GENERAL CONCRETE SLAB CONCRETE HOLLOW BLOCK STRUCTURAL STEEL

REINFORCEMENT AS TABULATED SHALL BE PROVIDED UNLESS OTHERWISE 1. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTMA - 36Fy=252.0Mpa
A. MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS 1. ALL REINFORCEMENT SHALL BE 0.019 CLEAR MINIMUM FROM TOP SPECIFIED IN THE PLAN. 2. WELDING SHALL CONFORM TO AWS STANDARDS.
OF THE FOLLOWING BUILDING CODES: AND BOTTOM OF SLAB.
3. FABRICATOR SHALL SUBMIT SHOP DRAWINGS FOR APPROVAL BY THE
1. ACI 318 - 11 2. FOR TWO - WAY SLAB ALONG THE LONGER SPAN SHALL BE PLACED BELOW ENGINEER AND THE OWNER PRIOR TO FABRICATION.
2. AISC 2013 THOSE ALONG THE LONGER SPAN AT CENTER AND OVER THE LONGER SPAN
3. NSCP 20th EDITION BARS NEAR THE SUPPORT UNLESS OTHERWISE INDICATED OR SHOWN STANDARD DETAILS
B. ALL DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES IN DETAILS THE SPACING OF THE BARS AT THE COLUMN STRIPS CAN 24 DIA. 24 DIA.
UNLESS OTHERWISE INDICATED. BE APPROXIMATELY 1 13 OF THE MIDDLE STRIP IN NO CASE GREATER (0.30 MIN) (0.30 MIN)
C. FOR ALL OTHER REQUIREMENTS, REFER TO ARCHITECTURAL, SANITARY, THAN 2 13 TIMES THE SLAB THICKNESS. 0.0093
ELECTRICAL AND MECHANICAL WORKING DRAWINGS. SLAB REINFORCEMENT
3. UNLESS OTHERWISE DETAILED IN CONDITIONING SLAB HAVING SAME
REINFORCEMENT RUNNING IN ONE DIRECTION, REINFORCING SHALL
FOOTINGS BE BEND, EXTENDED OR CUT AS FOLLOWS. CONCRETE WALLS
UNLESS OTHERWISE INDICATED IN THE PLANS, WALL REINFORCEMENT SHALL
1. FOOTINGS ARE DESIGNED TO REST ON SOIL WITH BEARING L4 L4 L4 L4 L4 L4 BE FOLLOWED ACCORDING TO THE FOLLOWING SCHEDULE.
CAPACITY OF 188 KPa
2. NO FOOTING SHALL REST ON FILL.

0.30
MIN

T
0.10mm (MIN) COMPACTED
3. MINIMUM CONCRETE PROTECTION FOR REINFORCE SHALL BE 0.076 CLEAR GRAVEL BASE
FOR CONCRETE DEPOSITED AGAINST THE GROUND AND 0.051 CLEAR
FOR CONCRETE DEPOSITED AGAINST THE FRAMEWORK. L5 L5 L5 L5 L5 L5
NATURAL GRADE LEVEL OR
L1 L2 L3 CANTILIVER COMPACTED SOIL LAYER

CONCRETE MIXES & PLACINGS 25 DIA.


SLAB CONSTRUCTION JOINT
25 DIA.
1. UNLESS OTHERWISE SPECIFIED, THE MIN. 28 DAYS CYLINDER COMPRESSIVE 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE (0.30 MIN) (0.30 MIN)
STRENGHT ARE AS FOLLOWS. TENSION FACE AND SHALL NOT BE LESS THAN 0.025 BT.
FOOTINGS & FOOTING TIE BEAMS 40.00 MPa 5. UNLESS OTHERWISE NOTED, ALL BEDDED SLAB BE REINFORCED WITH
COLUMNS 40.00 MPa 10MM BAR AT 0.25MOC E.W. AT CENTER OF SLAB. CONSTRUCTION JOINT
BEAMS, SLABS, CONCRETE TOPPINGS 40.00 MPa FOR SLAB SHALL NOT BE MORE THAN 3.00M APART.

(0.30 MIN)

(0.30 MIN)
24 DIA.

24 DIA.
REINFORCE CONCRETE STAIRS 40.00 MPa
BEDDED SLABS, CATCH BASINS & SIDEWALK 6. PROVIDE EXTRA REINFORCEMENT AT CORNER SLAB
17.50 MPa (TWO ADJACENT DISCONTINEOUS) AS SHOWN BELOW.
0.05X0.10m KEY 0.038X0.063m KEY
2. ALL CONCRETE MUST BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE
WITH ACI STANDARD. 5-10MM BARS @ 0.208M
CONCRETE COLUMN SEE NOTE
FOR DOWELS
12mm TIES
O.C. BOTTOM BARS d=MAX.
3. STRIPPING OF FORMS AND SHORES SHALL BE AS FOLLOWS: @ 0.102m 12mm TIES
O.C. (MAX.) @ 0.102m
FOUNDATIONS 1 DAY O.C. (MAX.) WALL INTERSECTION
COLUMNS 3 DAY
24 DIA. 24 DIA.
BEAMS & GIRDER 21 DAY 3-10mm (0.30 MIN) (0.30 MIN)

