ANALISIS DE GASTO PLUVIAL

FRACCIONAMIENTO "LOS OLIVOS II" CELAYA, GTO.

A. ANALISIS DE LA MICROCUENCA

1.- AREA TRIBUTARIA


AREA MICROCUENCA = ### m2
AREA VIVIENDA = 0.000 m2
AREA TRIBUTARIA AL PLUVIAL ### m2

2.- CALCULO DEL TIEMPO DE ENTRADA.


Longitud del punto ms alejado de la cuenca tributaria = 500.00 m
Desnivel del punto ms alejado hasta la rejilla = 0.45 m

ROWE: T entrada = (0.87 x L3 / H)0.385 = 0.579 horas = 34.73 minutos


KIRPICH: T entrada = 0.0003245 X (L / S1/2)0.77 = 0.578 horas = 34.69 minutos
SCS: T entrada = (0.87 x L^3 / H)^0.387 = 0.558 horas = 33.46 minutos
T entrada promedio = 34.29 minutos
3.- CALCULO DEL TIEMPO DE TRASLADO EN LA ATARJEA.
Longitud entre los pozos 0 y 0 L= 50.00 m
Desnivel entre plantillas de pozos = 5 m
Pendiente geomtrica entre pozos = 100.00 al millar
Suponiendo una velocidad de traslado de 10.50 m/s :

T traslado = L/v= 4.76 seg = 2.20 minutos

4.- CALCULO DEL TIEMPO DE CONCENTRACION EN LA ATARJEA.


El tiempo de concentracin es la suma de los tiempos de ingreso y traslado del tramo analizado.
Por lo tanto: Tc = 36.49 minutos

5.- DURACION DE LA TORMENTA DE DISEO PARA EL TRAMO ANALIZADO.


Se aplica el criterio de igualar la duracion de tormenta al tiempo de concentracin:

Por lo tanto: d= 36.49 minutos

6.- INTENSIDAD DE LLUVIA DE ACUERDO A LAS CURVAS i-d-Tr desarrollada para la ciudad de Celaya, Gto.
Consultando la curva la intensidad de lluvia para una duracin de tormenta igual a la calculada:
i= 42.08 mm/hora

7.- COEFICIENTE DE ESCURRIMIENTO SUPERFICIAL.


Aplicando un coeficiente de escurrimiento ponderado de acuerdo a la distribucin y uso de las reas
se obtuvo el siguiente valor:
C = 0.70

8.- CALCULO DEL GASTO PLUVIAL EN EL TRAMO.


Aplicando el Mtodo Racional Americano, el gasto pluvial en el tramo analizado es:
Q= 0.278 C i A= 1.14645 m3/seg = 1146.45 l/seg

9.- DISEO DEL DIAMETRO DE LA ATARJEA.


Aplicando la expresin de MANNING para determinar el dimetro, y revisando posteriormente las
condiciones hidrulicas en la conduccin, se tiene:
Se propone de un dimetro de: 45 cm en PAD n= 0.009

Velocidad= 1/n x R^2/3 x s^1/2 = 8.19 m/seg

Gasto a tubo lleno = V x Area hidrulica = 1.302 m3/seg = 1,302.29 l/seg

Relacin de gasto parcial a gasto a tubo lleno = 0.88 88.03%

Relacin de velocidades = 1.28

Velocidad de la atarjea = 10.45 m/seg

SE ACEPTA LA TUBERIA DE 45 cm PARA EL TRAMO ANALIZADO

1/16
ANALISIS DE GASTO PLUVIAL
FRACCIONAMIENTO "LOS OLIVOS II" CELAYA, GTO.

CALCULO DEL COEFICIENTE DE ESCURRIMIENTO PONDERADO


COEFICIEN SUPERFICI PORCENTAJE PRODUCTO
AREA
TE DE E Cx%
HABITACIONAL ESCURRIM
0.51 M2
125,550.00 %
39.9% 0.20
AREAS
IENTO
VERDES,
DONACION,
SERVICIOS 0.10 47,177.10 15.0% 0.01
VIALIDAD 0.60 141,786.92 45.1% 0.27
TOTAL 314,514.02 100.0% 0.49

COEFICIENTE DE ESCURRIMIENTO PONDERADO = 0.49


TIEMPO DE RETORNO 2.00 aos

GASTO PLUVIAL DEL FRACCIONAMIENTO: 1146.45 L/S

2/16
0.000 0.000 0.000 0.056
0.000 0.056 0.000 0.089
0.000 0.089 0.000 0.116
0.000 0.116 0.001 0.141
0.001 0.141 0.001 0.163
0.001 0.163 0.002 0.184
0.002 0.184 0.002 0.204
0.002 0.204 0.003 0.222
0.003 0.222 0.004 0.240
0.004 0.240 0.005 0.257
0.005 0.257 0.006 0.273
0.006 0.273 0.007 0.289
0.007 0.289 0.008 0.305
0.008 0.305 0.010 0.319
0.010 0.319 0.011 0.334
0.011 0.334 0.013 0.348
0.013 0.348 0.015 0.362
0.015 0.362 0.017 0.375
0.017 0.375 0.019 0.388
0.019 0.388 0.021 0.401
0.021 0.401 0.023 0.414
0.023 0.414 0.025 0.426
0.025 0.426 0.028 0.438
0.028 0.438 0.031 0.450
0.031 0.450 0.033 0.462
0.033 0.462 0.036 0.473
0.036 0.473 0.039 0.484
0.039 0.484 0.042 0.495
0.042 0.495 0.045 0.506
0.045 0.506 0.049 0.517

0.049 0.517 0.052 0.527


0.052 0.527 0.056 0.538
0.056 0.538 0.059 0.548
0.059 0.548 0.063 0.558
0.063 0.558 0.067 0.568
0.067 0.568 0.071 0.577

0.071 0.577 0.075 0.587

0.075 0.587 0.079 0.597


0.079 0.597 0.083 0.606
0.083 0.606 0.088 0.615
0.088 0.615 0.092 0.624
0.092 0.624 0.097 0.633
0.097 0.633 0.101 0.642
0.101 0.642 0.106 0.651
0.106 0.651 0.111 0.659
0.111 0.659 0.116 0.668
0.116 0.668 0.121 0.676
0.121 0.676 0.126 0.684
0.126 0.684 0.132 0.693
0.132 0.693 0.137 0.701

