CONSORCIO HUERTAS PLAZO DE EJECUCION 240 DIAS CALENDARIOS

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE ABASTOS DEL MERCADO HUERTAS EN EL DISTRITO DE AMBO, PROVINCIA DE AMBO, DEPARTAMENTO DE HUNUCO
Id item Nombre de tarea DuracinComienzo Fin Costo lun 13/02 dom 19/02 sb 25/02 vie 03/03 jue 09/03 mi 15/03 mar 21/03 lun 27/03 dom 02/04 sb 08/04 vie 14/04 jue 20/04 mi 26/04 mar 02/05 lun 08/05 dom 14/05 sb 20/05 vie 26/05 jue 01/06 mi 07/06 mar 13/06 lun 19/06 dom 25/06 sb 01/07 vie 07/07 jue 13/07 mi 19/07 mar 25/07 lun 31/07 dom 06/08 sb 12/08 vie 18/08 jue 24/08 mi 30/08 mar 05/09 lun 11/09 dom 17/09 sb 23/09 vie 29/09 jue 05/10 mi 11/10 mar 17/10 lun 23/10 dom 29/10 sb 04/11 vie 10/11 jue 16/11 mi 22/11 mar 28/11 lun 04/12 dom 10/12 sb 16/12 vie 22/12 jue 28/12 mi 03/01 mar 09/01 lun 15/01 dom 21/01
1 I MEJORAMIENTO, AMPLIACIN DEL SERVICIO DE ABASTOS DEL MERCADO HUERTAS EN EL 316 mi 01/03/17 mi S/. 2,680,991.40 S/. 2,680,991.40
DISTRITO DE AMBO, PROVINCIA DE AMBO - HUNUCO das? 10/01/18
2 MEJORAMIENTO, AMPLIACIN DEL SERVICIO DE ABASTOS DEL MERCADO 0 das? mar 16/05/17 mar S/. 0.00
HUERTAS EN EL DISTRITO DE AMBO, PROVINCIA DE AMBO - HUNUCO 16/05/17 16/05
3 INICIO DE OBRA 316 mi 01/03/17 mi S/. 2,680,991.40
10/01
das 10/01/18
4 01 ESTRUCTURAS 316 das mi 01/03/17 mi 10/01/18 S/. 1,324,560.14 S/. 1,324,560.14
01/03 316 das
5 01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 316 das mi 01/03/17 mi 10/01/18 S/. 131,739.48 S/. 131,739.48
01/03 316 das
6 01.01.01 CONSTRUCCIONES PROVISIONALES 71 das mi 01/03/17 mi 10/05/17 S/. 10,529.77 S/. 10,529.77
01/03 71 das
7 01.01.01.01 AMBIENTE PARA PERSONAL TCNICO 2 das mi 01/03/17 jue 02/03/17 S/. 2,159.28 S/. 2,159.28
01/03 2 das
8 01.01.01.02 AMBIENTE PARA GUARDIANA 2 das lun 06/03/17 mar 07/03/17 S/. 989.64 S/. 989.64
06/03 2 das
9 01.01.01.03 AMBIENTE PARA ALMACEN DE MATERIALES EQUIPOS Y 3 das vie 03/03/17 dom S/. 3,930.00 S/. 3,930.00
HERRAMIENTAS 05/03/17 03/03 3 das
10 01.01.01.04 AMBIENTE PARA VESTUARIO DEL PERSONAL OBRERO 1 da mi 08/03/17 mi 08/03/17 S/. 1,360.00 S/. 1,360.00
08/03 1 da
11 01.01.01.05 SERVICIOS HIGIENICOS 1 da mar 02/05/17 mar S/. 720.90
02/05/17 1 da
12 01.01.01.06 CARTEL DE IDENTIFICACIN DE LA OBRA DE 5.40X3.60 M INC/INSTALACIN 8 das mi 03/05/17 mi S/. 1,369.95 S/. 1,369.95
10/05/17 03/05 8 das
13 01.01.02 INSTALACIONES PROVISIONALES 7 das mi 01/03/17 mar 07/03/17 S/. 12,966.87 S/. 12,966.87
01/03 7 das
14 01.01.02.01 AGUA PARA LA CONSTRUCCION 1 da mar 07/03/17 mar 07/03/17 S/. 4,420.03
1 da
15 01.01.02.02 DESAGUE PARA LA CONSTRUCCION 1 da mar 07/03/17 mar 07/03/17 S/. 2,755.62
1 da
16 01.01.02.03 ENERGIA ELECTRICA PROVISIONAL 1 da mi 01/03/17 mi S/. 5,791.22
01/03/17 1 da
17 01.01.03 REMOCIONES 3 das mi 01/03/17 vie 03/03/17 S/. 6,758.67 S/. 6,758.67
01/03 3 das
18 01.01.03.01 REMOCIN DE PUERTAS Y VENTANAS 1 da mi 01/03/17 mi 01/03/17 S/. 228.15 S/. 228.15
01/03 1 da
19 01.01.03.02 REMOCIN DE COBERTURA DE CALAMINA 1 da mi 01/03/17 mi S/. 1,716.02 S/. 1,716.02
01/03/17 01/03 1 da
20 01.01.03.03 REMOCIN DE ESTRUCTURA DE MADERA DE PUESTOS 2 das jue 02/03/17 vie 03/03/17 S/. 4,458.56
2 das
21 01.01.03.04 REMOCIN DE APARATOS SANITARIOS 2 das mi 01/03/17 jue 02/03/17 S/. 355.94 S/. 355.94
01/03 2 das
22 01.01.04 DEMOLICIONES 10 das mi 01/03/17 vie 10/03/17 S/. 40,987.92 S/. 40,987.92
01/03 10 das
23 01.01.04.01 DEMOLICION DE MUROS DE ALBAILERA C/MAQUINARIA 4 das sb 04/03/17 mar 07/03/17 S/. 16,653.16
4 das
24 01.01.04.02 DEMOLICION DE ELEMENTOS DE CONCRETO ARMADO CON MAQUINARIA 3 das mi 01/03/17 vie 03/03/17 S/. 10,294.41
3 das
25 01.01.04.03 DEMOLICION DE CIMIENTOS Y SOBRECIMIENTOS 3 das mi 01/03/17 vie 03/03/17 S/. 5,683.90
3 das
26 01.01.04.04 DEMOLICION DE PISO DE CONCRETO E=4 " 3 das sb 04/03/17 lun 06/03/17 S/. 3,924.89
3 das
27 01.01.04.05 ELIMINACIN DE MATERIAL DE DEMOLICIN 1 KM 7 das sb 04/03/17 vie 10/03/17 S/. 4,431.56 S/. 4,431.56
04/03 7 das
28 01.01.05 TRAZO, NIVEL Y REPLANTEO 124 das sb 04/03/17 mi 05/07/17 S/. 12,463.77 S/. 12,463.77
04/03 124 das
29 01.01.05.01 CORTE Y NIVELACIN DE TERRENO C/EQUIPO 1 da sb 04/03/17 sb 04/03/17 S/. 9,307.88
1 da
30 01.01.05.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR 2 das dom 05/03/17 lun 06/03/17 S/. 1,937.48
2 das
31 01.01.05.03 REPLANTEO DURANTE EL PROCESO DE CONSTRUCCIN 120 das mi 08/03/17 mi 05/07/17 S/. 1,218.41 S/. 1,218.41
08/03 120 das
32 01.01.06 MOVILIZACIN DE MATERIALES, EQUIPOS Y HERRAMIENTAS 197.75 lun 22/05/17 mar 05/12/17 S/. 35,732.48 S/. 35,732.48
das 22/05 197.75 das
33 01.01.06.01 MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS 197.75 lun 22/05/17 mar S/. 1,892.48 S/. 1,892.48
das 05/12/17 22/05 197.75 das

34 01.01.06.02 TRANSPORTE DE MATERIALES Y HERRAMIENTAS 150 das lun 22/05/17 mi S/. 33,840.00 S/. 33,840.00
18/10/17 22/05 150 das
35 01.01.07 CONTROL DE CALIDAD DE OBRA 106 das mar 16/05/17 mar S/. 12,050.00 S/. 12,050.00
29/08/17 16/05 106 das
36 01.01.07.01 DISEO DE MEZCLA 6 das lun 22/05/17 sb 27/05/17 S/. 1,350.00 S/. 1,350.00
22/05 6 das
37 01.01.07.02 ENSAYO DE RESISTENCIA A LA COMPRESIN DEL CONCRETO 106 das mar 16/05/17 mar 29/08/17 S/. 4,800.00 S/. 4,800.00
16/05 106 das
38 01.01.07.03 ANLISIS FSICO QUMICO DE LOS AGREGADOS 1 da lun 22/05/17 lun 22/05/17 S/. 850.00 S/. 850.00
22/05 1 da
39 01.01.07.04 ANLISIS QUMICO DEL AGUA USADO PARA EL CONCRETO 1 da lun 22/05/17 lun 22/05/17 S/. 850.00 S/. 850.00
22/05 1 da
40 01.01.07.05 PRUEBA DE COMPACTACION DENSIDAD DE CAMPO 90 das mar 16/05/17 dom 13/08/17 S/. 4,200.00 S/. 4,200.00
16/05 90 das
41 01.01.08 VARIOS 9 das mar 02/01/18 mi 10/01/18 S/. 250.00 S/. 250.00
02/01 9 das
42 01.01.08.01 PLACA RECORDATORIA DE OBRA ACRLICO DE 0.55x0.45 9 das mar 02/01/18 mi 10/01/18 S/. 250.00
9 das
43 01.02 MDULO I + MDULO II: AMPLIACION Y CONSTRUCCION DEL MERCADO 227 das mi 01/03/17 vie 13/10/17 S/. 1,010,727.71 S/. 1,010,727.71
HUERTAS 01/03 227 das
44 01.02.01 OBRAS PROVISIONALES 1 da dom 05/03/17 dom 05/03/17 S/. 1,244.91 S/. 1,244.91
05/03 1 da
45 01.02.01.01 LIMPIEZA DEL TERRENO MANUAL 1 da dom 05/03/17 dom S/. 1,244.91
05/03/17 1 da
46 01.02.02 OBRAS PRELIMINARES 2 das lun 06/03/17 mar S/. 2,082.01 S/. 2,082.01
07/03/17 06/03 2 das
47 01.02.02.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR 2 das lun 06/03/17 mar 07/03/17 S/. 2,082.01
2 das
48 01.02.03 MOVIMIENTO DE TIERRAS 62 das mi 01/03/17 lun 01/05/17 S/. 102,451.49 S/. 102,451.49
01/03 62 das
49 01.02.03.01 EXCAVACION PARA NIVELACIN DE TERRENO 1 da mi 01/03/17 mi 01/03/17 S/. 434.50
1 da
50 01.02.03.02 EXCAVACION DE ZANJAS PARA CIMIENTO CORRIDO 35 das mar 28/03/17 lun 01/05/17 S/. 4,387.52
35 das
51 01.02.03.03 EXCAVACION PARA ZAPATAS DE HM=4.10M DE PROFUNDIDAD 24 das mi 08/03/17 vie 31/03/17 S/. 76,658.08
24 das

52 01.02.03.04 RELLENO CON MATERIAL PROPIO 22 das dom 26/03/17 dom 16/04/17 S/. 6,521.93 S/. 6,521.93
26/03 22 das
53 01.02.03.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST=1 KM 2 das mi 01/03/17 jue 02/03/17 S/. 6,873.32 S/. 6,873.32
01/03 2 das

54 01.02.03.06 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E=4 " 4 das vie 31/03/17 lun 03/04/17 S/. 7,576.14 S/. 7,576.14
C/EQUIPO CAP=1 31/03 4 das

55 01.02.04 CONCRETO SIMPLE 93 das mi 29/03/17 jue 29/06/17 S/. 184,801.33 S/. 184,801.33
29/03 93 das
56 01.02.04.01 FALSO ZAPATA 25 das lun 05/06/17 jue 29/06/17 S/. 98,507.98 S/. 98,507.98
05/06 25 das
57 01.02.04.01.01 FALSA ZAPATA CEMENTO:HORMIGON MEZCLA 1:12 + 50% PG 25 das lun 05/06/17 jue 29/06/17 S/. 98,507.98
25 das

58 01.02.04.02 CIMIENTO CORRIDO 3 das mi 29/03/17 vie 31/03/17 S/. 29,528.69 S/. 29,528.69
29/03 3 das
59 01.02.04.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 3 das mi 29/03/17 vie 31/03/17 S/. 29,528.69 S/. 29,528.69
29/03 3 das