SLABS 17 DAY EXTRA TIES


5-10MM BARS @ 0.914M
4. IF BE REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FOR THE LONG @ 0.208M.O.C.
BARS TO THE FURTHER FACE OF THE WALL SHALL NOT BE LESS THAN
0.051 EMBEDMENT LENGHT SHALL BE 40 FOR COMPRESSION BARS.
5. MINIMUM CONCRETE PROTECTION OF REINFORCING BARS OR SHAPES
SHALL BE A SHOWN: 0.05X0.10m KEY 0.038X0.063m KEY

6. UNLESS OTHERWISE NOTED IN PLAN OR IN SPECIFICATIONS, CAMBER ALL BEAMS 7. PROVIDE SUPPLEMENTARY REINFORCEMENT AT SMALL UNFRAMED 5mmX150mm CORR. TYPE PVC WATERSTOP
AND GIRDERS AT LEAST 6.2MM FOR EVERY 3.00M SPAN EXCEPT CANTILIVERS OPENINGS IN FLOOR SLABS AS SHOWN BELOW.
FOR WHICH THE CAMBERS SHALL BE AS NOTED IN PLANS OR AS ORDERED WALL CONSTRUCTION JOINT
BY THE DESIGNER, BUT IN NO CASE LESS THAN 16.7MM OF EVERY 3.00M
OF FREE SPAN. 24 DIA. 24 DIA.
h = HEIGHT BETWEEN FLOOR
76
0.

0.76 (0.30 MIN) (0.30 MIN)

12mm TIES
76
0.

@ 0.102m
TRIMMER MAYBE
O.C. (MAX.)

(0.30 MIN)

(0.30 MIN)
24 DAI.

24 DAI.
OMITTED WHERE
OPENING IS FRAMED
BY BEAM COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE
25mm CLEAR

MIN. 1-16MM TOP & CAST MONOLITHICALLY WITH THE CORE OF MIN. THICKNESS OF 0.0127m AND
DISTANCE

(MINIMUM) BOT. FOR SLABS NOT LESS THAN 12 TIMES MAX. SIZE OF COARSE AGGREGATE WHERE COLUMNS
0.012M THICK AND OVER CHANGE IN SIZE. VERTICAL REINFORCEMENT SHALL BE OFFSET AT A SLOPE OF WALL REINFORCEMENT
NOT MORE THAN 0.025. AN EXTRA 12mm AT 0.076mm O.C. SHALL BE
0.914MM O.C. PROVIDE THROUGHOUT THE OFFSET REGION. WALL CORNERS
DISTANCE (MIN.)
37.7mm CLR.

37.7MM CLR.
HOCK SLAB REIN'T.
DISTANCE FOR
BEAMS & GIRDERS
(FOR BEAMS)
PROVIDE EXTRA BARS
OVER TRIMMER BAR MILD STEEL REINFORCEMENT 24 DIA.
(0.30 MIN)
24 DIA.
(0.30 MIN)

1. ALL MILLD STEEL REINFORCEMENT SHALL CONFORM TO ASTMA-15-62-2T 0.10m (MIN) COMPACTED
(NOT SHOWN) PARALLEL GRAVEL FILL
AND DEFORMATION TO A-305-56T LATEST REVISION.
TO SIDE OF EQUAL
25MM BAR
SEPARATOR AREA OF INTERRUPTED 2-16MM @ 2. DEVELOPMENT LENGHT FOR ALL BARS SHALL BE A MINIMUM OF 40-BAR
SLAB REINFORCEMENT EACH CORNER UNLESS OTHERWISE SPECIFIED FOR REINFORCING BARS 12 ; 233.0Mpa
NOTE FOR DOWELS
LESS AREA TRIMMER FOR REINFORCING BARS 12 ; 280.0Mpa PROVIDE DOWELS OF SAME SIZE AND
BARS SPACING AS HORIZONTAL OR BENT
3. ALL BARS SHALL BE WELDABLE. HORIZONTAL BARS.

CONSTRUCTION NOTES AND STANDARD DETAILS 16mm BEND 0.30 MIN.

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-1
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

10.00 10.00 10.00 10.00 1.30 10.00 10.00 10.00


5.78

C1 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C1


A

B C1 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C1


C5 C5
C
C5 C5
D
C5 C1 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C1 C5 F1
E C5 C5
F MF MF
C5 C5 C1 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C1 C5 C5
G
F1
H C5 C5
C5 C3 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C3 C5
I
C5 C5
J
C5 C5 F1
K
C1 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C1
L C3 C3
C3 C3
L F2
C1 FTB C1 FTB C1 FTB C1 FTB C1 C1 FTB C1 FTB C1 FTB C1
7.50

M
C3 C3 CF-1 CF-2 CF-3 CF-4 CF-2 CF-1 C3 C3
N
F2

FOUNDATION PLAN
SCALE 1:100M

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-2
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
0.

