Prelude FLNG Project WORKING INSTRUCTIONS

PRELUDE EPCI

Floating LNG PROJECT

WORKING INSTRUCTIONS

Type of Modification to FEED Deliverables:

Type 1 FEED without change


X Type 2 FEED + adaptations
Type 4 New Document

29 30/08/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt


28 17/07/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
27 16/07/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
26 03/07/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
25 25/06/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
24 11/06/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
23 06/06/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
22 05/06/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
21 15/05/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
20 19/04/2013 EPCI - IFE - ISSUED FOR IMPLEMENTATION P.Defrenne C.Napoleoni G.Hatt
Date WRITTEN BY CHECKED BY APPROVED BY
Rev DD/MM/YYYY STATUS
(name & visa) (name & visa) (name & visa)

DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
Prelude FLNG Project
Rev.29
LIST OF PIPING WORK INSTRUCTIONS
60869M-TS00G00000-DI-1300-00001
30/08/2013
Instruction
SUBJECT WI REVISION Issue date
N
1 PIPING LINE NUMBERING 6 11/02/2013
2 PIPING INSTALLATION AROUND END /TOP PUMPS 0 23/08/2011
3 PIPING VALVES ACCESS ATTRIBUT FILLING 0 23/08/2011
4 EQUIPMENT ORIGIN AND COG LOCATION 4 15/03/2013
5 EQUIPMENT MODELLING PROGRESS STATUS (DELETED) 2 05/12/2011
6 PIPING (LINES & EQUIPMENTS) 3D MODELLING PROGRESS STATUS 3 18/06/2012
7 CRYOGENIC LINE INSTALLATION 2 28/06/2013
8 LIMITS ON PEFS 0 23/08/2011
9 PIPE RACKS MODELLING 1 15/06/2012
10 3D MODEL ORIGIN AND COORDINATES SYSTEM 3 15/06/2012
11 PIPING UPSTREAM A SCHOEPENTOETER 3 16/07/2013
12 TAGGING OF TIE-IN POINTS IN PDMS 1 15/06/2012
13 BOP LEVEL OF MAIN DECK LINES 3 19/06/2012
14 HANDLING CORNERS 0 23/08/2011
15 VALVE NAMING 2 15/06/2012
16 PEFS MASTER FOR EPCI 4 15/06/2012
17 WI FOR WORKPROCESS FOR WEIGHT REPORT & COG 2 05/12/2011
18 UTILITY STATION TYPE FOR VARIOUS DECK & EQUIPMENT PLATFORMS 4 27/02/2012
19 DRIP PAN 3 02/10/2012
20 PDMS SPLIT OF INTEGRATION PIECE OF LINES BELOW PROCESS DECK A 4 02/08/2012
21 CANCELLED - HOT SURFACE MANAGEMENT 1 02/10/2012
22 FIRE CASE VALVES MANAGEMENT 1 18/06/2012
23 MODELLING OF SMALL BORE 1 18/06/2012
24 BUTTERFLY VALVE ORIENTATION AT RV INLET 1 15/06/2012
25 FOULING SERVICE 0 15/06/2012
26 STRESS AND SUPPORT FLOW CHART 1 19/03/2013
27 PRIMARY SUPPORT FLOW CHART 0 02/08/2012
28 PIPING LOAD ON VERTICAL STRUCTURAL COLUMN UNDER KLOC MODULE 1 15/03/2013
29 LNG-LPG TOXIC WITH PDS LT-PT-FT WARNING NOTE 1 17/07/2013
30 ECCENTRIC STACKED REDUCERS 0 14/09/2012
31 INSTRUMENT NOZZLE TAGGING 0 02/10/2012
32 VENT TO ATMOSPHERE AND DAVIT 2 03/07/2013
33 CRD NETWORK 0 16/01/2013
34 IA NETWORK- BASE & ALTERNATE CASE 1 11/02/2013
35 GALVANIZATION BATH FOR SPOOL 3 30/08/2013
36 CS+PE LINING LINES 2 11/06/2013
37 VALVES WITH VENT NOT APPEARING ON PID 0 12/04/2013
38 TOWING, SEA FASTENING AND ASSOCIATED PIPING SUPPORT 0 16/04/2013
39 DRIP HOLE MODELING IN PDMS 0 16/04/2013
40 SPRAY NOZZLE FOR DELUGE 0 16/04/2013
41 SS + PTFE LINED 2 11/06/2013
42 LINER and BOLTING for BLIND FLANGES in LR016410X / LR035100Z / 015100Z 1 25/06/2013
43 PIPING GENERAL ARRANGEMENT DRAWINGS SETTINGS 2 16/07/2013
44 DOUBLER PLATE REQUIREMENTS for SUPPORTS STANDARD 1 17/07/2013
45 BOLTING FOR FLARE LINE (specific location for piping class 011492F) 0 16/07/2013
46
47
48
49
50
51
52
53
54
55
57
58
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 1/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

WORKING INSTRUCTION: (PDMS) PIPING 3D MODELLING


Reference to PIPING 3D CAD PROCEDURE 60869-GF00G00000-
PP-00050

1) Line numbering:
The design area and the nominal diameter will be separated by /

CCCCCCC/AAAA-BBB-XXX-YYYYY-EEEEEEEEE-FFF-TT
=> 2P10A/1400-CCW-450-10003-LR011201X-N-01
CCCCCCC/ Design area code. where digit number can change as
per the
area.
AAAA is the Nominal Diameter (DN) as per ISO designation for
nominal pipe size
BBB is the Fluid Code.
XXX is the first three figures from the Unit Number.
YYYYY is the sequence number from 00001 to 99999.
EEEEE is the Piping Class Identification in accordance with DEP
31.38.01.12
DEP 31.38.01.15-Gen. Piping classes digit number may be
composed of 9 d
piping classes with prefix LR.
FFF is the Insulation Code (Refer to Tagging Procedure: 60869M-
GF00G000-PP-0000-
00204)
TT: is the train number.
The train will start with the value of 01 be increased by range of 1
when required.
1S10A/600-CCW-100-10031-LR031201Z-N-01
1S10A/350-CCW-100-71002-LR061201Z-N-01
1S10A/350-CCW-100-71002-LR061201Z-N-02

2) Zone / Design area:


The design area codes will be as described dedicated section in
60869M-GF00G000-PP-0000-
00050)

3) Hierarchy in PDMS:
3-1) Piping modeling

SITE Module/Discipline name


ZONE Module/Discipline name/Process Deck Level (*) / Fluid Code
PIPE Line number
BRAN / (Branch type)
(*) Process Deck Level: PDA or PDB or PDC or PDD (module decks
number)
Example:

SITE 2P10/MP
ZONE 2P10/MP/PDA/FW
PIPE 2P10A/600-FW-600-00002-035100Z-N-01

4) Tagging of lines for COMMISSIONNING:


Lines dedicated to commissioning activities shall be tagged as the
following:

CCCCCCC/AAAA-BBB-XXX-YYYYY-EEEEEEEEE-FFF-TT/COM
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 2/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

Note: Number of decks as illustrated below may do not reflect the exact number of modules decks.
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 3/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

4) Split of lines par deck level within Topsides Modules:

Split of lines within module shall take place at 3m below BOS of process deck as the following:

5) Integration between Topsides Modules:

Refer to 9847D-GF00G00000-PP-000-00050 / 9.1


Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 4/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

6) Piping interface limit between Main Deck and Topsides (for construction):

