Prelude FLNG Project WORKING INSTRUCTIONS
PRELUDE EPCI
WORKING INSTRUCTIONS
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
Prelude FLNG Project
Rev.29
LIST OF PIPING WORK INSTRUCTIONS
60869M-TS00G00000-DI-1300-00001
30/08/2013
Instruction
SUBJECT WI REVISION Issue date
N
1 PIPING LINE NUMBERING 6 11/02/2013
2 PIPING INSTALLATION AROUND END /TOP PUMPS 0 23/08/2011
3 PIPING VALVES ACCESS ATTRIBUT FILLING 0 23/08/2011
4 EQUIPMENT ORIGIN AND COG LOCATION 4 15/03/2013
5 EQUIPMENT MODELLING PROGRESS STATUS (DELETED) 2 05/12/2011
6 PIPING (LINES & EQUIPMENTS) 3D MODELLING PROGRESS STATUS 3 18/06/2012
7 CRYOGENIC LINE INSTALLATION 2 28/06/2013
8 LIMITS ON PEFS 0 23/08/2011
9 PIPE RACKS MODELLING 1 15/06/2012
10 3D MODEL ORIGIN AND COORDINATES SYSTEM 3 15/06/2012
11 PIPING UPSTREAM A SCHOEPENTOETER 3 16/07/2013
12 TAGGING OF TIE-IN POINTS IN PDMS 1 15/06/2012
13 BOP LEVEL OF MAIN DECK LINES 3 19/06/2012
14 HANDLING CORNERS 0 23/08/2011
15 VALVE NAMING 2 15/06/2012
16 PEFS MASTER FOR EPCI 4 15/06/2012
17 WI FOR WORKPROCESS FOR WEIGHT REPORT & COG 2 05/12/2011
18 UTILITY STATION TYPE FOR VARIOUS DECK & EQUIPMENT PLATFORMS 4 27/02/2012
19 DRIP PAN 3 02/10/2012
20 PDMS SPLIT OF INTEGRATION PIECE OF LINES BELOW PROCESS DECK A 4 02/08/2012
21 CANCELLED - HOT SURFACE MANAGEMENT 1 02/10/2012
22 FIRE CASE VALVES MANAGEMENT 1 18/06/2012
23 MODELLING OF SMALL BORE 1 18/06/2012
24 BUTTERFLY VALVE ORIENTATION AT RV INLET 1 15/06/2012
25 FOULING SERVICE 0 15/06/2012
26 STRESS AND SUPPORT FLOW CHART 1 19/03/2013
27 PRIMARY SUPPORT FLOW CHART 0 02/08/2012
28 PIPING LOAD ON VERTICAL STRUCTURAL COLUMN UNDER KLOC MODULE 1 15/03/2013
29 LNG-LPG TOXIC WITH PDS LT-PT-FT WARNING NOTE 1 17/07/2013
30 ECCENTRIC STACKED REDUCERS 0 14/09/2012
31 INSTRUMENT NOZZLE TAGGING 0 02/10/2012
32 VENT TO ATMOSPHERE AND DAVIT 2 03/07/2013
33 CRD NETWORK 0 16/01/2013
34 IA NETWORK- BASE & ALTERNATE CASE 1 11/02/2013
35 GALVANIZATION BATH FOR SPOOL 3 30/08/2013
36 CS+PE LINING LINES 2 11/06/2013
37 VALVES WITH VENT NOT APPEARING ON PID 0 12/04/2013
38 TOWING, SEA FASTENING AND ASSOCIATED PIPING SUPPORT 0 16/04/2013
39 DRIP HOLE MODELING IN PDMS 0 16/04/2013
40 SPRAY NOZZLE FOR DELUGE 0 16/04/2013
41 SS + PTFE LINED 2 11/06/2013
42 LINER and BOLTING for BLIND FLANGES in LR016410X / LR035100Z / 015100Z 1 25/06/2013
43 PIPING GENERAL ARRANGEMENT DRAWINGS SETTINGS 2 16/07/2013
44 DOUBLER PLATE REQUIREMENTS for SUPPORTS STANDARD 1 17/07/2013
45 BOLTING FOR FLARE LINE (specific location for piping class 011492F) 0 16/07/2013
46
47
48
49
50
51
52
53
54
55
57
58
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 1/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING
1) Line numbering:
The design area and the nominal diameter will be separated by /
CCCCCCC/AAAA-BBB-XXX-YYYYY-EEEEEEEEE-FFF-TT
=> 2P10A/1400-CCW-450-10003-LR011201X-N-01
CCCCCCC/ Design area code. where digit number can change as
per the
area.