GRADE
.90

.90
GRADE BEAM
BEAM

2.70 M.
2.70

NATURAL
GRADE LINE
VERIFY

VERIFY
FTB FTB FTB FTB FTB FTB
COMBINED FOOTING

COLUMN
FOOTING

3 4

25MM @ 150MM O.C


TOP & BOTTOM BOTHWAYS
COMBINED FOOTING

VARIABLE
FTB FTB FTB FTB FTB

BAR SCHEDULE LONGITUDINAL - SECTION


TYPICAL COMBINED FOOTING DETAIL OF COMBINED FOOTING DETAIL
SCALE 1:30M
SCALE 1:30M

25MM @ 160MM O.C


TOP & BOTTOM B.W
COLUMN
(3RD STEP)
1.45

FOOTING TIE BEAM


3 ( 2ND STEP )
25MM @ 150MM O.C
CROSS SECTION OF MAT FOOTING (MF) 2
COLUMN FOOTING
( 1ST STEP )
NOT TO SCALE
1
25MM @ 150MM O.C
TOP & BOTTOM B.W
VERIFY

BAR SCHEDULE CROSS - SECTION STEPS IN CONCRETE CASTING


OF COMBINED FOOTING DETAIL OF FOOTING UP TO COLUMN
CROSS SECTION OF COMBINED FOOTING SCALE 1:30M SCALE 1:30M

NOT TO SCALE

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-3
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF FOOTINGS
THICKNESS LEFT OVERHANG RIGHT OVERHANG SIZE (MM) F O O T I N G R E I N F O R C E M E N T
MARK
1 2 3 4 5 6 7 T (M) (M) (M) (LXW) MAIN STEEL TOP MAIN STEEL BOTTOM SECONDARY STEEL TOP SECONDARY STEEL BOT

12.01 CF1 1.35 2.0 2.0 36.00 X 7.00 25mm@145mm C/C 32mm@175mm C/C 25mm@ 160mm C/C 25mm@ 160mm C/C
2.00 0.96 2.04 1.46 3.54 2.00
CF2 1.35 2.0 2.0 36.00X 7.00 25mm@ 130mm C/C 25mm@ 100mm C/C 25mm@ 160mm C/C 25mm@ 160mm C/C
5.78
CF3 1.45 2.0 2.0 36.00X 7.00 25mm@ 125mm C/C 25mm@ 100mm C/C 25mm@ 160mm C/C 25mm@ 160mm C/C

C1 CF4 1.60 2.0 2.0 36.00 X 10.00 25mm@ 75mm C/C 25mm@ 80mm C/C 25mm@ 160mm C/C 25mm@ 160mm C/C
A
F1 0.90 - - 4.70 x 4.70 20mm@ 230mm C/C 20mm@ 160mm C/C 20mm@ 230mm C/C 20mm@ 160mm C/C
5.00

F2 0.90 - - 6.75 X 6.75 20mm@ 230mm C/C 20mm@ 190mm C/C 20mm@ 230mm C/C 20mm@ 190mm C/C
B C1
C5
1.00

MF 1.60 2.0 2.0 (SEE DETAIL) 25mm@ 110mm C/C 32mm@ 110mm C/C 25mm@200mm C/C 25mm@ 200mm C/C
C
2.91

C5
D
1.45 2.10

C5 C1
E C5
F MF
3.53

C5 C5 C1 39.15
G
39.15

14.81 12.89 11.45


35.50

3.54

H C5
C5 C3
2.06 1.38

I
C5
J
C5
2.93

K C5

4.58
C5 C5

5.40
C1
1.001.00

L C3
C3 C3 C3 C5 C5
MF C5 C5
L
4.01

C1 C3 C1

6.60
C1 C1 C1 C1 C1

5.78
M
3.50

C3 C3
N

6.60 TYPICAL MAT FOUNDATION PLAN


NOT TO SCALE

MAT AND ISOLATED FOOTING LAYOUT


NOT TO SCALE

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-4
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.30
10.00 10.00 10.00 10.00 10.00 10.00 10.00

C1 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C1


A

GB2
GB2

GB2

GB2

GB2
GB2

GB2

GB2

GB2
S1 S1 S1 S1 S1 S1 S1

B C1 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C1


C5 C5
1 GB
C GB 1

GB1
GB2
GB2

GB2

GB2

GB2

GB2

GB2

GB2

GB2
S1 S1 S1 S1 S1 S1 S1

1
C5 C5

GB
D GB
1 C5 C1 C1 C1 C1 C1 C1 C1 C5 B1
G

GB1 GB1 GB1 GB1 C1 C1 GB1 GB1 GB1 G


B1

E
1

C5 C5

GB1
GB

GB 1

GB2
GB
GB2

GB2

GB2

GB2

GB2

GB2

GB2

GB2
1 S1 S1 S1 S1 S1 S1 S1
F
C5 GB1 C5 C1 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C1 C5 GB1 C5
G

GB2
GB2

GB2

GB2

GB2

GB2

GB2

GB2

GB2
1 S1 S1 S1 S1 S1 S1 S1 GB
H GB C5 C5 1
1

GB
GB

C5 C3 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C3 C5


B1

G
I

1
B1
G

C5 C5
1

GB1

GB
GB

GB1
GB2
J
GB2

GB2

GB2

GB2

GB2

GB2

GB2

GB2
S1 S1 S1 S1 S1 S1 S1

1
K 1 C5 C5 GB1
GB C1 C1 C1 C1 C1 C1
GB1 GB1 GB1 GB1 C1 C1 GB1 GB1 GB1 C1
L C3 B5 C3 C3 B5 C3

GB2
GB2

GB2

GB2

GB2

GB2

GB2

GB2

GB2
S1 S1 S1 S1 S1 S1 S1
L
B5 B5 C1 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C1 B5 B5
M

B5 B5
N
C3 C3 C3 C3

GROUND FLOOR FRAMING PLAN


SCALE 1:100M

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-5
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.30
10.00 10.00 10.00 10.00 10.00 10.00 10.00

C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2
A
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

