You are on page 1of 120

CATLOGO DE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA

"SELECCIN" Cdigo Descripcin Unid. Costo


EQ. Y HERRAMIENTA BAI0001 COMPACTADOR BAILARINA HR $46.13
EQ. Y HERRAMIENTA EAN0001 ANDAMIO METALICO DE 2 X 2 PZA $50.00
EQ. Y HERRAMIENTA EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR $66.00
MAAR0016 ARMADURA SOLDADA CASTILLO ARMEX 15X15-4 MT $19.00
MATERIALES
MAAR0017 ARMADURA SOLDADA CASTILLO ARMEX 15X20-4 MT $19.20
MATERIALES
MATERIALES MAGU0010 AGUA M3 $12.00
MATERIALES MALA0180 ALAMBRE RECOCIDO No. 18 KG $13.00
MATERIALES MALA0190 ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.) TON $12,000.00
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT $20.00
MATERIALES
MATERIALES MBAR0009 VARILLA No.2.5 (5/16") FY=4200KG/CM2. TON $13,000.00
MATERIALES MCEM0010 MORTERO HIDRAULICO TON $1,440.00
MATERIALES MCEM0050 CALHIDRA TON $1,680.00
MATERIALES MCEM0060 CEMENTO GRIS EN SACOS TON $2,120.00
MATERIALES MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG $22.00
MATERIALES MCOM0010 DIESEL LT $20.00
MATERIALES MDUE0001 DUELA 3/4" X 4" X 8 PT $0.00
MATERIALES MEZ0002 MORTERO MORTERO - ARENA PROPORCION 1:5 M3 $1,194.54
MATERIALES MEZ0005 MORTERO CEMENTO-ARENA 1:6 M3 $1,056.96
MATERIALES MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 $1,194.54
MATERIALES MHIL0001 HILO DE PLAST.P/TRAZO EN CARRETE CAL.10 ML $0.00
MIMP0001 IMPERMEABILIZANTE AISLAFLEX 5 A, MARCA PASA. LT $0.00
MATERIALES
MJUNT0001 JUNTEADOR GRIS CON ARENA MARCA PERDURA SACO $0.00
MATERIALES STONE, SACO DE 10 K
MATERIALES MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT $0.00
MATERIALES MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT $0.00
MATERIALES MMAD0047 MADERA PINO DE 3a. EN POLN DE 4"X4" REG PT $0.00
MATERIALES MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT $0.00
MMAL0050 MALLA ELECTROSOLDADATECNOMALLA 6X6-10/10 M2 $16.56
MATERIALES
MMAL0080 MALLA ELECTROSOLDADA TECNOMALLA 6X6-6/6 M2 $16.56
MATERIALES
MMAL0090 MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8 M2 $16.56
MATERIALES
MMEM0001 MEMBRANA DE FIBRA DE POLIESTER#5 PARA M2 $0.00
MATERIALES IMPERMEABILIZACIN
MATERIALES MMOR0060 MORTERO TOLTECA TON $1,440.00
MANO DE OBRA. MOMM01 PEON JOR $359.58
MANO DE OBRA. MOMM30 OFICIAL ALBANIL JOR $493.06
MANO DE OBRA. MOMM32 OFICIAL PINTOR JOR $509.52
MATERIALES MPET0040 ARENA P/CONCRETOS M3 $150.00
MATERIALES MPET0170 GRAVA P/CONCRETOS 3/4" M3 $150.00
MATERIALES MPGP0001 PEGAPISO GRIS MARCA PERDURA STONE SACO $0.00
MATERIALES MPIN0001 PINTURA ESMALTE CUB $1,500.00
MATERIALES MPIN0060 PINTURA COLOR BLANCA BERLINTE CUB $1,053.00
MATERIALES MPIN0069 SELLADOR VINILICO LT $0.00
MATERIALES MPIS0240 PISO VITROMEX BCO. 2 AMERICAS 33X33 CM M2 $96.52
MATERIALES MRES0051 YESO DE RESANADOR KG $1.13
MATERIALES MSEL0001 SELLADOR PASA AISLAFLEX SELLO LT $0.00
MATERIALES MTAB0070 TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. MILL $3,000.00
MATERIALES MTAB0090 TABICON DE CEMENTO VIBRO BLOCK 7X14X28CM MILL $5,000.00
MATERIALES MVAR0009 VARILLA No.3 (3/8") FY=4200 KG/CM2. TON $13,000.00
MATERIALES MVAR0012 VARILLA No.4 (1/2") FY=4200 KG/CM2 TON $13,000.00
MATERIALES MVAR0013 VARILLA No.5 (5/8") FY=4200 KG/CM2. TON $13,000.00
MATERIALES MVAR0014 VARILLA No.6 (3/4") FY=4200 KG/CM2. TON $13,000.00
MATERIALES MVAR0015 VARILLA No.8 (1") FY=4200 KG/CM2. TON $13,000.00
MATERIALES MVAR0016 VARILLA No.10(11/4") FY=4200KG/CM2. TON $13,000.00
MATERIALES MVAR0017 VARILLA NO.12(11/2") FY=4200KG/CM2. TON $13,000.00
MATERIALES PUR0001 PUERTA METALICA 0.70 X 2.10 PZA $0.00
EQ. Y HERRAMIENTA VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR $45.00
MATERIALES MPETO200 PIEDRA DE CORTE P/MAMPOSTERIA M3 $ 32.00
MANO DE OBRA. MOMM33 INGENIERO TOPOGRAFO JOR $ 733.32
COSTO DE MATERIALES:
CEMENTO ARENA GRAVA AGUA
PRECIO x TON:PRECIO x CAMIN
PRECIO x CAMIN
PRECIO x PIPA
20 Bultos de 50 Kg. DE 7M3 DE 7M3 DE 4000 LTS
$2,120.00 $1,050.00 $1,050.00 $48.00
PRECIO x BULTO:
DE 50 KG PRECIO x M3: PRECIO x M3: PRECIO x M3:
$106.00 $150.00 $150.00 $12.00
DESPERDICIO:DESPERDICIO:DESPERDICIO:DESPERDICIO:
3% 8% 8% 30%
1.03 1.08 1.08 1.30
COSTO CON DESP.
COSTO CON DESP.
COSTO CON DESP.
COSTO CON DESP.
$2,183.60 $162.00 $162.00 $15.60
CATLOGO DE CONCEPTOS CON RENDIMIENTO POR ETAPA

Cdigo Descripcin Corta. Texto completo Unidad

DEMOLICIONES
DEM0001 DEM. CIMIENTOS DE PIEDRA. DEMOLICION AM3
DEM0002 DEM. CIM. CONC. ARM. S/REC. ACERO. DEMOLICION AM3
DEM0004 DEM. MUROS DE ADOBE Y TEPETATE DEMOLICION DM3
DEM0009 DEM. MURO TAB/BLOCK 14 CM. SIN/REC. DEMOLICION AM2
DEM0010 DEM. MURO TAB/BLOCK 14 CM. CON/REC. DEMOLICION AM2
DEM0014 DEM. CONC. ARMADO EN ESTRUCTURA. DEMOLICION AM3
DEM0020 DEM. PISO CONC. SIMPLE 8-10 CM. ESP. DEMOLICION AM2
DEM0022 DEM. PISO CONC. ARMADO 8-10 CM. ESP. DEMOLICION AUnidad
DEM0028 DEM. APLANADOS MURO/PLAFN 2.5 CM. ESP. DEMOLICION AM2
DEM0029 DEM. FALSO PLAFN DE YESO. DEMOLICION AM2
DEM0043 DEM. CONC. ASFLTICO 5-7 CM. ESP. DEMOLICION DM2

PRELIMINARES
LTZ0001 LIMPIEZA DEL TERRENO A MANO. LIMPIEZA DEL M2
EXC0001 EXCAV. MANUAL CEPAS SUELO TIPO II EXCAVACIN AM3
LTZ0005 TRAZO Y NIVELACIN MANUAL TRAZO Y NIVE M2

CIMENTACIN
CIM0001 CIM. MANPOSTERIA 60,30 X 80 CM. MORT.1:5 CIMENTACION M3
RELL01CC RELLENO CIM. COMP. BAILARINA 90% RELLENO EN CM3
RELL01CM RELLENO CIM. COMP. MANUAL RELLENO DE CM3

CASTILLOS Y COLUMNAS
CAST001V CASTILLO 15X15 , FC=150, 4 VARS. #3, 2 C CASTILLO CONM
CAST002V CASTILLO 15X15 , FC=200, 4 VARS. #3, 2 C CASTILLO CONM
CAST003V CASTILLO 15X15 , FC=250, 4 VARS. #3, 2 C CASTILLO CONM
CAST004V CASTILLO 15X20 , FC=150, 4 VARS. #3, 2 C CASTILLO CONM
CAST005V CASTILLO 15X20 , FC=200, 4 VARS. #3, 2 C CASTILLO CONM
CAST010V CASTILLO CON SECCION DE 15X30 CM DE CONC CASTILLO CONM
CAST006V CASTILLO 15X20, FC=250, 4 VARS. #3, 2 C CASTILLO CONM
CAST007V CASTILLO 20X20 , FC=150, 4 VARS. #3, 2 C CASTILLO CONM
CAST008V CASTILLO 20X20 , FC=200, 4 VARS. #3, 2 C CASTILLO CONM
CAST009V CASTILLO 20X20, FC=250, 4 VARS. #3, 2 C CASTILLO CONM

CONTRATRABES, TRABES Y CADENAS.


DALA001A DALA 15X15 , FC=150, ARMEX 15X15-4, 2 C DALA CON SECM
DALA002A DALA 15X15 , FC=200, ARMEX 15X15-4, 2 C DALA CON SECM
DALA003A DALA 15X15 , FC=250, ARMEX 15X15-4, 2 C DALA CON SECM
DALA004A DALA 15X20, FC=150, ARMEX 15X20-4, 2 C DALA CON SECM
DALA005A DALA 15X20, FC=200, ARMEX 15X20-4, 2 C DALA CON SECM
DALA006A DALA 15X20, FC=250, ARMEX 15X20-4, 2 C DALA CON SECM
DALA007A DALA 20X20, FC=150, ARMEX 15X20-4, 2 C DALA CON SECM
DALA008A DALA 20X20, FC=200, ARMEX 15X20-4, 2 C DALA CON SECM
DALA009A DALA 20X20, FC=250, ARMEX 15X20-4, 2 C DALA CON SECM

FIRMES
PLA05-100 PLANTILLA CONC. SIMPLE F`C =100 KG/CM2 PLANTILLA DE M2
PIS05-100 FIRME 5 CM, FC 100, RN, AGR. 3/4". FIRME DE CONM2
PIS05-150 FIRME 5 CM, FC 150, RN, AGR. 3/4". FIRME DE CONM2
PIS08-150 FIRME 8 CM, FC 150, RN, AGR. 3/4". FIRME DE CONM2
PIS08-200 FIRME 8 CM, FC 200, RN, AGR. 3/4". FIRME DE CONM2
PIS10-150 FIRME 10 CM, FC 150, RN, AGR. 3/4". FIRME DE CONM2
PIS10-200 FIRME 10 CM, FC 200, RN, AGR. 3/4". FIRME DE CONM2
PIS15-150 FIRME 15 CM, FC 150, RN, AGR. 3/4". FIRME DE CONM2
PIS15-200 FIRME 15 CM, FC 200, RN, AGR. 3/4". FIRME DE CONM2

MUROS
MURLAD7 MURO TRR, 7 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TABIM2
MURLAD14 MURO TRR, 14 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TABIM2
MURLAD28 MURO TRR, 28 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TABIM2
MURTAB10 MURO TAB, 10 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TABIM2
MURTAB14 MURO TAB, 14 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TABIM2
MURTAB28 MURO TAB, 28 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TABIM2
MURPRET15 MUR. PRETIL PERIM. 7X14X28, 15 CM. MURO DE PRET
M

MUROS ESPECIALES
MURTABI1 MURO LAMBRN DE TABLAROCA TIPO INTERIOR M2
MURTABE1 MURO LAMBRN DE TABLAROCA TIPO INTEMPERI M2
MURTABI2 MURO DE TABLAROCA A 2 CARAS TIPO INTERIO M2
MURTABE2 MURO DE TABLAROCA A 2 CARAS TIPO INTEMPE M2
MURMIXID MURO MIXTO TABLAROCA TIPO INTERIOR - DUR M2
MURMIXED MURO MIXTO TABLAROCA TIPO INTEMPERIE - D M2
MURMIXIE MURO DE TABLAROCA TIPO INTERIOR - INTEM M2
MURDUR2 MURO A 2 CARAS DE DUROK. M2
PLATAB001 PLAFN DE TABLAROCA M2
PLAPOLI001 PLAFN DE POLIESTIRENO DE 1" DE ESP. CON M2
DETTAB001 FABRICACIN DE DETALLES DE TABLAROCA (EN M2
DETTAB002 FABRICACIN DE BOQUILLAS. ML
MDURINT MURO LAMBRIN DE DUROK M2

ENTREPISOS Y CUBIERTAS
LOSA10-200 LOSA TECHO 10 CM, VAR. #3, FC=200 LOSA DE 10 C M2
LOSA10-250 LOSA TECHO 10 CM, VAR. #3, FC=250 LOSA DE 10 C M2

HERRERA Y CANCELERA

PTA0001 SUMINISTRO Y COLOCACIN DE PUERTA DE 0.7 SUMINISTRO YPZA


VENT0001 SUMINISTRO Y COLOCACIN DE VENTANA METL SUMINISTRO YPZA

ACABADOS
PIS0080 PISO DE CERMICA VITROMEX 33X33 CM. SUMINISTRO YM2
PIN0001 PINTURA VINILICA EN MUROS Y PLAFONES SUMINISTRO YM2
PIN0002 SUMINISTRO Y APLICACIN DE PINTURA ESMAL SUMINISTRO YM2
IMP0001 IMPERMEABILIZACIN DE LOSA DE AZOTEA SUMINISTRO YM2
APL0025 EMBOQ. REPELLADO C/CEMENTO Y ARENA 1:6 EMBOQUILLADO
M
APL0022 APLANADO PLAFONES C/MORTERO Y ARENA 1:5 APLANADO ENM2
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. ACABADO ESCO
M2
PSO0002 ACABADO PULIDO INTEGRAL PISO CONC. ACABADO PULIM2

FABRICACION DE MEZCLAS, MORTEROS Y CONCR


MEZ0003 MORTERO CEMENTO-ARENA 1:4 M3
MEZ0004 MORTERO CEMENTO-ARENA 1:5 M3
MEZ0005 MORTERO CEMENTO-ARENA 1:6 M3
MEZ0006 MORTERO CEMENTO-ARENA 1:7 M3
MEZ0007 MORTERO CEMENTO-ARENA 1:8 M3
MEZ0009 MEZCLA MORTERO-ARENA 1:3 M3
MEZ0010 MEZCLA MORTERO-ARENA 1:4 M3
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3
MEZ0012 MEZCLA MORTERO-ARENA 1:6 M3
MEZ0013 MEZCLA MORTERO-ARENA 1:7 M3
MEZ0014 MEZCLA MORTERO-ARENA 1:8 M3
FCO100M CONC. FC=100, RN, AGR MAX. 3/4", MANUAL. CONCRETO F'CM3
FCO100R CONC. FC=100, RN, AGR MAX. 3/4", REVOLV. CONCRETO F'CM3
FCO150M CONC. FC=150, RN, AGR MAX. 3/4", MANUAL. CONCRETO FC
M3
FCO150R CONC. FC=150, RN, AGR MAX. 3/4", REVOLV. CONCRETO FC
M3
FCO200M CONC. FC=200, RN, AGR MAX. 3/4", MANUAL. CONCRETO F'CM3
FCO200R CONC. FC=200, RN, AGR MAX. 3/4", REVOLV. CONCRETO F'CM3
FCO250M CONC. FC=250, RN, AGR MAX. 3/4", MANUAL. CONCRETO F'CM3
FCO250R CONC. FC=250, RN, AGR MAX. 3/4", REVOLV. CONCRETO F'CM3