The following split is valid for all the lines between the Main Deck and the Process Deck A excepet Cargo lines.
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 5/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

7) Piping Split Area in the Main Deck


Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 6/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

8) SHI PDMS 3D Model

SHI (Substructure scope and Topsides scope) PDMS 3D model is available as per the following:

Discipline Name Site Description of SHI Items


Piping MP-SHI Piping
MS-SHI Vessel, Package
MR-SHI Pump, compressor,
Equipment Utility stations for SHI substructure scope, etc
MX-SHI (Utility stations within SHI Topsides scope modelled by TP will be modelled in SB0T/MX)

Safety HS-SHI Escape route, Air vent of W.B tank, Fire fighting , Life saving equipment
Handling BC-SHI Material handling route, Pad eye, Davit, Crane
Support SU-SHI Pipe support
Platform, Ladder, Stair, Manhole, Hatch,, Main Deck of Substructure, Stool, LQ, Fan room,
Structural CS-SHI
Tertiary structure
Electrical EA-SHI MCT, Temporary Cable rack, Electrical cable tray, Instrument cable tray
Instrumentation Instrumentation junction box & Local panel, Instrumentation transmitter, In line instrument, Air
IN-SHI
manifold
HVAC MH-SHI Mechanical vent, Natural vent
Architecture CS AR-SHI LQ, LER
Naval Architecture NZ-SHI Fenders, Chock, Bollard, Winch
Telecom TA-SHI Loudspeaker, Beacons, Junction box
Proposal PO-SHI Alternate studies
General GE-SHI
9) TMS PDMS 3D Model

TMS (Turret) PDMS 3D Model is available as per the following:

Site Zone Description


MP Piping
MR ou MS Rotating or static equipment
BC Material handling route, Pad eye, Davit, Crane
SBOB
HS Escape route, Air vent of W.B tank, Fire fighting , Life saving equipment
NZ Items related to Naval
CS Platform, Ladder, Stair, Manhole, Hatch, etc
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 31/01/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 7/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

10) Equipment modelling:


SITE Module/Discipline name
ZONE Module/Discipline name/Process Deck Level
EQ Equipment TAG

11) Obstruction volume For Equipment Maintenance:


Obstruction volume for maintenance issue shall be modelled as
Hard Volume as follows:

SITE Module/Discipline name


ZONE Module/Discipline name/Process Deck Level
EQ Equipment TAG
SUBE EQ (Equipment Tag) / OB
(Obstruction volume for maintenance)

12) Handling devices modelling


SITE Module/Discipline name
ZONE Module/Discipline name (BC)/Process Deck
Level/ code zone (MT or MX)
EQ (Handling devices tag)
(*) Permanent handling equipment (Monorail, Pad-eye,
Sheave, and Davit) shall be modelled as Structural item
in dedicated Proposal (PO) zone
Example (modelling of Monorail):
SITE 1P10
ZONE 1P10 /BC/MX/PDC
EQ X-MR1P10C03
X-AACCCCCxx

X: Equipment Function Code (valid for all


handling equipment)

AA: Handling device code

CCCCC: Design area (area of service)

xx: Serial number

Equipment Function Code is as per Tagging Procedure: 60869M-GF00-00000-PP-0000-00204


For each permanent handling device, SWL (Safe Work Load) shall be specified for description.
* Design area shall be the same as design area of equipment to be handled.
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 31/01/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 8/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING

13) Modelling of Handling ways & Lay down areas:


Lay-down areas and Handling ways shall be modeled as Hard Volume
as follows:
SITE Module/Discipline name (BC)
ZONE Module/Discipline name (BC)/Process deck level/OB/HW
(for handling way) or LD (for Lay down area)
Area description Zone in PDMS
Handling way BC/Process deck Level (e.g
PDC)/OB/ HW
Lay-down BC/ Process deck Level (e.g
PDA)/OB/LD

14) Modeling of escape ways items related to safety


Escape ways shall be modeled as Hard Volume:
SITE Module/Discipline name (HS)
ZONE Module/Discipline name (HS)/Process deck level/OB
Area description Code in PDMS
Escape way Escape-xx (xx: serial number 01, 02,
etc

15) Structural modeling by piping group:


All modelling related to structural and carried out by piping group shall
be modelled in proposal model:
SITE (1P10,MDLHP, etc)/PO/CS/STUDY/FINAL
Example: {1S20/PO/CS/STUDY}/Stair-case-1 =>
ongoing modelling of stair-case-1 by piping team.
{1S20/PO/CS/FINAL}/Stair-case-1 => finalized modelling
of stair-case-1 which is ready for structural group
approval.
SITE (1P10,MDLHP,etc)/PO/CS/UNSIZ
UNSIZ (Copy by structural group, of PO/CS/FINAL
structural items modelled by piping group)
Structural Item Tag in Example of Hierarchy in PO Site
designation PDMS For structural approval
Handrail HR 1P10/PO/CS/Final/PDA/HR
Stairs STR-XX 1P10/PO/CS/Final/PDA/STR-XX
Stair Tower STTW 1P10/PO/CS/Final/PDA/STTW
Access Platform PLTF 1P10/PO/CS/Final/PDA/PLTF
Horizontal Brace HBRA 1P10/PO/CS/Final/PDA/HBRA
Vertical Brace VBRA 1P10/PO/CS/Final/PDA/VBRA
Ladder LDR-XX 1P10/PO/CS/Final/PDA/LDR-XX
Grating GRTG 1P10/PO/CS/Final/PDA/GRTG

16) Modeling of alternates:


All proposal studies related to piping activities shall be modelled as per
the following:
SITE/PO/MP/Discipline/(STUDY or FINAL):
{1P10/PO/MP/STUDY1}/1P10A/200-FW-600-00008-
013481Z-N => Alternate No.1 for design of 200-FW-600-
00008-013481Z-N in module 1P10 process deck A.
Prelude FLNG Work-Instruction : WI 002
Specific Floating LNG Project Date : 23/08/2011 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 003
Specific Floating LNG Project Date : 23/08/2011 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 004
Specific Floating LNG Project Date : 15/03/2013 Rev :4
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : P. Defrenne
PIPING ENGINEERING Checked by :G.Hatt

WORK INSTRUCTION: EQUIPMENT ORIGIN AND COG LOCATION

COG location and origin have to be setup properly in PDMS during equipment modelling.
These attributes will be used during extraction of DWG and to establish weight report.
Please locate COG as per vendor information
For equipment origin refer to page 2

COG coordinates to be filled


based on equipment origin
COG coordinates to be location
filled based on origin
location

Weight to be filled with information


Weight to be filled with
available on
information available on
Equipment list
Equipment list

Doc number to be filled (60 digits max.) with:


Vendor name and reference available.
Indicate vendor reference revision number .
Prelude FLNG Work-Instruction : WI 004
Specific Floating LNG Project Date : 15/03/2013 Rev :4
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : P. Defrenne
PIPING ENGINEERING Checked by :G.Hatt
Prelude FLNG Work-Instruction : WI 005
Specific Floating LNG Project Date : 05/12/2011 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING

D
E
L
E
T
E
D
Prelude FLNG Work-Instruction : WI 006
Specific Floating LNG Project Date :18/06/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING

PIPING (LINES & EQUIPMENTS) 3D MODELLING PROGRESS STATUS

Piping (lines & equipments) 3D modelling progress within PDMS will be measured, for the Design Area, as per the following:
Refer to 60869M-GF00G00000-DI-0000-00001 for the 3D Model Status Control User Design

60%
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING

WORK INSTRUCTION : CRYOGENIC LINE INSTALLATION

The present Work Instruction covers the minimum guide for piping, in case of Low Temperature Service,
applicable for pEpci Project.

