3 MECH VSTN-KUFF-B 1
WHTP-B damaged areas of the pipe & anchor.
to KUFF-B
PIPELINE - 4''
PIPELINE - 4''
4322 7-41D 1
WHTP-C
CIVIL KUFF-C to 1 House keeping to be carried out.
VSTN-KSFGSS
PIPELINE - 4''
PIPELINE - 4''
4323 7-41D 2
WHTP-C
MECH KUFF-C to 1 Line identification to be done.
VSTN-KSFGSS
PIPELINE - 4''
PIPELINE - 4'' Touch up painting to be done for all weld joints and
4324 7-41D 3 MECH KUFF-C to 1
WHTP-C damaged areas of the pipe & anchor.
VSTN-KSFGSS
PIPELINE - 4''
PIPELINE - 4''
4325 7-41D 4
WHTP-C
CIVIL KUFF-C to 1 Grouting to be done for Anchor support.
VSTN-KSFGSS
PIPELINE - 6''
4326 7-9F 1 FMDS MECH VSTN-FMDS 1 Pipe line welding joints painting not completed.
(NEW)
PIPELINE - 6''
4327 7-9F 2 FMDS MECH VSTN-FMDS 1 Identification & Stenciling not completed.
(NEW)
PIPELINE - 6''
House keeping around wellhead area to be done
4328 7-9F 3 FMDS MECH VSTN-FMDS 1
(NEW) properly.
PIPELINE -
PIPELINE - 36'' OHL high restriction goalposts and associated
4329 7-35D 1.01 36" STN U TO CIVIL 1
STN-U to STN-N works to be done.
N
PIPELINE -
PIPELINE - 36'' Apply touch up paint on pipes, supports and pole
4330 7-35D 1.02 36" STN U TO CIVIL 1
STN-U to STN-N markers.
N
PIPELINE -
PIPELINE - 36'' Bundwall to be reinstated/completed as per AFC
4331 7-35D 1.03 36" STN U TO CIVIL 1
STN-U to STN-N and SOW.
N
PIPELINE - Provide appropriate grouts for kilometer, pipeline
PIPELINE - 36''
4332 7-35D 1.04 36" STN U TO CIVIL
STN-U to STN-N
1 warning markers and CP box/post's concrete
N foundation.
PIPELINE -
PIPELINE - 36'' All exposed concrete plinths to be coated with
4333 7-35D 1.05 36" STN U TO CIVIL 1
STN-U to STN-N epoxy paint.
N
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE -
PIPELINE - 36'' ROW and approaches to be completed and free
4334 7-35D 1.06 36" STN U TO CIVIL 1
STN-U to STN-N form any obstructions wherever necessary.
N
PIPELINE -
PIPELINE - 36'' Pipe concrete slab protection lifting hooks to be
4335 7-35D 1.07 36" STN U TO CIVIL 1
STN-U to STN-N sealed with appropriate materials.
N
PIPELINE -
PIPELINE - 36''
4336 7-35D 1.08 36" STN U TO CIVIL
STN-U to STN-N
1 Pole markers to be completed.
N
PIPELINE -
PIPELINE - 36''
4337 7-35D 1.09 36" STN U TO CIVIL
STN-U to STN-N
1 Rock cap to be reinstated/completed properly.
N
PIPELINE -
PIPELINE - 36'' Extend buried pipe wrapping at least 1.00 meter
4338 7-35D 1.10 36" STN U TO MECH 1
STN-U to STN-N behind from the ground.
N
PIPELINE -
PIPELINE - 36'' Check and modify beam along sabkha area as per
4339 7-35D 1.11 36" STN U TO CIVIL 1
STN-U to STN-N AFC and SOW.
N
PIPELINE -
PIPELINE - 36''
4340 7-35D 1.12 36" STN U TO CIVIL
STN-U to STN-N
1 Remove any temporary installations.
N
PIPELINE -
PIPELINE - 36''
4341 7-35D 1.13 36" STN U TO MECH
STN-U to STN-N
1 Rectify the chainlink fence collar plate apertures.
N
PIPELINE -
PIPELINE - 36'' Debris and other excess construction materials to
4342 7-35D 1.14 36" STN U TO CIVIL 1
STN-U to STN-N be removed from site.
N
PIPELINE - 6''
PIPELINE - 6'' OHL high restriction goalposts and associated
4343 7-45D 2.01 CIVIL VSTN-FSDS to 1
FSDS works to be done.
FSDS
PIPELINE - 6''
PIPELINE - 6'' All exposed concrete plinths to be coated with
4344 7-45D 2.02 CIVIL VSTN-FSDS to 1
FSDS epoxy paint.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Slopes outside culvert to be protected with stone
4345 7-45D 2.03 CIVIL VSTN-FSDS to 1
FSDS pitching wherever necessary.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Reinstate/reposition any disturbed existing
4346 7-45D 2.04 CIVIL VSTN-FSDS to 1
FSDS concrete barriers.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Extend buried pipe wrapping at least 1.00 meter
4347 7-45D 2.05 MECH VSTN-FSDS to 1
FSDS behind from the ground.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4348 7-45D 2.06
FSDS
CIVIL VSTN-FSDS to 1 Crash barriers to be provided for the loop.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4349 7-45D 2.07
FSDS
CIVIL VSTN-FSDS to 1 Fix the loop pipe sleepers properly leveled.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Apply touch up paint on pipe, supports and pole
4350 7-45D 2.08 MECH VSTN-FSDS to 1
FSDS markers.
FSDS
PIPELINE - 6''
PIPELINE - 6'' New culverts and associated works to be
4351 7-45D 2.09 CIVIL VSTN-FSDS to 1
FSDS completed.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4352 7-45D 2.10
FSDS
CIVIL VSTN-FSDS to 1 ROW as per AFC and SOW to be completed.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4353 7-45D 2.11
FSDS
CIVIL VSTN-FSDS to 1 Pole markers to be completed.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Provide appropriate grouts for kilometer and
4354 7-45D 2.12 CIVIL VSTN-FSDS to 1
FSDS pipeline warning marker's concrete foundation.
FSDS
PIPELINE - 6'' Surrounds 2.00 Nos. PGB (pipe guide before
PIPELINE - 6''
4355 7-45D 2.13
FSDS
CIVIL VSTN-FSDS to 1 bends) foundations need to be backfilled and
FSDS compacted.
PIPELINE - 6'' Gap between pipe concrete slab protection and
PIPELINE - 6''
4356 7-45D 2.14
FSDS
CIVIL VSTN-FSDS to 1 asphalt road cutted to be filled with bituminous
FSDS base/wearing course properly.
