Professional Documents
Culture Documents
PROYECTO :
RODRIGU
ENTIDAD: GOBIERNO REGIONAL DE AMAZONAS
CONTRATISTA: CONSORCIO INGENIEROS ASOCIADOS
01 ESTRUCTURAS 331,293.43
01.01 OBRAS PROVISIONALES 107,400.43
01.01.01 ALMACEN, OFICINA, CASETA DE GUARDIANIA GLB 1.00 1,500.36 1,500.36 - -
1 159,509.48 0.00 0.00 0.00 159,509.48 0.00 0.00 159,509.48 0.00 0.00 0.00
2
3
4
TOTAL 159,509.48 0.00 0.00 0.00 159,509.48 0.00 0.00 159,509.48 0.00 0.00 0.00
Adelantos
N Directo Materiales
1 0.00 0.00
TOTALES = S/.
AS
OZA - AMAZONAS
159,509.48 0.00
159,509.48 0.00
0.00 0.00
### 0.00
CALENDARIO VALORIZADO DE AVANCE DE OBRA
PERIODO DEL 20/12/2016 AL 31/12/2016
20/12/16 al 01/03/21017 al
FORMULA 31/12/16 31-Jan-17 28/02/201 19/03/2017 TOTAL
12 dc 31 dc 28 dc 19 dc 90 dc
LIQUIDACION N 01
A. AVANCE VALORIZADO
Frmula
General
B. REINTEGROS Y OTROS
C. DEDUCCIONES
D. A PAGAR AL CONTRATISTA
Efectivo: Liquidacin Neta - (5) - (6) - (7)
IGV (0.00% de la Liquidacin Neta)
TOTAL A PAGAR
159,509.48
0.00
0.00
0.00
159,509.48
0.00
0.00
0.00
0.00
0.00
159,509.48
159,509.48
0.00
159,509.48
159,509.48
GRAFICO DE AVANCE FISICO DE OBRA
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO :
LUGAR :
FECHA :
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
0.00% 24.15%
0.00%
0.00% 24.15%
%) PROG. (%)
%) PROG. (%)
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN, OFICINA, CASETA DE GUARDIANIA
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.
01.01.03 FLETE TERRESTRE
01.01.04 SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
01.01.04.01
SEGURIDADY SALUD EN EL TRABAJO
01.01.04.02 CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y
01.01.04.03
SALUD DURANTE EL TRABAJO
01.01.04.04 SEALIZACION DE OBRA
01.01.04.05 EQUIPAMIENTO DE PROTECCION INDIVIDUAL
01.01.04.06 CERCO PERIMETRICO PROVISIONAL
01.02 EDIFICACION 01 (AULAS )
01.02.01 TRABAJOS PRELIMINARES
01.02.01.01 LIMPIEZA DE TERRENO MANUAL
01.02.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
01.02.02 MOVIMIENTO DE TIERRAS
01.02.02.01 EXCAVACIONES
01.02.02.01.01 EXCAVACION MANUAL DE ZANJAS Y ZAPATAS
01.02.02.02 REFINE Y NIVELACION
01.02.02.02.01 REFINE, NIVELACION Y COMPACTACION CON EQUIPO
01.02.02.03 RELLENOS
01.02.02.03.01 RELLENO COMPACTADO CON MATERIAL PROPIO
01.02.02.03.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
EXCAVACION MANUAL DE ZANJAS P/ PARA POZO PERCOLADOR Y
01.04.05.02.01
TANQUE SEPTICO
01.04.05.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO
01.04.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, DMAX = 30m
01.04.05.02.04 ACARREO INTERNO/MATERIAL PROCEDENTE DE EXCAVACIONES
01.04.05.02.05 REFINE, NIVELACION Y COMPACTACION CON PISON MANUAL
01.04.05.03 FILTROS
01.04.05.03.01 RELLENO CON PIEDRA MEDIANA DE 6"
01.04.05.03.02 RELLENO CON PIEDRA CHANCADA DE 3/4" - 1/2"
01.04.05.04 OBRAS DE CONCRETO SIMPLE
01.04.05.04.01 CONCRETO FC=100 KG/CM2, PARA SOLADOS EN CIMENTACIONES
01.04.05.04.02 CONCRETO FC=140KG/CM2 PARA CIMIENTO EN POZO PERCOLADOR
01.04.05.05 OBRAS DE CONCRETO ARMADO
01.04.05.05.01 CONCRETO FC=175 KG/CM2 PARA TANQUE SPTICO
