STATEMENT OF QUALIFICATIONSTO THE

City of Carmel-by-the-Sea

Architectural, Engineering, Municipal


Administration & Other Professional Services
For the Term October 1, 2017 June 30, 2019
Service Area: Construction Management and Inspection Services

SEPTEMBER 29, 2017

3150 Almaden Expressway, Suite 255


San Jose, CA 95118
408.618.8300 phone
408.618.8310 fax
www.csgengr.com
SECTION 1
Cover Letter
September 29, 2017
Robert M. Harary, P.E., Director of Public Works
City of Carmel, Public Works Department
Junipero 2 SE of 4th Avenue
Carmel, CA 93921
Re: Statement of Qualifications for Construction Management and Inspection Services
CSG Consultants, Inc. (CSG) is pleased to present our Statement of Qualifications for construction
management and inspection services to the City of Carmel-by-the-Sea (City). Our firm brings specialized
expertise, proximity, electronic plan review capability, knowledgeable and highly competent staff, and an
existing working relationship with the City performing plan review, inspection, permit tech, as well as
code enforcement services.
For over 26 years, CSG has been providing a host of professional municipal services to the public sector.
We provide our municipal clients with a range of services including full construction management teams,
resident engineers, assistant resident engineers, office engineers, and construction inspectors based
upon the need and particular scope of the project. Based on our teams knowledge and experience, and
CSGs broad service offerings, we are well suited to fulfill any of the Citys professional needs as they
may arise.
Nourdin Khayata, PE, will serve as the primary contact and as-need project manager/resident engineer
for this contract. Mr. Khayata served as a City Engineer for the City of Marina and is familiar with working
on the Monterey Peninsula. His contact information is below:
Nourdin Khayata, PE | Principal in Charge
(650) 333-0831 cell | nourdin@csgengr.com e-mail
We are confident that our team is best suited to deliver professional services for the City. Below is a
summary of specific reasons why the City should choose CSG as its on-call consultant.
The Right Experience CSG has extensive experience in providing similar services for both engineering
public works and building and safety services. CSG currently provides similar services to jurisdictions
throughout California, including local agencies such as the cities of Gilroy, Morgan Hill, Marina,
Watsonville, Salinas, and Seaside. We have held numerous on call contracts at various level of
engineering and construction management services and fully understand the needs of clients and
managing resources to meet those needs.
Experienced Project Managers CSGs project managers have a proven track record of delivering
projects on time and within budget. And, many of our staff bring expertise gained from direct public sector
experience providing the City with a unique perspective in approaching projects.
Commitment to Quality Assurance / Quality Control (QA/QC) CSG is committed to utilizing a peer
review process with multi-level internal quality checking of the deliverables for each service line. The
dedicated QA/QC personnel have extensive engineering, building and fire code, and municipal
experience.
We are excited about the opportunity to continue to serve the City of Carmel-by-the-Sea and would
welcome the opportunity to discuss with you further regarding your specific needs. If you have any
questions or need additional information, please contact Mr. Khayata at the information provided above.
Sincerely,

Cyrus Kianpour, PE, PLS


President, CSG Consultants, Inc.

3150 Almaden Expressway #255, San Jose, CA 95118


408.492.2275 phone | 408.618.8310 fax | www.csgengr.com
FORM A GENERAL FIRM INFORMATION

1. Firms Name: CSG Consultants, Inc.

2. Firms Local Address: 3150 Almaden Expressway, Suite 255, San Jose, CA 95118

3. Is your local office the Head Office? Yes No

Branch Office? Yes No Only Office? Yes No

4. Year your firm was established: 1991

5. Year your local office was established: 2016

6. Primary contacts (Principals) in the local office:

Name Title Telephone Number Email Address

Nourdin Khayata, PE Principal-in-Charge 650.333.0831 nourdin@cagengr.com

7. List locations of no more than three (3) other offices where work may be performed (if applicable):

Address Telephone Number # of Personnel


550 Pilgrim Drive, Foster City, CA 650-522-2500 19

8. Total employees presently employed:

a. In your local office: 166

b. In your firm: 288

9. Errors and Omissions Insurance

a. Amount your firm presently carries: $ 5,000,000 per claim


b. Carriers name and address:
Arthur J. Gallagher & Co.
Insurance Brokers of CA, Inc. LIC #0726293
1255 Battery Street, Suite 450
San Francisco, CA 94111
FORM B TENTATIVE PROJECT TEAM

