Penawaran R-2

satuan vol Owner

Prelim

2.1.1. Pembersihan lokasi m2 12,099 12,099


2.1.2.Pekerjaan Galian Alat Berat m3 - -
2.1.3.Pekerjaan Galian Manual m3 3,230 4,075
2.1.4. Pekerjaan Urugan
Urugan tanah m3 14,527 13,695
Pasir urug m3 675 675
2.1.5. Pekerjaan Buang Tanah m3 3,230 3,230
2.1.6. Pekerjaan Lain-lain
Dewatering bln 4 4
Potong bore pile ttk 387 391
Sparing m1 60 60
Beli tanah bekas galian m3 (3,277) (3,277)
Penahan tanah ls - -
DAFTAR NO. 2.2. - PEKERJAAN BETON
Lantai kerja m3 337 337
fc 25 non flyash m3 1,925 2,057
fc 30 non flyash m3 1,992 2,111
fc 33 Pilecap fly ash 15% suhu maks 34 m3 2,613 2,829
fc 33 fly ash 15% m3 2,810 2,826
fc 33 non fly ash m3 9,139 8,979

fc 38 non fly ash m3 1,062 1,035


fc 42 non fly ash m3 3,294 3,720
Besi kg 4,121,064 4,011,200

Bekisting
Pile cap m2 2,291 2,419
tiebeam m2 2,649 2,597
sumpit m2 600 600
saluran m2 950 950
Dinding penahan tanah m2 6,095 7,193
Corewall m2 7,694 8,924
Kolom m2 10,151 11,778
Ddg GWT m2 949 1,079
Tangga m2 2,521 1,801
Ramp m2 3,413 3,580
pondasi genset, pompa, solar m2 1,450 1,450
Pelat m2 48,821 48,168
Drop panel m2 358 360
Sisi plat m1 7,052 7,052
Balok m2 21,667 29,017
Lain-lain m2 233 233
Dinding kolam renang m2 325 325
Lisplank m2 246 246
Waterstop m1 1,387 1,536
WP Integral m3 3,789 3,864
Grove ramp m2 1,192 1,192
Struting kg 48,729 45,098
DAFTAR NO. 2.3. - PEKERJAAN RANGKA BAJA
Baja ornamen kg 152,305 174,202

Total Struktur

DAFTAR NO. 3.1 - PEKERJAAN DINDING


Dinding celcon m2 17,586 19,063
Plaster aci m2 35,173 34,549
Cat acrylic emulsion m2 7,928 10,658
Cat acrylic enamel m2 4,185 8,092
Marble dinding m2 3,731 3,468
Cat acrylic enamel pd kolom m2 1,982 2,111
Mozaik glass import dinding m2 128 128
HT m2 2,056 2,402
Keramik dinding m2 440 1,125
Granit dinding m2 795 883
Stainless ls
Composite m2 189 189
Kaca m2 258 300
Andesite m2 48 51
DAFTAR NO. 3,2 - PEKERJAAN PINTU, JENDELA DAN KUNCI
Pintu besi
Pintu alumunium
Pintu kayu
Pintu cubicle
DAFTAR NO. 3.3 - PEKERJAAN LANTAI
Floor har+dust proof (Spek)/TATA tawarkan tanpa dustproof
m2 16,785 17,151
Floor hardener liquid m2 795 784
Dust proof m2 2,682 2,987
Screed ruang tenant m2 21,360 20,537
Keramik lantai m2 504 549
HT Lantai m2 1,088 1,213
Marble lantai m2 1,911 2,044
Granit lantai m2 1,970 2,015
Mozaik glass import lantai m2 192 207
Bangkirai floor m2 196 232
Andesite m2 426 426
Removable 6x25mm SS. m2 35 35
Skirting SS m1
skirting enamel m1 3,075 4,033
skirting ht m1 544 541
Skirting keramik m1 114 119
Skirting import granit m1 79 79
Step nosing m1 1,595 1,731
WP membrane m2 722 771
WP coating m2 1,526 3,108
DAFTAR NO. 3.4 - PEKERJAAN PLAFOND
Fair face plafond m2 598 617
gypsum m2 6,022 6,834
gypsum WR m2 770 905
calsiboard m2 557 541
Acoustic m2 19,082 18,896
plafond Stainless steel m2 2 31
plafond alumunium m2 12 31
metal roof deck m2 143 150
cat plafond emulsion m2 25,400 26,698
Cat plafond enaeml m2 1,494 1,352
cove SS m1 39 39
cove gypsum m1 5,200 3,301
insulation dak beton m2 1,054 1,559
DAFTAR NO. 3.5 : PEKERJAAN SANITAIR
Pasang sanitary ls
DAFTAR NO.3.6 - PEKERJAAN LUAR DAN LAIN-LAIN
Vanity HT m1 5 8
Vanity marble m1 5 7
Vanity granit m1 123 187
Cermin bh 52 52
Railing m1 466 595
cat parking ls
sersan siku m2 840 840
Grill gutter m1 32 32
Kasteen m1 332 698
Pek besi lain-lain
Wheel stoper bh 542 542
Corner guard
gutter perimeter bangunan m1 985 985
granit m2 308 319
Andesite m2 851 853
Paving block m2 4,252 4,269
Parkir motor lantai m2 901 911
Dinding bata perimeter m1 493 587
VCP m1 24 -
Koral sikat m2 68 76
Water Feature
Pekerjaan Security post/guard house (3 POST)
Gate & fence
Pekerjaan Signage Tower

Pekerjaan Gardu PLN (Provisional BQ)


Pekerjaan Gas house
Pekerjaan BIN Centre (Provisional BQ)
Air intake grill m2
Steel grill fin coated pada dinding genset m2
Air intake grille steel tube 40x60 m1
Grill bh 46 47
Gorong-gorong m1 261 261
pembersihan gorong m1 261 261

Total Finishing

KERTAM
Baja
Pintu besi unit 26
Pintu kayu unit 26
Pintu alumunium unit 1
Peninggian lantai m2 2,162
Floor hardener m2 50
Plafond gypsum m2 254
cat plafond m2 413
Cermin unit 24
Grill unit 33
Pek beton utk pondasi Bang penunjang (Gbr revisi)
Trench pipa gas klarifiaksi 30Nov06
Galian area struting m3
Anti rayap / jawaban pertanyaan m2

Wood Louver-1/jawaban pertanyaan unit Tidak jadi ditawarkan


Ss pada kolom GF m2 29
Dinidng bata bawah kaca R.Wudhu unit 23
WP coating 30cm pada dinding m2 Tidak jadi ditawarkan
Granit lobby hall m2 190
WP membrane podium m2 2,652
Partisi cubicle m2 374
Batu andesite pagar m2 102
Pasangan Bata area VCP m2 50

Total kertam

Prov sum

Biaya Koordinasi

Total penawaran

-
-
(1,200,652,526)
39,195,524
(445,138,860)
(68,956,599)
(112,090,050)
Beton 22,834 23,557
Besi 4,121,064 4,011,200
Bekisting 117,463 127,771
Granit & marmer 4,756 5,021
Stainless Steel 76 106
Penawaran R-2 Penawaran R-2 Rp 93.000.000.000
Jumlah Rupiah Jumlah Rupiah
Owner vol Owner Owner

8,255,000,000

20,930,716 20,930,716 12,099 12,099 20,930,716


- - - - -
74,295,060 93,725,000 3,230 4,075 74,295,060

159,796,780 150,645,000 14,527 13,695 416,633,786


96,436,461 96,436,461 675 675 96,436,461
52,006,542 52,006,542 3,230 3,230 52,006,542

230,000,000 230,000,000 4 4 230,000,000


37,578,550 37,951,150 387 391 41,549,500
14,570,100 14,570,100 60 60 14,570,100
- - (3,277) (3,277) -
- - - - -

156,074,000 156,074,000 337 337 156,262,972


1,042,862,172 1,114,514,154 1,925 2,004 1,051,583,011
1,126,960,440 1,194,420,774 1,992 2,039 1,134,828,050
1,508,567,774 1,633,577,760 2,613 2,829 1,479,490,538
1,551,540,018 1,560,291,120 2,810 2,826 1,551,540,018
5,225,588,506 5,151,320,525 9,139 8,899 5,314,049,380

633,088,825 616,766,850 1,062 1,035 648,992,803


2,002,325,882 2,261,574,000 3,294 3,720 2,070,041,681
22,459,800,435 21,861,038,256 4,121,064 4,153,012 22,459,800,435

94,296,737 99,566,040 2,291 2,419 94,296,737


109,020,080 106,892,520 2,649 2,597 109,020,080
36,567,000 36,567,000 600 600 39,948,000
49,392,000 49,392,000 950 950 49,392,000
478,032,419 564,146,990 6,095 7,193 490,649,110
603,401,205 699,909,320 7,694 8,924 619,326,750
758,755,108 880,377,843 10,151 11,778 536,965,153
76,596,624 87,107,670 949 1,079 81,834,000
202,915,198 144,997,058 2,521 1,801 245,564,560
253,181,533 265,564,400 3,413 3,580 314,002,440
117,058,500 117,058,500 1,450 1,450 116,725,000
3,621,571,452 3,573,128,203 48,821 48,168 3,790,005,282
42,880,112 43,060,890 358 360 42,880,112
104,648,712 104,648,712 7,052 7,052 109,514,454
1,749,151,884 2,342,542,410 21,667 29,017 1,744,168,545
18,285,628 18,285,628 233 233 18,718,665
25,467,790 25,467,790 325 325 26,139,960
21,235,986 21,235,986 246 246 21,235,986
103,681,240 114,823,475 1,387 1,536 103,681,240
370,369,863 377,706,000 3,789 3,864 370,369,863
250,955,312 250,955,312 1,192 1,192 250,955,312
340,780,255 310,614,210 48,729 45,098 335,394,015

1,514,423,754 1,707,109,774 152,305 174,202 1,513,594,314

47,335,090,651 48,187,000,136 47,837,392,631

1,661,028,349 1,800,500,350 17,586 19,063 1,612,138,367


1,309,829,449 1,286,604,760 35,173 34,549 1,309,829,449
95,455,342 128,322,320 7,928 10,658 101,005,071
77,805,056 150,430,280 4,185 8,092 82,408,906
1,697,994,929 1,540,491,888 3,731 3,468 1,697,994,929
32,948,153 35,084,820 1,982 2,111 34,890,944
115,804,160 115,804,160 128 128 115,804,160
573,026,502 669,346,530 2,056 2,402 573,026,502
45,708,124 118,243,635 440 1,125 45,708,124
855,258,420 950,420,392 795 883 855,258,420
351,745,667 639,565,626 351,745,667
143,884,717 143,884,717 189 189 143,884,717
263,676,863 353,843,954 258 300 263,676,863
14,561,760 15,471,870 48 51 14,561,760

1,037,293,390 1,059,431,960 1,037,293,390


153,626,720 106,675,410 164,128,960
623,979,660 452,948,270 623,979,660
268,885,590 232,652,780 268,885,590

194,369,026 198,611,012 16,785 17,151 194,369,026


30,838,050 30,428,428 795 784 30,838,050
104,046,034 115,883,453 2,682 2,987 104,046,034
- - 21,360 20,537 136,063,200
53,721,761 58,521,457 504 549 53,721,761
323,295,601 360,376,654 1,088 1,213 323,295,601
879,753,756 948,000,480 1,911 2,044 879,753,756
2,279,326,686 2,307,811,920 1,970 2,015 2,279,326,686
173,697,193 187,638,928 192 207 173,697,193
102,791,945 121,983,280 196 232 102,791,945
142,927,913 142,927,913 426 426 142,927,913
162,532,248 162,861,120 35 35 162,532,248
133,825,686 132,865,986 133,825,686
12,454,981 16,333,464 3,075 4,033 12,454,981
24,412,519 24,287,959 544 541 24,412,519
2,488,013 2,602,454 114 119 2,488,013
15,226,920 15,226,920 79 79 15,226,920
55,148,276 59,855,051 1,595 1,731 44,460,008
45,988,957 49,079,514 722 771 45,988,957
149,475,768 305,062,784 1,526 3,059 160,965,437

5,041,814 5,199,624 598 617 5,041,814


418,434,268 474,818,677 6,022 6,834 418,434,268
74,389,728 87,423,000 770 905 74,389,728
56,273,770 54,689,690 557 541 56,273,770
1,789,908,484 1,772,407,280 19,082 18,896 1,789,908,484
5,674,200 87,950,100 2 31 5,674,200
5,414,520 13,987,510 12 31 5,414,520
20,177,300 21,165,000 143 150 20,177,300
298,009,649 313,634,776 25,400 26,698 315,335,791
25,214,732 25,129,962 1,494 1,352 26,706,728
68,653,318 68,653,318 39 39 68,653,318
632,881,984 436,552,010 5,200 3,301 632,881,984
102,522,580 151,643,930 1,054 1,559 102,522,580

105,123,240 105,123,240 105,123,240

2,365,191 3,298,248 5 8 2,365,191


4,206,800 5,905,700 5 7 4,206,800
100,958,208 153,425,584 123 187 100,958,208
216,265,880 216,265,880 52 52 216,265,880
120,399,226 144,220,498 466 595 144,973,322
48,817,520 70,207,980 48,817,520
178,004,400 178,004,400 840 840 178,004,400
21,121,920 21,121,920 32 32 21,121,920
37,960,880 79,809,320 332 698 37,960,880
40,336,040 40,336,040 40,336,040
119,998,800 119,998,800 542 542 119,998,800

91,034,307 91,034,307 985 985 91,034,307


227,977,204 238,371,655 308 319 227,977,204
292,048,220 292,932,448 851 853 292,048,220
1,218,842,009 1,223,666,160 4,252 4,269 1,218,842,009
134,573,157 136,030,520 901 911 137,015,517
479,236,812 539,993,320 493 587 481,794,963
72,054,242 70,827,346 24 - 69,796,805
12,717,360 14,213,520 68 76 12,717,360
129,786,896 129,786,896 130,204,645
61,259,381 62,113,690 61,452,806
24,011,130 24,011,130 24,011,130
100,189,278 106,040,652 100,272,789

24,940,570 24,940,570 25,078,580


56,438,980 62,470,195 56,518,290
45,321,340 45,321,340 45,593,385
25,439,000 25,439,000 25,439,000
43,802,649 80,600,760 43,802,649
21,413,736 23,171,580 21,413,736
17,567,860 17,949,770 46 47 17,567,860
68,706,048 68,706,048 261 261 68,706,048
7,561,740 7,561,740 261 261 7,561,740

21,861,910,553 22,976,237,631 22,019,803,140

404,523,312
110,164,900 26
140,421,390 26
2,924,490 1
179,748,680 2,162
579,000 50
17,647,920 254
6,013,970 413
46,398,000 24
20,873,400 33
234,382,256
64,757,380
125,527,200
71,481,200

ak jadi ditawarkan Tidak jadi ditawarkan


57,592,230 29
13,083,320 23
ak jadi ditawarkan Tidak jadi ditawarkan
170,515,500 190
238,494,360 2,652
351,672,200 495
30,382,740 102
4,722,500 50

2,291,905,948

415,000,000 415,000,000 415,000,000

1,000,000,000

69,612,001,204 83,125,143,715 70,272,195,771


13,090,933,618 13,532,465,183
22,459,800,435 21,861,038,256
8,362,457,966 9,179,948,958
4,029,565,781 4,221,459,712
722,431,120 1,091,896,151
93.000.000.000
Jumlah Rupiah Selisih

8,410,000,000 (155,000,000)

20,930,716 -
- -
93,725,000 -
-
392,772,600 (242,127,600)
96,436,461 -
52,006,542 -
-
230,000,000 -
41,963,500 (4,012,350) harga standar upah tinggi 1 meter sedangkan BQ 0,9m
14,570,100 -
- -
- -
-
156,262,972 (188,972)
1,094,528,400 19,985,754
1,161,686,065 32,734,709
1,602,090,990 31,486,770
1,560,291,120 -
5,192,219,315 (40,898,790)

632,260,800 (15,493,950)
2,338,057,200 (76,483,200)
22,633,916,218 (772,877,962)

-
99,566,040 -
106,892,520 -
39,948,000 (3,381,000)
49,392,000 -
579,036,500 (14,889,510)
718,382,000 (18,472,680)
623,036,627 257,341,216
93,063,750 (5,956,080)
175,235,390 (30,238,332)
329,360,000 (63,795,600)
116,725,000 333,500
3,739,309,011 (166,180,808)
43,060,890 -
109,514,454 (4,865,742)
2,335,868,500 6,673,910
18,718,665 (433,037)
26,139,960 (672,170)
21,235,986 -
114,823,475 -
377,706,000 -
250,955,312 -
308,257,730 2,356,480

1,706,280,334 829,440

49,296,226,141 (1,109,226,005)

1,747,505,210 52,995,140
1,286,604,760 -
135,782,920 (7,460,600) Diskon cat oleh Pa Moko
159,331,480 (8,901,200) Diskon cat oleh Pa Moko
1,540,491,888 -
37,153,600 (2,068,780) Diskon cat oleh Pa Moko
115,804,160 -
669,346,530 -
118,243,635 -
950,420,392 -
639,565,626 -
143,884,717 -
353,843,954 -
15,471,870 -

1,059,431,960 -
224,439,770 (117,764,360)
452,948,270 -
232,652,780 -

198,611,012 -
30,428,428 -
115,883,453 -
130,820,690 (130,820,690)
58,521,457 -
360,376,654 -
948,000,480 -
2,307,811,920 -
187,638,928 -
121,983,280 -
142,927,913 -
162,861,120 -
132,865,986 -
16,333,464 -
24,287,959 -
2,602,454 -
15,226,920 -
48,254,564 11,600,487
49,079,514 -
309,326,736 (4,263,952) harga screed dari tebal 50mm ke 30mm

5,199,624 -
474,818,677 -
87,423,000 -
54,689,690 -
1,772,407,280 -
87,950,100 -
13,987,510 -
21,165,000 -
331,869,356 (18,234,580) Diskon cat oleh Pa Moko
26,616,942 (1,486,980) Diskon cat oleh Pa Moko
68,653,318 -
436,552,010 - pd gambar lantai 2 keatas tinggi bukan 1,55 tetapi 0,95
151,643,930 -

105,123,240 -

3,298,248 -
5,905,700 -
153,425,584 -
216,265,880 -
174,566,770 (30,346,272) harga dari sekina ke cipta
70,207,980 -
178,004,400 -
21,121,920 -
79,809,320 -
40,336,040 -
119,998,800 -
-
91,034,307 -
238,371,655 -
292,932,448 -
1,223,666,160 -
138,499,330 (2,468,810)
542,888,680 (2,895,360) Diskon cat oleh Pa Moko
68,640,310 2,187,036 Diskon cat oleh Pa Moko
14,213,520 -
130,204,645 (417,749)
62,316,660 (202,970) Diskon cat oleh Pa Moko
24,011,130 -
106,124,163 (83,511)

25,078,580 (138,010) Diskon cat oleh Pa Moko


62,543,325 (73,130) Diskon cat oleh Pa Moko
45,593,385 (272,045) Diskon cat oleh Pa Moko
25,439,000 -
80,600,760 -
23,171,580 -
17,949,770 -
68,706,048 -
7,561,740 -

23,237,353,966 (261,116,335)

404,523,312 -
110,164,900 -
140,421,390 -
2,924,490 -
183,661,900 (3,913,220)
579,000 -
17,647,920 -
6,366,670 (352,700) Diskon cat oleh Pa Moko
46,398,000 -
20,873,400 -
234,378,844 3,412
65,289,297 (531,917)
122,492,000 3,035,200
69,766,200 1,715,000
tidak jadi dimasukan pertimbangan Bp Hans & Bp Moko
- (minta dibuat di catatan penawaran)
57,592,230 -
13,112,070 (28,750)
-
170,515,500 -
238,494,360 -
465,448,500 (113,776,300) Volume revisi
30,382,740 -
4,583,500 139,000