AAAA is the Nominal Diameter (DN) as per ISO designation for
nominal pipe size
BBB is the Fluid Code.
XXX is the first three figures from the Unit Number.
YYYYY is the sequence number from 00001 to 99999.
EEEEE is the Piping Class Identification in accordance with DEP
31.38.01.12
DEP 31.38.01.15-Gen. Piping classes digit number may be
composed of 9 d
piping classes with prefix LR.
FFF is the Insulation Code (Refer to Tagging Procedure: 60869M-
GF00G000-PP-0000-
00204)
TT: is the train number.
The train will start with the value of 01 be increased by range of 1
when required.
1S10A/600-CCW-100-10031-LR031201Z-N-01
1S10A/350-CCW-100-71002-LR061201Z-N-01
1S10A/350-CCW-100-71002-LR061201Z-N-02
3) Hierarchy in PDMS:
3-1) Piping modeling
SITE 2P10/MP
ZONE 2P10/MP/PDA/FW
PIPE 2P10A/600-FW-600-00002-035100Z-N-01
CCCCCCC/AAAA-BBB-XXX-YYYYY-EEEEEEEEE-FFF-TT/COM
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 2/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING
Note: Number of decks as illustrated below may do not reflect the exact number of modules decks.
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 3/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING
Split of lines within module shall take place at 3m below BOS of process deck as the following:
6) Piping interface limit between Main Deck and Topsides (for construction):
The following split is valid for all the lines between the Main Deck and the Process Deck A excepet Cargo lines.
Prelude FLNG Work-Instruction : WI 001
Specific Floating LNG Project Date : 11/02/2013 Rev :6
60869M-TS00G00000-DI-1300-00001 Page : 5/8
Issued by : K. BOURUISS
Checked by :B. HAMADA
PIPING ENGINEERING
SHI (Substructure scope and Topsides scope) PDMS 3D model is available as per the following:
Safety HS-SHI Escape route, Air vent of W.B tank, Fire fighting , Life saving equipment
Handling BC-SHI Material handling route, Pad eye, Davit, Crane
Support SU-SHI Pipe support
Platform, Ladder, Stair, Manhole, Hatch,, Main Deck of Substructure, Stool, LQ, Fan room,
Structural CS-SHI
Tertiary structure
Electrical EA-SHI MCT, Temporary Cable rack, Electrical cable tray, Instrument cable tray
Instrumentation Instrumentation junction box & Local panel, Instrumentation transmitter, In line instrument, Air
IN-SHI
manifold
HVAC MH-SHI Mechanical vent, Natural vent
Architecture CS AR-SHI LQ, LER
Naval Architecture NZ-SHI Fenders, Chock, Bollard, Winch
Telecom TA-SHI Loudspeaker, Beacons, Junction box
Proposal PO-SHI Alternate studies
General GE-SHI
9) TMS PDMS 3D Model
COG location and origin have to be setup properly in PDMS during equipment modelling.
These attributes will be used during extraction of DWG and to establish weight report.
Please locate COG as per vendor information
For equipment origin refer to page 2
D
E
L
E
T
E
D
Prelude FLNG Work-Instruction : WI 006
Specific Floating LNG Project Date :18/06/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Piping (lines & equipments) 3D modelling progress within PDMS will be measured, for the Design Area, as per the following:
Refer to 60869M-GF00G00000-DI-0000-00001 for the 3D Model Status Control User Design
60%
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
The present Work Instruction covers the minimum guide for piping, in case of Low Temperature Service,
applicable for pEpci Project.
