You are on page 1of 19

ENVIRONMENTAL SERVICES

STATEMENT OF QUALIFICATIONS

PREPARED FOR
The City of Carmel-By-The-Sea

PREPARED BY
Dudek
725 Front Street, Suite 400
Santa Cruz, California 95060
831.600.1412
www.dudek.com

September 29, 2017


September 29, 2017

Robert M. Harary, P.E., Director of Public Works


City of Carmel
Public Works Department
Junipero 2 SE of 4th Avenue
Carmel, California 93921

Subject: Environmental Services for the City of Carmel-by-the-Sea

Dear Mr. Harary:

The City of Carmel-by-the-Sea (City) needs a qualified consultant who can assist the Public Works Department
in providing environmental services as part of implementation of the Citys Capital Improvement Program (CIP).
Dudek will provide the City with the following advantages:

On-Call Experience. We provide on-call environmental and planning services, peer review, and technical studies
to municipalities across the state, and currently hold on-call environmental services contracts with the cities of
Monterey, Santa Cruz, Palo Alto, and Rohnert Park. We understand the regions environmental conditions, local
issues, and regulatory requirements for infrastructure and development projects. Our local team of experts is
available immediately and will perform the majority of the environmental services in-house.

Recognized CEQA/NEPA Experts. Since our founding in 1980, Dudek has prepared more than 2,700 high-
quality, legally defensible environmental documents for local, state, and federal agency clients. Our California
Environmental Quality Act (CEQA) team covers a range of technical specialties and has analyzed a wide range
of infrastructure and development projects throughout California of varying size and complexity.

Local Experience and Committed Project Management. The Dudek


teams commitment to the City for this contract begins with Project Point of Contact
Manager Stephanie Strelow, serving as your dedicated point of contact. Ms. Stephanie Strelow, Project Manager
Strelow has worked in the Monterey Bay and central coast region for 30 725 Front Street, Suite 400
years, and she currently lives in Monterey, which will facilitate meetings and Santa Cruz, California 95060
communications on short notice. This contract will be her top priority T: 831.600.1412
throughout its entire duration. In addition, our team includes experienced M: 831.425.6523
CEQA planners, biologists, historians, archaeologists, arborists, and sstrelow@dudek.com
stormwater quality specialists. Local traffic engineer Keith Higgins joins the
Dudek industry-leading team of environmental experts. Their combined depth of experience with on-call
contracts for similar cities throughout Monterey, San Luis Obispo, and Santa Cruz Counties will reduce
document processing times, facilitate timely decision making, and produce high-quality, legally sound
documents. If you have any questions, please contact Ms. Strelow at sstrelow@dudek.com or 831.425.6523.

Sincerely,

_____________________________ ____
Frank Dudek Stephanie Strelow
President Project Manager

Frank Dudek is authorized to sign on behalf of Dudek and is able to legally execute agreements and amendments.
FORM A- GENERAL FIRM INFORMATION

1. Firm's Name:
Dudek
2. Firm's Local 725 Front Street, Suite 400 Santa
Address: Cruz, California 95060

3. Is your local office the Head Office? DYes 5:JNo Branch Office? IXJ Yes 0 No
Only Office? 0 Yes til No
4. Year your firm was established: __1:..:9...:.
8..:...
0 _ __ _ _ __

5. Year your local office was established: _2_01_6_ _ _ __

6 Primary contacts (Principals) in the local office


Name Title Telephone E-Mail Address
Number
Principal/
Stephanie Strelow Senior Project Manager 83 1.600.1412 sstrelow@dudek.com
Principal/
A m1 Sansevero Senior Project Manager 831.400.1411 asansevero@dudck.com

7. List locations of no more than three (3) other offices where work may be performed (if
applicable) :
Address Telephone Number # of Personnel

8. Total employees presently employed:

a) In your local office 5 b) In your firm 400

9. Errors and Omissions Insurance

a) Amount your firm presently carries:$ $12.000.000 per claim

b) Carrier's name and address: Steadfast Insumnce Company. 1299 Zurich Way . Schaumburg. Illinois 60196-1056