2,405,616,223 (113,710,276)

415,000,000 -

1,000,000,000 -

84,764,196,330 (1,639,052,615)
(155,000,000)

-
-
- (4,263,952)

(242,127,600)
-
-

-
(4,012,350)

(188,972)
19,985,754
32,734,709
31,486,770
-
(40,898,790)

(15,493,950)
(76,483,200)
(772,877,962)

-
-
(3,381,000)
-
(14,889,510)
(18,472,680)
257,341,216
(5,956,080)
(30,238,332)
(63,795,600)
333,500
(166,180,808)
-
(4,865,742)
6,673,910
(433,037)
(672,170)
-
-
-
-
2,356,480

829,440

(1,109,226,005) ok

52,995,140
-
(7,460,600)
(8,901,200)
-
(2,068,780)
-
-
-
-
-
-
-
-

-
(117,764,360)
-

-
-
-
(130,820,690)
-
-
-
-
-
-
-
-
-
-
-
-

11,600,487
-
(4,263,952)

-
-
-
-
-
-
-
-
(18,234,580)
(1,486,980)
-
-
-

-
-
-
-
(30,346,272)
-
-
-
-
-
-

-
-
-
-
(2,468,810)
(2,895,360)
2,187,036
-
(417,749)
(202,970)
-
(83,511)
-
(138,010)
(73,130)
(272,045)
-
-
-
-
(261,116,335)

-
-
-
-
(3,913,220)
-
-
(352,700)
-
-
3,412
(531,917)
3,035,200
1,715,000

-
-
(28,750)
-
-
-
(113,776,300)
-
139,000

(113,710,276)

(1,639,052,615)
`1 33 12

DAFTAR HARGA BAHAN

No MATERIAL SATUAN

1 Pasir urug m3
2 Pasir Putih m3
3 Pasir Pasang biasa m3
4 Pasir Beton m3
5 Koral m3
6 Sirtu m3
7 Split m3
8 Lime stone m3
9 Macadam m3
10 Batu kali m3
11 Batu bata Press (karianto) bh
12 Batu batako tebal 10 cm bh
13 Celcon m3
14 Hebel m3
14 Semen ( Tiga Roda 50 Kg ) sak
15 Kayu Borneo Balok m3
16 Kayu Borneo Kaso m3
17 Papan terentang ( Borneo ) m3
18 Kayu Kamper Medan m3
19 Dolken 0 7 btg
20 Besi Beton Polos 8 mm kg
21 Besi Beton Polos 10 mm kg
22 Besi Beton Polos 12 kg
23 Besi Beton Polos 16 - 0 25 mm kg
24 Besi rata2 polos kg
25 Besi Beton Ulir 10 mm kg
26 Besi Beton Ulir 13 mm kg
27 Besi Beton Ulir 16 - 0 25 mm kg
28 Besi Beton Ulir 29 mm kg
29 Besi Beton Ulir 32 mm kg
30 Harga besi rata2 ulir kg
31 Kawat Beton kg
32 Paku kg
33 Paku Triplek kg
34 Multiplek 4 mm (4x8) lbr
35 Multiplek 6 mm (4x8) lbr
36 Multiplek 9 mm (4x8) lbr
37 Multiplek 9 mm (3x6) WBP lbr
38 Multiplek 12 mm (4x8) lbr
39 Multiplek 12 mm (4x8) film lbr
40 Multiplek 12 mm (4x8) WBP lbr
41 Multiplek 15 mm (4x8) lbr
42 Multiplek 15 mm (4x8) film lbr
43 Multiplek 15 mm (4x8) WBP lbr
44 Multiplek 18 mm (4x8) lbr
45 Multiplek 18 mm (4x8) film lbr
46 Concrete form work m2
47 Plastic concrete spacer bh
48 Tie rod bh
49 Form tie bh
50 Seng Gelombang 0,20 (3"x6") lbr
51 Seng Gelombang 0,25 lbr
52 Seng Gelombang 0,30 lbr
53 Herferin gln
54 Mould Oil ltr
55 Beton Readymix B0 m3
56 fc 25 non flyash m3
57 fc 30 non flyash m3
58 fc 33 Pilecap fly ash 15% suhu maks 34 m3
fc 33 fly ash 15% m3
59 fc 33 non fly ash m3
60 fc 38 non fly ash m3
61 fc 42 non fly ash m3
62 Besi BRC M4 (5.40 x 2.10) polos lbr
63 Besi BRC M5 (5.40 x 2.10) polos lbr
64 Besi BRC M6 (5.40 x 2.10) polos lbr
65 Besi BRC M7 (5.40 x 2.10) polos lbr
66 Besi BRC M8 (5.40 x 2.10) polos lbr
67 Besi BRC M9 (5.40 x 2.10) polos lbr
68 Besi BRC M10 (5.40 x 2.10) polos lbr
69 Besi BRC M4 (5.40 x 2.10) ulir lbr
70 Besi BRC M5 (5.40 x 2.10) ulir lbr
71 Besi BRC M6 (5.40 x 2.10) ulir lbr
72 Besi BRC M7 (5.40 x 2.10) ulir lbr
73 Besi BRC M8 (5.40 x 2.10) ulir lbr
74 Besi BRC M9 (5.40 x 2.10) ulir lbr
75 Besi BRC M10 (5.40 x 2.10) ulir lbr
76 Besi BRC M6- 200 lbr
77 Water stop Swellable Superstop m'
78 MU380 (Pasangan Celcon) zak
79 MU 100 (Plaster) zak
79 MU 301 (Plaster) zak
80 MU 200 (Acian) zak
81 MU 400 zak
82 MU 440 zak
83 MU 450 zak
84 MU 408 kg
84 AM Grout 50 (colour grout) kg
85 AM Grout 40 (cerama cement) kg
86 AM Grout 54 liter
87 AM 42 kg
88 AM 100 ltr mix
89 AM 30 ltr mix
90 Kawat ayam m2
91 Drymix Thinbed M111 zak
92 Drymix Render zak
93 Drymix Floor scread zak
94 Drymix tile adhesive zak
95 Drymix tile grout kg
96 PM100 zak
97 PM200 zak
98 PM300 zak
Uzin TB20 zak
Uzin plaster eco zak
Uzin SC50 zak
Uzin NC 301 zak
Uzin SC 100 zak
Uzin bond zak
Uzin grout zak
99 Step noosing 10x20 ex. Roman pc
100 Keramik Lantai 40x40 Gol B Rustic m2
101 Keramik dinding 30x30 ex. Roman Gol A m2
102 Keramik lantai 30x30 ex. Roman Gol C m2
103 Keramik lantai 45x45 ex Roaman Gol A m2
104 Keramik Lantai 20x20 ex Romangress m2
105 Stepnossing 10x30 Salt & Pepper Group B m1
106 Mozaik import glass primary multicolor m2
107 Batu Andesite 30x30 m2
108 Homogenous lantai 40x40 ex. Granito oasis Gold unpolish m2
109 Homogenous 60x60 ex.Essenza ermes unpolish m2
110 Homogeneous 60x60 ex.Essenza S White m2
111 Homogenous lantai 60x60 ex. Essenza Travertine polish m2
112 Homogenous lantai 60x60 ex. Essenza Travertine unpolish m2
Skirting HT 10x60 m1
113 Homogenous lantai 30x60 ex. Essenza Travertine Polish m2
Homogenous lantai 40x40 ex. Essenza Travertine unpolish m2

114 Cutting size 10x60 Granito m1


115 Keramik lantai 30x30 ex. Roman Gol B Rustic m2

ANALISA HARGA SATUAN

No. URAIAN ANALISA

PEKERJAAN STRUKTUR

I PEKERJAAN PERSIAPAN

1 Pagar sementara ( tinggi 1 tiang seng =1,83m )


Bahan : Dolken 1.510
Seng gelombang 1.075
Paku 0.060
Kaso (borneo) 0.008
Cat ( sisi luar saja ) 1.830
Upah : 1.000

2 Pasang Bowplank
Bahan : Kaso 0.005
Papan tarentang 0.008
Paku 0.200
Upah : 1.000
II PEKERJAAN TANAH

1 Galian tanah
Upah : 1.000

2 Urugan pasir padat


Bahan : Pasir urug 1.150
Upah : 1.000

4 Urugan Sirtu padat


Bahan : Sirtu 1.170
Upah : 1.000

5 Urugan Lime Stone


Bahan : Lime Stone 1.100
Upah : 1.000

6 Urugan Macadam
Bahan : Macadam 3-5 & 5-7 1.150
Pemadatan dengan mesin wales 1.100
Upah : 1.000
III PEKERJAAN PASANGAN

1 Aanstamping pondasi batu kali


Bahan : Batu kali 1.100
Upah : 1.000

2 Pasangan batu kali 1:2


Bahan : Batu kali 1.150
Semen 5.300
Pasir 0.420
Upah : 1.000

3 Pasangan batu kali 1:4


Bahan : Batu kali 1.150
Semen 3.260
Pasir 0.520
Upah : 1.000

4 Pasangan batu kali 1:5


Bahan : Batu kali 1.150
Semen 2.520
Pasir 0.560
Upah : 1.000

IV PEKERJAAN BETON

SITE MIX

1 Beton tumbuk 1:3:5


Bahan : Semen 4.000
Pasir beton 0.570
Split 0.850
Upah : 1.000

2 Beton tumbuk 1:2:3


Bahan : Semen 6.400
Pasir beton 0.540
Split 0.820
Upah : 1.000

3 Beton K 175
Bahan : Semen 6.000
Pasir beton 0.540
Split 0.850
Upah : 1.000

READY MIX

Bahan : Readymix B0 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Upah : 1.000

Bahan : Readymix fc 25 non fly ash 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

Bahan : Readymix fc 30 non fly ash 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

Bahan : Readymix Fc 33 fly ash 15% untuk pilecap 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

Bahan : Readymix Fc 33 fly ash 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

Bahan : Readymix Fc 33 non fly ash 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

Bahan : Readymix Fc 38 non fly ash 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

Bahan : Readymix Fc 42 non fly ash 1.040


Concrete Pump 1.000
Tip untuk sopir truck mixer 1.000
Alat bantu : Relat, Beton decking 1.000
Upah : 1.000

V PEKERJAAN BESI BETON

Besi beton U.24

Bahan: Besi beton U24 ( rata2 ) 105.000


Kawat beton 1.200
Upah: 100.000

1 Bahan: Besi beton 8mm 105.000


Kawat beton 1.200
Upah: 100.000

2 Bahan: Besi beton 10mm 105.000


Kawat beton 1.200
Upah: 100.000
3 Bahan: Besi beton 12mm 105.000
Kawat beton 1.200
Upah: 100.000

4 Bahan: Besi beton 13mm 105.000


Kawat beton 1.200
Upah: 100.000

Besi beton U.40

Besi beton ( Harga besi Rp. 4375 / kg untuk besi sejumlah 600.000 kg ) info Saat Rapat persi
Bahan: Besi beton U40 105.00
Kawat beton 1.20
Upah: 100.00

Bahan: Besi beton U40 ( rata2 ) harga TATA 105.00


Kawat beton 1.20
Upah: 100.00

Harga Satuan besi rata-rata


Harga besi Rp. 4375 / kg untuk besi sejumlah 600.000 kg 600,000
Harga besi Rp. 4450 / kg untuk besi sejumlah 3,000,000kg 4,400,000
Total besi 5,000,000
1 Bahan: Besi beton 10mm 105.000
Kawat beton 1.200
Upah: 100.000

1 Bahan: Besi beton 10mm ( untuk Bore Pile ) 105.000


Kawat beton 1.200
Upah: 100.000

2 Bahan: Besi beton 13mm 105.000


Kawat beton 1.200
Upah: 100.000

3 Bahan: Besi beton 16 ~ 25mm 105.000


Kawat beton 1.200
Upah: 100.000

Bahan: Besi beton 16 ~ 25mm ( untuk Bore Pile ) 105.000


Kawat beton 1.200
Upah: 100.000
4 Bahan: Besi beton 29mm 105.000
Kawat beton 1.200
Upah: 100.000

5 Bahan: Besi beton 32mm 105.000


Kawat beton 1.200
Upah: 100.000

3 Besi BRC
Bahan : BRC M3 x100x100mm 0.097
Kawat 1.000
Cakar ayam 1.000
Upah : 1.000

3 Besi BRC
Bahan : BRC M4 0.097
Kawat 1.000
Cakar ayam 1.000
Upah : 1.000

Besi BRC
Bahan : BRC M5 0.097
Kawat 1.000
Cakar ayam 1.000
Upah : 1.000

4 Besi BRC
Bahan : BRC M6 -150 0.097
Kawat 1.000
Cakar ayam 1.000
Upah : 1.000

5 Besi BRC
Bahan : BRC M7 0.097
Kawat 1.000
Cakar ayam 1.000
Upah : 1.000

5 Besi BRC
Bahan : BRC M8 0.097
Kawat 1.000
Cakar ayam 1.000
Upah : 1.000

VI PEKERJAAN BEKISTING

1 Pasangan Batako, Untuk Bekisting 0.080


Bahan : Batako 13.390
Semen 0.212
Pasir 0.025
Angkutan 1.000
Upah : 1.000

Pasangan Batako, Untuk Bekisting ( sistem tidur ) 0.036


Bahan : Batako 28.840
Semen 0.636
Pasir 0.075
Angkutan 1.000
Upah : 1.000
1 Pile cap / tie beam
Bahan : Plywood 12 mm (5 x pakai ) 0.067
Kaso kayu borneo ( 2 x pakai ) 0.011
Paku 0.330
Plastic Concrete spacer 2.000
Mould oil 0.020
Upah : 1.000

Concrete form work


Kaso 5/7 0.003
Balok 8/12 0.0064

2
Retaining wall / shear wall Fire Face
Bahan : Plywood 18mm 0.084
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 1.000
Upah : 1.000

2
Retaining wall / shear wall
Bahan : Plywood 18mm 0.168
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 1.000
Upah : 1.000

Scafolding / sewa per bulan modul 3,66x8 m 1.11111111


Main Frame h=1,9 m 6.000
Main Frame h=1,9 6.000
Leader Frame 6.000
Cross Brace 30.000
Cross Brace
U-head Jack 12.000
Jack Base 12.000
Joint Pin 12.000

Balok 6/12 0.288

Balok lantai
Bahan : Plywood 15 mm 0.112
Scafolding 1.000
Kayu 6/12cm 0.007
Kayu 5/7cm 0.009
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000

3
Balok lantai Fair Face
Bahan : Plywood 15 mm Film 0.112
Scafolding 1.000
Kayu 6/12cm 0.007
Kayu 5/7cm 0.009
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000

4 Plat lantai
Bahan : Plywood 15 mm 0.112
Scafolding 1.000
Kayu 6/12cm 0.007
Kayu 5/7cm 0.009
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000

4 Plat lantai Fair Face


Bahan : Plywood 15 mm Film 0.112
Scafolding 1.000
Kayu 6/12cm 0.007
Kayu 5/7cm 0.009
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000
4 Plat lantai Fair Face (drop panel)
Bahan : Plywood 15 mm Film 0.168
Scafolding 1.000
Kayu 6/12cm 0.007
Kayu 5/7cm 0.009
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000

Bekisting Pelat lantai ramp


Bahan : Multiplex 12mm 0.168
Scaffolding 1.000
Paku 0.250
Plastic concrete spacer 1.000
Mould oil 0.020
Kaso borneo 0.007
Balok borneo 0.009
Upah : 1.000

Bekisting Pelat lantai ramp


Bahan : Multiplex 12mm (Fair Face) 0.168
Scaffolding 1.000
Paku 0.250
Plastic concrete spacer 1.000
Mould oil 0.020
Kaso borneo 0.007
Balok borneo 0.009
Upah : 1.000

5 Kolom
Bahan : Plywood 15 mm 0.084
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 0.500
Kayu unt champer / sudutan 0.002
Upah : 1.000

5 Kolom Fire Face


Bahan : Plywood 15 mm Film 0.067
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 0.500
Kayu unt champer / sudutan 0.002
Upah : 1.000

Kolom Bulat
Bahan : Plywood 15 mm Film 0.168
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 0.500
Kayu unt champer / sudutan 0.000
Lapisan seng 0,3 x 90cm 0.500
Upah : 1.000
6 Tangga
Bahan : Plywood 15 mm 0.112
Kaso kayu borneo 0.022
Paku 0.450
Plastic Concrete spacer 3.000
Mould oil 0.020
Upah : 1.000

6 Tangga Fair face


Bahan : Plywood 15 mm Film 0.112
Kaso kayu borneo 0.022
Paku 0.450
Plastic Concrete spacer 3.000
Mould oil 0.020
Upah : 1.000

7 Lisplank Fireface
Bahan : Plywood 15 mm 0.134
Concrete form work 1.000
Paku 0.278
Plastic Concrete spacer 3.000
Mould oil 0.020
Tie rod 1.000
Upah : 1.000
5 Kolom & balok Praktis
Bahan : Plywood 9 mm 0.042
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 0.000
Upah : 1.000

4 Plat untuk meja wastafel


Bahan : Plywood 9 0.084
Scafolding 1.000
Kayu 6/12cm 0.004
Kayu 5/7cm 0.005
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000

2 Dinding Saluran
Bahan : Plywood 12 0.084
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 0.500
Upah : 1.000

BEKISTING 1 KALI PAKAI

4 Plat lantai
Bahan : Plywood 15 mm 0.336
Scafolding 1.000
Kayu 6/12cm 0.007
Kayu 5/7cm 0.009
Plastic Concrete spacer 1.000
Mould oil 0.020
Paku 0.250
Upah : 1.000

2
Retaining wall / shear wall
Bahan : Plywood 18mm 0.336
Concrete form work 1.000
Paku 0.250
Plastic Concrete spacer 2.000
Mould oil 0.020
Tie rod 1.000
Upah : 1.000

I. PEKERJAAN PASANGAN BATA

4 Pasangan bata 1/2 bt 1:5


Bahan : Batu bata 67.000
Wastage 0.000
Semen 0.252
Pasir 0.052
Kolom praktis 0.577
Angkur 0.123
Angkutan 1.000
Upah : 1.000

4 Pasangan bata 1/2 bt 1:3


Bahan : Batu bata 67.000
Wastage 0.000
Semen 0.372
Pasir 0.046
Kolom praktis 0.577
Angkur 0.123
Angkutan 1.000
Upah : 1.000

Pasangan bata 1/4 bt adukan 1:3 / m'


Bahan : Batu bata 5.000
Wastage 0.250
Semen 0.372
Pasir 0.046
Kolom praktis 0.577
Plester pada kedua sisinya 0.220
Angkutan 1.000
Upah : 1.000

74.419
Pasangan bata 1 bt 1:2 63.636
Bahan : Batu bata 138.000
Wastage 6.900
Semen 1.674
Pasir 0.092
Kolom praktis 1.154
Angkutan 1.000
Upah : 1.000

8.696
3 Pasangan bata / M3 71.556
Bahan : Batu bata 626.087
Wastage 12.522
Semen 3.235
Pasir 0.400
Angkutan 1.000
Kolom Praktis
Upah : 1.000

5 Pasangan Batako, 1 : 3 (90mm thick)


Bahan : Batako 13.000
Semen 0.212
Pasir 0.025
Kolom praktis 0.300
Angkutan 1.000
Upah : 1.000

6 Pasangan Batako, 1 : 5 (90mm thick)


Bahan : Batako 13.000
Semen 0.120
Pasir 0.031
Kolom praktis 0.300
Angkutan 1.000
Upah : 1.000

7 Pasangan Batako, 1 : 3 (19mm thick)


Bahan : Batako 13.000
Semen 0.212
Pasir 0.025
Kolom praktis 0.300
Angkutan 1.000
Upah : 1.000
8 Pasangan Batako, 1 : 5 (19mm thick)
Bahan : Batako 13.000
Semen 0.120
Pasir 0.031
Kolom praktis 0.300
Angkutan 1.000
Upah : 1.000

