SOL&CAFE
PROYECTO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE
BELLAVISTA JAN- CAJAMARCA."
FECHA Jul-17 UBICACIN REGION: CAJAMARCA
PROVINCIA: JAEN
DISTRITO: BELLAVISTA
CASERIO: SAN AGUSTIN
PLANILLA DE METRADOS
COMEDOR Y HABITACIONES
Item DESCRIPCIN Und. Cantidad L A H METRADO TOTAL
01.00.00 ESTRUCTURAS
01.01.00 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL M2 267.19
AREA A CONSTRUIR 1 23.75 11.25 267.19
01.04.05.00 VIGAS
DESCRIPCIN Und. Cantidad L A H NPISOS METRADO TOTAL
01.04.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 35.74
VP- 1A - 101 2 7.00 0.30 0.60 2.00 5.04
2 1.90 0.30 0.40 2.00 2.66
2 1.00 0.30 0.40 2.00 1.40
VP- 1A - 102 2 6.80 0.30 0.45 2.00 3.67
2 1.90 0.30 0.40 2.00 2.66
2 1.00 0.30 0.40 2.00 1.40
VP- 1A - 103 2 6.85 0.30 0.45 2.00 3.70
2 1.90 0.30 0.40 2.00 2.66
2 1.00 0.30 0.40 2.00 1.40
VS- 1A - 101 2 19.65 0.30 0.35 2.00 8.25
2 1.00 0.30 0.35 2.00 1.30
2 0.80 0.30 0.35 2.00 1.04
VL- 1A - 105 1 4.15 0.15 0.45 2.00 0.56
DESCANSO
Tramo paso 01 1 2.40 1.20 0.15 0.43
ESCALERA TIPO U
Tramo 01
Pasos 8 1.20 Area = 0.045 0.45
losa 1 2.50 1.20 0.15 0.45
DESCANSO
Tramo paso 01 1 2.40 1.20 0.15 0.43
TRAMO 02
Pasos 8 1.20 Area = 0.045 0.43
losa 1 2.50 1.20 0.15 0.45
TRAMO 02
Pasos 8 1.20 Area = 0.045 0.43
losa 1 2.50 1.20 0.15 0.45
01.05.02 TARRAJEOS
DESCRIPCION Und. Cantidad L A H METRADO TOTAL
01.05.02.01 TARRAJEO DE COLUMNAS E=1.5CM MEZCLA 1:5 M2 246.95
Igual a encofrado en columnas 1 Area = 246.95 246.95
2 do Piso
V-9 1 3.40 1.65 5.61
V-10 1 2.10 1.65 3.47
V-11 6 2.50 1.65 24.75
V-12 1 2.45 1.65 4.04
V-13 2 3.40 1.65 11.22
V-14 2 3.00 1.65 9.90
V-15 1 2.75 0.75 2.06
V-16 1 2.35 0.75 1.76
V-17 1 2.95 1.65 4.87
V-18 1 0.65 0.75 0.49
V-19 2 3.20 1.65 10.56
V-20 1 2.50 0.75 1.88
V-21 1 1.80 0.75 1.35
01.05.05 CERRAJERA
DESCRIPCION Und. Cantidad L A H METRADO TOTAL
01.05.05.01 BISAGRA CAPUCHINA DE 4"X4" UND 18.00
P-1 2 Unidades = 6 12.00
P-2 1 Unidades = 6 6.00
01.05.07 PINTURA
DESCRIPCION Und. Cantidad L A H METRADO TOTAL
01.05.07.01 PINTURA LATEX EN COLUMNAS M2 246.95
Igual a terrajeo en columnas 1 Area = 246.95 246.95
SEGUNDO PISO
Salida para lavatorio 5 5.00
Salida para inodoro 5 5.00
Salida para urinario 1 1.00
01.06.00 VARIOS
DESCRIPCIN Und. Cantidad L A H METRADO TOTAL
01.06.00 LIMPIEZA FINAL DE OBRA M2 267.19
GENERAL 1.00 23.75 11.25 267.19
RCA
STA
USTIN
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
Falza Zapata
Falza Zapata
Falza Zapata
Falza Zapata
Falza Zapata
Falza Zapata
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
MURO BAJO
MURO ALTO
MURO ALTO
MURO BAJO
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
debajo de la escalera
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
Pasamano h=1.20m
OBSERVACIONES.
Pasamano h=1.20m
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
Secadora y Saranda
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
Secadora y Saranda
OBSERVACIONES.
Secadora y Saranda
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
OBSERVACIONES.