ACARREOS
ACR0009 ACARREO CARR. SACOS: CEM. MORT. CAL. ACARREO EN C
M3
ACR0012 ACARREO CARR. AGREGADOS MORT. CONCRETOS. ACARREO EN C
M3
ACR0013 ACARREO CARR. PIEDRA BRAZA. ACARREO EN C
M3
ACR0037 ACARREO A MANO MADERA P/CIMBRA. ACARREO A MAMIL
ACR0082A ACARREO EN CAM. A PRIM. KM. VOL. MED. M3

ACERO DE REFUERZO EN ESTRUCTURA


AREF2 HAB.ARM. DE ACERO DE REF.ESTR. No.2 HABILITADO Y TON
AREF2.5 HAB.ARM. DE ACERO DE REF.ESTR. No.2.5 HABILITADO Y TON
AREF3 HAB.ARM. DE ACERO DE REF.ESTR. No.3 HABILITADO Y TON
AREF4 HAB.ARM. DE ACERO DE REF.ESTR. No.4 HABILITADO Y TON
AREF5 HAB.ARM. DE ACERO DE REF.ESTR. No.5 HABILITADO Y TON
AREF6 HAB.ARM. DE ACERO DE REF.ESTR. No.6 HABILITADO Y TON
AREF8 HAB.ARM. DE ACERO DE REF.ESTR. No.8 HABILITADO Y TON
AREF10 HAB.ARM. DE ACERO DE REF.ESTR. No.10 HABILITADO Y TON
AREF12 HAB.ARM. DE ACERO DE REF.ESTR. No.12 HABILITADO Y TON
MAL66-6/6 HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 6/6 HAB.ARM. DE M2
MAL66-8/8 HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 8/8 HAB.ARM. DE M2
MAL66-10/10 HAB.ARM. MALLA ELECTROSOLDADA 6X6 10/10 HAB.ARM. MALM2
ARM15X15 SUM/COL ARMEX 15X15-4 EN ESTRUCT. SUMINISTRO YM
ARM15X20 SUM/COL ARMEX 15X20-4 EN ESTRUCT. SUMINISTRO YM
ARM15X25 SUM/COL ARMEX 15X25-4 EN ESTRUCT. SUMINISTRO YM

CUADRILLAS
CUAD001 CUADRILLA 001(1 PEON) JOR
CUAD005 CUADRILLA 005(5 PEONES) JOR
CUAD040 CUADRILLA 040(1ALBANIL+1PEON) JOR
CUAD060 CUADRILLA 060 (1 PINTOR) JOR

CIMBRAS
CFZAP CIMB./DESCIM, ACAB. COMN FRONTERAS/ZAP. CIMBRA Y DESM2
CDADO CIMB./DESCIM, ACAB. COMN CONTRATRABES CIMBRA Y DESM2
CCADE CIMB./DESCIM, ACAB. COMN CADENAS. CIMBRA Y DESM2
CCAST CIMB./DESCIM, ACAB. COMN CASTILLOS. CIMBRA Y DESM2
CCOL30X30 CIMB./DESCIM, ACAB. COMN COLUMNAS 30X30 CIMBRA Y DESM2
CCOL50X50 CIMB./DESCIM, ACAB. COMN COLUMNAS 50X50 CIMBRA Y DESM2

VACIADOS
VDACAS150 VAC. DALA Y CAST, FC=150, RN. AGR. 3/4" VACIADO DE CM3
VDACAS200 VAC. DALA Y CAST, FC=200, RN. AGR. 3/4" VACIADO DE CM3
VDACAS250 VAC. DALA Y CAST, FC=250, RN. AGR. 3/4" VACIADO DE CM3
VCL200 VAC. COLUMNAS P.B, FC=200, RN, AGR 3/4" VACIADO DE CM3
VCL250 VAC. COLUMNAS P.B, FC=250, RN, AGR 3/4" VACIADO DE CM3
VZTL150 VAC. ZAP. CIM, FC=150, RN. AGR. 3/4" VACIADO DE CM3
VZTL200 VAC. ZAP. CIM, FC=200, RN. AGR. 3/4" VACIADO DE CM3
VZTL250 VAC. ZAP. CIM, FC=250, RN. AGR. 3/4" VACIADO DE CM3
VCOL150 VAC, COLUMAS S/E, FC=150, RN, AGR. 3/4" VACIADO DE CM3
VCOL200 VAC, COLUMAS S/E, FC=200, RN, AGR. 3/4" VACIADO DE CM3
VCOL250 VAC, COLUMAS S/E, FC=250, RN, AGR. 3/4" VACIADO DE CM3
VTRABE200 VAC. TRABES S/E, FC=200, RN, AGR.3/4" VACIADO DE CM3
VTRABE250 VAC. TRABES S/E, FC=250, RN, AGR.3/4" VACIADO DE CM3
VLOSA150 VAC.. LOSAS S/E, FC=150, RN, AGR.3/4" VACIADO DE CM3
VLOSA200 VAC.. LOSAS S/E, FC=200, RN, AGR.3/4" VACIADO DE CM3
VLOSA250 VAC., LOSAS ,S/E, FC=250, RN. AGR.3/4" VACIADO DE CM3
VCIM100R VAC.. CIMENTACIN, FC=100, RN, AGR.3/4" VACIADO DE CO
M3
VCIM150R VAC.. CIMENTACIN, FC=150, RN, AGR.3/4" VACIADO DE CO
M3
VCIM200R VAC.. CIMENTACIN, FC=200, RN, AGR.3/4" VACIADO DE CO
M3
VCIM250R VAC.. CIMENTACIN, FC=250, RN, AGR.3/4" VACIADO DE CO
M3
RENDIMIENTO POR ETAPA

cuadrilla Rend. unidad

CUADRILLA 001 (1 PEON) 1.50 M3/JOR


CUADRILLA 001 (1 PEON) 0.60 M3/JOR
CUADRILLA 001 (1 PEON) 5.50 M3/JOR
CUADRILLA 001 (1 PEON) 12.50 M2/JOR
CUADRILLA 001 (1 PEON) 6.50 M2/JOR
CUADRILLA 001 (1 PEON) 0.65 M3/JOR
CUADRILLA 001 (1 PEON) 16.67 M2/JOR
CUADRILLA 001 (1 PEON) 7.52 Unidad/JOR
CUADRILLA 001 (1 PEON) 25.00 M2/JOR
CUADRILLA 001 (1 PEON) 19.00 M2/JOR
CUADRILLA 001 (1 PEON) 22.22 M2/JOR

CUADRILLA 001 (1 PEON) 27.03 M2/JOR


CUADRILLA 001 (1 PEON) 2.78 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 100.00 M2/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 2.75 M3/JOR


CUADRILLA 001 (1 PEON) 4.35 M3/JOR
CUADRILLA 001 (1 PEON) 4.35 M3/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 10.84 M/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.64 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 8.74 M/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 12.76 M/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 12.76 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.76 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 20.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 6.49 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 5.00 M/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 2.50 PZA/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 2.50 PZA/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR


CUADRILLA 060 (1 PINTOR) 20.00 M2/JOR
CUADRILLA 060 (1 PINTOR) 21.45 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 30.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 26.71 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 45.45 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 30.00 M2/JOR
CUADRILLA 001 (1 PEON) 1.59 M3/JOR
CUADRILLA 005 (5 PEONES) 15.02 M3/JOR
CUADRILLA 001 (1 PEON) 1.59 M3/JOR
CUADRILLA 005 (5 PEONES) 15.02 M3/JOR
CUADRILLA 001 (1 PEON) 1.59 M3/JOR
CUADRILLA 005 (5 PEONES) 15.02 M3/JOR
CUADRILLA 001 (1 PEON) 1.50 M3/JOR
CUADRILLA 005 (5 PEONES) 15.00 M3/JOR

CUADRILLA 001 (1 PEON) 13.33 M3/JOR


CUADRILLA 001 (1 PEON) 5.25 M3/JOR
CUADRILLA 001 (1 PEON) 5.50 M3/JOR
CUADRILLA 001 (1 PEON) 4,347.83 MIL/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 0.10 TON/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 0.12 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.14 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.16 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.17 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.18 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.22 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.25 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.28 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 82.10 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 84.03 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 98.04 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 120.05 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 120.05 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 120.05 M/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 7.97 M2/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 7.97 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 14.01 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 14.01 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 6.95 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 6.65 M2/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 1.33 M3/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
* BSICOS Lista de elementos que componen la BASE de datos que intervienen generalmente en un Anlisis de PU.

MEZ0003 MORTERO CEMENTO-ARENA 1:4 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.433630 $2,120.00 $919.30
MPET0040 ARENA P/CONCRETOS M3 0.00 1.208030 $150.00 $181.20
MAGU0010 AGUA M3 0.00 0.321600 $12.00 $3.86

Subtotal: MATERIALES $1,104.36


Costo directo $1,104.36
INDIRECTO 0.1 $110.44
UTILIDADES 0.15 $165.65
COSTO TOTAL $1,380.45

MEZ0004 MORTERO CEMENTO-ARENA 1:5 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.361633 $2,120.00 $766.66
MPET0040 ARENA P/CONCRETOS M3 0.00 1.234700 $150.00 $185.21
MAGU0010 AGUA M3 0.00 0.314000 $12.00 $3.77

Subtotal: MATERIALES $955.63


Costo directo $955.63
INDIRECTO 0.1 $95.56
UTILIDADES 0.15 $143.35
COSTO TOTAL $1,194.54

MEZ0005 MORTERO CEMENTO-ARENA 1:6 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.307455 $2,120.00 $651.80
MPET0040 ARENA P/CONCRETOS M3 0.00 1.266880 $150.00 $190.03
MAGU0010 AGUA M3 0.00 0.310800 $12.00 $3.73

Subtotal: MATERIALES $845.57


Costo directo $845.57
INDIRECTO 0.1 $84.56
UTILIDADES 0.15 $126.83
COSTO TOTAL $1,056.96

MEZ0006 MORTERO CEMENTO-ARENA 1:7 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.255440 $2,120.00 $541.53
MPET0040 ARENA P/CONCRETOS M3 0.00 1.353500 $150.00 $203.03
MAGU0010 AGUA M3 0.00 0.302400 $12.00 $3.63

Subtotal: MATERIALES $748.19


Costo directo $748.19
INDIRECTO 0.1 $74.82
UTILIDADES 0.15 $112.23
COSTO TOTAL $935.23

MEZ0007 MORTERO CEMENTO-ARENA 1:8 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.215270 $2,120.00 $456.37
MPET0040 ARENA P/CONCRETOS M3 0.00 1.396300 $150.00 $209.45
MAGU0010 AGUA M3 0.00 0.296400 $12.00 $3.56

Subtotal: MATERIALES $669.37


Costo directo $669.37
INDIRECTO 0.1 $66.94
UTILIDADES 0.15 $100.41
COSTO TOTAL $836.72

MEZ0009 MEZCLA MORTERO-ARENA 1:3 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MCEM0010 MORTERO HIDRAULICO TON 0.00 0.429500 $1,440.00 $618.48
MPET0040 ARENA P/CONCRETOS M3 0.00 1.203700 $150.00 $180.56
MAGU0010 AGUA M3 0.00 0.356400 $12.00 $4.28

Subtotal: MATERIALES $803.31


Costo directo $803.31
INDIRECTO 0.1 $80.33
UTILIDADES 0.15 $120.50
COSTO TOTAL $1,004.14

MEZ0010 MEZCLA MORTERO-ARENA 1:4 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMOR0060 MORTERO TOLTECA TON 0.00 0.341960 $1,440.00 $492.42
MPET0040 ARENA P/CONCRETOS M3 0.00 1.232597 $150.00 $184.89
MAGU0010 AGUA M3 0.00 0.341000 $12.00 $4.09

Subtotal: MATERIALES $681.40


Costo directo $681.40
INDIRECTO 0.1 $68.14
UTILIDADES 0.15 $102.21
COSTO TOTAL $851.75

MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMOR0060 MORTERO TOLTECA TON 0.00 0.285300 $1,440.00 $410.83
MPET0040 ARENA P/CONCRETOS M3 0.00 1.264700 $150.00 $189.71
MAGU0010 AGUA M3 0.00 0.346800 $12.00 $4.16

Subtotal: MATERIALES $604.70


Costo directo $604.70
INDIRECTO 0.1 $60.47
UTILIDADES 0.15 $90.70
COSTO TOTAL $755.87

MEZ0012 MEZCLA MORTERO-ARENA 1:6 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMOR0060 MORTERO TOLTECA TON 0.00 0.238900 $1,440.00 $344.02
MPET0040 ARENA P/CONCRETOS M3 0.00 1.286100 $150.00 $192.92
MAGU0010 AGUA M3 0.00 0.344400 $12.00 $4.13

Subtotal: MATERIALES $541.06


Costo directo $541.06
INDIRECTO 0.1 $54.11
UTILIDADES 0.15 $81.16
COSTO TOTAL $676.33

MEZ0013 MEZCLA MORTERO-ARENA 1:7 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMOR0060 MORTERO TOLTECA TON 0.00 0.218300 $1,440.00 $314.35
MPET0040 ARENA P/CONCRETOS M3 0.00 1.296800 $150.00 $194.52
MAGU0010 AGUA M3 0.00 0.338400 $12.00 $4.06

Subtotal: MATERIALES $512.93


Costo directo $512.93
INDIRECTO 0.1 $51.29
UTILIDADES 0.15 $76.94
COSTO TOTAL $641.17

MEZ0014 MEZCLA MORTERO-ARENA 1:8 M3


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMOR0060 MORTERO TOLTECA TON 0.00 0.187400 $1,440.00 $269.86
MPET0040 ARENA P/CONCRETOS M3 0.00 1.318200 $150.00 $197.73
MAGU0010 AGUA M3 0.00 0.332400 $12.00 $3.99

Subtotal: MATERIALES $471.57


Costo directo $471.57
INDIRECTO 0.1 $47.16
UTILIDADES 0.15 $70.74
COSTO TOTAL $589.47
Anlisis: FCO100M Unidad: M3
FCO100M CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR M3
MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.275000 $2,120.00 $583.00
MPET0040 ARENA P/CONCRETOS M3 0.00 0.544600 $150.00 $81.69
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.659100 $150.00 $98.87
MAGU0010 AGUA M3 0.00 0.260400 $12.00 $3.12
MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 1.59 0.628931 $406.33 $255.55

Subtotal: MATERIALES $766.68


Subtotal: MANO DE OBRA $255.55
Costo directo $1,022.23
INDIRECTO 0.1 $102.22
UTILIDADES 0.15 $153.33
COSTO TOTAL $1,277.79

FCO100R CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN M3
REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.275000 $2,120.00 $583.00
MPET0040 ARENA P/CONCRETOS M3 0.00 0.544600 $150.00 $81.69
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.659100 $150.00 $98.87
MAGU0010 AGUA M3 0.00 0.260400 $12.00 $3.12
SUBCONTRATOS
EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR 0.00 0.533330 $66.00 $35.20
MANO DE OBRA
CUAD005 CUADRILLA 005 (5 PEONES) JOR 15.02 0.066578 $2,031.63 $135.26