Pasangan Celcon 10 Cm
Bahan : Celcon 0.100
Celcon 0.003
Semen 0.124
Pasir putih 0.017
MU 380 0.147
Drymix 0.121
PM100 0.083
Uzin TB 20 0.055
Kolom & balok praktis 0.700
Angkutan 1.000
Upah : 1.000

II. PEKERJAAN PLESTERAN

1 Acian plesteran dinding


Bahan : Semen 0.059
Angkutan 1.000
Upah : 1.000
2 Plesteran 1:2
Bahan : Semen 0.212
Pasir 0.025
Kawat ayam 0.500
Corner beat 0.300
Angkutan 1.000
Tali Air 0.200
Upah : 1.000

3 Plesteran 1:3
Bahan : Semen 0.196
Pasir 0.025
Kawat ayam 0.500
Corner beat 0.300
Angkutan 1.000
Tali Air 0.200
Upah : 1.000

3 Kamprot
Bahan : Semen 0.196
Pasir 0.025
Kawat ayam 0.500
Corner beat 0.300
Angkutan 1.000
Tali Air 0.200
Upah : 1.000

Plaster Mortar (sesuai spesifikasi hal 21)


Bahan : MU 100 0.525
Upah 1.000
Plaster Mortar (Dinding dalam+luar)
Bahan : MU 301 0.786
Plaster Drymix 0.294
PM200 0.695
Uzin plater eco 0.630
Kawat ayam 0.500
Corner beat 0.300
Angkutan 1.000
Tali Air 0.200
Upah 1.000

Acian Mortar (Dinding dalam+luar)


Bahan : PM300 0.077
Uzin SC 50 0.057
Upah 1.000

Tambahan perekat untuk plaster aci pada beton


Uzin NC 301 0.060
Upah 1.000

Acian pada beton


Uzin SC100 0.053
Upah 1.000

Plaster Mortar (Dinding luar)


Bahan : MU 301 0.786
Plaster Drymix 0.294
Kawat ayam 0.500
Corner beat 0.300
Angkutan 1.000
Tali Air 0.200
Upah 1.000
Acian Mortar (Dinding luar)
Bahan : MU 200 0.061
Upah 1.000

Skimcoat
Bahan : Skimcoat dymix 0.100
Upah 1.000

Perapihan beton tebal 5mm


Bahan : PM 300 0.129
Upah 1.000

6 Rendering 1:3 (Screed Lantai)


20 mm Thick
Bahan : Semen 0.196
Pasir putih 0.025
Wiremesh M6 1.000
Tali Air 1.000
Upah : 1.000

6 Rendering 1:3 (Screed Lantai)


30 mm Thick
Bahan : Semen 0.294
Pasir putih 0.031
Kawat ayam 1.000
Tali Air 1.000
Upah : 1.000
Upah Trowel finish 1.000
7 Rendering 1:3 (Screed Lantai)
70 mm Thick
Bahan : Semen 0.686
Pasir 0.105
Wiremesh M6 1.000
Angkutan 1.000
Tali Air 1.000
Upah : 1.000

7 Plesteran 1:3 (Screed Lantai to roof / waterproof slab)


5 cm thick
Bahan : Semen 0.490
Pasir 0.050
Wiremesh M4 (Gambar A-7104) 1.000
Angkutan 1.000
Tali Air 1.000
Upah : 1.000

Pekerjaan Lantai (tebal adukan 20mm) Semen Pasir


Pasangan Lantai 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Lantai (tebal adukan 20mm) Dengan MU


Pasangan Lantai 1.05
MU 440 0.687
MU 450 0.129
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan scread bwh pas krmk (tebal adukan 50mm) dengan Drymix
Pasangan Lantai 1.05
Drymix floor scread 2.060
tile adhesive 0.250
tile grout 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Lantai Granit New imperial chieselled


Pasangan lantai Granit 1.20
Semen @ 50 Kg 0.240
Pasir 0.030
MU 450 0.208
MU 408 0.515
AM Grout 30 1.100
AM Grout 50 (colour grout) 0.300
AM100 0.667
Angkutan 1.00
Upah pasang 1.00
Upah poles 1.00

Pekerjaan Dinding Granit Nero Absulutto


Pasangan lantai Granit 1.20
Semen @ 50 Kg 0.240
Pasir 0.030
MU 450 0.208
MU 408 0.515
AM Grout 30 1.100
AM Grout 50 (colour grout) 0.300
AM100 0.667
Angkutan 1.00
Upah pasang dan poles 1.00
Upah poles 1.00

Pekerjaan Lantai Granit New iperial red


Pasangan lantai Granit 1.20
Semen @ 50 Kg 0.240
Pasir 0.030
MU 450 0.208
MU 408 0.515
AM Grout 30 1.100
AM Grout 50 (colour grout) 0.300
AM100 0.667
Angkutan 1.00
Upah pasang dan poles 1.00
Upah poles 1.00

Pekerjaan Treshold Granit 200 mm


Pasangan Treshold 1.05
Semen @ 50 Kg 0.053
Pasir 0.006
MU 450 0.208
MU 408 0.515
AM Grout 30 0.231
AM Grout 50 (colour grout) 0.062
AM100 0.137
Angkutan 1.00
Upah pasang 1.00
Upah poles 1.00

Pekerjaan Plint lantai Marmer 100 mm


Pasangan Lantai slab 10x60 1.05
Semen @ 50 Kg 0.049
Pasir 0.006
MU 450 0.208
MU 408 0.515
AM Grout 30 0.231
AM Grout 50 (colour grout) 0.062
AM100 0.137
Angkutan 1.00
Upah pasang 1.00
Upah poles 1.00

Pekerjaan Plint lantai Granit 100 mm


Pasangan Lantai slab 10x60 1.05
Semen @ 50 Kg 0.049
Pasir 0.006
MU 450 0.208
MU 408 0.515
AM Grout 30 0.231
AM Grout 50 (colour grout) 0.062
AM100 0.137
Angkutan 1.00
Upah pasang 1.00
Upah poles 1.00

Pekerjaan Lantai keramik 20x20 Roman Rocktile


Pasangan lantai 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
AM100 0.137
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Lantai keramik 30x30 Roman Gol C


Pasangan lantai 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
AM100 0.137
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Ddg keramik 30x30 Roman Gol C ( area pantry tanpa plaster)
Pasangan lantai 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
AM100 0.137
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Dinding HT 30x60 Essenza Polish


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00
Pekerjaan Dinding HT 30x60 Essenza UnPolish
Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Dinding Homogenous 60x60 ex.Essenza ermes unpolish


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Dinding Homogeneous 60x60 ex.Essenza S White


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan lantai HT 60x60 type. Travertine ex. Essenza


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan lantai HT 60x60 type. Travertine ex. Essenza Un polish


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan lantai Andesite


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
Uzin Bond (tebal 5mm) 0.183
Uzin grout 0.030
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang + coating 1.00

Pekerjaan Dinding Mozaik 7,5x7,5


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Skirting HT 10x60 ex. Essenza


Pasangan Dinding 1.10
Semen @ 50 Kg 0.025
Pasir 0.003
MU 400 0.021
MU 408 0.130
Uzin Bond (tebal 5mm) 0.028
Uzin grout 0.005
AM Grout 40 (cerama cement) 0.515
AM Grout 50 (colour grout) 0.031
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Dinding plint keramik 10x30 ex. Roman


Pasangan Dinding 3.50
Semen @ 50 Kg 0.025
Pasir 0.003
MU 400 0.021
MU 408 0.130
AM Grout 40 (cerama cement) 0.515
AM Grout 50 (colour grout) 0.031
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Stepnossing 10x20 ex. Roman


Pasangan Dinding 1.05
Semen @ 50 Kg 0.025
Pasir 0.003
MU 400 0.021
MU 408 0.130
Uzin Bond (tebal 3mm) 0.015
Uzin grout 0.005
AM Grout 40 (cerama cement) 0.515
AM Grout 50 (colour grout) 0.031
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Stepnossing 10x30 Salt&Pepper Group B


Pasangan Dinding 1.10
Semen @ 50 Kg 0.025
Pasir 0.003
MU 400 0.021
MU 408 0.130
AM Grout 40 (cerama cement) 0.515
AM Grout 50 (colour grout) 0.031
Angkutan 1.00
Upah pasang 1.00

Pekerjaan Lantai HT 40x40 essenza UnPolish type Travertine


Pasangan Dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
MU 400 0.206
MU 408 1.000
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Pekerjaan scread keramik dinding tebal 20 mm


Pasangan keramik dinding 1.05
Semen @ 50 Kg 0.240
Pasir 0.030
Plaster aci dengan MU 1.000
MU 400 0.206
AM Grout 40 (cerama cement) 5.000
AM Grout 50 (colour grout) 0.300
Angkutan 1.00
Upah pasang 1.00

Plesteran 1:3 (Screed Lantai ) tebal 5 cm


Bahan : Semen 0.490
Pasir 0.050
Wiremesh M4 1.000
Angkutan 1.000
Tali Air 1.000
Upah : 1.000
Kaca cermin 5mm ( 1 x 1 m ) => ex Sinar Rasa 1.000
Kaca 1.000
Bevel lurus 30 mm 4.000
Gosok 4.000
List SS 5mm 4.000
Triplek 12mm ( termasuk waste ) 1.100
Upah angkut 1.000
Silicon + lakban 1.000
Upah dan accessories 1.000
Rangka cermin 1.000

Tanggulan bata 1.000


Pasangan Bata h=300 mm lebar 150 mm 0.30
keramik 0.75
Siku L40,40 1.00
Pengecatan 0.75

Dinding Plywood 18 mm 1.000


Rangka 0.10
Multiplek 18 mm 0.35
Corner bead 1.00
Pengecatan 0.35

Peninggian lantai setinggi 100 mm terdiri dari 70 mm lapisan pasir urug padat,
30 mm lapisan keramik dan adukan mortar semen pada selasar dan koridor :
( kanstin pada sudut peninggian level masuk Daftar no 6.6. ) (keramik suply by owner)

Pasir urug 0.74


keramik suply by owner 1.05
adukan mortar 1.00

Concrete topping 150mm thick (assumed thickness)


Beton fc 25 0.15
Wiremesh 6 mm 1 lapis 1.05
Pasir urug 0.11
Lantai kerja 0.05
smoth trowel finish 1.05
Tali air

Peninggian lantai setinggi 100 mm terdiri dari mortar semen smooth trowel finish

Beton fc 25 0.10
Wiremesh 6 mm 1 lapis 1.05
Pasir urug -
Lantai kerja -
smoth trowel finish 1.05
Tali air

Meja Beton 2700 x 600 cm


Beton 1:3:5 0.162
Bekisting plat dan balok 2.010
Besi ( ratio 175 kg/m3 ) 28.350
Tacon
Upah pasang 1.000

Meja Beton granit


Uk. 1800 x 600 cm pada Toilet
Beton 1:3:5 0.211
Bekisting plat dan balok 3.006
Besi ( ratio 125 kg/m3 ) 26.325
Granit 1.000
Upah pasang 1.000
Counter top/m1
Pasangan Bata 1.500
Marmer Giante classio blue 1.000
Adukan Mortar 1.000
Upah pasang 1.000

Tempat wudhu
Bahan : Pasangan Bata 4.40
Plaster 9.50
Keramik dinding gol A 9.50
waterproofing 9.50
Kran tembok 5.00
Floor drain 5.00

Dinding bata peringatan tinggi 100m


Bahan : Pasangan Bata 1.00
Plaster 2.15
Cat 2.15

Pek Car stoper 160 x 600 x 150 mm


Bahan : Car stoper 1.050
Urugan pasir 0.030
Adukan 1.000
Angkur 212 @ 20cm 2.000
Grouting epoxy 0.090
Upah pasang 1.000
Perapian dan Aci Nat 0.330
Precast concrete kerb to area basement /m1
Persiapan dengan air semen 0.033
Cansteen 1.100
Angkur 212 @ 20cm 1.500
Grouting epoxy 0.002
Perapihan dengan acian 0.610
Ongkos pasang 1.000

Precast concrete kerb water /m1


Persiapan dengan air semen 0.033
Water channel kerb 1.100
Angkur 212 @ 20cm 1.500
Grouting epoxy 0.003
Perapihan dengan acian 0.610
Ongkos pasang 1.000

Precast concrete kerb to island edging area parkir luar


Urugan pasir 0.018
Adukan 0.009
Kerb ex Dusaspun 1.100
Angkur 212 @ 20cm 2.000
Grouting epoxy 0.018
Perapihan dengan acian 0.540
Ongkos pasang 1.000

600 long x 120 wide x 150mm high car stopper including grout
Precast wheel stopper to parking area basement
Persiapan dengan air semen 0.072
Wheel stopper ex Dusaspun 1.000
Angkur 212 @ 20cm 2.000
Grouting epoxy 0.007
Perapihan dengan acian 0.288
Ongkos pasang 1.000
Precast wheel stopper to parking area parkir luar
Urugan pasir 0.024
Adukan 0.012
Wheel stopper ex Dusaspun 1.100
Angkur 212 @ 20cm 2.000
Grouting epoxy 0.005
Perapihan dengan acian 0.390
Ongkos pasang 1.000

Perapian saluran air terbuka ukuran 200 x 100 mm termasuk plesteran,


acian, sudutan, sikuan dan pembersihannya, pada:
Pasangan bata 0.400
Plaster aci 1.100
siku L40,40,4 4.840

Pek Paving block type Conpave toscana / M2


Bahan : Paving t 6cm Warna Natural 1.050
Urugan sirtu 0.300
Urugan pasir 0.150
Pasir pengisi nat 0.010
Abu batu t=5cm 1.000
Upah pasang 1.000
Pemadatan 1.000
Angkutan 1.000
Alat bantu 1.000

Pek Paving block type Conpave toscana / M2 (diatas beton Gbr A7102 det 6)
Bahan : Paving t 6cm Warna Natural 1.050
Urugan sirtu 0.030
Urugan pasir 0.150
Pasir pengisi nat 0.010
Abu batu t=5cm 1.000
Upah pasang 1.000
Pemadatan 1.000
Angkutan 1.000
Alat bantu 1.000

Pek Paving block type Grassblock / M2


Bahan : Paving t 10 cm Warna Natural 1.050
Urugan sirtu 0.300
Urugan pasir 0.150
Pasir pengisi nat 0.010
Abu batu t=5cm 1.000
Upah pasang 1.000
Pemadatan 1.000
Angkutan 1.000
Alat bantu 1.000

Pek Cansteen / M1
Bahan : Cansteen type KST DKI conblock 1.050
Urugan pasir 0.030
Adukan 1.000
Besi angkur 2.000
Upah pasang 1.000
Perapian dan Aci Nat 1.000

Pemasangan pipa DUSASPUN


Pipa Dusaspun dia 300 1.05
Galian tanah 0.09
Pasir urug t=10cm 0.03
pengurugan kembali 0.02
Upah 1
Pemasangan pipa DUSASPUN
Pipa Dusaspun dia 400 1.05
Galian tanah 0.09
Pasir urug t=10cm 0.03
pengurugan kembali 0.02
Upah 1

Pemasangan pipa DUSASPUN


Pipa Dusaspun dia 600 1.05
Galian tanah 0.09
Pasir urug t=10cm 0.03
pengurugan kembali 0.02
Upah 1

Pos jaga
Meja counter 1.00
Kanstin 4.40
Panel alumunium 2.78
Alumunium moulding 0.39
Kaca loket 1.28
kaca bening t=6mm 2.99
alumunium frame 15.40
atap galvanis sheet 8.40
Atap alumunium composite panel 4.40
Silicon sealant 4.20
Pintu kaca 1.00
Lantai keramik 1.20
Pondasi 0.18
bekisting 2.11
Besi 61.43

Sumur Resapan
Galian tanah 23.414
Buang tanah 23.414
Urug pasir 1.089
Lantai kerja 0.545
Pelat beton 0.900
Pasangan batu bata 9.900
Lapisan batu kasar 11.250
Timbunan tanah 1.634
Pipa dia 150 4.300

Bak kontrol beton (200x200x100)


Galian tanah 0.010
Buang tanah 0.010
Urug pasir 0.004
Lantai kerja 0.002
Pasangan bata 0.160
Plaster aci cat 0.560

Tanggul Ukuran 400 mm lebar x 300 mm tinggi


Pasangan bata 0.120
Plesteran 1.000

Hydrant box area luar


Pasangan bata 3.450
Plesteran,aci,cat 6.890
Batu andesit 20x20 3.950

Hydrant box area dalam


Pasangan bata 3.440
Plesteran,aci,cat 6.890
Batu andesit 0.000
Bak kontrol, size 1200mm x 1200mm x 1200mm
Galian tanah 1.944
Buang tanah 1.944
Urugan tanah 0.000
Urug pasir 0.144
Lantai kerja 0.072
Beton 1.728
Besi 302.400
Bekisting 8.640
Waterproofing membrane 8.640
tangga 1.000

Uk. 1000x1500x1000 mm
Uk. 2000x1400x2000 mm

Sump pit, size 2100mm x 2100mm x 2000mm


Galian tanah 8.820
Buang tanah 8.820
Urugan tanah 0.000
Urug pasir 0.441
Lantai kerja 0.221
Beton 5.052
Besi 530.460
Bekisting 20.850
Waterproofing membrane 20.850
tangga 1.000
tutup manhole 600x600 1.000

Sump pit, size 2100mm x 3800mm x 2000mm


Galian tanah 17.157
Buang tanah 17.157
Urugan tanah 0.000
Urug pasir 0.798
Lantai kerja 0.399
Beton 5.480
Besi 575.400
Bekisting 19.420
Waterproofing membrane 19.420
tangga 1.000
tutup manhole 600x600 1.000

Sump pit, size 2600mm x 2600mm x 2000mm


Galian tanah 14.534
Buang tanah 14.534
Urugan tanah 0.000
Urug pasir 0.676
Lantai kerja 0.338
Beton 6.792
Besi 509.400
Bekisting 27.200
Waterproofing membrane 27.200
tangga 1.000
tutup manhole 600x600 1.000

pit lift, size 2550mm x 5900mm x 2550mm


Galian tanah 38.365
Buang tanah 38.365
Urugan tanah 0.000
Urug pasir 1.505
Lantai kerja 0.752
Beton 12.420
Besi 1,654.000
Bekisting 71.000
Waterproofing membrane 44.960
tangga 0.000
tutup manhole 600x600 0.000

pit escalator, size 4500mm x 3200mm x 1950mm


Galian tanah 28.080
Buang tanah 28.080
Urugan tanah 0.000
Urug pasir 1.440
Lantai kerja 0.720
Beton 9.000
Besi 1,206.000
Bekisting 50.400
Waterproofing membrane 44.430
tangga 0.000
tutup manhole 600x600 0.000

Sump pit, size 1000mm x 1500mm x 1000mm


Galian tanah 1.725
Buang tanah 1.725
Urugan tanah 0.000
Urug pasir 0.150
Lantai kerja 0.050
Beton 1.528
Besi 114.600
Bekisting 6.140
Waterproofing membrane 6.140
tangga 1.000
tutup manhole 600x600 1.000

Sump pit, size 2000mm x 1400mm x 2000mm


Galian tanah 6.020
Buang tanah 6.020
Urugan tanah 0.000
Urug pasir 0.280
Lantai kerja 0.140
Beton 2.408
Besi 180.600
Bekisting 16.040
Waterproofing membrane 16.040
tangga 1.000
tutup manhole 600x600 1.000

1.11111111
Scafolding / sewa per bulan modul 3,66x8 m 1.11111111
Main Frame h=1,9 m 6.000
Main Frame h=1,9 6.000
Leader Frame 0.000
Cross Brace 20.000
Cross Brace
U-head Jack 12.000
Jack Base 12.000
Joint Pin 12.000

