PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK

Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: HVAC-Powder coated metal trunking (EW) Sample: BMS-Powder coated metal trunking (EW)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: HVAC-G.I. conduit (Maruchi) Sample: BMS-G.I conduit (Maruchi)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: HVAC-G.I through box (PUM) Sample: BMS-G.I. Through box (PUM)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: Stainless steel 304 stud bolt for outdoor condensing unit (M8, M10, M12) Sample: Drain Pipe c/w approved Sirim Class D/E concealed horizontal

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services- 23,000 & 25,000 Wall Mounted Split Unit Subject: Air-Conditioning & Ventilation Services
5/8" & 3/8" Copper pipe (Totaline), 3/4" & 3/4" tk (Superlon), c/w 2.5mm single PVC cable (UCS), High
Sample: Sample: Drain Pipe c/w approved Sirim Class D/E concealed vertical with 1/2" Insulation
impact PVC conduit (PVC Link) run inside 1" X 4" G.I trunking)/Surface

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments


Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services- 40,000/45,000 Ceiling Cassette Split Unit Subject: Air-Conditioning & Ventilation Services- 9,000 Wall Mounted Split Unit
3/4" & 1/2" Copper pipe (Totaline), 3/4" & 3/4" tk/1/2" & 1/2"tk (Superlon), c/w 4mm single PVC cable 3/8" & 1/4" Copper pipe (Totaline), 5/8" & 3/4" tk (Superlon), c/w 2.5mm single P
Sample: Sample:
(UCS) High impact PVC conduit run inside 3" X 4" G.I trunking (EMU)/Surface impact PVC conduit (PVC-Link) run inside 1" X 4" G.I Tray/Surface

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: Chilled water pre insulated class "B" blk steel pipe (Ricwill) Sample: 2"x3"x3mm c-channel, 1/4" G.I u clamp & stud bolt- Piping Ground Support Brac

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: 2" PVC drain pipe with approved sirim class "D" c/w 2 1/8" x 3/8" tk insulation (Superlon) Sample: 2mm steel plate bended c/w 3/8" G.I rop & anchor bolt- Piping Hanger Support B

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
2"x4"x4mm c-channel, 1/2" G.I rod, 3mm steel plate bended & stud bolt- for Piping Hanger Support
Sample: Sample: 0.5mm G.I. Sheet (Yong Kong)
Bracket (Big)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil
Sample: HVAC-Single PVC cable (UCS) Sample: HVAC-XLPE/SWA/PVC ca

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil
Sample: HVAC-G.I. Angle box c/w flexible conduit (PUM) Sample: BMS-PVC angle box c/w fl

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil
Sample: BMS-PVC High impact conduit c/w socket (PVC Link) Sample: BMS-PVC end box (PVC L

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil

Sample: Anti vibration rubber pad for outdoor condensing unit- (Tozen) Sample: High impact PVC conduit c

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services- 12,000 Wall Mounted Split Unit Subject: Air-Conditioning & Ventil
1/2" & 1/4" Copper pipe (Totaline), 5/8" & 3/4" tk (Superlon), c/w 2.5mm single PVC cable (UCS) High 1/2" & 1/4" Copper pipe (To
rtical with 1/2" Insulation (Insulflex) Sample: Sample:
impact PVC conduit (PVC-Link) run inside 1" X 4" G.I Tray/Surface impact PVC conduit (PVC-

Status : Approved, no comments Status :

Approved with comments


Rejected

Date Received : Date Responded : Date Received :

AH, SARAWAK
AVEMENT ACCESS ROAD, LANDSIDE

Mounted Split Unit


rlon), c/w 2.5mm single PVC cable (UCS) High
ray/Surface

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil

ping Ground Support Bracket Sample: 0.7mm G.I. Sheet (Yong Kong) Sample: G.I SGP Elbow (Welded Ty

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :


AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil

Piping Hanger Support Bracket (small) Sample: 0.8mm G.I. Sheet (Yong Kong) Sample: G.I SGP Elbow (Thread Ty

