You are on page 1of 5

Ranvilaage, Ground Floor | Dhoohimeri Magu Male

20074| Rep of Maldives


Tel: +960 7797669 | Fax: +960 3344789
Email: hnaxieh@gmail.com; trade@thehuna.com

QUOTATION
Date: 10-Nov-15 No: HUNA/2015/134
Your Ref No: H-2015/209

Customer: State Electric Company Ltd


Address: Male', Rep of Maldives

# Description Qty Rate Amount

1 Video Borescope and Wireless Inspection Camera 1 24,500.00 24,500.00


Captures both (images and video), memory card, detachable colour
LCD (min 3.5). 1m flexible gooseneck cable (dia 9mm or less),
complete with waterproof camera) dia 10mm or less) &
illumination leds, extension tools (magnet, hook, mirrors)

technical Data sheet and Pics attached

24,500.00
GST 6% 1,470.00
Total: (MVR Twenty Five Thousand Nine Hundred & Seventy Only) 25,970.00

Validity: 60 Days from date of quotation


Delivery Period: With in 10 Day

Shaffaf Rasheed / 7797669


Managing Director
Windscreen, 3rd Floor | Muranga Magu Male 20074|
Rep of Maldives
Tel: +960 7910606 |
Email: threedeehouse@gmail.com;

QUOTATION
Date: 6-Jun-17 No: 3dHouse/2017/0011
Your Ref No:

Customer: ASRAFEE BOOKSHOP


Address: Male', Rep of Maldives

# Description Qty Rate

CONSTRUCTION PROPOSED THINADHOO ASRAFEE


1 1 1,500,000.00
BOOKSHOP
Labour cost for the construction of proposed 2 storey Asrafee
Bookshop Building at Thinadhoo.

GST 6%
Total:

Delivery: AS PER THE SUPPLY OF THE MATERIAL

Ibrahim Ali / 7910606


Asst Managing Director
a Magu Male 20074|

om;

2017/0011

Amount

1,500,000.00

1,500,000.00
90,000.00
1,590,000.00
Total cost
rate qtty
BRICKS 860 2 1720 6
Plastering
Labour 15000 bags 55 160
Pickup 1000 Sand 550 15
Shahudh 1000
Shaffaf 2500 Mortar
Ibrahim 2500 PAINT 20l
Shaffaf 2500 SEALER 18L
24500 wastage 15%
GST 1470
25970

7470

area 1.5 860

5160
5160
10320
10320

8800
8250
27370

2000
1500
31475.5

1290

45,295.50
Profit 20,000.00
65,295.50

You might also like