Balok 6/12 0.288

Floor Deck t = 0,75 mm


Bahan : Floor deck t=0,75 mm ex Alkajaya 1.100
Temporary penyangga 0.007
Scafolding 1.000
End stop 0.680
Shear connector 1.813
Upah : 1.000
Upah bongkar pasang scafolding 1.000

Galian Tanah 0.39


Pasir Urug 0.15625
Lantai kerja 0.125
Batu andesite 1.5625
Cansten 5
beton hiasan 8

Driver's seat, concrete base with smooth trowelled finish, including


reinforcement, formwork and all necessary fixing as specified

Beton 0.013
Bekisting 0.4
Besi 60
Perapihan 0.4
Wood 2
Keramik tile 0.4
In U shape, size (2000+8000+2000) x 600 x 120mm

Beton 1.152
Bekisting 18.336
Besi 230.4
Perapihan 18.336

Beam Louvre Support Steel Structure


Beton 3.345
Bekisting 35.1225
Besi 1254.375
Perapihan + Cat 35.1225

Form guttter with size 250x250mm high, including additional


concrete, rebar, formwork, waterproofing and levelling screed
(Provisional)
Gutters; size 250 wide overall x 250mm deep

Galian Tanah 0.065625


Buangan tanah 0.065625
Pasir urug 150 mm 0.04635
Lantai kerja 50mm 0.01545
Scread 20 mm 0.3605
U ditch 1
Waterproofing 0.927

Gutters; size 400 wide overall x 400mm deep

Galian Tanah 0.231


Buangan tanah 0.231
Pasir urug 150 mm 0.0618
Lantai kerja 50mm 0.0206
Scread 20 mm 0.412
U ditch 1
Waterproofing 1.236
Gutters; size 500 wide overall x 500mm deep

Galian Tanah 0.34125


Buangan tanah 0.34125
Pasir urug 150 mm 0.07725
Lantai kerja 50mm 0.02575
Scread 20 mm 0.515
U ditch 1
Waterproofing 1.545

Gutters; size 600 wide overall x 600mm deep

Galian Tanah 0.4725


Buangan tanah 0.4725
Pasir urug 150 mm 0.0927
Lantai kerja 50mm 0.0309
Scread 20 mm 0.618
U ditch 1
Waterproofing 1.854

Gutters; size 800 wide overall x 800mm deep

Galian Tanah 0.798


Buangan tanah 0.798
Pasir urug 150 mm 0.1236
Lantai kerja 50mm 0.0412
Scread 20 mm 0.824
U ditch 1
Waterproofing 2.472
Form guttter with size 250x250mm high, including additional
concrete, rebar, formwork, waterproofing and levelling screed
(Provisional)

Galian Tanah 0.065625


Buangan tanah 0.065625
Pasir urug 150 mm 0
Scread 20 mm 0.7725
Beton 0.118125
Bekisting 0.515
Besi 11.8125
Waterproofing 0.7725

Form guttter with size 500x500mm high, including additional


concrete, rebar, formwork, waterproofing and levelling screed
(Provisional)

Galian Tanah 0.2625


Buangan tanah 0.2625
Pasir urug 150 mm 0
Scread 20 mm 1.545
Beton 0.23625
Bekisting 1.03
Besi 23.625
Waterproofing 1.545

Ramp gutter, 200x300mm high

Galian Tanah 0
Buangan tanah 0
Pasir urug 150 mm 0
Scread 20 mm 0.824
Beton 0.126
Bekisting 0.618
Besi 12.6
Waterproofing 0.824

Pondasi batu kali 600x600


Galian 0.6
pasir urug 0.06
Lantai kerja 0.03
Batu kali 0.28
Sloof beton 0.04
Sloof bekisting 0.3
Besi Sloof 6.56
Urug kembali 0.23

Dinding beton water feature


Beton 1.0065
Beksiting 4.6665
3.904
Besi 165.554

Dinding beton Signage tower


Beton 4.700
Beksiting 27.440

Besi 823.200

Dinding beton Plat guard house 7.99


Beton 1.358
Beksiting 9.945

Besi 203.745

Pondasi Gondola
Beton 0.034
Besi 8.143
Bekisting 0.375
Baseplat 1
Grouting 1
Angkur 4
Extra perkuatan dudukan closet jongkok termasuk
urugan pasir, pasangan bata, adukan, perapihan,
material bantu dan perlengkapan lainnya sesuai
gambar dan spesifikasi (pelapis lantai tepisah)
Uk. 92,5x67,5x22 cm pada Toilet Petugas Keamanan
Pasangan bata 0.1373625
plaster aci 1.179875

Uk. 85x130x25 cm pada Toilet Supir


Pasangan bata 0.27625
plaster aci 1.855

Uk. 65x90x25 cm pada Toilet Supir


Pasangan bata 0.14625
plaster aci 1.135

Extra pembuatan gutter termasuk perapihan, waterproofing


membrane, screed pelindung, material bantu dan
perlengkapannya lainnya sesuai gambar dan spesifikasi
Uk. 20 x 20cm
Galian tanah 0
Buang tanah 0
Beton 0.0945
Besi 7.0875
Bekisting 0.4
wp membrane 0.4
screed pelindung 0.4

Uk. 30x40 cm pada Ramp


Galian tanah 0.12
Buang tanah 0.12
Beton 0.2
Besi 15
Bekisting 0.8
wp membrane 1.1
screed pelindung 1.1

Uk.10 x 30 cm pada Area Parkir


Galian tanah 0.03
Buang tanah 0.03
Beton 0.2
Besi 15
Bekisting 0.6
wp membrane 0.7
screed pelindung 0.7

Gutter lebar 200 mm terbuat dari beton bertulang terdiri dari


tanggulan ukuran 15x20 cm termasuk waterproofing,
besi galvanis Dowel 12 mm dengan jarak 600 mm, material
bantu, finishing dan perlengkapan lainnya sesuai gambar
dan spesifikasi (Gbr no. IPEKA-AR-8002 detail 1) pada :
Beton tanggulan 0.03
Besi 2.25
Bekisting 0.55
Galv steel Dowel dia 12 mm @600mm 1.5
Grouting epoxy 0.005
Perapihan dengan acian 0.55

Parapet beton / m1
Beton 0.17
Bekisting 2.2
Besi 64

Balok beton
Beton 1
Bekisting 9.18
Besi 141
Peninggian lantai Ruang ,multi media luas 53,3 m2
Pasangan bata 16.08
Plaster aci 53.3

Peninggian lantai Ruang kelas SMP luas 11 m2 77.0385


Pasangan bata 2.92215
Plaster aci 78.936

Pagar terbuat dari dinding bata tinggi 2400 mm termasuk


pondasi batu kali uk. 800x1000 mm, pasir urug, pipa
suling 2" jarak 1,5 m, bata kamprotan, sloot uk. 250x300
mm, pengangkutan, plester, acian, cat, material bantu dan
perapihannya
Galian 0.50
Buang tanah 0.50
pondasi batu kali 0.50
Sloof 20x25 0.06
pipa suling 1.50
pasangan bata 1.05
Plaster aci 2.31
cat whathershield 4.84

Perimeter Gutter lebar 150 mm tinggi 70mm (Asumsi beton bekisting tulangan sdh masuk
Tali air 1.000
Plesteran termasuk acian 0.290

Cove lampu Ss Gambar 5308


Cove lampu detail 1 13.1
Drop ceiling detail 2 16.4
Bulkhead detail 2
- Gypsum 5.6
- SS-1 2.5
Bulkhead detail 5
- Gypsum 5.6
- SS-1 2.5
10 16 16 12

STRUKTUR
1

HARGA 1
- - - - - - - - - -

95,000 95,000
155,000 155,000
130,000 130,000
130,000 130,000
130,000 130,000
95,000 95,000
130,000 130,000
115,000 115,000
115,000 115,000
110,000 110,000
330 330
1,600 1,600
495,000 495,000 ref menara prima Rp 490,000
525,000 525,000
30,000 30,000
2,000,000 2,000,000
1,900,000 1,900,000
2,100,000 2,100,000
3,750,000 3,750,000
12,000 12,000 MASTER
4,475 4,475 38,000 4,590
4,450 4,450 42,500 4,565
4,450 4,450 50,000 4,565
4,450 4,450 50,000 4,565
4,453 4,453 4,568
4,485 4,485 4,600
4,475 4,475 master 4,590
4,450 4,450 4,565
4,475 4,475 4,590
4,500 4,500 4,615
4,471 4,471
7,150 7,150
6,800 6,800
10,000 10,000
52,000 52,000
75,000 75,000
105,000 105,000
110,000 110,000
146,000 146,000
210,000 210,000
127,000 127,000
175,000 175,000
240,000 240,000
160,000 160,000
185,000 185,000
260,000 260,000
12,500 12,500
950 950
11,250 11,250
2,500 2,500
35,000 35,000
22,000 22,000
30,000 30,000
10,000 10,000
11,625 11,625 pioner Karya beton
335,000 335,000 330,000 364,000
420,000 420,000 430,000 440,000
440,000 440,000 450,000 463,000
460,000 460,000 525,000 516,000
440,000 440,000 460,000 466,000
445,000 445,000 475,000 483,000
465,000 465,000 490,000 516,000
475,000 475,000 520,000 531,000
88,065 88,065 5,200
113,458 113,458 4,700
163,372 163,372 4,800
222,357 222,357
290,413 290,413
367,587 367,587
463,440 463,440
88,065 88,065
113,458 113,458
163,372 163,372
222,357 222,357
290,413 290,413
367,587 367,587
463,440 463,440
140,000 140,000
50,000 50,000 dics
50,000 50,000 7,500
25,000 25,000
18,000 18,000 3,000
52,000 52,000 5,000
45,000 45,000 7,000
17,500 17,500 3,000
65,000 65,000 9,000
6,000 6,000 1,700
8,097 8,097
3,499 3,499
20,134 20,134
2,095 2,095
53,431 53,431
26,635 26,635
2,500 2,500
35,000 35,000
36,000 36,000
23,750 23,750
66,000 66,000
5,500 5,500
55,000 55,000
22,000 22,000
54,000 54,000
42,500 42,500
20,000 20,000
39,000 39,000
20,000 20,000
62,500 62,500
76,250 76,250
55,000 55,000
4,173 4,173
39,018 39,018
28,955 28,955
32,291 32,291
55,164 55,164
34,682 34,682
68,530 68,530
570,000 570,000
115,000 115,000
72,800 72,800
143,715 143,715
186,115 186,115
199,557 199,557
177,249 177,249
23,894 23,894
188,760 188,760
162,305 162,305

40,333 40,333
30,341 30,341

HARGA SATUAN

HARGA SATUAN TOTAL


SAT Material Material

STRUKTUR
1
- - - - - - - - -
ARSIETEK
1
btg 12,000 18,120 12,000
lbr 35,000 37,634 35,000
kg 6,800 408 6,800
m3 2,000,000 16,000 2,000,000
m 12,000 21,960 12,000
m1 10,000 10,000 10,000
- - - - - - - - - - -
Jumlah 104,122 Jumlah

m3 2,000,000 10,000 2,000,000


m3 2,100,000 16,800 2,100,000
kg 6,800 1,360 6,800
m1 2,000 2,000 2,000
- - - - - - - - - - -
Jumlah 30,160 Jumlah
m3 17,000 17,000 17,000

m3 95,000 109,250 95,000


m3 15,000 15,000 15,000
- - - - - - - - - - -
Harga per 1m3 124,250 Harga per 1m3
Harga per 1m2 tebal 10cm 12,425 Harga per 1m2 tebal 10cm

m3 95,000 111,150 95,000


m3 15,000 15,000 15,000
- - - - - - - - - - -
Harga per 1m3 126,150 Harga per 1m3
Harga per 1m2 tebal 10cm 12,615 Harga per 1m2 tebal 10cm

m3 115,000 126,500 115,000


m3 15,000 15,000 15,000
- - - - - - - - - - -
Harga per 1m3 141,500 Harga per 1m3
Harga per 1m2 tebal 10cm 14,150 Harga per 1m2 tebal 10cm

m3 115,000 132,250 115,000


m3 7,500 8,250 7,500
m3 15,000 15,000 15,000
- - - - - - - - - - -
Harga per 1m3 155,500 Harga per 1m3
m3 110,000 121,000 110,000
m3 15,000 15,000 15,000
- - - - - - - - - - -
Jumlah 136,000 Jumlah

m3 110,000 126,500 110,000


sak 30,000 159,000 30,000
m3 155,000 65,100 155,000
m3 35,000 35,000 35,000
- - - - - - - - - - -
Jumlah 385,600 Jumlah

m3 110,000 126,500 110,000


sak 30,000 97,800 30,000
m3 155,000 80,600 155,000
m3 35,000 35,000 35,000
- - - - - - - - - - -
Jumlah 339,900 Jumlah

m3 110,000 126,500 110,000


sak 30,000 75,600 30,000
m3 155,000 86,800 155,000
m3 35,000 35,000 35,000
- - - - - - - - - - -
Jumlah 323,900 Jumlah
sak 30,000 120,000 30,000
m3 130,000 74,100 130,000
m3 130,000 110,500 130,000
m3 70,000 70,000 70,000
- - - - - - - - - - -
Harga per 1m3 374,600 Harga per 1m3
Harga per 1m2 tebal 5cm 18,730 Harga per 1m2 tebal 5cm

sak 30,000 192,000 30,000


m3 130,000 70,200 130,000
m3 130,000 106,600 130,000
m3 70,000 70,000 70,000
- - - - - - - - - - -
Harga per 1m3 438,800 Harga per 1m3

sak 30,000 180,000 30,000


m3 130,000 70,200 130,000
m3 130,000 110,500 130,000
m3 70,000 70,000 70,000
- - - - - - - - - - -
Harga per 1m3 430,700 Harga per 1m3

m3 335,000 348,400 335,000


m3 - -
m3 1,000 1,000 1,000
m3 50,000 50,000 50,000
- - - - - - - - - - -
Harga per 1m3 399,400 Harga per 1m3

m3 420,000 436,800 420,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 467,800 Harga per 1m3

m3 440,000 457,600 440,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 488,600 Harga per 1m3

m3 460,000 478,400 460,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 509,400 Harga per 1m3

m3 440,000 457,600 440,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 488,600 Harga per 1m3

m3 445,000 462,800 445,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 493,800 Harga per 1m3

m3 465,000 483,600 465,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 514,600 Harga per 1m3

m3 475,000 494,000 475,000


m3 10,000 10,000 10,000
m3 1,000 1,000 1,000
m3 5,000 5,000 5,000
m3 15,000 15,000 --> 15,000
- - - - - - - - - - -
Harga per 1m3 525,000 Harga per 1m3

kg 4,450 467,250 4,453


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 500,830
Harga satuan 1 Kg 5,008

kg 4,480 470,400 4,475


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 503,980
Harga satuan 1 Kg 5,040

kg 4,450 467,250 4,450


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 500,830
Harga satuan 1 Kg 5,008
kg 4,450 467,250 4,450
kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 500,830
Harga satuan 1 Kg 5,008

kg 4,450 467,250 4,450


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 500,830
Harga satuan 1 Kg 5,008

600,000

000 kg ) info Saat Rapat persiapan tender 13 Nov 2006


kg 4,380 459,900 4,375
kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 493,480
Harga satuan 1 kg 4,935
Harga satuan 1 ton 4,934,800

kg 4,470 469,350 4,471


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 502,930
Harga satuan 1 kg 5,029
Harga satuan 1 ton 5,029,300

kg 4,920 2,952,000,000 4,925


kg 5,030 22,132,000,000 5,025
- - - - - - - - - - -
Total harga 25,084,000,000
Total harga / total besi 5,017

Harga satuan /kg 5,017

kg 4,490 471,450 4,485


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 505,030
Harga satuan 1 Kg 5,050

kg 4,490 471,450 4,485


kg 7,150 8,580 7,150
kg 650 65,000 650
- - - - - - - - - - -
Harga satuan 100 Kg 545,030
Harga satuan 1 Kg 5,450

kg 4,480 470,400 4,475


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 503,980
Harga satuan 1 Kg 5,040

kg 4,450 467,250 4,450


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 500,830
Harga satuan 1 Kg 5,008

kg 4,450 467,250 4,450


kg 7,150 8,580 7,150
kg 650 65,000 650
- - - - - - - - - - -
Harga satuan 100 Kg 540,830
Harga satuan 1 Kg 5,408
kg 4,480 470,400 4,475
kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 503,980
Harga satuan 1 Kg 5,040

kg 4,500 472,500 4,500


kg 7,150 8,580 7,150
kg 250 25,000 245
- - - - - - - - - - -
Harga satuan 100 Kg 506,080
Harga satuan 1 Kg 5,061

lbr 35,000 3,395 35,000


m2 500 500 500
ls 750 750 750
ls 1,250 1,250 1,250
- - - - - - - - - - -
Harga satuan per 1 m2 5,895

lbr 88,070 8,543 88,065


m2 500 500 500
ls 750 750 750
ls 1,250 1,250 1,250
- - - - - - - - - - -
Harga satuan per 1 m2 11,043

lbr 113,460 11,006 113,458


m2 500 500 500
ls 750 750 750
ls 1,250 1,250 1,250
- - - - - - - - - - -
Harga satuan per 1 m2 13,506
lbr 163,370 15,847 163,372
m2 500 500 500
ls 750 750 750
ls 1,250 1,250 1,250
- - - - - - - - - - -
Harga satuan per 1 m2 18,347

lbr 222,360 21,569 222,357


m2 500 500 500
ls 750 750 750
ls 1,250 1,250 1,250
- - - - - - - - - - -
Harga satuan per 1 m2 24,069

lbr 290,410 28,170 290,413


m2 500 500 500
ls 750 750 750
ls 1,250 1,250 1,250
- - - - - - - - - - -
Harga satuan per 1 m2 30,670

bh 1,600 21,424 1,600


sak 30,000 6,360 30,000
m3 155,000 3,875 155,000
m2 130 130 130
m2 4,000 4,000 4,000
- - - - - - - - - - -
Jumlah 35,789

bh 1,600 46,144 1,600


sak 30,000 19,080 30,000
m3 155,000 11,625 155,000
m2 130 130 130
m2 5,500 5,500 5,500
- - - - - - - - - - -
Jumlah 82,479

Pemakaian
5.0
lbr 146,000 9,809 146,000
m3 1,900,000 21,375 1,900,000
kg 6,800 2,244 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
m2 13,500 13,500 13,500
- - - - - - - - - - -
Harga satuan bekisting 49,061

Pemakaian
10
m3 1,900,000 5,700 1,900,000
m3 2,000,000 12,800 2,000,000
- - - - - - - - - - -
18,500

Pemakaian
4.0
lbr 260,000 21,836 260,000
m2 18,500 18,500 18,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 11,250 11,250
m2 13,500 13,500 13,500
- - - - - - - - - - -
Harga satuan bekisting 68,918
Perapihan ada item plaster 5,000
- - - - - - - - - - -
Total 68,918

Pemakaian
2.0
lbr 185,000 31,074 185,000
m2 18,500 18,500 18,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 11,250 11,250
m2 13,500 13,500 13,500
- - - - - - - - - - -
Harga satuan bekisting 78,156
Perapihan tidak diperlukan
- - - - - - - - - - -
Total 78,156

unit 4,500 27,000 4,500


unit 4,500 27,000 4,500
unit 3,250 19,500 3,250
unit 2,500 75,000 2,500
unit - -
unit 2,650 31,800 2,650
unit 2,650 31,800 2,650
unit 600 7,200 600

m3 2,000,000 576,000 2,000,000


- - - - - - - - - - -
Harga per modul 795,300
Harga/m2 14,939
3.0
lbr 175,000 19,596 175,000
m2 14,940 14,940 14,939
m3 2,000,000 14,850 2,000,000
m3 1,900,000 16,623 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 14,000 14,000 14,000
- - - - - - - - - - -
Harga satuan bekisting 82,892
Perapihan ada item plaster
- - - - - - - - - - -
Total #VALUE!

