3 Provide cap for all the Fire detectors inside the UPS room before cleaning work is carried out.
4 Check genral cleanliness and wipe clean the panel surface if necessary.
5 Check and ensure all the cooling fans for UPS are working
6 Check all the batteries connection tightness.
7 Visually inspect batteries for cracks, leaks or corrosion.
8 Check and ensure the double earthing of UPS, Battery rack and Distribution panel
9 Clean the switchboard surface to remove debris and dust.
11 Check and re-tighten any lose bolts and nuts in proper sequence.
Check and Record the batteries individual Voltage and total voltage (Note: Switch off the incomer supply to UPS before taking readings)
1 5 9 13 17 21 25 29 Remarks
12
2 6 10 14 18 22 26 30
3 7 11 15 19 23 27 31
4 8 12 16 20 24 28 32 Total Voltage :
Check and ensure the Voltage, load current of the Distribution board switches
DB - DB - DB - DB - DB - DB- DB-