60 01.02.04.03 SOBRECIMIENTO 19 das jue 30/03/17 lun 17/04/17 S/. 27,149.37 S/. 27,149.37
30/03 19 das
61 01.02.04.03.01 CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 + 25% P.M. 18 das vie 31/03/17 lun 17/04/17 S/. 8,692.07 S/. 8,692.07
31/03 18 das
62 01.02.04.03.02 ENCOFRADO Y DESENCOGFRADO DE SOBRECIMIENTO DE 0.30 A h=0.60 19 das jue 30/03/17 lun 17/04/17 S/. 18,457.30 S/. 18,457.30
m 30/03 19 das
63 01.02.04.04 FALSO PISO 18 das sb 01/04/17 mar S/. 29,615.29 S/. 29,615.29
18/04/17 01/04 18 das
64 01.02.04.04.01 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=4 " 18 das sb 01/04/17 mar 18/04/17 S/. 29,615.29 S/. 29,615.29
01/04 18 das
65 01.02.05 CONCRETO ARMADO 213 das mi 15/03/17 vie 13/10/17 S/. 720,147.97 S/. 720,147.97
15/03 213 das
66 01.02.05.01 ZAPATAS 40 das mi 15/03/17 dom 23/04/17 S/. 80,263.55 S/. 80,263.55
15/03 40 das
67 01.02.05.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 30 das sb 25/03/17 dom 23/04/17 S/. 52,834.75 S/. 52,834.75
30 das
68 01.02.05.01.02
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 28 das mi 15/03/17 mar 11/04/17 S/. 27,428.80
28 das
69 01.02.05.02 COLUMNAS 213 das mi 15/03/17 vie 13/10/17 S/. 183,845.64 S/. 183,845.64
15/03 213 das
70 01.02.05.02.01
CONCRETO EN COLUMNETAS f'c=175 kg/cm2 68 das lun 07/08/17 vie 13/10/17 S/. 3,973.55 S/. 3,973.55
07/08 68 das
71 01.02.05.02.02
CONCRETO f'c=210 kg/cm2 EN COLUMNAS 90 das mar 09/05/17 dom 06/08/17 S/. 48,074.05 S/. 48,074.05
09/05 90 das
72 01.02.05.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 90 das lun 27/03/17 sb 24/06/17 S/. 44,936.24 S/. 44,936.24
27/03 90 das
73 01.02.05.02.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 90 das mi 15/03/17 lun 12/06/17 S/. 86,861.80
90 das
74 01.02.05.03 VIGAS 96 das vie 19/05/17 mar S/. 251,801.99 S/. 251,801.99
22/08/17 19/05 96 das
75 01.02.05.03.01 CONCRETO EN VIGAS f'c=210 kg/cm2 55 das jue 29/06/17 mar 22/08/17 S/. 84,181.83 S/. 84,181.83
29/06 55 das
76 01.02.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 61 das lun 29/05/17 vie 28/07/17 S/. 59,065.76 S/. 59,065.76
29/05 61 das
77 01.02.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 65 das vie 19/05/17 sb 22/07/17 S/. 108,554.40
65 das
78 01.02.05.04 LOSAS ALIGERADAS 73 das mar 13/06/17 jue 24/08/17 S/. 204,236.79 S/. 204,236.79
13/06 73 das
79 01.02.05.04.01 CONCRETO EN LOSAS ALIGERADAS f 'c=210 kg/cm2 55 das sb 01/07/17 jue 24/08/17 S/. 45,833.20
55 das
80 01.02.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 57 das mar 13/06/17 mar 08/08/17 S/. 49,586.09
57 das
81 01.02.05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 57 das mi 21/06/17 mi 16/08/17 S/. 74,187.25
57 das
82 01.02.05.04.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALIGERADA 57 das mar 20/06/17 mar 15/08/17 S/. 34,630.25
57 das
83 01.03 TANQUE ELEVADO Y CISTERNA 20 das mar 07/11/17 dom 26/11/17 S/. 29,991.07 S/. 29,991.07
07/11 20 das
84 01.03.01 OBRAS PROVISIONALES 1 da mar 07/11/17 mar 07/11/17 S/. 11.15 S/. 11.15
07/11 1 da
85 01.03.01.01 LIMPIEZA DEL TERRENO MANUAL 1 da mar 07/11/17 mar 07/11/17 S/. 11.15
1 da
86 01.03.02 OBRAS PRELIMINARES 1 da mi 08/11/17 mi 08/11/17 S/. 18.64 S/. 18.64
08/11 1 da
87 01.03.02.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR 1 da mi 08/11/17 mi 08/11/17 S/. 18.64
1 da
88 01.03.03 MOVIMIENTO DE TIERRAS 12 das jue 09/11/17 lun 20/11/17 S/. 571.60 S/. 571.60
09/11 12 das
89 01.03.03.01 EXCAVACION MANUAL PARA ESTRUCTURAS 2 das jue 09/11/17 vie 10/11/17 S/. 294.06
2 das
90 01.03.03.02 ELIMINACION DE MATERIAL EXCEDENTE DM=1 km 1 da lun 20/11/17 lun 20/11/17 S/. 175.96 S/. 175.96
20/11 1 da
91 01.03.03.03 REFINE, NIVELACION Y COMPACTACION EN TERRENO COMPACTADO 1 da lun 20/11/17 lun 20/11/17 S/. 101.58 S/. 101.58
20/11 1 da
92 01.03.04 OBRAS DE CONCRETO SIMPLE 1 da sb 11/11/17 sb 11/11/17 S/. 342.21 S/. 342.21
11/11 1 da
93 01.03.04.01 SOLADO 1 da sb 11/11/17 sb 11/11/17 S/. 342.21 S/. 342.21
11/11 1 da
94 01.03.04.01.01 SOLADO MEZCLA C:H, 1:10 E=4" 1 da sb 11/11/17 sb 11/11/17 S/. 342.21
1 da
95 01.03.05 OBRAS DE CONCRETO ARMADO 8 das dom 12/11/17 dom 19/11/17 S/. 23,686.29 S/. 23,686.29
12/11 8 das
96 01.03.05.01 LOSA FONDO CISTERNA 2 das dom 12/11/17 lun 13/11/17 S/. 2,410.77 S/. 2,410.77
12/11 2 das
97 01.03.05.01.01 CONCRETO F'C=210 KG/CM2 EN LOSA DE FONDO EN CISTERNA 1 da lun 13/11/17 lun 13/11/17 S/. 1,899.17 S/. 1,899.17
13/11 1 da
98 01.03.05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da dom 12/11/17 dom 12/11/17 S/. 511.60
1 da
99 01.03.05.02 COLUMNAS 7 das lun 13/11/17 dom 19/11/17 S/. 8,557.72 S/. 8,557.72
13/11 7 das
100 01.03.05.02.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 1 da dom 19/11/17 dom 19/11/17 S/. 1,486.99 S/. 1,486.99
19/11 1 da
101 01.03.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 2 das mi 15/11/17 jue 16/11/17 S/. 2,703.53 S/. 2,703.53
15/11 2 das
102 01.03.05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 2 das lun 13/11/17 mar 14/11/17 S/. 4,367.20
2 das
103 01.03.05.03 MUROS ARMADOS 4 das mi 15/11/17 sb 18/11/17 S/. 7,252.61 S/. 7,252.61
15/11 4 das
104 01.03.05.03.01 CONCRETO F'C=210 KG/CM2 EN MURO DE CISTERNA Y TANQUE 1 da sb 18/11/17 sb 18/11/17 S/. 2,629.62 S/. 2,629.62
18/11 1 da
105 01.03.05.03.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CISTERNA Y TANQUE 2 das jue 16/11/17 vie 17/11/17 S/. 2,621.24 S/. 2,621.24
16/11 2 das
106 01.03.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da mi 15/11/17 mi 15/11/17 S/. 2,001.75
1 da
107 01.03.05.04 VIGAS 3 das jue 16/11/17 sb 18/11/17 S/. 3,143.88 S/. 3,143.88
16/11 3 das
108 01.03.05.04.01 CONCRETO EN VIGAS f'c=210 kg/cm2 1 da sb 18/11/17 sb 18/11/17 S/. 474.66 S/. 474.66
18/11 1 da
109 01.03.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 1 da vie 17/11/17 vie 17/11/17 S/. 905.57 S/. 905.57
17/11 1 da
110 01.03.05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da jue 16/11/17 jue 16/11/17 S/. 1,763.65
1 da
111 01.03.05.05 LOSA MACIZA 3 das vie 17/11/17 dom 19/11/17 S/. 2,321.31 S/. 2,321.31
17/11 3 das
112 01.03.05.05.01 CONCRETO EN LOSA MACIZA F'C= 210 KG/CM2 1 da dom 19/11/17 dom 19/11/17 S/. 622.72
1 da
113 01.03.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS MACIZA 1 da sb 18/11/17 sb 18/11/17 S/. 704.84
1 da
114 01.03.05.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da vie 17/11/17 vie 17/11/17 S/. 993.75
1 da
115 01.03.06 REVOQUES ENLUCIDOS Y MOLDURAS 5 das lun 20/11/17 vie 24/11/17 S/. 4,654.77 S/. 4,654.77
20/11 5 das
116 01.03.06.01 LOSA FONDO CISTERNA 5 das lun 20/11/17 vie 24/11/17 S/. 4,654.77 S/. 4,654.77
20/11 5 das
117 01.03.06.01.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO- ARENA 1:5 1 da lun 20/11/17 lun 20/11/17 S/. 723.50
1 da
118 01.03.06.01.02 TARRAJEO CON IMPERMEABILIZANTE 2 das lun 20/11/17 mar 21/11/17 S/. 1,659.28
2 das
119 01.03.06.01.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 2 das mi 22/11/17 jue 23/11/17 S/. 1,847.58
2 das
120 01.03.06.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO- ARENA 1:5 1 da vie 24/11/17 vie 24/11/17 S/. 424.41
1 da
121 01.03.07 PINTURAS 2 das sb 25/11/17 dom 26/11/17 S/. 568.85 S/. 568.85
25/11 2 das
122 01.03.07.01 PINTURA AL OLEO 2 MANOS EN MUROS EXTERIORES E INTERIORES 1 da dom 26/11/17 dom 26/11/17 S/. 92.15
1 da
123 01.03.07.02 PINTURA AL OLEO 2 MANOS EN COLUMNAS Y VIGAS EXTERIORES E 1 da sb 25/11/17 sb 25/11/17 S/. 476.70
INTERIORES 1 da
124 01.03.08 OTROS 1 da dom 26/11/17 dom 26/11/17 S/. 137.56 S/. 137.56
26/11 1 da
125 01.03.08.01 TAPA METALICA DE 0.60 X 0.60 m x E=1/8" 1 da dom 26/11/17 dom 26/11/17 S/. 137.56
1 da
126 01.05 ACCESO DE CIRCULACION INTERIOR 251 das mi 01/03/17 lun 06/11/17 S/. 152,101.88 S/. 152,101.88
01/03 251 das
127 01.05.01 MEJORAMIENTO DE ESCALERA DE ACCESO 4 UND 2 das mi 01/03/17 jue 02/03/17 S/. 5,806.82 S/. 5,806.82
01/03 2 das
128 01.05.01.01 OBRAS PROVISIONALES 1 da mi 01/03/17 mi 01/03/17 S/. 155.62 S/. 155.62
01/03 1 da
129 01.05.01.01.01 LIMPIEZA Y DEMOLICIN DE PELDAOS DE ESCALERA 1 da mi 01/03/17 mi 01/03/17 S/. 155.62 S/. 155.62
01/03 1 da
130 01.05.01.02 OBRAS DE CONCRETO ARMADO 1 da jue 02/03/17 jue 02/03/17 S/. 5,651.20 S/. 5,651.20
02/03 1 da
131 01.05.01.02.01 ESCALERA 1 da jue 02/03/17 jue 02/03/17 S/. 5,651.20 S/. 5,651.20
02/03 1 da
132 01.05.01.02.01.01 CONCRETO EN ESCALERA F'C=210 KG/CM2 1 da jue 02/03/17 jue 02/03/17 S/. 2,380.54 S/. 2,380.54
02/03 1 da
133 01.05.01.02.01.02 CANTONERA DE ALUMINIO 1 da jue 02/03/17 jue 02/03/17 S/. 3,270.66 S/. 3,270.66
02/03 1 da
134 01.05.02 CONSTRUCCION DE ESCALERA RECTA N01 14 das vie 25/08/17 jue 07/09/17 S/. 19,661.93 S/. 19,661.93
25/08 14 das
135 01.05.02.01 OBRAS PROVISIONALES 1 da vie 25/08/17 vie 25/08/17 S/. 26.69 S/. 26.69
25/08 1 da
136 01.05.02.01.01 LIMPIEZA DEL TERRENO MANUAL 1 da vie 25/08/17 vie 25/08/17 S/. 26.69
1 da
137 01.05.02.02 OBRAS PRELIMINARES 1 da sb 26/08/17 sb 26/08/17 S/. 44.64 S/. 44.64
26/08 1 da
138 01.05.02.02.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR 1 da sb 26/08/17 sb 26/08/17 S/. 44.64 S/. 44.64
26/08 1 da
139 01.05.02.03 MOVIMIENTO DE TIERRAS 8 das dom 27/08/17 dom S/. 792.87 S/. 792.87
03/09/17 27/08 8 das
140 01.05.02.03.01 EXCAVACION DE ZANJAS PARA CIMIENTO CORRIDO 1 da dom 27/08/17 dom 27/08/17 S/. 62.89 S/. 62.89
27/08 1 da
141 01.05.02.03.02 EXCAVACION PARA ZAPATAS DE 2.00 M DE PROFUNDIDAD 2 das dom 27/08/17 lun 28/08/17 S/. 375.99 S/. 375.99
27/08 2 das
142 01.05.02.03.03 RELLENO CON MATERIAL PROPIO 1 da sb 02/09/17 sb 02/09/17 S/. 95.01 S/. 95.01
02/09 1 da
143 01.05.02.03.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1 km 1 da dom 03/09/17 dom 03/09/17 S/. 36.70 S/. 36.70
03/09 1 da
144 01.05.02.03.05 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E=4" 1 da dom 03/09/17 dom 03/09/17 S/. 222.28 S/. 222.28
C/EQUIPO CAP=1 03/09 1 da
145 01.05.02.04 OBRAS DE CONCRETO SIMPLE 4 das mar 29/08/17 vie 01/09/17 S/. 707.65 S/. 707.65
29/08 4 das
146 01.05.02.04.01 FALSA ZAPATA 1 da mar 29/08/17 mar S/. 125.71 S/. 125.71
29/08/17 29/08 1 da
147 01.05.02.04.01.01 FALSA ZAPATA CEMENTO:HORMIGON MEZCLA 1:12 + 50% PG 1 da mar 29/08/17 mar 29/08/17 S/. 125.71 S/. 125.71
29/08 1 da
148 01.05.02.04.02 CIMIENTO CORRIDO 1 da vie 01/09/17 vie 01/09/17 S/. 581.94 S/. 581.94
01/09 1 da
149 01.05.02.04.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1 da vie 01/09/17 vie 01/09/17 S/. 581.94 S/. 581.94
01/09 1 da
150 01.05.02.05 OBRAS DE CONCRETO ARMADO 9 das mi 30/08/17 jue 07/09/17 S/. 18,090.08 S/. 18,090.08
30/08 9 das
151 01.05.02.05.01 ZAPATAS 2 das mi 30/08/17 jue 31/08/17 S/. 1,129.24 S/. 1,129.24
30/08 2 das
152 01.05.02.05.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 1 da jue 31/08/17 jue 31/08/17 S/. 754.84 S/. 754.84
31/08 1 da
153 01.05.02.05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da mi 30/08/17 mi 30/08/17 S/. 374.40 S/. 374.40
30/08 1 da
154 01.05.02.05.02 COLUMNAS 3 das jue 31/08/17 sb 02/09/17 S/. 3,119.72 S/. 3,119.72
31/08 3 das
155 01.05.02.05.02.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 1 da sb 02/09/17 sb 02/09/17 S/. 730.45 S/. 730.45
02/09 1 da
156 01.05.02.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 1 da vie 01/09/17 vie 01/09/17 S/. 1,142.62 S/. 1,142.62
01/09 1 da
157 01.05.02.05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da jue 31/08/17 jue 31/08/17 S/. 1,246.65 S/. 1,246.65
31/08 1 da
158 01.05.02.05.03 VIGAS 3 das vie 01/09/17 dom S/. 1,136.16 S/. 1,136.16
03/09/17 01/09 3 das
159 01.05.02.05.03.01 CONCRETO EN VIGAS f'c=210 kg/cm2 1 da dom 03/09/17 dom 03/09/17 S/. 246.12 S/. 246.12
03/09 1 da
160 01.05.02.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 1 da sb 02/09/17 sb 02/09/17 S/. 278.99 S/. 278.99
02/09 1 da
161 01.05.02.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da vie 01/09/17 vie 01/09/17 S/. 611.05 S/. 611.05
01/09 1 da
162 01.05.02.05.04 ESCALERA 6 das sb 02/09/17 jue 07/09/17 S/. 12,704.96 S/. 12,704.96
02/09 6 das
163 01.05.02.05.04.01 CONCRETO EN ESCALERA F'C=210 KG/CM2 1 da jue 07/09/17 jue 07/09/17 S/. 4,349.52 S/. 4,349.52
07/09 1 da
164 01.05.02.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA 2 das mar 05/09/17 mi 06/09/17 S/. 3,994.84 S/. 3,994.84
05/09 2 das
165 01.05.02.05.04.03 ACERO CORRUGADO EN ESCALERA FY= 4200 kg/cm2 GRADO 60 3 das sb 02/09/17 lun 04/09/17 S/. 4,360.60 S/. 4,360.60
02/09 3 das
166 01.05.03 CONSTRUCCION DE ESCALERA EN U N02 16 das vie 25/08/17 sb 09/09/17 S/. 7,193.60 S/. 7,193.60
25/08 16 das
167 01.05.03.01 OBRAS PROVISIONALES 2 das vie 25/08/17 sb 26/08/17 S/. 19.37 S/. 19.37
25/08 2 das
168 01.05.03.01.01 LIMPIEZA DEL TERRENO MANUAL 2 das vie 25/08/17 sb 26/08/17 S/. 19.37
2 das
169 01.05.03.02 OBRAS PRELIMINARES 1 da dom 27/08/17 dom S/. 32.40 S/. 32.40
27/08/17 27/08 1 da
170 01.05.03.02.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR 1 da dom 27/08/17 dom 27/08/17 S/. 32.40
1 da
171 01.05.03.03 MOVIMIENTO DE TIERRAS 7 das lun 28/08/17 dom S/. 509.02 S/. 509.02
03/09/17 28/08 7 das
172 01.05.03.03.01 EXCAVACION DE ZANJAS PARA CIMIENTO CORRIDO 1 da lun 28/08/17 lun 28/08/17 S/. 35.94
1 da
173 01.05.03.03.02 EXCAVACION PARA ZAPATAS DE 2.00 M DE PROFUNDIDAD 1 da mar 29/08/17 mar 29/08/17 S/. 222.48
1 da
174 01.05.03.03.03 RELLENO CON MATERIAL PROPIO 1 da sb 02/09/17 sb 02/09/17 S/. 54.80 S/. 54.80
02/09 1 da
175 01.05.03.03.04 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA DIST=1 KM 1 da dom 03/09/17 dom 03/09/17 S/. 34.48 S/. 34.48
03/09 1 da
176 01.05.03.03.05 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E=4" 1 da dom 03/09/17 dom 03/09/17 S/. 161.32 S/. 161.32
C/EQUIPO CAP=1 03/09 1 da
177 01.05.03.04 OBRAS DE CONCRETO SIMPLE 3 das mi 30/08/17 vie 01/09/17 S/. 369.51 S/. 369.51
30/08 3 das
178 01.05.03.04.01 FALSA ZAPATA 2 das mi 30/08/17 jue 31/08/17 S/. 36.97 S/. 36.97
30/08 2 das
179 01.05.03.04.01.01 FALSA ZAPATA CEMENTO:HORMIGON MEZCLA 1:12 + 50% PG 2 das mi 30/08/17 jue 31/08/17 S/. 36.97
2 das
180 01.05.03.04.02 CIMIENTO CORRIDO 1 da vie 01/09/17 vie 01/09/17 S/. 332.54 S/. 332.54
01/09 1 da
181 01.05.03.04.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1 da vie 01/09/17 vie 01/09/17 S/. 332.54 S/. 332.54
01/09 1 da
182 01.05.03.05 OBRAS DE CONCRETO ARMADO 9 das vie 01/09/17 sb 09/09/17 S/. 6,263.30 S/. 6,263.30
01/09 9 das
183 01.05.03.05.01 ZAPATAS 3 das vie 01/09/17 dom S/. 978.84 S/. 978.84
03/09/17 01/09 3 das
184 01.05.03.05.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 1 da dom 03/09/17 dom 03/09/17 S/. 754.84 S/. 754.84
03/09 1 da
185 01.05.03.05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 2 das vie 01/09/17 sb 02/09/17 S/. 224.00
2 das
186 01.05.03.05.02 COLUMNAS 3 das dom 03/09/17 mar S/. 790.24 S/. 790.24
05/09/17 03/09 3 das
187 01.05.03.05.02.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 1 da mar 05/09/17 mar 05/09/17 S/. 161.74 S/. 161.74
05/09 1 da
188 01.05.03.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 1 da lun 04/09/17 lun 04/09/17 S/. 255.05 S/. 255.05
04/09 1 da
189 01.05.03.05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da dom 03/09/17 dom 03/09/17 S/. 373.45
1 da