0.154 0.724 0.159 0.732


0.159 0.732 0.165 0.740
0.165 0.740 0.171 0.747
0.171 0.747 0.177 0.754
0.177 0.754 0.183 0.762
0.183 0.762 0.190 0.769
0.190 0.769 0.196 0.776
0.196 0.776 0.202 0.783
0.202 0.783 0.209 0.790
0.209 0.790 0.215 0.797
0.215 0.797 0.222 0.804
0.222 0.804 0.228 0.811
0.228 0.811 0.235 0.817
0.235 0.817 0.242 0.824
0.242 0.824 0.249 0.830
0.249 0.830 0.256 0.837
0.256 0.837 0.263 0.843
0.263 0.843 0.270 0.849
0.270 0.849 0.277 0.855
0.277 0.855 0.284 0.862
0.284 0.862 0.292 0.868
0.292 0.868 0.299 0.873
0.299 0.873 0.307 0.879
0.307 0.879 0.314 0.885
0.314 0.885 0.322 0.891
0.322 0.891 0.329 0.897
0.329 0.897 0.337 0.902
0.337 0.902 0.345 0.908
0.345 0.908 0.353 0.913
0.353 0.913 0.360 0.919
0.368 0.924 0.376 0.929
0.376 0.929 0.384 0.934
0.384 0.934 0.392 0.939
0.392 0.939 0.400 0.944
0.400 0.944 0.408 0.949
0.408 0.949 0.417 0.954
0.417 0.954 0.425 0.959
0.425 0.959 0.433 0.964
0.433 0.964 0.441 0.969
0.441 0.969 0.450 0.973

0.450 0.973 0.458 0.978


0.492 0.996 0.500 1.000
0.500 1.000 0.508 1.004
0.508 1.004 0.517 1.008
0.517 1.008 0.526 1.012
0.526 1.012 0.534 1.016
0.534 1.016 0.543 1.020
0.543 1.020 0.551 1.024
0.551 1.024 0.560 1.028
0.560 1.028 0.568 1.032
0.568 1.032 0.577 1.036
0.577 1.036 0.586 1.039
0.586 1.039 0.594 1.043
0.594 1.043 0.603 1.046
0.603 1.046 0.612 1.050

0.637 1.060 0.646 1.063


0.646 1.063 0.655 1.066
0.655 1.066 0.663 1.069
0.663 1.069 0.672 1.072
0.672 1.072 0.680 1.075
0.680 1.075 0.689 1.078
0.689 1.078 0.697 1.081
0.697 1.081 0.706 1.084
0.706 1.084 0.714 1.087
0.714 1.087 0.723 1.089
0.723 1.089 0.731 1.092
0.731 1.092 0.740 1.094
0.740 1.094 0.748 1.097
0.748 1.097 0.756 1.099
0.756 1.099 0.765 1.102
0.765 1.102 0.773 1.104
0.773 1.104 0.781 1.106
0.781 1.106 0.789 1.108
0.789 1.108 0.797 1.110
0.797 1.110 0.806 1.112
0.806 1.112 0.814 1.114
0.814 1.114 0.821 1.116
0.821 1.116 0.829 1.118
0.829 1.118 0.837 1.120
0.837 1.120 0.845 1.121
0.845 1.121 0.853 1.123
0.853 1.123 0.860 1.125
0.860 1.125 0.868 1.126
0.868 1.126 0.875 1.128
0.875 1.128 0.883 1.129
ANALISIS HIDRAULICO DEL PROYECTO DE DRENAJE SUPERFICIAL
FRACCIONAMIENTO "VILLAS DEL BAJIO II", CELAYA, GTO.
AREA DE INTENSIDA COEFICIENTE GASTO DE ANCHO DE ALTURA DE TIRANTE AREA PERIMETRO RADIO S (al millar) COEFICIENTEVELOCIDAD CAPACIDAD TIRANTE AREA DE
MAXIMO HIDRAULIC DE
D DE DE ESCURRIMIEN GUARNICI DE HIDRAULICA EN MXIMO DE REJILLA
MICROCUENCA DRENAJE VIALIDAD DE A (una MOJADO HIDRAULIC R (2/3) S (1/2) ESCURRIMIEN
LLUVIA ESCURRIMIEN TO N DISEO cuneta) LONGITUDIN RUGOSIDAD TO LA VIALIDAD ESCURRIMIEN REQUERIDA
(km )
2
mm/hora TO (m /seg)
3
(m) (m) (m2) (m) O (m) AL MANNING (m/seg) (m3/seg) TO (m) (m2)
(m)
1 ### 42.08 0.70 1,146.45 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 2.21 580.7698
2 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
3 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
4 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
5 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
6 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
7 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
8 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
9 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
10 ### #REF! 0.49 #REF! 7.00 0.15 0.1 0.350000 7.1000 0.0493 0.1344 5.00 0.0707 0.012 0.792 0.2773 #REF! #REF!
INTENSIDAD PROMEDIO #REF! mm/hora #REF!

gasto max = 1,146.45 m3/seg GASTO CORRESPONDIENTE A LA MICROCUENCA 1, DONDE SE COLOCARAN 2 REJILLAS. EL GASTO POR REJILLA ES DE 573224.07 LITROS/SEGUNDO

En el fraccionamiento VILLAS DEL BAJIO II se colocarn rejillas de fierro fundido de 40 x 60 cm de 70 kg con bisagras,
sobrepuestas en registros de tabique de barro, con plantilla de concreto simple y aplanado pulido interior de mortero de De acuerdo a la expresin que evala el gasto que se introduce en un orificio sumergido (es decir,
cemento-arena en proporcin 1:3. El registro tendr por dimensiones interiores 60 x 40 x 100 cm, (ancho x largo x con un tirante de agua por encima del orificio), y considerando un coeficiente de obstruccin del
profundo), y se complementa con un tubo de 20 cm de dimetro de pvc para alcantarillado sanitario en serie 25, con 30% por acumulacin de basuras en la superficie, se obtiene que para el gasto pluvial mximo de la
pendiente del 20 al millar (ver plano de proyecto), con descarga libre al pozo de visita de la red de drenaje pluvial. MICROCUENCA No. 2, el gasto de desalojo de la rejilla propuesta es suficiente.

La rejilla propuesta tiene 9 aberturas de 33 cm y 3 cm de ancho, lo cual representa un rea de orificio de: Q=0. 600 . 30 AREA 2gh1000
A = 9 aberturas x 33 cm x 3 cm = 891 cm2 = 0.0891 m2. Q=0.60623.7010000 2 9.81 0.07251000=44.63 l/s > 573224.07

ARTURO GOMEZ VILLEGAS ORTIGA No. 210


INGENIERO CIVIL COLONIA LOS PINOS II
CED. PROF: 2105874 7/16 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
FRACCIONAMIENTO "VILLAS DEL BAJIO II"
TABLA DE CALCULO HIDRAULICO DE ALCANTARILLADO SANITARIO

Nmero de lotes 494 lotes


Poblacin Proyecto 2,470 hab Coeficiente de Harmon (M) 3.513
Dotacin 175.00 lts./hab/da Coeficiente de Rugosidad 0.009 FECHA: 13-Dec-07
Aportacin 140.00 lts./hab/da Tipo de tubera PVC
Longitud de la Red 2,235.00 mts. k 0.029
Longitud del Subcolector 340.50 mts.