B2
B2

B3

B2

B3

B2

B3

B2

B3

B2

B3

B2

B3

B2

B2
B3
B C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2
C6 C6
B4
C B4

B3

B3

B3

B3

B3

B3

B3
B2
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

B2
B2

B2

B2

B2

B2

B2

B2
B7

B7
B4
B4
C6 C6

B3
B3
D
C6 C2 C2 C2 C2 C2 C2 C2 C6 B4
B4

B1 B1 B1 B1 C2 C2 B1 B1 B1
E C6 C6

B4
B4

B3
B3
B2

B3

B3
B3

B3

B3

B3

B3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

B2
B2

B2

B2

B2

B2

B2

B2
F
C6 B4 C6 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 C6 B4 C6
G
B2

S1 B3 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

B3

B3
B3

B3

B3

B3
B2
B2

B2

B2

B2

B2

B2

B2
B3
H B3 C6 C6

B4
C6 C2 C4 C6
B4

B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1

B4
I
B4

C6 C6

B3
B4
B3

B7

B7
J
B4

B2

B3

B3

B3

B3

B3

B3

B2

B3

B2
B2
B2

B2

B2

B2

B2
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

K C6 C6 B4
B4 C2 C2 C2 C2 C2 C2
B1 B1 B1 B1 C2 C2 B1 B1 B1 C2
L C4 B5 C4 C4 B5 C4
B2

B3

B3
B3

B3

B3

B3

B3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

B2
B2

B2

B2

B2

B2

B2

B2
L
B7

B7
B5 B3 B5 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 B5 B3 B5
M
CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1
CB1
B5 B5
N
C4 C4 C4 C4

TYPICAL FROM 2ND TO 4TH FLOOR FRAMING PLAN


SCALE 1:100M

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-6
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

10.00 10.00 10.00 10.00 1.30 10.00 10.00 10.00

1.41
B6 B6
C2 CS B1 CS C2 CS B1 CS C2 CS B1 CS C2 CS B1 CS C2 C2 CS B1 CS C2 CS B1 C2 CS B1 CS C2
A
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

CS
S1

B6

B2

B6
B3

B2

B3

B2

B3

B2

B3

B2

B2

B2

B2
B3

B3

B3
B2

CS
B C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2

0.31
C6 C6 B4
C B4
S1

B3

B3

B3

B3

B3

B3

B3
S1

B2
S1 S1 S1 S1 S1 S1 S1 S1

B2
S1 S1 S1 S1

B2

B2

B2

B2

B2

B2

B2
B7

B7
B4
B4
C6 C6

B3
B3
D
C6 C2 C2 C2 C2 C2 C2 C2 C6
B4

B1 B1 B1 B1 C2 C2 B1 B1 B1 B4
E C6 C6

B4
B4

B3
B3
B2
S1 S1

B3

B3

B3

B3

B3

B3

B3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

B2
B2

B2

B2

B2

B2

B2

B2
F
C6 B4 C6 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 C6 B4 C6
G
S1 S1 S1 S1 S1 S1 S1
B2

S1 B3 S1 S1 S1 S1 S1 S1

B3

B3

B3

B3

B3

B3
B2
B2

B2

B2

B2

B2

B2

B2
B3
H B3 C6 C6

B4
C6 C2 C4 C6
B4

B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1

B4
I
B4

C6 C6

B3
B4
B3

B7

B7
J
B4

B2

B3

B3

B3

B3

B2

B2
B3

B3

B3
S1 S1 S1 S1 S1 S1 S1

B2
B2

B2

B2

B2

B2
S1 S1 S1 S1 S1 S1 S1

K C6 C6 B4
B4 C2 C2 C2 C2 C2 C2
B1 B1 B1 B1 C2 C2 B1 B1 B1 C2
L C4 B5 C4 C4 B5 C4
S1
B2

B3

B3

B3

B3

B3

B3

B3
S1 S1 S1 S1 S1 S1 S1 S1

B2
S1 S1 S1 S1 S1
B2

B2

B2

B2

B2

B2

B2
L

B7
B5 B3 B5 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 B5 B3 B5
M
CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1

CB2

CB1
CB1
CS CS CS CS CS CS CS CS CS CS CS CS CS CS
B6 B6
B5 B5
N
C4 C4 C4 C4

ROOFDECK FRAMING PLAN


SCALE 1:100M

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-7
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
ROOFDECK FLOOR LVL.

DEPTH
BEAM
50
7 SETS OF EXTRA TIES

Ah
AT BEAM-COLUMN
SCHEDULE OF COLUMN INTERSECTION
C1

3.50
0.80

Bh
ASPHALT TOPPING

0.80
FOUNDATION
25mm X1.2m X 25m STEEL PLATE TO
SECOND FLOOR

28-32MM VERT. BARS, 7 SETS


700MM
CANTILEVER SLAB
12MM CLOSED TIES SPACED @ 1@0.05
6@0.10, REST @ 0.150M O.C

Ah
FOURTH FLOOR LVL.
C2

DEPTH
BEAM
0.10

0.700

0.3

50
0.85

Ah
0.700
AM
RAMP BE
SECOND FLOOR 7 SETS OF EXTRA TIES
TO
ROOFDECK AT BEAM-COLUMN
24-32MM VERT. BARS, 7 SETS INTERSECTION

3.50
M CANTILEVER BEAM 12MM CLOSED TIES SPACED @
1@0.05, 4@0.15 REST @ .20M O.C

Bh
COLUMN

C3
0.60 7 SETS OF EXTRA TIES

.075.075.075.075
AT BEAM-COLUMN
INTERSECTION

0.60

Ah
FOUNDATION THIRD FLOOR LVL.