PIPELINE - 6''
PIPELINE - 6'' All exposed concrete plinths to be coated with
4357 7-45D 2.15 CIVIL VSTN-FSDS to 1
FSDS epoxy paint.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4358 7-45D 2.16
FSDS
CIVIL VSTN-FSDS to 1 Remove any temporary installations.
FSDS
PIPELINE - 6''
PIPELINE - 6''
4359 7-45D 2.17
FSDS
MECH VSTN-FSDS to 1 Rectify the chainlink fence collar plate apertures.
FSDS
PIPELINE - 6''
PIPELINE - 6'' Debris and other excess construction materials to
4360 7-45D 2.18 CIVIL VSTN-FSDS to 1
FSDS be removed from site.
FSDS
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4361 7-37E 1.01 MECH FNLGCS to 1
FNDS markers.
FNDS
PIPELINE - 4''
PIPELINE - 4''
4362 7-37E 1.02
FNDS
CIVIL FNLGCS to 1 Install road crash barrier at both ends of culvert.
FNDS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4'' Culvert faces to be properly covered with plywood
4363 7-37E 1.03 CIVIL FNLGCS to 1
FNDS to avoid sand intrusion.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Install stone pitching at surrounding bell mouth at
4364 7-37E 1.04 CIVIL FNLGCS to 1
FNDS both ends of culvert.
FNDS
PIPELINE - 4'' Remove concrete paving at culvert crossing and
PIPELINE - 4''
4365 7-37E 1.05
FNDS
CIVIL FNLGCS to 1 re-instate asphalt laying as per QCS road
FNDS specification.
PIPELINE - 4''
PIPELINE - 4'' Pipe line should be properly placed on the
4366 7-37E 1.06 CIVIL FNLGCS to 1
FNDS supports at culvert.
FNDS
PIPELINE - 4'' Provide appropriate grouts for kilometer, pipe line
PIPELINE - 4''
4367 7-37E 1.07
FNDS
CIVIL FNLGCS to 1 warning markers and CP box/post's concrete
FNDS foundations.
PIPELINE - 4''
PIPELINE - 4'' Remove all construction materials and site
4368 7-37E 1.08 CIVIL FNLGCS to 1
FNDS clearance.
FNDS
PIPELINE - 4''
PIPELINE - 4''
4369 7-37E 5.01
FNDS
CIVIL FNLGCS to 1 Remove all construction materials.
FNDS
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4370 7-37E 5.02 MECH FNLGCS to 1
FNDS markers.
FNDS
PIPELINE - 4''
PIPELINE - 4'' All exposed concrete plinths to be coated with
4371 7-37E 5.03 CIVIL FNLGCS to 1
FNDS epoxy paint.
FNDS
PIPELINE - 4''
PIPELINE - 4''
4372 7-37E 5.04
FNDS
CIVIL FNLGCS to 1 General site clearance.
FNDS
PIPELINE - 12''
PIPELINE - Crash barrier installation to be completed at all
4373 7-43D 2.01 CIVIL VSTN-FNLGCS 1
12'' FNLGCS culverts.
to FNLGCS
PIPELINE - 12''
PIPELINE - Remove drift sand, grade, level and compact
4374 7-43D 2.02 CIVIL VSTN-FNLGCS 1
12'' FNLGCS embankment at culvert near valve station.
to FNLGCS
PIPELINE - 12''
PIPELINE - Install stone pitching at surrounding bell mouth at
4375 7-43D 2.03 CIVIL VSTN-FNLGCS 1
12'' FNLGCS both ends of culvert.
to FNLGCS
PIPELINE - 12''
PIPELINE - Culvert faces to be properly covered with plywood
4376 7-43D 2.04 CIVIL VSTN-FNLGCS 1
12'' FNLGCS to avoid sand intrusion.
to FNLGCS
PIPELINE - 12''
PIPELINE -
4377 7-43D 2.05
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 Complete pipe support epoxy coating at culverts.
to FNLGCS
PIPELINE - 12''
PIPELINE - Remove the excess/unwanted materials from in
4378 7-43D 2.06 CIVIL VSTN-FNLGCS 1
12'' FNLGCS and around the culverts.
to FNLGCS
PIPELINE - 12'' Provide appropriate grouts for kilometer, pipeline
PIPELINE -
4379 7-43D 2.07
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 warning markers and CP box/post's concrete
to FNLGCS foundation.
PIPELINE - 12''
PIPELINE -
4380 7-43D 2.08
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 Crash barriers to be provided for the loops.
to FNLGCS
PIPELINE - 12''
PIPELINE - Debris and other excess construction materials to
4381 7-43D 2.09 CIVIL VSTN-FNLGCS 1
12'' FNLGCS be removed from site.
to FNLGCS
PIPELINE - 12''
PIPELINE -
4382 7-43D 5.01
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 Remove all construction materials.
to FNLGCS
PIPELINE - 12''
PIPELINE - Apply touch up paint on pipe, supports and pole
4383 7-43D 5.02 MECH VSTN-FNLGCS 1
12'' FNLGCS markers.
to FNLGCS
PIPELINE - 12''
PIPELINE - All exposed concrete plinths to be coated with
4384 7-43D 5.03 CIVIL VSTN-FNLGCS 1
12'' FNLGCS epoxy paint.
to FNLGCS
PIPELINE - 12''
PIPELINE -
4385 7-43D 5.04
12'' FNLGCS
CIVIL VSTN-FNLGCS 1 General site clearance.
to FNLGCS
PIPELINE - 4''
PIPELINE - 4'' Install stone pitching at surrounding bell mouth at
4386 7-44D 3.01 CIVIL VSTN-E&G to 1
WHTP-G both ends of culvert.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Install road crash barrier at culverts and track road
4387 7-44D 3.02 CIVIL VSTN-E&G to 1
WHTP-G crossing.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4388 7-44D 3.03
WHTP-G
CIVIL VSTN-E&G to 1 Pole markers to be completed.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Grade, level and compact pipe crossing area at
4389 7-44D 3.04 CIVIL VSTN-E&G to 1
WHTP-G track road.
KHUFF-G
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE - 4''
PIPELINE - 4'' Complete protection barrier works at pipe line
4390 7-44D 3.05 CIVIL VSTN-E&G to 1
WHTP-G crossing.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Pipe supports to be aligned properly wherever
4391 7-44D 3.06 CIVIL VSTN-E&G to 1
WHTP-G necessary.
KHUFF-G
PIPELINE - 4'' Provide appropriate grouts for kilometer, pipe line
PIPELINE - 4''
4392 7-44D 3.07
WHTP-G
CIVIL VSTN-E&G to 1 warning markers and CP box/post's concrete
KHUFF-G foundations.