GASTOS
TRAMO PENDIENTE DIAMETROS FUNCIONAMIENTO HIDRAULICO VELOC. VELOC.
LONG. LONG. POB. (LITROS/SEGUNDO) EN TUBO LLENO A GASTO MIN A GASTO MAX EXT. EFECT. EFECT.
POZO POZO COTA COTA COTA COTA TRAMO ACUM. ACUM Q Q Q Q MILESIMOS VELOC. Q Q'/Q V/V Q'/Q V/V A QMIN A QCOMB
INICIO TERMINO RAS. ATR. PLAN. ATR. RAS. AD. PLAN. AD. ml ml habs. MINIMO MEDIO INST. EXT. S CALC. PROP. M/S L/S m/s m/s

SECTOR NORTE
1 3 54.21 52.83 53.87 52.69 68.00 68.00 75 1.50 0.12 0.46 67.37 2 30.69 45 1.18 186.91 0.01 0.30 0.36 0.92 0.35 1.08
2 3 53.98 52.73 53.87 52.69 20.50 20.50 23 1.50 0.04 0.14 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
3 5 53.87 52.69 53.84 52.63 28.50 117.00 129 1.50 0.21 0.80 1.50 2 7.34 25 0.80 39.46 0.04 0.48 0.04 0.48 0.39 0.39
4 5 53.98 52.67 53.84 52.63 21.00 21.00 23 1.50 0.04 0.14 1.50 2 7.48 25 0.76 37.44 0.04 0.49 0.04 0.49 0.37 0.37
5 6 53.84 52.63 53.82 52.53 48.50 186.50 206 1.50 0.33 1.27 1.90 2 8.06 25 0.79 38.99 0.04 0.48 0.05 0.52 0.38 0.41
6 7 53.82 52.53 53.87 52.42 53.00 239.50 265 1.50 0.43 1.63 2.44 2 8.83 25 0.80 39.18 0.04 0.48 0.06 0.56 0.38 0.44
7 8 53.87 52.42 53.71 52.34 38.00 277.50 307 1.50 0.50 1.89 2.83 2 9.31 25 0.80 39.46 0.04 0.48 0.07 0.58 0.39 0.47

9 10 54.02 52.79 53.90 52.74 24.50 24.50 27 1.50 0.04 0.17 1.50 2 7.38 25 0.79 38.80 0.04 0.48 0.04 0.48 0.38 0.38
10 11 53.90 52.74 53.77 52.60 68.00 92.50 102 1.50 0.17 0.63 1.50 2 7.37 25 0.79 38.99 0.04 0.48 0.04 0.48 0.38 0.38
2 11 53.98 52.64 53.77 52.60 20.50 20.50 23 1.50 0.04 0.14 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
11 12 53.77 52.60 53.79 52.54 30.50 143.50 159 1.50 0.26 0.98 1.50 2 7.43 25 0.78 38.13 0.04 0.49 0.04 0.49 0.38 0.38
4 12 53.98 52.58 53.79 52.54 20.50 20.50 23 1.50 0.04 0.14 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
12 13 53.79 52.54 53.57 52.40 68.00 232.00 256 1.50 0.42 1.58 2.37 2 8.74 25 0.79 38.99 0.04 0.48 0.06 0.55 0.38 0.44
13 8 53.57 52.40 53.71 52.34 32.00 264.00 292 1.50 0.47 1.80 2.69 2 9.35 26 0.78 41.24 0.04 0.47 0.07 0.56 0.37 0.44

8 14 53.71 52.34 53.73 52.29 27.00 568.50 628 1.50 1.02 3.87 5.80 2 12.49 25 0.75 36.95 0.04 0.49 0.16 0.73 0.37 0.55
14 15 53.73 52.29 53.67 52.20 46.00 614.50 679 1.50 1.10 4.18 6.27 2 12.72 25 0.77 38.03 0.04 0.49 0.16 0.74 0.38 0.57
15 16 53.67 52.20 53.30 52.05 75.50 690.00 763 1.50 1.24 4.70 7.04 2 13.25 25 0.78 38.32 0.04 0.48 0.18 0.76 0.38 0.60

19 20 54.27 52.76 54.20 52.73 15.00 15.00 17 1.50 0.03 0.10 1.50 2 7.41 25 0.78 38.41 0.04 0.48 0.04 0.48 0.38 0.38
20 21 54.20 52.73 54.17 52.65 41.00 56.00 62 1.50 0.10 0.38 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
21 22 54.17 52.65 54.03 52.57 41.00 97.00 107 1.50 0.17 0.66 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
22 23 54.03 52.57 54.00 52.49 41.00 138.00 153 1.50 0.25 0.94 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
23 24 54.00 52.49 53.86 52.41 41.00 179.00 198 1.50 0.32 1.22 1.83 2 8.02 25 0.77 37.93 0.04 0.49 0.05 0.52 0.38 0.40
24 25 53.86 52.41 53.81 52.33 41.00 220.00 243 1.50 0.39 1.50 2.25 2 8.66 25 0.77 37.93 0.04 0.49 0.06 0.55 0.38 0.42
26 25 53.93 52.78 53.81 52.33 25.50 25.50 28 1.50 0.05 0.17 1.50 17.7 4.93 25 2.32 114.12 0.01 0.35 0.01 0.35 0.81 0.81
25 33 53.81 52.33 53.66 52.18 74.00 319.50 353 1.50 0.57 2.17 3.26 2 9.89 25 0.79 38.70 0.04 0.48 0.08 0.61 0.38 0.48

27 28 54.35 52.64 54.22 52.58 28.50 28.50 31 1.50 0.05 0.19 1.50 2 7.34 25 0.80 39.46 0.04 0.48 0.04 0.48 0.39 0.39
20 28 54.20 53.05 54.22 52.58 74.00 74.00 82 1.50 0.13 0.50 1.50 6.35 5.97 25 1.39 68.45 0.02 0.41 0.02 0.41 0.57 0.57
28 29 54.22 52.58 54.01 52.50 41.00 143.50 159 1.50 0.26 0.98 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
21 29 54.17 53.02 54.01 52.50 74.00 74.00 82 1.50 0.13 0.50 1.50 7 5.85 25 1.47 72.02 0.02 0.40 0.02 0.40 0.59 0.59
29 30 54.01 52.50 53.81 52.42 41.00 258.50 286 1.50 0.46 1.76 2.64 2 9.20 25 0.77 37.93 0.04 0.49 0.07 0.57 0.38 0.44
22 30 54.03 52.88 53.81 52.42 74.00 74.00 82 1.50 0.13 0.50 1.50 6.2 5.99 25 1.38 67.74 0.02 0.41 0.02 0.41 0.56 0.56
30 31 53.81 52.42 53.60 52.34 41.00 373.50 413 1.50 0.67 2.54 3.81 2 10.56 25 0.77 37.93 0.04 0.49 0.10 0.64 0.38 0.49
23 31 54.00 52.85 53.60 52.34 74.00 74.00 82 1.50 0.13 0.50 1.50 6.9 5.88 25 1.45 71.30 0.02 0.40 0.02 0.40 0.58 0.58
31 32 53.60 52.34 53.87 52.26 41.00 488.50 540 3.00 0.87 3.32 4.99 2 11.68 25 0.77 37.93 0.08 0.60 0.13 0.69 0.46 0.54
24 32 53.86 52.71 53.87 52.26 74.00 74.00 82 3.00 0.13 0.50 3.00 6.1 7.80 25 1.36 66.98 0.04 0.50 0.04 0.50 0.69 0.69
32 33 53.87 52.26 53.66 52.18 41.00 603.50 667 1.50 1.08 4.11 6.16 2 12.64 25 0.77 37.93 0.04 0.49 0.16 0.74 0.38 0.57
33 18 53.66 52.18 53.46 52.10 41.00 964.00 1,065 1.50 1.73 6.53 9.79 2 15.05 25 0.77 37.93 0.04 0.49 0.26 0.84 0.38 0.65