SERVICE AREA (Select one Service Area from list in SOQ package):

A. Consultants Key Personnel


Please identify your tentative, key Project Team members, their titles/role and primary duties:

Name Title/Role Primary Duties


Principal-in-Charge, QA/QC and Project
Nourdin Khayata, PE
Resident Engineer Management
Erik Nava Construction Inspector Construction Inspection

Mario Mendoza Construction Inspector Construction Inspection

Saeid Mostafavi Construction Inspector Construction Inspection

Kevin OConnell, PE Principal Engineer Construction Inspection

Ahmad Lam Construction Manager Construction Inspection

B. Subconsultant and Support Services


Please identify up to four (4) key subconsultants or vendors, contact person, and services they would
provide in order to support your Project Team.

Firm Name & Location Contact Person Support Services

C. Organizational Chart
Please insert an Organizational Chart of your tentative Project Team on the next page.
ORGANIZATIONAL CHART

Nourdin Khayata, PE
Principal Engineer

Ahmad Lam
Construction Manager

Kevin OConnell, PE
Principal Engineer

Erik Nava
Construction Inspector

Mario Mendoza
Construction Inspector

Saeid Mostafavi
Construction Inspector
FORM C RESUMES OF KEY PERSONNEL

1. Name: Nourdin Khayata, PE


2. Role in this Service Area: Resident Engineer
3. Years of Experience Total: 25 years+ With current firm: 13 years
4. Education (Degree and Specialization)
Master of Science, Civil Engineering, Tennessee State University, Nashville, TN
Bachelor of Science, Civil Engineering, University of Texas, Austin, TX
5. Current Registration/Certification (State & Discipline)
Professional Civil Engineer, State of California | C52446
Trench Excavation Safety
Confined Space Training
Cal OSHA 40-Hour HAZMAT
Storm Water Pollution Prevention Training
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
7. Relevant Project Title & Location (City & State):
2017 Pavement Resurfacing Project | City of Santa Clara, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Khayata served as the resident engineer for this locally funded project and was responsible
for coordinating work activities and resolving issues with City Departments, utility owners,
material testing providers, and other public agencies. He reviewed and processed contractor
RFIs and submittals, directed and notified contractor for non-compliance and resolved issues,
and managed public outreach.
Performed Relevant Project with Current Firm: Yes No
8. Relevant Project Title & Location (City & State):
Blossom Hill Road Improvements | City of Los Gatos, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Khayata was the resident engineer for this state funded project performed under a Safe
route to School program. The work involved road widening, resurfacing, overlay, new parking
area, storm drain, utility relocation, new C/G, sidewalk, curb ramps & driveways, bike lanes,
striping, signing, street lights and lighted crosswalks.
Performed Relevant Project with Current Firm: Yes No
9. Relevant Project Title & Location (City & State):
Highway 101/Tennant Avenue Interchange | City of Morgan Hill, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Khayata was the resident engineer for this project to widen the existing Tennant Ave.
overcrossing at Hwy 101 to four lanes and improve the traffic flow through the interchange. Work
included the construction of a new bridge structure, northbound 101 on-ramp loop for eastbound
Tennant traffic, high occupancy vehicle (HOV) bypass lane, ramp-metering infrastructure, joint
trench installation for the underground conversion of electrical and communications utilities,
asphalt concrete pavement, traffic signal modifications, safety and street lighting, drainage and
erosion control improvements, 12 main water line installation, concrete structures and flatwork
(i.e. sidewalk, driveways, access ramps), signage, landscaping restoration, and pavement.
Performed Relevant Project with Current Firm: Yes No
FORM C RESUMES OF KEY PERSONNEL