DUDEK Environmental Services Statement of Qualifications 1


FORM B- TENTATIVE PROJECT TEAM
SERVICE AREA (Select one Service Area from list in SOQ package):

A. Consultant's Key Personnel

Please identify your tentative, key Project Team members, their titles/roles and primary duties:

Name Title/Role Primary Duties

Stephanie Strelow Principal/Senior Project Manager Project Manager

Katherine Waugh Senior Project Manager CEQA Analyses

Cultural Resources/
Ryan Brady Archaeologist Archaeology
Cultural Resources/
Samantha Murray Architectural H istorian
Architectural Historian

Laura Burris Biologist/Botanist Biological Resources

Elizabeth Geisler Project Scientist Stormwater Monitoring

B. Subconsultant and Support Services

Please identify up to four (4) key subconsultants or vendors, contact persons, and services they
would provide in order to support your Project Team.

Firm Name & location Contact Person Support Services

Keith Higgins; Gilroy, California Keith Higgins Traffic Engineering Services

C. Organizational Chart

Please insert an Organizational Chart of your tentative Project Team on the next page.

DUDEK Environmental Services Statement of Qualifications 2


FIGURE 1. DUDEK ORGANIZATIONAL CHART

PROJECT TEAM
CEQA/ NEPA CULTURAL AND HISTORIC RESOURCES
Katherine Waugh, AICP Samantha Murray, RPA
Kara Laurenson-Wright Ryan Brady, RPA

BIOLOGICAL RESOURCES ARBORIST


Laura Burris Scott Eckhardt
Sean O'Brien

STORMWATER CONTROL/MANAGEMENT NOISE STUDIES


Elizabeth Geisler Christopher Barnobi, INCE Bd. Cert.
Bryn Evans, CPSWQ

HAZARDS AND HAZARDOUS MATERIALS AIR QUALITY/GREENHOUSE GAS EMISSIONS


Nicole Peacock, PE, PG Matthew Morales

REGULATORY PERMITTING TRAFF1C ENGINEERING SERVICES


David Wickens Keith /-Iiggins

DUDEK Environmental Services Statement of Qualifications 3


FORM C- RESUMES OF KEY PERSONNEL

1. Name: Stephanie Strelow

2. Role in this Service Area: Principal/Senior Project Manager

3. Years of experience- Total: .....:3;:..:;0:.....___ With current firm: 1.5


~~-----------------

4. Education (Degree and Specialization) BA Environmental Planning with Honors, UC Santa Cruz

5. Current Registration/Certification (State & Discipline) . . . I . . : I L . O - - - - - - - - - - - - - - -

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)


Santa Cruz County Regional Tmnsportation Commission Certificate of Merit for Bicycle Planning

City of Monterey Sanitary Sewer Collection System


7. Relevant Project- Title & Location (City & State): Rehabilitation Project Monterey, Califomia
- Year Completed - Professional Services: _2"'"'0""'1'-'7_________________________________________
-Year Completed- Construction (if applicable): _ _....._N"""/A=-----------------
- Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $22 000
Ms. Strelow prepared an addendum to an adopted Mitigated Negative Declaration for project modifications that
included addition of sewer manholes throughout the Citv and coordinated with City and U.S. Anny staff for
project at the Presidio of Monterey
- Performed Relevant Project with Current Firm: Yes lil NoD

Asilomar Coast Trail Managed Retreat and Restoration


8. Relevant Project- Title & Location (City & State): ___._P...,ro~je""'c""t:_.P...,a.,..cifi...,t..,.c.__.C,.,a""l""'i""'o
. m~a,__
i _ _ _ _ _ _ _ __
- Year Completed - Professiona I Services: --=2:..;;.0......
17.;...________________________________________
-Year Completed- Construction (if applicable): . .:. N""'/A: . . :. ,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: .._A>+p4p""ro"""x..,
' it...., n,...
at".e"!.J.
Iy_,$""'2""4...,0<>o0""0'----------------
M s Strelow worked closely with Cali fomia State Parks Staff in preparing an Initial Sll,dy!Mitigated Negative
D eclaration for trail! rehabilitatio n and dune restoration project at Asiloma r State Beach and Conference G rounds

