You are on page 1of 18

GEOTHERMAL

PRODUCTION EHHANCEMENT
2014 Baker Hughes Incorporated. All Rights Reserved.

2014 BAKER HUGHES I NCORPORATED. ALL RI GHTS RESERVED. TERM S AND CONDI TI ONS OF USE: BY ACCEPTI NG THI S DOCUM ENT, THE RECI PI ENT AGREES THAT THE DOCUM ENT TOGETHER W I TH ALL I NFORM ATI ON I NCLUDED THEREI N I S THE
CONFI DENTI AL AND PROPRI ETARY PROPERTY OF BAKER HUGHES I NCORPORATED AND I NCLUDES VALUABLE TRADE SECRETS AND/ OR PROPRI ETARY I NF OR M ATI ON OF BAKER HUGHES (COLLECTI VELY "I NFORM ATI ON"). BAKER HUGHES RETAI NS ALL RI GHTS
UNDER COPYRI GHT LAW S AND TRADE SECRET LAW S OF THE UNI TED STATES OF AM ERI CA AND OTHER COUNTRI ES. THE RECI PI ENT FURTHER AGREES TH AT THE DOCUM ENT M AY NOT BE DI STRI BUTED, TRANSM I TTED, COPI ED OR REPRODUCED I N W HOLE OR
1 I N PART BY ANY M EANS, ELECTRONI C, M ECHANI CAL, OR OTHERW I SE, W I THOUT THE EXPRESS PRI OR W RI TTEN CONSENT OF BAKER HUGHES, AND M A Y NOT BE USED DI RECTLY OR I NDI RECTLY I N ANY W AY DETRI M ENTAL TO BAKER HUGHES I NTEREST.
GEOTHERMAL STIMULATION OBJECTIVES

Wellbore Scale Removal

Damage from Lost Drilling Fluid

Formation Natural Fissures Cleanup


2014 Baker Hughes Incorporated. All Rights Reserved.

2
GEOTHERMAL STIMULATION OBJECTIVES

Wellbore Scale:

Best to Combine Mechanical


and Chemical Removal

Mechanical Removal: BHI RotoJet


2014 Baker Hughes Incorporated. All Rights Reserved.

Chemical Removal: BHI Sandstone Acid

3
BHI Roto-JetTM / Roto-PulseTM System

Roto-JetTM High pressure jetting


Brittle scale removal
360o full fluid coverage
Stress Cycling

Stimulation
Open hole acid delivery
Perforation
2014 Baker Hughes Incorporated. All Rights Reserved.

Slotted liners

4
Roto-JetTM

Substances Jetted
asphaltenes
screens
calcium carbonate
Sand
filter cake
sulfur
barium sulfate
gypsum
2014 Baker Hughes Incorporated. All Rights Reserved.

5
2014 Baker Hughes Incorporated. All Rights Reserved.

7
ROTOJET
ROTOJET

Before After
RotoJet RotoJet
2014 Baker Hughes Incorporated. All Rights Reserved.

Plugged Liner Section with base Liner Section after cleaning with
pipe removed consisting of calcium Roto-Jet + chemical treatment.
carbonate scale and other solids, The base pipe was removed after
containing fines. testing.
8
2014 Baker Hughes Incorporated. All Rights Reserved.

9
ROTOJET CLIPS
2014 Baker Hughes Incorporated. All Rights Reserved.

10
ROTOJET CLIPS
GEOTHERMAL STIMULATION OBJECTIVES

Wellbore Scale:

Best to Combine Mechanical


and Chemical Removal

Mechanical Removal: BHI RotoJet


2014 Baker Hughes Incorporated. All Rights Reserved.

Chemical Removal: BHI Sandstone Acid

11
Scale Analysis Example
Nicaragua Momotombo Geothermal Field
2014 Baker Hughes Incorporated. All Rights Reserved.

12
2014 Baker Hughes Incorporated. All Rights Reserved.