15 17 53.67 52.45 53.69 52.18 34.00 34.00 38 1.50 0.06 0.23 1.50 7.9 5.72 25 1.56 76.54 0.02 0.39 0.02 0.39 0.61 0.61
17 18 53.69 52.18 53.46 52.10 41.00 75.00 83 1.50 0.13 0.51 1.50 2 7.44 25 0.77 37.93 0.04 0.49 0.04 0.49 0.38 0.38
18 16 53.46 52.10 53.30 52.05 24.00 1,063.00 1,175 1.50 1.90 7.15 10.72 2 15.38 25 0.80 39.18 0.04 0.48 0.27 0.85 0.38 0.68

16 34 53.30 52.05 53.15 51.97 40.50 1,793.50 1,982 1.61 3.21 11.53 17.29 2 18.57 25 0.78 38.22 0.04 0.49 0.45 0.97 0.39 0.76

ARTURO GOMEZ VILLEGAS 8/16 ORTIGA No. 210,


INGENIERO CIVIL COLONIA LOS PINOS II
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: 482-A CELAYA, GTO.
FRACCIONAMIENTO "VILLAS DEL BAJIO II"
TABLA DE CALCULO HIDRAULICO DE ALCANTARILLADO SANITARIO

Nmero de lotes 494 lotes


Poblacin Proyecto 2,470 hab Coeficiente de Harmon (M) 3.513
Dotacin 175.00 lts./hab/da Coeficiente de Rugosidad 0.009 FECHA: 13-Dec-07
Aportacin 140.00 lts./hab/da Tipo de tubera PVC
Longitud de la Red 2,235.00 mts. k 0.029
Longitud del Subcolector 340.50 mts.

GASTOS
TRAMO PENDIENTE DIAMETROS FUNCIONAMIENTO HIDRAULICO VELOC. VELOC.
LONG. LONG. POB. (LITROS/SEGUNDO) EN TUBO LLENO A GASTO MIN A GASTO MAX EXT. EFECT. EFECT.
POZO POZO COTA COTA COTA COTA TRAMO ACUM. ACUM Q Q Q Q MILESIMOS VELOC. Q Q'/Q V/V Q'/Q V/V A QMIN A QCOMB
INICIO TERMINO RAS. ATR. PLAN. ATR. RAS. AD. PLAN. AD. ml ml habs. MINIMO MEDIO INST. EXT. S CALC. PROP. M/S L/S m/s m/s

SECTOR SUR
43 42 53.68 52.43 53.45 52.30 63.00 63.00 70 1.50 0.11 0.43 1.50 2 7.37 25 0.79 38.99 0.04 0.48 0.04 0.48 0.38 0.38
42 40 53.45 52.30 53.66 52.22 42.00 105.00 116 1.50 0.19 0.71 1.50 2 7.48 25 0.76 37.44 0.04 0.49 0.04 0.49 0.37 0.37
41 40 53.86 52.33 53.66 52.22 57.00 57.00 63 1.50 0.10 0.39 1.50 2 7.46 25 0.77 37.74 0.04 0.49 0.04 0.49 0.37 0.37
40 39 53.66 52.22 53.57 52.14 42.00 204.00 225 1.50 0.37 1.39 2.08 2 8.46 25 0.76 37.44 0.04 0.49 0.06 0.54 0.37 0.41
38 37 53.70 52.22 53.64 52.20 11.00 11.00 12 1.50 0.02 0.07 1.50 2 7.54 25 0.75 36.65 0.04 0.49 0.04 0.49 0.37 0.37
37 39 53.64 52.20 53.57 52.14 30.50 41.50 46 1.50 0.07 0.28 1.50 2 7.43 25 0.78 38.13 0.04 0.49 0.04 0.49 0.38 0.38
39 34 53.57 52.14 53.15 51.97 83.50 329.00 364 1.50 0.59 2.24 3.36 2 9.99 25 0.79 38.80 0.04 0.48 0.09 0.61 0.38 0.48

37 35 53.64 52.34 53.16 52.05 82.00 82.00 91 1.50 0.15 0.56 1.50 3.5 6.66 25 1.04 51.11 0.03 0.44 0.03 0.44 0.46 0.46
36 35 53.23 52.07 53.16 52.05 12.00 12.00 13 1.50 0.02 0.08 1.50 2 7.66 25 0.72 35.10 0.04 0.50 0.04 0.50 0.36 0.36
35 34 53.16 52.05 53.15 51.97 18.50 112.50 124 1.50 0.20 0.77 1.50 4.3 6.41 25 1.15 56.46 0.03 0.43 0.03 0.43 0.50 0.50

SUBCOLECTOR VILLAS DEL BAJIO II


34 44 53.15 51.97 53.68 51.83 72.50 2,307.50 2,470 2.00 4.00 14.06 21.09 2 20.10 25 0.77 37.74 0.05 0.53 0.56 1.03 0.41 0.79
44 45 53.68 51.83 53.83 51.68 72.50 2,380.00 2,470 2.00 4.00 14.06 21.09 2 19.84 25 0.80 39.08 0.05 0.52 0.54 1.02 0.42 0.81
45 46 53.83 51.68 53.85 51.54 72.50 2,452.50 2,470 2.00 4.00 14.06 21.09 2 20.10 25 0.77 37.74 0.05 0.53 0.56 1.03 0.41 0.79
46 47 53.85 51.54 54.33 51.39 72.50 2,525.00 2,470 2.00 4.00 14.06 21.09 2 19.84 25 0.80 39.08 0.05 0.52 0.54 1.02 0.42 0.81
47 48 54.33 51.39 54.10 51.38 7.00 2,532.00 2,470 2.00 4.00 14.06 21.09 2 19.97 25 0.78 38.41 0.05 0.53 0.55 1.02 0.41 0.80
48 49 54.10 51.38 54.00 51.29 43.50 2,575.50 2,470 2.00 4.00 14.06 21.09 2 19.84 40 1.09 136.86 0.01 0.36 0.15 0.72 0.39 0.79