50
TO

DEPTH
SECOND FLOOR

BEAM
TYPICAL EXPANSION JOINT TIES: 24-25MM VERT. BARS, 7 SETS

50
12MM CLOSED TIES SPACED @
1@0.05, 4@0.10 REST @ .20M O.C
NOT TO SCALE

Ah
C4

3.50
0.50
7 SETS OF EXTRA TIES

Bh
AT BEAM-COLUMN
INTERSECTION

0.50

1.2Ld
SECOND FLOOR
TO
TIES: 20-25MM VERT. BARS, 7 SETS

Ah
ROOFDECK
12MM CLOSED TIES SPACED @
1@0.05, 4@0.10 REST @ .250M O.C
ELEVATION 2ND FLOOR LVL.

50
1

DEPTH
C5

BEAM
0.70 NOT TO SCALE 6 (OFFSET MAXIMUM)

50
EXPANSION JOINT (SEE DETAIL)

Ah
FOUNDATION
TO
1.32 SECOND FLOOR

4.20
TRANSITION TIES: 24 -25MM VERT. BARS,
5 SLOPE
12MM SPIRAL SPACED @ 1@0.05 7 SETS OF EXTRA TIES
6@0.05, 4@0.075M O.C AT BEAM-COLUMN

Bh
C6 INTERSECTION
0.90
FINISH GRADE LINE
0.60
LEGENDS:

Ah
5 SLOPE AM
TYPICAL SECOND LEVEL TO FOURTH LEVEL RAMP BE
SECOND FLOOR Ah = CONFINEMENT TIES GROUND FLOOR LVL

0.180

50
TO Bh = REGULAR TIE SPACING
ROOFDECK 1

DEPTH
4.20

BEAM
Ld = DEVELOPMENT LENGTH GB 6 (OFFSET MAXIMUM)

2.0 (MIN.)
TIES: 20-25MM VERT. BARS,

50
12MM SPIRAL SPACED @ 1@0.05
1.50 GROUND LEVEL 7 SETS OF EXTRA TIES
6@0.05, 4@0.075M O.C
TRANSITION NOTE:
AT BEAM-COLUMN

Ah
5 SLOPE
1.50 INTERSECTION
TRANSITION 1. SEE SCHEDULE OF COLUMNS
FOR NUMBER OF TIES PER SET.

50
5 SLOPE

2. NOT MORE THAN 13 OF FTB FTB


VERTICAL BARS SHALL BE
FOOTING
TYPICAL RAMP DETAIL SPLICED AT ONE LOCATION.
3. CONSTRUCTION JOINT OF
NOT TO SCALE COLUMN SHALL BE LOCATED
AT MIDHEIGHT OF FLOOR. TYPICAL COLUMN ELEVATION
NOT TO SCALE

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-8
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
R.C BEAM

12MM CLOSED TIES COLUMN


@ 100MM O.C BEAM REBARS
REBARS
R.C BEAM
SCHEDULE OF BEAMS 0
8-12MM VERT.
BARS (TOTAL)
10

BEAM CROSS SUPPORT MIDSPAN


BEAM SECTION SIDE BARS STIRRUPS
MARK BOTTOM BARS
Width Depth TOP BARS BOTTOM BARS TOP BARS

FOOTING TIE BEAM

4-leg 12MM @ 0.05, 4@ 0.15


FTB 500 700 4-25mm 4-25mm 4-25mm 6-25mm 4-16mm rest @ 0.250M O.C R.C BEAM 5-12MM VERT.
EXTERIOR BARS (TOTAL)
SECOND & ROOFDECK FLOOR BEAM COLUMN

GB1 500 700 8-25mm 8-25mm 8-25mm 8-25mm 4-16mm 4-leg 12MM @ 0.05, 4@ 0.15 LINE OF BEAM
rest @ 0.20M O.C
4-16mm 4-leg 12MM @ 0.05, 4@ 0.15 EXTERIOR
GB2 500 700 4-32mm 4-32mm 4-32mm 4-32mm rest @ 0.20M O.C COLUMN LINE OF BEAM R.C BEAM
4-leg 12MM @ 0.05, 4@ 0.15 12MM CLOSED TIES
B1 500 700 6-32mm 6-32mm 6-32mm 6-32mm 4-16mm @ 100MM O.C
rest @ 0.20M O.C EDGES OF COLUMN
REBARS
B2 500 700 7-32 mm 7-32mm 7-32mm 7-32mm 4-16mm 4-leg 12MM @ 0.05, 4@ 0.15
rest @ 0.150M O.C
4-16mm 2-leg 12MM @ 0.05, 4@ 0.15 BEAMS REBARS
B3 300 400 3-25mm 3-25mm 3-25mm 3-25mm rest @ 0.250M O.C
B4 400 700 7-20mm 7-20mm 7-20mm 7-20mm 4-16mm 4-leg 12MM @ 0.05, 4@ 0.15
rest @ 0.250M O.C
B5 400 700 5-25mm 5-25mm 5-25mm 5-25mm 4-16mm 4-leg 12MM @ 0.05, 4@ 0.15
FOR BEAM WIDTH LESS THAN
rest @ 0.250M O.C
B6 2-10mm 2-leg 10MM @ 0.05, 4@ 0.15
COLUMN DIMENSION
200 700 2-16mm 2-16mm 2-16mm 2-16mm rest @ 0.200M O.C
B7 300 500 3-20mm 3-20mm 3-20mm 3-20mm 2-16mm 2-leg 12MM @ 0.05, 4@ 0.15