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGA
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES &
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventil

Sample: 1.2mm G.I. Sheet (Yong Kong) Sample: 1"x1" G.I angle bar c/w a/4

Status : Approved, no comments Status :

Approved with comments

Rejected

Date Received : Date Responded : Date Received :


EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
VAC-XLPE/SWA/PVC cable (UCS) Sample: BMS-PVC through box (PVC Link)

Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Responded : Date Received : Date Responded :

EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK


PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services
MS-PVC angle box c/w flexible conduit (PVC Link)

Approved, no comments

Approved with comments

Rejected

Date Responded :

EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK


PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services
MS-PVC end box (PVC Link)

Approved, no comments

Approved with comments

Rejected

Date Responded :

EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

igh impact PVC conduit c/w 2.5/4 mm single PVC cable connected to outdoor condensing unit Sample: 0.5mm G.I sheet. (Yong Kong)

Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Responded : Date Received : Date Responded :

EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services- 12,000 & 18,000 Ceiling Cassette Split Unit Subject: Air-Conditioning & Ventilation Services- 12,000 Wall Mounted Split Unit
/2" & 1/4" Copper pipe (Totaline), 5/8" & 3/4" tk (Insulflex), c/w 2.5mm single PVC cable (UCS) High
Sample: G.I Exhaust air duct c/w s & c slip joint
mpact PVC conduit (PVC-Link) run inside 1"X 4" G.I Tray/Surface

Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments


Rejected Rejected

Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK


Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services

Sample: G.I. 1" x 1" angle bar c/w 3/8" G.I rod and hilti anchor bolt for trunking/ducting

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :

EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

.I SGP Elbow (Welded Type)- Condenser Piping Sample: 2"x1" hollow c/w 3/8" G.I rod & hilti anchor- Main Duct Bracket

Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Responded : Date Received : Date Responded :


EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
G.I duct TDC joint c/w 12mm Trocellen (External) and 12mm Fire Seal Insulation (Internal)- G.I. Supply &
.I SGP Elbow (Thread Type)- Condenser Piping Sample:
Return Air Duct

Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Responded : Date Received : Date Responded :

EMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
NFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
ir-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

"x1" G.I angle bar c/w a/4" G.I rod & Hilti anchor- Branch Duct Bracket Sample: G.I. Duct S & C clip joint c/w 12mm Trocellen Insulation (External).

Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services
Sample: BMS-18 AWG communication cable (Belden) + 0.75mm control cable (Fajar)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MU
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD P
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: G.I S & C clip joint Sample: Hot Dipped Galvanized Outdoor Condensing Unit Bra

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MU
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD P
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services- 12,000 & 18,000 Ceiling Cassette Split Unit Subject: Air-Conditioning & Ventilation Services

Sample: G.I. 1" x 1" angle bar c/w 1/4" G.I rod and hilti anchor bolt for trunking/ducting Sample: Hot Dipped Galvanized Outdoor Condensing Unit Bra

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments


Rejected Rejected

Date Received : Date Responded : Date Received :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MU
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD P
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: H.D.G 1 1/2" x 1 1/2" unitrust c/w spring nut for trunking- (EMU) Sample: Hot Dipped Galvanized Outdoor Condensing Unit Bra

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MU
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD P
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: Round diffuser c/w 8" OBD (Prudentaire) Sample: Double deflection supply diffuser (Prudentaire)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MU
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD P
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
(Internal)- G.I. Supply &
Sample: 4-way supply diffuser c/w 8" OBD (Prudentaire) Sample: Perforated supply diffuser (Prudentaire)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MU
D, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD P
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: Egg crate- Exhaust Diffuser (Prudentaire) Sample: Bar grille c/w 6" plenum box with internal insulation (P

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received :


N TERBANG BARU MUKAH, SARAWAK
RMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
UILDING WORKS)
tion Services

door Condensing Unit Bracket Support

pproved, no comments

pproved with comments

Date Responded :

N TERBANG BARU MUKAH, SARAWAK


RMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
UILDING WORKS)
tion Services

door Condensing Unit Bracket Support

pproved, no comments

pproved with comments


Date Responded :