LOW TEMPERATURE PIPING CLASS

Piping classes here below are considered as low temp service.


For insulation thickness refers to line list.

CLASS RATING MATERIAL


013484C 150# RF 316 / 316L
LR013484C 150# RF 316 / 316L
033484C 300# RF 316 / 316L
033484CD 300# RF 316 / 316L
LR033484C 300# RF 316 / 316L
063484C 600# RF 316 / 316L
LR063484C 600# RF 316 / 316L
093484C 900# RF 316 / 316L
033484C2 300# RF 316 / 316L
093485C 900# RF 316 / 316L

2
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 4/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 5/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 6/6
Issued by : P. Defrenne
Checked by :G.Hatt

PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 008
Specific Floating LNG Project Date : 23/08/2011 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 009
Specific Floating LNG Project Date : 15/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : B. HAMADA
Checked by :G.Hatt
PIPING ENGINEERING

Interface Point Interface Point Interface Point

POC **/MP

Line will be modelled upto Interface point By KLOC and then


Continued by POC/COC in Rack portion
Prelude FLNG Work-Instruction : WI 010
Specific Floating LNG Project Date : 15/06/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING

590000 mm
Prelude FLNG Work-Instruction : WI 011
Specific Floating LNG Project Date : 16/07/2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING

Piping upstream a Schoepentoeter

ALL FIGURES REVISED


Piping upstream a Schoepentoeter : Piping upstream a Schoepentoeter:
Ideal configuration Bend in horizontal plane

5D MINI
10D minimum from the
nozzle and the valve 10D of straight length minimum
from the nozzle and5Dthe elbow in
MINI
horizontal plan

Piping upstream a Schoepentoeter : Piping upstreama Schoepentoeter :


Bend in horizontal plane reducer in horizontal plane

10D minimum from the


10D minimum
5D MINI nozzle to 5D
theMINI
reducer

Except for
V-15004 refer to 2000-110-003-TD-PX-10202
V-15003 refer to 2000-110-003-TD-PX-10203
C-15003 refer to 2000-110-003-TD-PX-10204
V-41004A/B refer to 2000-110-003-TD-PX-10205
V-14010/11/12 refer to 2000-110-003-TQ-MP-0028
Prelude FLNG Work-Instruction : WI 011
Specific Floating LNG Project Date : 16/07/2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING

ALL FIGURES REVISED

Piping upstream a Schoepentoeter: Piping upstream a Schoepentoeter:


1 elbow in vertical plane and 1 elbow in horizontal 2 elbows and valve in vertical plane
plane

IF LESS
IF 5D MINI
Developped length 5D
10D
minimum from the nozzle and
the valve
Developped
length
5D MINI

0D

Developped length 10D


minimum from the nozzle and
the elbow in horizontal plane

Piping upstream a Schoepentoeter :


1 reducer after a vertical pipe

10D minimum
5D MINI
Developped
length 10D
minimum from
the nozzle and
Developped
the reducer
length 5D MINI

Except for
C-11002 refer to 2000-140-003-TD-PX-10021
V-14025 refer to 2000-110-003-TD-PX-10385
3
Prelude FLNG Work-Instruction : WI 012
Specific Floating LNG Project Date : 15/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING

Tagging of Tie-in points in PDMS

Rev 1

Rev 1

Rev 1
Prelude FLNG W ork-Instruction : W I 013
Specific Floating LNG Project Date : 19/06/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING

BOP LEVEL OF MAIN DECK LINES


Prelude FLNG W ork-Instruction : W I 013
Specific Floating LNG Project Date : 19/06/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 014
Specific Floating LNG Project Date : 23/08/2011 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : S; DEMARCHELIER
Checked by :G.Hatt
PIPING ENGINEERING

HANDLING CORNERS
Prelude FLNG Work-Instruction : WI 015
Specific Floating LNG Project Date : 15/06/2012 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING

VALVE NAMING

5 Merci de considrer le numro de SP s'il y en a un au lieu du numro de vanne


Please consider the SP number if there is instead of the process valve name
Prelude FLNG Work-Instruction : WI 015
Specific Floating LNG Project Date : 15/06/2012 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING

Example n6 : SPV-XXX and QV-YYY


Prelude FLNG Work-Instruction : WI 016
Specific Floating LNG Project Date : 15/06/2012 Rev :4
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING

PEFS MASTER FOR EPCI

Preambule: cet WI est applicable tous les centres mais doit tre adapte si besoin par les centres (KLOC / COC)
Forenote: this WI is applicalbe to all centers but has to be adapted as necessary (KLOC/COC)

1) Les PIDs (PEFS) EPCI masters papier sont disponibles au format A2, le bordereau rcapitulatif est sur les ronos
PID's (i.e. PEFS) in paper copy are printed in A2 format, the list is available on the cabinet

2) La distribution documentaire est faites avec le PID prcdent avec double barre rose et le nouveau PID
afin de dtecter d'ventuelles erreurs de report.
Distribution is done with the previous one with double pink bar and the new one to detect any eventual
discrepancy in comment reporting

3) Les noms des chefs de groupes sont inscrits sur chaque PID merci de ne pas modifier sans m'informer (ou Philippe)
afin de mettre a jour le bordereau qui rcapitule quel chef de groupe a recu quel Pid
Group leader names are indicated on each PID, do not modify it unless I am informed (or Philippe) so that the list
can be updated, the list also indicate which group leader has received which PID

4) Le code couleur applicable est distribu et une copie est galement disponible sur les ronos
Color code in force has been given and a copy is also available on cabinet

5) Merci de mettre vos initiales a ct de vos commentaires; en cas de "discussion avec le process" indiquer le nom de la
personne ayant donne son accord
Thanks to indicate your initials right next to your comments; in case of "informal discussion" with process indicate name of process
representative

6) N'oubliez pas de mettre une fiche dans les ronos avec votre nom lorsque vous empruntez un PID
Don't forget to place a paper with your name on it when you take a PID in the cabinet

7) Pas de travail sur des Pids autres que les Master papier A2 EPCI
No work is allowed except with master paper copy A2 format

8) Les notes dans la marge doivent tre coches avec les intiales du projeteur lors de leur inclusion dans le trac / conception
Notes shall be highlighted when taken into account into the design by the designer with initials

9) Si la note n'est pas applicable indiquer N/A avec les initiales du projeteur
Non applicable notes shall highlighted N/A with designer initials
Prelude FLNG W ork-Instruction : W I 017
Specific Floating LNG Project Date : 05/12/2011 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING

WI for workprocess for weight report & Cog

WI applicable to all centers and is adapted as necessary for KLOC/COC for local communication to
KLOC/COC local weight controler

Format established and avaialble into P353 DDB shall be followed

For weight: three cases can exist and should be distinguished

Case 1 - Piping Mto is available since last issuance of piping weight report
POC will compile Weight report for Kloc & Coc and will send to Kloc & Coc for review.
Once agreed between Kloc & Poc, Kloc to communicate to Kloc local weight control copy Poc
Once agreed between Coc & Poc, Coc to communicate to Coc local weight control copy Poc