PIPELINE - 4''
PIPELINE - 4'' Culvert faces to be properly covered with plywood
4393 7-44D 3.08 CIVIL VSTN-E&G to 1
WHTP-G to avoid sand intrusion.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4394 7-44D 3.09 MECH VSTN-E&G to 1
WHTP-G markers.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Remove all construction materials and site
4395 7-44D 3.10 CIVIL VSTN-E&G to 1
WHTP-G clearance.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4396 7-44D 5.01
WHTP-G
CIVIL VSTN-E&G to 1 Remove all construction materials.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' Apply touch up paint on pipe, supports and pole
4397 7-44D 5.02 CIVIL VSTN-E&G to 1
WHTP-G markers.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4'' All exposed concrete plinths to be coated with
4398 7-44D 5.03 CIVIL VSTN-E&G to 1
WHTP-G epoxy paint.
KHUFF-G
PIPELINE - 4''
PIPELINE - 4''
4399 7-44D 5.04
WHTP-G
CIVIL VSTN-E&G to 1 General site clearance.
KHUFF-G
PIPELINE - 12''
PIPELINE -
4400 7-42D 4.01
12'' KNMP
CIVIL VSTN-KNMP to 1 Pole markers to be completed.
KNMP
PIPELINE - 12''
PIPELINE -
4401 7-42D 4.02
12'' KNMP
CIVIL VSTN-KNMP to 1 Anchor support cracks to be repaired.
KNMP
PIPELINE - 12''
PIPELINE - Crash barrier installation to be completed at army
4402 7-42D 4.03 CIVIL VSTN-KNMP to 1
12'' KNMP road crossing.
KNMP
PIPELINE - 12''
PIPELINE - Apply touch up paint on pipe, supports and pole
4403 7-42D 4.04 MECH VSTN-KNMP to 1
12'' KNMP markers.
KNMP
PIPELINE - 12''
PIPELINE - Complete protection barrier works at pipe line
4404 7-42D 4.05 CIVIL VSTN-KNMP to 1
12'' KNMP crossing.
KNMP
PIPELINE - 12''
PIPELINE - Pipe concrete slab protection lifting hooks to be
4405 7-42D 4.06 CIVIL VSTN-KNMP to 1
12'' KNMP sealed with appropriate materials.
KNMP
PIPELINE - 12''
PIPELINE - ROW to be completed as per SOW and
4406 7-42D 4.07 CIVIL VSTN-KNMP to 1
12'' KNMP specification.
KNMP
PIPELINE - 12''
PIPELINE -
4407 7-42D 4.08
12'' KNMP
MECH VSTN-KNMP to 1 Provide chinlink fence collar plate aperture.
KNMP
PIPELINE - 12''
PIPELINE - Extend crash barrier to protect QP pipe lines at
4408 7-42D 4.09 CIVIL VSTN-KNMP to 1
12'' KNMP asphalt road.
KNMP
PIPELINE - 12''
PIPELINE -
4409 7-42D 5.01
12'' KNMP
CIVIL VSTN-KNMP to 1 Remove all construction materials.
KNMP
PIPELINE - 12''
PIPELINE - Apply touch up paint on pipe, supports and pole
4410 7-42D 5.02 MECH VSTN-KNMP to 1
12'' KNMP markers.
KNMP
PIPELINE - 12''
PIPELINE - All exposed concrete plinths to be coated with
4411 7-42D 5.03 CIVIL VSTN-KNMP to 1
12'' KNMP epoxy paint.
KNMP
PIPELINE - 12''
PIPELINE -
4412 7-42D 5.04
12'' KNMP
CIVIL VSTN-KNMP to 1 General site clearance.
KNMP
Road marking and traffic sign board to be provided
4413 7-30C 1 UMMBAB-B CIVIL UBMS-B 1
as per requirement.
Rectification required for the damaged kerb stone
4414 7-30C 2 UMMBAB-B CIVIL UBMS-B 1
and painting to be done.
4415 7-30C 3 UMMBAB-B CIVIL UBMS-B 1 Joint sealant to be provided for the kerb stone.
4416 7-30C 4 UMMBAB-B CIVIL UBMS-B 1 Shoulder to be provided for the road both sides.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4431 7-30C 19 UMMBAB-B CIVIL UBMS-B 1 Painting to be done for the doors.
4433 7-30C 21 UMMBAB-B CIVIL UBMS-B 1 Joint sealant to be provided for the external wall.
4440 7-5F 2 FSP MECH ALL 1 To fix all missing valve wheels and handle.
4444 7-5F 6 FSP MECH ALL 1 One bolt of air volume is loose.
4446 7-5F 8 FSP INST ALL 1 To correct tag description of TI-0825 and TI-0826.
4447 7-5F 9 FSP MECH ALL 1 To fix missing clamps on drain line.
4448 7-5F 10 FSP MECH ALL 1 Handle of BV-7217 to be oriented to east side.
4451 7-5F 13 FSP MECH ALL 1 Z-4042 name plate is not clear.
4452 7-5F 14 FSP MECH ALL 1 To provide Z-4042 door with handle.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4453 7-5F 15 FSP INST ALL 1 To provide drain pipe for PI-5066.
4456 7-5F 18 FSP MECH ALL 1 Impact wall is not as per existing.
4461 7-5F 23 FSP MECH ALL 1 To fix missing accoustic insulation on 6'' flare line.
4463 7-5F 25 FSP MECH ALL 1 Provide ramp over 14'' line D/S of SDV-0087
4464 7-5F 26 FSP MECH ALL 1 Provide inst air line clamps with rubber packing.
Pig Launcher
4472 7-8L 3 STATION-N MECH
Area
1 Remove temporary scaffolding.
Pig Launcher
4473 7-8L 4 STATION-N MECH
Area
1 Apply paint on all the structural members.
Pig Launcher
4476 7-8L 7 STATION-N CIVIL
Area
1 General cleaning to be done.
VAL STN 1-
4477 7-9G 8
FMDS
MECH ALL 1 Apply paint on all the structural members.
VAL STN 1-
4478 7-9G 9
FMDS
MECH ALL 1 Remove temporary scaffolding.
VAL STN 1-
4479 7-9G 10
FMDS
MECH ALL 1 General cleaning to be done.
Pig Launcher
4480 7-5G 11 FSP MECH
Area
1 Apply paint on all the structural members.
Pig Launcher
4481 7-5G 12 FSP MECH
Area
1 Remove temporary scaffolding.
Pig Launcher
4482 7-5G 13 FSP MECH
Area
1 General cleaning to be done.
VAL STN 2-
4483 7-9D1 14
FMDS
CIVIL ALL 1 Grade and compact around the station properly.
VAL STN 2- Provide and fix ring at the location of pipe entry
4484 7-9D1 15 MECH ALL 1
FMDS through fence.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN 2-
4485 7-9D1 16
FMDS
MECH ALL 1 Remove temporary scaffolding.