Subtotal: MATERIALES $766.68


Subtotal: MANO DE OBRA $135.26
Subtotal: SUBCONTRATOS $35.20
Costo directo $937.14
INDIRECTO 0.1 $93.71
UTILIDADES 0.15 $140.57
COSTO TOTAL $1,171.43

FCO150M CONCRETO F'C=150 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR M3
MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.327500 $2,120.00 $694.30
MPET0040 ARENA P/CONCRETOS M3 0.00 0.538200 $150.00 $80.73
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.652700 $150.00 $97.91
MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 1.59 0.628931 $406.33 $255.55
Subtotal: MATERIALES $872.94
Subtotal: MANO DE OBRA $255.55
Costo directo $1,128.49
INDIRECTO 0.1 $112.85
UTILIDADES 0.15 $169.27
COSTO TOTAL $1,410.61

FCO150R CONCRETO F'C=150 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN M3
REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.327500 $2,120.00 $694.30
MPET0040 ARENA P/CONCRETOS M3 0.00 0.538200 $150.00 $80.73
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.652700 $150.00 $97.91
SUBCONTRATOS
EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR 0.00 0.533300 $66.00 $35.20
MANO DE OBRA
CUAD005 CUADRILLA 005 (5 PEONES) JOR 15.02 0.066578 $2,031.63 $135.26

Subtotal: MATERIALES $872.94


Subtotal: MANO DE OBRA $135.26
Subtotal: SUBCONTRATOS $35.20
Costo directo $1,043.39
INDIRECTO 0.1 $104.34
UTILIDADES 0.15 $156.51
COSTO TOTAL $1,304.24

FCO200M CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR M3
MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.369770 $2,120.00 $783.91
MPET0040 ARENA P/CONCRETOS M3 0.00 0.532060 $150.00 $79.81
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.645200 $150.00 $96.78
MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 1.59 0.628931 $406.33 $255.55

Subtotal: MATERIALES $960.50


Subtotal: MANO DE OBRA $255.55
Costo directo $1,216.05
INDIRECTO 0.1 $121.61
UTILIDADES 0.15 $182.41
COSTO TOTAL $1,520.07

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN M3
REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.369770 $2,120.00 $783.91
MPET0040 ARENA P/CONCRETOS M3 0.00 0.532060 $150.00 $79.81
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.645200 $150.00 $96.78
SUBCONTRATOS
EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR 0.00 0.533330 $66.00 $35.20
MANO DE OBRA
CUAD005 CUADRILLA 005 (5 PEONES) JOR 15.02 0.066578 $2,031.63 $135.26

Subtotal: MATERIALES $960.50


Subtotal: MANO DE OBRA $135.26
Subtotal: SUBCONTRATOS $35.20
Costo directo $1,130.96
INDIRECTO 0.1 $113.10
UTILIDADES 0.15 $169.64
COSTO TOTAL $1,413.70

FCO250M CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR M3
MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.413000 $2,120.00 $875.56
MPET0040 ARENA P/CONCRETOS M3 0.00 0.537100 $150.00 $80.57
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.639800 $150.00 $95.97
MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 1.50 0.666667 $406.33 $270.88

Subtotal: MATERIALES $1,052.10


Subtotal: MANO DE OBRA $270.88
Costo directo $1,322.98
INDIRECTO 0.1 $132.30
UTILIDADES 0.15 $198.45
COSTO TOTAL $1,653.72

FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN M3
REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.413000 $2,120.00 $875.56
MPET0040 ARENA P/CONCRETOS M3 0.00 0.537100 $150.00 $80.57
MPET0170 GRAVA P/CONCRETOS 3/4" M3 0.00 0.639800 $150.00 $95.97
SUBCONTRATOS
EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR 0.00 0.533300 $66.00 $35.20
MANO DE OBRA
CUAD005 CUADRILLA 005 (5 PEONES) JOR 15.00 0.066667 $2,031.63 $135.44

Subtotal: MATERIALES $1,052.10


Subtotal: MANO DE OBRA $135.44
Subtotal: SUBCONTRATOS $35.20
Costo directo $1,222.73
INDIRECTO 0.1 $122.27
UTILIDADES 0.15 $183.41
COSTO TOTAL $1,528.42
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO M3
CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 13.33 0.075019 $406.33 $30.48

Subtotal: MANO DE OBRA $30.48


Costo directo $30.48
INDIRECTO 0.1 $3.05
UTILIDADES 0.15 $4.57
COSTO TOTAL $38.10

ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA HORIZONTAL, SUBSECUENTES A LOS M3


PRIMEROS, DE AGREGADOS, MORTERO, CONCRETOS.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 5.25 0.190476 $406.33 $77.40

Subtotal: MANO DE OBRA $77.40


Costo directo $77.40
INDIRECTO 0.1 $7.74
UTILIDADES 0.15 $11.61
COSTO TOTAL $96.74

ACR0013 ACARREO EN CARRETILLA, A 20 M HORIZONTAL, DE PIEDRA BRASA INCLUYENDO CARGA Y M3


DESCARGA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 5.50 0.181818 $406.33 $73.88

Subtotal: MANO DE OBRA $73.88


Costo directo $73.88
INDIRECTO 0.1 $7.39
UTILIDADES 0.15 $11.08
COSTO TOTAL $92.35

ACR0037 ACARREO A MANO A 20 M DE DISTANCIA HORIZONTAL, DE MADERA PARA CIMBRA, INCLUYENDO MIL
CARGA Y DESCARGA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 4,347.83 0.000230 $406.33 $0.09

Subtotal: MANO DE OBRA $0.09


Costo directo $0.09
INDIRECTO 0.1 $0.01
UTILIDADES 0.15 $0.01
COSTO TOTAL $0.12

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=3000 KG/CM2, No. 2 TON
DIAMETRO 1/4" (ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL PRIMERA ESTACION
= 20.00 M
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=3000 KG/CM2, No. 2 TON
DIAMETRO 1/4" (ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL PRIMERA ESTACION
= 20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MALA0190 ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.) TON 0.00 1.070000 $12,000.00 $12,840.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 35.500000 $13.00 $461.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.10 10.000000 $963.48 $9,634.82

Subtotal: MATERIALES $13,301.50


Subtotal: MANO DE OBRA $9,634.82
Costo directo $22,936.32
INDIRECTO 0.1 $2,293.63
UTILIDADES 0.15 $3,440.45
COSTO TOTAL $28,670.40

AREF2.5 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.2.5 TON
DIAMETRO 5/16", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MBAR0009 VARILLA No.2.5 (5/16") FY=4200KG/CM2. TON 0.00 1.070000 -$13,000.00 -$13,910.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 35.500000 $13.00 $461.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.12 8.333333 $963.48 $8,029.02

Subtotal: MATERIALES -$13,448.50


Subtotal: MANO DE OBRA $8,029.02
Costo directo -$5,419.48
INDIRECTO 0.1 -$541.95
UTILIDADES 0.15 -$812.92
COSTO TOTAL -$6,774.36

AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.3 TON
DIAMETRO 3/8", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0009 VARILLA No.3 (3/8") FY=4200 KG/CM2. TON 0.00 1.070000 $13,000.00 $13,910.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 35.500000 $13.00 $461.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.14 7.142857 $963.48 $6,882.01

Subtotal: MATERIALES $14,371.50


Subtotal: MANO DE OBRA $6,882.01
Costo directo $21,253.51
INDIRECTO 0.1 $2,125.35
UTILIDADES 0.15 $3,188.03
COSTO TOTAL $26,566.89
AREF4 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.4 TON
DIAMETRO 1/2", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0012 VARILLA No.4 (1/2") FY=4200 KG/CM2 TON 0.00 1.080000 $13,000.00 $14,040.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 35.500000 $13.00 $461.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.16 6.250000 $963.48 $6,021.76

Subtotal: MATERIALES $14,501.50


Subtotal: MANO DE OBRA $6,021.76
Costo directo $20,523.26
INDIRECTO 0.1 $2,052.33
UTILIDADES 0.15 $3,078.49
COSTO TOTAL $25,654.08

AREF5 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.5 TON
DIAMETRO 5/8", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0013 VARILLA No.5 (5/8") FY=4200 KG/CM2. TON 0.00 1.090000 $13,000.00 $14,170.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 25.500000 $13.00 $331.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.17 5.882353 $963.48 $5,667.54

Subtotal: MATERIALES $14,501.50


Subtotal: MANO DE OBRA $5,667.54
Costo directo $20,169.04
INDIRECTO 0.1 $2,016.90
UTILIDADES 0.15 $3,025.36
COSTO TOTAL $25,211.30

AREF6 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.6 TON
DIAMETRO 3/4", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0014 VARILLA No.6 (3/4") FY=4200 KG/CM2. TON 0.00 1.100000 $13,000.00 $14,300.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 25.500000 $13.00 $331.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.18 5.555556 $963.48 $5,352.68

Subtotal: MATERIALES $14,631.50


Subtotal: MANO DE OBRA $5,352.68
Costo directo $19,984.18
INDIRECTO 0.1 $1,998.42
UTILIDADES 0.15 $2,997.63
COSTO TOTAL $24,980.22
AREF8 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.8 TON
DIAMETRO 1", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA
ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0015 VARILLA No.8 (1") FY=4200 KG/CM2. TON 0.00 1.120500 $13,000.00 $14,566.50
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 20.500000 $13.00 $266.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.22 4.545455 $963.48 $4,379.46

Subtotal: MATERIALES $14,833.00


Subtotal: MANO DE OBRA $4,379.46
Costo directo $19,212.46
INDIRECTO 0.1 $1,921.25
UTILIDADES 0.15 $2,881.87
COSTO TOTAL $24,015.58

AREF10 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.10 TON
DIAMETRO 1 ", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0016 VARILLA No.10(11/4") FY=4200KG/CM2. TON 0.00 1.120500 $13,000.00 $14,566.50
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 20.500000 $13.00 $266.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.25 4.000000 $963.48 $3,853.93

Subtotal: MATERIALES $14,833.00


Subtotal: MANO DE OBRA $3,853.93
Costo directo $18,686.93
INDIRECTO 0.1 $1,868.69
UTILIDADES 0.15 $2,803.04
COSTO TOTAL $23,358.66

AREF12 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.12 TON
DIAMETRO 1 ", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MVAR0017 VARILLA NO.12(11/2") FY=4200KG/CM2. TON 0.00 1.120500 $13,000.00 $14,566.50
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 20.500000 $13.00 $266.50
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 0.28 3.571429 $963.48 $3,441.01

Subtotal: MATERIALES $14,833.00


Subtotal: MANO DE OBRA $3,441.01
Costo directo $18,274.01
INDIRECTO 0.1 $1,827.40
UTILIDADES 0.15 $2,741.10
COSTO TOTAL $22,842.51

MAL66-6/6 HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 6/6 M2


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.107000 $13.00 $1.39
MMAL0080 MALLA ELECTROSOLDADA TECNOMALLA 6X6-6/6 M2 0.00 1.050000 $16.56 $17.39
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 82.10 0.012180 $963.48 $11.74

Subtotal: MATERIALES $18.78


Subtotal: MANO DE OBRA $11.74
Costo directo $30.51
INDIRECTO 0.1 $3.05
UTILIDADES 0.15 $4.58
COSTO TOTAL $38.14

Anlisis: MAL66-8/8 Unidad: M2


MAL66-8/8 HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 8/8 M2
Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMAL0090 MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8 M2 0.00 1.030000 $16.56 $17.06
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.107000 $13.00 $1.39
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 84.03 0.011901 $963.48 $11.47

Subtotal: MATERIALES $18.45


Subtotal: MANO DE OBRA $11.47
Costo directo $29.91
INDIRECTO 0.1 $2.99
UTILIDADES 0.15 $4.49
COSTO TOTAL $37.39

MAL66-10/10 HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 10/10 M2


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
MMAL0050 MALLA ELECTROSOLDADATECNOMALLA 6X6-10/10 M2 0.00 1.050000 $16.56 $17.39
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.107000 $13.00 $1.39
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 98.04 0.010200 $963.48 $9.83

Subtotal: MATERIALES $18.78


Subtotal: MANO DE OBRA $9.83
Costo directo $28.61
INDIRECTO 0.1 $2.86
UTILIDADES 0.15 $4.29
COSTO TOTAL $35.76

ARM15X15 SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X15-4 EN ESTRUCTURA, M


INCLUYE DESPERDICIO; ALTURA HASTA 3.00M, ACARREO MATERIAL PRIMERA ESTACION = 20 M
ARM15X15 SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X15-4 EN ESTRUCTURA, M
INCLUYE DESPERDICIO; ALTURA HASTA 3.00M, ACARREO MATERIAL PRIMERA ESTACION = 20 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.007300 $13.00 $0.09
MAAR0016 ARMADURA SOLDADA CASTILLO ARMEX 15X15-4 MT 0.00 1.130000 $19.00 $21.47
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 120.05 0.008330 $963.48 $8.03

Subtotal: MATERIALES $21.56


Subtotal: MANO DE OBRA $8.03
Costo directo $29.59
INDIRECTO 0.1 $2.96
UTILIDADES 0.15 $4.44
COSTO TOTAL $36.99

ARM15X20 SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X20-4 EN ESTRUCTURA, M


INCLUYE DESPERDICIO; ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION = 20.00
M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.007300 $13.00 $0.09
MAAR0017 ARMADURA SOLDADA CASTILLO ARMEX 15X20-4 MT 0.00 1.130000 $19.20 $21.70
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 120.05 0.008330 $963.48 $8.03

Subtotal: MATERIALES $21.79


Subtotal: MANO DE OBRA $8.03
Costo directo $29.82
INDIRECTO 0.1 $2.98
UTILIDADES 0.15 $4.47
COSTO TOTAL $37.27

ARM15X25 SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X25-4 EN ESTRUCTURA, M


ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION = 20.00 M

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.009300 $13.00 $0.12
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.130000 $20.00 $22.60
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 120.05 0.008330 $963.48 $8.03
Subtotal: MATERIALES $22.72
Subtotal: MANO DE OBRA $8.03
Costo directo $30.75
INDIRECTO 0.1 $3.07
UTILIDADES 0.15 $4.61
COSTO TOTAL $38.43

CUAD001 CUADRILLA 001 (1 PEON) JOR


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MANO DE OBRA
MOMM01 PEON JOR 1.00 1.000000 $359.58 $359.58
EQUIPO Y HERRAMIENTA
%MO001 MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO 7.69 0.130000 $359.58 $46.75

Subtotal: MANO DE OBRA $359.58


Subtotal: EQUIPO Y HERRAMIENTA $46.75
Costo directo $406.33
INDIRECTO 0.1 $40.63
UTILIDADES 0.15 $60.95
COSTO TOTAL $507.91

CUAD005 CUADRILLA 005 (5 PEONES) JOR


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MANO DE OBRA
MOMM01 PEON JOR 0.20 5.000000 $359.58 $1,797.90
EQUIPO Y HERRAMIENTA
%MO001 MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO 7.69 0.130000 $1,797.90 $233.73

Subtotal: MANO DE OBRA $1,797.90


Subtotal: EQUIPO Y HERRAMIENTA $233.73
Costo directo $2,031.63
INDIRECTO 0.1 $203.16
UTILIDADES 0.15 $304.74
COSTO TOTAL $2,539.54

CUAD40 CUADRILLA 040 (1ALBANIL+1PEON) JOR


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MANO DE OBRA
MOMM30 OFICIAL ALBANIL JOR 1.00 1.000000 $493.06 $493.06
MOMM01 PEON JOR 1.00 1.000000 $359.58 $359.58
EQUIPO Y HERRAMIENTA
%MO001 MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO 7.69 0.130000 $852.64 $110.84