1. Name: Kevin OConnell, PE


2. Role in this Service Area:
3. Years of Experience Total: 30+ years With current firm: 7 years
4. Education (Degree and Specialization)
5. Current Registration/Certification (State & Discipline)
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Relevant Project Title & Location (City & State):
7.
Utilities Program Management, Design, & Construction Management | City of Morgan Hill, CA
Year Completed Professional Services: 2017
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. OConnell served as the program manager for the Citys $18 million sewer and water
improvement program. As the overall manager, he oversaw the preparation of each project
scope of work, budget, and schedule. He prepared RFP documents for design services, per City
requirements, and performed as needed review of various sewer and water line designs, as well
as pump station improvements.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
8.
Program Manager | City of Gilroy, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. OConnell served as a Program Manager in a staff augmentation role to the City of Gilroy.
He provided big-picture development and plan review services while working with residential
and commercial developers on entitlements as the Citys representative. His day to day
functions include managing the Citys development engineering staff, resolving Public
Inspection construction issues, meeting internally with other department and revising the Citys
Development standard specifications and details.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
9.
General Manager | North Coast County Water District
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Initially hired as the Assistant General Manager to jump-start the Capital Improvement Program,
Mr. OConnell quickly performed a strategic assessment of the Districts infrastructure, personnel
and financial condition. Shortly thereafter he was promoted and as G.M. established a
comprehensive program to respond to the Districts essential needs; an aggressive twenty-year
Capital Improvement Program was developed and implemented; staff training was conducted
initially to respond to emergency repairs and then to construct projects from the Capital
Improvement Projects including transmission and distribution piping, tank retaining walls, grading
and foundation construction for three multi-million gallon tanks along with the connecting piping,
and major slide repairs; and, he was also instrumental in revising the budget in order to respond to
financial liabilities, the CIP program and increase District emergency reserves.
Performed Relevant Project with Current Firm: Yes No
FORM C RESUMES OF KEY PERSONNEL

1. Name: Ahmad Lam


2. Role in this Service Area: Construction Manager
3. Years of Experience Total: 25+ years With current firm: 1 year
Education (Degree and Specialization)
4. Master of Science, Structural Engineering, University of Colorado, Boulder, CO
Bachelor of Science, Civil Engineering, San Jose State University, San Jose, CA
Current Registration/Certification (State & Discipline)
5.
Professional Civil Engineer, State of California | C44820
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Relevant Project Title & Location (City & State):
7.
Assistant Structure Representative | Bakersfield, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Lam served as the Assistant Structure Representative on the $21M Hosking Avenue/State
Route 99 Interchange Project. The project included removal of a four-span CIP/PS box girder
bridge over SR99 under traffic detours.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
8.
Lead Structural Inspector | San Bernardino County, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
This project consisted of more than a dozen new bridges and bridge widenings including over
railroad tracks, ramp improvements, numerous traditional retaining walls, MSE walls, and soil
nailing walls. Mr. Lam was responsible for all aspects of construction inspection from foundation
(large CIDHs), temporary shoring adjacent to rail road tracks to superstructures (precast and cast-
in-place) pre-stressed concrete bridges.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
9.
Field Inspector | San Jose, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Lam was a field inspector of residential buildings. His responsibilities included structural
inspection of building structures including reinforcing steel, anchor bolts, holdowns, shear walls
and structural framings in accordance with structural plans and details.
Performed Relevant Project with Current Firm: Yes No
FORM C RESUMES OF KEY PERSONNEL