PIPELINE - 4"
PIPELINE - 4"
4488 7-34E 19
WHTP-L
MECH VSTN-H&L to 1 Complete the painting of pipes.
WHTP-L
PIPELINE - 4"
PIPELINE - 4" Apply paint on concrete supports wherever
4489 7-34E 20 CIVIL VSTN-H&L to 1
WHTP-L necessary.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4490 7-34E 21
WHTP-L
CIVIL VSTN-H&L to 1 Rectify the damaged surface of concrete support.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4491 7-34E 22
WHTP-L
MECH VSTN-H&L to 1 Apply paint on all the structural members.
WHTP-L
PIPELINE - 4"
PIPELINE - 4" Removal all construction debris and boulders from
4492 7-34E 23 CIVIL VSTN-H&L to 1
WHTP-L beneath the pipe line.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4493 7-34E 24
WHTP-L
MECH VSTN-H&L to 1 Remove temporary scaffolding.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4494 7-34E 25
WHTP-L
CIVIL VSTN-H&L to 1 Complete the installation of identification marker.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4495 7-34E 26
WHTP-L
MECH VSTN-H&L to 1 Complete the stenciling on pipes.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4496 7-34E 27
WHTP-L
CIVIL VSTN-H&L to 1 Grade and compact the area wherever necessary.
WHTP-L
PIPELINE - 4"
PIPELINE - 4"
4497 7-34E 28
WHTP-L
CIVIL VSTN-H&L to 1 General cleaning to be done.
WHTP-L
PIPELINE - 6"
PIPELINE - 6" Complete the stenciling of identification marker and
4498 7-33E 29 CIVIL VSTN-FNFIS to 1
FNFIS warning marker.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Apply structural paint on pipes and structural
4499 7-33E 30 MECH VSTN-FNFIS to 1
FNFIS members.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4500 7-33E 31
FNFIS
CIVIL VSTN-FNFIS to 1 Apply paint on concrete supports.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4501 7-33E 32
FNFIS
CIVIL VSTN-FNFIS to 1 Grade and compact the area wherever necessary.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Complete the covering of culvert mouth on both
4502 7-33E 33 CIVIL VSTN-FNFIS to 1
FNFIS sides with plywood to avoid the sand intrusion.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4503 7-33E 34
FNFIS
CIVIL VSTN-FNFIS to 1 Grade backfill and compact the road batter properly.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4504 7-33E 35
FNFIS
CIVIL VSTN-FNFIS to 1 Protect the culvert mouths thru stone pitching.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Complete the re-instatement of asphalt road above
4505 7-33E 36 CIVIL VSTN-FNFIS to 1
FNFIS the culvert.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Remove the extended part of flexcell board below
4506 7-33E 37 CIVIL VSTN-FNFIS to 1
FNFIS the culvert units.
FNFIS
PIPELINE - 6"
PIPELINE - 6" Remove the unwanted construction materials from
4507 7-33E 38 CIVIL VSTN-FNFIS to 1
FNFIS site.
FNFIS
PIPELINE - 6"
PIPELINE - 6"
4508 7-33E 39
FNFIS
CIVIL VSTN-FNFIS to 1 General cleaning to be completed.
FNFIS
4509 7-38D 14 FMDS CIVIL ALL 1 Grade and compact around the station properly.
PIPELINE -
4514 7-32D 1
12" N TO FSP
CIVIL ALL 1 Final bund/ berm shall be completed as per AFC
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE -
4517 7-32D 4
12" N TO FSP
MECH ALL 2 Location identification markers shall be installed
PIPELINE - All test packs 'B' punch items shall be cleared &
4518 7-32D 5 MECH ALL 1
12" N TO FSP signed off by QP
PIPELINE - Housekeeping shall be done throughout the
4519 7-32D 6 CIVIL ALL 1
12" N TO FSP pipeline ROW
PIPELINE - Interlock facility for pig traps shall be provided as
4520 7-32D 7 MECH ALL 2
12" N TO FSP per QP standard.
PIPELINE -
4521 7-32D 8
12" N TO FSP
MECH ALL 1 Pig trolley stopper to be installed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
33kv switchgear
4541 7-30D 3.01 UMMBAB-B ELEC 33-SB-3304 1 First aid box to be provided inside S/S
(General)
33kv switchgear
4542 7-30D 3.02 UMMBAB-B ELEC 33-SB-3304 1 33kv SLD drawing board to be provided inside S/S
(General)
33kv switchgear
For 33kv S/S cable trench access, permanent
4543 7-30D 3.03 UMMBAB-B ELEC 33-SB-3304 1
(General) ladder to be provided inside trench.
33kv switchgear
Aldrop latch to be provided for S/S single door for
4544 7-30D 3.04 UMMBAB-B ELEC 33-SB-3304 1
(General) padlocking.
33kv switchgear
4545 7-30D 3.05 UMMBAB-B ELEC 33-SB-3304 1 Identification labels to be provided for all S/S doors.
(General)
33kv switchgear
S/S boundary wall bottom area all holes to be
4546 7-30D 3.06 UMMBAB-B ELEC 33-SB-3304 1
(General) covered.
33kv switchgear
S/S chequered plates needs painting, marking &
4547 7-30D 3.07 UMMBAB-B ELEC 33-SB-3304 1
(General) provide correct size.
33kv switchgear
All testing works needs to complete (for cable,
4548 7-30D 3.08 UMMBAB-B ELEC 33-SB-3304 1
(General) swgr, relays & earth pits) as per QP standard.
33kv switchgear
S/S lighting, sockets & external lighting needs to
4549 7-30D 3.09 UMMBAB-B ELEC 33-SB-3304 1
(General) test.
33kv switchgear
4550 7-30D 3.10 UMMBAB-B ELEC 33-SB-3304 1 S/S fire alarm system needs to test.
(General)
33kv switchgear
4551 7-30D 3.11 UMMBAB-B ELEC 33-SB-3304 1 S/S HVAC unit needs to test.
(General)
33kv switchgear
Complete set of updated schematic drawings to be
4552 7-30D 3.12 UMMBAB-B ELEC 33-SB-3304 1
(General) provided inside S/S.
33kv switchgear
4553 7-30D 3.13 UMMBAB-B ELEC 33-SB-3304 1 Operating tool stand to be provided.
(General)
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
4569 7-15I 2
WHTP H&L
MECH ALL 2 Valves shall be greased for smooth operation.
4574 7-1G 2 FNDS MECH ALL 2 Valves shall be greased for smooth operation.
4579 7-2I 2 FNFIS MECH ALL 2 Valves shall be greased for smooth operation.