Jr. Tupac Yupanqui N 115 - Int. 5to Piso, Paucarbamba - Hunuco. Pgina 1 de 4
CONSORCIO HUERTAS PLAZO DE EJECUCION 240 DIAS CALENDARIOS

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE ABASTOS DEL MERCADO HUERTAS EN EL DISTRITO DE AMBO, PROVINCIA DE AMBO, DEPARTAMENTO DE HUNUCO
Id item Nombre de tarea DuracinComienzo Fin Costo lun 13/02 dom 19/02 sb 25/02 vie 03/03 jue 09/03 mi 15/03 mar 21/03 lun 27/03 dom 02/04 sb 08/04 vie 14/04 jue 20/04 mi 26/04 mar 02/05 lun 08/05 dom 14/05 sb 20/05 vie 26/05 jue 01/06 mi 07/06 mar 13/06 lun 19/06 dom 25/06 sb 01/07 vie 07/07 jue 13/07 mi 19/07 mar 25/07 lun 31/07 dom 06/08 sb 12/08 vie 18/08 jue 24/08 mi 30/08 mar 05/09 lun 11/09 dom 17/09 sb 23/09 vie 29/09 jue 05/10 mi 11/10 mar 17/10 lun 23/10 dom 29/10 sb 04/11 vie 10/11 jue 16/11 mi 22/11 mar 28/11 lun 04/12 dom 10/12 sb 16/12 vie 22/12 jue 28/12 mi 03/01 mar 09/01 lun 15/01 dom 21/01
190 01.05.03.05.03 VIGAS 3 das lun 04/09/17 mi 06/09/17 S/. 416.59 S/. 416.59
04/09 3 das
191 01.05.03.05.03.01 CONCRETO EN VIGAS f'c=210 kg/cm2 1 da mi 06/09/17 mi 06/09/17 S/. 48.35 S/. 48.35
06/09 1 da
192 01.05.03.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 1 da mar 05/09/17 mar 05/09/17 S/. 45.74 S/. 45.74
05/09 1 da
193 01.05.03.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1 da lun 04/09/17 lun 04/09/17 S/. 322.50
1 da
194 01.05.03.05.04 ESCALERA 5 das mar 05/09/17 sb 09/09/17 S/. 4,077.63 S/. 4,077.63
05/09 5 das
195 01.05.03.05.04.01 CONCRETO EN ESCALERA F'C=210 KG/CM2 1 da sb 09/09/17 sb 09/09/17 S/. 1,655.62
1 da
196 01.05.03.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA 1 da vie 08/09/17 vie 08/09/17 S/. 1,234.91
1 da
197 01.05.03.05.04.03 ACERO CORRUGADO EN ESCALERA FY= 4200 kg/cm2 GRADO 60 3 das mar 05/09/17 jue 07/09/17 S/. 1,187.10
3 das
198 01.05.04 CONSTRUCCION DE RAMPA N01 58 das dom 10/09/17 lun 06/11/17 S/. 119,439.53 S/. 119,439.53
10/09 58 das
226 02 ARQUITECTURA 172 das mar 11/07/17 vie 29/12/17 S/. 919,669.01 S/. 919,669.01
11/07 172 das
227 02.01 MODULO I Y MDULO II: AMPLIACIN DEL SERVICIO DE ABASTOS DEL MERCADO 172 das mar 11/07/17 vie 29/12/17 S/. 808,764.09 S/. 808,764.09
HUERTAS 11/07 172 das
228 02.01.01 MUROS DE ALBAILERA 86 das mar 11/07/17 mi 04/10/17 S/. 111,761.51 S/. 111,761.51
11/07 86 das
229 02.01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA 81 das mar 11/07/17 vie 29/09/17 S/. 108,534.51 S/. 108,534.51
JUNTA 1.5 cm. MORTERO 1:1:5 11/07 81 das
230 02.01.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H EN PARAPETOS ( 0.09x0.13x0.24) 5 das sb 30/09/17 mi 04/10/17 S/. 3,227.00 S/. 3,227.00
AMARRE DE SOGA JUNTA 1.5 cm. MORTERO 1:1:5 30/09 5 das
231 02.01.02 REVOQUES ENLUCIDOS Y MOLDURAS 131 das mar 18/07/17 sb 25/11/17 S/. 194,506.72 S/. 194,506.72
18/07 131 das
232 02.01.02.01 TARRAJEO PRIMARIO RAYADO INTERIORES CEMENTO- ARENA 1:4 26 das lun 18/09/17 vie 13/10/17 S/. 8,736.41 S/. 8,736.41
26 das

233 02.01.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO- ARENA 1:5 52 das lun 18/09/17 mi 08/11/17 S/. 67,080.67 S/. 67,080.67
52 das

234 02.01.02.03 TARRAJEO EN TABLEROS DE PUESTOS DE COMIDA 12 das sb 28/10/17 mi 08/11/17 S/. 3,595.12 S/. 3,595.12
12 das
235 02.01.02.04 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO- ARENA 1:5 30 das dom 17/09/17 lun 16/10/17 S/. 13,926.78 S/. 13,926.78
30 das

236 02.01.02.05 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 56 das mar 25/07/17 lun 18/09/17 S/. 22,555.81 S/. 22,555.81
56 das

237 02.01.02.06 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO- ARENA 1:5 61 das mar 18/07/17 sb 16/09/17 S/. 39,919.12 S/. 39,919.12
61 das

238 02.01.02.07 TARRAJEO EN MUROS DE CONCRETO CON CEMENTO- ARENA 1:5 3 das dom 17/09/17 mar 19/09/17 S/. 980.32 S/. 980.32
3 das
239 02.01.02.08 TARRAJEO CON IMPERMEABILIZANTE 6 das lun 20/11/17 sb 25/11/17 S/. 1,907.28 S/. 1,907.28
6 das
240 02.01.02.09 VESTIDURA DE DERRAMES CON CEMENTO- ARENA 1:5 E=1.5 CM 5 das jue 09/11/17 lun 13/11/17 S/. 1,248.79 S/. 1,248.79
5 das

241 02.01.02.10 BRUAS E=1 CM 5 das jue 21/09/17 lun 25/09/17 S/. 660.62 S/. 660.62
5 das
242 02.01.02.11 TARRAJEO EN FONDO DE ESCALERAS 5 das dom 10/09/17 jue 14/09/17 S/. 1,493.31 S/. 1,493.31
5 das
243 02.01.02.12 PREPARACION DE GRADAS DE CONCRETO 6 das vie 15/09/17 mi 20/09/17 S/. 1,795.31 S/. 1,795.31
6 das
244 02.01.02.13 PREPARACION DE DESCANSOS 2 das jue 21/09/17 vie 22/09/17 S/. 336.71 S/. 336.71
2 das
245 02.01.02.14 GRADAS CON PORCELANATO ANTIDESLIZANTE 12 das jue 21/09/17 lun 02/10/17 S/. 6,305.58 S/. 6,305.58
12 das
246 02.01.02.15 DESCANSO CON PORCELANATO ANTIDESLIZANTE 2 das sb 23/09/17 dom 24/09/17 S/. 973.77 S/. 973.77
2 das
247 02.01.02.16 CANTONERA DE ALUMINIO 7 das jue 21/09/17 mi 27/09/17 S/. 2,602.80 S/. 2,602.80
7 das
248 02.01.02.17 CANTONERA DE GOMA 9 das jue 21/09/17 vie 29/09/17 S/. 2,790.45 S/. 2,790.45
9 das
249 02.01.02.18 ENCHAPE TIPO PIEDRA EN TONOS BLANCO Y CREMA 21 das mar 17/10/17 lun 06/11/17 S/. 5,877.12 S/. 5,877.12
21 das
250 02.01.02.19 ENCHAPE EN SERVICIOS HIGIENICOS CON MAYOLICA DE 25x40 CM 5 das sb 14/10/17 mi 18/10/17 S/. 2,619.31 S/. 2,619.31
5 das
251 02.01.02.20 ENCHAPE CON CERAMICA DE 25x25 CM 18 das jue 19/10/17 dom 05/11/17 S/. 9,101.44 S/. 9,101.44
18 das
252 02.01.03 CIELORRASOS 116 das mar 11/07/17 vie 03/11/17 S/. 132,554.66 S/. 132,554.66
11/07 116 das
253 02.01.03.01 CIELORRASO CON MEZCLA CEMENTO-ARENA 1:5, E=1.5CM 60 das mar 11/07/17 vie 08/09/17 S/. 67,076.01 S/. 67,076.01
60 das

254 02.01.03.02 CIELORRASO CON EL SISTEMA DE CONSTRUCCION EN SECO DE 60 das mar 05/09/17 vie 03/11/17 S/. 65,478.65 S/. 65,478.65
FIBROCEMENTO 60 das
255 02.01.04 PISOS 135 das sb 05/08/17 dom 17/12/17 S/. 136,847.93 S/. 136,847.93
05/08 135 das
256 02.01.04.01 PREPARACION DE PISOS PARA PORCELANATO 42 das lun 06/11/17 dom 17/12/17 S/. 25,738.21 S/. 25,738.21
42 das
257 02.01.04.02 PORCELANATO DE 60x60 42 das lun 06/11/17 dom 17/12/17 S/. 105,134.27 S/. 105,134.27
42 das
258 02.01.04.03 PISO DE CONCRETO 1 da sb 05/08/17 sb 05/08/17 S/. 5,975.45 S/. 5,975.45
1 da
259 02.01.05 SARDINELES 1 da mar 07/11/17 mar 07/11/17 S/. 4,959.70 S/. 4,959.70
07/11 1 da
260 02.01.05.01 CONCRETO EN SARDINEL F'C=175 kg/cm2 1 da mar 07/11/17 mar 07/11/17 S/. 4,959.70 S/. 4,959.70
1 da
261 02.01.06 ZOCALOS, CONTRAZCALOS Y REVESTIMIENTOS 39 das mar 07/11/17 vie 15/12/17 S/. 27,564.64 S/. 27,564.64
07/11 39 das
262 02.01.06.01 CONTRAZOCALOS 39 das mar 07/11/17 vie 15/12/17 S/. 27,564.64 S/. 27,564.64
07/11 39 das
263 02.01.06.01.01 CONTRAZOCALO DE PORCELANATO DE 0.15 DE ALTO 39 das mar 07/11/17 vie 15/12/17 S/. 21,508.51 S/. 21,508.51
39 das

264 02.01.06.01.02 PERFIL PLASTICO PARA CONTRAZOCALO DE PERCELANATO 39 das mar 07/11/17 vie 15/12/17 S/. 6,056.13 S/. 6,056.13
39 das
265 02.01.07 CARPINTERIA DE MADERA 46 das mar 07/11/17 vie 22/12/17 S/. 7,375.98 S/. 7,375.98
07/11 46 das
266 02.01.07.01 PUERTAS DE MADERA CEDRO TABLERO REBAJADO SEGN DISEO 2 das jue 21/12/17 vie 22/12/17 S/. 5,876.28 S/. 5,876.28
2 das

267 02.01.07.02 PERGOLAS 2 das mar 07/11/17 mi 08/11/17 S/. 1,499.70 S/. 1,499.70
2 das
268 02.01.08 CARPINTERIA METALICA Y HERRERIA 45 das lun 06/11/17 mi 20/12/17 S/. 94,764.34 S/. 94,764.34
06/11 45 das
269 02.01.08.01 PUERTAS METLICAS 3 das lun 18/12/17 mi 20/12/17 S/. 35,848.56 S/. 35,848.56
3 das
270 02.01.08.02 VENTANA DE ALUMINIO EXTERIORES SEGN DISEO 3 das mar 14/11/17 jue 16/11/17 S/. 10,472.48 S/. 10,472.48
3 das