PLANILLA DE METRADO DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DIS
BELLAVISTA JAN- CAJAMARCA."
26.88
26.88
0.00
22.43
22.43
0.00
14.73
14.73
0.00
13.05
13.05
34.80
39.00
A DE METRADO DE ACERO
OR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE
LAVISTA JAN- CAJAMARCA."
59.46
59.20
EJE A-A , EJE C-C, EJE D-D, EJE E-E 1.00 0.25 8.00 0.25 5/8 8.50 3.00 25.50
Estribos 0.30
1.00 3/8 1.90 42.00 79.80
0.65 0.65
4@0.07, Resto @0.20c/e
0.30
LONGITUD TOTAL POR EN ML. 0.00 105.30 17.00 25.50 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 58.97 16.90 39.58 0.00
PESO TOTAL EN KG. 115.44
EJE 1-1, EJE 3-3 1.00 0.25 20.15 0.25 5/8 21.25 3.00 63.75
0.65 0.65
4@0.07, Resto @0.20c/e
0.25
LONGITUD TOTAL POR EN ML. 0.00 322.95 42.50 63.75 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 180.85 42.25 98.94 0.00
PESO TOTAL EN KG. 322.04
CORTE 3-3 1.00 0.15 5.35 0.15 1/2 5.65 2.00 11.30
Estribos 0.15
1.00 3/8 1.30 35.00 45.50
0.50 0.50
4@0.07, Resto @0.20c/e
0.15
LONGITUD TOTAL POR EN ML. 45.50 0.00 22.60 0.00 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 11.38 0.00 22.46 0.00 0.00
PESO TOTAL EN KG. 33.84
ESTRIBOS EN VIGAS DE CIMENTACION
EJE A-A , EJE C-C, EJE D-D, EJE E-E
TRAMO 1-2
TRAMO A-B
TRAMO C-D
3.40 m
3.75 m
3.90 m
4.15 m
PLANILLA DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
12.45 12.45
0.00 0.00
Estribos 0.30
0 3/8 1.60 81.00 129.60
1.00 0.50 0.50
1@.05, 8@.10, R@.20
0.30
Estribos 0.30
0 3/8 0.90 81.00 72.90
1.00 0.15 0.15
1@.05, 8@.10, R@.20
0.30
LONGITUD TOTAL POR EN ML. 0.00 202.50 50.60 75.90 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 113.40 50.30 117.8 0.00
PESO TOTAL EN KG. 281.49
C1
1.00 5/8 9.30 6.00 55.80
9.10 9.10
0.00 0.00
Estribos 0.30
0 3/8 1.60 58.00 92.80
1.00 0.50 0.50
1@.05, 8@.10, R@.20
0.30
Estribos 0.30
0 3/8 0.90 58.00 52.20
1.00 0.15 0.15
1@.05, 8@.10, R@.20
0.30
LONGITUD TOTAL POR EN ML. 0.00 145.00 37.20 55.80 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 81.20 36.98 86.6 0.00
PESO TOTAL EN KG. 204.78
C2
1.00 5/8 12.65 6.00 75.9
12.45 12.45 0
Estribos 0.30
0 3/8 1.40 81.00 113.40
1.00 0.40 0.40
1@.05, 8@.10, R@.20
0.30
LONGITUD TOTAL POR EN ML. 0.00 113.40 25.30 75.90 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 63.50 25.15 117.8 0.00
PESO TOTAL EN KG. 206.45
C2
1.00 5/8 9.30 6.00 55.8
9.1 9.10 0
Estribos 0.30
0 3/8 1.20 81.00 34.00
1.00 0.30 0.30
1@.05, 8@.10, R@.20
0.30
LONGITUD TOTAL POR EN ML. 0.00 34.00 50.60 50.60 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 19.04 50.30 78.5 0.00
PESO TOTAL EN KG. 147.87
C4
1.00 1/2 12.65 4.00 50.60
0.00
12.45 12.45 1/2 12.65 4.00 0.00
0.00
1.00 0.00
0.2 0.2
Estribos 0.15
0
0.00 0.40 0.40 3/8 1.10 81.00 89.10
1@.05, 8@.10, R@.20
0.15