Pemakaian
3.0
lbr 240,000 26,874 240,000
m2 14,940 14,940 14,939
m3 2,000,000 14,850 2,000,000
m3 1,900,000 16,623 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 14,000 14,000 14,000
- - - - - - - - - - -
Harga satuan bekisting 90,170
Perapihan ada item plaster
- - - - - - - - - - -
Total 90,170

Pemakaian
3.0
lbr 175,000 19,596 175,000
m2 14,940 14,940 14,939
m3 2,000,000 14,850 2,000,000
m3 1,900,000 16,623 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 12,000 12,000 12,000
- - - - - - - - - - -
Harga satuan bekisting 80,892
Perapihan ada item plaster
- - - - - - - - - - -
Total 80,892

3.0
lbr 240,000 26,874 240,000
m2 14,940 14,940 14,939
m3 2,000,000 14,850 2,000,000
m3 1,900,000 16,623 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 12,000 12,000 12,000
- - - - - - - - - - -
Harga satuan bekisting 88,170
Perapihan ada item plaster
- - - - - - - - - - -
Total 88,170
2.0
lbr 240,000 40,312 240,000
m2 14,940 14,940 14,939
m3 2,000,000 14,850 2,000,000
m3 1,900,000 16,623 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 14,500 14,500 14,500
- - - - - - - - - - -
Harga satuan bekisting 104,108
Perapihan ada item plaster
- - - - - - - - - - -
Total 104,108

2.0
lbr 146,000 24,523 146,000
m2 14,940 14,940 14,939
kg 6,800 1,700 6,800
bh 950 950 950
ltr 11,630 233 11,625
m3 1,900,000 13,300 1,900,000
m3 2,000,000 18,000 2,000,000
m2 14,500 14,500 14,500
- - - - - - - - - - -
Harga satuan bekisting 88,146

2.0
lbr 210,000 35,273 210,000
m2 14,940 14,940 14,939
kg 6,800 1,700 6,800
bh 950 950 950
ltr 11,630 233 11,625
m3 1,900,000 13,300 1,900,000
m3 2,000,000 18,000 2,000,000
m2 14,500 14,500 14,500
- - - - - - - - - - -
Harga satuan bekisting 98,895
Perapihan ada item plaster
- - - - - - - - - - -
Total 98,895
4.0
lbr 175,000 14,697 175,000
m2 12,500 12,500 12,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 5,625 11,250
m3 1,900,000 4,618 1,900,000
m2 15,500 15,500 15,500
- - - - - - - - - - -
Harga satuan bekisting 56,773
Perapihan
- - - - - - - - - - -
Total 56,773
Pemakaian
5.0
lbr 240,000 16,125 240,000
m2 12,500 12,500 12,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 5,625 11,250
m3 1,900,000 3,694 1,900,000
m2 19,000 19,000 19,000
- - - - - - - - - - -
Harga satuan bekisting 60,777
Perapihan ada item plaster
- - - - - - - - - - -
Total 60,777
Pemakaian
2
lbr 240,000 40,312 240,000
m2 12,500 12,500 12,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 5,625 11,250
m3 1,900,000 - 1,900,000
m2 - -
m2 21,000 21,000 21,000
- - - - - - - - - - -
Harga satuan bekisting 83,269
Perapihan ada item plaster
- - - - - - - - - - -
Total 83,269
Pemakaian
3.0
lbr 175,000 19,596 175,000
m3 1,900,000 41,800 1,900,000
kg 6,800 3,060 6,800
bh 950 2,850 950
ltr 11,630 233 11,625
m2 19,000 19,000 19,000
- - - - - - - - - - -
Harga satuan bekisting 86,539
Perapihan
- - - - - - - - - - -
Total 86,539

3.0
lbr 240,000 26,874 240,000
m3 1,900,000 41,800 1,900,000
kg 6,800 3,060 6,800
bh 950 2,850 950
ltr 11,630 233 11,625
m2 19,000 19,000 19,000
- - - - - - - - - - -
Harga satuan bekisting 93,817
Perapihan ada item plaster
- - - - - - - - - - -
Total 93,817

Pemakaian
2.5
lbr 240,000 32,249 240,000
m2 12,500 12,500 12,500
kg 6,800 1,890 6,800
bh 950 2,850 950
ltr 11,630 233 11,625
bh 11,250 11,250 11,250
m2 14,000 14,000 14,000
- - - - - - - - - - -
Harga satuan bekisting 74,972
Perapihan ada item plaster
- - - - - - - - - - -
Total 74,972
Pemakaian
8.0
lbr 105,000 4,409 105,000
m2 12,500 12,500 12,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 - 11,250
m2 10,000 10,000 10,000
- - - - - - - - - - -
Harga satuan bekisting 30,742

Pemakaian
4.0
lbr 105,000 8,818 105,000
m2 5,000 5,000 5,000
m3 2,000,000 8,910 2,000,000
m3 1,900,000 9,974 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 13,500 13,500 13,500
- - - - - - - - - - -
Harga satuan bekisting 49,085

Pemakaian
4.0
lbr 146,000 12,261 146,000
m2 12,500 12,500 12,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 5,625 11,250
m2 13,500 13,500 13,500
- - - - - - - - - - -
Harga satuan bekisting 47,719

1.0
lbr 175,000 58,788 175,000
m2 - -
m3 2,000,000 14,850 2,000,000
m3 1,900,000 16,623 1,900,000
bh 950 950 950
ltr 11,630 233 11,625
kg 6,800 1,700 6,800
m2 12,000 12,000 12,000
- - - - - - - - - - -
Harga satuan bekisting 105,144

Pemakaian
1.0
lbr 185,000 62,147 185,000
m2 18,500 18,500 18,500
kg 6,800 1,700 6,800
bh 950 1,900 950
ltr 11,630 233 11,625
bh 11,250 11,250 11,250
m2 13,500 13,500 13,500
- - - - - - - - - - -
Harga satuan bekisting 109,230

bh 330 22,110 330


bh 330 - 330
sak 30,000 7,560 30,000
m3 155,000 8,060 155,000
m' 25,410 14,668 25,413
kg 5,000 617 5,003
m2 500 500 500
m2 8,000 8,000 8,000
- - - - - - - - - - -
Jumlah 61,514

bh 330 22,110 330


bh 330 - 330
sak 30,000 11,160 30,000
m3 155,000 7,130 155,000
m' 25,410 14,668 25,413
kg 5,000 617 5,003
m2 500 500 500
m2 8,000 8,000 8,000
- - - - - - - - - - -
Jumlah 64,184

bh 330 1,650 330


bh 330 83 330
sak 30,000 11,160 30,000
m3 155,000 7,130 155,000
m' 25,410 14,668 25,413
m2 29,110 6,404 29,111
m2 50 50 50
m2 4,000 4,000 4,000
- - - - - - - - - - -
Jumlah 45,144

--> lapis 1 ( 8 lapis )


--> lapis 2 ( 7 lapis )
bh 330 45,540 330
bh 330 2,277 330
sak 30,000 50,220 30,000
m3 155,000 14,260 155,000
m' 25,410 29,335 25,413
m2 690 690 690
m2 10,000 10,000 10,000
- - - - - - - - - - -
Jumlah 152,322

bh 330 206,609 330


bh 330 4,132 330
sak 30,000 97,043 30,000
m3 155,000 62,000 155,000
m3 25,410 25,410 25,413
m' 690 - 690
m3 69,570 69,570 69,565
- - - - - - - - - - -
Jumlah 464,764

bh 1,600 20,800 1,600


sak 30,000 6,360 30,000
m3 155,000 3,875 155,000
m' 25,410 7,623 25,413
m2 500 500 500
m2 6,500 6,500 6,500
- - - - - - - - - - -
Jumlah 45,658

bh 1,600 20,800 1,600


sak 30,000 3,600 30,000
m3 155,000 4,805 155,000
m' 25,410 7,623 25,413
m2 500 500 500
m2 6,500 6,500 6,500
- - - - - - - - - - -
Jumlah 43,828

bh 1,600 20,800 1,600


sak 30,000 6,360 30,000
m3 155,000 3,875 155,000
m' 25,410 7,623 25,413
m2 500 500 500
m2 6,500 6,500 6,500
- - - - - - - - - - -
Jumlah 45,658
bh 1,600 20,800 1,600
sak 30,000 3,600 30,000
m3 155,000 4,805 155,000
m' 25,410 7,623 25,413
m2 500 500 500
m2 6,500 6,500 6,500
- - - - - - - - - - -
Jumlah 43,828

m3 495,000 49,500 495,000


m3 495,000 1,485 495,000
sak 30,000 tidak dipakai 30,000
m3 155,000 tidak dipakai 155,000
zak 50,000 tidak dipakai 50,000
zak tidak dipakai tidak dipakai
zak 55,000 tidak dipakai 55,000
zak 42,500 2,338 42,500
m1 25,410 17,787 25,413
m2 500 500 500
m2 6,000 6,000 6,000
- - - - - - - - - - -
77,610

sak 30,000 1,776 30,000


m2 - -
m2 3,500 3,500 3,500
- - - - - - - - - - -
Jumlah 5,276

sak 30,000 6,360 30,000


m3 155,000 3,875 155,000
m2 2,500 1,250 2,500
m' 12,000 3,600 12,000
m2 500 500 500
m 2,500 500 2,500
m2 7,750 7,750 7,750
- - - - - - - - - - -
Jumlah tanpa aci 23,835
Jumlah dengan aci 29,111

sak 30,000 5,880 30,000


m3 155,000 3,875 155,000
m2 2,500 1,250 2,500
m' 12,000 3,600 12,000
m2 500 500 500
m 2,500 500 2,500
m2 7,750 7,750 7,750
- - - - - - - - - - -
Jumlah tanpa aci 23,355
Jumlah dengan aci 28,631

sak 30,000 5,880 30,000


m3 155,000 3,875 155,000
m2 - -
m' - -
m2 500 500 500
m - -
m2 750 750 750
- - - - - - - - - - -
Jumlah tanpa aci 11,005

sak 25,000 13,125 25,000


m2 7,500 7,500 7,500 upah
- - - - - - - - - - -
20,625

sak 18,000 tidak dipakai 18,000


sak - tidak dipakai -
sak 22,000 tidak dipakai 22,000
sak 20,000 12,600 20,000
m2 2,500 1,250 2,500
m' 12,000 3,600 12,000
m2 500 500 500
m 2,500 500 2,500
m2 7,500 7,500 7,500
- - - - - - - - - - -
25,950

sak 54,000 tidak dipakai 54,000


sak 39,000 2,211 39,000
m2 4,000 4,000 4,000
- - - - - - - - - - -
6,211

sak 20,000 1,200 20,000


m2 500 500 500
- - - - - - - - - - -
1,700

sak 62,500 3,281 62,500


m2 4,000 4,000 4,000
- - - - - - - - - - -
7,281

sak 18,000 14,143 18,000


sak - - -
m2 2,500 1,250 2,500
m' 12,000 3,600 12,000
m2 500 500 500
m 2,500 500 2,500
m2 10,000 10,000 10,000 upah
- - - - - - - - - - -
29,993
sak 54,000 3,300 54,000
m2 4,000 4,000 4,000
- - - - - - - - - - -
7,300

sak 35,250 3,525 35,250


m2 4,000 4,000 4,000
- - - - - - - - - - -
7,525

sak 54,000 6,953 54,000


m2 4,000 4,000 4,000
- - - - - - - - - - -
10,953

sak 30,000 5,880 30,000


m3 155,000 3,875 155,000
m2 18,350 18,350 18,347
m 1,500 1,500 1,500
m2 5,000 5,000 5,000
- - - - - - - - - - -
Jumlah tanpa aci 34,605
Jumlah dengan aci 39,881

sak 30,000 8,820 30,000


m3 155,000 4,844 155,000
m2 2,500 2,500 2,500
m 1,500 1,500 1,500
m2 5,000 5,000 5,000
m2 - - -
- - - - - - - - - - -
Jumlah tanpa aci 22,664
Jumlah dengan aci 27,940

sak 30,000 20,580 30,000


m3 155,000 16,275 155,000
m2 18,350 18,350 18,347
m2 500 500 500
m 1,500 1,500 1,500
m2 5,000 5,000 5,000
- - - - - - - - - - -
Jumlah tanpa aci 62,205
Jumlah dengan aci 67,481

sak 30,000 14,700 30,000


m3 155,000 7,750 155,000
m2 11,040 11,040 11,042
m2 500 500 500
m 1,500 1,500 1,500
m2 5,000 5,000 5,000
- - - - - - - - - - -
Jumlah tanpa aci 40,490
Jumlah dengan aci 45,766

m2 - terpisah
Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
kg - terpisah
kg - terpisah -
m2 500 500 500
m2 6,000 6,000 6,000
- - - - - - - - - - -
18,350

m2 - -
sak 30,340 20,833 30,341
sak - - -
kg - - -
m2 1,000 1,000 1,000
m2 16,000 16,000 16,000
- - - - - - - - - - -
37,833

m2 - terpisah
sak 23,750 48,925 23,750
sak - terpisah
kg - terpisah -
m2 1,000 1,000 1,000
m2 6,000 6,000 6,000
- - - - - - - - - - -
55,925

unit rate
m2 450,000 540,000 450,000
Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai
sak - tidak dipakai
ltr 26,640 29,304 26,635
kg 8,100 2,430 8,097
lt mix - tidak dipakai
m2 1,000 1,000 1,000
m2 45,000 45,000 45,000
m2 50,000 50,000 50,000
- - - - - - - - - - -
679,584

m2 675,000 810,000 675,000


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
sak - tidak dipakai -
ltr 26,640 29,304 26,635
kg 8,100 2,430 8,097
lt mix - tidak dipakai -
m2 1,000 1,000 1,000
m2 45,000 45,000 45,000
m2 50,000 termasuk 50,000
- - - - - - - - - - -
899,584

m2 675,000 810,000 675,000


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
sak - tidak dipakai -
ltr 26,640 29,304 26,635
kg 8,100 2,430 8,097
lt mix - tidak dipakai -
m2 1,000 1,000 1,000
m2 45,000 45,000 45,000
m2 50,000 50,000 50,000
- - - - - - - - - - -
949,584

m1 225,000 236,250 225,000


Sak 30,000 1,584 30,000
m3 155,000 958 155,000
sak - tidak dipakai -
sak - tidak dipakai -
ltr 26,640 6,154 26,635
kg 8,100 501 8,097
lt mix - tidak dipakai -
m1 1,000 1,000 1,000
m1 50,000 50,000 50,000
m1 11,000 11,000 11,000
- - - - - - - - - - -
307,446

m1 47,500 49,875 47,500


Sak 30,000 1,483 30,000
m3 155,000 958 155,000
sak - tidak dipakai -
sak - tidak dipakai -
ltr 26,640 6,154 26,635
kg 8,100 501 8,097
lt mix - tidak dipakai -
m1 1,000 1,000 1,000
m1 50,000 50,000 50,000
m1 - - -
- - - - - - - - - - -
109,971

m1 200,000 210,000 200,000


Sak 30,000 1,483 30,000
m3 155,000 958 155,000
sak - tidak dipakai -
sak - tidak dipakai -
ltr 26,640 6,154 26,635
kg 8,100 501 8,097
lt mix - tidak dipakai -
m1 1,000 1,000 1,000
m1 50,000 50,000 50,000
m1 - - -
- - - - - - - - - - -
270,096

m2 34,680 36,414 34,682


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak 45,000 tidak dipakai 45,000
kg 6,000 tidak dipakai 6,000
kg 3,500 17,500 3,499
kg 8,100 2,430 8,097
lt mix 53,430 tidak dipakai 53,431
m2 1,000 1,000 1,000
m2 14,000 14,000 14,000
- - - - - - - - - - -
83,194
m2 32,290 33,905 32,291
Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak 45,000 tidak dipakai 45,000
kg 6,000 tidak dipakai 6,000
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
lt mix 53,430 tidak dipakai 53,431
m2 1,000 1,000 1,000
m2 14,000 14,000 14,000
- - - - - - - - - - -
Lantai 76,384
Dinding 79,384

pa plaster)
m2 32,290 33,905 32,291
Sak 30,000 tidak dipakai 30,000
m3 155,000 tidak dipakai 155,000
sak 45,000 tidak dipakai 45,000
kg 6,000 tidak dipakai 6,000
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
lt mix 53,430 tidak dipakai 53,431
m2 1,000 1,000 1,000
m2 17,000 17,000 17,000
- - - - - - - - - - -
Dinding 67,534

m2 188,760 198,198 188,760


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai
kg - tidak dipakai
kg 3,500 17,500 3,499
kg 8,100 2,430 8,097
m2 1,000 1,000 1,000
m2 17,000 17,000 17,000
- - - - - - - - - - -
Pas dinding 247,978
Pas lantai 244,978

m2 167,500 175,875 167,500


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
kg 3,500 17,500 3,499
kg 8,100 2,430 8,097
m2 1,000 1,000 1,000
m2 17,000 17,000 17,000
- - - - - - - - - - -
Pas dinding 225,655
Pas lantai 222,655

m2 143,720 150,906 143,715


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m2 1,000 1,000 1,000
m2 14,000 14,000 14,000
- - - - - - - - - - -
193,385

m2 186,120 195,426 186,115


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m2 1,000 1,000 1,000
m2 14,000 14,000 14,000
- - - - - - - - - - -
Pas lantai 237,905
Pas dinding 240,905

m2 199,560 209,538 199,557


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m2 1,000 1,000 1,000
m2 16,000 16,000 16,000
- - - - - - - - - - -
254,017

m2 177,250 186,113 177,249


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m2 1,000 1,000 1,000
m2 16,000 16,000 16,000
- - - - - - - - - - -
230,592

m2 - terpisah
Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 13,979 76,250
sak 55,000 1,650 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m2 1,000 1,000 1,000
m2 100,000 100,000 100,000
- - - - - - - - - - -
128,479

m2 570,000 598,500 570,000


Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
sak - tidak dipakai -
kg - tidak dipakai -
kg 3,500 17,500 3,499
kg 8,100 2,430 8,097
m2 1,000 1,000 1,000
m2 150,000 150,000 150,000
- - - - - - - - - - -
781,280

m1 23,890 26,279 23,894


Sak 30,000 742 30,000
m3 155,000 479 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 2,097 76,250
sak 55,000 248 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m1 500 500 500
m1 7,000 7,000 7,000
- - - - - - - - - - -
37,344

bh 2,970 10,395 2,968


Sak 30,000 742 30,000
m3 155,000 479 155,000
sak - tidak dipakai -
kg - tidak dipakai -
kg 3,500 1,803 3,499
kg 8,100 250 8,097
m1 200 200 200
m1 5,000 5,000 5,000
- - - - - - - - - - -
18,868

m1 20,860 21,903 20,864


Sak 30,000 742 30,000
m3 155,000 479 155,000
sak - tidak dipakai -
kg - tidak dipakai -
sak 76,250 1,144 76,250
sak 55,000 248 55,000
kg 3,500 tidak dipakai 3,499
kg 8,100 tidak dipakai 8,097
m1 - -
m1 5,000 5,000 5,000
- - - - - - - - - - -
29,515

m1 68,530 75,383 68,530


Sak 30,000 terpisah 30,000
m3 155,000 terpisah 155,000
sak - tidak dipakai -
kg - tidak dipakai -
kg 3,500 1,803 3,499
kg 8,100 250 8,097
m1 500 500 500
m1 7,000 7,000 7,000
- - - - - - - - - - -
84,936

m2 162,310 170,426 162,305


Sak 30,000 terpisah 30,000
m3 155,000 terpisah 155,000
sak - tidak dipakai -
kg - tidak dipakai -
kg 3,500 17,500 3,499
kg 8,100 2,430 8,097
m2 500 500 500
m2 16,000 16,000 16,000
- - - - - - - - - - -
Pas lantai 206,856
Pas dinding 209,856

m2 - terpisah
Sak 30,000 7,200 30,000
m3 155,000 4,650 155,000
m2 32,160 tidak dipakai 32,161
sak 45,000 tidak dipakai 45,000
kg 3,500 terpisah 3,499
kg 8,100 terpisah 8,097
m2 500 500 500
m2 6,000 6,000 6,000
- - - - - - - - - - -
18,350

sak 30,000 14,700 30,000


m3 155,000 7,750 155,000
m2 11,040 11,040 11,042
m2 100 100 100
m 1,500 1,500 1,500
m2 4,500 4,500 4,500
- - - - - - - - - - -
Jumlah tanpa aci 39,590
Jumlah dengan aci 44,866
m2 - -
m2 175,000 175,000 175,000
m' 11,000 44,000 11,000
m' 5,000 20,000 5,000
m' 75,000 300,000 75,000
m2 83,110 91,421 83,106
m2 7,500 7,500 7,500
m2 12,570 12,570 12,566
m2 35,000 35,000 35,000
m2 427,500 427,500 427,500
- - - - - - - - - - -
1,112,991

m2 - -
m1 45,150 13,545 45,146
m' #REF! #REF! #REF!
m' 20,570 20,570 20,570
m' - -
- - - - - - - - - - -
#REF!