01.04.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE SPTICO
01.04.05.05.03 ACERO FY=4200 KG/CM2 PARA TANQUE SPTICO
CONCRETO FC=175 KG/CM2 PARA LOSA SUPERIOR DE POZO
01.04.05.05.04
PERCOLADOR
ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA DE POZO
01.04.05.05.05
PERCOLADOR
01.04.05.05.06 ACERO FY=4200 KG/CM2 PARA POZO PERCOLADOR
CONCRETO FC=210 KG/CM2 PARA VIGA CIRCULAR EN POZO
01.04.05.05.07
PERCOLADOR
ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGA CIRCULAR EN
01.04.05.05.08
POZO PERCOLADOR
01.04.05.05.09 ACERO FY=4200 KG/CM2 PARA VIGA CIRCULAR EN POZO PERCOLADO
02 ARQUITECTURA
02.01 EDIFICACION 01
02.01.01 MUROS Y TABIQUES DE ALBAILERIA
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
MURO DE CABEZA C/LADRILLO MACIZO TIPO IV (9x13x24cm); MORTERO
02.01.01.01
C:A=1:4
MURO DE SOGA C/LADRILLO MACIZO TIPO IV (9x13x24cm); MORTERO
02.01.01.02
C:A=1:4
02.01.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.01.02.01 TARRAJEO PRIMARIO PARA CONTRAZOCALOS Y ENCHAPES
02.01.02.01.01 TARRAJEO PRIMARIO RAYADO E=1.5 CM; C:A=1:4
02.01.02.02 TARRAJEO EN MUROS INTERIOR Y EXTERIORES
02.01.02.02.01 TARRAJEO EN MUROS INTERIORES E=1.5 CM; C:A=1:4
02.01.02.02.02 TARRAJEO EN MUROS EXTERIORES E=1.5 CM; C:A=1:4
02.01.02.03 TARRAJEO EN COLUMNAS
02.01.02.03.01 TARRAJEO EN COLUMNAS E=1.5 CM; C:A=1:4
02.01.02.04 TARRAJEO EN VIGAS
02.01.02.04.01 TARRAJEO EN VIGAS E=1.5 CM; C:A=1:4
02.01.02.05 TARRAJEO EN CUNETAS
02.01.02.05.01 TARRAJEO EN CUNETAS E=1.50CM; MORTERO C:A=1:4
02.01.02.06 VESTIDURA DE DERRAMES
02.01.02.06.01 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.
02.01.02.07 BRUAS
02.01.02.07.01 BRUAS EN MUROS, COLUMNAS Y VIGAS - SEGUN DISEO
02.01.03 CIELORRASOS
02.01.03.01 CIELORRASOS PEGADOS
02.01.03.01.01 CIELORRASOS DE PLACAS DE FIBROCEMENTO E=6MM
02.01.04 PISOS Y PAVIMENTOS
02.01.04.01 CONCRETO
02.01.04.01.01 CONCRETO FC=175 KG/CM2, PARA VEREDAS, E=0.10M
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PISO DE CEMENTO PULIDO Y BRUADO E= 2" SIN COLOREAR/PULIDO
02.01.04.01.02
Y BRUADO
02.01.04.02 CERAMICA
PISO DE CERAMICA ANTIDESLIZANTE DE 30X30 CM. COLOR CLARO,
02.01.04.02.01
1er. DE ALTO TRANSITO
02.01.05 CONTRAZOCALOS
02.01.05.01 MORTERO
02.01.05.01.01 CONTRAZOCALO DE CEMENTO PULIDO C:A (1:3), DE H=20 CM
02.01.06 ZOCALOS
02.01.06.01 ZOCALO DE CERAMICA DE 20X30 CM
02.01.06.02 REVESTIMIENTO EN LAVATORIO CON CERAMICA BLANCA DE 20X30 CM
02.01.07 CARPINTERIA DE MADERA
02.01.07.01 PUERTAS
02.01.07.01.01 PUERTA APANELADA CON MADERA TIPO C O SIMILAR
02.01.07.02 VENTANAS
VENTANA C/MARCO DE MADERA TIPO C O SIMILAR Y VIDRIO
02.01.07.02.01
TEMPLADO, CON FIERRO LISO 1/2"+MALLA ELECT. DE 1/4"X1/4"
02.01.08 CARPINTERIA METALICA Y HERRERIA
02.01.08.01 REJILLA METALICA SOBRE CUNETA SEGUN DISEO
02.01.09 CERRAJERIA
02.01.09.01 BISAGRAS
02.01.09.01.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"
02.01.09.02 CERRADURAS
02.01.09.02.01 CERRADURA TIPO PESADA DE 2 GOLPES
02.01.09.03 ACCESORIOS DE CIERRE
02.01.09.03.01 MANIJA DE BRONCE PARA PUERTA EXTERIOR
02.01.10 PINTURA
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
