Design Parameters
Dia of Hilti Re-bar used, d = 25.0 mm
Re-bar hole diameter, d0 = 32.0 mm
Grade of concrete, fcu = 40 MPa
Base thickness,h = 1250.0 mm
Eff. anchorage depth, heff = 200.0 mm
Hilti re-bar spacing, s = 200.0 mm
Edge distance,c = 125.0 mm
Max. Tensile force, Nu = 50.0 kN
Max. Shear Force, Vu = 111.0 kN
Hilti Parameters
Anchorage depth limits
hefmin = 100.0 mm
hefmax = 500.0 mm
hef = 200.0 mm Effective depth check is ok
Min. base thickness required
hmin = 264.0 mm Base thickness check is ok
Min. spacing required
smin = 125.0 mm
Min. edge distance required
cmin = 125.0 mm
Critical edge distance for splitting failure
ccr,sp = 200.0mm
Critical spacing for conc. cone failure
scr,N = 600.0 mm
Critical spacing for splitting failure
scr,sp = 400.0 mm
Critical edge distance for conc. failure
ccr,N = 300.0 mm
Influencing factors
Concrete strength factor Embedment depth on conc. Resistance
fB,p = 1.05 fh,N = 2.83
Embedment depth factor Reinforcement factor
fh,p = 2.00 fre,N = 1.00
Concrete strength on cone resistance Shear factor k = 2.00
fB = 1.26 Angle of force = 90.0
Edge distance influence f = 2.50
c/ccr,N = 0.42 Base material thickness
c/ccr,sp = 0.63 fh = 1.00
f1N = 0.83 Anchor spacing & edge distance factor
f2N = 0.81 f4 = 0.38
f1,sp = 0.89 Embedment depth fhef = 1.64
f2,sp = 0.81
Anchor spacing influence Edge distance fc = 0.74
s/scr,N = 0.33
s/scr,sp = 0.50
f3N = 0.67
f3,sp = 0.75

Steel tensile resistance NRd,s = 192.9 kN


Combined pull-out & concrete cone resistance
NRd,p = N0Rd,p*fB,p*f1,N*f2,N*f3,N*fh,p*fre,N
N0Rd,p = 86.4 kN
NRd,p = 80.9 kN
Combined cone resistance
NRd,c = N0RD,c*fB*f1,N*f2,N*f3,N*fh,N*fre,N
N0Rd,c = 73.2 kN
NRd,c = 117.0 kN
Concrete splitting resistance
NRd,sp = N0Rd,c*fB*f1,sp*f2,sp*f3,sp*fh,N*fre,N
N0Rd,sp = 73.2 kN
NRd,c = 141.6 kN
The tensile resistance of 1 pair of bolts = 73.2 kN
No. of pairs of bolts used =3
Total resistance = 219.6 kN >Max.Ten. Force, Hence o.k
Steel shear resisitance VRd,s = 112.7 kN
Concrete pryout resistace VRd,cp = k*min(NRd,c,NRd,p)
VRd,cp = 161.9 kN
Concrete edge resistance VRd,c = V0Rd,c*fB*f*fh*f4*fhef*fc
V0Rd,c = 39.2 kN
VRd,c = 56.9 kN
The shear resistance of 1 pair of bolts = 56.9 kN
No. of pairs of bolts used =3
Total resistance = 170.7 kN >Max. S.F, Hence o.k.
Combined Shear and tension resistance check
N1.5+ V1.5 <1
N1.5 =(Nu/NRd)1.5 = 0.11
V
1.5
=(Vu/VRd)
1.5
= 0.52

N
1.5
+ V = 0.6 kN
1.5
<=1, Hence o.k
0 1
10 1.01
20 1.05
30 1.13
40 1.24
50 1.4
60 1.64
70 1.97
80 2.32
90 2.5
90> 2.5
HILTI HIT-RE-500 WITH RE-BAR CHECK
Design Parameters
Dia of Hilti Re-bar used, d = 25.0 mm
Re-bar hole diameter, d0 = 32.0 mm
Grade of concrete, fcu = 40 MPa
Base thickness,h = 1250.0 mm
Eff. anchorage depth, heff = 200.0 mm
Hilti re-bar spacing, s = 200.0 mm
Edge distance,c = 100.0 mm
Max. Tensile force, Nu = 125.0 kN
Max. Shear Force, Vu = 111.0 kN
Hilti Parameters
Anchorage depth limits
hefmin = 100.0 mm
hefmax = 500.0 mm
hef = 200.0 mm Effective depth check is ok
Min. base thickness required
hmin = 264.0 mm Base thickness check is ok
Min. spacing required
smin = 125.0 mm
Min. edge distance required
cmin = 125.0 mm
Critical edge distance for splitting failure
ccr,sp = 200.0mm
Critical spacing for conc. cone failure
scr,N = 600.0 mm
Critical spacing for splitting failure
scr,sp = 400.0 mm
Critical edge distance for conc. failure
ccr,N = 300.0 mm
Influencing factors
Concrete strength factor Embedment depth on conc. Resistance
fB,p = 1.05 fh,N = 2.83
Embedment depth factor Reinforcement factor
fh,p = 2.00 fre,N = 1.00
Concrete strength on cone resistance Shear factor k = 2.00
fB = 1.26 Angle of force = 90.0
Edge distance influence f = 2.50
c/ccr,N = 0.33 Base material thickness
c/ccr,sp = 0.50 fh = 1.00
f1N = 0.80 Anchor spacing & edge distance factor
f2N = 0.75 f4 = 0.29
f1,sp = 0.85 Embedment depth fhef = 1.64
f2,sp = 0.75
Anchor spacing influence Edge distance fc = 0.77
s/scr,N = 0.33
s/scr,sp = 0.50
f3N = 0.67
f3,sp = 0.75

