You are on page 1of 3

NO: 0?

FAT DOC

TEST RECORD OF GENERATOR SET


( DATE : 26 APRIL 2017 )

COSTUMER PT BGP MITSUBISHI S16R-PTA


RH : ????

GENERATOR SET SPESIFICATION


MAKER AGGREKO U.K.LTD
SERIAL NO 1001379-01
MODEL NHC20/QST30G2
PRIME POWER 649 KW
COUNT. POWER 494 KW
MAX.CURRENT 2500 A
VERSION COUNTAINER
VOLT 380-440 V
SPEED 1500 RPM
FREQUENCY 50 HZ
POWER FACTOR 0.8 KW
YEAR 2008

ENGINE SPESIFICATION GENERATOR SPESIFICATION

MAKER : CUMMINS ENGINE CO.INC. U.S.A MAKER : STAMFORD


MODEL : QST30G2 MODEL & SERIAL No HC.I1634H2
FAMILY : 0573001GX03 SERIAL NO : 0249516/001
SERIAL NO : 37236362 BASE RATING KVA : 660 KVA
SO NO : 10839
REF NO : 3637516
CPL : 2969
PRIME OUTPUT : 768 KW BASE RATING KW : 528 KW
STAND BY OUTPUT : 697 KW TL : 0,84 (ISO 8528,3)
ROTATION : 1500 RPM AMPERE BR : 1002,8 A
ARRANGEMENT : V TYPE FREQUENCY : 50 HERTZ
CYL.No X BORE X STROKE : RPM : 1500 RPM
TOTAL DIPLACEMENT : 30 Ltr VOLTAGE : 380 V
STATIC INJECTION TIMING : 18,5 BTDC PHASE : 3
FUEL RATE : 425
INTAKE VALVE CLEARANCE : 0,43 mm
EXHAUST VALVE CLEARANCE : 0,81 mm
COMBUTION SYSTEM : DIRECT INJECTION POWER FACTOR : 0.80 PF
COMPRESSION RATIO : RATTING : BASE COUNTINUES
COOLING METHODE : RADIATOR EXCITATION VOLTAGE : 44 V
STARTING METHODE : ELECTRIC MOTOR,24 VDC X 1 EXCITATION CURRENT : 2,6 A
ENGINE CONTROL : ECM INSULATION CLASS : H
TURBO MODEL : AMBIENT TEMPRATURE : 27C
INJ PUM MODEL OR PART No : THERMAL CLASSIFICATION : 180 (H)
ENCLOSURE : IP23
STATOR WINDING : 311
STATOR CONECTION : SERIES STAR
ENGINE CONTROL TRIMMER SETTING AVR MODEL : STAMFORD
MODULE AVR TYPE : AS 440
MODEL : DSE RATED SPEED (@ NO LOAD): 1500 rpm MOUTING TYPE :
SERIES : 7510 RATE VOLTAGE : 400 V COOLING METHODE :
SN : WEIGHT :

Page 1|3
NO: 0? FAT DOC

LOAD TEST
SPEC/
STATUS
TIME (M)
OK/ NOT
LIMIT at
100%
LOAD (%) 0 25 50 75 100 110
OUTPUT (KW) OK
L1-L2 (V) OK
VOLTAGE OK
L1-L3 (V)
(PHASE TO PHASE)
L2-L3 (V) OK
L1-N (V) OK
VOLTAGE
GENERATOR

L2-N (V) OK
(PHASE TO NEUTRAL)
L3-N (V) OK
L1 (A) OK
LOAD CURRENT L2 (A) OK
L3 (A) OK
POWER FAKTOR OK
FREQWENCY (HZ) OK
BEARING GENERATOR (C) OK
SPEED (RPM) OK
LUB OIL PRESS (BAR) OK
AIR FILTER INDICATION (CHECK) OK
AMBIENT TEMP (C) OK
BREATHER (VISON) OK
VISUAL CHECK SMOKE
EXHAUST (VISION) OK
COOLING WATER TEMP (C) OK
BEFORE (C) OK
COOLING RADIATOR
AFTER (C) OK
BEFORE (C) OK
AIR COOLER (R)
AFTER (C)
1 (C)
2 (C)
3 (C)
AIR BEFORE CYL HEAD (R)
4 (C)
5 (C)
6 (C)
BEFORE (C) OK
AIR COOLER (L)
AFTER (C)
1 (C)
2 (C)
3 (C)
AIR BEFORE CYL HEAD (L)
4 (C)
ENGINE

5 (C)
6 (C)
1 (C)
2 (C)
3 (C)
CYL HEAD TEMP (R)
4 (C)
5 (C)
6 (C)
1 (C)
2 (C)
3 (C)
CYL HEAD TEMP (L)
4 (C)
5 (C)
6 (C)
EXH GAS TEMP BEF TC R (C)
(C)
(C)
(C)
EXH GAS CYL HEAD (R)
(C)
(C)
(C)
EXH GAS TEMP BEF TC L (C)
(C)
EXH GAS CYL HEAD (L) (C)
(C)

Page 2|3
NO: 0? FAT DOC

(C)
(C)
(C)
R (C) OK
EXH GAS TEMP AFT TC
L (C) OK
DC VOLTAGE (V) OK

PROTECTIVE DEVICE TEST


SETTING CHEK
ITEM RETUR UNIT SENSOR USED CONTROLER EXSEKUTOR METHOD TRIP SIGNAL LIST
ALARM
N TRIP
LO OIL PRESS LOW - - - (BAR) ? ECM ECM NA - -
LOP SENSOR LOSE
- - - - - - - - -
WIRE
CW HIGH TEMP - - - (C) ? ECM ECM - -
CW HIGH TEMP - - -
ENGINE

- - SIGNAL ECM ECM


LOSE WIRE
(RPM) GENERATOR FREQ ECM/ DSE NA Shut Down
OVER SPEED - - 1710
7510
ECM
(RPM) GENERATOR FREQ ECM/ DSE NA Shut Down
UNDER SPEED - - 1290
7510
ECM
PUSH SPEED PUSH
EMERGENCY STOP - - - - -
BUTTON CONTROL BUTTON
Shut Down

SETTING CHEK
ITEM RETUR UNIT SENSOR USED CONTROLER EXSEKUTOR METHOD TRIP SIGNAL LIST
ALARM
N
TRIP
ADJUST
UNDER VOLTAGE - - 318 (V) GENERATOR VOLTAGE DSE 7510 ECM NOMINAL SHUT DOWN
VOLTAGE
ADJUST
GENERATOR

OVER VOLTAGE - - 479 (v) GENERATOR VOLTAGE DSE 7510 ECM NOMINAL SHUT DOWN
VOLTAGE
UNDER GENERATOR ADJUST
FREQUENCY
- - 40 (HZ)
FREQUENCY
DSE 7510 ECM
SPEED
SHU TDOWN
GENERATOR SHUT DOWN
OVER FREQUENCY - - 55 (HZ) DSE 7510 ECM NA
FREQUENCY
OVER CURRENT - - 1146 (A) CT DSE 7510 ECM NA Shut Down

NOTE :

1. Unit hunting (ECM fail )..Replace from another unit. Fixed


2. ..Fixed
3. Unit history at exs unit 6 blangpidie 2 mw (M.O)-----Stand by at BWTC----Visual check, be equipped, PM 2000-----
comissioning test (26 April 2017)

TESTED BY CHECKED BY APPROVE BY

We do not facing risk,but manager it

Page 3|3

You might also like