UND METRADO
GLB 1.00
und 1.00
GLB 0.75
GLB 0.50
GLB 0.50
GLB 0.50
GLB 0.50
GLB 0.50
m 132.14
m2 219.33
m2 219.33
m3 62.40
m2 96.26
m3 0.00
m3 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m3 225.67
m2 0.00
m3 75.22
m2 0.00
m3 0.00
m3 0.00
m2 0.00
m2 0.00
m2 0.00
m3 0.00
m2 0.00
m3 0.00
kg 518.40
m3 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
kg 799.37
m3 0.00
m2 0.00
kg 996.29
m3 0.00
m2 0.00
kg 393.95
m3 0.00
m2 0.00
kg 981.01
m3 0.00
m2 0.00
kg 107.10
p2 0.00
p2 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m 0.00
m2 33.30
m2 33.30
m3 145.42
m2 143.77
m3 0.00
m3 0.00
m3 0.00
m2 0.00
m2 150.66
m2 3.60
m3 0.00
m3 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m2 0.00
m3 0.00
m2 0.00
m3 0.00
kg 207.36
m3 0.00
m2 0.00
kg 94.44
m3 0.00
m2 0.00
kg 217.36
m3 0.00
m2 0.00
kg 117.73
N N 01
016 AL 31/12/2016
UND METRADO
m3 0.00
m2 0.00
kg 123.97
m3 0.00
m2 0.00
kg 53.42
m3 0.00
m2 0.00
kg 4.07
p2 0.00
p2 0.00
m2 0.00
m 0.00
m2 151.05
m2 151.05
N N 01
016 AL 31/12/2016
UND METRADO
m3 52.18
m2 0.00
m3 0.00
m3 33.04
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m3 0.00
m3 0.00
m2 0.00
kg 10.44
m2 34.00
m2 34.00
m3 0.00
m3 0.00
m3 0.00
m3 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m2 0.00
m3 0.00
m3 0.00
m2 0.00
m2 0.00
m2 0.00
m3 0.00
m2 0.00
m3 0.00
kg 15.61
m3 0.00
m2 0.00
kg 93.35
m3 0.00
m2 0.00
kg 68.12
N N 01
016 AL 31/12/2016
UND METRADO
m3 0.00
m2 0.00
kg 81.99
m3 0.00
m2 0.00
kg 126.23
m2 49.26
m2 49.26
m3 12.35
m3 15.44
m3 15.44
m3 0.00
m2 0.00
m2 4.00
m2 4.00
m3 0.50
N N 01
016 AL 31/12/2016
UND METRADO
m3 0.63
m3 0.63
m2 0.00
m3 0.00
kg 7.80
m3 0.00
m2 0.00
kg 29.92
m3 0.00
m2 0.00
kg 33.66
und 0.00
m2 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m3 0.00
m3 0.00
m3 0.00
m3 0.00
m2 0.00
m3 0.00
m3 0.00
m2 0.00
m3 0.00
m3 0.00
m2 0.00
kg 445.18
m3 0.00
m2 0.00
kg 170.56
m3 0.00
m2 0.00
kg 31.34
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m 0.00
m 0.00
m2 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m 0.00
pza 0.00
pza 0.00
pza 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m 0.00
m 0.00
m2 0.00
m2 0.00
und 0.00
m 0.00
m 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m2 0.00
m 0.00
m 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m 0.00
m2 0.00
m2 0.00
m 0.00
pza 0.00
pza 0.00
pza 0.00
pza 0.00
und 0.00
pza 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m 0.00
m 0.00
m2 0.00
m2 0.00
m 0.00
m 0.00
m2 0.00
m2 0.00
m2 0.00
m 0.00
m2 0.00
und 0.00
m 0.00
m2 0.00
m 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m 0.00
m 0.00
m 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m3 0.00
m2 0.00
0.00
0.00
m2 0.00
pza 0.00
m2 0.00
m2 0.00
m 0.00
m 0.00
m2 0.00
m2 0.00
m 0.00
m2 0.00
N N 01
016 AL 31/12/2016
UND METRADO
pza 0.00
m 0.00
pza 0.00
und 0.00
pto 0.00
pto 0.00
m 0.00
m 0.00
pza 0.00
und 0.00
und 0.00
pto 0.00
m 0.00
m 0.00
N N 01
016 AL 31/12/2016
UND METRADO
pza 0.00
und 0.00
und 0.00
m 0.00
m 0.00
pza 0.00
pza 0.00
pza 0.00
pza 0.00
pto 0.00
pto 0.00
m 0.00
m 0.00
N N 01
016 AL 31/12/2016
UND METRADO
pza 0.00