4582 7-3F 2 FNLGCS MECH ALL 2 Valves shall be greased for smooth operation.
4586 7-4G 2 FSDS MECH ALL 2 Valves shall be greased for smooth operation.
4590 7-5H 2 FSP MECH ALL 2 Valves shall be greased for smooth operation.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4595 7-8N 2 STATION-N MECH ALL 2 Valves shall be greased for smooth operation.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4646 7-19I 2 WHTP-H MECH ALL 2 Valves shall be greased for smooth operation.
4650 7-20I 2 WHTP-L MECH ALL 2 Valves shall be greased for smooth operation.
4654 7-21J 2 WHTP-A MECH ALL 2 Valves shall be greased for smooth operation.
4657 7-22J 2 WHTP-B MECH ALL 2 Valves shall be greased for smooth operation.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4661 7-23J 2 WHTP-C MECH ALL 2 Valves shall be greased for smooth operation.
4665 7-24J 2 WHTP-D MECH ALL 2 Valves shall be greased for smooth operation.
4669 7-25R 2 STATION-U MECH ALL 2 Valves shall be greased for smooth operation.
4681 7-27F 2 WHTP E MECH ALL 2 Valves shall be greased for smooth operation.
4687 7-28G 2 WHTP G MECH ALL 2 Valves shall be greased for smooth operation.
4692 7-31L 2 KSFGSS MECH ALL 2 Valves shall be greased for smooth operation.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4700 7-36C 2 KNMP MECH ALL 2 Valves shall be greased for smooth operation.
4705 7-38E 2 FMDS MECH ALL 2 Valves shall be greased for smooth operation.
6'' Pipeline
Loose soil to be removed, provide good material
4716 7-31M 8 KSFGSS CIVIL KSFGSS to 1
KMDS and compact it properly for TXU-005.
6'' Pipeline
4717 7-31M 9 KSFGSS CIVIL KSFGSS to 1 Crossing marker pole to be provided at TXU-004.
KMDS
6'' Pipeline
Removal of unwanted materials and house
4718 7-31M 10 KSFGSS CIVIL KSFGSS to 1
KMDS keeping shall be done.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN VAL STN WHTP- Pressure gage 5A-PI-0001 to be calibrate and
4727 7-16K 1 INST 1
WHTP-A A calibration sticker and certificate shall be provided.
VAL STN VAL STN WHTP- Pressure gage 5A-PI-0001 to be calibrate and
4739 7-17L 1 INST 1
WHTP-B B calibration sticker and certificate shall be provided.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN VAL STN WHTP- Pressure gage 5A-PI-0001 to be calibrate and
4751 7-18M 1 INST 1
WHTP-D D calibration sticker and certificate shall be provided.
VAL STN VAL STN WHTP Pressure gage 5A-PI-0001 to be calibrate and
4763 7-15K 1 INST 1
WHTP H&L H&L calibration sticker and certificate shall be provided.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN VAL STN WHTP Pressure gage 5A-PI-0001 to be calibrate and
4775 7-14L 1 INST 1
WHTP E&G E&G calibration sticker and certificate shall be provided.
VAL STN
4789 7-10K 3
FNFIS
INST VAL STN FNFIS 1 Analog barrier labelling bo be done as per drg.
VAL STN
4790 7-10K 4
FNFIS
INST VAL STN FNFIS 1 Panel Lamp shall be provided inside RTU panel.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
4813 7-12K 3
FSDS
INST VAL STN FSDS 1 Analog barrier labelling bo be done as per drg.
VAL STN
4814 7-12K 4
FSDS
INST VAL STN FSDS 1 Panel Lamp shall be provided inside RTU panel.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
VAL STN
4825 7-13L 3
KNMP
INST VAL STN KNMP 1 Analog barrier labelling bo be done as per drg.
VAL STN
4826 7-13L 4
KNMP
INST VAL STN KNMP 1 Panel Lamp shall be provided inside RTU panel.
Substation
For KVM switch permanent power supply with
4827 7-30E 1 UMMBAB-B ELEC Control system 1
(SCS) circuit breaker shall be provided.
Substation
Spare 2 Nos. 230V AC power socket shall be
4828 7-30E 2 UMMBAB-B ELEC Control system 1
(SCS) provided near operator work station.
4839 7-36E 3 KNMP INST KNMP 1 Analog barrier labelling bo be done as per drg.
4840 7-36E 4 KNMP INST KNMP 1 Panel Lamp shall be provided inside RTU panel.
As per revised drawing DGEN-2-54-0001, battery
4841 7Q 1 DPS/DESAL ELEC DPS/DESAL 2 shall be Ni-CD vented pocket plate type, where as
the installed bateries are VRLA type.
As per specification ( DGEN-2-14-0014, Page No-
21) the controller shall be provided with low voltage
dis connection from the load when the battery
4842 7Q 2 DPS/DESAL ELEC DPS/DESAL 2
voltage falls below -10% of nominal voltage.Where
as in actual the low voltage contact is configured
as a alarm contact only.
The manufacturer data sheet for installed battery
details shall be provided . The details such as
4843 7Q 3 DPS/DESAL ELEC DPS/DESAL 2
DOD, cut off voltage and cycle life shall be clearly
mentioned.
As per specification ( Section 2.12.4, Page -25)
4844 7Q 4 DPS/DESAL ELEC DPS/DESAL 2 short circuit and over load load protection shall be
provided for Solar panel and Load.
Manuals, manufacturer data sheet and test
4845 7Q 5 DPS/DESAL ELEC DPS/DESAL 1 certificates shall be provided for all installed
devices.
Special tools for programming Tri loop device,
4846 7Q 6 DPS/DESAL INST DPS/DESAL 1 PLC, charge regulator and calibration of variable
flow transmitter shall be provided.
Data sheet for battery and solar panel enclosure
4847 7Q 7 DPS/DESAL ELEC DPS/DESAL 1
shall be provided.
4848 7Q 8 DPS/DESAL INST DPS/DESAL 1 SPIR for Solar and RTU panels shall be provided.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4851 7R 3 DPS/DESAL INST DPS/DESAL 1 Analog barrier labelling bo be done as per drg.
4852 7R 4 DPS/DESAL INST DPS/DESAL 1 Panel Lamp shall be provided inside RTU panel.
Loop check for 13-GDF-12-001, 002 & 003: When fault comes,
4873 7-4H 21 FSDS INST DCS,ESD, 2 indication on graphic is not changing to purple
Himatrix & F&G color but stay healthy.
Loop check for
Loop drawing: On Sheet 7, the actual relay number
4874 7-4H 22 FSDS INST DCS,ESD, 2
Himatrix & F&G used is to be corrected/updated.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
Loop check for All intertrip signals to/from ESD & F&G system
4877 7-4H 25 FSDS INST DCS,ESD, 2 need to be tested and confirmed when the plant is
Himatrix & F&G down.