13
LABORATORY ANALYSIS
THE SOLUTION TO ENHANCE PRODUCTION / INJECTION

Pumping Small Volumes (10 to 20 gpf) of a


Sandstone Acid System (typical volumes for
shorter zones = +/- 50 to 200 gpf).

Volumes Designed to Penetrate the Very Near


Wellbore Area only (inches).
(typical penetration for shorter zones = +/- 3 to 5 feet).

Coil Tubing with Rotating jets to Help Ensure


Good Zone Coverage Over Long Sections.
2014 Baker Hughes Incorporated. All Rights Reserved.

14
RESULTS
RIGLESS ACIDIZING WITH BHI SANDSTONE ACID
Production Rate, MWe
Preflush Main Treatment Postflush or
Well Well Type Injection Rate, TM/hr

Volume, (m3) Type Volume, (m3) Type Volume, (m3) Type Before After

6% Sandstone
Injector
TR11A 30 15% HCl 50 Acid 160 3% HCl 0 90
7% Sandstone
Injector
TR7 40 15% HCl 90 Acid 390 3% HCl 0 144
6% Sandstone
Injector
TR8A 10 15% HCl 40 Acid 100 3% HCl 14 65
8% Sandstone
Injector
TR14 60 10% HCl 100 Acid 320 3% HCl 0 180
6% Sandstone
Injector
TR-11A 20 Scale/Rust Cleaner 50 Acid 210 3% HCl 14 90
6% Sandstone
Injector
TR-1B 70 10% HCl 90 Acid 320 3% HCl 50 130
6% Sandstone
2014 Baker Hughes Incorporated. All Rights Reserved.

Injector
TR-11A 20 10% HCl 50 Acid 110 3% HCl 0 90
6% Sandstone
Injector
TR-11A 20 10% HCl 50 Acid 140 3% HCl 0 90
10%:5%
3.7 8.7
TR-17B Producer 80 15% HCl 100 Sandstone Acid 360 3% HCl

10%:5%
Sandstone Acid
3.5 4.8
TR-17A Producer 80 15% HCl 110 270 3% HCl
5% Sandstone
1.5 9.1
TR-18 Producer 120 15% HCl 80 Acid 320 3% HCl
15
RESULTS
RIGLESS ACIDIZING WITH BHI SANDSTONE ACID

Production Rate, MWe or


Well Well Type Preflush Main Treatment Postflush Injection Rate, Tm/hr
Volume,
Type Type Type
Volume, m3 Volume, m3 m3 Before After

5% Sandstone
MT35 Producer 64 10% HCl 184 Acid 220 Fresh water 0 3.6

MT42 Producer - - 155 10% HCl 133 Fresh water 0 1.4

5% Sandstone
RMT30 Injector 64 10% HCl 184 Acid 220 Fresh water 90 150

5% Sandstone
RMT18 Injector 93 10% HCl 99 Acid 165 Fresh water 150 250
2014 Baker Hughes Incorporated. All Rights Reserved.

5% Sandstone
MT27 Producer 149 10% HCl 149 Acid 540 Fresh water 4.65 5.14

5% Sandstone
OM53 Producer 84 10% HCl 84 Acid 80 Fresh water 6.48 9.48

MT31 Producer 95 15% HCl 74 10% HCl 133 Fresh water 4.23 6.08

16
GETHERMAL STIM. No.
1
Date
December-04
Client
Unocal
Location
Salak
Well #
AWI 1-1
Type of Job
Clean out with milling.

BHI INDONESIA
2 December-04 Unocal Salak AWI 9-1 Clean out with milling.
3 February-05 Unocal Salak AWI 8-7 Acidizing
4 September-05 Unocal Salak AWI 10-3 Acidizing
5 March-06 Chevron Geothermal Salak Salak AWI 8-8 Acidizing
6 April-06 Chevron Geothermal Salak Salak AWI 13-8 Acidizing

10 years experience
7 April-07 Chevron Geothermal Salak Salak AWI 1-9 Acidizing
8 April-07 Chevron Geothermal Salak Salak AWI 11-4 N2 kick off
9 June-07 Chevron Geothermal Salak Salak AWI 11-6 Acidizing
10