Case 2 - Equipment list revised is available since last issuance of weight report,
Coc to propose Weight report revision to Poc for review for their scope
Kloc to propose Weight report revision to Poc for review for their scope
Once agreed between Coc & Poc, Coc to communicate to Coc local weight control copy Poc
Once agreed between Kloc & Poc, Kloc to communicate to Kloc local weight control copy Poc
Equipment list advance copy can also be considered on Poc leader request

Case 3 - Process department has made modification on PEFS not reflected into official revision of PEFS
since last issuance of weight report,
It has been agreed with process leader the following procedure in case of modification not reflected into official
revision of PEFS (i.e. intermediate modification)
Process engineer shall bring a paper copy of the concerned modification to piping weight controler,
Piping weight controler shall evaluate the impact in term of weight based on statistical data (previous Mto's) and record
tons associated and well as concerned module and deck (or Pdms site)
Then reporting into Master paper piping PEFS shall be done with weight associated indicated.
In case of modification over 20 tons dry net weight an email alert shall be sent to Poc

Coc shall report such cases into next weight report revision to Poc for review for their scope
Kloc shall report such cases into next weight report revision to Poc for review for their scope
Once agreed between Coc & Poc, Coc to communicate to Coc local weight control copy Poc
Once agreed between Kloc & Poc, Kloc to communicate to Kloc local weight control copy Poc

For Cog
Kloc shall extract Cog report from PDMS and send to Poc for Kloc scope, Poc will review and revert to Kloc
for communication to weight control team Kloc & Poc

Coc shall extract Cog report from PDMS and send to Poc for Coc scope Poc will review and revert to Coc
for communication to weight control team Coc & Poc
In case Coc could not extract Cog, Poc will assist
Prelude FLNG Work-Instruction : WI 018
Specific Floating LNG Project Date : 22/02/2012 Rev :4
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING

UTILITY STATION TYPE FOR VARIOUS DECK & EQUIPMENT PLATFORMS

The philosophy of choosing the type for utility stations (TYPE-A / TYPE B/ TYPE C) is as follows:

All the US directly serving the decks will be------> Type-B

All the equipment's platform US where there is requirement of steam out connection will be --------> Type -B

All other US stations located in the equipment's other than the top Platform will be --------> Type -A (seen note1)

All the Top platforms of the equipment's / PRV Platforms / All the platforms above the TOP deck---------> Type -C

Type A ==> 1000L x 650W x 1500H

Type B ==> 1200L x 650W x 1500H

Type C ==> 800L x 650W x 1500H

Utility connections

For utility connections, refer to the standard DWG 60869M-TS00G00000-STD-1380-00030

Note 1
Utility stations are not requiered on intermediate platform of equipment where multi-ladder are used
Utility stations are requiered on equipment platform with manhole or top access, type-A to be implemented or type-B in case of specific requirement on this
platform regarding steam
Prelude FLNG Work-Instruction : WI 019
Specific Floating LNG Project Date : 02/10/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING

DRIP PAN - LOCATION & SURFACE

Drip pan location and surface implementation will be as fper the following work-process:

1) Once layouts are emitted Piping Dpt will hand over to Process Dpt a set of layout in this purpose

2) Process Dpt will identify on the layout quipments or areas subjected to "cryogenic spill" / "amine spill" / "condensate"

3) Concerned surfaces will be deducted.

Follow PEFS and PMS


Prelude FLNG Work-Instruction : WI 020
Specific Floating LNG Project Date : 03/08/2012 Rev :4
60869M-TS00G00000-DI-1300-00001 Page : 1/1
PIPING ENGINEERING Issued by : K. BOURUISS
Checked by :G. HATT

PDMS SPLIT OF INTEGRATION PIECE OF LINES BELOW PROCESS DECK A


Prelude FLNG Work-Instruction : WI 021
Specific Floating LNG Project Date : 02/10/2012 Rev : 1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
PIPING ENGINEERING Checked by :G.Hatt

WORK INSTRUCTION: HOT SURFACE MANAGEMENT

In reference with the MOM 2000-100-003-MM-0463 following rules to be applied between equipment and lines with low AIT ( Auto Ignition Temperature) product
Prelude FLNG Work-Instruction : WI 022
Specific Floating LNG Project Date : 18/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING

WORK INSTRUCTION: FIRE CASE VALVES MANAGEMENT

All valves tagged as VP 101 and VP 105 shall be considered as a fire case isolation valve
As noted on PEFS "VALVE TO BE LOCATED AT THE EDGE OF THE FIRE ZONE." these valves to be located at the edge of the fire case area at less than 3 meters from the edge of module as shown on the fire zone limit here below .
These valves shall not be located inside the jet fire impingement - 10 minutes ( extract from fire protection report issued by Safety)

The line routing after UZV shall not go back inside the fire zone but shall be located at less than 3 meters from module
Here below typical representation of VP101 and VP105 as identified on PEFS

Rev 1 If valve is located on main deck to be placed at 3m distance approximately from main deck penetration.

FIRE ZONE LIMIT


Prelude FLNG Work-Instruction : WI 023
Specific Floating LNG Project Date : 18/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : Ph.Defrenne
Checked by :G.Hatt
PIPING ENGINEERING

MODELLING OF SMALL BORE

In order to follow the consortium agreement between SHI and TSC regarding the scope of work of small bore piping.
Please find here attached the limit of modeling of small bore pipes
All lines number reflected in the lines lists identified with a main diameter bellow DN 5O is under SHI scope of work.
This is include design,routing,3d modelling,supports,isometrics production, construction,inspection,testing,comissioning.
If this line is connected to a line above DN 50 the branch fittings is under TP scope of work

All lines number reflected in lines lists identified with main diameter above or equal to DN 50 is under TP scope including the small bore portion
under this line number

Typical SHI scope of work

Typical TP scope of work

Rev 1 Details for < 50 mm pipe support TP scope of work

Logical support = ATTA

Rev 1 Details for < 50 mm cold pipe support TP scope of work


For Cold support = Physical support (full model & details)
Prelude FLNG Work-Instruction : WI 024
Specific Floating LNG Project Date : 15/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G.Hatt
Checked by :Ph.Defrenne
PIPING ENGINEERING

BUTTERFLY VALVE ORIENTATION AT RV INLET

The aim of this work instruction is to cover COMPANY requirement regarding location and orientation of butterfly valve at Relief Valve inlet .
You will recover in the drawings below several cases which have to be considered in our design.
The main drivers are :
Process for fouling service and non fouling service.
Process service for two phase flow
The elbow orientation and location before and after the butterfly valve

The impacts on design for different cases are reflected in the following drawings.
Impact are:
lines routing
butterfly stem orientation
Elbows location and orientation
Upstream and downstream straight line d

Fouling service refer to WI n25

Typical TP scope of work


Prelude FLNG Work-Instruction : WI 025
Specific Floating LNG Project Date : 02/08/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G.Hatt
Checked by :Ph.Defrenne
PIPING ENGINEERING

FOULING SERVICE PEFS


Lines in brown are fouling service
- Butterfly valves shall be positioned with the stem horizontal in services where fouling
substances (fouling service) could collect in the lower shaft bearing ;
- Gate valves should be positioned with the stem horizontal in services where fouling
substances (fouling service) could collect in the bottom cavity;

\Scan PID.pdf
Prelude FLNG Work-Instruction : WI 026
Specific Floating LNG Project Date : 19/03/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : G.Hatt
Checked by :Ph.Defrenne
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 026
Specific Floating LNG Project Date : 19/03/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by :
PIPING ENGINEERING Checked by :Ph.Defrenne
Prelude FLNG Work-Instruction : WI 027
Specific Floating LNG Project Date : 02/08/2012 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K Dahmani
Checked by : G Hatt
PIPING ENGINEERING

PRIMARY SUPPORT FLOW CHART

Note: LEGEND

Caution to be exercised in understanding the definition


of "Primary Support" and " Secondary Support". Process
Preparation Document Multi - Terminator
Decision
Document Storage

PRIMARY SUPPORT

Support Engineer / designer to


create a new support

Is it a special support
YES (over allowable NO
loads) or particular
case?