2,575.50 VELOCIDAD MAYOR = 1.08 M/S


VELOCIDAD MENOR = 0.35 M/S

ARTURO GOMEZ VILLEGAS 9/16 ORTIGA No. 210,


INGENIERO CIVIL COLONIA LOS PINOS II
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: 482-A CELAYA, GTO.
CANTIDADES DE OBRA DEL PROYECTO DE ALCANTARILLADO SANITARIO
FRACCIONAMIENTO "VILLAS DEL BAJIO II"
Dimetro Espesor Cama Arena Ancho Cepa
25.00 0.010 0.15 0.65 FECHA: 13-Dec-07
40.00 0.010 0.15 0.80

TRAMO DIAMETRO (CM)


COTA COTA COTA COTA ESPESOR DE PROF. RELLENO RELLENO
ANCHO DE EXCAVACION AREA TUBO PLANTILLA
RASANTE RASANTE RASANTE RASANTE CAMA DE PROMEDIO ACOSTILLADO COMPACTADO
LONGITUD DIAMETRO ZANJA (M) (M3) EXTERIOR (M3)
POZO INICIO POZO FINAL ATRS ADELANTE ATRS ATRS ARENA (M) (M) (M3) (M3) 25 40
ml cm

SECTOR NORTE
1 3 68.00 45 54.21 52.83 53.87 52.69 0.15 1.43 0.80 77.79 0.173 8.160 29.00 28.83 0.00 0.00
2 3 20.50 25 53.98 52.73 53.87 52.69 0.15 1.37 0.65 18.19 0.057 1.999 6.16 8.86 20.50 0.00
3 5 28.50 25 53.87 52.69 53.84 52.63 0.15 1.35 0.65 24.92 0.057 2.779 8.56 11.95 28.50 0.00
4 5 21.00 25 53.98 52.67 53.84 52.63 0.15 1.41 0.65 19.25 0.057 2.048 6.31 9.69 21.00 0.00
5 6 48.50 25 53.84 52.63 53.82 52.53 0.15 1.40 0.65 44.14 0.057 4.729 14.56 22.07 48.50 0.00
6 7 53.00 25 53.82 52.53 53.87 52.42 0.15 1.52 0.65 52.36 0.057 5.168 15.91 28.25 53.00 0.00
7 8 38.00 25 53.87 52.42 53.71 52.34 0.15 1.56 0.65 38.53 0.057 3.705 11.41 21.24 38.00 0.00

9 10 24.50 25 54.02 52.79 53.90 52.74 0.15 1.35 0.65 21.42 0.057 2.389 7.36 10.27 24.50 0.00
10 11 68.00 25 53.90 52.74 53.77 52.60 0.15 1.32 0.65 58.12 0.057 6.630 20.42 27.18 68.00 0.00
2 11 20.50 25 53.98 52.64 53.77 52.60 0.15 1.41 0.65 18.72 0.057 1.999 6.16 9.39 20.50 0.00
11 12 30.50 25 53.77 52.60 53.79 52.54 0.15 1.36 0.65 26.96 0.057 2.974 9.16 13.08 30.50 0.00
4 12 20.50 25 53.98 52.58 53.79 52.54 0.15 1.48 0.65 19.65 0.057 1.999 6.16 10.33 20.50 0.00
12 13 68.00 25 53.79 52.54 53.57 52.40 0.15 1.36 0.65 60.11 0.057 6.630 20.42 29.17 68.00 0.00
13 8 32.00 26 53.57 52.40 53.71 52.34 0.15 1.42 0.65 29.54 0.062 3.120 9.68 14.77 0.00 0.00

8 14 27.00 25 53.71 52.34 53.73 52.29 0.15 1.56 0.65 27.29 0.057 2.633 8.11 15.01 27.00 0.00
14 15 46.00 25 53.73 52.29 53.67 52.20 0.15 1.61 0.65 47.99 0.057 4.485 13.81 27.06 46.00 0.00
15 16 75.50 25 53.67 52.20 53.30 52.05 0.15 1.51 0.65 74.10 0.057 7.361 22.67 39.75 75.50 0.00

19 20 15.00 25 54.27 52.76 54.20 52.73 0.15 1.64 0.65 15.99 0.057 1.463 4.50 9.17 15.00 0.00
20 21 41.00 25 54.20 52.73 54.17 52.65 0.15 1.65 0.65 43.84 0.057 3.998 12.31 25.18 41.00 0.00
21 22 41.00 25 54.17 52.65 54.03 52.57 0.15 1.64 0.65 43.71 0.057 3.998 12.31 25.05 41.00 0.00
22 23 41.00 25 54.03 52.57 54.00 52.49 0.15 1.64 0.65 43.57 0.057 3.998 12.31 24.92 41.00 0.00
23 24 41.00 25 54.00 52.49 53.86 52.41 0.15 1.63 0.65 43.44 0.057 3.998 12.31 24.78 41.00 0.00
24 25 41.00 25 53.86 52.41 53.81 52.33 0.15 1.62 0.65 43.04 0.057 3.998 12.31 24.38 41.00 0.00
26 25 25.50 25 53.93 52.78 53.81 52.33 0.15 1.47 0.65 24.28 0.057 2.486 7.66 12.68 25.50 0.00
25 33 74.00 25 53.81 52.33 53.66 52.18 0.15 1.63 0.65 78.40 0.057 7.215 22.22 44.73 74.00 0.00

27 28 28.50 25 54.35 52.64 54.22 52.58 0.15 1.83 0.65 33.81 0.057 2.779 8.56 20.84 28.50 0.00
20 28 74.00 25 54.20 53.05 54.22 52.58 0.15 1.55 0.65 74.31 0.057 7.215 22.22 40.64 74.00 0.00
28 29 41.00 25 54.22 52.58 54.01 52.50 0.15 1.73 0.65 45.97 0.057 3.998 12.31 27.32 41.00 0.00
21 29 74.00 25 54.17 53.02 54.01 52.50 0.15 1.48 0.65 71.19 0.057 7.215 22.22 37.52 74.00 0.00
29 30 41.00 25 54.01 52.50 53.81 52.42 0.15 1.60 0.65 42.64 0.057 3.998 12.31 23.99 41.00 0.00
22 30 74.00 25 54.03 52.88 53.81 52.42 0.15 1.42 0.65 68.30 0.057 7.215 22.22 34.63 74.00 0.00
30 31 41.00 25 53.81 52.42 53.60 52.34 0.15 1.48 0.65 39.31 0.057 3.998 12.31 20.65 41.00 0.00
23 31 74.00 25 54.00 52.85 53.60 52.34 0.15 1.36 0.65 65.18 0.057 7.215 22.22 31.51 74.00 0.00
31 32 41.00 25 53.60 52.34 53.87 52.26 0.15 1.59 0.65 42.24 0.057 3.998 12.31 23.59 41.00 0.00
24 32 74.00 25 53.86 52.71 53.87 52.26 0.15 1.53 0.65 73.59 0.057 7.215 22.22 39.92 74.00 0.00
32 33 41.00 25 53.87 52.26 53.66 52.18 0.15 1.70 0.65 45.17 0.057 3.998 12.31 26.52 41.00 0.00
33 18 41.00 25 53.66 52.18 53.46 52.10 0.15 1.57 0.65 41.84 0.057 3.998 12.31 23.19 41.00 0.00