18 of 42 Rotojet
September-08 Chevron Geothermal Salak Salak AWI 8-10 Acidizing
11 September-08 Chevron Geothermal Salak Salak AWI 11-5 Acidizing
12 September-08 Chevron Geothermal Salak Salak AWI 11-6 Acidizing
13 October-08 Chevron Geothermal Salak Salak AWI 19-2 Acidizing

acidizing or 14
15
16
October-08
December-09
December-09
Chevron Geothermal Salak
Chevron Geothermal Indonesia
Chevron Geothermal Indonesia
Salak
Darajat
Darajat
AWI 19-3
DRJ-13
DRJ-25
N2 kick off
Rotojet Clean out/Milling
Acidizing

cleanout jobs 17
18
19
January-10
November-10
November-10
Chevron Geothermal Indonesia
Chevron Geothermal Indonesia
Chevron Geothermal Indonesia
Darajat
Darajat
Darajat
DRJ-10
DRJ-13
DRJ-34
Acidizing
Acidizing
Acidizing

2015 Campaign 20
21
22
November-10
November-10
November-10
Chevron Geothermal Indonesia
Chevron Geothermal Salak
Chevron Geothermal Salak
Darajat
Salak
Salak
DRJ-36
AWI 13-10
AWI 18-1
Acidizing
Acidizing
Acidizing

with PGE 23
24
25
December-11
January-12
January-12
Chevron Geothermal Salak
Star Energy Geothermal
Star Energy Geothermal
Salak
Pangalengan
Pangalengan
AWI 21-2
MBB-2
MBE-3
Acidizing
Acidizing and Rotojet
Acidizing and Rotojet

Q4 Campaign with 26
27
28
March-12
May-12
May-12
Star Energy Geothermal
Chevron Geothermal Indonesia
Chevron Geothermal Indonesia
Pangalengan
Darajat
Darajat
MBA-5
DRJ-3
DRJ-S5
Acidizing and Rotojet
P&A
P&A

Chevron 29
30
July-12
July-12
Star Energy Geothermal
Star Energy Geothermal
Pangalengan
Pangalengan
MBA-3
MBA-4
Acidizing and Rotojet
Acidizing and Rotojet
2014 Baker Hughes Incorporated. All Rights Reserved.

31 July-12 Star Energy Geothermal Pangalengan MBB-6 Acidizing and Rotojet


32 January-13 Chevron Geothermal Indonesia Darajat DRJ-7 Rotojet Clean out
33 January-13 Chevron Geothermal Indonesia Darajat DRJ-8 Rotojet Clean out
34 January-13 Chevron Geothermal Indonesia Darajat DRJ-11 Rotojet Clean out
35 January-13 Chevron Geothermal Indonesia Darajat DRJ-17 Rotojet Clean out
36 January-13 Chevron Geothermal Indonesia Darajat DRJ-27 Rotojet Clean out
37 November-13 Chevron Geothermal Indonesia Darajat DRJ-18 Rotojet Clean out
38 December-13 Chevron Geothermal Indonesia Darajat DRJ-22 Rotojet Clean out
39 December-13 Chevron Geothermal Indonesia Darajat DRJ-37 Rotojet Clean out
40 August-14 Chevron Geothermal Indonesia Darajat DRJ-13 Rotojet Clean out
41 August-14 Chevron Geothermal Indonesia Darajat DRJ 20 Acidizing and Rotojet
42
17 September-14 Chevron Geothermal Indonesia Darajat DRJ-23 Rotojet Clean out
SUMMARY

Wellbore Scale:
Combination Mechanical and
Chemical Removal

BHI RotoJet: Full wellbore coverage for cleanout &


acid placement
2014 Baker Hughes Incorporated. All Rights Reserved.

BHI Sandstone Acid: Smaller volumes with same


solubility as HCL fluid
18
2014 Baker Hughes Incorporated. All Rights Reserved.

19
Thank you
Questions & Discussion

You might also like