1. Name: Saeid Mostafavi


2. Role in this Service Area: Construction Inspector
3. Years of Experience Total: 26+ years With current firm: 14 years
Education (Degree and Specialization)
4.
Bachelor of Science, Mechanical Engineering, University of Texas, El Paso, TX
5. Current Registration/Certification (State & Discipline)
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Relevant Project Title & Location (City & State):
7.
Crystal Springs El Cerrito Phase II Sewer Improvement | Town of Hillsborough, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Mostafavi served as the lead construction inspector for the installation of over two miles of 26-
28 fusible high-density polyethylene (HDPE) gravity sewer main to replace the existing pipe. The
project included the installation of over 60 new sewer manholes, 75 service lateral re-connections,
system bypassing through portions of the existing pipeline, and four drilled concrete stitch pier
walls to stabilize the adjacent San Mateo Creek embankment and support the utility work.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
8.
2015 Street Resurfacing Project | Town of Hillsborough, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Mostafavi served as the primary construction inspector for the rehabilitation of
approximately 26 miles of roadways. The rehabilitation included Asphalt Concrete Overlay,
Cape Seal, Microsurfacing, and Crack Sealing treatments. His duties included verifying limits of
work, observing the placement of materials and ensuring they are in accordance with the
Design and Specifications, as well as to document the construction activities and reporting to
the Resident Engineer of the progress. Mr. Mostafavi maintained a Daily Report outlining that
type of work performed as well as the crews and equipment utilized on site, and provided
photographic documentation to support the written report.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
9.
Redwood City Recycle Water Project | City of Redwood City, CA
Year Completed Professional Services:
Year Completed Construction (if applicable):
Brief Description (Scope, size, cost, etc.) and Specific Role:
As construction inspector, Mr. Mostafavi oversaw the installation of 2,300 feet of recycled water
double containment HDPE pipe and 3,250 feet of recycled water PVC pipe, ranging from 8 to
20 in diameter. The project included HDPE fusions, new leak detection structures, ductile iron
fitting and joint restraints, butterfly and gate valves, blow-offs, air valves, recycled water
services, wax tape and galvanic zinc anode cathodic protection, connections to existing lines,
and a slurry seal. He was responsible for daily inspection, SWPPP, and project coordination
with utility agencies.
Performed Relevant Project with Current Firm: Yes No
FORM C RESUMES OF KEY PERSONNEL

1. Name: Erik Nava


2. Role in this Service Area: Construction Inspector
3. Years of Experience Total: 6+ years With current firm: 2 years
4. Education (Degree and Specialization)
5. Current Registration/Certification (State & Discipline)
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Relevant Project Title & Location (City & State):
7.
Construction / Public Works Inspection | City of Marina, CA
Year Completed Professional Services: on going
Year Completed Construction (if applicable): on going
Brief Description (Scope, size, cost, etc.) and Specific Role:
As the construction inspector for the City of Marina, Mr. Nava provided as needed construction
inspection for various public works and development projects. Some of the projects Mr. Nava
has provided inspection services for include:
The Dunes Phase II and Phase III
Cinemark Movie Theater
Veterans Affair/Department of Defense Clinic
Marina Heights
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
8.
East Garrison Phase 2 | County of Monterey, CA
Year Completed Professional Services: 2016
Year Completed Construction (if applicable): 2017
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Nava served as the construction inspector for infrastructure improvements for phase 2 of the
East Garrison development. He performed inspection of grading operations, SWPPP and BMP
enforcement, roadway excavations and embankments, drainage culverts, bridge crossings,
storm drain lines, and roadway construction.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
9.
Construction Inspection | City of Gilroy, CA
Year Completed Professional Services: 2015
Year Completed Construction (if applicable): 2015
Brief Description (Scope, size, cost, etc.) and Specific Role:
As the construction inspector for the City of Gilroy, Mr. Nava provided as needed construction
inspection for various public works and development projects. He performed inspections for the
Hecker Pass and Oak Place developments, as well as for the construction of a new roundabout.
He inspected all underground utilities as well as all drainage and roadway aspects of the
developments.
Performed Relevant Project with Current Firm: Yes No
FORM C RESUMES OF KEY PERSONNEL

1. Name: Mario Mendoza


2. Role in this Service Area: Construction Inspector
3. Years of Experience Total: 10+ years With current firm: 1 year
Education (Degree and Specialization)
4.
Associates of Arts, Business Administration | Monterey Peninsula College, CA
5. Current Registration/Certification (State & Discipline)
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Relevant Project Title & Location (City & State):
7.
Public Works Inspector | City of Gilroy
Year Completed Professional Services: on going
Year Completed Construction (if applicable): on going
Brief Description (Scope, size, cost, etc.) and Specific Role:
Provided public works inspection for the City on various CIP infrastructure as well development
projects. His duties also include inspecting all development sites for compliance with storm
water permit and writing progress reports for all sites.
Performed Relevant Project with Current Firm: Yes No
Relevant Project Title & Location (City & State):
8.
Grade Checker & Operator | Robert F. Enz Construction
Year Completed Professional Services: 2016
Year Completed Construction (if applicable): 2016
Brief Description (Scope, size, cost, etc.) and Specific Role:
Mr. Mendoza was responsible for scheduling and made sure the elevations matched according
to the plan. He also managed the operation of equipment and machinery.
Performed Relevant Project with Current Firm: Yes No
9. Relevant Project Title & Location (City & State):
Year Completed Professional Services: 2015
Year Completed Construction (if applicable): 2015
Brief Description (Scope, size, cost, etc.) and Specific Role:
Performed Relevant Project with Current Firm: Yes No
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 3 4 (Match the bottom of Form E)