2
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 4/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 5/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 007
Specific Floating LNG Project Date : 28/06/2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 6/6
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 008
Specific Floating LNG Project Date : 23/08/2011 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 009
Specific Floating LNG Project Date : 15/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : B. HAMADA
Checked by :G.Hatt
PIPING ENGINEERING
POC **/MP
590000 mm
Prelude FLNG Work-Instruction : WI 011
Specific Floating LNG Project Date : 16/07/2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING
5D MINI
10D minimum from the
nozzle and the valve 10D of straight length minimum
from the nozzle and5Dthe elbow in
MINI
horizontal plan
Except for
V-15004 refer to 2000-110-003-TD-PX-10202
V-15003 refer to 2000-110-003-TD-PX-10203
C-15003 refer to 2000-110-003-TD-PX-10204
V-41004A/B refer to 2000-110-003-TD-PX-10205
V-14010/11/12 refer to 2000-110-003-TQ-MP-0028
Prelude FLNG Work-Instruction : WI 011
Specific Floating LNG Project Date : 16/07/2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING
IF LESS
IF 5D MINI
Developped length 5D
10D
minimum from the nozzle and
the valve
Developped
length
5D MINI
0D
10D minimum
5D MINI
Developped
length 10D
minimum from
the nozzle and
Developped
the reducer
length 5D MINI
Except for
C-11002 refer to 2000-140-003-TD-PX-10021
V-14025 refer to 2000-110-003-TD-PX-10385
3
Prelude FLNG Work-Instruction : WI 012
Specific Floating LNG Project Date : 15/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING
Rev 1
Rev 1
Rev 1
Prelude FLNG W ork-Instruction : W I 013
Specific Floating LNG Project Date : 19/06/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : K. BOURUISS
Checked by :G.Hatt
PIPING ENGINEERING
HANDLING CORNERS
Prelude FLNG Work-Instruction : WI 015
Specific Floating LNG Project Date : 15/06/2012 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : Ph. DEFRENNE
Checked by :G.Hatt
PIPING ENGINEERING
VALVE NAMING
Preambule: cet WI est applicable tous les centres mais doit tre adapte si besoin par les centres (KLOC / COC)
Forenote: this WI is applicalbe to all centers but has to be adapted as necessary (KLOC/COC)
1) Les PIDs (PEFS) EPCI masters papier sont disponibles au format A2, le bordereau rcapitulatif est sur les ronos
PID's (i.e. PEFS) in paper copy are printed in A2 format, the list is available on the cabinet
2) La distribution documentaire est faites avec le PID prcdent avec double barre rose et le nouveau PID
afin de dtecter d'ventuelles erreurs de report.
Distribution is done with the previous one with double pink bar and the new one to detect any eventual
discrepancy in comment reporting
3) Les noms des chefs de groupes sont inscrits sur chaque PID merci de ne pas modifier sans m'informer (ou Philippe)
afin de mettre a jour le bordereau qui rcapitule quel chef de groupe a recu quel Pid
Group leader names are indicated on each PID, do not modify it unless I am informed (or Philippe) so that the list
can be updated, the list also indicate which group leader has received which PID
4) Le code couleur applicable est distribu et une copie est galement disponible sur les ronos
Color code in force has been given and a copy is also available on cabinet
5) Merci de mettre vos initiales a ct de vos commentaires; en cas de "discussion avec le process" indiquer le nom de la
personne ayant donne son accord
Thanks to indicate your initials right next to your comments; in case of "informal discussion" with process indicate name of process
representative
6) N'oubliez pas de mettre une fiche dans les ronos avec votre nom lorsque vous empruntez un PID
Don't forget to place a paper with your name on it when you take a PID in the cabinet
7) Pas de travail sur des Pids autres que les Master papier A2 EPCI
No work is allowed except with master paper copy A2 format
8) Les notes dans la marge doivent tre coches avec les intiales du projeteur lors de leur inclusion dans le trac / conception
Notes shall be highlighted when taken into account into the design by the designer with initials
9) Si la note n'est pas applicable indiquer N/A avec les initiales du projeteur
Non applicable notes shall highlighted N/A with designer initials
Prelude FLNG W ork-Instruction : W I 017
Specific Floating LNG Project Date : 05/12/2011 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING
WI applicable to all centers and is adapted as necessary for KLOC/COC for local communication to
KLOC/COC local weight controler
Case 1 - Piping Mto is available since last issuance of piping weight report
POC will compile Weight report for Kloc & Coc and will send to Kloc & Coc for review.
Once agreed between Kloc & Poc, Kloc to communicate to Kloc local weight control copy Poc
Once agreed between Coc & Poc, Coc to communicate to Coc local weight control copy Poc
Case 2 - Equipment list revised is available since last issuance of weight report,
Coc to propose Weight report revision to Poc for review for their scope
Kloc to propose Weight report revision to Poc for review for their scope
Once agreed between Coc & Poc, Coc to communicate to Coc local weight control copy Poc
Once agreed between Kloc & Poc, Kloc to communicate to Kloc local weight control copy Poc
Equipment list advance copy can also be considered on Poc leader request
Case 3 - Process department has made modification on PEFS not reflected into official revision of PEFS
since last issuance of weight report,
It has been agreed with process leader the following procedure in case of modification not reflected into official
revision of PEFS (i.e. intermediate modification)
Process engineer shall bring a paper copy of the concerned modification to piping weight controler,
Piping weight controler shall evaluate the impact in term of weight based on statistical data (previous Mto's) and record
tons associated and well as concerned module and deck (or Pdms site)
Then reporting into Master paper piping PEFS shall be done with weight associated indicated.