Subtotal: MANO DE OBRA $852.64


Subtotal: EQUIPO Y HERRAMIENTA $110.84
Costo directo $963.48
INDIRECTO 0.1 $96.35
UTILIDADES 0.15 $144.52
COSTO TOTAL $1,204.35

CUAD060 CUADRILLA 060 (1 PINTOR) JOR


Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MANO DE OBRA
MOMM32 OFICIAL PINTOR JOR 1.00 1.000000 $509.52 $509.52
EQUIPO Y HERRAMIENTA
%MO001 MANDOS INTERMEDIOS Y HERRAMIENTA MENOR. %MO 7.69 0.130000 $509.52 $66.24

Subtotal: MANO DE OBRA $509.52


Subtotal: EQUIPO Y HERRAMIENTA $66.24
Costo directo $575.76
INDIRECTO 0.1 $57.58
UTILIDADES 0.15 $86.36
COSTO TOTAL $719.70

CFZAP CIMBRA Y DESCIMBRA ACABADO COMN EN FRONTERAS Y PERALTE DE ZAPATAS DE M2


CIMENTACIN, INCLUYE: MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT 0.00 2.400000 $0.00 $0.00
MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT 0.00 1.050000 $0.00 $0.00
MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG 0.00 0.420000 $22.00 $9.24
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 7.97 0.125471 $963.48 $120.89
MATERIALES
MCOM0010 DIESEL LT 0.00 0.780000 $20.00 $15.60

Subtotal: MATERIALES $24.84


Subtotal: MANO DE OBRA $120.89
Costo directo $145.73
COSTO DIRECTO 0.1 $14.57
UTILIDADES 0.15 $21.86
COSTO TOTAL $182.16

CDADO CIMBRA Y DESCIMBRA EN CONTRATRABES Y DADOS DE CIMENTACIN, INCLUYE: MATERIALES Y M2


MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT 0.00 2.930000 $0.00 $0.00
MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT 0.00 2.940000 $0.00 $0.00
MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG 0.00 0.320000 $22.00 $7.04
MCOM0010 DIESEL LT 0.00 1.100000 $20.00 $22.00
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.057000 $13.00 $0.74
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 7.97 0.125471 $963.48 $120.89

Subtotal: MATERIALES $29.78


Subtotal: MANO DE OBRA $120.89
Costo directo $150.67
INDIRECTO 0.1 $15.07
UTILIDADES 0.15 $22.60
COSTO TOTAL $188.34

CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE DESPLANTE Y CERRAMIENTO DE M2


SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT 0.00 4.110000 $0.00 $0.00
MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG 0.00 0.490000 $22.00 $10.78
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.860000 $13.00 $11.18
MCOM0010 DIESEL LT 0.00 0.600000 $20.00 $12.00
MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT 0.00 6.310000 $0.00 $0.00
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 14.01 0.071378 $963.48 $68.77

Subtotal: MATERIALES $33.96


Subtotal: MANO DE OBRA $68.77
Costo directo $102.73
INDIRECTO 0.1 $10.27
UTILIDADES 0.15 $15.41
COSTO TOTAL $128.41

CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE SECCIN MAYOR A 0.020 M2, M2
INCLUYE: MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT 0.00 3.660000 $0.00 $0.00
MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG 0.00 0.134000 $22.00 $2.95
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.860000 $13.00 $11.18
MCOM0010 DIESEL LT 0.00 0.600000 $20.00 $12.00
MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT 0.00 1.970000 $0.00 $0.00
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 14.01 0.071378 $963.48 $68.77

Subtotal: MATERIALES $26.13


Subtotal: MANO DE OBRA $68.77
Costo directo $94.90
INDIRECTO 0.1 $9.49
UTILIDADES 0.15 $14.23
COSTO TOTAL $118.62

CCOL30X30 CIMBRA Y DESCIMBRA ACABADO COMN CON DUELA, EN COLUMNAS DE 30 X 30 CM. HASTA M2
UNA ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT 0.00 2.759200 $0.00 $0.00
MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT 0.00 2.485900 $0.00 $0.00
MMAD0047 MADERA PINO DE 3a. EN POLN DE 4"X4" REG PT 0.00 1.630000 $0.00 $0.00
MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG 0.00 0.306500 $22.00 $6.74
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.240200 $13.00 $3.12
MCOM0010 DIESEL LT 0.00 0.610000 $20.00 $12.20
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 6.95 0.143885 $963.48 $138.63

Subtotal: MATERIALES $22.07


Subtotal: MANO DE OBRA $138.63
Costo directo $160.70
INDIRECTO 0.1 $16.07
UTILIDADES 0.15 $24.10
COSTO TOTAL $200.87
CCOL50X50 CIMBRA Y DESCIMBRA ACABADO COMN, CON DUELA EN COLUMNAS DE 50 X 50 CM. HASTA UNA M2
ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT 0.00 2.570000 $0.00 $0.00
MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT 0.00 1.480000 $0.00 $0.00
MMAD0047 MADERA PINO DE 3a. EN POLN DE 4"X4" REG PT 0.00 0.806500 $0.00 $0.00
MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG 0.00 0.306500 $22.00 $6.74
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.240200 $13.00 $3.12
MCOM0010 DIESEL LT 0.00 0.610000 $20.00 $12.20
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 6.65 0.150376 $963.48 $144.88

Subtotal: MATERIALES $22.07


Subtotal: MANO DE OBRA $144.88
Costo directo $166.95
INDIRECTO 0.1 $16.70
UTILIDADES 0.15 $25.04
COSTO TOTAL $208.69

VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS M3
DE SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE
AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M.
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 1.33 0.751880 $963.48 $724.42
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 1.030000 $1,043.39 $1,074.70
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE
MATERIALES A 1a ESTACION A 20 M.

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $724.42
Subtotal: BASICOS $1,112.48
Costo directo $1,837.27
INDIRECTO 0.1 $183.73
UTILIDADES 0.15 $275.59
COSTO TOTAL $2,296.59

VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS M3
DE SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE
AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M.
MATERIALES Y MANO DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS M3
DE SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE
AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M.
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 1.33 0.751880 $963.48 $724.42
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $724.42
Subtotal: BASICOS $1,202.68
Costo directo $1,927.47
INDIRECTO 0.1 $192.75
UTILIDADES 0.15 $289.12
COSTO TOTAL $2,409.33

VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS M3
DE SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE
AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M.
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 1.33 0.751880 $963.48 $724.42
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO200R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $724.42
Subtotal: BASICOS $1,297.20
Costo directo $2,021.99
INDIRECTO 0.1 $202.20
UTILIDADES 0.15 $303.30
COSTO TOTAL $2,527.49

VCL200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE M3


CIMENTACIN Y PLANTA BAJA, FC=200 KG/CM2, R.N. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $963.48 $385.39
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $385.39
Subtotal: BASICOS $1,202.68
Costo directo $1,588.44
INDIRECTO 0.1 $158.84
UTILIDADES 0.15 $238.27
COSTO TOTAL $1,985.55

VCL250 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE M3


CIMENTACIN Y PLANTA BAJA, FC=250 KG/CM2, R.N. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $963.48 $385.39
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $385.39
Subtotal: BASICOS $1,297.20
Costo directo $1,682.96
INDIRECTO 0.1 $168.30
UTILIDADES 0.15 $252.44
COSTO TOTAL $2,103.70

VZTL150 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, M3


CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=150
KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 1.030000 $1,043.39 $1,074.70
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE
MATERIALES A 1a ESTACION A 20 M.

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,112.48
Costo directo $1,410.16
INDIRECTO 0.1 $141.02
UTILIDADES 0.15 $211.52
COSTO TOTAL $1,762.70

VZTL200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, M3


CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=200
KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.
FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,202.68
Costo directo $1,500.35
INDIRECTO 0.1 $150.04
UTILIDADES 0.15 $225.05
COSTO TOTAL $1,875.44

VZTL250 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, M3


CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=250
KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,297.20
Costo directo $1,594.88
INDIRECTO 0.1 $159.49
UTILIDADES 0.15 $239.23
COSTO TOTAL $1,993.60

VCOL150 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE M3


SUPERESTRUCTURA, FC=150 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO,
CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y
MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.10 0.322581 $963.48 $310.80
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 1.030000 $1,043.39 $1,074.70
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE
MATERIALES A 1a ESTACION A 20 M.

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $310.80
Subtotal: BASICOS $1,105.28
Costo directo $1,416.39
INDIRECTO 0.1 $141.64
UTILIDADES 0.15 $212.46
COSTO TOTAL $1,770.49

VCOL200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE M3


SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO,
CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y
MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.10 0.322581 $963.48 $310.80
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $310.80
Subtotal: BASICOS $1,195.48
Costo directo $1,506.58
INDIRECTO 0.1 $150.66
UTILIDADES 0.15 $225.99
COSTO TOTAL $1,883.23

VCOL250 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE M3


SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO,
CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y
MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.10 0.322581 $963.48 $310.80
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $310.80
Subtotal: BASICOS $1,290.00
Costo directo $1,601.11
INDIRECTO 0.1 $160.11
UTILIDADES 0.15 $240.17
COSTO TOTAL $2,001.39

Anlisis: VTRABE200 Unidad: M3


VTRABE200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES M3
AISLADAS DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.10 0.322581 $963.48 $310.80
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $310.80
Subtotal: BASICOS $1,195.48
Costo directo $1,506.58
INDIRECTO 0.1 $150.66
UTILIDADES 0.15 $225.99
COSTO TOTAL $1,883.23
VTRABE250 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES M3
AISLADAS DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.10 0.322581 $963.48 $310.80
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $310.80
Subtotal: BASICOS $1,290.00
Costo directo $1,601.11
INDIRECTO 0.1 $160.11
UTILIDADES 0.15 $240.17
COSTO TOTAL $2,001.39

VLOSA150 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y M3
RETICULARES DE SUPERESTRUCTURA, FC=150 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $963.48 $385.39
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 1.030000 $1,043.39 $1,074.70
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE
MATERIALES A 1a ESTACION A 20 M.

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $385.39
Subtotal: BASICOS $1,105.28
Costo directo $1,490.98
INDIRECTO 0.1 $149.10
UTILIDADES 0.15 $223.65
COSTO TOTAL $1,863.73

VLOSA200 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y M3
RETICULARES DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $963.48 $385.39
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $385.39
Subtotal: BASICOS $1,195.48
Costo directo $1,581.18
INDIRECTO 0.1 $158.12
UTILIDADES 0.15 $237.18
COSTO TOTAL $1,976.47

VLOSA250 VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y M3
RETICULARES DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE:
VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL,
MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.025500 $12.00 $0.31
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $963.48 $385.39
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.510000 $45.00 $22.95
BASICOS
ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64
HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.
FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

Subtotal: MATERIALES $0.31


Subtotal: MANO DE OBRA $385.39
Subtotal: BASICOS $1,290.00
Costo directo $1,675.70
INDIRECTO 0.1 $167.57
UTILIDADES 0.15 $251.36
COSTO TOTAL $2,094.63

VCIM100R VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=100, M3


KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
FCO100R CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $937.14 $965.26
AGR.MAX. 3/4, FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO; ACARREO MATERIAL
PRIMERA ESTACION 20.00 M.

ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64


HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,003.04
Costo directo $1,300.78
INDIRECTO 0.1 $130.08
UTILIDADES 0.15 $195.12
COSTO TOTAL $1,625.97

VCIM150R VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=150, M3


KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 1.030000 $1,043.39 $1,074.70
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE
MATERIALES A 1a ESTACION A 20 M.

ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64


HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,112.48
Costo directo $1,410.22
INDIRECTO 0.1 $141.02
UTILIDADES 0.15 $211.53
COSTO TOTAL $1,762.77

VCIM200R VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=200, M3


KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,130.96 $1,164.89
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64


HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,202.68
Costo directo $1,500.41
INDIRECTO 0.1 $150.04
UTILIDADES 0.15 $225.06
COSTO TOTAL $1,875.52

VCIM250R VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=250, M3


KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
MAGU0010 AGUA M3 0.00 0.030500 $12.00 $0.37
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 3.24 0.308642 $963.48 $297.37
SUBCONTRATOS
VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR 0.00 0.670000 $45.00 $30.15
BASICOS
FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, M3 0.00 1.030000 $1,222.73 $1,259.42
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M

ACR0009 ACARREO EN CARRETILLA A 20 M DE DISTANCIA M3 0.00 0.250500 $30.48 $7.64


HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA,
YESO, ETC. ENVASADO EN SACOS, INCLUYENDO
CARGA Y DESCARGA.

Subtotal: MATERIALES $0.37


Subtotal: MANO DE OBRA $297.37
Subtotal: BASICOS $1,297.20
Costo directo $1,594.94
INDIRECTO 0.1 $159.49
UTILIDADES 0.15 $239.24
COSTO TOTAL $1,993.67
CLCULO DE PIE TABLN PARA CIMBRA DE FRONTERAS DE ZAPATAS CON CONTRATRABE (DADO) SUPERIOR.

LC LL
MEDIDA ZAPATA 1.20 1.20 M LC = LADO CORTO FC = FACTOR DE CONTACTO
SECCIN CIMBRADA DE DADO 0.50 0.50 M LL = LADO LARGO FD = FACTOR DE DESPERDICIO
PT = PIE TABLN FU = FACTOR DE USOS
PERALTE DE ZAPATA 0.30 M
ALTURA DE DADO 0.80 M PZAS = CANT. DE PIEZAS UTILIZADAS DE ESA MADERA
ESP.Y ANCHO = ESPESOR Y ANCHO DE LA MADERA
FACTOR DE DESPERDICIO 20.00 % MTS. = LONGITUD O LARGO DE LA MADERA
PROFUNDIDAD DE ESTACA 0.15 M DATOS QUE SE PUEDEN PROPONER O DEJAR EN CERO
HOLGURA YUGO 1 EXTREMO 0.05 M
SEPARACIN YUGO 0.50
LC LL
CARAS CIMBRADAS DE ZAPATA 2 2
CARAS CIMBRADAS DE DADO 2 2

DATOS PROPUESTOS CAPTURADOS DATOS CALCULADOS


MEDIDA PULG. CANT. PT/M2 TOTAL TOTAL
ELEMENTO MADERA FU PZAS MTS. PZAS" MTS."
ESP. ANCHO PT FC PT 1/FC FD=0.2 FU (PT/M2/USO) (PT/PZA/USO)
CONTACTO LADO CORTO 5 1 12 1.2 2
1.20 15.75 1.44 10.94 13.13 5 2.63 3.78
CONTACTO LADO LARGO 5 1 12 1.2 2
ESTACAS 5 3 2 4 12 0.45 11.81 1.44 8.20 9.84 5 1.97 2.84

CONTRATRABE (DADO)
CONTACTO LADO CORTO DUELA 5 2 1 20 0.80 2
0.80 17.50 1.60 10.94 13.13 5 2.63 1.26
CONTACTO LADO LARGO DUELA 5 2 1 20 0.80 2
CANT. DE YUGOS EN DADO BARROTE 5 2 4 3 3.42 22.42 1.60 14.01 16.81 5 3.36 5.38
CLCULO DE PIE TABLN PARA CIMBRA DE UN CASTILLO, COLUMNA, TRABE, DALA O CADENA

LC LL LC = LADO CORTO FC = FACTOR DE CONTACTO


SECCIN 0.50 0.50 M LL = LADO LARGO FD = FACTOR DE DESPERDICIO
ALTURA O LONG. CIMBRADA 0.80 M PT = PIE TABLN FU = FACTOR DE USOS