The support is created in MDS


using SC01 SUPPORT
CONNECTOR FOR
REPLACEMENT OF SPECIAL
(with specific number, see
60869M-GF00G00000-PP-

A drawing with the new


support design required
is edited by COC and sent to
the POC CAD administrator
using MDS log

Discuss support modification The support is created in MDS


with COC support team and using STD supports
The request is analysed by
POC Support Team
POC CAD administrator and
Get Approval on new design
POC Support Team

YES Any Comments on Support


feasibility (location,..) ?

NO

The support is created and


added in MDS library by POC
CAD administrator

PDMS 3D MODEL IS UDATED WITH THE NEW


SUPPORT
Prelude FLNG Work-Instruction : WI 028
Specific Floating LNG Project Date : 15/03/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : X CARCAUD
Checked by :G.Hatt
PIPING ENGINEERING

PIPING LOAD ON VERTICAL STRUCTURAL COLUMN UNDER KLOC MODULES


Prelude FLNG Work-Instruction : WI 028
Specific Floating LNG Project Date : 15/03/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : X CARCAUD
Checked by :G.Hatt
PIPING ENGINEERING

PIPING LOAD ON VERTICAL STRUCTURAL COLUMN UNDER KLOC MODULES


Prelude FLNG Work-Instruction : WI 029
Specific Floating LNG Project Date : 17/07/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/16
Issued by : X CARCAUD
Checked by :G HATT
PIPING ENGINEERING

6 Exception on page 16 only one block valve is by piping on isometric => single block by piping
Prelude FLNG Work-Instruction : WI 029
Specific Floating LNG Project Date : 02/08/2012 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2,3,4,5,6,7,8,9,10,11,12,13/14
Issued by : X CARCAUD
Checked by :G HATT
PIPING ENGINEERING

\LNG-LPG-Toxic
with PDS LT-PT-FT
Prelude FLNG Work-Instruction : WI 029
Specific Floating LNG Project Date : 17/07/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 16
Issued by : X CARCAUD
Checked by :G HATT
PIPING ENGINEERING

exception single block by piping

PEFS_TAG TAG_NUMBER LINE_NUMBER PEFS_TAG TAG_NUMBER LINE_NUMBER

140FT1008 140FT1008A 600P14000045091473WA 140PDIA1146 140PDT1146 600R14000086063484CC


140FT1008 140FT1008B 600P14000045091473WA 140PI1154 140PT1154 400P14000053093484CC
140FT1008 140FT1008C 600P14000045091473WA 140PI1155 140PT1155 750R14000001063484CC
140FT1010 140FT1010 400P14000054093484CC 140PC1163 140PT1163 400P14000108093484CC
140FT1012 140FT1012 350R14000006063484CC 140PZA1164 140PT1164 400P14000108093484CC
140FIA1040 140FT1040 400P14000054093484CC 140PI1165 140PT1165 400P14000054093484CC
140FI1058 140FT1058 500R14000064063480WC 140PIA1167 140PT1167 400P14000108093484CC
140FFC1075 140FT1075 450R14000067063480WC 140PDIA1209 140PDT1209 750P14000045091473WA
140FFC1076 140FT1076 350R14000070063484CC 140PDZA1218 140PDT1218 750R14000001063484CC
140FFC1077 140FT1077 400R14000073063484CC 140PI1235 140PT1235 400P14000054093484CC
140LIA1013 140LT1013 80VT14000001063484CC 140PDIA1236 140PDT1236 150P14000239093484CN
140LI1026 140LT1026 80VT14000001063484CC 140PI1241 140PT1241 450P14000102093484CC
140LIA1028 140LT1028 140PDZA1245 140PDT1245 400P14000054093484CC
140LI1029 140LT1029 140PI1255 140PT1255 750R14000001063484CC
140PDZA1003 140PDT1003 500P13500001061472XN 140PG1044 140PG1044 450P14000053093484CC
140PI1015 140PT1015 500P14000024063484CCA 140PG1098 140PG1098 800R14000052063480WN
140PT1028 140PT1028A 600P14000045091473WA 140PG1168 140PG1168 400P14000054093484CC
140PT1028 140PT1028B 600P14000045091473WA 160PI4005 160PT4005 100P16000008LR063484CC
140PT1028 140PT1028C 600P14000045091473WA 160PI4006 160PT4006 100P16000035LR063484CC
140PDZA1038 140PDT1038 400P14000054093484CC 340LZA1014 340LT1014 150P34000124LR063484CC
140PDZA1039 140PDT1039 450P14000053093484CC 340LCA1016 340LT1016 900P34000124LR063484CC
140PIA1040 140PT1040 450P14000053093484CC 340LI1026 340LT1026 150P34000124LR063484CC
140PDIA1041 140PDT1041 450P14000053093484CC 340PT1005 340PT1005 300P34070007LR063484CN
140PDIA1042 140PDT1042 450P14000053093484CC 340PZA1019 340PT1019 150P34000114LR063484CC
140PI1043 140PT1043 400P14000054093484CC 340PDIA1024 340PDT1024 150P34000114LR063484CC
140PI1048 140PT1048 400R14000002063484CC 340PI1026 340PT1026 100P34070011LR063484CC
140PDIA1050 140PDT1050 450R14000005063484CC 340PCA1081 340PT1081 50P14000214093484CC
140PDIA1051 140PDT1051 400R14000002063484CC 340PZA1091 340PT1091 300P34070007LR063484CN
140PCA1052 140PT1052 350R14000006063484CC 340PT1092 340PT1092 100P34070011LR063484CC
140PI1058 140PT1058 650PIA1011 650PT1011 150AV65000007013482ZN
140PI1059 140PT1059
140PDIA1061 140PDT1061 400R14000002063484CC
140PDIA1105 140PDT1105 800R14000063063480WN
140PDIA1106 140PDT1106 800R14000138063480WN
140PIA1110 140PT1110 750R14000064063480WC moredetailsinside=>
140PDIA1113 140PDT1113 600P14000195093480WN \PRELUDE
140PDIA1114 140PDT1114 600P14000100093480WN Instrument list with
DBB 100713.xlsx
140PI1116 140PT1116 600P14000100093480WN
140PI1122 140PT1122 600P14000101093484CC
140PDIA1125 140PDT1125 500R14000064063484CC
140PIA1128 140PT1128 500R14000065063484CC
140PDIA1130 140PDT1130 600P14000101093484CC
140PDIA1137 140PDT1137 500R14000065063484CC
140PIA1142 140PT1142 350R14000183063484CC
140PDIA1145 140PDT1145 450P14000102093484CC
Prelude FLNG Work-Instruction : WI 030
Specific Floating LNG Project Date : 14/09/2012 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G.Hatt
Checked by :Ph.Defrenne
PIPING ENGINEERING

ECCENTRIC STACKED REDUCERS

Eccentric reducers are 99% of the time, with seam on the flat portion

In case both reducers are not seamless , add a spool piece between reducers.
Seamless indication can be be found in piping classes details