In case of modification over 20 tons dry net weight an email alert shall be sent to Poc
Coc shall report such cases into next weight report revision to Poc for review for their scope
Kloc shall report such cases into next weight report revision to Poc for review for their scope
Once agreed between Coc & Poc, Coc to communicate to Coc local weight control copy Poc
Once agreed between Kloc & Poc, Kloc to communicate to Kloc local weight control copy Poc
For Cog
Kloc shall extract Cog report from PDMS and send to Poc for Kloc scope, Poc will review and revert to Kloc
for communication to weight control team Kloc & Poc
Coc shall extract Cog report from PDMS and send to Poc for Coc scope Poc will review and revert to Coc
for communication to weight control team Coc & Poc
In case Coc could not extract Cog, Poc will assist
Prelude FLNG Work-Instruction : WI 018
Specific Floating LNG Project Date : 22/02/2012 Rev :4
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING
The philosophy of choosing the type for utility stations (TYPE-A / TYPE B/ TYPE C) is as follows:
All the equipment's platform US where there is requirement of steam out connection will be --------> Type -B
All other US stations located in the equipment's other than the top Platform will be --------> Type -A (seen note1)
All the Top platforms of the equipment's / PRV Platforms / All the platforms above the TOP deck---------> Type -C
Utility connections
Note 1
Utility stations are not requiered on intermediate platform of equipment where multi-ladder are used
Utility stations are requiered on equipment platform with manhole or top access, type-A to be implemented or type-B in case of specific requirement on this
platform regarding steam
Prelude FLNG Work-Instruction : WI 019
Specific Floating LNG Project Date : 02/10/2012 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by :Ph. Defrenne
PIPING ENGINEERING
Drip pan location and surface implementation will be as fper the following work-process:
1) Once layouts are emitted Piping Dpt will hand over to Process Dpt a set of layout in this purpose
2) Process Dpt will identify on the layout quipments or areas subjected to "cryogenic spill" / "amine spill" / "condensate"
In reference with the MOM 2000-100-003-MM-0463 following rules to be applied between equipment and lines with low AIT ( Auto Ignition Temperature) product
Prelude FLNG Work-Instruction : WI 022
Specific Floating LNG Project Date : 18/06/2012 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : P. Defrenne
Checked by :G.Hatt
PIPING ENGINEERING
All valves tagged as VP 101 and VP 105 shall be considered as a fire case isolation valve
As noted on PEFS "VALVE TO BE LOCATED AT THE EDGE OF THE FIRE ZONE." these valves to be located at the edge of the fire case area at less than 3 meters from the edge of module as shown on the fire zone limit here below .
These valves shall not be located inside the jet fire impingement - 10 minutes ( extract from fire protection report issued by Safety)
The line routing after UZV shall not go back inside the fire zone but shall be located at less than 3 meters from module
Here below typical representation of VP101 and VP105 as identified on PEFS
Rev 1 If valve is located on main deck to be placed at 3m distance approximately from main deck penetration.
In order to follow the consortium agreement between SHI and TSC regarding the scope of work of small bore piping.
Please find here attached the limit of modeling of small bore pipes
All lines number reflected in the lines lists identified with a main diameter bellow DN 5O is under SHI scope of work.
This is include design,routing,3d modelling,supports,isometrics production, construction,inspection,testing,comissioning.
If this line is connected to a line above DN 50 the branch fittings is under TP scope of work
All lines number reflected in lines lists identified with main diameter above or equal to DN 50 is under TP scope including the small bore portion
under this line number
The aim of this work instruction is to cover COMPANY requirement regarding location and orientation of butterfly valve at Relief Valve inlet .
You will recover in the drawings below several cases which have to be considered in our design.
The main drivers are :
Process for fouling service and non fouling service.
Process service for two phase flow
The elbow orientation and location before and after the butterfly valve
The impacts on design for different cases are reflected in the following drawings.
Impact are:
lines routing
butterfly stem orientation
Elbows location and orientation
Upstream and downstream straight line d
\Scan PID.pdf
Prelude FLNG Work-Instruction : WI 026
Specific Floating LNG Project Date : 19/03/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : G.Hatt
Checked by :Ph.Defrenne
PIPING ENGINEERING
Prelude FLNG Work-Instruction : WI 026
Specific Floating LNG Project Date : 19/03/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by :
PIPING ENGINEERING Checked by :Ph.Defrenne
Prelude FLNG Work-Instruction : WI 027
Specific Floating LNG Project Date : 02/08/2012 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : K Dahmani
Checked by : G Hatt
PIPING ENGINEERING
Note: LEGEND
PRIMARY SUPPORT
Is it a special support
YES (over allowable NO
loads) or particular
case?