15 17 34.00 25 53.67 52.45 53.69 52.18 0.15 1.52 0.65 33.48 0.057 3.315 10.21 18.01 34.00 0.00
17 18 41.00 25 53.69 52.18 53.46 52.10 0.15 1.59 0.65 42.24 0.057 3.998 12.31 23.59 41.00 0.00
18 16 24.00 25 53.46 52.10 53.30 52.05 0.15 1.46 0.65 22.70 0.057 2.340 7.21 11.78 24.00 0.00

16 34 40.50 25 53.30 52.05 53.15 51.97 0.15 1.37 0.65 35.93 0.057 3.949 12.16 17.51 40.50 0.00

ARTURO GOMEZ VILLEGAS 10/16 ORTIGA No. 210,


INGENIERO CIVIL COLONIA LOS PINOS II,
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
CANTIDADES DE OBRA DEL PROYECTO DE ALCANTARILLADO SANITARIO
FRACCIONAMIENTO "VILLAS DEL BAJIO II"
Dimetro Espesor Cama Arena Ancho Cepa
25.00 0.010 0.15 0.65 FECHA: 13-Dec-07
40.00 0.010 0.15 0.80

TRAMO DIAMETRO (CM)


COTA COTA COTA COTA ESPESOR DE PROF. RELLENO RELLENO
ANCHO DE EXCAVACION AREA TUBO PLANTILLA
RASANTE RASANTE RASANTE RASANTE CAMA DE PROMEDIO ACOSTILLADO COMPACTADO
LONGITUD DIAMETRO ZANJA (M) (M3) EXTERIOR (M3)
POZO INICIO POZO FINAL ATRS ADELANTE ATRS ATRS ARENA (M) (M) (M3) (M3) 25 40
ml cm

SECTOR SUR
43 42 63.00 25 53.68 52.43 53.45 52.30 0.15 1.35 0.65 55.28 0.057 6.143 18.92 26.62 63.00 0.00
42 40 42.00 25 53.45 52.30 53.66 52.22 0.15 1.45 0.65 39.45 0.057 4.095 12.61 20.34 42.00 0.00
41 40 57.00 25 53.86 52.33 53.66 52.22 0.15 1.64 0.65 60.58 0.057 5.558 17.11 34.64 57.00 0.00
40 39 42.00 25 53.66 52.22 53.57 52.14 0.15 1.59 0.65 43.27 0.057 4.095 12.61 24.16 42.00 0.00
38 37 11.00 25 53.70 52.22 53.64 52.20 0.15 1.61 0.65 11.51 0.057 1.073 3.30 6.51 11.00 0.00
37 39 30.50 25 53.64 52.20 53.57 52.14 0.15 1.59 0.65 31.42 0.057 2.974 9.16 17.55 30.50 0.00
39 34 83.50 25 53.57 52.14 53.15 51.97 0.15 1.46 0.65 78.97 0.057 8.141 25.07 40.98 83.50 0.00

37 35 82.00 25 53.64 52.34 53.16 52.05 0.15 1.36 0.65 72.22 0.057 7.995 24.62 34.91 82.00 0.00
36 35 12.00 25 53.23 52.07 53.16 52.05 0.15 1.29 0.65 10.02 0.057 1.170 3.60 4.56 12.00 0.00
35 34 18.50 25 53.16 52.05 53.15 51.97 0.15 1.30 0.65 15.57 0.057 1.804 5.55 7.15 18.50 0.00

SUMAS 2,235.00 2,191.56 219.44 679.70 1,156.41 2,135.00 -

CANTIDADES DE OBRA RED DE ATARJEAS


TRAZO Y NIVELACION DEL TERRENO 2,235.00 ml POZO DE VISITA DE 1.25 mts. 13 pzas.
EXCAVACION EN ZANJAS 2,191.56 m3 POZO DE VISITA DE 1.50 mts. 25 pzas.
CAMA DE ARENA 219.44 m3 POZO DE VISITA DE 1.75 mts. 5 pzas.
RELLENO ACOSTILLADO 679.70 m3
RELLENO COMPACTADO 1,156.41 m3 BROCAL Y TAPA DE FOFO. 43 pzas.
SUMINISTRO E INSTALACION DE TUBERIA DE 25 CM 2,135.00 ml ESCALONES DE FOFO. 164 pzas.
CARGA Y ACARREO 1,168.89 m3
CARGA Y ACARREO KILOMETROS SUBSECUENTES (4 km) 4,675.55 m3

ARTURO GOMEZ VILLEGAS 11/16 ORTIGA No. 210,


INGENIERO CIVIL COLONIA LOS PINOS II,
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
CANTIDADES DE OBRA DEL PROYECTO DE ALCANTARILLADO SANITARIO
FRACCIONAMIENTO "VILLAS DEL BAJIO II"
Dimetro Espesor Cama Arena Ancho Cepa
25.00 0.010 0.15 0.65 FECHA: 13-Dec-07
40.00 0.010 0.15 0.80

TRAMO DIAMETRO (CM)


COTA COTA COTA COTA ESPESOR DE PROF. RELLENO RELLENO
ANCHO DE EXCAVACION AREA TUBO PLANTILLA
RASANTE RASANTE RASANTE RASANTE CAMA DE PROMEDIO ACOSTILLADO COMPACTADO
LONGITUD DIAMETRO ZANJA (M) (M3) EXTERIOR (M3)
POZO INICIO POZO FINAL ATRS ADELANTE ATRS ATRS ARENA (M) (M) (M3) (M3) 25 40
ml cm

SUBCOLECTOR VILLAS DEL BAJIO II


34 44 72.50 25 53.15 51.97 53.68 51.83 0.15 1.67 0.65 78.46 0.057 7.069 21.77 45.48 72.50 0.00
44 45 72.50 25 53.68 51.83 53.83 51.68 0.15 2.15 0.65 101.32 0.057 7.069 21.77 68.33 72.50 0.00
45 46 72.50 25 53.83 51.68 53.85 51.54 0.15 2.38 0.65 112.16 0.057 7.069 21.77 79.17 72.50 0.00
46 47 72.50 25 53.85 51.54 54.33 51.39 0.15 2.78 0.65 130.77 0.057 7.069 21.77 97.78 72.50 0.00
47 48 7.00 25 54.33 51.39 54.10 51.38 0.15 2.98 0.65 13.56 0.057 0.683 2.10 10.37 7.00 0.00

