Progress Tracking Sheet-Steel Piping Hydro Testing

Preparation Clear Punch


Testing Reinstated
Done List
TestPack No

Project Area

Weighting

Individual
Man hour

Progress

Progress
Overall
(Meter)
Quantity
Item

20% 45% 25% 10%

1 TP-001 A 950.0 532 0.08 100% 100% 100% 100% 100% 0.084
2 TP-002 A 1700.0 952 0.15 100% 100% 100% 0% 90% 0.136
3 TP-003 A 980.0 549 0.09 100% 100% 100% 0% 90% 0.078
4 TP-004 A 1370.0 767 0.12 100% 100% 100% 0% 90% 0.110
5 TP-005 B 2200.0 1100 0.17 100% 100% 100% 0% 90% 0.157
6 TP-006 B 2950.0 1475 0.23 56% 56% 29% 0% 44% 0.102
7 TP-007 B 800.0 400 0.06 0% 0% 0% 0% 0% 0.000
8 TP-008 B 1050.0 525 0.08 57% 57% 0% 0% 37% 0.031

Progress Summary by Project Area-Piping Hydro Testing


Weighting
Man hour

Progress

Progress
by Area
Project

Overall
(Meter)
Quantity
Area

Progress is updated using


data from Test Pack Tracker
A 5000 2800 0.44 92% 40.8%
Sheet
B 7000 3500 0.56 52% 29.0%
Total 12000 6300 1.00 69.9%
Progress updating Section Progress Calculation Section

Iso
Testpack Project Pipe Preparation Clear Punch Preparation Clear Punch
Item Drawing System Name Workpack Man Hour Testing Reinstated Testing Reinstated
No Area Length(m) Done List Done List
No

1 ISO-01 TP-001 TP-001A WP-001 A 300 168 10-Jan-10 10-Jan-10 10-Jan-10 15-Jan-10 300 300 300 300
2 ISO-02 TP-001 TP-001A WP-001 A 200 112 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 200 200 200 200
3 ISO-03 TP-001 TP-001A WP-001 A 450 252 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 450 450 450 450
4 ISO-04 TP-002 TP-002A WP-001 A 600 336 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 600 600 600 600
5 ISO-05 TP-002 TP-002A WP-001 A 500 280 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 500 500 500 500
6 ISO-06 TP-002 TP-002A WP-001 A 600 336 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 600 600 600 600
7 ISO-07 TP-003 TP-003A WP-001 A 500 280 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 500 500 500 500
8 ISO-08 TP-003 TP-003A WP-001 A 480 269 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 480 480 480 480
9 ISO-09 TP-004 TP-004A WP-002 A 690 386 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 690 690 690 690
10 ISO-10 TP-004 TP-004A WP-002 A 680 381 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 680 680 680 680
11 ISO-11 TP-005 TP-005B WP-002 B 750 375 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 750 750 750 750
12 ISO-12 TP-005 TP-005B WP-002 B 800 400 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 800 800 800 800
13 ISO-13 TP-005 TP-005B WP-002 B 650 325 10-Jan-10 20-Jan-10 23-Jan-10 650 650 650 0
14 ISO-14 TP-006 TP-006B WP-003 B 850 425 10-Jan-10 20-Jan-10 23-Jan-10 850 850 850 0
15 ISO-15 TP-006 TP-006B WP-003 B 800 400 10-Jan-10 20-Jan-10 800 800 0 0
16 ISO-16 TP-006 TP-006B WP-003 B 650 325
17 ISO-17 TP-006 TP-006B WP-003 B 650 325
18 ISO-18 TP-007 TP-007B WP-004 B 800 400
19 ISO-19 TP-008 TP-008B WP-005 B 450 225
16 ISO-16 TP-008 TP-008B WP-005 B 600 300 10-Jan-10 20-Jan-10 600 600 0 0

Progress Summary (work step) by TestPack level


Preparation

Reinstated

Punch List
Testing
Project

(meter)
Length

Done

Clear

TestPack
Area

Item
No
0.5
1 TP-001 A 950 100% 100% 100% 100%
2 TP-002 A 1700 100% 100% 100% 100%
3 TP-003 A 980 100% 100% 100% 100%
4 TP-004 A 1370 100% 100% 100% 100%
5 TP-005 B 2200 100% 100% 100% 70%
6 TP-006 B 2950 56% 56% 29% 0%
7 TP-007 B 800 0% 0% 0% 0%
8 TP-008 B 1050 57% 57% 0% 0%

Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com