NO
6 Exception on page 16 only one block valve is by piping on isometric => single block by piping
Prelude FLNG Work-Instruction : WI 029
Specific Floating LNG Project Date : 02/08/2012 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2,3,4,5,6,7,8,9,10,11,12,13/14
Issued by : X CARCAUD
Checked by :G HATT
PIPING ENGINEERING
\LNG-LPG-Toxic
with PDS LT-PT-FT
Prelude FLNG Work-Instruction : WI 029
Specific Floating LNG Project Date : 17/07/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 16
Issued by : X CARCAUD
Checked by :G HATT
PIPING ENGINEERING
Eccentric reducers are 99% of the time, with seam on the flat portion
In case both reducers are not seamless , add a spool piece between reducers.
Seamless indication can be be found in piping classes details
New requirement has been provide by safety thru MOM 2000-110-003-MM-11031 and vent report 60869M-GF00G00000-RT-6200-62003 .
On this Basis vent orientation to be oriented sea side for hydrocarbon, regarding utilities vent toward unit is acceptable
By default Report 60869M-GF00G00000-RT-6200-62003 consider 7.6 m given as a minimum by piping and precise if hydrocarbon contain
It has been agreed that horizontal vent discharge to sea side is acceptable,
whatever the type of release is (e.g hydrocarbon, steam, nitrogen), as long as the
outlet piping does not exceed the edge of the FLNG
Horizontal vent release facing an other platform/module is acceptable:
within utility modules for all type of release except hydrocarbon. High
temperatures will be assessed within the hazardous contours.
within other modules as long as product release is not hydrocarbon. High
temperatures will be assessed within the hazardous contours.
2-Safe area
Following review of preliminary representation of safe area for horizontal release,
it has been agreed as shown in attachment 1 that
As hazardous contour have to be outside the area affecting personnel based on
normal man height of 2.1 meters and outlet discharge piping shall release at least
3 m above the tallest plant structure, hazardous contour has no drop more than 0.9m
IF 60869M-GF00G00000-RT-6200-62003 call for more 7,6 meters refer pages 12 TO 35 last column
Piping designer have to model a sphere with a radius equal to final safe area in last column .
This sphere to be cut back at 3 meter to reflet the main requirement given above
Bottom portion as per the table to be also cutback by 6 metter.
Cutted sphere shall not interfer with PLTF space, 2.1 Meter shall be maintain or 3M until the davit beam as shown above
For Hydrocarbon contain overlap above other Platform is not authorised even with the safety gap maintain
Vent to be oriented sea side
FINALVOLUMEFORINTERFERENCECHECK.
THISVOLUMESHALLNOTINTERFERWITHOPERATINGZONEAS
DEFINEABOVE.
MODELING OF SPHERE AS PER GIVEN EXEMPLE
THISVOLUMSHALLNOTBEABOVEANOPERATINGPLATFORMFOR
THEHYDROCARBONVENT.
TOBEORIENTEDSEASIDE;
ventoutlet
6M
2.1or3Mif
davit
handrail
3M
CRD NETWORK
Prelude FLNG Work-Instruction : WI 034
Specific Floating LNG Project Date : 11/02/2013 Rev :1
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by :
PIPING ENGINEERING Checked by :Ph.Defrenne
IA NETWORK
Prelude FLNG Work-Instruction : WI035
Specific Floating LNG Project Date : 30-AUG-2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 1/2
Issued by : Xcarcaud
Checked by : Ghatt
PIPING ENGINEERING
Galvanization bath for spool with pipe diameter DN80 and above
1. All galvanized pipe have to follow the size requirement as shown in the next figure
IN ADDITION A BREAK FLANGE TO BE ADDED AT EACH DESIGN AREA LIMIT
Below DN 80mm a union shall be placed every 5m maximum 3
80
Prelude FLNG Work-Instruction : WI035
Specific Floating LNG Project Date : 30-AUG-2013 Rev :3
60869M-TS00G00000-DI-1300-00001 Page : 2/2
Issued by : Xcarcaud
Checked by : Ghatt
PIPING ENGINEERING
Galvanization bath for spool with pipe diameter DN80 and above
DN50 DN80
DN50
Prelude FLNG Work-Instruction : WI036
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
CS + PE Lining Lines
1. Piping Classes:
- LR018201Z
2. Design:
-All fittings are flanged type. Concerning piping , flanged spool pieces are used.
-The quantity of spools shall be minimized using spools pieces available below.
-The use of spool pieces not available below shall be minimized
-IMPORTANT
Spool pieces lenght must be chosen according supports construction standards used (refer to
chapter "Supports" )
3. Spool pieces:
- Straight Pipes:
Notes:
1) In case of nominal sizes 100mm and larger , 2pc's of thebranch may be connected with
the run, but the angle between the axes of each branch shall be less than 90.