N TERBANG BARU MUKAH, SARAWAK


RMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
UILDING WORKS)
tion Services

door Condensing Unit Bracket Support

pproved, no comments

pproved with comments

Date Responded :

N TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
RMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
UILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
tion Services Subject: Air-Conditioning & Ventilation Services

user (Prudentaire) Sample: Return air diffuser (Prudentaire)

pproved, no comments Status : Approved, no comments

pproved with comments Approved with comments

Rejected

Date Responded : Date Received : Date Responded :


N TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
RMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
UILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
tion Services Subject: Air-Conditioning & Ventilation Services

Prudentaire) Sample: External weatherproof Louvre c/w insect screen (Prudentaire)

pproved, no comments Status : Approved, no comments

pproved with comments Approved with comments

Rejected

Date Responded : Date Received : Date Responded :

N TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
RMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
UILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
tion Services Subject: Air-Conditioning & Ventilation Services

with internal insulation (Prudentaire) Sample: 3-slot linear diffuser (Prudentaire)

pproved, no comments Status : Approved, no comments

pproved with comments Approved with comments

Rejected

Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAW
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT A
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services- 23,000 & 25,000 Wall Mounted Split Unit Subject: Air-Conditioning & Ventilation Services- 12,000 & 18,000 Ceiling
5/8" & 3/8" Copper pipe (Totaline), 3/4" & 3/4" tk (Superlon), c/w 2.5mm single PVC cable (UCS), High 1/2" & 1/4" Copper pipe (Totaline), 5/8" & 3/4" tk (Superlon), c/w 2.
Sample: Sample:
impact PVC conduit (PVC Link) run inside 1" X 4" G.I tray/Surface impact PVC conduit (PVC-Link) run inside 1"X 4" G.I Tray/Surface

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAW
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT A
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services- 9,000 Wall Mounted Split Unit Subject: Air-Conditioning & Ventilation Services
3/8" & 1/4" Copper pipe (Totaline), 5/8" & 3/4" tk (Superlon), c/w 2.5mm single PVC cable (UCS) High
Sample: Sample: Bar grille c/w 6" plenum box with internal insulation (Prudentaire)
impact PVC conduit (PVC-Link) run inside 1" X 4" G.I Tray/Surface

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments


Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAW
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT A
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services- 12,000 Wall Mounted Split Unit Subject: Air-Conditioning & Ventilation Services
1/2" & 1/4" Copper pipe (Totaline), 5/8" & 3/4" tk (Superlon), c/w 2.5mm single PVC cable (UCS) High
Sample: Sample: External weatherproof Louvre c/w insect screen (Prudentaire)
impact PVC conduit (PVC-Link) run inside 1" X 4" G.I Tray/Surface

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: Volume control damper (Prudentaire) Sample: Volume control damper (Prudentaire)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS RO
INFRASTRUCTURES & BUILDING WORKS) INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services

Sample: Fusible link fire damper (Prudentaire) Sample: Fusible link fire damper (Prudentaire)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


BARU MUKAH, SARAWAK
AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
WORKS)
12,000 & 18,000 Ceiling Cassette Split Unit
3/4" tk (Superlon), c/w 2.5mm single PVC cable (UCS) High
e 1"X 4" G.I Tray/Surface

ate Responded :

BARU MUKAH, SARAWAK


AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
WORKS)

insulation (Prudentaire)
ate Responded :

BARU MUKAH, SARAWAK


AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
WORKS)

screen (Prudentaire)

ate Responded :

AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK


AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services

Sample: VAV Box (ADF)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


AH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
AVEMENT ACCESS ROAD, LANDSIDE Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, LANDSIDE
INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services