- Performed Relevant Project with Current Firm: Yes EU NoD

City of Santa Cruz General Plan EIR and LCP Update;


9. Relevant Project- Title & Location (City & State): .....~s...a.,.n...ta.._C.......,
n iZ......_,....
C...,al..,
i""'o""'rn..,j.._a_______________________
- Year Completed- Professional Services: 2012 (Completed EIR: LCP Update in progress)
-Year Completed- Construction (if a p p l i c a b l e ) : - - - - - - - - - - - - - - - - - - - -
- Brief Description (Scope, size, cost, etc.) and Specific Role: Al)proximately $150 000
Ms. Strelow pre,pared the EIR for the City of Santa Cmz updated Generdl Plan 2030 and also prepared
an Addendum to the General Plan EIR for the City' s Climate Action Plan and the City's 2016 Housing Element update.
Ms. Strelow also worked with the City in completing an update to the City' s LCP Land Use Plan as a separate docmnent.
- Performed Relevant Project with Current Firm: Yes D No 0

DUDEK Environmental Services Statement of Qualifications 4


FORM C- RESUMES OF KEY PERSONNEL

1. Name: Katherine Waugh. AICP

2. Role in this Service Area: __;;C=E'-"Q..,_A.::.. AI::..=lal=-<-ys::..::e;.::.s_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Years of experience- Total: ___:1:...:6_ _ With current firm: 5


------------
4. Education (Degree and Specialization) BS, Environmental Policy Analysis and Planning, UC Davis

5. Current Registration/Certification (State & Discipline) American Instjtute of Certified Planners <AICP)

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)


Ainerican Planning Association. Association of Envirorunental Professionals

2555 Park Blvd. Development EIR


7. Relevant Project- Title & location (City & State): _,P...,.a...,lo....A.. .lto""'
. _. -"C""'a...,
li.. .,o""'rru.. .,. .,a_ _ _ _ _ _ _ _ _ __
-Year Completed- Professional Services: --=2~0.!.;15"-----------------------
- Year Completed- Construction (if applicable): ~N~/Ac.:.___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $96 000
SeiVed as project manager for a focused EIR for the proposed demolition of an existing potentially historic building and construction
of a new. larger office building on the site with underground parking. Coordinated subconsultant peer reviews of the project's historic
evaluation and traffic impact study and managed Dudek staff revjews of the Phase I Environmental Site Assessment
- Performed Relevant Project with Current Firm: Yes ([) No D

Avenidas Expansion;
8. Relevant Project- Title & location (City & State): ....r.P-'law.lo.L..oA~
lto~C""aw
hwfo.u.m.LWJial.__ _ _ _ _ _ _ _ _ __
-Year Completed- Professional Services: ....::.20"-1..,6.....__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Year Completed- Construction (if applicable): ..&..J.L.ol.......__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $27 500 ($16 500 under budget)
As project manager, Ms. Waugh prepared an ISIMND evaluating the expansion of an existing senior community
center. Issues focused on the historical status of the building and ensuring compliance with the Secretary of the
Interior Standards to ensure that the proposed expansion would not impair t11e historic significance of the building.
- Performed Relevant Project with Current Firm: Yes ~ No D