CB1 400 700 5-25mm 2-25mm 5-25mm 2-25mm


rest @ 0.250M O.C
2-16mm 4-leg 12MM @ 0.05, 4@ 0.15
TYPICAL INTERIOR BEAM TO
rest @ 0.250M O.C
CB2 300 400 3-25mm 2-25mm 3-25mm 2-25mm 2-16mm 2-leg 12MM @ 0.05, 4@ 0.15
rest @ 0.250M O.C
COLUMN JOINT DETAIL
NOT TO SCALE

R.C BEAM COLUMN REBARS

BEAMS REBARS
12-12MM VERT.
CONFINEMENT TIES @
BARS (TOTAL) LINE OF BEAMS COLUMN TO BEAM JOINT

12MM CLOSED 12MM CLOSED


SCHEDULE OF SLAB (GROUND FLOOR TO ROOFDECK LEVEL)

0
10
R.C BEAM TIES @ 100MM O. C
TIES
SHORT SPAN (MM) LONG SPAN (mm)
(SPACING) (SPACING)
SLAB THK BAR BOTTOM BOTTOM REMARKS R.C BEAM
MARK (MM) (dia) BARS TOP BARS BARS TOP BARS

S1 180 12MM 100 100 100 100

45.
00
EDGES OF

m
CS 180 12MM 200 100 200 100 INTERIOR
COLUMN COLUMN 12MM VERT. BARS
(TYPICAL)

FOR BEAM WIDTH LESS THAN


COLUMN DIMENSION

TYPICAL INTERIOR BEAM TO TYPICAL BEAM TO COLUMN JOINT


COLUMN JOINT DETAIL ELEVATION DETAIL
NOT TO SCALE NOT TO SCALE

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-9
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
1 3 4 5 6 1 2 3 4 5 6
PEDESTRIAN LANE
CAR RAMP 6" THK CHB RAMP WALL
SEE DETAIL
C6 12MM RSB
@ 250 O.C BOTH
C B4 VERT. & HOR.

1.00
B7
B4
ROOFDECK FFL
C6

5.00
B3
D SIDE
WALK

C6
B4 12MM RSB

3.30
E C6 @ 400 BOTHWAYS SPIRAL RAMP
B4

B3
7-20MM TOP BEAM

F 4TH FLR FFL BEAM

200
BARS
S2 SIDE
WALK

C6 B4 C6 4-16MM SIDE

10.00
G SEE DETAIL

3.30
BARS SPIRAL RAMP

S1 BEAM

B3 3RD FLR FFL BEAM

H C6
7-20MM BOTTOM B-4 B-4 WALK
C6
B4

SIDE
BARS
I
B4

3.30
SPIRAL RAMP
C6
RAMP DETAIL
B3

B7

J
B4

5.00

BEAM
2ND FLR FFL BEAM

K C6 NOT TO SCALE SIDE


WALK

B4

4.20
SPIRAL RAMP

BEAM
GROUND FLR FFL BEAM

0.40
NGL

TYPICAL 2ND TO ROOFDECK


RAMP FRAMING PLAN 6 RAMP ELEVATIONSECTION
SCALE NOT TO SCALE
10.93 NOT TO SCALE
8.00 1.13
.90 2.00 2.00 2.00 2.00 2.03

50 x 75mm
C-PURLINS BAR SPACED
.90

C C-PURLINS SPACED
@ 0.60M O.C.

@ 0.60M O.C 50MM x 150MM


C - RAFTER
RAFTER
RAFTER

RAFTER

RAFTER
RAFTER
7.50

RIB TYPE ROOFING


W PRE-PAINTED RB
GUTTER (PNP BLUE)

A
.90

RAFTER DETAIL
NOT TO SCALE

ROOF FRAMING PLAN


NOT TO SCALE

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-10
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SHORT SPAN "S" SHORT SPAN "S" ADD 12 THE NO OF
BARS INTERRUPTED
NOTE: TOP BARS DISCONT. TOP BARS CONTINUOUS
@ OPENING PLUS

0
75
ALONG THE LONG ALONG THE SHORT SPAN
SPAN DIRECTION (SEE SCHEDULE) 1 (ONE) @ 75 O.C. 6h
PART OF BEND UP BARS

0
75
EXTENDED TO ADJACENT SLAB

T
ADD 1-16

T
L4
EACH FACE
OPEN EACH CORNER
PART OF STRAIGHT
FOR OPENINGS
BOTTOM BARS
TOP BARS DISCONT.

(TYP.)
750
ALONG THE SHORT SPAN
(SEE SCHEDULE)
LONG SPAN "L"