SUMAS 297.00 436.27 28.96 89.17 301.14 297.00 -

CANTIDADES DE OBRA SUBCOLECTOR VILLAS DEL BAJIO II A COLECTOR PONIENTE


TRAZO Y NIVELACION DEL TERRENO 297.00 ml POZO DE VISITA DE 2.00 mts. 1 pzas.
EXCAVACION EN ZANJAS 436.27 m3 POZO DE VISITA DE 2.25 mts. 1 pzas.
CAMA DE ARENA 28.96 m3 POZO DE VISITA DE 2.50 mts. 1 pzas.
RELLENO ACOSTILLADO 89.17 m3 POZO DE VISITA DE 2.75 mts. 1 pzas.
RELLENO COMPACTADO 301.14 m3 POZO DE VISITA DE 3.00 mts. 1 pzas.
SUMINISTRO E INSTALACION DE TUBERIA DE 25 CM 297.00 ml BROCAL Y TAPA DE FOFO. 5 pzas.
SUMINISTRO E INSTALACION DE TUBERIA DE 45 CM - ml ESCALONES DE FOFO. 40 pzas.
CARGA Y ACARREO 153.57 m3
CARGA Y ACARREO KILOMETROS SUBSECUENTES (4 km) 614.28 m3

ARTURO GOMEZ VILLEGAS 12/16 ORTIGA No. 210,


INGENIERO CIVIL COLONIA LOS PINOS II,
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
CANTIDADES DE OBRA DEL PROYECTO DE DRENAJE PLUVIAL
FRACCIONAMIENTO "VILLAS DEL BAJIO II"
Dimetro Espesor Cama Arena Ancho Cepa
30.00 0.100 0.15 0.65
45.00 0.100 0.15 0.65 FECHA: 13-Dec-07
61.00 0.120 0.15 0.80

TRAMO DIAMETRO (CM)


COTA COTA COTA COTA ESPESOR DE PROF. RELLENO RELLENO
ANCHO DE EXCAVACION AREA TUBO PLANTILLA
RASANTE PLANTILLA RASANTE PLANTILLA CAMA DE PROMEDIO ACOSTILLADO COMPACTADO
POZO POZO LONGITUD DIAMETRO ZANJA (M) (M3) EXTERIOR (M3)
ATRS ATRS ADELANTE ADELANTE ARENA (M) (M) (M3) (M3) 30 45 61
INICIO FINAL ml cm

1 2 76.00 30 53.94 53.14 53.70 52.76 0.15 1.02 0.65 50.39 0.196 7.410 14.72 13.34 76.00 0.00 0.00
2 3 51.50 30 53.70 52.76 53.29 52.20 0.15 1.17 0.65 39.00 0.196 5.021 9.97 13.89 51.50 0.00 0.00
3 4 65.00 45 53.29 52.20 53.65 52.06 0.15 1.49 0.65 62.95 0.332 6.338 10.12 24.93 0.00 65.00 0.00
4 5 56.00 45 53.65 52.06 53.85 51.92 0.15 1.91 0.65 69.52 0.332 5.460 8.72 36.76 0.00 56.00 0.00
6 7 83.00 30 53.90 52.40 53.74 52.22 0.15 1.66 0.65 89.56 0.196 8.093 16.07 49.09 83.00 0.00 0.00
8 9 23.00 30 53.86 52.29 53.97 52.24 0.15 1.80 0.65 26.91 0.196 2.243 4.45 15.70 23.00 0.00 0.00
9 7 10.00 30 53.97 52.24 53.74 52.22 0.15 1.78 0.65 11.54 0.196 0.975 1.94 6.66 10.00 0.00 0.00
7 10 82.50 45 53.74 52.22 53.57 52.06 0.15 1.67 0.65 89.29 0.332 8.044 12.84 41.02 0.00 82.50 0.00
10 11 35.50 45 53.57 52.06 53.71 51.99 0.15 1.77 0.65 40.73 0.332 3.461 5.53 19.96 0.00 35.50 0.00
11 5 30.00 45 53.71 51.99 53.82 51.92 0.15 1.96 0.65 38.22 0.332 2.925 4.67 20.67 0.00 30.00 0.00
12 11 62.50 30 53.40 52.20 53.82 52.08 0.15 1.62 0.65 65.81 0.196 6.094 12.10 35.34 62.50 0.00 0.00
5 13 26.00 61 53.82 51.92 53.87 51.87 0.15 2.10 0.80 43.68 0.567 3.120 4.17 21.63 0.00 0.00 26.00
14 13 62.00 30 53.55 52.35 53.87 51.87 0.15 1.75 0.65 70.52 0.196 6.045 12.01 40.30 62.00 0.00 0.00
16 15 71.00 30 53.51 52.15 53.60 52.01 0.15 1.63 0.65 74.99 0.196 6.923 13.75 40.38 71.00 0.00 0.00
15 13 70.00 30 53.60 52.01 53.87 51.87 0.15 1.95 0.65 88.50 0.196 6.825 13.56 54.37 70.00 0.00 0.00
13 17 107.00 61 53.87 51.87 53.65 51.65 0.15 2.15 0.80 184.04 0.567 12.840 17.18 93.30 0.00 0.00 107.00

SUMAS 911.00 1,045.65 91.82 161.80 527.36 509.00 269.00 133.00

CANTIDADES DE OBRA RED DE DRENAJE PLUVIAL


TRAZO Y NIVELACION DEL TERRENO 911.00 ml CARGA Y ACARREO 329.69 m3
EXCAVACION EN ZANJAS 1,045.65 m3 ACARREO KMS SUBSECUENTES (4 km) 1,318.78 m3
CAMA DE ARENA 91.82 m3 POZO DE VISITA DE 1.25 mts. 5 pozos
RELLENO ACOSTILLADO 161.80 m3 POZO DE VISITA DE 1.50 mts. 3 pozos
RELLENO COMPACTADO 527.36 m3 POZO DE VISITA DE 1.75 mts. 6 pozos
SUMINISTRO E INSTALACION DE TUBERIA DE 30 CM 509.00 ml POZO DE VISITA DE 2.00 mts. 3 pozos
SUMINISTRO E INSTALACION DE TUBERIA DE 45 CM 269.00 ml BROCAL Y TAPA DE FOFO 17 pzas.

ARTURO GOMEZ VILLEGAS 13/16 ORTIGA No. 210


INGENIERO CIVIL COLONIA LOS PINOS II
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
FRACCIONAMIENTO HABITACIONAL "VILLAS DEL BAJIO II"
CATALOGO DE CONCEPTOS
RED DE ATARJEAS DE ALCANTARILLADO SANITARIO