271 02.01.08.03 TABIQUE DE ALUMINIO Y VIDRIO 1 da vie 17/11/17 vie 17/11/17 S/. 2,363.75 S/. 2,363.75
1 da
272 02.01.08.04 BARANDAS METALICAS 4 das vie 17/11/17 lun 20/11/17 S/. 28,845.40 S/. 28,845.40
4 das
273 02.01.08.05 DIVISIONES METALICAS PARA SS-HH 2 das lun 06/11/17 mar 07/11/17 S/. 4,545.80 S/. 4,545.80
2 das
274 02.01.08.06 PLANCHA DE ACERO GALVANIZADO PARA PORTADA 3 das jue 09/11/17 sb 11/11/17 S/. 12,688.35 S/. 12,688.35
3 das
275 02.01.09 ACCESORIOS EN GENERAL 1 da sb 23/12/17 sb S/. 194.20 S/. 194.20
23/12/17 23/12 1 da
276 02.01.09.01 ESPEJO PARA SS.HH. 1 da sb 23/12/17 sb 23/12/17 S/. 194.20 S/. 194.20
1 da
277 02.01.10 PINTURA EN INTERIORES Y EXTERIORES 135 das vie 21/07/17 sb 02/12/17 S/. 62,539.97 S/. 62,539.97
21/07 135 das
278 02.01.10.01 PINTURA LATEX LAVABLE EN INTERIORES COLOR BLANCO 35 das lun 25/09/17 dom 29/10/17 S/. 34,735.97 S/. 34,735.97
35 das
279 02.01.10.02 PINTURA EN CIELO RASO (ENTRE PISO) COLOR BLANCO 24 das vie 21/07/17 dom 13/08/17 S/. 14,449.32 S/. 14,449.32
24 das
280 02.01.10.03 PINTURA EN CIELO RASO CON EL SISTEMA DE CONSTRUCCIN EN SECO DE 24 das jue 09/11/17 sb 02/12/17 S/. 12,456.75 S/. 12,456.75
FIBROCEMENTO COLOR BLANCO 24 das
281 02.01.10.04 PINTURA EN PORTADA 3 das dom 12/11/17 mar 14/11/17 S/. 897.93 S/. 897.93
3 das
282 02.01.11 LIMPIEZA Y JARDINERA 14 das sb 16/12/17 vie 29/12/17 S/. 33,770.00 S/. 33,770.00
16/12 14 das
283 02.01.11.01 LIMPIEZA FINAL DE OBRA 7 das vie 22/12/17 jue 28/12/17 S/. 450.00 S/. 450.00
7 das
284 02.01.11.02 SEMBRADO DE GRASS 7 das sb 23/12/17 vie 29/12/17 S/. 30,020.00 S/. 30,020.00
7 das
285 02.01.11.03 TRABAJOS DE JARDINERA 7 das sb 16/12/17 vie 22/12/17 S/. 3,300.00 S/. 3,300.00
7 das
286 02.01.12 OTROS 2 das dom 03/12/17 lun 04/12/17 S/. 1,924.44 S/. 1,924.44
03/12 2 das
287 02.01.12.01 LETRAS 3D DE ALUMINIO COLOR DORADO O ALUMINIO 2 das dom 03/12/17 lun 04/12/17 S/. 1,924.44 S/. 1,924.44
2 das
288 02.03 ACCESO DE CIRCULACIN INTERIOR 75 das vie 08/09/17 mar 21/11/17 S/. 110,904.92 S/. 110,904.92
08/09 75 das
289 02.03.01 CONSTRUCCION DE ESCALERA RECTA N01 6 das vie 08/09/17 mi 13/09/17 S/. 12,605.27 S/. 12,605.27
08/09 6 das
290 02.03.01.01 REVOQUES ENLUCIDOS Y MOLDURAS 6 das vie 08/09/17 mi 13/09/17 S/. 2,858.65 S/. 2,858.65
08/09 6 das
291 02.03.01.01.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 3 das vie 08/09/17 dom 10/09/17 S/. 641.42 S/. 641.42
3 das
292 02.03.01.01.02 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO- ARENA 1:5 1 da lun 11/09/17 lun 11/09/17 S/. 196.13 S/. 196.13
1 da
293 02.03.01.01.03 REVESTIMIENTO DE FONDO DE ESCALERA 2 das mar 12/09/17 mi 13/09/17 S/. 2,021.10 S/. 2,021.10
2 das
294 02.03.01.02 PREPARACION DE GRADAS Y DESCANSOS DE CONCRETO 1 da vie 08/09/17 vie 08/09/17 S/. 928.77 S/. 928.77
08/09 1 da
295 02.03.01.02.01 CONTRAPISO DE CONCRETO 40 MM 1 da vie 08/09/17 vie 08/09/17 S/. 928.77 S/. 928.77
1 da
296 02.03.01.03 GRADAS Y DESCANSOS 3 das sb 09/09/17 lun 11/09/17 S/. 4,872.37 S/. 4,872.37
09/09 3 das
297 02.03.01.03.01 PISO DE PORCELANATO 40 X 40 CM 3 das sb 09/09/17 lun 11/09/17 S/. 3,195.67 S/. 3,195.67
3 das
298 02.03.01.03.02 CANTONERAS DE ALUMINIO 2" 1 da lun 11/09/17 lun 11/09/17 S/. 1,676.70 S/. 1,676.70
1 da
299 02.03.01.04 CARPINTERIA METALICA Y HERRERIA 1 da mar 12/09/17 mar 12/09/17 S/. 3,408.49 S/. 3,408.49
12/09 1 da
300 02.03.01.04.01 BARANDA DE FIERRO GRIS H=1.00 M 1 da mar 12/09/17 mar 12/09/17 S/. 3,266.95 S/. 3,266.95
1 da
301 02.03.01.04.02 COLOCACIN DE BARANDAS 1 da mar 12/09/17 mar 12/09/17 S/. 141.54 S/. 141.54
1 da
302 02.03.01.05 PINTURAS 1 da mar 12/09/17 mar 12/09/17 S/. 536.99 S/. 536.99
12/09 1 da
303 02.03.01.05.01 PINTURA AL OLEO 2 MANOS EN COLUMNAS Y VIGAS EXTERIORES E 1 da mar 12/09/17 mar 12/09/17 S/. 174.60 S/. 174.60
INTERIORES 1 da
304 02.03.01.05.02 PINTURA ESMALTE EN PASAMANOS DE 2" - 1"- COLOR RAYO 1 da mar 12/09/17 mar 12/09/17 S/. 362.39 S/. 362.39
1 da
305 02.03.02 CONSTRUCCION DE ESCALERA EN U N02 11 das dom 10/09/17 mi 20/09/17 S/. 4,568.13 S/. 4,568.13
10/09 11 das
306 02.03.02.01 REVOQUES ENLUCIDOS Y MOLDURAS 11 das dom 10/09/17 mi 20/09/17 S/. 831.22 S/. 831.22
10/09 11 das
307 02.03.02.01.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 2 das dom 10/09/17 lun 11/09/17 S/. 174.30 S/. 174.30
2 das
308 02.03.02.01.02 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO- ARENA 1:5 2 das mar 12/09/17 mi 13/09/17 S/. 32.15 S/. 32.15
2 das
309 02.03.02.01.03 REVESTIMIENTO DE FONDO DE ESCALERA 7 das jue 14/09/17 mi 20/09/17 S/. 624.77 S/. 624.77
7 das
310 02.03.02.02 PREPARACION DE GRADAS Y DESCANSOS DE CONCRETO 1 da dom 10/09/17 dom 10/09/17 S/. 377.48 S/. 377.48
10/09 1 da
311 02.03.02.02.01 CONTRAPISO DE CONCRETO 40 MM 1 da dom 10/09/17 dom 10/09/17 S/. 377.48 S/. 377.48
1 da
312 02.03.02.03 GRADAS Y DESCANSOS 4 das lun 11/09/17 jue 14/09/17 S/. 1,639.73 S/. 1,639.73
11/09 4 das
313 02.03.02.03.01 PISO DE PORCELANATO 40 X 40 CM 4 das lun 11/09/17 jue 14/09/17 S/. 1,298.80 S/. 1,298.80
4 das
314 02.03.02.03.02 CANTONERAS DE ALUMINIO 2" 3 das mar 12/09/17 jue 14/09/17 S/. 340.93 S/. 340.93
3 das
315 02.03.02.04 CARPINTERIA METALICA Y HERRERIA 1 da vie 15/09/17 vie 15/09/17 S/. 1,518.93 S/. 1,518.93
15/09 1 da
316 02.03.02.04.01 BARANDA DE FIERRO GRIS H=1.00 M 1 da vie 15/09/17 vie 15/09/17 S/. 1,417.83 S/. 1,417.83
1 da
317 02.03.02.04.02 COLOCACIN DE BARANDAS 1 da vie 15/09/17 vie 15/09/17 S/. 101.10 S/. 101.10
1 da
318 02.03.02.05 PINTURAS 2 das jue 14/09/17 vie 15/09/17 S/. 200.77 S/. 200.77
14/09 2 das
319 02.03.02.05.01 PINTURA AL OLEO 2 MANOS EN COLUMNAS Y VIGAS EXTERIORES E 1 da jue 14/09/17 jue 14/09/17 S/. 43.50 S/. 43.50
INTERIORES 1 da
320 02.03.02.05.02 PINTURA ESMALTE EN PASAMANOS DE 2" - 1"- COLOR RAYO 1 da vie 15/09/17 vie 15/09/17 S/. 157.27 S/. 157.27
1 da
321 02.03.03 CONSTRUCCION DE RAMPA N01 15 das mar 07/11/17 mar 21/11/17 S/. 93,731.52 S/. 93,731.52
07/11 15 das
322 02.03.03.01 REVOQUES ENLUCIDOS Y MOLDURAS 8 das mar 07/11/17 mar 14/11/17 S/. 16,306.57 S/. 16,306.57
07/11 8 das
323 02.03.03.01.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 2 das mar 07/11/17 mi 08/11/17 S/. 4,489.97 S/. 4,489.97
2 das
324 02.03.03.01.02 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO- ARENA 1:5 2 das mi 08/11/17 jue 09/11/17 S/. 6,354.44 S/. 6,354.44
2 das
325 02.03.03.01.03 TARRAJEO EN LOSA ARMADA 5 das vie 10/11/17 mar 14/11/17 S/. 5,462.16 S/. 5,462.16
5 das
326 02.03.03.02 PISOS 2 das mi 15/11/17 jue 16/11/17 S/. 4,653.84 S/. 4,653.84
15/11 2 das
327 02.03.03.02.01 PISO DE CEMENTO FROTACHADO BRUADO A 10 CM 2 das mi 15/11/17 jue 16/11/17 S/. 4,653.84 S/. 4,653.84
2 das
328 02.03.03.03 JUNTAS 1 da mi 15/11/17 mi 15/11/17 S/. 206.86 S/. 206.86
15/11 1 da
329 02.03.03.03.01 JUNTA DE DILATACION 1 da mi 15/11/17 mi 15/11/17 S/. 206.86 S/. 206.86
1 da
330 02.03.03.04 CARPINTERIA METALICA Y HERRERIA 6 das jue 16/11/17 mar 21/11/17 S/. 68,782.25 S/. 68,782.25
16/11 6 das
331 02.03.03.04.01 COLOCACIN DE BARANDAS 1 da jue 16/11/17 jue 16/11/17 S/. 525.72 S/. 525.72
1 da
332 02.03.03.04.02 BARANDA DE FIERRO GRIS H=1.00 M 6 das jue 16/11/17 mar 21/11/17 S/. 68,256.53 S/. 68,256.53
6 das
333 02.03.03.05 PINTURAS 5 das jue 09/11/17 lun 13/11/17 S/. 3,782.00 S/. 3,782.00
09/11 5 das
334 02.03.03.05.01 PINTURA LATEX EN COLUMNAS 1 da jue 09/11/17 jue 09/11/17 S/. 1,018.81 S/. 1,018.81
1 da
335 02.03.03.05.02 PINTURA LATEX EN VIGAS 2 das vie 10/11/17 sb 11/11/17 S/. 1,339.19 S/. 1,339.19
2 das
336 02.03.03.05.03 PINTURA EN CIELORRASO COLOR BLANCO 2 das dom 12/11/17 lun 13/11/17 S/. 1,424.00 S/. 1,424.00
2 das
337 03 INSTALACIONES ELECTRICAS 56 das jue 09/11/17 mi S/. 268,881.18 S/. 268,881.18
03/01/18 09/11 56 das
338 1 MODULO I Y II: INSTALACIN DE INSTALACIONES ELCTRICAS DEL 56 das jue 09/11/17 mi 03/01/18 S/. 268,881.18 S/. 268,881.18
MERCADO DE AMBO 09/11 56 das

339 1.01 TRABAJOS PROVISIONALES 1 da jue 09/11/17 jue 09/11/17 S/. 3,999.11 S/. 3,999.11
09/11 1 da
340 01.01.01 TRAZO Y REPLANTEO 1 da jue 09/11/17 jue 09/11/17 S/. 3,999.11 S/. 3,999.11
1 da
341 1.02 MOVIMIENTO DE TIERRAS 9 das vie 10/11/17 sb 18/11/17 S/. 6,891.32 S/. 6,891.32
10/11 9 das
342 01.02.01 EXCAVACION Y RELLENO DE ZANJAS (0.70x0.60) 9 das vie 10/11/17 sb 18/11/17 S/. 6,570.00 S/. 6,570.00
9 das
343 01.02.02 EXCAVACION DE HOYOS P/POZO TIERRA 0.90x3 M PROF. 2 das sb 11/11/17 dom 12/11/17 S/. 321.32 S/. 321.32
2 das

344 1.03 TUBERAS Y DUCTOS 17 das lun 13/11/17 mi S/. 63,095.80 S/. 63,095.80
29/11/17 13/11 17 das
345 01.03.01 TUBERA DE PVC A-10 SP DE 2 " (50MM) INC. ELEM. UNIN+ 2 % DESPER. 1 da lun 13/11/17 lun 13/11/17 S/. 117.60 S/. 117.60
1 da

346 01.03.02 TUBERIA P.V.C.-SAP/INST. ELECTRICAS DE 25 mm 8 das mar 14/11/17 mar 21/11/17 S/. 2,628.20 S/. 2,628.20
8 das
347 01.03.03 TUBERIA P.V.C.-SAP/INST. ELECTRICAS DE 20 mm 8 das mi 22/11/17 mi 29/11/17 S/. 60,350.00 S/. 60,350.00
8 das
348 1.04 CABLES Y CONDUCTORES 11 das jue 30/11/17 dom S/. 27,034.55 S/. 27,034.55
10/12/17 30/11 11 das
349 01.04.01 CONDUCTOR 3x25 MM2. N2XOH TRIPOLAR 1 da jue 30/11/17 jue 30/11/17 S/. 594.15 S/. 594.15
1 da
350 01.04.02 CONDUCTOR 3-1x6 MM2. N2XOH TRIPOLAR 1 da vie 01/12/17 vie 01/12/17 S/. 3,646.00 S/. 3,646.00
1 da
351 01.04.03 CONDUCTOR 3-1x4 MM2. N2XOH TRIPOLAR 1 da sb 02/12/17 sb 02/12/17 S/. 5,314.40 S/. 5,314.40
1 da
352 01.04.04 CONDUCTOR DE CU. LSOH 2.5 MM2.UNIPOLAR 8 das dom 03/12/17 dom 10/12/17 S/. 17,480.00 S/. 17,480.00
8 das
353 1.05 CAJAS DE PASO Y BUZONES DE REGISTRO 3 das lun 13/11/17 mi 15/11/17 S/. 827.88 S/. 827.88
13/11 3 das
354 01.05.01 CAJA DE PASO, CAJA OCTOGONAL DE GOGO 100x40 MM 2 das lun 13/11/17 mar 14/11/17 S/. 16.00 S/. 16.00
2 das

355 01.05.02 CAJA DE PASO, CAJA OCTOGONAL DE GOGO 250x250 MM 1 da lun 13/11/17 lun 13/11/17 S/. 8.00 S/. 8.00
1 da

356 01.05.03 BUZON CON TAPA DE CONCRETO 1 da mi 15/11/17 mi 15/11/17 S/. 803.88 S/. 803.88
1 da
357 01.06.00 EQUIPOS DE ALUMBRADO INTERIOR 10 das dom mar 02/01/18 S/. 33,271.10 S/. 33,271.10
24/12/17 24/12 10 das
358 01.06.01 EQUIPOS DICROICOS LEDS 10W 10 das dom 24/12/17 mar 02/01/18 S/. 14,422.52 S/. 14,422.52
10 das
359 01.06.02 SPOT LIGHT C/2 FOCOS LEDS 10 W 3 das dom 24/12/17 mar 26/12/17 S/. 12,144.00 S/. 12,144.00
3 das
360 01.06.03 SISTEMA DE LUCES DE EMERGENCIA 1 da mi 27/12/17 mi 27/12/17 S/. 507.76 S/. 507.76
1 da
361 01.06.05 SPOT LED C/LAMPARA 3 LED: LUXEN(K2) 12W. 2 das dom 24/12/17 lun 25/12/17 S/. 4,614.72 S/. 4,614.72
2 das
362 01.06.06 REFLECTOR VAYA FLOOD P/LAMPARA LED 40W 1 da mar 26/12/17 mar 26/12/17 S/. 1,582.10 S/. 1,582.10
1 da
363 01.07.00 TABLEROS Y SUBTABLEROS 5 das mar 19/12/17 sb 23/12/17 S/. 30,557.94 S/. 30,557.94
19/12 5 das
364 01.07.01 TABLERO GENERAL TRIFSICO 1 da mar 19/12/17 mar 19/12/17 S/. 1,121.89 S/. 1,121.89
1 da
365 01.07.02 SUBTABLERO DE DISTRIBUCIN TRIFSICO CAJA METLICA DE 16 POLOS 2 das mi 20/12/17 jue 21/12/17 S/. 15,344.97 S/. 15,344.97
2 das

366 01.07.03 SUBTABLEROS DISTRIBUCION MONOFASICO CAJA METALICA DE 4 POLOS 1 da vie 22/12/17 vie 22/12/17 S/. 11,630.88 S/. 11,630.88
1 da

367 01.07.04 TABLERO DE CONTROL DE ELECTROBOMBA MONOFSICO 1 da sb 23/12/17 sb 23/12/17 S/. 2,460.20 S/. 2,460.20
1 da

368 01.08.00 SALIDA DE PARED- INTERRUPTORES 8 das lun 11/12/17 lun 18/12/17 S/. 3,970.44 S/. 3,970.44
11/12 8 das
369 01.08.01 SALIDA DE PARED P/INTERRUPTOR SIMPLE, CAJA RECTANGULAR 6 das lun 11/12/17 sb 16/12/17 S/. 3,709.80 S/. 3,709.80
6 das

370 01.08.02 SALIDA DE PARED P/INTERRUPTOR DOBLE, CAJA RECTANGULAR 1 da dom 17/12/17 dom 17/12/17 S/. 169.08 S/. 169.08
1 da

371 01.08.03 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DE CONMUTACIN 1 da lun 18/12/17 lun 18/12/17 S/. 91.56 S/. 91.56
1 da

372 01.09.00 SALIDA PARA TOMACORRIENTES 7 das mar 19/12/17 lun 25/12/17 S/. 3,451.95 S/. 3,451.95
19/12 7 das
373 01.09.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC 7 das mar 19/12/17 lun 25/12/17 S/. 3,451.95 S/. 3,451.95
7 das

