The level difference of concrete plinth of hoarding type 2 and existing footing
= 54.13mPD 0.5m - 50.67mPD
= 2.96m (Say 3.0m)
The spreading pressure to the existing footing is only 0.15kPa (see following page).
The impacts can be negligible.