m2 - -
m2 2,280 228 2,277
m2 62,150 21,753 62,147
m' - -
m2 11,000 3,850 11,000
- - - - - - - - - - -
25,831

urug padat,

mik suply by owner)

m3 124,250 91,324 124,250


m2 - suply by owner -
m2 18,350 18,350 18,350
- - - - - - - - - - -
109,674
m3 488,600 73,290 488,600
m2 18,350 19,268 18,347
m3 124,250 13,046 124,250
m3 374,600 19,667 374,600
m2 3,500 3,675 3,500
m1 1,500 - 1,500
- - - - - - - - - - -
128,945

h trowel finish

m3 488,600 48,860 488,600


m2 18,350 19,268 18,347
m3 124,250 tidak dipergunakan 124,250
m3 374,600 tidak dipergunakan 374,600
m2 3,500 3,675 3,500
m1 1,500 - 1,500
- - - - - - - - - - -
71,803

m3 374,600 60,685 374,600


m2 49,080 98,651 49,085
Kg 5,030 142,601 5,025
m2 275,000 terpisah 275,000
unit 60,000 60,000 60,000
- - - - - - - - - - -
harga / unit 361,937
harga / m2 223,418

m3 374,600 78,891 374,600


m2 49,080 147,534 49,085
Kg 5,030 132,415 5,025
unit - harga subkon
unit 60,000 60,000 60,000
- - - - - - - - - - -
harga / unit 418,840
harga / m1 2,094,200
m2 61,520 92,280 61,516
m1 55,000 55,000 55,000
m1 4,040 4,040 4,037
unit 45,000 45,000 45,000
- - - - - - - - - - -
196,320

m2 123,030 541,332 123,033


m2 29,110 276,545 29,111
m2 97,730 928,435 97,735
m2 26,000 247,000 26,000
unit 65,000 terpisah 65,000
unit 100,000 terpisah 100,000
- - - - - - - - - - -
1,993,312
476,869

m2 61,520 61,520 61,516


m2 29,110 62,587 29,111
m2 11,000 23,650 11,000
- - - - - - - - - - -
147,757

bh 44,000 46,200 44,000


m3 124,250 3,728 124,250
ls 6,000 6,000 6,000
bh 15,000 30,000 15,000
bh 360,000 32,400 360,000
bh 5,000 5,000 5,000
m2 21,280 7,022 21,276
- - - - - - - - - - -
130,350
m2 5,280 174 5,276
m1 - harga subkon -
bh 5,000 7,500 5,000
m3 13,930,000 32,910 13,930,000
m 5,280 3,221 5,276
m 7,000 7,000 7,000
- - - - - - - - - - -
50,805

m2 5,280 174 5,276


m1 53,630 58,993 53,625
bh 5,000 7,500 5,000
m3 13,930,000 45,969 13,930,000
m 5,280 3,221 5,276
m 7,000 7,000 7,000
- - - - - - - - - - -
122,857

m3 124,250 2,237 124,250


m3 374,600 3,371 374,600
m1 - - -
bh 5,000 10,000 5,000
m3 560,000 10,080 560,000
m 5,280 2,851 5,276
m 7,000 7,000 7,000
- - - - - - - - - - -
35,539

m2 5,280 380 5,276


bh - harga subkon
bh 5,000 10,000 5,000
m3 13,930,000 100,296 13,930,000
m 5,280 1,521 5,276
bh 7,000 7,000 7,000
- - - - - - - - - - -
119,197
m3 - terpisah -
m3 374,600 terpisah 374,600
m1 - - -
bh 5,000 10,000 5,000
m3 13,930,000 62,685 13,930,000
m 5,280 2,059 5,276
m 7,000 7,000 7,000
- - - - - - - - - - -
81,744

m2 61,520 24,608 61,516


m2 29,110 32,021 29,111
kg 10,000 48,400 10,000
- - - - - - - - - - -
105,029

Discount
0.65

m2 113,750 119,438 113,750


m3 126,150 37,845 126,150
m3 124,250 18,638 124,250
m3 124,250 1,243 124,250
m2 8,000 8,000 8,000
m2 7,000 7,000 7,000
m2 3,000 3,000 3,000
m2 1,000 1,000 1,000
Ls 300 300 300
- - - - - - - - - - -
196,463

br A7102 det 6)
m2 113,750 119,438 113,750
m3 126,150 3,785 126,150
m3 - -
m3 126,500 1,265 126,500
m2 8,000 8,000 8,000
m2 7,000 7,000 7,000
m2 3,000 3,000 3,000
m2 1,000 1,000 1,000
Ls 300 300 300
- - - - - - - - - - -
143,787

m2 63,050 66,203 63,050


m3 126,150 37,845 126,150
m3 124,250 18,638 124,250
m3 124,250 1,243 124,250
m2 8,000 8,000 8,000
m2 7,000 7,000 7,000
m2 3,000 3,000 3,000
m2 1,000 1,000 1,000
Ls 300 300 300
- - - - - - - - - - -
143,228

m1 47,940 50,337 47,938


m3 124,250 tidak dipakai 124,250
ls 3,500 3,500 3,500
bh 5,000 10,000 5,000
m1 7,000 7,000 7,000
Ls 1,500 tidak dipakai 1,500
- - - - - - - - - - -
70,837

m1 136,170 142,979 136,170


m3 17,000 1,562 17,000
m3 124,250 3,262 124,250
m3 17,000 281 17,000
m1 75,000 75,000 75,000
- - - - - - - - - - -
223,083
m1 134,000 140,700 134,000
m3 17,000 1,562 17,000
m3 124,250 3,262 124,250
m3 17,000 281 17,000
m1 81,350 81,350 81,350
- - - - - - - - - - -
227,154

m1 253,980 266,679 253,980


m3 17,000 1,562 17,000
m3 124,250 3,262 124,250
m3 17,000 281 17,000
m1 115,000 115,000 115,000
- - - - - - - - - - -
386,783

unit 134,010 134,010 134,005


m1 70,830 311,652 70,834
m2 500,000 1,387,500 500,000
m1 150,000 57,750 150,000
m2 100,000 127,600 100,000
m2 10,000 29,920 10,000
m 53,500 823,900 53,500
m 50,000 420,000 50,000
m2 500,000 2,200,000 500,000
m 4,110 17,262 4,106
unit 1,031,300 1,031,300 1,031,300
m2 18,350 22,020 18,350
m3 - -
m2 82,480 174,033 82,479
kg 5,025,350 308,707,251 5,025,350
- - - - - - - - - - -
315,444,197

m3 17,000 398,030 17,000


m3 8,000 187,308 8,000
m3 124,250 135,308 124,250
m3 374,600 203,970 374,600
m3 - -
m2 61,520 609,048 61,516
m3 55,000 618,750 55,000
m3 35,000 57,173 35,000
m1 57,000 245,100 57,000

- - - - - - - - - - -
1,869,348

m3 17,000 170 17,000


m3 5,000 50 5,000
m3 124,250 497 124,250
m3 374,600 749 374,600
m2 64,190 10,270 64,186
m2 47,110 26,382 47,111
- - - - - - - - - - -
38,118

m2 61,520 7,382 61,516


m2 - -
- - - - - - - - - - -
7,382

m2 61,520 212,244 61,516


m2 - - -
m2 #REF! #REF! #REF!
- - - - - - - - - - -
#REF!

m2 61,520 211,629 61,516


m2 - - -
m2 - -
- - - - - - - - - - -
211,629

m3 17,000 33,048 17,000


m3 17,000 33,048 17,000
m3 17,000 - 17,000
m3 124,250 17,892 124,250
m3 374,600 26,971 374,600
m3 #REF! #REF! #REF!
kg 5,030 1,521,072 5,025
m2 68,920 595,469 68,918
m2 71,000 613,440 71,000
unit 80,000 80,000 80,000

- - - - - - - - - - -
#REF!

m3 17,000 149,940 17,000


m3 17,000 149,940 17,000
m3 17,000 - 17,000
m3 124,250 54,794 124,250
m3 374,600 82,599 374,600
m3 #REF! #REF! #REF!
kg 5,030 2,668,214 5,025
m2 68,920 1,436,982 68,918
m2 71,000 1,480,350 71,000
unit 80,000 80,000 80,000
unit 825,000 825,000 825,000
- - - - - - - - - - -
#REF!

m3 17,000 291,669 17,000


m3 17,000 291,669 17,000
m3 17,000 - 17,000
m3 124,250 99,152 124,250
m3 374,600 149,465 374,600
m3 #REF! #REF! #REF!
kg 5,030 2,894,262 5,025
m2 68,920 1,338,426 68,918
m2 60,000 1,165,200 60,000
unit 80,000 80,000 80,000
unit 825,000 825,000 825,000
- - - - - - - - - - -
#REF!

m3 17,000 247,078 17,000


m3 17,000 247,078 17,000
m3 17,000 - 17,000
m3 124,250 83,993 124,250
m3 374,600 126,615 374,600
m3 #REF! #REF! #REF!
kg 5,030 2,562,282 5,025
m2 68,920 1,874,624 68,918
m2 60,000 1,632,000 60,000
unit 80,000 80,000 80,000
unit 825,000 825,000 825,000
- - - - - - - - - - -
#REF!

m3 17,000 652,201 17,000


m3 17,000 652,201 17,000
m3 17,000 - 17,000
m3 124,250 186,934 124,250
m3 374,600 281,793 374,600
m3 #REF! #REF! #REF!
kg 5,030 8,319,620 5,025
m2 68,920 4,893,320 68,918
m2 60,000 2,697,600 60,000
unit 80,000 - 80,000
unit 825,000 - 825,000
- - - - - - - - - - -
#REF!

m3 17,000 477,360 17,000


m3 17,000 477,360 17,000
m3 17,000 - 17,000
m3 124,250 178,920 124,250
m3 374,600 269,712 374,600
m3 #REF! #REF! #REF!
kg 5,030 6,066,180 5,025
m2 68,920 3,473,568 68,918
m2 60,000 2,665,800 60,000
unit 80,000 - 80,000
unit 825,000 - 825,000
- - - - - - - - - - -
#REF!

m3 17,000 29,325 17,000


m3 17,000 29,325 17,000
m3 17,000 - 17,000
m3 124,250 18,638 124,250
m3 374,600 18,730 374,600
m3 #REF! #REF! #REF!
kg 5,030 576,438 5,025
m2 68,920 423,169 68,918
m2 60,000 368,400 60,000
unit 80,000 80,000 80,000
unit - -
- - - - - - - - - - -
#REF!

m3 17,000 102,340 17,000


m3 17,000 102,340 17,000
m3 17,000 - 17,000
m3 124,250 34,790 124,250
m3 374,600 52,444 374,600
m3 #REF! #REF! #REF!
kg 5,030 908,418 5,025
m2 68,920 1,105,477 68,918
m2 60,000 962,400 60,000
unit 80,000 80,000 80,000
unit - -
- - - - - - - - - - -
#REF!

unit 4,500 27,000 4,500


unit 4,500 27,000 4,500
unit 3,250 - 3,250
unit 2,500 50,000 2,500
unit - -
unit 2,650 31,800 2,650
unit 2,650 31,800 2,650
unit 600 7,200 600

m3 2,000,000 576,000 2,000,000


- - - - - - - - - - -
Harga per modul 750,800
Harga/m2 14,103

m2 72,000 79,200 72,000


m3 - -
m2 14,100 14,100 14,103
m' 3,500 2,380 3,500
kg - -
m2 3,500 3,500 3,500
m2 3,500 3,500 3,500
- - - - - - - - - - -
102,680

m3 17,000 6,630 17,000


m3 124,250 19,414 124,250
m3 399,400 49,925 399,400
m2 #REF! #REF! #REF!
m1 #REF! #REF! #REF!
bh 30,730 245,840 30,727
- - - - - - - - - - -
#REF!

m3 #REF! #REF! #REF!


m2 #REF! #REF! #REF!
kg 5,030 301,800 5,025
m2 28,630 11,452 28,631
bh 11,250 22,500 11,250
m2 #REF! #REF! #REF!
- - - - - - - - - - -
#REF!

m3 #REF! #REF! #REF!


m2 #REF! #REF! #REF!
kg 5,030 1,158,912 5,025
m2 28,630 524,960 28,631
- - - - - - - - - - -
#REF!

m3 #REF! #REF! #REF!


m2 #REF! #REF! #REF!
kg 5,030 6,309,506 5,025
m2 40,630 1,427,027 40,631
- - - - - - - - - - -

#REF!

m3 17,000 1,116 17,000


m3 17,000 1,116 17,000
m3 124,250 5,759 124,250
m3 399,400 6,171 399,400
m2 34,600 12,473 34,602
m1 124,000 124,000 124,000
m2 60,000 55,620 60,000
- - - - - - - - - - -
206,254

m3 17,000 3,927 17,000


m3 17,000 3,927 17,000
m3 124,250 7,679 124,250
m3 399,400 8,228 399,400
m2 34,600 14,255 34,602
m1 173,000 173,000 173,000
m2 60,000 74,160 60,000
- - - - - - - - - - -
285,175

m3 17,000 5,801 17,000


m3 17,000 5,801 17,000
m3 124,250 9,598 124,250
m3 399,400 10,285 399,400
m2 34,600 17,819 34,602
m1 173,000 173,000 173,000
m2 60,000 92,700 60,000
- - - - - - - - - - -
315,004

m3 17,000 8,033 17,000


m3 17,000 8,033 17,000
m3 124,250 11,518 124,250
m3 399,400 12,341 399,400
m2 34,600 21,383 34,602
m1 173,000 173,000 173,000
m2 60,000 111,240 60,000
- - - - - - - - - - -
345,547

m3 17,000 13,566 17,000


m3 17,000 13,566 17,000
m3 124,250 15,357 124,250
m3 399,400 16,455 399,400
m2 34,600 28,510 34,602
m1 173,000 173,000 173,000
m2 60,000 148,320 60,000
- - - - - - - - - - -
408,775
m3 17,000 1,116 17,000
m3 17,000 1,116 17,000
m3 124,250 - 124,250
m2 34,600 26,729 34,602
m3 124,000 14,648 124,000
m2 47,720 24,576 47,719
kg 5,030 59,417 5,025
m2 60,000 46,350 60,000
- - - - - - - - - - -
173,950

m3 17,000 4,463 17,000


m3 17,000 4,463 17,000
m3 124,250 - 124,250
m2 34,600 53,457 34,602
m3 124,000 29,295 124,000
m2 47,720 49,152 47,719
kg 5,030 118,834 5,025
m2 60,000 92,700 60,000
- - - - - - - - - - -
352,362

m3 17,000 - 17,000
m3 17,000 - 17,000
m3 124,250 - 124,250
m2 34,600 28,510 34,602
m3 124,000 15,624 124,000
m2 47,720 29,491 47,719
kg 5,030 63,378 5,025
m2 60,000 49,440 60,000
- - - - - - - - - - -
186,443

m3 17,000 10,200 17,000


m3 124,250 7,455 124,250
m3 374,600 11,238 374,600
m3 385,600 107,968 385,600
m3 467,800 18,712 467,800
m2 47,720 14,316 47,719
kg 5,010 32,866 5,013
m3 17,000 3,910 17,000
- - - - - - - - - - -
harga /m1 206,665

m3 467,800 470,841 467,800


m2 68,920 321,615 68,918
m2 105,140 410,467 105,144
kg 5,010 829,426 5,013
- - - - - - - - - - -
harga /m3 2,032,348

m3 467,800 2,198,660 467,800


m2 68,920 1,891,165 68,918
m2 105,140 - 105,144
kg 5,010 4,124,232 5,013
- - - - - - - - - - -
harga /m3 8,214,057
harga/m2 717,385

m2
m3 467,800 635,413 467,800
m2 68,920 685,409 68,918
m2 105,140 - 105,144
kg 5,010 1,020,762 5,013
- - - - - - - - - - -
harga /unit 2,341,585
harga /m2 293,064

m3 #REF! #REF! #REF!


kg 5,025,350 40,920,139 5,025,350
m2 #VALUE! #VALUE! #VALUE!
unit - -
unit - -
bh 187,500 750,000 187,500
- - - - - - - - - - - - - -
#REF! -

m3 464,760 63,841 464,763


m2 29,110 34,346 29,111
- - - - - - - - - - - - - -
98,187 -

m3 464,760 128,390 464,763


m2 29,110 53,999 29,111
- - - - - - - - - - - - - -
182,389 -

m3 464,760 67,971 464,763


m2 29,110 33,040 29,111
- - - - - - - - - - - - - -
101,011 -

m3 17,000 - 17,000
m3 6,000 - 6,000
m3 masuk plat utama #REF!
kg 5,010 35,508 5,006
m2 47,720 19,088 47,719
m2 60,000 24,000 60,000
m2 44,870 17,948 44,868
- - - - - - - - - - - - - -
96,544

m3 17,000 2,040 17,000


m3 6,000 720 6,000
m3 masuk plat utama #REF!
kg masuk plat utama 5,006
m2 47,720 38,176 47,719
m2 60,000 66,000 60,000
m2 44,870 49,357 44,868
- - - - - - - - - - - - - -
156,293

m3 17,000 510 17,000


m3 6,000 180 6,000
m3 masuk plat utama #REF!
kg masuk plat utama 5,006
m2 47,720 28,632 47,719
m2 60,000 42,000 60,000
m2 44,870 31,409 44,868
- - - - - - - - - - - - - -
102,731

m3 464,760 13,943 464,763


kg 5,010 11,273 5,006
m2 47,720 26,246 47,719
bh 15,000 22,500 15,000
m3 12,000,000 54,000 12,000,000
m2 5,280 2,904 5,276
- - - - - - - - - - - - - -
130,865

m3 464,760 79,009 464,763


m2 74,970 164,934 74,972
kg 5,010 320,640 5,006
- - - - - - - - - - - - - -
564,583

m3 464,760 464,760 464,763


m2 90,170 827,761 90,169
kg 5,010 706,410 5,006
- - - - - - - - - - - - - -
1,998,931
m3 464,760 7,473,341 464,763
m2 29,110 1,551,563 29,111
- - - - - - - - - - - - - -
9,024,904
169,323

m3 464,760 1,358,098 464,763


m2 29,110 2,297,827 29,111
- - - - - - - - - - - - - -
3,655,925
47,456

m3 17,000 8,500 17,000


m3 6,000 3,000 6,000
m3 339,900 169,950 339,900
m3 1,998,350 109,909 1,998,353
bh 35,000 52,500 35,000
m2 64,190 67,400 64,186
m2 58,220 134,488 58,222
m2 18,000 87,120 18,000
- - - - - - - - - - - - - -
632,867

bekisting tulangan sdh masuk saat pengecoran Pelat)


m1 7,500 7,500 7,500
m2 29,110 8,442 29,111
----------------------------
Jumlah 15,941.90

m1 2,081,440 27,266,864 2,081,440


m1 41,720 684,208 41,716

m2 60,000 336,000 60,000


m1 6,498,000 16,245,000 6,498,000

m2 60,000 336,000 60,000


m1 5,767,200 14,418,000 5,767,200

----------------------------
per unit 59,286,072.00
perm1 1,504,723
Cakra harga pen 2
4,850
4,800
4,775
4,750
4,770
4,800
4,775
4,750
4,775
4,800
4,773
Adhimix Adhimix tgl 20-des-06
345,000 335,000
435,000 420,000
455,000 440,000
465,000 460,000
440,000 440,000
465,000 445,000
490,000 465,000
505,000 475,000
NET
Material