FACTOR DE DESPERDICIO 20.00 % PZAS = CANT. DE PIEZAS UTILIZADAS DE ESA MADERA


HOLGURA YUGO 1 EXTREMO 0.05 M ESP.Y ANCHO = ESPESOR Y ANCHO DE LA MADERA
SEPARACIN YUGO 0.50 MTS. = LONGITUD O LARGO DE LA MADERA
LC LL DATOS QUE SE PUEDEN PROPONER O DEJAR EN CERO
CARAS CIMBRADAS 2 2

ELEMENTO CONSTRUCTIVO 2
Elemento Horizontal

DATOS PROPUESTOS CAPTURADOS DATOS CALCULADOS


MEDIDA PULG. CANT. PT/M2 TOTAL TOTAL
ELEMENTO MADERA FU PZAS MTS. PZAS" MTS."
ESP. ANCHO PT FC PT 1/FC FD=0.2 FU (PT/M2/USO) (PT/PZA/USO)
TRABE, DALA O CADENA
CONTACTO LADO CORTO DUELA 5 1 4 1.00 10
1.00 21.88 2.00 10.94 13.13 5 2.63 4.20
CONTACTO LADO LARGO DUELA 5 1 4 1.00 10
YUGOS BARROTE 5 2 4 3 3.42 22.42 2.00 11.21 13.45 5 2.69 4.30
PIES DERECHOS POLN 10 4 4 2.70 4 2.70 47.25 2.00 23.63 28.35 10 2.84 4.54
ESTACAS BARROTE 3 2 4 0.40 4 0.40 3.50 2.00 1.75 2.10 3 0.70 1.12
8.85 14.16
ANALISIS DEL FACTOR DE LA MANO DE OBRA (FACTOR SALARIO REAL)

TEXTO AZUL= CELDAS CAMBIABLES Datos PRESTACIONES EN ESPECIE (IMSS)


TEXTO NEGRO = CELDAS CON FRMULAS CUOTA FIJA= 23.65 %
AO 2013 EXEDENTE A 3 SAL. MIN. GRAV. D- 1.75 %
S.M $ 61.38 3 S.M $ 184.14
Salario Nominal. Salario que se le paga directamente al trabajador INFONAVIT 5% IMPORTE CUOTA FIJA 14.52
Salario Integrado. Salario real, que le cuesta el trabajador al contratista. IMPORTE EXCEDENTE - 3.22

DIAS NO TRABAJADOS AL AO DAS PAGADOS AL AO PRESTACIONES DEL IMSS (%)


g) Domingos 54.00 Das Calendario 365.00 Enfermedad y maternidad
h)Das festivos por ley 7.00 b) Aguinaldo por Ley 15.00 Invalidz y vida 2.375 %
i)Das por costumbre 4.00 c)Prima Vacacional 25% por ley 3.00 Cesanta en edad avanzada y retiro 4.275 %
j)Das Sindicato d)Prima Dominical 0.25% por ley 0.00 Riesgos de trabajo 7.590 %
k) Vacaciones 10.00 e)Horas extra al ao (especifique) por ley en das Guarderas 1.000 %
l)Permisos y Enfermedad 2.00 f)Prestaciones por Contrato de trabajo Pensionados 1.425 %
m)Condiciones Climatolgicas 3.00 g)Das por terminacin de obra al ao (CFE) Prestaciones en dinero 0.950 %
n)Horas inactivas por arrastre
o)Das no trabajados por guardia TOTAL X1 (DIAS)= 383.00

TOTAL Y1 (DIAS)= 285.00 Factor para Salario Integrado X1/Y1 1.3439 Suma en % de prestaciones del IMSS 17.62 %

*Determinacin del FSR calculado con importes


SALARIO PRESTACIONES DEL IMSS ($)
CDIGO CATEGORA DIARIO CUOTA EXCEDENTE PRESTACIONES PENSIN RIESGO INVALIDEZ EDAD.AV. GUARDERA INFONAVIT FSR
NOMINAL FIJA 3 S.M EN DINERO TRABAJO Y VIDA Y RETIRO

- - - - - - - - - -
1 CABO 220.00 14.52 - 3.22 2.09 3.14 16.70 5.23 9.41 2.20 11.00 1.7168
2 ALBAIL 290.00 14.52 - 3.22 2.76 4.13 22.01 6.89 12.40 2.90 14.50 1.7002

3 CARPINTERO 300.00
14.52 - 3.22 2.85 4.28 22.77 7.13 12.83 3.00 15.00 1.6984
4 PINTOR 300.00 14.52 - 3.22 2.85 4.28 22.77 7.13 12.83 3.00 15.00 1.6984
5 PLOMERO 300.00 14.52 - 3.22 2.85 4.28 22.77 7.13 12.83 3.00 15.00 1.6984

6 ELECTRICISTA 320.00
14.52 - 3.22 3.04 4.56 24.29 7.60 13.68 3.20 16.00 1.6953
7 PEON 209.01 14.52 - 3.22 1.99 2.98 15.86 4.96 8.94 2.09 10.45 1.7204
8 AYUDANTE EN GRAL. 209.01 14.52 - 3.22 1.99 2.98 15.86 4.96 8.94 2.09 10.45 1.7204
9 HERRERO 300.00 14.52 - 3.22 2.85 4.28 22.77 7.13 12.83 3.00 15.00 1.6984
10 CHOFER 209.01 14.52 - 3.22 1.99 2.98 15.86 4.96 8.94 2.09 10.45 1.7204
TOPOGRAFO $435.80 14.52 - 3.22 4.14 6.21 33.08 10.35 18.63 4.36 21.79 1.6827
- - - - - - - - - -
- - - - - - - - - -
PERSONAL TCNICO ADMINISTRATIVO - - - - - - - - - -
A1 SECRETARIA $130.00 14.52 - 1.24 1.85 9.87 3.09 5.56 1.30 6.50 1.7979
A2 DIBUJANTE $150.00 14.52 - 1.43 2.14 11.39 3.56 6.41 1.50 7.50 1.7779
A3 BODEGUERO $150.00 14.52 - 1.43 2.14 11.39 3.56 6.41 1.50 7.50 1.7779
A4 SUPERVISOR $200.00 14.52 - 3.22 1.90 2.85 15.18 4.75 8.55 2.00 10.00 1.7237
A5 CONTADOR $200.00 14.52 - 3.22 1.90 2.85 15.18 4.75 8.55 2.00 10.00 1.7237
A6 ADMINISTRADOR $600.00 14.52 - 3.22 5.70 8.55 45.54 14.25 25.65 6.00 30.00 1.6731
A7 - - - - - - - - - -

TABULADOR DE SALARIOS INTEGRADOS

SALARIO PRESTACIONES EN % SALARIO


No. CATEGORA DIARIO CUOTA IMSS INFONAVIT FSR INTEGRADO
NOMINAL FIJA

- - - - -
1 CABO 220.00 6.60 17.62 5.00 1.7365 382.03
2 ALBAIL 290.00 5.01 17.62 5.00 1.7151 497.38
3 CARPINTERO 300.00 4.84 17.62 5.00 1.7129 513.87
4 PINTOR 300.00 4.84 17.62 5.00 1.7129 513.87
5 PLOMERO 300.00 4.84 17.62 5.00 1.7129 513.87
6 ELECTRICISTA 320.00 4.54 17.62 5.00 1.7088 546.82
7 PEON 209.01 6.95 17.62 5.00 1.7412 363.93
8 AYUDANTE EN GRAL. 209.01 6.95 17.62 5.00 1.7412 363.93
9 HERRERO 300.00 4.84 17.62 5.00 1.7129 513.87
10 CHOFER 209.01 6.95 17.62 5.00 1.7412 363.93
- - - - -
- - - - -
- - - - -
PERSONAL TCNICO ADMINISTRATIVO - - - - -
A1 SECRETARIA $130.00 11.17 17.62 5.00 1.7979 233.73
A2 DIBUJANTE $150.00 9.68 17.62 5.00 1.7779 266.69
A3 BODEGUERO $150.00 9.68 17.62 5.00 1.7779 266.69
A4 SUPERVISOR $200.00 7.26 17.62 5.00 1.7454 349.08
A5 CONTADOR $200.00 7.26 17.62 5.00 1.7454 349.08
A6 ADMINISTRADOR $600.00 2.42 17.62 5.00 1.6803 1,008.18
A7 - - - - -
SALARIO
INTEGRADO

-
377.70
493.06

509.52
509.52
509.52

542.50
359.58
359.58
509.52
359.58
733.32
-
-
-
233.73
266.69
266.69
344.74
344.74
1,003.86
-
ANLISIS, CLCULO E INTEGRACIN DE LOS COSTOS HORARIOS
DE LA MAQUINARIA Y EQUIPO DE CONSTRUCCIN

EQUIPO No.
DATOS GENERALES Gasolina Diesel Otro
(Pm) Precio de la maquina como nueva $1,200,000.00 (Ah )Cantidad de aceite consumido por hora 10.00
(Pn) Precio de las llantas $12,000.00 (Ga) Relacin capacidad del carter entre 20.00
(Vm) Valor de la mquina $1,187,910.00 tiempo de cambios aceite
(Vr) Valor de rescate 30 %Vm $360,000.00 (t) Horas enrte cambio de lubricante 30.00
(Ve) Vida econmica de la mquina 14,600.00 Horas (Pa) Precio de lubricante $40.00
(IC) Instrumentos de captacin 1.00 (Vn) Vidad de las llantas 50.00
(i) Tasa de interes anual 18.00 (Ht) Horas efectivas por turno 8.00
(Hea) Horas efectivas por ao 2,920.00 Horas (Po) Costo horario por operacin $70.00
(s) Prima anual promedio 9.00 % (Sr) Salario real del personal operador $80.00
(Ko) Mantenimiento mayor y menor 5.00 % (Ppe) Valor de piezas especiales consideradas como nuevas $90.00
(Gh) Cantidad de combustible por hora 2.00 Lt (Vpe) Vida econmica de las piezas especiales 100.00
(Pc) Precio del combustible $12.00 Lt

I CARGOS FIJOS
I.1 Depreciacin D= (Vm-Vr)/Ve = 56.71
I.2 Inversin Im= (Vm+Vr) i /2Hea = 4,770.96
I.3 Seguros Sm= (Vm+Vr) s /2Hea = 2,385.48
I.4 Mantenimiento Mn= Ko x D = 283.53
(1) SUMA CARGOS FIJOS = 7,496.67
II. CONSUMOS
II.1 Combustibles CO= Gh x Pc = 24.00
II.2 Otras fuentes de energa =
II.3 Lubricantes Lb= (Ah+Ga) x Pa = 1,200.00
II.4 Llantas N= Pn/Vn = 240.00
II.5 Piezas Especiales Ae= Ppe/Vpe 0.90
(2) SUMA CONSUMOS = 1,464.90
III. OPERACIN
CATEGORAS CANTIDAD SALARIO REAL IMPORTE
OPERADOR 001 1 $10.00 10
$0.00 0
$0.00 0
$0.00 0
$0.00 0
(Po)= $10.00
III.1 OPERACIN Po=Sr/Ht
(3) SUMA OPERACIN
(1)+(2)+(3)= 8,971.57
Lt
Lt/Hr.

Horas
Lt
Horas
Horas

Horas
PROGRAMA MONTOS MENSUALES DE UTILIZACIN DE PERSONAL TCNICO, ADMINISTRATIVO Y DE SERVICIOS ENCARGADOS DE LA DIRECCIN,
SUPERVISIN Y ADMINISTRACIN DE LOS TRAAJOS

MONTO DE LA OBRA ACTUAL (C. D.) 775319.99 Ttulo del periodo SEM1 SEM2 SEM3 SEM 4 SEM 5
MONTO DE CONTRATOS VIGENTES (AO) $0.00 Ao
PERIODICIDAD SEMANAL Das naturales 7 7 7 7 4
Fecha de Inicio: Das por periodo 7 7 7 7 7
Fecha de terminacin: Factor 1.0000 1.0000 1.0000 1.0000 0.5714 0.0000 0.0000 0.0000 0.0000
Duracin en Dias: 1.00

1.1.- PERSONAL DIRECTIVO SEM1 SEM2 SEM3 SEM 4 SEM 5 - - - -


Cant. Categora Salario Importe
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
Total -

1.2.- PERSONAL TCNICO


Cant. Categora Salario Importe
SUPERINTENDENTE - - - - - - - - - -
1 RESIDENTE GENERAL $431.02 1,970.38 431.02 431.02 431.02 431.02 246.30 - - - -
AUXILIAR DE RESIDENTE - - - - - - - - - -
ing. De seguridad industrial - - - - - - - - - -
control de calidad - - - - - - - - - -
TECNICO SUPERVISOR B - - - - - - - - - -
tecnico 7 - - - - - - - - - -
tecnico 8 - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
Total 1,970.38

1.3- PERSONAL ADMINISTRATIVO


Cant. Categora Salario Importe
ADMINISTRADOR DE OBRA - - - - - - - - - -
1 AUXILIAR CONTABLE $417.01 1,906.33 417.01 417.01 417.01 417.01 238.29 - - - -
auxiliar a - - - - - - - - - -
auxiliar b - - - - - - - - - -
auxiliar c - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
Total 1,906.33

1.4.- PERSONAL DE SERVICIO


Cant. Categora Salario Importe
BODEGUERO - - - - - - - - - -
VELADOR - - - - - - - - - -
1 CHOFER $328.97 1,503.86 328.97 328.97 328.97 328.97 187.98 - - - -
chofer 2 - - - - - - - - - -
chofer 3 - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
Total 1,503.86

DESGLOSE DE COSTOS INDIRECTOS

MONTO DE LA OBRA ACTUAL (C. D.) $775,319.99 MONTO DE CONTRATOS VIGENTES (AO) $0.00 PERIODICIDAD

TOTAL DE COSTOS INDIRECTOS


No. CONCEPTO OFICINAS CENTRALES (ANUALES) EN SITIO (Duracion de los trabajos)
PORCENTAJE MONTO PORCENTAJE2 MONTO2

I.- HONORARIOS SUELDOS Y PRESTACIONES


1.1 Personal directivo $ - - $ -
1.2 Personal tcnico $ - 0.2541 $ 1,970.38
1.3 Personal administrativo $ - 0.2459 $ 1,906.33
1.4 Personal servicio $ - 0.1940 $ 1,503.86
1.5 Cuota Patronal IMSS e ISRP del 1 al 4 $ -
1.6 Prestaciones de la LFT del 1 al 4 $ -
1.7 Pasajes y viticos $ -

II.- DEPRECIACION, MANTENIMIENTO Y RENTAS


2.1 Edificios y Locales 1.0000 $ - $ -
2.2 Locales de Mantenimiento y Guarda $ - $ -
2.3 Bodegas $ - 0.5000 $ 3,876.60
2.4 Instalaciones Generales $ - 0.8000 $ 6,202.56
2.5 Muebles y enseres $ - $ -
2.6 Depreciacin o Renta, y Operacin de Vehculos $ - 0.6000 $ 4,651.92

III.- SERVICIOS
3.1 $ - $ -
3.2 $ - $ -
3.3 $ - $ -

IV.- FLETES Y ACARREOS DE EQUIPO


4.1 De Campamentos $ - $ -
4.2 De Equipo de Construccin(relacionado a relacin de maquinaria) $ - $ -
4.3 De Plantas y elementos para Instalaciones $ - $ -
4.4 De mobiliario $ - $ -

V.- GASTOS OFICINA


5.1 Papelera y tiles de escritorio 0.5000 $ - $ -
5.2 Correos, telfonos, fax, radio, telgrafos 0.7000 $ - $ -
5.3 Situacin de fondos $ - $ -
5.4 Copias y duplicados 0.2000 $ - $ -
5.5 Luz, gas y otros consumos 1.0000 $ - $ -
5.6 Gastos de concurso $ - $ -