II.- ALCANTARILLADO SANITARIO FECHA: 13-Dec-07


No. DESCRIPCIN UNIDAD CANTIDAD P. U. IMPORTE
1 Trazo y nivelacin topogrfica de la lnea de drenaje, estableciendo
ejes, niveles y referencias. P.U.O.T. ml 2,235.00
2 Excavacin mecnica en cepas de material tipo I de 0.00 a 4.00 de
profundidad. Incluye herramienta, equipo y mano de obra. P.U.O.T. m3 2,191.56
3 Suministro y tendido de cama de arena para recibir tubera de drenaje
en 10 cm de espesor promedio. P.U.O.T. m3 219.44
4 Relleno acostillado en cepas con material producto de la excavacin
compactado al 90% de su P.V.S.M. Incluye humectado, herramienta, m3 679.70
equipo y mano de obra. P.U.O.T.
5 Relleno compactado en cepas con material sano de banco al 95% de su
P.V.S.M. Incluye humectado, herramienta, equipo y mano de obra. m3 1,156.41
P.U.O.T.
6 Suministro y tendido de tubo de PVC Alcantarillado S-20 de 25 cm de
dimetro (10"), con junta hermtica. P.U.O.T. ml 2,135.00
7 Carga mecnica y acarreo de material producto de la excavacin,
primer kilmetro, medido abundado. P.U.O.T. m2 1,168.89
8 Acarreo de material producto de la excavacin, kilmetro subsecuente
(4 km), medido abundado. P.U.O.T. m3-km 4,675.55
9 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 1.25 m de prof.,
incluye escalones de redondo liso de 5/8", brocal y tapa de Fo.Fo.,
excavaciones, rellenos P.U.O.T. pozo 13.00
10 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 1.50 m de prof.,
incluye escalones de redondo liso de 5/8", brocal y tapa de Fo.Fo.,
excavaciones, rellenos P.U.O.T. pozo 25.00
11 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 1.75 m de prof.,
incluye escalones de redondo liso de 5/8", brocal y tapa de Fo.Fo.,
excavaciones, rellenos P.U.O.T. pozo 5.00
12 Descarga domiciliaria a base de tubera de PVC Alcantarillado de 15 cm
de dimetro S-25 con junta hermtica, incluye excavacin, rellenos,
silleta de descarga de PVC y codo de PVC 45x15 cm (6") para conexin
a red, herramienta y mano de obra, long. de descarga promedio de 6.00
mts. P.U.O.T. descarga 494.00
SUBTOTAL: $0.00
15% IVA: $0.00
TOTAL: $0.00

ARTURO GOMEZ VILLEGAS Pgina/14 ORTIGA No. 210


INGENIERO CIVIL COLONIA LOS PINOS II
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
FRACCIONAMIENTO HABITACIONAL "VILLAS DEL BAJIO"
CATALOGO DE CONCEPTOS
SUBCOLECTOR PROYECTO A COLECTOR PONIENTE

III.- COLECTOR SANITARIO FECHA: ###


No. DESCRIPCIN UNIDAD CANTIDAD P. U. IMPORTE
1 Trazo y nivelacin topogrfica de la lnea de drenaje, estableciendo ejes,

niveles y referencias. P.U.O.T. ml 297.00


2 Excavacin mecnica en cepas de material tipo I de 0.00 a 2.00 de

profundidad. Incluye herramienta, equipo y mano de obra. P.U.O.T. m3 436.27


3 Suministro y tendido de cama de arena para recibir tubera de drenaje

en 10 cm de espesor promedio. P.U.O.T. m3 28.96


4 Relleno acostillado en cepas con grava triturada de tamao 3/4" (19

mm) a finos. Incluye herramienta, equipo y mano de obra. P.U.O.T. m3 89.17


5 Relleno compactado en cepas con material sano de banco al 95% de su
P.V.S.M. Incluye humectado, herramienta, equipo y mano de obra.
P.U.O.T. m3 301.14
6 Suministro y tendido de tubo de PVC SANITARIO S-20 de 25 cm de

dimetro (10"), con junta hermtica. P.U.O.T. ml 297.00


7 Suministro y tendido de tubo de PVC SANITARIO S-20 de 40 cm de

dimetro (15"), con junta hermtica. P.U.O.T. ml 0.00


8 Carga mecnica y acarreo de material producto de la excavacin, primer

kilmetro, medido abundado. P.U.O.T. m3 153.57


9 Acarreo de material producto de la excavacin, kilmetro subsecuente

(16 km), medido abundado. P.U.O.T. m3-km 614.28


10 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 2.00 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 1.00
11 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 2.25 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 1.00
12 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 2.50 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 1.00
13 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 2.75 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 1.00
14 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 3.00 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 1.00
SUBTOTAL: $0.00
15% IVA: $0.00
TOTAL: $0.00

ARTURO GOMEZ VILLEGAS 15/16 ORTIGA No. 210,


INGENIERO CIVIL. COLONIA LOS PINOS II
CED. PROF: 2105874 TEL Y FAX: 61-55554
DRO. CELAYA: A-482 CELAYA, GTO.
FRACCIONAMIENTO HABITACIONAL "VILLAS DEL BAJIO II"
CATALOGO DE CONCEPTOS
RED DE DRENAJE PLUVIAL

IV.- RED PLUVIAL FECHA: 13-Dec-07


No. DESCRIPCIN UNIDAD CANTIDAD P. U. IMPORTE
1 Trazo y nivelacin topogrfica de la lnea de drenaje, estableciendo ejes,
niveles y referencias. P.U.O.T. ml 911.00
2 Excavacin mecnica en cepas de material tipo I de 0.00 a 4.00 de
profundidad. Incluye herramienta, equipo y mano de obra. P.U.O.T. m3 1,045.65
3 Suministro y tendido de cama de arena para recibir tubera de drenaje
en 10 cm de espesor promedio. P.U.O.T. m3 91.82
4 Relleno acostillado en cepas con material producto de la excavacin
compactado al 85% de su P.V.S.M. Incluye humectado, herramienta,
equipo y mano de obra. P.U.O.T. m3 161.80
5 Relleno compactado en cepas con material sano de banco al 90% de su
P.V.S.M. Incluye humectado, herramienta, equipo y mano de obra.
P.U.O.T. m3 527.36
5 Suministro y tendido de tubo de PAD para drenaje pluvial de 30 cm de
dimetro (12"), con junta hermtica. P.U.O.T. ml 509.00
6 Suministro y tendido de tubo de PAD para drenaje pluvial de 45 cm de
dimetro (18"), con junta hermtica. P.U.O.T. ml 269.00
7 Suministro y tendido de tubo de PAD para drenaje pluvial de 61 cm de
dimetro (24"), con junta hermtica. P.U.O.T. ml 133.00
7 Carga mecnica y acarreo de material producto de la excavacin, primer

kilmetro, medido abundado. P.U.O.T. m3 329.69


8 Acarreo de material producto de la excavacin, kilmetro subsecuente

(16 km), medido abundado. P.U.O.T. m3-km 1,318.78


9 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 1.25 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 5.00
10 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 1.50 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 3.00
11 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 1.75 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 6.00
12 Pozo de visita de tabicn 10x14x28, en 28 cm de esp., asentado con
mort. cemento arena 1:5, plantilla de concreto simple f'c = 100 kg/cm2
de 15 cm de espesor, acabado pulido interior, de 2.00 m de prof., incluye
brocal y tapa de Fo.Fo., excavaciones, rellenos P.U.O.T. pozo 3.00
13 Boca de tormenta de 40 x 60 cm y 1.00 m de profundidad, con muros de
tabique de barro, aplanado pulido interior, rejilla con bisagras de fierro
fundido de 70 kg, tubera de PVC S-20 de 20 cm de dimetro, incluye
suministro de materiales, mano de obra, excavaciones y rellenos
compacatados con material de banco. P.U.O.T. pza 18.00
SUBTOTAL: $0.00
15% IVA: $0.00