LONGITUD TOTAL POR EN ML. 0.00 89.10 50.60 0.00 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 49.90 50.30 0.0 0.00
PESO TOTAL EN KG. 100.19
0.00
C5 1.00 1/2 6.40 3.00 19.20
0.00
6.20 6.20 1/2 6.40 3.00 0.00
0.00
1.00 0.00
0.2 0.2
Estribos 0.15
0
0.00 0.40 0.40 3/8 1.10 34.00 37.40
1@.05, 8@.10, R@.20
0.15
LONGITUD TOTAL POR EN ML. 0.00 37.40 19.20 0.00 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 20.94 19.08 0.0 0.00
PESO TOTAL EN KG. 40.03
PLANILLA DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
0.00
2.00 5/8 6.80 2.00 27.20
Estribos 0.25
0
2@.05, 4@.10, 3@.15, 2.00 0.25 0.25 3/8 1.00 63.00 63.00
R@.25
0.25
LONGITUD TOTAL POR EN ML. 0.00 63.00 0.00 81.60 0.00
PESO EN KG/ML. 0.250 0.560 0.994 1.552 2.235
PESO TOTAL POR EN KG. 0.00 35.28 0.00 126.6 0.00
PESO TOTAL EN KG. 161.92
PLANILLA DE ACERO
PEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
0.00
3.970
0.00
281.49
0.00
3.970
0.00
204.78
0.00
3.970
0.00
206.45
PLANILLA DE ACERO
PEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
0.00
3.970
0.00
138.91
0.00
3.970
0.00
147.87
0.00
3.970
0.00
100.19
0.00
3.970
0.00
40.03
PLANILLA DE ACERO
PEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
0.00
3.970
0.00
161.92
ESTRIBOS EN COLUMNAS
COLUMNA C1
ESTRIBOS EN COLUMNA 26 26
COLUMNA C2
ESTRIBOS EN COLUMNA 22 21
COLUMNA C3
ESTRIBOS EN COLUMNA 25 21
COLUMNA C4 (15x25)
RESTO DE ESTRIBOS 19
ESTRIBOS EN COLUMNA 19
PLANILLA DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
5.00 0.00
1.00 3/4 5.00 2.00
5.70 0.00
1.00 5/8 5.70 2.00
5.70 0.00
1.00 1/2 5.70 1.00 5.70
7.60 0.00
1.00 3/8 7.60 2.00 15.20
11.75 0.00
1.00 0.20 0.20 3/4 12.15 3.00
0.00
1.00 0.20 7.80 0.20 3/4 8.20 3.00
1.00 5/8 8.20 1.00
Estribos 0.30
1@0.05, 10@0.13, Resto @0.26 1.00 0.45 0.45 3/8 1.50 42.00 63.00
c/e
0.30
Estribos 0.30
1@0.05, 10@0.13, Resto @0.26 1.00 0.35 0.35 3/8 1.30 19.00 24.70
c/e
0.30
LONGITUD TOTAL POR EN ML. 0.00 102.90 5.70
PESO EN KG/ML. 0.250 0.560 0.994
PESO TOTAL POR EN KG. 0.00 57.62 5.67
PESO TOTAL EN KG. 266.63
2.25
VP- 1A - 102 1.00 0.25 0.25 5/8 2.75 2.00
1.30
1.00 0.25 0.25 5/8 1.80 2.00
4.50 0.00
1.00 5/8 4.50 1.00
5.60 0.00
1.00 5/8 5.60 2.00
2.00 0.00
1.00 1/2 2.00 1.00 2.00
11.75 0.00
1.00 0.20 0.20 5/8 12.15 2.00
0.00
1.00 0.20 7.80 0.20 5/8 8.20 3.00
1.00
Estribos 0.30
1@0.05, 8@0.10, Resto @0.25 1.00 0.45 0.45 3/8 1.50 46.00 69.00
c/e
0.30
Estribos 0.30
1@0.05, 8@0.10, Resto @0.25 1.00 0.35 0.35 3/8 1.30 19.00 24.70
c/e
0.30
LONGITUD TOTAL POR EN ML. 0.00 93.70 2.00
PESO EN KG/ML. 0.250 0.560 0.994
PESO TOTAL POR EN KG. 0.00 52.47 1.99
PESO TOTAL EN KG. 168.84
PLANILLA DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
5.80 0.00
1.00 5/8 5.80 1.00
3.05 0.00
1.00 5/8 3.05 2.00
11.75 0.00
1.00 0.20 0.20 5/8 12.15 2.00
0.00