374 01.10.00 SUMINISTRO Y MONTAJE DE POZO A TIERRA 1 da mar 26/12/17 mar 26/12/17 S/. 2,716.78 S/. 2,716.78
26/12 1 da
375 01.10.01 POZO DE TIERRA CON VARILLA DE COBRE- RURAL 1 da mar 26/12/17 mar 26/12/17 S/. 2,716.78 S/. 2,716.78
1 da
376 01.11.00 EQUIPOS ELECTROMECNICOS 1 da mi 27/12/17 mi S/. 8,251.65 S/. 8,251.65
27/12/17 27/12 1 da
377 01.11.02 SUMINISTRO Y MONTAJE DE ELECTROBOMBA 1 HP 1 da mi 27/12/17 mi 27/12/17 S/. 8,251.65 S/. 8,251.65
1 da
378 01.12.00 PRUEBAS ELECTRICAS 7 das mar 26/12/17 lun 01/01/18 S/. 1,994.24 S/. 1,994.24
26/12 7 das
379 01.12.01 PRUEBA DE AISLAMIENTO EN BT 3 das mar 26/12/17 jue 28/12/17 S/. 723.90 S/. 723.90
3 das
380 01.12.02 PRUEBA DE RESISTIVIDAD 3 das vie 29/12/17 dom 31/12/17 S/. 92.52 S/. 92.52
3 das
381 01.12.03 PRUEBA DE CONTINUIDAD 4 das vie 29/12/17 lun 01/01/18 S/. 597.66 S/. 597.66
4 das
382 01.12.04 PRUEBA DE CORRIENTE Y BALANCEO DE CARGAS 4 das vie 29/12/17 lun 01/01/18 S/. 580.16 S/. 580.16
4 das
383 01.13.00 SISTEMA DE ALTAVOCES Y OTROS 7 das mar 26/12/17 lun 01/01/18 S/. 182.40 S/. 182.40
26/12 7 das
384 01.13.01 CONDUCTOR DE CU. TIPO CFM DE 16 AWG 2 das mar 26/12/17 mi 27/12/17 S/. 90.80 S/. 90.80
2 das
385 01.13.02 SALIDA DE TECHO, PARA ALTAVOZ ANALGICO DE 6OHMIOS 2 das jue 28/12/17 vie 29/12/17 S/. 32.64 S/. 32.64
2 das

386 01.13.03 SALIDA DE TECHO, PARA ACCES POINT, CONECTOR RJ-45 6A 2 das sb 30/12/17 dom 31/12/17 S/. 42.64 S/. 42.64
2 das

387 01.13.04 SALIDA DE PARED, RELOJ SIMPLE 1 da lun 01/01/18 lun 01/01/18 S/. 16.32 S/. 16.32
1 da
388 01.14.00 SISTEMA DE ALARMA CONTRA INCENDIO 9 das mar 26/12/17 mi S/. 2,636.02 S/. 2,636.02
03/01/18 26/12 9 das
389 01.14.01 PANEL DE MANDO AUTOMTICO DE ALARMA CONTRAINCENDIOS (ACI) 1 da mar 26/12/17 mar 26/12/17 S/. 517.60 S/. 517.60
1 da

390 01.14.02 CONDUCTOR DE CU. FPL-P 2X18 AWG 1 da mi 27/12/17 mi 27/12/17 S/. 220.80 S/. 220.80
1 da
391 01.14.03 SALIDA DE PARED P/CAJA DE PASO (ACI) 1 da jue 28/12/17 jue 28/12/17 S/. 74.82 S/. 74.82
1 da
392 01.14.04 SALIDA DE PARED P/PULSADOR, SEAL SONORA Y LUZ ESTROBOSCPICA 5 das vie 29/12/17 mar 02/01/18 S/. 924.24 S/. 924.24
5 das

393 01.14.05 SALIDA P/SENSOR DE HUMO 1 da mi 03/01/18 mi 03/01/18 S/. 898.56 S/. 898.56
1 da

Jr. Tupac Yupanqui N 115 - Int. 5to Piso, Paucarbamba - Hunuco. Pgina 2 de 4
CONSORCIO HUERTAS PLAZO DE EJECUCION 240 DIAS CALENDARIOS