Steel tensile resistance NRd,s = 192.9 kN


Combined pull-out & concrete cone resistance
NRd,p = N0Rd,p*fB,p*f1,N*f2,N*f3,N*fh,p*fre,N
N0Rd,p = 86.4 kN
NRd,p = 72.4 kN
Combined cone resistance
NRd,c = N0RD,c*fB*f1,N*f2,N*f3,N*fh,N*fre,N
N0Rd,c = 73.2 kN
NRd,c = 104.8 kN
Concrete splitting resistance
NRd,sp = N0Rd,c*fB*f1,sp*f2,sp*f3,sp*fh,N*fre,N
N0Rd,sp = 73.2 kN
NRd,c = 125.2 kN
The tensile resistance of 1 pair of bolts = 72.4 kN
No. of pairs of bolts used =3
Total resistance = 217.3 kN >Max.Ten. Force, Hence o.k
Steel shear resisitance VRd,s = 112.7 kN
Concrete pryout resistace VRd,cp = k*min(NRd,c,NRd,p)
VRd,cp = 144.9 kN
Concrete edge resistance VRd,c = V0Rd,c*fB*f*fh*f4*fhef*fc
V0Rd,c = 39.2 kN
VRd,c = 46.2 kN
The shear resistance of 1 pair of bolts = 46.2 kN
No. of pairs of bolts used =3
Total resistance = 138.5 kN >Max. S.F, Hence o.k.
Combined Shear and tension resistance check
N1.5+ V1.5 <1
N1.5 =(Nu/NRd)1.5 = 0.44
V
1.5
=(Vu/VRd) 1.5
= 0.72
N
1.5
+ V = 1.2 kN
1.5
>1, Hence not o.k
HILTI HIT-RE-500 WITH RE-BAR CHECK
Design Parameters
Dia of Hilti Re-bar used, d = 12.0 mm
Re-bar hole diameter, d0 = 14.0 mm
Grade of concrete, fcu = 40 MPa
Base thickness,h = 1500.0 mm
Eff. anchorage depth, heff = 150.0 mm
Hilti re-bar spacing, s = 90.0 mm
Edge distance,c = 60.0 mm
Max. Tensile force, Nu = 48.0 kN
Max. Shear Force, Vu = 0.0 kN
Hilti Parameters
Anchorage depth limits
hefmin = 70.0 mm
hefmax = 240.0 mm
hef = 150.0 mm Effective depth check is ok
Min. base thickness required
hmin = 178.0 mm Base thickness check is ok
Min. spacing required
smin = 60.0 mm
Min. edge distance required
cmin = 60.0 mm
Critical edge distance for splitting failure
ccr,sp = 150.0mm
Critical spacing for conc. cone failure
scr,N = 450.0 mm
Critical spacing for splitting failure
scr,sp = 300.0 mm
Critical edge distance for conc. failure
ccr,N = 225.0 mm
Influencing factors
Concrete strength factor Embedment depth on conc. Resistance
fB,p = 1.05 fh,N = 3.14
Embedment depth factor Reinforcement factor
fh,p = 2.14 fre,N = 1.00
Concrete strength on cone resistance Shear factor k = 2.00
fB = 1.26 Angle of force = 0.0
Edge distance influence f = 1.00
c/ccr,N = 0.27 Base material thickness
c/ccr,sp = 0.40 fh = 1.00
f1N = 0.78 Anchor spacing & edge distance factor
f2N = 0.70 f4 = 0.19
f1,sp = 0.82 Embedment depth fhef = 3.48
f2,sp = 0.70
Anchor spacing influence Edge distance fc = 0.74
s/scr,N = 0.20
s/scr,sp = 0.30
f3N = 0.60
f3,sp = 0.65

Steel tensile resistance NRd,s = 44.3 kN


Combined pull-out & concrete cone resistance
NRd,p = N0Rd,p*fB,p*f1,N*f2,N*f3,N*fh,p*fre,N
N0Rd,p = 23.7 kN
NRd,p = 17.4 kN
Combined cone resistance
NRd,c = N0RD,c*fB*f1,N*f2,N*f3,N*fh,N*fre,N
N0Rd,c = 27.7 kN
NRd,c = 36.0 kN
Concrete splitting resistance
NRd,sp = N0Rd,c*fB*f1,sp*f2,sp*f3,sp*fh,N*fre,N
N0Rd,sp = 27.7 kN
NRd,c = 41.0 kN
The tensile resistance of 1 pair of bolts = 17.4 kN
No. of pairs of bolts used =4
Total resistance = 69.8 kN >Max.Ten. Force, Hence o.k
Steel shear resisitance VRd,s = 112.7 kN
Concrete pryout resistace VRd,cp = k*min(NRd,c,NRd,p)
VRd,cp = 34.9 kN
Concrete edge resistance VRd,c = V0Rd,c*fB*f*fh*f4*fhef*fc
V0Rd,c = 39.2 kN
VRd,c = 24.1 kN
The shear resistance of 1 pair of bolts = 24.1 kN
No. of pairs of bolts used =4
Total resistance = 96.5 kN >Max. S.F, Hence o.k.
Combined Shear and tension resistance check
N1.5+ V1.5 <1
N1.5 =(Nu/NRd)1.5 = 0.57
V
1.5
=(Vu/VRd) 1.5
= 0.00
N
1.5
+ V = 0.6 kN
1.5
<=1, Hence o.k