The above reasoning can be extended to 3 , 4 , 5 reducers


Prelude FLNG Work-Instruction : WI 032
Specific Floating LNG Project Date :03/07/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by :
PIPING ENGINEERING Checked by :Ph.Defrenne

VENT TO ATMOSPHERE WITH OR WITHOUT DAVIT

New requirement has been provide by safety thru MOM 2000-110-003-MM-11031 and vent report 60869M-GF00G00000-RT-6200-62003 .
On this Basis vent orientation to be oriented sea side for hydrocarbon, regarding utilities vent toward unit is acceptable
By default Report 60869M-GF00G00000-RT-6200-62003 consider 7.6 m given as a minimum by piping and precise if hydrocarbon contain

It has been agreed that horizontal vent discharge to sea side is acceptable,
whatever the type of release is (e.g hydrocarbon, steam, nitrogen), as long as the
outlet piping does not exceed the edge of the FLNG
Horizontal vent release facing an other platform/module is acceptable:
within utility modules for all type of release except hydrocarbon. High
temperatures will be assessed within the hazardous contours.
within other modules as long as product release is not hydrocarbon. High
temperatures will be assessed within the hazardous contours.
2-Safe area
Following review of preliminary representation of safe area for horizontal release,
it has been agreed as shown in attachment 1 that
As hazardous contour have to be outside the area affecting personnel based on
normal man height of 2.1 meters and outlet discharge piping shall release at least
3 m above the tallest plant structure, hazardous contour has no drop more than 0.9m

Here below new schematic as per the above rules


VENT FOR UTILITIES FLUIDS Page : 2/4
Page : 3/4
VENT FOR HYROCARBON FLUID
Page : 4/4

IF 60869M-GF00G00000-RT-6200-62003 call for more 7,6 meters refer pages 12 TO 35 last column

Piping designer have to model a sphere with a radius equal to final safe area in last column .
This sphere to be cut back at 3 meter to reflet the main requirement given above
Bottom portion as per the table to be also cutback by 6 metter.
Cutted sphere shall not interfer with PLTF space, 2.1 Meter shall be maintain or 3M until the davit beam as shown above
For Hydrocarbon contain overlap above other Platform is not authorised even with the safety gap maintain
Vent to be oriented sea side
FINALVOLUMEFORINTERFERENCECHECK.
THISVOLUMESHALLNOTINTERFERWITHOPERATINGZONEAS
DEFINEABOVE.
MODELING OF SPHERE AS PER GIVEN EXEMPLE
THISVOLUMSHALLNOTBEABOVEANOPERATINGPLATFORMFOR
THEHYDROCARBONVENT.
TOBEORIENTEDSEASIDE;

ventoutlet
6M

2.1or3Mif
davit
handrail

3M

PDF report . PDF MOM

60869M- MOM 2000-110-


GF00G00000-RT- 003-MM-11031
6200-62003
Prelude FLNG Work-Instruction : WI 033
Specific Floating LNG Project Date : 16/01/2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by :
PIPING ENGINEERING Checked by :Ph.Defrenne

CRD NETWORK
Prelude FLNG Work-Instruction : WI 034
Specific Floating LNG Project Date : 11/02/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by :
PIPING ENGINEERING Checked by :Ph.Defrenne

IA NETWORK
Prelude FLNG Work-Instruction : WI035
Specific Floating LNG Project Date : 30-AUG-2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : Xcarcaud
Checked by : Ghatt
PIPING ENGINEERING

Galvanization bath for spool with pipe diameter DN80 and above

1. All galvanized pipe have to follow the size requirement as shown in the next figure
IN ADDITION A BREAK FLANGE TO BE ADDED AT EACH DESIGN AREA LIMIT
Below DN 80mm a union shall be placed every 5m maximum 3

80
Prelude FLNG Work-Instruction : WI035
Specific Floating LNG Project Date : 30-AUG-2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : Xcarcaud
Checked by : Ghatt
PIPING ENGINEERING

Galvanization bath for spool with pipe diameter DN80 and above

Point 1. In case of reducer 80x50 or 80x40mm :

Specific note to be added on


isometric:
"Threaded (NPTF) by prefabricator
after galvanization and before
assembly with DN<80mm" by
adding STEXT

DN50 DN80

Point 2. Branch connection for 50x80/100/150/200mm :

Use Threadolet for branch


connection DN50 to DN80
(Typical) DN80

DN50
Prelude FLNG Work-Instruction : WI036
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

CS + PE Lining Lines

1. Piping Classes:

- LR018201Z

2. Design:

-All fittings are flanged type. Concerning piping , flanged spool pieces are used.
-The quantity of spools shall be minimized using spools pieces available below.
-The use of spool pieces not available below shall be minimized
-IMPORTANT
Spool pieces lenght must be chosen according supports construction standards used (refer to
chapter "Supports" )

3. Spool pieces:

- Straight Pipes:

Notes:
1) In case of nominal sizes 100mm and larger , 2pc's of thebranch may be connected with
the run, but the angle between the axes of each branch shall be less than 90.
2) The nominal size ofn the branch should be smaller than that of the run
3) Other dimension not listed in this table shall be subject to an agreement withn us.

Prelude FLNG Work-Instruction : WI036


Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

CS + PE Lining Lines

- Fitting Pipes

Notes:
a. Branch connections
1) Max 5pc's of branches may be connected with the run pipe.
2) Angle of the axes of the branch should be less than 90.
b. One bend or branch connections
1) Max 3pc's of branches may be connected with the run to the contrary angle of the elbow.
c. Two bend connections
1) Angle of the bend or elbow should be less than 45.
Prelude FLNG Work-Instruction : WI036
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

CS + PE Lining Lines

4. Butterfly:

- Spacers
In order to open butterfly valves, it is necessary to add spacers for following diameters :

Spacers must be installed as follows:

- DN 80
- DN 150
- DN 200
- DN 250
- DN 300

Spacers are included in piping classes ( Short code SPAV ) with a thickness of 12 mm

-Fittings prohibited design:


All diameters - A fitting ( elbow , tee , reducer,.. ) can not be connected directly on a butterfly
or a swing check valve . It is necessary to install spacers as above.

WRONG DESIGN
Prelude FLNG Work-Instruction : WI036
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 4/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

CS + PE Lining Lines

5. Supports:
For any support type, minimum spool piece length used is 500 mm ( all diameters ).
Supply of supports is the same than for metallic isometrics (service provider & piping sub contractor)

- STOP and ANCHOR Support

Spool pieces used for Anchor or GT types are the same as those included in Piping classes
As general rule , spool piece length used for Anchor & Stop support types is 500 mm .
If the length is too short , spool piece length 1 m type can be used

STOP

ANCHOR

6.Holes:

On each spool piece and fitting, a hole is made. This hole is used for breathing of PTFE and
as witness leak.
If the line is insulated , a nipple DN 15 , supplied by SHI ,must be mounted on each spool
piece and fitting. Nipples are not shown on 3D models.
Following note is added on IFC isometrics
"If line is insulated, nipples should be mounted on fittings and spool pieces"
Prelude FLNG Work-Instruction : WI037
Specific Floating LNG Project Date : 12-April-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : G. Hatt
Checked by : Ph Defrenne
PIPING ENGINEERING
Valve with vent (also called valve self-relieving) not appearing on pid
Valve with vent (also called valve with vent hole) not appearing on pid
Valve with vent (also called valve uni-directionnal) not appearing on pid
Valve with vent (also called valve with body cavity pressure relief system) not appearing on pid