385 Shennan Avenue MND


9. Relevant Project- Title & location (City & State): ......._Pa...l....
o....,A....It.,.o..,;,C""'a,..li.,.
o""'rru.......,a'-------------
- Year Completed- Professional Services: .-::2.:.:.0~14!:-,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Year Completed- Construction (if applicable): _.N , . . . / " ' " ' A ' - - - - - - - - - - - - - - - - - - -
- Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $22 500
As project manager, Ms. Waugh prepared an ISIMND for the proposed demolition of an existing office building and construction of a
new three-story. mi'led-use building with two levels of underground parking. Critical project issues included traffic, noise and visual
effects to neighboring residences and a public park. and the presence of a contaminated groundwater plume underlying the site.
- Performed Relevant Project with Current Firm: Yes @ No D

DUDEK Environmental Services Statement of Qualifications 5


FORM C- RESUMES OF KEY PERSONNEL

1. Name: Ryan Brad ,

2. Role in this Service Area: Cultural Resources/Archaeology

3. Years of experience- Total: ...,.1.,..6_ __ With current firm: _1._5_ _ _ _ _ _ _ __

4. Education (Degree and Specialization) MA. Anthropology, CSU Sacramento

5. Current Registration/Certification (State & Discipline) Register of Professional Archaeologists. No.J6l 81

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)


Society for American Archaeology, Society for California Archaeology

On-CaUEnvironmental Services;
7. Relevant Project- Title & Location (City & State): __,.C""itv'"'-"o""f.:..:M..,o""n,.,te...,r"'"ev'----------------
- Year Completed- Professional Services: - - - - - - - - - - - - - - - - - - - - - - -
-Year Completed- Construction (if applicable): _.N"""/_._A,.__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: .....A..,..p~p""'ro""'XI,.........
mat.,.e""'
ll""'
' $""2""'5""'0"""0""0'----------
As project archaeologist Mr. Brady has assisted the City of Monterey with various infrastructure projects that
involved drainage repairs and upgrades to the Citv 's sanitary sewer svstem.

- Performed Relevant Project with Current Firm: Yes EU NoD

Interlake Tunnel Project; Monterey County Water


8. Relevant Project- Title & location (City & State): Resource Authoritv: Jolon. California
-Year Completed- Professional Services:--- - - - - - - - - - - - - - - - - - - - -
-Year Completed- Construction (if applicable):.........,""-"-------------------
- Brief Description (Scope, size, cost, etc.) and Specific Role: _.A...,.p..,p....ro
=x""
'i...,_m.....,a
te~lv'--"'-
$4""'0""'."
0 "'0""'0'---------
Managed 1200-acre field survev of Lake San Antonio shoreline that documented over 30 prehistoric and historic

- Performed Relevant Project with Current Firm: Yes li1 NoD

Phase III Data Recovery at Cam1el River State Beach; California


9. Relevant Project- Title & location (City & State):Department of Parks and Recreation: Carmel. California.
-Year Completed- Professional S e r v i c e s : - - - - - - - - - - - - - - - - - - - - - - -
-Year Completed- Construction (if applicable): --'-'LL.O..------------------
- Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $37.000
Analyzed the ground and battered stone assemblage from a data recovery project and wrote sections of the final report.

- Performed Relevant Project with Current Firm: Yes D No lil

DUDEK Environmental Services Statement of Qualifications 6


FORM C- RESUMES OF KEY PERSONNEL

1. Name: Samantha Murray, RPA

2. Role in this Service Area: Cultural Resources/Architectural Historian

3. Years of experience- Total: _1_0_ __ With current firm: ----"'3"'"'.5'---- - - - - - - -

4. Education (Degree and Specialization) MA, Forensic Anthropology, CSU Los Angeles

5. Current Registration/Certification (State & Discipline) Register of Professional Archaeologists No. 990015

6. Other Professional Qualifications {Publications, Organizations, Training, Awards, etc.)


Society for American Archaeology, Society for California Archaeology, Califomia Preservation Foundation

Historical Evaluation of 3877 El Camino Real;