VI.- SEGUROS Y FIANZAS


6.1 Primas por Seguro $ - $ -
6.2 Primas por Fianzas $ - $ -
CAPACITACIN Y ADIESTRAMIENTO
7.1 Consultores,Asesores,Servicio y Laboratorios 0.2000 $ - $ -
7.2 Estudios e Investigacin $ - $ -
7.3 Capacitacin 1.0000 $ - $ -

TRABAJOS PREVIOS Y AUXILIARES


8.1 Construccin y conservacin de caminos de acceso $ - $ -
8.3 Montaje y desmantelamiento de equipo $ - $ -
8.4 Construccin de Bodega 1.0000 $ - $ -
8.5 Letrero nominativo de obra $ - $ -
5.6000 $ - 2.5900 $ 20,111.65
INDIRECTO TOTAL % 8.19
0.0000

-
-
-
-

-
-
-
-
-
-

-
-

-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-

SEMANAL

de los trabajos)
MONTO2

-
1,970.38
1,906.33
1,503.86

-
-
3,876.60
6,202.56
-
4,651.92

-
-
-

-
-
-
-

-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
20,111.65
8.19
NOTA: ESTA HOJA NO SE DEBE AGREGAR AL REPORTE DE INDIRECTOS
PORQUE YA SE CONOCEN LOS % A LOS QUE SE QUIERE LLEGAR
PORCENTAJES PROPUESTOS PARA
CONOCER LOS SALARIOS PROMEDIOS PERIODICIDAD
INDIRECTOS PERSONAL DE OFICINA 5.81 % DIARIA
INDIRECTOS PERSONAL DE CAMPO 7.50 % SEMANAL
INDIRECTOS VARIOS (RENTA, MOBILIARIO, ETC.) 1.69 % QUINCENAL
TOTAL DE INDIRECTOS 15.00 % MENSUAL

INDIRECTOS DE CAMPO EN EL DESGLOSE DE IND. 7.50 % =


PERSONAL DIRECTIVO -
PERSONAL TCNICO 36.62 % 2.75
PERSONAL ADMINISTRATIVO 35.43 % 2.66
PERSONAL DE SERVICIO 27.95 % 2.10
TOTAL 100.00 % 7.50 %

MONTO DE LA OBRA ACTUAL $775,319.99


SUMA DE PERIODOS 4.5714

MONTO DE LA OBRA CARGADO AL PERSONAL EN EL IMPORTE


PERSONAL DIRECTIVO -
PERSONAL TCNICO 21,294.16
PERSONAL ADMINISTRATIVO 20,602.19
PERSONAL DE SERVICIO 16,252.65
58,149.00
SALARIO TOTAL DEL PERSONAL
PERSONAL DIRECTIVO -
PERSONAL TCNICO 4,658.10
PERSONAL ADMINISTRATIVO 4,506.73
PERSONAL DE SERVICIO 3,555.27

NOTA: EL SALARIO ANTERIOR ES LA SUMA TOTAL DE LOS IMPORTES


POR LO QUE SE DEBE SACAR UN PROMEDIO PARA CADA CATEGORA
TOMANDO EN CUENTA LA CANTIDAD DE ESE PERSONAL

EJEMPLO
PERSONAL ADMINISTRATIVO $ 83.00
Cant. Categora Salario TOTAL
1 ADMINISTRADOR DE OBRA $ 35.00 $ 35.00
2 AUXILIAR CONTABLE $ 20.00 $ 40.00
1 auxiliar a $ 8.00 $ 8.00

TOTAL $ 83.00
Tarjetas de anlisis de Urecios Unitarios

TRAZ0001 TRAZO Y NIVELACION DE TERRENO CON HILO CAL; DEJANDO REFERENCIA PARA EJECUCION DE
LOS TRABAJOS
Cdigo Concepto Unidad Rend. Cantidad Costo
MANO DE OBRA
CUAD001 CUADRILLA 001 (1 ALBAIL +1 PEON) JOR 100.00 0.010000 $852.64
5 % PARTICIPACION DE CABO, 30% ,HERRAMIENTA MENOR,
2.25%SEG E HIG

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0002 DESMONTAJE DE ESTRUCTURA METALICA EXISTENTE (TECHUMBRE DE LAMINA, MONTEN Y


PERFILES METALICOS), INCLUYE DESMONTAJE, CORTES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 ALBAIL +1PEON) JOR 100.00 0.010000 $852.64
5 % PARTICIPACION DE CABO, 30% ,HERRAMIENTA MENOR,
2.25%SEG E HIG

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0004 DEMOLICION DE MUROS DE ADOBE Y TEPETATE DE 30 A 40 CM DE ESPESOR, A MANO, SIN INCLUIR


ACARREOS, HASTA 2.50 M DE ALTURA

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 5.50 0.181818 $406.33

BASICOS
CYA0001B ANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE PZA 0.00 0.181810 $50.00
1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA
AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0009 DEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, SE INCLUYEN


DALAS Y CASTILLOS HASTA 2.50M DE ALTURA. SIN RECUPERACIN DE TABIQUE O BLOCK.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 12.50 0.080000 $406.33

BASICOS
CYA0001B ANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE PZA 0.00 0.080000 $50.00
1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA
AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0010 DEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, CON


RECUPERACION DE TABIQUE O BLOCK, SIN INCLUIR ACARREOS, SE INCLUYEN DALAS Y CASTILLOS
HASTA 2.50M DE ALTURA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 6.50 0.153846 $406.33

BASICOS
CYA0001B ANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE PZA 0.00 0.076920 $50.00
1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA
AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0014 DEMOLICION A MANO DE ELEMENTOS, DE CONCRETO ARMADO EN ESTRUCTURA, SIN INCLUIR


ACARREOS, CON 20 CM DE ESPESOR MAXIMO Y 2.50 M DE ALTURA

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 0.65 1.538462 $406.33

BASICOS
CYA0001B ANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE PZA 0.00 1.530000 $50.00
1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA
AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0020 DEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR


ACARREOS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 16.67 0.059988 $406.33

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0022 DEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR


ACARREOS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 7.52 0.132979 $406.33

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0028 DEMOLICION A MANO DE APLANADOS DE MEZCLA, YESO O PASTAS EN MUROS O PLAFONES DE 2.5
CM. DE ESPESOR PROMEDIO. SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURA

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 25.00 0.040000 $406.33

BASICOS
CYA0001B ANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE PZA 0.00 0.040000 $50.00
1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA
AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0029 DEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE
ALTURA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 19.00 0.052632 $406.33

BASICOS
CYA0001B ANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE PZA 0.00 0.052630 $50.00
1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA
AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DEM0043 DEMOLICION DE CARPETA DE CONCRETO ASFALTICO DE 5 A 7 CM DE ESPESOR, A MANO, SIN


INCLUIR ACARREOS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 22.22 0.045005 $406.33

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

LTZ0001 CARGA Y RETIRO DE MATERIAL PRODUCTO DE EXCAVACION Y/O DEMOLICIONES FUERA DE LA


OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 27.03 0.036996 $406.33
COSTO HORARIO CARGADOR FRONTAL , VOLTEO CAP. 6M3 M3/H $76.36 $0.01
9,971.47
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

EXC0001 EXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA ALTURA DE
CEPA DE 2.00 M. NO INCLUYE ACARREO.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 2.78 0.359712 $406.33

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

LTZ0005 TRAZO Y NIVELACIN POR MEDIOS MANUALES DEL TERRENO PLANO, PARA DESPLANTE DE
ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. INCLUYE:MATERIALES
Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT 0.00 0.027000 $0.00
MCEM0050 CALHIDRA TON 0.00 0.000250 $1,680.00
MDUE0001 DUELA 3/4" X 4" X 8 PT 0.00 0.018000 $0.00
MHIL0001 HILO DE PLAST.P/TRAZO EN CARRETE CAL.10 ML 0.00 0.350000 $0.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 100.00 0.010000 $963.48

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CIM0001 CIMENTACION DE MANPOSTERIA DE PIEDRA BRAZA ASENTADA CON MEZCLA MORTERO - ARENA EN
PROPORCION 1:5, SEC. 60,30 X 80 CM. INCLUYE ACARREO DE MATERIAL A 1 ESTACION A 20 M. DE
DISTANCIA HORIZONTAL.
CIM0001 CIMENTACION DE MANPOSTERIA DE PIEDRA BRAZA ASENTADA CON MEZCLA MORTERO - ARENA EN
PROPORCION 1:5, SEC. 60,30 X 80 CM. INCLUYE ACARREO DE MATERIAL A 1 ESTACION A 20 M. DE
DISTANCIA HORIZONTAL.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.75 0.363636 $963.48

BASICOS
MEZ0002 MORTERO MORTERO - ARENA PROPORCION 1:5 M3 0.00 0.325500 $604.70

SUBCONTRATOS
ACR0082A ACARREO EN CAMION A PRIMER KILOMETRO, MEDIDO EN M3 0.00 1.200000 $32.00
BANCO ABUNDAMIENTO 1.22, INCLUYE CARGA A MANO
MATERIAL SUELTO.

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Subtotal: SUBCONTRATOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

RELL01CC RELLENO EN CEPAS CON MATERIAL DE BANCO, COMPACTANDO AL 90% PROCTOR, CON
COMPACTADOR (BAILARINA), EN CAPAS DE 20 CM.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 4.35 0.229885 $406.33

SUBCONTRATOS
BAI0001 COMPACTADOR BAILARINA HR 0.00 0.300000 $46.13

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

RELL01CM COMPACTACION DEL TERRENO NATURAL AL 85%.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 16.35 0.061162 $406.33
BAILARINA HOR 46.13
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CAST001V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.077000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.84 0.092251 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.092251 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002340 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001000 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.300000 $94.90
SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $1,837.27
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CAST002V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.077000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.84 0.092251 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.092251 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002340 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001000 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.300000 $94.90
SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $1,927.47
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CAST003V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.077000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.84 0.092251 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.092251 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002340 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001000 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M

CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.300000 $94.90


SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $2,021.99
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CAST004V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo

MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 9.79 0.102145 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.102145 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001680 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M

CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.350000 $94.90


SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $1,837.27
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CAST005V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 9.79 0.102145 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.102145 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001680 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.350000 $94.90
SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $1,927.47
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CAST010V DALA CON SECCION DE 15X30 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 15 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 9.64 0.103734 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.103734 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002300 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001300 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.600000 $94.90
SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.046350 $2,021.99
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

CSAT006V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 15 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 9.79 0.102145 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.102145 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001680 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.350000 $94.90
SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $2,021.99
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.15
UTILIDADES 0.1
COSTO TOTAL

CAST007V CASTILLO CON SECCION DE 14X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 15 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $13.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 8.74 0.114416 $963.48

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.114416 $50.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 $21,253.51
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001800 $22,936.32


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.400000 $94.90
SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $1,837.27
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.15
UTILIDADES 0.1
COSTO TOTAL

CAST008V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA
COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 8.74 0.114416 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.114416 $0.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 $6,278.58
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001800 $8,783.46


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M

CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE M2 0.00 0.400000 $65.92


SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $773.81
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

CAST009V CASTILLO CON SECCION DE 30x45 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4,
REFORZADO CON 4 VARILLAS DE 5/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 15 CM, CON CIMBRA
COMN 4 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 8.74 0.114416 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.114416 $0.00

BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 $7,278.58
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001800 $9,783.46


ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL
PRIMERA ESTACION = 20.00 M

CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN ColumnaS DE M2 0.00 0.400000 $85.92


SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO
DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.080000 $773.81
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

DALA001A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.76 0.078370 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.078370 $0.00

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.300000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $759.21
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA002A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.
DALA002A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.76 0.078370 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.078370 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.300000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $773.81
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA003A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.76 0.078370 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.078370 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.300000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $773.81
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA004A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.12 0.082508 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.082508 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.350000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.

VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $759.21


REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA005A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.12 0.082508 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.082508 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.350000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $773.81
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA006A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.12 0.082508 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.082508 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.350000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.

VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $773.81


REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA007A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 11.48 0.087108 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.087108 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.400000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $759.21
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA008A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 11.48 0.087108 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.087108 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.400000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.

VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $773.81


REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

DALA009A DALA CON SECCION DE 15X30 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.
DALA009A DALA CON SECCION DE 15X30 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA
CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 11.48 0.087108 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.087108 $0.00

MATERIALES
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT 0.00 1.030000 $4.65

BASICOS
CCADE CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE M2 0.00 0.400000 $80.65
DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020
M2, INCLUYE: MATERIALES Y MANO DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $773.81
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PLA05-100 PLANTILLA DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) INCLYE: MATERIALES Y MANO DE OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 20.00 0.050000 $655.40

BASICOS
FCO100R CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.051500 $236.89
AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1
SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS05-100 FIRME DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 15.00 0.066667 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.051500 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO100R CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.051500 $236.89


AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1
SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.

PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS05-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 15.00 0.066667 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.051500 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.051500 $254.12


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a
ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS08-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 8 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 15.00 0.066667 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.082400 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.082400 $254.12


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a
ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS08-200 FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 8 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 15.00 0.066667 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.084000 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.082400 $268.29


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA
ESTACION=20.00M
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS10-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 10 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 15.00 0.066667 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.103000 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.103000 $254.12


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a
ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS10-200 FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 10 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 15.00 0.066667 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.103000 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.103000 $268.29


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA
ESTACION=20.00M
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS15-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 15 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.00 0.083333 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.153000 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.153000 $254.12


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a
ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS15-200 FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 15 CM. ESPESOR,
AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE
OBRA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MAGU0010 AGUA M3 0.00 0.070500 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.00 0.083333 $655.40

BASICOS
ACR0012 ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA M3 0.00 0.153000 $46.82
HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE
AGREGADOS, MORTERO, CONCRETOS.

FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.153000 $268.29


AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA
ESTACION=20.00M
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

MURLAD7 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 7 CM. DE ESP. (CAPUCHINO), ASENTADO
CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA
ALTURA DE 3.5 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0070 TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. MILL 0.00 0.031500 $1,800.00
MAGU0010 AGUA M3 0.00 0.024000 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.00 0.083333 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.083000 $0.00

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.011600 $355.96

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

MURLAD14 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 14 CM. DE ESP. ASENTADO CON MEZCLA
MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0070 TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. MILL 0.00 0.048000 $1,800.00
MAGU0010 AGUA M3 0.00 0.048000 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.00 0.100000 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.056625 $0.00

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.040000 $355.96

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

MURLAD28 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 28 CM. DE ESP. ASENTADO CON MEZCLA
MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0070 TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. MILL 0.00 0.086000 $1,800.00
MAGU0010 AGUA M3 0.00 0.086000 $2.21

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 6.49 0.154083 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.056625 $0.00

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.055000 $355.96

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL
MURTAB10 MURO DE TABICN DE CONCRETO LIGERO DE 10 1428 DE 10 CM. DE ESP. (CAPUCHINO),
ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN
HASTA UNA ALTURA DE 3.5 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0090 TABICON DE CEMENTO VIBRO BLOCK 7X14X28CM MILL 0.00 0.024000 $1,280.10

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.00 0.100000 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 1.000000 $0.00

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.018600 $355.96

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

MURTAB14 MURO DE TABICN DE CONCRETO LIGERO DE 101428 DE 14 CM. DE ESP. ASENTADO CON
MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA
DE 3.5 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0090 TABICON DE CEMENTO VIBRO BLOCK 7X14X28CM MILL 0.00 0.033000 $1,980.10

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.00 0.100000 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 1.000000 $0.00

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.031800 $355.96

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

MURTAB28 MURO DE TABICN DE CONCRETO LIGERO DE 101428 DE 28 CM. DE ESP. ASENTADO CON
MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA
DE 3.5 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0090 TABICON DE CEMENTO VIBRO BLOCK 7X14X28CM MILL 0.00 0.062000 $1,280.10

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 10.00 0.100000 $655.40

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 1.000000 $0.00

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.078100 $355.96
Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

MURPRET15 MURO DE PRETIL PERIMETRAL DE TABIQUE DE BARRO RECOCIDO DE 7X14X28 CM, DE 15 CM DE


ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM DE ESPESOR,
ACABADO COMUN.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MTAB0070 TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. MILL 0.00 0.006000 $1,800.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 5.00 0.200000 $655.40
APL0025 EMBOQUILLADO EN REPELLADO, DE 6 CM. DE ANCHO, CON M 0.00 1.000000 $24.78
MORTERO DE CEMENTO Y ARENA PROPORCION DE 1:6,
PERFILANDO UNA ARISTA; ALTURA HASTA 3.00 M, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M.

