TABLE OF CONTENTS

1 INTRODUCTION 3
1.1 Purpose and Scope 3
1.2 Responsibility 3
1.3 Approval 4
1.4 Distribution/revision 4
1.5 Filing/retrieving 4
1.6 Registration 4
1.7 Handling of non-conformances 4
1.8 Abbreviations/definitions 4
1.9 Normative references 5
2 HEALTH, ENVIRONMENT, SAFETY (HES) 5
3 TECHNICAL REQUIREMENTS 6
3.1 Design of Insulation Systems 6
3.2 Painting prior to Installation of Insulation 6
3.3 Build-up of Insulation Systems 6
3.4 Flanges and Valves 7
3.5 Offshore Maintenance of Insulation 7
ANNEX A: INSULATION BUILD-UP ON PIPING 8

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF
PPCoN Additional Technical Requirements
Piping and Equipment Insulation

1 INTRODUCTION

1.1 Purpose and Scope

These additional technical requirements to Norsok Standard R-CR-004 are developed by


Phillips Petroleum Company Norway (PPCoN), in order to clarify which of the solutions
specified in the Norsok Standard R-CR-004 are preferred by PPCoN.

Suppliers are invited to tender alternative solutions, but these will be subject to acceptance
by PPCoN in each case. All details of materials, components, equipment, procedures and
remedies shall be submitted to Company for approval should a Supplier wish to deviate
from this specification in any way.

All deviations from requirements as described in this document shall be subject to the
requirements as described in PPCoN document CP217, "Guidelines for the Control of
Non-conformances". All deviations to this document, including alternative solutions, shall
be subject to written approval by the responsible PPCoN department. The Materials &
Corrosion department is the responsible PPCoN department for this document.

The requirements specified in this document clarify requirements as desribed in Norsok


Standard R-CR-004 where this has been found necessary. The requirements apply to all
PPCoN insulation work, including:
- construction of new platforms or modules.
- modification of existing platforms or modules
- Insulation on equipment and bulk items, either purchased directly by
PPCoN or supplied through other organisations.

Requirements related to offshore maintenance of insulation are described in PPCoN


Procedure 3781.

1.2 Responsibility

The Competence Area Leader for Materials & Corrosion is responsible for this document
and for ensuring that it is updated or revoked when required by organizational or
operational conditions.

1.3 Approval

The document shall be approved by the Resource Area Manager - Oper. & Maint.

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF
PPCoN Additional Technical Requirements
Piping and Equipment Insulation

1.4 Distribution/revision

This document is distributed in accordance with the distribution list. Those persons
specified on the distribution list are responsible for inserting revised pages when received
and for removing obsolete. In addition they are responsible for informing Information
Logistics, lost manuals, changes in address and for returning the manual when no longer
required.

1.5 Filing/retrieving

The record copy (RC) is filed by the Competence Area for Information Logistics.

1.6 Registration

This manual as well as the directives are registered with an individual document number in
the company's document administration system (FYI) which is managed by the
Competence Area for Information Logistics.

1.7 Handling of non-conformances

All non-conformances / deviations from this document shall be handled in accordance with
PPCoN document CP 217. "Guidelines for the Control of Non-conformances". Appendix B
in CP 217, "Non-conformance / deviation report" shall be used. All non-conformances /
deviations shall be accepted in writing by PPCoN's TAG group for this document, the
Materials & Corrosion Competence Area.

1.8 Abbreviations/definitions

1.8.1 Abbreviations

N/A
1.8.2 Definitions

With reference to 1.5 in CP217, definitions used in relation to non-conformance /


deviations are as follows:

Non-conformance (Avvik): Non-fulfillment of specified requirements.


Deviation(Planlagt avvik ): Planned non-conformance for which a deviation permit will be
required.
Deviation permit (Avvikstillatelse): Written permission to use a product which does not
meet specified requirements.

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF
PPCoN Additional Technical Requirements
Piping and Equipment Insulation

Correction (Korrigering): Actions taken to deal with a deliverable which does not meet
specified requirements in order to resolve the non-conformance.
Corrective action (Korrigerende tiltak): Actions taken to remove the root-cause of an
existing non-conformance, in order to prevent recurrence.
Preventive action (Forebyggende tiltak): Actions taken to remove the root cause of
potential non-conformances to prevent them from recurring.

1.9 NORMATIVE REFERENCES

NORSOK Standards:

R-CR-004 Piping and Equipment Insulation


S-002 Working Environment

PPCoN References:

3781 Vedlikehold av Overflatebeskyttelse


CP217 Guidelines for the Control of Non-Conformances

Other References:

N/A

2 HEALTH, ENVIRONMENT, SAFETY (HES)

Some materials used during insulation work can create health, environmental and safety
problems during the construction and maintenance of offshore platforms:

w Chemicals and thinners in glues, etc. can be risky to health, or can cause allergenic
reactions.
w Installation of insulation can be ergonomically heavy work
w Products hazardous to health can be produced during combustion or hot work.

Procedures and work instructions during insulation work shall therefore always be well
defined during the design, construction and maintenance of platforms, and shall include:

w HES evaluation of all products to be used.


w HES evaluation of combustion products of products to be used.