7. Relevant Project- Title & Location (City & State): . :. P.:::al:. ::.o. .::.A.l.:.:to;.l..
:: , . : :;C.: .:la.::ifi-=-orm=a;;___ _ _ _ _ _ _ _ _ __
-Year Completed -Professional Services: __,2""'0'""1_,_7_ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ __
- Year Completed- Construction (if applicable): """'N"-=/A.:..-_ _ _ _ _ __ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific R o l e : - - - - - - - - - - - - - - - -
Ms. Murrav served as architectural historian. originally providing a peer review of another consultant's evaluation.
The City then asked Dudek to re-do the original evaluation report. As oart of tllis work Ms. Murray conducted additional
archival research on the property and evaluated the buildine for historical significance in consideration of designation criteria.
- Performed Relevant Project with Current Firm: Yes ~ No 0

1106 Nortl1 Branciforte Avenue:


8. Relevant Project- Title & Location (City & State): Santa Cmz, California
-Year Completed- Professional Services: _,2""'0'"1...:...7
'" _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- Year Completed- Construction (if applicable): _N~ /A..!...,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Brief Description (Scope, size, cost, etc.) and Specific Role: - - - - - - - - - - - - - - - -


Ms. Murray conducted peer review of historical resources report for Citv of Santa Cruz Planning and Community
Development Department. The peer review included an assessment ofNRHP. CRHR. CHL. and City of Santa Cruz
designation criteria and integrity requirements.
- Performed Relevant Project with Current Firm: Yes~ NoD

429 University Avenue Historic Resources Evaluation


9. Relevant Project - Title & Location (City & State): Report Peer Review: Palo Alto, California
- Year Completed- Professional Services: -=-20""1,_,6 ' - - - - - - - - - - - - - - - - - - - - - -
- Year Completed- Construction (if applicable): ..;N ~/~
A~-----------------
- Brief Description (Scope, size, cost, etc.) and Specific Role: - -- - - - - - - - - - - - - -
Ms. Murray conducted a peer review of a study prepared by another consultant, and provided a memorandum
sunm1arizing the review. cotmnents. and recommendations. and is currently working on additional building studies
for the City of Palo Alto
- Performed Relevant Project with Current Firm: Yes liJ No 0

DUDEK Environmental Services Statement of Qualifications 7


Approximately $25,000

Approximately $200,000

Projects ranged from $3,000 to $50,000

DUDEK Environmental Services Statement of Qualifications 8


FORM C- RESUMES OF KEY PERSONNEL

1. Name: Elizabeth Geisler

2. Role in this Service Area: Stomn\'ater Monitoring


----------------~----------------------------------------

3. Years of experience- Total: ---'9'----- With current firm:


~--------------------

4 . Education (Degree and Specialization) MS. Coastal and Watershed Science and Policy, CSU Monterey Bay

5. Current Registration/Certification (State & Discipline) - - - - - - - - - - - - - - - - - - - -

6. Other Professional Qualifications {Publications, Organizations, Training, Awards, etc.)

Waterways Maintenance Plan;


7. Relevant Project- Title & Location (City & State): City of San Diego, California
-Year Completed -Professional Services: __.::; O..:;:n""go.:..:in=g______________________
-Year Completed- Construction (if applicable): ___._,N""'/A....___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $500 000 FY17" $ 1 1 million FY18
Teclmical support and development of stream chmmel maintenance plans for the City of San Diego's Waterways
Maintenance Plan (WMP). Tasks include coordination with City Engineering and Operations and Maintenance staff,
development of stream channel fac t sheets. maintenm1ce methodology and maps. and Wl\1P EIR support.
- Performed Relevant Project with Current Firm: Yes [) No 0

San Clemente Dmn Removal and Cannel River Reroute


8. Relevant Project- Title & Location (City & State): Project; San Clemente California
-Year Completed- Professional Services: ....oio.l.u..l.l.----------------------
- Year Completed- Construction (if applicable): ....!.N~/"'"A,____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Awroximately $83 million
Envimm11ental compli<mce activities including: monitoring water quality, stream flow, w ildlife, BMPs, and hazardous
materials; producing daily. monthly. and annual compliance reports related to Project pennits/plans including the
Stormwater Pollution Prevention Pl<m (Level 3 SWPPP) and 401 Certification: and training employees.
- Performed Relevant Project with Current Firm: Yes 0 No !il