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE ABASTOS DEL MERCADO HUERTAS EN EL DISTRITO DE AMBO, PROVINCIA DE AMBO, DEPARTAMENTO DE HUNUCO
Id item Nombre de tarea DuracinComienzo Fin Costo lun 13/02 dom 19/02 sb 25/02 vie 03/03 jue 09/03 mi 15/03 mar 21/03 lun 27/03 dom 02/04 sb 08/04 vie 14/04 jue 20/04 mi 26/04 mar 02/05 lun 08/05 dom 14/05 sb 20/05 vie 26/05 jue 01/06 mi 07/06 mar 13/06 lun 19/06 dom 25/06 sb 01/07 vie 07/07 jue 13/07 mi 19/07 mar 25/07 lun 31/07 dom 06/08 sb 12/08 vie 18/08 jue 24/08 mi 30/08 mar 05/09 lun 11/09 dom 17/09 sb 23/09 vie 29/09 jue 05/10 mi 11/10 mar 17/10 lun 23/10 dom 29/10 sb 04/11 vie 10/11 jue 16/11 mi 22/11 mar 28/11 lun 04/12 dom 10/12 sb 16/12 vie 22/12 jue 28/12 mi 03/01 mar 09/01 lun 15/01 dom 21/01
394 01.15.00 SUMINISTRO Y MONTAJE DE SUBESTACION Y REDES DE MEDIA TENSION 3 das jue 28/12/17 sb 30/12/17 S/. 80,000.00 S/. 80,000.00
28/12 3 das
395 01.15.01 SUMINISTRO Y MONTAJE DE SUBESTACION TRIFASICO 100 KVA. 3 das jue 28/12/17 sb 30/12/17 S/. 80,000.00 S/. 80,000.00
3 das
396 04 INSTALACIONES SANITARIAS 207 das dom mi 03/01/18 S/. 126,432.45 S/. 126,432.45
11/06/17 11/06 207 das
397 04.01 MODULO I Y MDULO II: AMPLIACIN Y CONSTRUCCIN DEL 207 das dom 11/06/17 mi 03/01/18 S/. 126,432.45 S/. 126,432.45
MERCADO HUERTAS 11/06 207 das
398 04.01.01 APARATOS SANITARIOS Y ACCESORIOS 56 das jue 09/11/17 mi 03/01/18 S/. 22,619.13 S/. 22,619.13
09/11 56 das
399 04.01.01.01 SUMINISTRO DE APARATOS SANITARIOS 56 das jue 09/11/17 mi S/. 22,619.13 S/. 22,619.13
03/01/18 09/11 56 das
400 04.01.01.01.01 INODORO FLUXOMETRO DE DESCARGA REDUCIDAD 3 das jue 09/11/17 sb 11/11/17 S/. 4,800.00 S/. 4,800.00
3 das
401 04.01.01.01.02 INODORO TANQUE DESCARGA REDUCIDA 1 da jue 09/11/17 jue 09/11/17 S/. 269.90 S/. 269.90
1 da
402 04.01.01.01.03 LAVATORIO TIPO OVALIN EMPOTRADO AGUA FRIA 1 da jue 09/11/17 jue 09/11/17 S/. 1,000.00 S/. 1,000.00
1 da
403 04.01.01.01.04 LAVATORIO TIPO OVALIN PEDESTAL AGUA FRIA 1 da jue 09/11/17 jue 09/11/17 S/. 372.00 S/. 372.00
1 da
404 04.01.01.01.05 URINARIO FLUXOMETRO DE DESCARGA REDUCIDA 1 da jue 09/11/17 jue 09/11/17 S/. 1,550.00 S/. 1,550.00
1 da
405 04.01.01.01.06 LAVADERO DE ACERO INOXIDABLE UNA POZA CON ESCURRIDERO 8 das jue 09/11/17 jue 16/11/17 S/. 8,957.30 S/. 8,957.30
8 das
406 04.01.01.01.07 JABONERA LIQUIDA 1 da jue 09/11/17 jue 09/11/17 S/. 336.00 S/. 336.00
1 da
407 04.01.01.01.08 PAPELERAS 1 da jue 09/11/17 jue 09/11/17 S/. 102.27 S/. 102.27
1 da
408 04.01.01.01.09 COLOCACION DE APARATOS 10 das sb 23/12/17 lun 01/01/18 S/. 4,976.58 S/. 4,976.58
10 das
409 04.01.01.01.10 COLOCACION DE ACCESORIOS SANITARIOS 2 das mar 02/01/18 mi 03/01/18 S/. 255.08 S/. 255.08
2 das
410 04.01.02 SISTEMA DE DESAGUE Y VENTILACIN 9 das mar 11/07/17 mi S/. 17,348.89 S/. 17,348.89
19/07/17 11/07 9 das
411 04.01.02.01 SALIDA DE DESAGUE 9 das mar 11/07/17 mi 19/07/17 S/. 5,897.23 S/. 5,897.23
11/07 9 das
412 04.01.02.01.01 SALIDA DE DESAGUE CON PVC DE 2" 9 das mar 11/07/17 mi 19/07/17 S/. 4,987.75 S/. 4,987.75
9 das
413 04.01.02.01.02 SALIDA DE DESAGUE CON PVC DE 4" 2 das mar 11/07/17 mi 12/07/17 S/. 909.48 S/. 909.48
2 das
414 04.01.02.02 REDES DE DERIVACION 3 das jue 13/07/17 sb 15/07/17 S/. 3,105.14 S/. 3,105.14
13/07 3 das
415 04.01.02.02.01 TUBERIA DE PVC SAL 2" 2 das jue 13/07/17 vie 14/07/17 S/. 918.39 S/. 918.39
2 das
416 04.01.02.02.02 TUBERIA DE PVC SAL 4" 2 das vie 14/07/17 sb 15/07/17 S/. 2,186.75 S/. 2,186.75
2 das
417 04.01.02.03 ACCESORIOS DE REDES DERIVACION 3 das jue 13/07/17 sb 15/07/17 S/. 5,083.49 S/. 5,083.49
13/07 3 das
418 04.01.02.03.01 CODO PVC SAL 2"X45 2 das jue 13/07/17 vie 14/07/17 S/. 926.44 S/. 926.44
2 das
419 04.01.02.03.02 CODO PVC SAL 2"X90 1 da jue 13/07/17 jue 13/07/17 S/. 247.80 S/. 247.80
1 da
420 04.01.02.03.03 CODO PVC SAL 4"X45 2 das jue 13/07/17 vie 14/07/17 S/. 487.20 S/. 487.20
2 das
421 04.01.02.03.04 CODO PVC SAL 4"X90 3 das jue 13/07/17 sb 15/07/17 S/. 705.90 S/. 705.90
3 das
422 04.01.02.03.05 REDUCCION PVC SAL 4" x 2" PARA VENTILACIN 1 da jue 13/07/17 jue 13/07/17 S/. 390.63 S/. 390.63
1 da
423 04.01.02.03.06 TAPON PVC SAL 2" 1 da jue 13/07/17 jue 13/07/17 S/. 44.02 S/. 44.02
1 da
424 04.01.02.03.07 TEE SANITARIA SIMPLE PVC- SAL 2" 1 da jue 13/07/17 jue 13/07/17 S/. 83.60 S/. 83.60
1 da
425 04.01.02.03.08 TEE SANITARIA SIMPLE PVC- SAL 4" 1 da jue 13/07/17 jue 13/07/17 S/. 132.00 S/. 132.00
1 da
426 04.01.02.03.09 TEE SANITARIA DOBLE PVC- SAL 4" 1 da jue 13/07/17 jue 13/07/17 S/. 330.20 S/. 330.20
1 da
427 04.01.02.03.10 TRAMPA "P" PVC SAL 2" 1 da jue 13/07/17 jue 13/07/17 S/. 159.39 S/. 159.39
1 da
428 04.01.02.03.11 YEE CON REDUCCION PVC SAL DE 6-4" 1 da jue 13/07/17 jue 13/07/17 S/. 331.02 S/. 331.02
1 da
429 04.01.02.03.12 YEE CON REDUCCION PVC SAL DE 6-2" 1 da jue 13/07/17 jue 13/07/17 S/. 93.21 S/. 93.21
1 da
430 04.01.02.03.13 YEE CON REDUCCION PVC SAL DE 4-2" 1 da jue 13/07/17 jue 13/07/17 S/. 180.11 S/. 180.11
1 da
431 04.01.02.03.14 YEE DOBLE PVC SAL DE 2" 1 da jue 13/07/17 jue 13/07/17 S/. 22.03 S/. 22.03
1 da
432 04.01.02.03.15 YEE SIMPLE PVC SAL DE 2" 3 das jue 13/07/17 sb 15/07/17 S/. 689.04 S/. 689.04
3 das
433 04.01.02.03.16 YEE SIMPLE PVC SAL DE 4" 1 da jue 13/07/17 jue 13/07/17 S/. 260.90 S/. 260.90
1 da
434 04.01.02.04 TUBERIA Y ACCESORIOS EN INODORO FLUXOMETRO DESCARGA 2 das vie 14/07/17 sb 15/07/17 S/. 1,516.55 S/. 1,516.55
REDUCIDA 14/07 2 das
435 04.01.02.04.01 TEE PVC SAL DE 1 1/4" 1 da vie 14/07/17 vie 14/07/17 S/. 265.30 S/. 265.30
1 da
436 04.01.02.04.02 TAPON HEMBRA PVC SAL 1 1/4" 1 da vie 14/07/17 vie 14/07/17 S/. 185.00 S/. 185.00
1 da
437 04.01.02.04.03 REDUCCIN PVC SAP DE 1 1/4" A 1" 1 da vie 14/07/17 vie 14/07/17 S/. 154.20 S/. 154.20
1 da
438 04.01.02.04.04 ADAPTADOR UNION PRESION ROSCA PVC SAL 1" 1 da vie 14/07/17 vie 14/07/17 S/. 175.00 S/. 175.00
1 da
439 04.01.02.04.05 TUBERIA PVC SAL DE 1 1/4" (CAMARA DE AIRE) 1 da vie 14/07/17 vie 14/07/17 S/. 111.85 S/. 111.85
1 da
440 04.01.02.04.06 TAPON HEMBRA CON ROSCA PVC SAL 1" 2 das vie 14/07/17 sb 15/07/17 S/. 260.80 S/. 260.80
2 das
441 04.01.02.04.07 KIT DE DESCARGA INDIRECTA DE 1" PARA INODORO 1 da vie 14/07/17 vie 14/07/17 S/. 364.40 S/. 364.40
1 da
442 04.01.02.05 TUBERIA Y ACCESORIOS EN URINARIO FLUXOMETRO DESCARGA 1 da sb 15/07/17 sb 15/07/17 S/. 699.38 S/. 699.38
REDUCIDA 15/07 1 da
443 04.01.02.05.01 TEE PVC SAL DE 1" 1 da sb 15/07/17 sb 15/07/17 S/. 102.50 S/. 102.50
1 da
444 04.01.02.05.02 TAPON HEMBRA PVC SAL 1" 1 da sb 15/07/17 sb 15/07/17 S/. 81.50 S/. 81.50
1 da
445 04.01.02.05.03 REDUCCIN PVC SAP DE 1" A 3/4" 1 da sb 15/07/17 sb 15/07/17 S/. 103.00 S/. 103.00
1 da
446 04.01.02.05.04 ADAPTADOR UNION PRESION ROSCA PVC SAL 3/4" 1 da sb 15/07/17 sb 15/07/17 S/. 105.15 S/. 105.15
1 da
447 04.01.02.05.05 TUBERIA PVC SAL DE 1" (CAMARA DE AIRE) 1 da sb 15/07/17 sb 15/07/17 S/. 49.13 S/. 49.13
1 da
448 04.01.02.05.06 TAPON HEMBRA CON ROSCA PVC SAL 3/4" 1 da sb 15/07/17 sb 15/07/17 S/. 105.90 S/. 105.90
1 da
449 04.01.02.05.07 KIT DE DESCARGA INDIRECTA DE 3/4" PARA URINARIO 1 da sb 15/07/17 sb 15/07/17 S/. 152.20 S/. 152.20
1 da
450 04.01.02.06 ADITAMIENTOS VARIOS 2 das dom 16/07/17 lun 17/07/17 S/. 1,047.10 S/. 1,047.10
16/07 2 das
451 04.01.02.06.01 REGISTRO ROSCADO DE BRONCE CROMADO 4" 1 da dom 16/07/17 dom 16/07/17 S/. 839.20 S/. 839.20
1 da
452 04.01.02.06.02 SUMIDERO DE BRONCE CROMADO DE 2" 1 da lun 17/07/17 lun 17/07/17 S/. 207.90 S/. 207.90
1 da
453 04.01.03 SISTEMA DE REDES COLECTORAS 12 das mar 18/07/17 sb 29/07/17 S/. 14,078.61 S/. 14,078.61
18/07 12 das
454 04.01.03.01 TRABAJOS PRELIMINARES 1 da mar 18/07/17 mar 18/07/17 S/. 135.63 S/. 135.63
18/07 1 da
455 04.01.03.01.01 LIMPIEZA DEL TERRENO MANUAL 1 da mar 18/07/17 mar 18/07/17 S/. 50.75 S/. 50.75
1 da
456 04.01.03.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR 1 da mar 18/07/17 mar 18/07/17 S/. 84.88 S/. 84.88
1 da
457 04.01.03.02 MOVIMIENTO DE TIERRAS 9 das mi 19/07/17 jue 27/07/17 S/. 1,907.78 S/. 1,907.78
19/07 9 das
458 04.01.03.02.01 EXCAVACION DE ZANJAS Hprom. 0.80 M EN TERRENO GRAVOSO 5 das mi 19/07/17 dom 23/07/17 S/. 748.65 S/. 748.65
5 das
459 04.01.03.02.02 EXCAVACION DE CAJA REGISTRO 1 da mi 19/07/17 mi 19/07/17 S/. 76.45 S/. 76.45
1 da
460 04.01.03.02.03 REFINE Y NIVELACION DE ZANJAS 2 das jue 20/07/17 vie 21/07/17 S/. 304.06 S/. 304.06
2 das
461 04.01.03.02.04 RELLENO CON MATERIAL PROPIO 1 da jue 27/07/17 jue 27/07/17 S/. 638.76 S/. 638.76
1 da
462 04.01.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE DM=1 km 1 da jue 27/07/17 jue 27/07/17 S/. 139.86 S/. 139.86
1 da
463 04.01.03.03 SUMINISTRO E INSTALACION DE TUBERIA Y ACCESORIOS 5 das sb 22/07/17 mi 26/07/17 S/. 4,118.41 S/. 4,118.41
22/07 5 das
464 04.01.03.03.01 TUBERIA DE PVC SAL DE 6" 4 das sb 22/07/17 mar 25/07/17 S/. 3,994.38 S/. 3,994.38
4 das
465 04.01.03.03.02 CODO PVC SAL 6"X90 1 da mi 26/07/17 mi 26/07/17 S/. 25.42 S/. 25.42
1 da
466 04.01.03.03.03 TEE SANITARIA SIMPLE PVC- SAL 6" 1 da mi 26/07/17 mi 26/07/17 S/. 18.39 S/. 18.39
1 da
467 04.01.03.03.04 TRAMPA "P" PVC SAL DE 6" 1 da mi 26/07/17 mi 26/07/17 S/. 80.22 S/. 80.22
1 da
468 04.01.03.04 ADITAMIENTOS VARIOS 2 das mi 26/07/17 jue 27/07/17 S/. 397.92 S/. 397.92
26/07 2 das
469 04.01.03.04.01 REGISTRO ROSCADO DE BRONCE CROMADO 6" 2 das mi 26/07/17 jue 27/07/17 S/. 186.57 S/. 186.57
2 das
470 04.01.03.04.02 SUMIDERO DE BRONCE CROMADO DE 6" 1 da mi 26/07/17 mi 26/07/17 S/. 211.35 S/. 211.35
1 da
471 04.01.03.05 CAJAS DE REGISTRO 2 das jue 27/07/17 vie 28/07/17 S/. 1,495.44 S/. 1,495.44
27/07 2 das
472 04.01.03.05.01 CAJA DE REGISTRO DE 12"x24", CON TAPA DE COCNRETO ARMADO 2 das jue 27/07/17 vie 28/07/17 S/. 1,247.52 S/. 1,247.52
2 das
473 04.01.03.05.02 CAJA DE REGISTRO DE 24"x24", CON TAPA DE COCNRETO ARMADO 1 da jue 27/07/17 jue 27/07/17 S/. 247.92 S/. 247.92
1 da
474 04.01.03.06 PRUEBAS HIDRAULICAS 2 das vie 28/07/17 sb S/. 6,023.43 S/. 6,023.43
29/07/17 28/07 2 das
475 04.01.03.06.01 PRUEBA HIDRAULICA CAJA DE REGISTRO C/EMPLEO DE CISTERNA 1 da vie 28/07/17 vie 28/07/17 S/. 446.18 S/. 446.18
1 da
476 04.01.03.06.02 PRUEBA HIDRAULICA DE TUBERIAS C/EMPLEO DE CISTERNA 1 da sb 29/07/17 sb 29/07/17 S/. 5,577.25 S/. 5,577.25
1 da
477 04.01.04 SISTEMA DE VENTILACION 5 das dom 16/07/17 jue 20/07/17 S/. 4,538.48 S/. 4,538.48
16/07 5 das
478 04.01.04.01 SALIDAS 2 das dom 16/07/17 lun 17/07/17 S/. 2,676.24 S/. 2,676.24
16/07 2 das
479 04.01.04.01.01 SALIDA DE VENTILACION TUB. PVC DE 2" 2 das dom 16/07/17 lun 17/07/17 S/. 2,676.24 S/. 2,676.24
2 das
480 04.01.04.02 RED DE DERIVACION Y COLECTORA 1 da mar 18/07/17 mar 18/07/17 S/. 579.12 S/. 579.12
18/07 1 da
481 04.01.04.02.01 TUBERIA DE PVC SAL 2" 1 da mar 18/07/17 mar 18/07/17 S/. 579.12 S/. 579.12
1 da
482 04.01.04.03 ACCESORIOS DE REDES 2 das mar 18/07/17 mi 19/07/17 S/. 716.48 S/. 716.48
18/07 2 das
483 04.01.04.03.01 CODO PVC SAL 2"X90 2 das mar 18/07/17 mi 19/07/17 S/. 309.75 S/. 309.75
2 das
484 04.01.04.03.02 TEE SANITARIA SIMPLE PVC- SAL 2" 2 das mar 18/07/17 mi 19/07/17 S/. 313.50 S/. 313.50
2 das
485 04.01.04.03.03 TEE SANITARIA DOBLE PVC- SAL 2" 1 da mar 18/07/17 mar 18/07/17 S/. 71.22 S/. 71.22
1 da
486 04.01.04.03.04 TAPON PVC SAL 2" 1 da mar 18/07/17 mar 18/07/17 S/. 22.01 S/. 22.01
1 da
487 04.01.04.04 ADITAMIENTOS VARIOS 2 das mi 19/07/17 jue 20/07/17 S/. 566.64 S/. 566.64
19/07 2 das
489 04.01.05 SISTEMA DE AGUA FRIA 27 das mar 11/07/17 dom S/. 46,099.53 S/. 46,099.53