Sample: VAV Box(ASLI)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: 0.5mm G.I. Sheet (Yong Kong) Sample: 0.7mm G.I. Sheet (Yong Kong)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: 0.8mm G.I. Sheet (Yong Kong) Sample: 1.0mm G.I. Sheet (Yong Kong)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: 1.2mm G.I. Sheet (Yong Kong) Sample: Fireseal Ducting Acoustic Insulation (Hong Ho Eng.)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
G.I Supply & Return Air Duct w/ TDC Joint ; c/w 12mm External PU Insul. (Trocellen) G.I. Supply & Return Air Duct w/ S & C Slip Joint ; c/w 20mm External Insul.
Sample: Sample:
and 12mm Internal PU Insul. (Fire Seal) (Trocellen) - Ductwork Below Roof

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: G.I Exhaust Air Duct w/ S & C Slip Joint Sample: 250mm Flexible Duct (ADF)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: 1.25" x 1.25" Angle Iron Bar ; c/w 1/3" G.I rod & concrete anchor (Hilti) Sample: 2" x 2" Angle Iron Bar ; c/w 2/5" G.I rod & Concrete Anchor (HILTI)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected
Date Received : Date Responded : Date Received : Date Responded :
1"x1" G.I angle bar c/w 1/4" G.I rod & Hilti anchor- Branch Duct Bracket
PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services
Sample: G.I. S & C clip Joint

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK


Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
Subject: LANDSIDE INFRASTRUCTURES
Air-Conditioning & BUILDING WORKS)
& Ventilation Services
Sample: 5/8" & 3/8" Copper Pipe (Totaline) ; w/ 10mm & 19mm NBR Class 1 Insul. (Superlon)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :

Chillwater Pipe
PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Pre Insul. Blk Welded Steel Pipe - BS 1387 Class C ; c/w 0.5mm Galv. Steel Spiral Pre Insul. Blk Welded Steel Pipe JIS G 3452 ; c/w 0.6mm Galv. Steel Spiral Jacket
Sample: Sample:
Jacket (Ricwill HIGARD/TERRAGARD) (Ricwill HIGARD/TERRAGARD)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments


Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

Drain Pipe
PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services
Sample: UPVC Drain Pipe ; c/w 10mm NBR Class 1 Insul. (Superlon)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
50mm x 75mm x 3mm C-Channel, 10mm G.I U-Clamp & Stud Bolt- Piping Ground 50mm x 100mm x 3mm C-Channel, 12mm G.I rod, 3mm steel plate bended & stud
Sample: Sample:
Support Bracket bolt- for Piping Hanger Support Bracket (Big)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
Subject: LANDSIDE INFRASTRUCTURES
Air-Conditioning & BUILDING WORKS)
& Ventilation Services Subject: LANDSIDE INFRASTRUCTURES
Air-Conditioning & BUILDING WORKS)
& Ventilation Services
32mm x 50mm x 3mm C-Channel, 10mm G.I rod, 3mm steel plate bended & stud 32mm x 50mm x 3mm C-Channel, 6mm G.I rod, 3mm steel plate bended & stud bolt-
Sample: Sample:
bolt- for Piping Hanger Support Bracket [32-50mm Dia] for Piping Hanger Support Bracket [< 25mm Dia]

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
50mm x 175mm x 3mm C-Channel, 15mm G.I rod, 3mm steel plate bended & stud 50mm x 125mm x 3mm C-Channel, 12mm G.I U-Clamp & Stud Bolt- Piping Ground
Sample: Sample:
bolt- for Piping Hanger Support Bracket [125-150mm Dia] Support Bracket [65-100mm Dia]
Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :

PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK


Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services
32mm x 50mm x 3mm C-Channel, 6mm G.I rod, 3mm steel plate bended & stud bolt-
Sample:
for Piping Hanger Support Bracket [< 25mm Dia]

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK PEMBINAAN LAPANGAN TERBANG BARU MUKAH, SARAWAK
Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD, Project: (PACKAGE 2 - FINAL FORMATION, AIRFIELD PAVEMENT ACCESS ROAD,
LANDSIDE INFRASTRUCTURES & BUILDING WORKS) LANDSIDE INFRASTRUCTURES & BUILDING WORKS)
Subject: Air-Conditioning & Ventilation Services Subject: Air-Conditioning & Ventilation Services
Sample: 3/4" & 1/2" Copper Pipe (Totaline) ; w/ 10mm & 19mm NBR Class 1 Insul. (Superlon) Sample: 3/4" & 1/2" Copper Pipe (Totaline) ; w/ 10mm & 19mm NBR Class 1 Insul. (Superlon)