1,000,000,000
18,120
37,634
408
16,000
21,960
10,000
- - - - - - - - - - -
104,122

10,000 kris
16,800
1,360
2,000
- - - - - - - - - - -
30,160
17,000

109,250
15,000
- - - - - - - - - - -
124,250
12,425

111,150
15,000
- - - - - - - - - - -
126,150
12,615

126,500
15,000
- - - - - - - - - - -
141,500
14,150

132,250
8,250
15,000
- - - - - - - - - - -
155,500
121,000
15,000
- - - - - - - - - - -
136,000

126,500
159,000
65,100
35,000
- - - - - - - - - - -
385,600

126,500
97,800
80,600
35,000
- - - - - - - - - - -
339,900

126,500
75,600
86,800
35,000
- - - - - - - - - - -
323,900
120,000
74,100
110,500
70,000
- - - - - - - - - - -
374,600
18,730

192,000
70,200
106,600
70,000
- - - - - - - - - - -
438,800

180,000
70,200
110,500
70,000
- - - - - - - - - - -
430,700

348,400
-
1,000
50,000
- - - - - - - - - - -
399,400

436,800
10,000
1,000
5,000
15,000
- - - - - - - - - - -
467,800

457,600
10,000
1,000
5,000
15,000
- - - - - - - - - - -
488,600

478,400
10,000
1,000
5,000
15,000
- - - - - - - - - - -
509,400

457,600
10,000
1,000
5,000
15,000
- - - - - - - - - - -
488,600

462,800
10,000
1,000
5,000
15,000
- - - - - - - - - - -
493,800

483,600
10,000
1,000
5,000
15,000
- - - - - - - - - - -
514,600

494,000
10,000
1,000
5,000
15,000
- - - - - - - - - - -
525,000

467,513
8,580
24,500
- - - - - - - - - - -
500,593
5,006

469,875
8,580
24,500
- - - - - - - - - - -
502,955
5,030

467,250
8,580
24,500
- - - - - - - - - - -
500,330
5,003
467,250
8,580
24,500
- - - - - - - - - - -
500,330
5,003

467,250
8,580
24,500
- - - - - - - - - - -
500,330
5,003

459,375
8,580
24,500
- - - - - - - - - - -
492,455
4,925
4,924,550

469,455
8,580
24,500
- - - - - - - - - - -
502,535
5,025
5,025,350

2,954,730,000
22,111,540,000
- - - - - - - - - - -
25,066,270,000
5,013

5,013

470,925
8,580
24,500
- - - - - - - - - - -
504,005
5,040

470,925
8,580
65,000
- - - - - - - - - - -
544,505
5,445

469,875
8,580
24,500
- - - - - - - - - - -
502,955
5,030

467,250
8,580
24,500
- - - - - - - - - - -
500,330
5,003

467,250
8,580
65,000
- - - - - - - - - - -
540,830
5,408
469,875
8,580
24,500
- - - - - - - - - - -
502,955
5,030

472,500
8,580
24,500
- - - - - - - - - - -
505,580
5,056

3,395
500
750
1,250
- - - - - - - - - - -
5,895

8,542
500
750
1,250
- - - - - - - - - - -
11,042

11,006
500
750
1,250
- - - - - - - - - - -
13,506
15,847
500
750
1,250
- - - - - - - - - - -
18,347

21,569
500
750
1,250
- - - - - - - - - - -
24,069

28,171
500
750
1,250
- - - - - - - - - - -
30,671

21,424
6,360
3,875
130
4,000
- - - - - - - - - - -
35,789

46,144
19,080
11,625
130
5,500
- - - - - - - - - - -
82,479

9,809
21,375
2,244
1,900
233
13,500
- - - - - - - - - - -
49,061

5,700
12,800
- - - - - - - - - - -
18,500

21,836
18,500
1,700
1,900
233
11,250
13,500
- - - - - - - - - - -
68,918
ada item plaster
- - - - - - - - - - -
68,918

31,074
18,500
1,700
1,900
233
11,250
13,500
- - - - - - - - - - -
78,156
tidak diperlukan
- - - - - - - - - - -
78,156

27,000
27,000
19,500
75,000
-
31,800
31,800
7,200
-
576,000
- - - - - - - - - - -
795,300
14,939

19,596
14,939
14,850
16,623
950
233
1,700
14,000
- - - - - - - - - - -
82,891
ada item plaster
- - - - - - - - - - -
#VALUE!

26,874
14,939
14,850
16,623
950
233
1,700
14,000
- - - - - - - - - - -
90,169
ada item plaster
- - - - - - - - - - -
90,169

19,596
14,939
14,850
16,623
950
233
1,700
12,000
- - - - - - - - - - -
80,891
ada item plaster
- - - - - - - - - - -
80,891

26,874
14,939
14,850
16,623
950
233
1,700
12,000
- - - - - - - - - - -
88,169
ada item plaster
- - - - - - - - - - -
88,169
40,312
14,939
14,850
16,623
950
233
1,700
14,500
- - - - - - - - - - -
104,107
ada item plaster
- - - - - - - - - - -
104,107

24,523
14,939
1,700
950
233
13,300
18,000
14,500
- - - - - - - - - - -
88,145

35,273
14,939
1,700
950
233
13,300
18,000
14,500
- - - - - - - - - - -
98,894
ada item plaster
- - - - - - - - - - -
98,894
14,697
12,500
1,700
1,900
233
5,625
4,618
15,500
- - - - - - - - - - -
56,773

- - - - - - - - - - -
56,773

16,125
12,500
1,700
1,900
233
5,625
3,694
19,000
- - - - - - - - - - -
60,777
ada item plaster
- - - - - - - - - - -
60,777

40,312
12,500
1,700
1,900
233
5,625
-
-
21,000
- - - - - - - - - - -
83,269
ada item plaster
- - - - - - - - - - -
83,269

19,596
41,800
3,060
2,850
233
19,000
- - - - - - - - - - -
86,538

- - - - - - - - - - -
86,538

26,874
41,800
3,060
2,850
233
19,000
- - - - - - - - - - -
93,817
ada item plaster
- - - - - - - - - - -
93,817

32,249
12,500
1,890
2,850
233
11,250
14,000
- - - - - - - - - - -
74,972
ada item plaster
- - - - - - - - - - -
74,972
4,409
12,500
1,700
1,900
233
-
10,000
- - - - - - - - - - -
30,742

8,818
5,000
8,910
9,974
950
233
1,700
13,500
- - - - - - - - - - -
49,085

12,261
12,500
1,700
1,900
233
5,625
13,500
- - - - - - - - - - -
47,719

58,788
-
14,850
16,623
950
233
1,700
12,000
- - - - - - - - - - -
105,144

62,147
18,500
1,700
1,900
233
11,250
13,500
- - - - - - - - - - -
109,230

22,110 1m tinggi
- Hebel 36.90 Kolom Praktis 10 x 10cm / M'
7,560 p ( 3 bh) 12.30 Beton
8,060 ( tengah ) 9.00 Bekisting
14,669 21.30 Besi
617 Ratio 0.58 Upah
500
8,000 Total
- - - - - - - - - - -
61,516

22,110 1m tinggi
- Hebel 36.90 Kolom Praktis 10 x 10cm / M'
11,160 p ( 3 bh) 12.30 Beton
7,130 ( tengah ) 9.00 Bekisting
14,669 21.30 Besi
617 Ratio 0.58 Upah
500
8,000 Total
- - - - - - - - - - -
64,186

1,650
83
11,160
7,130
14,669
6,404
50
4,000
- - - - - - - - - - -
45,146

45,540
2,277
50,220 --> x 2.25 karena dari pasangan 1/2 bata di kali 2 ditambah di tengahnya
14,260
29,339 Kolom Praktis 12 x 25 / M' untuk 1 bata
690 Beton 16,151.25
10,000 Bekisting 7,378.01
- - - - - - - - - - - Besi 14,414.85
152,326 --------------------------------------------
Total 37,944.11

206,609
4,132
97,043
62,000
25,413
-
69,565
- - - - - - - - - - -
464,763

20,800
6,360
3,875
7,624
500
6,500
- - - - - - - - - - -
45,659

20,800
3,600
4,805
7,624
500
6,500
- - - - - - - - - - -
43,829

15,976
20,800 8,000
6,360 13,725
3,875 - - - -
7,624 37,701
500
6,500
- - - - - - - - - - -
45,659
20,800
3,600
4,805
7,624
500
6,500
- - - - - - - - - - -
43,829

49,500
1,485
tidak dipakai
tidak dipakai
tidak dipakai
tidak dipakai
tidak dipakai
2,338
17,789
500
6,000
- - - - - - - - - - -
77,612

1,776
-
3,500
- - - - - - - - - - -
5,276

6,360
3,875
1,250
3,600
500
500
7,750
- - - - - - - - - - -
23,835
29,111

5,880
3,875
1,250
3,600
500
500
7,750
- - - - - - - - - - -
23,355
28,631

5,880
3,875
-
-
500
-
750
- - - - - - - - - - -
11,005

13,125
7,500
- - - - - - - - - - -
20,625

tidak dipakai
tidak dipakai
tidak dipakai
12,600
1,250
3,600
500
500
7,500
- - - - - - - - - - -
25,950

tidak dipakai
2,211
4,000
- - - - - - - - - - -
6,211

1,200
500
- - - - - - - - - - -
1,700

3,281
4,000
- - - - - - - - - - -
7,281

14,143
-
1,250
3,600
500
500
10,000
- - - - - - - - - - -
29,993
3,300
4,000
- - - - - - - - - - -
7,300

3,525
4,000
- - - - - - - - - - -
7,525

6,953
4,000
- - - - - - - - - - -
10,953

5,880
3,875
18,347
1,500
5,000
- - - - - - - - - - -
34,602
39,878

8,820
4,844
2,500
1,500
5,000
-
- - - - - - - - - - -
22,664
27,940

20,580
16,275
18,347
500
1,500
5,000
- - - - - - - - - - -
62,202
67,478

14,700
7,750
11,042
500
1,500
5,000
- - - - - - - - - - -
40,492
45,768

terpisah
7,200 16,850
4,650
terpisah
terpisah
500
6,000
- - - - - - - - - - -
18,350

-
20,834
-
-
1,000
16,000
- - - - - - - - - - -
37,834

terpisah
48,925
terpisah
terpisah
1,000
6,000
- - - - - - - - - - -
55,925

540,000
7,200 16,850
4,650
tidak dipakai
tidak dipakai
29,299
2,429
tidak dipakai
1,000
45,000
50,000
- - - - - - - - - - -
679,578

810,000
7,200 16,850
4,650
tidak dipakai
tidak dipakai
29,299
2,429
tidak dipakai
1,000
45,000
termasuk
- - - - - - - - - - -
899,578

810,000
7,200 16,850
4,650
tidak dipakai
tidak dipakai
29,299
2,429
tidak dipakai
1,000
45,000
50,000
- - - - - - - - - - -
949,578

236,250
1,584 7,542
958
tidak dipakai
tidak dipakai
6,153
500
tidak dipakai
1,000
50,000
11,000
- - - - - - - - - - -
307,445

49,875
1,483 7,441
958
tidak dipakai
tidak dipakai
6,153
500
tidak dipakai
1,000
50,000
-
- - - - - - - - - - -
109,969

210,000
1,483
958 12,111
tidak dipakai
tidak dipakai
6,153
500
tidak dipakai
1,000
50,000
-
- - - - - - - - - - -
270,094

36,416
7,200 16,850
4,650
tidak dipakai
tidak dipakai
17,495
2,429
tidak dipakai
1,000
14,000
- - - - - - - - - - -
83,191
33,905
7,200 32,479
4,650
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
tidak dipakai
1,000
14,000
- - - - - - - - - - -
76,385
79,385

33,905
tidak dipakai 20,629
tidak dipakai
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
tidak dipakai
1,000
17,000
- - - - - - - - - - -
67,535

198,198
7,200 16,850
4,650
tidak dipakai
tidak dipakai
17,495
2,429
1,000
17,000
- - - - - - - - - - -
247,973
244,973

175,875
7,200 16,850
4,650
tidak dipakai
tidak dipakai
17,495
2,429
1,000
17,000
- - - - - - - - - - -
225,650
222,650

150,901
7,200 16,850
4,650
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
1,000
14,000
- - - - - - - - - - -
193,380

195,421
7,200 16,850
4,650
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
1,000
14,000
- - - - - - - - - - -
237,900
240,900

209,534
7,200 16,850
4,650
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
1,000
16,000
- - - - - - - - - - -
254,013

186,111
7,200 16,850
4,650
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
1,000
16,000
- - - - - - - - - - -
230,590

Terpisah
7,200 16,850
4,650
tidak dipakai
tidak dipakai
13,979
1,650
tidak dipakai
tidak dipakai
1,000
100,000
- - - - - - - - - - -
128,479

598,500
7,200 16,850
4,650
tidak dipakai
tidak dipakai
17,495
2,429
1,000
150,000
- - - - - - - - - - -
781,275

26,283
742 6,221
479
tidak dipakai
tidak dipakai
2,097
248
tidak dipakai
tidak dipakai
500
7,000
- - - - - - - - - - -
37,348

10,387
742 6,221
479
tidak dipakai
tidak dipakai
1,802
250
200
5,000
- - - - - - - - - - -
18,860

21,907
742 6,221
479
tidak dipakai
tidak dipakai
1,144
248
tidak dipakai
tidak dipakai
-
5,000
- - - - - - - - - - -
29,519

75,383
terpisah 5,000
terpisah
tidak dipakai
tidak dipakai
1,802
250
500
7,000
- - - - - - - - - - -
84,935

170,420
terpisah 5,000
terpisah
tidak dipakai
tidak dipakai
17,495
2,429
500
16,000
- - - - - - - - - - -
206,845
209,845

terpisah
7,200
4,650
tidak dipakai
tidak dipakai
terpisah
terpisah
500
6,000
- - - - - - - - - - -
18,350

14,700
7,750
11,042
100
1,500
4,500
- - - - - - - - - - -
39,592
44,868
175,000
44,000
20,000
300,000
91,416
7,500
12,566
35,000
427,500
- - - - - - - - - - -
1,112,982

13,544
#REF!
20,570
-
- - - - - - - - - - -
#REF!

228
21,752
-
3,850
- - - - - - - - - - -
25,829

91,324
-
18,350
- - - - - - - - - - -
109,674
73,290
19,265
13,046
19,667
3,675
-
- - - - - - - - - - -
128,942

48,860
19,265
tidak dipergunakan
tidak dipergunakan
3,675
-
- - - - - - - - - - -
71,800

60,685
98,660
142,469
terpisah
60,000
- - - - - - - - - - -
361,814
223,342

78,891
147,549
132,292
harga subkon
60,000
- - - - - - - - - - -
418,732
2,093,658
92,275
55,000
4,037
45,000
- - - - - - - - - - -
196,312

541,344
276,555
928,479
247,000
terpisah
terpisah
- - - - - - - - - - -
1,993,377
476,885

61,516
62,589
23,650
- - - - - - - - - - -
147,755

46,200
3,728
6,000
30,000
32,400
5,000
7,021
- - - - - - - - - - -
130,349
174
harga subkon
7,500
32,910
3,218
7,000
- - - - - - - - - - -
50,802

174
58,988
7,500
45,969
3,218
7,000
- - - - - - - - - - -
122,849

2,237
3,371
-
10,000
10,080
2,849
7,000
- - - - - - - - - - -
35,537

380
subkon
10,000
100,296
1,519
7,000
- - - - - - - - - - -
119,195
terpisah
terpisah
-
10,000
62,685
2,058
7,000
- - - - - - - - - - -
81,743

24,607
32,022
48,400
- - - - - - - - - - -
105,029

119,438
37,845
18,638
1,243
8,000
7,000
3,000
1,000
300
- - - - - - - - - - -
196,463

119,438
3,785
-
1,265
8,000
7,000
3,000
1,000
300
- - - - - - - - - - -
143,787

66,203
37,845
18,638
1,243
8,000
7,000
3,000
1,000
300
- - - - - - - - - - -
143,228

50,334
tidak dipakai
3,500
10,000
7,000
tidak dipakai
- - - - - - - - - - -
70,834

142,979
1,562
3,262
281
75,000
- - - - - - - - - - -
223,083
140,700
1,562
3,262
281
81,350
- - - - - - - - - - -
227,154

266,679
1,562
3,262
281
115,000
- - - - - - - - - - -
386,783

134,005
311,671
1,387,500
57,750
127,600
29,920
823,900
420,000
2,200,000
17,245
1,031,300
22,020
-
174,031
308,707,251
- - - - - - - - - - -
315,444,193
71,691,862

398,030
187,308
135,308
203,970
-
609,012
618,750
57,173
245,100

- - - - - - - - - - -
1,869,313

170
50
497
749
10,270
26,382
- - - - - - - - - - -
38,118

7,382
-
- - - - - - - - - - -
7,382

212,231
-
#REF!
- - - - - - - - - - -
#REF!

211,616
-
-
- - - - - - - - - - -
211,616

33,048
33,048
-
17,892
26,971
#REF!
1,519,666
595,452
613,440
80,000

- - - - - - - - - - -
#REF!

149,940
149,940
-
54,794
82,599
#REF!
2,665,747
1,436,941
1,480,350
80,000
825,000
- - - - - - - - - - -
#REF!

291,669
291,669
-
99,152
149,465
#REF!
2,891,586
1,338,388
1,165,200
80,000
825,000
- - - - - - - - - - -
#REF!

247,078
247,078
-
83,993
126,615
#REF!
2,559,913
1,874,570
1,632,000
80,000
825,000
- - - - - - - - - - -
#REF!

652,201
652,201
-
186,934
281,793
#REF!
8,311,929
4,893,180
2,697,600
-
-
- - - - - - - - - - -
#REF!

477,360
477,360
-
178,920
269,712
#REF!
6,060,572
3,473,469
2,665,800
-
-
- - - - - - - - - - -
#REF!

29,325
29,325
-
18,638
18,730
#REF!
575,905
423,157
368,400
80,000

- - - - - - - - - - -
#REF!

102,340
102,340
-
34,790
52,444
#REF!
907,578
1,105,445
962,400
80,000

- - - - - - - - - - -
#REF!

27,000
27,000
-
50,000
-
31,800
31,800
7,200
-
576,000
- - - - - - - - - - -
750,800
14,103

79,200
-
14,103
2,380
-
3,500
3,500
- - - - - - - - - - -
102,683

6,630
19,414
49,925
#REF!
#REF!
245,813
- - - - - - - - - - -
#REF!

#REF!
#REF!
301,521
11,452
22,500
#REF!
- - - - - - - - - - -
#REF!

#REF!
#REF!
1,157,841
524,978
- - - - - - - - - - -
#REF!

#REF!
#REF!
6,303,673
1,427,062
- - - - - - - - - - -

#REF!