Monitoring and Mitigation Progrmn ; Monterey


9. Relevant Project- Title & Location (City & State): Peninsula Water Management District CMPWMD)
- Year Completed- Professional Services:.......,......_._______________________
-Year Completed- Construction (if applicable): ---~..u...c~-----------------
- Brief Description (Scope, size, cost, etc.) and Specific Role: Approximately $2.5 million
Teclmical support through field biologist role with MPWMD. Tasks included monitoring Carmel River \Vater
quality. groundwater levels and vegetation and data management and reporting.

- Performed Relevant Project with Current Firm: YesO No~

DUDEK Environmental Services Statement of Qualifications 9


FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number {1 to 4): llil 20 30 4D (Match the bottom of Form E)

1. Title of Example Project: On-CaJl Envirotm1ental and Planning Setvices

2. Project Location {City and State): _ _


C_itv"-._of_M_o_nt.:....e_
re..::.y_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Year Completed- Professional Services: -=-20::....:1:..:::6.:....


-0 ::..:n::;J;g:~..:::o~
in ::.=g~.....-_ _ _ _ _ _ _ _ _ _ _ _ _ _ __

4. Year Completed- Construction (if applicable): _N_IA


_ _ _ _ _ _ _ _ _ _ _ _ __ __ _

5. Project Owner's Information:

-Project Owner: City of Monterey

-Point of Contact Name: ~E<!.!Ii~za!!.!b~e~tl~


l C~an~ak~e~r_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Point of Contact Telephone Number: ~8""'3o!..:l.~64..:..::6'""'.1!...!7~3..::..9_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Point of Contact E-Mail Address: -'c'""a;:..:


rak=er@=;:o:.
m;.;: ;on=-=
.: .:te..:;.;re""'v. ;.;.o:;.r.,.g
:; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Dudek was awarded a 3-year contract with the City of Monterey in May 2016 for on-call environmental and planning setvices.
Ms. Strelow is the point of contact and. to date. has overseen seven work orders for the Planning and Engineering offices. Two
of the projects included review of citywide biological and cultural resources as part of preparation of CEQA documents. Upon
completion of biological and cultural sutv~:<ys for two drainage improvement pro jects. which found no potentiallv significant
impacts Dudek prepared a notice of exemption and pem1it applications to the California Department of fish and Wildlife and
Regional Water Qnality Control Board Dudek also worked with the City to snccessfnlly obtain emergency pennits for fai led
drainage structures a:fter storms jn early 2017 Ms Strelow oversaw preparation of an Initial Study/Mitigated Negative
Declaration for the City's Park and Recreation Master Plan that included recommendations for the regional Recreational Trail.
7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service

DUDEK Environmental Services Statement of Qualifications 10


FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number {1 to 4): 10 2 liD 3 0 40 {Match the bottom of Form E)

1. Title of Example Project: On-Call Environmental Sen,ices

2. Project Location {City and State): _C""t...,ty~of._.S.,..awn.,.


ta...,C""'n~t"'""z_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Year Completed- Professional Services: _ .O


.:......
n'""go.:.i:.:..:g""
n - - - - - - - - - - - - - - - - - - -

4. Year Completed- Construction (if applicable): ....N~A~----------------

5. Project Owner's Information:

- Project Owner: City of Santa Cmz

-Point of Contact Name: _E


......,
ric........,
M,..a..,rlwa....
tt _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Point of Contact Telephone Number: __;8:..::3..:;.1;...;.4..:;;.2.;;..;0..;..5..;..