Status : Approved, no comments Status : Approved, no comments

Approved with comments Approved with comments

Rejected Rejected

Date Received : Date Responded : Date Received : Date Responded :


SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-
CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE TERRA-GARD PRE-INSULATED PIPE BLK-SCH 40 (RICWIL)
HI-GRAD PRE-INSULATED PIPE BLK-C (RICWIL)
Condenser G.I Pipe (MELEWAR)
Steel Butt Wedding & Threaded Pipe Fitting
Anchor & Bracket For Pipework
Drain pipe (Chin Lean) & Insulation (Superlon)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :

SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-


CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE TERRA-GARD PRE-INSULATED PIPE BLK-SCH 40 (RICWIL)
HI-GRAD PRE-INSULATED PIPE BLK-C (RICWIL)
Condenser G.I Pipe (MELEWAR)
Steel Butt Wedding & Threaded Pipe Fitting
Anchor & Bracket For Pipework
Drain pipe (Chin Lean) & Insulation (Superlon)

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :


SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-
CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE G.I SHEET
THICKNESS : 0.5MM, 0.7MM, 0.8MM, 1.0MM AND 1.2MM

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :

SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-


CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE G.I TDC JOIN SUPPLY AND RETURN AIR DUCT C/W 20MM TROCELLEN EXTERNAL INSULATION
AND 12MM FIRE SEAL INTERNAL INSULATION
DUCT WORK BELOW ROOF INSULATED WITH 25MM TROCELLEN EXTERNAL INSULATION

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :

SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-


CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE G.I S&C JOIN SUPPLY AND RETURN AIR DUCT C/W 20MM TROCELLEN EXTERNAL INSULATION
DUCT WORK BELOW ROOF INSULATED WITH 25MM TROCELLEN EXTERNAL INSULATION

Status : Approved, no comments


Approved with comments

Rejected

Date Received : Date Responded :

SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-


CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE MIAN DUCTING BRACKET
3/8 DIA. G.I ROD X G.I 48MM X 40MM STRUT CHANNELS

Status : Approved, no comments

Approved with comments

Rejected

Date Received : Date Responded :

SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING & COMMISSIONING OF AIR-


CONDITIONING & VENTILATION SYSTEM FOR THE CONSTRUCTION AND COMPLETION
PROJECT OF THE PROPOSED UNIVERSITY COLLEGE TECHNOLOGY S'WAK & TECHNOLOGY PARK
ON PART OF LOTS 451, 456, 458 & 645 AND LOT 868, BLOCK 1, SEDUAN LAND DISTRICT,
SIBU-SARAWAK (PH-1)
SUBJECT AIR-CONDITIONING & VENTILATION SERVICES
SAMPLE BRANCH DUCTING BRACKET
1/4 DIA. G.I ROD X G.I 48MM X 40MM STRUT CHANNELS

Status : Approved, no comments


Approved with comments

Rejected

Date Received : Date Responded :


G.I TDC JOIN SUPPLY AND RETURN AIR DUCT
C/W 20MM TROCELLEN EXTERNAL INSULATIO
AND 12MM FIRE SEAL INTERNAL INSULATION
DUCT WORK BELOW ROOF INSULATED WITH
25MM TROCELLEN EXTERNAL INSULATION

G.I S&C JOIN SUPPLY AND RETURN AIR DUCT


C/W 20MM TROCELLEN EXTERNAL INSULATIO
DUCT WORK BELOW ROOF INSULATED WITH
25MM TROCELLEN EXTERNAL INSULATION
DUCT
LATION
ATION
WITH
ON

DUCT
ULATION
WITH
ON
Hot Dipped Galvanized Outdoor Condensing Unit Bracket Support