pto 0.00
m 0.00
m 0.00
pza 0.00
und 0.00
und 0.00
m 0.00
0.00
m 0.00
m 0.00
und 0.00
und 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m 0.00
und 0.00
m3 10.65
m3 9.40
m3 12.78
m3 12.78
m 0.00
m 0.00
pza 0.00
und 0.00
und 0.00
pto 0.00
pto 0.00
pto 0.00
N N 01
016 AL 31/12/2016
UND METRADO
pto 0.00
m 0.00
m 0.00
m 0.00
m 0.00
m 0.00
m 0.00
und 0.00
und 0.00
und 0.00
und 0.00
pto 0.00
pto 0.00
pto 0.00
pto 0.00
m 0.00
N N 01
016 AL 31/12/2016
UND METRADO
m 0.00
m 0.00
m 0.00
m 0.00
m 0.00
und 0.00
und 0.00
und 0.00
und 0.00
m 0.00
m 0.00
und 0.00
und 0.00
m 0.00
N N 01
016 AL 31/12/2016
UND METRADO
und 0.00
und 0.00
pto 0.00
und 0.00
GLB 0.00
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN, OFICINA, CASETA DE GUARDIANIA
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.
01.01.03 FLETE TERRESTRE
01.01.04 SEGURIDAD Y SALUD
01.01.04.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE S
01.01.04.02 CAPACITACION EN SEGURIDAD Y SALUD
01.01.04.03 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y
01.01.04.04 SEALIZACION DE OBRA
01.01.04.05 EQUIPAMIENTO DE PROTECCION INDIVIDUAL
01.01.04.06 CERCO PERIMETRICO PROVISIONAL
01.02 EDIFICACION 01 (AULAS )
01.02.01 TRABAJOS PRELIMINARES
01.02.01.01 LIMPIEZA DE TERRENO MANUAL
01.02.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
01.02.02 MOVIMIENTO DE TIERRAS
01.02.02.01 EXCAVACIONES
01.02.02.01.01 EXCAVACION MANUAL DE ZANJAS Y ZAPATAS
01.02.02.02 REFINE Y NIVELACION
01.02.02.02.01 REFINE, NIVELACION Y COMPACTACION CON EQUIPO
01.02.02.03 RELLENOS
01.02.02.03.03 ACARREO INTERNO/MATERIAL PROCEDENTE DE EXCAVACIONES
01.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE
VALORIZACIN N 01
PERIODO DEL 20/12/2016 AL 31/12/2016
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
UND METRADO
GLB 1.00
und 1.00
GLB 0.75
GLB 0.50
GLB 0.50
GLB 0.50
GLB 0.50
GLB 0.50
m 132.14
m2 219.33
m2 219.33
m3 62.40
m2 96.26
m3 225.67
N N 01
016 AL 31/12/2016
UND METRADO
m3 75.22
kg 518.40
kg 799.37
kg 996.29
kg 393.95
kg 981.01
kg 107.10
m2 33.30
m2 33.30
m3 145.42
m2 143.77
N N 01
016 AL 31/12/2016
UND METRADO
m2 150.66
m2 3.60
kg 207.36
kg 94.44
kg 217.36
kg 117.73
kg 123.97
kg 53.42
kg 4.07
N N 01
016 AL 31/12/2016
UND METRADO
m2 151.05
m2 151.05
m3 52.18
m3 33.04
kg 10.44
m2 34.00
m2 34.00
kg 15.61
kg 93.35
kg 68.12
kg 81.99
kg 126.23
N N 01
016 AL 31/12/2016
UND METRADO
m2 49.26
m2 49.26
m3 12.35
m3 15.44
m3 15.44
m2 4.00
m2 4.00
m3 0.50
m3 0.63
m3 0.63
kg 7.80
kg 29.92
kg 33.66
N N 01
016 AL 31/12/2016
UND METRADO
kg 445.18
kg 170.56
kg 31.34
VALORIZACIN N 04 - PERIODO DEL 01/01/2016 AL 31/01/201
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
1 MODULO AULAS
01.01 ESTRUCTURAS
01.01.01 OBRAS PRELIMINARES
01.01.01.01 ALQUILER DE ALMACEN
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
01.01.02.07 AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
01.01.03 CONCRETO SIMPLE
01.01.03.01 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
01.01.03.03 PIEDRA
DADOS DE CONCRETO 1:8 + 25% PM
01.01.03.04 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M.