11 ;;..:5_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Point of Contact E-Mail Address: _e:..::m=ar::::


la:..:.;tt""@""c:. :.ity; . <. . ;:;.o; . :fs;.; ; an:. :.;t=ac.:.m
::..::=z..;. c.o:.:rr:::l' - - - - - - - - - - - - - - - - -

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Dudek Project Manager Stephanie Strelow has served as an on-call environmental planner with the City of Santa
Cmz for more than 15 years and is the project manager for Dudek's existing agreement with the City. She has
coordinated with Citv staff and prepared CEOA documents for development proposals and public pro jects. including
notices of exemption initial studies mitigated ne1;3tive declarations a11d EIRs Ms Strelow has orepared more than
150 initial studies for a variety of residential. mixed-use, hotel commercia l, and private school pro jects In this role
she has also ma naged a nd p repa red Fill contract s f or the Pla nning D e partme nt Tinde r Dudek' s cu rrent c ontract, M s .
Strelow prepared an EIR Addendum for the Delaware Addjtion project for a major modification to an approyed
pennit for a mixed-use project on 20 acres in the City.
7. Subconsultants from ~ORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service

DUDEK Environmental Services Statement of Qualifications 11


FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number {1 to 4): 1 D 2 D 3 lia 4 D {Match the bottom of Form E)

1. Title of Example Project: As-Needed Plamung and Environmental Services

2. Project location {City and State): _ ___..:..C~


ity'--..:..of;...;.P;...;.a;...;.
lo;...;.Al;_;_:_to=-------------------

3. Year Completed- Professional Services: _O_n.....


go_i_ng " ' - - - - - - - - - - - - - - - - - -

4. Year Completed- Construction (if applicable): ___..:..N.;;.;/A~-----------------

5. Project Owner's Information:

-Project Owner: _C..:...I...:..ty'' -o.:. . f. . :P. . :;al. . :o;. .;.A.;. .;1-=-to=------


. ---------------------

- Point of Contact Name: Amy French, CluefPlanning Official

- Point of Contact Telephone Number: ----"-6':::..:-0;:..:;.3:::.:2::.::;9..:.:.2'""'3""'-36"'-------------------

- Point of Contact E-Mai I Address: ---"Am=y'-".F:...:v:..::e.:.::


nc:..:.h@=-::
::.::
-C::.:.:itv~o::::::fi~
p:::::al::::.oal=to~.o::.:.rgQ..__ _ _ _ _ _ _ _ _ _ _ __

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Dudek is currently providing as-needed services to the City of Palo Alto. These services include preparation of
several EIRs and MNDs for both the Public Works and Communitv Development departments, requiring the
interpretation of applicable city codes, policies, standards, and guidelines. Current projects for the City include
1877 Fl Catpjno Real TS/MND 2555 Park Boulevard FIR 185 She n nan Avenue tvJND 429 Ti njlre r sity Avenue
MND, 1050 Page Mill Road ElR, and Pedestrian Overcrossing EIR.

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm location Support Service

DUDEK Environmental Services Statement of Qualifications 12


FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number (1 to 4): 1D 2 D 3 D 4 lia (Match the bottom of Form E)

1. Title of Example Project: As-Needed Environmental Services

of....R~o...lm.. .,.,ert.. . . ._P.. ,areo>k_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __


2. Project Location (City and State): __,C....,i...,ty""'...

3. Year Completed- Professional Services: __;;:,200.::.. .;:,:;9_--=


0;.:.n""'go.::.;i;.:.:n.,_g_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

4. Year Completed- Construction (if applicable): ___.!,;N::.IA...:._


.: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

5. Project Owner's Information:

- Project Owner: City of Rolmert Park

- Point of Contact Name: -=M=ary:. <. . . ,;G: o.:ra:.: c.: .;e: . . :P:. .:a:. .:.w-=s;.: ;.on:.:. .,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Point of Contact Telephone Number: _...:_7.::..