Clarification > this WI does not concern valves with high pressure side, don't mix !
Pid for high pressure side

1. When valves appear on Pid they are as such (ball or gate)


refer legend 60869M-GF00G00000-PID-0090-00001

2. As per 60869M-GF00G00000-DI-0000-00010 for PDMS


VALVE Attributes LOCK - HP VENT informationReinforcement Gusset Setting Design Instruction

3. In case of valve (ball or gate) with vent not appearing on Pid


> Valves to instrumentation (flow / pressure / level) or piping drain or piping vent

For DDB case


Prelude FLNG Work-Instruction : WI037
Specific Floating LNG Project Date : 12-April-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : G. Hatt
Checked by : Ph Defrenne
PIPING ENGINEERING

Valve with vent (also called valve self-relieving) not appearing on pid
Valve with vent (also called valve with vent hole) not appearing on pid
Valve with vent (also called valve uni-directionnal) not appearing on pid
Valve with vent (also called valve with body cavity pressure relief system) not appearing on pid

For single block case

For piping vent or piping drain

Special case for level

4. Applicable piping classes, diameter and valves


See page 3
Prelude FLNG Work-Instruction : WI037
Specific Floating LNG Project Date : 12-April-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 3/3
Issued by : G. Hatt
Checked by : Ph Defrenne
PIPING ENGINEERING

Valve with vent (also called valve self-relieving) not appearing on pid
Valve with vent (also called valve with vent hole) not appearing on pid
Valve with vent (also called valve uni-directionnal) not appearing on pid
Valve with vent (also called valve with body cavity pressure relief system) not appearing on pid

Piping class with Uni-directional valves (by type of valve per DN)
Options for valves (RB, FB, BW & FLG) not taken into account.
Uni-directional valves ONLY
Only type of valve
Size (DN)
Piping class Block valve type 15 20 25 40 50 80 100 150 200 250 300 350 400 450 500 600
011472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
011473W Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
013480W Ball valve Y Y Y Y Y Y Y Y
013484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
031472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033480W2 Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033480WD Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033484C2 Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033484CD Ball valve Y Y Y
Gate valve Y Y Y Y
061472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
063480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
063480WD Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
063481W Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
063481W2 Ball valve Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
063481WD Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
063484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
091472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
091473W Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
093480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
093484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
093485C Gate valve Y Y Y Y Y
LR011472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
LR013480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y
LR013484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
LR031472W Ball valve Y Y Y Y Y Y
Gate valve Y Y Y Y
LR033484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
LR061472W Ball valve Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
LR063484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Towing, Sea fastening and associated piping supports or portion of piping support

Here is the explanation of who does what when how in which purpose in piping team (support/stress/
field engineering) for towing, sea fastening and associated piping support or portion of piping support.

1.Support
a) Lines calculated

Support team follow stress calculation notes requierements for towing, piping support or portion
of piping support, see example of calculation note below.
Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Towing, Sea fastening and associated piping supports or portion of piping support

b) Lines not calculated

If lines are not calculated (so no calculation note) it is SHI scope, refer to TSC consortium agreement
8.2 for details in case of doubt.

2.MDS Function

Support designer use MDS function to indicate on isometrics specific request for:

Towing:
Use attribute "MDS-towing-note"

Use $ to change of line.


Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 3/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Towing, Sea fastening and associated piping supports or portion of piping support

Gap: Use MDS functionnality

3.Spring Box data sheet

Spring box data sheet indicate if spring box is "Blocked during Tow" or "Unblocked during Tow"
By defaut it is considered as blocked durung Tow (unless specific exeption duly indicated
in stress calculation note).

4.Specific offshore piping support deliverable for the GFLNG project

Doc ref: 2000-110-G000-GE00-G00000-MP-4380-00006


Piping Support to be dismantled at Final Location & Spring Boxes Unlocked Prior Tow
Doc Class 4 (internal SHI-TP)

Support team need to produce a specific offshore piping support deliverable for the GFLNG project.
A single document made of two part, inside one part for KLOC / one part for COC.
This document will be useful for the yard, field engineering and commissioning team.
This document will be issued by POC based on input from COC and KLOC. This document will
consist of
- data sheet of spring boxes unlocked during tow with their associated tags and X/Y/Z coordinates
with corresponding Calculation Note reference.
- X/Y/Z coordinates of piping support or portion of piping support to be dismantled at final location
with corresponding Calculation Note reference.
- recap list
Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 4/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Towing, Sea fastening and associated piping supports or portion of piping support

5.Isometric check list

Towing or Gap shall be checked carefully, as per checking working instruction in force (for
isometrics and supports).
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING

DRIP HOLE MODELLING in PDMS

13mm for weep holes are mandatory as per DEP 80.45.10.10

Definition :
Main Line or Header : Relief valve exhaust pipe.
Drain line or Branch : Connection to OSD DN50.

For safety reason, drain line shall be welded to the


main line. In the same time, to comply with the DEP
header shall not be cut for 50NB hole but only
for drip hole 13mm.

PDMS Modelling :

In order to model this particular tapping in PDMS there is 2 different methods, depending of the
header diameter and piping class branch table.

The first step for the designer is to check with the piping class and with the document
"Topside Branch Tables" Ref.2000-110-G000-GE00-G00000-RA-7737-00023 whether
Pi to
Pipe t pipe
i branch
b h connection
ti isi allowed
ll d with
ith regards
d to
t the
th header
h d diameter.
di t

If yes consequently designer can use "branch to header" Tee in PDMS to connect the drain line to the header.

If no, designer has to work with several "atta" and copy/past tapping position for branch head definition,
and also copy/past manually line number reference to edit several "stext" "atta" on header and drain line.
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING

DRIP HOLE MODELLING in PDMS

First case : pipe to pipe connection is possible :

Create a "tee" (branch to header) on the main line at the location of the planed drip hole.
Kindly check weld proximity.

Create at the same location (tee) an generic "atta" on the main header.

Then edit ATTA's ATTY attribute to 'CCNN' and ATTA's STEXT with the following sentence :
'DO NOT CUT 50NB HOLE IN THE HEADER PIPE BUT ONLY "DRIP HOLE" 13mm'

Finally connect the drain line to the header's "TEE" as you proceed usually.
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 3/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING

DRIP HOLE MODELLING in PDMS

Second case : pipe to pipe connection not allowed as per branch table wrt header NB :

Create a generic "atta" on the main line at the location of the planed drip hole.
Kindly check weld proximity.

Then designer has to copy the coordinates of this "atta" which will be used to define the location of the
"head" for the drain line. This can be done by selecting the "atta" (current element) and typing "Q pos" in
PDMS' command line window.
Designer has to create now the drain pipe and branch, selecting "Explicit" method for the head definition
and past the coordinate of the "atta" previously copied.
In addition, designer need to select '50' for the bore, 'D' for the direction and 'Butt Weld' for connection in
the branch head explicit definition box.

At this stage, designer can model the branch line as usual.

