Professional Documents
Culture Documents
PART C-EARTHWORKS
Tests: None
Tests: None
Tests: Same as for Item 103, 104 and 105 whichever is applicable.
Tests:
Tests:
1
For each 500 m2 Layer of compacted fill or fraction thereof at least
one group of three in-situ density tests. The layers shall on placed not
exceeding 200 mm in loose measurement or based on the result of
compaction trials.
Tests: None
Tests:
At least one group of three in-situ density tests for each 500 m2 or
fraction thereof.
Tests:
For every 300 m3 or fraction thereof:
2
For of every 500 m3 or fraction there of.
At least one group of three in-situ density tests for each 500 mm2
or fraction thereof.
Tests :
A. Soil Aggregate
B. Mix
3
1-T. Thickness determination for every 150 m or fraction
D. Hydrated Lime
Item 204 - Portland Cement Stabilized Road Mix Base Course Amount
Tests:
B. Cement
C. Water
D. Mix
Tests
4
B. Emulsified Asphalt:
A. Soil Aggregate
B. Portland Cement
Tests :
C. Water
Test :
D. Mix
Tests :
Tests :
5
PART E - SURFACE COURSE
Tests :
At least one group of three in-situ density tests for each 500 m2 or
fraction thereof
Quantity : 1 to 2 L /m2
A. Bituminous Materials
B. Cover Aggregates
6
Item 304 - Bituminous Surface Treatment Aggregates
A. Aggregrates
Quality :
Tests :
B. Bituminous Materials
Quantity :
A. Aggregates
Quantity :
7
Cover (Crushed or Screened) - - - - - - - - - - - - - - - 8 kg / m2
B. Bituminous Materials
A. Aggregates
B. Bituminous Materials
Quantity :
C. Mix
1-Ext., Extraction
1-Sty., Stability
D. Hydrated Lime
E. Compacted Pavement
Tests : D & T (Density and Thickness Test) - at Least one (1) but not
more than three (3) samples shall be taken.
8
Item 307 - Bituminous Plant - Mix Surface Course - General
A. Aggregates
Tests:
B. Bituminous Materials
C. Mix
1-Ext., Extraction
1-Sty., Stability
D. Hydrated lime
E. Mineral Filler
F. Compacted Pavement
9
Item 308 - Bituminous Plant - Mix Surface Course. Cold Laid Aggregate
A. Aggregate
B. Bituminous Material
Quantity:
1. Using Cut-Back Asphalt 4.5 to 7.0 mass percent of total dry aggregate.
C. Mix
D. Hydrated Lime
E. Mineral Filler
Tests : 1-G & P, Grading and Plasticity Tests (LL, PL, PI)
F. Compacted Pavement
A. Aggregate
B. Bituminous Materials
C. Mix
D. Hydrated Lime
10
E. Mineral Filler
Compacted Pavement
A. Aggregates
B. Bituminous Materials
C. Mix
D. Hydrated Lime
E. Mineral Filler
F. Compacted Pavement
A. Cement
B. Fine Aggregate
Quantity :
11
Tests : For every 1500 m3 or fraction thereof:
C. Coarse Aggregate
Quantity:
D. Water
12
E. Joint Filler
G. Steel Bars
H. Concrete
I. Completed Pavement
Five (5) holes per km per lane or five (5) holes per
500 m when 2 lanes are poured concurrently.
A. Timber Piles
B. Concrete Piles
a. Concrete
13
Tests : Same as for item 405
b. Reinforcing Steel
C. Structural Piles
A. Concrete
B. Reinforcing Steel
Tests :
Tests :
14
Item 405 - Structural Concrete
A. Cement
B. Fine Aggregate
C. Coarse Aggregates
15
a. For a source not vet tested or failed in previous quality test:
D. Water
Tests:
Tests:
F. Steel Reinforcement
Tests :
1-Q, Quality Test for every 10,000 kg or fraction thereof for each
size
G. Concrete
Tests :
A. Concrete
B. Steel Reinforcement
16
Tests : Same as for Item 404
C. Wire Strands
Tests : Same Test as for items 403, 404, 405 and 411
Electrometric Bearing Pad will be tested to
determine its quantity.
Painting
1-Q, One 4-L can for every 100 cans or fraction thereof.
Tests:
1-Q, One 4-L can for every 100 cans or fraction thereof.
A. Pipes
Tests
Alternative Requirement:
17
1-Inspection Report for each size for not more than 25 pipes cast in the
field.
Alternative Requirements:
B. Clay Pipe
Tests :
1-Pipe for every 200 pieces each size, with a minimum of 2 specimens
for strength, absorption and dimension
A. Concrete
18
Item 505 - Stone Masonry
A. Cement
B. Fine Aggregate
C. Stone
D. Water
A. Bed Course
19
Tests : Same as for Item 20
B. Steel Reinforcement
C. Concrete
Tests:
A. Concrete
B. Joint Filler
A. Concrete
A. Concrete
B. Reinforcing Steel
20
C. Timber
D. Paint
A. Steel Posts
S. Timber Posts
C. Concrete
D. Reinforcing Steel
E. Rail
F. Paint
B. Concrete Post
21
Item 607 - Reflective Pavement Studs
Tests : Same as for item 301, 302; 303, 306, 307, 303, 309
and 310.
Concrete Pipes
22
Tests : Same as stem 500
Reinforcing Steel
Wire Rope
Fence
Guardrail
23
24