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Subtotal: .
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

LOSA10-200 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c = 200
KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO DE REFUERZO X
M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO

Cdigo Concepto Unidad Rend. Cantidad Costo


BASICOS
VLOSA200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.103000 $543.18
REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y
RETICULARES DE SUPERESTRUCTURA, FC=200 KG/CM2,
RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y
ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA
HORIZONTAL, MATERIALES Y

AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.022330 $6,278.58


ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

CLOSA HAB. Y COL. DE CIMBRA CON TARIMAS DE DUELA PARA M2 0.00 1.000000 $62.40
LOSA DE CONCRETO.

Subtotal: BASICOS
Subtotal: .
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL
LOSA10-250 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c = 250
KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO DE REFUERZO X
M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO

Cdigo Concepto Unidad Rend. Cantidad Costo


BASICOS
VLOSA250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.103000 $558.87
REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y
RETICULARES DE SUPERESTRUCTURA, FC=250 KG/CM2,
RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y
ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA
HORIZONTAL, MATERIALES Y

AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.022330 $6,278.58


ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN
INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M

CLOSA HAB. Y COL. DE CIMBRA CON TARIMAS DE DUELA PARA M2 0.00 1.000000 $62.40
LOSA DE CONCRETO.

Subtotal: BASICOS
Subtotal: .
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PTA0001 SUMINISTRO Y COLOCACIN DE PUERTA DE 0.70 X 2.10 M. INCLUYE: CHAPA MODELO 715 Y PINTURA
BASE.

Cdigo Concepto Unidad Rend. Cantidad Costo


SUBCONTRATOS
PUR0001 PUERTA MADER 0.70 X 2.10 PZA 0.00 1.000000 $1,800.80

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $655.40
APL0025 EMBOQUILLADO EN REPELLADO, DE 6 CM. DE ANCHO, CON M 0.00 1.000000 $24.78
MORTERO DE CEMENTO Y ARENA PROPORCION DE 1:6,
PERFILANDO UNA ARISTA; ALTURA HASTA 3.00 M, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M.

Subtotal: MANO DE OBRA


Subtotal: .
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

VENT0001 SUMINISTRO Y COLOCACIN DE VENTANA METLICA DE 0.70 X 0.60 M. INCLUYE: PINTURA BASE Y
BOQUILLAS.

Cdigo Concepto Unidad Rend. Cantidad Costo


SUBCONTRATOS
PUR0001 PUERTA METALICA 0.70 X 2.10 PZA 0.00 1.000000 $0.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 2.50 0.400000 $655.40
APL0025 EMBOQUILLADO EN REPELLADO, DE 6 CM. DE ANCHO, CON M 0.00 1.000000 $24.78
MORTERO DE CEMENTO Y ARENA PROPORCION DE 1:6,
PERFILANDO UNA ARISTA; ALTURA HASTA 3.00 M, ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M.

Subtotal: MANO DE OBRA


Subtotal: .
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIS0080 SUMINISTRO Y COLOCACIN DE PISO DE CERMICA DE 33X33 CM. VITROMEX MODELO DOS
AMRICAS COLOR BLANCO, ASENTADO CON PEGAPISO COLOR GRIS Y JUNTEADOR COLOR GRIS
MARCA PERDURA.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MPIS0240 PISO VITROMEX BCO. 2 AMERICAS 33X33 CM M2 0.00 1.030000 $96.52
MPGP0001 PEGAPISO GRIS MARCA PERDURA STONE SACO 0.00 0.330000 $40.87
MJUNT0001 JUNTEADOR GRIS CON ARENA MARCA PERDURA STONE, SACO 0.00 0.135500 $37.39
SACO DE 10 K
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 12.00 0.083333 $655.40

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO 0.1
UTILIDADES 0.15
COSTO TOTAL

PIN0001 SUMINISTRO Y APLICACIN DE PINTURA VINLICA EN MUROS Y PLAFN CON YESO, INCLUYENDO
UNA MANO DE SELLADOR Y DOS MANOS DE PINTURA CALIDAD BERELINTE COLOR BLANCO Y
PREPARACIN DE SUPERFICIE.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MPIN0069 SELLADOR VINILICO LT 0.00 0.002762 $473.91
MPIN0060 PINTURA COLOR BLANCA BERLINTE CUB 0.00 0.009209 $668.69
MRES0051 YESO DE RESANADOR KG 0.00 0.082500 $0.00

MANO DE OBRA
CUAD060 CUADRILLA 060 (1 PINTOR) JOR 20.00 0.050000 $327.70

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.050000 $0.00

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PIN0002 SUMINISTRO Y APLICACIN DE PINTURA ESMALTE EN MARCOS HERRERA EN GENERAL, INCLUYE:


PREPARACIN DE SUPERFICIE Y DOS MANOS DE PINTURA BERELINTE.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD060 CUADRILLA 060 (1 PINTOR) JOR 21.45 0.046620 $327.70

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.050000 $0.00

MATERIALES
MPIN0001 PINTURA ESMALTE CUB 0.00 0.009734 $1,089.56

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

IMP0001 SUMINISTRO Y SISTEMA APLICACIN DE IMPERMEABILIZANTE ACRILICO MARCA PASA A BASE DE


UNA MANO DE SELLADOR A RAZON DE 0.25 LITROS/M2, MENBRANA DE REFUERZO DE FIBRA DE
POLIESTER # 5 , DOS MANOS DE IMPERMEABILIZANTE 5A A RAZON DE 0.5 LITROS/M2, INCLUYE
LIMPIEZA GENERAL.

Cdigo Concepto Unidad Rend. Cantidad Costo


MATERIALES
MIMP0001 IMPERMEABILIZANTE AISLAFLEX 5 A, MARCA PASA. LT 0.00 1.000000 $0.00
MSEL0001 SELLADOR PASA AISLAFLEX SELLO LT 0.00 0.250000 $0.00
MMEM0001 MEMBRANA DE FIBRA DE POLIESTER#5 PARA M2 0.00 1.000000 $0.00
IMPERMEABILIZACIN
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 30.00 0.033333 $655.40

Subtotal: MANO DE OBRA


Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

APL0025 EMBOQUILLADO EN REPELLADO, DE 6 CM. DE ANCHO, CON MORTERO DE CEMENTO Y ARENA


PROPORCION DE 1:6, PERFILANDO UNA ARISTA; ALTURA HASTA 3.00 M, ACARREO MATERIAL
PRIMERA ESTACION =20.00 M.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 26.71 0.037439 $655.40

BASICOS
MEZ0005 MORTERO CEMENTO-ARENA 1:6 M3 0.00 0.001440 $165.89

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

APL0022 APLANADO EN PLAFN DE LOSA, PULIDO A LLANA CON MEZCLA DE MORTERO Y ARENA
PROPORCION DE 1:5, DE 2.5 CM. DE ESPESOR PROMEDIO.

Cdigo Concepto Unidad Rend. Cantidad Costo


MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 9.00 0.111111 $655.40

BASICOS
MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 0.00 0.032500 $355.96

SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 1.000000 $0.00

Subtotal: MANO DE OBRA


Subtotal: BASICOS
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC.


Cdigo Concepto Unidad Rend. Cantidad Costo
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.001600 $350.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 45.45 0.022002 $655.40

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PSO0002 ACABADO PULIDO INTEGRAL PISO CONC.


Cdigo Concepto Unidad Rend. Cantidad Costo
MATERIALES
MCEM0060 CEMENTO GRIS EN SACOS TON 0.00 0.032000 $350.00

MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 30.00 0.033333 $655.40

Subtotal: MATERIALES
Subtotal: MANO DE OBRA
Costo directo
INDIRECTO
UTILIDADES
COSTO TOTAL

PSO0002SUMINISTRO Y COLOCACION DE REGISTRO SANITARIO APLANADO INTERIOR CON TAPA Y CONTRATA PZ

Cdigo Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
LADRILLO RECOSODO
MC CEMENTO TON 0.00 0.032000 $350.00 $11.20
EM GRIS EN
006 SACOS
0

MANO DE OBRA
CU CUADRILLA JOR 30.00 0.033333 $655.40 $21.85
AD 040
040 (1ALBANIL+1
PEON)

Subtotal: MATERIALES $11.20


Subtotal: MANO DE OBRA $21.85
Costo directo $33.05
INDIRECTO $0.00
UTILIDADES $0.00
COSTO TOTAL $33.05
m2