1,116
1,116
5,759
6,171
12,474
124,000
55,620
- - - - - - - - - - -
206,255

3,927
3,927
7,679
8,228
14,256
173,000
74,160
- - - - - - - - - - -
285,176

5,801
5,801
9,598
10,285
17,820
173,000
92,700
- - - - - - - - - - -
315,006

8,033
8,033
11,518
12,341
21,384
173,000
111,240
- - - - - - - - - - -
345,549

13,566
13,566
15,357
16,455
28,512
173,000
148,320
- - - - - - - - - - -
408,777
1,116
1,116
-
26,730
14,648
24,575
59,362
46,350
- - - - - - - - - - -
173,896

4,463
4,463
-
53,461
29,295
49,151
118,724
92,700
- - - - - - - - - - -
352,255

-
-
-
28,512
15,624
29,490
63,319
49,440
- - - - - - - - - - -
186,386

10,200
7,455
11,238
107,968
18,712
14,316
32,887
3,910
- - - - - - - - - - -
206,686

470,841
321,606
410,481
829,964
- - - - - - - - - - -
2,032,892

2,198,660
1,891,111
-
4,126,911
- - - - - - - - - - -
8,216,681
717,614

635,413
685,390
-
1,021,425
- - - - - - - - - - -
2,342,228
293,145

#REF!
40,920,139
#VALUE!
-
-
750,000
- - - - - - - - - - -
#REF!

63,841
34,347
- - - - - - - - - - -
98,188

128,391
54,001
- - - - - - - - - - -
182,392

67,972
33,041
- - - - - - - - - - -
101,013

-
-
masuk plat utama
35,479
19,088
24,000
17,947
- - - - - - - - - - -
96,514

2,040
720
masuk plat utama
masuk plat utama
38,175
66,000
49,355
- - - - - - - - - - -
156,290

510
180
masuk plat utama
masuk plat utama
28,631
42,000
31,408
- - - - - - - - - - -
102,729

13,943
11,263
26,245
22,500
54,000
2,902
- - - - - - - - - - -
130,853

79,010
164,939
320,379
- - - - - - - - - - -
564,328

464,763
827,755
705,835
- - - - - - - - - - -
1,998,353
7,473,382
1,551,616
- - - - - - - - - - -
9,024,999
169,325

1,358,106
2,297,906
- - - - - - - - - - -
3,656,012
47,457

8,500
3,000
169,950
109,909
52,500
67,396
134,493
87,120
- - - - - - - - - - -
632,868

7,500
8,442
-----------------------------
15,942.19

27,266,864
684,142

336,000
16,245,000

336,000
14,418,000

-----------------------------
59,286,006.40
1,504,721
Besi Semula Selisih terhadap besi Semula
4,502,950.91 #REF!
36.9
4,307 4319.3
6,148 6157.319403386
10,706 48 --> 1.66 10728.8613456
5,000 5000.577235772
------------------
25,413 6~200 0.48 25413.48943897
2.14 2.137632
36.9
4,307 4319.3
#VALUE! #VALUE!
10,706 48 --> 1.66 10728.8613456
5,000 5000.577235772
------------------
#VALUE! 6~200 0.48 #VALUE!
2.14 2.137632

bah di tengahnya

--> 48=> 1.74


-->6~200=> 1.14
-------------
2.88
terhadap besi Semula
HARDWARE SCHEDULE

NO TYPE DOOR HARDWARE

a. G2 pintu swing kaca frameless 2 daun uk. 2 x 800 x 2100 ( 7 unit )


basement 2: lobby lift(2)
basement 1: lobby lift(2)
lower groun: lobby lift(2)
ground floor: lobby lift(1)
Hardware
Glass Door Handle GHD0007 I US32
Floor Hinges CISA 60231
Covering Plate CISA 07124 US32D
Bottom Pivot Patch PT 2210 / C US32
Top Pivot Patch PT 2220 US32
Adjust Top Pin PT 2221
Patch Lock US 2210 US32
Double Cylinder CISA 08510-07 US14

b. G2 pintu swing kaca frameless 2 daun uk. 2 x 1000 x 3000 ( 2 unit )


ground floor: corridor restaurant(2)
Hardware
Glass Door Handle GHD0003 I US32
Floor Hinges CISA 60231
Covering Plate CISA 07124 US32D
Bottom Pivot Patch PT 2210 / C US32
Top Pivot Patch PT 2220 US32
Adjust Top Pin PT 2221
Patch Lock US 2210 US32
Double Cylinder CISA 08510-07 US14

A1 pintu swing kaca rangka aluminium 1 daun uk. 800 x 2100 ( 1 unit )
lower groun: security room(1)
Hardware
Lever Handle HREO.75.01 US32D
Lockcase Swing Aluminium CISA 46216-25
Double Cylinder CISA 08510-07 US14
Hinges KEND SEL0007 4x3x2 US32D
Door Stop KEND 75 014 US14D

a. S1 pintu swing besi 1 daun uk. 900 x 2100 ( 71 unit )


basement 2: fire stair(3)
basement 1: fire stair(3)
lower groun: fire stair(3)
ground floor: fire stair(5)
mezzanine f: fire stair(2)
1st floor : fire stair(2)
2nd floor : fire stair(2)
3rd - 27th floor
: fire stair(50)
28th floor : fire stair(1)
Hardware
Panic Exit Lock CISA 59301-10+07077-38 Black
Hinges KEND 497 USP
Door Closer CISA 71510-03 Silver

b. S1 pintu swing besi 1 daun uk. 900 x 2100 ( 31 unit )


basement 1: genset room (1), STP (1)
mezzanine f: AC ledge(1)
1st floor : AC ledge(1)
2nd floor : AC ledge(1)
3rd - 27th floor
: AC ledge(25)
28th floor : machine room (1)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-15 US14
Hinges KEND 497 USP

S2 pintu swing besi 1 daun uk. 900 x 2100 ( 1 unit )


basement 1: panel room(1)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-15 US14
Hinges KEND 497 USP
a. S4 pintu swing besi 2 daun uk. 2 x 800 x 2100 ( 13 unit )
basement 2: fan room(4), pump room(1)
basement 1: fan room(4)
lower groun: fan room(4)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-07 US14
Hinges KEND 497 USP
Flush Bolt KEND 306 6 US26D

Flush Bolt KEND 306 12 US26D

b. S4 pintu swing besi 2 daun uk. 2 x 800 / 1250 x 2100 ( 7 unit )


basement 1: genset room(1), panel room(1), fuel tank(1),trafo room(1)
ground floor: control room(2), MDF room(1)
Hardware

Lever Handle HRE.75.01 US32D


Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-15 US14
Hinges KEND 497 USP
Flush Bolt KEND 306 6 US26D
Flush Bolt KEND 306 12 US26D

c. S4 pintu swing besi 1 daun uk. 900 x 2100 ( 1 unit )


ground floor: shaft AC (1)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-07 US14
Hinges KEND 497 USP

S5 pintu swing besi 2 daun uk. 2 x 800 x 2100 ( 1 unit )


lower groun: laundry(1)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-07 US14
Hinges KEND 497 USP
Flush Bolt KEND 306 6 US26D
Flush Bolt KEND 306 12 US26D

S8 pintu swing besi 1 daun uk. 600 / 400 x 900 ( 2 unit )


basement 1: shaft AT toilet(1)
lower groun: shaft (1)
Hardware
Flush Ring Pull Handle FRP.75.01 US32D
Security Bolt KEND 5071 + key US14D
Hinges KEND 497 USP

S9 pintu swing besi 2 daun uk. 600+400 x 900 ( 59 unit )


basement 1: shaft STP(1)
ground floor: shaft AC (2)
mezzanine f: PL/FF (2)
1st floor : PL/FF (2)
2nd floor : PL/FF (2)
3rd - 27th floor
: PL/FF (50)
Hardware
Flush Ring Pull Handle FRP.75.01 US32D
Security Bolt KEND 5071 + key US14D
Hinges KEND 497 USP

S10 pintu swing besi 1 daun uk. 800 x 1900 ( 29 unit )


ground floor: elect room(1)
mezzanine f: elect room(1)
1st floor : elect room(1)
2nd floor : elect room(1)
3rd - 27th floor
: elect room(25)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing HD Non Panic FD CISA 52710-60 US32D
Double Cylinder CISA 08510-15 US14
Hinges KEND 497 USP

W1 pintu swing kayu 1 daun uk. 700/900 x 2100 ( 31 unit )


basement 1: janitor(1)
lower groun: storage(1)
ground floor: janitor(1)
mezzanine f: janitor(1)
1st floor : janitor(1)
2nd floor : janitor(1)
3rd - 27th floor
: janitor(25)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing Kayu CISA 52110-40 US14
Double Cylinder CISA 08510-07 US14
Hinges KEND SEL0007 4x3x2 US32D

W2 pintu swing kayu 1 daun uk. 600 x 1950 ( 11 unit )


basement 1: cubicle toilet(4)
ground floor: cubicle toilet(7)
Hardware
Grendel WC Indicator KEND SKT 751 US32D
Hinges KEND SEL0007 4x3x2 US32D

a. W3 pintu swing kayu 1 daun uk. 900 x 2100 ( 1 unit )


basement 1: storage(1)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing Kayu CISA 52110-40 US14
Double Cylinder CISA 08510-07 US14
Hinges KEND SEL0007 4x3x2 US32D

b. W3 pintu swing kayu 1 daun uk. 1000 x 2100 ( 1 unit )


ground floor: handycap(1)
Hardware
Pull Plate Handle PP.73.06 US32D
Push Plate Handle PUSH.73.07 US32D
Lockcase Pelor Kayu CISA 52120-60 US14
Knob WC Cylinder KEND K3115-61 US14
Hinges KEND SEL0010 4x3x3 2BBNRP US32D
Door Closer CISA 71410-03 Silver

a. W6 pintu swing kayu 1 daun uk. 900 x 2100 ( 28 unit )


mezzanine f: pantry(1)
1st floor : pantry(1)
2nd floor : pantry(1)
3rd - 27th floor
: pantry(25)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing Kayu CISA 52110-40 US14
Double Cylinder CISA 08510-07 US14
Hinges KEND SEL0007 4x3x2 US32D
Door Closer CISA 71410-03 Silver

b. W6 pintu swing kayu 1 daun uk. 900 x 2100 ( 28 unit )


mezzanine f: executive toilet(1)
1st floor : executive toilet(1)
2nd floor : executive toilet(1)
3rd - 27th floor
: executive toilet(25)
Hardware
Pull Plate Handle PP.73.06 US32D
Push Plate Handle PUSH.73.07 US32D
Lockcase Pelor Kayu CISA 52120-60 US14
Knob WC Cylinder KEND K3115-61 US14
Hinges KEND SEL0007 4x3x2 US32D
Door Closer CISA 71410-03 Silver

W7 pintu swing kayu 1 daun uk. 900 x 2100 ( 3 unit )


basement 1: musholla(1)
lower groun: copy center(1), post office(1)
Hardware
Lever Handle HRE.75.01 US32D
Lockcase Swing Kayu CISA 52110-40 US14
Double Cylinder CISA 08510-07 US14
Hinges KEND SEL0007 4x3x2 US32D

W8 pintu swing kayu 1 daun uk. 800 x 2650 ( 60 unit )


basement 1: toilet entry(2)
ground floor: toilet entry(2)
mezzanine f: toilet entry(2)
1st floor : toilet entry(2)
2nd floor : toilet entry(2)
3rd - 27th floor
: toilet entry(50)
Hardware
Pull Plate Handle PP.73.06 US32D
Push Plate Handle PUSH.73.07 US32D
Lockcase Pelor Kayu CISA 52120-60 US14
Double Cylinder CISA 08510-07 US14
Hinges KEND SEL0010 4x3x3 2BBNRP US32D
Door Closer CISA 71410-03 Silver
-1
Diskon 0.65 Indeks hardware

1.00
1.00
Net Cost
harga satuan
unit

2 pasang 936,000 608,400 1,216,800


2 buah 2,110,000 1,371,500 2,743,000
2 buah 136,000 88,400 176,800
2 buah 320,000 208,000 416,000
2 buah 320,000 208,000 416,000
2 buah 214,000 139,100 278,200
2 buah 528,000 343,200 686,400
2 buah 228,000 148,200 296,400
6,229,600
0
0 ( 2 unit )

2 pasang 386,000 250,900 501,800


2 buah 2,110,000 1,371,500 2,743,000
2 buah 136,000 88,400 176,800
2 buah 320,000 208,000 416,000
2 buah 320,000 208,000 416,000
2 buah 214,000 139,100 278,200
2 buah 528,000 343,200 686,400
2 buah 228,000 148,200 296,400
5,514,600 0

0 ( 1 unit )

1 pasang 180,000 117,000 117,000


1 buah 370,000 240,500 240,500
1 buah 228,000 148,200 148,200
1.5 pasang 78,000 50,700 76,050
1 buah 22,000 14,300 14,300
596,050

1 buah 4,902,000 3,186,300 3,186,300


1.5 pasang 216,000 140,400 210,600
1 buah 1,673,000 1,087,450 1,087,450
4,484,350

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 302,000 196,300 196,300
1.5 pasang 216,000 140,400 210,600
1,027,000

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 302,000 196,300 196,300
1.5 pasang 216,000 140,400 210,600
1,027,000

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 228,000 148,200 148,200
3 pasang 216,000 140,400 421,200
1 buah 144,000 93,600 93,600

1 buah 214,000 139,100 139,100


1,422,200

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 302,000 196,300 196,300
3 pasang 216,000 140,400 421,200
1 buah 144,000 93,600 93,600
1 buah 214,000 139,100 139,100
1,470,300

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 228,000 148,200 148,200
1.5 pasang 216,000 140,400 210,600
978,900

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 228,000 148,200 148,200
3 pasang 216,000 140,400 421,200
1 buah 144,000 93,600 93,600
1 buah 214,000 139,100 139,100
1,422,200

0.5 pasang 214,000 139,100 69,550


1 buah 66,000 42,900 42,900
1 pasang 216,000 140,400 140,400
252,850

1 pasang 214,000 139,100 139,100


1 buah 66,000 42,900 42,900
2 pasang 216,000 140,400 280,800
462,800

1 pasang 242,000 157,300 157,300


1 buah 712,000 462,800 462,800
1 buah 302,000 196,300 196,300
1.5 pasang 216,000 140,400 210,600
1,027,000
1 pasang 242,000 157,300 157,300
1 buah 308,000 200,200 200,200
1 buah 228,000 148,200 148,200
1.5 pasang 78,000 50,700 76,050
581,750

1 buah 60,000 39,000 39,000


1 pasang 78,000 50,700 50,700
89,700

1 pasang 242,000 157,300 157,300


1 buah 308,000 200,200 200,200
1 buah 228,000 148,200 148,200
1.5 pasang 78,000 50,700 76,050
581,750

1 buah 248,000 161,200 161,200


1 buah 104,000 67,600 67,600
1 buah 308,000 200,200 200,200
1 buah 60,000 39,000 39,000
1.5 pasang 132,000 85,800 128,700
1 buah 752,000 488,800 488,800
1,085,500

1 pasang 242,000 157,300 157,300


1 buah 308,000 200,200 200,200
1 buah 228,000 148,200 148,200
1.5 pasang 78,000 50,700 76,050
1 buah 752,000 488,800 488,800
1,070,550

1 buah 248,000 161,200 161,200


1 buah 104,000 67,600 67,600
1 buah 308,000 200,200 200,200
1 buah 60,000 39,000 39,000
1.5 pasang 78,000 50,700 76,050
1 buah 752,000 488,800 488,800
1,032,850

1 pasang 242,000 157,300 157,300


1 buah 308,000 200,200 200,200
1 buah 228,000 148,200 148,200
1.5 pasang 78,000 50,700 76,050
581,750

1 buah 248,000 161,200 161,200


1 buah 104,000 67,600 67,600
1 buah 308,000 200,200 200,200
1 buah 228,000 148,200 148,200
1.5 pasang 132,000 85,800 128,700
1 buah 752,000 488,800 488,800
1,194,700

GRAND TOTAL
US Dollar 9300

Cost
harga satuan Jumlah Total

-
PT TATAMULIA NUSANTARA INDAH

US $ 10,300
DIPAKAI
Item BQ Item Pekerjaaan Satuan Nama Subkon Harga Nama Subkon
Harga dasar Acss upah pasang Discount Total Harga dasar

Pembersihan lokasi m2 Roda dunia 2,500 1 2,500 Dasa Satrio Utam 2,500
Galian tanah Bsmt 5,000 1 5,000 12,500
Gali tepi bangunan 5,000 1 5,000 10,000
Gali dan buang bekas lumpur 5,000 1 5,000 17,500
Urug kembali tepi bangunan 25,000 1 25,000 17,500
Buang tanah B2 s/d GF 5,000 1 5,000 17,500
Buangan tanah lain 20,000 1 20,000 17,500

Dewatering (harga kesepakatan saat Rapat


persiapan tender 13 Nov 05) Perintis 276,250,000 (76,250,000) 1 200,000,000
Disc P'hans&P Ss
Soil nailing 12,000 mmm Perintis 1,900,000 424,714 0.80 1,944,714 Multistran 2,350,000
Soil nailing 9,000 mmm 1,450,000 318,536 0.80 1,478,536 1,875,000
Soil nailing 6,000 mmm 1,000,000 212,357 0.80 1,012,357 1,650,000
Geocomposite Drainstrip 105,000 0.80 84,000 150,000
Shotcret tebal 2x50 mm 325,000 0.80 260,000 500,000

curb kansteen m1 Conblock 73,750 0.65 47,938


Precast wheel stoper Dusaspun 62,000 10,000 1 72,000
Cast in situ curb Conblock 73,750 0.65 47,938

Waterstop m1 Fosroc 65,000 1 65,000 Asia asindo 42,000


Waterproofing integral m3 Fosroc 90,000 - 1 90,000 Sika 95,000
Waterproofing coating m2 Fosroc 25,000 3,000 1 28,000 25,000
Floor hardener 5kg/m2 m2 Fosroc 11,000 (1,000) 1 10,000 10,000
Floor hardener liquid m2 Fosroc 35,000 3,500 (5,000) 1 33,500 18,000
Trowel finish m2 3,500 1 3,500 3,500

Waterproofing membrane m2 Prokon 59,000 (4,000) 1 55,000

Cat dinding luar m2 Dwiprakasa 16,000 (500) 0.95 14,700 Propan 15,500
cat aclirylic emultion m2 pakai Danapaint 12,000 (1,000) 0.95 10,400 12,500
cat aclirylic enamel m2 19,000 (2,000) 0.95 16,050 23,500
Cat pintu besi m2 40,000 1 40,000 32,000
Cat kusen pintu besi m1 17,500 1 17,500 30,000
Cat dust proof m2 35,000 (5,000) 1 30,000 21,000
Acrylic enamel skirting m1 3,500 1 3,500 3,525

Cat parking line m1 TIGA ARGA 11,000 1 11,000


Trafic arrow no 165,000 1 165,000

Hasil Rapat persiapan tender untuk net


Granit dan Marner setelah harga diskon
dari subkon dikurangi lagi 10% tapi
untuk tampilan tetap harga diskon dari
subkon

wet Dinding lokal marble 60x60 m2 indo granit 330,000 110,000 0.95 423,500 RMG 341,250
dry dinding imported granit 1200x1200 ST1 m2 819,000 256,000 1.00 1,075,000 924,000
dry dinding imported granit 1200x1200 ST2 m2 1,428,000 225,000 1.00 1,653,000 2,992,500
Lantai Local marbel 600x600 ST-6 dengan
waterproofing m2 330,000 28,000 135,000 0.95 476,500 341,250
Lantai Imported granit 1200x1200
statuario white granit ST-2 m2 1,428,000 150,000 1.00 1,578,000 2,992,500
Lantai Imported granit 600x600 statuario
white granit ST-2 m2 1,428,000 150,000 1.00 1,578,000 2,992,500

TALAVERA OFFICE PARK PENJUMLAHAN TOTAL tata