4878 7-8O 1 STATION-N INST STATION-N 1 61-I-JB-F-0420/421JB tag to be replaced.
61-GDF-06-0001 cable tag should be the only
4879 7-8O 2 STATION-N INST STATION-N 1
cable tag in drawing / in field is the only tag.
4880 7-8O 3 STATION-N INST STATION-N 1 61-FDI-06-0001,2 JB tag to be corrected.
Panel-61-FGP-6103 with TB6A tag not required
4881 7-8O 4 STATION-N INST STATION-N 1
cable no: follow existing
Panel-61-FGP-6103 termination cable tag is too
4882 7-8O 5 STATION-N INST STATION-N 1 long & cannot see it is cover in cable tray, thus
useless.
Panel FGP-6103 override switch D1 is ok but lamp
4883 7-8O 6 STATION-N INST STATION-N 1 does not show in drawing. Lamp output in drawing
to be added.
Override switch cable log not fixed properly, found
4884 7-8O 7 STATION-N INST STATION-N 1
loose.
61-GDF-06-0001 H/HH alarm not configured in
4885 7-8O 8 STATION-N INST STATION-N 1
scada local.
Scada face plate in override condition alarm does
4886 7-8O 9 STATION-N INST STATION-N 1
not appear in face plate / alarm summary.
DCS face plate trend should be enabled /
4887 7-8O 10 STATION-N INST STATION-N 1
seamless.
DCS device icon H alarm indication appears while
4888 7-8O 11 STATION-N INST STATION-N 1
reconnecting the device.
DCS face plate alarm/event: HH alarm does not
4889 7-8O 12 STATION-N INST STATION-N 1
appear in tag 61-GDF-0002,3.
DCS 61-GDF-0007 o/r put on alarm appears in
alarm & event with time on but o/r removing act to
4890 7-8O 13 STATION-N INST STATION-N 1
rechange ok but timing not config. Both timing o/r
on/off are same.
61-FGP-6102 & 6103 panel o/r switch tag not in
4891 7-8O 14 STATION-N INST STATION-N 1
sequence, to be corrected.
61-FGP-6102 & 6103 o/r switch tag to be fixed as
4892 7-8O 15 STATION-N INST STATION-N 1
existing material.
61-GDT-0001 scada faceplate scale range analog
4893 7-8O 16 STATION-N INST STATION-N 1
value unit is %, to be changed to ppm.
Fire & gas layout page's device icon arrow to have
4894 7-8O 17 STATION-N INST STATION-N 1
confirmed direction.
61-FDI-06-0001, 2, 3, 4 alarm icon colour
4895 7-8O 18 STATION-N INST STATION-N 1 appeared red in B but yellow in D & loc, to be
changed to red.
G&E chart line no. 8 tax tag to be changed from
4896 7-8O 19 STATION-N INST STATION-N 1
SIR-0001 to XL-0001
G&E chart hard copy should match with DCS soft
4897 7-8O 20 STATION-N INST STATION-N 1
copy.
SIR-06-0001, XL-06-0001 & 0002 light/siren
4898 7-8O 21 STATION-N INST STATION-N 1
direction should be towards plant - N/S to E/W.
SIR-06-0002, XL-06-0003,4 light/siren direction
should be towards plant as above, and pole to be
4899 7-8O 22 STATION-N INST STATION-N 1
relocated to centre of W side, currently in NW
corner.
61-MAC-06-0002/01 (condition) eng to be changed
4900 7-8O 23 STATION-N INST STATION-N 1
to alarm in alarm summary page.
61-MAC-06-0002 during o/r active alarm is
4901 7-8O 24 STATION-N INST STATION-N 1 appearing in faceplate while other GDF/GDT/FDI
does not have same philosophy.
61-GDT-06-0001, 2, 3 calibration not found ok.
4902 7-8O 25 STATION-N INST STATION-N 1 Device 90 ppm, cylinder 25 ppm & DCS/scada
indication is 12 ppm. Needs recalibration.
Page E&D overview-1 (ESD common reset) icon
4903 7-8O 26 STATION-N INST STATION-N 1
should be provided on each ESD valve page.
Follow up loop tag sequence: SDV-0271 & TX 61-
PI-0271 A/B/C ok, SDV-0273 & TX 61-PI-0275
4904 7-8O 27 STATION-N INST STATION-N 1
A/B/C ?, SDV-0274 & TX 61-PI-0276 A/B/C ?,
SDV-0272 & TX 61-PI-0274 A/B/C ?
61-PI-0274 A/B/C TX to be provided a page link for
4905 7-8O 28 STATION-N INST STATION-N 1
SDV-0272
61-PI-272 A/B/C/D/E HH alarm to be configured in
4906 7-8O 29 STATION-N INST STATION-N 1
graphic tag icon.
Scada faceplate & graphic all low/high alarm
4907 7-8O 30 STATION-N INST STATION-N 1
should be yellow & low low high high red.
61-PIC-273A-E dotter line TX connection to be
4908 7-8O 31 STATION-N INST STATION-N 1
corrected.
Panel 61-SC-0271 all perole to be corrected as per
4909 7-8O 32 STATION-N INST STATION-N 1
red line loop drawing.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4927 7-8O 50 STATION-N INST STATION-N 1 61-PI-0276 A/B/C (2003) signal line to be corrected.
61-MOV-0286 & 0287 in between shows nothing.
4928 7-8O 51 STATION-N INST STATION-N 1
Press going to flare. In graphic
Khuff gas tie in header existing tag are blind and
4929 7-8O 52 STATION-N INST STATION-N 1
alarm. Should be displayed with signal.
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
4964 7-8O 87 STATION-N INST STATION-N 1 Test push button to be added lamp.
61-ESD-0002 buzzer alarm to be removed from
4965 7-8O 88 STATION-N INST STATION-N 1
alarm summary page.
4966 7-8O 89 STATION-N INST STATION-N 1 61-LSH-272 to add level setting in alarm text.
Scada server control information page to be
4967 7-25S 1 STATION-U INST STATION-U 1
configured in UBMS-A
62-LI-0003 face plate EU should be written unit not
4968 7-25S 2 STATION-U INST STATION-U 1
1750 also add % scale in bar graph
4969 7-25S 3 STATION-U INST STATION-U 1 History trend not responding
62-LCP-0014 for ESOV-0014 TB 1 termination 1-
4970 7-25S 4 STATION-U INST STATION-U 1
12 tags to be fixed
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
5066 7-25T 39 STATION-U INST STATION-U 2 SL & SI not activating for MAC-05-0005/0006
5067 7-25T 40 STATION-U INST STATION-U 2 Hydrogen sensor Hi alarm color should be red.