Importe

$8.53
$3.20

$11.72
$11.72
$1.17
$1.76
$14.65

m2

Importe

$8.53
$3.20

$11.72
$11.72
$1.17
$1.76
$14.65

m3

Importe

$73.88

$9.09

$73.88
$9.09
$82.97
$8.30
$12.45
$103.71

m2

Importe

$32.51
$4.00

$32.51
$4.00
$36.51
$3.65
$5.48
$45.63

M2

Importe

$62.51

$3.85

$62.51
$3.85
$66.36
$6.64
$9.95
$82.95

M3

Importe

$625.12

$76.50

$625.12
$76.50
$701.62
$70.16
$105.24
$877.02

M2

Importe

$24.37

$24.37
$24.37
$2.44
$3.66
$30.47

M2

Importe

$54.03

$54.03
$54.03
$5.40
$8.10
$67.54

M2

Importe

$16.25

$2.00

$16.25
$2.00
$18.25
$1.83
$2.74
$22.82

M2

Importe

$21.39

$2.63

$21.39
$2.63
$24.02
$2.40
$3.60
$30.02

M2

Importe
$18.29

$18.29
$18.29
$1.83
$2.74
$22.86

M2

Importe

$15.03
$130.58

$145.62
$145.62
$14.56
$21.84
$182.02

M3

Importe

$146.16

$146.16
$146.16
$14.62
$21.92
$182.70

M2

Importe

$0.00
$0.42
$0.00
$0.00

$9.63

$0.42
$9.63
$10.05
$1.01
$1.51
$12.57

M3
M3

Importe

$350.36

$196.83

$38.40

$350.36
$196.83
$38.40
$585.59
$58.56
$87.84
$731.98

M3

Importe

$93.41

$13.84

$93.41
$107.25
$10.72
$16.09
$134.06

M2

Importe

$24.85
$2.82
$27.67
$27.67
$2.77
$4.15
$34.59

Importe

$1.00

$88.88
$4.61

$49.73

$22.94

$28.47

$41.34

$1.00
$88.88
$147.09
$236.97
$23.70
$35.55
$296.22

Importe

$1.00

$88.88

$4.61

$49.73

$22.94

$28.47

$43.37

$1.00
$88.88
$149.12
$239.00
$23.90
$35.85
$298.75

Importe

$1.00

$88.88

$4.61

$49.73

$22.94

$28.47

$45.49

$1.00
$88.88
$151.25
$241.13
$24.11
$36.17
$301.41

Importe

$1.69

$98.41

$5.11
$53.56

$38.53

$33.21

$55.12

$1.69
$98.41
$185.53
$285.64
$28.56
$42.85
$357.05

Importe

$1.69

$98.41

$5.11

$53.56

$38.53

$33.21

$57.82

$1.69
$98.41
$188.24
$288.34
$28.83
$43.25
$360.43

Importe

$1.69

$99.95

$5.19

$48.88

$29.82

$56.94

$93.72

$1.69
$99.95
$234.55
$336.18
$33.62
$50.43
$420.23

Importe

$1.69

$98.41

$5.11
$53.56

$38.53

$33.21

$60.66

$1.69
$98.41
$191.07
$291.18
$43.68
$29.12
$363.97

Importe

$1.69

$110.24

$5.72

$53.56

$41.29

$37.96

$73.49

$1.69
$110.24
$212.02
$323.94
$48.59
$32.39
$404.93

Importe

$0.33

$74.99

$0.00

$15.82

$15.81

$26.37

$30.95

$0.33
$74.99
$88.95
$164.27
$0.00
$0.00
$164.27

Importe

$0.33

$74.99

$0.00
$18.34

$17.61

$34.37

$61.90

$0.93
$104.99
$118.95
$224.87
$22.49
$33.73
$281.09

Importe

$0.33
$4.79

$51.36

$0.00

$24.20

$17.08

$5.12
$51.36
$41.28
$97.76
$0.00
$0.00
$97.76

M
M

Importe

$0.33

$51.36

$0.00

$4.79

$24.20

$17.41

$5.12
$51.36
$41.61
$98.09
$0.00
$0.00
$98.09

Importe

$0.33

$51.36

$0.00

$4.79

$24.20

$17.41

$5.12
$51.36
$41.61
$98.09
$0.00
$0.00
$98.09

Importe

$0.33

$54.08

$0.00

$4.79

$28.23

$22.78

$5.12
$54.08
$51.01
$110.21
$0.00
$0.00
$110.21

Importe

$0.33

$54.08

$0.00

$4.79

$28.23
$23.21

$5.12
$54.08
$51.44
$110.64
$0.00
$0.00
$110.64

Importe

$0.33

$54.08

$0.00

$4.79

$28.23

$23.21

$5.12
$54.08
$51.44
$110.64
$0.00
$0.00
$110.64

Importe

$0.33

$57.09
$0.00

$4.79

$32.26

$30.37

$5.12
$57.09
$62.63
$124.84
$0.00
$0.00
$124.84

Importe

$0.33

$57.09

$0.00

$4.79

$32.26

$30.95

$5.12
$57.09
$63.21
$125.42
$0.00
$0.00
$125.42

M
M

Importe

$0.33

$57.09

$0.00

$4.79

$32.26

$30.95

$5.12
$57.09
$63.21
$125.42
$0.00
$0.00
$125.42

M2

Importe

$0.16

$32.77

$12.20

$0.16
$32.77
$12.20
$45.13
$0.00
$0.00
$45.13

M2

Importe

$0.16
$43.69

$2.41

$12.20

$14.98

$0.16
$43.69
$29.59
$73.44
$0.00
$0.00
$73.44

M2

Importe

$0.16

$43.69

$2.41

$13.09

$14.98

$0.16
$43.69
$30.48
$74.33
$0.00
$0.00
$74.33

M2

Importe

$0.16

$43.69
$3.86

$20.94

$14.98

$0.16
$43.69
$39.78
$83.63
$0.00
$0.00
$83.63

M2

Importe

$0.16

$43.69

$3.93

$22.11

$14.98

$0.16
$43.69
$41.02
$84.87
$0.00
$0.00
$84.87

M2

Importe

$0.16

$43.69
$4.82

$26.17

$14.98

$0.16
$43.69
$45.97
$89.82
$0.00
$0.00
$89.82

M2

Importe

$0.16

$43.69

$4.82

$27.63

$14.98

$0.16
$43.69
$47.43
$91.28
$0.00
$0.00
$91.28

M2

Importe

$0.16

$54.62
$7.16

$38.88

$14.98

$0.16
$54.62
$61.02
$115.80
$0.00
$0.00
$115.80

M2

Importe

$0.16

$54.62

$7.16

$41.05

$14.98

$0.16
$54.62
$63.19
$117.97
$0.00
$0.00
$117.97

M2

Importe

$56.70
$0.05

$54.62

$0.00
$4.13

$56.75
$54.62
$4.13
$115.50
$0.00
$0.00
$115.50

M2

Importe

$86.40
$0.11

$65.54

$0.00

$14.24

$86.51
$65.54
$14.24
$166.29
$0.00
$0.00
$166.29

M2

Importe

$154.80
$0.19

$100.99

$0.00

$19.58

$154.99
$100.93
$19.58
$275.50
$0.00
$0.00
$275.50
M2

Importe

$30.72

$65.54

$0.00

$6.62

$30.72
$65.54
$6.62
$102.88
$10.29
$10.29
$0.00

M2

Importe

$65.34

$65.54

$0.00

$11.32

$76.66
$65.54
$11.32
$153.52
$15.35
$23.03
$191.90

M2

Importe

$79.37

$65.54

$0.00

$27.80
$79.37
$65.54
$27.80
$172.71
$0.00
$0.00
$172.71

Importe

$10.80

$131.08
$24.78

$10.80
$131.08
$24.78
$166.66
$16.67
$16.67
$0.00

M2

Importe

$55.95

$140.20

$62.40

$296.15
$62.40
$358.55
$35.86
$53.78
$448.19
M2

Importe

$57.56

$140.20

$62.40

$197.76
$62.40
$260.16
$0.00
$0.00
$260.16

PZA

Importe

$1,800.80

$262.16
$24.78

$262.16
$24.78
$2,087.74

$313.16
$2,400.90

PZA

Importe

$0.00

$262.16
$24.78

$262.16
$24.78
$286.94
$0.00
$0.00
$286.94

M2

Importe

$99.42
$13.49
$5.07

$54.62

$117.98
$54.62
$172.60
$17.26
$25.89
$215.75

M2

Importe

$1.31
$6.16
$0.00

$16.39

$0.00

$7.47
$16.39
$23.86
$0.00
$0.00
$23.86

M2

Importe
$15.28

$0.00

$10.61

$10.61
$15.28
$25.89
$0.00
$0.00
$25.89

M2

Importe

$0.00
$0.00
$0.00

$21.85

$21.85
$21.85
$0.00
$0.00
$21.85

Importe

$24.54

$0.24

$24.54
$0.24
$24.78
$0.00
$0.00
$24.78

M2

Importe

$72.82
$11.57

$0.00

$72.82
$11.57
$84.39
$0.00
$0.00
$84.39

M2
Importe

$0.56

$14.42

$0.56
$14.42
$14.98
$0.00
$0.00
$14.98

M2
Importe

$11.20

$21.85

$11.20
$21.85
$33.05
$0.00
$0.00
$33.05
UTILIDAD PROPUESTA

CLAVE CONCEPTO FRMULA IMPORTE

CD MONTO DE LA OBRA ACTUAL (COSTO DIRECTO) 775,319.99


%CI PORCENTAJE DE COSTOS INDIRECTOS
%FIN PORCENTAJE DE FINANCIAMIENTO
CU CARGO POR UTILIDAD 86,207.83

CI I.-INDIRECTO CI=CD %CI 63,498.71


CF II.-FINANCIAMIENTO CF=CD %FIN 23,259.60

PORCENTAJE TOTAL DE UTILIDAD %=(UT/ (CD+CI+CF)) 100

CARGOS ADICIONALES

CLAVE CONCEPTO FRMULA IMPORTE

CD MONTO DE LA OBRA ACTUAL (COSTO DIRECTO) 775319.99

IMPUESTOS LOCALES Y FEDERALES


MOG IMPORTE TOTAL DE LA MANO DE OBRA GRAVABLE 2,210.94
%SAR PORCENTAJE DE APORTACIN AL SAR
%INF PORCENTAJE DE APORTACIN AL INFONAVIT

APORTACIONES POR CONCEPTO DE SAR CSAR=(MOG)*%SAR 44.22


APORTACIONES POR CONCEPTO DE INFONAVIT CINF=(MOG)*%INFONAVIT 110.55

GASTOS DE INSPECCIN Y SUPERVISIN


APORTACIONES POR CONCEPTO DE:SERVICIO DE VIGILANCIA,INSPECCION CSEC=CD 0.005
Y CONTROL(SECODAM). 3,876.60
SUBTOTAL 4,031.37

TOTAL DE CARGOS ADICIONALES


%

8.19
3.00
8.99

10.00

2.00
5.00
0.52
CLAVE CONCEPTO UNIDAD CANTIDAD P.U. Importe

1 PRELIMINARES
1.1 TRAZO Y NIVELACION DE TERRENO CON HILO CAL; M2 563.87 12.57 7,087.01
DEJANDO REFERENCIA PARA EJECUCION DE LOS
TRABAJOS

1.2 DESMONTAJE DE ESTRUCTURA METALICA M2 90.00 14.65 1,318.93


EXISTENTE (TECHUMBRE DE LAMINA, MONTEN Y
PERFILES METALICOS), INCLUYE DESMONTAJE,
CORTES Y MANO DE OBRA.

2 EXCAVACIONES Y DEMOLICIONES
2.1 EXCAVACION EN ZANJA Y EN TERRENO TIPO II CON M3 320.40 182.70 58,537.30
HERRAMIENTA DE MANO; PICO Y PALA HASTA UNA
PROFUNDIDAD DE 2.00 MTS. EN SECO PARA
DESPLANTE DE ESTRUCTURAS.

2.2 DEMOLICION DE PISOS DE CONCRETO EXISTENTE A M2 150.00 30.47 4,570.26


MANO; CINCEL Y MARRO, CUA Y LO NECESARIO PARA
EJECUTAR EL TRABAJO.

2.3 DEMOLICION DE LOSAS EXISTENTES DE CONCRETO M2 35.00 67.54 2,363.93


ARMADO; A MANO CON CINCEL Y MARRO, CUA Y LO
NECESARIO PARA EJECUTAR EL TRABAJO.

2.4 DEMOLICION DE MUROS DE TABIQUE EXISTENTE A M2 67.50 45.63 3,080.20


MANO CON MARRO Y CINCEL; INCLUYE
APUNTALAMIENTO PARA GARANTIZAR LOS
ELEMENTOS EXISTENTES

2.5 DEMOLICION DE TRABES DE CONCRETO ARMADO M3 3.50 877.02 3,069.58


EXISTENES; A MANO CON CINCEL, MARRO Y CUA.

2.6 CARGA Y RETIRO DE MATERIAL PRODUCTO DE M3 583.76 182.02 106,257.03

EXCAVACION Y/O DEMOLICIONES FUERA DE LA OBRA.

3 CIMENTACION
3.1 COMPACTACION DEL TERRENO NATURAL AL 85%. M2 196.00 34.59 6,779.93

3.2 BASE DE MATERIAL DE BANCO DE GRUESO FINO Y M3 27.75 134.06 3,720.14


COMPACTADO AL 95% DE SU PVSS; PARA RECIBIR
ZAPATAS.

3.3 PLANTILLA DE CONCRETO DE 6 CMS DE ESPESOR M2 196.00 45.13 8,845.48


F'C=100 KG/CM2

3.4 ZAPATA DE 17.5 CMS DE ESP. PROMEDIO Y 1.0 DE ML 69.37 573.61 39,791.15
ANCHO, ARMADA CON 6 VARILLAS NO. 4
TRANSVERSALMENTE; Y 10 LONGITUDINALMENTE DEL
NO. 3 CON CONTRATRABE DE 35X25 CMS. DE
CONCRETO ARMADO CON 4 VARILLAS DEL NO. 4 Y
ANILLOS @ 15 CMS DEL NO. 2 F'C= 250 KG/CM2.
CONCRETO HECHO EN OBRA, CIMBRA COMUN.

3.5 ZAPATA DE 17.5 CMS DE ESP. PROMEDIO Y 1.20 DE ML 89.00 573.61 51,051.07
ANCHO, ARMADA CON 6 VARILLAS NO. 4
TRANSVERSALMENTE; Y 10 LONGITUDINALMENTE DEL
NO. 3 CON CONTRATRABE DE 35X25 CMS. DE
CONCRETO ARMADO CON 4 VARILLAS DEL NO. 4 Y
ANILLOS @ 15 CMS DEL NO. 2.5 F'C= 250 KG/CM2.
CONCRETO HECHO EN OBRA, CIMBRA COMUN.
3.6 MURO DE ENRASE CON TABIQUE DE CONCRETO M2 137.60 191.90 26,405.93
MACIZO DE 10X14X25 CMS. ASENTADO CON
MORTERO-ARENA 1:5.

3.7 CASTILLO O CADENA DE CONCRETO EN ML 66.00 363.97 24,022.22


CIMENTACION ARMADO DE 14X20 CMS CON 4
VARILLAS DEL NO. 3 Y ANILLOS @ 15 CMS. CIMBRA
COMUN

3.8 CADENA DE DESPLANTE DE 14X30 ARMADA CON 4 ML 170.00 420.23 71,438.66


VARILLAS DEL NO. 4 Y ANILLOS @ 20 CMS. CIMBRA
COMUN

3.9 RELLENO DE ZANJAS CON MATERIAL DE BANCO M3 60.00 134.06 8,043.55


COMPACTADO EN CAPAS Y COMPACTADOR PORTATIL
LIGERO AL 90%.

3.10 FIRME DE CONCRETO DE 8 CMS DE ESPESOR. M2 286.78 84.87 24,339.02


CONCRETO SIMPLE 200 KGS/CM2. CORTADO EN
LOSAS

4 ALBAILERIA
4.1 MURO COMUN DE TABIQUE ROJO RECOCIDO M2 386.00 166.29 64,187.94

ASENTADO CON MORTERO-ARENA 1:5 A PLOMO E HILO

4.2 CADENA O CASTILLO DE 14X20 CONCRETO ARMADO ML 180.00 301.41 54,254.18


CON 4 VARILLAS DE NO.3 Y ANILLOS @ 15 CMS.
CIMBRA COMUN

4.4 SUMINISTRO Y COLOCACION DE REGISTRO PZA 6.00 767.47 4,604.82


SANITARIO APLANADO INTERIOR CON TAPA Y
CONTRATAPA

4.5 SUMINISTRO Y COLOCACION DE CISTERNA PZA 1.00 6,782.36 6,782.36


PREFABRICADA NO INCLUYE EXCAVACION.

5 ESTRUCTURA
5.1 LOSA MACIZA DE CONCRETO ARMADO DE HASTA 12 M2 180.00 448.19 80,673.75
CMS. DE ESPESOR. ARMADA CON VARILLA DEL NO. 3
@ 15 CMS. EN AMBOS SENTIDOS CON LOS BASTONES
Y BALLONETAS DE ACUERDO A PLANO. CIMBRA
COMUN Y CONCRETO DE 200 KG/CM2.

5.2 LOSA ALIGERADA CON CASETON 40X40X25 CMS; DE M2 93.90 448.19 42,084.81
30 CMS DE ESPESOR Y NERVADURAS DE 8 CMS. CON 3
VARILLAS DEL NO. 3 MALLA Y LO NECESARIO PARA SU
EJECUCION.

5.3 COLUMNA DE CONCRETO DE 5.0 MTS. DE LONGITUD PZA 7.00 281.09 1,967.61
Y DE 30X45 DE SECCION ARMADO CON 6 VARILLAS
DEL NO. 5 O EQUIVALENTE ANILLOS @ 15 CMS. DEL
NO. 2.5

7 INSTALACION HIDRAULICA
7.1 SUMINISTRO E INSTALACION DE EQUIPO PZA 1.00 1,987.05 1,987.05
HIDRONEUMATICO CON TANQUE DE 126 LITROS Y
MOTOR DE 1 HP MONOFASICO.

7.2 SALIDA DE ALIMENTACION DE INODOROS, PZA 10.00 115.06 1,150.60


MINGITORIOS Y LAVABOS CON TUBO DE COBRE DE
1/2" TIPO M. INCL. MATERIAL Y MANO DE OBRA
7.3 SUMINISTRO Y COLOCACION DE LLAVE PZA 4.00
ECONOMIZADORA MARCA HELVEX NO. 105 O SIMILAR
EN COSTO Y GARANTIA.

7.4 SUMINISTRO DE FLUXOMETRO PARA MINGITORIO PZA 6.00 1,832.00 10,992.00


Y/O WC; 110-38 Y 185-19 MARCA HELVEX.

7.5 SUMINISTRO Y COLOCACION DE LINEA DE COBRE DE ML 40.00 198.70 7,948.00

3/4" TIPO M PARA LINEA DE ALIMENTACION DE A.P.

7.6 SUMINISTRO Y COLOCACION DE LINEA DE COBRE DE ML 35.00 187.02 6,545.70

1/2" TIPO M PARA LINEA DE ALIMENTACION DE A.P.

8 INSTALACION SANITARIA
8.1 SUMINISTRO E INSTALACION DE DESCARGA PZA 15.00 98.04 1,470.60
SANITARIA DE LAVABOS Y MINGITORIOS, INNODOROS Y
COLADERAS EN PVC SANITARIO DE 2 A 4" CON
ACCESORIOS Y CEMENTO, AS COMO TODO LO
NECESARIO PARA SU FUNCIONAMIENTO. P.U.O.T.

8.2 SUMINISTRO E INSTALACION DE LINEA DE PVC DE 6" ML 35.00 140.80 4,928.00


COLECTORA; INCL. MATERIAL MANO DE OBRA E
INSTALACION.

8.3 CONSTRUCCION DE REGISTRO SANITARIO CON PZA 6.00 567.05 3,402.29


TABIQUE Y PLANTILLA, MEDIDAS DE 40X60X80.
INTERIORIES CON TAPA Y CONTRATAPA COLADA EN
CONCRETO.

9 MUEBLES SANITARIOS
9.1 CONSTRUCCION DE LOSA DE CONCRETO PARA PZA 1.00 1,197.52 1,197.52
ALOJAR OVALINES, DIMENSIONES DE 0.60X2 MTS DE
10 CMS. DE ESPESOR Y F'C= 150 KG/CM2 TERMINADA
CON AZULEJO Y ACERO DE REFUERZO DEL NO. 3 @ 15
CMS. EMPOTRADA EN LOS MUROS.

9.2 SUMINISTRO Y COLOCACION DE INNODORO PARA PZA 4.00 2,000.03 8,000.14


OPERAR CON FLUXOMETRO APOLO DE VITROMEX O
SIMILAR CON ACCESORIOS

9.3 SUMINISTRO Y COLOCACION DE LAVABO OVALIN PZA 4.00 1,876.02 7,504.08

PARA SOBREPONER VITROMEX COLOR BLANCO INCL.

CESPOL Y ACCESORIOS, ASI COMO LLAVE ANGULAR.

9.4 SUMINISTRO Y COLOCACION DE MINGITORIO PARA PZA 2.00 1,456.33 2,912.66


OPERAR CON FLUXOMETRO

11 CARPINTERIA
11.1 SUMINISTRO Y COLOCACION DE PUERTAS DE PZA 5.00 2,400.90 12,004.51
MADERA TIPO TAMBOR A BASE DE BASTIDOR Y
TRIPLAY, CON CHAPA.

Suma ###
BELTRAN PRIETO OSCAR F. 16% IVA ###
PRESUPUESTO PROPUESTO CONST.III. Total ###
presupuesto $ 899,371.18