06/08/17 11/07 27 das
490 04.01.05.01 SALIDAS 6 das mar 11/07/17 dom 16/07/17 S/. 5,526.99 S/. 5,526.99
11/07 6 das
491 04.01.05.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP CLASE 10 DE 1/2" 6 das mar 11/07/17 dom 16/07/17 S/. 3,532.29 S/. 3,532.29
6 das
492 04.01.05.01.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP CLASE 10 DE 1" 3 das mar 11/07/17 jue 13/07/17 S/. 1,139.70 S/. 1,139.70
3 das
493 04.01.05.01.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP CLASE 10 DE 1 1/4" 2 das mar 11/07/17 mi 12/07/17 S/. 855.00 S/. 855.00
2 das
494 04.01.05.02 REDES DE DISTRIBUCIN 15 das jue 13/07/17 jue 27/07/17 S/. 7,272.77 S/. 7,272.77
13/07 15 das
495 04.01.05.02.01 TUBERIA PVC SAP CLASE 10 1/2" 4 das jue 13/07/17 dom 16/07/17 S/. 1,715.28 S/. 1,715.28
4 das
496 04.01.05.02.02 TUBERIA PVC SAP CLASE 10 DE 3/4" 1 da lun 17/07/17 lun 17/07/17 S/. 190.45 S/. 190.45
1 da
497 04.01.05.02.03 TUBERIA PVC SAP CLASE 10 DE 1" 1 da mar 18/07/17 mar 18/07/17 S/. 396.18 S/. 396.18
1 da
498 04.01.05.02.04 TUBERIA PVC SAP CLASE 10 DE 1 1/4" 2 das mi 19/07/17 jue 20/07/17 S/. 866.57 S/. 866.57
2 das
499 04.01.05.02.05 TUBERIA PVC SAP CLASE 10 DE 1 1/2" 6 das vie 21/07/17 mi 26/07/17 S/. 3,201.24 S/. 3,201.24
6 das
500 04.01.05.02.06 TUBERIA PVC SAP CLASE 10 DE 2" 1 da jue 27/07/17 jue 27/07/17 S/. 903.05 S/. 903.05
1 da
501 04.01.05.03 ACCESORIO DE REDES 21 das lun 17/07/17 dom S/. 27,135.50 S/. 27,135.50
06/08/17 17/07 21 das
502 04.01.05.03.01 NIPLE ROSCADO DE FIERRO GALVANIZADO 1/2"x4" 6 das lun 17/07/17 sb 22/07/17 S/. 3,951.36 S/. 3,951.36
6 das
503 04.01.05.03.02 UNIN UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" 5 das lun 17/07/17 vie 21/07/17 S/. 2,427.04 S/. 2,427.04
5 das
504 04.01.05.03.03 CODO SP PVC SAP CLASE 10 DE 2"X90 1 da lun 17/07/17 lun 17/07/17 S/. 199.84 S/. 199.84
1 da
505 04.01.05.03.04 CODO SP PVC SAP CLASE 10 DE 1 1/2"X90 3 das lun 17/07/17 mi 19/07/17 S/. 1,000.23 S/. 1,000.23
3 das
506 04.01.05.03.05 CODO SP PVC SAP CLASE 10 DE 1 1/4"X90 3 das lun 17/07/17 mi 19/07/17 S/. 1,122.52 S/. 1,122.52
3 das
507 04.01.05.03.06 CODO SP PVC SAP CLASE 10 DE 1"X90 3 das lun 17/07/17 mi 19/07/17 S/. 1,094.40 S/. 1,094.40
3 das
508 04.01.05.03.07 CODO SP PVC SAP CLASE 10 DE 1/2"X90 21 das lun 17/07/17 dom 06/08/17 S/. 12,616.66 S/. 12,616.66
21 das
509 04.01.05.03.08 CODO SP PVC SAP CLASE 10 DE 3/4"X90 1 da lun 17/07/17 lun 17/07/17 S/. 243.09 S/. 243.09
1 da
510 04.01.05.03.09 NIPLE ROSCADO DE FIERRO GALVANIZADO 1 1/2"x4" 1 da lun 17/07/17 lun 17/07/17 S/. 344.40 S/. 344.40
1 da
511 04.01.05.03.10 REDUCCIN SP PVC SAP CLASE 10 DE 2" A 1 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 113.64 S/. 113.64
1 da
512 04.01.05.03.11 REDUCCIN SP PVC SAP CLASE 10 DE 1 1/2" A 1" 1 da lun 17/07/17 lun 17/07/17 S/. 27.67 S/. 27.67
1 da
513 04.01.05.03.12 REDUCCIN SP PVC SAP CLASE 10 DE 1 1/2" A 1/2" 2 das lun 17/07/17 mar 18/07/17 S/. 1,187.12 S/. 1,187.12
2 das
514 04.01.05.03.13 REDUCCIN SP PVC SAP CLASE 10 DE 1" A 3/4" 1 da lun 17/07/17 lun 17/07/17 S/. 26.27 S/. 26.27
1 da
515 04.01.05.03.14 REDUCCIN SP PVC SAP CLASE 10 DE 1 1/4" A 1" 1 da lun 17/07/17 lun 17/07/17 S/. 282.37 S/. 282.37
1 da
516 04.01.05.03.15 REDUCCIN SP PVC SAP CLASE 10 DE 1" A 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 127.05 S/. 127.05
1 da
517 04.01.05.03.16 REDUCCIN SP PVC SAP CLASE 10 DE 2" A 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 198.87 S/. 198.87
1 da
518 04.01.05.03.17 REDUCCIN SP PVC SAP CLASE 10 DE 2" A 1" 1 da lun 17/07/17 lun 17/07/17 S/. 52.86 S/. 52.86
1 da
519 04.01.05.03.18 REDUCCIN SP PVC SAP CLASE 10 DE 1 1/2" A 1 1/4" 1 da lun 17/07/17 lun 17/07/17 S/. 27.29 S/. 27.29
1 da
520 04.01.05.03.19 TAPON HEMBRA CON ROSCA PVC SAP CLASE 10 DE 3/4" 1 da lun 17/07/17 lun 17/07/17 S/. 51.00 S/. 51.00
1 da
521 04.01.05.03.20 TEE SP PVC- SAP CLASE 10 DE 2" 1 da lun 17/07/17 lun 17/07/17 S/. 198.10 S/. 198.10
1 da
522 04.01.05.03.21 TEE SP PVC- SAP CLASE 10 DE 1 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 665.60 S/. 665.60
1 da
523 04.01.05.03.22 TEE SP PVC- SAP CLASE 10 DE 1 1/4" 1 da lun 17/07/17 lun 17/07/17 S/. 308.10 S/. 308.10
1 da
524 04.01.05.03.23 TEE SP PVC- SAP CLASE 10 DE 1" 1 da lun 17/07/17 lun 17/07/17 S/. 143.50 S/. 143.50
1 da
525 04.01.05.03.24 TEE SP PVC- SAP CLASE 10 DE 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 18.00 S/. 18.00
1 da
526 04.01.05.03.25 TEE SP PVC- SAP CLASE 10 DE 3/4" 1 da lun 17/07/17 lun 17/07/17 S/. 37.40 S/. 37.40
1 da
527 04.01.05.03.26 UNIN UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 353.40 S/. 353.40
1 da
528 04.01.05.03.27 CRUZ SP PVC SAP CLASE 10 DE 1 1/4" 1 da lun 17/07/17 lun 17/07/17 S/. 22.00 S/. 22.00
1 da
529 04.01.05.03.28 CRUZ SP PVC SAP CLASE 10 DE 1 1/2" 1 da lun 17/07/17 lun 17/07/17 S/. 236.50 S/. 236.50
1 da
530 04.01.05.03.29 CRUZ SP PVC SAP CLASE 10 DE 2" 1 da lun 17/07/17 lun 17/07/17 S/. 59.22 S/. 59.22
1 da
531 04.01.05.04 VALVULAS 4 das mar 18/07/17 vie 21/07/17 S/. 4,704.48 S/. 4,704.48
18/07 4 das
532 04.01.05.04.01 VALVULA COMPUERTA DE BRONCE DE 1 1/2" 1 da mar 18/07/17 mar 18/07/17 S/. 643.84 S/. 643.84
1 da
533 04.01.05.04.02 VALVULA COMPUERTA DE BRONCE DE 1" 4 das mar 18/07/17 vie 21/07/17 S/. 3,974.88 S/. 3,974.88
4 das
534 04.01.05.04.03 VALVULA CHECK DE 1 1/2" 1 da mar 18/07/17 mar 18/07/17 S/. 85.76 S/. 85.76
1 da
535 04.01.05.05 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 3 das mi 19/07/17 vie 21/07/17 S/. 1,019.31 S/. 1,019.31
19/07 3 das
536 04.01.05.05.01 PRUEBA HIDRAULICA Y DESINFECCIN DE TUBERA DE AGUA 3 das mi 19/07/17 vie 21/07/17 S/. 1,019.31 S/. 1,019.31
3 das
537 04.01.05.06 ADITAMIENTOS VARIOS 1 da sb 22/07/17 sb 22/07/17 S/. 440.48 S/. 440.48
22/07 1 da
538 04.01.05.06.01 MEDIDOR DE AGUA POTABLE DE 1 1/2" 1 da sb 22/07/17 sb 22/07/17 S/. 198.56 S/. 198.56
1 da
539 04.01.05.06.02 CAJA DE CONCRETO PARA PROTECCION DE MEDIDOR DE AGUA POTABLE 1 da sb 22/07/17 sb 22/07/17 S/. 153.56 S/. 153.56
DE 0.34x0.155 1 da
540 04.01.05.06.03 TAPA DE CONCRETO DE CAJA PROTECTORA MEDIDOR DE AGUA POTABLE 1 da sb 22/07/17 sb 22/07/17 S/. 88.36 S/. 88.36
1 da
541 04.01.06 SISTEMA DE AGUA CONTRA INCENDIO 7 das jue 09/11/17 mi 15/11/17 S/. 3,811.30 S/. 3,811.30
09/11 7 das
542 04.01.06.01 SALIDAS 1 da jue 09/11/17 jue 09/11/17 S/. 65.45 S/. 65.45
09/11 1 da
543 04.01.06.01.01 SALIDA DE AGUA CONTRA INCENDIO CON TUBERIA SCHEDULE 40 DE 2" 1 da jue 09/11/17 jue 09/11/17 S/. 65.45 S/. 65.45
1 da
544 04.01.06.02 RED DE ALIMENTACION 1 da vie 10/11/17 vie 10/11/17 S/. 743.01 S/. 743.01
10/11 1 da
545 04.01.06.02.01 TUBERIA SCHEDULE 40 NEGRO SIN COSTURA DE 2" 1 da vie 10/11/17 vie 10/11/17 S/. 743.01 S/. 743.01
1 da
546 04.01.06.03 ACCESORIOS 3 das sb 11/11/17 lun 13/11/17 S/. 1,086.09 S/. 1,086.09
11/11 3 das
547 04.01.06.03.01 TEE RANURADO HD DE 2" 1 da sb 11/11/17 sb 11/11/17 S/. 32.22 S/. 32.22
1 da
548 04.01.06.03.02 CODO RANURADO HD DE 2"x45 1 da sb 11/11/17 sb 11/11/17 S/. 145.12 S/. 145.12
1 da
549 04.01.06.03.03 CODO RANURADO HD DE 2"x90 1 da sb 11/11/17 sb 11/11/17 S/. 72.56 S/. 72.56
1 da
550 04.01.06.03.04 NIPLE ADAPTADOR HD RANURA X ROSCA MACHO DE 2" 1 da sb 11/11/17 sb 11/11/17 S/. 34.28 S/. 34.28
1 da
551 04.01.06.03.05 REDUCCIN CONCENTRICA, ACERO INOXIDABLE MACHO- MACHO DE 2"-1 1 da sb 11/11/17 sb 11/11/17 S/. 193.38 S/. 193.38
1/2" 1 da
552 04.01.06.03.06 ACOPLE RIGIDO RANURADO HD DE 2" 3 das sb 11/11/17 lun 13/11/17 S/. 608.53 S/. 608.53
3 das
553 04.01.06.04 VALVULAS 1 da mar 14/11/17 mar 14/11/17 S/. 303.15 S/. 303.15
14/11 1 da
554 04.01.06.04.01 VALVULA ANGULAR CON REDUCTORA DE PRESION BRONCE 175 PSI NTP X 1 da mar 14/11/17 mar 14/11/17 S/. 159.86 S/. 159.86
NH (HEBRA-MACHO) DE 2" 1 da
555 04.01.06.04.02 VALVULA DE AIRE DE DOBLE EFECTO DE 2" CON ROSCA MACHO 1 da mar 14/11/17 mar 14/11/17 S/. 143.29 S/. 143.29
1 da
556 04.01.06.05 ADITAMIENTOS VARIOS 1 da mi 15/11/17 mi 15/11/17 S/. 1,613.60 S/. 1,613.60
15/11 1 da
557 04.01.06.05.01 GABINETE CONTRA INCENDIO EQUIPADO (MANGUERA DE 30M Y PITON 1 da mi 15/11/17 mi 15/11/17 S/. 1,613.60 S/. 1,613.60
CHORRO 1 1/2", EXTINTOR P.Q.) 1 da
558 04.01.07 SISTEMA DE AGUA PARA RIEGO 2 das dom 23/07/17 lun 24/07/17 S/. 446.51 S/. 446.51
23/07 2 das
559 04.01.07.01 SALIDAS 1 da dom 23/07/17 dom S/. 75.92 S/. 75.92
23/07/17 23/07 1 da
560 04.01.07.01.01 SALIDA DE AGUA PARA RIEGO CON TUBERIA DE PVC SAP CLASE 10 DE 1 1 da dom 23/07/17 dom 23/07/17 S/. 75.92 S/. 75.92
1/4" 1 da
561 04.01.07.02 REDES DE DISTRIBUCIN 1 da lun 24/07/17 lun 24/07/17 S/. 163.10 S/. 163.10
24/07 1 da
562 04.01.07.02.01 TUBERIA PVC SAP CLASE 10 DE 1 1/4" 1 da lun 24/07/17 lun 24/07/17 S/. 149.58 S/. 149.58
1 da
563 04.01.07.02.02 TUBERIA PVC SAP CLASE 10 1/2" 1 da lun 24/07/17 lun 24/07/17 S/. 13.52 S/. 13.52
1 da
564 04.01.07.03 ACCESORIOS DE REDES 1 da lun 24/07/17 lun 24/07/17 S/. 207.49 S/. 207.49
24/07 1 da
565 04.01.07.03.01 CODO SP PVC SAP CLASE 10 DE 1 1/4"X90 1 da lun 24/07/17 lun 24/07/17 S/. 29.54 S/. 29.54
1 da
566 04.01.07.03.02 REDUCCION SP PVC SAP CLASE 10 DE 1 1/4" A 1/2" 1 da lun 24/07/17 lun 24/07/17 S/. 24.53 S/. 24.53
1 da
567 04.01.07.03.03 REDUCCIN SP PVC SAP CLASE 10 DE 1 1/2" A 1 1/4" 1 da lun 24/07/17 lun 24/07/17 S/. 27.29 S/. 27.29
1 da
568 04.01.07.03.04 TEE SP PVC- SAP CLASE 10 DE 1 1/2" 1 da lun 24/07/17 lun 24/07/17 S/. 25.60 S/. 25.60
1 da
569 04.01.07.03.05 GRIFO DE RIEGO DE 1/2" 1 da lun 24/07/17 lun 24/07/17 S/. 38.87 S/. 38.87
1 da
570 04.01.07.03.06 NIPLE ROSCADO DE FIERRO GALVANIZADO 1/2"x2" 1 da lun 24/07/17 lun 24/07/17 S/. 34.49 S/. 34.49
1 da
571 04.01.07.03.07 CODO DE FIERRO GALVANIZADO DE 1/2" 1 da lun 24/07/17 lun 24/07/17 S/. 27.17 S/. 27.17
1 da
572 04.01.08 CISTERNA ENTERRADA 15 das dom 11/06/17 dom S/. 3,865.31 S/. 3,865.31
25/06/17 11/06 15 das
573 04.01.08.01 TRABAJOS PRELIMINARES 2 das dom 11/06/17 lun 12/06/17 S/. 39.06 S/. 39.06
11/06 2 das
574 04.01.08.01.01 LIMPIEZA DEL TERRENO MANUAL 1 da dom 11/06/17 dom 11/06/17 S/. 14.62 S/. 14.62
1 da
575 04.01.08.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR 1 da lun 12/06/17 lun 12/06/17 S/. 24.44 S/. 24.44
1 da
576 04.01.08.02 MOVIMIENTO DE TIERRAS 8 das mar 13/06/17 mar S/. 1,588.65 S/. 1,588.65
20/06/17 13/06 8 das
577 04.01.08.02.01 EXCAVACION DE ZANJAS Hprom. 0.80 M EN TERRENO GRAVOSO 2 das mar 13/06/17 mi 14/06/17 S/. 215.40 S/. 215.40
2 das
578 04.01.08.02.02 REFINE Y NIVELACION DE ZANJAS 1 da mar 20/06/17 mar 20/06/17 S/. 87.57 S/. 87.57
1 da
579 04.01.08.02.03 CAMA DE APOYO PARA TUBERAS DE 1 1/2" 1 da jue 15/06/17 jue 15/06/17 S/. 1,040.00 S/. 1,040.00
1 da
580 04.01.08.02.04 RELLENO CON MATERIAL PROPIO 1 da lun 19/06/17 lun 19/06/17 S/. 212.25 S/. 212.25
1 da
581 04.01.08.02.05 ELIMINACION DE MATERIAL EXCEDENTE DM=1 km 1 da mar 20/06/17 mar 20/06/17 S/. 33.43 S/. 33.43
1 da
582 04.01.08.03 TUBERIAS 3 das vie 16/06/17 dom 18/06/17 S/. 980.74 S/. 980.74
16/06 3 das
583 04.01.08.03.01 TUBERIA PVC SAP CLASE 10 DE 1 1/2" 1 da vie 16/06/17 vie 16/06/17 S/. 522.14 S/. 522.14
1 da
584 04.01.08.03.02 TUBERIA PVC SAP CLASE 10 DE 1" 1 da sb 17/06/17 sb 17/06/17 S/. 362.10 S/. 362.10
1 da
585 04.01.08.03.03 TUBERIA PVC SAP CLASE 10 DE 1 1/4" 1 da dom 18/06/17 dom 18/06/17 S/. 96.50 S/. 96.50
1 da
586 04.01.08.04 OBRAS DE CONCRETO SIMPLE 2 das mi 21/06/17 jue 22/06/17 S/. 285.91 S/. 285.91
21/06 2 das