2) The nominal size ofn the branch should be smaller than that of the run
3) Other dimension not listed in this table shall be subject to an agreement withn us.
CS + PE Lining Lines
- Fitting Pipes
Notes:
a. Branch connections
1) Max 5pc's of branches may be connected with the run pipe.
2) Angle of the axes of the branch should be less than 90.
b. One bend or branch connections
1) Max 3pc's of branches may be connected with the run to the contrary angle of the elbow.
c. Two bend connections
1) Angle of the bend or elbow should be less than 45.
Prelude FLNG Work-Instruction : WI036
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
CS + PE Lining Lines
4. Butterfly:
- Spacers
In order to open butterfly valves, it is necessary to add spacers for following diameters :
- DN 80
- DN 150
- DN 200
- DN 250
- DN 300
Spacers are included in piping classes ( Short code SPAV ) with a thickness of 12 mm
WRONG DESIGN
Prelude FLNG Work-Instruction : WI036
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 4/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
CS + PE Lining Lines
5. Supports:
For any support type, minimum spool piece length used is 500 mm ( all diameters ).
Supply of supports is the same than for metallic isometrics (service provider & piping sub contractor)
Spool pieces used for Anchor or GT types are the same as those included in Piping classes
As general rule , spool piece length used for Anchor & Stop support types is 500 mm .
If the length is too short , spool piece length 1 m type can be used
STOP
ANCHOR
6.Holes:
On each spool piece and fitting, a hole is made. This hole is used for breathing of PTFE and
as witness leak.
If the line is insulated , a nipple DN 15 , supplied by SHI ,must be mounted on each spool
piece and fitting. Nipples are not shown on 3D models.
Following note is added on IFC isometrics
"If line is insulated, nipples should be mounted on fittings and spool pieces"
Prelude FLNG Work-Instruction : WI037
Specific Floating LNG Project Date : 12-April-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : G. Hatt
Checked by : Ph Defrenne
PIPING ENGINEERING
Valve with vent (also called valve self-relieving) not appearing on pid
Valve with vent (also called valve with vent hole) not appearing on pid
Valve with vent (also called valve uni-directionnal) not appearing on pid
Valve with vent (also called valve with body cavity pressure relief system) not appearing on pid
Clarification > this WI does not concern valves with high pressure side, don't mix !
Pid for high pressure side
Valve with vent (also called valve self-relieving) not appearing on pid
Valve with vent (also called valve with vent hole) not appearing on pid
Valve with vent (also called valve uni-directionnal) not appearing on pid
Valve with vent (also called valve with body cavity pressure relief system) not appearing on pid
Valve with vent (also called valve self-relieving) not appearing on pid
Valve with vent (also called valve with vent hole) not appearing on pid
Valve with vent (also called valve uni-directionnal) not appearing on pid
Valve with vent (also called valve with body cavity pressure relief system) not appearing on pid
Piping class with Uni-directional valves (by type of valve per DN)
Options for valves (RB, FB, BW & FLG) not taken into account.
Uni-directional valves ONLY
Only type of valve
Size (DN)
Piping class Block valve type 15 20 25 40 50 80 100 150 200 250 300 350 400 450 500 600
011472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
011473W Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
013480W Ball valve Y Y Y Y Y Y Y Y
013484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
031472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033480W2 Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033480WD Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033484C2 Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
033484CD Ball valve Y Y Y
Gate valve Y Y Y Y
061472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
063480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
063480WD Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
063481W Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
063481W2 Ball valve Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
063481WD Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
063484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
091472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
091473W Ball valve Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y Y Y Y Y
093480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
093484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
093485C Gate valve Y Y Y Y Y
LR011472W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
LR013480W Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y
LR013484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
LR031472W Ball valve Y Y Y Y Y Y
Gate valve Y Y Y Y
LR033484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
LR061472W Ball valve Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
LR063484C Ball valve Y Y Y Y Y Y Y Y Y Y Y Y
Gate valve Y Y Y Y
Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
Towing, Sea fastening and associated piping supports or portion of piping support
Here is the explanation of who does what when how in which purpose in piping team (support/stress/
field engineering) for towing, sea fastening and associated piping support or portion of piping support.
1.Support
a) Lines calculated
Support team follow stress calculation notes requierements for towing, piping support or portion
of piping support, see example of calculation note below.
Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
Towing, Sea fastening and associated piping supports or portion of piping support
If lines are not calculated (so no calculation note) it is SHI scope, refer to TSC consortium agreement
8.2 for details in case of doubt.
2.MDS Function
Support designer use MDS function to indicate on isometrics specific request for:
Towing:
Use attribute "MDS-towing-note"
Towing, Sea fastening and associated piping supports or portion of piping support
Spring box data sheet indicate if spring box is "Blocked during Tow" or "Unblocked during Tow"
By defaut it is considered as blocked durung Tow (unless specific exeption duly indicated
in stress calculation note).