07:..:.;:;.;58::. ; 8:.2:.::2;;:.
.;.;: 32 = - - - - - - - - - - - - - - - - - - -

- Point of Contact E-Mail Address: -=-m"-"p""a""w:.. ::s=on=@


- .=m::..::c=ity-"-=.o-=-<rg,___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Dudek is currently under conLract to the City of Rohnert Park. acting as adjunct staff on a variety of planning and
envirorunental review assigrunents. On-Call Envirorunental projects include Avram House Apartment Complex
EIR Consistency Review; KG Teclmologies CEQA Consistency Review; Clearwater at Sonoma Hills ISIMND:
Residences at Five Creek and City Public Safety I Public Works Facility. On-Call Planning projects includes the
Universitv District Specific Plan to facilitat the review and processing of amendments.

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service

DUDEK Environmental Services Statement of Qualifications 13


FORM E- KEY PERSONNEL PARTICIPATION
IN EXAMPLE PROJECTS
Example Projects from FORM D
(Fill in "Example Projects Key"
section shown below before
No. Key Personnel From Role completing this table. Then,
FORMC place "X" under project key
numbers below for key
personnel's participation in
Example Projects.

1 2 3 4
1.
Stephanie Strelow Project Manager .
X X X

2.
Katherine Waugh X X
CEQA Analyses
3.
Ryan Brady Cultural Resources/ Archaeology X

4. Cultural Resources/
Samantha Murray X X
Architectural Historian
s.
Elizabeth Geisler Stormwater Monitoring X
6.
Laura B urris Botany/Biology X X X

7.

8.

9.

10.

Example Projects Key from FORM D


No.
Title of Example Project No. Title of Example Project
1. On-Call Enviromnental and Planning 3. As-Needed Planning and Environmental Services;
Services; City of Monterey City of Palo Alto
2. On-Can Environmental Services; 4. As-Needed Enviro1m1ental Services;
City of Santa Cruz City of Rohnert Park

DUDEK Environmental Services Statement of Qualifications 14


FORM G- HOURLY RATE SHEET

Fully Burdened Hourly Rates


No. Key Personnel from FORM C Role
2017 2018 2019
1. Project Manager
Stephanie Strelow $215 $215 $ 215

2.
Katherine Waugh CEQA Analyses $205 $205 $205

3. Cultural Resources/
Ryan Brady $ 145 $ 145 $t45
Archaeology
4. Cultural Resources/
Architectural Histori ~ 145
Samantha Murray $ 145 $ 145

5. Stonnwater $ 135
Elizabeth Geisler $ 135 $ 135
Monitoring
6.
Laura Burris BotanisVBiologist $}55 $ 155 $ 155

7.
Keith Higgins Traffic Engineer $250 $255 $260

8. $ $ $
9. $ $ $

10. $ $
$

Fully Burdened Hourly Rates


No. Other Staff Role
(or Classfficatlons) 2017 2018 2019
11.
Envirorunental Specialist IV $165 $ 165 $t65

12.
Technical Editor I $ 125 $ 125 $)25

13.
GIS Specialist II $ 135 $ 135 $135

14.
Publications Specialist II $ 105 $ 105 $105

Does your firm's fully burdened hourly rates include the following?
Software Yes~ NoD Vehicles Yes~ NoD
Phone/Cell Yes~ NoD Printing YesD No Iii
Mileage YesD No Iii Postage/Courier YesD No Iii

Please initial here \iilliowledge that markups for subconsultants and other direct costs shall not
exceed 10.0% - - - -

DUDEK Environmental Services Statement of Qualifications 15


DUDEK Environmental Services Statement of Qualifications 16
800.450.1818 | DUDEK.COM | INFO@DUDEK.COM

SOUTHERN CALIFORNIA
Encinitas (Main)
La Quinta
Pasadena
Riverside
San Juan Capistrano

CENTRAL COAST
Santa Barbara
Santa Cruz

NORTHERN CALIFORNIA
Auburn
Larkspur
Oakland
Sacramento

HAWAII
Honolulu

OREGON
Portland

HABITAT RESTORATION SCIENCES


A Dudek Subsidiary

You might also like