BEAM

BOTTOM BARS ALONG TYPICAL DETAIL OF SLAB CHANGE IN SLAB ELEVATION


THE SHORT SPAN
(SEE SCHEDULE) OPENING (UNFRAMED) (ONE-WAY SLABS)
A
NOT TO SCALE NOT TO SCALE
L4
SHORT SPAN "S"
PART OF BEND UP BARS
COL MIDDLE COL
STRIP STRIP STRIP EXTENDED TO ADJACENT SLAB
BOTTOM BARS ALONG THE LONG SPAN S4 S2 S4 2- 10 TIE BAR 6h
(SEE SCHEDULE) (CONTINUOUS)
PLAN
NOTES:
1. IF TOP BARS OF ADJACENT SLABS
DETAIL OF BEAM

h
1

T
DIFFER AT THEIR COMMON SUPPORT THE 6
NOT TO SCALE BEAM OR

T
SMALLER SPACING SHALL GOVERN.
WALL 45

TYPICAL ONE-WAY R.C. SLAB DETAIL BOTTOM BARS @


MIDDLE STRIP
6h

PART OF STRAIGHT
NOT TO SCALE BOTTOM BAR SHALL BE BOTTOM BARS
S5 S5
CUT-OFF W RATIO 1 OF 3
SHORT SPAN "A" = S SHORT SPAN "B" = S BEAM
BOTTOM BARS @ COLUMN STRIP @ DISTANCE S5 FROM THE FACE L5
L4 SPAN "A" *L4 SPAN "A" *L4 SPAN "A" SHALL BE SPACED 43 TIMES SUPPORTING MEMBER
OR L4 SPAN "B" OR L4 SPAN "B" THE MIDDLE STRIP
TOP BARS DISCONT. (TBD)
TOP BARS CONT. (TBC) SECTION "B" CHANGE IN SLAB ELEVATION
(TWO-WAY SLABS)
2 010 TIE BARS
2 010 TIE BARS
NOT TO SCALE
SHORT CLEAR SPAN "S" SHORT CLEAR SPAN "S"
COL MIDDLE COL COL MIDDLE COL
BEAM OR BOTTOM BARS ALONG SHORT SPAN STRIP STRIP STRIP STRIP STRIP STRIP
WALL BOTTOM BARS (BB)
BOTTOM BARS ALONG THE LONG SPAN DIRECTION S4 S2 S4 S S S
SEE SCHEDULE 4 2 4
SPAN "A" SPAN "B"
* WHICHEVER IS LARGER GOVERN.

SECTION "A"
A

STRIP
LONG CLEAR SPAN "L"
STRIP

COL
100

COL

L4
L4
LONG CLEAR SPAN "L"
150

MIDDLE
STRIP
100 THK. CHB

MIDDLE
STRIP
150 THK. CHB WALL W/ 10 @

L2
WALL W/ 10 @ 600 EACH WAY
600 EACH WAY (TYPICAL)

STRIP
COL
NATURAL (TYPICAL) 3-10

L4
STRIP
GRADE LINE

COL
100 THK. SLAB

L4
ON GRADE W
300 10 @ 350
EACH WAY
750 (MIN.)

PLAN
3-10
100

fc' = 6000 psi


100

PLAN TYP. FRAMING PLAN OF TWO WAY SLAB


200

fy' = 60,00 psi (12 & LARGER)

10 @ 300 10 @ 300 fy' = 40,00 psi (10) SHOWING BOTTOM BAR REINFORCEMENT
400 300 TYP. FRAMING PLAN OF TWO WAY SLAB
100 100
SHOWING TOP BAR REINFORCEMENT
WF-1 DETAIL WF-2 DETAIL
NTS
TYPICAL TWO-WAY R.C. SLAB DETAIL
NTS
NOT TO SCALE
WALL FOOTING DETAIL
SCALE 1:100M

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR S-11
POLICE CHIEF INSPECTOR POLICE CHIEF SUPERINTENDENT
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
TOP BARS 6h 100 150100 THK
CHB WALL

150
BEAM DEPTH

BEAM DEPTH
25mm
10 @300
2-12
t3

t3

DETAIL AT DOOR OPENING


t3

BOTTOM BARS 6h NOT TO SCALE


10MM X 1000MM LONG @ 300MM O.C. 150
MAIN REINFORCEMENTS 150 150 150
TO BE CONTINOUS
CHANGE IN BEAM ELEVATION
SUSPENDED SLAB CONSTRUCTION NOT TO SCALE

JOINT DETAIL
2-12
NOT TO SCALE 2-12
PROVIDE SEALANT

350
300
25X75 WIDE 10 DOWELS

200

200
FLOOR SYTROPOR FLOOR @800 FOR 100THK CHB
LINE (TYP.) BEAM @600 FOR 150THK CHB 12 2-12 2-16
ON EXPOSED FACE WALL 2-16
RAKE PUT MORTAR 19
AND FILL WITH CAULKING 10 STIRR 1@50; 10 STIRR 1@50;
COMPOUND
REST @ 300 REST @ 300

MAX SPAN MAX SPAN MAX SPAN MAX SPAN


48 40D 48 1.20M 2.50M 3.50M 4.00M
LAP CONCRETE FILL ABOVE DOOR WINDOW OPENINGS ON CHB WALL
RC COLUMN (EXTEND 0.30M. FROM EDGES OF MASONRY OPENINGS)
13 t

t2

t3

OR RC WALL
t
t

MAIN REINFORCEMENTS PROVIDE SHEAR RODS


MAIN REINFORCEMENT CONTROL JOINT DETAIL LINTEL BEAM SCHEDULE
TO BE CONTINUOUS TO BE CONTINUOUS
AT SHEAR STRESS POINTS
WITH ENGINEERS APPROVAL CHB WALL INTERSECTION NOT TO SCALE
NOT TO SCALE
WITH FLOOR BEAMS
CLEAN CONSTRUCTION JOINT THOROUGHLY NOT TO SCALE
AND APPLY CLEAN CEMENT GROUT BEFORE
PLACEMENT OF ADJACENT CONCRETE