Support team need to produce a specific offshore piping support deliverable for the GFLNG project.
A single document made of two part, inside one part for KLOC / one part for COC.
This document will be useful for the yard, field engineering and commissioning team.
This document will be issued by POC based on input from COC and KLOC. This document will
consist of
- data sheet of spring boxes unlocked during tow with their associated tags and X/Y/Z coordinates
with corresponding Calculation Note reference.
- X/Y/Z coordinates of piping support or portion of piping support to be dismantled at final location
with corresponding Calculation Note reference.
- recap list
Prelude FLNG Work-Instruction : WI038
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 4/4
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
Towing, Sea fastening and associated piping supports or portion of piping support
Towing or Gap shall be checked carefully, as per checking working instruction in force (for
isometrics and supports).
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING
Definition :
Main Line or Header : Relief valve exhaust pipe.
Drain line or Branch : Connection to OSD DN50.
PDMS Modelling :
In order to model this particular tapping in PDMS there is 2 different methods, depending of the
header diameter and piping class branch table.
The first step for the designer is to check with the piping class and with the document
"Topside Branch Tables" Ref.2000-110-G000-GE00-G00000-RA-7737-00023 whether
Pi to
Pipe t pipe
i branch
b h connection
ti isi allowed
ll d with
ith regards
d to
t the
th header
h d diameter.
di t
If yes consequently designer can use "branch to header" Tee in PDMS to connect the drain line to the header.
If no, designer has to work with several "atta" and copy/past tapping position for branch head definition,
and also copy/past manually line number reference to edit several "stext" "atta" on header and drain line.
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING
Create a "tee" (branch to header) on the main line at the location of the planed drip hole.
Kindly check weld proximity.
Create at the same location (tee) an generic "atta" on the main header.
Then edit ATTA's ATTY attribute to 'CCNN' and ATTA's STEXT with the following sentence :
'DO NOT CUT 50NB HOLE IN THE HEADER PIPE BUT ONLY "DRIP HOLE" 13mm'
Finally connect the drain line to the header's "TEE" as you proceed usually.
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 3/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING
Second case : pipe to pipe connection not allowed as per branch table wrt header NB :
Create a generic "atta" on the main line at the location of the planed drip hole.
Kindly check weld proximity.
Then designer has to copy the coordinates of this "atta" which will be used to define the location of the
"head" for the drain line. This can be done by selecting the "atta" (current element) and typing "Q pos" in
PDMS' command line window.
Designer has to create now the drain pipe and branch, selecting "Explicit" method for the head definition
and past the coordinate of the "atta" previously copied.
In addition, designer need to select '50' for the bore, 'D' for the direction and 'Butt Weld' for connection in
the branch head explicit definition box.
In order to get a correct representation on isometrics, designer need copy the branch name of the drain :
In the example above '50-OSD-xxx-yyyyy/B1' and add it when editing the first 'atta' on the header.
Prelude FLNG Work-Instruction : WI039
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 4/4
Issued by : T.Heritier
Checked by : P.Defrenne
PIPING ENGINEERING
Edit header's ATTA ATTY attribute to 'CCCC' and ATTA's STEXT with the following sentences :
'DO NOT CUT 50NB HOLE IN THE HEADER PIPE BUT ONLY "DRIP HOLE" 13mm'
'50-OSD-xxx-yyyyy/B1'
Finally, in the same optic to get a correct representation on drain isometric designer need to create
one last "ATTA" at the head location of the drain line.
Editing drain's ATTA ATTY attribute to 'CCNN' and ATTA's STEXT with the following sentences :
'DO NOT CUT 50NB HOLE IN THE HEADER PIPE BUT ONLY "DRIP HOLE" 13mm'
'branch name of the header'
Prelude FLNG Work-Instruction : WI040
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
There are 3 kind of spray nozzle for deluge, they will be available in the catalogue with these
tag numbers:
-WDN-12027
-WDN-12046
-WDN-12061
Please note that on PEFS these tags are not directly mentionned in the line
example:
Prelude FLNG Work-Instruction : WI040
Specific Floating LNG Project Date : 16-APR-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
It' s necessary to refer to the table on the right side of the PEFS which provides the spray nozzle tag
associated to the equipment deluged that hasto be added in lnie.
Example:
Information on Isometric :
SS + PTFE LINED
1. Piping Classes:
- 011836Z
2. Design:
-All fittings are flanged type. Concerning piping , flanged spool pieces are used.
-The quantity of spools shall be minimized using spools pieces available below.