In order to get a correct representation on isometrics, designer need copy the branch name of the drain :
In the example above '50-OSD-xxx-yyyyy/B1' and add it when editing the first 'atta' on the header.
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 4/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING

DRIP HOLE MODELLING in PDMS

Edit header's ATTA ATTY attribute to 'CCCC' and ATTA's STEXT with the following sentences :
'DO NOT CUT 50NB HOLE IN THE HEADER PIPE BUT ONLY "DRIP HOLE" 13mm'
'50-OSD-xxx-yyyyy/B1'

Finally, in the same optic to get a correct representation on drain isometric designer need to create
one last "ATTA" at the head location of the drain line.
Editing drain's ATTA ATTY attribute to 'CCNN' and ATTA's STEXT with the following sentences :
'DO NOT CUT 50NB HOLE IN THE HEADER PIPE BUT ONLY "DRIP HOLE" 13mm'
'branch name of the header'
Prelude FLNG Work-Instruction : WI040
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Spray Nozzle for Deluge

There are 3 kind of spray nozzle for deluge, they will be available in the catalogue with these
tag numbers:

-WDN-12027
-WDN-12046
-WDN-12061

Please note that on PEFS these tags are not directly mentionned in the line

example:
Prelude FLNG Work-Instruction : WI040
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Spray Nozzle for Deluge

It' s necessary to refer to the table on the right side of the PEFS which provides the spray nozzle tag
associated to the equipment deluged that hasto be added in lnie.

Example:

Information on Isometric :

Spray nozzle for deluge is not considered as "SP ITEM"


It will be non-reportable in BOM.
It's necessary to add "STEXT" with tag number on isometric.
Prelude FLNG Work-Instruction : WI040
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 3/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

Spray Nozzle for Deluge

Spray Nozzle connection:


Prelude FLNG Work-Instruction : WI041
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

SS + PTFE LINED

1. Piping Classes:

- 011836Z

2. Design:

-All fittings are flanged type. Concerning piping , flanged spool pieces are used.
-The quantity of spools shall be minimized using spools pieces available below.
-The use of spool pieces not available below shall be minimized
-IMPORTANT
Spool pieces lenght must be chosen according supports construction standards used (refer to
chapter "Supports" )

3. Spool pieces:

Spool pieces available in piping classes:

- DN 25 to 40 : 0.1m
- DN 25 to 150 : 0.2m, 0.3m, 0.4m, 0.6m, 0.8m, 1m, 1.5m, 2m, 3m, 6m

Spool piece not available in piping classes:

If you have this case it's necessary to check the feasibility with material group. (raise a query)

For each diameter, minimum and maximum spool lenghts shall be in accordance with spool piece
lenghts included in piping classes.
Prelude FLNG Work-Instruction : WI041
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

SS + PTFE LINED

4. Butterfly:

- Spacers
In order to open butterfly valves, it is necessary to add spacers for following diameters :

Spacers must be installed as follows:

- DN 80
- DN 150
- DN 200
- DN 250
- DN 300

Spacers are included in piping classes ( Short code SPR ) with a thickness of 20 mm

-Fittings prohibited design:


All diameters - A fitting ( elbow , tee , reducer,.. ) can not be connected directly on a butterfly
or a swing check valve . It is necessary to install spacers as above.

WRONG DESIGN
Prelude FLNG Work-Instruction : WI041
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING

SS + PTFE LINED

5. Supports:

For any support type, minimum spool piece length used is 500 mm ( all diameters ).
Supply of supports is the same than for metallic isometrics (service provider & piping sub contractor)

- STOP and ANCHOR Support

Spool pieces used for Anchor or GT types are the same as those included in Piping classes
As general rule , spool piece length used for Anchor & Stop support types is 500 mm .
If the length is too short , spool piece length 1 m type can be used

STOP

ANCHOR

6.Holes:

On each spool piece and fitting, a hole is made. This hole is used for breathing of PTFE and
as witness leak.
If the line is insulated , a nipple DN 15 , supplied by SHI ,must be mounted on each spool
piece and fitting. Nipples are not shown on 3D models.
Following note is added on IFC isometrics
"If line is insulated, nipples should be mounted on fittings and spool pieces"
Prelude FLNG Work-Instruction : WI043
Specific Floating LNG Project Date : 16-JUL-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : XCarcaud
Checked by : Ghatt
PIPING ENGINEERING

Piping General Arrangement Drawings Settings

1. Composition

Piping GAD designate the piping system in accordance with the requirements of
the PEFS (including SP and Instrument Tag),
Equipment Layouts, Specifications, etc
Piping GAD shall be extracted from 3D Model
Piping GAD shall indicate the following items :
=> Configuration, Elevation, Line number of hard piping into 3D Model
=> Coordinates of Equipments, Structural and Piping
=> Dimensions are rounded off to the nearest interger

2. General Requirements

Drawing Size A0
Scale 1/50e
Dxf and Pdf format

3. General Notes in the Border

All dimensions and coordinates are in millimeters


Piping Arrangement Drawing is valid only for general routing of lines for fabrication details refer to piping isos

Piping Arrangement Drawing to be read in conjuction with Equipment Layout Drawing and
Handling Ways and Devices

4. Key Plan on the GAD

Shall be the same as the one on Equipment Layout and Handling Ways Drawings

Key Plan of GAD's (for reference)

2000-110-G000-GE00-G00000-MP-4024-00007-001
2000-110-G000-GE00-G00000-MP-4024-00008-001
Prelude FLNG Work-Instruction : WI043
Specific Floating LNG Project Date : 16-JUL-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : XCarcaud
Checked by : Ghatt
North Orientation (top left corner)

5. Doc Class and Revision

Doc Class 2
Revision AFC only

6. Border

Shall be the same as the key plans


2000-110-G000-GE00-G00000-MP-4024-00007-001
2000-110-G000-GE00-G00000-MP-4024-00008-001

7. Pipe Size and Reference

Nominal Size shall be in mm


Center Line for Piping
No Flow Arrow

8. Drawing Area

Shall be in accordance with the key plan

9. Connecting Drawing Number

Adjacent Drawing Number shall be indicated on GAD

10. Designation of Equipment and Structural Row

Use the same as on this document :


2000-110-F001--SU01-U67000-MP-4180-00041-001

Deck TOS / Platform TOS ( on Equipment or Stand alone) shall appear as illustrated above
Prelude FLNG Work-Instruction : WI043
Specific Floating LNG Project Date : 16-JUL-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/3
Issued by : XCarcaud
Checked by : Ghatt

11. Pipe Support and Structural Row

Location of Pipe Support shall be shown without any relevant dimension from
piping structure, match line, row.
Reference to the standard or Special shall be made as such :

In case of common pipe support location,


One blank line shall be introduced to indicate which support correspond to
which line (picture below need to integrate a "white cell" to segregate both lines)

"white cell" to introduce

All spring boxes and rigid struts shall appear whatever the size
All supports shall appear above Dn 350mm 2

12. Content

MP / MS / MR / MX / HS (escape ways excluded) / SU / MH / GE / AR / NZ / "PO/CS-SHI" / IN ( INLINE )


Prelude FLNG Work-Instruction : WI 044
Specific Floating LNG Project Date : 17/07/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
PIPING ENGINEERING Checked by :G.Hatt

WORK INSTRUCTION: Doubler Plate Requirement => for primary structural only
1

GeneralNote:DoublerPlateMaterialS355/DC4minithickness8mm,DoublerPlateshallbe10mmgreaterthantheoutsidedimensionoftheincoming

1
Prelude FLNG Work-Instruction : WI045
Specific Floating LNG Project Date : 17-July-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by : Ph Defrenne
PIPING ENGINEERING

BOLTING FOR FLARE LINE (specific location for piping class 011492F)

Spec ident MESC header size size dia length


011492F CD24PFA 813830.639DN1000 1.5in 280MM

For line 1000-FWL-630-0010-011492F at connection with A-63004 the above bolting shall be placed in the model.
This optionnal bolting is available in the catalog