Professional Documents
Culture Documents
Location :_________________________
PAHU No.________
Sl. No Description YES NO Remarks/Observation
\ Isolate the incoming source and apply LOTO.
Make sure that supply is not available at the i/p terminal of the equipment
2
4 Ensure Chilled water Inlet and Outlet valves are in fully open condition.
5 Check for any cable / wire colour change in the panel and rectify if so.
Ensure functioning of chilled water outlet line actuator by increasing the return
7 air temperature setting in front panel. Actuator top knob should be rotated and
shaft will be moved till the actuator is opened 100%
8 Check the condition of blower V-belt for any damage and replace if so
14 Check and tight all the electrical connections. Check the isolator connection also.
Check the dampers actuator are ease to open and close if required lubricate.
15
Check and Ensure all the dampers are open after P.M.
Check and Ensure the equipment is properly working after the completion of
16
Preventive Maintenance.
17 Ensure housekeeping after PM completed
Done by :
Inspected by :
Start Time :
End time :