-The use of spool pieces not available below shall be minimized
-IMPORTANT
Spool pieces lenght must be chosen according supports construction standards used (refer to
chapter "Supports" )
3. Spool pieces:
- DN 25 to 40 : 0.1m
- DN 25 to 150 : 0.2m, 0.3m, 0.4m, 0.6m, 0.8m, 1m, 1.5m, 2m, 3m, 6m
If you have this case it's necessary to check the feasibility with material group. (raise a query)
For each diameter, minimum and maximum spool lenghts shall be in accordance with spool piece
lenghts included in piping classes.
Prelude FLNG Work-Instruction : WI041
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
SS + PTFE LINED
4. Butterfly:
- Spacers
In order to open butterfly valves, it is necessary to add spacers for following diameters :
- DN 80
- DN 150
- DN 200
- DN 250
- DN 300
Spacers are included in piping classes ( Short code SPR ) with a thickness of 20 mm
WRONG DESIGN
Prelude FLNG Work-Instruction : WI041
Specific Floating LNG Project Date : 11-JUN-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/3
Issued by : Jmarchesan
Checked by : Ghatt
PIPING ENGINEERING
SS + PTFE LINED
5. Supports:
For any support type, minimum spool piece length used is 500 mm ( all diameters ).
Supply of supports is the same than for metallic isometrics (service provider & piping sub contractor)
Spool pieces used for Anchor or GT types are the same as those included in Piping classes
As general rule , spool piece length used for Anchor & Stop support types is 500 mm .
If the length is too short , spool piece length 1 m type can be used
STOP
ANCHOR
6.Holes:
On each spool piece and fitting, a hole is made. This hole is used for breathing of PTFE and
as witness leak.
If the line is insulated , a nipple DN 15 , supplied by SHI ,must be mounted on each spool
piece and fitting. Nipples are not shown on 3D models.
Following note is added on IFC isometrics
"If line is insulated, nipples should be mounted on fittings and spool pieces"
Prelude FLNG Work-Instruction : WI043
Specific Floating LNG Project Date : 16-JUL-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 1/3
Issued by : XCarcaud
Checked by : Ghatt
PIPING ENGINEERING
1. Composition
Piping GAD designate the piping system in accordance with the requirements of
the PEFS (including SP and Instrument Tag),
Equipment Layouts, Specifications, etc
Piping GAD shall be extracted from 3D Model
Piping GAD shall indicate the following items :
=> Configuration, Elevation, Line number of hard piping into 3D Model
=> Coordinates of Equipments, Structural and Piping
=> Dimensions are rounded off to the nearest interger
2. General Requirements
Drawing Size A0
Scale 1/50e
Dxf and Pdf format
Piping Arrangement Drawing to be read in conjuction with Equipment Layout Drawing and
Handling Ways and Devices
Shall be the same as the one on Equipment Layout and Handling Ways Drawings
2000-110-G000-GE00-G00000-MP-4024-00007-001
2000-110-G000-GE00-G00000-MP-4024-00008-001
Prelude FLNG Work-Instruction : WI043
Specific Floating LNG Project Date : 16-JUL-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 2/3
Issued by : XCarcaud
Checked by : Ghatt
North Orientation (top left corner)
Doc Class 2
Revision AFC only
6. Border
8. Drawing Area
Deck TOS / Platform TOS ( on Equipment or Stand alone) shall appear as illustrated above
Prelude FLNG Work-Instruction : WI043
Specific Floating LNG Project Date : 16-JUL-2013 Rev :2
60869M-TS00G00000-DI-1300-00001 Page : 3/3
Issued by : XCarcaud
Checked by : Ghatt
Location of Pipe Support shall be shown without any relevant dimension from
piping structure, match line, row.
Reference to the standard or Special shall be made as such :
All spring boxes and rigid struts shall appear whatever the size
All supports shall appear above Dn 350mm 2
12. Content
WORK INSTRUCTION: Doubler Plate Requirement => for primary structural only
1
GeneralNote:DoublerPlateMaterialS355/DC4minithickness8mm,DoublerPlateshallbe10mmgreaterthantheoutsidedimensionoftheincoming
1
Prelude FLNG Work-Instruction : WI045
Specific Floating LNG Project Date : 17-July-2013 Rev :0
60869M-TS00G00000-DI-1300-00001 Page : 1/1
Issued by : G. Hatt
Checked by : Ph Defrenne
PIPING ENGINEERING
BOLTING FOR FLARE LINE (specific location for piping class 011492F)
For line 1000-FWL-630-0010-011492F at connection with A-63004 the above bolting shall be placed in the model.
This optionnal bolting is available in the catalog