TYPICAL CONSTRUCTION JOINTS 75 75 WIDE X 25 THK


CONTROL JOINT CONCRETE BEAM STYROPOR (TYP)
NOT TO SCALE 10 @600
DOWELS OR SLAB
DOWELS PROVIDE SEALANT

25
75
RC SLAB OR BEAM

200
75 WIDE STYROPOR

25
PLASTER BOTTOM OF BEAM
4-10 CONT.BAR
WITH 10 STIRRUP 25X75 WIDE PLASTER
1@ 50 REST @250 150 THK CHB WALL STYROPOR
WITH 10 mm @ 600
O.C. EACHWAY (TYP.)
CHB THICKNESS X .40m
LINTEL BEAM WITH
10 X 900 LONG 4-16 BARS
DOWELS 10 X 900 LONG AND 10 STIRRUPS
@800 FOR 100THK CHB DOWELS @ 250 O.C.
@600 FOR 150THK CHB @800 FOR 100THK CHB 10 HORIZONTAL BARS
@600 FOR 150THK CHB @800 FOR 100THK CHB
@600 FOR 150THK CHB
SEE CONTROL
(TYP)

SEE CONTROL
450

JOINT DETAILS JOINT DETAILS 10 CONTINUOUS 10 VERTICAL BARS


BAR @800 FOR 100THK CHB
@600 FOR 150THK CHB
100

FINISH FLOOR LINE


CHB PLAN AT CORNER & INTERSECTIONS 10 DOWELS
RC SLAB @ 600 O.C. DOWELS
NOT TO SCALE 200

CONCRETE COLUMN
CONN. DETAIL 150 mm THK OR WALL

CHB WALL TO R.C. SLAB CHB WALL ELEVATION & TYPICAL CHB WALL SECTON
NOT TO SCALE LINTEL BEAM DETAIL NOT TO SCALE
NOT TO SCALE
NOT TO SCALE

PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS ABELARDO C MATILLANO ANTONIO A TAYLAN, JR S-12
POLICE CHIEF INSPECTOR POLICE SENIOR SUPERINTENDENT POLICE SENIOR SUPERINTENDENT POLICE CHIEF SUPERINTENDENT
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2 6 2 6 2 6 2 6 2 6
8.00 8.00 8.00 8.00 8.00

K 12 13 14 15 16 17 18 19 20 11 12 13 14 15 16 17 18 19
DN
11 12 13 14 15 16 17 18 19
DN
11 12 13 14 15 16 17 18 19
DN
11 12 13 14 15 16 17 18 19
DN
11 10 10 10 10
10 9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
4.50

UP UP UP UP

0.30
0.30 0.30 0.30 0.30
1.45 2.40 TREAD
1.45 2.40 TREAD 1.45 4.80 TREAD 1.45 4.80 TREAD TREAD
STAIR STAIR STEPS 1.45 2.40
STAIR STAIR STEPS STAIR STAIR STEPS STAIR STAIR STEPS STAIR STAIR STEPS
LANDING
L LANDING LANDING LANDING LANDING
2.50

W1

GROUND FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR ROOF DECK FLOOR

ROOFDECK FLR FFL


18
RISER
0.18

17

14
15
16
STAIR DETAIL PLAN
13
12
LANDING
11 NOT TO SCALE

3.50
9
8
7
6
5
4
3
2
1
19 FOURTH FLR FFL
18
RISER
0.18

17
16
15
13
14 B2- SEE
11
12 STRUC. DET.
LANDING
3.50

9
8
7 0.30 M 0.05
6
5 TREAD
4 2" STAINLESS

0.1
3

HT. OF HANDRAIL
HANDRAIL

25
2
1

0.90M

0.18 M
THIRD FLR FFL

RISER
19
18
RISER
0.18

17
16
15
14 SQUARE BAR GRILLS
13 PAINTED FIN.
12
11 FLR. FIN. 1-10MM NOZING BAR W/
LANDING 10
SEE STEPS 10MM TIES @ 300 MM.O.C.
3.50

9
8 FLOOR TILE 12MM @ 100 MM. O.C.
7 DETAIL
6 FIN. BOTT. BARS (TYP.)
12MM @ 100 MM. O.C. 5
BOTT. BARS (TYP.) 4
3
2 10MM @ 300 MM. O.C.
10MM @ 300 MM. O.C. 1
TEMP. BARS (TYP.) SECOND FLR FFL TEMP. BARS (TYP.)
20 CONCRETE STAIR

0. 18 M
RISER
19
17
18 SEE STRUC. DET.
16
15 0.30 M
0.05
14 TREAD
13
5
2

12
0.1

LANDING 11
2" NON-SLIP
10
STEPS D E T A IL
4.20

9 BRASS NOZING
8
7 0.30
6 TREAD
5 NOT TO SCALE
4
RISER
0.19

3
2
1

0.05
10MM @ 300MM. O.C. GROUND FLR FFL
HOR. BARS E.F. (TYP.)
.60

12MM @ 300MM. O.C. NGL


VERT. BARS E.F. (TYP.)
.20 .70

4-10MM TEMP. BARS


SPACED AS SHOWN
12MM @ 250MM. O.C.
BOTHWAYS
1.45 2.40
.80 TYPICAL HANDRAIL DETAIL
LANDING STEPS WIDTH
NOT TO SCALE
STAIR ELEVATION
NOT TO SCALE
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

CONSTRUCTION OF MULTI-LEVEL PARKING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
S-13
LOCATION: PNP GRANDSTAND, CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE

You might also like