62-HD-05-001/002 while override alarm not getting
5068 7-25T 41 STATION-U INST STATION-U 2
in mimic.
Zone 5 & 6 Heat detection not added in mimic
5069 7-25T 42 STATION-U INST STATION-U 2
page.
In SCADA MIMIC matrix page should be configure
5070 7-25T 43 STATION-U INST STATION-U 2
all the zone alarms.
All the Switches and Lamps should be Traffolyte
5071 7-25T 44 STATION-U INST STATION-U 2
tagged.
GDF 20% Confirmed alarm triggers 50% confirmed
5072 7-25T 45 STATION-U INST STATION-U 2 alarm (STUFNG62GDF0038288) also should
rectify.
GDF 20% Confirmed alarm appears when one
5073 7-25T 46 STATION-U INST STATION-U 2
GDF in Hi alarm.
5074 7-25T 47 STATION-U INST STATION-U 2 SDV Trip alarm should be "SDV-0014 Trip"
5075 7-25T 48 STATION-U INST STATION-U 2 Partial stroke 10% close alarm not available.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
5140 7-31N 19 KSFGSS INST KSFGSS 2 PSL for 55-SDV-0004 still not working
5146 7-31N 25 KSFGSS INST KSFGSS 2 HSSD fault status not generate on mimic panel
5147 7-31N 26 KSFGSS INST KSFGSS 2 While MOV on local selection fault alarm is appear.
PIPELINE- 18''
PIPELINE - Grouting and epoxy coating to be done for installed
5148 7-46A 1 CIVIL STATION-N to 1
18'' crossing marker pole from station-N to KSFGSS
KSFGSS
PIPELINE- 18''
PIPELINE - ROW to be provided from station-N to RXA-003 as
5149 7-46A 2 CIVIL STATION-N to 1
18'' per shown in the AFC drawing.
KSFGSS
PIPELINE- 18'' Removal of temporary protectionslab and re-instate
PIPELINE -
5150 7-46A 3
18''
CIVIL STATION-N to 1 the existing bound ofor pipe line near PXU-002 &
KSFGSS PXU-003
PIPELINE- 18''
PIPELINE - Unwanted materials to be removed and properly
5151 7-46A 4 CIVIL STATION-N to 1
18'' level the area from Station-N to RXS-001
KSFGSS
PIPELINE- 18''
PIPELINE - Epoxy coating to be done for the installed CP ost
5152 7-46A 5 CIVIL STATION-N to 1
18'' foundation from station-N to KSFGSS
KSFGSS
PIPELINE- 18'' Bound height to be maintained as per the dawing
PIPELINE -
5153 7-46A 6
18''
CIVIL STATION-N to 1 requirement min 1.00 m forom natural grade for the
KSFGSS trench area.
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5154 7-46A 7
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXS-
KSFGSS 001 to RXE-002
PIPELINE- 18''
PIPELINE - Installation of Kilometer marker pole shall be
5155 7-46A 8 CIVIL STATION-N to 1
18'' completed from Station-N to KSFGSS
KSFGSS
PIPELINE- 18''
PIPELINE - Rectification of the ROW and proper slope to be
5156 7-46A 9 CIVIL STATION-N to 1
18'' rpovided for the side of ROW at Sabkha area
KSFGSS
PIPELINE- 18''
PIPELINE - Bund open area at CP location to be re-instated
5157 7-46A 10 CIVIL STATION-N to 1
18'' from Station-N to KSFGSS
KSFGSS
Bund height to be maintained as per the drawing
PIPELINE- 18''
PIPELINE - requirmentnt min. 1.00m. From the top of pipe at
5158 7-46A 11 CIVIL STATION-N to 1
18'' chainage from 0+377 to 1+550 for the sabkha
KSFGSS
area
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5159 7-46A 12
18''
CIVIL STATION-N to 1 materials and housekeeping to be done form RXE-
KSFGSS 002 to RXA-007
PIPELINE- 18'' Rectification for the existing track crossing and
PIPELINE -
5160 7-46A 13
18''
CIVIL STATION-N to 1 installation of crossing marker pole to be done at
KSFGSS TXU-001
PIPELINE- 18'' Installation of crash barreier and embankment
PIPELINE -
5161 7-46A 14
18''
CIVIL STATION-N to 1 protection to be done for the culvert from station-N
KSFGSS to KSFGSS
PIPELINE- 18'' End of culvert mouth both sides to be coated and
PIPELINE -
5162 7-46A 15
18''
CIVIL STATION-N to 1 covered with marine plywood of minimum
KSFGSS thickness 18mm. From station-N to KSFGSS
PIPELINE- 18'' Lifting hook pocket of protection slab to be filled
PIPELINE -
5163 7-46A 16
18''
CIVIL STATION-N to 1 with appropriate materials for the crossings from
KSFGSS Station-N to KSFGSS
PIPELINE- 18'' Second layer for the ROW wherever required,
PIPELINE -
5164 7-46A 17
18''
CIVIL STATION-N to 1 compaction test and shoulder to be provided for
KSFGSS the trench area of 18'' pipe line.
PIPELINE- 18'' Installation of crossing marker pole and rectification
PIPELINE -
5165 7-46A 18
18''
CIVIL STATION-N to 1 shall be done for the existing track crossing TXU-
KSFGSS 003
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE- 18''
PIPELINE - Re-instatement of existing bund and end cap to be
5189 7-46A 42 CIVIL STATION-N to 1
18'' provided at RXA-018
KSFGSS
PIPELINE- 18''
PIPELINE - Re-instatement for the existing bund to be done at
5190 7-46A 43 CIVIL STATION-N to 1
18'' PXU-009 & PXU-010
KSFGSS
PIPELINE- 18''
PIPELINE - Rectification for track road and crash barrier to be
5191 7-46A 44 CIVIL STATION-N to 1
18'' provided at RXE-004 RXE-005.
KSFGSS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE- 18'' Re-instatement for the marker pole for the existing
PIPELINE -
5216 7-46A 69
18''
CIVIL STATION-N to 1 crosssing & installation of crossing marker pole for
KSFGSS the new track corssing TXU-015 shall be done.
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE- 18''
PIPELINE - ROW shall be provided from PXA-026A to PT-60
5218 7-46A 71 CIVIL STATION-N to 1
18'' as per the drawing.