01.01.03.05 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
01.01.04 CONCRETO ARMADO
01.01.04.05 VIGAS
01.01.04.05.01 VIGAS.- CONCRETO fc = 210 Kg/cm
01.01.04.05.02 VIGAS.- ENCOFRADO Y DESENCOFRADO
01.01.04.05.03 VIGAS.- ACERO fy = 4200 Kg/cm
01.01.04.06 LOSAS ALIGERADAS
01.01.04.06.01 LOSA ALIGERADA - CONCRETO fc = 210 Kg/cm
01.01.04.06.02 LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO
01.01.04.06.03 LOSA ALIGERADA.- ACERO fy = 4,200 Kg/cm
01.01.04.06.04 LOSA ALIGERADA.- LADRILLO HUECO 15 x 30 x 30 cm
01.02 ARQUITECTURA
01.02.01 MUROS Y TABIQUES
01.02.01.01 MURO DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (e = 1.5 cm)
01.02.01.02 MURO DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (e = 1.5 cm)
2 CERCO PERIMETRICO
2.01 ESTRUCTURAS
02.01.02 MOVIMIENTO DE TIERRAS
VALORIZACIN N 04 - PERIODO DEL 01/01/2016 AL 31/01/201
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
4 MODULO ADMINISTRATIVO
4.01 ESTRUCTURAS
04.01.02 MOVIMIENTO DE TIERRAS
04.01.02.05 NIVELACION INTERIOR Y APISONADO
04.01.02.06 AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
04.01.03 CONCRETO SIMPLE
04.01.03.01 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
PIEDRA
04.01.03.03 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M.
04.01.03.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
04.01.03.05 FALSO PISO DE 4" DE CONCRETO 1:10
04.01.04 CONCRETO ARMADO
04.01.04.01 ZAPATAS
04.01.04.01.01 ZAPATAS.- CONCRETO fc = 210 Kg/cm
04.01.04.02 VIGAS DE CIMENTACION
04.01.04.02.01 VIGAS DE CIMENTACION - CONCRETO fc = 210 Kg/cm
04.01.04.02.02 VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADOS
04.01.04.03 SOBRECIMIENTOS REFORZADOS
VALORIZACIN N 04 - PERIODO DEL 01/01/2016 AL 31/01/201
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
5 OBRAS EXTERIORES
5.01 PATIOS, VEREDAS, RAMPAS
VALORIZACIN N 04 - PERIODO DEL 01/01/2016 AL 31/01/201
PROYECTO
LUGAR
FECHA
ITEM DESCRIPCIN
UND METRADO
mes 1.00
m3 3.30
m2 38.20
m3 3.09
m3 0.77
m3 0.34
m2 4.55
m3 22.76
m2 194.48
kg 2024.82
m3 15.53
m2 143.52
kg 704.83
und 1478.46
m2 34.64
m2 42.93
DEL 01/01/2016 AL 31/01/2016
UND METRADO
m3 7.22
m3 18.00
m3 22.21
m2 98.96
m3 0.42
m2 5.62
m3 2.62
m3 7.51
m2 61.11
m3 1.67
m2 16.70
m3 7.85
m2 87.89
m3 2.81
m2 37.46
m2 141.12
m3 14.96
m3 1.76
DEL 01/01/2016 AL 31/01/2016
UND METRADO
m3 0.98
m3 0.54
m2 6.16
kg 78.05
m3 0.38
m2 2.56
kg 30.49
kg 10199.63
m2 17.99
m2 24.75
m3 3.30
m3 0.13
m2 1.77
m2 3.45
m3 3.38
m3 0.89
m2 7.09
DEL 01/01/2016 AL 31/01/2016
UND METRADO
m3 2.28
m2 30.83
kg 118.11
m3 1.51
m2 19.51
kg 470.32
m3 2.62
m2 25.20
kg 296.64
m3 1.89
m2 71.76
kg 81.98
und 180.30
m2 25.71
m2 14.45
m2 4.36
pto 2.00
m 2.10
und 1.00
DEL 01/01/2016 AL 31/01/2016
UND METRADO
m2 113.09
m3 113.09
m3 31.15
m2 74.15
m2 74.15