1.00 0.20 7.80 0.20 5/8 8.20 3.00
1.00
Estribos 0.30
1@0.05, 8@0.10, Resto @0.25 1.00 0.45 0.45 3/8 1.50 46.00 69.00
c/e
0.30
Estribos 0.30
1@0.05, 8@0.10, Resto @0.25 1.00 0.35 0.35 3/8 1.30 19.00 24.70
c/e
0.30
LONGITUD TOTAL POR EN ML. 0.00 93.70 0.00
PESO EN KG/ML. 0.250 0.560 0.994
PESO TOTAL POR EN KG. 0.00 52.47 0.00
PESO TOTAL EN KG. 160.96
1.25
VS- 1A - 101 1.00 0.25 0.25 5/8 1.75 2.00
0.95
1.00 0.25 0.25 5/8 1.45 2.00
13.15 0.00
1.00 1/2 13.15 1.00
11.50 0.00
1.00 1/2 11.50 1.00
25.15 0.00
1.00 0.20 0.20 5/8 25.55 2.00
0.00
1.00 0.20 23.05 0.20 5/8 23.45 3.00
1.00
Estribos 0.25
1@0.05, 8@0.10, Resto @0.25 1.00 0.35 0.35 3/8 1.25 120.00 150.00
c/e
0.30
Estribos 0.25
1@0.05, 8@0.10, Resto @0.25 1.00 0.35 0.35 3/8 1.25 15.00 18.75
c/e
0.30
LONGITUD TOTAL POR EN ML. 0.00 168.75 0.00
PESO EN KG/ML. 0.250 0.560 0.994
PESO TOTAL POR EN KG. 0.00 94.50 0.00
PESO TOTAL EN KG. 331.18
VL- 1A - 105 4.70 0.00
1.00 0.20 0.20 5/8 5.10 4.00
0.00
1.00 0.20 4.70 0.20 1/2 5.10 2.00
1.00
Estribos 0.15
5.50
3.60
10.00
11.40
0.00
36.45
0.00
24.60
8.20
28.70 71.05
1.552 2.235
44.54 158.80
266.63
5.50
3.60
4.50
11.20
0.00
24.30
24.60
73.70 0.00
1.552 2.235
114.38 0.00
168.84
PLANILLA DE ACERO
SPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE BELLAVISTA JAN-
CAJAMARCA."
5.50
3.60
5.80
6.10
0.00
24.30
24.60
69.90 0.00
1.552 2.235
108.48 0.00
160.96
3.50
2.90
13.15
11.50
0.00
51.10
70.35
152.50 0.00
1.552 2.235
236.68 0.00
331.18
0.00
20.40
10.20
30.60 0.00
1.552 2.235
47.49 0.00
54.99
ESTRIBOS EN VIGAS
VP- 1A - 101
TRAMO 1-2
TRAMO 2-3
#REF!
TRAMO A-B y E-F
RESTO DE ESTRIBOS 7
3.10 m
3.80 m
2.75 m
PLANILLA DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE
BELLAVISTA JAN- CAJAMARCA."
2.2
Acero Negativo 0.15 2.35 26 61.10
D I M E T R O
3/4"
0.00
0.00
3/4"
0.00
0.00
3/4"
0.00
0.00
PLANILLA DE ACERO
"CONSTRUCCIN DE INFRAESTRUCTURA PARA COMEDOR HOSPEDAJE Y USOS MLTIPLES EN EL CASERIO. SAN AGUSTN, DISTRITO DE
BELLAVISTA JAN- CAJAMARCA."
ITEM DISEO DEL ACERO
01.01.04.07.02 ACERO f'y= 4200 KG/CM2, GRADO 60 D I M E T R O
ESCALERA UN TRAMO
UBICACIN FORMA LONG CANT. 3/8" 1/2" 5/8"
PRIMER TRAMO
2.5 0.9
Acero Principal Superior 3.8 9 34.20
0.4
0.8
Acero Principal Inferior 0.8 0.9 3.25 6 19.50
0.75
0.95
ESCALERA TIPO U
SEGUNDO TRAMO
2.55 1.2
Acero Principal Superior 4.95 9 44.55
1.2
1
Acero Principal Inferior 1 1.2 4.4 9 39.60
1.2
1.2
1.2
Acero Principal Inferior 0.5 1.7 6 10.20
1
Acero Principal Inferior 1 1.2 4.4 9 39.60
1.2
1.2
1.2
Acero Principal Inferior 0.5 1.7 6 10.20
CUARTO TRAMO
2.55 1.2
Acero Principal Superior 4.95 9 44.55
1.2
1
Acero Principal Inferior 1 1.2 4.4 9 39.60
1.2
1.2
1.2
Acero Principal Inferior 0.5 1.7 6 10.20
D I M E T R O
3/4" 1/4"
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00