KSFGSS
PIPELINE- 18'' Backfilling for the identification slab & re-
PIPELINE -
5219 7-46A 72
18''
CIVIL STATION-N to 1 instatement shall be done for the support of
KSFGSS existing above ground pipeline at PXA-026A
PIPELINE- 18'' Rectification of track road & installation of crossing
PIPELINE -
5220 7-46A 73
18''
CIVIL STATION-N to 1 marker pole shall be done at track crossing TXU-
KSFGSS 017
PIPELINE- 18'' Backfilling shall be done for the identification slab
PIPELINE -
5221 7-46A 74
18''
CIVIL STATION-N to 1 of existing above ground pipeline at
KSFGSS PXA-026, PXA-028 & PXA-029
PIPELINE- 18''
PIPELINE - Re-instatement of existing bund, end cap &
5222 7-46A 75 CIVIL STATION-N to 1
18'' crossing marker pole to be provided at RXA-035
KSFGSS
PIPELINE- 18'' Rectification of track crossing & crossing marker
PIPELINE -
5223 7-46A 76
18''
CIVIL STATION-N to 1 pole to be provided at crossing RXE-012 & RXA-
KSFGSS 036
PIPELINE- 18'' Backfilling shall be done for the identification slab
PIPELINE -
5224 7-46A 77
18''
CIVIL STATION-N to 1 of existing above ground pipeline at PXA-030, 031,
KSFGSS 033, 034 & 035
PIPELINE- 18''
PIPELINE - Concrete protection & backfilling shall be done for
5225 7-46A 78 CIVIL STATION-N to 1
18'' the splicing pit near RXE-012
KSFGSS
PIPELINE- 18''
PIPELINE - Backfilling shall be done for the identification slab
5226 7-46A 79 CIVIL STATION-N to 1
18'' at CXU-017 & PXA-036 to 042
KSFGSS
PIPELINE- 18'' Removal of excavated materials, construction
PIPELINE -
5227 7-46A 80
18''
CIVIL STATION-N to 1 materials and housekeeping to be done from RXE-
KSFGSS 011 to KSFGSS
PIPELINE- 18''
PIPELINE - Re-instate the support of existing above ground
5228 7-46A 81 CIVIL STATION-N to 1
18'' pipeline at crossing PXA-001 Chainage 0+360.18
KSFGSS
PIPELINE- 18''
PIPELINE - AJB-1 and AJB-2 variable resistance to be
5233 7-46B 3 ELEC STATION-N to 1
18'' provided.
KSFGSS
PIPELINE- 18''
PIPELINE -
5234 7-46B 4
18''
ELEC STATION-N to 1 Cables at all FBB shall be connected.
KSFGSS
Km chainage has to be reflected on the pipeline
PIPELINE- 18'' Marker Post Need to be rechecked after
PIPELINE -
5235 7-46B 5
18''
ELEC STATION-N to 1 Commissioning ICCP System drawings/location
KSFGSS maps shall be submitted & Submission of final
reports/survey readings
PIPELINE- 18''
PIPELINE -
5236 7-46C 1
18''
MECH STATION-N to 1 Housekeeping to be carried out.
KSFGSS
PIPELINE- 18''
PIPELINE - Line identification to be done and flow direction to
5237 7-46C 2 MECH STATION-N to 1
18'' be marked with arrows.
KSFGSS
PIPELINE- 18''
PIPELINE - Remaining Bund wall & ROW to be constructed as
5238 7-46C 3 MECH STATION-N to 1
18'' per AFC drawing.
KSFGSS
PIPELINE- 18''
PIPELINE -
5239 7-46C 4
18''
MECH STATION-N to 1 Required post to be installed as per drawing .
KSFGSS
PIPELINE- 18''
PIPELINE -
5240 7-46C 5
18''
MECH STATION-N to 1 Km marker post to be installed as per drawing .
KSFGSS
RAISED BY CLEARED BY BCEC ACCEPTED BY QP
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT
PIPELINE- 18''
PIPELINE -
5241 7-46C 6
18''
MECH STATION-N to 1 Crash barrier to be provided at all track crossing.
KSFGSS
PIPELINE- 18''
PIPELINE - Unidentified Pipeline KM and CP posts to be
5242 7-46D 1 MECH STATION-N to 1
18'' stencilled.
KSFGSS
PIPELINE- 18''
PIPELINE - CP-TR-001-N needs to be protected with a Fence
5243 7-46D 2 MECH STATION-N to 1
18'' (Point N-KM.0) and need to be toped up with oil.
KSFGSS
PIPELINE- 18''
PIPELINE - CP-TR-002-KSFGSS needs to be barricaded with
5244 7-46D 3 MECH STATION-N to 1
18'' a fence and need to be top up with oil.
KSFGSS
PIPELINE- 18''
PIPELINE -
5245 7-46D 4
18''
ELEC STATION-N to 1 Folding Box Board cable not connected at KM1.3
KSFGSS
PIPELINE- 18''
PIPELINE - CP and KM posts foundation backfilling
5246 7-46D 5 CIVIL STATION-N to 1
18'' incomplete.
KSFGSS
PIPELINE- 18''
PIPELINE -
5247 7-46D 6
18''
ELEC STATION-N to 1 CP cables to be connected
KSFGSS
PIPELINE- 18''
PIPELINE -
5248 7-46D 7
18''
ELEC STATION-N to 2 CP system to be completed and commissioned
KSFGSS
PIPELINE- 18''
PIPELINE -
5249 7-46D 8
18''
CIVIL STATION-N to 2 Pipeline bund wall to be completed.
KSFGSS
PIPELINE- 18''
PIPELINE -
5250 7-46D 9
18''
CIVIL STATION-N to 2 ROW to be completed as per AFC.
KSFGSS
PIPELINE- 18''
PIPELINE -
5251 7-46D 10
18''
CIVIL STATION-N to 2 Pipeline crossings to be completed as per AFC
KSFGSS
PIPELINE - 4''
PIPELINE - 4''
5252 7-39E 2
WHTP-A
ELEC VSTN-WHTP-A 1 Identification cable tags on all connection calbles.
to WHTP-A
PIPELINE - 4''
PIPELINE - 4'' SFG-4'' Line VSTN-WHTP-A to WHTP-A plant - no
5253 7-39E 3 ELEC VSTN-WHTP-A 1
WHTP-A CP system installed - surfaceline (above ground)
to WHTP-A
PIPELINE - 4''
5260 7-41E 5
PIPELINE - 4''
ELEC WHTP-C to 1
Submission of Final reports/survey readings including
WHTP-C drawings/location maps after the polaraization of system.
KSFGSS
EDD/
SYSTEM / PUNCH CONST QC QC
CONCERN END ACCEPT
REF LIST SUB- LOCATION DISCIPLINE LIST R.CONST R.INITIAL R.DATE CAT. COMPLE C/DATE ACCEPT ACCEP AC/DATE
AREA USE ED BY
SYSTEM TYPE TION ANCE DATE
R CLIENT