Jr. Tupac Yupanqui N 115 - Int. 5to Piso, Paucarbamba - Hunuco. Pgina 3 de 4
CONSORCIO HUERTAS PLAZO DE EJECUCION 240 DIAS CALENDARIOS

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE ABASTOS DEL MERCADO HUERTAS EN EL DISTRITO DE AMBO, PROVINCIA DE AMBO, DEPARTAMENTO DE HUNUCO
Id item Nombre de tarea DuracinComienzo Fin Costo lun 13/02 dom 19/02 sb 25/02 vie 03/03 jue 09/03 mi 15/03 mar 21/03 lun 27/03 dom 02/04 sb 08/04 vie 14/04 jue 20/04 mi 26/04 mar 02/05 lun 08/05 dom 14/05 sb 20/05 vie 26/05 jue 01/06 mi 07/06 mar 13/06 lun 19/06 dom 25/06 sb 01/07 vie 07/07 jue 13/07 mi 19/07 mar 25/07 lun 31/07 dom 06/08 sb 12/08 vie 18/08 jue 24/08 mi 30/08 mar 05/09 lun 11/09 dom 17/09 sb 23/09 vie 29/09 jue 05/10 mi 11/10 mar 17/10 lun 23/10 dom 29/10 sb 04/11 vie 10/11 jue 16/11 mi 22/11 mar 28/11 lun 04/12 dom 10/12 sb 16/12 vie 22/12 jue 28/12 mi 03/01 mar 09/01 lun 15/01 dom 21/01
587 04.01.08.04.01 CONCRETO F'C=210 KG/CM2 EN CAJA DE REBOSE 1 da mi 21/06/17 mi 21/06/17 S/. 57.39 S/. 57.39
1 da
588 04.01.08.04.02 ENCOFRADO Y DESENCOFRADO DE CAJA DE REBOSE 1 da jue 22/06/17 jue 22/06/17 S/. 228.52 S/. 228.52
1 da
589 04.01.08.05 TAPA METALICA 3 das vie 23/06/17 dom S/. 479.66 S/. 479.66
25/06/17 23/06 3 das
590 04.01.08.05.01 SUMINISTRO E INSTALACION DE TAPA METALICA DE 0.60x0.60 M + 1 da vie 23/06/17 vie 23/06/17 S/. 257.56 S/. 257.56
MARCO METALICO 1 da
591 04.01.08.05.02 PINTURA ANTICORROSIVA ESMALTE PARA METALES 1 da dom 25/06/17 dom 25/06/17 S/. 6.10 S/. 6.10
1 da
592 04.01.08.05.03 REJILLA CAJA DE REBOSE TIPICA DE 0.50x0.50 M E=1/4" 1 da sb 24/06/17 sb 24/06/17 S/. 216.00 S/. 216.00
1 da
593 04.01.08.06 ADITAMIENTOS VARIOS 1 da dom 25/06/17 dom S/. 491.29 S/. 491.29
25/06/17 25/06 1 da
594 04.01.08.06.01 SUMINISTRO Y COLOCACION DE TUBERIA DE VENTILACION DE 4" 1 da dom 25/06/17 dom 25/06/17 S/. 26.77 S/. 26.77
1 da
595 04.01.08.06.02 ESCALERA TIPO GATO DE FIERRO GALVANIZADO ALT=1.70 M 1 da dom 25/06/17 dom 25/06/17 S/. 370.69 S/. 370.69
1 da
596 04.01.08.06.03 FLOTADOR ROSCADO CON BOYA DE COBRE DE 1 1/2" 1 da dom 25/06/17 dom 25/06/17 S/. 93.83 S/. 93.83
1 da
597 04.01.09 SISTEMA DE DESAGUE Y REBOSE- CISTERNA 3 das lun 26/06/17 mi 28/06/17 S/. 400.21 S/. 400.21
26/06 3 das
598 04.01.09.01 TUBERIAS 1 da lun 26/06/17 lun 26/06/17 S/. 74.49 S/. 74.49
26/06 1 da
599 04.01.09.01.01 TUBERIA DE PVC SAL 4" 1 da lun 26/06/17 lun 26/06/17 S/. 74.49 S/. 74.49
1 da
600 04.01.09.02 ACCESORIOS 1 da lun 26/06/17 lun 26/06/17 S/. 167.85 S/. 167.85
26/06 1 da
601 04.01.09.02.01 TRAMPA "P" PVC SAL 4" 1 da lun 26/06/17 lun 26/06/17 S/. 25.72 S/. 25.72
1 da
602 04.01.09.02.02 CODO PVC SAL 4"X45 1 da lun 26/06/17 lun 26/06/17 S/. 69.60 S/. 69.60
1 da
603 04.01.09.02.03 YEE PVC SAL DE 6" 1 da lun 26/06/17 lun 26/06/17 S/. 30.63 S/. 30.63
1 da
604 04.01.09.02.04 REDUCCIN PVC SAP DE 6" A 4" 1 da lun 26/06/17 lun 26/06/17 S/. 20.17 S/. 20.17
1 da
605 04.01.09.02.05 CODO PVC SAL 4"X90 1 da lun 26/06/17 lun 26/06/17 S/. 21.73 S/. 21.73
1 da
606 04.01.09.03 ADITAMIENTOS VARIOS 2 das mar 27/06/17 mi 28/06/17 S/. 157.87 S/. 157.87
27/06 2 das
607 04.01.09.03.01 SUMIDERO DE BRONCE CROMADO DE 4" 1 da mar 27/06/17 mar 27/06/17 S/. 91.60 S/. 91.60
1 da
608 04.01.09.03.02 REBOSE DE FIERRO GALVANIZADO DE 4" EN CISTERNA 1 da mi 28/06/17 mi 28/06/17 S/. 66.27 S/. 66.27
1 da
609 04.01.10 SISTEMA ELEVATORIO DE AGUA POTABLE 2 das jue 29/06/17 vie 30/06/17 S/. 3,877.04 S/. 3,877.04
29/06 2 das
610 04.01.10.01 EQUIPO MOTOR BOMBA AGUA POTABLE 2 das jue 29/06/17 vie 30/06/17 S/. 2,713.92 S/. 2,713.92
29/06 2 das
611 04.01.10.01.01 EQUIPO DE BOMBEO CENTRIFUGO VERTICAL MONOBLOCK SERIE A- PARA 1 da jue 29/06/17 jue 29/06/17 S/. 1,913.12 S/. 1,913.12
AGUA POTABLE, HP=0.60 M 1 da
612 04.01.10.01.02 INSTALACION ESPECIALIZADA EQUIPADOR PARA EQUIPO DE BOMBEO 2 das jue 29/06/17 vie 30/06/17 S/. 800.80 S/. 800.80
AGUA POTABLE 2 das
613 04.01.10.02 SUMINISTRO E INSTALACION DE TUBERIA, VALVULAS Y ACCESORIOS DE 1 da jue 29/06/17 jue 29/06/17 S/. 1,163.12 S/. 1,163.12
AGUA POTABLE 29/06 1 da
614 04.01.10.02.01 VALVULA DE PIE CON CANASTILLA DE 1 1/4" 1 da jue 29/06/17 jue 29/06/17 S/. 122.14 S/. 122.14
1 da
615 04.01.10.02.02 UNIN UNIVERSAL DE FIERRO GALVANIZADO DE 1" 1 da jue 29/06/17 jue 29/06/17 S/. 108.48 S/. 108.48
1 da
616 04.01.10.02.03 TEE DE FIERRO GALVANIZADO DE 1" 1 da jue 29/06/17 jue 29/06/17 S/. 61.24 S/. 61.24
1 da
617 04.01.10.02.04 TAPON DE CEBADO 1 da jue 29/06/17 jue 29/06/17 S/. 58.34 S/. 58.34
1 da
618 04.01.10.02.05 VALVULA DE COMPUERTA DE ACERO INOXIDABLE DE 1" 1 da jue 29/06/17 jue 29/06/17 S/. 288.62 S/. 288.62
1 da
619 04.01.10.02.06 VALVULA CHECK DE 1" 1 da jue 29/06/17 jue 29/06/17 S/. 180.86 S/. 180.86
1 da
620 04.01.10.02.07 CONTROL DE NIVEL TIPO FLOTADOR 1 da jue 29/06/17 jue 29/06/17 S/. 343.44 S/. 343.44
1 da
621 04.01.11 SISTEMA ELEVATORIO DE AGUA CONTRA INCENDIO 1 da vie 30/06/17 vie 30/06/17 S/. 4,363.17 S/. 4,363.17
30/06 1 da
622 04.01.11.01 EQUIPO MOTOR BOMBA AGUA CONTRA INCENDIO 1 da vie 30/06/17 vie 30/06/17 S/. 2,612.61 S/. 2,612.61
30/06 1 da
623 04.01.11.01.01 EQUIPO DE BOMBEO CENTRIFUGO VERTICAL MULTIETAPA PARA AGUA 1 da vie 30/06/17 vie 30/06/17 S/. 2,212.21 S/. 2,212.21
CONTRA INCENDIO, HP=0.85 M 1 da
624 04.01.11.01.02 INSTALACION ESPECIALIZADA EQUIPADOR PARA EQUIPO DE BOMBEO 1 da vie 30/06/17 vie 30/06/17 S/. 400.40 S/. 400.40
AGUA CONTRA INCENDIO 1 da
625 04.01.11.02 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS DE AGUA 1 da vie 30/06/17 vie 30/06/17 S/. 1,750.56 S/. 1,750.56
CONTRA INCENDIO 30/06 1 da
626 04.01.11.02.01 MANOMETRO PARA PRESION DE AGUA DE 0 A 300 PSI 1 da vie 30/06/17 vie 30/06/17 S/. 80.56 S/. 80.56
1 da
627 04.01.11.02.02 UNIN FLEXIBLE TIPO DRESSER DN 100 1 da vie 30/06/17 vie 30/06/17 S/. 356.44 S/. 356.44
1 da
628 04.01.11.02.03 VALVULA DE CONTROL DE RETENCION ACTIVA DN 100 1 da vie 30/06/17 vie 30/06/17 S/. 380.36 S/. 380.36
1 da
629 04.01.11.02.04 VALVULA MARIPOSA TIPO WAFER DN 100 1 da vie 30/06/17 vie 30/06/17 S/. 368.22 S/. 368.22
1 da
630 04.01.11.02.05 BRIDA DE FIERRO FUNDIDO DUCTIL DN 100 1 da vie 30/06/17 vie 30/06/17 S/. 218.22 S/. 218.22
1 da
631 04.01.11.02.06 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN 100x45 1 da vie 30/06/17 vie 30/06/17 S/. 156.44 S/. 156.44
1 da
632 04.01.11.02.07 TUBERIA FIERRO FUNDIDO DUCTIL DN 100 1 da vie 30/06/17 vie 30/06/17 S/. 190.32 S/. 190.32
1 da
633 04.01.12 SISTEMA DE ALIMENTACION Y REBOSE DE TANQUE ELEVADO 5 das sb 01/07/17 mi 05/07/17 S/. 4,984.27 S/. 4,984.27
01/07 5 das
634 04.01.12.01 RED DE ALIMENTACION Y REBOSE 3 das sb 01/07/17 lun 03/07/17 S/. 2,546.67 S/. 2,546.67
01/07 3 das
635 04.01.12.01.01 TUBERIA PVC SAP CLASE 10 DE 2" 1 da sb 01/07/17 sb 01/07/17 S/. 351.31 S/. 351.31
1 da
636 04.01.12.01.02 TUBERIA PVC SAP CLASE 10 1/2" 1 da dom 02/07/17 dom 02/07/17 S/. 21.03 S/. 21.03
1 da
637 04.01.12.01.03 TUBERIA DE FIERRO GALVANIZADO DE 2" 1 da lun 03/07/17 lun 03/07/17 S/. 2,174.33 S/. 2,174.33
1 da
638 04.01.12.02 ACCESORIOS 1 da sb 01/07/17 sb 01/07/17 S/. 662.44 S/. 662.44
01/07 1 da
639 04.01.12.02.01 CODO DE FIERRO GALVANIZADO DE 2x90" 1 da sb 01/07/17 sb 01/07/17 S/. 117.72 S/. 117.72
1 da
640 04.01.12.02.02 CODO DE FIERRO GALVANIZADO DE 1x90" 1 da sb 01/07/17 sb 01/07/17 S/. 70.68 S/. 70.68
1 da
641 04.01.12.02.03 REDUCCIN DE FIERRO GALVANIZADO DE 2"- 1/2" 1 da sb 01/07/17 sb 01/07/17 S/. 43.64 S/. 43.64
1 da
642 04.01.12.02.04 RUPTOR DE VACIO 1/2" 1 da sb 01/07/17 sb 01/07/17 S/. 30.29 S/. 30.29
1 da
643 04.01.12.02.05 TEE DE FIERRO GALVANIZADO DE D=2" 1 da sb 01/07/17 sb 01/07/17 S/. 29.47 S/. 29.47
1 da
644 04.01.12.02.06 VALVULA COMPUERTA DE BRONCE DE 2" 1 da sb 01/07/17 sb 01/07/17 S/. 128.16 S/. 128.16
1 da
645 04.01.12.02.07 VALVULA DE NIVEL ROSCA HEMBRA 1" 1 da sb 01/07/17 sb 01/07/17 S/. 48.75 S/. 48.75
1 da
646 04.01.12.02.08 UNIN SP PVC SAP CLASE 10 DE 2" 1 da sb 01/07/17 sb 01/07/17 S/. 121.68 S/. 121.68
1 da
647 04.01.12.02.09 UNIN SP PVC SAP CLASE 10 DE 1" 1 da sb 01/07/17 sb 01/07/17 S/. 49.28 S/. 49.28
1 da
648 04.01.12.02.10 TRAMPA "P" PVC SAL 2" 1 da sb 01/07/17 sb 01/07/17 S/. 22.77 S/. 22.77
1 da
649 04.01.12.03 ADITIVOS VARIOS 1 da dom 02/07/17 dom S/. 1,225.59 S/. 1,225.59
02/07/17 02/07 1 da
650 04.01.12.03.01 BRIDA ROMPE AGUA DE 2" 1 da dom 02/07/17 dom 02/07/17 S/. 91.68 S/. 91.68
1 da
651 04.01.12.03.02 BRIDA ROMPE AGUA DE 1" 1 da dom 02/07/17 dom 02/07/17 S/. 26.58 S/. 26.58
1 da
652 04.01.12.03.03 COLGADOR METALICO PARA TUBERIA CON TENSOR DE 2" 1 da dom 02/07/17 dom 02/07/17 S/. 85.89 S/. 85.89
1 da
653 04.01.12.03.04 COLGADOR METALICO PARA TUBERIA CON TENSOR DE 1" 1 da dom 02/07/17 dom 02/07/17 S/. 24.42 S/. 24.42
1 da
654 04.01.12.03.05 SOMBRERO DE VENTILACION GALVANIZADO DE 2" 1 da dom 02/07/17 dom 02/07/17 S/. 17.52 S/. 17.52
1 da
655 04.01.12.03.06 SUMIDERO DE BRONCE CROMADO DE 2" 1 da dom 02/07/17 dom 02/07/17 S/. 29.70 S/. 29.70
1 da
656 04.01.12.03.07 ESCALERA TIPO GATO DE FIERRO GALVANIZADO ALT=4.00 M 1 da dom 02/07/17 dom 02/07/17 S/. 480.69 S/. 480.69
1 da
657 04.01.12.03.08 ESCALERA TIPO GATO DE FIERRO GALVANIZADO ALT=1.25 M 1 da dom 02/07/17 dom 02/07/17 S/. 270.69 S/. 270.69
1 da
658 04.01.12.03.09 ABRAZADERA METALICA DE ACERO INOXIDABLE CON TIRAFONDO Y DOS 1 da dom 02/07/17 dom 02/07/17 S/. 198.42 S/. 198.42
OREJAS TORNILLOS DE 2" 1 da
659 04.01.12.04 OBRAS DE CONCRETO SIMPLE 2 das lun 03/07/17 mar S/. 285.91 S/. 285.91
04/07/17 03/07 2 das
660 04.01.12.04.01 CONCRETO F'C=210 KG/CM2 EN CAJA DE REBOSE 1 da mar 04/07/17 mar 04/07/17 S/. 57.39 S/. 57.39
1 da
661 04.01.12.04.02 ENCOFRADO Y DESENCOFRADO DE CAJA DE REBOSE 1 da lun 03/07/17 lun 03/07/17 S/. 228.52 S/. 228.52
1 da
662 04.01.12.05 TAPA METALICA 1 da mi 05/07/17 mi 05/07/17 S/. 263.66 S/. 263.66
05/07 1 da
665 05 PLAN DE MANEJO AMBIENTAL 217 das vie 03/03/17 jue 05/10/17 S/. 15,467.00 S/. 15,467.00
03/03 217 das
666 05.01 PLAN DE MONITOREO, SEGUIMIENTO Y CONTROL 30 das mi 07/06/17 jue 06/07/17 S/. 2,039.40 S/. 2,039.40
07/06 30 das
667 05.01.01 MONITOREO DE LA CALIDAD DEL AIRE 15 das mi 07/06/17 mi 21/06/17 S/. 1,133.00 S/. 1,133.00
15 das
668 05.01.02 MONITOREO DE LA CALIDAD DEL RUIDO 15 das jue 22/06/17 jue 06/07/17 S/. 906.40 S/. 906.40
15 das
669 05.02 PROGRAMA DE CONTROL Y/O MITIGACIN AMBIENTAL 103 das vie 03/03/17 mar 13/06/17 S/. 5,427.34 S/. 5,427.34
03/03 103 das
670 05.02.01 SUBPROGRAMA DE MANEJO DE RESIDUOS SOLIDOS NO PELIGROSOS 103 das vie 03/03/17 mar 13/06/17 S/. 2,361.07 S/. 2,361.07
103 das
671 05.02.01.01 CONTENEDORES DE RESIDUOS SLIDOS 5 das vie 03/03/17 mar 07/03/17 S/. 345.68 S/. 345.68
5 das
672 05.02.01.02 DISPOSICIN FINAL DE RESIDUOS SLIDOS (BOTADEROS) 7 das mar 23/05/17 lun 29/05/17 S/. 1,401.04 S/. 1,401.04
7 das
673 05.02.01.03 LETRINA SANITARIA (INCLUYE CLAUSURA) 15 das mar 30/05/17 mar 13/06/17 S/. 614.35 S/. 614.35
15 das
674 05.02.02 SUBPROGRAMA DE MANEJO DE RESIDUOS SOLIDOS PELIGROSOS 76 das mi 08/03/17 lun 22/05/17 S/. 779.87 S/. 779.87
76 das
675 05.02.02.01 CONTENEDORES DE RESIDUOS PELIGROSOS (CILINDROS METLICOS) 7 das mi 08/03/17 mar 14/03/17 S/. 300.56 S/. 300.56
7 das
676 05.02.02.02 LOSA DE CONCRETO F'C=140 KG/CM2 PARA RESIDUOS PELIGROSOS 7 das mar 16/05/17 lun 22/05/17 S/. 479.31 S/. 479.31
7 das
677 05.02.03 SUBPROGRAMA DE SEALIZACIN AMBIENTAL 15 das vie 24/03/17 vie 07/04/17 S/. 1,056.40 S/. 1,056.40
15 das
678 05.02.03.01 SEALIZACIN AMBIENTAL TEMPORAL 15 das vie 24/03/17 vie 07/04/17 S/. 1,056.40 S/. 1,056.40
15 das
679 05.02.04 MEDIDAS DE PREVENCIN Y EDUCACIN AMBIENTAL 60 das sb 08/04/17 mar S/. 1,230.00 S/. 1,230.00
06/06/17 60 das
680 05.02.04.01 RIEGO DEL REA EN ZONAS POLVORIENTAS O CRTICAS 60 das sb 08/04/17 mar 06/06/17 S/. 1,230.00 S/. 1,230.00
60 das
681 05.03 PROGRAMA DE CAPACITACIN Y EDUCACIN AMBIENTAL 82 das vie 10/03/17 mar S/. 6,377.10 S/. 6,377.10
30/05/17 10/03 82 das
682 05.03.01 CAPACITACIN AMBIENTAL AL PERSONAL 15 das vie 10/03/17 vie 24/03/17 S/. 2,506.72 S/. 2,506.72
15 das
683 05.03.02 CAPACITACIN AMBIENTAL A LOS BENEFICIARIOS 60 das sb 25/03/17 mar 23/05/17 S/. 3,241.28 S/. 3,241.28
60 das
684 05.03.03 MATERIAL DIDCTICO (TRIPTICOS) PARA TELLERES DE CAPACITACIN 15 das mar 16/05/17 mar 30/05/17 S/. 629.10 S/. 629.10
15 das
685 05.04 PLAN DE CONTINGENCIAS 21 das vie 03/03/17 jue 23/03/17 S/. 1,459.42 S/. 1,459.42
03/03 21 das
686 05.04.01 EQUIPOS DE PRIMEROS AUXILIOS 7 das vie 03/03/17 jue 09/03/17 S/. 610.00 S/. 610.00
7 das
687 05.04.02 EQUIPOS CONTRA INCENDIOS 7 das vie 10/03/17 jue 16/03/17 S/. 249.42 S/. 249.42
7 das
688 05.04.03 CONFORMACIN Y CAPACITACIN DEL EQUIPO DE CONTINGENCIA 7 das vie 17/03/17 jue 23/03/17 S/. 600.00 S/. 600.00
7 das
689 05.05 PLAN DE CIERRE Y ABANDONO 15 das jue 21/09/17 jue 05/10/17 S/. 163.74 S/. 163.74
21/09 15 das
690 05.05.01 DESMONTAJE DE LAS OBRAS PRELIMIARES Y LIMPIEZA GENERAL DE LAS REAS 15 das jue 21/09/17 jue 05/10/17 S/. 163.74 S/. 163.74
INTERVENIDAD 15 das
691 06 PLAN DE SEGURIDAD Y SALUD 164 das vie 03/03/17 dom 13/08/17 S/. 15,981.62 S/. 15,981.62
03/03 164 das
692 06.01 ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y 7 das vie 03/03/17 jue 09/03/17 S/. 3,000.00 S/. 3,000.00
SALUD EN EL TRABAJO 7 das
693 06.02 EQUIPOS DE PROTECCIN INDIVIDUAL 7 das vie 10/03/17 jue 16/03/17 S/. 9,650.40 S/. 9,650.40
7 das
694 06.03 EQUIPOS DE PROTECCIN COLECTIVA 7 das vie 17/03/17 jue 23/03/17 S/. 694.42 S/. 694.42
7 das
695 06.04 SEALIZACIN TEMPORAL DE SEGURIDAD 15 das jue 30/03/17 jue 13/04/17 S/. 636.80 S/. 636.80
15 das
696 06.05 CAPACITACIN EN SEGURIDAD Y SALUD 150 das vie 17/03/17 dom 13/08/17 S/. 2,000.00 S/. 2,000.00
150 das
697 07 CAPACITACIN DE ESTRATEGIAS DE MERCADO 60 das lun 07/08/17 jue 05/10/17 S/. 10,000.00 S/. 10,000.00
07/08 60 das
698 07.01 CAPACITACION EN ESTRATEGIAS DE MERCADO 60 das lun 07/08/17 jue 05/10/17 S/. 10,000.00 S/. 10,000.00
60 das

Jr. Tupac Yupanqui N 115 - Int. 5to Piso, Paucarbamba - Hunuco. Pgina 4 de 4