1. Title of Example Project: Imjin Parkway Bike Lane Improvement

2. Project Location (City and State): Marina, CA

3. Year Completed Professional Services:

4. Year Completed Construction (if applicable):

5. Project Owners Information:

Project Owner: City of Marina, CA

Point of Contact Name: Ed Meachum

Point of Contact Telephone Number: (831) 884-1209

Point of Contact E-mail Address: emeachum@cityofmarina.org


Description of Project and Relevance to this Service Area (include scope, size, cost, etc.)
CSG provided full construction management services including resident engineer, assistant resident
engineer/office engineer, and construction inspector for this 3.2 mile Class II bike lane project. This
project was funded from the 2010 Regional Transportation Improvement Program and increased
the capacity of the regional bicycle network.
6.
The bike route provides a connection between two existing routes, connecting central Marina to
the southern expansion of the City. With work being on a highly trafficked corridor, CSGs
construction management team had to take necessary measures to ensure traffic was properly
managed. A portion of the paving was done at night to reduce the impact on traffic.

7. Subconsultants from FORM B Involved with this Example Project, if any: none

Firm Name Firm Location Support Service


FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 3 4 (Match the bottom of Form E)

1. Title of Example Project: Crystal Springs - El Cerrito Phase II Sewer Improvement

2. Project Location (City and State): Town of Hillsborough, CA

3. Year Completed Professional Services: 2016

4. Year Completed Construction (if applicable): 2016

5. Project Owners Information:

Project Owner: Town of Hillsborough

Point of Contact Name: Daniel Gonzales

Point of Contact Telephone Number: (650) 375-7588

Point of Contact E-mail Address: dgonzales@hillsborough.net


Description of Project and Relevance to this Service Area (include scope, size, cost, etc.)
Mr. Mostafavi served as the lead construction inspector for the installation of over two miles of
26-28 fusible high-density polyethylene (HDPE) gravity sewer main to replace the existing pipe.
6. The project included the installation of over 60 new sewer manholes, 75 service lateral re-
connections, system bypassing through portions of the existing pipeline, and four drilled concrete
stitch pier walls to stabilize the adjacent San Mateo Creek embankment and support the utility
work.
7. Subconsultants from FORM B Involved with this Example Project, if any: none

Firm Name Firm Location Support Service


FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 3 4 (Match the bottom of Form E)

1. Title of Example Project: Reservation Road Improvement Project

2. Project Location (City and State): City of Marina, CA

3. Year Completed Professional Services: 2015

4. Year Completed Construction (if applicable): 2015

5. Project Owners Information:

Project Owner: City of Marina

Point of Contact Name: Ed Meachum

Point of Contact Telephone Number: (831) 884-1209

Point of Contact E-mail Address: emeachum@cityofmarina.org


6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.)
The Reservation Road Improvement Project was a major reconstruction of Reservation Road
between Del Monte Boulevard and Seaside Court. The roadway has been reconfigured to
reduce traffic speeds and to facilitate entrance/exit turning movement at the intersecting
neighborhood without installing traffic signals. This was to be accomplished by creating two
roundabouts, configured for a 20 MPH design speed. Additional site improvements were
included to encourage pedestrian and bicycle travel such as new sidewalks, brick pathways,
and decorative crosswalks. Additional project details include:
Demolition and removal of existing sidewalk, curb and gutter, and roadway sections,
including roadway pulverization; reconfiguring the existing roadway, including two new
traffic roundabouts; installing new concrete curb and gutter, roadway section (as
required), sidewalk, driveways and curb ramps, placing an asphalt concrete overlay
over the street sections to remain, installation of a new paver pathway;
Installation of new landscaping and irrigation; installation of decorative street lights,
placement of underground storm drain piping and appurtenances; new striping,
pavement marking and traffic signage; and all other related work specified in the plans
and specifications including traffic control, SWPPP and erosion control. CSG provided a
resident engineer, assistant resident engineer and an inspector for this project.