Products containing the following shall not be used without prior written approval by
PPCoN:

w Chemical substances named in Annex D1 and D2 of Norsok Standard S-002.


w Products containing carcinogens, mutagenes, reproduction hazardous chemicals,
allergenes.

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF
PPCoN Additional Technical Requirements
Piping and Equipment Insulation

w Products which produce health-hazardous chemicals during heating or combustion.


w Products containing lead, chromates or isocyanates shall never at any time be used.

3 TECHNICAL REQUIREMENTS
3.1 Design of Insulation Systems

Norsok Standard R-CR-004 does not specify the exact design of insulation systems. The
design of all insulation systems, including removable jackets for valves and flanges, shall
therefore be subject to acceptance by PPCoN prior to use. The design and installation of
insulation systems shall be such that the ingress of water into the insulation shall be
avoided. Method for termination of non-metallic jacketing (tape) onto hot service piping
must also be taken into account.

3.2 Painting prior to Installation of Insulation

For all materials, except titanium, it is a requirement that surfaces to be insulated shall be
painted as described in Norsok Standard M-501. It shall be noted that the insulation
contractor is responsible to ensure that no insulation is carried out until painting of all
surfaces is 100% completed.

3.3 Build-up of Insulation Systems

Reference is made to Annex A of this document, where the build-up for insulation systems
to be used on PPCoN projects is described.

The following shall be noted:

w Non-metallic jacketing shall be used on insulation classes 1,2,3,4,6,7,8 and 9. A thin


aluminium foil shall be installed directly underneath the non-metallic jacketing in order to
simplify removal and replacement of the membrane when and if necessary.
w The colour of the non-metallic jacketing shall be light grey.
w The build-up of class 5 insulation is dependant on the relevant fire protection
requirements. Stainless steel jacketing shall always be used on class 5 insulation, also
when in combination with other insulation classes.
w All materials to be used in connection with insulation work shall be subject to written
approval by the responsible PPCoN department, i.e. Materials & Corrosion department.
The following materials have so far been found acceptable in accordance with this
specification:

- Foamglass T4 as cellular insulant


- BIS Scotchwrap 52 CPT tape as non-metallic weather-proofing membrane
- BIS Soundstop 2225940 (2,6mm) as acoustic insulant
- Ticon foil (48u) as foil underneath the non-metallic weather-proofing membrane
- Firemaster X607 (128kg/m3) as ceramic fibre

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF
PPCoN Additional Technical Requirements
Piping and Equipment Insulation

w Insulation systems for HVAC ducting shall be subject to approval.


w All operators shall have received the necessary training related to the work they will
carry out.

3.4 Flanges and Valves

Flanges and valves shall when possible be left uninsulated. When insulation of valves and
flanges is necessary the following shall be applicable:

w removable, deluge proof, tailor-made insulation jackets to be used in all areas


w jackets must be designed in order to minimise the entrance of water and to allow the
drainage of any water.
w jackets must be such that water does not enter into the insulation material
w jackets shall have identification marking on external and internal of jacket.
w design of the removable jackets shall be subject to PPCoN approval

3.5 Offshore Maintenance of Insulation

Requirements applicable to the maintenance of insulation systems are described in


PPCoN document 3781, Vedlikehold av Overflatebeskyttelse.

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF
PPCoN Additional Technical Requirements
Piping and Equipment Insulation

ANNEX A, INSULATION BUILD-UP ON PIPING

Class, Service Material types Cladding Comments / Build-up


Class 1, Cellular glass +
Heat See "build-up" Non-metallic foil +
conservation jacketing non-metallic jacketing
Class 2, Cellular glass +
Cold medium See "build-up" Non-metallic foil +
conservation jacketing non-metallic jacketing
Class 3, Either:
Personnel Class 1-9 In acc. with Perforated guards to be of stainless steel
protection or: classes 1-9 as
Perforated applicable
sheet-metal
guards
Class 4, Cellular glass +
Frost-proofing See "build-up" Non-metallic foil +
jacketing non-metallic jacketing
Class 5, Cellular glass + Materials are dependant on fire
Fire-proofing ceramic fibre 316 stainless protection requirements, and must be
blankets as steel accepted by PPCoN for each case
necessary
Class 6, 30mm cellular glass +
Acoustic, - See "build-up" Non-metallic 25mm ceramic fibre +
10dB jacketing acoustic insulant +
foil +
non-metallic jacketing
Class 7, 30mm cellular glass +
Acoustic, - See "build-up" Non-metallic 38mm ceramic fibre +
20dB jacketing acoustic insulant
foil +
non-metallic jacketing
Class 8, 30mm cellular glass +
Acoustic, - See "build-up" Non-metallic 38mm ceramic fibre +
30dB jacketing acoustic insulant +
38mm ceramic fibre +
acoustic insulant +
foil +
non-metallic jacketing
Class 9,
Ext. See "build-up" Non-metallic Cellular glass +
condensation jacketing foil +
and icing non-metallic jacketing
protection

DOCUMENT NO.: REVISION NO.: REVISION DATE: APPROVED:


4294 01 06-98 Resource Area Manager - Oper. &
Maint.
4294 PAGE ERROR! BOOKMARK NOT DEFINED. OF

You might also like