7. Subconsultants from FORM B Involved with this Example Project, if any: none

Firm Name Firm Location Support Service


FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS

Project Key Number (1 to 4): 1 2 3 4 (Match the bottom of Form E)

1. Title of Example Project: East Garrison Phase 2

2. Project Location (City and State): County of Monterey, CA

3. Year Completed Professional Services: 2017

4. Year Completed Construction (if applicable): 2017

5. Project Owners Information:

Project Owner: County of Monterey

Point of Contact Name:

Point of Contact Telephone Number:

Point of Contact E-mail Address:


Description of Project and Relevance to this Service Area (include scope, size, cost, etc.)
Mr. Nava served as the construction inspector for infrastructure improvements for phase 2 of the
6. East Garrison development. He performed inspection of grading operations, SWPPP and BMP
enforcement, roadway excavations and embankments, drainage culverts, bridge crossings,
storm drain lines, and roadway construction.
7. Subconsultants from FORM B Involved with this Example Project, if any: none

Firm Name Firm Location Support Service


FORM E KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS

Example Projects from FORM D


(Fill in Example Projects Key section
shown below before completing this table.
No. Key Personnel from FORM C Role
Then, place X under project key numbers
below for key personnels participation in
Example Projects.
QA/QC and Project
1. Nourdin Khayata, PE 1, 3
Management
2. Erik Nava Construction Inspection 3, 4

3. Mario Mendoza Construction Inspection

4. Saeid Mostafavi Construction Inspection 2

5. Kevin OConnell, PE Construction Inspection

6. Ahmad Lam Construction Inspection

7.

8.

9.

10.

Example Projects Key from FORM D


No. Title of Example Project No. Title of Example Project

1. Imjin Parkway Bike Lanes 3. Reservation Road Improvement Project


Crystal Springs - El Cerrito Phase II Sewer
2. 4. East Garrison Phase 2
Improvement
FORM F APPLICABLE SPECIALIZED EQUIPMENT AND RESOURCES

List specialized and/or unique equipment, vehicles, software, or other resources your firm possesses that
is advantageous or necessary to perform this service and which your firm is willing to commit locally.
Equipment may include, but is not limited to: heavy equipment, special purpose or specially-equipped
vehicles, equipment, specialized computer programs, reference manuals/codes, laboratory testing
equipment, audio visual equipment, tools, supplies, or other relevant resources.

1. Applicable Specialized Equipment

2. Applicable Specialized Software Programs

3. Applicable Reference Manuals, Codes, Data, etc.

4. Other Applicable Resources


FORM G HOURLY RATE SHEET

Fully Burdened Hourly Rates


No. Key Personnel from FORM C Role
2017 2018 2019
QA/QC and Project
1. Nourdin Khayata, PE $165 $170 $175
Management
Construction
2. Erik Nava $115 $118 $122
Inspection
Construction
3. Mario Mendoza $115 $118 $122
Inspection
Construction
4. Saeid Mostafavi $120 $123 $127
Inspection
Construction
5. Kevin OConnell, PE $165 $170 $175
Inspection
Construction
6. Ahmad Lam $120 $123 $127
Inspection
7.

8.

9.

10.
Fully Burdened Hourly Rates
No. Other Staff (or Classifications) Role
2017 2018 2019
11. All available inspectors $115 $118 $122

12.

13.

14.

Does your firms fully burdened hourly rates include the following?

Software Yes No Vehicles Yes No

Phone/Cell Yes No Printing Yes No

Mileage Yes No Postage/Courier Yes No

Please initial here to acknowledge that markups for subconsultants and other direct costs shall
not exceed 10.0% CK
FORM H ADDITIONAL INFORMATION

Provide any additional information that would further clarify your interest, expertise, similar
experience, and/or capabilities relevant to this Service Area.

Signature of Authorized Representative:

Printed Name: Cyrus Kianpour, PE, PLS

Title of Signer: President

Date Signed: September 29, 2017